JP5420726B2 - Clinker ash removal apparatus and clinker ash removal method - Google Patents
[go: Go Back, main page]

JP5420726B2 - Clinker ash removal apparatus and clinker ash removal method - Google Patents

Clinker ash removal apparatus and clinker ash removal method Download PDF

Info

Publication number
JP5420726B2
JP5420726B2 JP2012159489A JP2012159489A JP5420726B2 JP 5420726 B2 JP5420726 B2 JP 5420726B2 JP 2012159489 A JP2012159489 A JP 2012159489A JP 2012159489 A JP2012159489 A JP 2012159489A JP 5420726 B2 JP5420726 B2 JP 5420726B2
Authority
JP
Japan
Prior art keywords
clinker ash
chisel
tube
ash removal
sheath
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2012159489A
Other languages
Japanese (ja)
Other versions
JP2014020668A (en
Inventor
秀樹 中村
武 大場
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hokkaido Electric Power Co Inc
Original Assignee
Hokkaido Electric Power Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hokkaido Electric Power Co Inc filed Critical Hokkaido Electric Power Co Inc
Priority to JP2012159489A priority Critical patent/JP5420726B2/en
Publication of JP2014020668A publication Critical patent/JP2014020668A/en
Application granted granted Critical
Publication of JP5420726B2 publication Critical patent/JP5420726B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Gasification And Melting Of Waste (AREA)

Description

この発明は、石炭ボイラ等の内部に付着するクリンカ灰の除去装置及び除去方法に関する。   The present invention relates to an apparatus and a method for removing clinker ash adhering to the inside of a coal boiler or the like.

石炭火力発電所では、石炭ボイラの火炉内のボイラ伝熱管や、石炭バーナ口の周辺部などへクリンカ灰が付着する。ここで、クリンカ灰とは、火炉内で燃焼した石炭灰の粒子が溶融固化したものである。近年、石炭火力発電所では、燃料コスト低減のために、不純物の多い劣質炭を燃料にすることがある。FeやMg等の低融点不純物が多い劣質炭を燃料にした場合、2次過熱器の伝熱管等に付着するクリンカ灰は、数m程のサイズにまで成長することもあり、定期点検などの火炉内での作業の妨げになっている。   In a coal-fired power plant, clinker ash adheres to the boiler heat transfer tube in the furnace of the coal boiler, the periphery of the coal burner port, and the like. Here, the clinker ash is obtained by melting and solidifying coal ash particles combusted in a furnace. In recent years, coal-fired power plants sometimes use inferior coal with many impurities as fuel to reduce fuel costs. When inferior coal with many low melting point impurities such as Fe and Mg is used as fuel, clinker ash adhering to the heat transfer tube of the secondary superheater may grow to a size of several meters, This hinders work in the furnace.

このようなクリンカ灰を除去する技術として、水等の流体の高圧噴射によりクリンカ灰を粉砕する技術が提案されている(例えば、特許文献1及び2参照)。   As a technique for removing such clinker ash, a technique for pulverizing clinker ash by high-pressure injection of a fluid such as water has been proposed (see, for example, Patent Documents 1 and 2).

特開2010−243122号公報JP 2010-243122 A 特開2000−111029号公報JP 2000-111029 A

しかしながら、流体の高圧噴射では伝熱管等に腐食や破損を引き起こす虞がある。腐食や破損を防ぐために突き棒やタガネ等による手作業で除去を行うと、今度は、膨大な作業時間を要してしまう。このため、火炉内に付着するクリンカ灰をより効果的かつ安全に除去する技術が求められていた。特に、2次過熱器は火炉の床面から50m以上の高さに位置するために、2次過熱器の下端部に付着するクリンカ灰の除去には多大な労力を要していた。   However, high-pressure injection of fluid may cause corrosion or damage to the heat transfer tube. If removal is performed manually with a stick or a chisel to prevent corrosion and breakage, enormous work time will be required. For this reason, the technique which removes clinker ash adhering in a furnace more effectively and safely was calculated | required. In particular, since the secondary superheater is located at a height of 50 m or more from the floor of the furnace, a great deal of labor has been required to remove the clinker ash adhering to the lower end of the secondary superheater.

本発明はこのような技術的背景の下でなされた。従って、この発明の目的は、石炭火力発電所において、特に2次過熱器の下端部に付着するクリンカ灰を効果的に除去するための装置及び除去方法を提案することにある。   The present invention has been made under such a technical background. Accordingly, an object of the present invention is to propose an apparatus and a removal method for effectively removing clinker ash adhering to the lower end portion of a secondary superheater particularly in a coal-fired power plant.

発明者らは、鋭意検討の結果、先端に、はつり工具を備えた長尺管を、鞘管に挿通することにより撓み耐性を高めた長尺な竿状のクリンカ灰除去装置を用いることで、上述の目的を達成できることに想到した。従って、この発明のクリンカ灰除去装置は、長尺管と鞘管とはつり工具とを備える。鞘管には、長尺管が軸方向に移動自在に挿通される。はつり工具は、長尺管の一端に取り付けられており、タガネを有する。さらに、このクリンカ灰除去装置は、はつり工具が設けられた側の鞘管の先端部を、鉛直方向に移動可能に支持する第1支持部と、はつり工具が設けられた側とは反対側の鞘管の後端部を、鞘管が歳差運動可能に支持する第2支持部とを備えている。また、第1支持部が、繰り出されるワイヤの長さを自在に変更できる第1巻き上げ機と、第1巻き上げ機から繰り出され、石炭ボイラのマンホールの上方に設けられた覗き孔を介して石炭ボイラ内部に位置する先端部を懸吊するワイヤとを備え、第2支持部が、マンホールに固定された剛体からなる支持枠と、後端部をそれぞれ張架する、支持枠の鉛直方向上側部分の上側吊金具に固定された第2巻き上げ機と、支持枠の鉛直方向下側部分の下側吊金具に固定された第3巻き上げ機とを備えている。 As a result of intensive studies, the inventors have used a long scissor-like clinker ash removal device that has improved bending resistance by inserting a long tube equipped with a lifting tool at the tip into the sheath tube, We have come up with the idea that the above-mentioned purpose can be achieved. Therefore, the clinker ash removing apparatus of the present invention includes a long tube, a sheath tube, and a hanging tool. A long tube is inserted into the sheath tube so as to be movable in the axial direction. The hanging tool is attached to one end of the long tube and has a chisel. Further, the clinker ash removing apparatus includes a first support portion that supports the tip of the sheath tube on the side on which the lifting tool is provided so as to be movable in the vertical direction, and a side opposite to the side on which the lifting tool is provided. The rear end portion of the sheath tube is provided with a second support portion that supports the sheath tube so that it can precess. In addition, the first support unit can freely change the length of the wire to be fed, and the coal boiler through a peephole that is fed from the first winder and provided above the manhole of the coal boiler. A wire that suspends a tip portion located inside, and a second support portion that is a rigid support frame fixed to the manhole, and a rear upper end portion of the support frame that extends in the vertical direction. A second hoisting machine fixed to the upper hoisting bracket, and a third hoisting machine fixed to the lower hoisting metal fitting on the lower portion in the vertical direction of the support frame.

また、この発明のクリンカ灰除去方法は、上述のクリンカ灰除去装置のタガネをクリンカ灰に接触させることでクリンカ灰を破砕して除去する。   Moreover, the clinker ash removal method of this invention crushes and removes clinker ash by making the chisel of the above-mentioned clinker ash removal apparatus contact clinker ash.

上述の構成を備える本発明のクリンカ灰除去装置及び除去方法は、石炭火力発電所の2次過熱器の下端部に付着するクリンカ灰を効果的に除去することができる。   The clinker ash removal apparatus and the removal method of the present invention having the above-described configuration can effectively remove clinker ash adhering to the lower end portion of the secondary superheater of a coal-fired power plant.

石炭火力発電所で用いられる石炭ボイラの構造を模式的に示す模式図である。It is a schematic diagram which shows typically the structure of the coal boiler used in a coal-fired power station. 石炭ボイラに設けられる覗き孔及びマンホールを拡大して示す部分拡大図である。It is the elements on larger scale which expand and show the peephole and manhole which are provided in a coal boiler. 2次過熱器の下端部に付着するクリンカ灰の様子を示す斜視図である。It is a perspective view which shows the mode of the clinker ash adhering to the lower end part of a secondary superheater. クリンカ灰除去装置の火炉内での使用状況の一例を模式的に示す図である。It is a figure which shows typically an example of the use condition in the furnace of a clinker ash removal apparatus. (A)は、クリンカ灰除去装置の本体の全体構造を示す模式図であり、(B)は、長尺管の構造を示す模式図であり、(C)は、鞘管の構造を示す模式図である。(A) is a schematic diagram which shows the whole structure of the main body of a clinker ash removal apparatus, (B) is a schematic diagram which shows the structure of a long tube, (C) is a model which shows the structure of a sheath tube FIG. (A)は、はつり工具の一態様であるケレンの構造を模式的に示す模式図であり、(B)は、はつり工具の別の態様であるフラックスチッパーの構造を模式的に示す模式図である。(A) is a schematic diagram schematically showing the structure of kelen, which is one mode of a hanging tool, and (B) is a schematic diagram schematically showing the structure of a flux chipper, which is another mode of the hanging tool. is there. (A)は、第1態様のタガネの正面図であり、(B)は、(A)のタガネの側面図である。(A) is a front view of the chisel of a 1st aspect, (B) is a side view of the chisel of (A). (A)は、第2態様のタガネの正面図であり、(B)は、(A)のタガネの側面図である。(A) is a front view of the chisel of a 2nd aspect, (B) is a side view of the chisel of (A). 第3態様のタガネの正面図である。It is a front view of the chisel of the 3rd mode. 第1支持部の構成を模式的に示す模式図である。It is a schematic diagram which shows typically the structure of a 1st support part. 第2支持部の構成を模式的に示す模式図である。It is a schematic diagram which shows the structure of a 2nd support part typically. (A)及び(B)は、クリンカ灰除去方法の工程段階を順に示す模式図である。(A) And (B) is a schematic diagram which shows the process step of a clinker ash removal method in order. (A)及び(B)は、図12(B)に続く、クリンカ灰除去方法の工程段階を順に示す模式図である。(A) And (B) is a schematic diagram which shows in order the process step of the clinker ash removal method following FIG. 12 (B). (A)及び(B)は、クリンカ灰除去方法において、特に鞘管及び長尺管の延長方法の工程段階を順に示す模式図である。(A) And (B) is a schematic diagram which shows in order the process step of the extension method of a sheath tube and a long tube especially in a clinker ash removal method. 図14(B)に続く、鞘管及び長尺管の延長方法の工程段階を示す模式図である。It is a schematic diagram which shows the process step of the extension method of a sheath pipe and a long tube following FIG. 14 (B).

以下、図面を参照して、この発明の実施形態について説明する。なお、各図においては、各構成要素の形状、大きさ及び配置関係を、この発明が理解できる程度に概略的に示してある。また、以下、この発明の好適な構成例について説明するが、各構成要素の材質及び数値的条件などは、単なる好適例にすぎない。従って、この発明は、以下の実施形態に何ら限定されない。また、各図において、共通する構成要素には同符号を付し、重複する説明を省略することもある。また、他の図面との対応関係が明らかな構成要素の符号を省略することもある。   Embodiments of the present invention will be described below with reference to the drawings. In each figure, the shape, size, and arrangement relationship of each component are schematically shown to such an extent that the present invention can be understood. Moreover, although the preferable structural example of this invention is demonstrated hereafter, the material of each component, a numerical condition, etc. are only a suitable example. Therefore, the present invention is not limited to the following embodiments. Moreover, in each figure, the same code | symbol is attached | subjected to a common component and the overlapping description may be abbreviate | omitted. In addition, reference numerals of components that have a clear correspondence with other drawings may be omitted.

