JP5355491B2 - Work site work management system - Google Patents
Work site work management system Download PDFInfo
- Publication number
- JP5355491B2 JP5355491B2 JP2010108856A JP2010108856A JP5355491B2 JP 5355491 B2 JP5355491 B2 JP 5355491B2 JP 2010108856 A JP2010108856 A JP 2010108856A JP 2010108856 A JP2010108856 A JP 2010108856A JP 5355491 B2 JP5355491 B2 JP 5355491B2
- Authority
- JP
- Japan
- Prior art keywords
- work
- information
- work site
- site
- route
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Description
この発明は、作業現場への作業経路を作成し、作業経路に必要となる地図情報および作業経路を携帯端末手段へ転送することができる作業現場作業管理システムに関するものである。 The present invention relates to a work site work management system capable of creating a work route to a work site and transferring map information and work route necessary for the work route to portable terminal means.
従来の作業現場作業管理システムは、GPSとVICSとを使用して作成した経路情報を携帯端末手段へ転送する際、経路情報を地図情報として転送していなかった。このため、作業現場員が携帯端末手段を保持して作業現場へ出向く際は、作業現場の位置を示す経路情報と地図とを照らし合わせ、作業現場を巡回していた。そして、作業者の土地勘と経験により作業現場の巡回を行っていた(例えば、特許文献1参照)。 The conventional work site work management system does not transfer route information as map information when transferring route information created using GPS and VICS to the portable terminal means. For this reason, when the work site worker holds the portable terminal means and goes to the work site, the route information indicating the position of the work site and the map are collated to go around the work site. And the patrol of the work site was performed by the worker's intuition and experience (see, for example, Patent Document 1).
従来の作業現場作業管理システムは、作成した作業現場の巡回経路データを携帯端末手段へ転送する際、地図情報として転送することが考慮されておらず、作業者が実際に作業現場を巡回するための情報が不足しているという問題点があった。また、携帯端末手段へデータを転送する際のデータサイズは考慮されず、使用する携帯端末手段の記憶領域が多く消費する問題点があった。また、その際にデータサイズが大きいために転送時間が長いなどの問題点があった。 The conventional work site work management system does not consider transferring the travel route data of the created work site as map information when transferring it to the portable terminal means, and the operator actually visits the work site. There was a problem of lack of information. Further, the data size when transferring data to the portable terminal means is not considered, and there is a problem that the storage area of the portable terminal means to be used is large. In addition, since the data size is large at that time, there are problems such as a long transfer time.
この発明は上記のような課題を解決するためになされたものであり、作業現場への作業経路を地図画面上に表示でき、携帯端末手段へ転送する際の経路情報を地図情報とともに提供することができる作業現場作業管理システムを提供することを目的とする。 The present invention has been made to solve the above-described problems, and can display a work route to a work site on a map screen, and provide route information together with map information when transferring to portable terminal means. It is an object to provide a work site work management system that can be used.
この発明は、複数の作業者がそれぞれ携帯している各携帯端末手段に対して作業現場への作業経路を作成して送信する現場作業管理システムであって、
作業現場に関する作業希望日時、作業見込み時間および位置情報を含む作業現場情報を取得して作業現場情報データベースに格納する作業現場情報取得手段と、
各携帯端末手段の位置情報および作業者の状態情報を含む作業者情報を取得して作業者情報データベースに格納する作業者情報取得手段と、
道路の混雑状況情報を取得して道路情報データベースに格納する道路情報取得手段と、
地図情報が格納されている地図情報データベースと、
作業現場へ最適時間にて到達することができる作業者および作業経路を作業現場情報データベースおよび作業者情報データベースおよび道路情報データベースおよび地図情報データベースの各情報に基づいて作成し、作成した作業経路を含む地図情報を生成して当該作業者の携帯端末手段に転送する作業経路作成手段とを備え、
上記作業現場として複数の作業現場を設定した場合、上記作業経路は、上記複数の作業現場を巡回する順番に基づいた地図情報を生成し、
上記作業経路作成手段は、上記地図情報の複数箇所の作業現場の中から、作業希望日時と現在日時とが所定の時間内の作業現場は、それ以外の他の作業現場と区別して表示させるものである。
This invention is a site work management system that creates and transmits a work route to a work site for each portable terminal means carried by a plurality of workers,
Work site information acquisition means for acquiring work site information including a desired work date and time, a work expected time and position information related to the work site and storing it in the work site information database;
Worker information acquisition means for acquiring worker information including position information of each portable terminal means and worker status information and storing it in the worker information database;
Road information acquisition means for acquiring road congestion status information and storing it in a road information database;
A map information database in which map information is stored;
The workers and work paths that can be reached at the optimum time to the job site created on the basis of the work site information database and worker information database and road information database and the ground Zujo report each information in the database, work path that was created And a work route creating means for generating map information including and transferring the map information to the portable terminal means of the worker,
When a plurality of work sites are set as the work sites, the work route generates map information based on the order of circulating around the plurality of work sites,
The work route creation means displays a work site whose desired date / time and current date / time are within a predetermined time among a plurality of work sites in the map information, separately from other work sites. It is.
この発明の作業現場作業管理システムは、上記のように構成されているため、
作業現場への作業経路を地図画面上に表示することができる。
Since the work site work management system of the present invention is configured as described above,
The work route to the work site can be displayed on the map screen.
実施の形態1.
以下、本願発明の実施の形態について説明する。図1はこの発明の実施の形態1における作業現場作業管理システムの構成を示す図、図2は図1に示した作業現場作業管理システムの作業現場情報DBのテーブルを示す図、図3は図1に示した作業現場作業管理システムの作業者情報DBのテーブルを示す図、図4は図1に示した作業現場作業管理システムの地図情報DBのメッシュ番号と位置とを管理するDBを示す図、図5は図1に示した作業現場作業管理システムの地図マスタ情報DBのメッシュで区切られた地図データを示す図、図6は図1に示した作業現場作業管理システムの道路情報DBのテーブルを示す図、図7は図1に示した作業現場作業管理システムの携帯端末手段の構成を示す図、図8は図7に示した携帯端末手段の作業情報ファイルおよび経路情報ファイルのテーブルを示す図、図9は図1に示した作業現場作業管理システムの動作を説明するためのフローチャートである。
Embodiments of the present invention will be described below. 1 is a diagram showing a configuration of a work site work management system according to
図において、作業現場作業管理システム101は、複数の作業現場に対して、作業者109が携帯している携帯端末手段108に対して所望の作業現場への作業経路を作成して送信するものである。そして、複数の作業現場に関する作業現場情報を取得して作業現場情報データベース(データベースは”DB”と略して示す)104に格納する作業現場情報取得手段118と、作業者情報を取得して作業者情報DB105に格納する作業者情報取得手段116と、VICS(道路情報通信システムの略称)112の情報から道路の混雑状況情報を取得して情報道路情報DB107に格納する道路情報取得手段117と、作業現場の位置を含む地図情報の一定の領域サイズ(以下、メッシュと称す。)メッシュで区切られた地図データが格納されている地図マスタ情報DB106とを備える。
In the figure, the work site
さらに、メッシュ番号と位置とを管理するデータが格納されている地図情報DB119と、作業現場情報DB104および作業者情報DB105および道路情報DB107および地図マスタ情報DB106の各情報に基づいて、作業現場へ最適時間にて到達することができる作業者109および作業経路を作成し、作成した作業経路を含む位置の地図情報を地図画面表示手段102にて抽出して、この抽出された地図情報と作業経路とを作業者109の携帯端末手段108に地図転送手段110を介して転送する作業経路作成手段103とにて構成されている。
Furthermore, it is optimal for the work site based on the map information DB 119 storing data for managing the mesh number and position, the work
そして、作業現場作業管理システム101はネットワーク113に接続されている。作業現場作業管理システム101と携帯端末手段108とのデータの送受信は、携帯端末手段108から無線通信により最寄りの基地局115へ送信され、ISP114、ネットワーク113を介して行うことができる。また、近距離にいる作業者108の携帯端末手段108へは、USBケーブルなどの有線通信、またはBluetoothなどの無線通信にて送受信することができる。
The work site
それぞれのDBは以下のように構成されている。作業現場情報DB104には、複数の作業現場に関する作業現場情報として、例えば図2に示すような、作業現場コード、作業登録日時、作業内容、作業希望日時、作業にかかる作業見込み時間、作業現場の位置情報(位置X座標、位置Y座標)とが登録されている。また、作業者情報DB105には、作業者情報として、例えば図3に示すように、作業者コード、作業者名、作業者の状態情報としての現在状態と、作業者108の携帯している携帯端末手段108の位置情報(位置X座標、位置Y座標)とが登録されている。作業者108の携帯している携帯端末手段108の位置情報の取得の方法としては、GPS(全地球測位システムの略称)111から、作業者109が携帯している携帯端末手段108が取得する。そして、取得した位置情報は携帯端末手段108から作業者情報取得手段116へ送信され取得する。
Each DB is configured as follows. In the work site information DB 104, as work site information related to a plurality of work sites, for example, as shown in FIG. 2, a work site code, work registration date / time, work content, desired work date / time, expected work time, and work site information Position information (position X coordinate, position Y coordinate) is registered. In the
また、地図情報DB119には、各作業現場の位置を含む地図情報としてのメッシュ情報が、例えば図4に示すように、メッシュ番号と、そのメッシュ番号に対する左上位置X座標、左上位置Y座標、右下位置X座標、右下位置Y座標が登録されている。また、地図マスタ情報DB106は、地図情報がメッシュ単位に区切られており、各々のメッシュにはメッシュ番号が割り当てられ、図5に示すように登録されている。また、道路情報DB107には、道路の混雑状況情報として、例えば図6に示すように、メッシュ番号と、道路コードと、混雑度とが登録されている。道路の混雑状況情報の取得方法としては、VICS112からの道路情報は、民間情報提供事業者から提供されており、テキスト型、フリガナ型、簡易図型、VICS符号型のデータ型式情報で提供される。これらの道路情報をネットワーク113を通じて道路情報取得手段117にて取得する。
Further, in the map information DB 119, mesh information as map information including the position of each work site includes, for example, as shown in FIG. 4, a mesh number, an upper left position X coordinate, an upper left position Y coordinate, A lower position X coordinate and a lower right position Y coordinate are registered. Further, in the map
そして、作業経路作成手段103では、作業現場情報DB104と地図マスタ情報DB106と道路情報DB107と地図情報DB119とから取得した情報に基づいて、複数箇所の作業現場を巡回するための作業現場へ最適時間にて到達することができる作業者および作業経路を作成し、作業経路の位置座標に基づいて、必要となるメッシュ情報を抽出して地図情報を抽出し、地図情報を含んだ作業経路情報を作成する。そして、地図画面表示手段102では、上記で作成した作業経路を画面上に表示するものであり、例えば、JAVASCRIPT(登録商標)などのプログラムを使用することにより、地図画面表示を実現する。JAVASCRIPTはスクリプト言語で、主にWebブラウザ上で動作し、HTMLの動的書き換えが可能で、ウェブページの使用感向上を目的として使用され、リッチクライアントアプリケーションの構築に使用される。
Then, the work route creation means 103 uses the work site information DB 104, the map
そして、携帯端末手段108は図7に示すように構成されている。GPS111からの位置情報を受信する位置検出手段1303と、地図転送手段110から転送された作業経路情報を経路情報ファイル保存部1306に保存する経路情報処理手段1303と、作業現場で行った作業情報を作業情報ファイル保存部1305に保存する作業情報処理手段1302と、経路情報処理手段1303を介して地図情報を含む作業経路情報を表示する地図表示手段1301とを備えている。そして、作業情報ファイル保存部1305に保存されている作業情報は、例えば図8(a)に示すように、作業現場コード、作業日時、作業内容、作業見込み時間、作業実績時間、作業者コード、作業者、作業状況が登録されている。作業経路情報ファイル保存部1306に保存されている経路は、例えば図8(b)に示すように、順番、作業現場コード、メッシュ番号が登録されている。
And the portable terminal means 108 is comprised as shown in FIG. Position detection means 1303 that receives position information from the
次に、上記のように構成された実施の形態1の作業現場作業管理システムの作業経路作成手段の動作について図9を交えて説明する。まず、作業経路作成手段103は作業現場情報DB105から、例えば作業現場の作業希望日時から、同一日の作業現場の作業現場情報から作業現場の位置情報を取得する(図9のステップS201)。次に、作業者情報DB105から休暇中でない作業者の作業者情報を取得する(図9のステップS202)。次に、道路情報DB107から先に取得した作業現場の位置情報から作業現場および作業現場付近の道路および先に取得した作業者情報の位置情報から作業者の位置の道路のそれぞれの混雑状況情報を取得する(図9のステップS203)。使用する道路は、作業現場の位置X,Yを含むメッシュの中にある複数候補から、混雑度が低いものを優先して選択する。例えば、図2の作業現場コード“0001”の位置X,Yは、図4のメッシュ番号“0001”に含まれる。図6を見るとメッシュ番号“0001”には、道路コード“0001”、“0002”、“0003”を含むことがわかり、この中から混雑度が低い道路コード“0001”を選択する。次に、このようにして得られた作業現場情報、作業者情報、道路の混雑状況情報に基づいて、複数の作業者の中から、最も作業現場での作業に適した作業者、例えば任意の作業現場を設定し、当該作業現場の一番近い位置の作業者を選定する(図9のステップS204)。
Next, the operation of the work route creation means of the work site work management system of the first embodiment configured as described above will be described with reference to FIG. First, the work route creation means 103 acquires the position information of the work site from the work site information of the work site on the same day from the work
次に、選定された作業者が作業現場までに到着する到着予想時刻を算出する(図9のステップS205)。この際、この選定された作業者に作業中の作業があれば、その作業が終了してからの到着予想時刻を算出することとなる。次に、到着予想時刻が許容範囲内であるか否かを判断する(図9のステップS206)。この、許容範囲とは、作業毎に時間を設定する場合や、システムとして同一の時間を設定する場合など、当該作業現場作業管理システム101の仕様に応じて適宜設定することが可能である。そして、許容範囲内であれば作業経路の作成を行う(図9のステップS208)。また、許容範囲外であれば、他に作業可能な作業者が存在するか確認判断する(図9のステップS207)。そして、作業者が存在しない場合には、当該作業者を選定したまま、ステップS208に移る。また、作業者が存在する場合は、ステップS204に移り、再度各作業者から、例えば、次に作業現場に近い位置の最適な作業者を選定して行う。
Next, the estimated arrival time at which the selected worker arrives at the work site is calculated (step S205 in FIG. 9). At this time, if the selected worker has a work in progress, the estimated arrival time after the work is completed is calculated. Next, it is determined whether the estimated arrival time is within an allowable range (step S206 in FIG. 9). This allowable range can be set as appropriate according to the specifications of the work site
そして、作業経路作成手段103は、この作業経路に相当する位置座標に基づいて、必要となるメッシュ情報を地図情報DB119から抽出して、その抽出されたメッシュ情報に基づいて、地図マスタ情報DB106から必要となる地図情報を抽出する。そして、地図画面表示手段102にて作業経路を地図画面上に表示するように生成する。そして、地図転送手段110から例えば、ネットワーク113、ISP114、中継局115を介して作業者109の携帯する携帯端末手段108に送信する。そして、携帯端末手段108では、経路情報処理手段1303にて経路情報を経路情報ファイル保存部1306に保存する。そして、経路情報処理手段1303を介して地図情報を含む作業経路情報を地図表示手段1301に表示する。また、作業現場で行った作業情報を入力して作業情報処理手段1302から作業情報ファイル保存部1305に保存する。
Then, the work
上記のように構成された実施の形態1の作業現場作業管理システムによれば、作業現場情報、作業者情報、道路の混雑状況情報および地図情報に基づいて、作業者を選択して、地図情報を含む作業経路情報を作成して、当該作業者に提供することができるため、作業経路を地図情報とともに容易に確認することができる。尚、上記実施の形態1においては、複数の作業現場を巡る場合について説明したが、これに限られることはなく、1箇所の作業現場に向かうための地図情報を含む作業経路情報を作成する場合であっても同様に行うことができる。 According to the work site work management system of the first embodiment configured as described above, map information is obtained by selecting a worker based on work site information, worker information, road congestion status information, and map information. Can be created and provided to the worker, so the work route can be easily confirmed together with the map information. In the first embodiment, the case of visiting a plurality of work sites has been described. However, the present invention is not limited to this, and the case where work route information including map information for heading to one work site is created. However, the same can be done.
実施の形態2.
図10はこの発明の実施の形態2における作業現場作業管理システムにおいて示される地図画面の例を示した図、図11はこの発明の実施の形態2の作業現場作業管理システムの動作を説明するためのフローチャートである。尚、作業現場作業管理システム101の構成は上記実施の形態1にて示した図1と同様である。また、このことは下記に示す各実施の形態においても同様であるため、その説明は適宜省略し、図1ないし図8を交えて説明するものである。
FIG. 10 is a diagram showing an example of a map screen shown in the work site work management system according to the second embodiment of the present invention, and FIG. 11 is a diagram for explaining the operation of the work site work management system according to the second embodiment of the present invention. It is a flowchart of. The construction of the work site
上記実施の形態1では、作業経路情報を作成する場合について述べたが、本実施の形態2においては、図10に示すように、地図画面表示手段102に、作業現場と作業経路を巡回する順番とを地図画面上に表示する。そして、作業経路作成にあたり、地図画面上の作業経路外に存在する追加作業現場405をマウスなどの操作で指示することで、作業経路に追加することができるものである。地図画面上の追加作業現場405の位置は、作業現場情報DB104の位置X座標、位置Y座標を使用して表示する。さらに、作業経路内に存在する作業現場をマウス操作で選択することで、作業経路から削除することもできる。
In the first embodiment, the case of creating work route information has been described. In the second embodiment, as shown in FIG. 10, the order in which the work site and the work route are circulated on the map
例えば、図10(a)は上記実施の形態1と同様の工程を経て得られた作業経路の初期状態を示す。地図画面上には、作業者の現在位置(拠点)401と、作業現場402と、作業経路403と、作業経路情報404とが表示されている。次に、図10(b)に示すように、作業経路の変更時状態は、追加作業現場405を追加位置406(経路情報404において、「A」の次を指す)に巡回する作業現場として追加したい場合、経路情報404の追加位置406をマウスなどの操作で指示した後、追加作業現場405をマウスなどの操作で指示する。次に、図10(c)に示すように、追加作業現場405が追加位置406に追加されるように作業経路が変更される。
For example, FIG. 10A shows an initial state of a work route obtained through the same process as in the first embodiment. On the map screen, the worker's current position (base) 401,
次に、本実施の形態2の作業現場作業管理システム101の作業経路作成手段103の動作について図11のフローチャートに基づいて説明する。まず、マウスなどの操作により追加位置をマウスの左ダウンなどの操作で指示された内容を受信する(図11のステップS1601)。次に、指示された場所に追加位置が存在するか否かを地図マスタ情報DB106の情報にて判定を行う(図11のステップS1602)。この判定は、例えばJAVASCRIPTなどのプログラムのマウスイベント処理により実現する。次に、存在しないと判断された場合には、ステップS1601に戻る。また、マウスの左ダウン位置に追加位置があると判断された場合には、その追加位置として決定する(図11のステップS1603)。
Next, the operation of the work route creation means 103 of the work site
次に、マウスなどの操作により追加作業現場をマウスの左ダウンなどの操作された内容を受信する(図11のステップS1604)。次に、指示した場所に作業現場が存在するか否かを作業現場情報DB104の情報にて判定を行う(図11のステップS1605)。次に、存在しないと判断された場合にはステップS1604に戻る。また、マウスの左ダウン位置に作業現場があると判断された場合には、その作業現場を追加作業現場として決定する(図11のステップS1606)。次に、作業経路の順番入れ替えを行う(図11のステップS1607)。次に、完成した作業経路は、最終的に経路情報ファイル保存部1306に登録される。尚、作業現場の削除に対しても同様に行うことができる。
Next, the operation content such as the left down of the mouse is received at the additional work site by the operation of the mouse or the like (step S1604 in FIG. 11). Next, it is determined from the information in the work
上記のように構成された実施の形態2の作業現場作業管理システムによれば、上記実施の形態1と同様の効果を奏するのはもちろんのこと、追加したいまたは削除したい作業現場を検索して容易に追加または削除することができるため、作業現場を追加または削除しても作業経路を作成する時間を短縮することができる。 According to the work site work management system of the second embodiment configured as described above, the same effect as that of the first embodiment can be obtained, and it is easy to search for a work site to be added or deleted. Therefore, even if a work site is added or deleted, the time for creating a work route can be shortened.
実施の形態3.
図12はこの発明の実施の形態3における作業現場作業管理システムにおいて示される地図画面の例を示した図、図13はこの発明の実施の形態3の作業現場作業管理システムの動作を説明するためのフローチャートである。上記各実施の形態の作業現場作業管理システムの場合、経路情報とともに送信する地図情報を図12(a)に示すように、地図画面表示手段102にて作業者の現在位置301から作業現場302を巡回する作業経路303を作成した場合、携帯端末手段108へ転送する際に必要となる地図は、必要地図メッシュ304のようになる。しかしながら本実施の形態3では、図12(b)に示すように、携帯端末手段108へ転送する際、作業経路に関係ない不要地図メッシュ305の部分の地図情報は転送しないものである。図12(c)には、作業現場の追加時における地図情報を示す。図に示すように、作業経路に追加作業現場306が追加された場合、新たに作業経路として追加作業経路307が追加され、携帯端末手段108へ経路情報を転送する際、追加地図メッシュ308の地図情報のみを送信する。
FIG. 12 is a diagram showing an example of a map screen shown in the work site work management system according to
次に、本実施の形態3の作業現場作業管理システム101の作業経路作成手段103の必要作業経路情報作成の動作について図13のフローチャートに基づいて説明する。まず、作業現場情報DB104から追加された追加作業現場の情報を取得する(図13のステップS1701)。次に、作業現場情報DB104から追加作業現場の位置を確認する(図13のステップS1702)。次に、作業者の位置を作業者情報DB105から取得する(図13のステップS1703)。次に、作業者の携帯端末手段108の作業情報ファイル保存部1305から作業情報ファイルを取得する(図13のステップS1704)。次に、作業者の携帯端末手段108の経路情報ファイル保存部1306から経路情報ファイルを取得する(図13のステップS1705)。
Next, an operation for creating necessary work route information by the work route creating means 103 of the work site
次に、作業経路作成手段103にて作業経路を再生成する(図13のステップS1706)。次に、作業者の携帯端末手段108へ作業情報ファイルを転送する(図13のステップS1707)。次に、作業者の携帯端末手段108へ経路情報ファイルを転送する(図13のステップS1708)。次に、元々の経路情報ファイルに再生成した地図のメッシュ番号が含まれるか否かを確認する(図13のステップS1709)。次に、含まれている場合には、処理を終了する。また、含まれていない場合、追加分の地図情報を地図情報DB119から抽出して作業者の携帯端末手段108へ転送する(図13のステップS1710)。 Next, the work route creating means 103 regenerates the work route (step S1706 in FIG. 13). Next, the work information file is transferred to the portable terminal means 108 of the worker (step S1707 in FIG. 13). Next, the route information file is transferred to the portable terminal means 108 of the worker (step S1708 in FIG. 13). Next, it is confirmed whether or not the regenerated map mesh number is included in the original route information file (step S1709 in FIG. 13). Next, if it is included, the process ends. If not included, the additional map information is extracted from the map information DB 119 and transferred to the portable terminal means 108 of the worker (step S1710 in FIG. 13).
上記のように構成された実施の形態3の作業現場作業管理システムによれば、上記各実施の形態と同様の効果を奏するのはもちろんのこと、作業経路に必要となる地図情報のみを転送して表示することができる。また、追加の作業現場が発生し、既に作業現場の地図ファイルが携帯端末手段へ転送されている場合には、転送済みの地図情報から、新たに必要となる部分の地図情報のみを抽出して転送を行うので、転送にかかる時間を短縮することができる。また、これにより、携帯端末手段の限られた資源を効率良く使用することができる装置を得ることができる。 According to the work site work management system of the third embodiment configured as described above, not only the same effects as those of the above-described embodiments are obtained, but also only map information necessary for the work route is transferred. Can be displayed. In addition, if an additional work site has occurred and the map file of the work site has already been transferred to the portable terminal means, only the map information of the newly required part is extracted from the transferred map information. Since the transfer is performed, the time required for the transfer can be shortened. This also makes it possible to obtain an apparatus that can efficiently use the limited resources of the portable terminal means.
実施の形態4.
図14はこの発明の実施の形態4における作業現場作業管理システムにおいて示される地図画面の例を示した図、図15はこの発明の実施の形態4の作業現場作業管理システムの動作を説明するためのフローチャートである。上記各実施の形態では、作業経路情報を作成する場合について述べたが、本実施の形態4では図14に示すように、地図画面を設け、縮尺を切り替えて拡大表示と縮小表示が行えるようにしたものである。縮小表示時は位置情報が近い作業現場が1つの作業現場に集約されて表示され、拡大表示時は実際の位置情報で作業現場が表示される。地図画面の拡大、縮尺表示は、JAVASCRIPTなどのプログラムにより実現する。縮尺による集約処理は、作業現場情報DB104の位置X座標、位置Y座標が一定の値に収まるかどうかにより判断する。
FIG. 14 is a diagram showing an example of a map screen shown in the work site work management system according to the fourth embodiment of the present invention, and FIG. 15 is a diagram for explaining the operation of the work site work management system according to the fourth embodiment of the present invention. It is a flowchart of. In each of the embodiments described above, the case of creating work route information has been described. In the fourth embodiment, as shown in FIG. 14, a map screen is provided, and the scale can be switched so that enlarged display and reduced display can be performed. It is a thing. At the time of reduced display, the work sites having close positional information are displayed together in one work site, and at the time of enlarged display, the work sites are displayed with actual position information. Enlargement and scale display of the map screen are realized by a program such as JAVASCRIPT. The consolidation process based on the scale is determined based on whether the position X coordinate and the position Y coordinate of the work
例えば、図14(a)に、縮小表示時の地図画面を示す。このとき、作業現場501にはメッシュ内の複数の集約情報502が含まれている。図14(b)に、拡大表示時の地図画面を示す。拡大することにより、メッシュ内の含まれていた複数の集約情報502が、メッシュ内の作業現場503のそれぞれの位置情報に基づいて表示される。
For example, FIG. 14A shows a map screen during reduced display. At this time, the
本実施の形態4の作業現場作業管理システム101の作業経路作成手段103の拡大表示と縮小表示の動作について図15のフローチャートに基づいて説明する。まず、作業現場の位置情報を作業現場情報DB118から取得する(図15のステップS1801)。次に、取得した位置情報が、一定の値に収まるか否かを、例えば「X座標<一定値」かつ「Y座標<一定値」にて判断する(図15のステップS1802)。次に、収まらない場合にはステップS1804に移る。また、収まった場合には、集約対象として処理を行う(図15のステップS1803)。次に、全ての作業現場において集約処理が終了したか否かを判断し、地図画面内の全ての作業現場について上記処理を繰り返して行う。
The operation of the enlarged display and reduced display of the work route creation means 103 of the work site
上記のように構成された実施の形態4の作業現場作業管理システムによれば、上記各実施の形態と同様の効果を奏するのはもちろんのこと、これにより、作業現場を地図画面上で表示する際、視覚的に見やすい表示を行うことができる。また、集約して作業現場を地図画面上に表示することができるため、地図画面を表示するためにかかる時間を短縮することができる。 According to the work site work management system of the fourth embodiment configured as described above, the work site is displayed on the map screen as well as the same effects as those of the above embodiments. In this case, it is possible to perform a display that is visually easy to see. In addition, since the work sites can be aggregated and displayed on the map screen, the time required to display the map screen can be shortened.
実施の形態5.
図16はこの発明の実施の形態5における作業現場作業管理システムにおいて示される地図画面の例を示した図、図17はこの発明の実施の形態5の作業現場作業管理システムの動作を説明するためのフローチャートである。上記各実施の形態では、作業者が作業現場位置情報を使用して作業現場で作業を行う場合について述べたが、本実施の形態5においては、図16に示すように、作業現場の登録の例を示す。作業対象物601を、作業現場603の取り付け箇所602へ取り付けた際、取り付け箇所602の位置情報を携帯端末手段108の位置検出手段1304で取得する(図17のステップS1901)。次に、作業現場情報DB104の位置X座標、位置Y座標を、この取得した情報に更新する(図17のステップS1902)。
FIG. 16 is a diagram showing an example of a map screen shown in the work site work management system according to the fifth embodiment of the present invention, and FIG. 17 is a diagram for explaining the operation of the work site work management system according to the fifth embodiment of the present invention. It is a flowchart of. In each of the above embodiments, the case where the worker performs work on the work site using the work site position information has been described, but in the fifth embodiment, as shown in FIG. 16, the registration of the work site is performed. An example is shown. When the
上記のように構成された実施の形態5の作業現場作業管理システムによれば、上記各実施の形態と同様の効果を奏するのはもちろんのこと、作業現場位置情報の中で実際に機器の取り付け、交換などの作業を行った位置情報を登録する。次回から同じ作業現場へ向かった際、実際は作業を行った詳細な位置情報が解る為、作業に取り掛かる時間を短縮することができる。 According to the work site work management system of the fifth embodiment configured as described above, the same effect as in each of the above embodiments can be obtained, but the actual installation of equipment in the work site position information is also possible. , Register the location information where the work such as exchange was performed. When the user goes to the same work site from the next time, the detailed position information on the actual work is understood, so the time required for the work can be shortened.
実施の形態6.
図18はこの発明の実施の形態6における作業現場作業管理システムにおいて示される地図画面の例を示した図、図19はこの発明の実施の形態6の作業現場作業管理システムの動作を説明するためのフローチャートである。上記各実施の形態では、作業経路情報を作成する場合について述べたが、本実施の形態6においては、図18に示すように、地図画面を設け、作業現場の作業内容により、表示変更を行えるようにしたので、例えば緊急性の高い作業のみを特別表示とすることができる。緊急性の高い作業は、作業現場情報DB104の作業希望日時と現在日時とにより判断する。緊急性の高い作業の表示色の変更は、地図画面表示手段102にて行う。
Embodiment 6 FIG.
FIG. 18 is a diagram showing an example of a map screen shown in the work site work management system according to the sixth embodiment of the present invention, and FIG. 19 is a diagram for explaining the operation of the work site work management system according to the sixth embodiment of the present invention. It is a flowchart of. In each of the above embodiments, the case of creating work route information has been described. However, in the sixth embodiment, as shown in FIG. 18, a map screen is provided, and the display can be changed depending on the work contents at the work site. Since it did in this way, only a highly urgent work can be made into a special display, for example. Highly urgent work is determined based on the desired work date and current date and time in the work
具体的には、図18(a)に、通常表示時の地図画面を示す。図18(b)に、変更表示時の地図画面を示す。作業現場701の表示が、作業現場(変更表示時)702のように色が切り替わって表示される。本実施の形態5の作業現場作業管理システム101の作業経路作成手段103の色変更表示の動作について図19のフローチャートに基づいて説明する。まず、現在日時を取得する(図19のステップS2001)。次に、取得した現在日時と作業希望日時とを比較し、現在日時が作業希望日時に迫っているか否かを判断する(図19のステップS2002)。尚、迫っているか否かの判断は、例えば、現在日時と作業希望日時との差が1時間以内であるというように所定の時間を設定しても良いし、作業毎にまたは作業の種類毎に所定の時間をそれぞれ設定してもよく、システムに応じて適宜設定することが可能である。次に、迫っていないと判断された場合には、ステップS2004に移る。また、迫っていると判断された場合には、色変更対象として処理を行う(図19のステップS2003)。次に、全ての作業現場において色変更処理が終了したか否かを判断し、地図画面内の全ての作業現場について上記処理を繰り返して行う(図19のステップS2004)。
Specifically, FIG. 18A shows a map screen during normal display. FIG. 18B shows a map screen during change display. The display of the
上記のように構成された実施の形態6の作業現場作業管理システムによれば、上記各実施の形態と同様の効果を奏するのはもちろんのこと、緊急性の高い作業現場など他の作業現場と区別して表示したい場合には、容易に色を変更して表示することが可能となり、視覚的に容易に判断することができる。尚、上記実施の形態6においては、色を変更することにより他の作業現場との区別ができるように表示させる例を示したが、これに限られることはなく、例えば、表示自体を点滅させるなど、他の方法であっても他の作業現場と区別できるような表示であればよい。 According to the work site work management system of the sixth embodiment configured as described above, the same effects as those of the above embodiments can be obtained, as well as other work sites such as highly urgent work sites. In the case where it is desired to distinguish and display, it is possible to easily change the color and display it, and it is possible to easily judge visually. In the sixth embodiment, an example is shown in which the color is changed so that it can be distinguished from other work sites. However, the present invention is not limited to this. For example, the display itself blinks. Any other method may be used as long as it can be distinguished from other work sites.
101 作業現場作業管理システム、102 地図画面表示手段、
103 作業経路作成手段、104 作業現場情報DB、105 作業者情報DB、
106 地図マスタ情報DB、107 道路情報DB、108 携帯端末手段、
109 作業者、113 ネットワーク、116 作業者情報取得手段、
117 道路情報取得手段、118 作業現場情報取得手段、119 地図情報DB、
301,401 現在位置、
302,402,501,503,603,701 作業現場、
303,403 作業経路、304 地図メッシュ、305 不要地図メッシュ、
306,405 追加作業現場、307 追加作業経路、308 追加地図メッシュ、
502 集約情報、702 色変更作業現場。
101 work site work management system, 102 map screen display means,
103 work route creation means, 104 work site information DB, 105 worker information DB,
106 map master information DB, 107 road information DB, 108 portable terminal means,
109 workers, 113 networks, 116 worker information acquisition means,
117 road information acquisition means, 118 work site information acquisition means, 119 map information DB,
301,401 current position,
302, 402, 501, 503, 603, 701 work site,
303, 403 work route, 304 map mesh, 305 unnecessary map mesh,
306,405 additional work site, 307 additional work route, 308 additional map mesh,
502 Integrated information, 702 Color change work site.
Claims (5)
上記作業現場に関する作業希望日時、作業見込み時間および位置情報を含む作業現場情報を取得して作業現場情報データベースに格納する作業現場情報取得手段と、
上記各携帯端末手段の位置情報および上記作業者の状態情報を含む作業者情報を取得して作業者情報データベースに格納する作業者情報取得手段と、
道路の混雑状況情報を取得して道路情報データベースに格納する道路情報取得手段と、
地図情報が格納されている地図情報データベースと、
上記複数の作業者の上記作業現場への到達時間および作業経路を上記作業現場情報データベースおよび上記作業者情報データベースおよび上記道路情報データベースおよび上記地図情報データベースの少なくとも上記作業現場の位置情報、上記各携帯端末手段の位置情報、上記作業者の状態情報、道路の上記混雑状況情報、および上記地図情報に基づいて作成し、作成した上記作業経路を含む地図情報を生成して当該作業者の携帯端末手段に転送する作業経路作成手段とを備え、
上記作業現場として複数の作業現場を設定した場合、上記作業経路は、上記複数の作業現場を巡回する順番に基づいた地図情報を生成し、
上記作業経路作成手段は、上記地図情報の複数箇所の作業現場の中から、作業希望日時と現在日時とが所定の時間内の作業現場は、それ以外の他の作業現場と区別して表示させる現場作業管理システム。 A site work management system for creating and transmitting a work route to a work site for each portable terminal means carried by a plurality of workers,
Work site information acquisition means for acquiring work site information including work desired date and time, expected work time and position information related to the work site and storing it in the work site information database;
Worker information acquisition means for acquiring worker information including the position information of each portable terminal means and the worker status information and storing it in the worker information database;
Road information acquisition means for acquiring road congestion status information and storing it in a road information database;
A map information database in which map information is stored;
The plurality of worker at least the position information of the work site of the arrival time and the work task routing site information database and the operator information database and the road information database and the locations Zujo report database to the work site, the Created based on the position information of each portable terminal means, the worker's status information, the road congestion information, and the map information, and generates the map information including the created work route to carry the worker's mobile for example Bei and a working path definition means to be transferred to the terminal means,
When a plurality of work sites are set as the work sites, the work route generates map information based on the order of circulating around the plurality of work sites,
The work route creation means is configured to display a work site whose desired date / time and current date / time are within a predetermined time from a plurality of work sites in the map information, separately from other work sites. Work management system.
上記作業経路作成手段は、追加された上記作業現場情報を含めて新たな作業経路を作成し、既に上記携帯端末手段へ転送済の地図情報に対して、上記追加された作業経路に対応して新たに必要となる地図情報のみを上記新たな作業経路とともに転送することを特徴とする請求項1ないし請求項3のいずれか1項に記載の現場作業管理システム。 When work site information of a work site is added to the above work site information database,
The work route creation means creates a new work route including the added work site information, and corresponds to the added work route for the map information already transferred to the portable terminal means. The field work management system according to any one of claims 1 to 3 , wherein only map information that is newly required is transferred together with the new work route.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2010108856A JP5355491B2 (en) | 2010-05-11 | 2010-05-11 | Work site work management system |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2010108856A JP5355491B2 (en) | 2010-05-11 | 2010-05-11 | Work site work management system |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2011238021A JP2011238021A (en) | 2011-11-24 |
| JP5355491B2 true JP5355491B2 (en) | 2013-11-27 |
Family
ID=45325924
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2010108856A Active JP5355491B2 (en) | 2010-05-11 | 2010-05-11 | Work site work management system |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP5355491B2 (en) |
Families Citing this family (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2015087425A1 (en) * | 2013-12-12 | 2015-06-18 | 富士通株式会社 | Equipment inspection work assistance program, equipment inspection work assistance method, and equipment inspection work assistance device |
| CN105793883A (en) * | 2013-12-13 | 2016-07-20 | 富士通株式会社 | Equipment inspection work assistance program, equipment inspection work assistance method, and equipment inspection work assistance device |
| KR101961928B1 (en) * | 2017-09-18 | 2019-03-25 | 에이치앤(주) | Safety Management System for Workers of a Sidewalk Near River |
| JP7283110B2 (en) * | 2019-02-20 | 2023-05-30 | 中国電力株式会社 | Patrol support system |
| JP7280811B2 (en) * | 2019-12-02 | 2023-05-24 | 株式会社日立ビルシステム | Congestion predictive display system, congestion predictive display method and program |
| JP7329477B2 (en) * | 2020-05-08 | 2023-08-18 | 東京瓦斯株式会社 | support system, program |
Family Cites Families (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP4080123B2 (en) * | 1999-12-07 | 2008-04-23 | パイオニア株式会社 | Navigation system |
| JP2002007600A (en) * | 2000-06-26 | 2002-01-11 | Hitachi Chem Co Ltd | Method, support device, and support system for patrol management of structure, recording medium with recorded data structure for patrol management, and recording medium with recorded patrol management support program |
| JP3753110B2 (en) * | 2002-08-07 | 2006-03-08 | 株式会社デンソー | Car navigation system |
| JP2004164615A (en) * | 2002-10-11 | 2004-06-10 | Seiko Epson Corp | Work person support method and work person support program |
| JP2005339303A (en) * | 2004-05-28 | 2005-12-08 | Nec Mobiling Ltd | Maintenance / inspection work support device, maintenance / inspection work support method, and maintenance / inspection work support program |
| JP2007047922A (en) * | 2005-08-08 | 2007-02-22 | Osaka Gas Co Ltd | Operation arrangement support system |
| JP2007310723A (en) * | 2006-05-19 | 2007-11-29 | Fuji Xerox Co Ltd | Installation position registration method |
-
2010
- 2010-05-11 JP JP2010108856A patent/JP5355491B2/en active Active
Also Published As
| Publication number | Publication date |
|---|---|
| JP2011238021A (en) | 2011-11-24 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP5355491B2 (en) | Work site work management system | |
| KR101459190B1 (en) | Travel scheduling system and travel scheduling method using the system | |
| EP2549231A2 (en) | Map data distribution server, map data distribution system, and map data distribution method | |
| JPWO2007102309A1 (en) | Information processing apparatus, information communication system, information processing method, etc. | |
| JP2016164655A (en) | Administration system of infrastructure installation, method thereof, display system thereof, server employed therein, terminal device, and program | |
| JPWO2010084615A1 (en) | Map information provision mediation system, map information provision mediation server, and map information provision method in map information provision mediation system | |
| KR101632065B1 (en) | System for sharing thematic maps of urban planning information based on data-distributed processing | |
| CN108446298A (en) | Room method and device is looked in a kind of commuting | |
| DK178501B1 (en) | Construction site image management system and method | |
| JP2016023978A (en) | Navigation device, portable terminal, navigation method, and program | |
| JP6767840B2 (en) | Information processing equipment, information processing methods, and programs | |
| CN102331578A (en) | A method for transmitting navigation information, a navigation server, and a location service terminal | |
| US10824969B2 (en) | System and method for locate request entry configured for defining multiple excavation sites as part of a single locate request | |
| JP4684043B2 (en) | Power facility information provision system | |
| US20150186894A1 (en) | Locate ticket management | |
| JP5456835B2 (en) | Advertisement information providing apparatus and advertisement information providing method | |
| JP2015132968A (en) | Information processing server, information processing method, and information processing program | |
| KR20210051023A (en) | Method for Managing Facility Visiting Repair Services in Network, and Managing Server Used Therein | |
| JP2017173972A (en) | Dynamic state management system, dynamic state management method, and program | |
| JP2006221109A (en) | Real estate property information display system | |
| KR101515811B1 (en) | A smartphone equipped with a location-information application method using the computerized number of Jeonju | |
| JP2014026647A (en) | Management server managing indicator or information stake and service providing system | |
| JP5710796B2 (en) | Information providing apparatus, information providing method, and information providing program | |
| JP5131803B2 (en) | Map display system for mobile information devices | |
| JP2009140259A (en) | Evacuation support information providing method and apparatus |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20120215 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20130530 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20130604 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20130724 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20130820 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20130827 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 5355491 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |