Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP5348197B2 - Synthetic wall structure - Google Patents
[go: Go Back, main page]

JP5348197B2 - Synthetic wall structure - Google Patents

Synthetic wall structure Download PDF

Info

Publication number
JP5348197B2
JP5348197B2 JP2011170646A JP2011170646A JP5348197B2 JP 5348197 B2 JP5348197 B2 JP 5348197B2 JP 2011170646 A JP2011170646 A JP 2011170646A JP 2011170646 A JP2011170646 A JP 2011170646A JP 5348197 B2 JP5348197 B2 JP 5348197B2
Authority
JP
Japan
Prior art keywords
steel
wall
bolt
retaining wall
sheet pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2011170646A
Other languages
Japanese (ja)
Other versions
JP2012012932A (en
Inventor
淳 岡田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Steel Corp
Original Assignee
JFE Steel Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JFE Steel Corp filed Critical JFE Steel Corp
Priority to JP2011170646A priority Critical patent/JP5348197B2/en
Publication of JP2012012932A publication Critical patent/JP2012012932A/en
Application granted granted Critical
Publication of JP5348197B2 publication Critical patent/JP5348197B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Description

本発明は、土木・建築構造物に用いられる、鋼製土留め壁と鉄筋コンクリート壁からなる合成壁構造に関する。   The present invention relates to a composite wall structure including a steel retaining wall and a reinforced concrete wall used for civil engineering and building structures.

鋼矢板や鋼管矢板などを連結して構成した鋼製土留め壁と鉄筋コンクリート壁からなる合成壁の構築方法として、まず、鋼製土留め壁を地中に打設し、次に、鋼製土留め壁の内側を掘削して、鉄筋コンクリート壁との接合面に頭付きスタッドなどのずれ止めを溶接し、配筋後、型枠を組んでコンクリートを打設して、一体化する方法が一般的に行われている。   As a method of constructing a composite wall consisting of a steel retaining wall and a reinforced concrete wall constructed by connecting steel sheet piles and steel pipe sheet piles, the steel retaining wall is first placed in the ground, and then the steel soil retaining wall is constructed. A common method is to excavate the inside of the retaining wall and weld a stopper such as a headed stud to the joint surface with the reinforced concrete wall. Has been done.

図10は、特許文献1記載の合成土留め壁構造を示し、鋼製土留め壁100を地中に打設し、鋼製土留め壁100の内側を掘削した後で、鋼製土留め壁100に複数のずれ止め材300とずれ止め兼用せん断補強筋400をスタッド溶接により固定し、さらに複数の配力筋を配置して、コンクリートを打設し、鉄筋コンクリート壁200を構築している。   FIG. 10 shows a composite earth retaining wall structure described in Patent Document 1, in which a steel earth retaining wall 100 is placed in the ground and the inside of the steel earth retaining wall 100 is excavated, and then the steel earth retaining wall. A plurality of anti-slipping materials 300 and anti-slipping shear reinforcement bars 400 are fixed to 100 by stud welding, and a plurality of force distribution bars are arranged to place concrete, thereby constructing a reinforced concrete wall 200.

図11(a)、(b)は、特許文献2記載のソイルセメント柱列壁を利用した合成地下壁の構築方法を示し、土留め壁の芯材500の表面に短いネジ切りボルト600をあらかじめ溶接で取り付け、ネジ切りボルト600に保護キャップ700を設置し、ソイルセメント柱列壁を構築した後(図11(a))、芯材500の表面までソイルセメント1000を除去し、保護キャップ700を外し、ネジ切りボルト600にジョイントカプラー800、ネジ切りコネクター900を順次取り付けて、ずれ止め材を形成した後、コンクリート1100を打設する(図11(b))。   11 (a) and 11 (b) show a method for constructing a synthetic underground wall using a soil cement column wall described in Patent Document 2, and a short threaded bolt 600 is previously placed on the surface of the core material 500 of the retaining wall. After mounting by welding and installing the protective cap 700 on the threaded bolt 600 and constructing the soil cement column wall (FIG. 11A), the soil cement 1000 is removed to the surface of the core material 500, and the protective cap 700 is attached. The joint coupler 800 and the threaded connector 900 are sequentially attached to the threaded bolt 600 to form a slip prevention material, and then the concrete 1100 is placed (FIG. 11B).

特開平7−310365号公報Japanese Patent Laid-Open No. 7-310365 特開平7−48846号公報JP 7-48846 A

しかしながら、図10に示した特許文献1記載の合成土留め壁構造は、鋼製土留め壁100を地中に打設し、鋼製土留め壁100の内側を掘削した後で、複数のずれ止め材300とずれ止め兼用せん断補強筋400を横向きのスタッド溶接により固定しなければならない。   However, the composite retaining wall structure described in Patent Document 1 shown in FIG. 10 has a plurality of misalignments after the steel retaining wall 100 is placed in the ground and the inside of the steel retaining wall 100 is excavated. The stopper member 300 and the shear-preventing shear reinforcing bar 400 must be fixed by lateral stud welding.

横向きのスタッド溶接は、作業姿勢が横向きなること、重力の影響で溶融金属の偏りが生じることなどにより、下向き溶接に比べて施工性および施工品質が悪くなるため、日本建築学会の「鉄骨工事技術指針・工事現場施工編1996改定版」には、横向きのスタッド溶接に対しては、望ましくは軸径16mm以下のスタッドに限定することと記載されている。   Lateral stud welding has poor workability and construction quality compared to downward welding due to the fact that the working posture is sideways and the molten metal is biased under the influence of gravity. The “Guideline / Construction site construction edition 1996 revised edition” states that for lateral stud welding, it is preferably limited to studs with a shaft diameter of 16 mm or less.

従って、作用力が大きくなり、軸径19mm、軸径22mmのスタッドが必要となるケースに、特許文献1記載の合成土留め壁構造を適用することは困難である。また、大深度地下壁の構築などで深度が大きくなる場合には、さらに作用力が大きくなるため、設計上軸径30mm程度以上のスタッドが必要となるケースも想定され、この場合、横向きのスタッド溶接の適用は施工性の面から事実上不可能となる。   Therefore, it is difficult to apply the composite earth retaining wall structure described in Patent Document 1 to a case where the acting force becomes large and a stud having a shaft diameter of 19 mm and a shaft diameter of 22 mm is required. In addition, when the depth increases due to construction of a deep underground wall or the like, the acting force increases further, so there is a case where a stud with a shaft diameter of about 30 mm or more is required in the design. Welding is virtually impossible from the viewpoint of workability.

また、特許文献2記載のソイルセメント柱列壁は、ネジ切りボルト600、保護キャップ700、ジョイントカプラー800、ネジ切りコネクター900でずれ止め材を構成する必要があり、部品数が多いため作業工数が多くかかり、また現場での作業が煩雑となる。   In addition, the soil cement column wall described in Patent Document 2 needs to constitute a detent material by the threaded bolt 600, the protective cap 700, the joint coupler 800, and the threaded connector 900, and the number of parts is large, so the work man-hours are large. It takes a lot of work and the work at the site becomes complicated.

これらの部品は汎用品でないため、加工および製作コストが割高で、さらに、ネジ切りボルト600の全長が50mm程度と比較的長いため、傷がついたり、変形したりしないように、ネジ切りボルト回りの掘削を慎重に行う必要があり、掘削作業に時間を要する。これらの欠点は、軸径が大きくなるほど助長され、特に軸径30mm程度以上では、加工および製作コストの面から、適用は困難であると考えられる。   Since these parts are not general-purpose products, the processing and manufacturing costs are high, and the total length of the threaded bolt 600 is relatively long at about 50 mm, so that the threaded bolt is not damaged or deformed. It is necessary to perform excavation carefully, and excavation work takes time. These disadvantages are promoted as the shaft diameter increases, and it is considered that application is difficult from the viewpoint of processing and manufacturing costs, especially when the shaft diameter is about 30 mm or more.

そこで本発明は、上記課題を解決した合成壁構造を提供することを目的とする。   Therefore, an object of the present invention is to provide a composite wall structure that solves the above problems.

本発明の課題は以下の手段で達成可能である。
1.鋼製土留め壁と鉄筋コンクリート壁からなる合成壁であって、前記鋼製土留め壁を挿通する軸径22〜36mmの表面ナット付きずれ止め用ボルトが、前記表面ナットと、前記鋼製土留め壁に固定された裏面ナットとの間で螺着するようにして、前記鋼製土留め壁を打設する際に用いた仮ボルト用ボルト孔を挿通して、前記鋼製土留め壁に固定され、該表面ナット付きずれ止め用ボルトが、前記鋼製土留め壁と前記鉄筋コンクリート壁のずれ止めとして機能することを特徴とする合成壁構造。
2.前記鋼製土留め壁は、フランジ部とウェブ部を有する鋼矢板で構成され、前記鋼矢板のウェブ部に前記表面ナット付きずれ止め用ボルトが固定されていることを特徴とする1記載の合成壁構造。
3.前記鋼製土留め壁は、鋼管矢板で構成されていることを特徴とする1記載の合成壁構造。
The object of the present invention can be achieved by the following means.
1. A synthetic wall composed of a steel earth retaining wall and a reinforced concrete wall, and a locking bolt with a surface nut having a shaft diameter of 22 to 36 mm, which is inserted through the steel earth retaining wall, includes the surface nut and the steel earth retaining wall. It is screwed between the back nut fixed to the wall, and the bolt hole for temporary bolt used when placing the steel earth retaining wall is inserted and fixed to the steel earth retaining wall. A composite wall structure, wherein the locking bolt with a surface nut functions as a locking between the steel earth retaining wall and the reinforced concrete wall.
2. The composite steel wall according to claim 1, wherein the steel earth retaining wall is composed of a steel sheet pile having a flange portion and a web portion, and the locking bolt with a surface nut is fixed to the web portion of the steel sheet pile. Wall structure.
3. The synthetic wall structure according to 1, wherein the steel earth retaining wall is formed of a steel pipe sheet pile.

本発明によれば以下の効果が得られ、産業上極めて有用である。
1.仮ボルト、本設用ボルト、裏面ナット、表面ナット、座金は、例えば市販品のボルトセットなどを用いることができるため、コストを抑えられ、かつ調達が容易である.たとえば日本橋梁建設協会の「’01デザインデータブック 改定3版 2003年」には、JIS B 1180、JIS B 1181、JIS B 1256の六角ボルト、六角ナット、および座金として軸径6mm〜軸径80mm、JIS B 1186の高力ボルト、ナット、および座金として軸径10mm〜軸径36mmが記載されている。
2.突出部である仮ボルトの頭部の高さ、裏面ナットの高さが低いため、鋼製土留め壁を地中に打設する際にほとんど抵抗とならない。
3.また、仮ボルトおよび裏面ナットが鋼製土留め壁に固定されているため、これらが打設時にほとんど変形を生じない。さらに、鋼製土留め壁の内側を掘削する際にも、仮ボルトの頭部の高さが小さいため、掘削作業が迅速に行える。
4.裏面ナットが溶接などにより固定されているため、鋼製土留め壁の内側からの作業のみで、仮ボルトから本設用ボルトへの差し替えを行うことができる。すなわち、片側からのボルト施工が可能となる。
5.また、仮ボルトから本設用ボルトへの差し替えは、例えば電動トルクレンチなどを用いることにより、精度よく、迅速かつ容易に作業できる。
6.鋼製土留め壁の内側を掘削した後に、施工性および施工品質が悪い横向きのスタッド溶接を行う必要がないため、軸径24mm、軸径30mm、軸径36mmなど、太径で高い耐力が得られるボルトの適用が可能となる。
7.以上より、コスト削減、現場での施工性および施工品質の向上、工期短縮、鋼製土留め壁と鉄筋コンクリート壁の接合部の耐力向上の効果が得られる。
8.さらに、鋼製土留め壁の裏面に板部材を付加する場合には、鋼製土留め壁を地中に打設する際に、鋼製土留め壁の剛性を高め、鋼製土留め壁の変形や座屈が防止される。
9.また、鋼製土留め壁と鉄筋コンクリート壁が一体となった合成壁においては、板部材が外縁側になるため、土圧や水圧などによる曲げモーメントなどの作用力に対して効率よく抵抗することができる。
10.深度が大きくなり土圧や水圧などによる作用力が増大する場合、あるいはスラブや基礎との接合部で局部的に大きな力を生じる場合であっても、作用力が大きい部分に板部材を設置して部分的に耐力を大きくすることができる。
According to the present invention, the following effects can be obtained, which are extremely useful industrially.
1. For temporary bolts, permanent bolts, back nuts, front nuts, and washers, for example, commercially available bolt sets can be used, so costs can be reduced and procurement is easy. For example, the '01 Design Data Book Revised 3rd Edition 2003 ”of the Japan Bridge Construction Association includes JIS B 1180, JIS B 1181, JIS B 1256 hex bolts, hex nuts, and washers as shaft diameters of 6 mm to 80 mm. A shaft diameter of 10 mm to a shaft diameter of 36 mm is described as a high-strength bolt, nut, and washer of JIS B 1186.
2. Since the height of the head of the temporary bolt which is the protrusion and the height of the back nut are low, there is almost no resistance when the steel retaining wall is driven into the ground.
3. Further, since the temporary bolt and the back nut are fixed to the steel earth retaining wall, they hardly deform at the time of placing. Furthermore, when excavating the inside of the steel retaining wall, the height of the head of the temporary bolt is small, so that excavation work can be performed quickly.
4). Since the back nut is fixed by welding or the like, the temporary bolt can be replaced with the permanent bolt only by the work from the inside of the steel retaining wall. That is, the bolt construction from one side becomes possible.
5. Moreover, the replacement from the temporary bolt to the permanent bolt can be performed quickly and easily with high accuracy by using, for example, an electric torque wrench.
6). After excavating the inside of the steel retaining wall, it is not necessary to perform side-to-side stud welding with poor workability and construction quality, so a high proof strength can be obtained with a large diameter such as a shaft diameter of 24 mm, a shaft diameter of 30 mm, and a shaft diameter of 36 mm. Can be applied.
7). From the above, the effects of cost reduction, on-site workability and work quality improvement, shortening the work period, and improving the proof stress of the joint between the steel retaining wall and the reinforced concrete wall can be obtained.
8). Furthermore, when a plate member is added to the back surface of the steel retaining wall, when the steel retaining wall is placed in the ground, the rigidity of the steel retaining wall is increased, Deformation and buckling are prevented.
9. In addition, in a composite wall in which a steel retaining wall and a reinforced concrete wall are integrated, the plate member is on the outer edge side, so that it can efficiently resist the acting force such as bending moment due to earth pressure or water pressure. it can.
10. Even if the working force due to earth pressure or water pressure increases as the depth increases or a large force is generated locally at the joint with the slab or foundation, a plate member is installed in the part where the working force is large. This can partially increase the yield strength.

鋼製土留め壁に仮ボルトおよび裏面ナットが固定された状態を示す水平断面図。The horizontal sectional view which shows the state by which the temporary volt | bolt and the back surface nut were fixed to the steel retaining wall. 合成壁の一実施形態を示す水平断面図。The horizontal sectional view showing one embodiment of a synthetic wall. 図2に示す本発明の1実施例に係る合成壁における本設用ボルトの配置を示す図。The figure which shows arrangement | positioning of the bolt for permanent installation in the synthetic | combination wall which concerns on one Example of this invention shown in FIG. 図1、2に示す本発明に係る合成壁の構築方法における工程の一例に示す。It shows to an example of the process in the synthetic | combination wall construction method based on this invention shown to FIG. 本発明に係る他の実施例。Another embodiment according to the present invention. 本発明に係る他の実施例(鋼管矢板を用いた場合)。Another embodiment according to the present invention (when a steel pipe sheet pile is used). 本発明に係る他の実施例。Another embodiment according to the present invention. 本発明に係る他の実施例で図7のA−A断面図。FIG. 8 is a cross-sectional view taken along line AA of FIG. 7 in another embodiment according to the present invention. 本発明に係る他の実施例。Another embodiment according to the present invention. 従来例。Conventional example. 従来例。Conventional example.

本発明は鋼製土留め壁と鉄筋コンクリート壁からなる合成壁において、鋼製土留め壁に、鉄筋コンクリート壁を固着させるためスタッド溶接で取り付けるずれ止め材に換えて、ボルトを用い、当該ボルトは鋼製土留め壁を地中に打設する前後で、短い仮設ボルトから長い本設用ボルトに交換されることを特徴とする。以下、図を用いて本発明を詳細に説明する。   The present invention relates to a composite wall composed of a steel retaining wall and a reinforced concrete wall, and uses bolts instead of a detent material attached by stud welding in order to fix the reinforced concrete wall to the steel retaining wall. Before and after placing the earth retaining wall into the ground, the short temporary bolt is replaced with a long permanent bolt. Hereinafter, the present invention will be described in detail with reference to the drawings.

図1は鋼製土留め壁に仮ボルトおよび裏面ナットが固定された状態を示す水平断面図である。また、図2は本発明に係る合成壁構造の一実施形態を示す水平断面図である.これらの図において、1は鋼製土留め壁、11a、11b、11c、11d、11eは鋼製土留め壁1の1区間を構成する鋼矢板、2は鉄筋コンクリート壁、3は仮ボルト、3aは仮ボルト3の頭部、4は裏面ナット、5は座金、6は本設用ボルト、7は表面ナット、8は裏面ナット4を鋼矢板に固定する固定部、9は鉄筋コンクリート壁2の鉄筋、10はコンクリート、12は鋼矢板11a、11b、11c、11d、11e同士を連結する継手部、111は鋼矢板のウェブで合成壁の内側となる内面、112は鋼矢板のウェブで合成壁の外側となる外面を示す。 FIG. 1 is a horizontal sectional view showing a state in which a temporary bolt and a back nut are fixed to a steel retaining wall. FIG. 2 is a horizontal sectional view showing an embodiment of the composite wall structure according to the present invention. In these drawings, 1 is a steel retaining wall, 11a, 11b, 11c, 11d, and 11e are steel sheet piles constituting one section of the steel retaining wall 1, 2 is a reinforced concrete wall, 3 is a temporary bolt, 3a is The head of the temporary bolt 3, 4 is a back nut, 5 is a washer, 6 is a bolt for permanent installation, 7 is a surface nut, 8 is a fixing portion for fixing the back nut 4 to the steel sheet pile, 9 is a rebar of the reinforced concrete wall 2, 10 concrete, 12 steel sheet pile 11a, 11b, 11c, 11d, the joint portion connecting 11e each other, the inner surface 111 of the inner synthetic wall of steel sheet piles web 112 outside of the synthetic wall of steel sheet pile web The outer surface is shown.

以下の説明において、鋼製土留め壁1の内側とは、鉄筋コンクリート壁2に対向する側を指し、鋼製土留め壁1の外側とは、鋼製土留め壁1の外部となる土壌側を指す。合成壁の内側とは、合成壁の内部構造側、合成壁の外側とは合成壁の外部となる土壌側を指し、また、説明は、鋼製土留め壁1の鋼矢板11a、11b、11c、11d、11eで構成される1区間を対象として行う。   In the following description, the inside of the steel retaining wall 1 refers to the side facing the reinforced concrete wall 2, and the outside of the steel retaining wall 1 refers to the soil side that is the outside of the steel retaining wall 1. Point to. The inner side of the synthetic wall refers to the inner structure side of the synthetic wall, and the outer side of the synthetic wall refers to the soil side which is the outer side of the synthetic wall. , 11d, and 11e.

鋼製土留め壁1は、連続して配置される、フランジとウェブを有する鋼矢板11a、11b、11c、11d、11eで構成され、これらの鋼矢板はウェブが、鉄筋コンクリート壁に対して、凹凸となるように上下反転して連続配置される。フランジとウェブを有する鋼矢板11a、11b、11c、11d、11eとして、例えばU形鋼矢板やハット形鋼矢板が利用できる。ここではU形鋼矢板を例として説明する。 Steel earth retaining wall 1, are placed sequentially, steel sheet pile 11a having a flange and a web, 11b, 11c, 11d, are configured in 11e, these steel sheet pile has a web, with respect to reinforced concrete walls, uneven Inverted up and down so that As the steel sheet piles 11a, 11b, 11c, 11d, and 11e having flanges and webs, for example, U-shaped steel sheet piles or hat-shaped steel sheet piles can be used. Here, a U-shaped steel sheet pile will be described as an example.

鋼矢板11a、11b、11c、11d、11eを地中に打設する前に、前記鋼矢板のウェブのうち、合成壁の内側で、鉄筋コンクリート壁2と接するようになる、鋼矢板11b(11d)のウェブに、ボルト孔(図では省略)を複数加工する。 Before placing the steel sheet piles 11a, 11b, 11c, 11d, and 11e into the ground, the steel sheet pile 11b (11d) that comes in contact with the reinforced concrete wall 2 inside the synthetic wall of the steel sheet pile web. A plurality of bolt holes (not shown in the figure) are processed in the web .

前記ボルト孔に仮ボルト3をウェブの内面111側から挿通後、外面112側で裏面ナット4を螺着させる。鋼矢板11bを地中に打設した際、仮ボルト3が弛まないように座金5を用いることが望ましい。 After the temporary bolt 3 is inserted into the bolt hole from the inner surface 111 side of the web , the back nut 4 is screwed on the outer surface 112 side. It is desirable to use the washer 5 so that the temporary bolt 3 does not loosen when the steel sheet pile 11b is driven into the ground.

仮ボルト3がその頭部3aと裏面ナット4間で鋼矢板11b(11d)に締結された後、裏面ナット4を、鋼製土留め壁1の外側となる前記ウェブの外面112にスポット溶接あるいは全周すみ肉溶接などにより固定部8で固定する。 After the temporary bolt 3 is fastened to the steel sheet pile 11b (11d) between the head 3a and the back surface nut 4, the back surface nut 4 is spot welded to the outer surface 112 of the web that is outside the steel retaining wall 1 or It is fixed at the fixing portion 8 by fillet welding around the entire circumference.

仮ボルト3の長さは、鋼矢板11b(11d)を地中に打設する際、変形せず、且つ鋼製土留め壁を挿通して裏面ナット4で固定できれば良く特に規定しない。例えば、軸径22mmのボルトセットを用いる場合、仮ボルト3の頭部の高さが14mm程度、裏面ナットの高さが22mm程度と小さく、鋼製土留め壁を打設する際にほとんど抵抗とならない。   The length of the temporary bolt 3 is not particularly limited as long as it is not deformed when the steel sheet pile 11b (11d) is driven into the ground and can be fixed by the back nut 4 through the steel retaining wall. For example, when using a bolt set with a shaft diameter of 22 mm, the height of the head of the temporary bolt 3 is as small as about 14 mm and the height of the back nut is as small as about 22 mm. Don't be.

また、鋼製土留め壁1の内側を掘削する際、仮ボルト3の頭部の高さが低く、突出部の長さが短いため、掘削作業が迅速に行える。尚、仮ボルト3を誤って損傷した場合でも、本設用ボルト6に取り替えるため、支障を生じない。   Moreover, when excavating the inside of the steel retaining wall 1, the height of the head of the temporary bolt 3 is low and the length of the protruding portion is short, so that excavation work can be performed quickly. Even if the temporary bolt 3 is accidentally damaged, the temporary bolt 3 is replaced with the permanent bolt 6 so that no trouble occurs.

裏面ナット4の固定は、固定用部材を用いたり、接着剤等、溶接以外の手段を用いてもよい。必要に応じて仮ボルト3と裏面ナット4に止水処理を行うものとする。止水処理方法としては、止水材を塗布する方法、裏面ナット4に防水キャップ等を設置する方法などを用いる。   The back nut 4 may be fixed using a fixing member or using a means other than welding, such as an adhesive. It is assumed that the temporary bolt 3 and the back nut 4 are subjected to water stop treatment as necessary. As a water stop treatment method, a method of applying a water stop material, a method of installing a waterproof cap or the like on the back nut 4 and the like are used.

本発明では、鋼矢板11b、11dに仮ボルト3および裏面ナット4を取り付けた状態で鋼矢板11aから順に、鋼矢板11eを逐次打設して鋼製土留め壁1を地中に形成する。打設方法は、バイブロハンマによる施工、油圧装置による圧入施工など各種方法が適用可能である。   In the present invention, the steel sheet pile 11e is sequentially placed in order from the steel sheet pile 11a in a state where the temporary bolt 3 and the back nut 4 are attached to the steel sheet piles 11b and 11d to form the steel earth retaining wall 1 in the ground. As the placing method, various methods such as construction using a vibro hammer and press-fitting construction using a hydraulic device can be applied.

仮ボルト3を裏面ナット4に螺着させないで鋼製土留め壁1を打設した場合は、孔あき欠損により鋼製土留め壁1の剛性が小さくなるため、打設時に変形や座屈を生じやすくなるばかりでなく、孔から地下水などが浸透するおそれがある。このため、仮ボルト3は裏面ナット4に螺着させ、さらに必要に応じて仮ボルト3および裏面ナット4に止水処理を行なった上で打設するものとする。   When the steel retaining wall 1 is driven without screwing the temporary bolt 3 to the back nut 4, the rigidity of the steel retaining wall 1 is reduced due to the perforated defect, so that deformation or buckling occurs during the placing. Not only is it likely to occur, but there is a risk that groundwater will permeate through the hole. For this reason, the temporary bolt 3 is screwed to the back nut 4 and, if necessary, the temporary bolt 3 and the back nut 4 are subjected to water stop treatment and then placed.

上記鋼製土留め壁1を打設し、その内側を掘削した後、仮ボルト3を外し、表面ナット7を備えた本設用ボルト6に差し替え、表面ナット7と裏面ナット4で、螺着するようにして鋼矢板11b(11d)に本設用ボルト6を固定する。その後、鉄筋コンクリート壁2を鋼製土留め壁の内側に凸となる鋼矢板11b、11dのウェブに接して平行となるように略直線状に打設して構築する。 After placing the steel retaining wall 1 and excavating the inside, the temporary bolt 3 is removed and replaced with a main bolt 6 having a front surface nut 7, and screwed with a front surface nut 7 and a back surface nut 4. In this way, the permanent bolt 6 is fixed to the steel sheet pile 11b (11d). Thereafter, the reinforced concrete wall 2 is constructed by being driven in a substantially straight line so as to be in contact with and parallel to the webs of the steel sheet piles 11b and 11d that are convex on the inside of the steel earth retaining wall.

図2は、鋼製土留め壁1と鋼製土留め壁1の内側に構築された鉄筋コンクリート壁2が、本設用ボルト6を介して一体化された状態を示している。本設用ボルト6がずれ止めとして機能するため、鉄筋コンクリート壁2と鋼製土留め壁1が一体化される。   FIG. 2 shows a state in which the steel retaining wall 1 and the reinforced concrete wall 2 constructed on the inner side of the steel retaining wall 1 are integrated via the bolts 6 for installation. Since the main installation bolt 6 functions as a slip stopper, the reinforced concrete wall 2 and the steel earth retaining wall 1 are integrated.

本設用ボルト6および表面ナット7は、例えば市販品のボルトセットなどを用いればよい。また、必要に応じて座金を併用する。本設用ボルト6の軸径は仮ボルト3と同じとする.本設用ボルト6の長さは、鉄筋コンクリート壁2の厚さや本設用ボルト6の軸径によって異なるが、例えば鉄筋コンクリート壁2の厚さが300mmで本設用ボルト6の軸径が22mmの場合、150mm〜200mm程度とすることができる。   For the main bolt 6 and the surface nut 7, for example, a commercially available bolt set may be used. Also, use a washer if necessary. The shaft diameter of the permanent bolt 6 is the same as that of the temporary bolt 3. The length of the permanent bolt 6 varies depending on the thickness of the reinforced concrete wall 2 and the shaft diameter of the permanent bolt 6. For example, when the thickness of the reinforced concrete wall 2 is 300 mm and the shaft diameter of the permanent bolt 6 is 22 mm. , About 150 mm to 200 mm.

なお、鋼矢板11b、11dのウェブに加工するボルト孔の配置は、本設用ボルト6がずれ止めとしての所定の性能を発揮できるようなものとする。図3に、鋼矢板11b、11dのウェブ面に対する本設用ボルト6の配置例を示す。 In addition, the arrangement | positioning of the bolt hole processed into the web of the steel sheet piles 11b and 11d shall make the predetermined bolt 6 exhibit the predetermined performance as a slip stopper. In FIG. 3, the example of arrangement | positioning of the volt | bolt 6 for permanent installation with respect to the web surface of the steel sheet piles 11b and 11d is shown.

本発明によれば、裏面ナット4が溶接などにより鋼製土留め壁1に固定されているため、片側からのボルト施工が可能で、鋼製土留め壁1の内側からの作業のみで、仮ボルト3の取り外しと本設用ボルト6の固定を行うことが可能である。   According to the present invention, since the back nut 4 is fixed to the steel earth retaining wall 1 by welding or the like, it is possible to perform bolting from one side, and only work from the inside of the steel earth retaining wall 1 is possible. It is possible to remove the bolt 3 and fix the permanent bolt 6.

仮ボルト3から本設用ボルト6への差し替えは、例えば電動トルクレンチなどを用いることにより、精度よく、迅速かつ容易に作業可能である。図4に、本発明に係る合成壁の構築方法における工程の一例に示す。   The replacement from the temporary bolt 3 to the permanent bolt 6 can be performed quickly and easily with high accuracy by using, for example, an electric torque wrench. FIG. 4 shows an example of steps in the synthetic wall construction method according to the present invention.

図5に、本発明の他の実施形態に係る合成壁の断面構造を示す。鋼矢板11b、11c、11dの各ウェブに、本設用ボルト6が、上述した手順に従って取り付けられている。なお、鋼矢板11cに取り付ける本設用ボルト6は鉄筋コンクリート壁2の中に50mm以上入るような長さにすることが好ましい。 FIG. 5 shows a cross-sectional structure of a composite wall according to another embodiment of the present invention. The bolt 6 for permanent installation is attached to each web of the steel sheet piles 11b, 11c, and 11d according to the procedure mentioned above. The permanent bolt 6 attached to the steel sheet pile 11c is preferably long enough to fit in the reinforced concrete wall 2 by 50 mm or more.

鉄筋コンクリート壁2は鋼製土留め壁1の一区間を構成する、鋼矢板11b、11c、11dの内側の形状に沿って連続的にコンクリートが打設されて構築される。   The reinforced concrete wall 2 is constructed by continuously placing concrete along the inner shape of the steel sheet piles 11b, 11c, 11d constituting one section of the steel earth retaining wall 1.

鋼製土留め壁の形状に合わせてコンクリートを打設すること、比較的長い本設用ボルトを併用することにより、鋼製土留め壁と鉄筋コンクリート壁の一体性がさらに高まり、耐力を大きくすることが可能である。   By placing concrete according to the shape of the steel retaining wall and using a relatively long permanent bolt, the integrity of the steel retaining wall and the reinforced concrete wall will be further increased and the proof stress will be increased. Is possible.

図6は、本発明の他の実施形態を示し、鋼製土留め壁1を連続して配置される鋼矢板に換えて、鋼管矢板14を用いた場合を示す。鋼管矢板14の管壁のうち、鉄筋コンクリート壁2側となる部分に、裏面ナット4と表面ナット7を用いて、本設用ボルト6を固定する。ボルト孔の加工から本設用ボルト6を固定するまでは上述した手順に準じる。   FIG. 6 shows another embodiment of the present invention, and shows a case where a steel pipe sheet pile 14 is used instead of the steel sheet pile arranged continuously. The bolt 6 for permanent installation is fixed to the part which becomes the reinforced concrete wall 2 side among the pipe walls of the steel pipe sheet pile 14 using the back surface nut 4 and the surface nut 7. FIG. The procedure from the processing of the bolt holes to the fixing of the permanent bolts 6 follows the above-described procedure.

合成壁は深度が大きくなるにつれて、土圧や水圧などによる作用力が大きくなる.また、スラブや基礎との接合部で局部的に大きな力を生じる場合がある。従来の鋼製土留め壁は、断面形状を深さ方向に変化させることは困難である。   As the depth of the composite wall increases, the action force due to earth pressure and water pressure increases. In addition, a large force may be locally generated at the joint between the slab and the foundation. It is difficult to change the cross-sectional shape of the conventional steel earth retaining wall in the depth direction.

本発明では、作用力が大きい部分に板部材を設置して部分的に耐力を大きくすることも可能である。   In the present invention, it is possible to partially increase the proof stress by installing a plate member in a portion where the acting force is large.

図7に、図5に示す合成壁の、鋼製土留め壁に、板部材13を取り付けた構造を説明する水平方向断面図を示す。   FIG. 7 is a horizontal cross-sectional view illustrating a structure in which the plate member 13 is attached to the steel retaining wall of the composite wall shown in FIG.

鋼矢板11cを打設前に、ボルト孔を加工した板部材13を、当該ボルト孔と鋼矢板11cのウェブに加工されたボルト孔の位置が一致するようにして、鋼矢板11cのウェブの外面112側に配置し、仮ボルトを挿通させる。 The steel sheet pile 11c to hit設前, the plate member 13 obtained by processing the bolt hole, as the position of the bolt hole and the steel sheet pile 11c web processed bolt holes of match, an outer surface of the steel sheet pile 11c web It arrange | positions at 112 side and lets a temporary volt | bolt pass.

次に、板部材13の裏面側で、裏面ナットを螺着させ、当該裏面ナットを板部材13に溶接などで固定する。その後、必要に応じて仮ボルトおよび裏面ナット部分に止水処理を行なった上で鋼矢板11cを打設し、土壌を掘削後、仮ボルトを本設用ボルト6に差し替えを行なう。ここで、仮ボルトから本設用ボルトへの差し替えは、板部材13が応力の一部を分担していることを考慮して、1本づつ行なうことが望ましい。   Next, a back nut is screwed on the back side of the plate member 13, and the back nut is fixed to the plate member 13 by welding or the like. Then, after performing a water stop process to a temporary bolt and a back surface nut part as needed, the steel sheet pile 11c is driven, and after excavating the soil, the temporary bolt is replaced with the permanent bolt 6. Here, it is desirable to replace the temporary bolts with the permanent bolts one by one in consideration of the fact that the plate member 13 shares a part of the stress.

鋼製土留め壁に板部材が付加された場合、鋼製土留め壁を地中に打設する際に、鋼製土留め壁の剛性を高め、鋼製土留め壁の変形や座屈が防止される。   When a plate member is added to the steel retaining wall, when the steel retaining wall is placed in the ground, the rigidity of the steel retaining wall is increased and deformation or buckling of the steel retaining wall is prevented. Is prevented.

図8に、図7のA−A断面図を示す。板部材13は作用力が大きい部分のみに設置して部分的に耐力を大きくすることができる。これにより、土圧や水圧などによる曲げモーメントなどの作用力に対して効率よく抵抗でき、断面の合理化、鋼重低減、およびコストダウンを実現できる。   FIG. 8 is a cross-sectional view taken along the line AA in FIG. The plate member 13 can be installed only in the portion where the acting force is large to partially increase the proof stress. As a result, it is possible to efficiently resist an acting force such as a bending moment due to earth pressure or water pressure, and it is possible to achieve rationalization of the cross section, reduction of steel weight, and cost reduction.

図9に、鋼管矢板14の内壁の一部に、板部材13を取り付けた構造を示す。なお、板部材13の取り付け位置は、鋼管矢板14の内壁面となる。   FIG. 9 shows a structure in which the plate member 13 is attached to a part of the inner wall of the steel pipe sheet pile 14. The mounting position of the plate member 13 is the inner wall surface of the steel pipe sheet pile 14.

以上の説明は、鋼製土留め壁を、U形鋼矢板、鋼管矢板で構築する場合について行ったが、ハット形鋼矢板、溝形鋼矢板、平板鋼矢板を用いて鋼製土留め壁を構築した場合でも、本発明を実施することが可能である。   Although the above explanation was made about the case where a steel earth retaining wall is constructed with a U-shaped steel sheet pile and a steel pipe sheet pile, a steel earth retaining wall is formed using a hat-shaped steel sheet pile, a grooved steel sheet pile, and a flat steel sheet pile. Even when constructed, the present invention can be implemented.

1 鋼製土留め壁
2 鉄筋コンクリート壁
3 仮ボルト
3a 仮ボルト頭部
4 裏面ナット
5 座金
6 本設用ボルト
7 表面ナット
8 固定部(溶接部)
9 鉄筋
10 コンクリート
11a、11b、11c、11d、11e 鋼矢板
12 継手部
13 板部材
14 鋼管矢板
111 内面
112 外面
100 鋼製土留め壁
200 鉄筋コンクリート壁
300 ずれ止め材
400 ずれ止め兼用せん断補強筋
500 芯材
600 ネジ切りボルト
700 保護キャップ
800 ジョイントカプラー
900 ネジ切りコネクター
1000 ソイルセメント
1100 コンクリート
DESCRIPTION OF SYMBOLS 1 Steel retaining wall 2 Reinforced concrete wall 3 Temporary bolt 3a Temporary bolt head 4 Back surface nut 5 Washer 6 Main bolt 7 Surface nut 8 Fixing part (welding part)
DESCRIPTION OF SYMBOLS 9 Reinforcement 10 Concrete 11a, 11b, 11c, 11d, 11e Steel sheet pile 12 Joint part 13 Plate member 14 Steel pipe sheet pile 111 Inner surface 112 Outer surface 100 Steel earth retaining wall 200 Reinforced concrete wall 300 Detension material 400 Shear reinforcement reinforcing bar 500 Core Material 600 Thread Bolt 700 Protection Cap 800 Joint Coupler 900 Thread Connector 1000 Soil Cement 1100 Concrete

Claims (3)

鋼製土留め壁と鉄筋コンクリート壁からなる合成壁であって、前記鋼製土留め壁を挿通する軸径22〜36mmの表面ナット付きずれ止め用ボルトが、前記表面ナットと、前記鋼製土留め壁に固定された裏面ナットとの間で螺着するようにして、前記鋼製土留め壁を打設する際に用いた仮ボルト用ボルト孔を挿通して、前記鋼製土留め壁に固定され、該表面ナット付きずれ止め用ボルトが、前記鋼製土留め壁と前記鉄筋コンクリート壁のずれ止めとして機能することを特徴とする合成壁構造。 A synthetic wall composed of a steel earth retaining wall and a reinforced concrete wall, and a locking bolt with a surface nut having a shaft diameter of 22 to 36 mm, which is inserted through the steel earth retaining wall, includes the surface nut and the steel earth retaining wall. It is screwed between the back nut fixed to the wall, and the bolt hole for temporary bolt used when placing the steel earth retaining wall is inserted and fixed to the steel earth retaining wall. A composite wall structure, wherein the locking bolt with a surface nut functions as a locking between the steel earth retaining wall and the reinforced concrete wall. 前記鋼製土留め壁は、フランジ部とウェブ部を有する鋼矢板で構成され、前記鋼矢板のウェブ部に前記表面ナット付きずれ止め用ボルトが固定されていることを特徴とする請求項1記載の合成壁構造。 The said steel earth retaining wall is comprised with the steel sheet pile which has a flange part and a web part, The said bolt for surface locking with a surface nut is being fixed to the web part of the said steel sheet pile. Composite wall structure. 前記鋼製土留め壁は、鋼管矢板で構成されていることを特徴とする請求項1記載の合成壁構造。   The synthetic wall structure according to claim 1, wherein the steel earth retaining wall is formed of a steel pipe sheet pile.
JP2011170646A 2011-08-04 2011-08-04 Synthetic wall structure Active JP5348197B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2011170646A JP5348197B2 (en) 2011-08-04 2011-08-04 Synthetic wall structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2011170646A JP5348197B2 (en) 2011-08-04 2011-08-04 Synthetic wall structure

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
JP2007153863A Division JP4844477B2 (en) 2007-06-11 2007-06-11 Synthetic wall structure and its construction method

Publications (2)

Publication Number Publication Date
JP2012012932A JP2012012932A (en) 2012-01-19
JP5348197B2 true JP5348197B2 (en) 2013-11-20

Family

ID=45599673

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2011170646A Active JP5348197B2 (en) 2011-08-04 2011-08-04 Synthetic wall structure

Country Status (1)

Country Link
JP (1) JP5348197B2 (en)

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2572897Y2 (en) * 1992-06-24 1998-05-25 新日軽株式会社 Hanging bolt connection structure of hanging movable panel
JPH08209683A (en) * 1995-02-03 1996-08-13 Nippon Steel Corp Steel pipe sheet pile with external projection
JP2001254353A (en) * 2000-03-08 2001-09-21 Hanshin Expressway Public Corp Earth retaining wall / RC composite structure and its construction method
JP3578210B2 (en) * 2001-01-17 2004-10-20 安藤建設株式会社 Underground wall structure
JP2003138732A (en) * 2001-11-01 2003-05-14 Maruesu:Kk Post
JP2006322229A (en) * 2005-05-19 2006-11-30 Railway Technical Res Inst Steel sheet pile with nut and its construction method
JP2006322226A (en) * 2005-05-19 2006-11-30 Railway Technical Res Inst Steel sheet pile with bolt, its construction method, steel sheet pile main body used in the method, and perforated steel sheet with steel material

Also Published As

Publication number Publication date
JP2012012932A (en) 2012-01-19

Similar Documents

Publication Publication Date Title
KR20190036591A (en) Thrust pile with prestress and self-supporting type pile construction using it
JP5413541B2 (en) Combination steel sheet pile, underground continuous wall, and reuse method of combination steel sheet pile
JP2022067519A (en) Small step construction method in sloped land
JP4888915B2 (en) Building structure using composite structural beams with beam ends made of PC
JP5267278B2 (en) Steel sheet pile wall and construction method thereof, synthetic floor board structure using steel sheet pile wall and construction method thereof
JP2016180223A (en) Earth retaining frame, and construction method thereof
JP4844477B2 (en) Synthetic wall structure and its construction method
JP7123782B2 (en) Joint structure of diaphragm wall
JP6233752B2 (en) Pile head structure
JP6317122B2 (en) Yamazushi support work
JP5348197B2 (en) Synthetic wall structure
JP3826348B2 (en) Construction method of composite wall with mountain retaining core and underground outer wall
KR101627092B1 (en) Panel-type retaining wall structure wiyh joint coupling and working method thereof
JP2013019245A (en) Combination steel sheet pile, underground continuous wall, and method of removing combination steel sheet pile
JP2015129426A (en) Method and structure for joining reinforced concrete beam to steel column or column with steel frame
JP6368562B2 (en) Pile foundation structure
JP6905813B2 (en) Synthetic segment and ring
JP3805342B2 (en) Yamadome wall structure
JP4552114B2 (en) Synthetic wall
JP5037997B2 (en) Leading beam construction method and leading beam connection structure
JP2017101394A (en) Joint part fixture of steel sheet pile
JP4452066B2 (en) Pile head joint structure
JP5432653B2 (en) Seismic isolation building method
JP4393945B2 (en) Power transmission mechanism construction method and power transmission mechanism
KR101274944B1 (en) Column structure reinforcing method for bending and ductility by partial reinforcing

Legal Events

Date Code Title Description
RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20120327

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20120905

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20121106

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20121220

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20130723

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20130805

R150 Certificate of patent or registration of utility model

Ref document number: 5348197

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250