Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP5493170B2 - Recovery work planning system, blackout work planning method and program - Google Patents
[go: Go Back, main page]

JP5493170B2 - Recovery work planning system, blackout work planning method and program - Google Patents

Recovery work planning system, blackout work planning method and program Download PDF

Info

Publication number
JP5493170B2
JP5493170B2 JP2010044657A JP2010044657A JP5493170B2 JP 5493170 B2 JP5493170 B2 JP 5493170B2 JP 2010044657 A JP2010044657 A JP 2010044657A JP 2010044657 A JP2010044657 A JP 2010044657A JP 5493170 B2 JP5493170 B2 JP 5493170B2
Authority
JP
Japan
Prior art keywords
power
work
candidate
power outage
equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2010044657A
Other languages
Japanese (ja)
Other versions
JP2011182557A (en
Inventor
春海 朝原
直人 餘利野
芳文 造賀
耕治 川原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chugoku Electric Power Co Inc
Hiroshima University NUC
Original Assignee
Chugoku Electric Power Co Inc
Hiroshima University NUC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chugoku Electric Power Co Inc, Hiroshima University NUC filed Critical Chugoku Electric Power Co Inc
Priority to JP2010044657A priority Critical patent/JP5493170B2/en
Publication of JP2011182557A publication Critical patent/JP2011182557A/en
Application granted granted Critical
Publication of JP5493170B2 publication Critical patent/JP5493170B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Description

本発明は、復旧作業計画システム、停電作業計画方法およびプログラムに関する。   The present invention relates to a recovery work planning system, a power outage work planning method, and a program.

周知のとおり、わが国における電力の需要量は増加の一途を辿っている。電力需要量の増加に伴い、発電機や変圧器、送電線等の電力設備の増強が行われ、電力系統の規模は非常に複雑なものとなってきている。一方、経済のグローバル化に伴い国際競争が激化していく中で、電力料金は欧米並の低廉化が求められており、電力市場においては規制緩和等により競争原理が導入され始めている。そしてこのような時代背景の中で、電力会社等は電力設備のスリム化を促進し、最小限の設備で最大のサービスを提供することが求められるようになってきている。   As is well known, the demand for electricity in Japan continues to increase. With the increase in power demand, power facilities such as generators, transformers, and transmission lines have been enhanced, and the scale of the power system has become very complex. On the other hand, as international competition intensifies with the globalization of the economy, electricity prices are required to be as low as in the United States and Europe, and the principle of competition has begun to be introduced in the electricity market due to deregulation. Against this backdrop of the times, electric power companies and the like have been demanded to promote the streamlining of electric power equipment and provide the maximum service with the minimum equipment.

特開平8−322149号公報JP-A-8-322149

このように社会的な要請に応えなければならない一方で、電力会社等は電力の安定供給のために、電力設備の増設、改良、修繕、点検などの業務を遂行していかねばならない。ここでこれらの業務の遂行に際しては、電力設備の機能を停止させる作業(以下、「停電作業」という。)が必要となるが、この停電作業に際しては、系統切換、発雷時期や重負荷時期における制約、同調作業による作業停止期間の減少等の諸事情を加味し、可能な限り停電作業による需要者等への影響を抑えるように作業計画(以下、「停電作業計画」という。)を立てる必要がある。   While it is necessary to respond to social demands in this way, electric power companies and the like must carry out operations such as expansion, improvement, repair, and inspection of power facilities in order to stably supply power. Here, when performing these operations, it is necessary to stop the function of the power equipment (hereinafter referred to as “power failure operation”). During this power failure operation, system switching, lightning timing and heavy load timing. In consideration of various circumstances such as restrictions on the work and reduction of work stoppage time due to synchronized work, a work plan (hereinafter referred to as “power outage work plan”) is made so as to suppress the influence of power outage work on consumers and the like as much as possible. There is a need.

しかしながら、停電作業計画に際しては膨大な電力設備と制約を取り扱わねばならず、そのためには多大な労力と広い知識・経験等が要求される。従って電力系統を維持する電力会社等においては、効率よく供給信頼度の高い停電作業計画を立てることができるような停電作業計画に有効なシステムが必要とされている。   However, the power outage work plan must deal with a huge amount of power equipment and restrictions, and this requires a great deal of labor and extensive knowledge and experience. Therefore, in an electric power company or the like that maintains the power system, a system that is effective for a power outage work plan that can efficiently make a power outage work plan with high supply reliability is required.

本発明はこのような背景に鑑みてなされたもので、効率よく最適な停電作業計画を立てることが可能な停電作業計画システム、停電作業計画方法およびプログラムを提供することを目的とする。   The present invention has been made in view of such a background, and an object of the present invention is to provide a power failure work planning system, a power failure work planning method, and a program capable of efficiently creating an optimal power failure work plan.

上記課題を解決するための本発明の主たる発明は、複数の電力設備によって構成される電力系統の停電作業計画に用いられる停電作業計画システムであって、停電作業の対象となる電力設備である停電対象設備の指定を受け付ける指定手段と、前記電力系統において前記停電対象設備が停電状態となる、前記電力系統における前記電力設備のそれぞれの状態の組合せからなる作業系統候補を生成する作業系統候補生成手段と、前記各作業系統候補について、前記停電対象設備以外の前記電力設備の少なくともひとつを停電状態とした電力系統であるN−1系統を生成するN−1系統生成手段と、前記各作業系統候補について、対応する前記N−1系統の全てが所定の運用制約を満たすか否かに応じて、前記作業系統候補の運用可否を判定する運用可否判定手段と、前記運用可能な作業系統候補が存在しない場合に、前記各作業系統候補に対応する前記N−1系統のうち前記運用制約を満たさないものについて、当該運用制約を満たさないN−1系統とは異なる他の電力系統のうち、当該N−1系統における前記各電力設備の状態と、前記他の電力系統における前記各電力設備の状態とが異なる数が所定値以下のものである復旧目標系統候補を抽出し、前記復旧目標系統候補のうち前記運用制約を満たすものが存在するときには、当該作業系統候補は運用可能と判定する復活手段と、前記運用可能な作業系統の中から、停電作業計画として採用すべき作業系統を決定する作業計画決定手段と、を備えることとする。   A main invention of the present invention for solving the above problems is a power failure work planning system used for a power failure work plan of a power system composed of a plurality of power facilities, and is a power failure that is a target of power failure work. A designation means for accepting designation of a target facility; and a work system candidate generation means for generating a work system candidate comprising a combination of states of the power equipment in the power system, wherein the power failure target equipment is in a power failure state in the power system. And N-1 system generation means for generating an N-1 system that is a power system in which at least one of the power facilities other than the power outage target facility is in a power outage state, and each work system candidate. In accordance with whether or not all of the corresponding N-1 systems satisfy a predetermined operation constraint, it is determined whether or not the work system candidate can be operated. When the availability determination means and the operable work system candidates do not exist, the N-1 systems corresponding to the work system candidates that do not satisfy the operation restrictions are not N Among other power systems different from the -1 system, the number of states of the power facilities in the N-1 system and the states of the power facilities in the other power systems is less than a predetermined value. When a certain recovery target system candidate is extracted, and there is a recovery target system candidate that satisfies the operation constraints, the recovery system that determines that the work system candidate is operable and the operational system that can be operated And a work plan determining means for determining a work system to be adopted as the power outage work plan.

また、本発明の停電作業計画システムは、前記電力設備を特定する情報に対応付けて、前記電力系統の供給信頼度を算出するための信頼度情報を記憶する記憶手段と、前記作業系統候補および前記N−1系統の各々について、前記記憶手段に記憶されている各電力設備に関する情報に基づいて、供給信頼度を決定する供給信頼度決定手段と、を備え、前記運用可否判定手段は、前記作業系統候補の前記供給信頼度に応じて、前記作業系統候補の運用可否を判定し、前記復活手段は、前記N−1系統の前記供給信頼度に応じて、前記N−1系統が運用制約を満たすか否かを判定するようにしてもよい。   Further, the power outage work planning system of the present invention includes storage means for storing reliability information for calculating supply reliability of the power system in association with information for specifying the power equipment, the work system candidates, and For each of the N-1 systems, a supply reliability determination unit that determines a supply reliability based on information about each power facility stored in the storage unit, and the operation availability determination unit includes: According to the supply reliability of the work system candidate, it is determined whether or not the work system candidate can be operated, and the restoration unit determines whether the N-1 system is in operation restriction according to the supply reliability of the N-1 system. It may be determined whether or not the above is satisfied.

また、本発明の停電作業計画システムは、前記電力設備を特定する情報に対応付けて、前記電力系統の供給信頼度を算出するための信頼度情報を記憶する記憶手段を備え、前記復活手段は、前記運用制約を満たす復旧目標系統候補について前記供給信頼度を算出し、前記供給信頼度の最も高い前記復旧目標系統候補を復旧目標系統として決定し、前記記憶手段は、前記N−1系統に対応付けて前記復旧目標系統を記憶するようにしてもよい。   Further, the power failure work planning system of the present invention comprises storage means for storing reliability information for calculating supply reliability of the power system in association with information for specifying the power equipment, and the resurrection means is The supply reliability is calculated for a recovery target system candidate that satisfies the operation constraints, the recovery target system candidate having the highest supply reliability is determined as a recovery target system, and the storage means includes the N-1 system. The recovery target system may be stored in association with each other.

また、本発明の他の態様は、複数の電力設備により構成される電力系統の停電作業計画に用いられる停電作業計画方法であって、コンピュータが、停電作業の対象となる電力設備である停電対象設備の指定を受け付け、前記電力系統において前記停電対象設備が停電状態となる、前記電力系統における前記電力設備のそれぞれの状態の組合せからなる作業系統候補を生成し、前記各作業系統候補について、前記停電対象設備以外の前記電力設備の少なくともひとつを停電状態とした電力系統であるN−1系統を生成し、前記各作業系統候補について、対応する前記N−1系統の全てが所定の運用制約を満たすか否かに応じて、前記作業系統候補の運用可否を判定し、前記運用可能な作業系統候補が存在しない場合に、前記各作業系統候補に対応する前記N−1系統のうち前記運用制約を満たさないものについて、当該運用制約を満たさないN−1系統とは異なる他の電力系統のうち、当該N−1系統における前記各電力設備の状態と、前記他の電力系統における前記各電力設備の状態とが異なる数が所定値以下のものである復旧目標系統候補を抽出し、前記復旧目標系統候補のうち前記運用制約を満たすものが存在するときには、当該作業系統候補は運用可能と判定し、前記運用可能な作業系統の中から、停電作業計画として採用すべき作業系統を決定することとする。   Another aspect of the present invention is a power outage work planning method used for a power outage work plan of a power system composed of a plurality of power equipments, wherein the computer is a power outage target for power outage work. Accepting designation of equipment, generating a work system candidate consisting of a combination of the states of the power equipment in the power system, where the power outage target equipment is in a power outage state in the power system, for each work system candidate, An N-1 system that is a power system in which at least one of the power facilities other than the power failure target equipment is in a power outage state is generated, and for each of the work system candidates, all of the corresponding N-1 systems have predetermined operation restrictions. It is determined whether or not the work system candidate can be operated according to whether or not the work system candidate is satisfied. Among the N-1 systems that do not satisfy the operational constraint, among other power systems that are different from the N-1 system that does not satisfy the operational constraint, the state of each power facility in the N-1 system When a recovery target system candidate in which the number of states different from the state of each power facility in the other power system is less than or equal to a predetermined value is extracted, and among the recovery target system candidates that satisfy the operation constraints exist The work system candidate is determined to be operable, and the work system to be adopted as the power outage work plan is determined from the operational work systems.

また、本発明の他の態様は、複数の電力設備により構成される電力系統の停電作業計画に用いられるプログラムであって、コンピュータに、停電作業の対象となる電力設備である停電対象設備の指定を受け付けるステップと、前記電力系統において前記停電対象設備が停電状態となる、前記電力系統における前記電力設備のそれぞれの状態の組合せからなる作業系統候補を生成するステップと、前記各作業系統候補について、前記停電対象設備以外の前記電力設備の少なくともひとつを停電状態とした電力系統であるN−1系統を生成するステップと、前記各作業系統候補について、対応する前記N−1系統の全てが所定の運用制約を満たすか否かに応じて、前記作業系統候補の運用可否を判定するステップと、前記運用可能な作業系統候補が存在しない場合に、前記各作業系統候補に対応する前記N−1系統のうち前記運用制約を満たさないものについて、当該運用制約を満たさないN−1系統とは異なる他の電力系統のうち、当該N−1系統における前記各電力設備の状態と、前記他の電力系統における前記各電力設備の状態とが異なる数が所定値以下のものである復旧目標系統候補を抽出し、前記復旧目標系統候補のうち前記運用制約を満たすものが存在するときには、当該作業系統候補は運用可能と判定するステップと、前記運用可能な作業系統の中から、停電作業計画として採用すべき作業系統を決定するステップと、を実行させることとする。   Another aspect of the present invention is a program used for a power outage work plan of a power system composed of a plurality of power equipments, and the computer designates a power outage target equipment that is a power equipment subject to power outage work The step of accepting, the step of generating a work system candidate consisting of a combination of the states of the power equipment in the power system, where the power failure target equipment is in a power outage state in the power system, and each work system candidate, A step of generating an N-1 system that is a power system in which at least one of the power facilities other than the power failure target facility is in a power outage state, and for each of the work system candidates, all of the corresponding N-1 systems are predetermined. A step of determining whether or not the work system candidate can be operated according to whether or not an operation constraint is satisfied; Among the other power systems different from the N-1 system that does not satisfy the operation constraints, the N-1 systems corresponding to the work system candidates that do not satisfy the operation restrictions A recovery target system candidate in which the number of different states of the power facilities in the N-1 system and the states of the power facilities in the other power systems is equal to or less than a predetermined value is extracted, and the recovery target system candidates Determining that the candidate work system is operable, and determining a work system to be adopted as a power outage work plan from the operable work systems; , Are executed.

その他本願が開示する課題やその解決方法については、発明の実施形態の欄及び図面により明らかにされる。   Other problems and solutions to be disclosed by the present application will be made clear by the embodiments of the invention and the drawings.

本発明によれば、効率よく最適な停電作業計画を立てることができる。   According to the present invention, an optimal power outage work plan can be made efficiently.

本発明の一実施形態に係る停電作業計画システムを実現する情報処理装置200を示す図である。It is a figure showing information processor 200 which realizes a power failure work planning system concerning one embodiment of the present invention. 本発明の一実施形態に係る停電作業計画システムにより実行される処理の流れを説明する図である。It is a figure explaining the flow of the process performed by the power failure work planning system which concerns on one Embodiment of this invention. 電力系統の一例を示す図である。It is a figure which shows an example of an electric power grid | system. 電力系統の一例を示す図である。It is a figure which shows an example of an electric power grid | system. 電力系統の一例を示す図である。It is a figure which shows an example of an electric power grid | system. 作業系統候補の復活処理の流れを示す図である。It is a figure which shows the flow of a restoration process of a work system candidate. 事故対策の有無をチェックする処理の流れを示す図である。It is a figure which shows the flow of the process which checks the presence or absence of accident countermeasures. 系統間のハミング距離を説明するための図である。It is a figure for demonstrating the Hamming distance between systems. 電力系統の一例を示す図である。It is a figure which shows an example of an electric power grid | system. 電力系統の状態遷移の例を示す図である。It is a figure which shows the example of the state transition of an electric power grid | system. 操作票を出力する処理の流れを説明する図である。It is a figure explaining the flow of a process which outputs an operation slip. 常時系統と作業系統とのそれぞれにおける各電力設備の状態の例を示す図である。It is a figure which shows the example of the state of each electric power installation in each of a normal system and a work system | strain. 常時系統から作業系統への遷移を示す図である。It is a figure which shows the transition from a regular system to a work system.

以下、本発明の一実施形態にかかる停電作業計画システムについて、図面とともに詳細に説明する。   Hereinafter, a power failure work planning system according to an embodiment of the present invention will be described in detail with reference to the drawings.

==システムの概要==
停電作業計画システムは、作業計画期間内で供給信頼度が最大化されるように供給信頼度の高い停電作業計画における系統切替手順計画に用いられる。ここで供給信頼度とは、電力の安定性を示す指標であり、例えば、停電作業により電力設備の機能が停止されると電力系統の冗長性が低下し、これにより供給信頼度は低下することになる。供給信頼度の指標としては、需要家側での停電回数や停電時間などがある。また、供給者側での供給信頼度の指標としては、電源部門での供給予備率や電力不足確率、送配電部門でのアデカシーやセキュリティなどがある。アデカシーとは、電力系統を構成する電力設備の運用制約を考慮に入れ、電力系統に異常を生じることなく電力を供給することができる電力系統の能力の尺度であり、静的な供給信頼度である。これらの指標は、電力設備ごとに、あるいは電力系統全体の値(総和や平均)として評価される。
== System overview ==
The power failure work planning system is used for system switching procedure planning in a power failure work plan with high supply reliability so that the supply reliability is maximized within the work plan period. Here, the supply reliability is an index indicating the stability of the power. For example, when the function of the power facility is stopped due to a power failure operation, the redundancy of the power system is lowered, and thereby the supply reliability is lowered. become. As indicators of supply reliability, there are the number of power outages and power outage hours on the customer side. Further, the supply reliability index on the supplier side includes a supply reserve rate and a power shortage probability in the power supply department, adequacy and security in the power transmission and distribution department, and the like. Adequacy is a measure of the power system's ability to supply power without causing any abnormality in the power system, taking into account operational constraints of the power equipment that constitutes the power system. is there. These indexes are evaluated for each power facility or as a value (total or average) of the entire power system.

本実施形態にかかる停電作業計画システムでは、供給信頼度を定量化するために、供給信頼度の指標として、N−2供給支障電力、N−2過負荷電力、N−2余裕電力量等、を用いている。ここで電力系統の構成要素の一つが事故等で機能を停止した場合がN−1であり、電力設備の二つが機能を停止した場合がN−2である。一般にN−1を想定した設備構成の考え方は、N−1基準と呼ばれている。N−2基準は、さらに厳しい事故等を想定したものである。N−2基準はN−1に比べてより高レベルの信頼度が要求される場合に採用される基準である。一般的な電力設備は、N−1基準に従って作成されている。本実施例ではN−2基準を原則としている。但し、後述するように、N−2基準だけでは必ずしも採用すべき作業系統候補の優先順位を完全に順序づけることができない場合もありうる。そこでそのような場合には、より高次の基準であるN−3基準、N−4基準、・・・等を適宜採用する。   In the power failure work planning system according to the present embodiment, in order to quantify the supply reliability, N-2 supply trouble power, N-2 overload power, N-2 margin power amount, etc. are used as indicators of supply reliability. Is used. Here, the case where one of the components of the power system stops functioning due to an accident or the like is N-1, and the case where two of the power facilities stop functioning is N-2. In general, the concept of equipment configuration assuming N-1 is called the N-1 standard. The N-2 standard assumes a more severe accident. The N-2 standard is a standard adopted when a higher level of reliability is required than N-1. General power equipment is created in accordance with the N-1 standard. In this embodiment, the N-2 standard is used in principle. However, as will be described later, the priority order of work system candidates to be adopted cannot always be completely ordered only by the N-2 standard. Therefore, in such a case, higher standards such as N-3 standard, N-4 standard,.

N−2基準のうち上述したN−2供給支障電力は、電力系統を構成している電力設備のうち二つの電力設備が事故等により機能を停止している場合における供給支障電力である。供給支障電力には、負荷への電力供給が完全に遮断されているものと、電力供給が完全に遮断されているわけではないが負荷に必要とされる電力よりも減少しているものとが含まれる。本実施例では、N−2供給支障電力として、二つの電力設備が機能を停止している全ての電力系統のバリエーションについての各負荷の供給支障電力の総和、もしくは、前記総和を前記バリエーション数で除した平均値を採用している。供給支障電力が少ないほど、供給信頼度は高くなる。   The N-2 supply hindering power described above in the N-2 standard is a power hindering power supply when two power facilities out of the power facilities constituting the power system have stopped functioning due to an accident or the like. Supply hindering power includes power that is completely interrupted to the load and power that is not completely interrupted but is less than the power required for the load. included. In the present embodiment, as the N-2 supply hindrance power, the sum of the supply hindrance power of each load for all power system variations in which the functions of the two power facilities are stopped, or the total is the number of variations. The average value divided is used. The less reliable supply power, the higher the supply reliability.

N−2基準のうち上述したN−2過負荷量は、電力系統を構成している電力設備のうち二つの電力設備が事故等により機能を停止している場合において、機能を停止していない他の電力設備に定格容量を超えて流れている過負荷の電力量である。本実施例では、N−2供給支障電力と同様に、二つの電力設備が機能を停止している全ての電力系統のバリエーションについての各電力設備のN−2過負荷量の総和、もしくは、前記総和を前記バリエーション数で除した平均値を採用している。過負荷量が小さいほど、供給信頼度は高くなる。   Among the N-2 standards, the N-2 overload amount described above does not stop the function when two power facilities of the power facilities constituting the power system are stopped due to an accident or the like. This is the amount of overload power flowing beyond the rated capacity to other power facilities. In the present embodiment, similar to the N-2 supply hindering power, the sum of the N-2 overload amounts of each power facility for all variations of the power system in which the functions of the two power facilities are stopped, or the above An average value obtained by dividing the sum by the number of variations is adopted. The smaller the overload amount, the higher the supply reliability.

N−2基準のうち上述したN−2余裕電力量は、電力系統を構成している電力設備のうち二つの電力設備が事故等により機能を停止している場合において、機能を停止していない他の電力設備における、電力の定格容量とその電力設備における送電量の差である。N−2余裕電力量が大きいほど、供給信頼度は高くなる。   Among the N-2 standards, the above-mentioned N-2 marginal power amount does not stop the function when two of the power facilities constituting the power system have stopped functioning due to an accident or the like. It is the difference between the rated capacity of power in another power facility and the amount of power transmitted in that power facility. The greater the N-2 margin power amount, the higher the supply reliability.

なお、供給信頼度は、上述したものに限ることなく、他の電力の安定性を示す指標を適宜採用することができる。   The supply reliability is not limited to that described above, and other indexes indicating the stability of power can be appropriately adopted.

==情報処理装置==
図1は本実施形態に係る停電作業計画システムを実現する情報処理装置200である。CPU201は、情報処理装置200の全体の制御を司るもので、記憶手段としてのメモリ202や記憶装置208に格納されたプログラム202cを実行することにより停電作業計画システムの機能やデータベースの機能等を実現する。記録媒体読取装置204は、記録媒体207に記録されているプログラムやデータを読み取るための装置である。読み取られたプログラムやデータは、メモリ202や記憶装置208に格納される。従って、例えば記録媒体207に記録された停電作業計画システムの機能を実現するためのプログラム202cを、記録媒体読取装置204を用いて上記記録媒体207から読み取って、メモリ202や記憶装置208に格納するようにすることができる。例えば、上述のデータベースに記憶されるデータは、メモリ202や記憶装置208に格納される。記録媒体207としてはフレキシブルディスクやCD−ROM、DVD−ROM/RAM、DVD−RAM/RAM、半導体メモリ等を用いることができる。
== Information processing device ==
FIG. 1 shows an information processing apparatus 200 that realizes a power failure work planning system according to this embodiment. The CPU 201 is responsible for overall control of the information processing apparatus 200. By executing the program 202c stored in the memory 202 or the storage device 208 as storage means, the power failure work planning system function, database function, and the like are realized. To do. The recording medium reading device 204 is a device for reading a program and data recorded on the recording medium 207. The read program and data are stored in the memory 202 and the storage device 208. Therefore, for example, the program 202c for realizing the function of the power failure work planning system recorded in the recording medium 207 is read from the recording medium 207 using the recording medium reading device 204 and stored in the memory 202 or the storage device 208. Can be. For example, data stored in the above-described database is stored in the memory 202 or the storage device 208. As the recording medium 207, a flexible disk, CD-ROM, DVD-ROM / RAM, DVD-RAM / RAM, semiconductor memory, or the like can be used.

記録媒体読取装置204は、情報処理装置200に内蔵されている形態とすることもできるし、外付されている形態とすることもできる。記憶装置208は、例えばハードディスク装置やフレキシブルディスク装置、半導体記憶装置等である。入力装置205はオペレータ等による情報処理装置200へのデータ入力等のために用いられる。入力装置205としては例えばキーボードやマウス等が用いられる。出力装置206は情報を外部に出力するための装置である。出力装置206としては例えばディスプレイやプリンタ等が用いられる。通信インタフェース203は、情報処理装置200をLAN等の外部ネットワークに接続するためのインタフェースである。情報処理装置200は、通信インタフェース203を介して他のコンピュータ等の外部装置との間で通信を行うことができる。   The recording medium reading device 204 can be built in the information processing device 200 or can be externally attached. The storage device 208 is, for example, a hard disk device, a flexible disk device, a semiconductor storage device, or the like. The input device 205 is used for data input to the information processing apparatus 200 by an operator or the like. For example, a keyboard or a mouse is used as the input device 205. The output device 206 is a device for outputting information to the outside. For example, a display or a printer is used as the output device 206. The communication interface 203 is an interface for connecting the information processing apparatus 200 to an external network such as a LAN. The information processing apparatus 200 can communicate with an external apparatus such as another computer via the communication interface 203.

==作業系統の決定処理==
停電作業計画システムは、上述の情報処理装置200上で動作するプログラムにより提供される。情報処理装置200では、各種のデータを記憶するためのデータベースが動作している。このデータベースには、系統切替手順計画の対象となる電力系統の構成や電力系統を構成している各電力設備に係る、例えば、消費電力、定格電力、送電容量、電力損失などの情報(上述の供給信頼度を算出するための情報である。以下、信頼度情報という。)が記憶されている。また、このデータベースには、以下に説明する処理で用いられる各種のデータが適宜記憶される。
== Work system determination process ==
The power failure work planning system is provided by a program that operates on the information processing apparatus 200 described above. In the information processing apparatus 200, a database for storing various data is operating. In this database, for example, information (eg, power consumption, rated power, transmission capacity, power loss, etc.) relating to the configuration of the power system and the power facilities constituting the power system that are the targets of the system switching procedure plan (described above) Information for calculating supply reliability, hereinafter referred to as reliability information) is stored. In addition, various data used in the processes described below are appropriately stored in this database.

図2に停電作業計画システムにより実行される処理の流れを説明するフローチャートを示している。この処理には、1.作業系統候補生成処理(I)、2.系統運用制約判断処理(II)、3.系統構成組合せ処理(III)、の三つの処理が含まれている。以下、これらの各処理について詳述する。   FIG. 2 shows a flowchart for explaining the flow of processing executed by the power failure work planning system. This process includes: Work system candidate generation processing (I), 2. 2. System operation constraint judgment processing (II) Three processes of the system configuration combination process (III) are included. Hereinafter, each of these processes will be described in detail.

==1.作業系統候補生成処理(I)==
作業系統候補生成処理(I)では、当該処理に後続する処理において用いられる、電力系統における各電力設備の状態(以下、「作業系統」という。)の候補(以下、「作業系統候補」という。)を生成する。生成された作業系統候補は、情報処理装置200のデータベースに記憶される。作業系統候補生成処理(I)には、縮約系統生成処理(S311)、詳細系統生成処理(S312)、停電作業設備の組合せ処理(S313)、候補生成処理(S314)、などの処理が含まれる。
== 1. Work system candidate generation processing (I) ==
In the work system candidate generation process (I), a candidate (hereinafter referred to as a “work system candidate”) of the state of each power facility in the power system (hereinafter referred to as “work system”) used in a process subsequent to the process. ) Is generated. The generated work system candidates are stored in the database of the information processing apparatus 200. The work system candidate generation process (I) includes processes such as a reduced system generation process (S311), a detailed system generation process (S312), a power outage facility combination process (S313), and a candidate generation process (S314). It is.

縮約系統生成処理(S311)では、停電作業要求を満たす状態(以下、「縮約系統」という。)を生成する。電力系統の状態の数は、各電力設備が通電および停電の2つの状態を取り得るため、単純に計算すると2b[b:電力設備の数(例えば、送電線の数+変圧器の数)]という莫大な数となる。そこで本実施形態においては、処理の対象とする電力系統の状態の数を絞り込むために、二つの制約を課すこととしている。そのうちの一つは、同一の電力設備が冗長な構成を有している場合にこれを一つの電力設備として扱うようにすること(以下、「縮約」という)である。例えば、同じ電気所(発電所・変電所等)間が複数回線の送電線で構成される場合には、これら複数回線を一つの電力設備として扱うようにする。また同じ電力設備(母線)間が複数の変圧器で構成される場合には、これら複数の変圧器を一つの電力設備として扱うようにする。このような制約を課すことにより、最適化の精度を殆ど低下させることなく計算量を減らすことができる。   In the reduced system generation process (S311), a state that satisfies the power outage work request (hereinafter referred to as “reduced system”) is generated. The number of power system states can be calculated as 2b [b: number of power facilities (for example, number of power transmission lines + number of transformers)] because each power facility can take two states of energization and power failure. It becomes a huge number. Therefore, in this embodiment, two restrictions are imposed to narrow down the number of states of the power system to be processed. One of them is to treat the same power equipment as a single power equipment when the power equipment has a redundant configuration (hereinafter referred to as “contraction”). For example, when the same electrical station (power plant, substation, etc.) is composed of a plurality of transmission lines, these multiple lines are handled as one power facility. When the same power equipment (bus) is composed of a plurality of transformers, the plurality of transformers are handled as one power equipment. By imposing such restrictions, the amount of calculation can be reduced without substantially reducing the accuracy of optimization.

二つめの制約は、採用する作業系統候補を、常時系統における停電設備の数を増減させた常時系統に近似する構成(周辺)に絞ることである。常時系統とは通常の運用状態における電力系統の状態である。例えば、常時系統における停電設備数が2である場合には、停電設備数が1あるいは3などの場合が常時系統周辺である。停電作業のための系統は、常時系統に近い(周辺)作業系統であるという結果が調査で得られており経験的にも納得できるものであることから、このようにサンプルとして採用する系統を常時系統周辺に制約することにより、最適化の精度を低下させることなく計算量を減らすことができる。図3に電力系統の状態の一例を示している。図3が常時系統である場合において、例えば、図4に示す状態は常時系統周辺である。なお、常時系統周辺に制約した場合の系統数は、例えば、次式により求められる。

Figure 0005493170
M=1,2,…,MM,N=1,2,…,MN The second restriction is to narrow down the working system candidates to be adopted to a configuration (periphery) that approximates a continuous system in which the number of power outage facilities in the continuous system is increased or decreased. The normal system is a state of the power system in a normal operation state. For example, when the number of power outage facilities in the normal system is 2, the number of power outage facilities is 1 or 3 is always around the system. The system for power outage work is a (peripheral) work system that is close to the system at all times, and the results have been obtained in the survey. By constraining the periphery of the system, the amount of calculation can be reduced without reducing the optimization accuracy. FIG. 3 shows an example of the state of the power system. In the case where FIG. 3 is a constant system, for example, the state shown in FIG. 4 is always around the system. Note that the number of systems when always restricted to the periphery of the system is obtained by the following equation, for example.
Figure 0005493170
M = 1,2, ..., MM, N = 1,2, ..., MN

なお、上式において、MMは常時停電状態にある電力設備の中から同時に通電状態とする最大数、MNは常時通電状態にある電力設備の中から同時に停電状態とする最大数、offは常時停電状態にある電力設備の数、onは常時通電状態にある電力設備の数、mは常時停電状態にある電力設備から同時に通電状態とする数、nは常時通電状態の電力設備から同時に停電状態とする数である。常時系統周辺の範囲は、上式におけるMMやMNの値を変えることにより任意に設定することができる。常時系統周辺の範囲は、最適化の精度を低下させることなく計算量を減らすことができる範囲に設定される。   In the above equation, MM is the maximum number that can be energized at the same time from power facilities that are always in a power outage state, MN is the maximum number that is always in a power outage state from power facilities that are always in an energized state, and off is a constant power outage. The number of power equipment in the state, on is the number of power equipment that is always energized, m is the number of power equipment that is always energized, and n is the power outage from the power equipment that is always energized. It is a number to do. The range around the normal system can be arbitrarily set by changing the values of MM and MN in the above equation. The range around the regular system is set to a range in which the amount of calculation can be reduced without reducing the optimization accuracy.

詳細系統生成処理(S312)では、上記縮約系統生成処理(S311)で得られた縮約系統について、縮約をもとに戻した状態(以下、「詳細系統」という。)を生成する。生成された詳細系統はデータベースに記憶される。   In the detailed system generation process (S312), a state (hereinafter referred to as “detailed system”) in which the contraction system obtained by the contracted system generation process (S311) is restored to the original state is generated. The generated detailed system is stored in the database.

停電作業設備の組合せ処理(S313)では、停電作業が要求される電力設備の組合せを生成し、データベースに記憶する。ここで同時に複数の停電作業(以下、「同調作業」という。)が行なわれると供給信頼度を低下させてしまうので、組合せの生成は同調作業となる組合せができるだけ少なくなるように行われる。例えば、組合せは同調作業数が計画期間内に要求された電力設備を停止するのに必要な最小数となるように生成される。この場合に組合せの数は次式から求められる。

Figure 0005493170
なお、上式において、wは同調作業の数、MWは同調作業の最大数、MBは全作業設備数である。 In the power outage work facility combination processing (S313), a power equipment combination that requires power outage work is generated and stored in the database. If a plurality of power outage operations (hereinafter referred to as “synchronization operations”) are performed at the same time, the supply reliability is lowered. Therefore, the generation of combinations is performed so that the number of combinations that can be synchronized operations is as small as possible. For example, the combination is generated such that the number of tuned operations is the minimum number required to shut down the required power equipment within the planning period. In this case, the number of combinations is obtained from the following equation.
Figure 0005493170
In the above equation, w is the number of synchronized work, MW is the maximum number of synchronized work, and MB is the total number of work facilities.

候補生成処理(S314)では、詳細系統生成処理(S312)で得られた詳細系統に、停電作業設備の組合せ処理(S313)で得られた組合せを重ね合わせることにより作業系統の候補を生成し、データベースに記憶する。図4および図5に電力系統の一例を示す。図4は、詳細系統生成処理(S312)で得られた詳細系統であり、図5は、図4の詳細系統に、停電作業設備の組合せ処理(S313)で得られた停電作業が要求される電力設備の組合せの一つを重ねて生成した作業系統候補である。なお、この例では、停電作業の対象となる電力設備(以下、「停電作業設備」という)は送電線b3である。   In the candidate generation process (S314), a candidate for the work system is generated by superimposing the combination obtained in the power outage work facility combination process (S313) on the detailed system obtained in the detailed system generation process (S312). Store in the database. 4 and 5 show an example of the power system. 4 is a detailed system obtained by the detailed system generation process (S312), and FIG. 5 requires the power outage work obtained by the combination process (S313) of the power outage work facility in the detailed system of FIG. It is a work system candidate generated by overlapping one of the combinations of electric power facilities. In this example, a power facility (hereinafter referred to as “power failure work facility”) to be subjected to a power failure operation is a transmission line b3.

==2.系統運用制約判断処理(II)==
系統運用制約判断処理(II)には、系統損失電力計算処理(S315)および作業系統候補に対するN−M系統作成処理(S316)、N−M系統に対し運用制約を満たすかどうかの判断処理(S317)が含まれる。
== 2. System operation constraint judgment processing (II) ==
The system operation constraint determination process (II) includes a system power loss calculation process (S315), an NM system creation process (S316) for a work system candidate, and a process for determining whether or not the operation constraint is satisfied for the NM system ( S317).

系統損失電力計算処理(S315)では、上述の作業系統候補生成処理(S314)で生成された各作業系統候補について、系統損失電力を計算する。ここで系統損失電力とは、電力設備において生じる損失の総和である。作業系統候補に対するN−M系統作成処理(S316)では、N−M基準についての作業系統候補を作成する。なお、Mの初期値は「1」である。N−M系統に対し運用制約を満たすかどうかの判断処理(S317)では、作業系統候補に対するN−M系統作成処理(S316)で作成されてデータベースに記憶されている作業系統候補について、系統を運用する上での制約(以下、「運用制約」という。)を満たすかどうかの判断を行い、実際に運用可能な作業系統候補を抽出する。なお、運用制約は、運用箇所によって異なるため、様々なバリエーションに変更される性質のものである。そこで、本実施例の停電作業計画システムにおいては、制約を満たすかどうかの判断を行う処理を、判断される制約ごとに分割している。このように処理を分割していることで、運用制約の様々なバリエーションに迅速かつ柔軟に対応させることができる。また、制約を満たすかどうかの判断の結果をデータベースに設けた共通のテーブルに管理するようにしている。これにより判断結果について集約的な把握と管理が可能となる。   In the system power loss calculation process (S315), system power loss is calculated for each work system candidate generated in the above-described work system candidate generation process (S314). Here, the system loss power is the sum of losses generated in the power equipment. In the NM system creation process (S316) for the work system candidate, a work system candidate for the NM standard is created. Note that the initial value of M is “1”. In the determination process (S317) of whether or not the operation constraint is satisfied for the NM system, the system is determined for the work system candidates created in the NM system creation process (S316) for the work system candidates and stored in the database. It is determined whether or not operational constraints (hereinafter referred to as “operational constraints”) are satisfied, and work system candidates that can actually be operated are extracted. In addition, since the operation constraints differ depending on the operation location, the operation constraints are changed to various variations. Therefore, in the power failure work planning system of the present embodiment, the process for determining whether or not the constraint is satisfied is divided for each determined constraint. By dividing the processing in this way, it is possible to respond quickly and flexibly to various variations of operation constraints. In addition, the result of determination as to whether or not the constraint is satisfied is managed in a common table provided in the database. This makes it possible to comprehensively grasp and manage the determination results.

上記共通のテーブルには、例えば、運用違反に対する違反の有無や、後述するN−M供給支障電力、N−M余裕電力量、送電損失電力等が記憶される。なお、運用制約を満たすかどうかの判断において、一つでも運用違反を有する作業系統候補は運用可能な候補とはなり得ない。そこで、運用違反の判断において違反が確認された場合には、以後の他の制約についての判断処理の対象から除外するようにして処理効率を向上させている。   The common table stores, for example, whether or not there is a violation of operation violation, NM supply hindrance power, NM margin power, transmission loss power, and the like, which will be described later. It should be noted that in determining whether or not the operation constraint is satisfied, any one work system candidate having an operation violation cannot be an operable candidate. Therefore, when a violation is confirmed in the determination of an operation violation, the processing efficiency is improved by excluding it from the determination processing target for other constraints thereafter.

なお、運用制約の判断は、例えば、潮流計算を用いて行われる。潮流計算手法としては処理が高速に行われるものが望ましく、例えば、OSPF(Optimal Switching Power Flow:例えば、R.Bacher,H.Glavitsch:" Network Topology Optimization with Security Constraints " IEEE Trans.PS, Vol.PWRS-1,No.4,103-111(1986)を参照)を用いる。   The operation constraint is determined using, for example, power flow calculation. As a power flow calculation method, it is desirable that the processing is performed at high speed. For example, OSPF (Optimal Switching Power Flow: For example, R. Bacher, H. Glavitsch: “Network Topology Optimization with Security Constraints” IEEE Trans. PS, Vol. PWRS -1, No. 4, 103-111 (1986)).

===3.系統構成組合せ処理(III)===
系統構成組合せ処理(III)では、上述の系統運用制約判断処理(II)により抽出された作業系統候補に対して、諸条件を課すことにより順位付けを行い、供給信頼度の高い電力系統の状態を抽出する。系統構成組合せ処理(III)は、N−M供給支障電力計算処理(S318)、N−M過負荷量計算処理(S319)、N−M余裕電力量計算処理(S320)、バランス断面ごとの繰り返し計算処理(S321)、作業系統候補の復活処理(S322)、ソート処理(S323)、作業系統候補を完全に順序づけることができたかどうかの判断処理(S324)、停電作業要求を満たす系統構成の選択処理(S325)、所要日数が計画期間内であるかどうかを判断する処理(S326)〜(S327)、計画期間内の供給信頼度の高い停電作業計画の作成処理(S328)等の処理が含まれる。
=== 3. System configuration combination processing (III) ===
In the system configuration combination process (III), the working system candidates extracted by the above-described system operation constraint determination process (II) are ranked by imposing various conditions, and the state of the power system with high supply reliability To extract. System configuration combination processing (III) includes NM supply hindrance power calculation processing (S318), NM overload amount calculation processing (S319), NM margin power amount calculation processing (S320), and repeated for each balance section. Calculation process (S321), work system candidate restoration process (S322), sort process (S323), judgment process whether work system candidates have been completely ordered (S324), system configuration that satisfies power outage work requirements Processing such as selection processing (S325), processing to determine whether the required number of days is within the planning period (S326) to (S327), and power outage work plan creation processing (S328) with high supply reliability within the planning period included.

N−M供給支障電力計算処理(S318)では、上述の系統運用制約判断処理(II)により抽出された各作業系統候補についてのN−M供給支障電力を計算する。計算されたN−M供給支障電力は、各作業系統候補に対応させてデータベースに記憶される。   In the NM supply hindrance power calculation process (S318), the NM supply hindrance power for each work system candidate extracted by the above-described system operation restriction determination process (II) is calculated. The calculated NM supply hindrance power is stored in the database in correspondence with each work system candidate.

N−M過負荷量計算処理(S319)では、上述の系統運用制約判断処理(II)により抽出された各作業系統候補についてのN−M過負荷量を計算する。計算されたN−M過負荷量は、各作業系統候補に対応させてデータベースに記憶される。   In the NM overload amount calculation process (S319), the NM overload amount is calculated for each work system candidate extracted by the above-described system operation constraint determination process (II). The calculated NM overload amount is stored in the database in correspondence with each work system candidate.

N−M余裕電力量計算処理(S320)では、上述の系統運用制約判断処理(II)により抽出された各作業系統候補についてのN−M余裕電力量を計算する。計算されたN−M余裕電力量は、各作業系統候補に対応させてデータベースに記憶される。   In the NM margin power amount calculation process (S320), the NM margin power amount is calculated for each work system candidate extracted by the above-described system operation constraint determination process (II). The calculated NM marginal electric energy is stored in the database in association with each work system candidate.

バランス断面ごとの繰り返し計算処理(S321)では、電力設備の負荷の状態の異なる複数のバランス断面について、(S316)〜(S320)までの処理を繰り返し実行する。ここで電力系統の供給信頼度は、例えば、発電機の状態(起動・停止)や電力系統を構成している電力設備の負荷などの電力設備の状態によって変化する。なお、バランス断面とは、実際に採取された、もしくは、シミュレーションされた、ある時点における発電と負荷の状態である。繰り返し実行される(S316)〜(S320)の処理結果は、バランス断面ごとにデータベースに記憶される。N−M供給支障電力や系統損失電力の値は、バランス断面に応じて変化する。従って、このようにバランス断面ごとにN−M供給支障電力や系統損失電力を求めることにより、最適化が特定のバランス断面に依存して行われるのを防ぐことができる。   In the repeated calculation process (S321) for each balance section, the processes from (S316) to (S320) are repeatedly executed for a plurality of balance sections with different load conditions of the power equipment. Here, the supply reliability of the power system varies depending on the state of the power equipment such as the state of the generator (start / stop) and the load of the power equipment constituting the power system, for example. The balance section is a state of power generation and load at a certain point of time that is actually collected or simulated. The processing results of (S316) to (S320) that are repeatedly executed are stored in the database for each balance section. The values of the NM supply hindrance power and the system loss power vary according to the balance section. Therefore, by obtaining the NM supply hindrance power and the system loss power for each balance section in this way, it is possible to prevent optimization from being performed depending on a specific balance section.

作業系統候補の復活処理(S322)では、運用可能な作業系統候補の存在しない作業について、運用可能な候補となり得ない場合であっても、事故対策がなされているときには、運用可能な候補として復活させる。図6に、作業系統候補の復活処理の流れを示すフローチャートを示す。   In the work system candidate restoration process (S322), work that does not have an operable work system candidate is restored as an operational candidate when accident countermeasures are taken, even if the work system candidate cannot be operated. Let FIG. 6 is a flowchart showing the flow of work system candidate restoration processing.

Mが1である場合(S411:YES)、情報処理装置200は、電力系統を構成する電力設備を順に1つ選択する(S412)。情報処理装置200は、選択した電力設備(以下、「選択設備」という。)を停電作業設備とする作業系統候補をデータベースから検索し(S413)、検索した作業系統候補のうち運用可能な(運用制約違反がない)候補が存在しない場合(S414:NO)、検索した作業系統候補を順に1つ抽出する(S415)。情報処理装置200は、抽出した作業系統候補(以下、「抽出系統」という。)に対応するN−1系統をデータベースから1つ抽出し(S416)、抽出したN−1系統が運用制約を満たすかどうかを判断する(S417)。N−1系統が運用制約を満たすかどうかの判断は、上記(S317)の処理と同様である。N−1運用制約違反がある場合(S418:YES)、情報処理装置200は、当該N−1系統について事故対策の有無をチェックする(S419)。N−1系統についての事故対策の有無をチェックする処理の流れを示すフローチャートを図7に示す。情報処理装置200は、変数Dを0に初期化し(S431)、Dをインクリメントし(S432)、Dが指定値を超えた場合には(S433:NO)、事故対策がないものと判断する(S434)。一方、Dが指定値以下である場合(S433:YES)、情報処理装置200は、詳細系統生成処理(S312)でデータベースに記憶された詳細系統のうち、抽出系統からのハミング距離がDであるものを抽出してリストとする(S435)。系統間のハミング距離とは、各系統を構成する各電力設備の状態を文字列として表現した場合に異なる文字の数である。例えば図8の例では、系統を構成する設備b1〜b9の状態が、通電状態の場合「1」、停電状態の場合「0」として9文字の文字列として表現されている。図8の例では、系統11の状態は「011001001」として表現され、系統12の状態は「010101001」として表現され、これらの文字列の間で異なる文字の数である「2」がハミング距離となる。情報処理装置200は、ハミング距離がDと一致する詳細系統のうちの1つを選択し(S436)、抽出系統において作業対象設備として停電状態となっている電力設備と、上記(S416)で抽出されたN−1系統において事故の発生などにより停電状態とされた電力設備(以下、「事故設備」という。)とを、上記選択した詳細系統において停電状態とし(S437)、作業対象設備と事故設備とを停電状態とした詳細系統が運用制約を満たすかどうかを判断する(S438)。なお、運用制約を満たすかどうかの判断は、上記(S317)の処理と同様である。情報処理装置200は、運用制約に違反する判断した場合には(S439:YES)、当該詳細系統を上記リストから除外する(S440)。情報処理装置200は、上記(S435)で抽出した詳細系統の全てを選択するまで(S435)〜(S438)の処理を繰り返し(S441:YES)、リストに詳細系統が残っていなければ(S442:NO)、(S432)からの処理を繰り返す。リストの詳細系統が残っていれば(S442:YES)、情報処理装置200は、リスト中の各詳細系統について供給信頼度を計算し(S443)、供給信頼度の一番高い詳細系統を復旧目標系統として決定して(S444)、事故対策があると判断する(S445)。   When M is 1 (S411: YES), the information processing apparatus 200 sequentially selects one power facility constituting the power system (S412). The information processing apparatus 200 searches the database for work system candidates that use the selected power equipment (hereinafter referred to as “selected equipment”) as a power outage work equipment (S413), and is operable among the searched work system candidates (operation If no candidate exists (no constraint violation) (S414: NO), one retrieved work system candidate is extracted in order (S415). The information processing apparatus 200 extracts one N-1 system corresponding to the extracted work system candidate (hereinafter referred to as “extracted system”) from the database (S416), and the extracted N-1 system satisfies the operation constraint. It is determined whether or not (S417). The determination as to whether or not the N-1 system satisfies the operation constraint is the same as the processing in (S317) above. When there is an N-1 operation constraint violation (S418: YES), the information processing apparatus 200 checks whether or not there is an accident countermeasure for the N-1 system (S419). FIG. 7 is a flowchart showing a flow of processing for checking whether or not there is an accident countermeasure for the N-1 system. The information processing apparatus 200 initializes the variable D to 0 (S431), increments D (S432), and determines that there is no accident countermeasure when D exceeds a specified value (S433: NO) ( S434). On the other hand, when D is equal to or less than the specified value (S433: YES), the information processing apparatus 200 has the Hamming distance from the extracted system among the detailed systems stored in the database in the detailed system generation process (S312). The list is extracted from the list (S435). The hamming distance between systems is the number of different characters when the state of each power facility constituting each system is expressed as a character string. For example, in the example of FIG. 8, the states of the facilities b1 to b9 configuring the system are expressed as a 9-character string as “1” in the energized state and “0” in the power failure state. In the example of FIG. 8, the state of the system 11 is expressed as “011001001”, the state of the system 12 is expressed as “010101001”, and “2”, which is the number of characters that differ between these character strings, is the Hamming distance. Become. The information processing apparatus 200 selects one of the detailed systems whose Hamming distance matches D (S436), and extracts the power equipment that is in the power outage state as the work target equipment in the extraction system and the above (S416) In the selected N-1 system, the power facility that is in a power outage state (hereinafter referred to as “accident equipment”) due to the occurrence of an accident or the like is changed to a power outage state in the selected detailed system (S437). It is determined whether the detailed system in which the facility is in a power failure state satisfies the operational constraints (S438). Note that whether or not the operation constraint is satisfied is the same as the processing in (S317) described above. When determining that the operation constraint is violated (S439: YES), the information processing apparatus 200 excludes the detailed system from the list (S440). The information processing apparatus 200 repeats the processing of (S435) to (S438) until all of the detailed systems extracted in (S435) are selected (S441: YES), and if no detailed system remains in the list (S442: NO) and (S432) are repeated. If the detailed system of the list remains (S442: YES), the information processing apparatus 200 calculates the supply reliability for each detailed system in the list (S443), and restores the detailed system with the highest supply reliability to the recovery target. The system is determined (S444), and it is judged that there is an accident countermeasure (S445).

情報処理装置200は、事故対策があると判断した場合には(S420:YES)、抽出系統から復旧目標系統に切り替える手順が計画可能か否かを判定する(S421)。抽出系統から復旧目標系統への切り替え可否は、一般的な手法を用いることができる。例えば、抽出系統から電力設備を一つずつ通停電して電力系統の状態を変化させていく電力系統の状態遷移(以下、「切替手順計画」という。)において、途中の状態である操作中系統の全てが所定の制約を満たすような切替手順計画が存在するか否かにより判定することができる。情報処理装置200は、切替可能と判定した場合には(S422:YES)、全てのN−1系統について(S416)からの処理を繰り返す(S423)。情報処理装置200は、全てのN−1系統について、運用制約違反がない場合(S418:NO)、または、事故対策があり(S420:YES)かつ有効な切替手順計画がある場合(S422:YES)には、抽出系統が運用可能な候補となるように、データベースを更新する(S424)。情報処理装置200は、以上の処理を、(S413)で検索した全ての作業系統候補について繰り返す(S425)。   When it is determined that there is an accident countermeasure (S420: YES), the information processing apparatus 200 determines whether a procedure for switching from the extracted system to the recovery target system can be planned (S421). A general method can be used to determine whether or not the extraction system can be switched to the recovery target system. For example, in the power system state transition (hereinafter referred to as “switching procedure plan”) in which the power facility is interrupted one by one from the extracted system and the power system state is changed (hereinafter referred to as “switching procedure plan”) It is possible to determine whether or not there is a switching procedure plan that satisfies all of the predetermined constraints. If it is determined that switching is possible (S422: YES), the information processing apparatus 200 repeats the processing from (S416) for all N-1 systems (S423). The information processing apparatus 200 has no operation constraint violation for all N-1 systems (S418: NO), or has an accident countermeasure (S420: YES) and has an effective switching procedure plan (S422: YES) ), The database is updated so that the extracted system is a candidate for operation (S424). The information processing apparatus 200 repeats the above processing for all work system candidates searched in (S413) (S425).

以上のようにして、作業系統候補の復活処理(S322)では、作業系統候補が存在しない作業について、運用制約を満たさない作業系統候補でも、事故からの復旧が可能なものについては、運用可能な候補として復活させるようにすることができる。したがって、各日に停電作業計画を立案することが可能となる。   As described above, in the work system candidate revival process (S322), work that does not have a work system candidate can be operated even if the work system candidate that does not satisfy the operation constraints can be recovered from an accident. Can be revived as a candidate. Therefore, it is possible to make a power outage work plan on each day.

ソート処理(S323)では、作業系統候補を、N−M供給支障電力を第1のソートキーとしてN−M供給支障電力の昇順となるようにソート(整列)する。このソートは、全てのバランス断面から得られた作業系統候補を対象として行われる。そして、N−M供給支障電力が同じ作業系統候補が存在する場合には、そのような作業系統候補の関係では、N−M過負荷量を第2ソートキーとしてN−M過負荷量の昇順となるように作業系統候補がソートされる。さらに、N−M過負荷量が同じ作業系統候補が存在する場合には、そのような作業系統候補の関係では、N−M余裕電力量を第3のソートキーとしてN−M余裕電力量の降順となるように作業系統候補がソートされる。さらに、N−M余裕電力量が同じ作業系統候補が存在する場合には、そのような作業系統候補の関係では、系統損失電力を第4のソートキーとして系統損失電力の昇順となるように作業系統候補がソートされる。   In the sort process (S323), the work system candidates are sorted (aligned) in the ascending order of the NM supply trouble power using the NM supply trouble power as the first sort key. This sorting is performed on work system candidates obtained from all balance sections. When there are work system candidates having the same NM supply hindrance power, the relationship between the work system candidates is ascending order of the NM overload quantity with the NM overload quantity as the second sort key. Work system candidates are sorted so that Further, when there are work system candidates having the same NM overload amount, in the relationship of such work system candidates, the NM margin power amount is set as the third sort key and the NM margin power amount is descending. Work system candidates are sorted so that Further, when there are work system candidates having the same NM margin power amount, the work systems are arranged in the ascending order of the system loss power with the system loss power as the fourth sort key in the relationship of such work system candidates. Candidates are sorted.

以上の処理では、異なるバランス断面に所属する同じ作業系統候補が存在することがありうるが、作業系統候補が同じであってもバランス断面ごとに需要量が異なるため、N−M供給支障電力に差が生じることになる。つまり、同じ作業系統候補であってもN−M供給支障電力の差によってソート順が変わってくることになり、これにより優先して選出する作業系統候補を決定することができる。以上の方法によれば、複数のバランス断面を考慮して作業系統候補が決定され、これにより作業すべき日程が決定され、単一のバランス断面を用いる場合に比べてより供給信頼度の高い作業計画を立てることができる。   In the above processing, there may be the same work system candidates belonging to different balance sections, but even if the work system candidates are the same, the demand amount is different for each balance section. There will be a difference. That is, even if the work system candidates are the same, the sort order changes depending on the difference in NM supply hindrance power, so that the work system candidates to be preferentially selected can be determined. According to the above method, work system candidates are determined in consideration of a plurality of balance sections, thereby determining a schedule to be worked on, and work with higher supply reliability than when using a single balance section. You can make a plan.

なお、以上に示したソート処理(S323)では、N−M供給支障電力、N−M過負荷量、N−M余裕電力量、系統損失電力の順にソートしているが、この順序(ソートキーの優先順位)は、例えば、どの値を重視するかに応じてユーザ等が任意に変更することができる。この変更は、例えば、GUI(Graphical User Interface)やCLI(Command Line Interface)を使ったインタフェースによって行うことができる。また、N−M過負荷量が指定された値以上となる状態を作業系統候補としないように処理させることもできる。   In the sorting process (S323) shown above, the NM supply trouble power, the NM overload amount, the NM margin power amount, and the system loss power are sorted in this order (sort key of the sort key). The priority can be arbitrarily changed by the user or the like depending on which value is important. This change can be performed by, for example, an interface using GUI (Graphical User Interface) or CLI (Command Line Interface). Further, it is possible to perform processing so that a state where the NM overload amount is equal to or greater than a specified value is not set as a work system candidate.

作業系統候補を完全に順序づけることができたかどうかの判断処理(S324)では、(S323)におけるソート処理で完全に作業系統候補を順序づけることができたかどうかを判断している。ここで作業系統候補を完全に順序づけることができていない場合には、Mの値を1つ増やして(S316)以降の処理を再び実行する。このように作業系統候補を完全に順序づけることができない場合に、M(M=3,4,5・・・)個の電力設備が機能を停止している場合を想定した基準(これらを例えば、N−3基準、N−4基準、・・・という)について、(S316)以降の処理を繰り返し行うことにより、最終的に作業系統候補を完全に順序づけることができることになる。   In the determination process (S324) of whether or not the work system candidates have been completely ordered, it is determined whether or not the work system candidates have been completely ordered by the sort process in (S323). If the work system candidates are not completely ordered, the value of M is increased by 1 (S316) and the subsequent processing is executed again. In this way, when the work system candidates cannot be completely ordered, it is assumed that M (M = 3, 4, 5,...) Power facilities have stopped functioning (for example, these are , N-3 standard, N-4 standard,...), It is possible to finally order the work system candidates completely by repeatedly performing the processing after (S316).

停電作業要求を満たす系統構成の選択処理(S325)では、停電作業の要求が満たされるまで上述のようにしてソートされている作業系統候補の中から供給信頼度の高い作業系統候補から優先的に選択していく。そしてこのようにして選択される作業系統候補を実施した場合における所要日数を計算し、所要日数が設定されている計画期間を上回る場合には(S326:YES)、既に採用されている作業系統候補に代えて、選択されていない作業系統候補から最も供給信頼度の高い同調作業可能な作業系統候補を採用し(S327)、所要日数が計画期間内となるように調節する。   In the system configuration selection process that satisfies the power outage work request (S325), the work system candidates with high supply reliability are preferentially selected from the work system candidates sorted as described above until the power outage work request is satisfied. Select. Then, the number of days required when the work system candidate selected in this way is executed is calculated, and if the required number of days exceeds the set plan period (S326: YES), the work system candidates that have already been adopted Instead, a work system candidate that can be tuned with the highest supply reliability is adopted from the unselected work system candidates (S327), and the required number of days is adjusted to be within the planned period.

そして、計画期間内の供給信頼度の高い停電作業計画の作成処理(S328)では、以上のようにして得られた作業系統候補と上記バランス断面とに基づいて日程を決定し、停止させる電力設備から作業を決めて計画期間内の供給信頼度の高い停電作業計画を作成する。なお、上記のようにして、図4に示した電力系統において線路b3を停電設備とした場合に作業系統を決定すると、例えば図9に示すような作業系統となる。   Then, in the power outage work plan creation process (S328) with high supply reliability within the planning period, the power facility to be determined and stopped based on the work system candidates obtained as described above and the balance section. The work is decided from and a power outage work plan with high supply reliability within the planning period is created. As described above, when the work system is determined when the line b3 is a power failure facility in the power system shown in FIG. 4, for example, a work system as shown in FIG. 9 is obtained.

以上に説明したように、本発明の停電作業計画システムによれば、運用制約の範囲内でかつ計画期間内で電力系統の供給信頼度を最大化する作業系統を決定することができる。すなわち、本発明の停電作業計画システムは、電力系統の運用者のみならず顧客に対する利益をも最大化するように作業系統を決定することができる。   As described above, according to the power failure work planning system of the present invention, it is possible to determine a work system that maximizes the supply reliability of the power system within the scope of operation restrictions and within the planning period. That is, the power failure work planning system of the present invention can determine the work system so as to maximize not only the operator of the power system but also the customer.

==系統切替手順計画作成処理==
上記のようにして作業系統が決定されると、次に、常時系統から作業系統に移行するための手順を示す情報(以下、「操作票」という。)の出力処理が行われる。常時系統から作業系統への電力系統の状態の移行は、電力設備を1つずつ通停電していくことにより行われる。図10は停電作業計画における電力系統の状態遷移の例を示す図である。図10の例において、常時系統41から作業系統42に電力系統の状態を移行させる場合、電力系統の制御操作を行う運用者は、常時系統41から電力設備を一つずつ通停電して電力系統の状態を変化させていく。常時系統から作業系統に移行する間の状態が操作中系統43である。本実施形態の停電作業計画システムでは、後述するように、電力系統の供給信頼度が高くなるように操作中系統が定められる。停電計画システムからは常時系統、操作中系統、および作業系統を基に操作票を作成(出力)する。電力系統の制御操作を行う運用者は、操作票に基づいて電力系統の制御操作を行う。図11に、操作票の出力処理の流れを示す図である。
== System switching procedure plan creation process ==
When the work system is determined as described above, next, output processing of information (hereinafter referred to as “operation sheet”) indicating a procedure for shifting from the normal system to the work system is performed. Transition of the state of the power system from the regular system to the work system is performed by powering out the power equipment one by one. FIG. 10 is a diagram illustrating an example of state transition of the power system in the power outage work plan. In the example of FIG. 10, when the state of the electric power system is transferred from the constant system 41 to the work system 42, the operator who performs the control operation of the electric power system cuts off the power facility one by one from the constant system 41 one by one. The state of will be changed. The state during the transition from the regular system to the work system is the operating system 43. In the power outage work planning system of the present embodiment, as will be described later, the operating system is determined so that the supply reliability of the power system becomes high. From the power outage planning system, operation slips are created (output) based on the continuous system, the operating system, and the work system. The operator who performs the control operation of the power system performs the control operation of the power system based on the operation slip. FIG. 11 is a diagram illustrating a flow of operation sheet output processing.

情報処理装置200は、常時系統と作業系統との間で状態が変化する電力設備(以下、「差分設備」という。)をデータベースに記憶する(S511)。図12に常時系統と作業系統とのそれぞれにおける各電力設備の状態の例を示す。図12の例では、各電力設備毎に、通電状態の場合には「1」、停電状態の場合には「0」が示されており、常時系統と作業系統との間で状態が変化しているのは、電力設備b3、b4、b5、およびb9である(図中丸で示す部分)。   The information processing apparatus 200 stores, in the database, power equipment (hereinafter referred to as “difference equipment”) whose state changes between the regular system and the work system (S511). FIG. 12 shows an example of the state of each power facility in each of the regular system and the work system. In the example of FIG. 12, for each power facility, “1” is shown in the energized state and “0” is shown in the power outage state, and the state changes between the regular system and the work system. The power facilities b3, b4, b5, and b9 are indicated by the circles in the figure.

情報処理装置200は、まず常時系統を現在系統としてデータベースに記憶する(S512)。次に情報処理装置200は、作業系統候補のうち、通電状態となっている電力設備の数(以下、「通電設備数」という。)が、現在系統における通電設備数から「1」減算した数であり、差分設備の状態が現在系統における差分設備の状態と異なるものを抽出する(S513)。図12の例において常時系統が現在系統である場合、上記差分設備の状態が変化して通電設備数が1減ることから、電力設備b3またはb5の状態が停電状態(0)になる作業系統候補を選択することになる。   The information processing apparatus 200 first stores the continuous system in the database as the current system (S512). Next, the information processing apparatus 200 is the number obtained by subtracting “1” from the number of energized facilities in the current system, the number of energized power facilities (hereinafter referred to as “number of energized facilities”) among the work system candidates. The difference equipment state is different from the difference equipment state in the current system (S513). In the example of FIG. 12, when the current system is the current system, the status of the differential equipment changes and the number of energized equipment is reduced by 1, so that the work system candidate in which the power equipment b3 or b5 is in the power outage state (0) Will be selected.

情報処理装置200は、抽出した作業系統候補(以下、「操作中系統候補」という。)を供給信頼度の高い順に一つずつ操作中系統として選択し(S514)、選択した操作中系統に対して、現在系統から操作中系統に電力設備の状態を変化させることに関する制約(以下、「操作制約」という。)を満たすかどうかの判断を行う(S515)。本実施形態では、操作制約として、現在系統と操作中系統との相差角の範囲が15°以内であることを採用している。操作中系統が操作制約を満たす場合には(S515:YES)、後述の(S519)に進む。   The information processing apparatus 200 selects the extracted work system candidates (hereinafter referred to as “operating system candidates”) one by one as the operating system in descending order of supply reliability (S514). Thus, it is determined whether or not a constraint relating to changing the state of the power equipment from the current system to the operating system (hereinafter referred to as “operation constraint”) is satisfied (S515). In the present embodiment, as the operation constraint, it is adopted that the range of the phase difference angle between the current system and the operating system is within 15 °. When the operating system satisfies the operation constraint (S515: YES), the process proceeds to (S519) described later.

上記の操作中系統候補のいずれも操作制約を満たさないとき、情報処理装置200は、作業系統候補のうち、作業系統候補における通電設備数が、現在系統における通電設備数に「1」加算した数であり、差分設備の状態が現在系統における差分設備の状態と異なるものを抽出する(S516)。図12の例において常時系統が現在系統である場合には、電力設備b4またはb9の状態が通電状態(1)になる作業系統候補を選択することになる。   When none of the above operating system candidates satisfies the operation constraint, the information processing apparatus 200 is the number obtained by adding “1” to the number of energized facilities in the current system, among the work system candidates. The difference equipment state is different from the state of the difference equipment in the current system (S516). In the example of FIG. 12, when the normal system is the current system, the work system candidate in which the state of the power equipment b4 or b9 is in the energized state (1) is selected.

情報処理装置200は、抽出した操作中系統候補を、供給信頼度の高い順に一つずつ操作中系統として選択し(S517)、選択した操作中系統に対して、上記(S515)と同様に操作制約を満たすかどうかの判断を行う(S518)。操作中系統が操作制約を満たすか(S518:YES)、または上記(S515)において操作中系統が操作制約を満たす場合(S515:YES)、情報処理装置200は、操作中系統を現在系統としてデータベースに記憶する(S519)。現在系統と作業系統とが一致した場合(S520:YES)、情報処理装置200は、常時系統と、データベースに登録された操作中系統の履歴と、作業系統とを出力装置206に出力し(S521)、処理を終了する。現在系統と常時系統とが同じでない場合(S521:NO)は、操作中系統の履歴をデータベースに登録し(S522)、(S513)に進む。   The information processing apparatus 200 selects the extracted operating system candidates one by one as the operating system in descending order of supply reliability (S517), and operates the selected operating system in the same manner as in the above (S515). It is determined whether or not the constraint is satisfied (S518). If the operating system satisfies the operation constraint (S518: YES) or if the operating system satisfies the operation constraint (S515: YES) in the above (S515), the information processing apparatus 200 sets the operating system as the current system in the database. (S519). When the current system and the work system match (S520: YES), the information processing apparatus 200 outputs the continuous system, the history of the operating system registered in the database, and the work system to the output device 206 (S521). ), The process is terminated. If the current system and the regular system are not the same (S521: NO), the history of the operating system is registered in the database (S522), and the process proceeds to (S513).

一方、上記の操作中系統候補のいずれも操作制約を満たさないときには、操作制約を満たす手順を示すことができない旨のメッセージを表示するなどの、エラー処理を行い(S523)、処理を終了する。   On the other hand, when none of the above-described operating system candidates satisfy the operation constraint, error processing such as displaying a message indicating that the procedure satisfying the operation constraint cannot be indicated is performed (S523), and the processing is terminated.

上記のようにして、電力系統の状態が常時系統から操作中系統を経て作業系統なるまでの各状態が出力される。これにより、どの電力設備を通停電していくのかを示すことが可能となり、操作票が作成されることになる。したがって、作成された操作票に基づいて、自動的又は半自動的に電力設備の通停電を行うことが可能となる。すなわち、停電作業計画から系統切替手順計画まで一連の流れとして処理が可能となる。   As described above, each state from the power system to the working system through the operating system is output. As a result, it is possible to indicate which power facility is going through a power failure, and an operation slip is created. Therefore, it is possible to automatically or semi-automatically perform power outage of the power facility based on the created operation slip. That is, processing can be performed as a series of flow from the power failure work plan to the system switching procedure plan.

なお、上記図11の(S514)において、操作中系統候補の供給信頼度が高く相差角が小さいものから順に一つずつ操作中系統を選択するようにしてもよい。この場合には、操作制約を満たす可能性が高いものから順に操作制約を満たすかどうかを判断していくことになるので、操作中系統候補が操作制約を満たさなかった場合には、他の操作中系統候補が操作制約を満たすかどうかを判断することなく(S516)に進むようにすることができる。   In addition, in (S514) of FIG. 11 described above, the operating systems may be selected one by one in descending order from the supply reliability of the operating system candidates that is high and the phase difference angle is small. In this case, since it is determined whether the operation constraints are satisfied in order from the highest possibility of satisfying the operation constraints, if the in-operation system candidate does not satisfy the operation constraints, another operation is performed. It is possible to proceed to (S516) without determining whether the middle system candidate satisfies the operation constraint.

図13は常時系統から作業系統への遷移を示す図である。図13の例では、1回目の操作で常時系統から電力設備b3を停電状態に変更し(S601)、2回目の操作で電力設備b5を停電状態にし(S602)、3回目の操作で電力設備b4を通電状態にし(S603)、4回目の操作で電力設備b9を通電状態にする(S604)という手順を示している。このように常時系統から作業系統に至るまでの電力系統の状態の遷移を基に各電力設備を通停電させる手順を定めることにより、常時系統から作業系統に移行するための操作票を容易かつ確実に作成することができる。操作票が作成されることにより、電力系統の制御操作を行う運用者は、操作中系統の各段階において、通停電を行う対象となる電力設備を容易かつ確実に把握することができる。また、運用者は出力された操作票の各状態に合わせるように電力設備の通停電を行うことにより、容易に電力系統の系統操作を遂行することができる。したがって、操作のミスを防止することができる。   FIG. 13 is a diagram showing a transition from the regular system to the work system. In the example of FIG. 13, the power facility b3 is always changed from the power system to the power failure state by the first operation (S601), the power facility b5 is changed to the power failure state by the second operation (S602), and the power facility by the third operation. A procedure is shown in which b4 is energized (S603) and the power equipment b9 is energized by the fourth operation (S604). In this way, by defining the procedure for power failure of each power facility based on the transition of the state of the power system from the always-on system to the work system, it is easy and reliable to provide operation slips for shifting from the always-on system to the work system. Can be created. By creating the operation slip, the operator who performs the control operation of the power system can easily and surely grasp the power equipment to be subjected to the power failure at each stage of the operating system. In addition, the operator can easily perform system operation of the power system by performing a power outage of the power equipment so as to match each state of the output operation slip. Accordingly, an operation error can be prevented.

また、本実施形態の停電作業計画システムでは、系統候補のうち、最も供給信頼度の高いものが操作中系統として選択される。つまり、電力系統の状態遷移において、最も供給信頼度が高くなるように、電力設備を通停電する系統操作を行うことのできる操作票が出力される。したがって、供給信頼度を高く保ちながら、電力系統の状態を遷移させることが可能となり、電力供給サービスの質を高めることができる。   Moreover, in the power failure work planning system of this embodiment, among the system candidates, the system with the highest supply reliability is selected as the operating system. That is, an operation slip that can perform a system operation for power failure through the power facility is output so that the supply reliability is highest in the state transition of the power system. Therefore, it is possible to change the state of the power system while keeping the supply reliability high, and the quality of the power supply service can be improved.

また、本実施形態の停電作業計画システムでは、作業系統を決定する上で作成した作業系統候補を用いて、常時系統から作業系統に電力系統の状態を遷移させる操作手順を出力する。したがって、情報処理装置200は、常時系統から作業系統に電力系統の状態を遷移させる系統操作の手順を示す場合に、操作中系統の候補となる状態を再度生成する必要がない。よって、情報処理装置200の処理負荷を抑えることができる。   Moreover, in the power failure work planning system of the present embodiment, an operation procedure for constantly changing the state of the power system from the system to the work system is output using the work system candidates created when determining the work system. Therefore, the information processing apparatus 200 does not need to generate a state that is a candidate for the currently operating system again when the procedure of the system operation for changing the state of the power system from the normal system to the working system is shown. Therefore, the processing load of the information processing apparatus 200 can be suppressed.

また、常時系統から作業系統に電力系統の状態を遷移させる際、どの電力設備を通停電するのかを選択していく選択肢も莫大な数となるが、本実施形態の停電作業計画システムでは、差分設備の状態が変化しており、供給信頼度が最も高い選択肢を選ぶこととしているため、その膨大な選択肢の全てを検討する必要がなく、容易に供給信頼度の高いものを選択することができる。   In addition, when changing the state of the power system from the regular system to the work system, there are an enormous number of options for selecting which power facility to perform the power failure. Since the state of the equipment is changing and the option with the highest supply reliability is selected, it is not necessary to consider all of the huge options, and it is possible to easily select the one with the highest supply reliability. .

なお、上述の系統切替手順計画の作成処理において、(S517)では、抽出した作業系統候補から供給信頼度の高い順に一つずつ操作中系統を選択するようにしたが、現在系統との間の相差角が小さい順に一つずつ操作中系統を選択するようにしてもよい。   In the process of creating the system switching procedure plan described above, in (S517), the operating system is selected one by one in descending order of supply reliability from the extracted work system candidates. The operating system may be selected one by one in ascending order of phase difference angle.

また、エラー処理(S523)の後、処理を終了せず、他の作業系統候補を操作中系統として選択するように(S514)や(S517)に進むようにしてもよい。また、図2に示す作業系統の決定処理に戻り、他の作業系統を決定するようにしてもよい。   Further, after the error process (S523), the process may not be terminated, and the process may proceed to (S514) or (S517) so as to select another work system candidate as the operating system. Further, returning to the work system determination process shown in FIG. 2, another work system may be determined.

また、本実施形態では、図6に示す作業系統候補の復活処理において、事故対策の有無チェック(S419、図7)により、供給信頼度の最も高い詳細系統を復旧目標系統として決定(S444)した後に、作業系統候補から復旧目標系統までの切替手順計画の作成可否をチェック(S421)するようにしたが、事故対策の有無のチェック処理(S419、図7)において運用制約を満たす詳細系統のうち、供給信頼度の最も高いものを復旧目標系統として決定するようにしてもよい。この場合、運用制約を満たす詳細系統が残っていなければ、事故対策がないと判定するようにする。   Further, in the present embodiment, in the restoration process of the work system candidates shown in FIG. 6, the detailed system with the highest supply reliability is determined as the recovery target system (S444) by checking whether there is an accident countermeasure (S419, FIG. 7). Later, it was checked whether or not a switching procedure plan from the work system candidate to the recovery target system could be created (S421). However, among the detailed systems that satisfy the operational constraints in the check process for accident countermeasures (S419, Fig. 7) The one with the highest supply reliability may be determined as the recovery target system. In this case, if there is no detailed system that satisfies the operational constraints, it is determined that there is no accident countermeasure.

また、本実施形態では、切替手順計画の作成可否チェック処理(S421)において、一般的な手法により切替手順計画を作成するものとしたが、上述した図11の処理を用いて切替手順計画を作成するようにしてもよい。すなわち、CPUとメモリとを有するコンピュータが、前記電力系統における前記電力設備のそれぞれの状態の組合せからなる常時系統を前記メモリに記憶し、前記電力設備を特定する情報に対応付けて、前記電力系統の供給信頼度を算出するための信頼度情報を前記メモリに記憶し、停電作業の対象となる電力設備である停電対象設備の指定を受け付け、前記電力系統において前記停電対象設備が停電状態となる、前記電力系統における前記電力設備のそれぞれの状態の組合せからなる作業系統候補を生成し、前記作業系統候補のそれぞれについて、前記作業系統候補における前記電力設備の状態と、前記作業系統候補における前記電力設備に対応する前記信頼度情報とに基づいて、前記供給信頼度を算出し、算出した前記供給信頼度に基づいて、前記作業系統候補の一つである作業系統を決定し、前記作業系統と異なる前記作業系統候補のうち、前記作業系統候補における、通電状態となっている前記電力設備の数である通電設備数と、前記常時系統における前記通電設備数との差が所定範囲内であるものを選択し、前記算出した前記供給信頼度に基づいて、前記選択した前記作業系統候補のうちの一つを操作中系統として決定して、切替手順計画を作成するようにすることができる。この場合、コンピュータにより実現される系統切替手順計画システムは、CPUとメモリと、前記電力系統における前記電力設備のそれぞれの状態の組合せからなる常時系統を記憶する常時系統記憶部と、前記電力設備を特定する情報に対応付けて、前記電力系統の供給信頼度を算出するための信頼度情報を記憶する信頼度情報記憶部と、停電作業の対象となる電力設備である停電対象設備の指定を受け付ける停電対象設備入力部と、前記電力系統において前記停電対象設備が停電状態となる、前記電力系統における前記電力設備のそれぞれの状態の組合せからなる作業系統候補を生成する作業系統候補生成部と、前記作業系統候補のそれぞれについて、前記作業系統候補における前記電力設備の状態と、前記作業系統候補における前記電力設備に対応する前記信頼度情報とに基づいて、前記供給信頼度を算出する供給信頼度算出部と、算出した前記供給信頼度に基づいて、前記作業系統候補の一つである作業系統を決定する作業系統決定部と、前記作業系統と異なる前記作業系統候補のうち、前記作業系統候補における、通電状態となっている前記電力設備の数である通電設備数と、前記常時系統における前記通電設備数との差が所定範囲内であるものを選択する操作中系統候補選択部と、前記算出した前記供給信頼度に基づいて、前記選択した前記作業系統候補のうちの一つを操作中系統として決定する操作中系統決定部と、を備えることになる。   In this embodiment, in the switching procedure plan creation availability check process (S421), the switching procedure plan is created by a general method. However, the switching procedure plan is created by using the processing shown in FIG. You may make it do. That is, a computer having a CPU and a memory stores, in the memory, a continuous system composed of a combination of the states of the power equipment in the power system, and associates the power system with information for specifying the power equipment. The reliability information for calculating the supply reliability of the power is stored in the memory, the designation of the power outage target equipment that is the target of the power outage work is received, and the power outage target equipment is in a power outage state in the power system. Generating a work system candidate comprising a combination of the states of the power equipment in the power system, and for each of the work system candidates, the state of the power equipment in the work system candidate and the power in the work system candidate The supply reliability is calculated based on the reliability information corresponding to the facility, and based on the calculated supply reliability. And determining a work system that is one of the work system candidates, and among the work system candidates that are different from the work system, the energization equipment that is the number of the power facilities in the energized state in the work system candidate A difference between the number and the number of energized equipment in the regular system is within a predetermined range, and one of the selected work system candidates is operated based on the calculated supply reliability It is possible to determine the middle system and create a switching procedure plan. In this case, a system switching procedure planning system realized by a computer includes a CPU, a memory, a continuous system storage unit that stores a continuous system composed of a combination of the states of the power equipment in the power system, and the power equipment. In association with the information to be specified, a reliability information storage unit that stores reliability information for calculating the supply reliability of the power system, and designation of a power outage target facility that is a power facility subject to a power outage operation are received. The power failure target facility input unit, the power failure target facility in the power system is in a power failure state, a work system candidate generation unit that generates a work system candidate consisting of a combination of the states of the power facility in the power system, For each of the work system candidates, the state of the power equipment in the work system candidates and the power in the work system candidates A supply reliability calculation unit that calculates the supply reliability based on the reliability information corresponding to the preparation, and a work system that is one of the work system candidates is determined based on the calculated supply reliability. Among the work system candidates that are different from the work system, the number of energized equipment that is the number of the power facilities that are energized in the work system candidate, and the energized equipment in the regular system An in-operation system candidate selection unit that selects a difference between the number and the number within a predetermined range; and, based on the calculated supply reliability, one of the selected work system candidates as an in-operation system And an in-operation system determination unit to determine.

また、前記コンピュータは、前記常時系統と、前記操作中系統と、前記作業系統とを出力装置に出力するようにしてもよい。この場合、系統切替手順計画システムは、前記常時系統と、前記操作中系統と、前記作業系統とを出力装置に出力する操作票出力部を備えることになる。   The computer may output the continuous system, the operating system, and the work system to an output device. In this case, the system switching procedure planning system includes an operation form output unit that outputs the continuous system, the operating system, and the work system to an output device.

また、前記コンピュータは、前記電力系統が前記常時系統から前記作業系統に至るまでの複数の前記操作中系統を前記メモリに記憶するようにしてもよい。   In addition, the computer may store a plurality of the operating systems from the constant system to the working system in the memory.

また、前記コンピュータは、前記複数の操作中系統の一つの指定を受け付け、指定された前記操作中系統を出力装置に出力するようにしてもよい。   The computer may receive one designation of the plurality of operating systems and output the designated operating system to an output device.

また、前記コンピュータは、前記電力設備のうち、前記常時系統と前記作業系統との間で状態が変化している前記電力設備である差分設備を前記メモリに記憶し、前記作業系統と異なる前記作業系統候補のうち、前記作業系統候補における前記通電設備数と、前記常時系統における前記通電設備数との差が所定範囲内であり、前記作業系統候補における前記差分設備の状態と、前記操作中系統における前記差分設備の状態とが変化しているものを選択するようにしてもよい。   In addition, the computer stores, in the memory, differential equipment that is the power equipment whose state is changing between the regular system and the work system, and the work different from the work system. Among the system candidates, the difference between the number of energized facilities in the work system candidate and the number of energized facilities in the regular system is within a predetermined range, the state of the differential facility in the work system candidate, and the operating system You may make it select the thing in which the state of the said difference equipment in has changed.

また、前記コンピュータは、前記作業系統と異なる前記作業系統候補のうち、前記作業系統候補における前記通電設備数が、前記常時系統における前記通電設備数から1減算した数になっているものである選択作業系統候補を選択し、前記選択作業系統候補がない場合は、前記作業系統とは異なる前記作業系統候補のうち、前記作業系統候補における前記通電設備数が、前記常時系統における前記通電設備数に1加算した数になっているものを選択するようにしてもよい。   Further, the computer selects the number of energized equipment in the work system candidate among the work system candidates different from the work system, which is a number obtained by subtracting 1 from the number of energized equipment in the always-on system. When a work system candidate is selected and there is no selected work system candidate, among the work system candidates different from the work system, the number of energized equipment in the work system candidate is equal to the number of energized equipment in the regular system. You may make it select the thing which becomes the number added 1.

また、前記コンピュータは、前記電力系統を運用する上での制約を示す運用制約情報を前記メモリに記憶し、前記供給信頼度と前記運用制約情報とに基づいて、前記作業系統を決定するようにしてもよい。この場合、系統切替手順計画システムは、前記電力系統における前記電力設備の通停電を行う上での制約を示す操作制約情報を記憶する操作制約情報記憶部を備え、前記操作中系統決定部は、前記供給信頼度と前記操作制約情報とに基づいて、前記操作中系統を決定することになる。   In addition, the computer stores operation constraint information indicating a constraint in operating the power system in the memory, and determines the work system based on the supply reliability and the operation constraint information. May be. In this case, the system switching procedure planning system includes an operation constraint information storage unit that stores operation constraint information indicating constraints on performing a power failure of the power facility in the power system, and the in-operation system determination unit includes: The operating system is determined based on the supply reliability and the operation constraint information.

また、前記コンピュータは、前記電力系統における前記電力設備の通停電を行う上での制約を示す操作制約情報を前記メモリに記憶し、前記供給信頼度と前記操作制約情報とに基づいて、前記操作中系統を決定するようにしてもよい。   Further, the computer stores operation restriction information indicating restrictions on performing power failure of the power facility in the power system in the memory, and the operation is performed based on the supply reliability and the operation restriction information. The middle system may be determined.

また、前記コンピュータは、前記供給信頼度が最も高い前記作業系統候補を前記操作中系統として決定するようにしてもよい。   The computer may determine the work system candidate having the highest supply reliability as the operating system.

また、前記コンピュータは、前記作業系統候補のうち、前記常時系統と前記作業系統候補との相差角が所定の範囲内である前記作業系統候補の一つを、前記供給信頼度に基づいて前記操作中系統として決定するようにしてもよい。   Further, the computer selects one of the work system candidates whose phase difference angle between the normal system and the work system candidate is within a predetermined range among the work system candidates based on the supply reliability. You may make it determine as a middle system.

また、前記コンピュータは、前記常時系統と前記作業系統後方との相差角の前記所定の範囲を特定する相差角範囲情報の入力を受け付け、受け付けた前記相差角範囲情報を前記メモリに記憶するようにしてもよい。   Further, the computer accepts input of phase difference angle range information specifying the predetermined range of the phase difference angle between the regular system and the rear of the work system, and stores the received phase difference range information in the memory. May be.

また、前記コンピュータは、前記作業系統候補のうち、前記常時系統と前記作業系統候補との相差角が所定の範囲内である前記作業系統候補の一つを、前記供給信頼度と前記相差角とに基づいて前記操作中系統として決定するようにしてもよい。   Further, the computer selects one of the work system candidates whose phase difference angle between the normal system and the work system candidate is within a predetermined range among the work system candidates, the supply reliability and the phase difference angle. May be determined as the operating system.

また、前記電力系統を構成する前記電力設備には、発電機、送電線、変圧器の少なくともいずれかが含まれるようにしてもよい。   In addition, the power equipment constituting the power system may include at least one of a generator, a transmission line, and a transformer.

以上、本実施形態について説明したが、上記実施形態は本発明の理解を容易にするためのものであり、本発明を限定して解釈するためのものではない。本発明は、その趣旨を逸脱することなく、変更、改良され得ると共に、本発明にはその等価物も含まれる。   Although the present embodiment has been described above, the above embodiment is intended to facilitate understanding of the present invention and is not intended to limit the present invention. The present invention can be changed and improved without departing from the gist thereof, and the present invention includes equivalents thereof.

200 情報処理装置
201 CPU
202 メモリ
202c プログラム
205 入力装置
206 出力装置
207 記録媒体
208 記憶装置
S311 縮約系統生成処理
S312 詳細系統生成処理
S313 停電作業設備の組合せ処理
S314 候補生成処理
S315 系統損失電力計算処理
S316 N−M系統作成処理
S317 運用制約を満たすかどうかの判断処理
S318 N−2供給支障電力計算処理
S319 N−2過負荷量計算処理
S320 N−2余裕電力量計算処理
S321 バランス断面ごとの繰り返し計算処理
S322 作業系統候補の復活処理
S323 ソート処理
S325 停電作業要求を満たす系統構成の選択処理
S328 計画期間内の供給信頼度の高い停電作業計画の作成処理
200 Information processing apparatus 201 CPU
202 Memory 202c Program 205 Input Device 206 Output Device 207 Recording Medium 208 Storage Device S311 Reduced System Generation Processing
S312 Detailed system generation processing
S313 Combination processing of power failure work equipment
S314 candidate generation processing
S315 Power loss calculation processing
S316 NM system creation process S317 Judgment process whether operation constraint is satisfied
S318 N-2 supply hindrance power calculation processing
S319 N-2 overload calculation processing
S320 N-2 margin energy calculation process
S321 Iterative calculation process for each balance section
S322 Work system candidate restoration process S323 Sort process S325 System configuration selection process that satisfies power outage work request
S328 Create power outage work plan with high supply reliability within the planning period

Claims (5)

複数の電力設備によって構成される電力系統の停電作業計画に用いられる停電作業計画システムであって、
停電作業の対象となる電力設備である停電対象設備の指定を受け付ける指定手段と、
前記電力系統において前記停電対象設備が停電状態となる、前記電力系統における前記電力設備のそれぞれの状態の組合せからなる作業系統候補を生成する作業系統候補生成手段と、
前記各作業系統候補について、前記停電対象設備以外の前記電力設備の少なくともひとつを停電状態とした電力系統であるN−1系統を生成するN−1系統生成手段と、
前記各作業系統候補について、対応する前記N−1系統の全てが所定の運用制約を満たすか否かに応じて、前記作業系統候補の運用可否を判定する運用可否判定手段と、
前記運用可能な作業系統候補が存在しない場合に、前記各作業系統候補に対応する前記N−1系統のうち前記運用制約を満たさないものについて、当該運用制約を満たさないN−1系統とは異なる他の電力系統のうち、当該N−1系統における前記各電力設備の状態と、前記他の電力系統における前記各電力設備の状態とが異なる数が所定値以下のものである復旧目標系統候補を抽出し、前記復旧目標系統候補のうち前記運用制約を満たすものが存在するときには、当該作業系統候補は運用可能と判定する復活手段と、
前記運用可能な作業系統の中から、停電作業計画として採用すべき作業系統を決定する作業計画決定手段と、
を備えることを特徴とする停電作業計画システム。
A power outage work planning system used for a power outage work plan of a power system composed of a plurality of power facilities,
A designation means for accepting designation of a power outage target facility which is a power facility subject to the power outage work,
Work system candidate generating means for generating a work system candidate consisting of a combination of states of the power facilities in the power system, wherein the power outage target facility is in a power outage state in the power system,
For each work system candidate, an N-1 system generating means for generating an N-1 system that is an electric power system in which at least one of the electric power facilities other than the power outage target equipment is in a power outage state;
For each of the work system candidates, an operation availability determination unit that determines whether the work system candidates can be operated according to whether all of the corresponding N-1 systems satisfy a predetermined operation constraint;
When there is no operable work system candidate, the N-1 system corresponding to each work system candidate is different from the N-1 system that does not satisfy the operation restriction for the N-1 system that does not satisfy the operation restriction. Among other power systems, restoration target system candidates in which the number of states of each power equipment in the N-1 system and the state of each power equipment in the other power system are less than or equal to a predetermined value. And when there is a recovery target system candidate that satisfies the operation constraint, the recovery system system determines that the work system candidate is operable,
Work plan determination means for determining a work system to be adopted as a power outage work plan from the operational work systems,
A blackout work planning system characterized by comprising:
請求項1に記載の停電作業計画システムであって、
前記電力設備を特定する情報に対応付けて、前記電力系統の供給信頼度を算出するための信頼度情報を記憶する記憶手段と、
前記作業系統候補および前記N−1系統の各々について、前記記憶手段に記憶されている各電力設備に関する情報に基づいて、供給信頼度を決定する供給信頼度決定手段と、
を備え、
前記運用可否判定手段は、前記作業系統候補の前記供給信頼度に応じて、前記作業系統候補の運用可否を判定し、
前記復活手段は、前記N−1系統の前記供給信頼度に応じて、前記N−1系統が運用制約を満たすか否かを判定すること、
を特徴とする停電作業計画システム。
The power outage planning system according to claim 1,
Storage means for storing reliability information for calculating supply reliability of the power system in association with information for specifying the power equipment;
For each of the work system candidates and the N-1 system, supply reliability determination means for determining supply reliability based on information on each power facility stored in the storage means;
With
The operation availability determination means determines the operation availability of the work system candidate according to the supply reliability of the work system candidate,
The resurrection means determines whether or not the N-1 system satisfies operational restrictions according to the supply reliability of the N-1 system;
Power failure work planning system characterized by
請求項1に記載の停電作業計画システムであって、
前記電力設備を特定する情報に対応付けて、前記電力系統の供給信頼度を算出するための信頼度情報を記憶する記憶手段を備え、
前記復活手段は、前記運用制約を満たす復旧目標系統候補について前記供給信頼度を算出し、前記供給信頼度の最も高い前記復旧目標系統候補を復旧目標系統として決定し、
前記記憶手段は、前記N−1系統に対応付けて前記復旧目標系統を記憶すること、
を特徴とする停電作業計画システム。
The power outage planning system according to claim 1,
Corresponding to the information specifying the electric power equipment, comprising storage means for storing reliability information for calculating the supply reliability of the electric power system,
The resurrection means calculates the supply reliability for a recovery target system candidate that satisfies the operation constraint, determines the recovery target system candidate with the highest supply reliability as a recovery target system,
The storage means stores the recovery target system in association with the N-1 system;
Power failure work planning system characterized by
複数の電力設備により構成される電力系統の停電作業計画に用いられる停電作業計画方法であって、
コンピュータが、
停電作業の対象となる電力設備である停電対象設備の指定を受け付け、
前記電力系統において前記停電対象設備が停電状態となる、前記電力系統における前記電力設備のそれぞれの状態の組合せからなる作業系統候補を生成し、
前記各作業系統候補について、前記停電対象設備以外の前記電力設備の少なくともひとつを停電状態とした電力系統であるN−1系統を生成し、
前記各作業系統候補について、対応する前記N−1系統の全てが所定の運用制約を満たすか否かに応じて、前記作業系統候補の運用可否を判定し、
前記運用可能な作業系統候補が存在しない場合に、前記各作業系統候補に対応する前記N−1系統のうち前記運用制約を満たさないものについて、当該運用制約を満たさないN−1系統とは異なる他の電力系統のうち、当該N−1系統における前記各電力設備の状態と、前記他の電力系統における前記各電力設備の状態とが異なる数が所定値以下のものである復旧目標系統候補を抽出し、前記復旧目標系統候補のうち前記運用制約を満たすものが存在するときには、当該作業系統候補は運用可能と判定し、
前記運用可能な作業系統の中から、停電作業計画として採用すべき作業系統を決定すること、
を特徴とする停電作業計画方法。
A power outage work planning method used for a power outage work plan of a power system composed of a plurality of power facilities,
Computer
Accepting designation of power outage target equipment that is the target of power outage work,
In the power system, the power outage target facility is in a power outage state, generating a work system candidate consisting of a combination of the states of the power equipment in the power system,
For each work system candidate, generate an N-1 system that is a power system in which at least one of the power facilities other than the power outage target facility is in a power outage state,
For each work system candidate, depending on whether all of the corresponding N-1 systems satisfy a predetermined operation constraint, determine whether the work system candidate can be operated,
When there is no operable work system candidate, the N-1 system corresponding to each work system candidate is different from the N-1 system that does not satisfy the operation restriction for the N-1 system that does not satisfy the operation restriction. Among other power systems, restoration target system candidates in which the number of states of each power equipment in the N-1 system and the state of each power equipment in the other power system are less than or equal to a predetermined value. Extract, and when there is a recovery target system candidate that satisfies the operation constraints, determine that the work system candidate is operable,
Determining a work system to be adopted as a power outage work plan from the operable work systems;
Power outage planning method characterized by
複数の電力設備により構成される電力系統の停電作業計画に用いられるプログラムであって、
コンピュータに、
停電作業の対象となる電力設備である停電対象設備の指定を受け付けるステップと、
前記電力系統において前記停電対象設備が停電状態となる、前記電力系統における前記電力設備のそれぞれの状態の組合せからなる作業系統候補を生成するステップと、
前記各作業系統候補について、前記停電対象設備以外の前記電力設備の少なくともひとつを停電状態とした電力系統であるN−1系統を生成するステップと、
前記各作業系統候補について、対応する前記N−1系統の全てが所定の運用制約を満たすか否かに応じて、前記作業系統候補の運用可否を判定するステップと、
前記運用可能な作業系統候補が存在しない場合に、前記各作業系統候補に対応する前記N−1系統のうち前記運用制約を満たさないものについて、当該運用制約を満たさないN−1系統とは異なる他の電力系統のうち、当該N−1系統における前記各電力設備の状態と、前記他の電力系統における前記各電力設備の状態とが異なる数が所定値以下のものである復旧目標系統候補を抽出し、前記復旧目標系統候補のうち前記運用制約を満たすものが存在するときには、当該作業系統候補は運用可能と判定するステップと、
前記運用可能な作業系統の中から、停電作業計画として採用すべき作業系統を決定するステップと、
を実行させるためのプログラム。
A program used in a power outage work plan for a power system composed of a plurality of power facilities,
On the computer,
A step of receiving designation of a power outage target facility that is a power facility subject to the power outage work;
Generating a work system candidate consisting of a combination of each state of the power equipment in the power system, wherein the power outage target equipment is in a power outage state in the power system;
For each work system candidate, generating an N-1 system that is a power system in which at least one of the power facilities other than the power outage target facility is in a power outage state;
For each of the work system candidates, determining whether or not the work system candidates can be operated according to whether or not all of the corresponding N-1 systems satisfy a predetermined operation constraint;
When there is no operable work system candidate, the N-1 system corresponding to each work system candidate is different from the N-1 system that does not satisfy the operation restriction for the N-1 system that does not satisfy the operation restriction. Among other power systems, restoration target system candidates in which the number of states of each power equipment in the N-1 system and the state of each power equipment in the other power system are less than or equal to a predetermined value. Extracting, and when there is a recovery target system candidate that satisfies the operation constraint, determining that the work system candidate is operable;
Determining a work system to be adopted as a power outage work plan from the operable work systems;
A program for running
JP2010044657A 2010-03-01 2010-03-01 Recovery work planning system, blackout work planning method and program Expired - Fee Related JP5493170B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2010044657A JP5493170B2 (en) 2010-03-01 2010-03-01 Recovery work planning system, blackout work planning method and program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2010044657A JP5493170B2 (en) 2010-03-01 2010-03-01 Recovery work planning system, blackout work planning method and program

Publications (2)

Publication Number Publication Date
JP2011182557A JP2011182557A (en) 2011-09-15
JP5493170B2 true JP5493170B2 (en) 2014-05-14

Family

ID=44693479

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2010044657A Expired - Fee Related JP5493170B2 (en) 2010-03-01 2010-03-01 Recovery work planning system, blackout work planning method and program

Country Status (1)

Country Link
JP (1) JP5493170B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101278309B1 (en) * 2011-11-07 2013-06-25 엘에스산전 주식회사 Outage schedule management apparatus and method in ems
CN112541601B (en) * 2020-12-14 2024-07-12 深圳供电局有限公司 Application form generation method, application form generation device, computer equipment and storage medium
CN113036821B (en) * 2021-04-20 2023-08-01 国网四川省电力公司经济技术研究院 Method and system for constructing an AC-DC coordinated backbone network framework for massive DC transmission

Also Published As

Publication number Publication date
JP2011182557A (en) 2011-09-15

Similar Documents

Publication Publication Date Title
CN102474131B (en) Comprehensive monitoring and control system for smart grid and microgrid
Bouffard et al. Market-clearing with stochastic security-part I: formulation
Gjorgiev et al. Cascade-risk-informed transmission expansion planning of AC electric power systems
Sun et al. Network partitioning strategy for parallel power system restoration
Hu et al. Optimal reliability allocation of±800 kV ultra HVDC transmission systems
US10103575B2 (en) Power interchange management system and power interchange management method for maintaining a balance between power supply and demand
JP5493170B2 (en) Recovery work planning system, blackout work planning method and program
JP2008271625A (en) Electric power system shutdown system, method, and program
US9502898B2 (en) Systems and methods for managing a power distribution system
Aziz et al. Two-stage MILP model for optimal skeleton-network reconfiguration of power system for grid-resilience enhancement
JP2025001037A (en) Power outage risk evaluation system and power outage risk evaluation method
US20130197706A1 (en) Systems and Methods for Dynamic Islanding to Minimize Load Shed During Restoration After a Fault
Alizadeh et al. Resiliency‐oriented islanding of distribution network in the presence of charging stations for electric vehicles
Guo et al. Contingency-constrained unit commitment with intervening time for system adjustments
CN107069801A (en) A kind of power distribution network isolated island division methods based on minimum Custom interruption cost
JP4185835B2 (en) Blackout work planning system, blackout work planning method, and program
Propst et al. Improvements in modeling and evaluation of electrical power system reliability
JP4341034B2 (en) System switching procedure planning method, system switching procedure planning system, program, and recording medium
JP6836530B2 (en) Computer system and system configuration management method
El-Werfelli et al. Backbone-network reconfiguration for power system restoration using genetic algorithm and expert system
Taheri et al. Hardening strategy to boost resilience of distribution systems via harnessing a proactive operation model
JP2008086152A (en) Method of generating work system, power failure work planning method, work system generating system, power failure work planning system, and program
JP2018055567A (en) Risk evaluation device, evaluation method of risk variation and program
CN111047188A (en) Power failure plan generation method and system, computer equipment and storage medium
CN117559427A (en) Power grid fault handling methods, devices, electronic equipment and storage media

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20130301

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20130301

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20140122

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20140128

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20140210

R150 Certificate of patent or registration of utility model

Ref document number: 5493170

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees