Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP5506122B2 - Reinforcement method of outer steel tube concrete composite pile - Google Patents
[go: Go Back, main page]

JP5506122B2 - Reinforcement method of outer steel tube concrete composite pile - Google Patents

Reinforcement method of outer steel tube concrete composite pile Download PDF

Info

Publication number
JP5506122B2
JP5506122B2 JP2013077181A JP2013077181A JP5506122B2 JP 5506122 B2 JP5506122 B2 JP 5506122B2 JP 2013077181 A JP2013077181 A JP 2013077181A JP 2013077181 A JP2013077181 A JP 2013077181A JP 5506122 B2 JP5506122 B2 JP 5506122B2
Authority
JP
Japan
Prior art keywords
concrete
pile
axial
steel pipe
pile body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2013077181A
Other languages
Japanese (ja)
Other versions
JP2013130058A (en
Inventor
正治 梅澤
哲 豊田
健一 金子
徹 岡部
昌弘 上村
勉 井川
洋平 寺川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Concrete Industries Co Ltd
Original Assignee
Nippon Concrete Industries Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Concrete Industries Co Ltd filed Critical Nippon Concrete Industries Co Ltd
Priority to JP2013077181A priority Critical patent/JP5506122B2/en
Publication of JP2013130058A publication Critical patent/JP2013130058A/en
Application granted granted Critical
Publication of JP5506122B2 publication Critical patent/JP5506122B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)
  • Foundations (AREA)

Description

本発明は、杭本体部の頭部内に複数の軸方向鉄筋が埋込まれた外殻鋼管コンクリート合成杭の鉄筋を現す方法に関する。   The present invention relates to a method for revealing a reinforcing bar of a shell steel pipe concrete composite pile in which a plurality of axial reinforcing bars are embedded in the head of a pile main body.

外殻鋼管コンクリート合成杭(SC杭)の埋設後、杭とフーチングとの結合を行なう場合、図7(a)から(b)に示されるようにSC杭1の頭頂部の外殻鋼管2に切れ目3,4を入れて、その杭頭頂部の外殻鋼管2のみを剥ぎ取り、図7(b)から(c)に示されるように杭本体のコンクリート5を壊して、杭製造時に予めコンクリート5内に埋め込んだ補強鉄筋6をはつり出し、図7(d)に示されるようにこれらの補強鉄筋6を介してSC杭1とフーチング7との結合を行なう施工方法が用いられている。   When the pile and footing are connected after burying the outer shell steel pipe concrete composite pile (SC pile), as shown in FIGS. 7 (a) to 7 (b), the outer shell steel pipe 2 at the top of the SC pile 1 is formed. The cuts 3 and 4 are made, and only the outer shell steel pipe 2 at the top of the pile is peeled off, and the concrete 5 of the pile body is broken as shown in FIGS. A construction method is used in which the reinforcing reinforcing bars 6 embedded in 5 are pulled out and the SC piles 1 and the footings 7 are coupled via the reinforcing reinforcing bars 6 as shown in FIG.

このように、SC杭1の外殻鋼管2を剥す作業は、この外殻鋼管2の切断作業を伴なうため、多くの時間と労力を必要とし、さらに、外殻鋼管2は平板を巻いて溶接し成形されているため残留応力があり、外殻鋼管2の切断作業において外殻鋼管2に切り込みを入れた段階で、拘束されていた外殻鋼管2が弾けるおそれが有る。   As described above, the operation of peeling off the outer shell steel pipe 2 of the SC pile 1 involves cutting the outer shell steel pipe 2 and requires a lot of time and labor. Further, the outer shell steel pipe 2 winds a flat plate. Therefore, there is a possibility that the constrained outer shell steel pipe 2 may be repelled when the outer shell steel pipe 2 is cut in the cutting operation of the outer shell steel pipe 2.

これに対し、コンクリート筒状体をその端面から所定の長さにわたって露出させてコンクリート筒状体の残余の部分を外殻鋼管にて被覆するSC杭がある。このSC杭は、複数のアンカー鉄筋を露出させるに際し、被覆された外殻鋼管を溶断して除去する作業上の手間を省略できる利点がある(例えば、特許文献1参照)。   On the other hand, there is an SC pile in which a concrete cylindrical body is exposed from its end face over a predetermined length and the remaining portion of the concrete cylindrical body is covered with a shell steel pipe. This SC pile has the advantage that it can eliminate the labor in the work of fusing and removing the coated outer shell steel pipe when exposing a plurality of anchor reinforcing bars (see, for example, Patent Document 1).

特開平7−18675号公報(第2−3頁、図4−5)Japanese Patent Laid-Open No. 7-18675 (page 2-3, FIG. 4-5)

しかしながら、このような外殻鋼管の一部を省略したSC杭であっても、それらの杭頭頂部のコンクリートを壊し、補強鉄筋をはつり出す作業は必要であり、それらの作業に時間と労力がかかるため、コスト負担が増大する問題があり、コンクリート破砕時に内部の補強鉄筋を損傷するおそれもある。   However, even with such SC piles that omit some of the outer shell steel pipes, it is necessary to break the concrete at the top of the piles and lift out the reinforcing bars, which takes time and effort. For this reason, there is a problem that the cost burden increases, and there is a possibility that the internal reinforcing steel bars may be damaged when the concrete is crushed.

本発明は、このような点に鑑みなされたもので、コンクリート破砕・鉄筋はつり出し作業を簡略化できる外殻鋼管コンクリート合成杭の鉄筋を現す方法を提供することを目的とするものである。   This invention is made | formed in view of such a point, and it aims at providing the method of revealing the reinforcing steel of a shell steel pipe concrete composite pile which can simplify a concrete crushing and reinforcing steel bar lifting operation.

請求項1に記載された発明は、コンクリートにより成形された杭本体部と、この杭本体部の一端部に仕切座板を介して形成され杭本体部に解除可能に締付固定された除去予定コンクリート部と、杭本体部から除去予定コンクリート部にわたってそれらの内部に埋込まれた複数の軸方向鉄筋と、これらの軸方向鉄筋のうち除去予定コンクリート部に対応する部分にそれぞれ被嵌されて軸方向鉄筋と除去予定コンクリート部との結合を阻止する管と、杭本体部の外周面に設けられた外殻鋼管と、除去予定コンクリート部の外周面に成型された外殻鋼管のないコンクリート露出部とを具備した外殻鋼管コンクリート合成杭の鉄筋を現す方法であって、除去予定コンクリート部の締付固定を解除し、除去予定コンクリート部を吊り上げ、杭本体部から分離された除去予定コンクリート部を軸方向鉄筋から引抜き、軸方向鉄筋を現すようにした外殻鋼管コンクリート合成杭の鉄筋を現す方法である。 The invention described in claim 1 is a pile main body formed of concrete, and a removal plan that is formed on one end of the pile main body via a partition seat plate and is releasably fastened to the pile main body. A concrete part, a plurality of axial rebars embedded in the concrete part from the pile body part to the concrete part to be removed, and a shaft that is respectively fitted to a part corresponding to the concrete part to be removed among these axial reinforcing bars. A pipe that prevents the directional reinforcing bar and the concrete part to be removed from being joined, a shell steel pipe provided on the outer peripheral surface of the pile body part, and a concrete exposed part without the outer steel pipe formed on the outer peripheral surface of the concrete part to be removed a method of representing a rebar shell steel concrete composite piles provided with the bets, to release the clamping fixation of the to be removed concrete section, lifting the removal planned concrete section, from the pile body portion Pull the isolated removal planned concrete section from the longitudinal bars, is a method of representing the rebar shell steel concrete composite piles were to reveal longitudinal bars.

請求項2に記載された発明は、コンクリートにより成形された杭本体部と、この杭本体部の一端部に仕切座板を介して形成された除去予定コンクリート部と、杭本体部から除去予定コンクリート部にわたってそれらの内部に埋込まれた複数の軸方向鉄筋と、これらの軸方向鉄筋のうち除去予定コンクリート部に対応する部分にそれぞれ被嵌されて軸方向鉄筋と除去予定コンクリート部との結合を阻止する管と、各軸方向鉄筋の外端部にそれぞれ形成されたネジ、およびこれらのネジと螺合して除去予定コンクリート部を杭本体部に締付固定するナットと、杭本体部の外周面に設けられた外殻鋼管と、除去予定コンクリート部の外周面に成型された外殻鋼管のないコンクリート露出部とを具備した外殻鋼管コンクリート合成杭の鉄筋を現す方法であって、ナットによる締付固定を解除し、除去予定コンクリート部を吊り上げ、杭本体部から分離された除去予定コンクリート部を軸方向鉄筋から引抜き、軸方向鉄筋を現すようにした外殻鋼管コンクリート合成杭の鉄筋を現す方法である。   The invention described in claim 2 is a pile main body formed from concrete, a concrete to be removed formed at one end of the pile main body via a partition plate, and concrete to be removed from the pile main body. A plurality of axial rebars embedded within them, and the axial rebars and the concrete portions to be removed are respectively fitted to the portions corresponding to the concrete portions to be removed of these axial rebars. Pipes to be blocked, screws formed on the outer ends of the respective axial reinforcing bars, nuts to be screwed into these screws to fix the concrete part to be removed to the pile body part, and the outer periphery of the pile body part A method for revealing the reinforcing steel of a steel pipe concrete composite pile with a shell steel pipe provided on the surface and a concrete exposed part without a shell steel pipe formed on the outer peripheral surface of the concrete part to be removed Clamping with nuts is released, the concrete part to be removed is lifted, the concrete part to be removed separated from the pile main body part is pulled out from the axial rebar, and the outer shell steel pipe concrete composition is made to reveal the axial rebar. It is a method to reveal the reinforcing bars of the pile.

請求項1記載の発明によれば、除去予定コンクリート部を杭本体部に解除可能に締付固定するので、この締付固定を解除するまでは、除去予定コンクリート部を杭本体部に一体化でき、除去予定コンクリート部のひび割れなどの製品価値の低下を防止でき、また、外殻鋼管コンクリート合成杭においてコンクリートにより成形された杭本体部から、この杭本体部の一端部に仕切座板を介して形成された除去予定コンクリート部にわたって、それらの内部に複数の軸方向鉄筋を埋込み、これらの軸方向鉄筋のうち除去予定コンクリート部に対応する部分にそれぞれ管を被嵌して軸方向鉄筋と除去予定コンクリート部との結合を阻止するので、軸方向鉄筋を現すときは、除去予定コンクリート部の締付固定を解除し、これらの管により軸方向鉄筋との結合を阻止された除去予定コンクリート部を吊り上げることで、除去予定コンクリート部のみを容易に抜出すことができ、コンクリートの破砕・軸方向鉄筋のはつり出し作業を簡略化でき、これらの作業に要する時間、負担および費用を削減できる。 According to the first aspect of the present invention, the concrete portion to be removed is fastened and fixed to the pile main body so as to be releasable. Therefore, the concrete portion to be removed can be integrated with the pile main body until the fastening is released. The product value such as cracking of the concrete part to be removed can be prevented, and the pile body part formed by concrete in the outer shell steel pipe concrete composite pile can be connected to one end part of this pile body part through a partition plate. A plurality of axial rebars are embedded inside the concrete part to be removed, and the pipes are fitted to the parts corresponding to the concrete part to be removed, and the axial rebar and the part are to be removed. since blocking binding to the concrete part, when representing the longitudinal bars, to release the clamping fixation of the to be removed concrete section, longitudinal bars by the tubes By lifting the concrete part to be removed that is prevented from joining, only the concrete part to be removed can be easily pulled out, and the crushing of concrete and the lifting of the axial rebar can be simplified. Save time, burden and money.

請求項2記載の発明によれば、各軸方向鉄筋の外端部にそれぞれ形成されたネジおよびこれらのネジと螺合するナットにより除去予定コンクリート部を杭本体部に締付固定するので、ナットによる締付固定を解除するまでは、除去予定コンクリート部を杭本体部に一体化でき、除去予定コンクリート部のひび割れなどの製品価値の低下を防止できるとともに、軸方向鉄筋を現すときは、ナットによる締付固定を解除し、除去予定コンクリート部を吊り上げることで、除去予定コンクリート部のみを容易に抜出すことができ、コンクリートの破砕・軸方向鉄筋のはつり出し作業を簡略化でき、これらの作業に要する時間、負担および費用を削減できる。   According to the second aspect of the present invention, the concrete portion to be removed is fastened and fixed to the pile body portion by the screws respectively formed at the outer end portions of the respective axial reinforcing bars and the nuts screwed to these screws. Until it is released, the concrete part to be removed can be integrated with the main body of the pile, and the product value such as cracks in the concrete part to be removed can be prevented from being reduced. By releasing the fastening and lifting the concrete part to be removed, only the concrete part to be removed can be easily pulled out, and the work of crushing concrete and lifting off the axial rebar can be simplified. The time, burden and cost required can be reduced.

(a)は本発明に係る外殻鋼管コンクリート合成杭の一実施の形態を示す断面図、(b)は(a)のb部を拡大した断面図、(c)は(a)のc部を拡大した断面図、(d)は(a)のd部を拡大した断面図である。(A) is sectional drawing which shows one Embodiment of the outer shell steel pipe concrete composite pile concerning this invention, (b) is sectional drawing which expanded the b part of (a), (c) is c part of (a) (D) is sectional drawing to which the d section of (a) was expanded. 同上杭の平面図である。It is a top view of a pile same as the above. 図1(a)のIII−III線断面図である。It is the III-III sectional view taken on the line of Fig.1 (a). 図1(a)のIV−IV線断面図である。It is the IV-IV sectional view taken on the line of Fig.1 (a). 図1(a)のV−V線断面図である。It is the VV sectional view taken on the line of Fig.1 (a). 同上杭の鉄筋を現すときの施工例を示す説明図であり、(a)は同上杭の斜視図、(b)は同上杭の除去予定コンクリート部を取外す工程の斜視図、(c)は同上杭の除去予定コンクリート部を取外した後の斜視図である。It is explanatory drawing which shows the construction example when showing the reinforcement of a pile same as the above, (a) is a perspective view of a pile same as the above, (b) is a perspective view of the process of removing the concrete part to be removed of the pile same as above, (c) is the same as above It is a perspective view after removing the removal planned concrete part of a pile. 従来の外殻鋼管コンクリート合成杭の鉄筋を現すときの施工例を示す説明図であり、(a)は同上杭の外殻鋼管に切れ目を入れた状態の斜視図、(b)は同上杭の外殻鋼管の一部を剥取った状態を示す斜視図、(c)は同上杭の補強鉄筋をはつり出した状態を示す斜視図、(d)は同上杭とフーチングとの結合状態を示す断面図である。It is explanatory drawing which shows the construction example when showing the reinforcement of the conventional outer shell steel pipe concrete composite pile, (a) is a perspective view of the state which cut | disconnected the outer shell steel pipe of the same pile, (b) is the same pile The perspective view which shows the state which peeled off a part of outer shell steel pipe, (c) is a perspective view which shows the state which protruded the reinforcement reinforcement of the same pile, (d) is a cross section which shows the combined state of the same pile and footing FIG.

以下、本発明を、図1乃至図6に示された一実施の形態に基いて詳細に説明する。   Hereinafter, the present invention will be described in detail based on one embodiment shown in FIGS.

図1は、外殻鋼管コンクリート合成杭(以下、SC杭という)11を示し、コンクリートにより杭本体部12が成形され、この杭本体部12の一端部に除去予定コンクリート部13が連続的に形成されている。これらの杭本体部12および除去予定コンクリート部13は、共通の遠心成型枠内で遠心成型される。   FIG. 1 shows an outer shell steel pipe concrete composite pile (hereinafter referred to as SC pile) 11, a pile body portion 12 is formed of concrete, and a concrete portion 13 to be removed is continuously formed at one end of the pile body portion 12. Has been. These pile main body portion 12 and the concrete portion 13 to be removed are centrifugally molded in a common centrifugal molding frame.

図1、図3および図5に示されるように、杭本体部12の外周面には外殻鋼管14が設けられ、除去予定コンクリート部13の外周面には、外殻鋼管14のないコンクリート露出部15が成型されている。   As shown in FIGS. 1, 3, and 5, an outer shell steel pipe 14 is provided on the outer peripheral surface of the pile main body 12, and the concrete exposed without the outer shell steel pipe 14 is provided on the outer peripheral surface of the concrete portion 13 to be removed. Part 15 is molded.

図1(a)に示されるように杭本体部12から除去予定コンクリート部13にわたって、それらの内部に複数の軸方向鉄筋16が、図2乃至図5に示されるように円筒状に配置されて埋込まれている。   As shown in FIG. 1 (a), a plurality of axial reinforcing bars 16 are arranged in a cylindrical shape as shown in FIGS. 2 to 5 from the pile main body portion 12 to the concrete portion 13 to be removed. Embedded.

図1(a),(b),(c)および図3に示されるように、これらの軸方向鉄筋16のうち除去予定コンクリート部13に対応する部分には、軸方向鉄筋16と除去予定コンクリート部13との結合を阻止する管17がそれぞれ被嵌されている。   As shown in FIGS. 1 (a), (b), (c) and FIG. 3, the axial rebar 16 and the concrete to be removed are included in the portion corresponding to the concrete part 13 to be removed of these axial reinforcing bars 16. Tubes 17 that prevent the coupling with the part 13 are respectively fitted.

図1(b)に示されるように、各軸方向鉄筋16の外端部には座板嵌着部20がそれぞれ設けられ、これらの座板嵌着部20に、図6(b)に示されるように軸方向鉄筋位置に通孔21を有するリング状の座板22が嵌着され、各軸方向鉄筋16の外端部にネジ23がそれぞれ形成され、図1(a),(b)および図2に示されるように、これらのネジ23と螺合するナット24により座板22が締着されている。   As shown in FIG. 1 (b), seat plate fitting portions 20 are provided at the outer ends of the respective axial reinforcing bars 16, and these seat plate fitting portions 20 are shown in FIG. 6 (b). As shown in FIGS. 1A and 1B, a ring-shaped seat plate 22 having a through hole 21 is fitted at the position of the axial reinforcing bar, and a screw 23 is formed at the outer end of each axial reinforcing bar 16, respectively. As shown in FIG. 2, the seat plate 22 is fastened by a nut 24 that is screwed with these screws 23.

図1(a),(c),(d)および図4に示されるように、杭本体部12の上端および下端には、外殻鋼管14の上端および下端に溶接されたリング状の仕切座板25および底側座板26が配置されている。   As shown in FIGS. 1 (a), (c), (d) and FIG. 4, ring-shaped dividers welded to the upper and lower ends of the outer shell steel pipe 14 are attached to the upper and lower ends of the pile main body 12. A plate 25 and a bottom seat plate 26 are arranged.

図1(a)に示されるように、円筒状に配置された複数の軸方向鉄筋16の内周側には、杭本体部12内に配筋された異形筋内リング27が設けられ、また、円筒状に配置された複数の管17の外周側には、除去予定コンクリート部13内に配筋された異形筋外リング28が設けられている。   As shown in FIG. 1 (a), on the inner peripheral side of the plurality of axial rebars 16 arranged in a cylindrical shape, a deformed intramuscular ring 27 arranged in the pile main body 12 is provided. On the outer peripheral side of the plurality of tubes 17 arranged in a cylindrical shape, a deformed bar outer ring 28 arranged in the concrete portion 13 to be removed is provided.

次に、図1および図6などを参照しながら上記実施の形態の方法および作用効果を説明する。   Next, the method and effect of the above embodiment will be described with reference to FIGS.

図1および図6(a)に示されるように、外殻鋼管14のうち、杭頭頂部の切断・剥がし作業を行なう部分の外殻鋼管を無くした状態のSC杭11を工場の遠心成型機により製造する。   As shown in FIG. 1 and FIG. 6 (a), the SC pile 11 in a state where the outer shell steel pipe in the portion of the outer shell steel pipe 14 where cutting / peeling of the top of the pile is removed is removed from the factory centrifugal molding machine. Manufactured by.

このSC杭11は、円筒状に配置された複数の軸方向鉄筋16が、杭本体部12の上端部から円筒状の除去予定コンクリート部13の内部を貫通して、各軸方向鉄筋16の先端部が除去予定コンクリート部13の上端面よりそれぞれ突出しており、それらの各先端部にネジ加工がそれぞれ施されているので、図1(b)に示されるように、それらの各ネジ23に、軸方向鉄筋位置に通孔21を有するリング状の座板22を嵌着して、各ネジ23に螺合したナット24でそれぞれ締付けて固定することで、荷扱い時に杭本体部12および除去予定コンクリート部13にひび割れなどが生じるおそれを防ぎ、製品としての機能を損なわないようにする。   In this SC pile 11, a plurality of axial rebars 16 arranged in a cylindrical shape penetrate the inside of the concrete portion 13 to be removed from the upper end portion of the pile body portion 12, and the tip of each axial rebar 16 Since each part protrudes from the upper end surface of the concrete part 13 to be removed and each of their tip parts is threaded, as shown in FIG. A ring-shaped seat plate 22 having a through-hole 21 at the position of the axial rebar is fitted and fixed by tightening each with a nut 24 screwed to each screw 23, and the pile main body 12 and planned to be removed during handling The risk of cracks and the like in the concrete portion 13 is prevented, and the product function is not impaired.

除去予定コンクリート部13は、従来のコンクリートを破砕して鉄筋はつり出し作業を行なう部分に相当するが、この除去予定コンクリート部13の内部に複数の軸方向鉄筋16を円周状に配置し、それらの各軸方向鉄筋16の周りをそれぞれ管17で覆って杭を製造することによって、これらの管17により除去予定コンクリート部13のコンクリートが各軸方向鉄筋16に直接付着することを無くし、除去予定コンクリート部13のコンクリートを破砕せずとも、図6(b)に示されるように、クレーン等の重機により除去予定コンクリート部13を吊り上げることで、杭本体部12から除去予定コンクリート部13を分離させ、除去予定コンクリート部13のみを各軸方向鉄筋16から引抜くことができ、図6(c)に示されるように円筒状に配置された軸方向鉄筋16を現すことが可能となる。   The concrete part 13 to be removed corresponds to a part where the conventional concrete is crushed and the rebar is lifted, and a plurality of axial reinforcing bars 16 are arranged in a circle inside the concrete part 13 to be removed. By manufacturing the piles by covering each of the axial rebars 16 with pipes 17 respectively, the concrete of the concrete part 13 scheduled to be removed by these pipes 17 is eliminated and planned to be removed Even if the concrete of the concrete part 13 is not crushed, the concrete part 13 to be removed is separated from the pile body part 12 by lifting the concrete part 13 to be removed by a heavy machine such as a crane as shown in FIG. 6 (b). In this case, only the concrete part 13 to be removed can be pulled out from each axial reinforcing bar 16, and as shown in FIG. 6 (c), the axial reinforcing bar 16 arranged in a cylindrical shape can be shown. It is possible.

このように、ナット24による締付固定を解除し、除去予定コンクリート部13を吊り上げ、杭本体部12から分離された除去予定コンクリート部13を軸方向鉄筋16から引抜き、軸方向鉄筋16を現すようにする。コンクリートにより成形された杭本体部12から、この杭本体部12の一端部に連続的に形成された除去予定コンクリート部13にわたって、それらの内部に複数の軸方向鉄筋16を埋込み、これらの軸方向鉄筋16のうち除去予定コンクリート部13に対応する部分にそれぞれ管17を被嵌して軸方向鉄筋16と除去予定コンクリート部13との結合を阻止するので、これらの管17により軸方向鉄筋16との結合を阻止された除去予定コンクリート部13のみを容易に抜出すことができ、コンクリートの破砕・軸方向鉄筋16のはつり出し作業を簡略化でき、これらの作業に要する時間、負担および費用を削減できる。はつり出し作業で各軸方向鉄筋16を損傷するおそれも防止できる。   In this way, the tightening and fixing by the nut 24 is released, the concrete part 13 to be removed is lifted, and the concrete part 13 to be removed separated from the pile body part 12 is pulled out from the axial rebar 16 so that the axial rebar 16 appears. To. A plurality of axial reinforcing bars 16 are embedded inside the pile main body portion 12 formed of concrete, and the concrete portion 13 to be removed continuously formed at one end portion of the pile main body portion 12, and these axial directions are embedded therein. Since the pipes 17 are respectively fitted to the portions of the reinforcing bars 16 corresponding to the concrete portions 13 to be removed to prevent the axial reinforcing bars 16 and the concrete portions 13 to be removed from being connected, the pipes 17 are connected to the axial reinforcing bars 16 and 16. It is possible to easily extract only the concrete part 13 to be removed, which is prevented from joining, and to crush the concrete and to lift the axial rebar 16 can be simplified, reducing the time, burden and cost required for these operations. it can. The risk of damaging each axial rebar 16 during the lifting operation can also be prevented.

また、部分的に外殻鋼管14を無くし、除去予定コンクリート部13の外周面に外殻鋼管14のないコンクリート露出部15を成型したので、コンクリートを露出させるために外殻鋼管14の一部を剥取る作業を省略でき、鋼管剥取り作業時に生じる種々の問題を取除くことができる。要するに、部分的に外殻鋼管14を無くすことによって、外殻鋼管14の剥がし作業時に起きる問題を取除くとともに、外殻鋼管14および外殻鋼管取外し工程の削除によって、費用低減効果も得られる。   In addition, the outer shell steel pipe 14 is partially removed, and the concrete exposed portion 15 without the outer shell steel pipe 14 is formed on the outer peripheral surface of the concrete portion 13 to be removed, so that a part of the outer shell steel pipe 14 is removed to expose the concrete. Stripping work can be omitted, and various problems that occur during steel pipe stripping work can be eliminated. In short, by partially eliminating the outer shell steel pipe 14, problems that occur during the peeling operation of the outer shell steel pipe 14 are eliminated, and the cost reduction effect can also be obtained by eliminating the outer shell steel pipe 14 and the outer shell steel pipe removal process.

さらに、除去予定コンクリート部13と対応する外殻鋼管14を無くし、除去予定コンクリート部13と対応する軸方向鉄筋16の周りを管17で覆ってコンクリートとの付着を無くした杭構造は、工場内移動時および施工時におけるSC杭11の荷扱いで、除去予定コンクリート部13にひび割れを生じさせて製品価値を低下させるおそれも有しているが、各軸方向鉄筋16の外端部にそれぞれ設けられた座板嵌着部20にリング状の座板22を嵌着し、各軸方向鉄筋16の外端部にそれぞれ形成されたネジ23およびこれらのネジ23と螺合するナット24により座板22を除去予定コンクリート部13に締着するので、ナット24による締付固定を解除するまでは、リング状の座板22による押圧作用により除去予定コンクリート部13を杭本体部12に一体化でき、除去予定コンクリート部13のひび割れなどの製品価値の低下を防止できる。   Furthermore, the pile structure that eliminates the outer steel pipe 14 corresponding to the concrete part 13 to be removed, and covers the surrounding axial rebar 16 corresponding to the concrete part 13 to be removed with the pipe 17 to eliminate adhesion with the concrete is There is a risk that the SC pile 11 will be cracked at the time of movement and construction, causing cracks in the concrete part 13 to be removed and reducing the product value, but it is provided at the outer end of each axial rebar 16 respectively. A ring-shaped seat plate 22 is fitted to the seat plate fitting portion 20 formed, and a seat plate is formed by screws 23 formed on the outer end portions of the respective axial reinforcing bars 16 and nuts 24 screwed to these screws 23. Since 22 is fastened to the concrete part 13 to be removed, the concrete part 13 to be removed can be integrated with the pile main body part 12 by the pressing action of the ring-shaped seat plate 22 until the fastening by the nut 24 is released. Planned removal concrete part 13 A decrease in product value, such as cracks can be prevented.

すなわち、工場製造時に外殻鋼管14を無くし、杭体内の軸方向鉄筋16の周りを管17で覆い、コンクリートとの付着を無くした状態の杭構造には、工場内移動時および施工時におけるSC杭11の荷扱いで、杭の両端の空洞部に吊り具を掛けるか、軸方向の2箇所にワイヤロープを巻いて吊ることが多いので、除去予定コンクリート部13にひび割れが出て製品の品質を低下させるおそれも有るが、各軸方向鉄筋16の外端部にそれぞれ設けられた座板嵌着部20にリング状の座板22を嵌着し、各軸方向鉄筋16の外端部にそれぞれ形成されたネジ23およびこれらのネジ23と螺合するナット24により座板22を除去予定コンクリート部13に締着するので、この除去予定コンクリート部13に対しリング状の座板22から圧縮力を作用させるように締付けて固定することで、除去予定コンクリート部13でのひび割れなどの製品の品質低下を防止することができる。   That is, the pile steel structure in which the outer shell steel pipe 14 is eliminated at the time of factory manufacture, the axial rebar 16 in the pile body is covered with the pipe 17 and the adhesion with the concrete is eliminated, the SC structure during the movement in the factory and during construction When handling piles 11, it is often the case that a hanging tool is hung on the cavity at both ends of the pile, or a wire rope is wound around two places in the axial direction. The ring-shaped seat plate 22 is fitted to the seat plate fitting portion 20 provided at the outer end portion of each axial reinforcing bar 16, and the outer end portion of each axial reinforcing bar 16 is attached to the outer end portion of each axial reinforcing bar 16. Since the seat plate 22 is fastened to the concrete portion 13 to be removed by the screws 23 formed and the nuts 24 screwed to these screws 23, the compressive force from the ring-shaped seat plate 22 is applied to the concrete portion 13 to be removed. By tightening and fixing to act, The deterioration in the quality of products, such as cracks in the planned concrete section 13 can be prevented.

本発明は、遠心成型機により製造するSC杭11に利用できる。   The present invention can be used for the SC pile 11 manufactured by a centrifugal molding machine.

11 外殻鋼管コンクリート合成杭(SC杭)
12 杭本体部
13 除去予定コンクリート部
14 外殻鋼管
15 コンクリート露出部
16 軸方向鉄筋
17 管
23 ネジ
24 ナット
25 仕切座板
11 Shell steel pipe concrete composite pile (SC pile)
12 Pile body
13 Concrete part to be removed
14 Outer shell steel pipe
15 Exposed concrete
16 axial rebar
17 tubes
23 screws
24 nuts
25 Partition board

Claims (2)

コンクリートにより成形された杭本体部と、
この杭本体部の一端部に仕切座板を介して形成され杭本体部に解除可能に締付固定された除去予定コンクリート部と、
杭本体部から除去予定コンクリート部にわたってそれらの内部に埋込まれた複数の軸方向鉄筋と、
これらの軸方向鉄筋のうち除去予定コンクリート部に対応する部分にそれぞれ被嵌されて軸方向鉄筋と除去予定コンクリート部との結合を阻止する管と、
杭本体部の外周面に設けられた外殻鋼管と、
除去予定コンクリート部の外周面に成型された外殻鋼管のないコンクリート露出部と
を具備した外殻鋼管コンクリート合成杭の鉄筋を現す方法であって、
除去予定コンクリート部の締付固定を解除し、
除去予定コンクリート部を吊り上げ、
杭本体部から分離された除去予定コンクリート部を軸方向鉄筋から引抜き、
軸方向鉄筋を現すようにした
ことを特徴とする外殻鋼管コンクリート合成杭の鉄筋を現す方法。
A pile body formed of concrete;
A concrete part to be removed that is formed on one end of this pile body part via a partition plate and fastened and fixed to the pile body part so as to be releasable ,
A plurality of axial rebars embedded within the pile body from the pile body to the concrete part to be removed;
Pipes that are respectively fitted to portions corresponding to the concrete portion to be removed among these axial rebars and prevent the connection between the axial rebar and the concrete portion to be removed,
An outer shell steel pipe provided on the outer peripheral surface of the pile body,
A method of revealing the reinforcing steel of the outer steel pipe concrete composite pile, which has a concrete exposed part without the outer steel pipe formed on the outer peripheral surface of the concrete part to be removed,
Release the fastening of the concrete part to be removed,
Lift the concrete part to be removed,
Pull out the concrete part to be removed separated from the pile body part from the axial rebar,
A method for revealing the reinforcement of a steel pile concrete composite pile, characterized by revealing the axial rebar.
コンクリートにより成形された杭本体部と、
この杭本体部の一端部に仕切座板を介して形成された除去予定コンクリート部と、
杭本体部から除去予定コンクリート部にわたってそれらの内部に埋込まれた複数の軸方向鉄筋と、
これらの軸方向鉄筋のうち除去予定コンクリート部に対応する部分にそれぞれ被嵌されて軸方向鉄筋と除去予定コンクリート部との結合を阻止する管と、
各軸方向鉄筋の外端部にそれぞれ形成されたネジ、およびこれらのネジと螺合して除去予定コンクリート部を杭本体部に締付固定するナットと、
杭本体部の外周面に設けられた外殻鋼管と、
除去予定コンクリート部の外周面に成型された外殻鋼管のないコンクリート露出部と
を具備した外殻鋼管コンクリート合成杭の鉄筋を現す方法であって、
ナットによる締付固定を解除し、
除去予定コンクリート部を吊り上げ、
杭本体部から分離された除去予定コンクリート部を軸方向鉄筋から引抜き、
軸方向鉄筋を現すようにした
ことを特徴とする外殻鋼管コンクリート合成杭の鉄筋を現す方法。
A pile body formed of concrete;
The concrete part to be removed, which is formed on one end of this pile body part via a partition plate,
A plurality of axial rebars embedded within the pile body from the pile body to the concrete part to be removed;
Pipes that are respectively fitted to portions corresponding to the concrete portion to be removed among these axial rebars and prevent the connection between the axial rebar and the concrete portion to be removed,
Screws respectively formed on the outer end of each axial rebar, and nuts that fasten and fix the concrete part to be removed by screwing with these screws to the pile body part,
An outer shell steel pipe provided on the outer peripheral surface of the pile body,
A method of revealing the reinforcing steel of the outer steel pipe concrete composite pile, which has a concrete exposed part without the outer steel pipe formed on the outer peripheral surface of the concrete part to be removed,
Release the tightening fixation with the nut,
Lift the concrete part to be removed,
Pull out the concrete part to be removed separated from the pile body part from the axial rebar,
A method for revealing the reinforcement of a steel pile concrete composite pile, characterized by revealing the axial rebar.
JP2013077181A 2013-04-02 2013-04-02 Reinforcement method of outer steel tube concrete composite pile Active JP5506122B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2013077181A JP5506122B2 (en) 2013-04-02 2013-04-02 Reinforcement method of outer steel tube concrete composite pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2013077181A JP5506122B2 (en) 2013-04-02 2013-04-02 Reinforcement method of outer steel tube concrete composite pile

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
JP2009038903A Division JP2010196251A (en) 2009-02-23 2009-02-23 Existing concrete pile

Publications (2)

Publication Number Publication Date
JP2013130058A JP2013130058A (en) 2013-07-04
JP5506122B2 true JP5506122B2 (en) 2014-05-28

Family

ID=48907819

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2013077181A Active JP5506122B2 (en) 2013-04-02 2013-04-02 Reinforcement method of outer steel tube concrete composite pile

Country Status (1)

Country Link
JP (1) JP5506122B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101549524B1 (en) 2013-12-20 2015-09-03 삼성중공업 주식회사 Vertical fixing apparatus for cable

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0449250Y2 (en) * 1987-04-16 1992-11-19
JPH0510528U (en) * 1991-07-25 1993-02-12 日本コンクリート工業株式会社 Steel tube concrete composite pile
JPH06346438A (en) * 1993-06-08 1994-12-20 Times Eng:Kk Manufacturing method for high bending tenacious pc pile

Also Published As

Publication number Publication date
JP2013130058A (en) 2013-07-04

Similar Documents

Publication Publication Date Title
JP5258099B2 (en) Prestressed concrete pile, method for manufacturing the same, and method for connecting pile head and footing
CN103429519B (en) Methods of Installing Large Concrete Blocks
CN103114717A (en) Formwork system of shear walls at two sides of extensible seam
JP2010196251A (en) Existing concrete pile
JP5036007B2 (en) SC pile, its manufacturing method and pile head processing method
JP5506122B2 (en) Reinforcement method of outer steel tube concrete composite pile
JP2009293349A (en) Joint structure between pile and foundation, construction method thereof, and joint method of pile to foundation
JP6782667B2 (en) Prestressed concrete pile
JP5349263B2 (en) SC pile, its manufacturing method and its pile head joining method
JP6179980B2 (en) Tensile connection method and part replacement method
EP1896670A1 (en) Concrete reinforcement connectors
JP6998815B2 (en) Insert mounting jig and sleeve, insert mounting method
JPH0788832A (en) Member for forming sheath hole of PC member and method for manufacturing PC member having sheath hole
WO2010018300A1 (en) Wire loop box
JP2005307676A (en) Joint structure of foundation pile head and upper foundation
JPS58153816A (en) Reinforced cap device for pile head
CN109024876A (en) A kind of connection method of prefabricated concrete structure component
AU2020378656B2 (en) Method and arrangement for supporting a floor element on a beam and beam
JP6721940B2 (en) Widening structure of existing PC floor slab
JP3918016B2 (en) Bearded ring member
KR100915629B1 (en) Pipe fixing device for building construction
CN202416574U (en) Embedded interconnection type lacing bar component with external protrusive inside screwed hole
KR100850230B1 (en) A standing type sleeve structure and installing method thereof
JP2018104944A (en) Column base structure and its construction method
JP2009174216A (en) Prestressed concrete pole and manufacturing method therefor

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20130402

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20131209

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20131225

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20140207

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20140312

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20140317

R150 Certificate of patent or registration of utility model

Ref document number: 5506122

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250