Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP5296591B2 - Gas meter and control method thereof - Google Patents
[go: Go Back, main page]

JP5296591B2 - Gas meter and control method thereof - Google Patents

Gas meter and control method thereof Download PDF

Info

Publication number
JP5296591B2
JP5296591B2 JP2009085870A JP2009085870A JP5296591B2 JP 5296591 B2 JP5296591 B2 JP 5296591B2 JP 2009085870 A JP2009085870 A JP 2009085870A JP 2009085870 A JP2009085870 A JP 2009085870A JP 5296591 B2 JP5296591 B2 JP 5296591B2
Authority
JP
Japan
Prior art keywords
flow rate
registered
correction
change
time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2009085870A
Other languages
Japanese (ja)
Other versions
JP2010237060A (en
Inventor
賢知 小林
望 長井
祥子 甲野
孝一郎 大坪
勝一 菅野
昌弘 野澤
泰宏 藤井
宏 石田
三男 難波
和男 久保
尚 齋藤
清 丸山
加藤  明
一高 浅野
龍志 岩本
廣純 中村
卓久 大谷
雄一 平山
仁朗 石野
剛 森永
充彦 坂巻
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
High Pressure Gas Safety Institute of Japan
Panasonic Corp
Osaka Gas Co Ltd
Tokyo Gas Co Ltd
Toshiba Toko Meter Systems Co Ltd
Toho Gas Co Ltd
Panasonic Holdings Corp
Original Assignee
High Pressure Gas Safety Institute of Japan
Panasonic Corp
Osaka Gas Co Ltd
Tokyo Gas Co Ltd
Toshiba Toko Meter Systems Co Ltd
Toho Gas Co Ltd
Matsushita Electric Industrial Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by High Pressure Gas Safety Institute of Japan, Panasonic Corp, Osaka Gas Co Ltd, Tokyo Gas Co Ltd, Toshiba Toko Meter Systems Co Ltd, Toho Gas Co Ltd, Matsushita Electric Industrial Co Ltd filed Critical High Pressure Gas Safety Institute of Japan
Priority to JP2009085870A priority Critical patent/JP5296591B2/en
Publication of JP2010237060A publication Critical patent/JP2010237060A/en
Application granted granted Critical
Publication of JP5296591B2 publication Critical patent/JP5296591B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Measuring Volume Flow (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To enable an appropriate safety-continuing time to be set on the basis of an actual flow-volume state at not only an ignition timing in equipment which carries out a proportional control for a fan heater or the like, even if a gas flow volume is decreased and increased gradually after an ignition. <P>SOLUTION: After the ignition, an average flow volume calculating section 220 calculates an average flow volume Qave for each prescribed time interval, based on the gas flow volume Qi, and a determining means 281 of a registration flow-volume compensation determining section 280 determines whether the average flow volume Qave is equal to or less than a threshold Qd1, and a counter means 282 increments a count value being continuously equal to or less than the threshold, determines whether the count value being continuously equal to or less than the threshold reaches a prescribed set value N, and outputs a compensation request signal of a registration flow volume to a protective section 250 when reaching the set value N, and then the protective section 250 deletes all of individual flow volumes Q0, Q1, ..., registered in an individual flow volume table 271 of a memory section 270, and newly registers the current average flow volume Qave as the maximum flow volume Q0. <P>COPYRIGHT: (C)2011,JPO&amp;INPIT

Description

本発明は、各家庭へのガス供給ライン中に設置されるガスメータ及びその制御方法に係り、特に、ガスの消し忘れに対して適切なタイミングで安全継続時間遮断を実現する技術に関する。   The present invention relates to a gas meter installed in a gas supply line to each household and a control method therefor, and more particularly to a technique for realizing safety duration interruption at an appropriate timing for forgetting to turn off gas.

一般的に、現行のガスメータは、ガスの消し忘れを判定することで当該ガスを遮断する機能(安全継続時間遮断機能)を搭載する。この機能は、ガスの流量に所定値以上(例えば3%以上)の変化があった場合に、着火又は火力調整があったと判断し、その際の変化量に応じて予め設定された安全継続時間(制限時間とも言う)を決定し、その後、所定値以上(例えば、3%以上)の流量の変化がない状態で、当該安全継続時間が過ぎた場合にガスを遮断する。   Generally, current gas meters are equipped with a function (safety duration cut-off function) that cuts off the gas by determining whether to forget to turn off the gas. This function determines that there has been ignition or thermal power adjustment when the gas flow rate has changed by more than a predetermined value (for example, 3% or more), and the safety duration set in advance according to the amount of change at that time. (Also referred to as a time limit) is determined, and then the gas is shut off when the safety duration has passed in a state where the flow rate has not changed by a predetermined value or more (for example, 3% or more).

具体的には、機器の着火を判断後、その際の変化量を、例えば、図22に示すように7区分に分けて登録し(あるいは更新する処理を行い)、この登録流量に応じて予め設定された安全継続時間を決定する。その後、所定値以上の流量の変化がない状態で、当該安全継続時間が経過した場合にガスを遮断する。   Specifically, after determining the ignition of the device, the amount of change at that time is registered (or updated) in seven categories as shown in FIG. 22, for example, and in advance according to this registered flow rate Determine the set safety duration. Thereafter, the gas is shut off when the safety duration has elapsed in a state where there is no change in the flow rate equal to or greater than the predetermined value.

ところで、近年のファンヒーターや給湯器等のガス器具の中には、着火後に比例制御を行い、ガス流量が徐々に減少することで設定温度になると、燃焼をこの設定温度の状態で維持するようガス流量を少量に制御するものが提案されている(通称、比例制御機器)。この比例制御機器では、また、燃焼が一定状態(設定温度の状態)に維持された後、窓を開けるなどして室温が下がってしまうと、比例制御により流量を徐々に上昇させ、室温が設定温度になるよう制御する。   By the way, in recent gas appliances such as fan heaters and water heaters, proportional control is performed after ignition, and when the gas flow rate gradually decreases and reaches a set temperature, combustion is maintained at this set temperature state. A device that controls the gas flow rate to a small amount has been proposed (commonly known as a proportional control device). In this proportional control device, if the room temperature decreases by opening a window after the combustion is maintained in a constant state (set temperature state), the flow rate is gradually increased by proportional control to set the room temperature. Control to reach temperature.

しかしながら、この比例制御機器において上記のような安全継続時間遮断機能を実行する場合、図23に示す通り、ファンヒーターの着火(600L/h)後、比例制御により、ガスの流量変化が例えば3%以下の状態で、当該ガス流量を徐々に減少させ、燃焼が一定状態(200L/h)になると下記のような問題が生じる。   However, when the above-described safety duration cutoff function is executed in this proportional control device, as shown in FIG. 23, after the fan heater is ignited (600 L / h), the change in gas flow rate is, for example, 3% by proportional control. When the gas flow rate is gradually decreased in the following state and combustion becomes a constant state (200 L / h), the following problems occur.

すなわち、このように、着火後、ガス流量が3%以下の状態で減少することで燃焼が一定状態に達した場合、着火時の登録流量(600L/h)は、一定燃焼時の実際の流量(200L/h)に対して大きくなるため、この実際の流量に対して設定される安全継続時間が着火時の登録流量に対応したものとなってしまう。   That is, after the ignition, when the combustion reaches a constant state by reducing the gas flow rate at 3% or less, the registered flow rate at the time of ignition (600 L / h) is the actual flow rate at the constant combustion time. Since it becomes large with respect to (200 L / h), the safety continuation time set for this actual flow rate corresponds to the registered flow rate at the time of ignition.

これにより、実際のガス流量(200L/h)に対して、安全継続時間である遮断時間が短くなるという「早切れ」現象とった問題が生じる。この「早切れ」現象は、ファンヒーターのような比例制御を行う暖房器具の利便性を低下させ、さらにはユーザへのサービス低下にも繋がる。   As a result, there arises a problem of an “early break” phenomenon in which the shut-off time, which is the safety continuation time, is shortened with respect to the actual gas flow rate (200 L / h). This “early out” phenomenon reduces the convenience of a heating appliance that performs proportional control such as a fan heater, and further leads to a decrease in service to the user.

一方、図24に示すように、ファンヒーター等の比例制御機器が一定状態で燃焼しているとき(200L/h)に、窓が開くなどにより室温が低下すると、比例制御が働くことで、ガス流量が例えば3%以下の状態で徐々に増加し、燃焼が一定状態(600L/h)になった場合には、下記のようになる。   On the other hand, as shown in FIG. 24, when a proportional control device such as a fan heater is burning in a constant state (200 L / h), if the room temperature is lowered by opening a window or the like, the proportional control works, For example, when the flow rate gradually increases in a state of 3% or less and the combustion reaches a constant state (600 L / h), the following occurs.

すなわち、比例制御により、3%以下の状態で流量が増加することで燃焼が再度一定状態(600L/h)になると、登録流量(200L/h)が実際の流量(600L/h)よりも小さくなるため、実際の流量に対して設定される安全継続時間は登録流量に対応したものとなってしまう。これにより、実際のガス流量(600L/h)に対して、安全継続時間である遮断時間が長くなる。   That is, when the flow rate increases in a state of 3% or less by proportional control and the combustion again becomes a constant state (600 L / h), the registered flow rate (200 L / h) is smaller than the actual flow rate (600 L / h). Therefore, the safety continuation time set for the actual flow rate corresponds to the registered flow rate. Thereby, the cutoff time which is a safety continuation time becomes long with respect to the actual gas flow rate (600 L / h).

本発明は、上記のような課題を解消するために提案されたものであって、その目的は、ファンヒーター等の比例制御を行う機器において、着火後に、緩やかなガス流量(例えば3%以下)の減少及び増加が生じた場合であっても、着火時だけでなく実際の流量状態を踏まえた上で、適切な安全継続時間(制限時間)を設定可能なガスメータ及びその制御方法を提供することにある。   The present invention has been proposed to solve the above-described problems, and its purpose is to provide a gentle gas flow rate (for example, 3% or less) after ignition in a device that performs proportional control such as a fan heater. To provide a gas meter capable of setting an appropriate safety duration (time limit) and its control method based on the actual flow rate state as well as at the time of ignition, even if there is a decrease or increase in It is in.

上述した目的を達成するために、本発明は、ガス流量を監視し、登録した登録流量の流量区分に応じて予め設定された使用制限時間を設定し、当該使用制限時間を超えて使用した場合に遮断弁によりガスを遮断するガスメータであって、ガス流量を検出する流量検出手段と、前記流量検出手段により検出されたガス流量を所定の時間間隔で平均化することで平均流量を算出する平均流量算出手段と、前記所定の時間間隔前後の前記平均流量の変化量を算出し、当該変化量が流量変化に相当する第1の閾値以上であるかを判定する流量変化判定手段と、前記流量変化判定手段により前記変化量が第1の閾値以上であると判定された場合に、この変化の増減方向に基づいて前記変化量を登録又は削除する登録手段と、前記登録手段により登録された前記変化量である登録流量を補正する補正手段と、を備え、前記補正手段は、前記平均流量算出手段により算出された平均流量がゆるやかな流量変化に相当する第2の閾値以下であるかを判定する判定手段と、前記平均流量が連続して前記判定手段により第2の閾値以下であると判定される回数をカウントし、このカウントされた回数が所定の設定回数に達するかを判定するカウンタ手段と、を有し、前記カウンタ手段により所定の設定回数に達すると判定された場合に、前記登録流量を当該平均流量に補正することを特徴とする。   In order to achieve the above-described object, the present invention monitors the gas flow rate, sets a preset use time limit according to the registered flow rate category, and uses the time limit exceeding the use limit time. A gas meter that shuts off gas by means of a shutoff valve, a flow rate detection means for detecting a gas flow rate, and an average for calculating an average flow rate by averaging the gas flow rate detected by the flow rate detection means at a predetermined time interval A flow rate calculation unit, a flow rate change determination unit that calculates a change amount of the average flow rate before and after the predetermined time interval, and determines whether the change amount is equal to or greater than a first threshold corresponding to the flow rate change; and the flow rate When the change determining means determines that the change amount is equal to or greater than the first threshold, the change means registers or deletes the change amount based on the increase / decrease direction of the change, and is registered by the registration means. Correcting means for correcting the registered flow rate that is the change amount, wherein the correction means determines whether the average flow rate calculated by the average flow rate calculation unit is equal to or lower than a second threshold value corresponding to a gradual flow rate change. A determination means for determining, and a counter for counting the number of times that the average flow rate is continuously determined to be equal to or less than a second threshold by the determination means, and determining whether the counted number reaches a predetermined set number of times Means for correcting the registered flow rate to the average flow rate when it is determined by the counter means that a predetermined set number of times has been reached.

さらに、本発明は、前記補正手段による補正時、又は前記流量変化判定手段による前記変化量が第1の閾値以上であるとの判定時を基準として、前記使用制限時間を設定する設定手段を備える点も包含する。   Furthermore, the present invention includes setting means for setting the use time limit with reference to the time when correction is performed by the correction means or when the amount of change by the flow rate change determination means is greater than or equal to a first threshold. Also includes points.

以上のような本発明によれば、着火後、ガス流量が例えば3%以下の状態で徐々に減少した場合であっても、記憶部に登録される登録流量を補正することができ、その上で、当該補正後の登録流量に対応する制限時間の開始基準を補正時に設定することができるので、着火時のガス流量に対応する制限時間を設定することで実際の制限時間が短くなるといった「早切れ」現象を抑制することが可能となる。それ故、ファンヒーターのような比例制御を行う暖房器具の利便性を向上させ、さらにはユーザへのサービス向上にも貢献することができる。   According to the present invention as described above, even after the ignition, even if the gas flow rate is gradually reduced in a state of, for example, 3% or less, the registered flow rate registered in the storage unit can be corrected. Therefore, since the start reference of the time limit corresponding to the corrected registered flow rate can be set at the time of correction, setting the time limit corresponding to the gas flow rate at the time of ignition shortens the actual time limit. It becomes possible to suppress the “early break” phenomenon. Therefore, the convenience of a heating appliance that performs proportional control such as a fan heater can be improved, and further, the service to the user can be improved.

本発明の実施形態に係る構成例を示す機能ブロック図Functional block diagram showing a configuration example according to an embodiment of the present invention 本発明の実施形態に係る登録流量補正処理の実施例1を示すフローチャート(流量減少)The flowchart (flow rate reduction) which shows Example 1 of the registration flow volume correction process which concerns on embodiment of this invention. 本発明の実施形態に係る登録流量補正処理の実施例2の概略図Schematic of Example 2 of registered flow rate correction processing according to an embodiment of the present invention 本発明の実施形態に係る登録流量補正処理の実施例2を示すフローチャート(流量減少)(1)Flow chart (flow rate reduction) (1) showing Example 2 of the registered flow rate correction processing according to the embodiment of the present invention. 本発明の実施形態に係る登録流量補正処理の実施例2を示すフローチャート(流量減少)(2)Flow chart (flow rate reduction) (2) showing Example 2 of the registered flow rate correction processing according to the embodiment of the present invention. 本発明の実施形態に係る登録流量補正処理の実施例3の概略図Schematic of Example 3 of registered flow rate correction processing according to an embodiment of the present invention 本発明の実施形態に係る登録流量補正処理の実施例3を示すフローチャート(流量減少)(1)Flow chart (flow rate reduction) (1) showing Example 3 of the registered flow rate correction processing according to the embodiment of the present invention. 本発明の実施形態に係る登録流量補正処理の実施例3を示すフローチャート(流量減少)(2)Flow chart (flow rate reduction) (2) showing Example 3 of the registered flow rate correction processing according to the embodiment of the present invention. 本発明の実施形態に係る登録流量補正処理の実施例1〜3の概略図Schematic of Examples 1 to 3 of registered flow rate correction processing according to an embodiment of the present invention 本発明の実施形態に係る制限時間の再設定処理の実施例1を示すフローチャートThe flowchart which shows Example 1 of the reset process of the time limit which concerns on embodiment of this invention. 本発明の実施形態に係る制限時間の再設定処理の実施例1〜3の概略図Schematic of Examples 1 to 3 of resetting processing of time limit according to the embodiment of the present invention 本発明の実施形態に係る制限時間の再設定処理の実施例3の概略図Schematic of Example 3 of time limit resetting processing according to an embodiment of the present invention 本発明の実施形態に係る記憶部の制限時間テーブルを示す図The figure which shows the time limit table of the memory | storage part which concerns on embodiment of this invention. 本発明の実施形態に係る登録流量補正処理の実施例1を示すフローチャート(流量増加)The flowchart (flow rate increase) which shows Example 1 of the registration flow volume correction process which concerns on embodiment of this invention. 本発明の実施形態に係る登録流量補正処理の実施例1の概略図Schematic of Example 1 of registered flow rate correction processing according to an embodiment of the present invention 本発明の実施形態に係る登録流量補正処理の実施例1における個別流量テーブルを示す図The figure which shows the separate flow rate table in Example 1 of the registration flow correction process which concerns on embodiment of this invention. 本発明の実施形態に係る登録流量補正処理の実施例2を示すフローチャート(流量増加)The flowchart (flow rate increase) which shows Example 2 of the registration flow volume correction process which concerns on embodiment of this invention. 本発明の実施形態に係る登録流量補正処理の実施例2の概略図Schematic of Example 2 of registered flow rate correction processing according to an embodiment of the present invention 本発明の実施形態に係る登録流量補正処理の実施例2における個別流量テーブルを示す図The figure which shows the separate flow rate table in Example 2 of the registration flow correction process which concerns on embodiment of this invention. 本発明の他の実施形態に係る構成例を示す機能ブロック図Functional block diagram showing a configuration example according to another embodiment of the present invention 本発明の他の実施形態に係る登録流量の補正処理を示すフローチャートThe flowchart which shows the correction process of the registration flow volume which concerns on other embodiment of this invention. 本発明の従来技術であるガス流量と制限時間の関係及び制限時間テーブルを示す図The figure which shows the relationship between the gas flow rate and time limit which is the prior art of this invention, and a time limit table. 本発明の従来技術である比例制御機器における流量減少を示す図The figure which shows the flow volume reduction | decrease in the proportional control apparatus which is the prior art of this invention 本発明の従来技術である比例制御機器における流量増加を示す図The figure which shows the flow volume increase in the proportional control apparatus which is the prior art of this invention

[本実施形態]
[1.構成]
本発明を実施するための実施形態に係るガスメータの構成について図1を参照して以下に説明する。図1は、本実施形態に係るガスメータの構成例を示す機能ブロック図である。
[This embodiment]
[1. Constitution]
A configuration of a gas meter according to an embodiment for carrying out the present invention will be described below with reference to FIG. FIG. 1 is a functional block diagram illustrating a configuration example of a gas meter according to the present embodiment.

図1に示す通り、本実施形態のガスメータは、対象ガス流路を流れるガスに関する物理量を計測する計測部100と、当該ガスメータの各種機能を実現するコントローラ(制御器)200と、ガスを遮断する遮断弁300と、から構成されている。   As shown in FIG. 1, the gas meter of the present embodiment shuts off the gas, a measuring unit 100 that measures a physical quantity related to the gas flowing through the target gas flow path, a controller (controller) 200 that realizes various functions of the gas meter, and the like. And a shut-off valve 300.

計測部100は、図1の通り、対象ガス流路中のガス流量を計測するガス流量センサ110と、他の各種の物理量として、例えば、供給圧力、加速度等を計測する各種センサ120を備えている。   As shown in FIG. 1, the measurement unit 100 includes a gas flow sensor 110 that measures the gas flow rate in the target gas flow path, and various sensors 120 that measure supply pressure, acceleration, and the like as other various physical quantities. Yes.

コントローラ200は、後述する各機能として、流量積算部210、平均流量算出部220、流量変化検出部230、表示部240、継続時間計測部260、保安部250、記憶部270、及び登録流量補正判定部280を備えている。   The controller 200 includes a flow integration unit 210, an average flow calculation unit 220, a flow rate change detection unit 230, a display unit 240, a duration measurement unit 260, a security unit 250, a storage unit 270, and a registered flow rate correction determination as functions to be described later. Part 280.

流量積算部210は、計測部100のガス流量センサ110により得られた計測テータQiに基づいて、需要家において使用したガス使用量を積算する手段である。なお、この流量積算部210により積算された積算値は、保安部250と表示部240へ送信される。   The flow rate integration unit 210 is a unit that integrates the amount of gas used at the consumer based on the measurement data Qi obtained by the gas flow rate sensor 110 of the measurement unit 100. The integrated value integrated by the flow rate integration unit 210 is transmitted to the security unit 250 and the display unit 240.

平均流量算出部220は、計測部100のガス流量センサ110により得られた計測データQiに基づいて、ガス流量の平均流量Qaveを算出する手段である。この平均流量算出部220は、予め設定された所定の時間間隔毎(例えば30秒間毎)に、ガス流量の連続する計測データQiの平均値を平均流量Qaveとして算出する。   The average flow rate calculation unit 220 is a unit that calculates the average flow rate Qave of the gas flow rate based on the measurement data Qi obtained by the gas flow rate sensor 110 of the measurement unit 100. The average flow rate calculation unit 220 calculates the average value of the measurement data Qi having a continuous gas flow rate as the average flow rate Qave at predetermined time intervals (for example, every 30 seconds).

流量変化検出部230は、平均流量算出部220により算出された所定の時間間隔の前後の平均流量Qave(n)と平均流量Qave(n−1)の差分を算出し、この差分を流量変化検出用の予め設定された閾値(例えば3%)と対比することで、ガス流量の変化を検出する手段である。   The flow rate change detection unit 230 calculates the difference between the average flow rate Qave (n) and the average flow rate Qave (n−1) before and after the predetermined time interval calculated by the average flow rate calculation unit 220, and detects this difference in the flow rate change detection. This is a means for detecting a change in gas flow rate by comparing with a preset threshold value (for example, 3%).

具体的には、この流量変化検出部230は、算出した平均流量Qave(n)と平均流量Qave(n−1)との差分が、予め設定された閾値(例えば3%)以上であると判定する場合に、ガス流量の変化を検出する(流量変化有りと判定する)。なお、流量変化検出部230は、流量変化を検出すると保安部250に流量変化有り信号と、その変化量(ΔQave(n)=Qave(n)−Qave(n−1))を出力する機能を備えている。   Specifically, the flow rate change detection unit 230 determines that the difference between the calculated average flow rate Qave (n) and the average flow rate Qave (n−1) is greater than or equal to a preset threshold value (eg, 3%). In this case, a change in gas flow rate is detected (determined that there is a flow rate change). The flow rate change detection unit 230 has a function of outputting a flow rate change presence signal and a change amount thereof (ΔQave (n) = Qave (n) −Qave (n−1)) to the security unit 250 when the flow rate change is detected. I have.

表示部240は、液晶表示器等により実現され、流量積算部210により積算された積算値等を表示する機能などを備えている。   The display unit 240 is realized by a liquid crystal display or the like, and has a function of displaying the integrated value and the like integrated by the flow rate integrating unit 210.

保安部250は、前記流量変化検出部230によりガス流量の変化が検出されると、流量変化有り信号及び流量変化量を受信し、当該変化量が増加又は減少しているかを判定する機能を備えている。この保安部250は、また、前記変化量が増加していると判定する場合には、記憶部270の個別流量テーブル271に当該変化量を登録し、減少していると判定する場合には、減少したガスの平均流量Qave(n)を削除する機能を備えている。   When the change in gas flow rate is detected by the flow rate change detection unit 230, the security unit 250 has a function of receiving a flow rate change presence signal and a flow rate change amount and determining whether the change amount is increasing or decreasing. ing. When the security unit 250 determines that the change amount is increasing, the security unit 250 registers the change amount in the individual flow rate table 271 of the storage unit 270 and determines that the change amount is decreasing. A function of deleting the average flow rate Qave (n) of the reduced gas is provided.

また、保安部250は、前記流量変化検出部230によりガス流量の変化が検出されると、記憶部270の個別流量テーブル271に記憶されている最大流量Q0に対応した制限時間(図13参照)を、後述する継続時間計測部260のタイマにセットしスタートさせる機能を備えている。さらに、保安部250は、この継続時間計測部260からの制限時間の経過信号に基づき、遮断弁300に対して、遮断信号を出力しガスを遮断させる機能も備えている。なお、保安部250が有する、これ以外の各種機能は[2.作用]の項目において説明する。   In addition, when the change in gas flow rate is detected by the flow rate change detection unit 230, the security unit 250 has a time limit corresponding to the maximum flow rate Q0 stored in the individual flow rate table 271 of the storage unit 270 (see FIG. 13). Is set in a timer of a duration measuring unit 260 (to be described later) and started. Further, the security unit 250 has a function of outputting a shut-off signal to the shut-off valve 300 based on the elapsed time limit signal from the duration measuring unit 260 to shut off the gas. Various other functions of the security unit 250 are described in [2. This will be described in the item of [Action].

継続時間計測部260は、前記保安部250により最大流量Q0に対応した制限時間がセットされると、当該制限時間をスタートさせ、制限時間を経過するかを判定する機能を備えている。なお、この継続時間計測部260は、制限時間を経過すると判定する場合に保安部250に対して、この経過信号を送信する。   When the time limit corresponding to the maximum flow rate Q0 is set by the security unit 250, the duration measurement unit 260 has a function of starting the time limit and determining whether the time limit has elapsed. The duration measurement unit 260 transmits this elapsed signal to the security unit 250 when determining that the time limit has elapsed.

記憶部270は、各種のメモリまたは記憶装置により実現され、ガス流量の変化が検出された際に、保安部250により変化量が増加している場合に当該変化量が登録され、減少している場合に減少したガスの平均流量Qave(n)が削除されることで形成される個別流量テーブル271と、図13に示すような、個別流量の流量区分毎に対応した制限時間が記憶された制限時間テーブル(図1には示していない)と、を備えている。   The storage unit 270 is realized by various types of memories or storage devices. When a change amount is increased by the security unit 250 when a change in the gas flow rate is detected, the change amount is registered and decreased. In this case, the individual flow rate table 271 formed by deleting the average flow rate Qave (n) of the decreased gas, and the restriction in which the restriction time corresponding to each flow rate division as shown in FIG. 13 is stored. And a time table (not shown in FIG. 1).

登録流量補正判定部280は、平均流量算出部220により算出された平均流量Qaveが、予め設定された閾値Qd1(例えば、600L/h)以下であるかを判定する判定手段281と、平均流量Qaveが連続して当該閾値以下になった回数(カウント値)をカウントするカウンタ手段282と、を備えている。   The registered flow rate correction determination unit 280 includes a determination unit 281 that determines whether the average flow rate Qave calculated by the average flow rate calculation unit 220 is equal to or less than a preset threshold value Qd1 (for example, 600 L / h), and the average flow rate Qave. Counter means 282 that counts the number of times (count value) that continuously becomes equal to or less than the threshold value.

この登録流量補正判定部280の判定手段281により平均流量Qaveが閾値を上回ると判定された場合には、カウンタ手段282において、カウント値をゼロにリセットするする機能も備えている。また、登録流量補正判定部280のカウンタ手段282は、平均流量Qaveが連続して当該閾値以下になった回数であるカウント値が所定の設定値Nに達すると判定する場合に、保安部250に登録流量補正要求信号を出力する機能を備えている。   When the determination unit 281 of the registered flow rate correction determination unit 280 determines that the average flow rate Qave exceeds the threshold value, the counter unit 282 also has a function of resetting the count value to zero. In addition, the counter unit 282 of the registered flow rate correction determination unit 280 determines that the count value, which is the number of times that the average flow rate Qave is continuously equal to or less than the threshold value, reaches a predetermined set value N, the security unit 250 A function for outputting a registered flow rate correction request signal is provided.

なお、以上のようなコントローラ200のうち、流量積算部210、平均流量算出部220、流量変化検出部230、安部250、継続時間計測部260、及び登録流量補正判定部280は、これらの各部の機能を実現するために特化されたプログラムとそれを組み込んだ電子回路またはコンピュータにより実現される。   Of the controller 200 as described above, the flow rate integration unit 210, the average flow rate calculation unit 220, the flow rate change detection unit 230, the safety unit 250, the duration measurement unit 260, and the registered flow rate correction determination unit 280 are included in each of these units. It is realized by a program specialized for realizing the function and an electronic circuit or computer incorporating the program.

[2.作用]
次に、上記のような構成を有するガスメータの作用を図2〜19を参照して、以下に説明する。なお、本作用は、流量が減少する場合の登録流量の補正処理([2.1.」)と、流量が増加する場合の登録流量の補正処理(「2.3.」)と、登録流量補正後の制限時間の設定処理(「2.2.」)と、に分けて説明する。
[2. Action]
Next, the operation of the gas meter having the above configuration will be described below with reference to FIGS. In addition, this operation includes a correction process for the registered flow rate when the flow rate decreases ([2.1.]), A correction process for the registered flow rate when the flow rate increases (“2.3.”), And a registered flow rate. The time limit setting process after correction (“2.2.”) Will be described separately.

[2.1.登録流量の補正処理(ゆるやかな流量減少に対応)]
[2.1.1.実施例1]
まず、図2及び9(a)を参照して、ゆるやかにガス流量が減少する場合(例えば、3%以下)における実施例1に係る登録流量の補正処理について説明する。なお、記憶部270の個別流量テーブル271には、所定の範囲で区分された個別流量(登録流量とも言う)Q0、Q1、・・・が登録されているものとする。
[2.1. Registered flow rate correction processing (corresponding to a slow flow rate decrease)]
[2.1.1. Example 1]
First, with reference to FIGS. 2 and 9 (a), the registration flow rate correction process according to the first embodiment when the gas flow rate is gradually reduced (for example, 3% or less) will be described. In the individual flow rate table 271 of the storage unit 270, individual flow rates (also referred to as registered flow rates) Q0, Q1,... Divided in a predetermined range are registered.

図2に示す通り、着火後、計測部100のガス流量センサ110により対象ガス流路を流れるガス流量(計測データ)Qiが取得されると、コントローラ200の平均流量算出部220は、このガス流量Qiに基づいて、所定の時間間隔毎の平均流量(例えば、30秒間毎の平均流量)Qaveを算出する(S201)。そして、コントローラ200の登録流量補正判定部280の判定手段281は、平均流量算出部220により平均流量が算出される毎に(30秒毎に)、当該平均流量Qaveが閾値Qd1(例えば、600L/h)以下であるかを判定する(S202)。   As shown in FIG. 2, after the ignition, when the gas flow rate (measurement data) Qi flowing through the target gas flow path is acquired by the gas flow rate sensor 110 of the measurement unit 100, the average flow rate calculation unit 220 of the controller 200 Based on Qi, an average flow rate (for example, an average flow rate every 30 seconds) Qave for each predetermined time interval is calculated (S201). Each time the average flow rate is calculated by the average flow rate calculation unit 220 (every 30 seconds), the determination unit 281 of the registered flow rate correction determination unit 280 of the controller 200 sets the average flow rate Qave to a threshold value Qd1 (for example, 600 L / h) It is determined whether or not (S202).

この登録流量補正判定部280の判定手段281により平均流量Qaveが閾値Qd1以下であると判定された場合には(S202のYES)、カウンタ手段282が、連続して閾値以下となるカウント値をアップする(S203)。   When the determination unit 281 of the registered flow rate correction determination unit 280 determines that the average flow rate Qave is equal to or less than the threshold value Qd1 (YES in S202), the counter unit 282 continuously increases the count value that is equal to or less than the threshold value. (S203).

一方、登録流量補正判定部280の判定手段281により平均流量Qaveが閾値Qd1を上回ると判定された場合には(S202のNO)、カウンタ手段282が、カウント値をゼロにリセットする(S204)。   On the other hand, when the determination unit 281 of the registered flow rate correction determination unit 280 determines that the average flow rate Qave exceeds the threshold value Qd1 (NO in S202), the counter unit 282 resets the count value to zero (S204).

そして、カウンタ手段282は、連続して閾値以下となるカウント値がアップされることにより、当該カウント値が所定の設定値N(例えば、N=3)に達するかを判定し(S205)、この設定値Nに達している場合には(S205のYES)、保安部250に登録流量の補正要求信号を出力する。   Then, the counter unit 282 determines whether the count value reaches a predetermined set value N (for example, N = 3) by continuously increasing the count value that is equal to or less than the threshold value (S205). When the set value N is reached (YES in S205), a registration flow rate correction request signal is output to the security unit 250.

保安部250は、登録流量補正判定部280からの補正要求信号を検出すると、記憶部270の個別流量テーブル271に登録されている個別流量Q0、Q1、・・・を全て削除し、新たに現在の平均流量Qaveを最大流量Q0として登録する(S206、S207)。これにより、記憶部270の個別流量テーブル271における登録流量の補正処理は完了する。その後、後述する[2.2.登録流量補正後の制限時間の再設定処理]が行われる。   When the security unit 250 detects the correction request signal from the registered flow rate correction determination unit 280, the security unit 250 deletes all the individual flow rates Q0, Q1,... Registered in the individual flow rate table 271 of the storage unit 270, and newly adds the current flow rate. The average flow rate Qave is registered as the maximum flow rate Q0 (S206, S207). Thereby, the correction process of the registered flow rate in the individual flow rate table 271 of the storage unit 270 is completed. Thereafter, [2.2. [Resetting process of time limit after correction of registered flow rate] is performed.

なお、S205において、カウンタ手段282によりカウント値が所定の設定値N(例えば、N=3)に達していないと判定された場合は(S205のNO)、上記S201〜204が、取得したガス流量Qiに基づいて算出される平均流量の時間間隔毎に繰り返される。   In S205, when it is determined by the counter means 282 that the count value has not reached the predetermined set value N (for example, N = 3) (NO in S205), the above-described S201 to 204 are the acquired gas flow rates. It repeats for every time interval of the average flow calculated based on Qi.

以上のような実施例1に係る登録流量の補正処理によれば、着火後、ガス流量が例えば3%以下の状態で徐々に減少した場合であっても、記憶部に登録される登録流量を補正することができるので、着火時のガス流量に対応する制限時間を設定することにより実際の制限時間が短くなるといった「早切れ」現象を抑制することが可能となる。それ故、ファンヒーターのような比例制御を行う暖房器具の利便性を向上させ、さらにはユーザへのサービス向上にも貢献することができる。   According to the correction process of the registered flow rate according to the first embodiment as described above, even if the gas flow rate gradually decreases in a state of 3% or less after ignition, the registered flow rate registered in the storage unit is reduced. Since the correction can be made, it is possible to suppress the “early interruption” phenomenon that the actual time limit is shortened by setting the time limit corresponding to the gas flow rate at the time of ignition. Therefore, the convenience of a heating appliance that performs proportional control such as a fan heater can be improved, and further, the service to the user can be improved.

[2.1.2.実施例2]
また、前記実施例1では、平均流量を算出する毎に(例えば、30秒毎に)、登録流量補正処理を行う態様を示したが、次のように、所定の周期(例えば、60分)で、登録流量の補正を行うことも可能であり、図3〜5及び9(b)を参照して、実施例2に係る補正処理を説明する。
[2.1.2. Example 2]
Further, in the first embodiment, a mode in which the registered flow rate correction process is performed every time the average flow rate is calculated (for example, every 30 seconds) is described. However, as described below, a predetermined cycle (for example, 60 minutes) is performed. Therefore, it is possible to correct the registered flow rate, and the correction process according to the second embodiment will be described with reference to FIGS. 3 to 5 and 9 (b).

具体的には、図3に示す通り、コントローラ200の保安部250が、所定時間(例えば60分)毎に、登録流量補正判定部280に対して登録流量の補正処理を実行する起動信号を送信し、上記実施例1のS202以降のような登録流量の補正処理が行われる。   Specifically, as shown in FIG. 3, the security unit 250 of the controller 200 transmits an activation signal for executing a registered flow rate correction process to the registered flow rate correction determination unit 280 every predetermined time (for example, 60 minutes). Then, the registered flow rate correction process is performed as in S202 and subsequent steps of the first embodiment.

より詳細に示すと、図4の通り、まず、計測部100のガス流量センサ110により対象ガス流路を流れるガス流量(計測データ)Qiが取得されると、コントローラ200の平均流量算出部220は、このガス流量Qiに基づいて、所定の時間間隔毎の平均流量(例えば、30秒間毎の平均流量)Qaveを算出する(S401)。   More specifically, as shown in FIG. 4, when the gas flow rate (measurement data) Qi flowing through the target gas flow path is first acquired by the gas flow rate sensor 110 of the measurement unit 100, the average flow rate calculation unit 220 of the controller 200 is Based on the gas flow rate Qi, an average flow rate (for example, an average flow rate every 30 seconds) Qave for each predetermined time interval is calculated (S401).

そして、流量変化検出部230が、平均流量算出部220により算出された所定の時間間隔の前後の平均流量Qave(n)と平均流量Qave(n−1)の差分を算出し、この差分が予め設定された閾値(例えば、3%)以上であるかを判定する(S402)。   Then, the flow rate change detection unit 230 calculates the difference between the average flow rate Qave (n) and the average flow rate Qave (n−1) before and after the predetermined time interval calculated by the average flow rate calculation unit 220, and this difference is calculated in advance. It is determined whether or not the set threshold value (for example, 3%) is exceeded (S402).

流量変化検出部230により、差分が予め設定された閾値(例えば3%)以上でないと判定された場合には(S402のNO)、保安部250において、所定の周期(例えば、60分)で、登録流量補正処理を実行する起動信号を送信するタイミングを判断する(S403)。すなわち、保安部250は、登録流量の補正処理が実行されるタイミングであるかを判断する。   When the flow rate change detection unit 230 determines that the difference is not equal to or greater than a preset threshold value (for example, 3%) (NO in S402), the security unit 250 performs a predetermined cycle (for example, 60 minutes), The timing for transmitting an activation signal for executing the registered flow rate correction process is determined (S403). That is, the security unit 250 determines whether it is time to execute the registered flow rate correction process.

起動信号の送信タイミングであると判定されると(S403のYES)、当該保安部250は、起動信号をONとして登録流量補正判定部280に送信し、図5に示すような登録流量の補正処理が行われる(S404)。   When it is determined that it is the transmission timing of the activation signal (YES in S403), the security unit 250 transmits the activation signal to the registered flow rate correction determination unit 280 as ON, and the registered flow rate correction process as shown in FIG. Is performed (S404).

実施例2に係る登録流量の補正処理は、図5に示す通り、前記実施例1のS202以降の処理とほぼ同様であるが、カウンタ手段282によりカウント値が所定の設定値N8(例えば、N=3)に達していると判定された場合には(S505のYES)、カウンタ値をリセットする共に、起動信号をOFFとする(S504、S505)。   As shown in FIG. 5, the registration flow rate correction process according to the second embodiment is substantially the same as the process after S202 of the first embodiment. However, the counter unit 282 counts a predetermined set value N8 (for example, N = 3) (YES in S505), the counter value is reset and the activation signal is turned OFF (S504, S505).

また、S501において、登録流量補正判定部280の判定手段281により平均流量Qaveが閾値Qd1を上回ると判定された場合においても(S501のNO)、カウンタ値をリセットする共に、起動信号をOFFとする(S506、507)。これ以外の処理は実施例1と同様であるため説明は省略する。   In S501, even when the determination unit 281 of the registered flow rate correction determination unit 280 determines that the average flow rate Qave exceeds the threshold value Qd1 (NO in S501), the counter value is reset and the activation signal is turned OFF. (S506, 507). Since other processes are the same as those in the first embodiment, the description thereof is omitted.

一方、図4のS403において、起動信号の送信タイミングにないと判断された場合は(S403のNO)、登録流量の補正処理は行われずにS401〜403の処理が繰り返される。また、S402において、流量変化検出部230により、差分が予め設定された閾値(例えば、3%)以上であると判定された場合には(S402のYES)、起動信号の送信にあたり所定周期で計測していたタイマをリセットし(S405)、登録流量の補正処理は行われずにS401〜402の処理が繰り返される。   On the other hand, if it is determined in S403 in FIG. 4 that the start signal transmission timing is not reached (NO in S403), the processing of S401 to 403 is repeated without performing the registration flow rate correction processing. In S402, when the flow rate change detection unit 230 determines that the difference is greater than or equal to a preset threshold value (eg, 3%) (YES in S402), measurement is performed at a predetermined period when transmitting the activation signal. The timer that has been reset is reset (S405), and the process of S401 to 402 is repeated without performing the correction process of the registered flow rate.

以上のような実施例2に係る登録流量の補正処理によれば、下記の通り、30秒毎に補正を行う実施例1と比較して消費電力を低減することが可能となる。例えば、平均流量の算出時間が30秒毎であり、カウンタ手段282によるカウント回数Nが3回であり、補正処理を実行する所定の周期が60分であるとすれば、このような状況下では、消費電力を1/120(=30秒×3回÷3600秒÷3)に低減することが可能となる。   According to the registered flow rate correction processing according to the second embodiment as described above, it is possible to reduce power consumption as compared with the first embodiment in which correction is performed every 30 seconds as described below. For example, if the calculation time of the average flow rate is every 30 seconds, the number of times N counted by the counter means 282 is 3, and the predetermined period for executing the correction process is 60 minutes, under such circumstances The power consumption can be reduced to 1/120 (= 30 seconds × 3 times ÷ 3600 seconds ÷ 3).

[2.1.3.実施例3]
また、次のように、継続時間計測部260により経過判定される制限時間を超過する(遮断成立)前に登録流量の補正処理の判定を行うことも可能であり、図6〜8及び9(c)を参照して、実施例3に係る補正処理を説明する。
[2.1.3. Example 3]
In addition, as described below, it is also possible to determine the correction process of the registered flow rate before the time limit determined by the duration measurement unit 260 is exceeded (shutdown is established), and FIGS. The correction process according to the third embodiment will be described with reference to c).

図6に示す通り、実施例3では、継続時間計測部260に、登録流量の補正処理の開始時間を設定可能な登録流量補正判定タイマ261を設け、補正処理を実施する時点を制限時間の満了前(例えば、10分前)に設定することを特徴とする。   As shown in FIG. 6, in the third embodiment, the duration measuring unit 260 is provided with a registered flow rate correction determination timer 261 that can set the start time of the registered flow rate correction process, and the time point at which the correction process is performed is expired. It is characterized by being set before (for example, 10 minutes before).

具体的には、図7の通り、コントローラ200の平均流量算出部220が、取得されたガス流量Qiに基づいて、所定の時間間隔毎の平均流量(例えば、30秒間毎の平均流量)Qaveを算出し(S701)、流量変化検出部230が、所定の時間間隔の前後の平均流量Qave(n)と平均流量Qave(n−1)の差分を算出し、この差分が予め設定された閾値(例えば3%)以上であるかを判定する(S702)。   Specifically, as shown in FIG. 7, the average flow rate calculation unit 220 of the controller 200 calculates an average flow rate (for example, an average flow rate every 30 seconds) Qave at predetermined time intervals based on the acquired gas flow rate Qi. The flow rate change detection unit 230 calculates the difference between the average flow rate Qave (n) and the average flow rate Qave (n−1) before and after a predetermined time interval, and this difference is set to a preset threshold value (S701). For example, it is determined whether it is 3% or more (S702).

ここで、流量変化検出部230により、差分が予め設定された閾値(例えば3%)以上であると判定された場合には(S702のYES)、保安部250は、登録流量補正判定タイマ251に補正処理の開始時間(例えば、制限時間満了の10分前)を設定することで、当該登録流量補正判定タイマ251をゼロスタートさせ(S703)、図8に示すようなカウントアップ処理が行われる。   Here, when the flow rate change detection unit 230 determines that the difference is greater than or equal to a preset threshold value (for example, 3%) (YES in S702), the security unit 250 sets the registered flow rate correction determination timer 251. By setting the start time of the correction process (for example, 10 minutes before the expiration of the time limit), the registered flow rate correction determination timer 251 is zero-started (S703), and the count-up process as shown in FIG. 8 is performed.

すなわち、登録流量補正判定タイマ251は、保安部により補正処理の開始時間(例えば、制限時間満了の10分前)が設定されると、経過時間をカウントアップし(S801)、補正処理の開始時間に達したかを判定する(S802)。補正処理の開始時間に達していると判定される場合には(S802のYES)、登録流量補正処理の起動信号(タイムオーバー信号とも言う)をONとして(S803)、当該起動信号を保安部250に出力する。なお、起動信号がONされると、当該登録流量補正判定タイマ251によるカウントアップは終了する(S804)。   That is, the registered flow rate correction determination timer 251 counts up the elapsed time when the start time of the correction process (for example, 10 minutes before the time limit expires) is set by the security unit (S801), and the correction process start time Is determined (S802). If it is determined that the correction processing start time has been reached (YES in S802), the registration flow correction processing activation signal (also referred to as a time-over signal) is turned ON (S803), and the activation signal is sent to the security unit 250. Output. When the activation signal is turned ON, the count up by the registered flow rate correction determination timer 251 ends (S804).

保安部250は、前記起動信号を受信すると、登録流量補正判定部280に対して、次のように、登録流量の補正処理の起動信号を送信し補正処理が行われる。すなわち、その後、流量変化検出部230により、差分が予め設定された閾値(例えば3%)以上でないと判定された場合には(S702のNO)、保安部250において、図8に示した補正処理開始を示す起動信号がONされているか(起動信号を受信したか)を判断する(S704)。   When the security unit 250 receives the activation signal, the security unit 250 transmits the activation signal for the correction process of the registered flow rate to the registered flow rate correction determination unit 280 as follows, and the correction process is performed. That is, after that, when the flow rate change detection unit 230 determines that the difference is not greater than or equal to a preset threshold value (for example, 3%) (NO in S702), the security unit 250 performs the correction process illustrated in FIG. It is determined whether the start signal indicating the start is ON (whether the start signal has been received) (S704).

保安部250により起動信号がONである判定されると(S704のYES)、当該保安部250は、この起動信号を登録流量補正判定部280に送信し、図5に示すような実施例2と同様の登録流量補正処理が行われる(S705)。   When the safety unit 250 determines that the activation signal is ON (YES in S704), the security unit 250 transmits this activation signal to the registered flow rate correction determination unit 280, and the second embodiment as illustrated in FIG. A similar registered flow rate correction process is performed (S705).

以上のような実施例3によれば、例えば、制限時間が満了する10分前(ガス遮断が発生する10分前)に、登録流量の補正処理を実行することができるので、夜間等のガス使用のない状況下における遮断を抑制でき、登録流量補正に係わる消費電力を大幅に低減することが可能となる。   According to the third embodiment as described above, for example, the registration flow rate correction process can be executed 10 minutes before the time limit expires (10 minutes before the gas shut-off occurs). It is possible to suppress the interruption in the situation of no use, and it is possible to greatly reduce the power consumption related to the registered flow rate correction.

[2.2.登録流量補正後の制限時間の再設定処理]
次に、上記のような登録流量の補正処理が実行された後の制限時間の再設定処理について、図10〜13を参照して以下に説明する。なお、以下では、コントローラ200の平均流量算出部220により算出された所定の時間間隔前後の平均流量の差分が流量変化検出部230により予め設定された閾値(例えば3%)以上であると判定され(着火状態にあると判定され)、保安部250が既に当該流量に対応した記憶部270の制限時間テーブルに記憶された制限時間を継続時間計測部260のタイマにセットしスタートさせているものとして説明する。
[2.2. Resetting the time limit after correcting the registered flow rate]
Next, the time limit resetting process after the above-described registered flow rate correction process is executed will be described with reference to FIGS. In the following, it is determined that the difference between the average flow rates before and after the predetermined time interval calculated by the average flow rate calculation unit 220 of the controller 200 is greater than or equal to a threshold (for example, 3%) set in advance by the flow rate change detection unit 230. (Determined to be in an ignition state), the security unit 250 has already set and started the time limit stored in the time limit table of the storage unit 270 corresponding to the flow rate in the timer of the duration measurement unit 260 explain.

[2.2.1.実施例1]
実施例1に係る制限時間の再設定処理について説明すると、まず、コントローラ200では、前記図2に示したように、保安部250が、登録流量補整判定部280からの補正要求信号を検出し、記憶部270の個別流量テーブル271に登録されている個別流量Q0〜Q4を全て削除し、新たに現在の平均流量Qaveを最大流量Q0として登録する。そして、この保安部250は、記憶部270の個別流量テーブル271に記憶されている最大流量Q0に対応した制限時間(図13参照)を、継続時間計測部260のタイマにセットする。
[2.2.1. Example 1]
The time limit resetting process according to the first embodiment will be described. First, in the controller 200, as shown in FIG. 2, the security unit 250 detects the correction request signal from the registered flow rate correction determination unit 280, All the individual flow rates Q0 to Q4 registered in the individual flow rate table 271 of the storage unit 270 are deleted, and the current average flow rate Qave is newly registered as the maximum flow rate Q0. Then, the security unit 250 sets a time limit (see FIG. 13) corresponding to the maximum flow rate Q0 stored in the individual flow rate table 271 of the storage unit 270 in the timer of the duration measurement unit 260.

継続時間計測部260では、図10に示す通り、前記保安部250により最大流量Q0に対応した制限時間がセットされると、当該制限時間をゼロスタートさせる(S1001)。その後、当該継続時間計測部260は、この制限時間が経過するかを判定し(S1002)、制限時間が経過する判定する場合に(S1002のYES)、保安部250に対して、その旨を示す経過信号を送信すると共に、制限時間の経過判定処理をリセットする(S1003)。   In the duration measuring unit 260, when the time limit corresponding to the maximum flow rate Q0 is set by the security unit 250 as shown in FIG. 10, the time limit is zero-started (S1001). Thereafter, the duration measuring unit 260 determines whether or not the time limit has elapsed (S1002), and when it is determined that the time limit has elapsed (YES in S1002), indicates that to the security unit 250. The progress signal is transmitted, and the time limit progress determination process is reset (S1003).

そして、保安部250は、この継続時間計測部260からの制限時間の経過信号に基づき、遮断弁300に対して遮断信号を出力し、ガスを遮断する(S1004)。   Then, the security unit 250 outputs a cutoff signal to the cutoff valve 300 based on the elapsed time limit signal from the duration measurement unit 260, and shuts off the gas (S1004).

例えば、図11に示す通り、始めに設定した現行制限時間が、ガス流量1000L/hに対応する220分であった場合に(図13参照)、現在のガス流量が500L/hであれば、制限時間を登録流量の補正時を開始基準として660分(図13参照)に再設定することができる。   For example, as shown in FIG. 11, when the current limit time set at the beginning is 220 minutes corresponding to the gas flow rate of 1000 L / h (see FIG. 13), if the current gas flow rate is 500 L / h, The time limit can be reset to 660 minutes (see FIG. 13) with the registered flow rate correction time as a starting reference.

以上のような実施例1に係る制限時間の設定処理によれば、補正後の登録流量に対応する制限時間の開始基準を補正時に設定することができるので、現行の場合において、着火時に流量1000L/hが登録され、その後比例制御によりゆるやかな(例えば3%以下の)流量変化で減少することにより生じる「早切れ」現象を抑制することが可能となる。   According to the time limit setting process according to the first embodiment as described above, the start reference for the time limit corresponding to the corrected registered flow rate can be set at the time of correction. / H is registered, and thereafter, it becomes possible to suppress the “early break” phenomenon that occurs when the flow rate is gradually decreased (for example, 3% or less) by proportional control.

[2.2.2.実施例2]
また、登録流量の補正前に流れていたガス流量を考慮し、再設定した制限時間の開始基準を下記のように変更した実施例2に係る制限時間の設定処理について、以下に説明する。具体的には、実施例2では、再設定した制限時間の開始基準を、登録流量の補正処理の実行時ではなく、現行の制限時間の基準である着火時、すなわち、所定の時間間隔前後の平均流量の差分が流量変化検出部230により予め設定された閾値(例えば、3%)以上であると判定した時点に設定する。
[2.2.2. Example 2]
In addition, the time limit setting process according to the second embodiment in which the reset time limit reference is changed as follows in consideration of the gas flow that has flowed before the correction of the registered flow rate will be described below. Specifically, in the second embodiment, the reset time limit start criterion is not the time of execution of the registered flow rate correction process, but the ignition time that is the current time limit reference, that is, before and after a predetermined time interval. The difference is set at a time point when the difference between the average flow rates is determined by the flow rate change detection unit 230 to be equal to or greater than a preset threshold value (for example, 3%).

前記図10で言えば、S1001において、継続時間計測部260では、前記保安部250により最大流量Q0に対応した制限時間がセットされた場合に、当該制限時間をゼロスタートさせるのではなく、着火時を基準として、この制限時間をスタートさせる。   Speaking in FIG. 10, in S1001, in the duration measurement unit 260, when the time limit corresponding to the maximum flow rate Q0 is set by the security unit 250, the time limit is not zero-started, but is started. This time limit is started with reference to.

以上のような実施例2に係る制限時間の再設定処理によれば、例えば、図11に示す通り、始めに設定した現行の制限時間が、ガス流量1000L/hに対応する220分であった場合であっても(図13参照)、現在のガス流量が500L/hであるため、制限時間を着火時を基準とした660分(図13参照)に再設定することが可能となる。これにより、着火時から補正時までに流れていたガス流量を考慮した制限時間を設定することができ、必要以上の制限時間の設定を防止することができる。   According to the time limit resetting process according to the second embodiment as described above, for example, as shown in FIG. 11, the current time limit set initially is 220 minutes corresponding to the gas flow rate of 1000 L / h. Even in this case (see FIG. 13), since the current gas flow rate is 500 L / h, it is possible to reset the time limit to 660 minutes (see FIG. 13) based on the ignition time. Thereby, it is possible to set a time limit in consideration of the gas flow rate flowing from the time of ignition to the time of correction, and it is possible to prevent the time limit from being set more than necessary.

[2.2.3.実施例3]
また、登録流量の補正前に流れていたガス量をさらに具体的に考慮し、再設定した制限時間の開始基準を下記のように変更した実施例3に係る制限時間の設定処理について、以下に説明する。なお、実施例3は、着火時から登録流量の補正時までのガス流量に応じて制限時間を再設定することを特徴とする。以下、図12及び13を参照して、詳述する。
[2.2.3. Example 3]
In addition, regarding the time limit setting process according to Example 3 in which the amount of gas that has flowed before the correction of the registered flow rate is more specifically taken into account and the start criterion for the reset time limit is changed as follows, explain. The third embodiment is characterized in that the time limit is reset according to the gas flow rate from the time of ignition until the correction of the registered flow rate. Hereinafter, a detailed description will be given with reference to FIGS.

まず、前提として、着火時において、流量積算部210が、計測部100のガス流量センサ110により得られた計測テータQiに基づいてガス使用量の積算値を算出し保安部250に送信することで、当該保安部250を通じて当該積算値を記憶部270に保存しておく。すなわち、保安部250は、流量変化検出部230により流量変化が検出されると、この流量変化の検出時の流量積算部210による積算値を読み込み、最新の流量変化有り時の積算値を記憶部270に保存する。   First, as a premise, at the time of ignition, the flow rate integration unit 210 calculates an integrated value of gas usage based on the measurement data Qi obtained by the gas flow rate sensor 110 of the measurement unit 100 and transmits it to the security unit 250. The integrated value is stored in the storage unit 270 through the security unit 250. That is, when the flow rate change detection unit 230 detects a flow rate change, the security unit 250 reads the integrated value by the flow rate integration unit 210 when this flow rate change is detected, and stores the latest integrated value when there is a flow rate change. Save to 270.

その後、保安部250において、前記図2に示すように継続時間計測部260から登録流量の補正要求信号を受信すると、流量積算部210が、この時点(補正時と呼ぶ)のガス使用量の積算値を算出する。そして、保安部250は、この補正時の積算値と記憶部270を通じて読み出した流量変化有り時の積算値との差に基づいて、着火時から補正時までに流れたガス流量を計算し、当該流量に応じて制限時間を設定する。   After that, when the security unit 250 receives a correction request signal for the registered flow rate from the duration measurement unit 260 as shown in FIG. 2, the flow rate integration unit 210 integrates the gas usage at this time (referred to as correction). Calculate the value. Then, the security unit 250 calculates the gas flow rate that flows from the time of ignition to the time of correction based on the difference between the integrated value at the time of correction and the integrated value when there is a flow rate change read out through the storage unit 270, and Set the time limit according to the flow rate.

例えば、図12に示すように、着火時の流量が1000L/hであり、補正時の流量が600L/h(閾値Qd1に対応する)である場合において、流量積算部210は、補正時のガス流量600L/hの制限時間が660分(11時間)(図13参照)であることを踏まえ、流すことが可能なガスの総流量は下記式により算出される。
[数1]
600L/h×11時間=6600L
For example, as shown in FIG. 12, in the case where the flow rate during ignition is 1000 L / h and the flow rate during correction is 600 L / h (corresponding to the threshold value Qd1), the flow rate integrating unit 210 performs gas correction during correction. Considering that the limit time of the flow rate of 600 L / h is 660 minutes (11 hours) (see FIG. 13), the total flow rate of the gas that can be flowed is calculated by the following equation.
[Equation 1]
600L / h × 11 hours = 6600L

一方、保安部250は、記憶部270から読み出した着火時のガス流量を基に、当該着火時から補正時までに流れたガス流量が3000Lであると算出された場合(図12の斜線部分)、流すことができる残流量は下記式で計算される。
[数2]
6600L−3000L=3600L
On the other hand, the security unit 250 calculates, based on the gas flow rate at the time of ignition read from the storage unit 270, that the gas flow rate flowing from the ignition time to the correction time is 3000 L (shaded portion in FIG. 12). The remaining flow rate that can be flowed is calculated by the following equation.
[Equation 2]
6600L-3000L = 3600L

以上から、保安部250は、補正時に設定される制限時間を、上記残流量3600Lと閾値Qd1(600L/h)から以下のように算出する。
[数3]
3600L÷600L/h=6時間(360分)
From the above, the security unit 250 calculates the time limit set at the time of correction from the remaining flow rate 3600L and the threshold value Qd1 (600 L / h) as follows.
[Equation 3]
3600L ÷ 600L / h = 6 hours (360 minutes)

このように、保安部250により、着火時から補正時までの流量に応じて制限時間が設定されると、当該制限時間が継続時間計測部260のタイマにセットされスタートする。これ以降は前記実施例1と同様である。   Thus, when the time limit is set by the security unit 250 according to the flow rate from the time of ignition to the time of correction, the time limit is set in the timer of the duration measuring unit 260 and started. The subsequent steps are the same as in the first embodiment.

以上のような実施例3に係る制限時間の再設定処理によれば、着火時から補正時までに流れたガス流量の総和に応じて、遮断までの制限時間を調整することができるので、必要以上に長い制限時間の設定を防止することができ、さらには、ガス流量の増加も抑制することができるので、遮断までに係る必要電力を低減することが可能となる。なお、上記の制限時間の計算方法は一例であり、流量に応じた制限時間を示す表であったり、流量Qと制限時間tの関数t=f(Q)に基づいて制限時間を算出するものであっても構わない。   According to the resetting process of the time limit according to the third embodiment as described above, the time limit until the shut-off can be adjusted according to the sum of the gas flow rates flowing from the time of ignition to the time of correction. Since it is possible to prevent the setting of the time limit being longer than this, and furthermore, it is possible to suppress an increase in the gas flow rate, it is possible to reduce the required power required until the interruption. The time limit calculation method described above is an example, and is a table showing the time limit according to the flow rate, or the time limit is calculated based on a function t = f (Q) of the flow rate Q and the time limit t. It does not matter.

[2.3.登録流量の補正処理(ゆるやかな流量増加に対応)]
[2.3.1.実施例1]
次に、前記[2.1.登録流量の補正処理(ゆるやかな流量減少に対応)]で示した流量の減少とは逆に、ゆるやかな流量(例えば、3%)で増加する場合の実施例1に係る登録流量の補正処理について、図14〜16を参照して説明する。
[2.3. Registered flow rate correction processing (corresponding to a slow flow rate increase)]
[2.3.1. Example 1]
Next, [2.1. Registered flow rate correction processing (corresponding to a slow flow rate decrease)] Contrary to the flow rate decrease shown in FIG. 7, the registered flow rate correction processing according to the first embodiment when increasing at a slow flow rate (for example, 3%). This will be described with reference to FIGS.

なお、実施例1は、記憶部270に登録されている登録流量が1つの場合(かつ、器具が1台だけ使用されていると想定される場合)において、3%以上の流量変化がない状態から3%以上の流量変化が生じた際に、登録流量(例えば、200L/h)と流量変化直前の流量(例えば、600L/h)を比較し登録流量よりも大きい場合は、3%以下のゆるやかな流量上昇が発生していたと判断し、登録流量を前記流量変化直前の流量(600L/h)に補正することを特徴とする。以下、具体的に説明する。   In the first embodiment, when there is one registered flow rate registered in the storage unit 270 (and it is assumed that only one device is used), there is no flow rate change of 3% or more. When a flow rate change of 3% or more occurs, the registered flow rate (for example, 200 L / h) is compared with the flow rate immediately before the flow rate change (for example, 600 L / h). It is determined that a moderate flow rate increase has occurred, and the registered flow rate is corrected to the flow rate immediately before the flow rate change (600 L / h). This will be specifically described below.

図14に示す通り、まず、計測部100のガス流量センサ110により対象ガス流路を流れるガス流量(計測データ)Qiが取得されると、コントローラ200の平均流量算出部220は、このガス流量Qiに基づいて、所定の時間間隔毎の平均流量(例えば、30秒間毎の平均流量)Qaveを算出する(S1401)。   As shown in FIG. 14, first, when the gas flow rate (measurement data) Qi flowing through the target gas flow path is acquired by the gas flow rate sensor 110 of the measurement unit 100, the average flow rate calculation unit 220 of the controller 200 performs the gas flow rate Qi. Based on the above, an average flow rate (for example, an average flow rate every 30 seconds) Qave for each predetermined time interval is calculated (S1401).

そして、流量変化検出部230が、平均流量算出部220により算出された所定の時間間隔の前後の平均流量Qave(n)と平均流量Qave(n−1)の差分を算出し(S1402)、この差分が予め設定された閾値(例えば、3%)以上であるかを判定する(S1403)。   Then, the flow rate change detection unit 230 calculates the difference between the average flow rate Qave (n) and the average flow rate Qave (n−1) before and after the predetermined time interval calculated by the average flow rate calculation unit 220 (S1402). It is determined whether the difference is greater than or equal to a preset threshold value (eg, 3%) (S1403).

流量変化検出部230により、差分が予め設定された閾値(例えば、3%)以上である(流量変化有り)と判定された場合には(S1403のYES)、保安部250に対して、流量変化有り信号及び流量変化検出部230で検出した変化量(ΔQave(n))を送信する。そして、保安部250では、流量変化有り信号と、流量変化検出部230で検出した変化量を受信すると、下記のように記憶部270の個別流量テーブル271に登録されていた登録流量を補正する。   When the flow rate change detection unit 230 determines that the difference is equal to or greater than a preset threshold value (eg, 3%) (there is a flow rate change) (YES in S1403), the flow rate change is performed with respect to the security unit 250. The presence signal and the change amount (ΔQave (n)) detected by the flow rate change detection unit 230 are transmitted. When receiving the flow rate change signal and the change amount detected by the flow rate change detection unit 230, the security unit 250 corrects the registered flow rate registered in the individual flow rate table 271 of the storage unit 270 as described below.

すなわち、保安部250は、まず、個別流量テーブル271に登録されているガス流量は1つであるか否かを判定する(S1404)。そして、登録流量が1つと判定された場合には(S1404のYES)、その登録流量Q0と流量変化直前の流量Qave(n−1)とを比較し、当該流量変化直前の流量Qave(n−1)が登録流量Q0よりも大きい場合に、ゆるやかな流量(例えば、3%以下)上昇が発生していたと判断し、登録流量Q0を前記流量変化直前の流量Qave(n−1)に補正する(S1405)。   That is, the security unit 250 first determines whether there is one gas flow rate registered in the individual flow rate table 271 (S1404). If it is determined that there is one registered flow rate (YES in S1404), the registered flow rate Q0 is compared with the flow rate Qave (n−1) immediately before the flow rate change, and the flow rate Qave (n− immediately before the flow rate change). When 1) is larger than the registered flow rate Q0, it is determined that a moderate flow rate (for example, 3% or less) has risen, and the registered flow rate Q0 is corrected to the flow rate Qave (n-1) immediately before the flow rate change. (S1405).

例えば、図15に示す通り、平均流量算出部220により算出される平均流量Qave(n)が2000L/hであり、流量変化直前の流量Qave(n−1)が600L/hであり、記憶部270の個別流量テーブル271に登録されている1つの登録流量Q0が200L/hである場合においては、下記のように登録流量が補正される。すなわち、S1405において、流量変化直前の流量Qave(n−1)(600L/h)が、個別流量テーブル271の登録流量Q0(200L/h)よりも大きいと判定されるため、ゆるやかな流量(例えば、3%以下)上昇が発生していたと判断し、図16の通り、個別流量テーブル271の登録流量Q0(200L/h)を流量変化直前の流量(600L/h)に補正する。   For example, as shown in FIG. 15, the average flow rate Qave (n) calculated by the average flow rate calculation unit 220 is 2000 L / h, the flow rate Qave (n−1) immediately before the flow rate change is 600 L / h, and the storage unit When one registered flow rate Q0 registered in the individual flow rate table 271 of 270 is 200 L / h, the registered flow rate is corrected as follows. That is, in S1405, since it is determined that the flow rate Qave (n−1) (600 L / h) immediately before the flow rate change is larger than the registered flow rate Q0 (200 L / h) in the individual flow rate table 271, a gentle flow rate (for example, 3% or less), it is determined that an increase has occurred, and as shown in FIG. 16, the registered flow rate Q0 (200 L / h) in the individual flow rate table 271 is corrected to the flow rate immediately before the flow rate change (600 L / h).

なお、上記のように登録流量Q0が前記流量変化直前の流量Qave(n−1)に補正れた後は、[2.1.登録流量の補正処理(ゆるやかな流量減少に対応)]と同様に、前記[2.2.登録流量補正後の制限時間の再設定処理]による制限時間の再設定処理が行われる。   After the registered flow rate Q0 is corrected to the flow rate Qave (n−1) immediately before the flow rate change as described above, [2.1. Similarly to [Registered flow rate correction process (corresponding to a gentle decrease in flow rate)], the above-mentioned [2.2. The time limit resetting process is performed by [Reset time limit processing after correction of registered flow rate].

以上のような実施例1に係る登録流量の補正処理によれば、例えば、3%以上の流量変化が検出され、その後、3%以下のゆるやかな流量で増加した場合であっても、登録流量を流量変化直前の流量に補正することができる。すなわち、2台目に器具が着火し消化する場合において、当該2台目が着火する前に発生した1台目の器具の比例制御による3%以下の流量上昇を考慮して、登録流量を補正し制限時間を設定することができる。   According to the registered flow rate correction process according to the first embodiment as described above, for example, even when a flow rate change of 3% or more is detected and then increased at a moderate flow rate of 3% or less, the registered flow rate is increased. Can be corrected to the flow rate immediately before the flow rate change. In other words, when a second instrument ignites and digests, the registered flow rate is corrected in consideration of a flow rate increase of 3% or less due to proportional control of the first instrument that occurred before the second instrument ignited. A time limit can be set.

[2.3.2.実施例2]
また、図17〜19を参照して、ゆるやかな流量(例えば、3%以下)増加により、図13に示す制限時間テーブルの区分が変更した場合の個別流量テーブル271に登録されている実施例2に係る登録流量の補正処理について以下に説明する。なお、実施例2では、ゆるやかな流量増加(3%以下)により流量変化が検出されない状況下で、記憶部270に記憶された制限時間テーブルの区分が変更した場合の登録流量の補正処理について説明する。
[2.3.2. Example 2]
In addition, referring to FIGS. 17 to 19, the second embodiment registered in the individual flow rate table 271 when the division of the time limit table shown in FIG. 13 is changed due to a moderate increase in flow rate (for example, 3% or less). The registered flow rate correction process according to the above will be described below. In the second embodiment, the correction process of the registered flow rate when the classification of the time limit table stored in the storage unit 270 is changed in a situation where the flow rate change is not detected due to a moderate flow rate increase (3% or less) will be described. To do.

まず、図17に示す通り、上記実施例1と同様に、計測部100のガス流量センサ110により対象ガス流路を流れるガス流量(計測データ)Qiが取得されると、コントローラ200の平均流量算出部220は、このガス流量Qiに基づいて、所定の時間間隔毎の平均流量(例えば、30秒間毎の平均流量)Qaveを算出する(S1701)。   First, as shown in FIG. 17, when the gas flow rate (measurement data) Qi flowing through the target gas flow path is acquired by the gas flow rate sensor 110 of the measurement unit 100 as in the first embodiment, the average flow rate calculation of the controller 200 is performed. The unit 220 calculates an average flow rate (for example, an average flow rate every 30 seconds) Qave at predetermined time intervals based on the gas flow rate Qi (S1701).

そして、流量変化検出部230が、平均流量算出部220により算出された所定の時間間隔の前後の平均流量Qave(n)と平均流量Qave(n−1)の差分を算出し(S1702)、この差分が予め設定された閾値(例えば、3%)以上であるかを判定する(S1703)。   Then, the flow rate change detection unit 230 calculates the difference between the average flow rate Qave (n) and the average flow rate Qave (n−1) before and after the predetermined time interval calculated by the average flow rate calculation unit 220 (S1702). It is determined whether the difference is greater than or equal to a preset threshold value (eg, 3%) (S1703).

流量変化検出部230により、差分が予め設定された閾値(例えば、3%)を下回る(流量変化無し)と判定された場合には(S1703のNO)、保安部250に対して流量変化無し信号及び流量変化検出部230で検出した変化量(ΔQave(n))を送信する。そして、保安部250では、流量変化無し信号と、流量変化検出部230で検出した変化量を受信すると、記憶部270の個別流量テーブル271に登録された登録流量は下記のように補正される。   When the flow rate change detection unit 230 determines that the difference falls below a preset threshold value (for example, 3%) (no flow rate change) (NO in S1703), the flow rate change not signal is sent to the security unit 250. The change amount (ΔQave (n)) detected by the flow rate change detection unit 230 is transmitted. Then, when the security unit 250 receives the no flow rate change signal and the change amount detected by the flow rate change detection unit 230, the registered flow rate registered in the individual flow rate table 271 of the storage unit 270 is corrected as follows.

すなわち、保安部250は、まず、個別流量テーブル271に登録されている登録流量は1つであるか否かを判定し(S1704)、登録流量が1つの場合には(S1704のYES)、この登録流量Q0と検出した平均流量Qave(n)とを比較する(S1705)。この平均流量Qave(n)が登録流量Q0よりも大きい場合には(S1705のYES)、保安部250は、登録流量Q0を平均流量Qave(n)に補正する(S1706)。   That is, the security unit 250 first determines whether there is one registered flow rate registered in the individual flow rate table 271 (S1704). If there is one registered flow rate (YES in S1704), The registered flow rate Q0 is compared with the detected average flow rate Qave (n) (S1705). When the average flow rate Qave (n) is larger than the registered flow rate Q0 (YES in S1705), the security unit 250 corrects the registered flow rate Q0 to the average flow rate Qave (n) (S1706).

例えば、図18及び19に示す通り、平均流量算出部220により算出される平均流量Qave(n)が301L/hであり、流量変化直前の流量Qave(n−1)が200L/hであり、記憶部270の個別流量テーブル271に登録されている1つの登録流量Q0が200L/hである場合においては、次のように登録流量が補正される。すなわち、S1705において、平均流量Qave(n)(301L/h)は個別流量テーブル271の登録流量Q0(200L/h)よりも大きいと判定されるため、図18の(A)の時点で、個別流量テーブル271が図19に示すように補正される。   For example, as shown in FIGS. 18 and 19, the average flow rate Qave (n) calculated by the average flow rate calculation unit 220 is 301 L / h, the flow rate Qave (n−1) immediately before the flow rate change is 200 L / h, When one registered flow rate Q0 registered in the individual flow rate table 271 of the storage unit 270 is 200 L / h, the registered flow rate is corrected as follows. That is, in S1705, it is determined that the average flow rate Qave (n) (301 L / h) is larger than the registered flow rate Q0 (200 L / h) in the individual flow rate table 271, so that the individual flow rate Qave (n) (301 L / h) is The flow rate table 271 is corrected as shown in FIG.

つまり、図19の通り、個別流量テーブル271の登録流量Q0(200L/h)が平均流量Qave(n)(301L/h)に補正される。また、図17に示す通り、その後、上記実施例1のように、流量変化検出部230により流量変化有りが検出される場合には、図14のS1403〜1405と同様の補正処理が行われる(S1707、1708)。   That is, as shown in FIG. 19, the registered flow rate Q0 (200 L / h) in the individual flow rate table 271 is corrected to the average flow rate Qave (n) (301 L / h). Further, as shown in FIG. 17, when the flow rate change detecting unit 230 detects that there is a change in the flow rate as in the first embodiment, correction processing similar to S1403-1405 in FIG. S1707, 1708).

なお、上記のように登録流量Q0が平均流量Qave(n)に補正れた後は、[2.1.登録流量の補正処理(ゆるやかな流量減少に対応)]と同様に、前記[2.2.登録流量補正後の制限時間の再設定処理]による制限時間の再設定処理が行われる。   After the registered flow rate Q0 is corrected to the average flow rate Qave (n) as described above, [2.1. Similarly to [Registered flow rate correction process (corresponding to a gentle decrease in flow rate)], the above-mentioned [2.2. The time limit resetting process is performed by [Reset time limit processing after correction of registered flow rate].

以上のような実施例2に係る制限時間の再設定処理によれば、例えば、3%以上の流量変化が検出されな状況下で、その後、3%以下のゆるやか流量で増加した場合であっても、登録流量を補正することができるので、実際のガス流量に対して適切な制限時間を設定できる。   According to the resetting process of the time limit according to the second embodiment as described above, for example, in a situation where a flow rate change of 3% or more is not detected, and thereafter the flow rate increases gradually at 3% or less. Since the registered flow rate can be corrected, an appropriate time limit can be set for the actual gas flow rate.

[他の実施形態]
なお、本発明は、上記のような登録流量補正判定部280を有する実施形態に限定するものではなく、下記のような構成を有する実施形態も包含する。
[Other Embodiments]
In addition, this invention is not limited to embodiment which has the above registration flow correction | amendment determination parts 280, The embodiment which has the following structures is also included.

すなわち、図20に示す通り、登録流量補正判定部280は、記憶部270に登録された登録流量の最大値Q0と平均流量算出部220により算出された平均流量Qaveとの差分(Q0−Qave)を計算する演算手段283と、当該演算手段283により計算された差分が、予め設定された閾値Qd2(例えば、400L/h)以上であるかを判定する判定手段284と、を備えている。この判定手段284は、差分が閾値Qd2以上であると判定する場合に、保安部250に対して登録流量補正要求信号を出力する機能を備えている。   That is, as shown in FIG. 20, the registered flow rate correction determination unit 280 has a difference (Q0−Qave) between the maximum value Q0 of the registered flow rate registered in the storage unit 270 and the average flow rate Qave calculated by the average flow rate calculation unit 220. And a determination unit 284 that determines whether the difference calculated by the calculation unit 283 is equal to or greater than a preset threshold value Qd2 (for example, 400 L / h). The determination unit 284 has a function of outputting a registered flow rate correction request signal to the security unit 250 when determining that the difference is equal to or greater than the threshold value Qd2.

このような登録流量補正判定部280の構成を踏まえた登録流量の補正処理について、図21を参照して以下に説明する。
まず、図21に示す通り、計測部100のガス流量センサ110により対象ガス流路を流れるガス流量(の計測データ)Qiが取得されると、コントローラ200の平均流量算出部220は、このガス流量Qiに基づいて、所定の時間間隔毎の平均流量(例えば、30秒間毎の平均流量)Qaveを算出する(S2101)。
A registered flow rate correction process based on the configuration of the registered flow rate correction determination unit 280 will be described below with reference to FIG.
First, as shown in FIG. 21, when the gas flow rate (measurement data) Qi flowing through the target gas flow path is acquired by the gas flow rate sensor 110 of the measurement unit 100, the average flow rate calculation unit 220 of the controller 200 Based on Qi, an average flow rate (for example, an average flow rate every 30 seconds) Qave for each predetermined time interval is calculated (S2101).

登録流量補正判定部280の演算手段283は、記憶部270に登録された登録流量の最大値Q0と平均流量算出部220により算出された平均流量Qaveとの差分(Q0−Qave)を計算する(S2102)。そして、判定手段284は、この演算手段283により計算された差分が予め設定された閾値Qd2(例えば、400L/h)以上であるかを判定する(S2103)。この判定手段284は、差分が閾値Qd2以上であると判定する場合に(S2103のYES)、保安部250に対して登録流量補正要求信号を出力する。   The calculation means 283 of the registered flow rate correction determination unit 280 calculates a difference (Q0−Qave) between the maximum value Q0 of the registered flow rate registered in the storage unit 270 and the average flow rate Qave calculated by the average flow rate calculation unit 220 ( S2102). Then, the determination unit 284 determines whether the difference calculated by the calculation unit 283 is greater than or equal to a preset threshold value Qd2 (for example, 400 L / h) (S2103). When determining that the difference is equal to or greater than the threshold value Qd2 (YES in S2103), the determination unit 284 outputs a registered flow rate correction request signal to the security unit 250.

保安部250は、登録流量補整判定部280からの補正要求信号を検出すると、記憶部270の個別流量テーブル271に登録されている個別流量Q0〜Q4を全て削除し、新たに現在の平均流量Qaveを最大流量Q0として登録する(S2104、S2105)。その後、上述した[2.2.登録流量補正後の制限時間の再設定処理]が行われる(S2106)。   When the security unit 250 detects the correction request signal from the registered flow rate correction determination unit 280, the security unit 250 deletes all the individual flow rates Q0 to Q4 registered in the individual flow rate table 271 of the storage unit 270 and newly adds the current average flow rate Qave. Is registered as the maximum flow rate Q0 (S2104, S2105). After that, [2.2. The process of resetting the time limit after correcting the registered flow rate] is performed (S2106).

なお、S2103において、判定手段により、差分が予め設定された閾値Qd2(例えば、400L/h)以上でないと判定された場合には(S2103のNO)、上記S2101〜2102が、取得したガス流量Qiに基づいて算出される平均流量の時間間隔毎に繰り返される。   In S2103, when it is determined by the determination means that the difference is not equal to or greater than a preset threshold value Qd2 (for example, 400 L / h) (NO in S2103), the above S2101 to 2102 indicate the acquired gas flow rate Qi. It repeats for every time interval of the average flow calculated based on.

100・・・計測部
110・・・ガス流量センサ
120・・・各種センサ
200・・・コントローラ
210・・・流量積算部
220・・・平均流量算出部
230・・・流量変化検出部
240・・・表示部
250・・・保安部
260・・・継続時間計測部
261・・・登録流量補正判定タイマ
270・・・記憶部
271・・・個別流量テーブル
280・・・登録流量補整判定部
280・・・登録流量補正判定部
281・・・判定手段
282・・・カウンタ手段
283・・・演算手段
284・・・判定手段
300・・・遮断弁
100 ... Measurement unit 110 ... Gas flow rate sensor 120 ... Various sensors 200 ... Controller 210 ... Flow rate integration unit 220 ... Average flow rate calculation unit 230 ... Flow rate change detection unit 240 ... Display unit 250 ... Security unit 260 ... Duration measurement unit 261 ... Registered flow rate correction determination timer 270 ... Storage unit 271 ... Individual flow rate table 280 ... Registered flow rate correction determination unit 280 ..Registered flow rate correction determination unit 281... Determination unit 282 .. counter unit 283... Calculation unit 284.

Claims (8)

ガス流量を監視し、登録した登録流量の流量区分に応じて予め設定された使用制限時間を設定し、当該使用制限時間を超えて使用した場合に遮断弁によりガスを遮断するガスメータであって、
ガス流量を検出する流量検出手段と、
前記流量検出手段により検出されたガス流量を所定の時間間隔で平均化することで平均流量を算出する平均流量算出手段と、
前記所定の時間間隔前後の前記平均流量の変化量を算出し、当該変化量が流量変化に相当する第1の閾値以上であるかを判定する流量変化判定手段と、
前記流量変化判定手段により前記変化量が第1の閾値以上であると判定された場合に、この変化の増減方向に基づいて前記変化量を登録又は削除する登録手段と、
前記登録手段により登録された前記変化量である登録流量を補正する補正手段と、を備え、
前記補正手段は、
前記平均流量算出手段により算出された平均流量がゆるやかな流量変化に相当する第2の閾値以下であるかを判定する判定手段と、
前記平均流量が連続して前記判定手段により第2の閾値以下であると判定される回数をカウントし、このカウントされた回数が所定の設定回数に達するかを判定するカウンタ手段と、を有し、
前記カウンタ手段により所定の設定回数に達すると判定された場合に、前記登録流量を当該平均流量に補正することを特徴とするガスメータ。
A gas meter that monitors the gas flow rate, sets a preset use time limit according to the registered flow rate classification of the registered flow rate, and shuts off the gas with a shut-off valve when used beyond the use limit time,
A flow rate detecting means for detecting a gas flow rate;
An average flow rate calculating means for calculating an average flow rate by averaging the gas flow rates detected by the flow rate detecting means at predetermined time intervals;
A flow rate change determination means for calculating a change amount of the average flow rate before and after the predetermined time interval and determining whether the change amount is equal to or more than a first threshold corresponding to the flow rate change;
A registration unit that registers or deletes the change amount based on an increase / decrease direction of the change when the change amount is determined by the flow rate change determination unit to be equal to or greater than a first threshold;
Correction means for correcting a registered flow rate that is the amount of change registered by the registration means,
The correction means includes
A determination unit that determines whether the average flow rate calculated by the average flow rate calculation unit is equal to or less than a second threshold corresponding to a gradual flow rate change;
Counter means for counting the number of times that the average flow rate is continuously determined to be equal to or less than a second threshold by the determination means, and determining whether the counted number reaches a predetermined set number of times. ,
A gas meter that corrects the registered flow rate to the average flow rate when it is determined by the counter means that a predetermined set number of times is reached.
前記補正手段は、所定の周期で前記登録流量の補正を行うことを特徴とする請求項1に記載のガスメータ。   The gas meter according to claim 1, wherein the correction unit corrects the registered flow rate at a predetermined period. 前記補正手段は、前記登録流量の流量区分に対応する使用制限時間満了の所定時間前に補正を行うことを特徴とする請求項1に記載のガスメータ。   The gas meter according to claim 1, wherein the correction unit performs correction before a predetermined time before expiration of a use restriction time corresponding to a flow rate classification of the registered flow rate. 前記補正手段による補正時を基準として、前記使用制限時間を設定する設定手段を備えることを特徴とする請求項1〜のいずれか1項に記載のガスメータ。 Wherein based on the time correction by the correction means, according to any one of claims 1 to 3, characterized in that it comprises a setting means for setting the use time limit gas meter. 前記流量変化判定手段による前記変化量が第1の閾値以上であるとの判定時を基準として、前記使用制限時間を設定する設定手段を備えることを特徴とする請求項1〜のいずれか1項に記載のガスメータ。 Based on the time determination of the amount of change by the flow change determination unit is equal to or greater than the first threshold value, any one of claims 1-3, characterized in that it comprises a setting means for setting the use time limit 1 The gas meter according to item. 前記平均流量を積算することで積算値を算出する流量積算手段と、
前記流量変化判定手段による前記変化量が第1の閾値以上であるとの判定時の前記積算値と前記補正手段による補正時の前記積算値とに基づいて、前記使用制限時間を算出する使用制限時間算出手段と、を備えることを特徴とする請求項1〜のいずれか1項に記載のガスメータ。
Flow rate integration means for calculating an integrated value by integrating the average flow rate; and
A use restriction that calculates the use restriction time based on the integrated value at the time of determination that the amount of change by the flow rate change determination means is equal to or greater than a first threshold and the integrated value at the time of correction by the correction means. gas meter according to any one of claims 1 to 3, characterized in that it comprises a time calculation means.
前記使用制限時間算出手段は、
前記変化量が所定の閾値以上であるとの判定時の前記積算値と前記補正手段による補正時の前記積算値から当該判定時から補正時までの使用流量を算出し、
前記補正手段による補正後の前記登録流量に、当該登録流量に対応する前記使用制限時間を乗算することで総流量を算出し、
前記総流量から前記判定時から補正時までの使用流量を減算後、前記補正後の登録流量で除算することにより使用制限時間を算出することを特徴とする請求項に記載のガスメータ。
The use time limit calculating means is:
From the integrated value at the time of determination that the amount of change is equal to or greater than a predetermined threshold and the integrated value at the time of correction by the correction unit, the flow rate used from the determination time to the correction time is calculated,
The total flow rate is calculated by multiplying the registered flow rate corrected by the correction means by the use time limit corresponding to the registered flow rate,
7. The gas meter according to claim 6 , wherein the use time limit is calculated by subtracting the use flow rate from the determination time to the correction time from the total flow rate and then dividing the subtraction by the corrected registered flow rate.
ガス流量を監視し、登録した登録流量の流量区分に応じて予め設定された使用制限時間を設定し、当該使用制限時間を超えて使用した場合に遮断弁によりガスを遮断するようにガスメータをコンピュータにより制御するガスメータの制御方法であって、
前記コンピュータは、
ガス流量を検出する流量検出ステップと、
前記流量検出ステップで検出されたガス流量を所定の時間間隔で平均化することで平均流量を算出する平均流量算出ステップと、
前記所定の時間間隔前後の前記平均流量の変化量を算出し、当該変化量が流量変化に相当する第1の閾値以上であるかを判定する流量変化判定ステップと、
前記流量変化判定ステップで前記変化量が第1の閾値以上であると判定された場合に、この変化の増減方向に基づいて前記変化量を登録又は削除する登録ステップと、
前記登録ステップで登録された前記変化量である登録流量を補正する補正ステップと、を実行し、
前記補正ステップは、
前記平均流量算出ステップで算出された平均流量がゆるやかな流量変化に相当する第2の閾値以下であるかを判定する判定処理と、
前記平均流量が連続して前記判定処理により第2の閾値以下であると判定される回数をカウントし、このカウントされた回数が所定の設定回数に達するかを判定するカウンタ処理と、を有し、
前記カウンタ処理により所定の設定回数に達すると判定された場合に、前記登録流量を当該平均流量に補正することを特徴とするガスメータの制御方法。
Monitoring the gas flow rate, and set the usage time limit that is set in advance according to the flow rate class of the registered flow rate registered, computer gas meter so as to block the gas by shut-off valve when used beyond the use time limit A gas meter control method controlled by
The computer
A flow rate detecting step for detecting a gas flow rate;
An average flow rate calculating step for calculating an average flow rate by averaging the gas flow rates detected in the flow rate detection step at predetermined time intervals;
A flow rate change determination step of calculating a change amount of the average flow rate before and after the predetermined time interval and determining whether the change amount is equal to or more than a first threshold corresponding to the flow rate change;
A registration step of registering or deleting the change amount based on an increase / decrease direction of the change when the change amount is determined to be greater than or equal to a first threshold in the flow rate change determination step;
A correction step of correcting a registered flow rate that is the change amount registered in the registration step, and
The correction step includes
A determination process for determining whether the average flow rate calculated in the average flow rate calculation step is equal to or less than a second threshold corresponding to a gradual flow rate change;
A counter process for counting the number of times that the average flow rate is continuously determined to be less than or equal to a second threshold value by the determination process, and determining whether the counted number reaches a predetermined set number of times. ,
A gas meter control method, comprising: correcting the registered flow rate to the average flow rate when it is determined by the counter process that a predetermined set number of times is reached.
JP2009085870A 2009-03-31 2009-03-31 Gas meter and control method thereof Active JP5296591B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2009085870A JP5296591B2 (en) 2009-03-31 2009-03-31 Gas meter and control method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2009085870A JP5296591B2 (en) 2009-03-31 2009-03-31 Gas meter and control method thereof

Publications (2)

Publication Number Publication Date
JP2010237060A JP2010237060A (en) 2010-10-21
JP5296591B2 true JP5296591B2 (en) 2013-09-25

Family

ID=43091508

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2009085870A Active JP5296591B2 (en) 2009-03-31 2009-03-31 Gas meter and control method thereof

Country Status (1)

Country Link
JP (1) JP5296591B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5857179B2 (en) * 2011-05-20 2016-02-10 パナソニックIpマネジメント株式会社 Gas shut-off device

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005265530A (en) * 2004-03-17 2005-09-29 Matsushita Electric Ind Co Ltd Gas shut-off device
JP5171142B2 (en) * 2007-07-24 2013-03-27 矢崎エナジーシステム株式会社 Gas meter
JP5235531B2 (en) * 2008-06-26 2013-07-10 リコーエレメックス株式会社 Gas meter

Also Published As

Publication number Publication date
JP2010237060A (en) 2010-10-21

Similar Documents

Publication Publication Date Title
CN101743441B (en) Gas cut-off device
EP2369233B1 (en) Gas shut-off device
US8386084B2 (en) Gas shutoff device
US20120016527A1 (en) Gas shutoff device
JP2007192774A (en) Flowmeter
CN102144130B (en) Gas circuit breaker
JP5296591B2 (en) Gas meter and control method thereof
JP4956342B2 (en) Gas shut-off device
JP5269440B2 (en) Gas meter and gas security system
JP5662493B2 (en) Gas shut-off device, flow rate change determination method therefor, and controller for gas shut-off device
JP2010008200A (en) Gas meter
CN219243902U (en) Water storage type water heater
JP5563202B2 (en) Gas leak detection device and method, and controller for gas leak detection device
JP3963745B2 (en) Gas consumption estimation method and system
JP4626606B2 (en) Gas shut-off device
JP5125077B2 (en) Gas shut-off device
JP4622996B2 (en) Gas shut-off device
JP2009299931A (en) Gas shutoff device, flow variation determining method by the same, and controller for gas shutoff device
JP5046057B2 (en) Gas shut-off device
JP4893523B2 (en) Gas shut-off device and gas supply system
JP2009168703A (en) Flow measuring device and program thereof
JP5186759B2 (en) Gas shut-off device
JP2010008186A (en) Gas meter
JP5493610B2 (en) Gas shut-off device
JP2002090200A (en) Gas metering device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20111226

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20130226

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20130305

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20130425

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20130514

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20130613

R150 Certificate of patent or registration of utility model

Ref document number: 5296591

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250