(クリンカ灰)
まず、図1〜図3を参照して、この発明のクリンカ灰除去装置(以下、単に除去装置とも称する。)の除去対象であるクリンカ灰について説明する。図1は、石炭火力発電所で用いられる石炭ボイラの構造を模式的に示す模式図である。図2は、石炭ボイラに設けられる覗き孔及びマンホールを拡大して示す部分拡大図である。図3は、2次過熱器の下端部付近に付着するクリンカ灰の様子を示す斜視図である。
(Clinker ash)
First, with reference to FIGS. 1 to 3, a clinker ash that is a removal target of a clinker ash removal device (hereinafter, also simply referred to as a removal device) of the present invention will be described. FIG. 1 is a schematic diagram schematically showing the structure of a coal boiler used in a coal-fired power plant. FIG. 2 is a partially enlarged view showing a peephole and a manhole provided in the coal boiler. FIG. 3 is a perspective view showing a state of clinker ash adhering to the vicinity of the lower end portion of the secondary superheater.

まず、図1を参照して石炭ボイラ(以下、ボイラとも称する。)の構造を簡単に説明する。ボイラ100は、火炉102と、後部伝熱部104とを備える。火炉102は、複数の石炭バーナ102aが設けられた下部領域102Dと、2次、3次及び4次過熱器102b,102c及び102dが設けられる上部領域102Uとに区画される。2次〜4次過熱器102b,102c及び102dは、それぞれ、所定形状に屈曲された多数の伝熱管の集合体であり、内部を流通する蒸気を過熱する。   First, the structure of a coal boiler (hereinafter also referred to as a boiler) will be briefly described with reference to FIG. The boiler 100 includes a furnace 102 and a rear heat transfer unit 104. The furnace 102 is divided into a lower region 102D provided with a plurality of coal burners 102a and an upper region 102U provided with secondary, tertiary and quaternary superheaters 102b, 102c and 102d. The secondary to quaternary superheaters 102b, 102c, and 102d are each an assembly of a large number of heat transfer tubes bent into a predetermined shape, and superheat the steam flowing inside.

後部伝熱部104は、規則的に配列された複数の後部伝熱管の集合体であり、後部伝熱管内部を流通する蒸気や水等の被加熱流体を加熱する。この例に示すボイラ100は、鉛直方向に測った高さが約70mであり、火炉102と後部伝熱部104とを合わせた水平方向の長さが約40mである。   The rear heat transfer unit 104 is an assembly of a plurality of rear heat transfer tubes arranged regularly, and heats a fluid to be heated such as steam and water flowing through the rear heat transfer tube. The boiler 100 shown in this example has a height measured in the vertical direction of about 70 m, and the horizontal length of the furnace 102 and the rear heat transfer section 104 combined is about 40 m.

また、上部領域102Uの壁面には、マンホール106と覗き孔108とが設けられている。   In addition, a manhole 106 and a viewing hole 108 are provided on the wall surface of the upper region 102U.

図2に示すように、覗き孔108は、2次過熱器102b等を目視点検するための直径10〜20cmの開口部であり、ボイラ100の稼働中には不図示の蓋で閉じられている。この覗き孔108の鉛直方向下側には、マンホール106が設けられている。この例では、覗き孔108の約8m下方にマンホール106が設けられている。   As shown in FIG. 2, the peep hole 108 is an opening having a diameter of 10 to 20 cm for visually inspecting the secondary superheater 102 b and the like, and is closed with a lid (not shown) during operation of the boiler 100. . A manhole 106 is provided below the viewing hole 108 in the vertical direction. In this example, a manhole 106 is provided about 8 m below the peep hole 108.

マンホール106は、火炉102の壁に設けられた略楕円形状の開口部であり、ボイラ100の稼動時には不図示の蓋で閉じられている。この例では、マンホール106の楕円の長軸方向(鉛直方向)の長さは約80cmであり、楕円の短軸方向(水平方向)の長さは約40cmである。   The manhole 106 is a substantially elliptical opening provided on the wall of the furnace 102 and is closed with a lid (not shown) when the boiler 100 is in operation. In this example, the length of the manhole 106 in the major axis direction (vertical direction) of the ellipse is about 80 cm, and the length of the ellipse in the minor axis direction (horizontal direction) is about 40 cm.

次に図3を参照して、火炉102内に付着するクリンカ灰について説明する。図3は、本発明の除去対象である、2次過熱器102bの下端部付近に付着したクリンカ灰110を示している。多数の伝熱管112がU字形に屈曲する2次過熱器102bの下端部の伝熱管112に、クリンカ灰110が纏わり付くように付着している。この例では、クリンカ灰110のサイズは、数mオーダである。なお、マンホール106から2次過熱器102bの下端部、即ちクリンカ灰110までの距離は7〜9mである。   Next, clinker ash adhering to the furnace 102 will be described with reference to FIG. FIG. 3 shows the clinker ash 110 attached to the vicinity of the lower end portion of the secondary superheater 102b, which is a removal target of the present invention. A large number of heat transfer tubes 112 are attached to the heat transfer tubes 112 at the lower end of the secondary superheater 102b, which bends in a U-shape, so that the clinker ash 110 is attached. In this example, the size of the clinker ash 110 is on the order of several meters. In addition, the distance from the manhole 106 to the lower end part of the secondary superheater 102b, ie, the clinker ash 110, is 7 to 9 m.

一般にクリンカ灰110は、SiO、Al及びFeを主成分とする比重が2程度の軽石状又はガラス状の塊状物質である。クリンカ灰110が破壊されるまでの機械的強度は、軽量コンクリートブロックが破壊されるまでの強度よりも若干小さい程度である。 Generally, the clinker ash 110 is a pumice-like or glass-like massive substance having a specific gravity of about 2 and mainly composed of SiO 2 , Al 2 O 3 and Fe 2 O 3 . The mechanical strength until the clinker ash 110 is destroyed is slightly smaller than the strength until the lightweight concrete block is destroyed.

(発明の概要)
次に、図4を参照して、この発明の除去装置とクリンカ灰除去方法(以下、単に除去方法とも称する。)を概略的に説明する。図4は、除去装置の火炉内での使用状況の一例を模式的に示す図である。
(Summary of Invention)
Next, with reference to FIG. 4, the removal apparatus and the clinker ash removal method of the present invention (hereinafter also simply referred to as the removal method) will be schematically described. FIG. 4 is a diagram schematically illustrating an example of a usage state of the removal apparatus in the furnace.

除去装置10は、長尺管12と、長尺管12が挿通される鞘管14と、長尺管12の一端に取り付けられたはつり工具16とを備える。さらに、除去装置10は、任意的な部材として支持部18を備える。なお、これらの構成の詳細は後述する。また、支持部18以外の除去装置10、すなわち長尺管12、鞘管14及びはつり工具16を備える竿状の構成を本体10Hとも称する。また、以降、長尺管12の延在方向に沿って、はつり工具16に向かう方向を軸方向又は振動方向とも称し、矢印D1で示す。また、はつり工具16が取り付けられた側の長尺管12の端部を先端部と称し、先端部とは反対側の端部を後端部と称する。   The removal device 10 includes a long tube 12, a sheath tube 14 through which the long tube 12 is inserted, and a suspension tool 16 attached to one end of the long tube 12. Furthermore, the removal apparatus 10 includes a support portion 18 as an optional member. Details of these configurations will be described later. Moreover, the removal apparatus 10 other than the support part 18, ie, the elongate pipe | tube 12, the sheath pipe | tube 14, and the hook-shaped structure provided with the lifting tool 16, is also called the main body 10H. Further, hereinafter, the direction toward the lifting tool 16 along the extending direction of the long tube 12 is also referred to as an axial direction or a vibration direction, and is indicated by an arrow D1. Further, the end of the long tube 12 on the side where the lifting tool 16 is attached is referred to as a front end, and the end opposite to the front end is referred to as a rear end.

除去装置10の長尺管12と鞘管14は、長尺な二重管として構成されている。二重管の内側のパイプである長尺管12は、二重管の外側のパイプである鞘管14に軸方向D1に移動自在に挿通されている。   The long tube 12 and the sheath tube 14 of the removing device 10 are configured as long double tubes. The long pipe 12 which is a pipe inside the double pipe is inserted through a sheath pipe 14 which is a pipe outside the double pipe so as to be movable in the axial direction D1.

はつり工具16は、その先端部側にクリンカ灰110を破砕するタガネ16aを備えており、長尺管12の先端部に装着されている。はつり工具16は、圧縮空気の供給を受け振動方向D1に高速に往復運動(振動)して、クリンカ灰110を破砕する動力工具である。なお、「はつり」とは、岩等を砕いて削り取ることを示す。   The lifting tool 16 is provided with a chisel 16 a for crushing the clinker ash 110 on the tip side thereof, and is attached to the tip of the long tube 12. The suspension tool 16 is a power tool that receives supply of compressed air and reciprocates (vibrates) at high speed in the vibration direction D <b> 1 to crush the clinker ash 110. “Hatsuri” means that rocks are crushed and scraped off.

本体10Hの軸方向D1に測った長さである全長は、マンホール106からクリンカ灰110まで最短距離である7m以上である。本体10Hは、マンホール106から火炉102内に挿入され、クリンカ灰110の破砕を行う際は、全長の殆どが火炉102内に位置する。そして、マンホール106の外側には、オペレータが操作してタガネ16aを移動させる操作部10Aが約1m突出している。   The total length, which is the length measured in the axial direction D1 of the main body 10H, is 7 m or more which is the shortest distance from the manhole 106 to the clinker ash 110. The main body 10H is inserted into the furnace 102 from the manhole 106, and when the clinker ash 110 is crushed, most of the entire length is located in the furnace 102. Further, on the outside of the manhole 106, an operation portion 10A for operating the operator 16a to move the chisel 16a protrudes by about 1 m.

除去装置10の支持部18は、第1支持部20と第2支持部22とを備える。   The support unit 18 of the removal apparatus 10 includes a first support unit 20 and a second support unit 22.

第1支持部20は、本体10Hが鉛直方向に自在に移動可能に、鞘管14の先端部側を支持する。第1支持部20は、第1巻き上げ機20とワイヤ20と吊金具20とを備える。なお、吊金具20は覗き孔108に取り付けられている。 The 1st support part 20 supports the front-end | tip part side of the sheath pipe | tube 14 so that the main body 10H can move freely to a perpendicular direction. The first support portion 20 is provided with a first hoist 20 1 and the wire 20 2 and hanging bracket 20 3. Incidentally, hanging bracket 20 3 are attached to peephole 108.

