Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP5451572B2 - Connector - Google Patents
[go: Go Back, main page]

JP5451572B2 - Connector - Google Patents

Connector Download PDF

Info

Publication number
JP5451572B2
JP5451572B2 JP2010225070A JP2010225070A JP5451572B2 JP 5451572 B2 JP5451572 B2 JP 5451572B2 JP 2010225070 A JP2010225070 A JP 2010225070A JP 2010225070 A JP2010225070 A JP 2010225070A JP 5451572 B2 JP5451572 B2 JP 5451572B2
Authority
JP
Japan
Prior art keywords
tool
screw
stud bolt
screwed
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2010225070A
Other languages
Japanese (ja)
Other versions
JP2012077545A (en
Inventor
憲峰 大倉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP2010225070A priority Critical patent/JP5451572B2/en
Publication of JP2012077545A publication Critical patent/JP2012077545A/en
Application granted granted Critical
Publication of JP5451572B2 publication Critical patent/JP5451572B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Description

本発明は、各種木造構造において、棒材同士をつなぐための連結具に関する。   The present invention relates to a connector for connecting bars in various wooden structures.

住宅などの建築方法として普及している木造軸組構法は、土台や柱や横架材などの各種棒材を組み合わせて建物の骨格を構築している。この骨格の強度を確保するには、隣接する棒材同士を強固に連結する必要があり、古くからホゾとホゾ溝を組み合わせるなどの対策が講じられている。しかしホゾは、部材の断面欠損が大きくなるなどの課題があり、近年は耐震性の確保などを目的として、各種金具を使用することも多くなっており、その例として後記の特許文献が挙げられる。   The wooden frame construction method, which is widely used as a construction method for houses, constructs a building skeleton by combining various rods such as foundations, pillars, and horizontal members. In order to secure the strength of the skeleton, it is necessary to firmly connect the adjacent bar members, and measures such as combining a ridge and a ridge groove have been taken for a long time. However, hozo has problems such as a large cross-sectional defect of members, and in recent years, various metal fittings are often used for the purpose of ensuring seismic resistance, and examples thereof include the following patent documents. .

特許文献1では、柱を基礎などに据え付けるための木部材接合構造が開示されており、柱にねじ込まれたスクリュー部材と、基礎の表面に固定された接合金具と、を長ボルトで連結している。この長ボルトをできるだけ長くすることで、柱などに外力が作用した際、終局状態に至るまでの塑性変形量を大きくでき、粘り強い構造とすることができる。   Patent Document 1 discloses a wood member joining structure for installing a pillar on a foundation or the like, in which a screw member screwed into a pillar and a joint fitting fixed to the surface of the foundation are connected with a long bolt. Yes. By making the long bolt as long as possible, when an external force is applied to the column or the like, the amount of plastic deformation until reaching the final state can be increased, and a tenacious structure can be obtained.

また特許文献2では、柱や梁などの二部材を締結するための締結金物が開示されている。この締結金物は、側周面に螺旋状の凸条を形成してあり、その軸心に設けた雌ネジにボルトを螺合させて部材同士を締結している。ただし、単に二部材をボルトで締結している訳ではなく、締結金物に導入穴を設けてボルトを長尺化して、弾塑性変形を生じやすくしている。そのため地震などによる衝撃を吸収しやすくなり、構造物の破損を抑制できる。   Moreover, in patent document 2, the fastening hardware for fastening two members, such as a pillar and a beam, is disclosed. The fastening hardware is formed with spiral ridges on the side peripheral surface, and the members are fastened by screwing a bolt into a female screw provided on the axial center thereof. However, the two members are not simply fastened with bolts, but an introduction hole is provided in the fastening hardware to lengthen the bolts to easily cause elastoplastic deformation. Therefore, it becomes easy to absorb an impact caused by an earthquake or the like, and damage to the structure can be suppressed.

特開2007−77611号公報JP 2007-77611 A 特開2010−7428号公報JP 2010-7428 A

前記の特許文献は、いずれも部材同士の連結部に組む込まれるボルトをできるだけ長尺化して、その弾塑性変形でエネルギーを吸収して、構造物の安全性を確保する技術である。しかしこれらの技術は、ボルトに引張荷重が作用して塑性変形した後、ボルトの頭部に緩みが生じてしまい、以降は連結部の強度を維持できなくなる。したがって余震などで繰り返して外力が作用する場合、耐久性が失われて構造物に及ぶ被害が増大する恐れがある。   Each of the above-mentioned patent documents is a technique for ensuring the safety of a structure by lengthening a bolt incorporated in a connecting portion between members as much as possible and absorbing energy by its elastic-plastic deformation. However, in these techniques, after a tensile load acts on the bolt and undergoes plastic deformation, the bolt head is loosened, and thereafter the strength of the connecting portion cannot be maintained. Therefore, when an external force is repeatedly applied due to aftershocks, durability may be lost and damage to the structure may increase.

また従来から使用されている各種金具は、その一部が柱などの表面に露出することが多い。例えば特許文献1では、柱の下部に接合金具が露出するほか、特許文献2でも、金具の表面やボルトの頭部などが露出する。この点は、何らの問題も生じないことも多いが、和室などで柱や横架材などを視認可能な構造とする場合、美感の観点から金属部品を覆い隠すなどの対策が必要である。   In addition, various metal fittings conventionally used are often exposed on the surface of a pillar or the like. For example, in Patent Document 1, the joint fitting is exposed at the lower portion of the column, and in Patent Document 2, the surface of the fitting, the head of the bolt, and the like are exposed. In this respect, there is often no problem, but when a structure such as a pillar or horizontal member is visible in a Japanese-style room or the like, it is necessary to take measures such as covering metal parts from the viewpoint of aesthetics.

本発明はこうした実情を基に開発されたもので、連結部に組み込まれたボルトが塑性変形した後もある程度の強度を維持でき、しかも全体を棒材の中に埋め込み可能で美感にも優れた連結具の提供を目的としている。   The present invention was developed on the basis of such circumstances, and can maintain a certain level of strength even after the bolt incorporated in the connecting portion is plastically deformed, and the whole can be embedded in a bar material and has excellent aesthetics. The purpose is to provide a connector.

前記の課題を解決するための請求項1記載の発明は、面接触している一方材と他方材とを連結するために用い、両材の接触面から延びる一対の下穴のうち一方材側の下穴にねじ込まれるラグスクリューと、他方材側の下穴に埋め込まれ且つ接着剤で固定される棒状の埋設具と、前記ラグスクリューと前記埋設具とを引き寄せるためのスタッドボルトと、を備え、前記ラグスクリューの内部には、前記スタッドボルトの一端側に螺合する内ネジを設けてあり、前記埋設具の内部には、前記スタッドボルトの他端側に螺合する内ネジを設けてあり、前記内ネジのうちの一方または両方は、前記ラグスクリューと前記埋設具との境界から延びる中穴の奥方に位置することを特徴とする連結具である。   The invention according to claim 1 for solving the above-mentioned problem is used to connect the one material and the other material which are in surface contact with each other, and one material side of the pair of pilot holes extending from the contact surfaces of both materials. A lag screw screwed into the lower hole, a rod-like burying tool embedded in the lower hole on the other material side and fixed with an adhesive, and a stud bolt for pulling the lag screw and the burying tool. The lag screw is provided with an internal screw that is screwed to one end of the stud bolt, and the buried tool is provided with an internal screw that is screwed to the other end of the stud bolt. In addition, one or both of the inner screws is a connecting tool that is located in the back of the inner hole extending from the boundary between the lag screw and the embedded tool.

