JP5616625B2 - SC pile and its manufacturing method - Google Patents
SC pile and its manufacturing method Download PDFInfo
- Publication number
- JP5616625B2 JP5616625B2 JP2009297304A JP2009297304A JP5616625B2 JP 5616625 B2 JP5616625 B2 JP 5616625B2 JP 2009297304 A JP2009297304 A JP 2009297304A JP 2009297304 A JP2009297304 A JP 2009297304A JP 5616625 B2 JP5616625 B2 JP 5616625B2
- Authority
- JP
- Japan
- Prior art keywords
- anchor
- pile
- guide plate
- annular guide
- reinforcing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
- Foundations (AREA)
Description
本発明は、建築及び土木の杭基礎工事において上杭として用いられるSC杭とその製造方法等に関するものであって、特に、フーチングと接合するためのアンカー鉄筋を杭頭部の杭体内に配設したSC杭とその製造方法、該SC杭に用いることができるアンカー鉄筋を支持するための支持パイプが複数設けられたSC杭用端板に関する。 The present invention relates to an SC pile used as an upper pile in construction and civil engineering pile foundation work, and a method for manufacturing the same, and in particular, anchor reinforcing bars for joining with a footing are arranged in the pile body of the pile head. The present invention relates to an SC pile end plate provided with a plurality of support pipes for supporting anchor reinforcing bars that can be used for the SC pile.
従来から、建物等の構造物を構築する際には、地盤の支持層の深さまで基礎杭を設け、この基礎杭の杭頭上に構造物の基礎を形成する杭基礎工法が用いられており、基礎杭工事により施工された基礎杭上に構造物の基礎部分(フーチング)が基礎杭の上杭杭頭部に接合され一体化されて形成されている。 Conventionally, when constructing a structure such as a building, a pile foundation method has been used in which a foundation pile is provided up to the depth of the ground support layer and the foundation of the structure is formed on the pile head of this foundation pile. The foundation part (footing) of the structure is joined and integrated with the top pile head of the foundation pile on the foundation pile constructed by foundation pile construction.
このような杭基礎構造においては、基礎杭における上杭杭頭部とその上に形成される構造物の基礎部分とが一体に接合されることから、例えば地震により揺れが生じると、上部構造物から伝達される水平力や回転力によって上杭杭頭部付近には大きな曲げモーメントやせん断力が発生する。そのため、これら曲げモーメントやせん断力に抗するための方法が種々考えられているが、その中の一つとして上杭にSC杭を用いる方法がある。 In such a pile foundation structure, the upper pile head in the foundation pile and the foundation part of the structure formed on it are joined together, so that if an earthquake occurs, for example, the upper structure A large bending moment and shear force are generated near the top of the upper pile pile due to the horizontal force and rotational force transmitted from the head. Therefore, various methods for resisting these bending moments and shearing forces have been considered, and one of them is a method of using SC piles for the upper piles.
SC杭は外殻鋼管付きコンクリート杭とも言われ、鋼管の内面に膨張コンクリートを円筒状に一体成形した中空状のコンクリート杭であり、膨張コンクリートが鋼管により拘束されているので非常に大きな靭性を有するものである。 The SC pile is also called a concrete pile with a shell steel pipe, and is a hollow concrete pile formed by integrally molding expanded concrete in a cylindrical shape on the inner surface of the steel pipe, and has very large toughness because the expanded concrete is restrained by the steel pipe Is.
上記のように、SC杭は基礎杭における上杭として用いられ構造物の基礎部分(フーチング)と接合されるので、SC杭においては、該接合が強固で施工ができるだけ簡便となる種々の方法が検討されている。 As described above, the SC pile is used as the upper pile in the foundation pile and is joined to the foundation portion (footing) of the structure. Therefore, in the SC pile, there are various methods in which the joining is strong and the construction is as simple as possible. It is being considered.
そんな中で、フーチングに接合されるアンカー鉄筋を、予め杭頭部の杭体内に埋め込んだSC杭が知られている。例えば、特許文献1には、「鋼管と、該鋼管の内周面に打設したコンクリート筒状体と、該コンクリート筒状体と、該コンクリート筒状体内に軸方向に埋設した複数のアンカー鉄筋とからなるSC杭」が開示されている。
Under such circumstances, an SC pile is known in which anchor reinforcing bars to be joined to the footing are embedded in the pile body of the pile head in advance. For example,
また、特許文献2には、「一端側にコンクリート製の杭頭接合部を、これより他方端まで鋼管コンクリート複合部をそれぞれ形成するとともに、前記杭頭接合部から鋼管コンクリート複合部にまたがって配設した複数本のフーチング結合用補強鉄筋を介して、前記コンクリート製の杭頭接合部と鋼管コンクリート複合部とを一体に形成した鋼管コンクリート複合杭」が開示されている。
これらは、いずれもフーチングに接合されるアンカー鉄筋が予め杭体内に埋設されているので、杭頭上に定着筋を設ける必要もなく、所定の部位で鋼管の切断除去やコンクリートのはつり出しを行えばアンカー鉄筋のフーチングに接合される部分が露出できるので施工が簡便となる。また、アンカー鉄筋がSC杭内に埋設される形で一体的に設けられているので、定着筋を鋼管の外壁や端板に溶接する工法に比べ、SC杭とフーチングとの結合が強固となるといった効果を奏する。 In both cases, anchor reinforcing bars to be joined to the footing are pre-embedded in the pile body, so there is no need to provide anchoring bars on the pile heads. Since the part joined to the footing of the anchor reinforcing bar can be exposed, the construction becomes simple. In addition, since the anchor rebar is integrally provided in the form embedded in the SC pile, the connection between the SC pile and the footing is stronger than the method of welding the anchor bar to the outer wall or end plate of the steel pipe. There are effects such as.
しかし、特許文献1に記載されるものは、単に複数のアンカー鉄筋をコンクリート筒状体の軸方向に埋設したものであり横筋のある籠状のものではないので、必ずしも強固な鉄筋構造にはなっていない。
However, what is described in
また、このSC杭の製造方法は開示されていないが、SC杭は遠心成形により製造されるので、概して、単に複数のアンカー鉄筋を軸方向に配筋しただけでは製造時にズレが生じたりして、アンカー鉄筋をまっすぐ軸方向にたもったまま、応力が発生しないようにして所定の間隔で均一にコンクリート筒状体内に埋設することは難しい。 Moreover, although the manufacturing method of this SC pile is not disclosed, since the SC pile is manufactured by centrifugal molding, in general, simply arranging a plurality of anchor reinforcing bars in the axial direction may cause a deviation during manufacturing. It is difficult to embed the anchor rebar uniformly in the concrete cylindrical body at predetermined intervals so that no stress is generated while the anchor rebar is held straight in the axial direction.
また、特許文献2に記載されるものは、フーチング結合用補強鉄筋(アンカー鉄筋)がドーナツ型の金具と環状位置決め部材により固定されているので上記特許文献1のような問題を生じるリスクは低いが、フーチング結合用補強鉄筋と環状位置決め部材との接触部は溶接などにより固定されるとなっているので、溶接固定される場合は、フーチング結合用補強鉄筋に断面欠損や変質による強度不足を招くおそれがある。
Moreover, although what is described in
また、異形鉄筋の場合は溶接し難くなる。更に、フーチング結合用補強鉄筋の配筋は型枠内に設置した鋼管の内部空間にまたがって行われるので、外形600mm以下の鋼管を用いた場合は、鋼管内に組立作業員が入りにくくなり、作業性が悪くなるといった問題も生ずる。 Moreover, in the case of a deformed bar, it becomes difficult to weld. Furthermore, since the reinforcing bar reinforcement for the footing connection is performed across the internal space of the steel pipe installed in the formwork, when a steel pipe having an outer diameter of 600 mm or less is used, it becomes difficult for an assembly worker to enter the steel pipe. There is also a problem that workability is deteriorated.
本発明は、上記課題に鑑みてなされたものであって、その目的は、杭頭部のアンカー鉄筋による配筋構造が強固であり構造物等の基礎工事がし易いSC杭及び該SC杭を簡便に製造する方法を提供することにある。 The present invention has been made in view of the above-mentioned problems, and its purpose is to provide an SC pile and an SC pile that have a strong bar arrangement structure with anchor reinforcing bars at the head of the pile and that are easy to perform foundation work for structures and the like. It is in providing the method of manufacturing simply.
本発明者らは上記目的を達成すべく鋭意検討した結果、(1)アンカー鉄筋を杭頭端部で端板により支持する、(2)環状ガイドプレートと補強リングとを併用する、(3)アンカー鉄筋にはなるべく溶接しない、(4)SC杭を製造するに当たり、予めアンカー鉄筋と端板と環状ガイドプレートと補強リングとからなるアンカー鉄筋組立体を組み立てておく、といったことを行えば上記目的が達成できることを見出し、本発明を完成させた。その内容は請求項1〜6に記載されるものであり、
As a result of intensive studies to achieve the above object, the present inventors have supported (1) an anchor reinforcing bar by an end plate at the pile head end, and (2) a combined use of an annular guide plate and a reinforcing ring, (3) If the anchor rebar is not welded as much as possible, and (4) the anchor rebar assembly consisting of the anchor rebar, the end plate, the annular guide plate and the reinforcing ring is assembled in advance in the manufacture of the SC pile The present invention has been completed. The contents are described in
本願の請求項1に係る発明は、「杭頭部の杭体コンクリート内にフーチングに接合されるアンカー鉄筋が複数本円周方向に間隔をおいて配設されてなるSC杭であって、前記アンカー鉄筋は、杭頭部の端部で端板により支持され、前記アンカー鉄筋を挿通するための挿通溝が外周又は内周にそって設けられている環状ガイドプレートと補強リングにより固定されており、前記環状ガイドプレートと前記補強リングとは、前記アンカー鉄筋に対し無溶接で設けられており、前記環状ガイドプレートと一部の前記補強リングとは、これらでアンカー鉄筋を通すための挿通穴を形成するようにして、一体化して設けられていることを特徴とするSC杭」である。
The invention according to
アンカー鉄筋は、杭体内補強鉄筋、フーチング結合用補強鉄筋などとも言われ、フーチングに接合される杭頭結合鉄筋(定着鉄筋)の役割を果たすものである。本発明のSC杭では、これが杭頭部の杭体内に所定の間隔で環状に軸方向に平行に配設されている。 The anchor reinforcing bar is also called a reinforcing reinforcing bar in the pile, a reinforcing reinforcing bar for footing connection, and the like, and plays a role of a pile head connecting reinforcing bar (fixed reinforcing bar) joined to the footing. In the SC pile according to the present invention, the piles are arranged annularly and parallel to the axial direction at predetermined intervals in the pile body of the pile head.
このような構造にすれば、杭頭上に定着筋を設ける必要もなくフーチングの工事が簡略化できる。また、前記アンカー鉄筋は杭頭部の端部で端板により支持されている。アンカー鉄筋が端板により支持されることにより、製造時におけるアンカー鉄筋の配筋が容易となるとともに、強固な配筋構造となるのでフーチングの工事がし易くなる。 With such a structure, footing work can be simplified without the need to provide anchoring bars on the pile head. Moreover, the said anchor reinforcement is supported by the end plate in the edge part of a pile head. Since the anchor reinforcing bars are supported by the end plates, the anchor reinforcing bars can be easily arranged at the time of manufacture, and the footing work can be easily performed because of the strong reinforcing bar arrangement structure.
また、前記アンカー鉄筋は、環状ガイドプレートもしくは環状ガイドプレートと補強リングにより固定される。環状ガイドプレートは、アンカー鉄筋を杭本体内に配設する際、位置決めしズレを防止するために用いる。また、アンカー鉄筋による配筋構造を補強する役割も果たす。環状ガイドプレートは、鉄筋籠を組み立てる際に用いられる従来のものが使用できる。 The anchor reinforcing bars are fixed by an annular guide plate or an annular guide plate and a reinforcing ring. The annular guide plate is used for positioning and preventing misalignment when the anchor reinforcing bar is disposed in the pile body. Moreover, it also plays a role of reinforcing the bar arrangement structure by anchor reinforcing bars. As the annular guide plate, a conventional guide plate used when assembling the reinforcing bar rod can be used.
補強リングは、アンカー鉄筋の環状ガイドプレートからなる籠状のものを束ね、前記環状ガイドプレートによるアンカー鉄筋の固定を補強するものとして用いる。補強リングには、前記籠状のものの外周に巻く外リングと内周に配設される内リングとがあり、適宜使い分けられる。これら補強リングにはプレート状のものと棒状のものがある。 The reinforcing ring is used for bundling a hook-shaped member made of an anchor guide bar annular guide plate and reinforcing the anchor bar reinforcing by the ring guide plate. The reinforcing ring includes an outer ring wound around the outer periphery of the bowl-shaped member and an inner ring disposed on the inner periphery, and can be appropriately used. These reinforcing rings include a plate shape and a rod shape.
環状ガイドプレートと補強リングは、アンカー鉄筋に対しては無溶接で設けられる。無溶接とすることにより、アンカー鉄筋の劣化が防げるのでフーチングとの結合がしっかりしたものとなる。 The annular guide plate and the reinforcing ring are provided without welding to the anchor reinforcing bar. By not welding, deterioration of the anchor rebar can be prevented, so that the connection with the footing becomes firm.
また、本願発明では、環状ガイドプレートには挿通溝が外周又は内周にそって設けられており、該環状ガイドプレートと一部の補強リングとは、これらでアンカー鉄筋を通すための挿通穴を形成するようにして、一体化して設けられている。 Further, in the present gun onset bright, annular guide the plate is provided along the inner circumference is an outer peripheral or insertion grooves, with the annular guide plate and a portion of the reinforcing ring, for passing these anchor rebar so as to form the insertion hole, that provided integrally.
環状ガイドプレートと補強リングとは別の位置に設けてもよいが、環状ガイドプレートは主としてアンカー鉄筋の位置決めをするためのものであるので、環状ガイドプレートだけではその位置でアンカー鉄筋をしっかり固定できない。補強リングと組み合わせてもちいることにより、環状ガイドプレートの位置でもアンカー鉄筋が固定されるので、強固な配筋構造となる。特に外周又は内周に沿ってアンカー鉄筋を挿通するための挿通溝が設けてある環状ガイドプレートでは、補強リングによりアンカー鉄筋を通すための挿通穴を形成するようにして、これらを一体化して設ければ、前記固定効果は大きいので好ましい。 Although the annular guide plate and the reinforcing ring may be provided at different positions, the annular guide plate is mainly used for positioning the anchor rebar, so the anchor rebar cannot be firmly fixed at that position only by the annular guide plate. . By combining with the reinforcing ring, the anchor reinforcing bar is fixed even at the position of the annular guide plate, so that a strong reinforcing bar arrangement structure is obtained. In particular, in the annular guide plate provided with an insertion groove for inserting the anchor rebar along the outer circumference or inner circumference, these holes are integrally provided so as to form an insertion hole for passing the anchor rebar through the reinforcing ring. If so, the fixing effect is large, which is preferable.
本願の請求項2に係る発明は、「前記端板の杭体内側には、前記アンカー鉄筋を挿入するだけで支持できる支持パイプが複数設けられていることを特徴とする請求項1に記載のSC杭」である。
The invention according to
上記の通り、アンカー鉄筋は杭頭端部で端板により支持される。支持方法については特に限定されず、一般的には端板に立設した環状フラットバーに溶接するかたちで行われるが、例えば除去部が20cm以下と短い場合には、杭体内側に支持パイプを複数設けた端板を用いることが好ましい。 As described above, the anchor reinforcing bar is supported by the end plate at the pile head end. The support method is not particularly limited, and is generally performed by welding to an annular flat bar erected on the end plate. For example, when the removal portion is as short as 20 cm or less, a support pipe is provided inside the pile body. It is preferable to use a plurality of end plates.
この端板を用いれば、アンカー鉄筋を支持パイプに挿入するだけで支持できるので溶接する手間が省ける。また、アンカー鉄筋への溶接がなくなるので、アンカー鉄筋の溶接による劣化を防げる。 If this end plate is used, the anchor rebar can be supported simply by being inserted into the support pipe, so that the labor of welding can be saved. Moreover, since there is no welding to the anchor reinforcing bars, deterioration due to the welding of the anchor reinforcing bars can be prevented.
通常、支持パイプはアンカー鉄筋の配筋位置に合わせて環状に複数設けられる。支持パイプの端板への取り付けは、溶接などの従来のパイプ取り付け方法による。支持パイプの材質は特に限定されないが、溶接による取り付けが簡便なので、溶接可能な金属が好ましい。 Usually, a plurality of support pipes are provided in an annular shape in accordance with the reinforcing bar arrangement position. The support pipe is attached to the end plate by a conventional pipe attachment method such as welding. The material of the support pipe is not particularly limited, but a weldable metal is preferable because attachment by welding is simple.
本願の請求項3に係る発明は、「上記SC杭の外殻鋼管と上記補強リングとの間には、スペーサと楔が設けられていることを特徴とする請求項1又は2に記載のSC杭」である。
The invention according to
SC杭は外殻鋼管を有し、その内面に遠心成形によりコンクリートを打設して製造されるが、環状ガイドプレートと補強リングはアンカー鉄筋に対し無溶接で設けられているので、外郭鋼管との間に隙間があるとこれらの位置がズレたり補強リングが外れてしまうおそれがある。そこで、外殻鋼管と補強リングとの隙間にスペーサや楔を設けて、アンカー鉄筋等による当初の配筋構造が崩れないようにするのが好ましい。 The SC pile has a shell steel pipe and is manufactured by placing concrete on the inner surface by centrifugal molding. However, since the annular guide plate and the reinforcing ring are provided without welding to the anchor reinforcement, If there is a gap between them, these positions may be misaligned or the reinforcing ring may come off. Therefore, it is preferable to provide a spacer or a wedge in the gap between the outer shell steel pipe and the reinforcing ring so that the initial bar arrangement structure by the anchor reinforcing bar or the like does not collapse.
本願の請求項4に係る発明は、「杭頭部の杭体コンクリート内にフーチングに接合されるアンカー鉄筋が複数本円周方向に間隔をおいて配設されてなり、はつり出し部が100cm以上あるSC杭であって、前記アンカー鉄筋は、杭頭部の端部で端板により支持され、前記アンカー鉄筋を挿通するための挿通溝が外周又は内周にそって設けられている環状ガイドプレートと補強リングにより固定されており、前記環状ガイドプレートと前記補強リングとは、前記アンカー鉄筋に対し無溶接で設けられており、前記環状ガイドプレートと前記補強リングとをこれらでアンカー鉄筋を通すための挿通穴を形成するように結合して一体化してなるものが、前記はつり出し部と杭孔内残存部との界面を挟んで該界面から40〜60cmの等距離に、少なくとも一対設けられていることを特徴とするSC杭」である。
The invention according to
環状ガイドプレートと補強リングの配置はアンカー鉄筋の長さやはつり出し部の長さによって異なるので一概に決められないが、はつり出し部が100cm以上と長い場合は、環状ガイドプレートと補強リングとが一体化してなるものが、前記はつり出し部と杭孔内残存部との界面を挟んで該界面から40〜60cmの等距離に、少なくとも一対設けられているのが好ましい。 The arrangement of the annular guide plate and the reinforcing ring varies depending on the length of the anchor reinforcing bar and the length of the protruding part, so it cannot be determined unconditionally. However, if the protruding part is longer than 100 cm, the annular guide plate and the reinforcing ring are integrated. It is preferable that at least one pair is formed at an equal distance of 40 to 60 cm from the interface across the interface between the protruding portion and the remaining portion in the pile hole.
環状ガイドプレートと補強リングとが一体化してなるものは、アンカー鉄筋の位置決めがしっかりできるとともに、配筋構造を補強する面でも効果が大きい。したがって、上記範囲の位置にあれば、端部の端板による補強と相まって、杭頭部が耐久性のある配筋構造となるので、はつり出し工事やフーチングとの結合工事が確実に行える。 A structure in which the annular guide plate and the reinforcing ring are integrated is capable of firmly positioning the anchor reinforcing bars and has a great effect in terms of reinforcing the bar arrangement structure. Therefore, if it exists in the position of the said range, since the pile head becomes a durable reinforcement arrangement | positioning structure combined with the reinforcement by the end plate of an edge part, it can carry out the construction work with a lifting work or a footing reliably.
本願の請求項5に係る発明は、「請求項1〜4のいずれか一項に記載のSC杭の製造方法であって、前記アンカー鉄筋が、前記端板により支持され、かつ前記環状ガイドプレートと前記補強リングにより固定されてなるアンカー鉄筋組立体を予め組み立てておき、その後、前記組立体を上記SC杭の外殻鋼管内に前記端板のある杭頭部の反対側から挿入してアンカー鉄筋を外殻鋼管内に配筋する製造方法であり、前記アンカー鉄筋組立体は、複数のアンカー鉄筋を前記端板に立設した環状フラットバーの立設面に杭軸方向に環状に配して溶接するとともに該アンカー鉄筋を所定の位置に設けられた前記環状ガイドプレートに挿通して籠状にするか、前記端板の杭体内側に環状に設けられた複数の支持パイプに挿し込むとともに該アンカー鉄筋を所定の位置に設けられた前記環状ガイドプレートに挿通して籠状にするかして支持し、前記補強リングを所定の位置で前記籠状のアンカー鉄筋の外周に巻きつけて該アンカー鉄筋を拘束固定し、前記外周に巻きつけた補強リングにスペーサを取り付けて組み立てられることを特徴とするSC杭の製造方法」である。
The invention according to
このように、端板、アンカー鉄筋、環状ガイドプレート、補強リング等からなるアンカー鉄筋組立体を予めSC杭を遠心成形する場所とは別の場所で組立てておき、これを後で外殻鋼管内にフォークリフトやクレーンを用いて押し込んで設置するようにすれば、鋼管内での組み立て作業がなくなるのでSC杭の製造が簡略化できるとともに、組立作業員が外殻鋼管内に入れない外径の小さいSC杭への対応も可能となる。 In this way, an anchor rebar assembly consisting of an end plate, anchor rebar, annular guide plate, reinforcing ring, etc. is assembled in advance at a place different from the place where the SC pile is centrifugally formed, and this is later assembled in the outer shell steel pipe. If a forklift or a crane is used to install it, the assembly work in the steel pipe is eliminated, so that the manufacture of the SC pile can be simplified and the assembly worker cannot enter the outer shell steel pipe. It is also possible to handle SC piles.
また、本願発明では、前記アンカー鉄筋組立体は、複数のアンカー鉄筋を前記端板に立設した環状フラットバーの立設面に杭軸方向に環状に配して溶接するとともに該アンカー鉄筋を所定の位置に設けられた前記環状ガイドプレートに挿通して籠状にするか、前記端板の杭体内側に環状に設けられた複数の支持パイプに挿し込むとともに該アンカー鉄筋を所定の位置に設けられた前記環状ガイドプレートに挿通して籠状にするかして支持し、前記補強リングを所定の位置で前記籠状のアンカー鉄筋の外周に巻きつけて該アンカー鉄筋を拘束固定し、前記外周に巻きつけた補強リングにスペーサを取り付けて組み立てられる。 Further, the with the present gun onset bright, before Symbol anchor rebar assembly is welded by disposing annularly Kuijiku direction a plurality of anchor rebar stand設面annular flat bar which is erected on the end plate An anchor rebar is inserted into the annular guide plate provided at a predetermined position to form a hook shape, or is inserted into a plurality of support pipes provided in an annular shape inside the pile body of the end plate and the anchor rebar is specified. It is inserted into the annular guide plate provided at the position of and is supported in the form of a hook, and the reinforcing ring is wound around the outer periphery of the hook-shaped anchor reinforcing bar at a predetermined position to restrain and fix the anchor reinforcing bar. and, Ru assembled by attaching a spacer to the wound reinforcement ring on the outer periphery.
ここでは、アンカー鉄筋の端板への取り付け方を溶接による方法か支持パイプによる方法かに限定している。SC杭の除去部が20cm以下と短い場合は、後者の方が簡便であるのでこの方法を用いるのが好ましい。 Here, the method of attaching the anchor reinforcing bar to the end plate is limited to a method using welding or a method using a support pipe. If the SC pile removal part is as short as 20 cm or less, the latter is simpler and it is preferable to use this method.
本願の請求項6に係る発明は、「前記アンカー鉄筋組立体は、前記環状ガイドプレートに接する位置で、前記環状ガイドプレートと一部の補強リングとで挿通穴を形成するようにして該アンカー鉄筋を拘束固定するとともに、前記挿通穴を形成するのに用いられる前記補強リングを前記環状ガイドプレートと結合して一体化し組み立てられることを特徴とする請求項5に記載のSC杭の製造方法」である。
複数アンカー鉄筋は、端板と環状ガイドプレートにより、杭軸方向に略平行に籠状(環状)に配される。環状ガイドプレートに予めアンカー鉄筋を挿通するための挿通穴が設けられている場合は上記請求項6に係る発明の工程は必ずしも必要ないが、アンカー鉄筋を挿通するための挿通溝が外周又は内周にそって設けられている場合は、補強リングと組み合わせて挿通穴を形成することが好ましい。
The invention according to
The plurality of anchor reinforcing bars are arranged in a bowl shape (annular) substantially in parallel with the pile axis direction by the end plate and the annular guide plate. When the annular guide plate is previously provided with an insertion hole for inserting the anchor reinforcing bar, the process according to the sixth aspect is not necessarily required, but the insertion groove for inserting the anchor reinforcing bar has an outer periphery or an inner periphery. Therefore, it is preferable to form the insertion hole in combination with the reinforcing ring.
補強リングは、外周に挿通溝が形成されている場合は外リングが、内周に挿通溝が形成されている場合は内リングが用いられる。また、いずれの形状の環状ガイドプレートであっても、溶接等で補強リングと一体化して用いることは強度面とアンカー鉄筋の固定強化の面から好ましい。補強鉄筋は単独でも用いられ、前記籠状のアンカー鉄筋の内周に設置するか外周に巻きつけるかして該アンカー鉄筋を拘束固定する。 As for the reinforcing ring, an outer ring is used when an insertion groove is formed on the outer periphery, and an inner ring is used when an insertion groove is formed on the inner periphery. Moreover, it is preferable to use the annular guide plate of any shape by integrating it with the reinforcing ring by welding or the like from the viewpoint of strength and anchor reinforcement. Reinforcing bars are also used alone, and are anchored to the anchor reinforcing bars by being installed on the inner periphery of the hook-shaped anchor reinforcing bars or wound around the outer periphery.
アンカー鉄筋の固定が完了後、補強鉄筋のうちの外リングにスペーサが取り付けられる。スペーサの材質、形状、取り付け方等は特に限定されない。以上のようにして組立てられたアンカー鉄筋組立体は、遠心成形を行うまでこのまま保管されるか、外殻鋼管内に挿入されて保管される。 After fixing the anchor reinforcing bars, spacers are attached to the outer ring of the reinforcing bars. The material, shape, and mounting method of the spacer are not particularly limited. The anchor rebar assembly assembled as described above is stored as it is until it is centrifuged, or inserted into the outer shell steel pipe and stored.
前述の通り、SC杭の除去部が20cm以下と短い場合は、アンカー鉄筋の端板での支持は支持パイプによるのが好ましく、その場合は、端板の杭体内側にアンカー鉄筋を支持するための支持パイプが複数設けられている本発明の端板が用いられる。As described above, when the removed portion of the SC pile is as short as 20 cm or less, it is preferable to support the anchor reinforcing bar with the end plate, and in that case, to support the anchor reinforcing bar inside the pile body of the end plate. The end plate of the present invention provided with a plurality of supporting pipes is used.
特許文献2に示されるように、アンカー鉄筋を端板に取り付けたSC杭は知られているが、従来は溶接か固定部材(ネジ、ボルト等)で取り付けられていた。本発明の支持パイプが設けられた端板を用いれば、アンカー鉄筋を端板に取り付ける手間が簡略化できる。
As shown in
支持パイプは杭本体内側にアンカー鉄筋の配筋構造に合わせて設けられる。支持パイプの材質は特に限定されないが、端板への取り付けが容易となるものが好ましい。 The support pipe is provided on the inner side of the pile body in accordance with the bar arrangement structure of the anchor reinforcing bar. The material of the support pipe is not particularly limited, but a material that facilitates attachment to the end plate is preferable.
支持パイプの寸法も特に限定されない。長さが短すぎるとしっかり支持できなくなる。長すぎるとアンカー鉄筋を挿入し難くムダが増える。内径は、アンカー鉄筋が容易に挿入でき挿入後に径方向に大きくズレない程度の径が好ましい。支持力を強化するには、支持パイプとアンカー鉄筋との隙間を充填材等で充填固定すればよい。本発明のこの端板は、フーチングとの接合工事において、アンカー鉄筋から取り外され回収される。 The dimensions of the support pipe are not particularly limited. If the length is too short, it cannot be supported firmly. If it is too long, it will be difficult to insert the anchor rebar and waste will increase. The inner diameter is preferably such that the anchor rebar can be easily inserted and does not deviate greatly in the radial direction after insertion. In order to strengthen the support force, the gap between the support pipe and the anchor reinforcing bar may be filled and fixed with a filler or the like. This end plate of the present invention is removed from the anchor reinforcing bar and collected in the joining work with the footing.
本発明のSC杭は、籠状(環状)に配されたアンカー鉄筋が端板により杭頭端部で支持され環状ガイドプレートと補強リングにより固定されているとともに、アンカー鉄筋への溶接が低減されてなる強固な配筋構造のアンカー鉄筋組立体を、杭頭部に有している。したがって、本発明のSC杭を用いれば、構造物等の基礎工事が簡便かつ確実にでき、しっかりとした建造物等の基礎部を構築できる。 In the SC pile of the present invention, anchor rebars arranged in a bowl shape (annular) are supported at the pile head end by end plates and fixed by an annular guide plate and a reinforcing ring, and welding to the anchor rebars is reduced. An anchor reinforcing bar assembly having a strong reinforcing bar structure is provided on the pile head. Therefore, if the SC pile of the present invention is used, the foundation work such as a structure can be easily and reliably performed, and a solid foundation such as a building can be constructed.
また、本発明のSC杭の製造方法は、上記アンカー鉄筋組立体を遠心成形する場所とは別の場所で組立てておく方法なので、SC杭の製造が簡便にでき小径のSC杭へも対応できるとともに、複雑な配筋構造にも対応できる。 In addition, since the SC pile manufacturing method of the present invention is a method of assembling the anchor rebar assembly at a place different from the place where centrifugal molding is performed, the SC pile can be easily manufactured and can be applied to a small-diameter SC pile. At the same time, it can handle complex reinforcement structures.
以下、本発明の具体的な実施の形態について説明する。なお、以下に記載されるものは、本発明のほんの一例であり、本発明がこれに限定されるものではない。 Hereinafter, specific embodiments of the present invention will be described. In addition, what is described below is only an example of this invention, and this invention is not limited to this.
A.SC杭
図1は、本発明のSC杭における遠心成形によりコンクリートを打設する前の配筋構造体1(以下、単に配筋構造体1という)を示し、(a)はその正面図、(b)は杭頭部側の側面図、(c)は外リング(補強リング)を配した箇所での側面図、(d)は環状ガイドプレートと外リング(補強リング)とを一体化してなるものを配した箇所での側面図である。
A. SC Pile FIG. 1 shows a reinforcing bar structure 1 (hereinafter simply referred to as a reinforcing bar structure 1) before placing concrete by centrifugal molding in the SC pile of the present invention, (a) is a front view thereof, ( b) is a side view of the pile head side, (c) is a side view at a place where an outer ring (reinforcing ring) is arranged, and (d) is an integrated ring guide plate and outer ring (reinforcing ring). It is a side view in the place which arranged things.
配筋構造体1は、本発明のアンカー鉄筋組立体10を外殻鋼管2内に杭頭部の端板3(以下、単に端板3という)のある方と反対側から矢印の方向に挿入して構築されるものである。この配筋構造体1を型枠に設置し、内部に膨張コンクリート12を遠心成形しながら打設してSC杭が製造される。
The reinforcing
配筋構造体1は、外殻鋼管2とアンカー鉄筋組立体10からなり、アンカー鉄筋組立体10は杭頭端部に端板3を有し、この他、アンカー鉄筋4、環状フラットバー5、外リング(補強リング)6、スペーサ8、環状ガイドプレート7、内リング(補強リング)9からなる。外殻鋼管2とスペーサ8との間に隙間があれば、外殻鋼管2内にアンカー鉄筋組立体10を設置後、固定を補強するための楔11が適宜配される。
The reinforcing
Xは、はつり出し部と残存部との境界であり、Xより端板3側のアンカー鉄筋4がはつり出し工事により露出され、フーチングとの結合に用いられる。
杭頭端部には端板3があり複数のアンカー鉄筋4が杭軸方向に平行に環状に支持される。
X is a boundary between the protruding portion and the remaining portion, and the
There is an
ここでは、端板3に環状フラットバー5を立設し、それにアンカー鉄筋4を溶接により取り付けている。拡大したものを図2(a)に示す。
Here, an annular
通常、このような端板3が用いられるが、例えば除去部が20cm以下と短く露出筋の構造に変形が生じ難い場合には、図2(b)に示すような杭体内側に支持パイプ13を複数立設した端板3を用いることができる。この端板3を用いればアンカー鉄筋4を支持パイプ13に挿入するだけで支持できるので、アンカー鉄筋4を溶接する手間が省けるとともにアンカー鉄筋4の溶接による劣化を防止できる。
Usually, such an
支持パイプ13は鉄製で溶接により端板3に取り付けられている。支持パイプ13の長さは特に限定されないが、通常10〜20cm程度である。支持パイプの内径もアンカー鉄筋4がスムーズに挿入できれば特に限定されないが、例えば、異形鉄筋の呼び名+6mm程度であり、D29の場合は内径は35mm程度である。
The
アンカー鉄筋4を支持パイプ13に挿入後、隙間に細砂等の充填材を充填してアンカー鉄筋4を抜け難くなるようにしてもよい。アンカー鉄筋4はSC杭本体のコンクリート内に埋設され、はつり出し部においては、はつり出し工事により露出されてフーチングとの結合に用いられる定着筋の役目を果たすものである。
After the
通常、D16〜D39の異形鉄筋が使われ、等間隔に籠状(環状)に配される。ここでは26本のアンカー鉄筋4が配されている。
Usually, deformed reinforcing bars D16 to D39 are used and arranged in a bowl shape (annular) at equal intervals. Here, 26
本発明では、アンカー鉄筋4の配筋(位置決め)及び固定を容易にするために、図1に示すように、複数の環状ガイドプレート7が用いられる。環状ガイドプレート7の外径は大きな隙間を残さずスムーズに外殻鋼管内に収めることができる程度の寸法である。
In the present invention, a plurality of
形状は特に限定されず、公知のものが使用できる。例えば、特開2002−227188号公報、特開2003−13550号公報に開示されているものである。これらに示されるように、環状ガイドプレート7にはアンカー鉄筋4を挿通するための挿通溝又は挿通穴が設けられ、これらにアンカー鉄筋7を挿通することにより、前記端板3と環状ガイドプレート7とでアンカー鉄筋4が係止(固定)される。環状ガイドプレート7は単独で用いてもよいが、図1に示すように、また後述するように、補強リングと組合せて用いることが好ましい。
A shape is not specifically limited, A well-known thing can be used. For example, it is disclosed in Japanese Patent Application Laid-Open Nos. 2002-227188 and 2003-13550. As shown in these figures, the
また、本発明では、上記端板3と環状ガイドプレート7により係止(固定)される籠状のアンカー鉄筋4の固定を補強するために、補強リングが所定の間隔で配される。補強リングには外リング6と内リング9があり、状況に応じて適宜使い分けられる。形状は、大別してプレート状のもの(フラットバー)と棒状のものがあり、形状も状況に応じて適宜使い分けられる。
Further, in the present invention, reinforcing rings are arranged at a predetermined interval in order to reinforce fixing of the hook-shaped
図1の例では、外径89cmの棒状の外リング6が端板3と環状ガイドプレート7との間もしくは環状ガイドプレート7同士の間に間隔がほぼ等間隔になるようにして設けられている。設置位置や数は、籠状のアンカー鉄筋4をしっかり拘束固定できれば、特に限定されない。
In the example of FIG. 1, a rod-shaped
また、図1の例では、棒状の内リング9を環状ガイドプレート7の内周に沿って設けられた挿通溝14とで挿通穴15を形成するようにして環状ガイドプレート7に溶接固定し、環状ガイドプレート7と一体化して用いている。
In the example of FIG. 1, the rod-shaped
なお、図1と図2に示される前述の環状フラットバー5も内リングの一種である。上記補強リングは一つのものを籠状アンカー鉄筋の周方向に巻きつけ端部同士を溶接等により固定してもよいが、周方向に複数に分割した分割部材を用いてもよい。分割したものを用いれば作業がし易くなる。
The above-described annular
図3は、図1における環状ガイドプレート7と内リング9を一体化してなるものを拡大した図である。(a)はアンカー鉄筋4を挿通した状態での正面図、(b)は図3(a)のZにおける部分拡大図である。
FIG. 3 is an enlarged view of the
環状ガイドプレート7は特開2003−13550に開示されるものと同様のものであり、内周側に複数の挿通溝14が環状に設けられている。アンカー鉄筋4は各挿通溝14に挿通され、その内側に棒状の内リング9が環状ガイドプレート7に接し各挿通溝14が挿通穴15を形成しアンカー鉄筋4を挟むようにして設けられている。
The
環状ガイドプレート7と内リング9とは、溶接16により一体化している。このような構造にすることにより、アンカー鉄筋4がしっかり固定されるので搬送時や製造時での位置ズレが防止できるとともに、強固な構造のアンカー鉄筋組立体10が得られるので、フーチング形成工事がやり易くなる。
The
前述の通り、環状ガイドプレート7は上記例に限らず種々の形態のものが使用できる。
例えば、特開2002−227188の図8に開示されるような外周に挿通溝のある環状ガイドプレートを用いる場合は、外リングを用いて上記と同様に一体化して用いればよい。
As described above, the
For example, when using an annular guide plate having an insertion groove on the outer periphery as disclosed in FIG. 8 of JP-A-2002-227188, the outer ring may be used in the same manner as described above.
また、特開2002−227188号公報の図1に開示されるような最初から挿通穴が形成されている環状ガイドプレートを用いる場合は、必ずしも補強リングと一体化して用いる必要はない。 Moreover, when using the annular guide plate in which the insertion hole is formed from the beginning as disclosed by FIG. 1 of Unexamined-Japanese-Patent No. 2002-227188, it does not necessarily need to be integrated with a reinforcement ring.
図4は環状ガイドプレートの他の例である。(a)はその斜視図、(b)はその平面図である。この例ではフラットバー状の内リング9が環状ガイドプレート7の一部を構成し、該内リング9とUボルト17とで環状ガイドプレート7をなしている。アンカー鉄筋4は、前記内リング9とUボルト17とで形成される挿通穴15に挿通しUボルトにより固定される。
FIG. 4 shows another example of the annular guide plate. (A) is the perspective view, (b) is the top view. In this example, a flat bar-shaped
Uボルトは、特開平11−343739号公報、特開2002−106113号公報、特開2003−129664号公報、特開2003−171929号公報など様々な形態のものが使用できる。
この例のように、本発明で言う環状ガイドプレートが補強リングを兼ねたものであってもよい。
Various types of U-bolts can be used, such as JP-A-11-343739, JP-A-2002-106113, JP-A-2003-129664, and JP-A-2003-171929.
As in this example, the annular guide plate referred to in the present invention may also serve as a reinforcing ring.
上記外リング6、内リング9、環状ガイドプレート7はいずれもアンカー鉄筋4に対しては無溶接である。必要に応じて、公知の取り付け金具やバンセンを用いてもよいが、手間がかかったり、コスト高となるので、なるべく用いない方がよい。アンカー鉄筋4に溶接が施されないことによってアンカー鉄筋の劣化を防げるので、強固な配筋構造のSC杭が得られる。
The
本発明では、アンカー鉄筋組立体10が外殻鋼管2に挿入され易く、かつ挿入後にはこれらの隙間が少なくなってできるだけ内接するように、アンカー鉄筋組立体10の最外側の適当な箇所にスペーサ8を設けるのが好ましい。図1の例では、外リング6と環状ガイドプレート7に取り付けられている。
In the present invention, a spacer is provided at a suitable location on the outermost side of the
スペーサ8の形状、寸法、取付け位置、個数等は、上記目的が達成できれば特に限定されない。図5にスペーサの一例を示す。(a)はスペーサの平面図、(b)はスペーサの側面図、(c)と(d)はスペーサの外リングへの取り付け図である。ここに示すスペーサ8は厚さ4.5mmの鉄片を若干山形に湾曲させてなるものであり、山部を外側にして外リング6に溶接されている。
The shape, dimensions, mounting position, number, and the like of the
図1に示す上記配筋構造のアンカー鉄筋組立体10は予め組立てられ、その後、フォークリフトやクレーンなどにより外殻鋼管2内に挿入されて配筋構造体1となるが、その際、図1に示すように固定の最終調整のための楔11が設置される。
1 is assembled in advance, and then inserted into the outer
なお、外殻鋼管の材質は、JIS G 3444に規定されるSTK400、STK490、JIS A 5525に規定されるSKK400、SKK490等が一般的である。配筋構造体1に膨張コンクリートを打設して本発明のSC杭となるが、例えば、該コンクリートは設計基準強度80N/mm2以上の高強度コンクリートである。
The material of the outer shell steel pipe is generally STK400, STK490 specified in JIS G 3444, SKK400, SKK490 specified in JIS A 5525, or the like. Expanded concrete is placed on the
B.SC杭の製造方法
本発明のSC杭の製造方法例を次に示す。
B. SC pile manufacturing method An example of the SC pile manufacturing method of the present invention is shown below.
1.アンカー鉄筋組立体の組立て
アンカー鉄筋組立体の製作場所で以下の作業を行う。
1. Assembling the anchor rebar assembly The following work is performed at the place where the anchor rebar assembly is manufactured.
(1) 図2(a)に示す環状フラットバーを立設した端板、もしくは、図2(b)に示す支持パイプを立設した端板を用意する。これらの立設は溶接により行う。 (1) Prepare an end plate provided with an annular flat bar as shown in FIG. 2 (a) or an end plate provided with a support pipe as shown in FIG. 2 (b). These are set up by welding.
(2) 複数の環状ガイドプレート、必要に応じて内リングを所定の間隔で配置し、上記端板にアンカー鉄筋を取り付けてアンカー鉄筋を組立てる。前者の端板を用いた場合は環状フラットバーへの溶接により、後者の端板を用いた場合は支持パイプに挿入することによりアンカー鉄筋を取り付ける。 (2) A plurality of annular guide plates and inner rings as necessary are arranged at predetermined intervals, and anchor reinforcing bars are attached to the end plates to assemble the anchor reinforcing bars. When the former end plate is used, the anchor rebar is attached by welding to the annular flat bar, and when the latter end plate is used, it is inserted into the support pipe.
(3) 外周又は内周に挿通溝のある環状ガイドプレートを用いた場合は、環状ガイドプレートに接して挿通穴を形成する形で外リング又は内リングを配し、溶接により環状ガイドプレートと外リング、もしくは、環状ガイドプレートと内リングを一体化するとともにアンカー鉄筋を固定する。 (3) When an annular guide plate with an insertion groove on the outer periphery or inner periphery is used, an outer ring or an inner ring is placed in contact with the annular guide plate to form an insertion hole, and the annular guide plate and the outer ring are welded. The ring or the annular guide plate and the inner ring are integrated and the anchor reinforcing bar is fixed.
(4) 外リングを所定の位置に配し、アンカー鉄筋の固定を補強する。
(3)、(4)に示す外リング、内リングはリング状のもの、円周方向に分割された分割部材からなるもののいずれを用いてもよい。これらは端部同士が溶接され一体化される。
(4) Place the outer ring in place and reinforce the anchor reinforcement.
The outer ring and the inner ring shown in (3) and (4) may be either ring-shaped or made of divided members divided in the circumferential direction. These end portions are welded and integrated.
(5) 外リング、必要に応じて環状ガイドプレートにスペーサを取り付け、アンカー鉄筋組立体の組立てを完了する。 (5) Attach the spacer to the outer ring and, if necessary, the annular guide plate, and complete the assembly of the anchor rebar assembly.
(6) 組立てたアンカー鉄筋組立体は、SC杭を製造する時点まで、保管場所で保管される。 (6) The assembled anchor rebar assembly is stored at the storage location until the SC pile is manufactured.
2.配筋構造体の構築
配筋構造体の構築場所で以下の作業を行う。
2. Construction of reinforcement structure The following work is done at the construction place of reinforcement structure.
(1) 上記のようにして予め組立てておいたアンカー鉄筋組立体を、フォークリフトやクレーンを用いて外殻鋼管内に挿入する。 (1) The anchor rebar assembly assembled in advance as described above is inserted into the outer shell steel pipe using a forklift or a crane.
(2) 外殻鋼管と端板を溶接し固定する。 (2) Weld and fix the outer shell pipe and end plate.
(3) 挿入したアンカー鉄筋組立体が、外殻鋼管内で変形したり位置のズレを生じたりしないように、外リング、環状ガイドプレートの適当な箇所に、楔を打って溶接固定し、配筋構造体の構築を完了する。 (3) In order to prevent the inserted anchor rebar assembly from being deformed or misaligned in the outer shell steel pipe, it is fixed by welding by placing wedges at appropriate locations on the outer ring and the annular guide plate. Complete the construction of the muscle structure.
(4)構築した配筋構造体をSC杭の遠心成形場所に移動する。 (4) Move the constructed reinforcement structure to the centrifugal forming location of the SC pile.
3.コンクリートの打設
SC杭の遠心成形場所で以下の作業を行う。
3. Concrete placement The following work is performed at the centrifugal forming site of the SC pile.
(1) 上記配筋構造体を遠心成形用型枠内に設置する。
(2) 従来のSC杭の製造方法により、所定配合のコンクリートを遠心成形用型枠内に投入し、遠心成形をする。
(1) Place the above bar arrangement structure in a centrifugal mold.
(2) Using a conventional SC pile manufacturing method, concrete of a predetermined composition is put into a centrifugal mold and centrifugally formed.
4.養生
SC杭の養生場所で従来の養生方法により以下の作業を行う。
(1) 上記遠心成形したSC杭を蒸気養生する。
(2) SC杭の置き場で7日間自然養生(気中養生)する。
なお、養生の方法は、これに限らず、オートクレーブ養生等でもよい。
4). Curing The following work is carried out by the conventional curing method at the curing site of SC pile.
(1) Steam cure the above-mentioned centrifugally-formed SC pile.
(2) Carry out natural curing (in-air curing) for 7 days at the SC pile yard.
The curing method is not limited to this, and autoclave curing may be used.
上記製造方法により得られた上記SC杭は、基礎杭とフーチングとの接合工事における上杭として用いられる。所定のはつり出し部で外殻鋼管が切除され、コンクリートがはつり出され、アンカー鉄筋組立体の一部が露出される。その後、端板、環状ガイドプレート、外リング、内リング等をはずし、フーチングと接合する部分のアンカー鉄筋を得る。 The said SC pile obtained by the said manufacturing method is used as an upper pile in the joining construction of a foundation pile and a footing. The outer shell steel pipe is cut at a predetermined protruding portion, the concrete is extracted, and a part of the anchor rebar assembly is exposed. Thereafter, the end plate, the annular guide plate, the outer ring, the inner ring, and the like are removed, and the anchor rebar of the portion to be joined to the footing is obtained.
本発明に係るSC杭は、建物等の構造物を構築する際の基礎工事において、フーチングとの結合に用いられる上杭として好適である。また、本発明に係るSC杭の製造方法によれば本発明のSC杭が簡便に製造できるが、SC杭に限らず、杭体内に鉄筋を配する各種杭の製造も可能である。また、支持パイプを有する本発明に係る端板は、アンカー鉄筋を配したSC杭はもちろん、主筋(縦筋)を配した各種杭にも利用できる。 The SC pile according to the present invention is suitable as an upper pile used for coupling with a footing in foundation work when a structure such as a building is constructed. Moreover, according to the manufacturing method of the SC pile concerning this invention, although the SC pile of this invention can be manufactured simply, the manufacture of the various pile which distributes a reinforcing bar not only in an SC pile but in a pile body is also possible. Moreover, the end plate which concerns on this invention which has a support pipe can be utilized not only for the SC pile which arranged the anchor reinforcement, but also for the various piles which arranged the main reinforcement (longitudinal).
1…配筋構造体、2…外殻鋼管、3…杭頭部の端板、4…アンカー鉄筋、5…環状フラットバー、6…外リング(補強リング)、7…環状ガイドプレート、8…スペーサ、9…内リング(補強リング)、10…アンカー鉄筋組立体、11…楔、12…膨張コンクリート、13…支持パイプ、14…挿通溝、15…挿通穴、16…溶接、17…Uボルト
X…はつり出し部と残存部との境界
DESCRIPTION OF
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2009297304A JP5616625B2 (en) | 2009-12-28 | 2009-12-28 | SC pile and its manufacturing method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2009297304A JP5616625B2 (en) | 2009-12-28 | 2009-12-28 | SC pile and its manufacturing method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2011137320A JP2011137320A (en) | 2011-07-14 |
| JP5616625B2 true JP5616625B2 (en) | 2014-10-29 |
Family
ID=44348984
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2009297304A Active JP5616625B2 (en) | 2009-12-28 | 2009-12-28 | SC pile and its manufacturing method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP5616625B2 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US9857351B2 (en) | 2015-11-09 | 2018-01-02 | University Of Dammam | Concrete reinforcement assembly, method of installation, and method to determine cyclic load response |
Families Citing this family (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104759771A (en) * | 2015-03-31 | 2015-07-08 | 北京首航艾启威节能技术股份有限公司 | Porous welding reinforcement piece |
| CN107030450A (en) * | 2016-12-14 | 2017-08-11 | 中国二十冶集团有限公司 | A kind of flange form that carries is by the preparation method of the steel reinforcement cage of strong stirrup |
| JP6849523B2 (en) * | 2017-05-09 | 2021-03-24 | 日本コンクリート工業株式会社 | Outer shell steel pipe concrete pile and its manufacturing method |
| JP7556827B2 (en) | 2021-06-22 | 2024-09-26 | 岡部株式会社 | Pile head construction method |
| CN115162359A (en) * | 2022-08-15 | 2022-10-11 | 河南董氏管道有限公司 | Lightweight squirrel cage steel tube support structure |
| CN118375122B (en) * | 2024-06-25 | 2024-08-20 | 济南市交通工程质量与安全中心 | Concrete anti-pulling pipe pile |
Family Cites Families (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS5633688Y2 (en) * | 1975-11-28 | 1981-08-10 | ||
| JPS5542906A (en) * | 1978-09-18 | 1980-03-26 | Takechi Koumushiyo:Kk | Concrete pile for constructing footing and production method thereof |
| JPS58160432A (en) * | 1983-02-02 | 1983-09-22 | Asahi Chem Ind Co Ltd | Steel tube-concrete composite pile |
| JPS616529U (en) * | 1984-06-14 | 1986-01-16 | 児玉コンクリ−ト工業株式会社 | concrete pile |
| JPS616533U (en) * | 1984-06-18 | 1986-01-16 | 児玉コンクリ−ト工業株式会社 | concrete pile |
| JPH06146273A (en) * | 1992-11-09 | 1994-05-27 | Asahi Chem Ind Co Ltd | Prc pile and combined member of its frame body |
| JPH1076370A (en) * | 1996-09-03 | 1998-03-24 | High Frequency Heattreat Co Ltd | Manufacture of high strength pc pile |
| JP2002013140A (en) * | 2000-06-30 | 2002-01-18 | Nittoc Constr Co Ltd | Cage for pier formation and construction method of assembling cage |
| JP2002227188A (en) * | 2001-01-31 | 2002-08-14 | Yoriko Masuda | Ring assembly for reinforced cage and reinforced cage assembling method as well as reinforced cage connecting method |
| JP2003013550A (en) * | 2001-06-27 | 2003-01-15 | Yoriko Masuda | Assembling hoop for cage |
| JP2003171929A (en) * | 2001-12-05 | 2003-06-20 | Kyoto Supeesaa:Kk | Metal fitting for fixing main reinforcement of pile and band steel |
| JP5142200B2 (en) * | 2008-01-10 | 2013-02-13 | 岡部株式会社 | SC pile jointer and joint structure |
-
2009
- 2009-12-28 JP JP2009297304A patent/JP5616625B2/en active Active
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US9857351B2 (en) | 2015-11-09 | 2018-01-02 | University Of Dammam | Concrete reinforcement assembly, method of installation, and method to determine cyclic load response |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2011137320A (en) | 2011-07-14 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP5616625B2 (en) | SC pile and its manufacturing method | |
| JP4957894B2 (en) | Reinforcement method for power transmission towers | |
| JP2010090607A (en) | Method for constructing tunnel and structure of the tunnel | |
| JP5329364B2 (en) | Precast steel pipe concrete composite pile and its manufacturing method | |
| JP7304248B2 (en) | Pile head connection structure and construction method of pile head connection structure | |
| US11028551B2 (en) | Foundation for a tower of a wind-turbine | |
| JP6924682B2 (en) | Pile head seismic isolation structure and its construction method | |
| JP6924683B2 (en) | Pile head seismic isolation structure and its construction method | |
| JP2008231799A (en) | Seismic isolation structure | |
| JP4800899B2 (en) | Pile head joint structure and construction method | |
| KR20100125162A (en) | Prefab apparatus for reinforcing head of pile | |
| JP4185870B2 (en) | Pile head joint structure and pile construction method | |
| JP4835918B2 (en) | Pile-column connection structure and method | |
| JP4386804B2 (en) | Seismic reinforcement structure for existing steel towers | |
| JP5131645B2 (en) | Construction method of steel tower foundation | |
| JP3247071U (en) | Spacers and rebar cages | |
| JPH1018424A (en) | Root wrapping reinforcing structure of column base of steel post or the like | |
| JP2018131740A (en) | Hollow precast pile, joint cap, and pile head joint structure | |
| JP2018115514A (en) | Method for constructing pile bearing structure, and reinforcement member used in the pile bearing structure | |
| JP5008683B2 (en) | Pile head reinforcement member and pile head reinforcement structure using it | |
| JP6006004B2 (en) | Pile head space formation auxiliary tool, hollow ready-made pile provided with the same, pile head processing method using the hollow ready-made pile, and pile head space forming method | |
| JP5253316B2 (en) | Method for strengthening shear strength of ready-made concrete piles | |
| JP5077865B2 (en) | Ready-made pile and foundation pile structure | |
| JP4209314B2 (en) | Pile head joint structure and pile body construction method | |
| JP4024449B2 (en) | Seismic isolation method for existing buildings |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20120906 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20130628 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20130731 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20130913 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20140422 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20140430 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20140909 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20140912 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 5616625 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |