Method of continuously laying two or more precast concrete structures through an ascending slope Download PDFInfo
- Publication number
- JP5524014B2 JP5524014B2 JP2010227600A JP2010227600A JP5524014B2 JP 5524014 B2 JP5524014 B2 JP 5524014B2 JP 2010227600 A JP2010227600 A JP 2010227600A JP 2010227600 A JP2010227600 A JP 2010227600A JP 5524014 B2 JP5524014 B2 JP 5524014B2
- Authority
- JP
- Japan
- Prior art keywords
- precast concrete
- gap
- concrete structures
- ascending slope
- precast
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Sewage (AREA)
Description
本発明は、上下水管路や電力配線、地下道などに供される共同溝等の暗渠やL型の擁壁等のプレキャストコンクリート構造物を上り勾配を経て連続敷設する方法に関するものである。 The present invention relates to a method for continuously laying precast concrete structures such as underdrains such as joint grooves provided for water and sewage pipes, electric power lines, underground passages, etc., and L-shaped retaining walls, etc., through an ascending slope.
たとえば、都市部の幹線道路直下に上下水道、電力配線、各種地下道などのための共同溝(もしくは暗渠)を構築する方法として、現在、先行して地盤を開削して土留めをおこない、プレキャスト製の函渠(カルバート、ヒューム管等のプレキャストボックスカルバート)の搬入ポイントから所定の移送ポイントまで延びる移送路を構築し、地下空間に搬入された函渠をウィンチ等で牽引(横引きともいう)しながら所定の敷設位置まで移送し、これを順次繰り返しながら、函渠同士を接合して暗渠を構築する方法が開発され、多くの実績を挙げている。 For example, as a method of constructing a common ditch (or underdrain) for water supply and sewerage, electric power wiring, various underpasses, etc. directly under an urban trunk road, the ground is first excavated and earthed and precast. A transfer path that extends from the loading point of the box box (pre-cast box culverts such as culverts and fume pipes) to the specified transfer point, and pulls the box box that has been loaded into the underground space with a winch or the like (also referred to as horizontal pulling). However, a method of joining a box and constructing a culvert by transferring it to a predetermined laying position and repeating this step in sequence has been developed and has many achievements.
より具体的に説明すると、上記移送路は、たとえばコンクリート製の基盤からなり、この基盤内に、断面がコの字状、もしくはCの字状の型鋼等からなる凹溝材をその開口を上方に臨ませた姿勢で埋設し、さらに、この型鋼の内部に多数の鋼球を収容して構成される。この鋼球上で、函渠の下面に装着された突起(型鋼や、型鋼とコンクリートの複合体)が直接載置され、鋼球の回転、転動等によってその移送時の摩擦抵抗が低減された姿勢で、函渠が所定の敷設位置まで移送されるものである。 More specifically, the transfer path is made of, for example, a concrete base, and a concave groove material having a U-shaped cross section or a C-shaped steel plate is placed in the base above the opening. It is embedded in a posture facing the surface, and a large number of steel balls are accommodated inside the mold steel. On this steel ball, a protrusion (die steel or a composite of die steel and concrete) mounted on the lower surface of the box is placed directly, and the frictional resistance during the transfer is reduced by the rotation, rolling, etc. of the steel ball. The box is transported to a predetermined laying position in the above posture.
また、函渠の底版にはたとえばグラウト充填孔が設けてあり、敷設位置にある函渠の底版下方と移送路との間の空間、移送路を構成する鋼球間の空隙等にグラウト等が充填硬化されることで、函渠と移送路を構成する基盤との一体化が図られ、函渠の設置がおこなわれる。 Also, for example, a grout filling hole is provided in the bottom plate of the box, and a grout or the like is formed in the space between the bottom plate of the box in the laying position and the transfer path, the gap between the steel balls constituting the transfer path, or the like. By filling and curing, the box and the base constituting the transfer path are integrated, and the box is installed.
敷設位置に順次移送設置された函渠同士が一体に連結されることにより、所定の縦断線形および長さを有した暗渠が構築されるものである。 Boxes that are sequentially transferred and installed at the laying position are integrally connected to each other, thereby constructing a culvert having a predetermined vertical alignment and length.
上記する暗渠の構築方法は、いわゆる横引き工法(もしくはボックスベアリング横引き工法)とも称されており、本出願人等によってなされた関連技術も多数開示されており、その一部として、たとえば特許文献1〜8を挙げることができる。 The above-described method of constructing a culvert is also called a so-called horizontal pulling method (or box bearing horizontal pulling method), and many related techniques made by the present applicant have been disclosed. 1-8 can be mentioned.
これらの公開技術は、上記する一連の横引き工法に関する基本発明、移送路の勾配等のために転動してしまう鋼球の姿勢を保障するための発明、グラウトの充填方法に関する発明、移送路を構成する凹溝材における鋼球の占積率を規定した発明、移送路の途中で回転台を設け、函渠の移送方向の転換を図るようにした発明、などに関するものであり、その内容は多岐に亘っている。 These disclosed technologies include a basic invention relating to the above-described series of horizontal drawing methods, an invention for ensuring the attitude of a steel ball that rolls due to the gradient of the transfer path, the invention relating to a grout filling method, and a transfer path. This invention relates to an invention that prescribes the space factor of steel balls in the concave groove material that constitutes the invention, an invention that provides a turntable in the middle of the transfer path, and changes the transfer direction of the box, etc. Is a wide variety.
上記する横引き工法を適用することにより、特にその工期短縮が最優先される都市部の幹線道路直下における、共同溝等の暗渠の構築は可及的に短時間で、しかも安全かつ効率的におこなわれている。しかし、その一層の工期短縮を図るための方策の一つとして、函渠を1基ずつ移送する方法に代わって、2以上の函渠を連接し、この連接された複数の函渠を一度に敷設位置まで移送するという方法の発案に本発明者等は至っている。 By applying the horizontal pulling method described above, the construction of underdrains such as common trenches, etc. under the main roads in urban areas where shortening of the construction period is the highest priority, is as short as possible and safe and efficient. It is done. However, as one of the measures for further shortening the construction period, instead of transferring the boxes one by one, two or more boxes are connected and the connected boxes are connected at once. The present inventors have come up with the idea of a method of transferring to a laying position.
そして、本発明者等は、2以上の函渠(プレキャストコンクリート構造物)を連接して移送する際に生じ得る課題を掲げ、その課題を解決できる技術思想に至ったものである。 And the present inventors raised the problem which may arise when connecting and transferring two or more boxes (precast concrete structure), and came to the technical idea which can solve the problem.
ここで、上記する課題を図6を参照して説明する。本発明者等の掲げる課題とは、移送路が上り勾配部を有する場合、たとえば、平坦部から上り勾配部に移行する線形(図示例)や、下り勾配部から上り勾配部に移行する線形などを有する、いわゆる谷越えの場合に、2以上のプレキャストコンクリート構造物である函渠K,Kが緊張材T等で連接されることで、それらの進行方向の函渠全体の厚み(一つの函渠の厚みがtの場合に、これが2つ連接されて全体厚みは2t)が厚くなってしまう結果、この上り勾配部に進行方向前方の函渠が進入した際に、該前方の函渠が上り勾配部と干渉する可能性が極めて高く、この干渉によって函渠移送ができなくなるという課題である。 Here, the above-described problem will be described with reference to FIG. The problems raised by the present inventors are, for example, when the transfer path has an ascending slope part, for example, a linearity transition from the flat part to the ascending slope part (illustration example), a linearity transitioning from the descending slope part to the ascending slope part, etc. In the case of the so-called trough crossing, two or more precast concrete structures, K and K, are connected by a tension material T or the like, so that the thickness of the entire box in the traveling direction (one box When the thickness of the kite is t, two of these are connected and the total thickness becomes 2t). As a result, when the box in front of the traveling direction enters this upward slope portion, There is an extremely high possibility of interference with the ascending slope, and this is a problem that the box cannot be transferred due to this interference.