本発明は、面接触している二本の棒材を一体化するためのものだが、棒材の配置は自在であり、一方の棒材の側面に他方の棒材の端面を接触させたT字状やL字状のほか、二本の棒材の端面同士を接触させて一直線に並ぶ形態でも構わない。なお一方材や他方材という称呼は、一体化される二本の棒材を識別するため、便宜上付与したに過ぎず、二本の棒材のうち、いずれか一方を一方材として、他方を他方材とする。次に下穴は、棒材同士の接触面を基点として、一方材側と他方材側の両方に設ける穴であり、当然ながら一方材側と他方材側の下穴は同心で対向する配置となる。なお一箇所の連結部において、対になる下穴は一組だけとは限らず、複数組とする場合もある。   The present invention is for integrating two bars in surface contact, but the arrangement of the bars is free, and the end face of the other bar is in contact with the side of one bar. In addition to a letter shape or an L shape, the end faces of two bars may be in contact with each other and aligned in a straight line. In addition, in order to identify two bar materials to be integrated, the designation of one material or the other material is only given for the sake of convenience, and one of the two bar materials is used as one material and the other is used as the other. Use wood. Next, the pilot hole is a hole provided on both the one material side and the other material side with the contact surface between the rods as a base point. Naturally, the prepared hole on the one material side and the other material side are concentrically opposed to each other. Become. In addition, in one connection part, the pilot holes which become a pair are not restricted to one set, and may be a plurality of sets.

ラグスクリューは、金属製の丸棒状で一方材の下穴に埋め込まれるもので、側周面には螺旋状に延びる凸条を形成してある。この凸条が一方材の中に食い込み、ラグスクリューと一方材が強固に一体化する。なお一方材に加工する下穴の直径は、ラグスクリューの直径(凸条は除外)とほぼ同じとして、下穴の入口にラグスクリューの端面を接触させた後、ねじ込みによって埋め込んでいく。   The lag screw is in the shape of a metal round bar and is embedded in the pilot hole of one material, and a spirally extending ridge is formed on the side peripheral surface. This ridge bites into one material, and the lag screw and the one material are firmly integrated. The diameter of the pilot hole processed into one material is substantially the same as the diameter of the lag screw (excluding ridges), and the end surface of the lag screw is brought into contact with the inlet of the pilot hole and then embedded by screwing.

埋設具は、金属製の棒状でラグスクリューと対向する他方材の下穴に埋め込む。ただしラグスクリューのような凸条は形成しておらず、下穴に注入された接着剤によって他方材と一体化する。そのため埋設具は、下穴に余裕で詰め込むことのできる大きさであり、また接着剤の付着性を向上するため、側周面に複数のリブを形成することもある。   The embedment tool is a metal rod and is embedded in the pilot hole of the other material facing the lag screw. However, no ridge like a lag screw is formed, and it is integrated with the other material by an adhesive injected into the pilot hole. Therefore, the embedment tool is of a size that can be easily packed in the prepared hole, and a plurality of ribs may be formed on the side peripheral surface in order to improve the adhesiveness of the adhesive.

スタッドボルトは、全ネジボルトとも呼ばれ、単純な丸棒の両端側または全域に雄ネジを形成したもので、本発明では、対向する下穴に埋め込まれたラグスクリューと埋設具とを引き寄せて、双方の端面同士を密着させるために使用する。このスタッドボルトを螺合できるよう、ラグスクリューと埋設具のいずれにも、軸線方向に沿って延びる雌ネジ状の内ネジを形成する。   The stud bolt is also called an all screw bolt, and is formed by forming a male screw on both sides or the entire area of a simple round bar.In the present invention, the lag screw and the embedded tool embedded in the opposed pilot holes are drawn together, Used to bring both end faces into close contact. An internal thread-like internal thread extending along the axial direction is formed on each of the lag screw and the embedding tool so that the stud bolt can be screwed together.

このようにスタッドボルトは、一方材と他方材を一体化する機能を担っているほか、一方材と他方材を引き離す方向に荷重が作用した場合、弾塑性変形をすることで衝撃を緩和して、棒材のヒビ割れなどを防止する。しかもスタッドボルトは、引張荷重で塑性変形した後も、螺合するラグスクリューや埋設具との間で緩みを生じることがなく、一方材と他方材との連結強度をある程度の水準で維持できる。   In this way, the stud bolt has the function of integrating the one material and the other material, and when a load is applied in the direction of separating the one material and the other material, the impact is reduced by elastic-plastic deformation. Prevents cracks in the bar. In addition, even after the plastic bolt is plastically deformed by a tensile load, the stud bolt does not loosen between the lag screw and the embedded tool to be screwed together, and the connection strength between the one material and the other material can be maintained at a certain level.

中穴は、スタッドボルトをできるだけ長尺化するための機能を有する。本発明は、スタッドボルトの弾塑性変形を利用して衝撃を緩和しており、スタッドボルトの変形量をできるだけ多くすることが好ましい。そのため対向する内ネジは、遠ざけて配置する必要があり、ラグスクリューと埋設具の一方または両方には、単にスタッドボルトを通過させるためだけの中穴を設ける。当然ならら中穴の内径は、スタッドボルトの外径よりも大きい。   The center hole has a function for making the stud bolt as long as possible. In the present invention, the impact is mitigated by utilizing the elastic-plastic deformation of the stud bolt, and it is preferable to increase the deformation amount of the stud bolt as much as possible. For this reason, it is necessary to dispose the opposing inner screws away from each other, and one or both of the lag screw and the embedding tool are provided with a bore for simply allowing the stud bolt to pass therethrough. Of course, the inner diameter of the center hole is larger than the outer diameter of the stud bolt.

スタッドボルトは、両端側または全域に右ネジを形成してある物のほか、一端側に左ネジを、他端側に右ネジを形成してある物も使用できる。なお右ネジだけを形成してあるスタッドボルトの場合、ラグスクリューの内ネジに一定の深さまでねじ込むと、双方の間に何からの接触や噛み込みが生じて、ねじ込み深さを制限できるようにする。   In addition to the stud bolt having a right-hand thread formed at both ends or the entire region, a stud bolt having a left-hand thread at one end and a right-hand thread at the other end can be used. In the case of a stud bolt that has only a right-hand thread, if it is screwed into the inner thread of the lag screw to a certain depth, contact or biting will occur between them, so that the screw-in depth can be limited. To do.

右ネジだけを形成してあるスタッドボルトを用いて、実際に一方材と他方材を連結する際は、まずラグスクリューを一方材の下穴にねじ込み、次にラグスクリューの内ネジにスタッドボルトの一端側を螺合させて、スタッドボルトが回転不能になるまでねじ込みを続ける。その後、スタッドボルトの他端側に埋設具の内ネジを螺合させて、さらに埋設具のねじ込みを続けて、ラグスクリューと埋設具の端面同士を密着させる。   When actually connecting one material to the other material using a stud bolt that has only a right-hand thread, first screw the lag screw into the pilot hole of one material, and then attach the stud bolt to the inner screw of the lag screw. Screw one end side and continue screwing until the stud bolt becomes unrotatable. Thereafter, the inner screw of the buried tool is screwed to the other end of the stud bolt, and the screw of the buried tool is further screwed to bring the end surfaces of the lag screw and the buried tool into close contact with each other.

この段階では、一方材の表面から埋設具が突出した状態になっており、次に他方材の下穴や埋設具の側周面に接着剤を塗布した後、埋設具を下穴に埋め込み、一方材と他方材を密着させて接着剤の凝固を待つ。なおラグスクリューと埋設具の端面同士が接触している位置は、一方材と他方材の接触面と一致させる必要はなく、ある程度の食い違いが生じていても構わない。   At this stage, the embedding tool is in a state of protruding from the surface of one material, and then, after applying adhesive to the side hole of the other material and the side peripheral surface of the embedding tool, the embedding tool is embedded in the prepared hole, One material and the other material are brought into close contact with each other and waiting for the adhesive to solidify. In addition, the position where the end surfaces of the lag screw and the embedding tool are in contact with each other does not need to coincide with the contact surface of the one material and the other material, and a certain amount of discrepancy may occur.

他の形態として、一端側に左ネジを、他端側に右ネジを形成してあるスタッドボルトを使用する場合、当然ながらラグスクリューと埋設具の内ネジのうち、いずれか一方を左ネジとする。そして一方材と他方材を実際に連結する際は、まずスタッドボルトの一端側にラグスクリューの内ネジをわずかに螺合させて、さらに他端側に埋設具の内ネジをわずかに螺合させて、次にスタッドボルトだけを回転させて、ラグスクリューと埋設具の端面同士を密着させる。   As another form, when using a stud bolt having a left-hand thread on one end and a right-hand thread on the other end, of course, one of the lag screw and the inner thread of the embedded tool is a left-hand thread. To do. When actually connecting the one material to the other material, first, slightly screw the inner screw of the lag screw into one end of the stud bolt, and then slightly screw the inner screw of the buried tool into the other end. Then, only the stud bolt is rotated so that the end faces of the lag screw and the buried tool are brought into close contact with each other.

そのほかにも、両端側からスタッドボルトを差し込んで螺合できるラグスクリューを用いて、一方材の側面に二本の他方材の端面を接触させて十字状に連結することもできる。この場合、一方材の側面を貫通するように下穴を加工して、この中にラグスクリューをねじ込み、次に両面からスタッドボルトを差し込み、一方材の側面に二個の埋設具を対向するように固定する。   In addition, by using a lag screw that can be screwed by inserting stud bolts from both ends, the end surfaces of the two other materials can be brought into contact with the side surface of the one material and connected in a cross shape. In this case, drill a pilot hole so that it penetrates the side surface of one material, screw a lag screw into it, and then insert stud bolts from both sides so that the two embedded tools face each other. Secure to.

請求項2記載の発明は、中心材とその側面に接触する二本の枝部材とを十字状に連結するために用い、中心材を貫通して両枝部材との接触面に開口する中心孔にねじ込まれるラグスクリューと、前記中心孔に連通して一方の枝部材に延びる下穴に埋め込まれ且つ接着剤で固定される棒状の埋設具と、前記中心孔に連通して他方の枝部材に延びる下穴に固定される係留具と、前記埋設具と前記係留具とを引き寄せるためのスタッドボルトと、を備え、前記埋設具の内部には、前記スタッドボルトの一端側に螺合する内ネジを設けてあり、前記係留具の内部には、前記スタッドボルトの他端側に螺合する内ネジを設けてあり、前記ラグスクリューには、前記スタッドボルトを挿通可能な中穴を設けてあることを特徴とする連結具である。   The invention according to claim 2 is used to connect the central member and the two branch members contacting the side surfaces in a cross shape, and is a central hole that penetrates the central member and opens to the contact surface with both branch members. A lag screw that is screwed into the center hole, a rod-like embedding tool that is embedded in a pilot hole that communicates with the central hole and extends into one branch member, and that is fixed with an adhesive; and the other branch member that communicates with the central hole. An anchoring screw fixed to the extending pilot hole, and a stud bolt for pulling the buried tool and the anchoring tool, and an internal screw screwed into one end side of the stud bolt inside the buried tool An inner screw that is screwed to the other end side of the stud bolt is provided inside the mooring tool, and an inner hole through which the stud bolt can be inserted is provided in the lag screw. It is the coupling tool characterized by this.

この発明は、請求項1記載のものとは異なり、一本の中心材の側面に二本の枝部材の端面が接触する十字状の連結部を構成するためのものだが、ラグスクリューや埋設具やスタッドボルトを使用する点は、請求項1に記載したものと何ら変わりがない。ただしスタッドボルトは、対向する枝部材同士を引き寄せている。またラグスクリューは、中心材の側面を貫通する中心孔にねじ込まれ、しかもスタッドボルトを挿通できるよう両端面を貫通する中穴を形成してあり、これまでのような内ネジは不要である。   This invention is different from the one described in claim 1 in that it forms a cross-shaped connecting portion in which the end faces of two branch members are in contact with the side surface of one central member. The point that the stud bolt is used is not different from that described in claim 1. However, the stud bolt draws the branch members facing each other. Further, the lag screw is screwed into a central hole that penetrates the side surface of the central member, and further, an inner hole that penetrates both end surfaces is formed so that a stud bolt can be inserted.

二本の枝部材のうち、一方には埋設具が埋め込まれ、他方には係留具が埋め込まれる。埋設具は、請求項1に記載したものと同じであり、下穴の中に接着で固定される。対する係留具は、ラグスクリュー状または接着で固定される棒状(埋設具と同様の物)である。そして埋設具と係留具の内部には、スタッドボルトと螺合できるよう内ネジを形成してある。なおスタッドボルトは、右ネジだけを形成したものと、左ネジと右ネジを形成したものの、いずれも使用できる。   Of the two branch members, an embedding tool is embedded in one and a mooring tool is embedded in the other. The embedding tool is the same as that described in claim 1 and is fixed to the prepared hole by bonding. On the other hand, the anchoring device is in the form of a lag screw or a rod fixed by bonding (similar to an embedding tool). And an internal thread is formed inside the embedding tool and the mooring tool so that it can be screwed into the stud bolt. In addition, the stud bolt can use both what formed only the right-handed screw and what formed the left-handed screw and the right-handed screw.

ラグスクリュー状の係留具を用いる場合、中心材の中心孔にラグスクリューをねじ込み、一方の枝部材の下穴に係留具をねじ込む。次に、スタッドボルトの一端側を係留具の内ネジに螺合させ、他端側を中心材にねじ込まれたラグスクリューの中穴に差し込み、反対側に突出させる。その後、スタッドボルトの他端側に埋設具を螺合させて締め上げると、中心材の一側面に枝部材が接触して、対向する側面に埋設具が突出する。そして埋設具に接着剤を塗布してから、他方の枝部材を埋設具に固定すると、十字状の連結部が完成する。なお係留具として、棒状の物を使用する場合、中心材の側面に埋設具と係留具を対向するように取り付けた後、接着で二本の枝部材を固定する。   In the case of using a lag screw-like anchoring tool, the lag screw is screwed into the center hole of the central member, and the anchoring tool is screwed into the pilot hole of one branch member. Next, one end side of the stud bolt is screwed into the inner screw of the mooring tool, and the other end side is inserted into the inner hole of the lag screw screwed into the center member, and protruded to the opposite side. After that, when the buried tool is screwed to the other end side of the stud bolt and tightened, the branch member comes into contact with one side surface of the central member, and the buried tool protrudes on the opposite side surface. And after apply | coating an adhesive agent to an embedding tool, if the other branch member is fixed to an embedding tool, a cross-shaped connection part will be completed. In addition, when using a rod-shaped thing as a mooring tool, after attaching an embedding tool and a mooring tool on the side of a center material so that it may oppose, two branch members are fixed by adhesion | attachment.

請求項1記載の発明のように、一方材にねじ込むラグスクリューと、他方材に接着で固定する埋設具と、ラグスクリューと埋設具とを引き寄せるスタッドボルトと、で連結具を構成することで、過大な荷重が作用してスタットボルトが塑性変形した後も、ラグスクリューおよび埋設具との螺合が維持される。そのため連結部に緩みを生じることがなく、ある程度の強度を維持でき、余震などで繰り返して外力が作用する場合でも、構造物に及ぶ被害を軽減できる。   As in the invention according to claim 1, by configuring the coupling tool with a lag screw screwed into one material, a buried tool fixed by adhesion to the other material, and a stud bolt that draws the lag screw and the buried tool, Even after an excessive load is applied and the stat bolt is plastically deformed, the screwing with the lag screw and the buried tool is maintained. For this reason, the connecting portion is not loosened, and a certain degree of strength can be maintained. Even when an external force is repeatedly applied due to aftershocks, damage to the structure can be reduced.

また本発明は、他方材と埋設具を接着で固定しているため、連結具の全体を棒材の中に覆い隠すことができ、柱などが室内に露出する場合でも、金属部品が見えることはなく、美感に優れている。しかも結露や火災に対しても有利である。なお本発明から外れて、埋設具の代替としてラグスクリューを使用する場合、スタッドボルトを締め上げるため何らかの開口部が必要になり、連結具の全体を覆い隠すことができない。   In the present invention, since the other member and the buried tool are fixed by bonding, the whole connecting tool can be covered in the bar, and the metal parts can be seen even when the pillar is exposed to the room. There is no aesthetic sense. Moreover, it is advantageous against condensation and fire. If the lag screw is used as an alternative to the buried tool outside of the present invention, some kind of opening is required to tighten the stud bolt, and the entire connecting tool cannot be covered.

請求項2記載の発明のように、中心材にねじ込むラグスクリューと、一方の枝部材に埋め込む埋設具と、他方の枝部材に埋め込む係留具と、対向する埋設具と係留具とを引き寄せるスタッドボルトと、で連結具を構成することで、中心材の側面に二本の枝部材を十字状に連結することができる。しかも請求項1記載の発明と同様、スタッドボルトが引き延ばされて塑性変形した場合でも、連結部の強度をある程度維持できるほか、連結具の全体を中心材や枝部材の中に埋め込むことができる。   As in the second aspect of the present invention, a lag screw screwed into the center member, a buried tool embedded in one branch member, a mooring tool embedded in the other branch member, and a stud bolt that draws the opposing buried tool and the mooring tool together. By constructing a connecting tool, the two branch members can be connected to the side surface of the central member in a cross shape. Moreover, as in the first aspect of the invention, even when the stud bolt is stretched and plastically deformed, the strength of the connecting portion can be maintained to some extent, and the entire connecting tool can be embedded in the central member or the branch member. it can.

本発明による連結具の構成例とその使用状態を示す斜視図である。It is a perspective view which shows the structural example of the coupling tool by this invention, and its use condition. 図1の連結部の詳細を示す縦断面図である。It is a longitudinal cross-sectional view which shows the detail of the connection part of FIG. T字状の連結部に本発明を使用した状態を示す斜視図である。It is a perspective view which shows the state which used this invention for the T-shaped connection part. 一端側に左ネジを形成して他端側に右ネジを形成したスタッドボルトを使用した構成を示す斜視図と縦断面図である。It is the perspective view and longitudinal cross-sectional view which show the structure using the stud bolt which formed the left screw in the one end side, and formed the right screw in the other end side. 一方材の側面に二本の他方材を接触させて、十字状の連結部を構成する形態を示す斜視図である。It is a perspective view which shows the form which makes two side materials contact the side surface of one material, and comprises a cross-shaped connection part. 図5の連結部の詳細を示す縦断面図である。It is a longitudinal cross-sectional view which shows the detail of the connection part of FIG. 中心材の側面に二本の枝部材を接触させて、十字状の連結部を構成する形態を示す斜視図である。It is a perspective view which shows the form which makes two branch members contact the side surface of a center material, and comprises a cross-shaped connection part. 図7の連結部の詳細を示す縦断面図である。It is a longitudinal cross-sectional view which shows the detail of the connection part of FIG.

図1は、本発明による連結具の構成例とその使用状態を示している。一方材41と他方材51はいずれも棒状であり、その端面同士を密着させて一本化するため、一組の連結具を使用している。連結具は、ラグスクリュー11と埋設具21とスタッドボルト31で構成され、ラグスクリュー11は一方材41にねじ込み、埋設具21は他方材51に埋め込む。そしてスタッドボルト31は、ラグスクリュー11と埋設具21とを引き寄せるために使用している。   FIG. 1 shows an example of the structure of a connector according to the present invention and how it is used. The one material 41 and the other material 51 are both rod-shaped, and a set of connecting tools is used to bring the end surfaces into close contact with each other. The coupling tool includes a lag screw 11, a buried tool 21, and a stud bolt 31. The lag screw 11 is screwed into one material 41, and the buried tool 21 is buried in the other material 51. And the stud bolt 31 is used in order to draw the lag screw 11 and the embedded tool 21 together.

ラグスクリュー11は金属製の円柱状であり、側周面には螺旋状に延びる凸条12を形成してあり、また一端面には、工具を掛けるために六角部14を形成してある。さらに六角部14の中心には、単純な円断面で軸線方向に延びる中穴13を形成してある。なお中穴13は、スタッドボルト31を余裕で差し込める内径としてある。そして中穴13の下には、スタッドボルト31を螺合するための内ネジ15を形成してある。   The lag screw 11 has a cylindrical shape made of metal, and has a spiral ridge 12 formed on the side peripheral surface, and a hexagonal portion 14 formed on one end surface for hooking a tool. Further, a center hole 13 extending in the axial direction with a simple circular cross section is formed at the center of the hexagonal portion 14. The inner hole 13 has an inner diameter into which the stud bolt 31 can be inserted with a margin. An inner screw 15 for screwing the stud bolt 31 is formed under the inner hole 13.

一方材41の端面中央には、ラグスクリュー11をねじ込むための下穴42を加工してある。この内径は、ラグスクリュー11の外径(円柱状の部分の外径であり、凸条12は除外)に等しく、凸条12が一方材41の中に食い込むことで、ラグスクリュー11と一方材41が強固に一体化する。なおラグスクリュー11をねじ込む際は、回転力を与えるため必ず六角部14が後端側に位置する。   On the other hand, a prepared hole 42 for processing the lag screw 11 is machined in the center of the end face of the material 41. This inner diameter is equal to the outer diameter of the lag screw 11 (the outer diameter of the cylindrical portion, excluding the ridge 12), and the ridge 12 bites into the one material 41, so that the lag screw 11 and the one material are 41 is firmly integrated. When the lag screw 11 is screwed, the hexagonal portion 14 is always located on the rear end side in order to give a rotational force.

埋設具21も金属製の円柱状だが、側周面には円周方向と軸線方向に延びるリブ22を形成してあり、また一端面には、工具を掛けるために六角部24を形成してある。さらに六角部24の中心には、スタッドボルト31を螺合するための内ネジ25を形成してある。そして内ネジ25の下には、単純な円断面で下端面に達する中穴23を形成してある。なお中穴23は、スタッドボルト31を余裕で差し込める内径としてある。   The embedding tool 21 is also made of a metal column, but has a rib 22 extending in the circumferential direction and the axial direction on the side circumferential surface, and a hexagonal portion 24 on one end surface for hooking a tool. is there. Further, an inner screw 25 for screwing the stud bolt 31 is formed at the center of the hexagonal portion 24. Under the inner screw 25, an inner hole 23 reaching the lower end surface with a simple circular cross section is formed. The inner hole 23 has an inner diameter into which the stud bolt 31 can be inserted with a margin.

他方材51の端面中央には、埋設具21を埋め込むための下穴52を加工してある。この内径は、埋設具21のリブ22の外径よりもわずかに大きい。そして埋設具21を埋め込む前に、埋設具21の側周面や下穴52の内周面に接着剤55を塗布しておき、接着によって埋設具21と他方材51を一体化する。なおリブ22は、接着強度を向上するために形成してあり、同様に下穴52の内周面にも溝を加工してもよい。   A pilot hole 52 for embedding the embedding tool 21 is processed in the center of the end surface of the other material 51. This inner diameter is slightly larger than the outer diameter of the rib 22 of the embedding tool 21. And before embedding the embedding tool 21, the adhesive agent 55 is apply | coated to the side peripheral surface of the embedding tool 21, and the internal peripheral surface of the prepared hole 52, and the embedding tool 21 and the other material 51 are integrated by adhesion | attachment. The rib 22 is formed to improve the adhesive strength, and a groove may be processed on the inner peripheral surface of the prepared hole 52 in the same manner.

スタッドボルト31は、単純な円断面の金属棒で上下の両端側に右ネジ32、33を形成してあるが、両右ネジ32、33の間は単純な円断面である。さらに弾塑性変形を円滑に引き起こすため、低降伏点鋼を素材とすることもできる。また全長は、ラグスクリュー11と埋設具21を確実に引き寄せることができるよう調整してあり、しかも各右ネジ32、33の形成範囲も一連の作業に支障がないよう調整してある。なおラグスクリュー11と埋設具21のぞれぞれの内ネジ15、25は、当然ながらスタッドボルト31と螺合可能な右ネジである。   The stud bolt 31 is a metal rod having a simple circular cross section, and right and left screws 32 and 33 are formed on both upper and lower ends. The space between the right screws 32 and 33 is a simple circular cross section. Furthermore, in order to cause elastoplastic deformation smoothly, low yield point steel can be used as a raw material. Further, the total length is adjusted so that the lag screw 11 and the embedment tool 21 can be reliably drawn, and the formation range of the right screws 32 and 33 is adjusted so as not to hinder a series of operations. The internal screws 15 and 25 of the lag screw 11 and the embedding tool 21 are right screws that can be screwed into the stud bolt 31 as a matter of course.

この連結具を用いて、一方材41と他方材51を連結する際は、図中の矢印のように作業を進める。最初の段階では、左上の図のように、一方材41の下穴42にラグスクリュー11をねじ込む。この際、六角部14が後端側になるため、内ネジ15は下穴42の奥方に位置することになる。次に右上の図のように、ねじ込まれたラグスクリュー11の中穴13にスタッドボルト31を差し込み、その下方の右ネジ32をラグスクリュー11の内ネジ15に螺合させる。螺合が進んで、右ネジ32の全体が内ネジ15に入り込むと、双方の間に噛み込みが生じてスタッドボルト31が固定され、左下の図のように、一方材41の端面からスタッドボルト31の上半分が突出する。   When the one member 41 and the other member 51 are connected using this connector, the operation proceeds as indicated by the arrows in the figure. In the first stage, the lag screw 11 is screwed into the prepared hole 42 of the one material 41 as shown in the upper left figure. At this time, since the hexagonal portion 14 is on the rear end side, the inner screw 15 is positioned in the back of the prepared hole 42. Next, as shown in the upper right figure, the stud bolt 31 is inserted into the inner hole 13 of the screwed lag screw 11, and the lower right screw 32 is screwed into the inner screw 15 of the lag screw 11. When the screwing progresses and the entire right screw 32 enters the inner screw 15, the stud bolt 31 is fixed by being engaged between the two, and the stud bolt 41 is fixed from the end surface of the one material 41 as shown in the lower left figure. The upper half of 31 protrudes.

次に、突出するスタッドボルト31に埋設具21を差し込み、上方の右ネジ33を内ネジ25に螺合させて、さらに六角部24に工具を掛けて締め上げると、右下の図のように、スタッドボルト31を介してラグスクリュー11と埋設具21の端面同士が密着して、埋設具21が一方材41と一体化する。最後に、埋設具21の側周面や他方材51の下穴52の内周面に接着剤55を塗布して、埋設具21を下穴52に埋め込み、接着剤55が凝固するまでの間、一方材41と他方材51を強制的に密着させる。   Next, when the buried tool 21 is inserted into the protruding stud bolt 31, the upper right screw 33 is screwed into the inner screw 25, and the hexagonal portion 24 is further tightened with a tool, as shown in the lower right figure. The end surfaces of the lag screw 11 and the buried tool 21 are brought into close contact with each other via the stud bolt 31, and the buried tool 21 is integrated with the one material 41. Finally, the adhesive 55 is applied to the side peripheral surface of the embedding tool 21 and the inner peripheral surface of the pilot hole 52 of the other material 51, the embedding tool 21 is embedded in the pilot hole 52, and the adhesive 55 is solidified. The one material 41 and the other material 51 are forcibly adhered.

図2は、図1の連結部の詳細を縦断面で示している。左上の図のように、ラグスクリュー11と埋設具21は、双方の中穴13、23が対向しており、その奥に内ネジ15、25を形成してあり、必然的にスタッドボルト31の全長が増大する。そのほか、スタッドボルト31下方の右ネジ32の延長は、対になる内ネジ15よりも短く、右ネジ32と内ネジ15が螺合できる範囲が限られている。そのため螺合を続けていくと、右ネジ32と内ネジ15との間で噛み込みが生じて、スタッドボルト31が内ネジ15に固定された状態になり、ラグスクリュー11と埋設具21を強固に密着させることができる。   FIG. 2 shows the details of the connecting portion of FIG. 1 in a longitudinal section. As shown in the upper left figure, the lag screw 11 and the embedding tool 21 have both inner holes 13 and 23 facing each other, and inner screws 15 and 25 are formed in the back thereof. The total length increases. In addition, the extension of the right screw 32 below the stud bolt 31 is shorter than the paired inner screw 15 and the range in which the right screw 32 and the inner screw 15 can be screwed is limited. Therefore, when the screwing is continued, the right screw 32 and the inner screw 15 are bitten, and the stud bolt 31 is fixed to the inner screw 15 so that the lag screw 11 and the buried tool 21 are firmly fixed. Can be adhered to.

施工後は、右上の図のように、スタッドボルト31を介して一方材41と他方材51が連結される。なお、ラグスクリュー11は凸条12によって一方材41と一体化しており、埋設具21は接着剤55によって他方材51と一体化している。その後、地震などで過大な外力が作用すると、左下の図のように、スタッドボルト31に塑性変形が生じる。この変形によって衝撃が緩和され、一方材41や他方材51などの破損を防止する。さらにスタッドボルト31が塑性変形した後も、ラグスクリュー11や埋設具21との螺合部分には、何らの緩みも生じることがなく、連結部の強度がある程度維持される。   After the construction, the one material 41 and the other material 51 are connected via the stud bolt 31 as shown in the upper right figure. The lag screw 11 is integrated with the one material 41 by the ridges 12, and the embedding tool 21 is integrated with the other material 51 by the adhesive 55. Thereafter, when an excessive external force is applied due to an earthquake or the like, plastic deformation occurs in the stud bolt 31 as shown in the lower left figure. This deformation reduces the impact and prevents damage to the one material 41, the other material 51, and the like. Further, even after the stud bolt 31 is plastically deformed, no looseness occurs in the threaded portion with the lag screw 11 and the embedment tool 21, and the strength of the connecting portion is maintained to some extent.

スタッドボルト31が塑性変形した後、一方材41と他方材51を押し付けるような外力が作用すると、右下の図のように、スタッドボルト31が押し潰されて蛇行するように塑性変形して、連結部が当初のように復元する。なお図2では、ラグスクリュー11と埋設具21との境界と、一方材41と他方材51との境界と、を一致させているが、実際にはある程度の段差が生じていても構わない。   After the stud bolt 31 is plastically deformed, when an external force is applied to press the one material 41 and the other material 51, the stud bolt 31 is plastically deformed so as to be crushed and meandered as shown in the lower right figure. The connecting part is restored as it was originally. In FIG. 2, the boundary between the lag screw 11 and the embedment tool 21 and the boundary between the one material 41 and the other material 51 are made to coincide with each other.

図3は、T字状の連結部に本発明を使用した状態を示している。本発明は、部材に下穴42、52が加工できるならば、図1のような二本の棒材の端面同士をつなぐ場合のほか、この図のような横架材の側面に柱の端面が接触するT字状の連結部など、様々な箇所に使用できる。しかも一箇所の連結部において、使用する連結具は一組だけとは限らず、複数組を使用してもよい。この図では、四組の連結具を使用しており、そのうちの二組は、横架材にラグスクリュー11をねじ込んでおり、残る二組は、柱にラグスクリュー11を埋め込んでおり、強度のアンバランスを解消している。   FIG. 3 shows a state in which the present invention is used for a T-shaped connecting portion. In the present invention, if the pilot holes 42 and 52 can be processed in the member, in addition to connecting the end faces of the two bars as shown in FIG. 1, the end face of the column on the side surface of the horizontal member as shown in FIG. It can be used in various places such as a T-shaped connecting portion that comes into contact. Moreover, in one connecting portion, the connecting tool to be used is not limited to one set, and a plurality of sets may be used. In this figure, four sets of connectors are used, two of which have the lag screw 11 screwed into the horizontal member, and the remaining two have the lag screw 11 embedded in the column, Unbalance has been eliminated.

図4は、一端側に左ネジ36を形成して他端側に右ネジ33を形成したスタッドボルト35を使用した構成を示している。これまでの各図は、両端に右ネジ32、33を形成した一般的なスタッドボルト31を使用していたが、この図のように、左ネジ36と右ネジ33を形成したものも使用できる。その場合は当然ながら、対になる内ネジ15、25のうち、一方を左ネジとする必要があり、この図ではラグスクリュー11の内ネジ15を左ネジとしている。なおスタッドボルト35を円滑に回転させるため、その端面に六角穴37を設けてある。   FIG. 4 shows a configuration using a stud bolt 35 in which a left screw 36 is formed on one end side and a right screw 33 is formed on the other end side. Each figure so far uses a general stud bolt 31 having right screws 32 and 33 formed at both ends. However, as shown in this figure, a bolt having a left screw 36 and a right screw 33 can also be used. . In this case, of course, one of the pair of inner screws 15 and 25 needs to be a left screw, and in this figure, the inner screw 15 of the lag screw 11 is a left screw. In addition, in order to rotate the stud bolt 35 smoothly, the hexagon hole 37 is provided in the end surface.

図5は、一方材41の側面に二本の他方材51を接触させて、十字状の連結部を構成する形態を示している。この場合、一方材41に加工してある下穴42は側面を貫通しており、この下穴42にねじ込まれるラグスクリュー17は、両端面に中穴13を形成してあり、その奥には、上下の中穴13を結ぶように内ネジ15を形成してあり、両側からスタッドボルト31を差し込むことができる。そのほか二本の他方材51は、端面に下穴52を加工してあり、この中に埋設具21を接着剤55で固定する。なおスタッドボルト31と埋設具21のいずれも、上下の二個は同形状で対称の配置となっている。   FIG. 5 shows a form in which two other members 51 are brought into contact with the side surface of one member 41 to form a cross-shaped connecting portion. In this case, the pilot hole 42 processed into the one material 41 penetrates the side surface, and the lag screw 17 screwed into the pilot hole 42 has the inner hole 13 formed at both end faces, The inner screw 15 is formed so as to connect the upper and lower inner holes 13, and the stud bolt 31 can be inserted from both sides. In addition, the two other members 51 have a prepared hole 52 formed in the end surface, and the embedded tool 21 is fixed with an adhesive 55 therein. Note that both the stud bolt 31 and the embedding tool 21 have the same shape and symmetrical arrangement.

図6は、図5の連結部の詳細を縦断面で示している。一方材41にねじ込まれるラグスクリュー17は、両端面に中穴13を形成してあり、その奥に内ネジ15を形成してあり、上下からスタッドボルト31を差し込むことができる。施工時は、内ネジ15に計二本のスタッドボルト31を螺合させた後、埋設具21の内ネジ25にスタッドボルト31を螺合させて、二個の埋設具21をラグスクリュー17に密着させる。その後、接着剤55で枝部材51を埋設具21に固定すると、一方材41の両側面から他方材51が突出する十字状の連結部が完成する。   FIG. 6 shows the details of the connecting portion of FIG. 5 in a longitudinal section. On the other hand, the lag screw 17 to be screwed into the material 41 has the inner hole 13 formed at both end faces, and the inner screw 15 formed at the back thereof, and the stud bolt 31 can be inserted from above and below. At the time of construction, a total of two stud bolts 31 are screwed to the inner screw 15, and then the stud bolt 31 is screwed to the inner screw 25 of the buried tool 21, so that the two buried tools 21 are attached to the lag screw 17. Adhere closely. Thereafter, when the branch member 51 is fixed to the embedding tool 21 with the adhesive 55, a cross-shaped connecting portion in which the other material 51 protrudes from both side surfaces of the one material 41 is completed.

図7は、中心材61の側面に二本の枝部材63、66を接触させて、十字状の連結部を構成する形態を示している。中心材61には、側面を貫通する中心孔62を加工してあり、この中にラグスクリュー18をねじ込む。ラグスクリュー18には、凸条12や六角部14を形成してあるが、内ネジ15はなく、中穴13が両端を貫通している。また下方の枝部材66には、下穴67を加工して係留具19を埋め込んでいる。係留具19は、実質的にはラグスクリューであり、側周面に凸条12を形成してあり、さらに上端面に内ネジ15を形成してある。   FIG. 7 shows a form in which two branch members 63 and 66 are brought into contact with the side surface of the central member 61 to form a cross-shaped connecting portion. A center hole 62 penetrating the side surface is processed in the center member 61, and the lag screw 18 is screwed therein. The lag screw 18 is formed with the ridges 12 and the hexagonal portion 14, but has no inner screw 15, and the inner hole 13 penetrates both ends. In the lower branch member 66, the anchor hole 19 is embedded by processing the lower hole 67. The anchoring tool 19 is substantially a lag screw, has a ridge 12 formed on the side peripheral surface, and further has an inner screw 15 formed on the upper end surface.

上方の枝部材63には、埋設具21を埋め込む。この点は図1などと同じである。またスタッドボルト31は、対向する係留具19と埋設具21とを引き寄せるためのもので、中心材61にねじ込まれるラグスクリュー18と螺合することはない。施工時は、まず中心材61にラグスクリュー18をねじ込み、さらに下方の枝部材66に係留具19をねじ込む。次に、中心材61側の中穴13にスタッドボルト31を差し込み、その先端側の右ネジ32を係留具19の内ネジ15に螺合させる。その後、スタッドボルト31の後端側の右ネジ33に埋設具21の内ネジ25を螺合させて、中心材61を挟んで枝部材66と埋設具21を対向するように固定する。   The embedding tool 21 is embedded in the upper branch member 63. This is the same as in FIG. The stud bolt 31 is for pulling the anchoring tool 19 and the embedded tool 21 facing each other, and does not screw with the lag screw 18 screwed into the center member 61. At the time of construction, first, the lag screw 18 is screwed into the central member 61, and the anchoring tool 19 is screwed into the lower branch member 66. Next, the stud bolt 31 is inserted into the inner hole 13 on the center member 61 side, and the right screw 32 on the tip side is screwed into the inner screw 15 of the anchoring tool 19. Thereafter, the inner screw 25 of the buried tool 21 is screwed into the right screw 33 on the rear end side of the stud bolt 31, and the branch member 66 and the buried tool 21 are fixed so as to face each other with the center member 61 interposed therebetween.

図8は、図7の連結部の詳細を縦断面で示している。中心材61にねじ込まれるラグスクリュー18は、中穴13が両端面を貫通しており、スタッドボルト31を通過させることができる。また下方の枝部材66には係留具19がねじ込まれており、その上端には、スタッドボルト31を螺合するための内ネジ15を形成してある。さらに上側の枝部材63は、埋設具21を介して中心材61に固定される。施工時は、中心材61を挟んで枝部材66と埋設具21を対向するように固定した後、接着剤55で枝部材63を埋設具21に固定する。なお、この図の形態についても、一箇所の連結部に複数組の連結具を組み込むことができるほか、図4のような左ネジ36と右ネジ33を形成したスタッドボルト35も使用できる。   FIG. 8 shows the details of the connecting portion of FIG. 7 in a longitudinal section. The lag screw 18 to be screwed into the center member 61 has the inner hole 13 passing through both end faces, and can pass the stud bolt 31. An anchoring tool 19 is screwed into the lower branch member 66, and an inner screw 15 for screwing the stud bolt 31 is formed at the upper end thereof. Further, the upper branch member 63 is fixed to the central member 61 through the burying tool 21. At the time of construction, the branch member 66 and the embedded tool 21 are fixed to face each other with the central member 61 interposed therebetween, and then the branch member 63 is fixed to the embedded tool 21 with an adhesive 55. In this embodiment as well, a plurality of sets of connecting tools can be incorporated into one connecting portion, and a stud bolt 35 having a left screw 36 and a right screw 33 as shown in FIG. 4 can be used.

図7および図8では、係留具19としてラグスクリュー状のものを使用しているが、この係留具19は、接着剤55で枝部材66に固定する棒状の物(埋設具と同様の物)に置き換えることもできる。この場合、中心材61にラグスクリュー18をねじ込んだ後、対向する係留具19と埋設具21とをスタッドボルト31で引き寄せて、中心材61の側面に係留具19と埋設具21を固定して、最後に、係留具19と埋設具21に接着剤55を塗布して、二本の枝部材63、66を固定する。   7 and 8, a lug screw-like thing is used as the anchoring tool 19, but this anchoring tool 19 is a rod-like object (similar to an embedding tool) fixed to the branch member 66 with an adhesive 55. Can also be replaced. In this case, after screwing the lag screw 18 into the center member 61, the opposing anchoring device 19 and the embedded device 21 are pulled by the stud bolt 31, and the anchoring device 19 and the embedded device 21 are fixed to the side surface of the center member 61. Finally, the adhesive 55 is applied to the anchoring tool 19 and the embedding tool 21, and the two branch members 63 and 66 are fixed.

11 ラグスクリュー
12 凸条
13 中穴
14 六角部
15 内ネジ
16 ラグスクリュー(内ネジが左ネジ)
17 ラグスクリュー(両端に中穴、内部に内ネジ)
18 ラグスクリュー(中穴が貫通、内ネジなし)
19 係留具(ラグスクリュー状)
21 埋設具
22 リブ
23 中穴
24 六角部
25 内ネジ
31 スタッドボルト(両端側に右ネジ)
32 右ネジ(一端側)
33 右ネジ(他端側)
35 スタッドボルト(一端側に左ネジ、他端側に右ネジ)
36 左ネジ
37 六角穴
41 一方材
42 下穴(一方材側)
51 他方材
52 下穴(他方材側)
55 接着剤
61 中心材
62 中心孔
63 枝部材
64 下穴
66 枝部材
67 下穴
11 lag screw 12 ridge 13 inner hole 14 hexagonal part 15 inner screw 16 lag screw (the inner screw is a left screw)
17 lag screw (medium hole at both ends, internal screw inside)
18 Lag screw (the inner hole penetrates, there is no inner screw)
19 Mooring tool (lag screw shape)
21 Embedding tool 22 Rib 23 Middle hole 24 Hexagonal part 25 Internal thread 31 Stud bolt (Right thread on both ends)
32 Right-hand thread (one end side)
33 Right-hand thread (other end side)
35 Stud bolt (Left-hand thread on one end, right-hand thread on the other end)
36 Left-hand thread 37 Hexagon hole 41 One material 42 Pilot hole (one material side)
51 Other material 52 Pilot hole (the other material side)
55 Adhesive 61 Center Material 62 Center Hole 63 Branch Member 64 Pilot Hole 66 Branch Member 67 Pilot Hole

Claims (2)

面接触している一方材(41)と他方材(51)とを連結するために用い、
両材(41、51)の接触面から延びる一対の下穴(42、52)のうち一方材(41)側の下穴(42)にねじ込まれるラグスクリュー(11、16又は17)と、
他方材(51)側の下穴(52)に埋め込まれ且つ接着剤(55)で固定される棒状の埋設具(21)と、
前記ラグスクリュー(11、16又は17)と前記埋設具(21)とを引き寄せるためのスタッドボルト(31又は35)と、
を備え、
前記ラグスクリュー(11、16又は17)の内部には、前記スタッドボルト(31又は35)の一端側に螺合する内ネジ(15)を設けてあり、
前記埋設具(21)の内部には、前記スタッドボルト(31又は35)の他端側に螺合する内ネジ(25)を設けてあり、
前記内ネジ(15、25)のうちの一方または両方は、前記ラグスクリュー(11、16又は17)と前記埋設具(21)との境界から延びる中穴(13、23)の奥方に位置することを特徴とする連結具。
Used to connect one material (41) and the other material (51) in surface contact,
A lag screw (11, 16 or 17) to be screwed into the lower hole (42) on the one material (41) side of the pair of lower holes (42, 52) extending from the contact surfaces of the two materials (41, 51);
A rod-like embedding tool (21) embedded in the prepared hole (52) on the other material (51) side and fixed with an adhesive (55);
A stud bolt (31 or 35) for pulling the lag screw (11, 16 or 17) and the buried tool (21);
With
Inside the lag screw (11, 16 or 17), an internal screw (15) is provided which is screwed to one end of the stud bolt (31 or 35).
An internal screw (25) that is screwed to the other end side of the stud bolt (31 or 35) is provided inside the buried tool (21),
One or both of the inner screws (15, 25) are located behind a center hole (13, 23) extending from a boundary between the lag screw (11, 16 or 17) and the embedding tool (21). A connector characterized by that.
中心材(61)とその側面に接触する二本の枝部材(63、66)とを十字状に連結するために用い、
中心材(61)を貫通して両枝部材(63、66)との接触面に開口する中心孔(62)にねじ込まれるラグスクリュー(18)と、
前記中心孔(62)に連通して一方の枝部材(63)に延びる下穴(64)に埋め込まれ且つ接着剤(55)で固定される棒状の埋設具(21)と、
前記中心孔(62)に連通して他方の枝部材(66)に延びる下穴(67)に固定される係留具(19)と、
前記埋設具(21)と前記係留具(19)とを引き寄せるためのスタッドボルト(31又は35)と、
を備え、
前記埋設具(21)の内部には、前記スタッドボルト(31又は35)の一端側に螺合する内ネジ(25)を設けてあり、
前記係留具(19)の内部には、前記スタッドボルト(31又は35)の他端側に螺合する内ネジ(15)を設けてあり、
前記ラグスクリュー(18)には、前記スタッドボルト(31又は35)を挿通可能な中穴(13)を設けてあることを特徴とする連結具。
Used to connect the central member (61) and the two branch members (63, 66) contacting the side surfaces in a cross shape,
A lag screw (18) screwed into a central hole (62) that passes through the central member (61) and opens in a contact surface with both branch members (63, 66);
A rod-like embedding tool (21) that is embedded in a pilot hole (64) that communicates with the central hole (62) and extends to one branch member (63) and is fixed by an adhesive (55);
A tether (19) secured to a pilot hole (67) communicating with the central hole (62) and extending to the other branch member (66);
A stud bolt (31 or 35) for pulling the buried tool (21) and the mooring tool (19);
With
An internal screw (25) that is screwed to one end side of the stud bolt (31 or 35) is provided inside the embedding tool (21),
Inside the mooring tool (19), an internal screw (15) that is screwed to the other end of the stud bolt (31 or 35) is provided,
The lag screw (18) is provided with a center hole (13) through which the stud bolt (31 or 35) can be inserted.
JP2010225070A 2010-10-04 2010-10-04 Connector Active JP5451572B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2010225070A JP5451572B2 (en) 2010-10-04 2010-10-04 Connector

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2010225070A JP5451572B2 (en) 2010-10-04 2010-10-04 Connector

Publications (2)

Publication Number Publication Date
JP2012077545A JP2012077545A (en) 2012-04-19
JP5451572B2 true JP5451572B2 (en) 2014-03-26

Family

ID=46238106

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2010225070A Active JP5451572B2 (en) 2010-10-04 2010-10-04 Connector

Country Status (1)

Country Link
JP (1) JP5451572B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104088401A (en) * 2014-06-19 2014-10-08 北京工业大学 Buckling-restrained steel bar construction

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6587926B2 (en) * 2015-12-19 2019-10-09 株式会社Seto Anchor bolt and anchor bolt installation method
JP6718776B2 (en) * 2016-09-02 2020-07-08 大倉 憲峰 Connector
JP7107724B2 (en) * 2018-04-10 2022-07-27 株式会社Ihi Storage containers and stacks
JP7290505B2 (en) * 2019-08-05 2023-06-13 株式会社フジタ Structure and construction method
JP7134152B2 (en) * 2019-10-01 2022-09-09 株式会社三栄建築設計 Horizontal structural surface reinforcement plate and horizontal structural surface reinforcement structure
JP7323201B2 (en) * 2020-06-12 2023-08-08 株式会社ストローグ Linked structure
JP7755296B2 (en) * 2021-11-10 2025-10-16 株式会社スクリムテックジャパン Joint material, joint structure of members, and wooden members with joint material

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3635520B2 (en) * 1998-11-30 2005-04-06 秀利 大川 Wood joint and method of joining wood using the joint
JP2002220874A (en) * 2001-01-23 2002-08-09 Aoki Kensetsu:Kk Wood connector
JP4181512B2 (en) * 2004-02-17 2008-11-19 三井ホーム株式会社 Joint structure of wood shafts
JP4628212B2 (en) * 2005-07-27 2011-02-09 有限会社グランドフォーム Fastener
JP4649303B2 (en) * 2005-09-22 2011-03-09 有限会社グランドフォーム Pillar fasteners
JP4949194B2 (en) * 2007-10-25 2012-06-06 義邦 大倉 Fastener
JP5188892B2 (en) * 2008-06-30 2013-04-24 義邦 大倉 Fastening structure
JP5430497B2 (en) * 2010-05-28 2014-02-26 義邦 大倉 Fastener

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104088401A (en) * 2014-06-19 2014-10-08 北京工业大学 Buckling-restrained steel bar construction

Also Published As

Publication number Publication date
JP2012077545A (en) 2012-04-19

Similar Documents

Publication Publication Date Title
JP5451572B2 (en) Connector
JP4494129B2 (en) Joining method and structure of column beam frame with wooden structure material
JP5430497B2 (en) Fastener
JP5606410B2 (en) Fastener
US20140271034A1 (en) Post installed concealable concrete anchor
JP2016132868A (en) Bar-form metal fitting
JP5188892B2 (en) Fastening structure
JP6351471B2 (en) Connected structure
JP2016108893A (en) Connection structure
KR20070069101A (en) Fixed nailing device and construction method
JP2025006118A (en) Lug screw bolt installation jig and installation method
CN104499622A (en) Vibration-absorption type eccentric back bolt and mounting method
JP5002428B2 (en) Fastener
JP6909380B2 (en) Rug screw bolt connection structure and connection method
JP2015166520A (en) fastening structure
JP4372208B2 (en) Joint fitting for wood connection reinforcement
CN203532453U (en) Tapping expansion screw improved structure
JP2018012934A (en) Fitting, wood connecting fitting, wood connecting method, and building
JP4949194B2 (en) Fastener
JP6503314B2 (en) Connected structure
CN207005028U (en) A kind of hidden-type expansion bolt
JP5557305B2 (en) Wood reinforcement
JP7740704B2 (en) Connection structure
JP6664282B2 (en) Connecting device and roof structure using the connecting device
JP3691553B2 (en) Integrated structure of joint metal fittings for embedding wooden poles, and wooden pole joint structures using the same

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20130320

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20130516

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20131205

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20131217

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20131226

R150 Certificate of patent or registration of utility model

Ref document number: 5451572

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250