Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP5508917B2 - Self-supporting temporary closing structure and self-supporting temporary closing method - Google Patents
[go: Go Back, main page]

JP5508917B2 - Self-supporting temporary closing structure and self-supporting temporary closing method - Google Patents

Self-supporting temporary closing structure and self-supporting temporary closing method Download PDF

Info

Publication number
JP5508917B2
JP5508917B2 JP2010075408A JP2010075408A JP5508917B2 JP 5508917 B2 JP5508917 B2 JP 5508917B2 JP 2010075408 A JP2010075408 A JP 2010075408A JP 2010075408 A JP2010075408 A JP 2010075408A JP 5508917 B2 JP5508917 B2 JP 5508917B2
Authority
JP
Japan
Prior art keywords
temporary
water
temporary body
tubular
foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2010075408A
Other languages
Japanese (ja)
Other versions
JP2011208389A (en
Inventor
範寛 大高
隆 小野寺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Steel Metal Products Co Ltd
Original Assignee
Nippon Steel and Sumikin Metal Products Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Steel and Sumikin Metal Products Co Ltd filed Critical Nippon Steel and Sumikin Metal Products Co Ltd
Priority to JP2010075408A priority Critical patent/JP5508917B2/en
Publication of JP2011208389A publication Critical patent/JP2011208389A/en
Application granted granted Critical
Publication of JP5508917B2 publication Critical patent/JP5508917B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Description

この発明は、既設の水中橋脚の補強工事及び補修工事に好適な仮締切構造および仮締切工法の技術分野に属し、更にいえば、従来、水中橋脚に反力をとって取り付けていた切梁を一切無用とする自立式仮締切構造および自立式仮締切工法に関する。   The present invention belongs to the technical field of temporary closing structure and temporary closing method suitable for reinforcement work and repair work of existing underwater bridge piers. The present invention relates to a self-supporting temporary closing structure and a self-supporting temporary closing method that are completely useless.

既設の水中橋脚の補強工事及び補修工事を行うにあたり、既に橋桁が存在する等の理由から既往の鋼矢板を建て込む仮締切工法(仮締切構造)が採用できない場合がある。
そのような場合に適用できる仮締切工法として、従来、複数枚のライナープレート等を周方向および高さ方向に互いに連結してなる筒状仮設体を用いた発明が開示されている(例えば、特許文献1〜4参照)。また、複数に分割した鋼殻を、水中橋脚の基礎上で周方向に互いに連結して筒状仮設体を形成する発明も開示されている(例えば、特許文献5参照)。
When reinforcing and repairing existing underwater bridge piers, the temporary closing method (temporary closing structure) in which existing steel sheet piles are built may not be adopted due to the fact that bridge girders already exist.
Conventionally, as a temporary closing method applicable to such a case, an invention using a cylindrical temporary body formed by connecting a plurality of liner plates and the like in the circumferential direction and the height direction has been disclosed (for example, patents) References 1-4). Also disclosed is an invention in which steel shells divided into a plurality are connected to each other in the circumferential direction on the foundation of an underwater bridge pier to form a cylindrical temporary body (see, for example, Patent Document 5).

特許文献1の図1には、既設の水中橋脚1の基礎2上に、水中橋脚を囲む第1の筒状仮設体(止水槽本体)11と、第1の筒状仮設体11の内側に設けられ同筒状仮設体11より低層の第2の筒状仮設体(内側リング)12と、前記第1及び第2の筒状仮設体11、12を接続する連結部材13とからなる筒状構造物(止水槽)10が設置され、前記第1及び第2の筒状仮設体11、12の間に止水コンクリート(水中コンクリート)15が打設されている。また、水圧による前記第1の筒状仮設体11の変形(倒れ込み)を防止するべく、既設の水中橋脚1と第1の筒状仮設体11との間に、高さ方向に3箇所、周方向に4箇所の計12本もの切梁18が張設されている。
この特許文献1に係る発明によれば、橋桁が障害とならずに筒状仮設体を形成することができるので、既往の鋼矢板による仮締切工法の代替案として一応の効果が認められる。
In FIG. 1 of Patent Document 1, on the foundation 2 of an existing underwater bridge pier 1 , a first tubular temporary body (waterstop tank body) 11 surrounding the underwater bridge pier 1 and the inside of the first tubular temporary body 11 A cylinder comprising a second cylindrical temporary body (inner ring) 12 that is lower than the cylindrical temporary body 11 and a connecting member 13 that connects the first and second cylindrical temporary bodies 11 and 12. A structure (water-stopping tank) 10 is installed, and water-stopping concrete (underwater concrete) 15 is placed between the first and second tubular temporary bodies 11 and 12. Further, in order to prevent deformation (falling down) of the first tubular temporary body 11 due to water pressure, there are three places in the height direction between the existing underwater bridge pier 1 and the first tubular temporary body 11. A total of twelve cut beams 18 are stretched in four directions.
According to the invention according to Patent Document 1, a tubular temporary structure can be formed without hindering the bridge girder, so that a temporary effect can be recognized as an alternative to the existing temporary closing method using steel sheet piles.

特許文献2〜4に係る発明もまた、前記特許文献1と同様の筒状仮設体を用いた仮締切工法(仮締切構造)が開示されており、既往の鋼矢板による仮締切工法の代替案として一応の効果が認められる。
特許文献5に係る発明は、水中橋脚の基礎上で筒状仮設体を形成する仮締切工法が開示されており、既往の鋼矢板による仮締切工法の代替案として一応の効果が認められる。
The inventions according to Patent Documents 2 to 4 also disclose a temporary closing method (temporary closing structure) using a cylindrical temporary structure similar to that of Patent Document 1, and an alternative to the existing temporary closing method using steel sheet piles. A temporary effect is recognized.
The invention according to Patent Document 5 discloses a temporary closing method for forming a cylindrical temporary body on the foundation of an underwater bridge pier, and a temporary effect is recognized as an alternative to the existing temporary closing method using steel sheet piles.

特開平11−131488号公報Japanese Patent Laid-Open No. 11-131488 特開平9−158192号公報Japanese Patent Laid-Open No. 9-158192 特開平9−221760号公報JP-A-9-221760 特開平10−54037号公報Japanese Patent Laid-Open No. 10-54037 特開平11−256587号公報Japanese Patent Application Laid-Open No. 11-256587

しかしながら、上記特許文献1に係る仮締切構造によれば、補強工事及び補修工事の対象物たる既設の水中橋脚の四方に多数の切梁18が存在するため、部材点数が多くコストが嵩むことに加え、なにより多数の切梁18が当該工事の障害となり不合理な工事を余儀なくされ、工事に難渋していた。例えば、橋脚の補強を行うために仮締切構造を構築して橋脚にコンクリートの巻きたて工事を実施する場合は、切梁18があるためにコンクリートの打設作業を分割して行わなければならず、その際は、補強対象箇所に存在する切梁18を左右、或いは上下にずらして盛り替える作業を複数回繰り返す必要があった。この問題点は、上記特許文献5の段落[0022]でも指摘されているところである。
このように、特許文献1に係る仮締切構造によれば、多数の切梁18が存在することにより、作業効率が著しく低下し、工期の長期化を招くという問題があった。
However, according to the temporary closing structure according to Patent Document 1 described above, since there are a large number of cut beams 18 on four sides of an existing underwater bridge pier that is an object of reinforcement work and repair work, the number of members increases and the cost increases. In addition, a large number of beams 18 obstructed the construction, forcing unreasonable construction, making construction difficult. For example, when a temporary closing structure is constructed to reinforce a bridge pier and concrete is wound around the pier, the concrete placement work must be divided because of the cut beam 18. However, in that case, it was necessary to repeat the work of shifting the cut beam 18 existing at the reinforcement target portion left and right or up and down a plurality of times. This problem is pointed out in paragraph [0022] of Patent Document 5 above.
As described above, according to the temporary closing structure according to Patent Document 1, there are problems that the work efficiency is remarkably lowered due to the presence of a large number of cut beams 18 and the construction period is prolonged.

上記特許文献2〜4に係る発明もまた、図示こそされていないものの、これらの仮締切構造を現場で実際に実施する場合、切梁は必要不可欠であり、水圧による筒状仮設体の変形(倒れ込み)を防止するべく、補強工事及び補修工事の対象物たる既設の水中橋脚の四方に多数の切梁18を張設しているのが実情である。よって、上記特許文献1と同様の問題があった。
上記特許文献5に係る発明は、切梁を盛り替える作業が不要となるとの記載が認められるが(段落[0058]の8行目参照)、切梁を用いることに変わりなく、部材点数が多くコストが嵩む問題はなんら解消されていない。むしろ個々の切梁を、アジャスタダブルジャッキなどによる長さ調整用の伸縮継手(14a)を有し、先端に橋脚(1)との滑りをよくするための滑り部材としてローラ(14b)を取り付けた構成で実施しているので(段落[0042]参照)、更にコストが嵩むという問題があった。
また、切梁を盛り替える作業が不要となるとの記載は認められるものの、その実体は、水中橋脚(1)に巻く鋼板(2)の高さよりも高い位置に切梁を設けて実施しているにすぎず、部材単価が高い鋼殻のせいを必要以上(無駄)に高く設定する必要があり、不合理な上にコストが非常に嵩むという問題があった。
Although the inventions according to the above-mentioned Patent Documents 2 to 4 are not shown in the drawings, when these temporary closing structures are actually implemented in the field, the cutting beam is indispensable, and deformation of the cylindrical temporary structure due to water pressure ( In order to prevent (falling), it is the actual situation that a large number of beams 18 are stretched on the four sides of the existing underwater bridge pier, which is the object of reinforcement work and repair work. Therefore, there was a problem similar to that of Patent Document 1.
Although it is recognized that the invention according to Patent Document 5 does not require the work of rearranging the cut beam (see the eighth line of paragraph [0058]), there is no change in using the cut beam, and the number of members is large. The problem of increasing costs has not been solved. Rather, each cut beam has an expansion joint (14a) for adjusting the length by an adjuster double jack or the like, and a roller (14b) is attached to the tip as a sliding member for improving sliding with the pier (1). Since the configuration is implemented (see paragraph [0042]), there is a problem that the cost is further increased.
In addition, although it is recognized that the work of rearranging the cut beam is unnecessary, the substance is implemented by providing the cut beam at a position higher than the height of the steel plate (2) wound around the underwater pier (1). However, there is a problem that it is necessary to set the steel shell having a high unit unit cost higher than necessary (waste), which is unreasonable and very expensive.

本発明の目的は、筒状仮設体の内壁面に沿って立ち上がる支保材により筒状仮設体を自立させて切梁を一切無用とし、既設の水中橋脚の補強工事及び補修工事を合理的に迅速、且つ確実に遂行することができる、施工性および経済性に非常に優れた自立式仮締切構造および自立式仮締切工法を提供することにある。   The purpose of the present invention is to make the tubular temporary body self-supporting by a support material that rises along the inner wall surface of the tubular temporary body so that no cutting beams are required, and the existing underwater bridge pier reinforcement work and repair work can be carried out reasonably quickly. Another object of the present invention is to provide a self-supporting temporary fastening structure and a self-supporting temporary fastening method that can be reliably executed and are excellent in workability and economy.

上記背景技術の課題を解決するための手段として、請求項1に記載した発明に係る自立式仮締切構造は、既設の水中橋脚を囲むように筒状仮設体を設け、筒状仮設体の内部の水抜きを行って作業空間を形成する自立式仮締切構造であって、
前記筒状仮設体が、水中橋脚の基礎の上面に設けられていること、
前記筒状仮設体の内側に、筒状仮設体の内壁面に沿って水位以上に立ち上がる支柱材と、該支柱材の下端に設けられた水平材とでL字形に剛結されてなる支保材が、筒状仮設体に作用する水圧が伝達される構成で複数設置されていること、
前記筒状仮設体の下端部の内壁面に対向する配置に止水コンクリートの漏れを防止する仕切材がリング状に設けられていること、
前記複数の支保材はそれぞれ、前記水平材を筒状仮設体に対し直角方向に配置して前記水中橋脚の基礎の上面にボルト接合して設置されており、前記筒状仮設体の下端部前記仕切材と前記水中橋脚の基礎の上面とで形成した凹溝部に止水コンクリートが打設されて前記支保材の支柱材と水平材とで形成した前記L字形のコーナー部が前記止水コンクリート中に埋め込まれていることを特徴とする。
As a means for solving the above-mentioned background art, the self-supporting temporary closing structure according to the invention described in claim 1 is provided with a cylindrical temporary structure so as to surround an existing underwater bridge pier, and the inside of the cylindrical temporary structure. It is a self-supporting temporary closing structure that forms a work space by draining water,
The tubular temporary body is provided on the upper surface of the foundation of the underwater pier,
Inside of the tubular temporary body, it is rigidly connected with the struts that rising above the water level along the inner wall surface of the cylindrical temporary body, the L-shape in the horizontal provided at a lower end of said supporting pillar member A plurality of supporting materials are installed in a configuration in which water pressure acting on the cylindrical temporary body is transmitted;
The partition member to prevent leakage of the waterproofing concrete arrangement which faces the inner wall surface of the lower end portion of the tubular temporary member is provided in a ring shape,
Each of the plurality of support members is installed by being bolted to the upper surface of the foundation of the underwater bridge pier by arranging the horizontal member in a direction perpendicular to the tubular temporary body, and a bottom end portion of the tubular temporary body , The L-shaped corner formed by the support material of the support material and the horizontal material is formed by water-stopping concrete in a groove formed by the partition material and the upper surface of the foundation of the underwater bridge pier, and the water-stopping concrete It is embedded inside .

請求項2に記載した発明に係る自立式仮締切構造は、既設の水中橋脚を囲むように筒状仮設体を設け、筒状仮設体の内部の水抜きを行って作業空間を形成する自立式仮締切構造であって、
前記水中橋脚の基礎の外周部上面には、外方へ水平に張り出す張り出しプレートが設けられていること、
前記筒状仮設体が、水中橋脚の基礎の外方部における前記張り出しプレートの上面に設けられていること、
前記筒状仮設体の内側に、筒状仮設体の内壁面に沿って水位以上に立ち上がる支柱材と、該支柱材の下端に設けられた水平材とでL字形に剛結されてなる支保材が、筒状仮設体に作用する水圧が伝達される構成で複数設置されていること、
前記筒状仮設体の下端部の内壁面に対向する配置に止水コンクリートの漏れを防止する仕切材が、リング状に設けられていること、
前記複数の支保材はそれぞれ、前記水平材を筒状仮設体に対し直角方向に配置して前記水中橋脚の基礎の上面にボルト接合して設置されており、前記筒状仮設体の下端部と前記仕切材と前記張り出しプレートの上面とで形成した凹溝部に止水コンクリートが打設されて前記支保材の支柱材と水平材とで形成した前記L字形のコーナー部が前記止水コンクリート中に埋め込まれていることを特徴とする。
The self-supporting temporary cutoff structure according to the invention described in claim 2 is a self-supporting type in which a cylindrical temporary body is provided so as to surround an existing underwater bridge pier, and a working space is formed by draining water inside the cylindrical temporary body. A temporary deadline structure,
An overhanging plate is provided on the upper surface of the outer peripheral portion of the foundation of the underwater pier so as to project horizontally outward.
The tubular temporary body is provided on the upper surface of the overhang plate in the outer part of the foundation of the underwater bridge pier;
A support material which is rigidly connected in an L shape with a column material standing above the water level along the inner wall surface of the cylindrical temporary structure and a horizontal material provided at the lower end of the column material inside the cylindrical temporary structure. However, a plurality of water pressures that are applied to the tubular temporary body are transmitted.
A partition material for preventing leakage of water-stopping concrete is provided in a ring shape in an arrangement facing the inner wall surface of the lower end portion of the cylindrical temporary body,
Each of the plurality of support members is installed by being bolted to the upper surface of the foundation of the underwater bridge pier by arranging the horizontal member in a direction perpendicular to the tubular temporary body, and a bottom end portion of the tubular temporary body, The L-shaped corner formed by the support material of the support material and the horizontal material is placed in the groove formed by the partition material and the upper surface of the projecting plate, and the L-shaped corner portion is formed in the water-resistant concrete. It is embedded .

請求項3に記載した発明は、請求項1又は2に記載した自立式仮締切構造において、前記筒状仮設体は、複数枚のライナープレート、コルゲートシート、鋼製セグメント、又はPCセグメントを周方向および高さ方向に互いに連結してなることを特徴とする。 According to a third aspect of the present invention, in the self-supporting temporary closing structure according to the first or second aspect , the cylindrical temporary structure includes a plurality of liner plates, corrugated sheets, steel segments, or PC segments in the circumferential direction. And connected to each other in the height direction .

請求項4に記載した発明に係る自立式仮締切工法は、既設の水中橋脚を囲むように筒状仮設体を設け、筒状仮設体の内部の水抜きを行って作業空間を形成する自立式仮締切工法であって、
前記筒状仮設体を水中橋脚の基礎の上面に設けると共に、前記筒状仮設体の内側に、筒状仮設体の内壁面に沿って水位以上に立ち上がる支柱材と、該支柱材の下端に設けられた水平材とでL字形に剛結されてなる支保材を、筒状仮設体に作用する水圧が伝達される構成で複数設置すること、
前記筒状仮設体の下端部の内壁面に対向する配置に止水コンクリートの漏れを防止する仕切材を、リング状に設けること、
前記複数の支保材はそれぞれ、前記水平材を筒状仮設体に対し直角方向に配置して前記水中橋脚の基礎の上面にボルト接合して設置しており、前記筒状仮設体の下端部と前記仕切材と前記水中橋脚の基礎の上面とで形成した凹溝部に止水コンクリートを打設して前記支保材の支柱材と水平材とで形成した前記L字形のコーナー部を前記止水コンクリート中に埋め込み、止水コンクリートの硬化後に筒状仮設体の内部の水抜きを行うことを特徴とする。
The self-supporting temporary closing method according to the invention described in claim 4 is a self-supporting method in which a cylindrical temporary structure is provided so as to surround an existing underwater bridge pier, and a working space is formed by draining the inside of the cylindrical temporary structure. A temporary closing method,
The tubular temporary body is provided on the upper surface of the foundation of the underwater bridge pier, and is provided on the inner side of the tubular temporary body, on a support column that rises above the water level along the inner wall surface of the cylindrical temporary structure, and on the lower end of the support column. Installing a plurality of supporting members rigidly joined in an L shape with the horizontal member formed in a configuration in which water pressure acting on the cylindrical temporary structure is transmitted;
Providing a partition material that prevents leakage of water-stopping concrete in an arrangement facing the inner wall surface of the lower end portion of the tubular temporary body, in a ring shape;
Each of the plurality of support members is disposed by placing the horizontal member in a direction perpendicular to the tubular temporary body and bolted to the upper surface of the foundation of the underwater bridge pier, and a lower end portion of the tubular temporary body, The L-shaped corner portion formed by the support material and the horizontal material is placed in the groove portion formed by the partition material and the upper surface of the foundation of the submerged bridge pier, and the L-shaped corner portion is formed by the water-resistant concrete. It is embedded therein, and the water inside the cylindrical temporary structure is drained after the water-stopping concrete is hardened.

請求項5に記載した発明に係る自立式仮締切工法は、既設の水中橋脚を囲むように筒状仮設体を設け、筒状仮設体の内部の水抜きを行って作業空間を形成する自立式仮締切工法であって、
前記水中橋脚の基礎の外周部上面に、外方へ水平に張り出す張り出しプレートを設け、 前記筒状仮設体を、水中橋脚の基礎の外方部における前記張り出しプレートの上面に設けると共に、前記筒状仮設体の内側に、筒状仮設体の内壁面に沿って水位以上に立ち上がる支柱材と、該支柱材の下端に設けられた水平材とでL字形に剛結されてなる支保材を、筒状仮設体に作用する水圧が伝達される構成で複数設置すること、
前記筒状仮設体の下端部の内壁面に対向する配置に止水コンクリートの漏れを防止する仕切材を、リング状に設けること、
前記複数の支保材はそれぞれ、前記水平材を筒状仮設体に対し直角方向に配置して前記水中橋脚の基礎の上面にボルト接合して設置しており、前記筒状仮設体の下端部と前記仕切材と前記張り出しプレートの上面とで形成した凹溝部に止水コンクリートを打設して前記支保材の支柱材と水平材とで形成した前記L字形のコーナー部を前記止水コンクリート中に埋め込み、止水コンクリートの硬化後に筒状仮設体の内部の水抜きを行うことを特徴とする、自立式仮締切工法。
The self-supporting temporary closing method according to the invention described in claim 5 is a self-supporting method in which a cylindrical temporary structure is provided so as to surround an existing underwater bridge pier, and a working space is formed by draining the inside of the cylindrical temporary structure. A temporary closing method,
An overhang plate that projects horizontally outward is provided on the upper surface of the outer periphery of the foundation of the underwater pier, and the tubular temporary body is provided on the upper surface of the overhang plate in the outer portion of the foundation of the underwater pier. A support material that is rigidly joined in an L shape with a support material that rises above the water level along the inner wall surface of the cylindrical temporary structure and a horizontal material that is provided at the lower end of the support material. Installing a plurality of water pressures acting on the cylindrical temporary body in a configuration to transmit,
Providing a partition material that prevents leakage of water-stopping concrete in an arrangement facing the inner wall surface of the lower end portion of the tubular temporary body, in a ring shape;
Each of the plurality of support members is disposed by placing the horizontal member in a direction perpendicular to the tubular temporary body and bolted to the upper surface of the foundation of the underwater bridge pier, and a lower end portion of the tubular temporary body, The L-shaped corner formed by the support material and the horizontal material is placed in the groove formed by the partition material and the upper surface of the projecting plate, and the L-shaped corner portion is formed in the water-resistant concrete. A self-supporting temporary closing method characterized in that water is drained from the inside of the tubular temporary body after being embedded and the water-stopping concrete is hardened.

請求項1〜請求項に係る自立式仮締切構造および自立式仮締切工法によれば、以下の効果を奏する。
端を水位以上とした支保材と、止水コンクリートとを基礎へ定着させて筒状仮設体を自立させることができるので、従来必要不可欠であった切梁が無用となる。よって、工事対象物たる水中橋脚の周囲に工事を制約する何物も存在せず、迅速、かつ確実に工事を進めることができるので、作業効率を飛躍的に向上させることができ、工期短縮を図ることができる。したがって、施工性および経済性に非常に優れている。
また、台船等で行う筒状仮設体の構築作業と、水中で行う支保材及び仕切材の設置作業を並行して実施することもできるので、合理的な作業を行うことができる。
According to the self-supporting temporary fastening structure and the self-supporting temporary fastening method according to claims 1 to 5 , the following effects can be obtained.
Since the cylindrical temporary structure can be made self-supporting by fixing the support material with the top end to the water level or higher and the still water concrete to the foundation, the conventionally required beam is unnecessary. Therefore, there is nothing that restricts the construction around the underwater pier, which is the construction target, and the construction can be carried out quickly and reliably, so the work efficiency can be dramatically improved and the construction period can be shortened. Can be planned. Therefore, it is very excellent in workability and economy.
Moreover, the construction work of the cylindrical temporary body performed by barge or the like, since the installation work of the pre-supports and the partition member performed in water may be performed in parallel, Ru can make rational work.

Aは、本発明に係る自立式仮締切構造を概略的に示した立面図であり、Bは、同平断面図である。A is an elevation view schematically showing a self-supporting temporary closing structure according to the present invention, and B is a plan sectional view of the same. Aは、実施例1に係る自立式仮締切構造の枢要部を示した立面図であり、Bは、同平面図である。A is an elevation view showing a pivotal part of the self-supporting temporary closing structure according to the first embodiment, and B is a plan view of the same. Aは、参考例1に係る自立式仮締切構造の枢要部を示した立面図であり、Bは、同平面図である。A is an elevation view showing a pivotal part of the self-standing temporary closing structure according to Reference Example 1 , and B is a plan view of the same. Aは、参考例2に係る自立式仮締切構造の枢要部を示した立面図であり、Bは、同平面図である。A is an elevation view showing a pivotal part of a self-supporting temporary closing structure according to Reference Example 2 , and B is a plan view of the same. Aは、参考例3に係る自立式仮締切構造の枢要部を示した立面図であり、Bは、同平面図である。A is an elevation view showing a pivotal part of a self-supporting temporary closing structure according to Reference Example 3 , and B is a plan view of the same. Aは、参考例4に係る自立式仮締切構造の枢要部を示した立面図であり、Bは、同平面図である。A is an elevation view showing a pivotal part of a self-supporting temporary closing structure according to Reference Example 4 , and B is a plan view of the same. 参考例5に係る自立式仮締切構造の枢要部を示した立面図である。 10 is an elevational view showing a pivotal part of a self-supporting temporary closing structure according to Reference Example 5. FIG. 参考例5に係る自立式仮締切構造のバリエーションを示した立面図である。 10 is an elevation view showing a variation of the self-supporting temporary closing structure according to Reference Example 5. FIG. Aは、実施例に係る自立式仮締切構造の枢要部を示した立面図であり、Bは、同平面図である。A is the elevation which showed the principal part of the self-supporting type temporary closing structure which concerns on Example 2 , B is the same top view. 本発明の実施例1に係る自立式仮締切構造のバリエーションを示した平断面図である。It is the plane sectional view showing the variation of the self-standing temporary closing structure concerning Example 1 of the present invention.

本発明に係る自立式仮締切構造および自立式仮締切工法は、剛性が高い支保材を用いて筒状仮設体を自立させることにより、切梁を用いることなく筒状仮設体の水圧による変形(倒れ込み)を防止する技術的思想に立脚している。   In the self-supporting temporary fastening structure and the self-supporting temporary fastening method according to the present invention, the tubular temporary body is deformed by water pressure without using a cutting beam by making the cylindrical temporary body self-supporting using a support material having high rigidity ( It is based on the technical idea that prevents falling down.

図1は、本発明に係る自立式仮締切構造の全体図を概略的に示している。図2は、図1の部分拡大図である。
図示例に係る自立式仮締切構造は、既設の水中橋脚10を囲むように筒状仮設体1を設け、筒状仮設体1の内部の水抜きを行って作業空間12を形成する自立式仮締切構造であり、筒状仮設体1が、水中橋脚10の基礎11の上面に、当該水中橋脚10を囲むように設けられている。
前記筒状仮設体1の内側の周方向に沿って複数(図示例ではバランス良く4個)配置され筒状仮設体1の内壁面に沿って立ち上がり当該筒状仮設体1の変形を防止する支保材2が、前記作業空間12の内部に(アンカー)ボルト5で設置されている。
各支保材2は、筒状仮設体1の内壁面に沿って立ち上がる支柱材21と、同支柱材21の下端に水平に設けられた水平材22と、支柱材21から斜め下方に設けられた斜材23とで構成され、前記支柱材21の天端は、水位(H)以上の高さとされている。
前記筒状仮設体1の下端部の内壁面に対向する配置に仕切材3がリング状に設けられている。
前記筒状仮設体1の下端部と仕切材3と水中橋脚10の基礎11の上面とで形成した凹溝部に止水コンクリート4が打設されて前記支保材2の支柱材21と水平材22とで形成した前記L字形のコーナー部が前記止水コンクリート4中に埋め込まれている。
FIG. 1 schematically shows an overall view of a self-supporting temporary closing structure according to the present invention. FIG. 2 is a partially enlarged view of FIG.
In the self-supporting temporary closing structure according to the illustrated example, a cylindrical temporary body 1 is provided so as to surround an existing underwater bridge pier 10, and the working space 12 is formed by draining water inside the cylindrical temporary structure 1. The tubular temporary structure 1 is provided on the upper surface of the foundation 11 of the underwater pier 10 so as to surround the underwater pier 10.
A plurality (four in a balanced manner in the illustrated example) are arranged along the inner circumferential direction of the cylindrical temporary body 1 and rise along the inner wall surface of the cylindrical temporary body 1 to prevent deformation of the cylindrical temporary body 1. The material 2 is installed inside the working space 12 with (anchor) bolts 5.
Each supporting material 2 is provided with a column material 21 rising along the inner wall surface of the cylindrical temporary body 1, a horizontal material 22 provided horizontally at the lower end of the column material 21, and obliquely below the column material 21. It is comprised with the diagonal material 23, and the top end of the said support | pillar material 21 is made into the height more than a water level (H).
A partition member 3 is provided in a ring shape so as to face the inner wall surface of the lower end portion of the cylindrical temporary body 1.
Water- stopping concrete 4 is placed in a groove formed by the lower end portion of the tubular temporary body 1, the partition material 3, and the upper surface of the foundation 11 of the underwater bridge pier 10, and the support material 2 and the horizontal material 22. The L-shaped corner portion formed by and is embedded in the water-stopping concrete 4 .

前記筒状仮設体1の具体的構成は後述する自立式仮締切工法で説明するが、図示例に係る筒状仮設体1は、複数枚のライナープレートを周方向および高さ方向に互いに連結することにより、補強工事及び補修工事の対象物たる既設の水中橋脚10の平断面形状に対応させた円形状に形成して実施している。ちなみに、図示例に係る筒状仮設体1は、直径が6500mm程度、高さが1500mm程度の大きさで、鉛直方向に補強リング19を配し、水中橋脚10の基礎11の外周部に載置されている。
なお、前記筒状仮設体1の平断面形状は、切梁を無用とするので水中橋脚の平断面形状に拘わらず、円形のほか小判形(図10参照)、矩形等でも実施できる。筒状仮設体1の大きさ及び形状は、工事対象物たる水中橋脚10の形態、水位(H)、及び工事に必要な作業空間12に応じて適宜設計変更される(図10参照)。
Although the concrete structure of the said cylindrical temporary body 1 is demonstrated by the self-supporting temporary closing method mentioned later, the cylindrical temporary body 1 which concerns on the example of illustration connects several liner plates mutually in the circumferential direction and a height direction. Therefore, it is carried out by forming it into a circular shape corresponding to the flat cross-sectional shape of the existing underwater bridge pier 10 which is the object of reinforcement work and repair work. Incidentally, the tubular temporary body 1 according to the illustrated example has a diameter of about 6500 mm and a height of about 1500 mm, and is provided with a reinforcing ring 19 in the vertical direction and placed on the outer periphery of the foundation 11 of the underwater pier 10. Has been.
In addition, since the cross-sectional shape of the said cylindrical temporary body 1 does not use a cut beam, it can be implemented not only in a circular cross-sectional shape but also in an oval shape (see FIG. 10), a rectangular shape, etc. The size and shape of the tubular temporary body 1 are appropriately changed in design according to the form of the underwater pier 10 as a construction object, the water level (H), and the work space 12 necessary for the construction (see FIG. 10).

前記筒状仮設体1を支える支保材2は、既設の水中橋脚10の四方にバランスよく計4個設けられている。
各支保材2は、図2に示したように、筒状仮設体1の内壁面に沿って立ち上がる支柱材21と、同支柱材21の下端に水平に設けられた水平材22と、支柱材21から斜め下方に設けられた斜材23とから成り、各部材の当接部を溶接(又はボルト)で接合して一体的に剛結されている。
上記構成の各支保材2は、前記水平材22を筒状仮設体1に対し直角方向に配置し、図示例では、支保材2を構成する水平材22の下面に2箇所固定したプレート6に複数のアンカーボルト5を打ち込むことにより、水中橋脚10の基礎11の外周部に着脱可能に設置している。
A total of four support members 2 that support the tubular temporary body 1 are provided in a well-balanced manner on four sides of the existing underwater bridge pier 10.
As shown in FIG. 2, each support material 2 includes a column material 21 that rises along the inner wall surface of the cylindrical temporary body 1, a horizontal material 22 that is provided horizontally at the lower end of the column material 21, and a column material. 21 and a diagonal member 23 provided obliquely downward from 21. The contact portions of the respective members are joined together by welding (or bolts) to be integrally rigidly connected.
Each support member 2 having the above-described configuration is arranged on the plate 6 in which the horizontal member 22 is arranged in a direction perpendicular to the cylindrical temporary body 1 and fixed to two lower surfaces of the horizontal member 22 constituting the support member 2 in the illustrated example. By driving a plurality of anchor bolts 5, they are detachably installed on the outer periphery of the foundation 11 of the underwater pier 10.

なお、図示例に係る支保材2の個数は勿論4個に限定されず、適用する筒状仮設体1の大きさ、筒状仮設体1に作用する水圧等に応じて適宜増減可能である。前記支保材2を構成する支柱材21、水平材22、及び斜材23は、すべてH形鋼が用いられているがこれに限定されず、I形鋼、鋼管等の鋼材、又はこれらの組み合わせでも同様に実施できる。 前記支保材2は、支柱材21、水平材22、及び斜材23で構成するほか、筒状仮設体1を安定状態で自立させ得ることを条件に、支柱材21と水平材22とからなるL字形の支保材、或いは支柱材21と斜材23とからなる支保材でも実施できる。
支保材2の大きさについては、特に基礎11上に固定した支柱材21の天端が水位(H)以上となる高さとし、当該支柱材21を安定状態で自立させるのに好適な大きさの水平材22及び(/又は)斜材23で実施されている。ちなみに、図示例に係る支柱材21の高さは、前記筒状仮設体1と同等の1500mm程度で実施し、水平材22の長さは1000mm程度で実施している。支保材2を構成する支柱材21、水平材22、及び斜材23に用いるH形鋼の断面寸法は、一例として、ともに125×125×6.9×9(mm)で実施している。さらに、本実施例に係る支保材2を設置する水中橋脚10の基礎11は既存基礎11で実施しているが、新設(増設含む)の基礎でも同様に実施できる。
Of course, the number of supporting members 2 according to the illustrated example is not limited to four, and can be appropriately increased or decreased according to the size of the cylindrical temporary body 1 to be applied, the water pressure acting on the cylindrical temporary body 1, and the like. The support material 21, the horizontal material 22, and the diagonal material 23 constituting the support material 2 are all H-shaped steel, but are not limited to this, steel materials such as I-shaped steel and steel pipe, or a combination thereof. But it can be done in the same way. The support material 2 is composed of a support material 21, a horizontal material 22, and a diagonal material 23, and is composed of a support material 21 and a horizontal material 22 on the condition that the cylindrical temporary structure 1 can be made independent in a stable state. An L-shaped support material or a support material composed of the support material 21 and the diagonal material 23 can also be implemented.
The size of the pre-supports 2, high Satoshi, a size suitable to cause free-standing the struts 21 in a stable state crest of the strut member 21 fixed on the foundation 11 in JP becomes water level (H) or The horizontal member 22 and / or the diagonal member 23 are used. By the way, the height of the support material 21 according to the illustrated example is about 1500 mm, which is equivalent to the cylindrical temporary body 1, and the length of the horizontal material 22 is about 1000mm. As an example, the cross-sectional dimensions of the H-section steel used for the support member 21, the horizontal member 22, and the diagonal member 23 constituting the support member 2 are 125 × 125 × 6.9 × 9 (mm). Furthermore, although the foundation 11 of the underwater pier 10 on which the support material 2 according to the present embodiment is installed is implemented by the existing foundation 11, it can be similarly implemented by the foundation of a new construction (including an extension).

前記筒状仮設体1と支保材2との設置間隔については、筒状仮設体1に作用する水圧を支保材2へ確実に伝達させるべく、筒状仮設体10に配した補強リング19のフランジ面と支保材2を構成する支柱材21のフランジ面とが当接する間隔で実施されている。補強リング19を用いないで筒状仮設体10を形成する場合には、筒状仮設体10を構成するライナープレートの周方向フランジが、支柱材21のフランジ面と当接する間隔で実施されている。なお、最終調整の段階で、前記筒状仮設体1と支保材2との間に隙間が生じている場合には、当該隙間に楔を打ち込む等して筒状仮設体1に作用する水圧を支保材2へ確実に伝達させる工夫は適宜行われる。   With respect to the installation interval between the tubular temporary body 1 and the support member 2, the flange of the reinforcing ring 19 disposed on the tubular temporary body 10 is surely transmitted to the support member 2 so that the water pressure acting on the tubular temporary body 1 is transmitted. It is carried out at an interval at which the surface and the flange surface of the support material 21 constituting the support material 2 abut. In the case where the cylindrical temporary body 10 is formed without using the reinforcing ring 19, the circumferential flange of the liner plate constituting the cylindrical temporary body 10 is carried out at an interval at which it abuts against the flange surface of the column material 21. . In the final adjustment stage, when a gap is generated between the tubular temporary body 1 and the support material 2, a hydraulic pressure acting on the tubular temporary body 1 is applied by driving a wedge into the gap. A device to ensure transmission to the support material 2 is appropriately performed.

前記仕切材3は、所要の曲率で湾曲させた鋼板等のプレート材3を用い、隣り合う支保材2同士の間に断続的に配設し、支保材2(特には水平材22)とプレート材3との取り合い部にシール手段を施す等して、全体的に、後に打設する止水コンクリート4が漏れないようなリング状に形成している。ちなみに、本実施例に係る仕切材(プレート材)3は、止水コンクリート4を形成するのに必要な高さ(図示例では200mm程度)で、筒状仮設体1から300mm程度の間隔をあけ、当該筒状仮設体1の平断面形状(図示例では円形)に近似するリング状に設けられている。
なお、本実施例に係る仕切材3は、リング状に形成することにより起立させているがこの限りでなく、所要の間隔毎に斜材(控え材)を設けて起立させたり、下端にプレートを設けた倒立T字形状に形成して起立させるなど種々の起立方法が採用される。
The partition material 3 uses a plate material 3 such as a steel plate curved with a required curvature, and is intermittently disposed between the adjacent support materials 2 to support the support material 2 (particularly the horizontal material 22) and the plate. Sealing means is applied to the joint portion with the material 3 to form a ring shape so that the waterproof concrete 4 to be placed later does not leak. Incidentally, the partition material (plate material) 3 according to the present embodiment has a height (about 200 mm in the illustrated example) necessary to form the water-stopping concrete 4 and is spaced from the cylindrical temporary body 1 by about 300 mm. The cylindrical temporary body 1 is provided in a ring shape that approximates the flat cross-sectional shape (circular in the illustrated example).
In addition, although the partition material 3 which concerns on a present Example is made to stand by forming in a ring shape, it is not this limitation, It provides with diagonal material (holding material) for every required space | interval, or it is a plate in a lower end. Various standing-up methods, such as forming an upside-down T-shape with a ridge and standing up, are employed.

前記仕切材3と筒状仮設体1と基礎11とで形成したリング状の凹溝部内には止水コンクリート4が打設されている。止水コンクリート4を打設する際には予め、筒状仮設体1の下端に基礎11との隙間を塞ぐゴムベルト等のシール部材の取り付けや、土嚢による間詰め等は適宜行われる。
かくして、打設した止水コンクリート4が硬化することにより、筒状仮設体1の下端部の止水を確実に図ることができると共に、支保材2を基礎11にさらに強固に定着させることができる。
A water-stopping concrete 4 is placed in a ring-shaped concave groove formed by the partition member 3, the tubular temporary body 1 and the foundation 11. When the water-stopping concrete 4 is placed, attachment of a sealing member such as a rubber belt that closes the gap with the base 11 at the lower end of the tubular temporary body 1 or padding with a sandbag is appropriately performed.
Thus, when the placed water-stopping concrete 4 is cured, water can be reliably stopped at the lower end portion of the tubular temporary body 1 and the support material 2 can be more firmly fixed to the foundation 11. .

上記自立式仮締切構造は、以下のような手順で行う。
先ず、筒状仮設体1の構築作業を台船を利用する等して行う。
台船を利用する場合は、台船を橋脚に近づけて浮かべ、作業の足場とする。この台船上で、弧状の複数枚(図示例では4枚。以下同じ。)のライナープレートを周方向に接続して円弧状の第1段目のライナープレートを構築する。次に、第1段目のライナープレートを橋桁に取り付けた揚重機によりワイヤで吊り上げ、その下方で前記と同様に、弧状の複数枚のライナープレートを周方向に接続して円弧状の第2段目のライナープレートを構築する。次に、第1段目のライナープレートを下降させ、第2段目のライナープレートをピッチをずらし、補強リング19を介在させて両者を接続する。次に、接続した第1段目及び第2段目のライナープレートを揚重機によりワイヤで吊り上げ、その下方で前記と同様に、弧状の複数枚のライナープレートを周方向に接続して円弧状の第3段目のライナープレートを構築する。次に、接続された第1段目及び第2段目のライナープレートを下降させ、第3段目のライナープレートをピッチをずらし、補強リング19を介在させて両者を接続し、かくして筒状仮設体1が構築される。
The above self-supporting temporary closing structure is performed in the following procedure.
First, the construction work of the tubular temporary body 1 is performed by using a carriage.
When using a trolley, float the trolley close to the pier and use it as a scaffold for work. On this carriage, a plurality of arc-shaped liner plates (four in the illustrated example; the same applies hereinafter) liner plates are connected in the circumferential direction to construct an arc-shaped first-stage liner plate. Next, the first stage liner plate is lifted with a wire by a lifting machine attached to the bridge girder, and a plurality of arc-shaped liner plates are connected in the circumferential direction at the lower side in the same manner as described above. Build an eye liner plate. Next, the first-stage liner plate is lowered, the pitch of the second-stage liner plate is shifted, and the two are connected via the reinforcing ring 19. Next, the connected first-stage and second-stage liner plates are lifted with a wire by a lifting machine, and below the same, a plurality of arc-shaped liner plates are connected in the circumferential direction in the same manner as described above. Build a third stage liner plate. Next, the connected first-stage and second-stage liner plates are lowered, the third-stage liner plates are shifted in pitch, and both are connected via the reinforcing ring 19, thus forming a cylindrical temporary Body 1 is constructed.

なお、構築する筒状仮設体1の大きさ及び形状は、工事対象物たる水中橋脚10の形態、水位(H)、及び工事に必要な作業空間12に基づいて構造設計されるが、本実施例では、直径が6500mm程度、高さが1500mm程度の大きさの円筒形状の筒状仮設体1を構築して実施している。図示例に係る筒状仮設体1は前記3段からなるライナープレートで構築しているが勿論これに限定されず、4段以上からなるライナープレートも前記工程に倣って構築することができる。
また、筒状仮設体1の構築作業を水密的に行うべく、各ライナープレートの接続部にパッキンを介す等のシール手段を施すことは適宜行われる。
さらに、本実施例に係る筒状仮設体1はライナープレートで構築しているがこれに限定されず、コルゲートシート(コルゲートセクション含む)、鋼製セグメント、或いはPCセグメントでも同様に実施することができる。
ライナープレートを吊り上げる揚重機は橋桁に取り付けるほか、作業船に搭載することもできるし、岸に近い場合は陸上のクレーン車を利用することもできる。
In addition, although the size and shape of the cylindrical temporary body 1 to be constructed are structurally designed based on the form of the underwater bridge pier 10 as a construction object, the water level (H), and the work space 12 necessary for the construction, In the example, the cylindrical temporary structure 1 having a diameter of about 6500 mm and a height of about 1500 mm is constructed and implemented. The cylindrical temporary body 1 according to the illustrated example is constructed of the three-stage liner plate, but is not limited to this, and a liner plate of four or more stages can also be constructed following the above steps.
Moreover, in order to perform the construction work of the cylindrical temporary body 1 in a watertight manner, it is appropriately performed to provide a sealing means such as a packing at the connection portion of each liner plate.
Furthermore, although the cylindrical temporary body 1 which concerns on a present Example is constructed | assembled with the liner plate, it is not limited to this, It can implement similarly also with a corrugated sheet (a corrugated section is included), a steel segment, or a PC segment. .
The lifter that lifts the liner plate can be mounted on a bridge girder, mounted on a work boat, or on land cranes when close to the shore.

台船上での筒状仮設体1の構築作業を終えた後、以下のような水中作業に着手する。
すなわち、台船を水中橋脚10から遠ざけ、前記揚重機により構築した筒状仮設体1を下降させて水中橋脚10の基礎11上の所定の位置に載置する(図2参照)。
次に、基礎11上に載置した筒状仮設体1の内方に突き出た補強リング19のフランジ面に、支柱材21のフランジ面が当接するように、支保材2を配設する。本実施例に係る支保材2は、前記筒状仮設体1を自立させるのに好適な部位にバランス良く複数(図示例では4個)配置し、各支保材2の支柱材21のフランジ面を補強リング19のフランジ面に当接させた状態で、水平材22をアンカーボルト5で着脱可能に基礎11上に設置して実施している。
次に、隣り合う支保材2同士の間に、前記仕切材(プレート材)3を断続的に配設し、支保材2を構成する水平材22と、仕切材3との取り合い部にシール手段を施す等して、全体的にリング状に形成する。図示例に係る仕切材3は所要の曲率で湾曲されているので自立させることもできるが、仕切材3の両端部を水平材22に溶接又はボルトで接合して起立させてもよいし、上述したように所要の間隔毎に斜材を設けて起立させることもできる。
After completing the construction work of the tubular temporary body 1 on the trolley, the underwater work described below is started.
That is, the trolley is moved away from the underwater pier 10, and the tubular temporary body 1 constructed by the lifting machine is lowered and placed at a predetermined position on the foundation 11 of the underwater pier 10 (see FIG. 2).
Next, the support material 2 is disposed so that the flange surface of the support member 21 comes into contact with the flange surface of the reinforcing ring 19 protruding inward of the cylindrical temporary body 1 placed on the foundation 11. A plurality of support materials 2 according to the present embodiment are arranged in a balanced manner (four in the illustrated example) in a portion suitable for allowing the tubular temporary body 1 to stand on its own, and the flange surface of the support material 21 of each support material 2 is arranged. The horizontal member 22 is installed on the foundation 11 so as to be detachable with the anchor bolt 5 while being in contact with the flange surface of the reinforcing ring 19.
Next, the partition material (plate material) 3 is intermittently disposed between the adjacent support materials 2, and a sealing means is provided at a joint portion between the horizontal material 22 constituting the support material 2 and the partition material 3. To form a ring shape as a whole. Since the partition member 3 according to the illustrated example is curved with a required curvature, the partition member 3 can be self-supporting, but both ends of the partition member 3 may be welded or joined to the horizontal member 22 with a bolt or may be erected. As described above, diagonal materials can be provided at every required interval to stand up.

なお、本実施例では、既設の基礎11上に筒状仮設体1、支保材2、及び仕切材3を設けて実施しているが、当該基礎11は新設でも増設でもよい。要するに、水中橋脚10を工事するに際し、作業空間を確保するのに必要な筒状仮設体1を構造設計し、当該筒状仮設体1を載置する部位に既設基礎が存在していれば当該基礎を利用するし、基礎がなければ基礎を新設または増設し、その上に筒状仮設体1、支保材2、及び仕切材3を設けて実施する。
また、本実施例に係る水中作業の手順は、筒状仮設体1を基礎11上に載置した後、支保材2及び仕切材3の設置作業を行っているがこれに限定されず、支保材2及び仕切材3の設置作業を行った後、筒状仮設体1を基礎11上に載置してもよい。以下の実施例についても同様の技術的思想とする。
In addition, in the present Example, although the cylindrical temporary body 1, the support material 2, and the partition material 3 are provided and implemented on the existing foundation 11, the said foundation 11 may be newly installed or expanded. In short, when the underwater bridge pier 10 is constructed, if the tubular temporary body 1 necessary for securing the work space is structurally designed and the existing foundation is present at the part on which the tubular temporary body 1 is placed, If the foundation is used, or if there is no foundation, the foundation is newly installed or expanded, and the tubular temporary body 1, the support material 2, and the partition material 3 are provided on the foundation.
Further, the underwater work procedure according to the present embodiment is not limited to this, although the installation work of the support material 2 and the partition material 3 is performed after the cylindrical temporary body 1 is placed on the foundation 11. After the installation work of the material 2 and the partition material 3, the cylindrical temporary body 1 may be placed on the foundation 11. The same technical idea applies to the following embodiments.

かくして、基礎11上に筒状仮設体1、支保材2、及び仕切材3を設けた後、筒状仮設体1の下端に、必要に応じて基礎11との隙間を塞ぐゴムベルト等のシール部材の取り付けや、土嚢による間詰め等を適宜行う。次に、仕切材3と筒状仮設体1と基礎11とで形成したリング状の凹溝部内に止水(水中)コンクリート4を打設する。止水コンクリート4を打設する際は、筒状仮設体1の内部の水抜きをした際に筒状仮設体1が浮力によりずり動かないように、基礎11と止水コンクリート4との定着を図るための異形棒鋼等のアンカー(又は差し筋)7を基礎11へ打ち込んでおく。
前記止水コンクリート4が養生した後、筒状仮設体1の下端の止水が確実に図られていることを確認し、筒状仮設体1の内部の水抜きを行い作業空間12を形成する。
かくして、水中での作業をすべて終えた後、水中橋脚10の補強工事又は補修工事に着手する。
Thus, after providing the cylindrical temporary body 1, the support material 2, and the partition material 3 on the foundation 11, a sealing member such as a rubber belt that closes the gap with the foundation 11 as necessary at the lower end of the cylindrical temporary structure 1. Attaching the padding and / or padding with sandbags is performed as appropriate. Next, water-stopping (underwater) concrete 4 is placed in a ring-shaped concave groove formed by the partition member 3, the tubular temporary body 1, and the foundation 11. When the water-stopping concrete 4 is placed, the foundation 11 and the water-stopping concrete 4 are fixed so that the tubular temporary structure 1 does not move due to buoyancy when the water inside the tubular temporary structure 1 is drained. An anchor (or reinforcing bar) 7 such as a deformed steel bar for driving is driven into the foundation 11.
After the water-stopping concrete 4 is cured, it is confirmed that the water is surely stopped at the lower end of the tubular temporary body 1, and the interior of the tubular temporary body 1 is drained to form the work space 12. .
Thus, after all the underwater work has been completed, the underwater bridge pier 10 is reinforced or repaired.

水中橋脚10の補強工事又は補修工事が完了した後は、筒状仮設体1の最下段以外のライナープレートは、最下段との接続部のボルトを外せば容易に撤去でき、他の箇所で実施する仮締切工法に転用できる。前記最下段のライナープレートと支保材2は、水中での止水コンクリート4の斫り作業を伴うが撤去することも可能である。特に支保材2は、アンカーボルト5で着脱可能に基礎11へ設置しているので、止水コンクリート4の斫り作業が済めば楽に取り外すことができる。   After the underwater bridge pier 10 has been reinforced or repaired, the liner plate other than the lowest level of the tubular temporary body 1 can be easily removed by removing the bolt at the connection with the lowest level, and implemented at other locations. Can be diverted to the temporary closing method. The lowermost liner plate and the supporting material 2 are accompanied by a work of turning the water-stopping concrete 4 in water, but can also be removed. In particular, since the support material 2 is detachably installed on the foundation 11 with the anchor bolts 5, it can be easily removed after the water-stopping concrete 4 has been turned.

上述した自立式仮締切構造および自立式仮締切工法によれば、天端を水位(H)以上とした支保材2と止水コンクリート4とを基礎11へ定着させて筒状仮設体1を自立させることができるので、従来必要不可欠であった切梁が無用となる。
よって、工事対象物たる水中橋脚10の周囲に工事を制約する何物も存在せず、迅速、かつ確実に工事を進めることができるので、作業効率を飛躍的に向上させることができ、工期短縮を図ることができる。したがって、施工性および経済性に非常に優れている。
また、台船等で行う筒状仮設体1の構築作業と、水中で行う支保材2及び仕切材3の設置作業とを並行して実施することもできるので、合理的な作業を行うことができる。
[参考例1]
According to the above-described self-supporting temporary closing structure and the self-supporting temporary closing method, the tubular temporary structure 1 is self-supported by fixing the support material 2 having the top end to the water level (H) or higher and the still water concrete 4 to the foundation 11. Therefore, the beam that has been indispensable in the past becomes useless.
Therefore, there is nothing to restrict the construction around the underwater pier 10 that is the construction target, and the construction can be carried out quickly and reliably, so that the work efficiency can be dramatically improved and the construction period can be shortened. Can be achieved. Therefore, it is very excellent in workability and economy.
Moreover, since the construction work of the cylindrical temporary body 1 performed with a trolley etc. and the installation work of the support material 2 and the partition material 3 performed underwater can also be implemented in parallel, a rational work can be performed. it can.
[Reference Example 1]

図3は、自立式仮締切構造および自立式仮締切工法の参考例1を示している。この図3に係る自立式仮締切構造は、上記実施例1と比して、基礎11と支保材2との間にベース部材8を介在させて当該支保材2を嵩上げしたことが主に相違する。筒状仮設体1、支保材2、及び仕切材3などの構成部材は、上記実施例1と同様なので同一の符号を付してその説明を適宜省略する。
具体的に、図示例に係る前記ベース部材8は、所定の部位に方形状に組み立てた型枠内へ水中コンクリートを打設し、直方体に形成して実施している。前記ベース部材8は、当該ベース部材8に設置する支保材2を安定した状態で支持可能な大きさで実施することはもとより、止水コンクリート4の打設スペースを確保できる部位に設ける。ちなみに、図示例に係るベース部材8の高さ寸法は、前記仕切材3と同等の200mm程度で実施している。なお、前記ベース部材(水中コンクリート)8と基礎11との定着性を高めるべく、基礎11の上面に目荒しを施し、異形棒鋼等のアンカー9(又は差し筋)を基礎11に打ち込んでベース部材8を構築する等の工夫は適宜行われる。
前記支保材2は、支保材2を構成する水平材22の下面に2箇所固定したプレート6に複数のアンカーボルト5を打ち込むことにより、当該ベース部材8の上面に着脱可能に設置している。
前記仕切材3を起立させて固定する方法は上述したように種々の方法を採用できる。
Figure 3 shows a reference example 1 of the own Tatsushiki provisional deadline structural and self-supporting temporary deadline method. 3 is different from the first embodiment mainly in that the support member 2 is raised by interposing a base member 8 between the base 11 and the support member 2. To do. Since the structural members such as the cylindrical temporary body 1, the support material 2, and the partition material 3 are the same as those in the first embodiment, the same reference numerals are given and the description thereof is omitted as appropriate.
Specifically, the base member 8 according to the illustrated example is formed by placing underwater concrete into a rectangular frame assembled at a predetermined site and forming it into a rectangular parallelepiped. The base member 8 is provided in a portion where a space for placing the water-stopping concrete 4 can be secured, as well as the support member 2 installed on the base member 8 in a stable size. Incidentally, the height dimension of the base member 8 according to the illustrated example is about 200 mm, which is equivalent to the partition member 3. In order to improve the fixing property between the base member (underwater concrete) 8 and the foundation 11, the upper surface of the foundation 11 is roughened, and an anchor 9 (or a reinforcing bar) such as a deformed steel bar is driven into the base 11 to form the base member. The idea of constructing 8 is appropriately performed.
The support material 2 is detachably installed on the upper surface of the base member 8 by driving a plurality of anchor bolts 5 into a plate 6 fixed at two positions on the lower surface of the horizontal material 22 constituting the support material 2.
As described above, various methods can be adopted as a method of standing and fixing the partition member 3.

この参考例1に係る自立式仮締切工法は、前記基礎11上の所定の部位にベース部材8を構築した後、台船上で構築した前記筒状仮設体1を揚重機により下降させて水中橋脚10の基礎11上の所定の位置に載置する。しかる後、前記ベース部材8上に支保材2を設置すると共に、仕切材3をリング状に配設する。その後に行う止水コンクリートの打設作業は上記実施例1と同様に進め(段落[0028]参照)、これらの水中での作業をすべて終えた後、水中橋脚10の補強工事又は補修工事に着手する。 In the self-supporting temporary closing method according to the first reference example , after the base member 8 is constructed at a predetermined part on the foundation 11, the tubular temporary structure 1 constructed on the trolley is lowered by a lifting machine, and the underwater pier is constructed. 10 at a predetermined position on the foundation 11. Thereafter, the support member 2 is installed on the base member 8 and the partition member 3 is arranged in a ring shape. Subsequent work for placing water-stopping concrete proceeds in the same way as in Example 1 above (see paragraph [00 28 ]). After all these underwater operations have been completed, the underwater bridge pier 10 is reinforced or repaired. Start.

この参考例1に係る自立式仮締切構造および自立式仮締切工法によれば、上記実施例1に係る作用効果(段落[0030]参照)を奏することは勿論のこと、前記支保材2は、ベース部材8及び止水コンクリート4の上面に設置し、且つベース部材8にアンカーボルト5で着脱可能に設置した構成で実施するので、支保材2の水中での撤去作業をアンカーボルト5を取り外すだけで行うことができ、上記実施例1と比し、止水コンクリート4の斫り作業をする必要がなく大変至便である。上記背景技術の項で挙げた先行技術と比しても同等以下の手間で撤去することができる。 According to the self-supporting temporary fastening structure and the self-supporting temporary fastening method according to the first reference example , the support material 2 is not limited to the effects of the first embodiment (see paragraph [00 30 ]). Since the base member 8 is installed on the upper surface of the water-stopping concrete 4 and the base member 8 is detachably installed on the base member 8 with the anchor bolt 5, the anchor bolt 5 is removed from the support member 2 in water. Compared with the above-mentioned Example 1, it is not necessary to work on the water-stopping concrete 4 and is very convenient. Even if compared with the prior art mentioned in the above-mentioned background art section, it can be removed with the same or less effort.

なお、本参考例1では、ベース部材(水中コンクリート)8と止水コンクリート4とを打ち分けて実施しているが、コンクリートの打設作業を合理的に行うべく、一度(同時期)に打設して実施することもできる。
[参考例2]
In this reference example 1, the base member (underwater concrete) 8 and the still water concrete 4 are separately placed. However, in order to rationalize the concrete placement work, it is placed once (simultaneously). It can also be implemented.
[Reference Example 2]

図4は、自立式仮締切構造および自立式仮締切工法の参考例2を示している。この図4に係る自立式仮締切構造は、上記実施例1と比して、基礎11と支保材2との間にベース部材8’を介在させて当該支保材2を嵩上げしたことが主に相違する。いわば上記参考例1の代替案である。筒状仮設体1、支保材2、及び仕切材3などの構成部材は、上記実施例1と同様なので同一の符号を付してその説明を適宜省略する。
図示例に係る前記ベース部材8’はH形鋼を用い、当該ベース部材8’に設置する支保材2を安定した状態で支持可能な大きさ及び配置で実施する。具体的には、長さ500mm程度の2本のH形鋼8’を、当該H形鋼8’上に設置する支保材2を構成する水平材22の中央部と開放端部に相当する位置に配置し、そのウエブ部を鉛直方向にしてフランジ部と基礎11とをアンカーボルト15で固定している。基礎11上に固定されたベース部材8’の上面には、支保材2を構成する水平材22が設置され、ベース部材8’のフランジ部と水平材22に設けたプレート6とをボルト16で着脱可能に接合されている。ちなみに、図示例に係るベース部材(H形鋼)8’の高さ寸法は、前記仕切材3と同等の200mm程度で実施している。また、ベース部材8’は、鋼材であれば上述したH形鋼以外にも支保材2を載置できる構造を形成していれば、I形鋼や山形鋼、溝形鋼などの形鋼を組み合わせたものや、角形鋼管などであってもよい。
参考例2に係る仕切材3は、所要の曲率で湾曲させた複数枚のプレート材を溶接又はボルトの接合手段で適宜継ぎ足してリング状に形成して起立させている。
Figure 4 shows a reference example 2 of self Tatsushiki provisional deadline structural and self-supporting temporary deadline method. Compared with the first embodiment, the self-supporting temporary closing structure according to FIG. 4 is mainly that the support member 2 is raised by interposing a base member 8 ′ between the base 11 and the support member 2. Is different. In other words, this is an alternative to Reference Example 1 above. Since the structural members such as the cylindrical temporary body 1, the support material 2, and the partition material 3 are the same as those in the first embodiment, the same reference numerals are given and the description thereof is omitted as appropriate.
The base member 8 ′ according to the illustrated example uses H-shaped steel, and is implemented in a size and arrangement that can support the support member 2 installed on the base member 8 ′ in a stable state. Specifically, two H-section steels 8 ′ having a length of about 500 mm are positioned corresponding to the central portion and the open end portion of the horizontal member 22 constituting the support member 2 installed on the H-section steel 8 ′. The flange portion and the foundation 11 are fixed with anchor bolts 15 with the web portion set in the vertical direction. On the upper surface of the base member 8 ′ fixed on the foundation 11, a horizontal member 22 constituting the support member 2 is installed, and the flange portion of the base member 8 ′ and the plate 6 provided on the horizontal member 22 are connected with bolts 16. It is detachably joined. Incidentally, the base member (H-section steel) 8 ′ according to the illustrated example has a height dimension of about 200 mm, which is equivalent to the partition member 3. Moreover, if base member 8 'forms the structure which can mount support material 2 other than H shape steel mentioned above if it is steel materials, shape steels, such as I shape steel, angle steel, and channel steel, will be used. A combination or a square steel pipe may be used.
The partition member 3 according to the present reference example 2 is made up of a plurality of plate materials curved with a required curvature by appropriately adding a welding or bolt joining means to form a ring shape.

この参考例2に係る自立式仮締切工法は、前記基礎11上の所定の部位にベース部材8’を配設した後、台船上で構築した前記筒状仮設体1を揚重機により下降させて水中橋脚10の基礎11上の所定の位置に載置する。しかる後、前記ベース部材8’上に支保材2を設置すると共に、仕切材3をリング状に配設する。その後に行う止水コンクリートの打設作業は上記実施例1と同様に進め(段落[0028]参照)、これらの水中での作業をすべて終えた後、水中橋脚10の補強工事又は補修工事に着手する。 In the self-supporting temporary closing method according to the reference example 2 , after the base member 8 'is disposed at a predetermined portion on the foundation 11, the tubular temporary body 1 constructed on the carriage is lowered by a lifting machine. It is placed at a predetermined position on the foundation 11 of the underwater pier 10. Thereafter, the support member 2 is installed on the base member 8 ', and the partition member 3 is arranged in a ring shape. Subsequent work for placing water-stopping concrete proceeds in the same way as in Example 1 above (see paragraph [00 28 ]). After all these underwater operations have been completed, the underwater bridge pier 10 is reinforced or repaired. Start.

この参考例2に係る自立式仮締切構造および自立式仮締切工法によれば、上記実施例1に係る作用効果(段落[0030]参照)を奏することは勿論のこと、上記参考例1と同様に、前記支保材2は、ベース部材8’及び止水コンクリート4の上面に設置し、且つベース部材8’にアンカーボルト5で着脱可能に設置した構造で実施するので、支保材2の水中での撤去作業をアンカーボルト5を取り外すだけで行うことができ、上記実施例1と比し、止水コンクリート4の斫り作業をする必要がなく大変至便である。上記背景技術の項で挙げた先行技術と比しても同等以下の手間で撤去することができる。
[参考例3]
According to free-standing temporary deadline structural and self-supporting temporary deadline method according to the reference example 2, operations and effects according to the above Example 1 (paragraph [00 30] See) be exerted is of course, the above Reference Example 1 Similarly, the support material 2 is installed on the upper surface of the base member 8 ′ and the waterproof concrete 4 and is detachably installed on the base member 8 ′ with anchor bolts 5. The removal work can be performed simply by removing the anchor bolt 5, and compared with the first embodiment, it is not necessary to perform the work of turning the water-stopping concrete 4, which is very convenient. Even if compared with the prior art mentioned in the above-mentioned background art section, it can be removed with the same or less effort.
[Reference Example 3]

図5は、自立式仮締切構造および自立式仮締切工法の参考例3を示している。この図5に係る自立式仮締切構造は、上記参考例1に係るベース部材8をリング状に形成することにより、仕切材3を無用とした実施例を示している。
図示例に係る前記ベース部材(水中コンクリート)18は、水中橋脚10を囲むようにリング状に組み立てた型枠内へ水中コンクリートを打設して実施している。前記ベース部材18は、当該ベース部材18上に設置する支保材2を安定した状態で支持可能な大きさで実施することはもとより、止水コンクリート4の打設スペースを確保できる部位に設ける。ちなみに、図示例に係るベース部材18の高さ寸法は、200mm程度で実施している。なお、前記ベース部材18と基礎11との定着性を高めるべく、基礎11の上面に目荒しを施し、異形棒鋼等のアンカー9(又は差し筋)を基礎11に打ち込んでベース部材18を構築する等の工夫は適宜行われる。
Figure 5 shows a reference example 3 of the own Tatsushiki provisional deadline structural and self-supporting temporary deadline method. The self-standing temporary cutoff structure according to FIG. 5 shows an embodiment in which the partition member 3 is not used by forming the base member 8 according to the reference example 1 in a ring shape.
The base member (underwater concrete) 18 according to the illustrated example is implemented by placing underwater concrete into a mold assembled in a ring shape so as to surround the underwater bridge pier 10. The base member 18 is provided in a portion where a space for placing the water-stopping concrete 4 can be secured as well as the support member 2 installed on the base member 18 in a size that can be supported in a stable state. Incidentally, the height dimension of the base member 18 according to the illustrated example is about 200 mm. In order to improve the fixing property between the base member 18 and the base 11, the upper surface of the base 11 is roughened, and an anchor 9 (or a reinforcing bar) such as a deformed steel bar is driven into the base 11 to construct the base member 18. Such ideas are appropriately performed.

この参考例3に係る自立式仮締切工法は、前記基礎11上の所定の部位にベース部材18をリング状に構築した後、台船上で構築した前記筒状仮設体1を揚重機により下降させて水中橋脚10の基礎11上の所定の位置に載置する。しかる後、前記ベース部材8上に支保材2を設置する。その後に行う止水コンクリートの打設作業は上記実施例1と同様に進め(段落[0028]参照)、これらの水中での作業をすべて終えた後、水中橋脚10の補強工事又は補修工事に着手する。 In the self-supporting temporary closing method according to the reference example 3 , the base member 18 is constructed in a ring shape at a predetermined part on the foundation 11, and then the tubular temporary structure 1 constructed on the trolley is lowered by a lifting machine. Then, it is placed at a predetermined position on the foundation 11 of the underwater pier 10. Thereafter, the support material 2 is installed on the base member 8. Subsequent work for placing water-stopping concrete proceeds in the same way as in Example 1 above (see paragraph [00 28 ]). After all these underwater operations have been completed, the underwater bridge pier 10 is reinforced or repaired. Start.

この参考例3に係る自立式仮締切構造および自立式仮締切工法によれば、上記実施例1に係る作用効果(段落[0030]参照)を奏することは勿論のこと、前記支保材2は、ベース部材18及び止水コンクリート4の上面に設置し、且つベース部材18にアンカーボルト5で着脱可能に設置した構造で実施するので、支保材2の水中での撤去作業をアンカーボルト5を取り外すだけで行うことができ、上記実施例1と比し、止水コンクリート4の斫り作業をする必要がなく大変至便である。上記背景技術の項で挙げた先行技術と比しても同等以下の手間で撤去することができる。
また、前記ベース部材18の壁面が前記仕切材3の役割を兼ねるので仕切材3が無用となり、仕切材3に要する鋼材費の削減に寄与すると共に、仕切材3の設置に伴うシール手段、固定手段も無用となり施工性も向上する。
なお、図示例ではリング状に形成するベース部材18として水中コンクリートで実施しているがこれに限定されず、上記参考例2に用いるH形鋼8’でも同様に実施できる。この場合、筒状仮設体1寄りのH形鋼8’を、所要の曲率で湾曲させた複数本のH形鋼を溶接又はボルトの接合手段で適宜継ぎ足してリング状に形成し、仕切材3の役割を兼ねるベース部材として実施する。
[参考例4]
According to the self-supporting temporary fastening structure and the self-supporting temporary fastening method according to the reference example 3 , the supporting material 2 is not limited to the effects of the first embodiment (see paragraph [00 30 ]). Since the base member 18 and the water-stopping concrete 4 are installed on the upper surface of the base member 18 and the base member 18 is detachably installed with the anchor bolt 5, the anchor bolt 5 is removed from the support member 2 in water. Compared with the above-mentioned Example 1, it is not necessary to work on the water-stopping concrete 4 and is very convenient. Even if compared with the prior art mentioned in the above-mentioned background art section, it can be removed with the same or less effort.
Further, since the wall surface of the base member 18 also serves as the partition member 3, the partition member 3 becomes useless, contributing to the reduction of the steel material cost required for the partition member 3, and the sealing means and fixing accompanying the installation of the partition member 3. Means become useless and workability is improved.
In the illustrated example, the base member 18 formed in a ring shape is made of underwater concrete. However, the present invention is not limited to this, and the same can be applied to the H-section steel 8 ′ used in the reference example 2 . In this case, the H-section steel 8 'close to the cylindrical temporary body 1 is formed into a ring shape by appropriately adding a plurality of H-sections obtained by bending with a required curvature by means of welding or bolt joining, and the partition material 3 It is implemented as a base member that also serves as a role.
[Reference Example 4]

図6は、自立式仮締切構造および自立式仮締切工法の参考例4を示している。この参考例4に係る自立式仮締切構造は、上記参考例1のバリエーションであり、工事対象物たる水中橋脚10の基礎11の上面が傾斜した場合に好適な例を示している。
この参考例4に係る自立式仮締切構造は、上面が傾斜した基礎11に上記参考例1に係るベース部材(水中コンクリート)8を、その上面が水平になるように形成して実施している。よって、上面が傾斜している等の特殊形状をした基礎11の形態に拘わらず、労せずに支保材2(支柱材21)を鉛直方向に設置でき、合理的な施工を行い得る。その他の構成および施工手順は上記参考例1と同様である(段落[0031]、[0032]参照)。
Figure 6 shows a reference example 4 of the own Tatsushiki provisional deadline structural and self-supporting temporary deadline method. The self-supporting temporary closing structure according to the reference example 4 is a variation of the reference example 1 , and shows a preferable example when the upper surface of the foundation 11 of the underwater bridge pier 10 as a construction object is inclined.
In the self-supporting temporary closing structure according to the reference example 4 , the base member (underwater concrete) 8 according to the reference example 1 is formed on the foundation 11 whose upper surface is inclined so that the upper surface is horizontal. . Therefore, irrespective of the form of the foundation 11 having a special shape such as the top surface being inclined, the support material 2 (the support material 21) can be installed in the vertical direction without any effort, and rational construction can be performed. Other configurations and construction procedures are the same as those in Reference Example 1 (see paragraphs [00 31 ] and [00 32 ]).

この参考例4に係る自立式仮締切構造および自立式仮締切工法によれば、上記参考例1に係る作用効果(段落[0033]参照)を奏することは勿論のこと、上面が傾斜している等の特殊形状をした基礎11の形態に拘わらず、労せずに支保材2(支柱材21)を鉛直方向に設置することができる。よって至極合理的な施工を実現でき、フレキシビリティに優れている。
なお、図6に係るベース部材8を、上記参考例3のように、水中橋脚10を囲むようにリング状に形成することにより、仕切材3を無用とする実施も可能である。
[参考例5]
According to free-standing temporary deadline structural and self-supporting temporary deadline method according to this reference example 4, of course it is possible to achieve the operation and effect according to Reference Example 1 (see paragraph [00 33]), and the upper surface is inclined Regardless of the form of the foundation 11 having a special shape such as being present, the support material 2 (the support material 21) can be installed in the vertical direction without any effort. Therefore, extremely reasonable construction can be realized and it has excellent flexibility.
In addition, the base member 8 according to FIG. 6 is formed in a ring shape so as to surround the underwater bridge pier 10 as in the above-described Reference Example 3 , so that the partition member 3 can be dispensed with.
[Reference Example 5]

図7は、自立式仮締切構造および自立式仮締切工法の参考例5を示している。この参考例5に係る自立式仮締切構造は、上記実施例1と比して、水中橋脚10の基礎11の外壁面を仕切材3に代用させることで仕切材3を無用とした点が主に相違する。その他、筒状仮設体1及び支保材2の設置部位、および止水コンクリート4の打設部位も相違する。なお、筒状仮設体1、支保材2などの構成部材は、上記実施例1と同様なので同一の符号を付してその説明を適宜省略する。
前記支保材2は、前記基礎11から張り出した状態で基礎11の外周縁部に設置している。このため、前記筒状仮設体1は当然に基礎2上へ載置することはできないので、基礎11の外壁面に沿ってリング状に取り付けた支持部材13上に載置する構成で実施している。
前記支持部材13は、スチフナーを適所に設けたアングル材が好適に用いられる。当該アングル材は、アンカーボルト5により基礎11の外壁面に固定されている。
前記止水コンクリート4は、基礎11の外壁面と支持部材13の上面と筒状仮設体1の下端部で形成したリング状の凹溝部内に打設され、基礎11の上面と面一の高さに形成している。
その他の構成および施工手順については、筒状仮設体1の設置作業に先行して、基礎11の外壁面に沿って支持部材13を固定しておく以外は、上記実施例1と同様である。
Figure 7 shows a reference example 5 of the self Tatsushiki provisional deadline structural and self-supporting temporary deadline method. The self-supporting temporary cutoff structure according to the reference example 5 is mainly different from the first embodiment in that the partition material 3 is not used by substituting the partition wall 3 for the outer wall surface of the foundation 11 of the underwater pier 10. Is different. In addition, the installation site | part of the cylindrical temporary body 1 and the support material 2 and the placement site | part of the waterproofing concrete 4 are also different. In addition, since structural members, such as the cylindrical temporary body 1 and the support material 2, are the same as that of the said Example 1, the same code | symbol is attached | subjected and the description is abbreviate | omitted suitably.
The support material 2 is installed on the outer peripheral edge of the foundation 11 in a state of protruding from the foundation 11. For this reason, since the said cylindrical temporary body 1 cannot naturally be mounted on the base 2, it implements by the structure mounted on the support member 13 attached to the ring shape along the outer wall surface of the base 11. Yes.
The support member 13 is preferably an angle member provided with stiffeners in place. The angle member is fixed to the outer wall surface of the foundation 11 by anchor bolts 5.
The water-stopping concrete 4 is placed in a ring-shaped concave groove formed by the outer wall surface of the foundation 11, the upper surface of the support member 13, and the lower end of the cylindrical temporary body 1, and is flush with the upper surface of the foundation 11. Is formed.
Other configurations and construction procedures are the same as those in the first embodiment except that the support member 13 is fixed along the outer wall surface of the foundation 11 prior to the installation work of the cylindrical temporary body 1.

この参考例5に係る自立式仮締切構造および自立式仮締切工法によれば、上記実施例1と同様の作用効果を奏する(段落[0030]参照)ほか、仕切材3を無用として実施できる利点がある。また、既設基礎11の上面面積が若干小さい場合でも、当該基礎11を増設することなく、支保材2及び筒状仮設体1を設置できる利点もある。さらに、工事終了後は、アンカーボルト5を取り外すのみで容易に支保材2を撤去できる利点もある。 According to the self-supporting temporary fastening structure and the self-supporting temporary fastening method according to the reference example 5 , the same effect as that of the first embodiment can be obtained (see paragraph [00 30 ]), and the partition member 3 can be used without being used. There are advantages. In addition, even when the upper surface area of the existing foundation 11 is slightly small, there is an advantage that the support material 2 and the cylindrical temporary body 1 can be installed without adding the foundation 11. Furthermore, after the construction is completed, there is an advantage that the support material 2 can be easily removed simply by removing the anchor bolt 5.

なお、図8は参考例5のバリエーションを示している。図8に示したように、基礎11のせいが低い場合は、前記支持部材13の代わりに水底から立ち上げた支持部材14上に筒状仮設体1を載置しても同様に実施できる。勿論、参考例5と同様の作用効果を奏する。 FIG. 8 shows a variation of Reference Example 5 . As shown in FIG. 8, when the foundation 11 is low, it can be similarly implemented by placing the tubular temporary body 1 on the support member 14 raised from the bottom of the water instead of the support member 13. Of course, the same effects as those of Reference Example 5 are obtained.

図9は、本発明に係る自立式仮締切構造および自立式仮締切工法の異なる実施例を示している。この実施例に係る自立式仮締切構造は、上記実施例1と比して、筒状仮設体1及び支保材2の設置部位、および筒状仮設体1の載置手段が主に相違する。筒状仮設体1、支保材2、及び仕切材3などの構成部材は、上記実施例1と同様なので同一の符号を付してその説明を適宜省略する。
前記支保材2は、前記基礎11から外方へ張り出した状態で基礎11の外周縁部に設置している。このため、前記筒状仮設体1は当然に基礎2上へ載置することはできないので、本実施例では、水平材22の下面に取り付けた、外方へ水平に張り出す張り出しプレート17の上面に載置する構成で実施している。その他の構成および施工手順については、支保材2の設置作業を終えた後に筒状仮設体1の載置作業を行う以外は、上記実施例1と同様である。
すなわち、この実施例2にかかる自立式仮締切構造は、既設の水中橋脚10を囲むように筒状仮設体1を設け、筒状仮設体1の内部の水抜きを行って作業空間12を形成する自立式仮締切構造であり、前記水中橋脚10の基礎11の外周部上面には、外方へ水平に張り出す張り出しプレート17が設けられている。前記筒状仮設体1が、水中橋脚10の基礎11の外方部における前記張り出しプレート17の上面に設けられている。前記筒状仮設体1の内側に、筒状仮設体1の内壁面に沿って水位以上に立ち上がる支柱材21と、該支柱材2の下端に設けられた水平材22とでL字形に剛結されてなる支保材2が、筒状仮設体1に作用する水圧が伝達される構成で複数設置されている。前記筒状仮設体1の下端部の内壁面に対向する配置に止水コンクリート4の漏れを防止する仕切材3が、リング状に設けられている。前記複数の支保材2はそれぞれ、前記水平材22を筒状仮設体1に対し直角方向に配置して前記水中橋脚10の基礎11の上面にボルト接合して設置されており、前記筒状仮設体1の下端部と前記仕切材3と前記張り出しプレート17の上面とで形成した凹溝部に止水コンクリート4が打設されて前記支保材2の支柱材21と水平材22とで形成した前記L字形のコーナー部が前記止水コンクリート4中に埋め込まれている。
FIG. 9 shows different embodiments of the self-supporting temporary fastening structure and the self-supporting temporary fastening method according to the present invention. Free-standing temporary deadline structure according to the second embodiment is different from the first embodiment, the site of installation tubular temporary body 1 and pre-supports 2, and placing means of the tubular temporary body 1 differs mainly . Since the structural members such as the cylindrical temporary body 1, the support material 2, and the partition material 3 are the same as those in the first embodiment, the same reference numerals are given and the description thereof is omitted as appropriate.
The support material 2 is installed on the outer peripheral edge of the foundation 11 in a state of projecting outward from the foundation 11. For this reason, since the said cylindrical temporary body 1 cannot be mounted naturally on the foundation 2, in the present Example 2 , it is attached to the lower surface of the horizontal material 22, and the overhang | projection plate 17 extended horizontally outwardly is used. It is implemented with a configuration that is placed on the upper surface. About another structure and construction procedure, it is the same as that of the said Example 1 except performing the mounting operation | work of the cylindrical temporary body 1 after finishing the installation operation | work of the support material 2. FIG.
That is, in the self-supporting temporary closing structure according to the second embodiment, the tubular temporary body 1 is provided so as to surround the existing underwater bridge pier 10, and the interior of the tubular temporary body 1 is drained to form the work space 12. An overhanging plate 17 is provided on the upper surface of the outer periphery of the foundation 11 of the underwater pier 10 so as to project horizontally outward. The tubular temporary body 1 is provided on the upper surface of the overhang plate 17 in the outer portion of the foundation 11 of the underwater pier 10. Inside the tubular temporary body 1, a column material 21 rising above the water level along the inner wall surface of the cylindrical temporary body 1 and a horizontal material 22 provided at the lower end of the column material 2 are rigidly connected in an L shape. A plurality of support members 2 thus formed are installed in a configuration in which water pressure acting on the cylindrical temporary body 1 is transmitted. A partition material 3 for preventing leakage of the water-stopping concrete 4 is provided in a ring shape in an arrangement facing the inner wall surface of the lower end portion of the tubular temporary body 1. Each of the plurality of support members 2 is installed by bolting the horizontal member 22 to the upper surface of the foundation 11 of the underwater bridge pier 10 by arranging the horizontal member 22 in a direction perpendicular to the tubular temporary body 1. The water-stopping concrete 4 is placed in a concave groove formed by the lower end of the body 1, the partition material 3, and the upper surface of the overhang plate 17, and the support material 2 is formed by the support material 21 and the horizontal material 22. L-shaped corners are embedded in the still water concrete 4.

この実施例に係る自立式仮締切構造および自立式仮締切工法によれば、上記実施例1と同様の作用効果を奏する(段落[0030]参照)ほか、既設基礎11の上面面積が若干小さい場合でも、当該基礎11を増設することなく、支保材2及び筒状仮設体1を設置できる利点がある。 According to free-standing temporary deadline structural and self-supporting temporary deadline method according to the second embodiment, the same effects as in Example 1 (paragraph [00 30] Referring) In addition, the top surface area of the existing foundation 11 slightly Even if it is small, there is an advantage that the support material 2 and the tubular temporary body 1 can be installed without adding the foundation 11.

以上に実施形態を図面に基づいて説明したが、本発明は、図示例の実施形態の限りではなく、その技術的思想を逸脱しない範囲において、当業者が通常に行う設計変更、応用のバリエーションの範囲を含むことを念のために言及する。   The embodiments have been described with reference to the drawings. However, the present invention is not limited to the illustrated embodiments, and design modifications and application variations that are usually made by those skilled in the art are within the scope of the technical idea of the invention. Note that it includes the range.

1 筒状仮設体
2 支保材
3 仕切材
4 止水コンクリート
5 アンカーボルト
6 プレート
7 アンカー
8 ベース部材(水中コンクリート)
8’ ベース部材(H形鋼)
9 アンカー
10 水中橋脚
11 基礎
12 作業空間
13 支持部材
14 支持部材
15 アンカーボルト
16 ボルト
17 張り出しプレート
18 ベース部材(水中コンクリート)
19 補強リング
20 水中橋脚
21 支柱材
22 水平材
23 斜材
H 水位
DESCRIPTION OF SYMBOLS 1 Cylindrical temporary body 2 Support material 3 Partition material 4 Water-stop concrete 5 Anchor bolt 6 Plate 7 Anchor 8 Base member (underwater concrete)
8 'Base member (H-section steel)
9 Anchor 10 Underwater bridge pier 11 Foundation 12 Work space 13 Support member 14 Support member 15 Anchor bolt 16 Bolt 17 Overhang plate 18 Base member (underwater concrete)
19 Reinforcement ring 20 Underwater bridge pier 21 Post material 22 Horizontal material 23 Diagonal material H Water level

Claims (5)

既設の水中橋脚を囲むように筒状仮設体を設け、筒状仮設体の内部の水抜きを行って作業空間を形成する自立式仮締切構造であって、
前記筒状仮設体が、水中橋脚の基礎の上面に設けられていること、
前記筒状仮設体の内側に、筒状仮設体の内壁面に沿って水位以上に立ち上がる支柱材と、該支柱材の下端に設けられた水平材とでL字形に剛結されてなる支保材が、筒状仮設体に作用する水圧が伝達される構成で複数設置されていること、
前記筒状仮設体の下端部の内壁面に対向する配置に止水コンクリートの漏れを防止する仕切材がリング状に設けられていること、
前記複数の支保材はそれぞれ、前記水平材を筒状仮設体に対し直角方向に配置して前記水中橋脚の基礎の上面にボルト接合して設置されており、前記筒状仮設体の下端部前記仕切材と前記水中橋脚の基礎の上面とで形成した凹溝部に止水コンクリートが打設されて前記支保材の支柱材と水平材とで形成した前記L字形のコーナー部が前記止水コンクリート中に埋め込まれていることを特徴とする、自立式仮締切構造。
A self-supporting temporary closing structure in which a cylindrical temporary body is provided so as to surround an existing underwater bridge pier, and water is drained inside the cylindrical temporary body to form a work space,
The tubular temporary body is provided on the upper surface of the foundation of the underwater pier,
Inside of the tubular temporary body, it is rigidly connected with the struts that rising above the water level along the inner wall surface of the cylindrical temporary body, the L-shape in the horizontal provided at a lower end of said supporting pillar member A plurality of supporting materials are installed in a configuration in which water pressure acting on the cylindrical temporary body is transmitted;
The partition member to prevent leakage of the waterproofing concrete arrangement which faces the inner wall surface of the lower end portion of the tubular temporary member is provided in a ring shape,
Each of the plurality of support members is installed by being bolted to the upper surface of the foundation of the underwater bridge pier by arranging the horizontal member in a direction perpendicular to the tubular temporary body, and a bottom end portion of the tubular temporary body , The L-shaped corner formed by the support material of the support material and the horizontal material is formed by water-stopping concrete in a groove formed by the partition material and the upper surface of the foundation of the underwater bridge pier, and the water-stopping concrete A self-supporting temporary closing structure characterized by being embedded inside .
既設の水中橋脚を囲むように筒状仮設体を設け、筒状仮設体の内部の水抜きを行って作業空間を形成する自立式仮締切構造であって、A self-supporting temporary closing structure in which a cylindrical temporary body is provided so as to surround an existing underwater bridge pier, and water is drained inside the cylindrical temporary body to form a work space,
前記水中橋脚の基礎の外周部上面には、外方へ水平に張り出す張り出しプレートが設けられていること、An overhanging plate is provided on the upper surface of the outer peripheral portion of the foundation of the underwater pier so as to project horizontally outward.
前記筒状仮設体が、水中橋脚の基礎の外方部における前記張り出しプレートの上面に設けられていること、The tubular temporary body is provided on the upper surface of the overhang plate in the outer part of the foundation of the underwater bridge pier;
前記筒状仮設体の内側に、筒状仮設体の内壁面に沿って水位以上に立ち上がる支柱材と、該支柱材の下端に設けられた水平材とでL字形に剛結されてなる支保材が、筒状仮設体に作用する水圧が伝達される構成で複数設置されていること、A support material which is rigidly connected in an L shape with a column material standing above the water level along the inner wall surface of the cylindrical temporary structure and a horizontal material provided at the lower end of the column material inside the cylindrical temporary structure. However, a plurality of water pressures that are applied to the tubular temporary body are transmitted.
前記筒状仮設体の下端部の内壁面に対向する配置に止水コンクリートの漏れを防止する仕切材が、リング状に設けられていること、A partition material for preventing leakage of water-stopping concrete is provided in a ring shape in an arrangement facing the inner wall surface of the lower end portion of the cylindrical temporary body,
前記複数の支保材はそれぞれ、前記水平材を筒状仮設体に対し直角方向に配置して前記水中橋脚の基礎の上面にボルト接合して設置されており、前記筒状仮設体の下端部と前記仕切材と前記張り出しプレートの上面とで形成した凹溝部に止水コンクリートが打設されて前記支保材の支柱材と水平材とで形成した前記L字形のコーナー部が前記止水コンクリート中に埋め込まれていることを特徴とする、自立式仮締切構造。Each of the plurality of support members is installed by being bolted to the upper surface of the foundation of the underwater bridge pier by arranging the horizontal member in a direction perpendicular to the tubular temporary body, and a bottom end portion of the tubular temporary body, The L-shaped corner formed by the support material of the support material and the horizontal material is placed in the groove formed by the partition material and the upper surface of the projecting plate, and the L-shaped corner portion is formed in the water-resistant concrete. A self-supporting temporary cut-off structure characterized by being embedded.
前記筒状仮設体は、複数枚のライナープレート、コルゲートシート、鋼製セグメント、又はPCセグメントを周方向および高さ方向に互いに連結してなることを特徴とする、請求項1又は2に記載した自立式仮締切構造。 The cylindrical temporary body is formed by connecting a plurality of liner plates, corrugated sheets, steel segments, or PC segments to each other in a circumferential direction and a height direction . Self-supporting temporary deadline structure. 既設の水中橋脚を囲むように筒状仮設体を設け、筒状仮設体の内部の水抜きを行って作業空間を形成する自立式仮締切工法であって、A self-supporting temporary closing method in which a tubular temporary body is provided so as to surround an existing underwater bridge pier, and a working space is formed by draining water inside the cylindrical temporary body,
前記筒状仮設体を水中橋脚の基礎の上面に設けると共に、前記筒状仮設体の内側に、筒状仮設体の内壁面に沿って水位以上に立ち上がる支柱材と、該支柱材の下端に設けられた水平材とでL字形に剛結されてなる支保材を、筒状仮設体に作用する水圧が伝達される構成で複数設置すること、The tubular temporary body is provided on the upper surface of the foundation of the underwater bridge pier, and is provided on the inner side of the tubular temporary body, on a support column that rises above the water level along the inner wall surface of the cylindrical temporary structure, and on the lower end of the support column. Installing a plurality of supporting members rigidly joined in an L shape with the horizontal member formed in a configuration in which water pressure acting on the cylindrical temporary structure is transmitted;
前記筒状仮設体の下端部の内壁面に対向する配置に止水コンクリートの漏れを防止する仕切材を、リング状に設けること、Providing a partition material that prevents leakage of water-stopping concrete in an arrangement facing the inner wall surface of the lower end portion of the tubular temporary body, in a ring shape;
前記複数の支保材はそれぞれ、前記水平材を筒状仮設体に対し直角方向に配置して前記水中橋脚の基礎の上面にボルト接合して設置しており、前記筒状仮設体の下端部と前記仕切材と前記水中橋脚の基礎の上面とで形成した凹溝部に止水コンクリートを打設して前記支保材の支柱材と水平材とで形成した前記L字形のコーナー部を前記止水コンクリート中に埋め込み、止水コンクリートの硬化後に筒状仮設体の内部の水抜きを行うことを特徴とする、自立式仮締切工法。Each of the plurality of support members is disposed by placing the horizontal member in a direction perpendicular to the tubular temporary body and bolted to the upper surface of the foundation of the underwater bridge pier, and a lower end portion of the tubular temporary body, The L-shaped corner portion formed by the support material and the horizontal material is placed in the groove portion formed by the partition material and the upper surface of the foundation of the submerged bridge pier, and the L-shaped corner portion is formed by the water-resistant concrete. A self-supporting temporary closing method characterized in that the inside of the cylindrical temporary structure is drained after being embedded inside and the water-stopping concrete is cured.
既設の水中橋脚を囲むように筒状仮設体を設け、筒状仮設体の内部の水抜きを行って作業空間を形成する自立式仮締切工法であって、A self-supporting temporary closing method in which a tubular temporary body is provided so as to surround an existing underwater bridge pier, and a working space is formed by draining water inside the cylindrical temporary body,
前記水中橋脚の基礎の外周部上面に、外方へ水平に張り出す張り出しプレートを設け、On the upper surface of the outer periphery of the foundation of the underwater bridge pier, a projecting plate that projects horizontally outwards is provided. 前記筒状仮設体を、水中橋脚の基礎の外方部における前記張り出しプレートの上面に設けると共に、前記筒状仮設体の内側に、筒状仮設体の内壁面に沿って水位以上に立ち上がる支柱材と、該支柱材の下端に設けられた水平材とでL字形に剛結されてなる支保材を、筒状仮設体に作用する水圧が伝達される構成で複数設置すること、The cylindrical temporary body is provided on the upper surface of the projecting plate in the outer part of the foundation of the underwater bridge pier, and the column material that rises above the water level along the inner wall surface of the cylindrical temporary body inside the cylindrical temporary body. And installing a plurality of support members rigidly connected in an L shape with a horizontal member provided at the lower end of the support member in a configuration in which water pressure acting on the cylindrical temporary body is transmitted,
前記筒状仮設体の下端部の内壁面に対向する配置に止水コンクリートの漏れを防止する仕切材を、リング状に設けること、Providing a partition material that prevents leakage of water-stopping concrete in an arrangement facing the inner wall surface of the lower end portion of the tubular temporary body, in a ring shape;
前記複数の支保材はそれぞれ、前記水平材を筒状仮設体に対し直角方向に配置して前記水中橋脚の基礎の上面にボルト接合して設置しており、前記筒状仮設体の下端部と前記仕切材と前記張り出しプレートの上面とで形成した凹溝部に止水コンクリートを打設して前記支保材の支柱材と水平材とで形成した前記L字形のコーナー部を前記止水コンクリート中に埋め込み、止水コンクリートの硬化後に筒状仮設体の内部の水抜きを行うことを特徴とする、自立式仮締切工法。Each of the plurality of support members is disposed by placing the horizontal member in a direction perpendicular to the tubular temporary body and bolted to the upper surface of the foundation of the underwater bridge pier, and a lower end portion of the tubular temporary body, The L-shaped corner formed by the support material and the horizontal material is placed in the groove formed by the partition material and the upper surface of the projecting plate, and the L-shaped corner portion is formed in the water-resistant concrete. A self-supporting temporary closing method characterized in that water is drained from the inside of the tubular temporary body after being embedded and the water-stopping concrete is hardened.
JP2010075408A 2010-03-29 2010-03-29 Self-supporting temporary closing structure and self-supporting temporary closing method Active JP5508917B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2010075408A JP5508917B2 (en) 2010-03-29 2010-03-29 Self-supporting temporary closing structure and self-supporting temporary closing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2010075408A JP5508917B2 (en) 2010-03-29 2010-03-29 Self-supporting temporary closing structure and self-supporting temporary closing method

Publications (2)

Publication Number Publication Date
JP2011208389A JP2011208389A (en) 2011-10-20
JP5508917B2 true JP5508917B2 (en) 2014-06-04

Family

ID=44939715

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2010075408A Active JP5508917B2 (en) 2010-03-29 2010-03-29 Self-supporting temporary closing structure and self-supporting temporary closing method

Country Status (1)

Country Link
JP (1) JP5508917B2 (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102535487B (en) * 2012-02-10 2014-10-01 中铁第五勘察设计院集团有限公司 Diagonal-web-member-free fabricated steel cofferdam structure
JP6258022B2 (en) * 2013-12-02 2018-01-10 鹿島建設株式会社 Temporary deadline structure
JP6266821B2 (en) * 2017-03-13 2018-01-24 五洋建設株式会社 Deadline structure and deadline method
JP6475310B2 (en) * 2017-12-06 2019-02-27 鹿島建設株式会社 Temporary deadline structure
CN110528542A (en) * 2018-05-24 2019-12-03 上海勘测设计研究院有限公司 Assembled cofferdam structure
CN109403363B (en) * 2018-12-14 2023-09-05 南水北调中线干线工程建设管理局 Self-balancing combined water retaining cofferdam and construction method thereof
CN109537443A (en) * 2018-12-28 2019-03-29 中交二航局第四工程有限公司 Bridge pier anticollision device, collision-prevention device and its construction method
JP7492423B2 (en) * 2020-10-01 2024-05-29 株式会社熊谷組 Temporary cofferdam structure and method of construction in river using temporary cofferdam structure
JP7093089B1 (en) 2022-02-21 2022-06-29 オリエンタル白石株式会社 Liner plate retaining wall root fixing member and liner plate retaining wall root fixing method
CN115045271B (en) * 2022-06-28 2024-08-27 中交建筑集团第六工程有限公司 Pile foundation steel pile casing positioning construction process based on pile foundation steel pile casing transportation construction trolley
CN119041464A (en) * 2024-10-31 2024-11-29 杭州江润科技有限公司 Suspended assembled section heightening sinking double-wall steel cofferdam and construction method

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3547505B2 (en) * 1994-11-11 2004-07-28 戸田建設株式会社 Retaining reinforcement
JPH09221760A (en) * 1996-02-15 1997-08-26 Sumikin Kozai Kogyo Kk Temporary coffering structure and method of construction thereof
JPH1054037A (en) * 1996-08-09 1998-02-24 Nippon Steel Metal Prod Co Ltd Coffering method and steel structural body therefor
JP3928225B2 (en) * 1997-10-09 2007-06-13 株式会社大林組 Temporary deadline structure
JPH11131488A (en) * 1997-11-04 1999-05-18 Nippon Kokan Light Steel Kk Cut-off tank for underwater pier reinforcing work

Also Published As

Publication number Publication date
JP2011208389A (en) 2011-10-20

Similar Documents

Publication Publication Date Title
JP5508917B2 (en) Self-supporting temporary closing structure and self-supporting temporary closing method
JP4625532B1 (en) Construction method of temporary closing structure around bridge pier and platform used for construction
JP4793634B2 (en) Temporary deadline construction method
AU2013342824B2 (en) Method for constructing cylindrical tank
CN111395351A (en) Assembled supporting structure of foundation pit and supporting construction method
JP2018017111A (en) Construction method of water cutoff work space
JP3928225B2 (en) Temporary deadline structure
CN111074775A (en) An assembled suspension bridge tower
JP2007327244A (en) Temporary closing method and structure of underwater structure
JP5885099B2 (en) Temporary closing device around columnar object and temporary closing method
JP4448556B1 (en) Existing steel pipe column corrosion prevention reinforcement
JP5264978B2 (en) Water cutoff wall body for deadline and deadline construction method using the same
JP2008297748A (en) Temporary deadline construction method, temporary deadline structure
JP2005350904A (en) Cofferdam structure and cofferdam construction method
JPH1054037A (en) Coffering method and steel structural body therefor
JP3888174B2 (en) Temporary deadline construction method
JPH1121908A (en) Method of temporary coffering construction and temporary coffering structure
JP2001348888A (en) Method and device for constructing underwater foundation structure
CN114855839A (en) Steel suspension box applied to hydraulic structure and construction method thereof
JP3903548B2 (en) Hanging scaffold
CN118639681A (en) A construction method for underwater structures in complex environments
CN216515635U (en) Assembled inclined inner support structure for foundation pit support
CN212505866U (en) Water enclosing device
CN212772373U (en) Assembled bearing structure of foundation ditch
CN115492141A (en) Steel suspension box cofferdam structure and bottom plate and construction method thereof

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20130205

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20131106

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20131119

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20140120

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20140318

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20140324

R150 Certificate of patent or registration of utility model

Ref document number: 5508917

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250