JP5587720B2 - Remote monitoring system for dome roof construction in air dome method - Google Patents
[go: Go Back, main page]

JP5587720B2 - Remote monitoring system for dome roof construction in air dome method - Google Patents

Remote monitoring system for dome roof construction in air dome method Download PDF

Info

Publication number
JP5587720B2
JP5587720B2 JP2010222146A JP2010222146A JP5587720B2 JP 5587720 B2 JP5587720 B2 JP 5587720B2 JP 2010222146 A JP2010222146 A JP 2010222146A JP 2010222146 A JP2010222146 A JP 2010222146A JP 5587720 B2 JP5587720 B2 JP 5587720B2
Authority
JP
Japan
Prior art keywords
dome
roof
pressure
storage tank
internal pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2010222146A
Other languages
Japanese (ja)
Other versions
JP2012077486A (en
Inventor
宏治 石井
泰之 高橋
正則 玉田
健也 徳田
由明 塩谷
潔 古澤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Abe Nikko Kogyo Co Ltd
Original Assignee
Abe Nikko Kogyo Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Abe Nikko Kogyo Co Ltd filed Critical Abe Nikko Kogyo Co Ltd
Priority to JP2010222146A priority Critical patent/JP5587720B2/en
Publication of JP2012077486A publication Critical patent/JP2012077486A/en
Application granted granted Critical
Publication of JP5587720B2 publication Critical patent/JP5587720B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Tents Or Canopies (AREA)

Description

この発明は、水や石油等の液体、低温液化ガス、消化ガス、粉体、粒状物などの各種貯蔵物を貯蔵する貯槽等構築物(以下、単に貯槽という)の上部を被覆するドーム屋根を構築するエアードーム工法におけるドーム屋根施工に用いる遠隔監視システムに関するものである。   This invention constructs a dome roof that covers the upper part of a structure such as a storage tank (hereinafter simply referred to as a storage tank) for storing various storage materials such as water, petroleum, and other liquids, low-temperature liquefied gas, digestion gas, powder, and granular materials. The present invention relates to a remote monitoring system used for dome roof construction in the air dome construction method.

貯槽の上部を被覆するドーム屋根を構築するエアードーム工法について、図13に基づいて説明する。
貯槽101は、平底円形の底版103と、この底版103の外周縁近傍に立設した円筒形状の側壁104と、この側壁104の上部を被覆する割球殻形状のドーム屋根102とから形成する。これらの底版103、側壁104、及びドーム屋根102は、コンクリート構造又は金属構造、あるいはコンクリート構造と金属構造などを組み合わせて形成する。
このドーム屋根102を施工するために、貯槽101の上部を被覆する可撓膜体105の周縁を、側壁104の上端部に気密に固着し、送風機106を利用してこの可撓膜体105で密閉状に被覆された貯槽101の下部に空気を導入して可撓膜体105を緊張させ、この緊張した可撓膜体105の上部に屋根部材を施工する。この可撓膜体105は、繊維織物に樹脂材料等をコーティングした可撓性を有する膜材が用いられている。
An air dome construction method for constructing a dome roof covering the upper part of the storage tank will be described with reference to FIG.
The storage tank 101 is formed of a flat bottom circular base plate 103, a cylindrical side wall 104 standing in the vicinity of the outer peripheral edge of the bottom plate 103, and a blast-shell-shaped dome roof 102 covering the upper part of the side wall 104. The bottom plate 103, the side wall 104, and the dome roof 102 are formed by a concrete structure or a metal structure, or a combination of a concrete structure and a metal structure.
In order to construct this dome roof 102, the periphery of the flexible membrane body 105 covering the upper part of the storage tank 101 is airtightly fixed to the upper end of the side wall 104, and the flexible membrane body 105 is used with the blower 106. Air is introduced into the lower portion of the sealed storage tank 101 to tension the flexible film body 105, and a roof member is applied to the upper portion of the tensioned flexible film body 105. As the flexible film body 105, a flexible film material obtained by coating a fiber fabric with a resin material or the like is used.

従来のエアードーム工法のエアーコントロールシステムの概略を図14に示す。
貯槽01内外の圧力信号を検知部05に受けて、給気部03と排気部04を制御部06でコントロールして可撓膜体のドーム屋根02の形状を維持するようにしていた。
FIG. 14 shows an outline of a conventional air dome construction air control system.
The pressure signal inside and outside the storage tank 01 is received by the detecting unit 05, and the shape of the flexible membrane dome roof 02 is maintained by controlling the air supply unit 03 and the exhaust unit 04 by the control unit 06.

従来の制御システムに関する発明には、特許第2782381号公報「エアードーム工法におけるエアーコントロール方法」がある。この発明は、貯槽等構造物本体内に供給するエアーは連続送風するとともに、所定内圧を維持するように、排風側に設けた制御器により、内圧検知信号を受けて排風量を制御して連続排風するものである。   As an invention related to a conventional control system, there is Japanese Patent No. 27842381 “Air Control Method in Air Dome Method”. In this invention, the air supplied into the structure body such as a storage tank continuously blows air, and the controller provided on the exhaust side controls the amount of exhaust air by receiving the internal pressure detection signal so as to maintain a predetermined internal pressure. Continuous exhaust.

また上記構築法に関する発明には、特許第2773003号公報「エアードーム工法の空圧制御システム及びその装置」がある。この発明は、貯槽等構造物内外圧力の差圧検知信号を受けて供給電力の周波数を変換するインバータによって送風機のモータ回転数を制御しながら逆止弁を介して貯槽等構造物へ連続して給気する給気部と、遮断弁からなる空気排出弁を介して、所定量を貯槽等構造物から連続して排気する排気部を設置して、可撓膜のドーム形状を維持するものである。 The invention relating to the above construction method is disclosed in Japanese Patent No. 2773003, “Pneumatic control system and apparatus for air dome method”. This invention continuously receives the structure of the storage tank or the like via the check valve while controlling the motor rotation speed of the blower by the inverter that receives the differential pressure detection signal of the internal and external pressure of the structure such as the storage tank and converts the frequency of the supplied power A flexible membrane dome shape is maintained by installing an exhaust unit that continuously exhausts a predetermined amount from a structure such as a storage tank via an air supply unit that supplies air and an air discharge valve that includes a shut-off valve. is there.

特許第2782381号公報Japanese Patent No. 2782381 特許第2773003号公報Japanese Patent No. 2773003

図14に示す従来のエアードーム工法のエアーコントロールシステムは、可撓膜体上に鉄筋等の補強材を配設し、その上からモルタルやコンクリート等を打設してドーム屋根02を形成する工程において、可撓膜をドーム形状に維持するために、作業者及び管理者が現地に常時詰めた状態で、貯槽01内外からの圧力信号を05、06で検知及び制御し、給気部03及び排気部04を操作しなければならなかった。   The air control system of the conventional air dome method shown in FIG. 14 is a process in which a reinforcing material such as a reinforcing bar is disposed on a flexible membrane body, and mortar, concrete or the like is placed thereon to form a dome roof 02. In order to maintain the flexible membrane in the dome shape, the pressure signals from the inside and outside of the storage tank 01 are detected and controlled at 05 and 06 in a state where workers and managers are constantly packed on site, and the air supply unit 03 and The exhaust part 04 had to be operated.

上記紹介した特許第2782381号公報「エアードーム工法におけるエアーコントロール方法」の発明は、貯槽等構造物本体内に供給するエアーは連続送風するとともに、所定内圧を維持するように、排風側に設けた制御器により、内圧検知信号を受けて排風量を制御して連続排風するもので、このエアーコントロール方法は簡単な機構で小規模のドーム屋根を構築するのに適するが、作業者がドーム屋根の工事期間中は24時間現場に常駐し計測や監視が必要であった。   The invention of the above-mentioned Japanese Patent No. 2782381 “Air Control Method in Air Dome Method” is provided on the exhaust side so that the air supplied into the structure body such as a storage tank is continuously blown and the predetermined internal pressure is maintained. This air control method is suitable for constructing a small-scale dome roof with a simple mechanism. During the construction period of the roof, they were stationed 24 hours a day and needed to be measured and monitored.

また、上記紹介した特許第2773003号公報「エアードーム工法の空圧制御システム及びその装置」の発明は、貯槽等構造物内外圧力の差圧検知信号、インバータ制御により送風量を変えることが出来る送風機、連続給気する給気部、連続排気する排気部などを設置して可撓膜のドーム形状を維持するものであるが、作業者がドーム屋根の工事期間中は現地に24時間常駐して計測や制御システムの運転状態を監視するため、大掛かりで長期間を要するドーム屋根の構築には人的負担が大きかった。   Further, the invention of the above-mentioned Japanese Patent No. 2773003 “Pneumatic pressure control system and device for air dome method” is a blower capable of changing the air flow rate by a differential pressure detection signal of internal and external pressure of a structure such as a storage tank, and inverter control. In order to maintain the dome shape of the flexible membrane by installing an air supply unit that continuously supplies air, an exhaust unit that continuously exhausts, etc., the worker stays on site 24 hours during the construction of the dome roof. In order to monitor the operation status of the measurement and control system, the construction of a large and long dome roof has been a human burden.

さらに、本発明の新たな技術課題として、貯槽の上部を密閉状に被覆した可撓膜体は、ドーム屋根の構成部材として機能するとともに可撓膜体上に鉄筋等の補強材を配設し、その上からモルタルやコンクリート等を打設してドーム屋根を形成する作業工程において作業者の足場としての機能を有し、かつ鉄筋等の補強材、モルタルやコンクリート等を打設する時の重要な支持部材としての機能をも有している。特に、ドーム屋根構築作業において貯槽内の内圧は常に一定の圧力を維持するのではなく、ドーム屋根構築の作業段階で可撓膜体にかかる重量や荷重が変化することから貯槽内の内圧を作業状況に応じて変化させる必要がある。このようにドーム屋根構築の作業段階では24時間体制で貯槽内の内圧を監視することが一層強く要請される。   Furthermore, as a new technical problem of the present invention, a flexible membrane body in which the upper portion of the storage tank is covered in a sealed manner functions as a constituent member of the dome roof and a reinforcing material such as a reinforcing bar is disposed on the flexible membrane body. In addition, it has a function as a scaffold for workers in the work process of forming dome roofs by placing mortar and concrete from above, and is important when placing reinforcing materials such as reinforcing bars, mortar and concrete, etc. It also has a function as a support member. In particular, the internal pressure in the storage tank does not always maintain a constant pressure in the construction of the dome roof, but the internal pressure in the storage tank is changed because the weight and load applied to the flexible membrane change during the construction stage of the dome roof. It is necessary to change according to the situation. In this way, at the work stage of constructing the dome roof, it is more strongly required to monitor the internal pressure in the storage tank 24 hours a day.

この発明の目的は、上述のような従来技術のエアードーム工法における課題を解決するためになされたもので、ドーム屋根構築過程における作業時間以外は現場に作業者が長時間、連続して詰める必要を無くし、現場で監視、調整、作業などをする負荷を低減させるとともに作業者が作業時間中又は作業時間外に作業現場を離れている場合でも貯槽内の内圧等の状況を遠隔地から確認でき、かつ貯槽内の圧力が極端に増加・減少する緊急事態が発生した場合でも遠隔からの監視者は携帯電話やパソコン等の通信手段であるパケット通信やインターネット端末回線を介して迅速に画面上に表示された操作を行ない緊急事態を回避することができるエアードーム工法におけるドーム屋根施工に用いる遠隔監視システムを提供することを目的とする。   The object of the present invention is to solve the problems in the prior art air dome construction method as described above, and it is necessary for the worker to continuously fill the site for a long time except for the work time in the dome roof construction process. This reduces the load of monitoring, adjustment, work, etc. at the site, and allows the status of the internal pressure in the storage tank to be confirmed from a remote location even when the worker is away from the work site during or outside the work time. In addition, even in the event of an emergency situation where the pressure in the storage tank increases or decreases extremely, remote supervisors can quickly display the screen via packet communication or Internet terminal lines, which are communication means such as mobile phones and personal computers. An object is to provide a remote monitoring system used for dome roof construction in an air dome method capable of performing the displayed operation and avoiding an emergency situation.

請求項1記載のエアードーム工法におけるドーム屋根施工に用いる遠隔監視システムは、エアードーム工法における貯槽の上部を密閉状に可撓膜体で被覆した貯槽内部を給気排気調整機構により所定圧力に維持された圧力を検知する内圧検知管を備えた内圧検知手段は、前記可撓膜体が作業足場として機能する内圧検知であり、かつ該可撓膜体上でアンカーピン・丸鋼の設置及び可撓膜体上に塗布した接着剤にてラス網・溶接金網の配置重量に耐える可撓膜体としての一次昇圧検知手段と、前記ラス網・溶接金網にモルタル打設の重量に耐える可撓膜体としての二次昇圧検知手段と、貯槽の外部からドーム屋根の施工過程における屋根高さ位置を計測する屋根レベル計測手段と、ドーム屋根施工中の屋根形状をバランス良く形成するための屋根の外形を監視するカメラ撮影手段と、貯槽内圧値、貯槽内圧上限スイッチ、下限スイッチを備えた内圧表示検知盤と、上記内圧値の変動を外部から監視するための遠隔監視盤と、該遠隔監視盤に表示されるデータをインターネットで遠隔監視専用サーバーを介して携帯電話画面監視表示又はパソコン等のWeb画面に送信する手段と、前記携帯電話画面又はWeb画面から設定圧力範囲値を超えた時に、貯槽内部圧力コントロールシステムの機器・設備の状況を遠隔監視専用サーバーと接続し、インターネットによって前記携帯電話画面又はWeb画面から送信し、内圧機器・設備の運転状態を正常状態に戻す操作手段を備えているものである。 The remote monitoring system used for dome roof construction in the air dome construction method according to claim 1 maintains the inside of the storage tank covered with a flexible film body in a sealed state at a predetermined pressure by a supply / exhaust adjustment mechanism. The internal pressure detecting means provided with an internal pressure detecting tube for detecting the detected pressure is an internal pressure detection in which the flexible membrane body functions as a working scaffold, and anchor pins and round steel can be installed on the flexible membrane body. Primary pressurization detecting means as a flexible film body that can withstand the arrangement weight of the lath net / welding wire mesh with an adhesive applied on the flexible film body, and a flexible film that can withstand the weight of mortar placement on the lath net / welding metal net a secondary boost detecting means as the body, and the roof level measuring means for measuring a roof height position in the construction process of the dome roof from the outside of the reservoir, ya for good balance form roof shape in the dome roof construction A camera capturing means for monitoring the external shape, reservoir pressure value, the reservoir pressure limit switch, the internal pressure indicating detection board having a lower limit switch, the remote monitoring system for monitoring the variation of the internal pressure value from the outside, the remote monitoring Means for transmitting data displayed on the panel to a mobile phone screen monitoring display or a web screen such as a personal computer via a remote monitoring dedicated server on the Internet, and when a set pressure range value is exceeded from the mobile phone screen or the web screen , It is provided with operation means for connecting the state of equipment / equipment of the internal pressure control system of the storage tank to a server for remote monitoring, transmitting from the mobile phone screen or the web screen via the Internet, and returning the operating state of the internal pressure equipment / equipment to the normal state. It is what.

請求項2記載のエアードーム工法におけるドーム屋根施工に用いる遠隔監視システムは、貯槽内部圧力コントロールシステムがエアードーム屋根を構成する可撓膜体がラス網・溶接金網の配置に耐える可撓膜体としての一次昇圧及び前記ラス網・溶接金網にモルタル打設に耐える可撓膜体としての二次昇圧を検知する内圧検知手段と、可撓膜体上のドーム屋根中央部に設置したゲージをレベル計で計測して施工過程における屋根高さ位置を計測する屋根レベル計測手段と、ドーム屋根施工中の屋根の外形形状を監視するカメラ撮影手段を備え、その計測値の変化の状態をインターネット情報、Eメール通報を利用して、遠隔の複数箇所で共有する遠隔監視システムである。 The remote monitoring system used for the dome roof construction in the air dome construction method according to claim 2 is a flexible membrane body in which the flexible membrane body constituting the air dome roof withstands the arrangement of the lath mesh and the welded wire mesh. An internal pressure detecting means for detecting a secondary pressure as a flexible membrane body that can withstand mortar placement on the lath and welded wire nets, and a gauge installed at the center of the dome roof on the flexible membrane body. With a roof level measuring means for measuring the roof height position in the construction process and a camera photographing means for monitoring the outer shape of the roof during the construction of the dome roof, and the status of changes in the measured values is Internet information, E It is a remote monitoring system that is shared by multiple remote locations using email notification.

請求項3記載のエアードーム工法におけるドーム屋根施工に用いる遠隔監視システムは、貯槽内部を給気排気調整により一次昇圧及び二次昇圧による圧力状態が所定圧力に維持された内圧を検知する検知管貯槽内の可撓膜体の近傍位置の離れた位置に複数箇所設置したことを特徴とする。 The remote monitoring system used for the dome roof construction in the air dome construction method according to claim 3 is provided with a detection tube for detecting an internal pressure in which a pressure state by the primary pressure increase and the secondary pressure increase is maintained at a predetermined pressure by adjusting an air supply / exhaust inside the storage tank. It is characterized in that a plurality of locations are installed at positions apart from the vicinity of the flexible film body in the storage tank.

請求項1記載のエアードーム工法におけるドーム屋根施工に用いる遠隔監視システムは、ドーム屋根施工中は常に貯槽内の設定圧力値であるドーム屋根施工膜圧の一次昇圧検知手段の管理によって作業足場として機能し、ドーム屋根の構築作業が行われる。また、可撓膜体上でアンカーピン・丸鋼の設置作業及び可撓膜体上に塗布した接着剤にてラス網・溶接金網の配置が行われる。さらに、ドーム屋根施工膜圧の二次昇圧検知手段による管理によって、前記ラス網・溶接金網にモルタル打設作業を行うことができる。
また、ドーム屋根施工膜圧の一次昇圧検知手段と二次昇圧検知手段による圧力制御と、ドーム屋根施工中、貯槽の外部からドーム屋根の施工過程における屋根高さ位置を計測する屋根レベル計測手段と、ドーム屋根施工中の屋根の外形を監視するカメラ撮影手段を組み合わせることにより、可撓膜体の形状やその可撓膜体上に打設するモルタルやコンクリートによるドーム屋根形状がバランス良く維持形成されるとともに屋根高さ位置が設定高さ位置に確保される。
さらに、請求項1記載のエアードーム工法におけるドーム屋根施工に用いる遠隔監視システムは、ドーム屋根施工中は常に貯槽内の設定圧力値を正常に戻す動作が可能であり、かつ圧力関連制御機器の制御が遠隔地から正常に戻す操作が可能となる。具体的には監視者の遠隔監視者の携帯電話の画面又はパソコン等のWeb画面で遠隔監視盤の電源の受電・停電表示、非常用発電機の停止中・運転中表示、貯槽内圧力計の圧力値の表示、内圧下限・上限の正常・異常表示、ドーム屋根高さ表示、内圧検知盤の電源のON・OFF表示、給気の電磁弁及び排気の電磁弁の各ON・OFF表示が監視でき、内圧の許容限度を超えた昇圧又は減圧時には、貯槽内圧のコントロールシステムの機器・設備の状況をインターネットで遠隔監視専用サーバーと接続し、インターネットによって遠隔監視者の画面上に送信し、内圧機器・設備の運転状態の遠隔監視が可能であり、ドーム屋根構築過程における作業時間中以外は現場に作業者が長時間、連続して詰める必要を無くなり、現場で監視、調整、作業などをする負荷を低減させることができる。
The remote monitoring system used for dome roof construction in the air dome construction method according to claim 1 functions as a work scaffold by managing the primary pressure increase detection means of the dome roof construction film pressure that is always the set pressure value in the storage tank during dome roof construction. Then, construction work of the dome roof is performed. In addition, an anchor pin and round steel are installed on the flexible film body, and a lath net and a welded wire net are arranged by an adhesive applied on the flexible film body. Furthermore, the mortar placing work can be performed on the lath net and the welded wire net by the management of the dome roof construction film pressure by the secondary pressurization detecting means.
Also, pressure control by the primary pressure increase detection means and the secondary pressure increase detection means of the dome roof construction membrane pressure, and a roof level measurement means for measuring the roof height position in the dome roof construction process from the outside of the storage tank during the dome roof construction By combining camera photographing means for monitoring the outer shape of the roof during construction of the dome roof, the shape of the flexible film body and the dome roof shape made of mortar or concrete placed on the flexible film body can be maintained in a well-balanced manner. And the roof height position is secured at the set height position.
Furthermore, the remote monitoring system used for the dome roof construction in the air dome construction method according to claim 1 can always return the set pressure value in the storage tank to normal during the dome roof construction, and can control the pressure-related control device. Can return to normal from a remote location. Specifically, the remote monitor's mobile phone screen or a personal computer's Web screen such as a personal computer displays the power reception / power outage of the remote monitoring panel, the emergency generator is stopped / running, and the pressure gauge in the storage tank Pressure value display, internal pressure lower / upper limit normal / abnormal display, dome roof height display, internal pressure detection panel power ON / OFF display, supply solenoid valve and exhaust solenoid valve ON / OFF display are monitored When the pressure exceeds or exceeds the allowable limit of internal pressure, the status of the storage tank internal pressure control system equipment / equipment is connected to the remote monitoring dedicated server via the Internet, and sent to the screen of the remote supervisor via the Internet.・ Remote monitoring of the operation status of the equipment is possible, and it is not necessary for the operator to stuff the site continuously for a long time except during the work time in the dome roof construction process. It is possible to reduce the loads and the like.

また作業者が作業時間中又は作業時間外に作業現場を離れている場合でも貯槽内の内圧等の状況を常時、確認でき、かつ作業者が作業現場から離れた状態で内圧の設定許容値範囲よりも増加・減少した時のような緊急事態が発生した場合、携帯電話やパソコン等のパケット通信やインターネット端末回線を介して迅速に緊急事態を回避できる。
特に、インターネットを使用するという特性上、Web画面でその他監視装置に接続した機器の状態を1分更新で閲覧が可能となる。また、Web画面で閲覧することによりエアードームコントロールシステムの運転状態の情報を監視者同士で共有できる。
In addition, even when the worker is away from the work site during or outside of the work time, the internal pressure setting can be confirmed at all times while the internal pressure of the storage tank is away from the work site. If an emergency such as an increase / decrease occurs, the emergency can be quickly avoided via packet communication such as a mobile phone or a personal computer or an Internet terminal line.
In particular, because of the characteristic of using the Internet, it is possible to view the status of other devices connected to the monitoring device on the Web screen with one minute update. In addition, information on the operating status of the air dome control system can be shared between the observers by browsing on the Web screen.

作業現場以外でも状況認識できることにより、作業者及び管理者が現場に24時間、連続して常駐する必要がなく、現場に出向く頻度や負担の減少効果が得られる。
特に本発明ではドーム屋根施工中の屋根の外形を監視するカメラ撮影手段を設けることにより、可撓膜体の形状やその可撓膜体上に打設するモルタルやコンクリートによるドーム屋根形状が一次、二次の各昇圧においてバランス良く維持形成されているかを貯槽の内圧制御と屋根レベル計測とを併せて屋根高さとともに屋根形状もより一層バランスの良いドーム屋根の形成が可能となる。
Since the situation can be recognized even outside the work site, it is not necessary for the worker and the manager to stay on site for 24 hours continuously, and the effect of reducing the frequency and burden of going to the site can be obtained.
In particular, in the present invention, by providing a camera photographing means for monitoring the outer shape of the roof during construction of the dome roof, the shape of the flexible membrane body and the dome roof shape by mortar or concrete placed on the flexible membrane body are primary, It is possible to form a dome roof with a well-balanced roof shape as well as the roof height by combining the internal pressure control of the storage tank and the roof level measurement to determine whether the secondary pressurization is maintained in a well-balanced manner.

請求項2記載のエアードーム工法におけるドーム屋根施工に用いる遠隔監視システムは、貯槽内部圧力コントロールシステムは、エアードーム屋根を構成する可撓膜体がラス網・溶接金網の配置に耐える可撓膜体としての一次昇圧及び前記ラス網・溶接金網にモルタル打設に耐える可撓膜体としての二次昇圧を検知する内圧検知手段と、可撓膜体上にドーム屋根中央部に設置したゲージをレベル計で計測して施工過程における屋根高さ位置を計測する屋根レベル計測手段と、ドーム屋根施工中の屋根の外形形状を監視するカメラ撮影手段を備え、その計測値の変化の状態をインターネット情報、Eメール通報を利用して、遠隔の複数箇所で共有するようにしたので、機器・設備の状態、異常をいち早く把握することができ、安全性の向上となる。ドーム屋根施工に用いる遠隔監視システムの情報を遠隔監視者同士で共有し、通報体制を確実にし、対応することができる。 The remote monitoring system used for the dome roof construction in the air dome construction method according to claim 2, wherein the storage tank internal pressure control system is a flexible membrane body in which the flexible membrane body constituting the air dome roof can withstand the arrangement of the lath mesh and the welded wire mesh. The internal pressure detection means for detecting the secondary pressure as a flexible membrane body that can withstand mortar placement on the lath net and welded wire mesh, and a gauge installed at the center of the dome roof on the flexible membrane body It is equipped with a roof level measuring means that measures the roof height position in the construction process by measuring with a meter, and a camera photographing means that monitors the outer shape of the roof during the construction of the dome roof, and Internet information about the state of changes in the measured value , Since it is shared by multiple remote locations using e-mail notification, it is possible to quickly grasp the state of equipment / equipment and abnormalities, which improves safety. . Information on the remote monitoring system used for the construction of the dome roof can be shared among remote monitoring personnel to ensure and respond to the reporting system.

請求項3記載のエアードーム工法におけるドーム屋根施工に用いる遠隔監視システムは、貯槽内部を給気排気調整により一次昇圧及び二次昇圧による圧力状態が所定圧力に維持された内圧を検知する検知管貯槽内の可撓膜体の近傍位置の離れた位置に複数箇所設置したことにより、複数箇所から検出した貯槽の内圧値が偏ることなくバランスされて圧力値を検知できる。また、一方の検知管が故障しても他方が作動していることにより、ドーム屋根施工作業が中断することなく予定通り仕上げることができる。 The remote monitoring system used for the dome roof construction in the air dome construction method according to claim 3 is provided with a detection tube for detecting an internal pressure in which a pressure state by the primary pressure increase and the secondary pressure increase is maintained at a predetermined pressure by adjusting an air supply / exhaust inside the storage tank. By installing a plurality of locations at positions distant from the vicinity of the flexible film body in the storage tank, the internal pressure values of the storage tank detected from the plurality of locations are balanced and the pressure value can be detected. Further, even if one of the detection tubes breaks down, the other is operating, so that the dome roof construction work can be finished as scheduled without interruption.

この発明に係るエアードーム工法におけるドーム屋根施工に用いる遠隔監視システムの装置、機器の貯槽周りの全体説明図である。BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is an overall explanatory view around a storage tank of an apparatus and equipment of a remote monitoring system used for dome roof construction in an air dome method according to the present invention. この発明に係るエアードーム工法におけるドーム屋根施工に用いる遠隔監視システムにおける貯槽の外部からドーム屋根の施工過程における屋根高さ位置を計測する屋根レベル計測手段と、ドーム屋根施工中の屋根の外形を監視するカメラ撮影手段を示す概略説明図である。The roof level measuring means for measuring the roof height position in the construction process of the dome roof from the outside of the storage tank in the remote monitoring system used for the dome roof construction in the air dome construction method according to the present invention, and monitoring the outer shape of the roof during the dome roof construction It is a schematic explanatory drawing which shows the camera imaging | photography means to do. エアードーム工法におけるドーム屋根施工に用いる遠隔監視システムの概略説明図である。It is a schematic explanatory drawing of the remote monitoring system used for the dome roof construction in an air dome construction method. エアードームコントロールシステムにおける遠隔監視システムのフロー図である。It is a flowchart of the remote monitoring system in an air dome control system. エアードームコントロールシステムにおける遠隔監視システムの遠隔監視者からの送信フロー図である。It is a transmission flow figure from the remote supervisor of the remote monitoring system in an air dome control system. 遠隔監視システムの全体図である。1 is an overall view of a remote monitoring system. 正常時におけるPC表示画面を示す図である。It is a figure which shows the PC display screen at the time of normal. 貯槽内の内圧が高い異常時の場合のPC表示画面を示す図である。It is a figure which shows the PC display screen in the case of abnormality at the time when the internal pressure in a storage tank is high. 貯槽内の内圧が低い異常時の場合のPC表示画面を示す図である。It is a figure which shows the PC display screen in the case of abnormality at the time when the internal pressure in a storage tank is low. PC表示画面の登録先メールアドレスの送信履歴を示す図である。It is a figure which shows the transmission log | history of the registration destination mail address of PC display screen. PC表示画面の貯槽内圧力推移を示す図である。It is a figure which shows the pressure transition in a storage tank of a PC display screen. 携帯電話表示画面を示す図で、(a)は正常時を示し、(b)は異常時を示す図である。It is a figure which shows a mobile telephone display screen, (a) shows the time of normality, (b) is a figure which shows the time of abnormality. エアードーム工法全体側断面説明図であるIt is a cross-sectional explanatory view of the entire air dome construction method 従来のエアードームコントロールシステムの概略説明図である。It is a schematic explanatory drawing of the conventional air dome control system.

この発明に係るエアードームコントロールシステムにおける遠隔監視システムの実施形態を、図1乃至図12に基づいて説明する。
図1は、この発明に係るエアードーム工法におけるドーム屋根施工に用いる遠隔監視システムの装置、機器の貯槽等構築物付近の全体説明図である。
図2は、この発明に係るエアードーム工法におけるドーム屋根施工に用いる遠隔監視システムにおける貯槽等構築物の外部からドーム屋根の施工過程における屋根高さ位置を計測する屋根レベル計測手段と、ドーム屋根施工中の屋根の外形を監視するカメラ撮影手段の概略を示す説明図である。
1は貯槽、2はドーム屋根、3は底版、4は側壁、5は可撓膜体をそれぞれ示す。
貯槽1内はエアードーム送風機6により既設配管の給気管7を介して貯槽内下部に給気が常時される。給気管7には給気をオン・オフさせる電磁弁8が設置されている。貯槽1内の圧力を予め設定した範囲に保持するために、貯槽1内の既設配管の排気管9を利用して貯槽1の上部から外部にエアーを排気する。排気管9には排気をオン・オフさせる電磁弁10が設置されている。電磁弁8、10のオン・オフ操作は遠隔監視盤11で行う。
An embodiment of a remote monitoring system in an air dome control system according to the present invention will be described with reference to FIGS.
FIG. 1 is an overall explanatory view of the vicinity of a structure such as an apparatus for a remote monitoring system used for construction of a dome roof in the air dome construction method according to the present invention and a storage tank for equipment.
FIG. 2 shows a roof level measuring means for measuring the roof height position in the construction process of the dome roof from the outside of the structure such as a storage tank in the remote monitoring system used for the dome roof construction in the air dome construction method according to the present invention, and during the dome roof construction. It is explanatory drawing which shows the outline of the camera imaging | photography means which monitors the external shape of this roof.
1 is a storage tank, 2 is a dome roof, 3 is a bottom plate, 4 is a side wall, and 5 is a flexible membrane.
In the storage tank 1, air is constantly supplied to the lower part of the storage tank by an air dome blower 6 through an existing supply pipe 7. The supply pipe 7 is provided with an electromagnetic valve 8 for turning on / off supply. In order to keep the pressure in the storage tank 1 within a preset range, air is exhausted from the upper part of the storage tank 1 to the outside by using the exhaust pipe 9 of the existing piping in the storage tank 1. The exhaust pipe 9 is provided with an electromagnetic valve 10 for turning on and off the exhaust. The on / off operation of the solenoid valves 8 and 10 is performed by the remote monitoring panel 11.

貯槽1の上部を密閉状に可撓膜体5で被覆した貯槽内部を給気排気調整により所定圧力に維持する。この圧力維持を一次昇圧という。この一次昇圧の状態で可撓膜体5は作業足場として機能する他、作業者が可撓膜体5上にアンカーピン・丸鋼の設置を行う(図示せず)。さらに可撓膜体5上に接着剤(図示せず)を塗布してラス網・溶接金網(図示せず)を配置する。前記網の配置後、貯槽1内の圧力を上げ、二次昇圧を行う。この二次昇圧により、可撓膜体5は可撓膜体1上に打設するモルタル(図示せず)等の重量に十分耐える強度が付与される。二次昇圧後、可撓膜体5上にモルタル打設を行ない、その後、散水養生して屋根鉄筋(図示せず)を組立て、屋根コンクリート(図示せず)の打設を行ない、養生期間をおいて、ドーム屋根の強度を確認し、十分な強度が得られたら貯槽1内のエアーを開放し、一連のドーム屋根施工の作業が終了となる。このように、ドーム屋根施工の作業において貯槽1内の圧力は大別して、一次昇圧及び二次昇圧であるが、一次、二次の各昇圧はその前後においてドーム形状をバランス良くの維持するためと、可撓膜体5上に配置、打設するモルタル等の重量変化に十分耐える強度を付与するために、貯槽1内の圧力を適宜変更する場合が求められる。   The inside of the storage tank in which the upper part of the storage tank 1 is covered with the flexible film body 5 in a sealed state is maintained at a predetermined pressure by adjusting the supply and exhaust air. This pressure maintenance is called primary pressure increase. The flexible membrane body 5 functions as a working scaffold in this primary pressure increase state, and an operator installs anchor pins and round steel on the flexible membrane body 5 (not shown). Further, an adhesive (not shown) is applied on the flexible film body 5 and a lath net / welding wire net (not shown) is arranged. After the arrangement of the net, the pressure in the storage tank 1 is increased to perform secondary pressure increase. By this secondary pressure increase, the flexible film body 5 is given a strength sufficient to withstand the weight of a mortar (not shown) or the like placed on the flexible film body 1. After the secondary pressurization, mortar is placed on the flexible membrane body 5, then watering is cured, roof reinforcing bars (not shown) are assembled, roof concrete (not shown) is placed, and the curing period is increased. In this case, the strength of the dome roof is confirmed. When sufficient strength is obtained, the air in the storage tank 1 is released, and a series of dome roof construction work is completed. Thus, in the work of dome roof construction, the pressure in the storage tank 1 is roughly divided into primary boosting and secondary boosting, and the primary and secondary boosting are for maintaining the dome shape in a well-balanced manner before and after that. In order to give the strength enough to withstand the weight change of the mortar or the like placed and placed on the flexible film body 5, it is necessary to change the pressure in the storage tank 1 as appropriate.

14は貯槽1内の可撓膜体5の近傍位置に取付けた貯槽内圧力を検知する内圧検知管14aを備え、内圧検知管14aで得られた圧力が圧力センサー(図示せず)を内蔵した内圧表示検知盤14bを備えた内圧検知手段である。内圧表示検知盤14bで得られた内圧信号は遠隔監視検出ケーブル14cを介して遠隔監視盤11に接続される。内圧を検知する内圧検知管14aが貯槽1内の離れた位置に複数箇所 (本例では2箇所) 設置することとしたのは、複数箇所から検出した貯槽1の内圧値が偏ることなくバランスされて圧力値を検知できることと、一方の内圧検知管14aが故障した場合でも他方の内圧検知管14aが作動していることにより、ドーム屋根施工作業が中断することなく予定通り仕上げることができることに基づく。   14 is provided with an internal pressure detection tube 14a for detecting the internal pressure of the storage tank attached in the vicinity of the flexible membrane 5 in the storage tank 1, and the pressure obtained by the internal pressure detection tube 14a incorporates a pressure sensor (not shown). It is an internal pressure detection means provided with the internal pressure display detection board 14b. The internal pressure signal obtained by the internal pressure display detection panel 14b is connected to the remote monitoring panel 11 via the remote monitoring detection cable 14c. The reason why the internal pressure detection pipes 14a for detecting the internal pressure are installed at a plurality of locations (two locations in this example) in the storage tank 1 is that the internal pressure values of the storage tank 1 detected from the plurality of locations are balanced without being biased. Based on the fact that the pressure value can be detected, and even if one of the internal pressure detection pipes 14a breaks down, the other internal pressure detection pipe 14a is operated, so that the dome roof construction work can be finished as scheduled without interruption. .

エアードーム送風機6や電磁弁8、10等の電気で駆動、作動する機器は電力会社から購入する電源15を用いるが停電等のトラブルを避けるために電源15は自家発電用の非常用発電機16の切替え回路を介して各機器に電源を供給する。電源15に接続したエアードーム送風機6を稼動し給気管7及び電磁弁8により貯槽1内の送気量を制御し、電磁弁10を使用して排気管9から排気する排気量を制御して内圧を維持する。   The devices that are driven and operated by electricity such as the air dome blower 6 and the electromagnetic valves 8 and 10 use a power source 15 purchased from an electric power company, but the power source 15 is an emergency generator 16 for private power generation in order to avoid troubles such as a power failure. Power is supplied to each device via the switching circuit. The air dome blower 6 connected to the power supply 15 is operated, the air supply amount in the storage tank 1 is controlled by the air supply pipe 7 and the electromagnetic valve 8, and the exhaust amount exhausted from the exhaust pipe 9 is controlled by using the electromagnetic valve 10. Maintain internal pressure.

図2において、12は貯槽1の外部からドーム屋根2の施工過程における屋根高さ位置を計測する屋根レベル計測手段で、屋根頂部に垂直に設けた寸法を記入したゲージ12aと側壁4に近接して立設した測定台12cに設置したレベル計12bを備えており、レベル計12bで計測した数値は貯槽1内の圧力を決める1要素となる。13はドーム屋根施工中の屋根の外形を監視するカメラ撮影手段で、測定台13bの上部に設置したカメラ13aを備え、撮影したドーム屋根施工中の屋根の外形を映像信号または屋根の外形を示す信号として遠隔監視盤に送る。   In FIG. 2, reference numeral 12 denotes a roof level measuring means for measuring the roof height position in the construction process of the dome roof 2 from the outside of the storage tank 1, and is close to the gauge 12 a and the side wall 4 in which the dimension provided perpendicularly to the roof top is entered. A level meter 12b installed on a measuring stand 12c standing upright is provided, and the numerical value measured by the level meter 12b is one element that determines the pressure in the storage tank 1. Reference numeral 13 denotes a camera photographing means for monitoring the outer shape of the roof under construction of the dome roof. The camera photographing means 13 includes a camera 13a installed at the upper part of the measuring table 13b, and shows the photographed outer shape of the roof during construction of the dome roof as a video signal or a roof outer shape. Send to the remote monitoring panel as a signal.

図3はエアードーム工法におけるドーム屋根施工に用いる遠隔監視システムの概略説明図である。
貯槽1内の内圧に関する制御部を備えた内圧表示検知盤14bは、遠隔監視ケーブル、検知盤電源スイッチ、貯槽内圧値、内圧下限圧力スイッチ、内圧上限圧力スイッチ、下限スイッチツマミ位置、上限スイッチツマミ位置などの検出項目で構成される。屋根レベル計測手段12とカメラ撮影手段13は、遠隔監視盤11に接続されている。また、内圧表示検知盤14bと電源15と自家発電用の非常用発電機16とコントロールシステム17と遠隔監視盤11とは相互に電気的に接続されている。コントロールシステム17と遠隔監視盤11は、コントロールシステム筐体18に収納される。コントロールシステム17はエアードーム送風機の運転状態を制御する箇所で、コントロールシステム電源、INV運転状態、INVトリップ、サーマルトリップ、INV周波数、電磁弁などの検出項目で構成される。遠隔監視盤11は通信接続、チェック機構で構成される。遠隔監視盤11は外部の携帯電話網、インターネット等の通信網と接続されている。
携帯電話網を経由した遠隔監視専用サーバー19は、貯槽内圧情報に関してWeb画面で貯槽内圧情報の更新を逐次行う。また遠隔監視専用サーバー19は貯槽内圧の設定許容範囲を超えた圧力値を示した場合に、インターネットを介して異常データを遠隔監視者21に送信する。このように、異常データは転送専用メールサーバー20を介して転送登録者である遠隔監視者21aの携帯電話画面に異常メールとして送信され、又はパソコン等を使用している遠隔監視者21bのWeb画面上に送信される。
FIG. 3 is a schematic explanatory diagram of a remote monitoring system used for dome roof construction in the air dome method.
The internal pressure display detection panel 14b provided with a control unit related to the internal pressure in the storage tank 1 includes a remote monitoring cable, a detection panel power switch, a storage tank internal pressure value, an internal pressure lower limit pressure switch, an internal pressure upper limit pressure switch, a lower limit switch knob position, and an upper limit switch knob position. It consists of detection items such as. The roof level measuring means 12 and the camera photographing means 13 are connected to the remote monitoring panel 11. Further, the internal pressure display detection panel 14b, the power source 15, the emergency generator 16 for private power generation, the control system 17, and the remote monitoring panel 11 are electrically connected to each other. The control system 17 and the remote monitoring panel 11 are housed in a control system housing 18. The control system 17 is a part that controls the operating state of the air dome blower, and includes detection items such as a control system power supply, INV operating state, INV trip, thermal trip, INV frequency, and electromagnetic valve. The remote monitoring panel 11 is composed of a communication connection and check mechanism. The remote monitoring board 11 is connected to an external mobile phone network, a communication network such as the Internet.
The remote monitoring dedicated server 19 via the mobile phone network sequentially updates the storage tank pressure information on the Web screen with respect to the storage tank pressure information. The remote monitoring dedicated server 19 transmits abnormality data to the remote monitor 21 via the Internet when the pressure value exceeds the set allowable range of the internal pressure of the storage tank. As described above, the abnormal data is transmitted as an abnormal mail to the mobile phone screen of the remote monitor 21a who is the transfer registrant through the dedicated mail server 20, or the Web screen of the remote monitor 21b using a personal computer or the like. Sent over.

図4は、エアードーム(AD)コントロールシステムにおける遠隔監視システムのフロー図である。
現場で表示、検知、コントロールされるシステムについて、遠隔監視・制御ユニットに入力し、Fomaネットワークを使用し、サーバーに受けて、インターネット及び電話回線を経由してパソコン、携帯電話、メール通信などを利用する。
フローの一例として、メールサーバーに転送者を登録する。メールサーバーからADコントロールシステムに回線接続がされる。ADコントロールシステムにおける電源投入及び貯槽内圧維持が行われる。内圧表示検知盤14bで電源投入が表示され、遠隔監視盤11にも電源投入が表示される。サーバーではWeb画面更新、異常メール送信、メール送信が行われる。メールサーバーでは転送者登録、異常メールを転送、登録者の送信が行われる。遠隔監視者21はサーバーからメール受信を受ける。送信対象には電源表示、圧力変換器、変位計、電源遮断器、ケーブル接続、下限圧力スイッチ、上限圧力スイッチ等がチェック項目に含まれる。
FIG. 4 is a flowchart of the remote monitoring system in the air dome (AD) control system.
For systems that are displayed, detected, and controlled at the site, input to the remote monitoring / control unit, use the Foma network, receive at the server, and use a personal computer, mobile phone, mail communication, etc. via the Internet and telephone line To do.
As an example of the flow, a transfer person is registered in the mail server. A line connection is made from the mail server to the AD control system. The power is turned on and the internal pressure of the storage tank is maintained in the AD control system. Power-on is displayed on the internal pressure display detection panel 14b, and power-on is also displayed on the remote monitoring panel 11. The server updates the Web screen, sends abnormal emails, and sends emails. The mail server performs forwarder registration, abnormal mail forwarding, and registrant transmission. The remote monitor 21 receives mail from the server. The transmission items include power display, pressure converter, displacement meter, power breaker, cable connection, lower limit pressure switch, upper limit pressure switch, and the like.

図5はADコントロールシステムにおける遠隔監視システムの遠隔監視者からの送信フロー図である。運転状態の表示画面である。
遠隔監視者21は貯槽内の内圧が正常な状態であるときはWebプラウザを見ている状態が通常である。遠隔監視者21は作業現場に異常が生じた場合、PC・PDA・携帯電話等のWebプラウザから作業現場の内圧表示検知盤14bに表示されている非常警報を停止するためにPC・PDA・携帯電話等のWebプラウザに表示されている警報停止ボタンを押す。次に、内圧表示検知盤14bに表示される内圧上限・下限圧力スイッチを例えば+ (−) 0.005KPa変更させるためにサーバーを介してWebプラウザに表示されている内圧上限・下限圧力スイッチの設定値+ (−) 0.005KPaボタンを押す。さらに、遠隔監視者21はPC・PDA・携帯電話等のWebプラウザの画面に表示されている内圧設定値(−) 0.05KPaボタンを押したのを受け、サーバー25は遠隔監視端末へポートON指令を行ない、遠隔監視盤11のポートONにし、ADコントロールシステム17の内圧設定値を+(−)
0.05KPaに変更する。また、ADコントロールシステム17の給気管7の電磁弁8又は排気管9の電磁弁10をOFF (ON) させるためにWebプラウザに表示されている電磁弁8又は電磁弁10のOFF (ON) ボタンを押す。そして、ADコントロールシステムのインバータを運転 (停止) させるためにWebプラウザに表示されているINV運転 (停止)
ボタンを押す。
FIG. 5 is a transmission flow diagram from the remote supervisor of the remote monitoring system in the AD control system. It is a display screen of an operation state.
When the internal pressure in the storage tank is in a normal state, the remote monitor 21 is usually in a state of looking at the Web browser. When an abnormality occurs at the work site, the remote supervisor 21 uses a PC / PDA / mobile phone to stop the emergency alarm displayed on the internal pressure display detection panel 14b of the work site from a Web browser such as a PC / PDA / mobile phone. Press the alarm stop button displayed on the web browser such as a telephone. Next, in order to change the internal pressure upper limit / lower limit pressure switch displayed on the internal pressure display detection panel 14b by, for example, + (−) 0.005 KPa, setting of the internal pressure upper limit / lower limit pressure switch displayed on the Web browser via the server is performed. Value + (-) Press the 0.005 KPa button. Further, when the remote monitor 21 presses the internal pressure setting value (-) 0.05 KPa button displayed on the screen of a Web browser such as a PC, PDA, or mobile phone, the server 25 turns on the port to the remote monitoring terminal. Command, turn the port of the remote monitoring panel 11 ON, and set the internal pressure setting value of the AD control system 17 to + (-)
Change to 0.05 KPa. In addition, the electromagnetic valve 8 or the electromagnetic valve 10 OFF (ON) button displayed on the web browser in order to turn off the electromagnetic valve 10 of the air supply pipe 7 or the exhaust pipe 9 of the AD control system 17. push. Then, the INV operation (stop) displayed on the web browser to operate (stop) the inverter of the AD control system.
I press the button.

図6は遠隔監視システムの全体図である。
遠隔監視対象であるエアードーム工法におけるドーム屋根施工中の貯槽内の圧力が主たる対象であるがドーム屋根形状も施工上の重要な監視対象となる。ドーム屋根の施工中に屋根形状に変形等が生じた場合は貯槽内圧の調整により解決を図る。
可撓膜体5で密閉状に被覆された貯槽1の内圧を制御するエアードーム送風機6、給気管7に取付けた電磁弁8、排気管9に取付けた電磁弁10、遠隔監視盤11、屋根レベル計測手段12、カメラ撮影手段13、内圧検知手段14、電源15、非常用電源16等の遠隔監視したい設備・機器22は監視・制御ユニット23に電気、通信接続され、携帯電話網24に回線接続され、専用線を介してサーバー25に接続され、さらに専用線でインターネット26接続され、遠隔監視者21が所有する携帯電話27、パソコン28に接続される。必要に応じてサーバー25と遠隔監視者21が所有する電話乃至ファクシミリに接続する。
FIG. 6 is an overall view of the remote monitoring system.
Although the pressure in the storage tank during dome roof construction in the air dome method, which is the object of remote monitoring, is the main object, the shape of the dome roof is also an important monitoring target in construction. If the roof shape is deformed during the construction of the dome roof, it will be solved by adjusting the internal pressure of the storage tank.
An air dome blower 6 for controlling the internal pressure of the storage tank 1 covered in a sealed manner with the flexible membrane 5, an electromagnetic valve 8 attached to the air supply pipe 7, an electromagnetic valve 10 attached to the exhaust pipe 9, a remote monitoring panel 11, a roof Equipment / devices 22 to be remotely monitored, such as level measuring means 12, camera photographing means 13, internal pressure detecting means 14, power supply 15 and emergency power supply 16, are electrically and communicatively connected to monitoring / control unit 23, and are connected to cellular phone network 24. Connected to the server 25 via a dedicated line, connected to the Internet 26 via a dedicated line, and connected to a mobile phone 27 and a personal computer 28 owned by the remote monitor 21. As necessary, the server 25 and the remote monitor 21 are connected to a telephone or facsimile owned by the remote monitor 21.

図7は正常時におけるPC表示画面を示す図である。
正常時のPC表示画面上には、監視装置電源の受電ボタン、停電ボタンのうち受電にランプが点灯している状態を示す。同様に、非常用発電機の停止中ボタン、運転中ボタンには停止中にランプが点灯している。貯槽内圧計では本例では2000Paが表示されているが、この圧力表示は固定的ではなくドーム屋根形状の施工過程に応じて設定変更される。
また、PC表示画面には内圧設定値変更の設定値表示、ドーム高さの表示、内圧検知盤警報ON、停止の表示、内圧検知盤電源のON、OFF表示のうちONが点灯している。遠隔監視ケーブルの接続、切断の表示のうち「接続」に点灯している。
内圧下限の設定値を例えば1.5kPaとし、正常、異常ボタンのうち正常が点灯し、正常時の設定値を例えば+0.05kPaとする。異常時の設定値は−0.05kPaに設定しておく。内圧上限の設定値は例えば+2.5kPaにし、正常、異常ボタンのうち正常が点灯している。正常時の設定値を例えば+0.05kPaとする。異常時の設定値は−0.05kPaに設定しておく。
電磁弁のON、OFFボタンのうちONが点灯している。
No.1送風機のNo.1 INV周波数計の表示は例えば40.6HZと表示され、No.1 INVの運転、停止ボタンのうち運転に点灯し、No.1 INVトリップの正常、異常ボタンのうち正常に点灯し、No.1 サーマルトリップの正常、異常ボタンのうち正常が点灯している。
No.2送風機のNo.2 INV周波数計の表示は例えば0.0HZと表示され、No.2 INVの運転、停止ボタンのうち運転に点灯し、No.2 INVトリップの正常、異常ボタンのうち正常に点灯し、No.2 サーマルトリップの正常、異常ボタンのうち正常が点灯している。
FIG. 7 is a diagram showing a PC display screen in a normal state.
On the PC display screen at the normal time, a state in which the lamp is lit for power reception among the power reception button and the power failure button of the monitoring apparatus power supply is shown. Similarly, the stop button and the operation button of the emergency generator are lit while the stop is in progress. In this example, 2000 Pa is displayed in the internal pressure gauge of the storage tank, but this pressure display is not fixed and is changed according to the construction process of the dome roof shape.
On the PC display screen, ON among the set value display for changing the internal pressure set value, the dome height display, the internal pressure detection panel alarm ON, the stop display, the internal pressure detection panel power ON / OFF display is lit. “Connected” lights up in the remote monitoring cable connection / disconnection display.
The set value of the lower limit of the internal pressure is set to, for example, 1.5 kPa, normal among the normal and abnormal buttons is lit, and the set value at the normal time is set to, for example, +0.05 kPa. The set value at the time of abnormality is set to -0.05 kPa. The set value of the upper limit of the internal pressure is, for example, +2.5 kPa, and normal is lit among normal and abnormal buttons. The normal set value is, for example, +0.05 kPa. The set value at the time of abnormality is set to -0.05 kPa.
ON of the solenoid valve ON and OFF buttons is lit.
No.1 fan No.1 INV frequency meter is displayed as 40.6HZ, for example, No.1 INV operation, stop button lights up, No.1 INV trip normal, abnormal buttons Illuminates normally, and No. 1 thermal trip is normal and normal among the abnormal buttons is lit.
No.2 fan No.2 INV frequency meter is displayed as 0.0HZ, for example, No.2 INV operation, stop button lights up, No.2 INV trip normal, abnormal buttons Lights up normally, No. 2 Thermal trip is normal, normal button is lit.

図8は貯槽内の内圧が高い異常時の場合のPC表示画面を示す図である。
図7に比べ画面の表示項目は同じであるが、異なる箇所は貯槽内圧力計の表示が例えば正常時の2000Paから3000Paに上昇し、ドーム屋根高さも正常時の4200mmから4250mmに上昇した場合を示すときの遠隔監視者の操作について述べる。
先ず、(1)内圧検知盤の警報の停止ボタンを押す。次に、(2)エアードーム送風機(No.1)の電源を停止させ、貯槽内への給気を停止する。この操作は、貯槽内の圧力が正常値に達するまで行われる。貯槽内の圧力が設定値に復帰したら、再び正常運転を行う。
FIG. 8 is a diagram showing a PC display screen when the internal pressure in the storage tank is abnormal.
The display items on the screen are the same as in FIG. 7, but the difference is that the display of the pressure gauge in the storage tank increases from 2000 Pa to 3000 Pa, for example, and the dome roof height also increases from 4200 mm to 4250 mm in the normal state. The operation of the remote monitor when shown is described.
First, (1) press the alarm stop button on the internal pressure detection panel. Next, (2) the power supply to the air dome blower (No. 1) is stopped and the air supply to the storage tank is stopped. This operation is performed until the pressure in the storage tank reaches a normal value. When the pressure in the storage tank returns to the set value, normal operation is performed again.

図9は貯槽内の内圧が低い異常時の場合のPC表示画面を示す図である。
貯槽内圧力計の表示が例えば正常時の2000Paから1000Paに下降し、ドーム屋根高さも正常時の4200mmから4150mmに下降した場合を示すときの遠隔監視者の操作について述べる。
先ず、(1)内圧検知盤の警報の停止ボタンを押す。次に、(2)排気管の電磁弁を開から閉、ONからOFFに切り替える。エアードーム送風機(No.1)の電源は運転の状態で貯槽内に給気を継続する。(3)必要に応じてエアードーム送風機(No.2)の運転ボタンを押して給気を増加させる。この操作は貯槽内の圧力が設定値に復帰するまで続ける。
FIG. 9 is a diagram showing a PC display screen in the case of an abnormality when the internal pressure in the storage tank is low.
The operation of the remote supervisor when the display of the pressure gauge in the storage tank is lowered from, for example, 2000 Pa in the normal state to 1000 Pa and the height of the dome roof is lowered from 4200 mm in the normal state to 4150 mm will be described.
First, (1) press the alarm stop button on the internal pressure detection panel. Next, (2) the solenoid valve of the exhaust pipe is switched from open to closed and from ON to OFF. The power supply of the air dome blower (No. 1) continues to supply air into the storage tank while in operation. (3) If necessary, press the operation button of the air dome blower (No. 2) to increase the air supply. This operation is continued until the pressure in the storage tank returns to the set value.

図10はPC表示画面の登録先メールアドレスの送信履歴を示す図である。
これは貯槽内の圧力に異常が発生の場合に専用サーバーから登録先メールアドレスへの送信履歴を記録するために、発生時刻、監視内容、状態が表示される。本例では、2010年9月14日午前6時に、貯槽内の圧力の上限2.5Paを超過したことを示している。
FIG. 10 is a diagram showing the transmission history of the registered mail address on the PC display screen.
In order to record the transmission history from the dedicated server to the registered e-mail address when an abnormality occurs in the pressure in the storage tank, the occurrence time, monitoring contents, and status are displayed. In this example, it is shown that the upper limit of 2.5 Pa of the pressure in the storage tank was exceeded at 6 am on September 14, 2010.

図11はPC表示画面の貯槽内圧力推移を示す図である。この図は貯槽内の圧力が正常時の2000Paを基準にして午前6時頃に、内圧上限値を超えた場合を表示している。
このような場合に、前記詳述した遠隔監視システムの対応を行って正常な内圧設定値へ復帰させる。
FIG. 11 is a diagram showing the pressure transition in the storage tank on the PC display screen. This figure shows the case where the internal pressure exceeds the upper limit of the internal pressure around 6:00 am with reference to 2000 Pa in the normal state.
In such a case, the remote monitoring system described in detail above is used to restore the normal internal pressure set value.

図12は携帯電話表示画面を示す図で、(a)は正常時を示し、(b)は異常時を示す図である。この表示は図7及び図8に示す画面表示と略同じである。   12A and 12B are diagrams showing a mobile phone display screen, where FIG. 12A shows a normal time and FIG. 12B shows a abnormal time. This display is substantially the same as the screen display shown in FIGS.

本発明はエアードーム工法におけるドーム屋根施工において、貯槽内部昇圧期間中に、内部圧力を遠隔で監視するシステムである。内圧及びエアードームコントロールシステムの機器・設備の状況をFomaネットワークでサーバーと接続し、インターネットによって送信し、内圧及び機器設備の運転状態の監視を可能にするシステムである。
インターネットを使用するという特性上、Web画面でその他監視装置に接続した機器の状態を1分更新など、経時的に閲覧が可能となる。
Web画面で閲覧することによりエアードームコントロールシステムの運転状態の情報を共有できる。
作業現場以外でも状況認識できることにより、現場に24時間、連続して常駐する必要がなく、現場に出向く頻度を少なくし、人的負担の低減効果が得られる。
内圧の変化やエアードームコントロールシステムの異常をいち早く把握できるため安全確保が可能となる。Eメールでの通報を実現することができるため、情報を関係者が共有しいち早く伝達対応することが可能となる。
The present invention is a system for remotely monitoring the internal pressure during the internal pressure increase period of the storage tank in the dome roof construction in the air dome method. The internal pressure and air dome control system equipment / equipment status is connected to a server via the Foma network and transmitted via the Internet to enable monitoring of the internal pressure and equipment operating conditions.
Due to the characteristics of using the Internet, the status of devices connected to other monitoring devices on the Web screen can be viewed over time, such as updating for one minute.
By browsing on the web screen, you can share information on the operating status of the air dome control system.
By being able to recognize the situation even outside the work site, it is not necessary to stay on site for 24 hours continuously, reducing the frequency of going to the site and reducing human burden.
Safety can be ensured because changes in internal pressure and abnormalities in the air dome control system can be quickly grasped. Because it is possible to realize notification by e-mail, it is possible to share information quickly and communicate quickly.

この発明は、水や石油等の液体、低温液化ガス、消化ガス、粉体、粒状物などの各種貯蔵物を貯蔵する種々の貯槽等構築物の上部を被覆するドーム屋根施工に用いる遠隔監視システムとしてドーム屋根施工の分野等の広範囲に適用することができる。   This invention is a remote monitoring system used for construction of a dome roof for covering the upper part of a structure such as various storage tanks for storing various storage products such as liquids such as water and petroleum, low-temperature liquefied gas, digestion gas, powder, and granular materials. It can be applied to a wide range of fields such as dome roof construction.

1 貯槽
2 ドーム屋根
3 底版
4 側壁
5 可撓膜体
6 エアードーム送風機
7 給気管
8 電磁弁
9 排気管
10 電磁弁
11 遠隔監視盤
12 屋根レベル計測手段
12a ゲージ
12b レベル計
12c 測定台
13 カメラ撮影手段
13a カメラ
13b 測定台
14 内圧検知手段
14a 内圧検知管
14b 内圧表示検知盤
14c 遠隔監視ケーブル
15 電源
16 非常用発電機
17 コントロールシステム
18 コントロールシステム筐体
19 遠隔監視専用サーバー
20 転送専用メールサーバー
21、21a、21b 遠隔監視者
22 遠隔監視したい設備機器
23 監視・制御ユニット
24 携帯電話網
25 サーバー
26 インターネット
101 貯槽
102 ドーム屋根
103 底版
104 側壁
105 可撓膜体
106 送風機
01 貯槽
02 ドーム屋根
03 給気部
04 排気部
05 検知部
06 制御部

1 Storage tank
2 Dome roof
3 Bottom plate
4 Side walls
5 Flexible membrane
6 Air dome blower
7 Air supply pipe
8 Solenoid valve
9 Exhaust pipe
10 Solenoid valve
11 Remote monitoring panel
12 Roof level measuring means
12a gauge
12b Level meter
12c measuring table
13 Camera photographing means
13a camera
13b Measuring table
14 Internal pressure detection means
14a Internal pressure detection tube
14b Internal pressure display detection panel
14c Remote monitoring cable
15 Power supply
16 Emergency generator
17 Control system
18 Control system housing
19 Remote monitoring dedicated server
20 Forwarding mail server
21, 21a, 21b Remote monitor
22 Equipment to be monitored remotely
23 Monitoring and control unit
24 Mobile phone network
25 servers
26 Internet
101 Storage tank
102 Dome roof
103 Bottom plate
104 Side wall
105 Flexible membrane
106 Blower
01 Storage tank
02 Dome roof
03 Air supply part
04 Exhaust section
05 detector
06 Control unit

Claims (3)

エアードーム工法における貯槽の上部を密閉状に可撓膜体で被覆した貯槽内部を給気排気調整機構により所定圧力に維持された圧力を検知する内圧検知管を備えた内圧検知手段は、前記可撓膜体が作業足場として機能する内圧検知であり、かつ該可撓膜体上でアンカーピン・丸鋼の設置及び可撓膜体上に塗布した接着剤にてラス網・溶接金網の配置重量に耐える可撓膜体としての一次昇圧検知手段と、前記ラス網・溶接金網にモルタル打設の重量に耐える可撓膜体としての二次昇圧検知手段と、貯槽の外部からドーム屋根の施工過程における屋根高さ位置を計測する屋根レベル計測手段と、ドーム屋根施工中の屋根形状をバランス良く形成するための屋根の外形を監視するカメラ撮影手段と、貯槽内圧値、貯槽内圧上限スイッチ、下限スイッチを備えた内圧表示検知盤と、上記内圧値の変動を外部から監視するための遠隔監視盤と、該遠隔監視盤に表示されるデータをインターネットで遠隔監視専用サーバーを介して携帯電話画面監視表示又はパソコン等のWeb画面に送信する手段と、前記携帯電話画面又はWeb画面から設定圧力範囲値を超えた時に、貯槽内部圧力コントロールシステムの機器・設備の状況を遠隔監視専用サーバーと接続し、インターネットによって前記携帯電話画面又はWeb画面から送信し、内圧機器・設備の運転状態を正常状態に戻す操作手段を備えていることを特徴とするエアードーム工法におけるドーム屋根施工に用いる遠隔監視システム。 Internal pressure detecting means having a pressure sensing pipe for sensing the pressure maintained at a predetermined pressure reservoir interior coated with the flexible film member sealingly the upper reservoir in the air dome method the air supply exhaust adjusting mechanism, the friendly The internal pressure is detected so that the flexible film body functions as a working scaffold, and the placement weight of the lath net and the welded wire mesh is set with an adhesive applied on the flexible film body. Primary pressure detection means as a flexible film body that can withstand the load, secondary pressure detection means as a flexible film body that can withstand the weight of the mortar placed on the lath net and welded wire net, and the construction process of the dome roof from the outside of the storage tank and roof level measuring means for measuring a roof height position in a camera photographing means for monitoring the outer shape of the roof in order to form a well-balanced roof shape in the dome roof construction, reservoir pressure value, the reservoir pressure limit switch, lower limit switch A pressure display detection panel with and a remote monitoring system for monitoring the variation of the internal pressure value from the outside, the mobile phone screen monitor display via the remote monitoring dedicated server the data displayed on the remote monitoring system in the Internet Or a means for transmitting to a web screen such as a personal computer, and when the set pressure range value is exceeded from the mobile phone screen or web screen , the device / equipment status of the storage tank internal pressure control system is connected to a remote monitoring dedicated server, The remote monitoring system used for dome roof construction in the air dome construction method is provided with operation means for transmitting from the mobile phone screen or the Web screen by the above and returning the operating state of the internal pressure equipment / equipment to the normal state. 貯槽内部圧力コントロールシステムは、エアードーム屋根を構成する可撓膜体がラス網・溶接金網の配置に耐える可撓膜体としての一次昇圧及び前記ラス網・溶接金網にモルタル打設に耐える可撓膜体としての二次昇圧を検知する内圧検知手段と、可撓膜体上のドーム屋根中央部に設置したゲージをレベル計で計測して施工過程における屋根高さ位置を計測する屋根レベル計測手段と、ドーム屋根施工中の屋根の外形形状を監視するカメラ撮影手段を備え、その計測値の変化の状態をインターネット情報、Eメール通報を利用して、遠隔の複数箇所で共有する請求項1記載のエアードーム工法におけるドーム屋根施工に用いる遠隔監視システム。 The internal pressure control system of the storage tank is a flexible film body that constitutes the air dome roof. The flexible film body can withstand the placement of the lath net and the welded wire mesh. An internal pressure detection means for detecting secondary pressure as a membrane body, and a roof level measurement means for measuring the roof height position in the construction process by measuring a gauge installed at the center of the dome roof on the flexible membrane body with a level meter And a camera photographing means for monitoring the outer shape of the roof under construction of the dome roof , and sharing the state of change in the measured value at a plurality of remote locations using Internet information and e-mail notification. Remote monitoring system used for dome roof construction in the air dome construction method. 貯槽内部を給気排気調整により一次昇圧及び二次昇圧による圧力状態が所定圧力に維持された内圧を検知する検知管貯槽内の可撓膜体の近傍位置の離れた位置に複数箇所設置したことを特徴とする請求項1又は2記載のエアードーム工法におけるドーム屋根施工に用いる遠隔監視システム。 A plurality of detection tubes are installed at positions apart from the vicinity of the flexible film body in the storage tank to detect the internal pressure in which the pressure state by the primary pressure increase and the secondary pressure increase is maintained at a predetermined pressure by adjusting the supply and exhaust air inside the storage tank. The remote monitoring system used for the dome roof construction in the air dome construction method according to claim 1 or 2.
JP2010222146A 2010-09-30 2010-09-30 Remote monitoring system for dome roof construction in air dome method Active JP5587720B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2010222146A JP5587720B2 (en) 2010-09-30 2010-09-30 Remote monitoring system for dome roof construction in air dome method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2010222146A JP5587720B2 (en) 2010-09-30 2010-09-30 Remote monitoring system for dome roof construction in air dome method

Publications (2)

Publication Number Publication Date
JP2012077486A JP2012077486A (en) 2012-04-19
JP5587720B2 true JP5587720B2 (en) 2014-09-10

Family

ID=46238050

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2010222146A Active JP5587720B2 (en) 2010-09-30 2010-09-30 Remote monitoring system for dome roof construction in air dome method

Country Status (1)

Country Link
JP (1) JP5587720B2 (en)

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0213669A (en) * 1988-06-30 1990-01-18 Fujita Corp Snow slipping device for arch type film roof
JP3225407B2 (en) * 1991-07-30 2001-11-05 株式会社石井鐵工所 Roof shape maintenance system and its device in air dome method
JP2002229640A (en) * 2001-01-30 2002-08-16 Fujita Corp Remote management control system and method thereof
JP5133627B2 (en) * 2007-07-18 2013-01-30 東洋ゴム工業株式会社 Variable capacity gas holder
JP5128331B2 (en) * 2008-03-17 2013-01-23 三機工業株式会社 Indoor pressure measurement port and drip-proof hood used therefor

Also Published As

Publication number Publication date
JP2012077486A (en) 2012-04-19

Similar Documents

Publication Publication Date Title
KR101648194B1 (en) System for controlling automatically pump using pressure of fire fighting tank
US12311212B2 (en) Fire suppression system remote monitoring
WO2011088457A2 (en) Wireless annunciator for an electrical generator
KR101056063B1 (en) Supervision and control system of water treatment plant pump room using spot
JP2017141771A (en) Feed water device and control method of feed water device
JP6391964B2 (en) Communications system
KR101114294B1 (en) Real-time Weight sensing Apparatus of fire extinguishing chemical and Method thereof
JP6392063B2 (en) Distribution board
JP5587720B2 (en) Remote monitoring system for dome roof construction in air dome method
EP3886997B1 (en) Fire suppression system remote monitoring
CN209790696U (en) A distributed fire hydrant and sprinkler fire extinguishing system
KR102627674B1 (en) Lifting deck for loading and unloading materials equipped with load sensors and monitoring devices
CN205038501U (en) CNG Central Station Centralized Control System
CN112891810A (en) Intelligent online monitoring system and monitoring method for fire-fighting gas cylinders in battle cave depot
CN216945898U (en) Fire pipeline hoist and mount system
KR20170122496A (en) Control system for heating cable of fire protection piping
CN217908677U (en) Fill electric pile gas fire extinguishing system
KR101065629B1 (en) Hydraulic pressure control device for fire fighting water supply pipe and hydraulic pressure control method using same
JP6714457B2 (en) Detecting device, detecting system, and method for constructing detecting system
JP2019019799A (en) Pump device
KR20190068077A (en) Sensor expandable wireless monitoring system
KR100470969B1 (en) Digital Automatic Exhausting System Using Load Cell
JP2008304993A (en) Communication system
CN208589125U (en) Fire extinguisher remote monitoring system
JP2015052553A (en) Gas leakage monitor

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20130314

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20140109

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20140117

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20140318

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20140627

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20140724

R150 Certificate of patent or registration of utility model

Ref document number: 5587720

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250