Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP5531559B2 - Stroke design drawing creation method and strike design drawing creation apparatus - Google Patents
[go: Go Back, main page]

JP5531559B2 - Stroke design drawing creation method and strike design drawing creation apparatus - Google Patents

Stroke design drawing creation method and strike design drawing creation apparatus Download PDF

Info

Publication number
JP5531559B2
JP5531559B2 JP2009249077A JP2009249077A JP5531559B2 JP 5531559 B2 JP5531559 B2 JP 5531559B2 JP 2009249077 A JP2009249077 A JP 2009249077A JP 2009249077 A JP2009249077 A JP 2009249077A JP 5531559 B2 JP5531559 B2 JP 5531559B2
Authority
JP
Japan
Prior art keywords
concrete
support
stress
region
small areas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2009249077A
Other languages
Japanese (ja)
Other versions
JP2011094379A (en
Inventor
隆志 金倉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
IHI Corp
Original Assignee
IHI Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by IHI Corp filed Critical IHI Corp
Priority to JP2009249077A priority Critical patent/JP5531559B2/en
Publication of JP2011094379A publication Critical patent/JP2011094379A/en
Application granted granted Critical
Publication of JP5531559B2 publication Critical patent/JP5531559B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Description

本発明は、コンクリートを含んで形成されるタンク屋根を製造する際の上記コンクリートの打設計画作成方法及び打設計画作成装置に関するものである。   The present invention relates to a concrete striking design creation method and a striking design creation device for manufacturing a tank roof formed with concrete.

LNG等を貯留するタンクでは、例えば鋼材からなる内槽とプレストレスコンクリートからなる外槽との二層構造が採用されている。
このようなタンクを製造する場合には、いわゆるエアレイジングを用いて屋根を製造する。より詳細には、底部と側壁とが形成されたタンクの底部においてスチール屋根(鋼材からなる内屋根)を形成し、底部と屋根との間に空気を圧送してスチール屋根を持ち上げてから側壁の上部に固定する。その後、底部とスチール屋根との間に空気を圧送し続けてスチール屋根をサポートしながら、スチール屋根上にコンクリートを打設してコンクリート屋根を形成する。
In a tank for storing LNG or the like, for example, a two-layer structure of an inner tank made of steel and an outer tank made of prestressed concrete is adopted.
When manufacturing such a tank, the roof is manufactured using so-called air lasing. More specifically, a steel roof (inner roof made of steel) is formed at the bottom of the tank in which the bottom and side walls are formed, air is pumped between the bottom and the roof to lift the steel roof, and Secure to the top. Then, while continuing to pump air between the bottom and the steel roof to support the steel roof, concrete is placed on the steel roof to form a concrete roof.

特開2000−248774号公報JP 2000-248774 A

ところで、従来は、コンクリート屋根を形成する全ての期間において、スチール屋根をエアレイジングによってサポートし、この状態でコンクリートの打設を進めている。
しかしながら、コンクリートの打設は、コンクリートの供給量等の制限によって複数回に分けて行われる。このため、スチール屋根をエアレイジングによって支える期間が長期化している。スチール屋根をエアレイジングによってサポートしている間は、タンク内が高圧状態となるため、タンク内に作業者が入って作業を行うことができず、工期の長期化を招く。また、スチール屋根をエアレイジングによってサポートするための費用が嵩むこととなる。
また、エアレイジング以外の方法でスチール屋根をサポートする場合を考えても、スチール屋根をサポートする影響によりエアレイジングと同様の問題が生じることとなる。
つまり、従来の方法は、スチール屋根上にコンクリートを打設する全期間においてスチール屋根を支持しており、このスチール屋根の支持によって、タンク製造の工期の長期化や費用の増大を招いていた。
By the way, conventionally, in all periods for forming a concrete roof, the steel roof is supported by air lasing, and the concrete is placed in this state.
However, concrete placement is performed in a plurality of times depending on the amount of concrete supplied. For this reason, the period which supports a steel roof by air lasing is prolonged. While the steel roof is supported by air lasing, the inside of the tank is in a high pressure state, so that an operator cannot enter the tank and perform work, resulting in a prolonged construction period. In addition, the cost for supporting the steel roof by air lasing increases.
Moreover, even when considering the case of supporting a steel roof by a method other than air lasing, the same problem as that of air lasing arises due to the effect of supporting the steel roof.
In other words, the conventional method supports the steel roof during the entire period of placing the concrete on the steel roof, and the support of the steel roof leads to an increase in the construction period of the tank and an increase in costs.

本発明は、上述する問題点に鑑みてなされたもので、タンク屋根を製造するにあたり、コンクリートの打設時に該コンクリートを支持する支持体(例えば上記スチール屋根)をサポートする期間の短縮化を図ることを目的とする。   The present invention has been made in view of the above-described problems. In manufacturing a tank roof, the period for supporting a support (for example, the steel roof) that supports the concrete when placing the concrete is shortened. For the purpose.

本発明は、上記課題を解決するための手段として、以下の構成を採用する。   The present invention adopts the following configuration as means for solving the above-described problems.

第1の発明は、コンクリートを含んで形成されるタンク屋根を製造する際の上記コンクリートの打設計画を作成する打設計画作成方法であって、上記コンクリートが打設される全領域を複数の小領域に分割する分割工程と、各上記小領域に対する上記コンクリートの打設により当該コンクリートを支持する支持体に発生する応力を計算する応力計算工程と、該応力計算工程にて計算された応力に基づいて上記支持体に対するサポートの必要性を判定する判定工程とを有するという構成を採用する。   A first aspect of the present invention is a striking design creation method for creating a concrete striking design image when manufacturing a tank roof formed to include concrete, wherein a plurality of areas where the concrete is placed are divided into a plurality of areas. A dividing step of dividing into small regions, a stress calculating step of calculating the stress generated in the support that supports the concrete by placing the concrete in each of the small regions, and a stress calculated in the stress calculating step. And a determination step of determining the necessity of support for the support based on the above.

第2の発明は、上記第1の発明において、上記タンク屋根が鋼材からなる内屋根とコンクリートを含む外屋根とから構成され、上記支持体が、上記内屋根と上記コンクリートが打設済みの上記外屋根の一部とを含むという構成を採用する。   According to a second invention, in the first invention, the tank roof is composed of an inner roof made of a steel material and an outer roof containing concrete, and the support body has the casted inner roof and the concrete. A configuration including a part of the outer roof is adopted.

第3の発明は、上記第1または第2の発明において、予め定められた打設期間に基づいて各上記小領域に上記コンクリートを打設する打設タイミングを算出する打設タイミング算出工程をさらに有し、上記応力計算工程にて上記打設タイミングに応じて上記応力を計算し、上記判定工程にて上記打設タイミングに応じて上記サポートの必要性を判定するという構成を採用する。   According to a third aspect of the present invention, in the first or second aspect of the present invention, a placement timing calculating step of calculating a placement timing for placing the concrete in each of the small areas based on a predetermined placement period is further provided. The stress is calculated in the stress calculation step according to the placement timing, and the determination step determines the necessity of the support in accordance with the placement timing.

第4の発明は、上記第1または第2の発明において、上記サポートの必要性が、全ての上記小領域に上記コンクリートが打設される場合に必要なしと判定されるように、各上記小領域に上記コンクリートを打設する打設タイミングを算出するという構成を採用する。   According to a fourth aspect of the present invention, in the first or second aspect of the present invention, the need for the support is determined to be unnecessary when the concrete is placed in all the small areas. A configuration is adopted in which the placement timing for placing the concrete in the region is calculated.

第5の発明は、上記第1〜4いずれかの発明において、上記サポートが、上記支持体を空気によって支えるエアレイジングであるという構成を採用する。   According to a fifth invention, in any one of the first to fourth inventions, the support is an air lasing that supports the support body with air.

第6の発明は、上記第1〜第5いずれかの発明において、上記分割工程にて、上記コンクリートが打設される全領域の少なくとも一部を上記タンク屋根の高さ方向に分割するという構成を採用する。   6th invention is the structure which divides | segments at least one part of the whole area | region where the said concrete is cast | placed in the said division | segmentation process in the said 1st-5th invention in the height direction of the said tank roof. Is adopted.

第7の発明は、コンクリートを含んで形成されるタンク屋根を製造する際の上記コンクリートの打設計画を作成する打設計画作成装置であって、上記コンクリートが打設される全領域を複数の小領域に分割する分割手段と、各上記小領域に対する上記コンクリートの打設により当該コンクリートを支持する支持体に発生する応力を計算する応力計算手段と、該応力計算工程にて計算された応力に基づいて上記支持体に対するサポートの必要性を判定する判定手段とを備えるという構成を採用する。   A seventh aspect of the present invention is a striking design creation device for creating a concrete striking design drawing for producing a tank roof formed including concrete, wherein the entire area where the concrete is placed is divided into a plurality of areas. Dividing means for dividing into small areas, stress calculating means for calculating the stress generated in the support that supports the concrete by the placement of the concrete in each of the small areas, and the stress calculated in the stress calculating step Based on this, a configuration is adopted in which determination means for determining the necessity of support for the support is provided.

本発明によれば、コンクリートが打設される全領域が複数の小領域に分割され、各上記小領域に対する上記コンクリートの打設により当該コンクリートを支持する支持体に発生する応力が計算され、当該応力に基づいて上記支持体に対するサポートの必要性が判定される。
つまり、本発明によれば、タンク屋根のコンクリートを打設する期間の全てで支持体をサポートするのではなく、必要な場合のみに支持体をサポートし、必要でない場合には支持体のサポートを行わないとする打設計画を作成することができる。
このため、本発明の打設計画に則ってタンク屋根を製造する場合には、支持体(例えば上記スチール屋根)をサポートする期間の短縮化を図ることができ、工期の短縮化や支持体のサポートに必要となる費用を低減させることが可能となる。
According to the present invention, the entire area where the concrete is placed is divided into a plurality of small areas, and the stress generated in the support that supports the concrete by the placement of the concrete with respect to each of the small areas is calculated, Based on the stress, the need for support for the support is determined.
That is, according to the present invention, the support is not supported during the entire period of placing the concrete on the tank roof, but is supported only when necessary, and the support is supported when not necessary. It is possible to create a hit design image that is not to be performed.
For this reason, when manufacturing a tank roof according to the hitting design image of the present invention, it is possible to shorten the period for supporting the support (for example, the steel roof). Costs required for support can be reduced.

本発明の第1実施形態における打設計画作成装置の概略構成を示すブロック図である。It is a block diagram which shows schematic structure of the hit design image creation apparatus in 1st Embodiment of this invention. 本発明によって打設計画が作成されるタンクの屋根を模式的に示した図である。It is the figure which showed typically the roof of the tank where a hit design image is created by this invention. 本発明の第1実施形態における打設計画作成方法を説明するためのフローチャートである。It is a flowchart for demonstrating the hit design image creation method in 1st Embodiment of this invention. 本発明の第2実施形態における打設計画作成方法を説明するためのフローチャートである。It is a flowchart for demonstrating the hit design image creation method in 2nd Embodiment of this invention.

以下、図面を参照して、本発明に係る打設計画作成方法及び打設計画作成装置の一実施形態について説明する。   Hereinafter, an embodiment of a hit design drawing creation method and a hit design drawing creation apparatus according to the present invention will be described with reference to the drawings.

(第1実施形態)
図1は、本実施形態の打設計画作成装置Sの概略構成を示すブロック図である。
本実施形態の打設計画作成装置Sは、図2に示すような、鋼材からなる内槽T1とプレストレスコンクリートからなる外槽T2とによって構成されるLNGタンクTの屋根(タンク屋根)を製造する際のコンクリートの打設計画を作成するものである。なお、本実施形態においてLNGタンクTの屋根TYは、スチール屋根TY1(内屋根)とコンクリート屋根TY2(外屋根)とによって構成されている。
そして、本実施形態の打設計画作成装置Sは、パーソナルコンピュータやワークステーション等のコンピュータ装置から構成されており、図1に示すように、打設計画作成装置Sは、CPU1と、記憶装置2と、入力装置3と、出力装置4と、通信装置5とを備えている。
(First embodiment)
FIG. 1 is a block diagram showing a schematic configuration of a hit design image creating apparatus S of the present embodiment.
The striking design creation device S of the present embodiment manufactures a roof (tank roof) of an LNG tank T composed of an inner tank T1 made of steel and an outer tank T2 made of prestressed concrete as shown in FIG. This is to create a concrete striking design drawing. In the present embodiment, the roof TY of the LNG tank T is composed of a steel roof TY1 (inner roof) and a concrete roof TY2 (outer roof).
The striking design creation apparatus S of this embodiment is composed of a computer device such as a personal computer or a workstation. As shown in FIG. 1, the striking design creation apparatus S includes a CPU 1 and a storage device 2. And an input device 3, an output device 4, and a communication device 5.

CPU1は、本実施形態の打設計画作成装置Sの全体を制御するものであり、記憶装置2、入力装置3、出力装置4及び通信装置5と電気的に接続されている。
また、CPU1は、記憶装置2に記憶された計算プログラムPに基づいて様々な演算処理を行う。
The CPU 1 controls the entire hit design image creation apparatus S of the present embodiment, and is electrically connected to the storage device 2, the input device 3, the output device 4, and the communication device 5.
Further, the CPU 1 performs various arithmetic processes based on the calculation program P stored in the storage device 2.

より詳細には、本実施形態においてCPU1は、コンクリートが打設される全領域(すなわちコンクリート屋根が形成される領域)を複数の小領域に分割する。すなわち、本実施形態においてCPU1は、本発明の分割手段として機能する。
具体的には、本実施形態においてCPU1は、図3に示すように、コンクリートが打設される全領域Rを8つの同心円領域R1〜R8(小領域)に分割する。また、本実施形態においてCPU1は、図4に示すように、同心円領域R4〜R8をさらにタンクTの屋根TKの高さ方向に2つに分割し、下層領域R41〜R81(小領域)と上層領域R42〜R82(小領域)に分割する。
なお、CPU1は、例えば各分割領域(同心円領域R1〜R3、下層領域R41〜R81及び上層領域R42〜R82)の形状データ(座標データ)を作成することで、全領域Rを各分割領域に分割する。
In more detail, in this embodiment, CPU1 divides | segments the whole area | region (namely, area | region where a concrete roof is formed) in which concrete is laid, into a some small area | region. That is, in this embodiment, the CPU 1 functions as a dividing unit of the present invention.
Specifically, in this embodiment, as shown in FIG. 3, the CPU 1 divides the entire region R where concrete is placed into eight concentric regions R1 to R8 (small regions). In the present embodiment, as shown in FIG. 4, the CPU 1 further divides the concentric circular regions R4 to R8 into two in the height direction of the roof TK of the tank T, so that the lower layer regions R41 to R81 (small region) and the upper layer The area is divided into areas R42 to R82 (small areas).
Note that the CPU 1 divides the entire region R into each divided region by creating shape data (coordinate data) of each divided region (concentric regions R1 to R3, lower layer regions R41 to R81, and upper layer regions R42 to R82), for example. To do.

また、本実施形態においてCPU1は、上記各領域(同心円領域R1〜R3、下層領域R41〜R81及び上層領域R42〜R82)に対するコンクリート打設により、当該コンクリートを支持する支持体に発生する応力を計算する。すなわち、本実施形態においてCPU1は、本発明の応力計算手段として機能する。   Further, in the present embodiment, the CPU 1 calculates the stress generated in the support that supports the concrete by placing the concrete in each of the above regions (concentric regions R1 to R3, lower layer regions R41 to R81, and upper layer regions R42 to R82). To do. That is, in this embodiment, the CPU 1 functions as a stress calculation unit of the present invention.

ここで、本実施形態においてコンクリートは、図2に示す側壁TS側から優先的に打設し、また全ての下層領域(R41〜R81)を上層領域(R42〜R82)よりも優先的に打設し、さらに各分割領域へのコンクリート打設には期間が空けられるものとする。つまり、本実施形態においては、所定期間を空けながら、同心円領域R1→同心円領域R2→同心円領域R3→同心円領域R4の下層領域R41→同心円領域R5の下層領域R51→同心円領域R6の下層領域R61→同心円領域R7の下層領域R71→同心円領域R8の下層領域R81→同心円領域R4の上層領域R42→同心円領域R5の上層領域R52→同心円領域R6の上層領域R62→同心円領域R7の上層領域R72→同心円領域R8の上層領域R82の順序でコンクリートが打設される。
この結果、先の領域に打設されたコンクリートは、後の領域にコンクリートが打設された際には時間の経過に伴って強度を増し、さらにはタンクTの側壁TSに接続されているため、後の領域に打設された軟化状態のコンクリート重量を支える支持体として機能する。
つまり、ある領域にコンクリートが打設される場合には、既に打設されたコンクリート(すなわち外槽Y2の一部)と内槽Y1の屋根TY1とが上述の支持体として、応力の計算対象とされる。
Here, in the present embodiment, the concrete is preferentially placed from the side wall TS shown in FIG. 2, and all lower layer regions (R41 to R81) are preferentially placed over the upper layer regions (R42 to R82). Further, it is assumed that there is a period for placing concrete in each divided area. That is, in the present embodiment, the concentric region R1 → the concentric region R2 → the concentric region R3 → the lower region R41 of the concentric region R4 → the lower region R51 of the concentric region R5 → the lower region R61 of the concentric region R6 while leaving a predetermined period of time → Lower layer region R71 of concentric region R7 → Lower region R81 of concentric region R8 → Upper region R42 of concentric region R4 → Upper region R52 of concentric region R5 → Upper region R62 of concentric region R6 → Upper region R72 of concentric region R7 → Concentric region Concrete is placed in the order of the upper layer region R82 of R8.
As a result, the concrete cast in the previous area increases in strength with the passage of time when the concrete is cast in the subsequent area, and is further connected to the side wall TS of the tank T. It functions as a support that supports the weight of the softened concrete placed in a later area.
That is, when concrete is placed in a certain area, the already-placed concrete (that is, a part of the outer tub Y2) and the roof TY1 of the inner tub Y1 serve as the above-mentioned support body and are subject to stress calculation. Is done.

なお、CPU1は、先に打設されて支持体として機能するコンクリートが存在する場合には、当該コンクリートの有効ヤング率を算出し、そして、当該有効ヤング率や、新たに打設される軟化状態のコンクリートの重量等を用いて支持体として機能するコンクリートに作用する応力を計算する。また、CPU1は、内槽Y1の屋根TY1に作用する応力も、上述のコンクリートの有効ヤング率を参照して計算する。
ここで、CPU1は、先に打設されたコンクリートの有効ヤング率を算出する場合には、当該コンクリートが打設されてからの期間に基づいてその値を算出する。具体的には、記憶装置2に有効ヤング率と時間との関係を示す有効ヤング率算出用データが記憶されており、CPU1は、当該有効ヤング率算出用データを参照することで、先に打設されたコンクリートの有効ヤング率を算出する。なお、有効ヤング率算出用データは、実験等により予め取得されるものである。
In addition, CPU1 calculates the effective Young's modulus of the said concrete, when the concrete which is previously cast and functions as a support body, And the said effective Young's modulus and the softened state newly laid The stress acting on the concrete functioning as a support is calculated using the weight of the concrete. Moreover, CPU1 calculates the stress which acts on the roof TY1 of the inner tank Y1 with reference to the effective Young's modulus of the above-mentioned concrete.
Here, when calculating the effective Young's modulus of the concrete previously placed, the CPU 1 calculates the value based on the period after the concrete is placed. Specifically, effective Young's modulus calculation data indicating the relationship between effective Young's modulus and time is stored in the storage device 2, and the CPU 1 refers to the effective Young's modulus calculation data in advance. The effective Young's modulus of the installed concrete is calculated. The effective Young's modulus calculation data is acquired in advance by experiments or the like.

また、本実施形態においてCPU1は、上述のようにして計算された支持体に作用する応力に基づいて、これらの支持体に対するエアレイジングによるサポートの必要性を判定する。すなわち、本実施形態においてCPU1は、本発明の判定手段として機能する。
具体的には、まずCPU1は、支持体の強度として、例えば、支持体の有効ヤング率から圧縮強度、引張強度等を算出し、これらの値と上述の支持体に作用する応力から求める圧縮応力、引張応力とを比較し、その比率を安全率として求める。
そしてCPU1は、当該安全率が予め定められた閾値(安全率閾値)よりも高い場合(安全度が高い場合)には、支持体に対するエアレイジングによるサポートの必要性がないと判定する。
なお、CPU1は、先に打設されたコンクリートの有効ヤング率、や圧縮強度、引張強度等を算出する場合には、当該コンクリートが打設されてからの期間に基づいてその値を算出する。
Moreover, in this embodiment, CPU1 determines the necessity of the support by air lasing with respect to these support bodies based on the stress which acts on the support body calculated as mentioned above. That is, in the present embodiment, the CPU 1 functions as a determination unit of the present invention.
Specifically, first, the CPU 1 calculates, for example, compressive strength, tensile strength, and the like from the effective Young's modulus of the support as the strength of the support, and obtains from these values and the stress acting on the support described above The tensile stress is compared and the ratio is obtained as a safety factor.
When the safety factor is higher than a predetermined threshold value (safety factor threshold value) (when the safety level is high), the CPU 1 determines that there is no need for support by air lasing for the support.
In addition, CPU1 calculates the value based on the period after the said concrete is poured, when calculating the effective Young's modulus, compressive strength, tensile strength, etc. of the concrete cast previously.

また、本実施形態においてCPU1は、予め記憶装置2に記憶された打設期間に基づいて各領域(同心円領域R1〜R3、下層領域R41〜R81及び上層領域R42〜R82)の打設タイミングを算出する。すなわち、本実施形態においてCPU1は、本発明の打設タイミング算出手段として機能する。
具体的には、本実施形態においては、上述のようにコンクリートが打設される全領域Rが、13個の領域に分割されている。このため、CPU1は、例えば、コンクリートの打設に確保できる全期間である上記打設期間が13日である場合には、各領域にコンクリートを打設するタイミングを1日ずつ設定して、これを打設タイミングとして算出する。
In the present embodiment, the CPU 1 calculates the placement timing of each region (concentric regions R1 to R3, lower layer regions R41 to R81, and upper layer regions R42 to R82) based on the placement period stored in the storage device 2 in advance. To do. That is, in the present embodiment, the CPU 1 functions as a placement timing calculation unit of the present invention.
Specifically, in the present embodiment, as described above, the entire region R where the concrete is placed is divided into 13 regions. For this reason, for example, when the placement period, which is the entire period that can be secured for placing concrete, is 13 days, the CPU 1 sets the timing for placing concrete in each area one day at a time. Is calculated as the placement timing.

記憶装置2は、メモリ等の内部記憶装置及びハードディスクドライブ等の外部記憶装置によって構成されており、CPU1から入力される情報を記憶すると共にCPU1から入力される指令に基づいて記憶した情報を出力するものである。
この記憶装置2は、図1に示すように、入力データD1と、計算データD2と、上記計算プログラムPとを記憶している。
The storage device 2 is configured by an internal storage device such as a memory and an external storage device such as a hard disk drive, and stores information input from the CPU 1 and outputs information stored based on a command input from the CPU 1. Is.
As shown in FIG. 1, the storage device 2 stores input data D1, calculation data D2, and the calculation program P.

なお、入力データD1は、打設計画作成装置Sの外部から入力されるデータであり、例えば、コンクリートが打設される全領域Rの形状を示すデータ、軟化状態のコンクリートの重量を示すデータ、有効ヤング率算出用データ、安全率閾値、打設期間等を含むデータ群である。
計算データD2は、CPU1による処理の結果として得られるデータであり、例えば、各分割領域の形状を示すデータ、打設順番、支持体に発生する応力、支持体の圧縮強度、支持体の引張強度、支持体に作用する圧縮応力、支持体に作用する引張応力、安全率、打設タイミング、支持体に対するエアレイジングによるサポートの必要性の有無を示すデータ等を含むデータ群である。
The input data D1 is data input from the outside of the striking design creation device S. For example, data indicating the shape of the entire region R where the concrete is placed, data indicating the weight of the softened concrete, This is a data group including data for calculating effective Young's modulus, safety factor threshold, placement period, and the like.
The calculation data D2 is data obtained as a result of the processing by the CPU 1, for example, data indicating the shape of each divided region, placing order, stress generated in the support, compressive strength of the support, and tensile strength of the support. This is a data group including compressive stress acting on the support, tensile stress acting on the support, safety factor, placement timing, data indicating the necessity of support by air-raising for the support, and the like.

入力装置3は、本実施形態の打設計画作成装置Sと作業者とのマンマシンインターフェイスであり、ポインティングデバイスであるキーボード3aやマウス3bを備えている。
出力装置4は、CPU1から入力される信号を可視化して出力するものであり、ディスプレイ4a及びプリンタ4bを備えている。
通信装置5は、本実施形態の打設計画作成装置Sと外部装置との間においてデータの受け渡しを行うものであり、社内LAN(Local Area Network)等のネットワークNに対して電気的に接続されている。
The input device 3 is a man-machine interface between the hit design image creation device S of this embodiment and an operator, and includes a keyboard 3a and a mouse 3b which are pointing devices.
The output device 4 visualizes and outputs a signal input from the CPU 1, and includes a display 4a and a printer 4b.
The communication device 5 exchanges data between the hit design image creation device S of the present embodiment and an external device, and is electrically connected to a network N such as an in-house LAN (Local Area Network). ing.

次に、このような構成を有する本実施形態の打設計画作成装置Sによる打設計画作成方法について、図3のフローチャートを参照しながら説明する。
なお、以下の説明において、記憶装置2には、予め上記入力データD1及び計算プログラムPが記憶されているものとする。
Next, a striking design creation method by the striking design creation device S of the present embodiment having such a configuration will be described with reference to the flowchart of FIG.
In the following description, it is assumed that the storage device 2 stores the input data D1 and the calculation program P in advance.

まず、CPU1は、コンクリート屋根TY2が形成される領域、すなわちコンクリートが打設される全領域Rを、複数(nmax)個の小領域に分割する(ステップS1)。このステップS1は、本発明における分割工程に相当する。
具体的には、本実施形態においては、全領域Rを13個(nmax=13)の領域(同心円領域R1〜R3、下層領域R41〜R81及び上層領域R42〜R82)に分割する。
より詳細には、CPU1は、全領域Rを示す形状データを、分割することによって、上述の各領域(同心円領域R1〜R3、下層領域R41〜R81及び上層領域R42〜R82)の形状データを作成し、この各分割領域の形状データを記憶装置2に記憶させる。
First, the CPU 1 divides the region where the concrete roof TY2 is formed, that is, the entire region R where concrete is placed, into a plurality of (n max ) small regions (step S1). This step S1 corresponds to the dividing step in the present invention.
Specifically, in the present embodiment, the entire region R is divided into 13 (n max = 13) regions (concentric regions R1 to R3, lower layer regions R41 to R81, and upper layer regions R42 to R82).
More specifically, the CPU 1 creates shape data of each of the above-described regions (concentric regions R1 to R3, lower layer regions R41 to R81, and upper layer regions R42 to R82) by dividing the shape data indicating the entire region R. Then, the shape data of each divided area is stored in the storage device 2.

なお、CPU1は、このステップS1において、各分割領域に対してコンクリートの打設順番を設定する。ここでは、上述のように、側壁TS側から優先的に打設し、また全ての下層領域(R41〜R81)を上層領域(R42〜R82)よりも優先的に打設する。このため、打設順番は、同心円領域R1(第1領域)→同心円領域R2(第2領域)→同心円領域R3(第3領域)→同心円領域R4の下層領域R41(第4領域)→同心円領域R5の下層領域R51(第5領域)→同心円領域R6の下層領域R61(第6領域)→同心円領域R7の下層領域R71(第7領域)→同心円領域R8の下層領域R81(第8領域)→同心円領域R4の上層領域R42(第9領域)→同心円領域R5の上層領域R52(第10領域)→同心円領域R6の上層領域R62(第11領域)→同心円領域R7の上層領域R72(第12領域)→同心円領域R8の上層領域R82(第13領域)となる。
そして、CPU1は、この打設順番に基づく領域番号を各領域に付与することで打設順番を設定し、この打設順番(すなわち領域番号)を記憶装置2に記憶させる。
In addition, CPU1 sets the concrete placement order with respect to each division area in this step S1. Here, as described above, it is preferentially placed from the side wall TS side, and all lower layer regions (R41 to R81) are preferentially placed over the upper layer regions (R42 to R82). Therefore, the placement order is as follows: concentric region R1 (first region) → concentric region R2 (second region) → concentric region R3 (third region) → lower region R41 (fourth region) of concentric region R4 → concentric region Lower layer region R51 of R5 (fifth region) → lower layer region R61 of concentric region R6 (sixth region) → lower layer region R71 of concentric region R7 (seventh region) → lower layer region R81 of concentric region R8 (eighth region) → Upper layer region R42 (the ninth region) of the concentric region R4 → Upper region R52 (the tenth region) of the concentric region R5 → Upper region R62 (the eleventh region) of the concentric region R6 → Upper region R72 (the twelfth region) of the concentric region R7 → The upper layer region R82 (13th region) of the concentric region R8.
Then, the CPU 1 sets a placement order by assigning an area number based on this placement order to each area, and stores the placement order (that is, the area number) in the storage device 2.

続いて、CPU1は、打設順番の最も早い領域である第1領域(すなわち同心円領域R1)に軟化状態のコンクリートを打設した場合に、支持体に作用する応力を計算する(ステップS2)。このステップS2は、本発明における応力計算工程に相当する。
なお、ここでは、支持体として機能するのは、スチール屋根TY1であるため、CPU1は、打設される軟化状態のコンクリートの重量や、スチール屋根TY1のヤング率等に基づいてスチール屋根TY1に作用する応力を計算する。
Then, CPU1 calculates the stress which acts on a support body, when concrete in a softened state is cast in the 1st area | region (namely, concentric area | region R1) which is the area | region where the placement order is the earliest (step S2). This step S2 corresponds to a stress calculation step in the present invention.
Here, since it is the steel roof TY1 that functions as a support, the CPU 1 acts on the steel roof TY1 based on the weight of the softened concrete to be placed, the Young's modulus of the steel roof TY1, and the like. Calculate the stress to be

続いて、CPU1は、ステップS2で計算した応力に基づいて支持体(ここではスチール屋根TY1)の安全率を計算する(ステップS3)。
より詳細には、CPU1は、支持体のヤング率から支持体の圧縮強度及び支持体の引張強度を算出し、ステップS2で計算された応力を用いて算出される支持体に作用する圧縮応力及び支持体に作用する引張応力と比較して安全率を計算する。
なお、本ステップS3では、支持体がスチール屋根TY1であり、そのヤング率は変化せず、さらには圧縮強度及び引張強度も変化しない。したがって、予めスチール屋根TY1の圧縮強度及び引張強度を記憶させておき、ステップS3における圧縮強度及び引張強度の算出を省略しても良い。
Then, CPU1 calculates the safety factor of a support body (here steel roof TY1) based on the stress calculated by step S2 (step S3).
More specifically, the CPU 1 calculates the compressive strength of the support and the tensile strength of the support from the Young's modulus of the support, and calculates the compressive stress acting on the support calculated using the stress calculated in step S2. The safety factor is calculated in comparison with the tensile stress acting on the support.
In this step S3, the support is the steel roof TY1, and its Young's modulus does not change, and further, the compressive strength and tensile strength do not change. Therefore, the compressive strength and tensile strength of the steel roof TY1 may be stored in advance, and the calculation of the compressive strength and tensile strength in step S3 may be omitted.

続いてCPU1は、ステップS3において計算した安全率が、記憶装置2に予め記憶された安全率閾値を上回っているか否かを判定する(ステップS4)。
この結果、ステップS3において計算した安全率が、記憶装置2に予め記憶された安全率閾値を上回っている場合には、第1領域に軟化状態のコンクリートを打設する場合に支持体(ここではスチール屋根TY1)をエアレイジングによってサポートする必要がないと判定する(ステップS5)。
一方、テップS3において計算した安全率が、記憶装置2に予め記憶された安全率閾値を下回っている場合には、第1領域に軟化状態のコンクリートを打設する場合に支持体(ここではスチール屋根TY1)をエアレイジングによってサポートする必要があると判定する(ステップS6)。
そして、CPU1は、ステップS5あるいはステップS6における判定の結果を支持体に対するエアレイジングによるサポートの必要性の有無を示すデータとして記憶装置2に記憶させる。
Subsequently, the CPU 1 determines whether or not the safety factor calculated in step S3 exceeds a safety factor threshold stored in advance in the storage device 2 (step S4).
As a result, when the safety factor calculated in step S3 exceeds the safety factor threshold value stored in advance in the storage device 2, the support body (here, the softened concrete is placed in the first region). It is determined that it is not necessary to support the steel roof TY1) by air lasing (step S5).
On the other hand, when the safety factor calculated in step S3 is lower than the safety factor threshold value stored in advance in the storage device 2, a support (here, steel) is used when placing softened concrete in the first region. It is determined that the roof TY1) needs to be supported by air lasing (step S6).
Then, the CPU 1 stores the result of the determination in step S5 or step S6 in the storage device 2 as data indicating whether or not the support needs to be supported by air lasing.

続いてCPU1は、各領域(同心円領域R2,R3、下層領域R41〜R81及び上層領域R42〜R82)への打設タイミングを算出する(ステップS7)。なお、このステップS7は、本発明の打設タイミング算出工程に相当するものであり、ステップS5やステップS6より前に行っても良い。
より詳細には、CPU1は、記憶装置2に記憶された打設期間が満足されるように、各領域への打設タイミングを設定する。
Subsequently, the CPU 1 calculates the placement timing for each region (concentric regions R2, R3, lower layer regions R41 to R81, and upper layer regions R42 to R82) (step S7). This step S7 corresponds to the placement timing calculation step of the present invention, and may be performed before step S5 or step S6.
More specifically, the CPU 1 sets the placement timing for each area so that the placement period stored in the storage device 2 is satisfied.

続いてCPU1は、軟化状態のコンクリートの打設対象とする領域を第2領域(同心円領域R2)とする処理を行う(ステップS8)。   Then, CPU1 performs the process which makes the area | region made into the placement object of the softened concrete the 2nd area | region (concentric circle area | region R2) (step S8).

この後は、全ての領域に対して支持体に対するエアレイジングによるサポートの必要性が判定されるまで、以下の処理が繰り返される。   Thereafter, the following processing is repeated until the necessity of support by air lasing for the support is determined for all regions.

まずCPU1は、現在、軟化状態のコンクリートの打設対象とされている第n領域に軟化状態のコンクリートを打設した場合に、支持体に作用する応力を計算する(ステップS9)。このステップS9は、本発明における応力計算工程に相当する。
なお、ここでは、支持体として機能するのは、スチール屋根TY1と、第n領域よりも先の領域に打設されたコンクリートであるため、CPU1は、打設される軟化状態のコンクリートの重量や、スチール屋根TY1に作用する応力及び第1〜第(n−1)領域に打設されたコンクリートに作用する応力を計算する。
なお、第1〜第(n−1)領域に打設されたコンクリートの有効ヤング率は、打設されてからの期間(ステップS7で設定された打設タイミング)に応じて変化する。このため、CPU1は、記憶装置2に記憶された有効ヤング率算出用データを参照して第1〜第(n−1)領域に打設されたコンクリートの有効ヤング率を算出し、この有効ヤング率に基づいて応力を計算する。
First, the CPU 1 calculates the stress acting on the support when the softened concrete is placed in the nth region, which is currently the target for placing the softened concrete (step S9). This step S9 corresponds to the stress calculation step in the present invention.
Here, since it is the steel roof TY1 and the concrete placed in the area ahead of the n-th area that functions as the support, the CPU 1 determines the weight of the softened concrete to be placed, The stress acting on the steel roof TY1 and the stress acting on the concrete placed in the first to (n-1) th regions are calculated.
Note that the effective Young's modulus of the concrete placed in the first to (n-1) th regions changes according to the period after placement (placement timing set in step S7). For this reason, the CPU 1 calculates the effective Young's modulus of the concrete placed in the first to (n-1) th regions with reference to the effective Young's modulus calculation data stored in the storage device 2, and this effective Young Calculate the stress based on the rate.

続いて、CPU1は、ステップS9で計算した応力に基づいて支持体(ここではスチール屋根TY1及び第1〜第(n−1)領域に打設されたコンクリート)の安全率を計算する(ステップS10)。
より詳細には、CPU1は、支持体のヤング率から支持体の圧縮強度及び支持体の引張強度を算出し、ステップS9で計算された応力を用いて算出される支持体に作用する圧縮応力及び支持体に作用する引張応力と比較して安全率を計算する。
Subsequently, the CPU 1 calculates the safety factor of the support (here, the concrete placed in the steel roof TY1 and the first to (n-1) th regions) based on the stress calculated in step S9 (step S10). ).
More specifically, the CPU 1 calculates the compressive strength of the support and the tensile strength of the support from the Young's modulus of the support, and the compressive stress acting on the support calculated using the stress calculated in step S9 and The safety factor is calculated in comparison with the tensile stress acting on the support.

続いてCPU1は、ステップS10において計算した安全率が、記憶装置2に予め記憶された安全率閾値を上回っているか否かを判定する(ステップS11)。
この結果、ステップS10において計算した安全率が、記憶装置2に予め記憶された安全率閾値を上回っている場合には、第n領域に軟化状態のコンクリートを打設する場合に支持体(ここではスチール屋根TY1及び第1〜第(n−1)領域に打設されたコンクリート)をエアレイジングによってサポートする必要がないと判定する(ステップS12)。
一方、ステップS10において計算した安全率が、記憶装置2に予め記憶された安全率閾値を下回っている場合には、第n領域に軟化状態のコンクリートを打設する場合に支持体(ここではスチール屋根TY1及び第1〜第(n−1)領域に打設されたコンクリート)をエアレイジングによってサポートする必要があると判定する(ステップS13)。
そして、CPU1は、ステップS12あるいはステップS13における判定の結果を支持体に対するエアレイジングによるサポートの必要性の有無を示すデータとして記憶装置2に記憶させる。
Subsequently, the CPU 1 determines whether or not the safety factor calculated in step S10 exceeds a safety factor threshold stored in advance in the storage device 2 (step S11).
As a result, when the safety factor calculated in step S10 exceeds the safety factor threshold value stored in advance in the storage device 2, the support body (here, the softened concrete is placed in the nth region). It is determined that it is not necessary to support the steel roof TY1 and the concrete placed in the first to (n-1) th regions by air lasing (step S12).
On the other hand, when the safety factor calculated in step S10 is lower than the safety factor threshold value stored in advance in the storage device 2, the support (here, steel) is used when placing softened concrete in the nth region. It is determined that it is necessary to support the roof TY1 and the concrete placed in the first to (n-1) regions with air lasing (step S13).
Then, the CPU 1 stores the result of the determination in step S12 or step S13 in the storage device 2 as data indicating whether or not the support needs to be supported by air lasing.

そして、CPU1は、現在、軟化状態のコンクリートの打設対象とされている第n領域が、打設順番の最も遅い領域であるかの判定をする(ステップS14)。
そして、CPU1は、現在、軟化状態のコンクリートの打設対象とされている第n領域が、打設順番の最も遅い領域であると判定した場合には、全ての領域に対して支持体に対するエアレイジングによるサポートの必要性が判定されたものとして処理を終了する。
一方、CPU1は、現在、軟化状態のコンクリートの打設対象とされている第n領域が、打設順番の最も遅い領域でないと判定した場合には、軟化状態のコンクリートの打設対象とされる領域を1つ先に進める処理(ステップS15)を行った後、再びステップS9に戻る。
And CPU1 determines whether the nth area | region currently made into the placement object of the concrete of a softened state is the area | region where the placing order is the slowest (step S14).
Then, when the CPU 1 determines that the n-th region that is currently the placement target of the softened concrete is the slowest placement order, the air to the support for all the regions. The processing is terminated assuming that the need for support by lasing has been determined.
On the other hand, when the CPU 1 determines that the n-th region that is currently the placement target of the softened concrete is not the slowest placement order, the CPU 1 is set as the soft concrete placement target. After performing the process of advancing the area one step (step S15), the process returns to step S9 again.

なお、CPU1は、入力装置3等から入力される指示に基づいて、記憶装置2に記憶された、支持体に対するエアレイジングによるサポートの必要性の有無を示すデータを抽出して出力装置4に入力する。
この結果、出力装置4によって、各領域(同心円領域R1〜R3、下層領域R41〜R81及び上層領域R42〜R82)に軟化状態のコンクリートを打設する際に、支持体に対してエアレイジングによるサポートが必要であるか否かを示す情報が打設計画として視覚化されて出力される。
The CPU 1 extracts the data stored in the storage device 2 indicating the necessity of support by air-raising for the support, and inputs the data to the output device 4 based on an instruction input from the input device 3 or the like. To do.
As a result, when the softened concrete is placed in each region (concentric regions R1 to R3, lower layer regions R41 to R81, and upper layer regions R42 to R82) by the output device 4, the support is supported by air lasing. Information indicating whether or not is necessary is visualized and output as a hit design image.

以上のような本実施形態の打設計画作成装置S及び打設計画作成方法によれば、コンクリートが打設される全領域Rが複数の小領域(同心円領域R1〜R3、下層領域R41〜R81及び上層領域R42〜R82)に分割され、各上記小領域に対する上記コンクリートの打設により当該コンクリートを支持する支持体に発生する応力が計算され、当該応力に基づいて支持体に対するサポートの必要性が判定される。
つまり、本発明によれば、本実施形態の打設計画作成装置S及び打設計画作成方法によれば、安全を確保した上で、エアレイジングによる支持体のサポートを必要としない期間を得ることができる。
このため、本実施形態の打設計画作成装置S及び打設計画作成方法によって作成された打設計画に基づいてコンクリートの打設を行うことによって、タンク屋根のコンクリートを打設する期間の全てで支持体をサポートするのではなく、必要な場合のみに支持体をサポートし、必要でない場合には支持体のサポートを行わないとすることができる。
そして、支持体のサポートを行わずにコンクリートの打設を行う際には、コンクリートの打設と同時にタンクT内部において作業を行うことが可能となる。したがって、本実施形態の打設計画作成装置S及び打設計画作成方法によれば、工期の短縮化を図ることが可能となる。
また、タンク屋根のコンクリートを打設する期間の全てで支持体をサポートする場合と比較して支持体のサポート期間が短くなる。したがって、本実施形態の打設計画作成装置S及び打設計画作成方法によれば、支持体のサポートに必要となる費用を低減させることが可能となる。
According to the hit design image creating apparatus S and the hit design image creating method of the present embodiment as described above, the entire region R where the concrete is placed is a plurality of small regions (concentric regions R1 to R3, lower layer regions R41 to R81). And the upper layer regions R42 to R82), the stress generated in the support that supports the concrete by the placement of the concrete in each of the small regions is calculated, and there is a need for support for the support based on the stress. Determined.
That is, according to the present invention, according to the hit design image creating apparatus S and the hit design image creating method of the present embodiment, a period during which support of the support by air lasing is not required can be obtained while ensuring safety. Can do.
For this reason, by placing concrete on the basis of the hit design drawing created by the hit design drawing creating apparatus S and the hit design drawing creating method of the present embodiment, the concrete of the tank roof is placed for the entire period. Instead of supporting the support, it is possible to support the support only when necessary, and not to support the support when it is not necessary.
Then, when placing concrete without supporting the support, it is possible to work inside the tank T simultaneously with placing the concrete. Therefore, according to the hit design image creating apparatus S and the hit design image creating method of the present embodiment, it is possible to shorten the construction period.
Moreover, the support period of a support body becomes short compared with the case where a support body is supported in all the periods which lay concrete of a tank roof. Therefore, according to the hit design image creating apparatus S and the hit design image creating method of the present embodiment, it is possible to reduce the cost required for supporting the support.

また、本実施形態の打設計画作成装置S及び打設計画作成方法においては、予め定められた打設期間に基づいて各領域にコンクリートを打設する打設タイミングを算出している。このため、予め定められた打設期間でコンクリートの打設を完了することができる。   Further, in the hit design image creating apparatus S and the hit design image creating method of the present embodiment, the placement timing for placing concrete in each region is calculated based on a predetermined placement period. For this reason, concrete placement can be completed in a predetermined placement period.

また、本実施形態の打設計画作成装置S及び打設計画作成方法においては、コンクリートが打設される全領域Rの少なくとも一部(R4〜R8)をタンク屋根の高さ方向に分割した。このため、領域R4〜R8におけるエアレイジングによるサポート判定をより細かく行うことができる。よって、エアレイジングによるサポート期間をより短くできる可能性が高まる。   Further, in the hit design image creating apparatus S and the hit design image creating method of the present embodiment, at least a part (R4 to R8) of the entire area R where the concrete is placed is divided in the height direction of the tank roof. For this reason, the support determination by the air lasing in the regions R4 to R8 can be performed more finely. Therefore, possibility that the support period by air lasing can be shortened increases.

(第2実施形態)
次に、本発明の第2実施形態について説明する。なお、本第2実施形態の説明において、上記第1実施形態と同様の部分については、その説明を省略あるいは簡略化する。
(Second Embodiment)
Next, a second embodiment of the present invention will be described. In the description of the second embodiment, the description of the same parts as in the first embodiment will be omitted or simplified.

図4は、本実施形態における打設計画作成装置Sによる打設計画作成方法を説明するためのフローチャートである。
この図に示すように、本実施形態においては、上記第1実施形態とステップS1〜ステップS6は同様であり、ステップS7は上記第1実施形態のステップS8と同様である。
そして、この後は、全ての領域に対して支持体に対するエアレイジングによるサポートの必要性がなしと判定されるまで、以下の処理が繰り返される。
FIG. 4 is a flowchart for explaining a hit design image creating method by the hit design image creating apparatus S in the present embodiment.
As shown in this figure, in this embodiment, steps S1 to S6 are the same as those in the first embodiment, and step S7 is the same as step S8 in the first embodiment.
Thereafter, the following processing is repeated until it is determined that there is no need for support by air-raising on the support for all regions.

まずCPU1は、打設間隔を最小時間単位に設定する(ステップS8)。
続いて、設定された打設間隔に基づいて、第n領域に軟化状態のコンクリートを打設した場合に、支持体に作用する応力を計算する(ステップS9)。
続いて、CPU1は、ステップS9で計算した応力に基づいて支持体(ここではスチール屋根TY1及び第1〜第(n−1)領域に打設されたコンクリート)の安全率を計算する(ステップS10)。
First, the CPU 1 sets the placement interval in the minimum time unit (step S8).
Subsequently, based on the set placement interval, when soft concrete is placed in the nth region, the stress acting on the support is calculated (step S9).
Subsequently, the CPU 1 calculates the safety factor of the support (here, the concrete placed in the steel roof TY1 and the first to (n-1) th regions) based on the stress calculated in step S9 (step S10). ).

続いてCPU1は、ステップS10において計算した安全率が、記憶装置2に予め記憶された安全率閾値を上回っているか否かを判定する(ステップS11)。
この結果、ステップS10において計算した安全率が、記憶装置2に予め記憶された安全率閾値を上回っている場合には、第n領域に軟化状態のコンクリートを打設する場合に支持体(ここではスチール屋根TY1及び第1〜第(n−1)領域に打設されたコンクリート)をエアレイジングによってサポートする必要がないとの判定であるため、現在の打設期間tを実際の打設期間に設定(ステップS12)して記憶装置2に記憶させる。
一方、テップS10において計算した安全率が、記憶装置2に予め記憶された安全率閾値を下回っている場合には、第n領域に軟化状態のコンクリートを打設する場合に支持体(ここではスチール屋根TY1及び第1〜第(n−1)領域に打設されたコンクリート)をエアレイジングによってサポートする必要があるとの判定であるため、CPU1は、打設期間を進める処理(ステップS13)を行った後、再びステップS9に戻る。
Subsequently, the CPU 1 determines whether or not the safety factor calculated in step S10 exceeds a safety factor threshold stored in advance in the storage device 2 (step S11).
As a result, when the safety factor calculated in step S10 exceeds the safety factor threshold value stored in advance in the storage device 2, the support body (here, the softened concrete is placed in the nth region). Since it is determined that it is not necessary to support the steel roof TY1 and the concrete placed in the first to (n-1) regions) by air lasing, the current placement period t is set to the actual placement period. The setting (step S12) is performed and stored in the storage device 2.
On the other hand, when the safety factor calculated in step S10 is below the safety factor threshold value stored in advance in the storage device 2, the support (here, steel) is used when softened concrete is placed in the nth region. Since it is determined that it is necessary to support the roof TY1 and the concrete placed in the first to (n-1) regions) by air lasing, the CPU 1 performs a process of advancing the placement period (step S13). After performing, it returns to step S9 again.

なお、CPU1は、ステップ12が終了すると、現在、軟化状態のコンクリートの打設対象とされている第n領域が、打設順番の最も遅い領域であるかの判定をする(ステップS14)。
そして、CPU1は、現在、軟化状態のコンクリートの打設対象とされている第n領域が、打設順番の最も遅い領域であると判定した場合には、全ての領域に対して支持体に対するエアレイジングによるサポートの必要性がなしと判定されたものとして処理を終了する。
一方、CPU1は、現在、軟化状態のコンクリートの打設対象とされている第n領域が、打設順番の最も遅い領域でないと判定した場合には、軟化状態のコンクリートの打設対象とされる領域を1つ先に進める処理(ステップS15)を行った後、再びステップS9に戻る。
When step 12 is completed, the CPU 1 determines whether or not the n-th region that is currently the placement target of the softened concrete is the latest placement order (step S14).
Then, when the CPU 1 determines that the n-th region that is currently the placement target of the softened concrete is the slowest placement order, the air to the support for all the regions. The processing ends as it is determined that there is no need for support by lasing.
On the other hand, when the CPU 1 determines that the n-th region that is currently the placement target of the softened concrete is not the slowest placement order, the CPU 1 is set as the soft concrete placement target. After performing the process of advancing the area one step (step S15), the process returns to step S9 again.

このような本実施形態の打設計画作成装置Sによる打設計画作成方法によれば、最初を除く、全ての小領域(同心円領域R2,R3、下層領域R41〜R81及び上層領域R42〜R82)に上記コンクリートが打設される場合に必要なしと判定されるように、コンクリートを打設する打設タイミング(打設間隔)が算出されて設定される。
このため、打設計画作成装置Sによる打設計画作成方法によれば、最初を除く、全ての小領域にコンクリートを打設するにあたり、エアレイジングによる支持体のサポートを必要とせずに作業を行うことができる。
According to the striking design image creating method by the striking design image creating apparatus S of this embodiment, all the small regions except the first (concentric regions R2, R3, lower layer regions R41 to R81, and upper layer regions R42 to R82). The placement timing (placement interval) for placing the concrete is calculated and set so that it is determined that it is not necessary when the concrete is placed.
For this reason, according to the striking design image creating method by the striking design image creating device S, when placing concrete in all small areas except the first, work is performed without the need for support of the support by air lasing. be able to.

以上、図面を参照しながら本発明の好適な実施形態について説明したが、本発明は上記実施形態に限定されるものではない。上述した実施形態において示した各構成部材の諸形状や組み合わせ等は一例であって、本発明の主旨から逸脱しない範囲において設計要求等に基づき種々変更可能である。   As mentioned above, although preferred embodiment of this invention was described referring drawings, this invention is not limited to the said embodiment. Various shapes, combinations, and the like of the constituent members shown in the above-described embodiments are examples, and various modifications can be made based on design requirements and the like without departing from the gist of the present invention.

例えば、上記実施形態においては、タンク屋根TYがスチール屋根TY1とコンクリート屋根TY2とからなるタンクTに対するコンクリートの打設計画に本発明を適用した。
しかしながら、本発明は、コンクリートを含む屋根を備えるタンクに対するコンクリートの打設計画であれば作成することが可能である。
For example, in the above-described embodiment, the present invention is applied to a concrete design for a tank T in which the tank roof TY includes a steel roof TY1 and a concrete roof TY2.
However, the present invention can be created as long as it is a concrete striking design for a tank having a roof containing concrete.

また、上記実施形態においては、支持体をエアレイジングによってサポートする構成について説明した。
しかしながら、本発明はこれに限定されるものではなく、他の手段によって支持体をサポートする構成に適用することも可能である。
Moreover, in the said embodiment, the structure which supports a support body by air lasing was demonstrated.
However, the present invention is not limited to this, and can be applied to a configuration in which the support is supported by other means.

また、上記実施形態においては、各領域に打設されたコンクリートに作用する応力を1つの値として算出した。
しかしながら本発明はこれに限定されるものではなく、各領域に打設されたコンクリートに作用する応力を、各領域をタンクの半径方向における複数個所に分けて算出するようにしても良い。
Moreover, in the said embodiment, the stress which acts on the concrete laid in each area | region was calculated as one value.
However, the present invention is not limited to this, and the stress acting on the concrete placed in each region may be calculated by dividing each region into a plurality of locations in the radial direction of the tank.

また、上記実施形態における打設計画作成装置の構成は一例である。本発明の打設計画作成装置の構成は、上記実施形態において説明した構成に限られるものではなく、一般的にコンピュータ装置が備える他の構成(DVDドライブ装置やBDドライブ装置等)を備えることもできる。   In addition, the configuration of the hit design image creation apparatus in the above embodiment is an example. The configuration of the striking design creation apparatus of the present invention is not limited to the configuration described in the above embodiment, and may generally include other configurations (DVD drive device, BD drive device, etc.) provided in the computer device. it can.

T……タンク、T1……内槽、T2……外槽、TY……タンク屋根、TY1……スチール屋根(内屋根)、TY2……コンクリート屋根(外屋根)、R……コンクリートが打設される全領域、R1〜R3……同心円領域(小領域)、R41〜R81……下層領域(小領域)、R42〜R82……上層領域(小領域)、S……打設計画作成装置、1……CPU(分割手段、応力計算手段、判定手段、打設タイミング算出手段、打設タイミング算出手段)   T ... tank, T1 ... inner tank, T2 ... outer tank, TY ... tank roof, TY1 ... steel roof (inner roof), TY2 ... concrete roof (outer roof), R ... concrete R1 to R3... Concentric region (small region), R41 to R81... Lower layer region (small region), R42 to R82... Upper layer region (small region), S. 1 ... CPU (division means, stress calculation means, determination means, placement timing calculation means, placement timing calculation means)

Claims (7)

コンクリートを含んで形成されるタンク屋根を製造する際の前記コンクリートの打設計画を作成する打設計画作成方法であって、
前記コンクリートが打設される全領域を複数の小領域に分割する分割工程と、
各前記小領域に対する前記コンクリートの打設により当該コンクリートを支持する支持体に発生する応力を計算する応力計算工程と、
該応力計算工程にて計算された応力に基づいて前記支持体に対するサポートの必要性を判定する判定工程と、
予め定められた打設期間に基づいて各前記小領域に前記コンクリートを打設する打設タイミングを算出する打設タイミング算出工程と
を有し、
前記応力計算工程にて前記打設タイミングに応じて前記応力を計算し、
前記判定工程にて前記打設タイミングに応じて前記サポートの必要性を判定する
ことを特徴とする打設計画作成方法。
A striking design drawing creation method for creating a concrete striking design drawing for manufacturing a tank roof formed including concrete,
A dividing step of dividing the entire area where the concrete is placed into a plurality of small areas;
A stress calculation step of calculating the stress generated in the support body supporting the concrete by placing the concrete with respect to each of the small areas;
A determination step of determining the necessity of support for the support based on the stress calculated in the stress calculation step;
Possess a pouring timing calculation step of calculating the pouring timing of pouring the concrete to each of said small regions, based on between predetermined punch 設期,
Calculate the stress according to the placement timing in the stress calculation step,
A hit design drawing creation method, wherein the necessity of the support is determined according to the placement timing in the determination step .
コンクリートを含んで形成されるタンク屋根を製造する際の前記コンクリートの打設計画を作成する打設計画作成方法であって、
前記コンクリートが打設される全領域を複数の小領域に分割する分割工程と、
各前記小領域に対する前記コンクリートの打設により当該コンクリートを支持する支持体に発生する応力を計算する応力計算工程と、
該応力計算工程にて計算された応力に基づいて前記支持体に対するサポートの必要性を判定する判定工程とを有し、
前記サポートの必要性が、全ての前記小領域に前記コンクリートが打設される場合に必要なしと判定されるように、各前記小領域に前記コンクリートを打設する打設タイミングを算出する
ことを特徴とする打設計画作成方法。
A striking design drawing creation method for creating a concrete striking design drawing for manufacturing a tank roof formed including concrete,
A dividing step of dividing the entire area where the concrete is placed into a plurality of small areas;
A stress calculation step of calculating the stress generated in the support body supporting the concrete by placing the concrete with respect to each of the small areas;
Possess a determination step of determining the necessity of support for the support based on the calculated stress at the stress calculation step,
Calculating the placement timing for placing the concrete in each of the small areas so that the necessity of the support is determined to be unnecessary when the concrete is placed in all the small areas. A striking design creation method.
前記タンク屋根が鋼材からなる内屋根とコンクリートを含む外屋根とから構成され、
前記支持体は、前記内屋根と前記コンクリートが打設済みの前記外屋根の一部とを含むことを特徴とする請求項1または2記載の打設計画作成方法。
The tank roof is composed of an inner roof made of steel and an outer roof containing concrete,
3. The striking design creation method according to claim 1, wherein the support includes the inner roof and a part of the outer roof on which the concrete has been placed.
前記サポートは、前記支持体を空気によって支えるエアレイジングであることを特徴とする請求項1〜いずれかに記載の打設計画作成方法。 The support, striking design image creation method according to any one of claims 1-3, characterized in that the support is an air lasing support by air. 前記分割工程にて、前記コンクリートが打設される全領域の少なくとも一部を前記タンク屋根の高さ方向に分割することを特徴とする請求項1〜いずれかに記載の打設計画作成方法。 Wherein the divided step, striking design image generating method according to any one of claims 1-4, characterized in that the concrete is to divide at least a portion of the total area to be pouring in the height direction of the tank roof . コンクリートを含んで形成されるタンク屋根を製造する際の前記コンクリートの打設計画を作成する打設計画作成装置であって、
前記コンクリートが打設される全領域を複数の小領域に分割する分割手段と、
各前記小領域に対する前記コンクリートの打設により当該コンクリートを支持する支持体に発生する応力を計算する応力計算手段と、
該応力計算工程にて計算された応力に基づいて前記支持体に対するサポートの必要性を判定する判定手段と
を備え
予め定められた打設期間に基づいて各前記小領域に前記コンクリートを打設する打設タイミングを算出し、前記応力計算手段にて前記打設タイミングに応じて前記応力を計算し、前記判定手段にて前記打設タイミングに応じて前記サポートの必要性を判定する
ことを特徴とする打設計画作成装置。
A striking design drawing creation device for creating a concrete striking design drawing when manufacturing a tank roof formed including concrete,
A dividing means for dividing the entire area where the concrete is placed into a plurality of small areas;
Stress calculating means for calculating the stress generated in the support that supports the concrete by placing the concrete to each of the small areas;
Determining means for determining the necessity of support for the support based on the stress calculated in the stress calculation step ;
Based on a predetermined placement period, the placement timing for placing the concrete in each of the small areas is calculated, the stress is calculated according to the placement timing by the stress calculation means, and the determination means And determining the necessity of the support according to the placement timing .
コンクリートを含んで形成されるタンク屋根を製造する際の前記コンクリートの打設計画を作成する打設計画作成装置であって、
前記コンクリートが打設される全領域を複数の小領域に分割する分割手段と、
各前記小領域に対する前記コンクリートの打設により当該コンクリートを支持する支持体に発生する応力を計算する応力計算手段と、
該応力計算工程にて計算された応力に基づいて前記支持体に対するサポートの必要性を判定する判定手段と
を備え
前記サポートの必要性が、全ての前記小領域に前記コンクリートが打設される場合に必要なしと判定されるように、各前記小領域に前記コンクリートを打設する打設タイミングを算出する
ことを特徴とする打設計画作成装置。
A striking design drawing creation device for creating a concrete striking design drawing when manufacturing a tank roof formed including concrete,
A dividing means for dividing the entire area where the concrete is placed into a plurality of small areas;
Stress calculating means for calculating the stress generated in the support that supports the concrete by placing the concrete to each of the small areas;
Determining means for determining the necessity of support for the support based on the stress calculated in the stress calculation step ;
Calculating the placement timing for placing the concrete in each of the small areas so that the necessity of the support is determined to be unnecessary when the concrete is placed in all the small areas. A striking design creation device.
JP2009249077A 2009-10-29 2009-10-29 Stroke design drawing creation method and strike design drawing creation apparatus Expired - Fee Related JP5531559B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2009249077A JP5531559B2 (en) 2009-10-29 2009-10-29 Stroke design drawing creation method and strike design drawing creation apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2009249077A JP5531559B2 (en) 2009-10-29 2009-10-29 Stroke design drawing creation method and strike design drawing creation apparatus

Publications (2)

Publication Number Publication Date
JP2011094379A JP2011094379A (en) 2011-05-12
JP5531559B2 true JP5531559B2 (en) 2014-06-25

Family

ID=44111589

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2009249077A Expired - Fee Related JP5531559B2 (en) 2009-10-29 2009-10-29 Stroke design drawing creation method and strike design drawing creation apparatus

Country Status (1)

Country Link
JP (1) JP5531559B2 (en)

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2662625B2 (en) * 1988-11-16 1997-10-15 清水建設株式会社 Construction method of dome-shaped concrete structure
JP2873613B2 (en) * 1990-08-31 1999-03-24 株式会社石井鐵工所 Dome roof and construction method
JPH08170444A (en) * 1994-12-16 1996-07-02 Kajima Corp Concrete roof construction method
JPH0926096A (en) * 1995-07-13 1997-01-28 Nkk Corp How to build a roof in a liquid storage tank
JP2000248774A (en) * 1999-02-26 2000-09-12 Ishikawajima Harima Heavy Ind Co Ltd How to build a concrete roof for a concrete tank

Also Published As

Publication number Publication date
JP2011094379A (en) 2011-05-12

Similar Documents

Publication Publication Date Title
US9789651B2 (en) Method for structure preserving topology optimization of lattice structures for additive manufacturing
CN102926538B (en) Reaction box and construction method of reaction wall
CN105550386A (en) Precast concrete deepening design method based on Revit
CN111079263A (en) Building main body structure generation method and device, computer equipment and storage medium
CN111859494A (en) Building model creating method and device and intelligent terminal
US8180588B2 (en) Compensation method for structural deformation occurring during construction of super tall building
JP2017177462A (en) Structure strength prediction method, structure modeling method, structure additive manufacturing method and program
CN111428316B (en) Design method, device, equipment and storage medium of tunnel support system
JP5531559B2 (en) Stroke design drawing creation method and strike design drawing creation apparatus
CN112560321A (en) Calculation method for ring-divided segmented pouring length of concrete wrapped outside arch ring of stiffened framework concrete arch bridge
US11465356B2 (en) Method for predicting strength of structure, method for modeling structure, support method for additive manufacturing of structure, and recording medium
CN109697322A (en) A kind of reinforcement parameter generation method, device and equipment based on BIM model
CN204081279U (en) Floor absolute altitude disjunctor split heads
CN109583102A (en) A kind of optimization method, the apparatus and system of reinforced concrete support design
CN105113799B (en) Prearranged adjustable clamping fixture of large embedded part and construction method thereof
JP5919111B2 (en) Outline data generation apparatus, outline data generation method and program
CN103678792A (en) Mesh division method for finite element model of prestressed tank structure
JP2015055267A (en) Intermediate base isolation structure
CN109740218B (en) Steel construction integral hoisting system based on BIM
CN109376442B (en) Railway tunnel main body structure steel bar design method and information data processing terminal
CN107227751A (en) A kind of concrete thin-wall wall and bottom plate formed by integrally casting device and method
CN107436984A (en) A kind of wine cellar construction method based on BIM
CN109376410B (en) Stirrup model generation method, device, equipment and computer readable storage medium
CN110866303B (en) A method to create an integrated T-shaped wall component model based on steel bar formwork
JP6223698B2 (en) Arrangement device and program for bar arrangement unit

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20120823

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20130529

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20130604

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20130801

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20140325

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20140407

R151 Written notification of patent or utility model registration

Ref document number: 5531559

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R151

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees