JP5286611B2 - Improved pile foundation and its construction method - Google Patents
[go: Go Back, main page]

JP5286611B2 - Improved pile foundation and its construction method - Google Patents

Improved pile foundation and its construction method Download PDF

Info

Publication number
JP5286611B2
JP5286611B2 JP2009165562A JP2009165562A JP5286611B2 JP 5286611 B2 JP5286611 B2 JP 5286611B2 JP 2009165562 A JP2009165562 A JP 2009165562A JP 2009165562 A JP2009165562 A JP 2009165562A JP 5286611 B2 JP5286611 B2 JP 5286611B2
Authority
JP
Japan
Prior art keywords
pile
improved
improved body
improvement
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2009165562A
Other languages
Japanese (ja)
Other versions
JP2011021344A (en
Inventor
昇昭 伊勢本
美敏 保井
治 金子
大作 佐野
修英 成田
恒 根本
博史 崎浜
順一 秋田
正仁 西口
泰夫 直江
徹 宮良
隆浩 林
陽一 浅井
圭三 藤川
義夫 武内
寿昭 新井
勉 山崎
光 八重樫
宏謙 堀井
正晃 西
洋一 加藤
好伸 木谷
雅樹 横山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nishimatsu Construction Co Ltd
Toda Corp
Gecoss Corp
Hazama Ando Corp
Mitani Sekisan Co Ltd
Toyo Asano Foundation Co Ltd
Original Assignee
Nishimatsu Construction Co Ltd
Toda Corp
Gecoss Corp
Hazama Ando Corp
Mitani Sekisan Co Ltd
Toyo Asano Foundation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nishimatsu Construction Co Ltd, Toda Corp, Gecoss Corp, Hazama Ando Corp, Mitani Sekisan Co Ltd, Toyo Asano Foundation Co Ltd filed Critical Nishimatsu Construction Co Ltd
Priority to JP2009165562A priority Critical patent/JP5286611B2/en
Publication of JP2011021344A publication Critical patent/JP2011021344A/en
Application granted granted Critical
Publication of JP5286611B2 publication Critical patent/JP5286611B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Foundations (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a pile foundation improving body which achieves a reduction in the cost of a conventional pile foundation improving body and the shortening of a construction period, and which increases the degree of freedom of installation of the improving body. <P>SOLUTION: A bearing pile, which has a leading end borne by a bearing layer below soft subsurface ground 5, is arranged; and the pile foundation improving body 3 is formed along a through-core of the bearing pile in the subsurface ground. The improving body 3 is individually provided for each bearing pile, and formed in such a manner as not to continue into the adjacent improving body 3, in the state of horizontally overhanging in a cross shape at a required depth from a head of the bearing pile 2. <P>COPYRIGHT: (C)2011,JPO&amp;INPIT

Description

本発明は、杭基礎において杭を囲む軟弱な地盤を改良する工法で、更に施工性を良くしてコストの嵩まない改良体とその構築工法に関するものである。   The present invention relates to a construction method for improving a soft ground surrounding a pile in a pile foundation, and further relates to an improved body with improved workability and less cost and a construction method thereof.

従来、軟弱な表層地盤の下方に支持地盤がある地盤において、杭基礎の水平剛性を高めたものとして、図8に示すように、前記支持層に先端部が支持された支持杭21が配設され、地盤に配設された支持杭21の通り芯に沿った表層地盤に、セメント系固化材を混合した高剛性な浅層改良体22が設けられたものが知られている(特許文献1参照)。   Conventionally, in a ground having a supporting ground below a soft surface layer ground, as shown in FIG. 8, a supporting pile 21 having a tip supported by the supporting layer is disposed as an increase in horizontal rigidity of the pile foundation. In addition, there is known a structure in which a surface layer ground along the core of a support pile 21 disposed on the ground is provided with a high-rigidity shallow layer improvement body 22 in which a cement-based solidified material is mixed (Patent Document 1). reference).

前記浅層改良体は、格子状に配設された改良体による改良工法を効率的に行うようにしている。前記支持杭21を、表層地盤の下の支持層に杭先端部を支持させるようにして打設する。該支持杭21の通り芯に沿って格子状の浅層改良体22を浅層混合処理工法で形成するものである。   The shallow layer improvement body efficiently performs the improvement method using the improvement bodies arranged in a lattice shape. The support pile 21 is driven so that the tip of the pile is supported by the support layer below the surface ground. A lattice-shaped shallow layer improvement body 22 is formed along the core of the support pile 21 by a shallow layer processing method.

特開2007−262782号公報JP 2007-262882 A

しかし、従来の杭基礎の浅層改良体とその構築工法においては、隣接する杭21同士のスパンが長いと、改良体22を連続的に施工するにはコストが嵩み、施工の工期も長くなる。また、深層改良体の場合は、多軸(3軸または5軸)オーガでのSMW工法(Soil Mixing Wall) において、隣接の穿孔をセミラップさせる場合などでは、連続する部分を2日間に亘って施工する必要があって工期が長期化するものである。更に、軟弱地盤の水平抵抗力を改良させる際の設置状況に応じた改良体の配置の自由度も低いものである。本発明に係る杭基礎の改良体とその構築工法は、このような課題を解決するとともに杭の水平抵抗の改良効果を従来よりも低下させないようにするために提案されたものである。   However, in the conventional pile foundation shallow body improvement body and its construction method, if the span between adjacent piles 21 is long, the cost for constructing the improvement body 22 continuously increases and the construction period is also long. Become. In addition, in the case of deep-layered improvements, in the SMW method (Soil Mixing Wall) with a multi-axis (3-axis or 5-axis) auger, when the adjacent drilling is semi-wrapped, the continuous part is constructed over 2 days. It is necessary to do this, and the construction period is prolonged. Furthermore, the degree of freedom of arrangement of the improved body according to the installation situation when improving the horizontal resistance force of the soft ground is low. The improvement body of the pile foundation and its construction method according to the present invention are proposed in order to solve such a problem and prevent the improvement effect of the horizontal resistance of the pile from being lowered as compared with the related art.

本発明に係る杭基礎の改良体の上記課題を解決して目的を達成するための要旨は、軟弱な表層地盤の下方における支持層に先端部が支持された支持杭が配設され、前記表層地盤における前記支持杭の通り芯に沿って形成される改良体において、前記改良体は、支持杭毎に個別に設けられ、支持杭の頭部から所要深さで水平方向に十字状に張り出して隣接の改良体と非連続的に形成されていることである。   The gist for achieving the object by solving the above problems of the improved pile foundation according to the present invention is that a support pile having a tip supported by a support layer below a soft surface layer ground is disposed, and the surface layer In the improved body formed along the core of the support pile in the ground, the improved body is provided individually for each support pile and protrudes in a cross shape horizontally from the head of the support pile to the required depth. It is formed discontinuously with the adjacent improvement body.

前記改良体で深層改良する場合には、単軸若しくは多軸の掘削機で表層地盤を掘削して連続壁を十字状に配設して前記改良体が形成されていること、;
十字状の改良体の長さ:(2B)を、支持杭間のスパン:(L)に対して、浅層改良の場合には30%≦(2B/L)×100≦55%にすること、若しくは、深層改良の場合には16%≦(2B/L)×100≦80%にすることを含むものである。
In the case of deep improvement with the improved body, the improved body is formed by excavating the surface layer ground with a single-axis or multi-axis excavator and arranging continuous walls in a cross shape;
The length of the cross-shaped improved body: (2B) should be 30% ≦ (2B / L) × 100 ≦ 55% in the case of shallow layer improvement with respect to the span between support piles: (L) Alternatively, in the case of deep layer improvement, it is included that 16% ≦ (2B / L) × 100 ≦ 80%.

本発明に係る改良体の構築工法における上記課題を解決して目的を達成する要旨は、支持杭の頭部に十字状の上記の改良体を有した杭基礎を軟弱地盤に配設して杭頭部の水平剛性によって地盤の水平変位を低減させる改良体の構築工法において、前記支持杭を支持層に支持させて格子状に配設した後に、前記支持杭の対角線と前記改良体の張出し部の軸芯とが略平行になるようにして、前記改良体を形成し、隣接の改良体同士が非連続になるように配設したことである。   The gist of achieving the object by solving the above problems in the construction method of the improved body according to the present invention is that a pile foundation having the cross-shaped improved body is arranged on the soft ground in the head of the support pile. In the construction method of the improved body that reduces the horizontal displacement of the ground due to the horizontal rigidity of the head, the support pile is supported by the support layer and arranged in a lattice shape, and then the diagonal line of the support pile and the overhang portion of the improved body The improvement body was formed so that the shaft core was substantially parallel to each other, and the adjacent improvement bodies were arranged so as to be discontinuous with each other.

本発明の杭基礎の改良体とその改良体を用いた構築工法によれば、改良体を隣接するものに連続させないので、表層地盤の水平変位は連続させた改良体に対しては減少するものの、改良長さの減少の割には表層地盤の水平変位の減少の割合が大きい。よって、改良長さ当たりの改良効果が大きく、それにより改良体を形成する材料費が低減され及び工期が短縮されてコストダウンとなる。
改良体を単軸もしくは多軸のオーガで連続壁に形成する場合、隣接させる連続壁とラップさせて格子状にしないので、効率的な施工が可能となる。
十字状の改良体を、各支持杭毎に形成するので、例えば、図7−B(a)に示すように、支持杭の通り芯a方向にこだわることなく施工が可能となり、軟弱地盤の改良状況に応じて、改良体の配置の自由度が高まる。例えば、改良体3,4を支持杭2,2の対角線b方向に沿って前記改良体の張出し部3a,4aの軸芯とが略平行になるように配設することで、この対角線b方向のせん断力に抵抗することになる。
According to the improved pile foundation of the present invention and the construction method using the improved body, since the improved body is not continued to the adjacent one, the horizontal displacement of the surface ground is reduced for the continuous improved body. However, the reduction rate of the horizontal displacement of the surface ground is large for the reduction of the improved length. Therefore, the improvement effect per improvement length is large, thereby reducing the material cost for forming the improved body and shortening the construction period, thereby reducing the cost.
When the improved body is formed on a continuous wall with a single-axis or multi-axis auger, it is not wrapped in a grid shape with the adjacent continuous wall, so that efficient construction is possible.
Since a cross-shaped improved body is formed for each support pile, for example, as shown in FIG. 7-B (a), construction is possible without sticking to the core a direction of the support pile, and improvement of soft ground Depending on the situation, the degree of freedom of arrangement of the improved body increases. For example, by arranging the improved bodies 3 and 4 along the diagonal b direction of the support piles 2 and 2 so that the axial cores of the overhang portions 3a and 4a of the improved body are substantially parallel, the diagonal b direction It will resist the shearing force.

本発明に係る浅層の地盤改良の場合における、杭基礎の改良体の概略斜視図である。It is a schematic perspective view of the improvement body of a pile foundation in the case of shallow ground improvement concerning the present invention. 同本発明に係る杭基礎の改良体の浅層地盤モデルに一定の水平力を加えた場合の境界条件及び解析用斜視図(a),その平面図(b),その立面図(c)である。Boundary conditions and perspective view for analysis when a constant horizontal force is applied to a shallow ground model of an improved pile foundation according to the present invention (a), its plan view (b), its elevation view (c) It is. 浅層の改良体3による変位低減効果とコストダウン効果とを示した特性図(a)、曲げ低減効果とその曲げのコストダウン効果とを示した特性図(b)である。It is the characteristic view (a) which showed the displacement reduction effect and cost reduction effect by the improvement body 3 of a shallow layer, and the characteristic diagram (b) which showed the bending reduction effect and the cost reduction effect of the bending. 同本発明に係る深層の地盤改良の場合における、杭基礎の改良体の概略斜視図である。It is a schematic perspective view of the improvement body of a pile foundation in the case of the deep ground improvement which concerns on the same invention. 同本発明に係る杭基礎の改良体の深層地盤モデルに一定の水平力を加えた場合の境界条件及び解析用斜視図(a),その平面図(b),その立面図(c)である。Boundary condition and analysis perspective view (a), plan view (b), elevation view (c) when a constant horizontal force is applied to the deep ground model of an improved pile foundation according to the present invention is there. 深層の改良体4による変位低減効果とコストダウン効果とを示した特性図(a)、曲げ低減効果とその曲げのコストダウン効果とを示した特性図(b)である。It is the characteristic view (a) which showed the displacement reduction effect and cost reduction effect by the deep improvement body 4, and the characteristic diagram (b) which showed the bending reduction effect and the cost reduction effect of the bending. 本発明の改良体3,4におけるスパンLが縦,横で異なっていて正方形でない場合の配置を示す平面図である。It is a top view which shows arrangement | positioning in case the span L in the improvement bodies 3 and 4 of this invention differs vertically and horizontally and is not square. 本発明の改良体3,4を、その張出し部3a,4aの軸芯が対角線上に平行に配置した場合の平面図(a)と、支持杭の通り芯aに沿って配置した場合の平面図(b)とである。The top view (a) when the axial bodies of the overhang portions 3a and 4a are arranged in parallel on the diagonal line, and the plane when the improvement bodies 3 and 4 of the present invention are arranged along the core a of the support pile. It is a figure (b). 従来例に係る杭基礎の改良体を示す斜視図である。It is a perspective view which shows the improvement body of the pile foundation which concerns on a prior art example.

本発明に係る杭基礎の改良体と改良体の構築工法は、図1に示すように、軟弱地盤の改良に当たり、各支持杭の頭部に表層地盤にセメント系固化材を混合した高剛性な十字状の改良体を設けて、当該改良体の材料費の削減と施工の工期短縮を図ると共に、併せて改良体の配置の自由度を高めるものである。   As shown in FIG. 1, the pile foundation improvement body according to the present invention and the construction method of the improvement body are high rigidity, in which a cement-based solidified material is mixed with the surface layer ground on the head of each support pile, as shown in FIG. A cross-shaped improved body is provided to reduce the material cost of the improved body and shorten the construction work period, and at the same time, increase the degree of freedom in arranging the improved body.

本発明に係る杭基礎1の改良体3について説明する。図1に示すように、軟弱な表層地盤5の下方における支持層に先端部が支持された支持杭2が配設され、前記表層地盤5における前記支持杭2の通り芯に沿って形成される、表層地盤にセメント系固化材を混合した高剛性な改良体3において、前記改良体3は、支持杭2,2…毎に個別に設けられ、支持杭2の頭部から水平方向に所要深さで十字状に張り出してバットレス状にし、隣接の改良体3と非連続的に形成されている。   The improved body 3 of the pile foundation 1 according to the present invention will be described. As shown in FIG. 1, a support pile 2 having a tip supported by a support layer below a soft surface ground 5 is disposed, and is formed along the core of the support pile 2 in the surface ground 5. In the high-rigidity improvement body 3 in which cement-based solidified material is mixed with the surface ground, the improvement body 3 is provided individually for each of the support piles 2, 2. Now, it is formed in a cross shape to form a buttress shape, and is formed discontinuously with the adjacent improvement body 3.

前記十字状の改良体3は、浅層改良の場合のものである。該改良体3の大きさは、バットレス長さBが、4.05m,2.25m,1.2m,0.6m及び0mの5ポイントを解析用に用意し、幅Wが1.2m(幅Wが杭径の2倍以上)、深さHが0.9m(深さHは杭径の2倍かつ2m以内、50cm以上)である。解析的検討のモデルは図2に示すように、支持杭2は、その杭径が0.6m(杭径は主として0.3m〜1.2m)で、杭長さが10mであり、杭定数としてヤング係数が4×10 kN/m、中実断面である。支持杭2,2間のスパンLは9mである。また、軟弱な表層地盤5の剛性は5MN/mで、浅層の改良体3の剛性は80MN/m(改良体の剛性は表層地盤の10倍以上の剛性)である。 The cross-shaped improvement body 3 is for the case of shallow layer improvement. As for the size of the improved body 3, five points of buttress length B of 4.05 m, 2.25 m, 1.2 m, 0.6 m and 0 m are prepared for analysis, and the width W is 1.2 m (width). W is at least twice the pile diameter) and depth H is 0.9 m (depth H is twice the pile diameter and within 2 m, 50 cm or more). As shown in Fig. 2, the model of the analytical study is that the support pile 2 has a pile diameter of 0.6m (pile diameter is mainly 0.3m to 1.2m) and a pile length of 10m. As a Young's modulus of 4 × 10 7 kN / m 2 and a solid section. The span L between the support piles 2 and 2 is 9 m. Further, the rigidity of the soft surface layer 5 is 5 MN / m 2 , and the rigidity of the shallow improvement body 3 is 80 MN / m 2 (the rigidity of the improvement body is 10 times or more that of the surface layer ground).

上記のような条件で、杭頭に水平力として荷重100kNを加える。3次元有限要素法(FEM)による解析結果を、図3(a),(b)に示す。横軸は、改良体3の改良長であるバットレス長さBの2倍がスパンLに占める割合(%)であり、縦軸は、上記バットレス長さBの5ポイントにおける、変位低減効果、変位低減におけるコストダウン効果、曲げ低減効果、曲げ低減におけるコストダウン効果を表したものである。   Under the above conditions, a load of 100 kN is applied as a horizontal force to the pile head. The analysis results by the three-dimensional finite element method (FEM) are shown in FIGS. The horizontal axis represents the percentage (%) of the buttress length B, which is the improved length of the improved body 3, in the span L, and the vertical axis represents the displacement reduction effect and displacement at 5 points of the buttress length B. This shows the cost reduction effect in reduction, the bending reduction effect, and the cost reduction effect in bending reduction.

例えば、図3(a)に示すように、バットレス長さBを4.05mとすると、(2B/L)は90%であり、そのときの変位低減効果は80%程度となり、90%よりも低く、下図のコストダウン効果もマイナスになっていて、手間が掛かる割には材料費の低減効果が発揮されず、効率的な効果を上げていない。   For example, as shown in FIG. 3A, when the buttress length B is 4.05 m, (2B / L) is 90%, and the displacement reduction effect at that time is about 80%, which is more than 90%. The cost reduction effect shown in the figure below is also negative, and although it takes time, the effect of reducing the material cost is not exhibited and the efficient effect is not achieved.

次に、改良体3のバットレス長さBを2.25mにすると、(2B/L)は50%であり、そのときの変位低減効果は60%以上となり、50%よりも遙かに高く、下図のコストダウン効果も10%以上になっている。よって、バットレス長さBを短くした割には、水平抵抗力が強く、コストダウンも図れているものである。   Next, when the buttress length B of the improved body 3 is 2.25 m, (2B / L) is 50%, and the displacement reduction effect at that time is 60% or more, much higher than 50%. The cost reduction effect in the figure below is also 10% or more. Therefore, although the buttress length B is shortened, the horizontal resistance is strong and the cost can be reduced.

このようにして考察すると、図3(b)に示す曲げの場合の効果も参酌して、低減効果が50%以上でコストダウン効果が10%以上となるような範囲を条件とすると、バットレス長さBは、30%≦(2B/L)×100≦55%にすることが最も好ましいものである。   In view of this, in consideration of the effect of bending shown in FIG. 3B, if the range is such that the reduction effect is 50% or more and the cost reduction effect is 10% or more, the buttress length The thickness B is most preferably 30% ≦ (2B / L) × 100 ≦ 55%.

また、図4に示すように、十字状の改良体4で深層改良する場合には、多軸(図示の場合は5軸の場合を示す)の掘削機で表層地盤5を掘削して連続壁を十字状に配設して前記改良体4が形成される。3軸や5軸のオーガを使用すれば、一つの改良体4を一度に穿孔することができて、隣接の改良体4にセミラップさせる必要がないので、工期短縮される。   In addition, as shown in FIG. 4, in the case of deep improvement with the cross-shaped improvement body 4, the continuous layer wall is excavated with the multi-axis excavator (showing the case of 5 axes in the figure). Are arranged in a cross shape to form the improved body 4. If a 3-axis or 5-axis auger is used, one improvement body 4 can be drilled at a time, and it is not necessary to semi-wrap the adjacent improvement body 4, so that the construction period is shortened.

解析的検討のモデルは、図5に示すように、前記改良体4の大きさは、孔径が600mm(施工径は550〜900mm)、深さHが5m(深さHは3m以上で10m以内)、支持杭2は前記と同様。支持杭2,2間のスパンLは9mである。また、軟弱な表層地盤5の剛性は、5MN/mで、深層の改良体4の剛性は350MN/m(改良体の剛性は100MN/m以上)である。 As shown in FIG. 5, the model of the analytical study is that the improved body 4 has a hole diameter of 600 mm (construction diameter of 550 to 900 mm) and a depth H of 5 m (depth H is 3 m or more and within 10 m). ), The support pile 2 is the same as described above. The span L between the support piles 2 and 2 is 9 m. Moreover, the rigidity of the soft surface layer 5 is 5 MN / m 2 , and the rigidity of the deep improvement body 4 is 350 MN / m 2 (the rigidity of the improvement body is 100 MN / m 2 or more).

前記改良体4に前述と同様に杭頭に水平力として荷重100kNを加える。深層改良体の解析において、改良体が杭を押す影響を考慮した、通常の単杭の境界とは相違した研究成果を踏まえた図4に示す境界条件を用いている。解析結果は図6(a),(b)に示すようになる。変位について検討すると、低減効果が50%以上でコストダウン効果が5%以上となるような範囲を条件とすると、バットレス長さBは、16%≦(2B/L)×100≦80%にすることが最も好ましいものである。これに、杭に生じる曲げモーメントも同様なコストダウンと変位低減効果を参酌すると、バットレス長さBは、38%≦(2B/L)×100≦50%にすることが最も好ましいものとなる。   A load of 100 kN is applied to the improved body 4 as a horizontal force on the pile head in the same manner as described above. In the analysis of the deep improvement body, the boundary condition shown in FIG. 4 based on the research result different from the boundary of the normal single pile considering the influence of the improvement body pushing the pile is used. The analysis results are as shown in FIGS. 6 (a) and 6 (b). Considering the displacement, assuming that the reduction effect is 50% or more and the cost reduction effect is 5% or more, the buttress length B is 16% ≦ (2B / L) × 100 ≦ 80%. Is most preferred. In consideration of the same cost reduction and displacement reduction effect, the buttress length B is most preferably 38% ≦ (2B / L) × 100 ≦ 50%.

一連の解析結果はスパンLが9mのケースであるが、スパンLが6m〜10mでも同様な結果となる。スパンLは一連の説明では正方形スパンLを用いたが、図7−Aに示すように、構造物の形状に対応させた結果、改良体の張出し部の長さが異なる場合における、横L1、縦L2でも同様に、2B1/L1,2B2/L2により、上記と同様な結果となる。   A series of analysis results are cases where the span L is 9 m, but the same result is obtained when the span L is 6 m to 10 m. As the span L, the square span L was used in the series of explanations. However, as shown in FIG. 7-A, as a result of making the length correspond to the shape of the structure, Similarly in the case of the vertical L2, 2B1 / L1, 2B2 / L2 gives the same result as above.

前記改良体3,4において、変位低減効果やコストダウンの効果を参酌して、バットレス長さBを技術的に最も好ましい範囲として、浅層の場合と深層の場合の当該バットレス長さBを技術的に範囲限定するものである。   In the improved bodies 3 and 4, considering the effect of reducing displacement and cost reduction, the buttress length B is the most technically preferable range, and the buttress length B in the shallow layer and deep layer is the technology. The range is limited.

また、本発明の改良体3,4は、隣接の改良体と連続していないので、設置回転角度が自由になり、例えば、図7−B(a)に示すように、支持杭の頭部に十字状の張出し部3a,4aでなる改良体を有した杭基礎を軟弱地盤に配設して、杭頭部の水平剛性によって地盤の水平変位を低減させる改良体の構築工法において、前記支持杭2を支持層に支持させて格子状に配設した後に、前記支持杭2の対角線bと前記改良体の張出し部3a,4aの軸芯とが略平行になるようにして、前記改良体3,4を形成し配設することができる。これにより、軟弱な表層地盤5の水平抵抗力を増強したい方向が、格子状に配設された支持杭2の対角線b上にあるような場合に、主せん断面に抵抗するように配置することができるなど、図7−B(b)に示す格子状配置ばかりでなく、設計自由度が高まるものである。   Moreover, since the improvement bodies 3 and 4 of this invention are not continuous with the adjacent improvement body, an installation rotation angle becomes free, for example, as shown to FIG. 7-B (a), the head of a support pile In the construction method of the improved body in which the pile foundation having the improved body composed of the cross-shaped projecting portions 3a and 4a is disposed on the soft ground and the horizontal displacement of the ground is reduced by the horizontal rigidity of the pile head, After the pile 2 is supported by the support layer and arranged in a lattice pattern, the improved body is set so that the diagonal line b of the support pile 2 and the axial centers of the overhang portions 3a and 4a of the improved body are substantially parallel to each other. 3, 4 can be formed and arranged. Thereby, when the direction which wants to strengthen the horizontal resistance force of the soft surface layer ground 5 exists on the diagonal b of the support pile 2 arrange | positioned at a grid | lattice form, arrange | position so that it may resist a main shear surface. In addition to the lattice arrangement shown in FIG. 7B (b), the degree of freedom in design is increased.

本発明の杭基礎の改良体と改良体の構築工法は、コスト低減と工期短縮の効率的な施工を求める地盤改良工事に適している。また、改良体の自由度が大きいので、複雑な地形の軟弱地盤にも適した工法である。   The pile foundation improvement body and the improvement body construction method of the present invention are suitable for ground improvement work that requires efficient construction for cost reduction and shortening of the construction period. In addition, since the degree of freedom of the improved body is large, this method is suitable for soft ground with complex terrain.

1 杭基礎、
2 支持杭、
3 浅層の改良体、 3a 張出し部、
4 深層の改良体、 4a 張出し部、
5 軟弱な表層地盤、
21 支持杭、
22 浅層改良体、
B バットレス長さ、
W 幅、
H 深さ、
a 通り芯、
b 対角線。
1 pile foundation,
2 support piles,
3 Improved shallow layer, 3a Overhang,
4 Deep improvement body, 4a Overhang part,
5 Soft surface ground,
21 Support pile,
22 Shallow improvement body,
B Buttress length,
W width,
H depth,
a Street core,
b Diagonal line.

Claims (4)

軟弱な表層地盤の下方における支持層に先端部が支持された支持杭が配設され、前記表層地盤における前記支持杭の通り芯に沿って形成される改良体において、
前記改良体は、支持杭毎に個別に設けられ、支持杭の頭部から所要深さで水平方向に十字状に張り出して隣接の改良体と非連続的に形成されていること、
を特徴とする杭基礎の改良体。
In the improved body in which the support pile supported at the tip is supported by the support layer below the soft surface ground, and is formed along the core of the support pile in the surface ground,
The improved body is individually provided for each support pile, and is formed discontinuously with the adjacent improved body by projecting in a cross shape in the horizontal direction from the head of the support pile at a required depth.
Improved pile foundation characterized by
改良体で深層改良する場合には、単軸若しくは多軸の掘削機で表層地盤を掘削して連続壁を十字状に配設して前記改良体が形成されていること、
を特徴とする請求項1に記載の杭基礎の改良体。
In the case of deep improvement with an improved body, the improved body is formed by excavating the surface ground with a single-axis or multi-axis excavator and arranging continuous walls in a cross shape,
The improvement body of the pile foundation of Claim 1 characterized by these.
十字状の改良体の長さ:(2B)を、支持杭間のスパン:(L)に対して、
浅層改良の場合には30%≦(2B/L)×100≦55%にすること、若しくは、
深層改良の場合には16%≦(2B/L)×100≦80%にすること、
を特徴とする請求項1又は2に記載の杭基礎の改良体。
The length of the cross-shaped improved body: (2B), the span between the support piles: (L),
In the case of shallow layer improvement, 30% ≦ (2B / L) × 100 ≦ 55%, or
In the case of deep layer improvement, 16% ≦ (2B / L) × 100 ≦ 80%,
An improved body of a pile foundation according to claim 1 or 2.
支持杭の頭部に十字状の張出し部でなる請求項1乃至3に記載の改良体を有した杭基礎を軟弱地盤に配設して杭頭部の水平剛性によって地盤の水平変位を低減させる改良体の構築工法において、
前記支持杭を支持層に支持させて格子状に配設した後に、前記支持杭の対角線と前記改良体の張出し部の軸芯とが略平行になるようにして、前記改良体を形成し配設したこと、
を特徴とする改良体の構築工法。
A pile foundation having the improved body according to any one of claims 1 to 3 formed in a cross-shaped projecting portion at a head portion of a support pile is disposed on a soft ground, and horizontal displacement of the ground is reduced by horizontal rigidity of the pile head. In the improved construction method,
After the support pile is supported by the support layer and arranged in a lattice pattern, the improved body is formed and arranged so that the diagonal line of the support pile and the axis of the overhang portion of the improved body are substantially parallel. Set up,
A construction method for improved bodies.
JP2009165562A 2009-07-14 2009-07-14 Improved pile foundation and its construction method Active JP5286611B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2009165562A JP5286611B2 (en) 2009-07-14 2009-07-14 Improved pile foundation and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2009165562A JP5286611B2 (en) 2009-07-14 2009-07-14 Improved pile foundation and its construction method

Publications (2)

Publication Number Publication Date
JP2011021344A JP2011021344A (en) 2011-02-03
JP5286611B2 true JP5286611B2 (en) 2013-09-11

Family

ID=43631655

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2009165562A Active JP5286611B2 (en) 2009-07-14 2009-07-14 Improved pile foundation and its construction method

Country Status (1)

Country Link
JP (1) JP5286611B2 (en)

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11193525A (en) * 1998-01-06 1999-07-21 Tone Geo Tech Co Ltd Pile producing method

Also Published As

Publication number Publication date
JP2011021344A (en) 2011-02-03

Similar Documents

Publication Publication Date Title
CN102653945B (en) Foundation reinforcing and replacing structure and construction method thereof
CN204370431U (en) A kind of occlusion long-short pile space enclosing structure
JP5347898B2 (en) Strengthening structure and method of existing sheet pile quay
CN103790393B (en) A kind of construction method of existing building structure integral replacement
CN202117068U (en) Micropile plate-type composite foundation
CN110820793A (en) Composite foundation for collapsible loess area and construction method
JP5330874B2 (en) Soil cement column mountain wall
CN103510530A (en) Embedded foundation of composite wallboard and implementation method thereof
JP2010248781A (en) Soil improving body
CN102691302A (en) Concrete structure for supporting deep foundation pit
CN206346205U (en) Sawtooth anchor type miniature steel pipe concrete pile for slope treatment
JP5668971B2 (en) Construction method for underground structures
JP2008308945A (en) Concrete foundation combined with tension pile, and construction method thereof
JP5286611B2 (en) Improved pile foundation and its construction method
JP2011017184A (en) Retaining wall and method of constructing the same
JP5228862B2 (en) Underground structure, construction method of underground structure
JP2010222854A (en) Joint structure of soil-cement improvement body, and pile draft foundation
CN208309592U (en) Foundation pit supporting structure
JP2010059622A (en) Underground structure and method for constructing the same
CN206752493U (en) A kind of slub type digging foundation
JP2008303587A (en) Top-down construction method for base-isolated building
CN105442616B (en) Support replacing method for bottom plate of mucky soil layer foundation pit in deep foundation pit supporting construction
JP3603134B2 (en) Mountain retaining method
JP4815248B2 (en) Pile foundation structure and its construction method
JP2010209605A (en) Piled-raft foundation

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20120601

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20130412

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20130423

A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A712

Effective date: 20130516

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20130516

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20130516

R150 Certificate of patent or registration of utility model

Ref document number: 5286611

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250