JP5375139B2 - Data collection management device and missing data interpolation processing method - Google Patents
Data collection management device and missing data interpolation processing method Download PDFInfo
- Publication number
- JP5375139B2 JP5375139B2 JP2009023160A JP2009023160A JP5375139B2 JP 5375139 B2 JP5375139 B2 JP 5375139B2 JP 2009023160 A JP2009023160 A JP 2009023160A JP 2009023160 A JP2009023160 A JP 2009023160A JP 5375139 B2 JP5375139 B2 JP 5375139B2
- Authority
- JP
- Japan
- Prior art keywords
- data
- energy consumption
- interpolation
- missing
- group
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Indication And Recording Devices For Special Purposes And Tariff Metering Devices (AREA)
- Testing And Monitoring For Control Systems (AREA)
Abstract
Description
本発明は、スーパーマーケットなどのバックヤードでの消費エネルギー量を計測・記録表示する技術に係り、特に計測値の収集過程で欠損が生じた場合でも、精度良く補間してデータ収集することのできるデータ収集管理装置および欠損データの補間処理方法に関する。 The present invention relates to a technique for measuring, recording and displaying energy consumption in a backyard such as a supermarket, and in particular, data that can be collected by interpolating with high accuracy even when a deficiency occurs in the process of collecting measured values. The present invention relates to a collection management device and a missing data interpolation processing method.
スーパーマーケットなどのバックヤードで機器の消費エネルギー量を計測する場合、機器ごとの消費エネルギー量と、主幹から収集した機器全体の消費エネルギー量のデータを収集している。このとき、計測データに欠損が発生した場合は、前回値を用いて補間するのが一般的である。 When measuring the energy consumption of a device in a backyard such as a supermarket, data on the energy consumption of each device and the energy consumption of the entire device collected from the main are collected. At this time, when a defect occurs in the measurement data, it is common to interpolate using the previous value.
なお、従来の消費エネルギー量の計測技術に関して、例えば、特許文献1では、複数部門が所在しているエリアのレイアウト条件が変動した場合であっても、エリアに対して設けられているエネルギー使用設備の全消費エネルギー量のうち各部門毎の個別の消費エネルギー量を算出するため、各部門の個別消費エネルギー量の全消費エネルギー量に対する使用割合を保存しておき、全消費エネルギー量にこの使用割合を乗ずることによって、レイアウトが変更になった各部門の個別消費エネルギー量を算出する方法および装置が提案されている。 Regarding conventional energy consumption measurement technology, for example, in Patent Document 1, even if the layout conditions of an area where a plurality of departments are located fluctuate, energy use facilities provided for the area In order to calculate the individual energy consumption for each department out of the total energy consumption, store the usage ratio of the individual energy consumption of each department to the total energy consumption, and use this ratio for the total energy consumption. There has been proposed a method and apparatus for calculating the individual energy consumption of each department whose layout has been changed by multiplying.
また、特許文献2では、欠損している消費エネルギー量を補間するため、例えば厨房用器具の所有台数等の属性に基づいて、旧属性の消費エネルギー量と新属性の消費エネルギー量とを収集し、CPUにより、新属性の標準値、旧属性の消費エネルギー量及び標準値に基づいて旧属性の消費エネルギー量に対応する新属性の消費エネルギー量を算出して、欠損部を補間するという手法、および、旧属性の標準値、新属性の消費エネルギー量及び標準値に基づいて新属性の消費エネルギー量に対応する旧属性の消費エネルギー量を算出して、欠損部を補間するという手法が開示されている。 Further, in Patent Document 2, in order to interpolate the missing energy consumption amount, for example, based on attributes such as the number of owned kitchen appliances, the old attribute consumption energy amount and the new attribute consumption energy amount are collected. , A method of calculating the consumed energy amount of the new attribute corresponding to the consumed energy amount of the old attribute based on the standard value of the new attribute, the consumed energy amount of the old attribute and the standard value by the CPU, and interpolating the missing part, In addition, a method is disclosed in which the old attribute standard value, the new attribute energy consumption amount and the standard value are calculated based on the old attribute energy consumption amount corresponding to the new attribute energy amount and the missing portion is interpolated. ing.
上述の従来の技術は、あるデータを用いて他のデータを算出するものであるが、バックヤードのデータを収集管理するような場合、データの欠損のしかたは多種多様であり、欠損のしかた(欠損パターン)に応じて精度の高いデータ補間を行う必要がある。 The above-mentioned conventional technique calculates other data using a certain data. However, when collecting and managing backyard data, there are various ways of data loss. It is necessary to perform highly accurate data interpolation according to (missing pattern).
また、リアルタイムに計測データを監視する必要から、欠損が生じたときに、直ちにデータを補間して、監視処理を継続する必要もある。 In addition, since it is necessary to monitor measurement data in real time, it is also necessary to continue the monitoring process by interpolating the data immediately when a defect occurs.
本発明は、上述のかかる事情に鑑みてなされたものであり、欠損パターンに応じて適切な補間処理を実行することにより補間データの精度を向上させ、より正確な監視業務を可能にするデータ収集管理装置および欠損データの補間処理方法を提供することを目的とする。 The present invention has been made in view of the above-described circumstances, and improves the accuracy of interpolation data by executing an appropriate interpolation process according to a missing pattern, thereby enabling more accurate monitoring work. It is an object of the present invention to provide a management device and a missing data interpolation processing method.
上記目的を達成するため、本発明に係わるデータ収集管理装置は、複数の機器が一または二以上のグループに分けられ、各グループの総消費エネルギー量データと各グループに属する機器の個別消費エネルギー量データとを所定の周期で収集する消費エネルギー量収集手段と、消費エネルギー量収集手段によって収集されたデータ中にデータ欠損を検出したときは、欠損パターンごとに予め定められた補間処理によって補間データを算出する欠損データ補間手段と、消費エネルギー量収集手段によって正常に収集されたデータと、欠損データ補間手段によって算出された補間データとを識別表示する表示手段と、を備えたことを特徴とする。 In order to achieve the above object, the data collection and management apparatus according to the present invention includes a plurality of devices divided into one or more groups, and the total energy consumption data of each group and the individual energy consumption of devices belonging to each group. Energy consumption collecting means for collecting data at a predetermined cycle; and when data loss is detected in the data collected by the energy consumption collecting means, interpolation data is obtained by interpolation processing predetermined for each missing pattern. It is characterized by comprising a missing data interpolation means for calculating, a display means for identifying and displaying the data normally collected by the consumed energy amount collecting means and the interpolation data calculated by the missing data interpolation means.
本発明では、データ欠損を検出したときは、欠損パターンごとに予め定められた手順で補間処理を行い、補間データと正常に受信したデータとを識別表示するので、データ欠損のパターンによって適切な補間処理が可能となり、また管理担当者は、正常に受信したデータか補間処理によって算出されたデータかを知ることができるので正しい判断が可能となる。 In the present invention, when data loss is detected, interpolation processing is performed according to a predetermined procedure for each missing pattern, and the interpolation data and normally received data are identified and displayed. Processing is possible, and the person in charge of management can know whether the data is normally received or calculated by interpolation processing, so that a correct determination can be made.
本発明に係わるデータ収集管理装置は、さらに、個別の機器ごとに消費エネルギー量の履歴情報を保存する手段と、履歴情報をもとに、各機器の個別消費エネルギー量の総消費エネルギー量に対する按分係数を計算する按分係数算出手段とを備え、欠損データ補間手段は、按分係数を用いて補間処理を実行することを特徴とする。 The data collection and management apparatus according to the present invention further includes means for storing history information of energy consumption for each individual device, and apportionment of the individual energy consumption of each device relative to the total energy consumption based on the history information. A distribution coefficient calculation unit for calculating a coefficient, and the missing data interpolation unit performs an interpolation process using the distribution coefficient.
本発明では、消費エネルギー量の履歴情報から按分係数を計算して補間処理を実行する。これにより、同一グループ内の複数の機器のデータが同時に欠損したときにも補間処理が可能となる。 In the present invention, an apportioning coefficient is calculated from the history information of the consumed energy amount, and interpolation processing is executed. This enables interpolation processing even when data of a plurality of devices in the same group is lost simultaneously.
なお、按分係数は、予め管理担当者が設定した値を用いてもよいが、好ましくは、消費エネルギー量の履歴は、例えば、季節ごと、平日・休祭日など機器の使用割合が異なることが想定される所定の時期ごとに各周期のデータの平均値をとるようにするとよい。これにより、精度の高い補間処理が可能となる。なお、管理担当者の設定した按分係数を初期値として用い、周期的に実行される按分係数算出手段で、新たに按分係数が求まったときには、この按分係数を用いることによって、時間の経過に伴い精度の高い按分係数を適用することができる。 Note that the apportionment coefficient may be a value set in advance by the person in charge of management, but preferably, the history of energy consumption assumes, for example, that the proportion of equipment used varies depending on the season, weekdays, holidays, etc. It is preferable to take the average value of the data of each period at every predetermined time. Thereby, highly accurate interpolation processing is possible. When the apportioning coefficient set by the manager is used as an initial value and the apportioning coefficient calculation means that is executed periodically finds an apportioning coefficient, this apportioning coefficient can be used as time passes. A highly accurate distribution coefficient can be applied.
また、本発明に係わるデータ収集管理装置は、さらに、収集タイミングごとの総消費エネルギー量の前回値と今回値の変化率を計算する変化率算出手段を備え、欠損データ補間手段は、ある収集タイミングで同一グループの全てのデータの欠損を検出したときは、変化率算出手段によって算出された変化率のうち、最新の変化率を用いて、当該グループの総消費エネルギー量を算出し、当該総消費エネルギー量に当該グループに属する各機器の按分係数を適用して各機器の個別消費エネルギー量を算出することを特徴とする。 The data collection management device according to the present invention further includes a change rate calculation means for calculating a change rate of the previous value and the current value of the total energy consumption at each collection timing, and the missing data interpolation means includes a certain collection timing. When all data in the same group is detected in step 1, the latest change rate is calculated from the change rates calculated by the change rate calculation means, and the total energy consumption of the group is calculated. The individual energy consumption amount of each device is calculated by applying an apportioning coefficient of each device belonging to the group to the energy amount.
本発明では、総消費エネルギー量の変化率を随時記録しておき、この変化率と各機器の按分係数とを用いることによって、全データ欠損時にも精度の良いデータ補間が可能となる。 In the present invention, the rate of change of the total energy consumption is recorded at any time, and by using this rate of change and the apportioning coefficient of each device, accurate data interpolation is possible even when all data is missing.
好ましくは、欠損データ補間手段は、算出した補間データに対して補間処理に対応する信頼度を付加し、表示手段は、補間データを識別表示する際に、当該補間データに付加されている信頼度に基づいてデータを識別表示すると良い。 Preferably, the missing data interpolation means adds reliability corresponding to the interpolation processing to the calculated interpolation data, and the display means adds the reliability added to the interpolation data when identifying and displaying the interpolation data. The data should be identified and displayed based on the above.
これにより、管理担当者は、補間データか否かのみでなく、さらに補間データの信頼度を知ることができるので、監視業務に役立てることができる。 Thereby, since the person in charge of management can know not only whether or not the data is interpolation data but also the reliability of the interpolation data, it can be used for monitoring work.
なお、この信頼度が、所定値以下の場合は、後の収集タイミングで収集したデータを用いて、例えば、後のデータの按分係数と補間処理時の按分係数との平均を用いて再計算するなどの処理によって、当該補間データを修正するのが好ましい。これによって、補間データの精度を向上させることができる。 When the reliability is equal to or less than a predetermined value, recalculation is performed using the data collected at the later collection timing, for example, using the average of the distribution coefficient of the subsequent data and the distribution coefficient during the interpolation process. It is preferable to correct the interpolation data by such a process. Thereby, the accuracy of the interpolation data can be improved.
また、本発明に係わる欠損データの補間処理方法は、複数の機器の消費エネルギー量データを収集し、データの欠損を検出して欠損データを補間する欠損データの補間処理方法であって、複数の機器を一または二以上のグループに分け、各グループの総消費エネルギー量データと各グループに属する機器の個別消費エネルギー量データとを所定の周期で収集するステップと、個別の機器ごとに消費エネルギー量の履歴情報を保存するステップと、履歴情報をもとに、各機器の個別消費エネルギー量の総消費エネルギー量に対する按分係数を計算するステップと、収集タイミングごとの総消費エネルギー量の前回値と今回値の変化率を算出するステップと、収集されたデータ中にデータ欠損を検出したとき、欠損パターンごとに予め定められた補間処理を実行する一方、ある収集タイミングで同一グループの全てのデータの欠損を検出したときは、算出された変化率のうち、最新の変化率を用いて、当該グループの総消費エネルギー量を算出した後、当該総消費エネルギー量に当該グループに属する各機器の按分係数を適用して各機器の個別消費エネルギー量を算出する補間処理を実行するステップと、正常に収集されたデータと、補間処理によって算出されたデータとを識別表示するステップと、を含むことを特徴とする。 The missing data interpolation processing method according to the present invention is a missing data interpolation processing method that collects energy consumption data of a plurality of devices, detects missing data, and interpolates the missing data. Dividing the equipment into one or more groups, collecting the total energy consumption data of each group and the individual energy consumption data of the equipment belonging to each group in a predetermined cycle, and the energy consumption for each individual equipment Saving historical information, calculating the apportioning coefficient of the individual energy consumption of each device relative to the total energy consumption based on the history information, and the previous and current values of the total energy consumption at each collection timing The step of calculating the rate of change of the value, and when data loss is detected in the collected data, it is predetermined for each missing pattern When all data in the same group is detected at a certain collection timing while performing inter-process processing, the total energy consumption of the group is calculated using the latest change rate among the calculated change rates. After that, the step of executing the interpolation process for calculating the individual energy consumption amount of each device by applying the apportioning coefficient of each device belonging to the group to the total energy consumption amount, the normally collected data, and the interpolation processing And the step of identifying and displaying the data calculated by the above.
本発明によれば、欠損パターンに応じて当該パターンに対応する補間処理を実行するので、データ補間の精度を向上させることができる。 According to the present invention, since the interpolation process corresponding to the pattern is executed according to the missing pattern, the accuracy of data interpolation can be improved.
また、ある収集タイミングにおいて全てのデータが欠損した場合でも、直近の総エネルギー量の変化率と過去の機器の個別消費エネルギー量の按分係数によって欠損データの補間をすることにより、監視業務を続行させることができ、さらに、補間したデータを識別表示することによって、より正確な監視業務が可能となる。 Even if all data is lost at a certain collection timing, the monitoring work is continued by interpolating the missing data by the apportioning coefficient of the most recent change rate of total energy amount and individual energy consumption of past devices. In addition, more accurate monitoring work can be performed by identifying and displaying the interpolated data.
また、データ補間のパターンと信頼度を関連付け、所定値以下の信頼度については、その後に収集した他のデータで修正することによって精度の高いデータ収集管理が可能となる。 In addition, the data interpolation pattern is associated with the reliability, and the reliability less than a predetermined value can be corrected with other data collected thereafter, thereby enabling highly accurate data collection management.
以下本発明の実施の形態を説明する。図1は、第1の実施の形態によるデータ収集管理装置1の機能ブロック図である。 Embodiments of the present invention will be described below. FIG. 1 is a functional block diagram of a data collection management device 1 according to the first embodiment.
この図において、データ収集管理装置1は、バックヤード50の計測対象機器(図中、主幹および機器)の消費エネルギー量のデータを、部門など所定のグループごとに消費エネルギー量を検知するセンサ2を介して入力する。データは、収集時刻においてグループNo.、およびグループ内の機器を特定する構成要素No.に関連付けてセンサで検知した消費エネルギー量のデータ値を付して送られる。このとき、ノイズや機器の不具合等によって収集データに欠損が発生した場合は、後述する補間処理によって欠損データを補間して、一連のデータを保存管理すると共に画面に表示出力する。管理担当者は、この表示画面に出力された消費エネルギー量によって計測対象機器の稼動状態や異常の有無等の監視を行う。 In this figure, the data collection management device 1 includes a sensor 2 that detects energy consumption data for each predetermined group such as a department, using data on the energy consumption of the measurement target devices (the main trunk and devices in the figure) of the backyard 50. Input through. The data is group No. at the collection time. , And the component No. identifying the device in the group. The data value of the energy consumption amount detected by the sensor in association with is sent and sent. At this time, if a defect occurs in the collected data due to noise or a malfunction of the device, the missing data is interpolated by an interpolation process described later, and a series of data is stored and managed and displayed on the screen. The manager in charge monitors the operating state of the measurement target device and the presence / absence of an abnormality based on the energy consumption output on the display screen.
次に、データ収集管理装置1の構成を説明する。
データ収集管理装置1は、計測対象機器センサ2から直接または図示しない伝送装置を介して送られてくる消費エネルギー量のデータを入力して、計測エネルギーDB21に保存する消費エネルギー量収集手段11、データ欠損の発生を検出し、収集したデータをもとに欠損データの補間処理を実行して、その結果および収集データを消費エネルギー量DB22に保存する欠損データ補間手段12、各計測対象機器の消費エネルギー量を表示装置の表示画面30へ出力する表示手段13を有している。各手段11〜13は、プログラムによって実現可能な機能である。
Next, the configuration of the data collection management device 1 will be described.
The data collection management device 1 receives energy consumption amount data sent from the measurement target device sensor 2 directly or via a transmission device (not shown), and saves it in the measurement energy DB 21. The occurrence of deficiency is detected, deficient data interpolation is performed based on the collected data, and the result and collected data are stored in the consumed energy amount DB 22. Display means 13 for outputting the quantity to the display screen 30 of the display device is provided. Each means 11-13 is a function realizable by a program.
データ収集管理装置1は、また、計測対象機器のグルーピングやデータ収集のための種々のパラメータを保存する設定テーブル19を備えている。 The data collection management device 1 also includes a setting table 19 that stores various parameters for grouping measurement target devices and collecting data.
図2は、設定テーブル19のデータ構成例である。各計測点の名称と、プログラムやデータベースで管理するための計測点ID、入力処理や伝送で使用する物理アドレス情報のほか、各計測点のグループNo.やその中の機器を特定する構成要素No.および按分係数が互いに関連付けられて保存されている。この按分係数は、各機器の消費エネルギー量の割合を示すもので管理担当者によって設定される。また、物理アドレス情報は、電力量計など使用するセンサの仕様で決まるアドレスで、通常は通信アドレスと回路No.の組み合わせとなる。グループ構成定義のグループNo.は主に部門を示す識別子、また構成要素No.は部門(グループ)内の機器を示す識別子であり、この図では、「0」は部門全体、「1」以降は各機器を示すようにしている。 FIG. 2 is a data configuration example of the setting table 19. In addition to the name of each measurement point, the measurement point ID for management by a program or database, physical address information used for input processing or transmission, the group number of each measurement point. And the component No. that identifies the device in it. And proration coefficients are stored in association with each other. This apportioning coefficient indicates the proportion of energy consumption of each device and is set by the person in charge of management. The physical address information is an address determined by the specifications of the sensor used, such as a watt hour meter. It becomes a combination. Group No. in group configuration definition Is an identifier mainly indicating a department, and a component number. Is an identifier indicating a device in a department (group). In this figure, “0” indicates the entire department, and “1” and thereafter indicate each device.
次に、上記の構成を有するデータ収集管理装置1の動作を説明する。
(消費エネルギー量収集処理)
消費エネルギー量収集手段11は、予め定められた所定の時刻毎に、消費エネルギー量を収集し、収集したデータを図3に例示する計測エネルギーDB21の該当するグループ構成定義の計測値欄に格納する。また、正常に消費エネルギー量を収集できたか否かを示す情報を、各計測値欄に関連付けて保存する。この図では、所定の収集タイミングでデータが正常受信された場合は「0」を結果欄に格納し、そうでない場合は異常として「1」を格納する。
Next, the operation of the data collection management apparatus 1 having the above configuration will be described.
(Energy consumption collection processing)
The consumed energy amount collecting means 11 collects the consumed energy amount at a predetermined time and stores the collected data in the measured value column of the corresponding group configuration definition in the measured energy DB 21 illustrated in FIG. . Further, information indicating whether or not the amount of energy consumption has been successfully collected is stored in association with each measured value column. In this figure, “0” is stored in the result column when the data is normally received at a predetermined collection timing, and “1” is stored as an abnormality otherwise.
(欠損データ補間処理)
以下、欠損データ補間手段12の処理手順を実施例ごとに説明する。
(Missing data interpolation process)
Hereinafter, the processing procedure of the missing data interpolation unit 12 will be described for each embodiment.
まず図4を用いて実施例1による欠損データ補間手段12の処理手順を説明する。
欠損データ補間手段12は、収集タイミングから一定時間経過後に起動されると、計測エネルギーDB21にアクセスして、当該収集タイミングの各計測値の結果欄を参照して、受信データが正常か異常かを判定する。当該収集タイミングの全ての結果欄が「0」すなわち正常の場合は、欠損なしとして(S101で「No」)、計測値から各計測対象機器の消費エネルギー量を抽出し、あるいはスケール変換等の所定の演算処理によって計算して(S102)、消費エネルギー量DB22の該当欄に格納する(S103)。
First, the processing procedure of the missing data interpolation unit 12 according to the first embodiment will be described with reference to FIG.
When the missing data interpolation means 12 is activated after a lapse of a certain time from the collection timing, it accesses the measurement energy DB 21 and refers to the result column of each measurement value at the collection timing to determine whether the received data is normal or abnormal. judge. When all the result columns of the collection timing are “0”, that is, normal, it is determined that there is no deficiency (“No” in S101), and the energy consumption amount of each measurement target device is extracted from the measurement value, or predetermined such as scale conversion (S102) and stored in the corresponding column of the energy consumption DB 22 (S103).
一方、ステップS101において、結果欄が「1」すなわち異常の場合は、欠損ありとして(S101で「Yes」)、次にそのデータがグループ定義されているか否かを判定する(S104)。グループ定義されていない場合、すなわち当該データ単独で収集した場合は(S104で「No」)、前回の収集タイミングのデータ(前値)で計算して(S105)、消費エネルギー量DB22に保存する(S103)。
ステップS104でグループ定義されている場合は、その収集タイミングの一連の結果欄の異常個数は一つのみか否かを判定し(S106)、一つのみの場合は下記の関係式(1)をもとにその一つの結果を算出し(S107)、当該演算結果を含め、当該収集タイミングのすべての計測データを消費エネルギー量DB22へ保存する(S103)。
関係式
全体(主幹)の消費エネルギー量=Σグループ内の機器の消費エネルギー量
・・・ (1)
On the other hand, in step S101, if the result column is “1”, that is, abnormal, it is determined that there is a defect (“Yes” in S101), and then it is determined whether the data is group-defined (S104). When the group is not defined, that is, when the data is collected alone (“No” in S104), the previous collection timing data (previous value) is calculated (S105) and stored in the energy consumption DB 22 ( S103).
If the group is defined in step S104, it is determined whether or not the number of abnormalities in the series of result columns of the collection timing is only one (S106). If there is only one, the following relational expression (1) is also obtained. One result is calculated (S107), and all measurement data of the collection timing including the calculation result is stored in the energy consumption DB 22 (S103).
Relational expression Total (main) energy consumption = Energy consumption of equipment in the Σ group
(1)
実施例2による欠損データ補間手段12の処理手順を図5に示す。この図において、ステップS201〜S205の処理は、図4のステップS101〜S105の処理に対応している。 FIG. 5 shows a processing procedure of the missing data interpolation unit 12 according to the second embodiment. In this figure, the processes of steps S201 to S205 correspond to the processes of steps S101 to S105 of FIG.
ステップS204において、グループ定義をされている場合は(S204で「Yes」)、次に、同じ収集タイミングで複数データの欠損があり、かつ、一連の計測データのうち最低一つでも計測されたか否かを判定し(S206)、Yesの場合は、設定テーブル19に保存されている按分係数を用いて計算し(S207)、その計算結果を含め、一連の計測データを消費エネルギー量DB22に保存する。 If the group is defined in step S204 (“Yes” in S204), then there is a plurality of missing data at the same collection timing, and at least one of the series of measurement data has been measured. (S206), in the case of Yes, it calculates using the proportionality coefficient preserve | saved in the setting table 19 (S207), and saves a series of measurement data including the calculation result in energy consumption DB22. .
ステップS207において、按分係数を用いた計算のしかたとして、総消費エネルギー量が計測されている場合は、この計測値に各機器の按分係数を乗じて、各機器の個別の消費エネルギー量を算出する。ある機器の消費エネルギー量のみが計測されている場合は、その機器の計測値にその機器の按分係数と他の機器の按分係数の比を乗じて、当該他の機器の消費エネルギー量を算出する。また、計測された機器の計測値をその機器の按分係数で除することによって総消費エネルギー量を算出することができる。 In step S207, if the total energy consumption is measured as a method of calculation using the distribution coefficient, the individual energy consumption of each apparatus is calculated by multiplying this measured value by the distribution coefficient of each apparatus. . If only the energy consumption of a device is measured, multiply the measured value of that device by the ratio of the apportioning factor of that device to the apportioning factor of the other device to calculate the energy consumption of that other device. . Further, the total energy consumption can be calculated by dividing the measured value of the measured device by the apportioning coefficient of the device.
次に、実施例3として、実施例1と実施例2とを複合した例を図6に示す。
図6において、ステップS301〜S307は、図4のステップS201〜S207と同様である。また、ステップS308,S309は、図5のステップS206,S207と同様である。
Next, as Example 3, an example in which Example 1 and Example 2 are combined is shown in FIG.
In FIG. 6, steps S301 to S307 are the same as steps S201 to S207 in FIG. Steps S308 and S309 are the same as steps S206 and S207 in FIG.
つまり、図6中に記載した処理A、処理B、処理Cを切替えて欠損データを補間することによって、欠損データ復元精度を向上させることができる。図6の例では、処理Aが最も精度が高く、続いて、処理B、処理Cの順となる。 That is, the missing data restoration accuracy can be improved by interpolating the missing data by switching between the processes A, B, and C described in FIG. In the example of FIG. 6, process A has the highest accuracy, followed by process B and process C in this order.
以下、欠損のケースごとに、どのように補間処理されるかを説明する。なお、下記において、計算例の番号は、図3の右欄に付した計算例番号に対応している。また、補間処理については、図6に示す対応する処理記号(A〜C)を付す。 The following describes how interpolation processing is performed for each missing case. In the following, the numbers of the calculation examples correspond to the calculation example numbers given in the right column of FIG. Further, for the interpolation processing, corresponding processing symbols (A to C) shown in FIG. 6 are given.
a.欠損が無い場合(計算例0)
欠損がない場合は、計測値をそのまま消費エネルギー量DB22に保存すると共に、補間なしを示すフラグ「0」を格納する。 When there is no deficiency, the measured value is stored as it is in the energy consumption DB 22 and a flag “0” indicating no interpolation is stored.
b.欠損が主幹のみの場合(計算例1)(処理A)
表2において、全体(主幹)の収集のみが出来なかった場合は、式(1)より、グループ内の機器の消費エネルギー量を合計して、全体(主幹)の消費エネルギー量を求める。 In Table 2, when only the entire (main trunk) cannot be collected, the energy consumption of the entire (main trunk) is obtained by summing up the energy consumption of the devices in the group from Equation (1).
c.欠損が機器2のみの場合(計算例2)(処理A)
表3において、機器2の収集のみが出来なかった場合は、式(1)をもとに、全体(主幹)の消費エネルギー量から機器1と機器3の消費エネルギー量の合計値を減算して、機器2の消費エネルギー量を求める。 In Table 3, if only device 2 could not be collected, subtract the total energy consumption of device 1 and device 3 from the total (main) energy consumption based on equation (1). The amount of energy consumed by the device 2 is obtained.
d.全体の総消費エネルギー量データのみ収集できた場合(計算例3)(処理B)
グループ内の総消費エネルギー量のみが収集できた場合は、総消費エネルギー量をもとに、各個別消費エネルギー量に設定された按分係数を乗じて、欠損した各個別消費エネルギー量を算出する。 When only the total energy consumption within the group can be collected, each missing individual energy consumption is calculated based on the total energy consumption by multiplying each individual energy consumption by a set proportionality factor.
e.複数の個別消費エネルギー量のうちの1つのみが収集できた場合(計算例4)(処理B)
複数の個別消費エネルギー量のうちの1つが収集できたとき、この収集できた個別消費エネルギー量をもとに、該個別消費エネルギー量に設定された按分係数を除算して総消費エネルギー量を復元し、この復元された総消費エネルギー量をもとに、個別消費エネルギー量毎に設定された按分係数を乗じて収集できなかった個別消費エネルギー量を算出する。
When one of multiple individual energy consumptions can be collected, based on this collected individual energy consumption, the apportioning coefficient set for the individual energy consumption is divided to restore the total energy consumption Then, based on the restored total consumed energy amount, an individual energy consumption amount that could not be collected is calculated by multiplying a proportionality coefficient set for each individual consumed energy amount.
表5の例では、機器2の個別消費エネルギー量「42」と、この按分係数「30%」から、表5中の計算式に基づいて、まず全体(主幹)の総消費エネルギー量「140」を求める。これに、機器1または機器3の按分係数を乗じて、それぞれの個別消費エネルギー量を計算する。 In the example of Table 5, based on the calculation formula in Table 5, from the individual energy consumption “42” of the device 2 and the apportionment coefficient “30%”, the total energy consumption “140” of the whole (main) first. Ask for. The individual energy consumption amount is calculated by multiplying this by the apportioning coefficient of the device 1 or the device 3.
f.全てのデータが欠損した場合(計算例5)(処理C)
全ての機器の消費エネルギー量が欠損したときは、このそれぞれの欠損した消費エネルギー量に、前回取得したそれぞれの消費エネルギー量を割り当てて復元する。
When the energy consumption amounts of all the devices are lost, the respective acquired energy amounts are allocated to the lost energy consumptions and restored.
全て欠損のため、今回値=前回値として、今回値−前回値によって消費エネルギー量を算出して「0」とする。 Since all are missing, the current value = previous value, and the amount of energy consumed is calculated as “0” by this value−previous value.
(その他の計算例)
なお、上記の計算のしかたは一例であり、他の計算式を用いてそれぞれの消費エネルギー量を求めることができる。例えば、下記の表7に示す個別消費エネルギー量が一つでも計測されている場合は、まず全体の使用量を求め、次に各機器の按分係数で按分するようにしても良いし、全体から計測されている機器の個別の消費量との差を求め、欠損機器の按分係数の比率からそれぞれの個別消費エネルギー量を求めるようにしても良い。
(Other calculation examples)
Note that the above calculation method is an example, and the amount of energy consumption can be obtained using another calculation formula. For example, if even one of the individual energy consumptions shown in Table 7 below is measured, the total amount used may be obtained first, and then apportioned by the apportioning coefficient of each device. It is also possible to obtain a difference from the individual consumption of the device being measured, and obtain the individual energy consumption amount from the ratio of the apportioning coefficient of the defective device.
なお、計測されている機器の使用量の按分係数と欠損している機器の按分係数との比から求めることもできるが、本実施の形態では、管理担当者により予め設定された按分係数を用いるので、精度が低くなるため好ましくない。 Although it can be obtained from the ratio between the apportioning coefficient of the used amount of the device being measured and the apportioning factor of the missing device, in this embodiment, an apportioning factor preset by the manager is used. Therefore, the accuracy is lowered, which is not preferable.
したがって、欠測パターンに応じて予め精度の高いアルゴリズムを定めておき、このアルゴリズムを用いて補間処理を行うのが良い。
欠損データ補間手段12は、上述のごとく欠損パターンごとに補間処理を行い、その結果と計測データとを消費エネルギー量DB22に保存する。また、補間データか、計測データかを示すフラグを各データに関連付けて格納する。 As described above, the missing data interpolation unit 12 performs the interpolation process for each missing pattern, and stores the result and the measurement data in the energy consumption DB 22. In addition, a flag indicating interpolation data or measurement data is stored in association with each data.
図7は、消費エネルギー量DB22のデータ例であり、図3との対応において示している。消費エネルギー量DB22には、欠損データが補間されて一連のデータが格納される。なお、表最右欄の計算例は、図3および上述の各計算例の説明と対応している。
図7において、消費エネルギー量DB22は、日付と時刻、および、所定時間当たりの消費エネルギー量と補間したか否かを示すフラグ(1:補間あり、0:補間なし)のデータを持っている。
FIG. 7 is a data example of the energy consumption DB 22 and is shown in correspondence with FIG. A series of data is stored in the energy consumption DB 22 by interpolating the missing data. The calculation example in the rightmost column of the table corresponds to FIG. 3 and the description of each calculation example described above.
In FIG. 7, the energy consumption DB 22 has data of a flag (1: interpolation, 0: no interpolation) indicating whether or not the date and time and the energy consumption per predetermined time are interpolated.
(消費エネルギー量表示処理)
表示手段13は、消費エネルギー量DB22に保存されている各計測対象機器の消費エネルギー量を表示画面30に表示する。
(Energy consumption display processing)
The display unit 13 displays the energy consumption amount of each measurement target device stored in the energy consumption amount DB 22 on the display screen 30.
図8は、表示装置に表示される表示画面の例である。ここで、欠損データ部を「●」として識別表示をすることにより、管理担当者が表やグラフを見ながら消費エネルギー量を目視にて確認できるようにしている。 FIG. 8 is an example of a display screen displayed on the display device. Here, the missing data portion is identified and displayed as “●”, so that the person in charge of management can visually confirm the amount of energy consumption while looking at a table or a graph.
以上、本実施の形態によれば、データ欠損を検出したときは、欠損パターンごとに予め定められた手順で補間処理を行い、補間データと正常に受信したデータとを識別表示するので、データ欠損のパターンによって適切な補間処理が可能となる。また、管理担当者は、正常に受信したデータか補間処理によって算出されたデータかを知ることができるので正しい判断が可能となる。 As described above, according to the present embodiment, when data loss is detected, interpolation processing is performed according to a predetermined procedure for each loss pattern, and the interpolation data and normally received data are identified and displayed. Appropriate interpolation processing is possible depending on the pattern. In addition, since the person in charge of management can know whether the data is normally received or the data calculated by the interpolation process, a correct determination can be made.
次に第2の実施の形態を説明する。
図9は、第2の実施の形態によるデータ収集管理装置の機能ブロック図である。図1との主な違いは、収集した消費エネルギー量データをもとに、全体の消費エネルギー量に対する各機器の消費エネルギー量の割合を時々刻々計算して按分係数算出DB23に保存する按分係数算出手段14を追加したことである。その他の構成は図1と同様であるので、同一要素には同一符号を付して説明を省略する。
Next, a second embodiment will be described.
FIG. 9 is a functional block diagram of a data collection management device according to the second embodiment. The main difference from FIG. 1 is that a proportional coefficient calculation that calculates the ratio of the energy consumption amount of each device to the total energy consumption from time to time and stores it in the proportional coefficient calculation DB 23 based on the collected energy consumption data. Means 14 is added. Since other configurations are the same as those in FIG. 1, the same elements are denoted by the same reference numerals and description thereof is omitted.
本実施の形態では、按分係数算出DB23に図10に例示する按分係数算出用設定テーブル23cを設けて、期間ごとに按分係数を管理可能にする。図10において、期間1〜4は、按分係数算出手段14で算出する按分係数を年間共通とするか、期間で分けるかを指定するもので、各期間の開始日、終了日を設定する。図10は年間共通の指定の例であるが、期間で分ける場合は例えば、期間1:4/1〜6/30、期間2:7/1〜9/30、期間3:10/1〜11/30、期間4:12/1〜3/31というように季節に対応させて分けることができる。 In the present embodiment, a distribution coefficient calculation setting table 23c illustrated in FIG. 10 is provided in the distribution coefficient calculation DB 23 so that the distribution coefficient can be managed for each period. In FIG. 10, periods 1 to 4 specify whether the distribution coefficient calculated by the distribution coefficient calculation means 14 is common to the year or divided by period, and the start date and end date of each period are set. FIG. 10 shows an example of designation common to the years. For example, when dividing by period, period 1: 4/1 to 6/30, period 2: 7/1 to 9/30, period 3: 10/1 to 11 / 30, period 4: 12/1 ~ 3/31, etc., can be divided according to the season.
次に図11を用いて按分係数算出DB23の構成について説明する。按分係数算出DB23は、平均消費エネルギー量テーブル23aと按分係数算出テーブル23bを有している。按分係数算出用設定テーブル23cの期間と対応して、それぞれ期間1〜4に分けてデータを管理する。図11は、期間1を例にしているが、他の期間(期間2〜4)についても同様である。 Next, the configuration of the distribution coefficient calculation DB 23 will be described with reference to FIG. The distribution coefficient calculation DB 23 has an average energy consumption amount table 23a and a distribution coefficient calculation table 23b. Corresponding to the period of the apportioning coefficient calculation setting table 23c, the data is managed in each of the periods 1 to 4. FIG. 11 illustrates the period 1 as an example, but the same applies to other periods (periods 2 to 4).
平均消費エネルギー量テーブル23aは、機器ごとに平日、休祭日ごとなど、機器の稼動状態が変ることによって消費エネルギー量の割合が変化する可能性のある管理単位で所定の周期(例えば時間ごと)の平均消費エネルギー量のデータを格納できるようになっている。 The average energy consumption table 23a has a predetermined cycle (for example, every hour) in a management unit in which the proportion of the energy consumption may change depending on the operation state of the device, such as weekdays and holidays, for each device. Data on average energy consumption can be stored.
一方、按分係数算出テーブル23bは、平均消費エネルギー量テーブル23aのデータに基づいて、上記の管理単位ごとに、同じグループ内の機器の所定周期ごとの平均消費エネルギー量の比率を格納できるようになっている。 On the other hand, the apportioning coefficient calculation table 23b can store the ratio of the average energy consumption amount for each predetermined period of the devices in the same group for each management unit based on the data of the average energy consumption amount table 23a. ing.
次に、上記の構成を有するデータ収集管理装置1において、次に按分係数算出手段14の処理手順を説明する。
図12は、按分係数算出手段14の処理概要を表した図である。この図において、按分係数算出手段14は、所定の収集タイミングから一定時間後に起動されると、設定テーブル19と按分検出算出DB23を参照して、以下に説明する平均消費エネルギー量計算処理(S401)と、按分係数算出処理(S402)を実行する。
Next, in the data collection management device 1 having the above-described configuration, the processing procedure of the distribution coefficient calculation unit 14 will be described.
FIG. 12 is a diagram showing an outline of the processing of the apportioning coefficient calculating means 14. In this figure, when the apportioning coefficient calculating means 14 is activated after a predetermined time from the predetermined collection timing, the average energy consumption calculating process (S401) described below with reference to the setting table 19 and the apportioning detection calculating DB 23 is performed. Then, a distribution coefficient calculation process (S402) is executed.
(平均消費エネルギー量計算処理)
平均消費エネルギー量計算処理は、収集タイミングごとに計測エネルギーDB21に格納されたデータの中で、グループ定義された構成要素の全計測点について収集が正常終了したデータを対象に行う。図2の惣菜グループの機器1(フライヤー)、機器2(多目的焼き器)、機器3(食器洗浄器)の2008年10月15日9時の計測データが全点で収集が正常終了した場合、図10按分係数算出用設定テーブル23cを参照して期間を判定すると、期間1となる。また、2008年10月15日は水曜日なので平日となる。按分係数算出DB23の平均消費エネルギー量テーブル23aの期間1、平日の機器1,2,3の各々の現在の平均消費エネルギー量と、今回の消費エネルギー量とから、平均値を再計算して、同テーブル23aに反映する。例えば、期間1、機器1、平日9時の現在の平均消費エネルギー量=79で、5日分のデータの場合、今回が85の場合、平均値を再計算すると、(79×5+85)/6=80となる。
(Average energy consumption calculation process)
The average energy consumption calculation process is performed on data that has been normally collected at all measurement points of group-defined constituent elements among the data stored in the measurement energy DB 21 at each collection timing. If the measurement data of 9:00 o'clock on October 15, 2008 for equipment 1 (flyer), equipment 2 (multi-purpose oven), and equipment 3 (tableware washing machine) of Fig. 2 is successfully collected, When the period is determined with reference to the proportional coefficient calculation setting table 23c in FIG. Also, since October 15, 2008 is a Wednesday, it will be a weekday. Recalculate the average value from the current average energy consumption amount of each of the devices 1, 2, and 3 of the period 1 of the average energy consumption amount table 23a of the apportioning coefficient calculation DB 23 and the current day, and the current energy consumption amount, This is reflected in the table 23a. For example, if the current average energy consumption at period 1 and device 1 at 9 o'clock on weekdays is 79 and the data for 5 days is 85 this time, recalculating the average value gives (79 x 5 + 85) / 6 = 80.
図13は、平均消費エネルギー量テーブル23a中の機器1(フライヤー)の具体的なデータ例である。 FIG. 13 is a specific data example of the device 1 (flyer) in the average energy consumption table 23a.
(按分係数算出処理)
平均消費エネルギー量計算処理の終了によって按分係数算出処理を起動する。按分係数算出DB23の平均消費エネルギー量テーブル23aの所定の管理単位(例えば期間1、平日)の各機器の平均消費エネルギー量から按分係数を再計算し、按分係数算出テーブル23bに反映する。なお、設定テーブル19に予め設定されている按分係数をテーブル23bの初期値として用いるようにしても良い。
(Proportional coefficient calculation process)
The apportioning coefficient calculation process is activated upon completion of the average energy consumption calculation process. The distribution coefficient is recalculated from the average energy consumption of each device in a predetermined management unit (for example, period 1, weekday) in the average consumption energy amount table 23a of the distribution coefficient calculation DB 23, and is reflected in the distribution coefficient calculation table 23b. The apportioning coefficient preset in the setting table 19 may be used as the initial value of the table 23b.
例えば、期間1、平日の9時の平均値が、機器1(フライヤー)=80[kWh],機器2(多目的焼き器)=103[kWh],機器3(食器洗浄器)=7[kWh]であったとき、按分係数を再計算すると、機器1(フライヤー)=42%,機器2(多目的焼き器)=54%,機器3(食器洗浄器)=4%となる。 For example, the average values for period 1 and weekdays at 9:00 are equipment 1 (flyer) = 80 [kWh], equipment 2 (multipurpose oven) = 103 [kWh], equipment 3 (dishwasher) = 7 [kWh] When the distribution coefficient is recalculated, the device 1 (flyer) = 42%, the device 2 (multipurpose oven) = 54%, and the device 3 (dishwasher) = 4%.
図14は、所定の管理単位(本例では、期間1,平日)の所定グループに属する機器の具体的な按分係数の例である。 FIG. 14 is an example of specific apportioning coefficients of devices belonging to a predetermined group in a predetermined management unit (in this example, period 1, weekday).
(欠損データ補間処理)
第1の実施の形態の第2,第3の実施例では、欠損データ補間手段12は、設定テーブル19に予め設定されている按分係数を用いて補間処理を実行していたが、本実施の形態では、欠損データ補間手段12は上記の処理で随時更新する按分係数算出DB23の按分係数を用いて、補間処理を実行する。
(Missing data interpolation process)
In the second and third examples of the first embodiment, the missing data interpolation unit 12 executes the interpolation process using the distribution coefficient preset in the setting table 19, but this embodiment In the embodiment, the missing data interpolation unit 12 performs the interpolation process using the distribution coefficient of the distribution coefficient calculation DB 23 that is updated as needed in the above process.
欠損データ補間手段12では、欠損データの日付をもとに曜日、また按分係数算出用設定テーブル23cを参照して期間1〜4のどの期間に該当するかを判定し、按分係数算出DB23の按分係数算出テーブル23bから対応する期間の按分係数算出テーブルを決定し、曜日、時刻、機器の按分係数を抽出して使用する。補間処理の手順は、図5,図6に示したアルゴリズムを用いることができる。 The missing data interpolating means 12 determines the day of the week based on the date of the missing data and the period 1 to 4 by referring to the setting table 23c for the distribution coefficient calculation, and the distribution data of the distribution coefficient calculation DB 23 is determined. The apportioning coefficient calculation table for the corresponding period is determined from the coefficient calculating table 23b, and the apportioning coefficients of the day of the week, time, and device are extracted and used. The algorithm shown in FIGS. 5 and 6 can be used for the procedure of the interpolation process.
以上、本実施の形態によれば、第1の実施の形態の効果に加えて以下の如くリアルタイムで算出した按分係数を使用する場合の効果を奏する。 As described above, according to the present embodiment, in addition to the effect of the first embodiment, there is an effect in the case of using a proportional coefficient calculated in real time as follows.
特に、実際のバックヤードでのエネルギーの消費量は、曜日(平日、休祭日)と時間帯によって異なる特徴がある。例えば、平日よりも休祭日の方が夜遅い時間帯でも調理する、調理順番によって使用する機器が異なる、調理しながら皿や容器などの片付け(洗浄)を行うが、最後にまとめて片付ける、などである。このような特徴があるので、按分係数を固定値とするよりも、リアルタイムで曜日(平日、休祭日)と時間毎に按分係数を算出して使用することにより、欠損データ復元精度をより向上させることが可能となる。 In particular, the actual amount of energy consumed in the backyard differs depending on the day of the week (weekdays and holidays) and the time zone. For example, cook even when the holiday is later than the weekday, use different equipment depending on the cooking order, clean dishes (container) while cooking, etc. It is. Because of these characteristics, the accuracy of missing data restoration is improved by calculating and using the distribution coefficient for each day of the week (weekdays, holidays) and time in real time rather than using a fixed distribution coefficient. It becomes possible.
次に第3の実施の形態について説明する。
本実施の形態は、リアルタイムにデータ補間を実行する一方、その後に収集したデータに基づいて、補間データを修正して、精度の良い収集管理を実現するものである。
図15は、第3の実施の形態によるデータ収集管理装置1の機能ブロック図である。
Next, a third embodiment will be described.
In the present embodiment, data interpolation is performed in real time, and interpolation data is corrected based on data collected thereafter, thereby realizing accurate collection management.
FIG. 15 is a functional block diagram of the data collection management device 1 according to the third embodiment.
本実施の形態によるデータ収集管理装置1は、図9に示す第2の実施の形態の構成に対して、総消費エネルギー量の変化率を収集タイミングごとに逐次算出する変化率算出手段15と補間データの信頼度を上げるため、後に収集する他のデータを用いて補間データを修正する補間データ修正手段16を追加した。 The data collection management device 1 according to the present embodiment is interpolated with a change rate calculation means 15 for sequentially calculating the change rate of the total energy consumption at each collection timing, with respect to the configuration of the second embodiment shown in FIG. In order to increase the reliability of the data, an interpolation data correction means 16 for correcting the interpolation data using other data collected later is added.
以下、本実施の形態によるデータ収集管理装置1の動作について、第2の実施の形態との違いを中心に説明する。 Hereinafter, the operation of the data collection management device 1 according to the present embodiment will be described focusing on the difference from the second embodiment.
(変化率算出処理)
変化率算出手段15は、収集タイミングごとに消費エネルギー量収集手段11からの指令によって起動されると、その収集タイミングで総消費エネルギー量を正常に収集できたか否かを判定して、正常に収集した総消費エネルギー量の前回値と今回値の変化率を計算する。
(Change rate calculation process)
When the change rate calculation means 15 is activated by a command from the energy consumption amount collection means 11 at each collection timing, the change rate calculation means 15 determines whether or not the total energy consumption amount has been normally collected at the collection timing and collects normally. Calculate the rate of change between the previous and current values of the total energy consumption.
図16に示すように、本実施の形態による按分係数算出テーブル23bには、収集タイミングごとに算出された総消費エネルギー量の変化率も格納されている。 As shown in FIG. 16, the apportioning coefficient calculation table 23b according to the present embodiment also stores the rate of change of the total energy consumption calculated at each collection timing.
(欠損データ補間処理)
本実施の形態による欠損データ補間手段12の動作を図17を用いて説明する。図6との違いは、全てのデータが欠損した場合に(S508で「No」)、上記の処理で算出した変化率を用いて、総消費エネルギー量の前値に対して、当該前値欄に関連付けて記録されている変化率を適用して総消費エネルギー量の推定値を算出する(S510)。このとき、この処理によって算出した推定値であることを示すフラグ「2」をこの推定値に関連付けて格納する。このフラグは、処理内容によってデータの信頼度を示すものである。
(Missing data interpolation process)
The operation of the missing data interpolation unit 12 according to this embodiment will be described with reference to FIG. The difference from FIG. 6 is that when all the data is missing (“No” in S508), the previous value column for the previous value of the total energy consumption using the rate of change calculated in the above process. The estimated value of the total energy consumption is calculated by applying the change rate recorded in association with (S510). At this time, the flag “2” indicating the estimated value calculated by this processing is stored in association with the estimated value. This flag indicates the reliability of data depending on the processing content.
さらに、ステップS510で算出した総消費エネルギー量の推定値に対して、按分係数算出テーブル23bに保存されている按分係数を乗じて、各機器の個別の消費エネルギー量を算出する(S511)。この消費エネルギー量についても上記と同様にフラグ「2」を格納する。その他の処理については図6と同様である。 Further, the estimated value of the total energy consumption calculated in step S510 is multiplied by the apportioning coefficient stored in the apportioning coefficient calculation table 23b to calculate the individual energy consumption of each device (S511). The flag “2” is stored for the amount of energy consumption as described above. Other processes are the same as those in FIG.
表示処理手段13は、消費エネルギー量をフラグ(0〜2)に基づいて識別表示する。 The display processing means 13 identifies and displays the energy consumption amount based on the flag (0 to 2).
(補間データ修正処理)
補間データ修正手段16は、消費エネルギー量収集手段11または欠損データ補間手段12からの起動要求によって起動されると、総消費エネルギー量の今回値のフラグが「0」または「1」であって前回値のフラグが「2」の場合は、前回値の修正処理を実行する。修正処理の内容としては、修正対象データの前後のフラグ「0」または「1」の直近データでその間の変化率が等しくなる方向に当該修正対象データの値を修正する。
(Interpolation data correction processing)
When the interpolation data correction means 16 is activated by an activation request from the consumption energy amount collection means 11 or the missing data interpolation means 12, the current value flag of the total consumption energy amount is “0” or “1” and the previous time. When the value flag is “2”, the previous value correction process is executed. As the contents of the correction processing, the value of the correction target data is corrected in the direction in which the change rate between the latest data of the flag “0” or “1” before and after the correction target data becomes equal.
総消費エネルギー量の修正後、上記の修正処理で用いた修正対象の前後の直近データの各機器の按分係数の平均によって、各機器の個別消費エネルギー量を算出する。修正したデータはフラグ「1」にセットする。 After the correction of the total energy consumption amount, the individual energy consumption amount of each device is calculated based on the average of the apportioning coefficient of each device of the latest data before and after the correction target used in the correction process. The corrected data is set in the flag “1”.
例えば、図18の消費エネルギー量DB22のデータで23:00の計測データがフラグ2となった場合で、その後24:00の時点で図19に示す計測データが収集されたときは、上述の修正処理を実行して図20に示すように消費エネルギー量DB22の23:00時点のデータを修正する。 For example, when the measurement data of 23:00 in the data of the energy consumption DB 22 of FIG. 18 becomes the flag 2, and then the measurement data shown in FIG. 19 is collected at the time of 24:00, the above correction is performed. The process is executed to correct the data at 23:00 in the energy consumption DB 22 as shown in FIG.
以上、本実施の形態によれば、補間処理の内容に対応して、算出した補間データに信頼度を付与し、この信頼度と共に収集データを識別表示するので、管理担当者はその信頼度に基づいて、より適切な評価・判断が可能となる。また、補間データ修正手段によって、所定値以下の信頼度のデータについては、その後に収集した、より信頼度の高いデータによって修正演算を行うので、精度の高いデータを保存・管理することができる。 As described above, according to the present embodiment, the reliability is given to the calculated interpolation data corresponding to the content of the interpolation processing, and the collected data is identified and displayed together with this reliability. Based on this, more appropriate evaluation and judgment are possible. In addition, the interpolation data correction means performs correction calculation on data having a reliability less than or equal to a predetermined value using data collected after that, so that highly accurate data can be stored and managed.
1 データ収集管理装置
2 センサ
11 消費エネルギー量収集手段
12 欠損データ補間手段
13 表示手段
14 按分係数算出手段
15 変化率算出手段
16 補間データ修正手段
19 設定テーブル
21 計測エネルギーDB
22 消費エネルギーDB
23 按分係数算出DB
30 表示画面
50 バックヤード
51 主幹
52 機器
DESCRIPTION OF SYMBOLS 1 Data collection management apparatus 2 Sensor 11 Consumption energy amount collection means 12 Missing data interpolation means 13 Display means 14 Proportional coefficient calculation means 15 Change rate calculation means 16 Interpolation data correction means 19 Setting table 21 Measurement energy DB
22 Energy Consumption DB
23 Apportioning coefficient calculation DB
30 Display screen 50 Backyard 51 Main trunk 52 Equipment
Claims (4)
前記消費エネルギー量収集手段によって収集されたデータ中にデータ欠損を検出したときは、欠損パターンごとに予め定められた補間処理によって補間データを算出する欠損データ補間手段と、
前記消費エネルギー量収集手段によって正常に収集されたデータと、前記欠損データ補間手段によって算出された補間データとを識別表示する表示手段と、
個別の機器ごとに消費エネルギー量の履歴情報を保存する手段と、
前記履歴情報をもとに、各機器の個別消費エネルギー量の総消費エネルギー量に対する按分係数を計算する按分係数算出手段と、
収集タイミングごとの総消費エネルギー量の前回値と今回値の変化率を計算する変化率算出手段と、
を備え、
前記欠損データ補間手段は、ある収集タイミングで同一グループの全てのデータの欠損を検出したときは、前記変化率算出手段によって算出された変化率のうち、最新の変化率を用いて、当該グループの総消費エネルギー量を算出し、当該総消費エネルギー量に当該グループに属する各機器の前記按分係数を適用して各機器の個別消費エネルギー量を算出することを特徴とするデータ収集管理装置。 A plurality of devices are divided into one or two or more groups, and energy consumption amount collecting means for collecting the total energy consumption amount data of each group and the individual energy consumption amount data of devices belonging to each group at a predetermined cycle;
When data loss is detected in the data collected by the energy consumption collecting means, missing data interpolation means for calculating interpolation data by a predetermined interpolation process for each missing pattern;
Display means for identifying and displaying the data normally collected by the energy consumption collecting means and the interpolation data calculated by the missing data interpolation means;
Means for storing history information of energy consumption for each individual device;
Based on the history information, an apportioning coefficient calculating means for calculating an apportioning coefficient for the total energy consumption of the individual energy consumption of each device;
A rate of change calculation means for calculating the rate of change of the previous value and the current value of the total energy consumption at each collection timing ;
With
When the missing data interpolation means detects the missing data of all the data of the same group at a certain collection timing, the latest change rate of the change rates calculated by the change rate calculation means is used. calculating a total consumed energy, the total consumed energy in characteristics and to Lud over data collection and management system to calculate the individual energy consumption of applying the proration factor of each device belonging to the group the devices .
前記表示手段は、前記補間データを識別表示する際に、当該補間データに付加されている前記信頼度に基づいてデータを識別表示することを特徴とする請求項1に記載のデータ収集管理装置。 The missing data interpolation means adds reliability corresponding to the interpolation processing to the calculated interpolation data,
The data collection management device according to claim 1 , wherein the display means identifies and displays data based on the reliability added to the interpolation data when the interpolation data is identified and displayed.
複数の機器を一または二以上のグループに分け、各グループの総消費エネルギー量データと各グループに属する機器の個別消費エネルギー量データとを所定の周期で収集するステップと、
個別の機器ごとに消費エネルギー量の履歴情報を保存するステップと、
前記履歴情報をもとに、各機器の個別消費エネルギー量の総消費エネルギー量に対する按分係数を計算するステップと、
収集タイミングごとの総消費エネルギー量の前回値と今回値の変化率を算出するステップと、
収集されたデータ中にデータ欠損を検出したとき、欠損パターンごとに予め定められた補間処理を実行する一方、ある収集タイミングで同一グループの全てのデータの欠損を検出したときは、前記算出された変化率のうち、最新の変化率を用いて、当該グループの総消費エネルギー量を算出した後、当該総消費エネルギー量に当該グループに属する各機器の前記按分係数を適用して各機器の個別消費エネルギー量を算出する補間処理を実行するステップと、
正常に収集されたデータと、前記補間処理によって算出されたデータとを識別表示するステップと、
を含むことを特徴とする欠損データの補間処理方法。 A deficient data interpolation method that collects energy consumption data of a plurality of devices, detects deficits in data, and interpolates deficient data,
Dividing a plurality of devices into one or more groups and collecting the total energy consumption data of each group and the individual energy consumption data of devices belonging to each group at a predetermined period;
A step of storing energy consumption history information for each individual device;
Based on the history information, calculating a distribution coefficient for the total energy consumption of the individual energy consumption of each device;
Calculating the rate of change between the previous and current values of total energy consumption at each collection timing;
When data missing is detected in the collected data, a predetermined interpolation process is executed for each missing pattern, while when the data missing of all data in the same group is detected at a certain collection timing, the above calculation is performed. After calculating the total energy consumption of the group using the latest rate of change, the individual consumption of each device is applied to the total energy consumption by applying the apportioning coefficient of each device belonging to the group. Executing an interpolation process for calculating an energy amount;
Identifying and displaying normally collected data and data calculated by the interpolation process;
A method for interpolating missing data, comprising:
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2009023160A JP5375139B2 (en) | 2009-02-03 | 2009-02-03 | Data collection management device and missing data interpolation processing method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2009023160A JP5375139B2 (en) | 2009-02-03 | 2009-02-03 | Data collection management device and missing data interpolation processing method |
Related Child Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2013080958A Division JP5668778B2 (en) | 2013-04-09 | 2013-04-09 | Data collection management device and missing data interpolation processing method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2010181982A JP2010181982A (en) | 2010-08-19 |
| JP5375139B2 true JP5375139B2 (en) | 2013-12-25 |
Family
ID=42763542
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2009023160A Expired - Fee Related JP5375139B2 (en) | 2009-02-03 | 2009-02-03 | Data collection management device and missing data interpolation processing method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP5375139B2 (en) |
Families Citing this family (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR101434296B1 (en) | 2012-06-18 | 2014-08-29 | 중앙대학교 산학협력단 | Apparatus and method for monitoring amount of energy consumption in apartment housing |
| JP6026266B2 (en) * | 2012-12-27 | 2016-11-16 | 株式会社日立製作所 | Control management apparatus, method, and program |
| JP2016207146A (en) * | 2015-04-28 | 2016-12-08 | 株式会社東芝 | Process recording system, process recording method and process recording program |
| CN112115025B (en) * | 2020-09-07 | 2024-04-02 | 青岛聚好联科技有限公司 | Energy consumption determining method and device for distributed equipment |
| CN115630052B (en) * | 2022-09-27 | 2025-11-11 | 中国建设银行股份有限公司 | Data interpolation method, device, electronic equipment and storage medium |
Family Cites Families (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2003269991A (en) * | 2002-03-12 | 2003-09-25 | Osaka Gas Co Ltd | Method and device for complementing use quantity of energy, use quantity of energy diagnosing system, computer program and recording medium |
| JP2004013674A (en) * | 2002-06-10 | 2004-01-15 | Daikin Ind Ltd | Equipment management device, equipment control method and equipment management system |
-
2009
- 2009-02-03 JP JP2009023160A patent/JP5375139B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JP2010181982A (en) | 2010-08-19 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP5375139B2 (en) | Data collection management device and missing data interpolation processing method | |
| JP5287478B2 (en) | Power energy monitoring system | |
| US10325331B2 (en) | Systems and methods for measuring and verifying energy usage in a building | |
| US20020077729A1 (en) | Multiple virtual meters in one physical meter | |
| US10699248B2 (en) | Inspection management system and inspection management method | |
| CN104603832A (en) | Method and system for improving time cost and accuracy of energy usage benchmarking | |
| EP3958195A1 (en) | Energy prediction system, energy prediction method, program, recording medium, and management system | |
| JP6519385B2 (en) | Baseline load estimation device and baseline load estimation program | |
| JP5668778B2 (en) | Data collection management device and missing data interpolation processing method | |
| JP4924457B2 (en) | Method of collecting and accumulating rainfall values and cumulative rainfall values | |
| JP2012190385A (en) | Totaling and analysis support device, and computer program | |
| JP2006309325A (en) | Co2 reduction and power saving monitoring method, and its system | |
| JP5476275B2 (en) | Water distribution plan prediction system, prediction method thereof, and program thereof | |
| JP2011018738A (en) | Production management system | |
| KR101042176B1 (en) | Loss calculation method by real-time daily minimum flow section analysis | |
| JP2008102816A (en) | Energy saving report generation apparatus and method for predicting energy consumption using the apparatus | |
| CN107563812A (en) | A kind of integrate-dump method, system | |
| JP6194246B2 (en) | Refrigerator performance evaluation apparatus and method | |
| JP6584914B2 (en) | Construction method of gas charge system and computer program | |
| JP2018061314A (en) | Demand response planning system, demand response planning method, and demand response planning program | |
| JP2007328682A (en) | Energy saving diagnostic method and energy saving diagnostic system | |
| JP2015155832A (en) | Meter data confirmation device and meter data confirmation method | |
| CN112686397B (en) | Air conditioner fault rate calculation method and device, computer equipment and storage medium | |
| JP2003178356A (en) | Sales prediction method | |
| JP5600665B2 (en) | Design man-hour estimation device and design man-hour estimation program |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A625 | Written request for application examination (by other person) |
Free format text: JAPANESE INTERMEDIATE CODE: A625 Effective date: 20120116 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20130213 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20130219 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20130408 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20130411 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20130827 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20130909 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 5375139 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| LAPS | Cancellation because of no payment of annual fees |