第2支持部22は、支持枠22と第2巻き上げ機22と第3巻き上げ機22とを備える。第2支持部22は、マンホール106に取り付けられ、図中に点線で示すように、鞘管14の後端部側を歳差運動可能に支持する。なお、歳差運動とは、点線で示すように、支点である第2支持部22を頂点とし、鞘管14を母線とする直円錐の範囲内で鞘管14(本体10H)が自在に移動することを示す。 The second supporting portion 22, and a support frame 22 1 and the second hoisting machine 22 2 and the third hoist 22 3. The 2nd support part 22 is attached to the manhole 106, and supports the rear-end part side of the sheath pipe 14 so that precession movement is possible, as shown with a dotted line in the figure. As shown by the dotted line, the precession movement means that the sheath tube 14 (main body 10H) can freely move within a straight cone having the second support portion 22 as a fulcrum at the apex and the sheath tube 14 as a generating line. Indicates to do.

次に、除去装置10を用いたクリンカ灰110の除去方法を簡単に説明する。概略的には、本体10Hの先端部側のタガネ16aをクリンカ灰110に狙いを定めて押し当てて(以下、位置決めとも称する。)、はつり工具16を稼働させることで、クリンカ灰110を破砕して除去していく。上述のように、2次過熱器102bに付着するクリンカ灰110は大きさが数mに及ぶこともあるので、タガネ16aの位置決め及び破砕を幾度も繰り返して、クリンカ灰110を除去していく。   Next, a method for removing the clinker ash 110 using the removing device 10 will be briefly described. Schematically, the chisel 16a on the tip end side of the main body 10H is aimed and pressed against the clinker ash 110 (hereinafter also referred to as positioning), and the clinker ash 110 is crushed by operating the lifting tool 16. And remove it. As described above, since the size of the clinker ash 110 attached to the secondary superheater 102b may reach several meters, the clinker ash 110 is removed by repeating positioning and crushing of the chisel 16a several times.

位置決めに当たり、タガネ16aの鉛直方向の位置(高さ)は、第1支持部20により調整する。具体的には、マンホール106からタガネ16aを目視しながら、オペレータが第1巻き上げ機20から繰り出すワイヤ20の長さを調整することで鉛直方向の位置決めを行う。 In positioning, the vertical position (height) of the chisel 16 a is adjusted by the first support portion 20. Specifically, while viewing the chisel 16a from the manhole 106, the operator to position the vertical by adjusting the length of the wire 20 2 for feeding out the first hoist 20 1.

また、水平方向の位置決めは、オペレータが除去装置10の操作部10Aを、手動で左右に振ることで行われる。すなわち、鞘管14は、第2支持部22を支点に歳差運動するので、操作部10Aを左及び右に移動すれば、タガネ16aを右及び左にそれぞれ移動させることができる。   Further, the positioning in the horizontal direction is performed by manually shaking the operation unit 10A of the removing device 10 left and right by the operator. That is, since the sheath tube 14 precesses about the second support portion 22 as a fulcrum, if the operation portion 10A is moved to the left and right, the chisel 16a can be moved to the right and left, respectively.

このようにして、第1支持部20によりタガネ16aの高さを合わせ、さらに上述の第2支持部22を支点として、本体10Hを左右に振ることで、タガネ16aを所望の位置に位置決めする。その上で、操作部10Aの長尺管12を軸方向D1の前方に押し出し、タガネ16aを適当な圧力でクリンカ灰110に接触させながらはつり工具16を稼働させて、クリンカ灰110を破砕する。   In this way, the height of the chisel 16a is adjusted by the first support portion 20, and further, the chisel 16a is positioned at a desired position by swinging the main body 10H left and right with the second support portion 22 as a fulcrum. Then, the long tube 12 of the operation unit 10A is pushed forward in the axial direction D1, and the clinker ash 110 is crushed by operating the hanging tool 16 while bringing the chisel 16a into contact with the clinker ash 110 with an appropriate pressure.

(本体)
次に図5を参照して、本体について詳細に説明する。図5(A)は、本体の全体構造を示す模式図であり、図5(B)は、長尺管の構造を示す模式図であり、図5(C)は、鞘管の構造を示す模式図である。
(Body)
Next, the main body will be described in detail with reference to FIG. FIG. 5A is a schematic diagram showing the overall structure of the main body, FIG. 5B is a schematic diagram showing the structure of a long tube, and FIG. 5C shows the structure of a sheath tube. It is a schematic diagram.

図5(A)に示すように、本体10Hは、相対的に軸方向D1の長さが短い鞘管14に、長さが長い長尺管12が挿通されて構成される。このように本体10Hを、言わば二重管とすることにより、長尺管12を単独で用いた場合に比較して、本体10Hの撓みを抑制することができる。鞘管14は、内部に挿通される長尺管12を、軸方向D1に移動自在に支持するガイドとして機能する。また、鞘管14は、長尺管12の撓み、及びこの撓みに起因するはつり工具16の振れを抑制し、除去装置10の操作性を向上する。   As shown in FIG. 5 (A), the main body 10H is configured by inserting a long tube 12 having a long length through a sheath tube 14 having a relatively short length in the axial direction D1. Thus, by using the main body 10H as a double pipe, the bending of the main body 10H can be suppressed as compared with the case where the long pipe 12 is used alone. The sheath tube 14 functions as a guide for supporting the long tube 12 inserted therein so as to be movable in the axial direction D1. In addition, the sheath tube 14 suppresses the bending of the long tube 12 and the swinging tool 16 caused by the bending, and improves the operability of the removing device 10.

鞘管14と長尺管12の長さの差は2〜3mの範囲の値とすることが好ましい。長さの差を2m以上とすることで、単位長さ当たりの質量が長尺管12よりも大きい鞘管14の長さを抑え、本体10Hの全重量を小さくすることができる。これにより、本体10Hの操作性を向上することができる。また、長さの差を3m以下とすることで、鞘管14から突出した長尺管12の突出部の撓みを実用上十分に小さくでき、本体10Hの操作性を向上することができる。   The difference in length between the sheath tube 14 and the long tube 12 is preferably set to a value in the range of 2 to 3 m. By setting the difference in length to 2 m or more, the length of the sheath tube 14 whose mass per unit length is larger than that of the long tube 12 can be suppressed, and the total weight of the main body 10H can be reduced. Thereby, the operativity of the main body 10H can be improved. Further, by setting the difference in length to 3 m or less, the deflection of the protruding portion of the long tube 12 protruding from the sheath tube 14 can be practically sufficiently reduced, and the operability of the main body 10H can be improved.

(長尺管)
図5(B)に示すように、長尺管12は、撓みの少ない剛体製のパイプとして構成されている。この例では、長尺管12として、呼び径が20Aの配管用炭素鋼管を用いている。また、長尺管12は、軸方向D1に関して3個の部分に分割可能に構成されている。すなわち、長尺管12は、長尺本管12と、第1長尺延長管12と、第2長尺延長管12とを備える。
(Long tube)
As shown in FIG. 5 (B), the long tube 12 is configured as a rigid pipe with less bending. In this example, a carbon steel pipe for piping having a nominal diameter of 20 A is used as the long pipe 12. Further, the long tube 12 is configured to be divided into three parts with respect to the axial direction D1. That is, the long tube 12 includes an elongate main tube 12 1, and the first long extension pipe 12 2, and a second elongate extension pipe 12 3.

長尺本管12と第1長尺延長管12との接続部には、クイックカップリング12a(迅速継手又は迅速管継手とも称する。)が設けられており、両管12及び12をクイックカップリング12aではめ込むだけで接続することができる。後述のように、長尺管12は、はつり工具16に圧縮空気を供給する動力伝達管を兼ねているので、クイックカップリング12aにより、両管12及び12は気密にシールされている。なお、同様に、はつり工具16及び長尺本管12の接続部と、第1及び第2長尺延長管12及び12の接続部と、第2長尺延長管12の後端部にもクイックカップリング12aが用いられる。なお、第2長尺延長管12の後端部のクイックカップリング12aには、コンプレッサーから圧縮空気を供給するホースが接続される。 The connecting portion of the long main pipe 12 1 and the first long extension pipe 12 2, (also referred to as quick connect or quick fitting.) Quick coupling 12a is provided, the two pipe 12 1 and 12 2 Can be connected simply by fitting in the quick coupling 12a. As described below, the elongated tube 12, since also serves as a chipping power transmission tube for supplying compressed air to the tool 16, the quick coupling 12a, the two pipe 12 1 and 12 2 are hermetically sealed. Incidentally, similarly, the chipping tool 16 and elongate main 12 1 of the connecting portion, the connecting portion of the first and second long extension pipe 12 2 and 12 3, the rear end of the second long extension pipe 12 3 The quick coupling 12a is also used for the part. Note that the quick coupling 12a of the rear end portion of the second long extension pipe 12 3, a hose for supplying compressed air is connected from the compressor.

この例では、長尺本管12の軸方向D1に沿って測った全長は、約5.5mである。また、第1及び第2長尺延長管12及び12の軸方向D1に沿って測った全長は互いに等しく、約2.1mである。また、はつり工具16の軸方向D1に沿って測った全長は約0.5mである。 In this example, the total length measured along the axial direction D1 of the long main pipe 12 1 is about 5.5 m. Also, the total length measured along the first and second long extension pipe 12 2 and 12 3 in the axial direction D1 are equal to each other, is about 2.1 m. Moreover, the full length measured along the axial direction D1 of the lifting tool 16 is about 0.5 m.

よって、3本の管12,12及び12を接続すれば、長尺管12の全長は約10mとなる。また、2本の管12及び12を接続すれば、長尺管の全長は約8mとなる。また、マンホール106から10mを超えた遠方に存在するクリンカ灰110を除去する必要がある場合には、3本以上の長尺延長管を接続して、長尺管12の全長を10mを超える長さとしても良い。 Therefore, if the three tubes 12 1 , 12 2 and 12 3 are connected, the total length of the long tube 12 is about 10 m. Further, by connecting two tubes 12 1 and 12 2, the total length of the long pipe is about 8m. In addition, when it is necessary to remove the clinker ash 110 existing at a distance exceeding 10 m from the manhole 106, three or more long extension pipes are connected, and the total length of the long pipe 12 exceeds 10 m. It's also good.

(鞘管)
図5(C)に示す鞘管14は、長尺管12(クイックカップリング12aも含む)の外径よりも大きな内径を有し、撓みの少ない剛体製のパイプとして構成されている。この例では、鞘管14として、呼び径50Aの配管用炭素鋼管を用いている。なお、本体10Hの総重量を抑えるために鞘管14には、機械的強度が同じであれば単位長さ当たりの質量が軽い材料を用いることが好ましい。
(Sheath tube)
The sheath tube 14 shown in FIG. 5C is configured as a rigid pipe that has an inner diameter larger than the outer diameter of the long tube 12 (including the quick coupling 12a) and is less bent. In this example, a carbon steel pipe for piping having a nominal diameter of 50 A is used as the sheath pipe 14. In order to suppress the total weight of the main body 10H, it is preferable to use a material having a light mass per unit length for the sheath tube 14 as long as the mechanical strength is the same.

鞘管14は、軸方向D1に関して2個の部分に分割可能に構成されている。すなわち、鞘管14は、鞘本管14と鞘延長管14とを備える。鞘本管14と鞘延長管14との接続部には、継手14eが設けられている。この継手14eは、いわゆるソケット継手であり、鞘本管14の後端部に設けられた鞘延長管14よりも一回り大径なパイプとして構成されている。この例では、鞘本管14の軸方向D1に沿って測った全長は、約5.0mである。また、鞘延長管14の軸方向D1に沿って測った全長は、約2mである。 The sheath tube 14 is configured to be split into two parts with respect to the axial direction D1. That is, the sheath tube 14, and a sheath main 14 1 and sheath extension pipe 14 2. The connecting portion of the sheath main 14 1 and sheath extension pipe 14 2, joint 14e is provided. The joint 14e is a so-called socket joint is configured as a large-diameter pipe slightly larger than the sheath extension pipe 14 2 provided at a rear end portion of the sheath main 14 1. In this example, the total length measured along the axial direction D1 of the sheath main 14 1 is about 5.0 m. Also, the total length measured along the axial direction D1 of the sheath extension pipe 14 2 is about 2m.

鞘延長管14を用いるか否かは、長尺管12の全長に応じて定まる。具体的には、長尺管12の全長が10mの場合には、鞘延長管14を用いる。それに対して、全長が8mの場合には、鞘本管14のみを用いる。鞘延長管14をこのように用いることで、除去装置10は、鞘管14からの長尺管12の突出量を適切に保つことができる。 Whether to use sheath extension pipe 14 2 is determined according to the entire length of the elongated tube 12. Specifically, when the entire length of the elongate tube 12 is 10m uses a sheath extension tube 14 2. In contrast, when the total length of 8m uses only the sheath main 14 1. By using a sheath extension pipe 14 2 Thus, removal device 10 can be kept appropriate amount of projection of the elongated tube 12 from the sheath tube 14.

鞘管14には、支持部18のワイヤやチェーンを取り付けるための複数の吊具が設けられている。詳細には、鞘管14の側面に、先端部側から後端部側に沿って、第1吊具14a、第2吊具14b、第3吊具14c及び第4吊具14dが設けられている。   The sheath tube 14 is provided with a plurality of hanging tools for attaching the wires and chains of the support portion 18. In detail, the 1st hanger 14a, the 2nd hanger 14b, the 3rd hanger 14c, and the 4th hanger 14d are provided in the side surface of the sheath pipe 14 from the front-end | tip part side to the rear-end part side. Yes.

第1吊具14aは鞘本管14の先端部付近に取り付けられた剛体製のO環である。この例では、第1吊具14aは、鞘本管14の側面に固定されたナットにボルト止めされている。第1吊具14aには、第1支持部20のワイヤ20が取り付けられる。 The first suspender 14a is O ring made of a rigid mounted near the distal end of the sheath main 14 1. In this example, the first load block 14a is bolted to a nut that is fixed to the side surface of the sheath main 14 1. The first suspender 14a, the wire 20 2 of the first support portion 20 is attached.

第2吊具14bは、鞘本管14の軸方向D1に沿った中間部付近に設けられている。第2吊具14bは、鞘本管14への取り付け方法を含めて第1吊具14aと同様に構成されている。第2吊具14bには、第1支持部20のワイヤ20が取り付けられる。第2吊具14bは、第1吊具14aの補助的な役割を果たす。つまり、第1吊具14aとともに第2吊具14bにもワイヤ20を掛けることで、より効果的に長尺管12及び鞘管14の撓みを抑制できる。 The second suspender 14b is provided in the vicinity of the intermediate portion along the axial direction D1 of the sheath main 14 1. The second suspender 14b is configured similarly to the first hanger 14a, including the method of mounting the sheath main 14 1. The second suspender 14b, wire 20 2 of the first support portion 20 is attached. The second hanger 14b plays an auxiliary role of the first hanger 14a. That is, by multiplying the wire 20 2 to the second load block 14b together with the first load block 14a, can be suppressed more effectively the deflection of the elongate tube 12 and the sheath pipe 14.

第3吊具14cは、鞘本管14の後端部付近に設けられた2個の剛体製のO環14c−1及び14c−2を備える。これらのO環14c−1及び14c−2は、鞘本管14を挟んで鉛直線上に対称的に設けられている。個々のO環14c−1及び14c−2は、第1吊具14aと同様に構成されている。O環14c−1は支持部18のチェーンで上方から、O環14c−2は支持部18のチェーンで下方から、それぞれ張架される。 The third hanger 14c is provided with an O ring 14c-1 and 14c-2 manufactured by two rigid provided in the vicinity of the rear end portion of the sheath main 14 1. These O rings 14c-1 and 14c-2 are provided symmetrically on the vertical line across the sheath main 14 1. The individual O-rings 14c-1 and 14c-2 are configured in the same manner as the first hanging tool 14a. The O-ring 14c-1 is stretched from above by the chain of the support portion 18, and the O-ring 14c-2 is stretched from below by the chain of the support portion 18.

第4吊具14dは、取り付け位置が鞘延長管14後端部付近である点を除き、第3吊具14cと同様に構成され、O環14d−1及び14d−2も同様に構成されている。 The fourth hanger 14d, except mounting position is near the sheath extension pipe 14 2 rear section, the same configuration as the third suspension link 14c, O ring 14d-1 and 14d-2 is also configured similarly ing.

(はつり工具)
次に、図6を参照して、クリンカ灰を破砕するはつり工具について説明する。図6(A)は、はつり工具の一態様であるケレンの構造を模式的に示す模式図であり、図6(B)は、はつり工具の別の態様であるフラックスチッパーの構造を模式的に示す模式図である。
(Hanging tool)
Next, with reference to FIG. 6, the suspension tool which crushes clinker ash is demonstrated. FIG. 6 (A) is a schematic view schematically showing the structure of kelen, which is one embodiment of a hanging tool, and FIG. 6 (B) is a diagram schematically showing the structure of a flux chipper, which is another embodiment of the hanging tool. It is a schematic diagram shown.

はつり工具16は、長尺本管12の先端部にクイックカップリング12aを介して取り付けられたはつり作業用の動力工具である。 Chipping tool 16 is mounted via a quick coupling 12a to the end portion of the long main pipe 12 1 is a power tool for fishing operations.

この例では、図6(A)に示すように、はつり工具16として、圧縮空気により稼働する空気工具であるケレン(例えば、株式会社中谷機械製作所 形式:NK1500)を用いる。ケレンは、タガネ16aと、本体部16bとを備える。タガネ16aは、本体部16bの先端部側に取り付けられている。タガネ16aは、本体部16bを稼働すると振動方向D1に高速で振動し、クリンカ灰110を破砕する。この例では、タガネ16aの振動数は、約4000回/分とする。なお、タガネ16aについては次項で詳述する。   In this example, as shown in FIG. 6A, keren (for example, Nakatani Machinery Co., Ltd. model: NK1500), which is an air tool operated by compressed air, is used as the lifting tool 16. Keren includes a chisel 16a and a main body 16b. The chisel 16a is attached to the tip end side of the main body 16b. The chisel 16a vibrates at high speed in the vibration direction D1 when the main body 16b is operated, and crushes the clinker ash 110. In this example, the frequency of the chisel 16a is about 4000 times / minute. The chisel 16a will be described in detail in the next section.

本体部16bは、動力伝達管を兼ねる長尺本管12から圧縮空気の供給を受けて稼働し、タガネ16aを振動させる。なお、本体部16bの構造は従来周知であるのでこれ以上の説明を省略する。 The body portion 16b is an elongated main pipe 12 1 which also serves as a power transmission tube supplied with compressed air operating, vibrates the chisel 16a. In addition, since the structure of the main-body part 16b is conventionally well-known, further description is abbreviate | omitted.

なお、この例では、はつり工具16としてケレンを用いた場合を説明した。しかし、はつり工具16には、図6(B)に示すフラックスチッパー(例えば、株式会社中谷機械製作所 形式:F2)を用いても良い。フラックスチッパーは、ケレンと同様に、タガネ16aの振動方向D1に沿って高速振動し、クリンカ灰110を効果的に破砕することができる。   In this example, the case where keren is used as the lifting tool 16 has been described. However, a flux chipper (for example, Nakatani Machinery Co., Ltd. model: F2) shown in FIG. Similar to Keren, the flux chipper vibrates at high speed along the vibration direction D1 of the chisel 16a and can effectively crush the clinker ash 110.

また、はつり工具16としては、電動工具を用いてもよい。この場合、長尺管12の内部に電源ケーブルを挿通し、電動工具に動力を供給することができる。   Further, as the lifting tool 16, an electric tool may be used. In this case, the power cable can be inserted into the long tube 12 to supply power to the electric tool.

(タガネ)
次に、図7〜図9を参照して、はつり工具に取り付けられるタガネについて説明する。図7(A)は、第1態様のタガネの正面図であり、図7(B)は、図7(A)のタガネの側面図である。図8(A)は、第2態様のタガネの正面図であり、図8(B)は、図8(A)のタガネの側面図である。図9は、第3態様のタガネの正面図である。
(Tag)
Next, with reference to FIGS. 7-9, the chisel attached to a hanging tool is demonstrated. FIG. 7 (A) is a front view of the chisel of the first embodiment, and FIG. 7 (B) is a side view of the chisel of FIG. 7 (A). FIG. 8 (A) is a front view of the chisel of the second embodiment, and FIG. 8 (B) is a side view of the chisel of FIG. 8 (A). FIG. 9 is a front view of the chisel of the third aspect.

まず始めに、図7(A)を参照して、タガネの説明に用いる方向を定義する。第1方向D2を振動方向D1に垂直な方向とする。図7及び図8に矢印D2で示すように、第1方向D2は、タガネの刃先50の延在方向と平行に設定している。なお、側面図とは、第1方向D2から見たタガネの構造を示す。   First, with reference to FIG. 7A, a direction used for explanation of the chisel is defined. The first direction D2 is a direction perpendicular to the vibration direction D1. As shown by the arrow D2 in FIGS. 7 and 8, the first direction D2 is set parallel to the extending direction of the blade edge 50 of the chisel. In addition, a side view shows the structure of the chisel seen from the 1st direction D2.

第2方向D3は、振動方向D1及び第1方向D2の両方向に垂直な方向とする。図7及び図8では、第2方向D3は、平タガネの刃先50の、言わば厚み方向に対応する。なお、正面図とは、第2方向D3から見たタガネの構造を示す。   The second direction D3 is a direction perpendicular to both the vibration direction D1 and the first direction D2. 7 and 8, the second direction D3 corresponds to the thickness direction of the blade edge 50 of the flat chisel. In addition, a front view shows the structure of the chisel seen from the 2nd direction D3.

図7(A)及び(B)を参照して、第1態様のタガネ16aについて説明する。タガネ16aは、クリンカ灰110を破砕できるが、クリンカ灰110が付着している2次過熱器102bの伝熱管112を傷つけないように構成されることが好ましい。そのために、タガネ16aでは刃先50の構造と、材質とが工夫されている。 Figure 7 Referring to (A) and (B), will be described chisel 16a 1 of the first embodiment. The chisel 16a 1 is capable of crushing the clinker ash 110, but is preferably configured so as not to damage the heat transfer tube 112 of the secondary superheater 102b to which the clinker ash 110 is attached. Therefore, in the chisel 16a 1 , the structure and material of the blade edge 50 are devised.

詳細には、第1態様のタガネ16aは、いわゆる平タガネであり、刃先50が第1方向D2に平行に延在する。そして、刃先50の第1方向D2に沿った両端部50Eが、面取りされて、刃先50の外側に向かって凸形の湾曲面状に丸められている。また、図7(B)に示すように、刃先50の先端は、第2方向D3に関して、刃先の外側に向かって凸形の湾曲面状に丸められている。この例では、タガネ16aの材料を未焼入れの軟鋼とする。より詳細には、機械構造用炭素鋼であるS17Cを用いている。このように、刃先50の角部を丸めるとともに、タガネ16aの材料として上述の材質を用いることで、伝熱管112の損傷を防止しつつ、クリンカ灰110を効果的に破砕することができる。 Specifically, the chisel 16a 1 of the first aspect is a so-called flat chisel, and the blade edge 50 extends in parallel to the first direction D2. Then, both end portions 50E along the first direction D2 of the blade edge 50 are chamfered and rounded into a convex curved surface toward the outside of the blade edge 50. Further, as shown in FIG. 7B, the tip of the blade edge 50 is rounded into a convex curved surface toward the outside of the blade edge in the second direction D3. In this example, the material of the chisel 16a 1 is unquenched mild steel. More specifically, S17C, which is a carbon steel for mechanical structure, is used. Thus, the clinker ash 110 can be effectively crushed while the corners of the cutting edge 50 are rounded and the above-mentioned materials are used as the material of the chisel 16a 1 while preventing the heat transfer tube 112 from being damaged.

なお、タガネ16aの材料としては、ポリアセタール、ポリアミド、ポリカーボネート、変性ポリフェニレンエーテル、ポリブチレンテレフタレート、及びポリフェニレンサルファイド等のエンジニアリングプラスチックを用いても良い。ここで、「エンジニアリングプラスチック」とは、構造用及び機械部材に適合した機械的強度を有する高性能プラスチックで、耐熱性が100℃以上のものである。エンジニアリングプラスチックを材料とすることでも、伝熱管112の損傷を防止しながら、実用上十分なクリンカ灰破砕能力を持つタガネを得ることができる。 The material of the chisel 16a 1 may be engineering plastics such as polyacetal, polyamide, polycarbonate, modified polyphenylene ether, polybutylene terephthalate, and polyphenylene sulfide. Here, the “engineering plastic” is a high-performance plastic having mechanical strength suitable for structural use and mechanical members and having a heat resistance of 100 ° C. or higher. By using engineering plastic as a material, it is possible to obtain a chisel having a practically sufficient clinker ash crushing capacity while preventing damage to the heat transfer tube 112.

続いて、図8及び図9を参照して、第2及び第3態様のタガネ16a及び16aについて説明する。 Next, with reference to FIGS. 8 and 9, the chisel 16a 2 and 16a 3 of the second and third modes will be described.

図8(A)及び(B)に示すように、第2態様のタガネ16aは、いわゆる平タガネであり、第1方向D2に沿った刃先50の輪郭線が弧状に形成されている。つまり、タガネ16aは、第1方向D2に沿って略楕円形に形成されている。また、図8(B)に示すように、刃先50の先端は、第2方向D3に関して、刃先の外側に凸の湾曲面状に丸められている。第2態様のタガネ16aは、第1態様16aと同様の材料で形成できる。 As shown in FIGS. 8A and 8B, the chisel 16a 2 of the second aspect is a so-called flat chisel, and the contour line of the blade edge 50 along the first direction D2 is formed in an arc shape. That is, the chisel 16a 2 is formed in a substantially elliptical shape along the first direction D2. Further, as shown in FIG. 8B, the tip of the blade edge 50 is rounded into a curved surface convex toward the outside of the blade edge in the second direction D3. The chisel 16a 2 of the second aspect can be formed of the same material as that of the first aspect 16a 1 .

図9に示すように、第3態様のタガネ16aは、刃先50が半球状に形成された棒状のいわゆる直タガネである。第3態様のタガネ16aは、第1態様16aと同様の材料で形成できる。 As shown in FIG. 9, the chisel 16a 3 of the third aspect is a so-called straight chisel with a cutting edge 50 formed in a hemispherical shape. The chisel 16a 3 of the third aspect can be formed of the same material as that of the first aspect 16a 1 .

刃先50の形状が異なるこれら3種のタガネ16a,16a及び16aには、クリンカ灰110の破壊力に関して以下の大小関係がある。 These three kinds of chiseles 16a 1 , 16a 2 and 16a 3 having different shapes of the blade edge 50 have the following magnitude relationship with respect to the destructive force of the clinker ash 110.

第1態様(16a)>第2態様(16a)>第3態様(16a
上述のように第1態様のタガネ16aでも、伝熱管112への損傷は実用上充分に防止されるので、大量のクリンカ灰110を短時間で除去するためには、第1態様のタガネ16aを用いることが好ましい。一方、第2及び第3態様のタガネ16a及び16aは、伝熱管112へ加わる衝撃力を小さくできるので、伝熱管112の表面近傍に付着するクリンカ灰110の除去に好適である。
First Aspect (16a 1 )> Second Aspect (16a 2 )> Third Aspect (16a 3 )
As described above, even in the first mode chisel 16a 1 , damage to the heat transfer tube 112 is sufficiently prevented in practical use. Therefore, in order to remove a large amount of clinker ash 110 in a short time, the first mode chisel 16a 1 is preferably used. On the other hand, the chisel 16a 2 and 16a 3 of the second and third aspects can reduce the impact force applied to the heat transfer tube 112, and is therefore suitable for removing the clinker ash 110 adhering to the vicinity of the surface of the heat transfer tube 112.

(支持部)
次に、図10及び図11を参照して、支持部について説明する。図10は、第1支持部の構成を模式的に示す模式図である。図11は、第2支持部の構成を模式的に示す模式図である。既に説明したように、支持部18は、第1及び第2支持部20及び22を備える(図4参照)。
(Support part)
Next, a support part is demonstrated with reference to FIG.10 and FIG.11. FIG. 10 is a schematic diagram schematically showing the configuration of the first support portion. FIG. 11 is a schematic diagram schematically showing the configuration of the second support portion. As already described, the support portion 18 includes first and second support portions 20 and 22 (see FIG. 4).

図10に示すように、第1支持部20は、第1巻き上げ機20と、ワイヤ20と、吊金具20とを備える。 As shown in FIG. 10, the first support portion 20 includes a first hoisting machine 20 1, the wire 20 2, and a hanging bracket 20 3.

第1巻き上げ機20には、ワイヤ20が巻き取られており、ワイヤ20の繰り出し長さを自在に変更できる。この例では、第1巻き上げ機20として手動ウインチが用いられる。 The first hoisting machine 20 1, the wire 20 2 are wound, can change the feed length of the wire 20 2 freely. In this example, the manual winch is used as the first hoist 20 1.

ワイヤ20は、第1巻き上げ機20とは逆側の自由端が、火炉102内に位置する鞘管14の第1吊具14aに、覗き孔108を介して接続されている。その結果、ワイヤ20の繰り出し長さを変えることにより、本体10Hを鉛直方向に自在に移動させることができる。ここで、「鉛直方向に自在に移動」とは、水平面と軸方向D1との角度を自在に変更できることであり、言わば本体10Hを自在に寝かせたり立てたりできることを意味する。 Wire 20 2, the first hoisting machine 20 first free end of the opposite side, the first hanger 14a of the sheath tube 14 positioned into the furnace 102, are connected through a peephole 108. As a result, by changing the feeding length of the wire 20 2, it can be moved freely body 10H in the vertical direction. Here, “moving freely in the vertical direction” means that the angle between the horizontal plane and the axial direction D1 can be freely changed, that is, it means that the main body 10H can be laid down or stood freely.

吊金具20は、覗き孔108に固定された剛体製のO環である。この例では、吊金具20は、覗き孔108の周囲の火炉102の外壁面にボルトで固定されており、ワイヤ20が挿通される。 Hanging bracket 20 3 is fixed rigid steel O ring peephole 108. In this example, it is suspending fitting 20 3 is bolted to the outer wall surface of the furnace 102 of the periphery of the viewing opening 108, the wire 20 2 is inserted.

図11に示すように、第2支持部22は、支持枠22と、第2及び第3巻き上げ機22及び22とを備える。 As shown in FIG. 11, the second support portion 22 includes a support frame 22 1, and second and third winches 22 2 and 22 3.

支持枠22は、金属等の剛体製のパイプを梯子状に組み立てた枠体であり、図中に点線で示したマンホール106に固定されている。より詳細には、マンホール106の周囲の火炉102の外壁面を利用して固定されている。支持枠22は、鉛直方向に延在し、互いに平行に配置された2本の縦パイプ22aと、この2本の縦パイプ22a間を水平方向に接続する3本の横パイプ22b,22c及び22dとで構成される。最も上方に位置する横パイプ22bの水平方向の中心部付近には、剛体製のO環である吊金具22Aが設けられている。また、最も下方に位置する横パイプ22dの水平方向の中心部付近には、剛体製のO環である吊金具22Bが設けられている。 Supporting frame 22 1 is a frame body assembled rigid pipe made of a metal such as a ladder shape and is fixed to the manhole 106 shown by a dotted line in FIG. More specifically, the outer wall surface of the furnace 102 around the manhole 106 is used for fixing. The support frame 22 1 extends in the vertical direction and is arranged in parallel with each other, and the two vertical pipes 22 1 a and three horizontal pipes connecting the two vertical pipes 22 1 a in the horizontal direction. 22 1 b, 22 1 c and 22 1 d. A suspension fitting 22A, which is a rigid O-ring, is provided in the vicinity of the central portion in the horizontal direction of the uppermost horizontal pipe 22 1 b. Further, in the vicinity of the horizontal center portion of the lateral pipe 22 1 d is located in the lowermost, hanging bracket 22B is provided as a rigid body made of O rings.

第2巻き上げ機22は、この例ではレバーブロック(登録商標)が用いられている。第2巻き上げ機22の一方のフックが、最も上方に位置する横パイプ22bの吊金具22Aに掛けられている。そして、他方のフックは、鞘管14の後端部付近に設けられたO環14d−1(又は、O環14c−1)に掛けられている。第2巻き上げ機22は、第3巻き上げ機22と協働して、適当な張力のチェーンで鞘管14を張架(支持)する。 The second hoisting machine 22 2 in this example is used the lever block (registered trademark). The second hoisting machine 22 2 of one of the hooks are hung on the horizontal pipe 22 1 b of the hanging metal fitting 22A is located in the uppermost. The other hook is hung on an O-ring 14d-1 (or an O-ring 14c-1) provided near the rear end of the sheath tube 14. The second hoisting machine 22 2 cooperates with the third hoist 22 3, for stretching (supporting) the sleeve pipe 14 at a suitable tension of the chain.

第3巻き上げ機22は、この例ではレバーブロックが用いられている。第3巻き上げ機22の一方のフックが、最も下方に位置する横パイプ22dの吊金具22Bに掛けられている。そして、他方のフックは、鞘管14の後端部付近に設けられたO環14d−2(又は、O環14c−2)に掛けられている。第3巻き上げ機22は、第2巻き上げ機22と協働して、適当な張力のチェーンで鞘管14を張架(支持)する。 Third hoist 22 3, in this example used the lever block. One of the hooks of the third hoist 22 3, are hung next to pipe 22 1 d hanging bracket 22B which is located lowermost. The other hook is hung on an O-ring 14d-2 (or an O-ring 14c-2) provided near the rear end of the sheath tube 14. Third hoist 22 3 cooperates with 2 second hoisting machine 22, for stretching (supporting) the sleeve pipe 14 at a suitable tension of the chain.

第2及び第3巻き上げ機22及び22は、鞘管14を鉛直方向の上下から挟んで設けられている。従って、両巻き上げ機22及び22のチェーンを巻き上げると、鞘管14は、言わば上下方向から引っ張られて、第4吊具14d(又は、第3吊具14c)の位置を支点として歳差運動可能に支持される。このように、鞘管14、つまり本体10Hを、第2及び第3巻き上げ機22及び22により上下方向から張架することで、本体10Hの水平方向の不所望な振動が抑えられるので、位置決めを容易に行うことができる。 Second and third winches 22 2 and 22 3 are provided to sandwich the sheath tube 14 from the upper and lower vertical directions. Therefore, when winding up the both winches 22 2 and 22 3 of the chain, the sheath tube 14, as it were pulled from the vertical direction, a fourth sling 14d (or the third load block 14c) precession positions as fulcrums Supported for movement. Thus, the sheath tube 14, that is, the main body 10H, by stretching in the vertical direction by the second and third winches 22 2 and 22 3, since undesired vibration in the horizontal direction of the main body 10H is suppressed, Positioning can be performed easily.

第2及び第3巻き上げ機22及び22にはレバーブロックの他に、チェーンブロック等、従来公知の他の巻き上げ機を用いることができる。 The second and third winches 22 2 and 22 3 in addition to the lever block, the chain block or the like, can be conventional other hoist.

以上説明したように、本発明の除去装置10は、本体10Hを鞘管14と長尺管12の二重管で構成することで撓みを防止し、さらに、本体10Hの先端部と後端部とをそれぞれ第1及び第2支持部20及び22で支持している。その結果、タガネ16aを、約10cmの精度で所望の位置に位置決めすることができ、クリンカ灰110の除去に要する時間を短縮できる。   As described above, the removing device 10 of the present invention prevents the bending by configuring the main body 10H with the double tube of the sheath tube 14 and the long tube 12, and further, the front end portion and the rear end portion of the main body 10H. Are supported by the first and second support portions 20 and 22, respectively. As a result, the chisel 16a can be positioned at a desired position with an accuracy of about 10 cm, and the time required for removing the clinker ash 110 can be shortened.

また、タガネ16aの材質及び刃先50の形状を上述のように構成することで、伝熱管112に損傷を与えること無く、クリンカ灰110のみを破砕することができる。   Further, by configuring the material of the chisel 16a and the shape of the blade edge 50 as described above, it is possible to crush only the clinker ash 110 without damaging the heat transfer tube 112.

(除去方法)
次に、この発明の除去方法について、図12及び図13を参照して説明する。図12(A)及び(B)は、除去方法の工程段階を順に示す模式図であり、図13(A)及び(B)は、図12(B)に続く、除去方法の工程段階を順に示す模式図である。なお、図12及び図13においては、除去装置10を簡略的に示している。
(Removal method)
Next, the removal method of the present invention will be described with reference to FIGS. FIGS. 12A and 12B are schematic views sequentially showing the process steps of the removal method. FIGS. 13A and 13B sequentially show the process steps of the removal method following FIG. 12B. It is a schematic diagram shown. In addition, in FIG.12 and FIG.13, the removal apparatus 10 is shown simply.

除去方法は、第1〜第8工程を備える。以下、これらの工程を順に説明する。   The removal method includes first to eighth steps. Hereinafter, these steps will be described in order.

<第1工程:図12(A)>
図12(A)に示すように、第1工程においては、覗き孔108を通じて火炉102の内部に挿入された第1支持部20のワイヤ20の自由端20fを、マンホール106から再び火炉102の外部に取り出す。
<First step: FIG. 12A>
Figure 12 (A), in the first step, the wire 20 2 of the free end 20 2 f of the first support portion 20 inserted in the interior of the furnace 102 through the peephole 108, again the furnace from the manhole 106 Take it out of 102.

より詳細には、ワイヤ20の自由端20fを、覗き孔108の吊金具20を通して火炉102の内部に送り込み、第1巻き上げ機20により、垂れ下がった自由端20fがマンホール106から目視可能となるまでワイヤ20を繰り出す(図中、白矢印HAr1参照)。そして、矢印Ar1に示すように、この自由端20fをフックや手で、マンホール106から火炉102の外側に引き出す。 More specifically, the wire 20 2 of the free end 20 2 f, fed into the interior of the furnace 102 through the hanging bracket 20 3 peephole 108, the first hoist 20 1, hanging free end 20 2 f is manhole 106 from until visible feed the wire 20 2 (see in the figure the white arrow Har1). Then, as shown by an arrow Ar1, this free end 20 2 f is pulled out of the furnace 102 from the manhole 106 by a hook or hand.

なお、以降の説明において、図で用いられる白矢印(符号HArで示す。)は、ワイヤ20及びチェーンの繰り出し及び巻き上げを示す。また、実線の矢印(符号Arで示す。)は構成要素の位置移動を示す。 In the following description, (. Indicated by symbol HAr) white arrow used in the figure, the wire 20 shown 2 and chain feeding and winding. A solid line arrow (indicated by symbol Ar) indicates the movement of the position of the component.

<第2〜5工程:図12(B)>
続いて、第2工程において、長尺管12の先端部にはつり工具16を装着し、その状態の長尺管12を、鞘管14に挿通する。なお、はつり工具16と長尺管12と鞘管14とからなる構造体(図中、点線参照)を、上述のように本体10Hとも称する。
<Second to fifth steps: FIG. 12 (B)>
Subsequently, in the second step, a suspension tool 16 is attached to the distal end portion of the long tube 12, and the long tube 12 in that state is inserted into the sheath tube 14. In addition, the structure (refer a dotted line in the figure) which consists of the hanging tool 16, the long tube 12, and the sheath tube 14 is also called the main body 10H as described above.

続いて、第3工程において、第2支持部22の支持枠22をマンホール106に固定する。続いて、第4工程において、火炉102の外部に取り出された自由端20fを、本体10Hの鞘管14の先端部の第1吊具14aに接続する。これで、本体10Hは、先端部付近がワイヤ20で懸吊された状態になる。なお、図12(B)には、第2〜4工程が終了した状態が示されている。 Subsequently, in the third step, to secure the supporting frame 22 1 of the second support portion 22 to the manhole 106. Subsequently, in the fourth step, the free end 20 2 f taken out of the furnace 102 is connected to the first hanger 14a at the tip of the sheath tube 14 of the main body 10H. Now, the main body 10H is in a state in which near the tip portion is suspended by a wire 20 2. In addition, the state which the 2nd-4th process was complete | finished is shown by FIG. 12 (B).

次に、第5工程において、白矢印HAr2に示すように、第1巻き上げ機20からワイヤ20を繰り出しながら、本体10Hをマンホール106から、火炉102の内部に押し入れていく。すなわち、オペレータは、第1巻き上げ機20からワイヤ20を繰り出し、この繰り出し量に応じた長さだけ、矢印Ar2及びAr3に示すように、本体10Hを火炉102の内部に挿入していく(図中点線で示す。)。 Next, in the fifth step, as shown in white arrow Har2, while feeding the wire 20 2 from the first hoist 20 1, the main body 10H from the manhole 106, will push the interior of the furnace 102. That is, the operator feeding the wire 20 2 from the first hoist 20 1, the feed amount by a length corresponding, as indicated by arrow Ar2 and Ar @ 3, continue to insert the main body 10H on the inside of the furnace 102 ( (Indicated by the dotted line in the figure).

<第6工程:図13(A)及び(B)>
第6工程において、本体10Hがある程度火炉102の内部に挿入されたならば、鞘管14の後端部に設けられた第3吊具14cに、第2及び第3巻き上げ機22及び22のチェーンを取り付ける。
<Sixth Step: FIGS. 13A and 13B>
In the sixth step, if the main body 10H is inserted to some extent inside the furnace 102, the second and third hoisting machines 22 2 and 22 3 are attached to the third hanger 14c provided at the rear end of the sheath tube 14. Install the chain.

詳細には、鞘管14のO環14c−1に第2巻き上げ機22のチェーンのフックを掛け、O環14c−2に第3巻き上げ機22のチェーンのフックを掛ける。これにより、本体10Hの後端部側は、第2及び第3巻き上げ機22及び22により、上下両方向から張架される。 In particular, the O ring 14c-1 of the sheath tube 14 over the hook of the second hoist 22 2 chain, multiplying the third hoist 22 3 chain hook O ring 14c-2. Thus, the rear end side of the main body 10H is the second and third winches 22 2 and 22 3, is stretched from both upper and lower directions.

この状態で、第1巻き上げ機20からのワイヤ20の繰り出し(白矢印HAr3)と、第2及び第3巻き上げ機22及び22のチェーンの巻き取り(白矢印HAr4及びHAr5)とを同期させて行う。そうすると、本体10Hは、矢印Ar4に示すように、火炉102内部に更に挿入される。 In this state, the wire 20 2 unwinding from the first hoisting machine 20 1 (white arrow HAr3), second and third winches 22 2 and 22 winding 3 of the chain and a (white arrows HAr4 and HAr5) Synchronized. Then, the main body 10H is further inserted into the furnace 102 as indicated by an arrow Ar4.

このように、ワイヤ20を繰り出しながら、第2及び第3巻き上げ機22及び22のチェーンを巻き上げると、やがて、これらのチェーンと鞘管14のO環14c−1及び14c−2が、鉛直方向に沿って一直線上に直列する。 Thus, while feeding the wire 20 2, when winding the second and third winches 22 2 and 22 3 chain, eventually, the O ring 14c-1 and 14c-2 of the chains and sheath pipe 14, Series in a straight line along the vertical direction.

このように、これらの部材が一直線に並んだ状態で第2及び第3巻き上げ機22及び22により、チェーンに適当な張力を与えれば、本体10Hは、第3吊具14cの位置で、歳差運動可能に支持される。つまり、除去装置10のセッティングが完了する。図13(B)は、この状態の除去装置10の様子を示している。 Thus, the second and third winches 22 2 and 22 3 in these conditions member arranged in a straight line, if you give an appropriate tension to the chain, the body 10H is the position of the third load block 14c, Supported by precession. That is, the setting of the removing device 10 is completed. FIG. 13B shows the state of the removal device 10 in this state.

<第7及び第8工程:図4>
第7工程において、タガネ16aの位置決めが行われる。具体的には、第1巻き上げ機20のワイヤ20の繰り出し量によりタガネ16aの高さを調整し、及び、操作部10Aを水平方向に移動させることでタガネ16aの水平位置を調整し、タガネ16aの位置決めを行う。
<Seventh and eighth steps: FIG. 4>
In the seventh step, the chisel 16a is positioned. Specifically, feed amount of the first hoist 20 1 of the wire 20 2 by adjusting the height of the chisel 16a, and to adjust the horizontal position of the chisel 16a by moving the operating portion 10A in a horizontal direction, The chisel 16a is positioned.

そして、第8工程において、タガネ16aを位置決めした上で、長尺管12を軸方向D1の前方に押し出してクリンカ灰110に接触させ、はつり工具16を稼動して、クリンカ灰110を破砕する。   Then, in the eighth step, after positioning the chisel 16a, the long tube 12 is pushed forward in the axial direction D1 to contact the clinker ash 110, and the lifting tool 16 is operated to crush the clinker ash 110.

なお、第7及び第8工程については、図4を参照して上述したので、これ以上の説明を省略する。   Since the seventh and eighth steps have been described above with reference to FIG. 4, further description thereof is omitted.

以上説明したように、本発明の除去方法によれば、除去装置10を簡単な手順でセッティングすることができる。よって、セッティングまでを含めたクリンカ灰110の除去作業に要する時間を短縮することができる。   As described above, according to the removal method of the present invention, the removal device 10 can be set by a simple procedure. Therefore, the time required for the removal work of the clinker ash 110 including the setting can be shortened.

(本体の延長方法)
次に、図14及び図15を参照して、使用中の除去装置における本体の延長方法、詳細には、鞘管及び長尺管の延長方法について説明する。図14(A)及び(B)は、鞘管及び長尺管の延長方法の工程段階を順に示す模式図である。図15は、図14(B)に続く、鞘管及び長尺管の延長方法の工程段階を示す模式図である。なお、図14(A)〜図15は、図13(B)に示す使用状態にある除去装置10における第2支持部22付近を拡大した模式図である。
(How to extend the body)
Next, with reference to FIG.14 and FIG.15, the extension method of the main body in the removal apparatus in use, in detail, the extension method of a sheath tube and a long tube is demonstrated. 14 (A) and 14 (B) are schematic views sequentially showing process steps of a method for extending a sheath tube and a long tube. FIG. 15 is a schematic diagram showing process steps of a method for extending a sheath tube and a long tube following FIG. 14 (B). 14A to 15 are enlarged schematic views of the vicinity of the second support portion 22 in the removing device 10 in the use state shown in FIG. 13B.

本体10Hを延長してクリンカ灰110を除去するためには、以下の第9〜第12工程を行う。以下、これらの工程を順に説明する。   In order to extend the main body 10H and remove the clinker ash 110, the following ninth to twelfth steps are performed. Hereinafter, these steps will be described in order.

<第9工程:図14(A)>
第9工程において、長尺管12、より詳細には第1長尺延長管12の後端部に第2長尺延長管12を接続する。なお、図14(A)では、既に第1及び第2長尺延長管12及び12が、クイックカップリング12aで接続された状態を示している。
<Ninth step: FIG. 14A>
In a ninth step, the elongated tube 12, and more particularly to connect the second long extension pipe 12 3 to the rear end portion of the first long extension pipe 12 2. In FIG. 14 (A), the already first and second long extension pipe 12 2 and 12 3, and shows a state connected by quick coupling 12a.

次に、矢印Ar5で示すように、接続が済んだ第2長尺延長管12を内部に挿入しながら、鞘管14、より詳細には鞘本管14の後端部に鞘延長管14を接続する。具体的には、鞘延長管14を継手14eに差し込む。 Then, an arrow as shown by Ar5, while inserting connection a second long extension pipe 12 3 having undergone the internal sheath tube 14, the sheath extension pipe to the rear end portion of the sheath main 14 1 and more 14 2 is connected. Specifically, inserting the sheath extension tube 14 2 in the joint 14e.

<第10工程:図14(B)>
第10工程において、第2支持部22の上側吊金具22Aと、鞘延長管14の後端部に設けられたO環14d−1との間に第4巻き上げ機22のチェーンを掛け渡す。同様に、第2支持部22の下側吊金具22Bと、鞘延長管14の後端部に設けられたO環14d−2との間に第5巻き上げ機22のチェーンを掛け渡す。
<Tenth step: FIG. 14B>
In a tenth step, to bridge the upper hanging bracket 22A of the second support portion 22, the fourth hoist 22 4 chain between the O ring 14d-1 provided at the rear end of the sheath extension pipe 14 2 . Similarly, pass over a lower hanging bracket 22B of the second support portion 22, the fifth hoist 22 5 chain between the O ring 14d-2 which is provided at the rear end of the sheath extension tube 14 2.

これにより、支持枠22の上側吊金具22Aには、既存の第2巻き上げ機22に加えて、第4巻き上げ機22が固定される。同様に、下側吊金具22Bには、既存の第3巻き上げ機22に加えて、第5巻き上げ機22が固定される。 Thus, the upper hanging brackets 22A of the support frame 22 1, in addition to the hoisting machine 22 2 existing second, fourth hoist 22 4 is fixed. Similarly, the lower hanging bracket 22B, in addition to the existing third hoist 22 3, 5 hoisting machine 22 5 is fixed.

この状態で、白矢印HAr6及びHAr7に示すように、第2及び第3巻き上げ機22及び22のチェーンを繰り出して緩めていく。その結果、本体10Hは、第4及び第5巻き上げ機22及び22と、第1吊具14aに掛けられたワイヤ20で支持された状態となり、第2及び第3巻き上げ機22及び22を取り外すことが可能となる。 In this state, as shown in white arrow HAr6 and HAr7, it will loosen feeding the second and third winches 22 2 and 22 3 of the chain. As a result, the main body 10H is a fourth and fifth hoist 22 4 and 22 5, a state of being supported by a wire 20 2 placed to the first load block 14a, the second and third winches 22 2 and 22 3 it is possible to remove the.

<第11工程:図15>
第11工程においては、不図示の第1巻き上げ機20から白矢印HAr10に示すようにワイヤ20を適当に繰り出す。そして、ワイヤ20の繰り出し量に応じて、第4及び第5巻き上げ機22及び22のチェーンを巻き上げる(白矢印HAr8及び9参照)。その結果、本体10Hは、後端部側が巻き上げ機22及び22のチェーンで、及び先端部側がワイヤ20でそれぞれ張架されたまま、矢印Ar5のように、徐々に火炉102内部に挿入される。なお、図15は、上述のように第2及び第3巻き上げ機22及び22を取り外した状態を示している。
<11th step: FIG. 15>
In the eleventh step, suitably feed the wire 20 2 as shown in white arrow HAr10 from the first hoist 20 1 (not shown). Then, in accordance with the feeding amount of the wire 20 2, winding the chain of the fourth and fifth hoist 22 4 and 22 5 (see the white arrows HAr8 and 9). As a result, the main body 10H is inserted at the rear end side of the hoisting machine 22 4 and 22 5 chain, and remains the leading end portion side is stretched respectively wires 20 2, as indicated by arrow Ar5, gradually within the furnace 102 Is done. Note that FIG. 15 shows a state in which removal of the second and third winches 22 2 and 22 3 as described above.

このように第9〜第11工程を実施することで、本体10Hを支持部18から取り外すことなく、使用中の状態で全長を延長することができる。   By performing the ninth to eleventh steps in this way, the entire length can be extended in use without removing the main body 10H from the support portion 18.

<第12工程:図4>
最後に、延長された本体10Hを用いて、上述の第7及び第8工程と同様の操作を行い、クリンカ灰110を破砕する。
<Twelfth step: FIG. 4>
Finally, the clinker ash 110 is crushed using the extended main body 10H by performing the same operation as in the seventh and eighth steps.

なお、この例では、本体10Hの全長が短い状態から長い状態へと延長する場合を説明したが、逆に、本体10Hを長い状態から短い状態に短縮する場合は、上述と逆の工程を行えば良い。   In this example, the case where the entire length of the main body 10H is extended from the short state to the long state has been described, but conversely, when the main body 10H is shortened from the long state to the short state, the reverse process is performed. Just do it.

以上説明したように、本発明の除去方法によれば、使用状態を保ったまま、簡単な手順で、除去装置10の全長を延長できる。よって、除去装置10の延長操作をも含めたクリンカ灰110の除去作業に要する時間を短縮することができる。   As described above, according to the removal method of the present invention, the entire length of the removal device 10 can be extended by a simple procedure while maintaining the use state. Therefore, the time required for the removal operation of the clinker ash 110 including the extension operation of the removal device 10 can be shortened.

なお、この延長操作は、例えば、全長が短い状態の除去装置10が届く範囲のクリンカ灰110の除去が終了し、連続して、さらに遠方のクリンカ灰110を除去する場合に好適である。   In addition, this extension operation is suitable, for example, when the removal of the clinker ash 110 in a range where the removal device 10 having a short overall length reaches is completed and the clinker ash 110 further distant is continuously removed.

10 クリンカ灰除去装置(除去装置)
10A 操作部
10H 本体
12 長尺管
12 長尺本管
12 第1長尺延長管
12 第2長尺延長管
12a クイックカップリング
14 鞘管
14 鞘本管
14 鞘延長管
14a 第1吊具
14b 第2吊具
14c 第3吊具
14c−1,14c−2,14d−1,14d−2 O環
14d 第4吊具
14e 継手
16 はつり工具
16a,16a,16a,16a タガネ
16b 本体部
18 支持部
20 第1支持部
20 第1巻き上げ機
20 ワイヤ
20,22A,22B 吊金具
22 第2支持部
22 支持枠
22a 縦パイプ
22b,22c,22d 横パイプ
22 第2巻き上げ機
22 第3巻き上げ機
22 第4巻き上げ機
22 第5巻き上げ機
50 刃先
50E 端部
100 石炭ボイラ(ボイラ)
102 火炉
102a 石炭バーナ
102b 2次過熱器
102c 3次過熱器
102d 4次過熱器
102D 下部領域
102U 上部領域
104 後部伝熱部
106 マンホール
108 覗き孔
110 クリンカ灰
112 伝熱管
10 Clinker ash removal device (removal device)
10A Operation unit 10H Main body 12 Long tube 12 1 Long main tube 12 2 First long extension tube 12 3 Second long extension tube 12a Quick coupling 14 Sheath tube 14 1 sheath main tube 14 2 sheath extension tube 14a 1 hanger 14b second load block 14c third load block 14c-1,14c-2,14d-1,14d- 2 O ring 14d fourth sling 14e joint 16 chipping tool 16a, 16a 1, 16a 2, 16a 3 The chisel 16b The main body part 18 The support part 20 The first support part 20 1 The first hoisting machine 20 2 The wires 20 3 , 22A, 22B The hanging bracket 22 The second support part 22 1 The support frame 22 1 a The vertical pipe 22 1 b, 22 1 c , 22 1 d Horizontal pipe 22 2 2nd hoisting machine 22 3 3rd hoisting machine 22 4 4th hoisting machine 22 5 5th hoisting machine 50 Cutting edge 50E End 100 Coal boiler (boiler)
102 furnace 102a coal burner 102b secondary superheater 102c tertiary superheater 102d quaternary superheater 102D lower region 102U upper region 104 rear heat transfer unit 106 manhole 108 peephole 110 clinker ash 112 heat transfer tube

Claims (14)

長尺管と、
該長尺管が、軸方向に移動自在に挿通される鞘管と、
前記長尺管の一端に取り付けられたタガネを有するはつり工具と
を備えるクリンカ灰除去装置であって、
前記はつり工具が設けられた側の前記鞘管の先端部を、鉛直方向に移動可能に支持する第1支持部と、
前記はつり工具が設けられた側とは反対側の前記鞘管の後端部を、該鞘管が歳差運動可能に支持する第2支持部と
を備え、
前記第1支持部が、繰り出されるワイヤの長さを自在に変更できる第1巻き上げ機と、該第1巻き上げ機から繰り出され、石炭ボイラのマンホールの上方に設けられた覗き孔を介して石炭ボイラ内部に位置する前記先端部を懸吊するワイヤとを備え、
前記第2支持部が、前記マンホールに固定された剛体からなる支持枠と、前記後端部をそれぞれ張架する、前記支持枠の鉛直方向上側部分の上側吊金具に固定された第2巻き上げ機と、該支持枠の鉛直方向下側部分の下側吊金具に固定された第3巻き上げ機とを備える
ことを特徴とするクリンカ灰除去装置。
A long tube,
A sheath tube through which the long tube is movably inserted in the axial direction;
A clinker ash removal device comprising a hanging tool having a chisel attached to one end of the long tube ,
A first support part that supports the tip of the sheath tube on the side where the hanger tool is provided so as to be movable in the vertical direction;
A second support portion that supports the rear end portion of the sheath tube opposite to the side on which the lifting tool is provided, so that the sheath tube is capable of precessing;
With
The first support unit can freely change the length of the wire to be fed, and the coal boiler through a peephole that is fed from the first winder and provided above the manhole of the coal boiler. A wire for suspending the tip located inside,
A second hoisting machine, wherein the second support part is fixed to an upper hanging bracket of a vertical upper part of the support frame, which stretches the support frame made of a rigid body fixed to the manhole and the rear end part, respectively. A clinker ash removal apparatus, comprising: a third hoisting machine fixed to a lower hanging bracket of a lower part in the vertical direction of the support frame .
前記タガネの振動方向に対して垂直な方向を第1方向とし、前記振動方向及び前記第1方向に垂直な方向を第2方向とするとき、
前記タガネが、刃先が前記第1方向に平行に延在する平タガネであり、前記刃先が前記第2方向に関して湾曲面として形成されており、前記刃先の第1方向に沿った両端部が曲面状に形成されていることを特徴とする請求項1に記載のクリンカ灰除去装置。
When the direction perpendicular to the vibration direction of the chisel is the first direction, and the direction perpendicular to the vibration direction and the first direction is the second direction,
The chisel is a flat chisel whose cutting edge extends in parallel with the first direction, the cutting edge is formed as a curved surface with respect to the second direction, and both end portions along the first direction of the cutting edge are curved surfaces. The clinker ash removal device according to claim 1, wherein the clinker ash removal device is formed in a shape.
前記タガネの振動方向に対して垂直な方向を第1方向とし、前記振動方向及び前記第1方向に垂直な方向を第2方向とするとき、
前記タガネが、前記第1方向に沿った刃先の輪郭線が弧状に形成されている平タガネであり、前記刃先が前記第2方向に関して湾曲面として形成されていることを特徴とする請求項1に記載のクリンカ灰除去装置。
When the direction perpendicular to the vibration direction of the chisel is the first direction, and the direction perpendicular to the vibration direction and the first direction is the second direction,
The said chisel is a flat chisel in which the contour line of the cutting edge along the first direction is formed in an arc shape, and the cutting edge is formed as a curved surface with respect to the second direction. The clinker ash removal apparatus described in 1.
前記タガネの刃先が、半球状に形成されていることを特徴とする請求項1に記載のクリンカ灰除去装置。   The clinker ash removing apparatus according to claim 1, wherein the blade edge of the chisel is formed in a hemispherical shape. 前記タガネが、未焼入れの軟鋼を材料とすることを特徴とする請求項1〜4の何れか一項に記載のクリンカ灰除去装置。   The clinker ash removing device according to any one of claims 1 to 4, wherein the chisel is made of unquenched mild steel. 前記タガネが、エンジニアリングプラスチックを材料とすることを特徴とする請求項1〜4の何れか一項に記載のクリンカ灰除去装置。   The clinker ash removing apparatus according to any one of claims 1 to 4, wherein the chisel is made of engineering plastic. 前記はつり工具が、ケレン又はフラックスチッパーであることを特徴とする請求項1〜6の何れか一項に記載のクリンカ灰除去装置。   The clinker ash removal apparatus according to any one of claims 1 to 6, wherein the hanging tool is keren or a flux chipper. 前記鞘管の軸方向に沿った長さが、前記長尺管よりも短いことを特徴とする請求項1〜7の何れか一項に記載のクリンカ灰除去装置。   The length along the axial direction of the said sheath pipe is shorter than the said elongate pipe, The clinker ash removal apparatus as described in any one of Claims 1-7 characterized by the above-mentioned. 前記鞘管と前記長尺管の長さの差が2〜3mの範囲の値であることを特徴とする請求項8に記載のクリンカ灰除去装置。   The clinker ash removal device according to claim 8, wherein a difference in length between the sheath tube and the long tube is a value in a range of 2 to 3 m. 前記長尺管が、軸方向に接続された以上の部分で構成されていることを特徴とする請求項1〜9の何れか一項に記載のクリンカ灰除去装置。 The clinker ash removal device according to any one of claims 1 to 9, wherein the long tube is configured by two or more portions connected in the axial direction. 前記鞘管が、軸方向に接続された以上の部分で構成されていることを特徴とする請求項1〜10の何れか一項に記載のクリンカ灰除去装置。 The said clinker ash removal apparatus as described in any one of Claims 1-10 comprised by the 2 or more part connected to the axial direction. 前記長尺管が、前記はつり工具に動力を伝えるための動力伝達管を兼ねることを特徴とする請求項1〜11の何れか一項に記載のクリンカ灰除去装置。   The clinker ash removing apparatus according to any one of claims 1 to 11, wherein the long pipe also serves as a power transmission pipe for transmitting power to the lifting tool. 請求項1〜12の何れか一項に記載のクリンカ灰除去装置を用い、前記タガネをクリンカ灰に接触させて、該クリンカ灰を破砕することを特徴とするクリンカ灰除去方法。 With clinker ash removal device according to any one of claim 1 to 12, wherein the chisel is contacted clinker ash, clinker ash removal method characterized by crushing the clinker ash. 請求項1〜12の何れか一項に記載のクリンカ灰除去装置を用いて行う
前記覗き孔を通じて前記石炭ボイラの火炉の内部に挿入された前記第1支持部の前記ワイヤの自由端を、前記マンホールから再び前記火炉の外部に取り出す第1工程と、
先端部に前記はつり工具を装着した状態の前記長尺管を前記鞘管に挿通する第2工程と、
前記支持枠を、前記マンホールに固定する第3工程と、
前記第1工程で前記火炉の外部に取り出された前記自由端を、前記長尺管が挿通された状態の前記鞘管の先端部に接続する第4工程と、
前記第1巻き上げ機から前記ワイヤを繰り出しながら、前記長尺管が挿通された状態の前記鞘管を前記マンホールから、前記火炉の内部に導入する第5工程と、
第5工程で前記火炉の内部に導入された、前記長尺管が挿通された状態の前記鞘管の後端部を、上方及び下方の両方向から、それぞれ前記第2及び第3巻き上げ機により張架する第6工程と、
前記第1巻き上げ機の前記ワイヤの繰り出し量により前記タガネの高さを調整し、及び、前記鞘管及び長尺管の前記マンホールから前記火炉の外部に突出した操作部を水平方向に移動させることで前記タガネの水平位置を調整し、前記タガネの位置決めを行う第7工程と、
前記タガネをクリンカ灰に接触させて、該クリンカ灰を破砕する第8工程と
を備えることを特徴とするクリンカ灰除去方法。
Carried out using the clinker ash removal device according to any one of claims 1 to 12,
A first step of taking the free end of the wire of the first support portion inserted into the furnace of the coal boiler through the peep hole again out of the furnace from the manhole;
A second step of inserting the long tube in a state in which the lifting tool is attached to the distal end portion through the sheath tube;
A third step of fixing the support frame to the manhole;
A fourth step of connecting the free end taken out of the furnace in the first step to a distal end portion of the sheath tube in a state in which the long tube is inserted;
A fifth step of introducing the sheath tube into which the long tube is inserted from the manhole into the furnace while feeding the wire from the first hoisting machine;
In the fifth step, the rear end portion of the sheath tube introduced into the furnace in the state where the long tube is inserted is stretched by the second and third hoisting machines from both the upper and lower directions, respectively. A sixth step to hang,
The height of the chisel is adjusted according to the amount of feeding of the wire of the first hoisting machine, and the operation portion protruding from the manhole of the sheath tube and the long tube to the outside of the furnace is moved in the horizontal direction. A seventh step of adjusting the horizontal position of the chisel and positioning the chisel;
A clinker ash removal method comprising: an eighth step of bringing the chisel into contact with clinker ash and crushing the clinker ash.
JP2012159489A 2012-07-18 2012-07-18 Clinker ash removal apparatus and clinker ash removal method Active JP5420726B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2012159489A JP5420726B2 (en) 2012-07-18 2012-07-18 Clinker ash removal apparatus and clinker ash removal method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2012159489A JP5420726B2 (en) 2012-07-18 2012-07-18 Clinker ash removal apparatus and clinker ash removal method

Publications (2)

Publication Number Publication Date
JP2014020668A JP2014020668A (en) 2014-02-03
JP5420726B2 true JP5420726B2 (en) 2014-02-19

Family

ID=50195761

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2012159489A Active JP5420726B2 (en) 2012-07-18 2012-07-18 Clinker ash removal apparatus and clinker ash removal method

Country Status (1)

Country Link
JP (1) JP5420726B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7337530B2 (en) * 2019-04-05 2023-09-04 株式会社マキタ power tools and tool holders

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6026285A (en) * 1983-07-21 1985-02-09 川崎重工業株式会社 Device for removing coating
JPH04292788A (en) * 1991-03-19 1992-10-16 Sumitomo Metal Ind Ltd Removing method for adhered matter to inner surface of iron oxide roasting furnace
FR2733032B1 (en) * 1995-04-12 1997-05-23 Cogema RINGARD MANEUVER BEHIND A PROTECTIVE WALL
JPH11279606A (en) * 1998-03-27 1999-10-12 Sumitomo Metal Ind Ltd Blast furnace inner wall repair equipment

Also Published As

Publication number Publication date
JP2014020668A (en) 2014-02-03

Similar Documents

Publication Publication Date Title
JP2014503763A (en) Pipe crusher
JP5420726B2 (en) Clinker ash removal apparatus and clinker ash removal method
CN107472587B (en) Shaping mechanism is piled up to many steel pipes
JP5524918B2 (en) Method and apparatus for cleaning the inside of plant equipment
CN203929508U (en) Root system of plant tensile test system
JP2014157292A (en) In-pipe moving device and in-pipe moving device insertion method
KR101316905B1 (en) Coupling apparatus of pile
CN201423413Y (en) Self-resetting device for steel ring expansion machine
JP6834628B2 (en) Lance tube braces and braces
CN104459922A (en) Automatic ground pulley collimation device and method
JP2017020264A (en) Placing device and placing method
CN201744651U (en) Hot quick replacement device for ladle upper nozzle and external porous brick core
CN204913777U (en) Epaxial sealing washer installation device
CN116590786B (en) Single crystal furnace thermal field dismounting device
JP6334121B2 (en) Wire take-up device
JP5014004B2 (en) How to dismantle the boiler
JP2015141091A (en) Holding device, insertion body installing method, and deposit removing method
CN204025904U (en) A kind of chimney counterpart device
JP6618129B1 (en) Connecting pipe support
CN203821858U (en) Novel concrete tumbling barrel
CN202292618U (en) Multifunctional chest developer
CN202418970U (en) Bell-and-spigot joint pipe
JP6251120B2 (en) Pipe connection method
CN218272920U (en) Pipeline QV detection periscope delivery system
CN204287566U (en) Lower sheave autocollimation device

Legal Events

Date Code Title Description
TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20131119

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20131120

R150 Certificate of patent or registration of utility model

Ref document number: 5420726

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250