このように、移送路が上り勾配部を有する、いわゆる谷超えの場合は往々にして想定されること、上記する谷越えとは反対の線形である、いわゆる山超えの場合には、2以上のプレキャストコンクリート構造物が連接されて移送される場合であっても山を超えたプレキャストコンクリート構造物が移送路と干渉するといった課題は生じ得ないこと、に鑑みれば、この谷超え移送路における上記課題を解消できる2以上のプレキャストコンクリート構造物を連続敷設する方法が提供されることで、上記する横引き工法の汎用性は一層拡大することは理解に易い。 Thus, it is often assumed that the transfer path has an ascending slope, so-called a valley crossing, and in the case of a so-called mountain crossing that is opposite to the above-described valley crossing, two or more Even if the precast concrete structure is connected and transferred, the above-mentioned problem in this valley crossing transfer path is not possible in view of the problem that the precast concrete structure exceeding the mountain cannot interfere with the transfer path. It is easy to understand that the versatility of the horizontal drawing method described above is further expanded by providing a method for continuously laying two or more precast concrete structures capable of eliminating the above-mentioned problem.
本発明は、上記する問題に鑑みてなされたものであり、敷設位置まで通じる移送路がその途中で上り勾配部を有する場合であっても、移送されるプレキャストコンクリート構造物と該上り勾配部とが干渉することなく、2以上のプレキャストコンクリート構造物を連接させた姿勢で移送することができ、もってその工期の一層の短縮を実現することのできる、2以上のプレキャストコンクリート構造物を上り勾配を経て連続敷設する方法を提供することを目的とする。
The present invention has been made in view of the above-described problems, and even when the transfer path leading to the laying position has an uphill portion in the middle, the precast concrete structure to be transferred and the
前記目的を達成すべく、本発明による2以上のプレキャストコンクリート構造物を上り勾配を経て連続敷設する方法は、連接された2以上のプレキャストコンクリート構造物を、少なくとも上り勾配部を有する移送路を経て敷設位置まで移送して連続敷設する方法において、前記移送路は、基盤路と、該基盤路に配設された凹溝状のレールと、該レール内に配された多数の転動体と、から構成されており、前記連接された2以上のプレキャストコンクリート構造物が、牽引手段もしくは押出し手段にて該転動体上を移送される、2以上のプレキャストコンクリート構造物を上り勾配を経て連続敷設する方法であって、前記2以上のプレキャストコンクリート構造物は、相互に隙間を置いて、かつ、少なくとも該隙間の上方および下方の2箇所で隙間調整材を介して連接された姿勢で転動体上を移送され、進行方向前方のプレキャストコンクリート構造物が前記上り勾配部に進入する際に、少なくとも上方の前記隙間調整材を調整して前記上方の隙間を狭くし、該前方のプレキャストコンクリート構造物を上り勾配部と同勾配の姿勢とする第1の姿勢調整をおこない、次いで、後続のプレキャストコンクリート構造物が前記上り勾配部に進入する際に、下方の前記隙間調整材を調整して前記下方の隙間を狭くし、該後続の暗渠構成体も上り勾配部と同勾配の姿勢とする第2の姿勢調整をおこなうことで、連接された2以上のプレキャストコンクリート構造物の上り勾配部への移送がおこなわれることを特徴とするものである。 In order to achieve the above object, a method of continuously laying two or more precast concrete structures according to the present invention through an ascending slope, the connected two or more precast concrete structures via at least a transfer path having an ascending slope portion. In the method of transferring to a laying position and continuously laying, the transfer path includes: a base path, a groove-shaped rail disposed in the base path, and a large number of rolling elements arranged in the rail. A method of continuously laying two or more precast concrete structures through an ascending slope, wherein the two or more connected precast concrete structures are transported on the rolling elements by traction means or extrusion means. The two or more precast concrete structures have a gap between each other and at least two places above and below the gap. When the precast concrete structure that is transported on the rolling elements in a posture connected via a gap adjusting material and enters the upward slope portion in the forward direction, the upper gap adjusting material is adjusted by adjusting at least the upper gap adjusting material. When the following precast concrete structure enters the ascending slope, the first attitude adjustment is performed so that the front precast concrete structure has the same inclination as that of the ascending slope. The second gap adjustment is performed by adjusting the lower gap adjusting material to narrow the lower gap, and performing the second posture adjustment in which the subsequent undercarriage is also in the same gradient as the upward gradient portion. The above-mentioned precast concrete structure is transferred to the ascending slope.
本発明による2以上のプレキャストコンクリート構造物を上り勾配を経て連続敷設する方法は、特に、その移送路に上り勾配部を有する場合、たとえば、その途中に平坦部から前記上り勾配部に移行する縦断線形を有している移送路、その途中に下り勾配部から前記上り勾配部に移行する縦断線形を有している移送路、に対して、2以上のプレキャストコンクリート構造物を連接させた姿勢で移送して連続敷設する方法に関するものである。 The method of continuously laying two or more precast concrete structures according to the present invention through an ascending slope, particularly when the transport path has an ascending slope part, for example, a longitudinal section that transitions from a flat part to the ascending slope part in the middle thereof In a posture in which two or more precast concrete structures are connected to a transfer path having alignment, a transfer path having a vertical alignment that transitions from a descending gradient portion to the ascending gradient portion in the middle thereof It relates to a method of transferring and continuously laying.
ここで、「プレキャストコンクリート構造物」とは、プレキャスト製のコンクリート構造物(コンクリート造、RC造、SRC造など)の全般を示称するものであり、上下水管路や電力配線、地下道などに供される共同溝等の暗渠(断面形状が矩形、正方形、円形、楕円形など)や、L型、U型、門型等の擁壁等を含むものである。また、「連続敷設」とは、2以上のプレキャストコンクリート構造物を相互に隣接させながら連続的に敷設し、必要に応じて相互に繋ぐことで所定延長の暗渠や擁壁等を施工することを意味している。このプレキャストコンクリート構造物の移送に際しては、適宜の方法によって地下空間が構築され、その際に、プレキャストコンクリート構造物の搬入地点(たとえば、地上からの吊り下ろし地点、地上からランプを介して地下空間へ通じる場合はこのランプの出発点など)から、各プレキャストコンクリート構造物の敷設位置まで通じる移送路も同時に構築される。なお、少なくとも、最初のプレキャストコンクリート構造物がその敷設位置に移送されるまでに移送路が完全に構築されていればよく、必ずしも、移送路の完成を待ってプレキャストコンクリート構造物の移送が開始される必要はない。 Here, the “precast concrete structure” is a general term for precast concrete structures (concrete structure, RC structure, SRC structure, etc.), and is used for water and water pipes, power wiring, underground passages, and the like. Such as common grooves (cross-sectional shape is rectangular, square, circular, elliptical, etc.), L-shaped, U-shaped, gate-shaped retaining walls, and the like. “Continuous laying” means that two or more precast concrete structures are laid continuously while adjoining each other and connected to each other as necessary to construct a predetermined extension of a culvert or retaining wall, etc. I mean. When this precast concrete structure is transferred, an underground space is constructed by an appropriate method. At that time, a precast concrete structure carrying point (for example, a suspension point from the ground, from the ground to the underground space via a ramp). A transfer path that leads from the starting point of this ramp to the laying position of each precast concrete structure is established at the same time. It is only necessary that the transfer path be completely constructed before the first precast concrete structure is transferred to the laying position, and the transfer of the precast concrete structure is not necessarily started until the transfer path is completed. There is no need to
また、地下空間の構築方法も任意であり、シールド工法や推進工法で適用される掘進機を使用して地下空間を先行施工してもよいし、地上部を一時的に占有し、開削工法にて地盤の掘削をおこない、地盤が掘削されてできた掘削壁面に土留めを施工することで地下空間(移送空間)を形成してもよい。なお、開削工法を適用する場合には、この移送空間の上方に仮の路盤を形成し、2以上のプレキャストコンクリート構造物の連続敷設に並行して該仮の路盤を地上交通路等に供するのが好ましい。 Also, the construction method of the underground space is arbitrary, and the underground space may be pre-constructed using an excavator that is applied in the shield method or propulsion method, or the ground part is temporarily occupied, and the excavation method is used. The underground space (transfer space) may be formed by excavating the ground and constructing earth retaining on the excavation wall surface formed by excavating the ground. In the case of applying the excavation method, a temporary roadbed is formed above the transfer space, and the temporary roadbed is provided to a ground traffic road or the like in parallel with continuous laying of two or more precast concrete structures. Is preferred.
ここで、形成される移送路は、基盤路と、この基盤路に配設された凹溝状のレールと、このレール内に配された多数の転動体と、から構成されている。 Here, the formed transfer path is composed of a base path, a groove-shaped rail disposed in the base path, and a large number of rolling elements arranged in the rail.
基盤路は、たとえばRC造を含むコンクリート製の基盤であり、2以上のプレキャストコンクリート構造物が連続敷設された完成形においては、この基盤路と相互に繋がれたプレキャストコンクリート構造物とがモルタル等を介して一体化されるものである。 The base road is a concrete base including, for example, RC structure. In a completed form in which two or more precast concrete structures are continuously laid, the base road and the precast concrete structures connected to each other are mortar, etc. It is integrated via.
また、凹溝状のレールは、たとえば、断面がコの字状、もしくはCの字状の型鋼がその開口を上方に向けた姿勢で上記基盤路内に埋設等されたものであり、たとえば、2条のレールが所定の間隔を置いて配設され、被移送のプレキャストコンクリート構造物の底版下面がこの2条のレールに案内されるようにして移送されるものである。 In addition, the groove-shaped rail is, for example, a U-shaped cross section of the cross-section, or a C-shaped steel plate is embedded in the above-mentioned basement path with its opening facing upward, for example, Two rails are arranged at a predetermined interval, and the bottom plate bottom surface of the precast concrete structure to be transferred is transferred so as to be guided by the two rails.
さらに、この凹溝状のレール内には、多数の転動体が配されている。ここで、この転動体は、ボールベアリング等の鋼球からなり、この鋼球が凹溝状のレール内に回転自在で隙間なく敷き詰められていてもよいし、分散して配されていてもよいが、鋼球の効果的な転動を奏する上では、鋼球同士が離れて配されているのがよい。また、上記する公開公報で開示のごとく、鋼球を保持するための粘着マットや網等の保持層が凹溝内に配されていてもよい。このような保持層にて鋼球を保持する形態は、特に、下り勾配部や上り勾配部等、該保持層がない場合に鋼球が転動してしまう線形部に対して好適である。尤も、凹溝内に鋼球が密に配されている場合には、このような保持層がない場合でも、下り勾配部、上り勾配部での鋼球の転動の虞はない。 Furthermore, a large number of rolling elements are arranged in the groove-shaped rail. Here, the rolling element is made of a steel ball such as a ball bearing, and the steel ball may be freely laid in the groove-shaped rail without gaps, or may be distributed. However, in order to achieve effective rolling of the steel balls, the steel balls are preferably arranged apart from each other. Further, as disclosed in the above-mentioned publication, a holding layer such as an adhesive mat or a net for holding the steel ball may be disposed in the concave groove. Such a configuration in which the steel ball is held by the holding layer is particularly suitable for a linear part in which the steel ball rolls in the absence of the holding layer, such as a descending slope part or an ascending slope part. However, when the steel balls are densely arranged in the concave groove, there is no possibility of rolling of the steel balls in the downward gradient portion and the upward gradient portion even if there is no such holding layer.
また、凹溝から転動体が上方に突出している場合には、プレキャストコンクリート構造物の底版のたとえばフラットな下面が、直接的にこの転動体上に載置され、移送されるが、転動体が凹溝から突出していない場合には、プレキャストコンクリート構造物の底版の下面に、型鋼等で形成された突起もしくは突条を取り付けておき、その一部を凹溝内の転動体と直接的に当接するようにしておくのがよい。尤も、プレキャストコンクリート構造物がレールを脱線することなく移送されるために、後者の形態が選定されるのが好ましい。 In addition, when the rolling element protrudes upward from the concave groove, for example, the flat lower surface of the bottom plate of the precast concrete structure is directly placed and transferred on the rolling element. If it does not protrude from the groove, attach a protrusion or protrusion made of steel mold or the like to the bottom surface of the bottom plate of the precast concrete structure, and a part of it directly contacts the rolling element in the groove. It is good to keep in touch. However, since the precast concrete structure is transferred without derailing the rail, the latter form is preferably selected.
上記構成の移送路上を、連接された2以上のプレキャストコンクリート構造物が、たとえばウィンチ等の牽引手段にて牽引されながら移送され、もしくは、プレキャストコンクリート構造物後方から押出し機等の押出し手段にて押出されるようにして移送されるものであり、その移送手段は、移送路の線形(縦断線形、平面線形)等によって適宜選定される。一般的な横引き工法は、牽引手段にてプレキャストコンクリート構造物をその前方から牽引するものであるが、たとえば、複雑な線形の移送路上でプレキャストコンクリート構造物を移送する場合には、前方から牽引手段にて牽引する際にこの牽引手段を何度か設置し直す等の必要性が考えられるため、このような場合には、押出し手段にて後方からプレキャストコンクリート構造物を押出す方法が有効となり得る。なお、押出し機の一つの形態としては、移送路上を自走できる本体と、この本体に装着された油圧シリンダ機構と、から構成されるようなものであり、本体を基盤路に固定し、この基盤路に反力をとりながら油圧シリンダ機構を作動してそのロッドを前方に伸ばしながらプレキャストコンクリート構造物を押出し、次いで、基盤路への本体固定を解除し、ロッドを収容した後に該本体が前方に移送されたプレキャストコンクリート構造物付近まで進み、以後、この動作を繰り返しながらプレキャストコンクリート構造物の移送をおこなうものである。 Two or more connected precast concrete structures are transported while being pulled by a pulling means such as a winch on the transfer path having the above configuration, or are extruded by an extrusion means such as an extruder from the rear of the precast concrete structure. The transfer means is appropriately selected depending on the alignment (vertical alignment, planar alignment) of the transfer path. A general horizontal pulling method is to pull a precast concrete structure from the front by a pulling means. For example, when a precast concrete structure is transported on a complicated linear transfer path, it is pulled from the front. In such cases, it is effective to extrude the precast concrete structure from the rear using the extrusion means. obtain. As one form of the extruder, it is composed of a main body capable of self-propelling on the transfer path and a hydraulic cylinder mechanism attached to the main body. The main body is fixed to the base path, The hydraulic cylinder mechanism is operated while applying a reaction force to the base path, and the rod is extended forward to extrude the precast concrete structure, and then the main body is fixed to the base path and the main body is moved forward after the rod is received. The process proceeds to the vicinity of the precast concrete structure that has been transferred to the front, and thereafter, the precast concrete structure is transferred while repeating this operation.
本発明の連続敷設方法では、2以上のプレキャストコンクリート構造物が相互に隙間を置いて(相互に遊び空間を有して)、さらに、少なくともこの隙間の上方と下方の2箇所で隙間調整材を介して連接された姿勢で、上記する転動体上を移送されるものである。 In the continuous laying method of the present invention, two or more precast concrete structures are spaced apart from each other (having a play space with each other), and further, a gap adjusting material is provided at least at two locations above and below the gap. The above-mentioned rolling elements are transported in a posture that is connected to each other.
ここで、この隙間調整材の一例として、2以上のPC鋼棒やPC鋼線等の緊張材と、緊張材同士を繋ぐカップラー等の繋ぎ材と、のユニットを挙げることができる。たとえば、相互に連接されるプレキャストコンクリート構造物それぞれの対向側面から、双方の緊張材が上記隙間内に伸び、双方の緊張材の端部を繋ぎ材で繋ぐような形態においては、この繋ぎ材の回転締め付け等で双方の緊張材同士を引きつけながら、隙間を狭くする等の調整を図ることができる。 Here, as an example of the gap adjusting material, a unit of a tension material such as two or more PC steel bars or PC steel wires and a connecting material such as a coupler that connects the tension materials can be given. For example, in a form in which both tendons extend from the opposing side surfaces of the precast concrete structures connected to each other into the gap and the ends of both tendons are joined by a joining material, Adjustments such as narrowing the gap can be achieved while attracting the two tendons together by rotational tightening or the like.
なお、「隙間の上方と下方の2箇所」とは、プレキャストコンクリート構造物の高さ方向において、その中央レベルに対する上方領域の任意のレベルと下方領域の任意のレベルのことであり、各レベルにおいて、プレキャストコンクリート構造物の幅方向に2以上の隙間調整材が設けられるものであってよい。 “Two places above and below the gap” means any level in the upper region and any level in the lower region relative to the central level in the height direction of the precast concrete structure. In addition, two or more gap adjusting materials may be provided in the width direction of the precast concrete structure.
たとえば、下方の隙間調整材はそのままで、上方の隙間調整材のみを調整して該上方の隙間を狭くすることにより、連接される2基のプレキャストコンクリート構造物のうち、後方のプレキャストコンクリート構造物は平坦姿勢のままであり、これに対して前方のプレキャストコンクリート構造物が斜めに持ち上げられるようにしてその姿勢が変更される。 For example, by adjusting only the upper gap adjusting material and narrowing the upper gap while leaving the lower gap adjusting material as it is, of the two precast concrete structures to be connected, the rear precast concrete structure Remains in a flat posture, and the posture is changed so that the front precast concrete structure is lifted diagonally.
そして、進行方向前方のプレキャストコンクリート構造物が上り勾配部に進入する際には、上方の隙間調整材を調整して上方の隙間を狭くし、前方のプレキャストコンクリート構造物を上り勾配と同勾配の姿勢とする第1の姿勢調整が図られ、次いで、後続のプレキャストコンクリート構造物が上り勾配部に進入する際には、下方の隙間調整材を調整して下方の隙間も同様に狭くし、該後続のプレキャストコンクリート構造物も上り勾配と同勾配の姿勢とする第2の姿勢調整が図られる。ここで、「進入する際」とは、プレキャストコンクリート構造物が進入する前のタイミング、進入後のタイミング、の双方を含む意味であり、少なくともプレキャストコンクリート構造物と上り勾配部との干渉防止が図られるような適宜のタイミングで姿勢調整が実行される。 Then, when the precast concrete structure forward in the traveling direction enters the ascending slope part, the upper gap adjusting material is adjusted to narrow the upper gap, and the front precast concrete structure has the same slope as the ascending slope. The first posture adjustment to the posture is attempted, and then, when the subsequent precast concrete structure enters the ascending slope portion, the lower gap adjustment material is adjusted to similarly narrow the lower gap, The second posture adjustment is performed so that the subsequent precast concrete structure also has the same gradient as the upward gradient. Here, “when entering” means both the timing before the precast concrete structure enters and the timing after the entry, and at least prevents the interference between the precast concrete structure and the uphill portion. The posture adjustment is executed at an appropriate timing.
このような第1、第2の姿勢調整が順次おこなわれることにより、後方のプレキャストコンクリート構造物は勿論のこと、進行方向前方のプレキャストコンクリート構造物を上り勾配部と干渉させることなく、該上り勾配部に進入させることができ、移送させることができる。 By sequentially performing such first and second posture adjustments, not only the precast concrete structure in the rear but also the precast concrete structure in the front in the traveling direction does not interfere with the ascending slope portion, and the ascending slope It can be entered and transferred.
たとえば3基のプレキャストコンクリート構造物が連接される場合の上記姿勢調整を概説すれば、進行方向前方のプレキャストコンクリート構造物に対して第1の姿勢調整が図られ、次いで、該前方のプレキャストコンクリート構造物が上り勾配部を進行する適宜のタイミングで2番目のプレキャストコンクリート構造物に対して第2の姿勢調整が図られ、次いで、最後尾のプレキャストコンクリート構造物が上り勾配部に進入する前後の適宜のタイミングで、該最後尾のプレキャストコンクリート構造物に対して第2の姿勢調整が図られるものである。なお、4基以上のプレキャストコンクリート構造物が連接された姿勢で移送される場合も同様である。 For example, when the above posture adjustment when three precast concrete structures are connected is outlined, the first posture adjustment is performed with respect to the precast concrete structure ahead in the traveling direction, and then the precast concrete structure ahead The second post-cast concrete structure is adjusted for the second precast concrete structure at an appropriate timing when the object travels the ascending slope portion, and then before and after the last precast concrete structure enters the ascending slope portion. At this time, the second attitude adjustment is performed on the last precast concrete structure. The same applies when four or more precast concrete structures are transported in an articulated posture.
上記するように、本発明の2以上のプレキャストコンクリート構造物を上り勾配を経て連続敷設する方法によれば、連接される2以上のプレキャストコンクリート構造物が移送される移送路が上り勾配部を有する場合であっても、この上り勾配部とプレキャストコンクリート構造物とを干渉させることなく、安全かつ効率的に移送させることが可能となる。したがって、上り勾配部を有する複雑な縦断線形の移送路に対して、一度に複数のプレキャストコンクリート構造物を効率的に移送させることができ、従来のプレキャストコンクリート構造物の連続敷設方法に比して、その構築条件を格段に広範囲とでき、しかもその構築工程を格段に短縮することができるものである。 As described above, according to the method of continuously laying two or more precast concrete structures of the present invention through an ascending slope, the transfer path through which the two or more precast concrete structures to be connected are transported has an ascending slope portion. Even in this case, it is possible to safely and efficiently transfer the ascending slope and the precast concrete structure without causing interference. Therefore, it is possible to efficiently transfer a plurality of precast concrete structures at a time to a complicated longitudinal linear transfer path having an ascending slope, as compared with the conventional continuous laying method of precast concrete structures. The construction conditions can be remarkably wide, and the construction process can be remarkably shortened.
また、本発明による2以上のプレキャストコンクリート構造物を上り勾配を経て連続敷設する方法の好ましい実施の形態は、前記第1の姿勢調整に先行して、該第1の姿勢調整で形成される前記下方の隙間を保持する第1の隙間保持材が介層され、第2の姿勢調整に先行して、該第1の隙間保持材が取り除かれるものである。 In addition, a preferred embodiment of a method for continuously laying two or more precast concrete structures according to the present invention through an ascending slope is formed by the first posture adjustment prior to the first posture adjustment. A first gap holding material that holds the lower gap is interposed, and the first gap holding material is removed prior to the second posture adjustment.
また、本発明による2以上のプレキャストコンクリート構造物を上り勾配を経て連続敷設する方法の好ましい実施の形態は、前記第1の姿勢調整に先行して、該第1の姿勢調整で形成される前記下方の隙間を保持する第1の隙間保持材と、前記上方の隙間を保持する第2の隙間保持材と、が介層され、前記第2の姿勢調整に先行して、該第1の隙間保持材および第2の隙間保持材が取り除かれるものである。 In addition, a preferred embodiment of a method for continuously laying two or more precast concrete structures according to the present invention through an ascending slope is formed by the first posture adjustment prior to the first posture adjustment. A first gap holding material that holds the lower gap and a second gap holding material that holds the upper gap are interposed, and prior to the second posture adjustment, the first gap The holding material and the second gap holding material are removed.
上記する連続敷設方法の実施の形態は、姿勢調整された後のプレキャストコンクリート構造物相互の姿勢を所定時間確実に保障するために、第1の隙間保持材を下方の隙間に介層させるもの、これに加えて第2の隙間保持材を上方の隙間に介層させるものであり、保持姿勢を解除したいタイミングで介層された隙間保持材を取り除くものである。なお、これらの隙間保持材は、プレキャストコンクリート構造物が移送路に搬入される前に、もしくは搬入された際に、予め取付けられていてもよい。 In the embodiment of the continuous laying method described above, the first gap holding material is interposed in the lower gap in order to ensure the predetermined posture of the precast concrete structure after the posture adjustment for a predetermined time, In addition to this, the second gap holding material is interposed in the upper gap, and the intervening gap holding material is removed at a timing when the holding posture is desired to be released. These gap retaining materials may be attached in advance before or when the precast concrete structure is carried into the transfer path.
ここで、これら第1、第2の隙間保持材として、たとえばライナープレートをはじめとする適宜の軸材、板材、ブロック材を適用できる。 Here, as these first and second gap maintaining materials, for example, an appropriate shaft material including a liner plate, a plate material, and a block material can be applied.
また、本発明による2以上のプレキャストコンクリート構造物を上り勾配を経て連続敷設する方法の好ましい実施の形態は、前記連接された2以上のプレキャストコンクリート構造物が牽引手段にて移送される場合において、少なくとも進行方向後方のプレキャストコンクリート構造物が、その重心よりも下方位置を被牽引点として牽引されるものである。 Further, in a preferred embodiment of the method of continuously laying two or more precast concrete structures according to the present invention through an ascending slope, in the case where the two or more precast concrete structures connected are transferred by traction means, At least the precast concrete structure at the rear of the traveling direction is towed with the position below the center of gravity as the towed point.
この実施形態として、進行方向前方のプレキャストコンクリート構造物の重心よりも下方位置に、たとえばこのプレキャストコンクリート構造物の壁内を貫通する貫通孔が設けてあり、ウィンチ等で牽引される緊張材は、この貫通孔に挿通され、進行方向後方のプレキャストコンクリート構造物の壁面もしくは壁内部の重心よりも下方位置の被牽引点に固定される形態を挙げることができる。このように、進行方向後方のプレキャストコンクリート構造物の重心よりも下方位置を被牽引点として、連接された2以上のプレキャストコンクリート構造物がウィンチ等で牽引されることで、牽引移送時のプレキャストコンクリート構造物の安定姿勢が保障されることが本発明者等によって確認されている。なお、進行方向前方のプレキャストコンクリート構造物の重心よりも下方位置を被牽引点として、連接された2以上のプレキャストコンクリート構造物が牽引される形態であっても、牽引移送時のプレキャストコンクリート構造物の安定姿勢を保障することができる。 As this embodiment, a through-hole penetrating through the wall of the precast concrete structure is provided at a position lower than the center of gravity of the precast concrete structure ahead in the traveling direction. The form which is inserted in this through-hole and is fixed to the tow point below the wall surface of the precast concrete structure behind the traveling direction or the center of gravity inside the wall can be mentioned. In this way, two or more connected precast concrete structures are pulled by a winch or the like with the position below the center of gravity of the precast concrete structure behind the traveling direction as a towed point, so that the precast concrete at the time of traction transfer It has been confirmed by the present inventors that a stable posture of the structure is guaranteed. In addition, even if it is a form where two or more connected precast concrete structures are towed with the position below the center of gravity of the precast concrete structure ahead in the traveling direction as a towed point, the precast concrete structure at the time of towing transfer Can ensure a stable posture.
さらに、本発明による2以上のプレキャストコンクリート構造物を上り勾配を経て連続敷設する方法の好ましい実施の形態は、前記連接された2以上のプレキャストコンクリート構造物がそれぞれ、その進行方向前方の下端領域に勾配部を有しており、これがプレキャストコンクリート構造物と前記上り勾配部との干渉防止手段となっているものである。 Furthermore, in a preferred embodiment of the method for continuously laying two or more precast concrete structures according to the present invention through an ascending slope, each of the two or more precast concrete structures connected to each other is located in a lower end region in front of the traveling direction. A slope portion is provided, which serves as a means for preventing interference between the precast concrete structure and the upward slope portion.
上記するように進行方向前方のプレキャストコンクリート構造物の姿勢を第1の姿勢調整にて調整することで、該プレキャストコンクリート構造物と上り勾配部との干渉は抑止されるものであるが、その干渉防止をより高い確率で保障するべく、連接された各プレキャストコンクリート構造物の進行方向前方の下端領域にテーパー状、湾曲状の勾配部を設けたものである。 As described above, by adjusting the posture of the precast concrete structure ahead of the traveling direction by the first posture adjustment, the interference between the precast concrete structure and the ascending slope is suppressed. In order to ensure prevention with a higher probability, tapered and curved gradient portions are provided in the lower end region in the forward direction of each connected precast concrete structure.
なお、上記する下端領域の勾配部に加えて、もしくはこれとは別途の形態として、この進行方向前方の下端領域に、変形吸収性のある緩衝材やクッション材を配しておき、プレキャストコンクリート構造物と上り勾配が万一干渉した場合であっても、干渉時の衝撃を該緩衝材等で吸収するようにしておいてもよい。 In addition to the slope portion of the lower end region described above, or as a separate form, a cushioning material and a cushioning material having deformation absorbability are arranged in the lower end region in front of the traveling direction, and a precast concrete structure Even if the object and the ascending slope interfere with each other, the shock at the time of interference may be absorbed by the buffer material or the like.
以上の説明から理解できるように、本発明の2以上のプレキャストコンクリート構造物を上り勾配を経て連続敷設する方法によれば、プレキャストコンクリート構造物が移送される移送路が上り勾配部を有した縦断線形を備えている場合であっても、2以上のプレキャストコンクリート構造物を一度に、しかも、該上り勾配部と干渉させることなく、安全かつ効率的に移送することが可能となり、このような移送路を有する場所での連続敷設施工を可及的に短い工期で実現することが可能となる。 As can be understood from the above description, according to the method of continuously laying two or more precast concrete structures of the present invention through an ascending slope, the transfer path through which the precast concrete structure is transferred has a longitudinal section having an ascending slope portion. Even in the case of having a linear shape, two or more precast concrete structures can be transported safely and efficiently at a time without interfering with the ascending slope. It is possible to realize continuous laying construction in a place having a road in as short a construction period as possible.
以下、図面を参照して本発明の実施の形態を説明する。なお、図示例は、プレキャストコンクリート構造物としてプレキャストボックスカルバートを取り上げたものであるが、L型やU型、門型の擁壁等、ボックスカルバート以外のプレキャストコンクリート構造物を本発明の敷設方法の適用対象としてもよいことは勿論のことである。また、図示例は、2つのプレキャストボックスカルバートを連接した姿勢で移送する方法を説明したものであるが、3以上のプレキャストボックスカルバートを連接した姿勢で移送するものであってもよいことは勿論のことである。また、図示例は、連接されたプレキャストボックスカルバートが、平坦部から上り勾配部への移送区間を移送される状況を説明しているが、移送路が下り勾配部から上り勾配部への移送区間を有し、この移送区間を2以上のプレキャストボックスカルバートが連接された姿勢で移送される場合にも本発明の構築方法が適用できることは勿論のことである。また、移送されるプレキャストボックスカルバートは、図示例の構成、形態に限定されるものでなく、その内部構造は任意であるし、たとえば、2基以上のプレキャストボックスカルバートが積層されて一つのユニットを構成し、2以上のユニットが移送方向に連接された姿勢で移送され、敷設位置で基盤路と一体化されるものであってもよい。さらに、移送空間の構築は、開削工法のほか、シールド工法や推進工法が適用されてもよい。 Embodiments of the present invention will be described below with reference to the drawings. In the illustrated example, a precast box culvert is taken up as a precast concrete structure. However, a precast concrete structure other than a box culvert such as an L-type, U-type, or a gate-type retaining wall is used in the laying method of the present invention. Of course, it may be applied. In addition, the illustrated example describes a method of transferring two precast box culverts in a concatenated posture. Of course, three or more precast box culverts may be transferred in a contiguous posture. That is. Moreover, although the example of illustration demonstrates the condition where the connected precast box culvert is transferred the transfer area from a flat part to an up-slope part, a transfer path is a transfer area from a down-slope part to an up-slope part. Of course, the construction method of the present invention can also be applied to a case where two or more precast box culverts are transported in a posture where they are connected in this transport section. Further, the precast box culvert to be transferred is not limited to the configuration and form of the illustrated example, and its internal structure is arbitrary. For example, two or more precast box culverts are stacked to form one unit. It may be configured so that two or more units are transported in a posture connected in the transport direction and integrated with the foundation path at the laying position. Furthermore, in addition to the open-cut method, the shield method and the propulsion method may be applied to construct the transfer space.
図1は、本発明の2以上のプレキャストコンクリート構造物を上り勾配を経て連続敷設する方法において、連接された2つのプレキャストボックスカルバートが牽引手段にて牽引されている状況を説明した模式図であり、図2は、a,bの順に、平坦部から上り勾配部への縦断線形を有する移送路において、上り勾配部に進入する前段階で、進行方向前方のプレキャストボックスカルバートを上り勾配部と同勾配の姿勢に調整している状況(第1の姿勢調整)を説明した模式図と、次いで、後続のプレキャストボックスカルバートが上り勾配部に進入する際に、該後続のプレキャストボックスカルバートも上り勾配部と同勾配の姿勢に調整している状況(第2の姿勢調整)を説明した模式図を示したものである。 FIG. 1 is a schematic diagram illustrating a situation where two connected precast box culverts are pulled by a traction means in a method of continuously laying two or more precast concrete structures according to the present invention through an ascending slope. FIG. 2 shows that in the order of a and b, in the transfer path having a vertical alignment from the flat portion to the upward gradient portion, the precast box culvert ahead of the traveling direction is the same as the upward gradient portion before entering the upward gradient portion. Schematic diagram explaining the situation (first posture adjustment) adjusted to the attitude of the gradient, and then, when the subsequent precast box culvert enters the ascending gradient section, the subsequent precast box culvert is also an ascending gradient section. The schematic diagram explaining the condition (2nd attitude | position adjustment) currently adjusted to the attitude | position of the same gradient is shown.
プレキャストボックスカルバート1は、プレキャスト製でRC造のカルバート、鋼製のカルバート、鋼とRCの合成構造のカルバートなどであり、その中央のレベルラインCLよりも上方と下方のそれぞれに、双方を繋ぐ隙間調整用の連接材2,2(隙間調整材)をそれぞれの隅角部付近に有している。なお、上方、下方の連接材2,2の設置位置や基数等は図示例に限定されるものではない。
The
連接材2は、プレキャストボックスカルバート1に開設された貫通孔に挿通されたPC鋼棒等の緊張材21と、この緊張材21,21を繋ぐカップラー等の調整材22と、から構成されており、たとえば、緊張材21は、不図示の楔留め材等でプレキャストボックスカルバート1の壁内に定着される。ここで、カップラー等からなる調整材22の具体的な内部構成として、図1中の拡大図a,bで示す形態を挙げることができる。拡大図aで示す形態は、カップラー22の内部に緊張材21,21が伸び、双方をナット23,23を介してカップラー22に固定する形態である。一方、拡大図bで示す形態は、カップラー22の内部に緊張材21,21が伸びて当接し、双方をナット23,23でカップラー22に固定するとともに、双方の当接箇所をパイプ24で防護する形態である。
The connecting
なお、図示例では、各プレキャストボックスカルバート1が4つの調整材22,…を有していて、連接されるプレキャストボックスカルバート1,1の間の隙間Sの調整の際に、いずれの調整材22にて緊張材21の長さ調整(隙間調整)をおこなってもよい実施例を示しているが、連接されるプレキャストボックスカルバート1のいずれか一方にのみ調整材22が設けられた実施例であってもよい。
In the illustrated example, each
中央のレベルラインCLよりも上方と下方に設けられた連接材2,2の長さを調整材22,22にて調整することで、上方の隙間S2,下方の隙間S1を所望に調整することができる。
By adjusting the lengths of the connecting
また、プレキャストボックスカルバート1の底版には、たとえば複数の注入孔12,12が開設されており、該プレキャストボックスカルバート1が所定の敷設位置に移送された際に、プレキャストボックスカルバート1の内部からモルタル等を充填し、その下方の移送路Rとプレキャストボックスカルバート1の間の空間にモルタル等を充填硬化させ、双方の一体化を図ることができるようになっている。
The bottom plate of the
連接された2つのプレキャストボックスカルバート1,1のうち、その進行方向(X方向)前方のプレキャストボックスカルバート1の重心よりも下方位置には緊張材31が挿通する貫通孔14が設けてあり、この貫通孔14を介して、進行方向(X方向)後方のプレキャストボックスカルバート1の重心よりも下方の被牽引点KPに緊張材31が固定され、この緊張材31がウィンチ等の牽引手段3にて牽引されることで、2つの移送路R,R上を移送される。
Among the two
この移送路Rは、たとえば地盤を開削し、掘削されてできた掘削壁面が土留めされることで形成された移送空間IK内に構築されるものであり、たとえばクレーン等の重機にて、地上からプレキャストボックスカルバート1をこの移送空間IK内に吊り下ろし、たとえば2つのプレキャストボックスカルバート1,1を移送路R,R上に順次載置し、双方を連接するとともに緊張材31を進行方向前方のプレキャストボックスカルバート1に繋いだ後に、移送が開始される。
The transfer path R is constructed in a transfer space IK formed by excavating the ground and excavating the excavated wall surface, for example. The
ここで、移送路Rは、たとえばコンクリート製の基盤路R1と、この基盤路R1内に埋設されたC型鋼、H型鋼などからなる凹溝状のレールR2と、このレールR2の凹溝内に収容された鋼球等からなる多数の転動体R3,…と、から構成される。 Here, the transfer path R is, for example, a concrete base path R1, a concave groove-shaped rail R2 made of C-type steel, H-type steel or the like embedded in the base path R1, and a concave groove of the rail R2. It is comprised from many rolling elements R3 ... which consist of the steel ball etc. which were accommodated.
この転動体R3は、レールR2の凹溝内に直接的に収容されてもよいし、粘着マットや網等の保持層(不図示)が凹溝内に配され、この保持層にてその位置決めがなされた姿勢で凹溝内に収容されてもよい。 The rolling element R3 may be directly accommodated in the concave groove of the rail R2, or a holding layer (not shown) such as an adhesive mat or a net is arranged in the concave groove, and the positioning is performed by the holding layer. You may accommodate in a ditch | groove with the attitude | position made.
プレキャストボックスカルバート1の底版下面には、2条のレールR,R内の転動体R3,…上に当接する型鋼などからなる脚11,11が設けてあり、転動体R3の転動もしくは回転により、可及的に低減された摩擦抵抗のもとで、この脚11,11が移動できるようになっている。
On the bottom surface of the bottom plate of the
本発明の連続敷設方法では、その移送路Rが、少なくとも上り勾配部を有するものであり、移送されるプレキャストボックスカルバート1がこの上り勾配部との間で干渉することなく、スムースに移送されることをその特徴とするものである。
In the continuous laying method of the present invention, the transfer path R has at least an ascending slope portion, and the
ここで、図2a,bは、移送路Rが、平坦部Raと上り勾配部Rbとからなる区間を有し、この平坦部Raから上り勾配部Rbへ移送される際のプレキャストボックスカルバート1,1の姿勢調整を説明するものである。なお、この縦断線形以外にも、移送路Rが、その途中に下り勾配部から上り勾配部へ移行する区間、下り勾配部から平坦部へ移行し、さらに平坦部から上り勾配へ移行する区間、等を有するものであっても、本発明の構築方法もしくは移送方法が適用できることに変わりはない。
2A and 2B, the transfer path R has a section composed of a flat portion Ra and an ascending slope portion Rb, and the
まず、図2aの一点鎖線で示すように、プレキャストボックスカルバート1,1はともに、その大きさが同程度の下方の隙間S1と上方の隙間S2をもった姿勢で平坦部Ra上を移送される。
First, as shown by the one-dot chain line in FIG. 2a, both the
平坦部Raから上り勾配部Rbへの移行に先んじて、上方の連接材2の長さを短く調整し(カップラーにPC鋼棒をよりねじ込むことで、隙間調整用の連接材2に張力Q1を生じさせる)、進行方向前方のプレキャストボックスカルバート1を上り勾配部Rbの傾斜角:θと同程度の角度に姿勢調整する。この姿勢調整により、下方の隙間S1はそのままで、上方の隙間が相対的に短いS2’になっている。
Prior to the transition from the flat portion Ra to the ascending slope portion Rb, the length of the upper connecting
姿勢調整された2つのプレキャストボックスカルバート1,1を牽引手段にて牽引し、次に、図2bで示すように、後続のプレキャストボックスカルバート1が上り勾配部Rbに進入する際に、徐々に下方の連接材2の長さを調整し(カップラーにPC鋼棒をよりねじ込むことで連接材2に張力Q2を生じさせる)、後続のプレキャストボックスカルバート1も前方のプレキャストボックスカルバート1と同程度の勾配に姿勢調整する。この姿勢調整により、下方の隙間は、上方の隙間S1’と同程度の隙間S2’となっている。
The two
このように、上り勾配部Rbへの進入の際に、進行方向前方のプレキャストボックスカルバート1と後続のプレキャストボックスカルバート1の姿勢調整を所望に実行することで、双方のプレキャストボックスカルバート1,1をともに上り勾配部Rbと何等干渉させることなく上り勾配部Rbへ進入させることができ、以後の移送を継続することができる。
In this way, when entering the ascending slope portion Rb, by adjusting the postures of the
また、図3a、bはそれぞれ、図2a,bに対応する図であって、2つのプレキャストボックスカルバートの間にライナープレート等からなる第1、第2の隙間保持材が介層されている状況を説明した図である。 FIGS. 3a and 3b are views corresponding to FIGS. 2a and 2b, respectively, in which the first and second gap holding members made of liner plates are interposed between two precast box culverts. FIG.
上方の隙間S2には、相対的に短めの第2の隙間保持材42がいずれか一方のプレキャストボックスカルバート1に予め取り付けられており、下方の隙間S1には、相対的に長めの第1の隙間保持材41が同様に予めいずれか一方のプレキャストボックスカルバート1に取付けられている。
In the upper gap S2, a relatively short second
これら第1の隙間保持材41、第2の隙間保持材42により、図3aにおける姿勢調整の際の下方の隙間S1,上方の隙間S1’を保証することができ、このことは、進行方向前方のプレキャストボックスカルバート1の傾斜角:θを保障することをも意味する。
The first
次に、後続のプレキャストボックスカルバート1が上り勾配部Rbに進入する際には、第1の隙間保持材41を取り除き、その代わりに第2の隙間保持材42と同程度の長さの隙間保持材41’を下方の隙間S1’に介層させることで、上り勾配部Rbを移送される2つのプレキャストボックスカルバート1,1間の上下の隙間を、同程度の隙間に保障することができる。
Next, when the subsequent
図4は、プレキャストボックスカルバートの他の実施の形態を使用して、連接された2つのプレキャストボックスカルバートが牽引手段にて牽引されている状況を説明した模式図である。 FIG. 4 is a schematic diagram for explaining a situation where two connected precast box culverts are pulled by the traction means using another embodiment of the precast box culvert.
図示するプレキャストボックスカルバート1Aは、その進行方向前方の下端領域に勾配部13を有したものであり、この勾配部13により、プレキャストボックスカルバート1と上り勾配部Rbとの干渉防止をより高い確率で保障することができる。なお、図示を省略するが、この勾配部13に加えて、もしくはこれとは別途の形態として、この進行方向前方の下端領域に、緩衝材やクッション材を配しておき、プレキャストボックスカルバート1と上り勾配部Rbが万一干渉した場合であっても、干渉時の衝撃を該緩衝材等で吸収するようにしておいてもよい。
The
図5は、プレキャストボックスカルバートが移送される移送空間の上方を地上交通に供しながら、該プレキャストボックスカルバートが敷設位置にて基盤路と一体化されている状況を説明した模式図である。 FIG. 5 is a schematic diagram for explaining a situation in which the precast box culvert is integrated with the basement road at the laying position while providing ground transportation above the transfer space in which the precast box culvert is transferred.
既述するように、開削工法にて地盤を掘削し、土留めDを施工することで移送空間IKを形成し、この移送空間IKの下面に上り勾配部を有する移送路Rが構築される。 As described above, the transfer space IK is formed by excavating the ground by the open-cut method and constructing the earth retaining D, and the transfer path R having the ascending slope portion is formed on the lower surface of the transfer space IK.
たとえば、地上から移送空間IK内の搬入位置へ吊り下ろされた2以上のプレキャストボックスカルバート1,…は、その搬入地点で連接され、連接された2以上のプレキャストボックスカルバート1,…は、その途中に位置する上り勾配部Rbを介して移送路Rをその敷設位置まで移送される。
For example, two or more
敷設位置においては、プレキャストボックスカルバート1の底版に開設された注入孔12を介してその内部からモルタル等が注入され、これがプレキャストボックスカルバート1と基盤路R1の間の空間、レールR2の間の転動体R3,…間の空隙を満たし、硬化することで、移送路Rとプレキャストボックスカルバート1の一体化が図られる。
At the laying position, mortar or the like is injected from the inside through an
連接する2以上のプレキャストボックスカルバート1,…が順次移送され、相互に繋がれることで所定長さの暗渠が構築される。
Two or more connected
なお、この移送空間IKの上方には仮の路盤KRが設置され、2以上のプレキャストボックスカルバート1,…の連続敷設に並行して該仮の路盤KRが地上の任意使用(図示例のごとき地上交通など)に供されるのが好ましい。
In addition, a temporary roadbed KR is installed above the transfer space IK, and the temporary roadbed KR is arbitrarily used on the ground in parallel with continuous laying of two or more
上記する本発明の2以上のプレキャストコンクリート構造物を上り勾配を経て連続敷設する方法によれば、その移送路の途中に上り勾配部が存在する場合であっても、2以上のプレキャストボックスカルバートを連接した姿勢で、該上り勾配部と何等干渉させることなく、複数基を一気に移送することが可能となるため、多様な縦断線形の移送路に対して、さらに工期の短縮が図られた横引き工法を実現することができる。 According to the above-described method for continuously laying two or more precast concrete structures of the present invention through an ascending slope, even when an ascending slope portion is present in the middle of the transfer path, two or more precast box culverts are provided. Since it is possible to transfer a plurality of units at once without interfering with the up-gradient part in a connected posture, horizontal pulling that further shortens the construction period for various vertical linear transfer paths The construction method can be realized.
以上、本発明の実施の形態を図面を用いて詳述してきたが、具体的な構成はこの実施形態に限定されるものではなく、本発明の要旨を逸脱しない範囲における設計変更等があっても、それらは本発明に含まれるものである。 The embodiment of the present invention has been described in detail with reference to the drawings. However, the specific configuration is not limited to this embodiment, and there are design changes and the like without departing from the gist of the present invention. They are also included in the present invention.
1,1A…プレキャストボックスカルバート(プレキャストコンクリート構造物)、11…脚、12…注入孔、13…勾配部、2…隙間調整用の連接材(隙間調整材)、21…緊張材(PC鋼棒)、22…調整材(カップラー)、3…牽引手段(ウィンチ)、31…緊張材、41…第1の隙間保持材(下方の隙間を保持する保持材)、42…第2の隙間保持材(上方の隙間を保持する保持材)、S…隙間、S1…下方の隙間、S2…上方の隙間、R…移送路、R1…基盤路、R2…凹溝状のレール、R3…転動体(鋼球)、Ra…平坦部、Rb…上り勾配部、M…モルタル、IK…移送空間、D…土留め、KR…仮の路盤
DESCRIPTION OF
Claims (8)
前記2以上のプレキャストコンクリート構造物は、相互に隙間を置いて、かつ、少なくとも該隙間の上方および下方の2箇所で隙間調整材を介して連接された姿勢で転動体上を移送され、
進行方向前方のプレキャストコンクリート構造物が前記上り勾配部に進入する際に、少なくとも上方の前記隙間調整材を調整して前記上方の隙間を狭くし、該前方のプレキャストコンクリート構造物を上り勾配部と同勾配の姿勢とする第1の姿勢調整をおこない、
次いで、後続のプレキャストコンクリート構造物が前記上り勾配部に進入する際に、下方の前記隙間調整材を調整して前記下方の隙間を狭くし、該後続のプレキャストコンクリート構造物も上り勾配部と同勾配の姿勢とする第2の姿勢調整をおこなうことで、連接された2以上のプレキャストコンクリート構造物の上り勾配部への移送がおこなわれることを特徴とする、2以上のプレキャストコンクリート構造物を上り勾配を経て連続敷設する方法。 In the method of continuously laying two or more connected precast concrete structures to a laying position through at least a transfer path having an ascending slope portion, the transfer path is disposed on the base path and the base path And a plurality of rolling elements arranged in the rail, and the two or more precast concrete structures connected to each other are moved by the traction means or the pushing means. It is a method of continuously laying two or more precast concrete structures to be transported through an ascending slope,
The two or more precast concrete structures are transported on the rolling elements with a gap between each other and at least two positions above and below the gap and connected via a gap adjusting material,
When the precast concrete structure forward in the advancing direction enters the ascending slope part, at least the upper gap adjusting material is adjusted to narrow the upper gap, and the forward precast concrete structure is defined as the ascending slope part. Perform the first posture adjustment with the same gradient posture,
Next, when the subsequent precast concrete structure enters the uphill portion, the lower gap adjustment material is adjusted to narrow the lower gap, and the subsequent precast concrete structure is the same as the uphill portion. The two or more precast concrete structures are transported to the ascending slope of the two or more precast concrete structures connected to each other by performing the second attitude adjustment with a gradient attitude. A method of continuous laying through a gradient.
前記移送空間の上方に仮の路盤が設置可能であり、2以上のプレキャストコンクリート構造物の連続敷設に並行して該仮の路盤が地上の任意使用に供される、請求項1〜7のいずれかに記載の2以上のプレキャストコンクリート構造物を上り勾配を経て連続敷設する方法。 A transfer space is formed by earthing the excavation wall surface formed by excavating the ground, and the transfer path is arranged on the bottom surface of this transfer space,
The temporary roadbed can be installed above the transfer space, and the temporary roadbed is provided for arbitrary use on the ground in parallel with continuous laying of two or more precast concrete structures. A method of continuously laying two or more precast concrete structures as described above in an upward gradient.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2010227600A JP5524014B2 (en) | 2009-10-13 | 2010-10-07 | Method of continuously laying two or more precast concrete structures through an ascending slope |
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2009236150 | 2009-10-13 | ||
| JP2009236150 | 2009-10-13 | ||
| JP2010227600A JP5524014B2 (en) | 2009-10-13 | 2010-10-07 | Method of continuously laying two or more precast concrete structures through an ascending slope |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2011102531A JP2011102531A (en) | 2011-05-26 |
| JP5524014B2 true JP5524014B2 (en) | 2014-06-18 |
Family
ID=44192966
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2010227600A Active JP5524014B2 (en) | 2009-10-13 | 2010-10-07 | Method of continuously laying two or more precast concrete structures through an ascending slope |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP5524014B2 (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP6306284B2 (en) * | 2013-04-02 | 2018-04-04 | Smcプレコンクリート株式会社 | Box culvert transport method |
Family Cites Families (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2997268B1 (en) * | 1999-03-24 | 2000-01-11 | ジオスター株式会社 | Precast concrete block |
| JP4892187B2 (en) * | 2000-09-12 | 2012-03-07 | 安藤建設株式会社 | Pipe laying method |
-
2010
- 2010-10-07 JP JP2010227600A patent/JP5524014B2/en active Active
Also Published As
| Publication number | Publication date |
|---|---|
| JP2011102531A (en) | 2011-05-26 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN106087629A (en) | Without conical slope prefabricated baffle plate foam concrete light road bank structure and construction method | |
| CN106542283A (en) | A construction material rail transport device and method of use adapted to rock pile slopes | |
| CN206495233U (en) | Door shape assembled armored concrete box culvert | |
| JP5470220B2 (en) | Method of transferring and laying precast concrete structures while changing the transfer direction | |
| JP6148709B2 (en) | Road surface lining method in propulsion type open shield method | |
| EP0560660B1 (en) | Multistorey underground garages and construction method thereof | |
| CN105421463B (en) | Longitudinal excavation construction method of long-span dense-support super-long deep foundation pit | |
| JP2879021B2 (en) | How to lay a sewer | |
| JP5524014B2 (en) | Method of continuously laying two or more precast concrete structures through an ascending slope | |
| CN108951642A (en) | The ruggedized construction and construction method of anti-pit accident on a kind of across existing tunnel | |
| CN114673525B (en) | A tunnel construction method using corrugated steel and shotcrete support | |
| JP4070566B2 (en) | Tunnel block continuous construction method | |
| JP5970305B2 (en) | Pipe laying method | |
| JP3453553B2 (en) | Continuous construction method of precast concrete column wall members | |
| JP6801847B2 (en) | Easy construction of tunnel guard passages using L-shaped precast concrete products | |
| JP5399111B2 (en) | Method and apparatus for laying heavy objects | |
| KR100834076B1 (en) | Non-adhesive tunnel excavation method and tunnel structure installed by the method | |
| CN216689105U (en) | Cast-in-place box culvert and template support system thereof | |
| JP5970303B2 (en) | Tubing body laying method | |
| JP5155236B2 (en) | Installation method of lining board in open shield method | |
| JP3996597B2 (en) | Open shield machine and open shield method using it | |
| EP0424223A1 (en) | Process for the rapid construction of two superimposed roadways with a structure placed on the existing road without hindering the traffic | |
| CN215858245U (en) | Assembled back wall suitable for steel pipe curtain jacking | |
| JP4892187B2 (en) | Pipe laying method | |
| KR100959413B1 (en) | Method for constructing a tunnel using front jackingconstruction method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20130628 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20140122 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20140128 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20140214 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20140401 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20140409 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 5524014 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| S111 | Request for change of ownership or part of ownership |
Free format text: JAPANESE INTERMEDIATE CODE: R313117 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |