Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP5635458B2 - Suspension jig for shaft inner wall inspection device - Google Patents
[go: Go Back, main page]

JP5635458B2 - Suspension jig for shaft inner wall inspection device - Google Patents

Suspension jig for shaft inner wall inspection device Download PDF

Info

Publication number
JP5635458B2
JP5635458B2 JP2011148795A JP2011148795A JP5635458B2 JP 5635458 B2 JP5635458 B2 JP 5635458B2 JP 2011148795 A JP2011148795 A JP 2011148795A JP 2011148795 A JP2011148795 A JP 2011148795A JP 5635458 B2 JP5635458 B2 JP 5635458B2
Authority
JP
Japan
Prior art keywords
shaft
guide member
wall
canopy
jig
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2011148795A
Other languages
Japanese (ja)
Other versions
JP2013014950A (en
Inventor
昌弘 鶴谷
昌弘 鶴谷
理 小町
理 小町
剛男 原田
剛男 原田
吉田 幸司
幸司 吉田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Steel Metal Products Co Ltd
Japan Conservation Engineers Co Ltd
Original Assignee
Japan Conservation Engineers Co Ltd
Nippon Steel and Sumikin Metal Products Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Japan Conservation Engineers Co Ltd, Nippon Steel and Sumikin Metal Products Co Ltd filed Critical Japan Conservation Engineers Co Ltd
Priority to JP2011148795A priority Critical patent/JP5635458B2/en
Publication of JP2013014950A publication Critical patent/JP2013014950A/en
Application granted granted Critical
Publication of JP5635458B2 publication Critical patent/JP5635458B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Description

本発明は、立坑内壁調査装置の吊下治具に係り、特に集水井などの立坑の主として経年による変形状況や腐食状況等を調査するために用いる立坑内壁調査装置を立坑内に吊り下げるための吊下治具に関するものである。   The present invention relates to a hanging jig for a shaft inner wall investigation device, and in particular for suspending a shaft inner wall investigation device used for investigating a deformation state, corrosion state, etc. of a shaft such as a drainage well mainly due to aging. The present invention relates to a hanging jig.

地すべりが起こりやすい場所では、地下水を集めて川等に流すために、図1に示すような集水井500が設けられることがある。地すべりの起こりやすい斜面に、例えば直径が3〜4m、深さが20〜60mの立坑501が設けられる。この立坑501には集水のための複数本の集水管502が接続され、かつ、集めた水を川等に流すための1本の排水管503が接続される。図1の破線504はすべり面を示す。立坑501は、例えば図2に示すようなライナープレート510を周方向および鉛直方向に連結して構築される。   In a place where a landslide is likely to occur, a water collection well 500 as shown in FIG. 1 may be provided to collect groundwater and flow it to a river or the like. For example, a shaft 501 having a diameter of 3 to 4 m and a depth of 20 to 60 m is provided on a slope where a landslide is likely to occur. A plurality of water collecting pipes 502 for collecting water are connected to the shaft 501 and one drain pipe 503 for flowing the collected water to a river or the like. A broken line 504 in FIG. 1 indicates a slip surface. The shaft 501 is constructed by connecting a liner plate 510 as shown in FIG. 2 in the circumferential direction and the vertical direction, for example.

このライナープレート製の立坑あるいはその他の金属部材で構築した立坑においては、構築後年月を経過したものについて変形状況や腐食状況を調査することが必要となる場合がある。また、セグメントなどの鉄筋コンクリート造りの立坑でも、変形状況などを調査することが必要となる場合がある。   In a shaft constructed with this liner plate shaft or other metal member, it may be necessary to investigate the deformation and corrosion status of the shaft that has been built since the construction. In addition, it may be necessary to investigate the deformation status of reinforced concrete shafts such as segments.

この種の立坑の内部を調査する方法として、立坑内に調査装置を吊り下げ、この調査装置により内壁の状態を取得する方法がある。このような調査装置を立坑内に吊り下げる治具や装置として、例えば特許文献1〜5に開示されたものが知られている。   As a method for investigating the inside of this type of shaft, there is a method in which a survey device is suspended in the shaft and the state of the inner wall is acquired by this survey device. As a jig or apparatus for suspending such an investigation apparatus in a vertical shaft, for example, those disclosed in Patent Documents 1 to 5 are known.

実開平4−96011号公報Japanese Utility Model Publication No. 4-96011 特開2000−2531号公報JP 2000-2531 A 特開平10−300461号公報Japanese Patent Laid-Open No. 10-300461 実開平4−78507号公報Japanese Utility Model Publication No. 4-78507 特開2003−5093号公報JP 2003-5093 A

しかしながら、上記特許文献1〜5に開示された治具や装置は、立坑の上端部に設置されている天蓋を取り外してから立坑内に調査装置を吊り下げるものであり、使用に際しては天蓋を取り外す必要がある。一般的に、天蓋の重量は300kgを超えるものであり、天蓋を取り外したり再度設置したりするためには重機を使用する必要がある。   However, the jigs and devices disclosed in Patent Documents 1 to 5 are for suspending the investigation device in the shaft after removing the canopy installed at the upper end of the shaft and removing the canopy when in use. There is a need. Generally, the weight of the canopy exceeds 300 kg, and it is necessary to use a heavy machine in order to remove or re-install the canopy.

また、上記特許文献1〜5に開示された治具や装置を用いて立坑内に調査装置を吊り下げる場合には、吊下治具を安定的に設置するために吊下治具を支持する土台を吊下治具の長さに応じて大型化する必要が生じる。   Moreover, when hanging an investigation apparatus in a shaft using the jig | tool and apparatus disclosed by the said patent documents 1-5, in order to install a hanging jig stably, a hanging jig is supported. The base needs to be enlarged according to the length of the hanging jig.

このように、調査装置自体を小型化したとしても、天蓋や吊下治具を支持する土台の重量が大きくなるため、重機を用いなければ立坑の調査ができないという問題がある。重機を立坑が設置される場所まで搬入するためには、立坑までの搬入路を確保する必要があるが、立坑の設置される場所は山間部であることが多く、重機の搬入には多大な手間とコストがかかる。   As described above, even if the surveying apparatus itself is downsized, the base supporting the canopy and the hanging jig becomes heavy, so that there is a problem that the shaft cannot be surveyed unless a heavy machine is used. In order to carry heavy machinery to the place where the vertical shaft is installed, it is necessary to secure a delivery route to the vertical shaft, but the location where the vertical shaft is installed is often in a mountainous area, It takes time and money.

本発明は、このような従来技術の問題点に鑑みてなされたもので、軽量かつ安価な構成で、立坑に設置された天蓋を取り外すことなく、立坑内に調査装置を吊り下げることができる立坑内壁調査装置の吊下治具を提供することを目的とする。   The present invention has been made in view of such problems of the prior art, and is a shaft that can suspend an investigation device in a shaft without removing a canopy installed in the shaft with a lightweight and inexpensive configuration. An object of the present invention is to provide a hanging jig for an inner wall inspection device.

上記課題を解決する請求項1の発明は、立坑の内壁を調査する立坑内壁調査装置を立坑内に吊り下げる吊下治具であって、前記立坑の上端部の開口を覆う天蓋の外周部または前記立坑の上端部に取付可能な取付部と、前記取付部から延びる竿部と、一端が前記立坑内壁調査装置に接続される線条体を前記竿部の先端でガイドする第1のガイド部材とを備え、前記竿部は、前記取付部を前記天蓋の外周部または前記立坑の上端部に取り付けたときに前記天蓋に形成された昇降口を通って斜め下方に傾斜するように構成されていることを特徴とする立坑内壁調査装置の吊下治具である。   The invention of claim 1 that solves the above-mentioned problem is a hanging jig for suspending a shaft inner wall surveying device for surveying the inner wall of a shaft in the shaft, and the outer periphery of the canopy covering the opening at the upper end of the shaft or A first guide member that guides, at the tip of the eaves portion, an attachment portion that can be attached to the upper end portion of the shaft, a eaves portion extending from the attachment portion, and a linear body having one end connected to the shaft inner wall investigation device And the eaves portion is configured to be inclined obliquely downward through an elevator port formed in the canopy when the attachment portion is attached to an outer peripheral portion of the canopy or an upper end portion of the shaft. It is the hanging jig of the shaft inner wall investigation apparatus characterized by having.

請求項2は、請求項1に記載の立坑内壁調査装置の吊下治具において、前記取付部は、前記天蓋の外周部または前記立坑の上端部に係合可能な係合部を備えたことを特徴とする。   According to a second aspect of the present invention, in the hanging jig of the shaft inner wall investigation device according to the first aspect, the attachment portion includes an engaging portion that can be engaged with an outer peripheral portion of the canopy or an upper end portion of the shaft. It is characterized by.

請求項3は、請求項1または2に記載の立坑内壁調査装置の吊下治具において、前記竿部は、該竿部の長手方向で結合される複数の部材からなることを特徴とする。   According to a third aspect of the present invention, in the hanging jig of the shaft inner wall investigation device according to the first or second aspect, the brim portion includes a plurality of members coupled in the longitudinal direction of the brim portion.

請求項4は、請求項1から3のいずれか一項に記載の立坑内壁調査装置の吊下治具において、前記第1のガイド部材と前記取付部との間で前記線条体をガイドする第2のガイド部材をさらに備えたことを特徴とする。   According to a fourth aspect of the present invention, in the hanging jig of the shaft inner wall investigation device according to any one of the first to third aspects, the linear member is guided between the first guide member and the mounting portion. A second guide member is further provided.

請求項5は、請求項4に記載の立坑内壁調査装置の吊下治具において、前記第2のガイド部材は、前記第1のガイド部材と該第2のガイド部材との間の前記線条体の軸線と、該第2のガイド部材から前記線条体の他端までの軸線とをずらすように構成されていることを特徴とする。   According to a fifth aspect of the present invention, in the hanging jig of the shaft inner wall investigation device according to the fourth aspect, the second guide member is the linear line between the first guide member and the second guide member. The axis of the body and the axis from the second guide member to the other end of the linear member are configured to be shifted.

請求項6は、請求項4または5に記載の立坑内壁調査装置の吊下治具において、前記竿部は、前記第2のガイド部材が設けられた位置で折れ曲がっていることを特徴とする。   According to a sixth aspect of the present invention, in the hanging jig of the shaft inner wall investigation device according to the fourth or fifth aspect, the brim portion is bent at a position where the second guide member is provided.

請求項7は、請求項1から6のいずれか一項に記載の立坑内壁調査装置の吊下治具において、前記取付部は、水平方向に延び、前記天蓋の外周部の上面に接触するフランジを有することを特徴とする。   A seventh aspect of the present invention is the suspension jig for the shaft inner wall survey device according to any one of the first to sixth aspects, wherein the attachment portion extends in a horizontal direction and contacts a top surface of an outer peripheral portion of the canopy. It is characterized by having.

本発明によれば、天蓋の昇降口から吊下治具の竿部を立坑内に斜め下方に挿入し、吊下治具の取付部を天蓋の外周部または立坑の上端部に取り付けることができる。これにより、線条体を介して立坑内壁調査装置を立坑内で昇降させることができる。このように、本発明によれば、軽量かつ安価な構成で、立坑に設置された天蓋を取り外すことなく、立坑内に調査装置を吊り下げることができる。   According to the present invention, the hook portion of the suspension jig can be inserted obliquely downward into the vertical shaft from the elevator opening of the canopy, and the attachment portion of the suspension jig can be attached to the outer periphery of the canopy or the upper end portion of the vertical shaft. . Thereby, a shaft inner wall investigation apparatus can be raised / lowered in a shaft via a linear body. As described above, according to the present invention, the investigation device can be suspended in the shaft without removing the canopy installed in the shaft with a light and inexpensive configuration.

集水井の設置状況を説明するための図である。It is a figure for demonstrating the installation condition of a catchment well. 立坑に用いられるライナープレートを示す斜視図である。It is a perspective view which shows the liner plate used for a shaft. 本発明の一実施例に係る吊下治具を用いて立坑内壁調査装置を立坑内に吊り下げている状態を示す模式的断面図である。It is typical sectional drawing which shows the state which has suspended the shaft inner wall investigation apparatus in the shaft using the hanging jig which concerns on one Example of this invention. 立坑の上端部の開口を覆う天蓋を示す平面図である。It is a top view which shows the canopy which covers opening of the upper end part of a shaft. 図4のV−V線断面図である。It is the VV sectional view taken on the line of FIG. 図3の吊下治具を模式的に示す図である。It is a figure which shows typically the hanging jig | tool of FIG. 図3の吊下治具の第1部材を示す正面図である。It is a front view which shows the 1st member of the hanging jig | tool of FIG. 図7のVIII方向から見た図である。It is the figure seen from the VIII direction of FIG. 図3の吊下治具の第2部材を示す正面図である。It is a front view which shows the 2nd member of the hanging jig | tool of FIG. 図9のX方向から見た図である。It is the figure seen from the X direction of FIG. 図9のXI方向から見た図である。It is the figure seen from the XI direction of FIG. 図3の吊下治具の第3部材を示す正面図である。It is a front view which shows the 3rd member of the hanging jig | tool of FIG. 図12のXIII方向から見た図である。It is the figure seen from the XIII direction of FIG. 図12の側面図である。It is a side view of FIG. 図12の第3部材の第1のL型フランジに枠リングが挿入された状態を示す部分拡大図である。It is the elements on larger scale which show the state by which the frame ring was inserted in the 1st L-shaped flange of the 3rd member of FIG. 図14の第3部材の第2のL型フランジを用いて取付部を固定する例を示す図である。It is a figure which shows the example which fixes an attaching part using the 2nd L-shaped flange of the 3rd member of FIG. 本発明の他の実施例に係る吊下治具を模式的に示す図である。It is a figure which shows typically the hanging jig | tool which concerns on the other Example of this invention. 本発明のさらに他の実施例に係る吊下治具を模式的に示す図である。It is a figure which shows typically the hanging jig | tool which concerns on the further another Example of this invention. 本発明のさらに他の実施例に係る吊下治具に用いられるガイド部材を示す斜視図である。It is a perspective view which shows the guide member used for the hanging jig | tool which concerns on the further another Example of this invention. 本発明のさらに他の実施例に係る吊下治具に用いられるガイド部材を示す斜視図である。It is a perspective view which shows the guide member used for the hanging jig | tool which concerns on the further another Example of this invention.

以下、本発明に係る立坑内壁調査装置の吊下治具の実施例について、図1から図20を参照して説明する。なお、図1から図20において、同一または相当する構成要素には、同一の符号を付して重複した説明を省略する。   Hereinafter, an embodiment of a hanging jig of a shaft inner wall investigation device according to the present invention will be described with reference to FIGS. 1 to 20. 1 to 20, the same or corresponding components are denoted by the same reference numerals, and redundant description is omitted.

まず、本発明に係る吊下治具を用いて立坑内壁調査装置を吊り下げる立坑について説明する。図1は、立坑501を含む集水井500の設置状況を説明するための図である。図1に示すように、集水井500は、地すべりが起こりやすい場所で地下水を集めて川等に流して地すべりを抑制するために設けられる。この集水井500は、立坑501と、立坑501に接続された複数本の集水管502と、立坑501に接続された1本の排水管503とから構成される。   First, the shaft which suspends a shaft inner wall investigation apparatus using the suspension jig | tool which concerns on this invention is demonstrated. FIG. 1 is a diagram for explaining an installation situation of a water collection well 500 including a vertical shaft 501. As shown in FIG. 1, the water collection well 500 is provided to collect groundwater in a place where landslides are likely to occur and flow it to a river or the like to suppress the landslide. The drainage well 500 includes a shaft 501, a plurality of water collecting pipes 502 connected to the shaft 501, and a single drain pipe 503 connected to the shaft 501.

立坑501は、図2に示すような円弧状のライナープレート510を周方向および鉛直方向に連結して構築した円筒状の構築物である。立坑501のサイズは特に限定されないが、例えばその直径が3〜4m、深さが20〜60mである。   The shaft 501 is a cylindrical structure constructed by connecting arc-shaped liner plates 510 as shown in FIG. 2 in the circumferential direction and the vertical direction. Although the size of the shaft 501 is not specifically limited, For example, the diameter is 3-4 m and the depth is 20-60 m.

図2に示すように、ライナープレート510は、円弧状の波付け鋼板部510aの波付け方向の両端に鋼板を折り曲げて形成したフランジ510bを持ち、波付け方向と直交する方向の両端に、別部材の端面プレートを溶接固定したフランジ510cを持つ構造であり、表面には亜鉛メッキが施されている。   As shown in FIG. 2, the liner plate 510 has flanges 510b formed by bending steel plates at both ends in the corrugated direction of the arc-shaped corrugated steel plate portion 510a, and is separately provided at both ends in the direction orthogonal to the corrugated direction. It has a structure having a flange 510c in which an end plate of the member is fixed by welding, and the surface is galvanized.

複数のライナープレート510の円周方向(波付け方向と直交する方向)のフランジ510c同士をボルト接合してリングを形成するとともに、上下に隣接するライナープレート510のフランジ510b同士をボルト接合して、円筒状の立坑501を構築する。その施工は一般に、立坑の頂部(最初の1〜3リング分)を組み立てその周囲を裏込めしかつ固定した後、掘削、組立てを繰り返してライナープレートを下に継ぎ足していき、所望の深さの立坑501を構築する。   The flanges 510c in the circumferential direction (direction orthogonal to the corrugation direction) of the plurality of liner plates 510 are bolted together to form a ring, and the flanges 510b of the liner plates 510 adjacent to each other are bolted together, A cylindrical shaft 501 is constructed. In general, after assembling the top of the shaft (for the first 1 to 3 rings), backing and fixing the surrounding area, the drilling and assembly are repeated, and the liner plate is added to the bottom. A shaft 501 is constructed.

このようなライナープレートにより構築された立坑501においては、構築後例えば20〜30年などと年月を経過しているものは、変形状況や腐食状況等を調査することが必要となる場合がある。そのような場合に、本発明に係る吊下治具を用いて立坑内壁調査装置を立坑501内に吊り下げ、立坑501の内壁の調査を行う。   In the shaft 501 constructed by such a liner plate, it may be necessary to investigate the deformation state, the corrosion state, etc. of the shaft 501 that has been built for 20 to 30 years after construction, for example. . In such a case, the shaft inner wall investigation device is suspended in the shaft 501 using the suspension jig according to the present invention, and the inner wall of the shaft 501 is investigated.

図3は、本発明の第1の実施例に係る吊下治具10を用いて立坑内壁調査装置1を立坑501内に吊り下げている状態を示す模式的断面図である。図3に示すように、立坑内壁調査装置1は、立坑501の上端部の開口を覆う天蓋520の外周部に固定された吊下治具10を用いて立坑501内に吊り下げられている。立坑内壁調査装置1は、吊下治具10に設けられたウィンチ12から延びるワイヤロープ(線条体)14に接続されており、ウィンチ12の駆動により立坑501内を昇降するようになっている。なお、立坑501の内壁501aに沿って梯子505が螺旋状に設けられている。   FIG. 3 is a schematic cross-sectional view showing a state in which the shaft inner wall survey device 1 is suspended in the shaft 501 by using the suspension jig 10 according to the first embodiment of the present invention. As shown in FIG. 3, the shaft inner wall survey device 1 is suspended in the shaft 501 using a suspension jig 10 fixed to the outer periphery of a canopy 520 that covers the opening at the upper end of the shaft 501. The shaft inner wall inspection device 1 is connected to a wire rope (wire body) 14 extending from a winch 12 provided in the suspension jig 10, and moves up and down in the shaft 501 by driving the winch 12. . A ladder 505 is provided spirally along the inner wall 501a of the shaft 501.

図4は天蓋520の平面図、図5は図4のV−V線断面図である。天蓋520は、転落事故等を防止するために立坑501の上端部の開口を覆うために設置されるものであり、立坑501に対応した形状を有している。図4に示すように、本実施例における天蓋520は、外周部に設けられた環状の枠リング521と、枠リング521に取り付けられた複数の梁材522と、枠リング521および梁材522の上に取り付けられた略円板状のエキスパンドメタル523と、梁材522に開閉可能に取り付けられた扉524とを有している。図5に示すように、天蓋520は、立坑501のライナープレート510の上端に載置される。   4 is a plan view of the canopy 520, and FIG. 5 is a cross-sectional view taken along the line V-V in FIG. The canopy 520 is installed to cover the opening at the upper end of the shaft 501 in order to prevent a fall accident or the like, and has a shape corresponding to the shaft 501. As shown in FIG. 4, the canopy 520 in this embodiment includes an annular frame ring 521 provided on the outer peripheral portion, a plurality of beam members 522 attached to the frame ring 521, and the frame ring 521 and the beam members 522. It has a substantially disk-shaped expanded metal 523 attached on top and a door 524 attached to the beam member 522 so as to be openable and closable. As shown in FIG. 5, the canopy 520 is placed on the upper end of the liner plate 510 of the shaft 501.

天蓋520の扉524は把手524aにより開閉可能となっており、扉524を開くと作業員が立坑501の内部に入るときに使用される昇降口が形成されるようになっている。作業員はこの昇降口から梯子505を使って立坑501の内部に入っていくことができる。   The door 524 of the canopy 520 can be opened and closed by a handle 524a, and when the door 524 is opened, an elevator opening used when an operator enters the shaft 501 is formed. The worker can enter the shaft 501 from the lift using the ladder 505.

図6は、吊下治具10を模式的に示す図である。図6に示すように、吊下治具10は、ワイヤロープ14を巻き上げるウィンチ12と、天蓋520の外周部に取付可能な取付部16と、取付部16から延びる竿部18と、竿部18の先端に設けられた第1のガイド部材20と、第1のガイド部材20とウィンチ12との間に設けられた第2のガイド部材22とを備えている。   FIG. 6 is a view schematically showing the hanging jig 10. As shown in FIG. 6, the hanging jig 10 includes a winch 12 that winds the wire rope 14, an attachment portion 16 that can be attached to the outer peripheral portion of the canopy 520, a flange portion 18 that extends from the attachment portion 16, and a flange portion 18. The first guide member 20 provided at the tip of the first guide member 20 and the second guide member 22 provided between the first guide member 20 and the winch 12 are provided.

第1のガイド部材20および第2のガイド部材22は、立坑内壁調査装置1に接続されたワイヤロープ14をガイドするものであり、本実施例においては、第1のガイド部材20および第2のガイド部材22として滑車が用いられている。図6に示すように、立坑内壁調査装置1から鉛直方向に延びるワイヤロープ14は、竿部18の先端に設けられた第1のガイド部材20の滑車の上面にガイドされ、第2のガイド部材22の滑車の下面にガイドされ、ウィンチ12に至る。このように、2つのガイド部材20,22によってワイヤロープ14をガイドすることによって、ウィンチ12から立坑内壁調査装置1に至るワイヤロープ14のブレが小さくなるようにしている。   The 1st guide member 20 and the 2nd guide member 22 guide the wire rope 14 connected to the shaft inner wall investigation apparatus 1, and in this example, the 1st guide member 20 and the 2nd guide member 20 A pulley is used as the guide member 22. As shown in FIG. 6, the wire rope 14 extending in the vertical direction from the shaft inner wall survey device 1 is guided by the upper surface of the pulley of the first guide member 20 provided at the distal end of the flange portion 18, and the second guide member 22 is guided by the lower surface of the pulley and reaches the winch 12. As described above, by guiding the wire rope 14 by the two guide members 20 and 22, the blur of the wire rope 14 from the winch 12 to the shaft inner wall inspection device 1 is reduced.

このように、本実施例においては、第1のガイド部材20と第2のガイド部材22との間のワイヤロープ14の延長方向軸線と、第2のガイド部材22からウィンチ12に至るまでのワイヤロープ14の延長方向軸線とがずれるように構成されており、ワイヤロープ14が確実に第1のガイド部材20および第2のガイド部材22にガイドされるようになっている。   As described above, in this embodiment, the extending direction axis of the wire rope 14 between the first guide member 20 and the second guide member 22, and the wire extending from the second guide member 22 to the winch 12. The rope 14 is configured to deviate from the extending direction axis, and the wire rope 14 is reliably guided by the first guide member 20 and the second guide member 22.

図6に示すように、本実施例における吊下治具10は、竿部18の長手方向で結合される3つの部材110,120,130から構成されており、これら3つの部材110,120,130に分割できるようになっている。このように、本実施例における吊下治具10は、3つの部材110,120,130に分割することができるので、持ち運びがしやすい。したがって、重機などが入っていけない山間部にある立坑の内壁調査が極めて容易になる。   As shown in FIG. 6, the hanging jig 10 in this embodiment includes three members 110, 120, and 130 that are coupled in the longitudinal direction of the flange portion 18, and these three members 110, 120, 130 can be divided. Thus, since the hanging jig 10 in the present embodiment can be divided into the three members 110, 120, and 130, it is easy to carry. Therefore, it becomes very easy to investigate the inner wall of a shaft in a mountainous area where heavy machinery cannot enter.

図7は第1部材110を示す正面図、図8は図7のVIII方向から見た図である。図7に示すように、第1部材110は、竿部18の一部を構成する四角柱状の軸部111と、軸部111の一端に設けられたフランジ112とを備えている。図8に示すように、フランジ112には4つの貫通孔112aが形成されている。   7 is a front view showing the first member 110, and FIG. 8 is a view seen from the direction VIII of FIG. As shown in FIG. 7, the first member 110 includes a quadrangular columnar shaft portion 111 that constitutes a part of the flange portion 18, and a flange 112 provided at one end of the shaft portion 111. As shown in FIG. 8, the flange 112 has four through holes 112a.

図9は第2部材120を示す正面図、図10は図9のX方向から見た図、図11は図9のXI方向から見た図である。図9に示すように、第2部材120は、竿部18の一部を構成する四角柱状の軸部121と、軸部121の一端に設けられたフランジ122と、軸部121の他端に設けられたフランジ123とを備えている。図10に示すように、フランジ122には4つの貫通孔122aが形成されている。また、図11に示すように、フランジ123には4つの貫通孔123aが形成されている。   9 is a front view showing the second member 120, FIG. 10 is a view seen from the X direction of FIG. 9, and FIG. 11 is a view seen from the XI direction of FIG. As shown in FIG. 9, the second member 120 includes a quadrangular columnar shaft portion 121 that constitutes a part of the flange portion 18, a flange 122 provided at one end of the shaft portion 121, and the other end of the shaft portion 121. And a flange 123 provided. As shown in FIG. 10, four through holes 122 a are formed in the flange 122. Further, as shown in FIG. 11, the flange 123 has four through holes 123a.

上述した第1部材110のフランジ112の貫通孔112aと第2部材120のフランジ122の貫通孔122aとにボルト(図示せず)を挿通し、これらのボルトにナット(図示せず)を締結することで第1部材110と第2部材120とを連結することができる。   Bolts (not shown) are inserted into the through holes 112a of the flange 112 of the first member 110 and the through holes 122a of the flange 122 of the second member 120 described above, and nuts (not shown) are fastened to these bolts. Thus, the first member 110 and the second member 120 can be connected.

図12は第3部材130を示す正面図、図13は図12のXIII方向から見た図、図14は図12の側面図である。図12に示すように、第3部材130は、竿部18の一部を構成する四角柱状の軸部131と、軸部131の一端に設けられたフランジ132と、軸部131の他端に設けられた取付部16と、取付部16の上部に設けられたウィンチ台133とを備えている。図13に示すように、フランジ132には4つの貫通孔132aが形成されている。   12 is a front view showing the third member 130, FIG. 13 is a view seen from the XIII direction of FIG. 12, and FIG. 14 is a side view of FIG. As shown in FIG. 12, the third member 130 includes a rectangular columnar shaft portion 131 that constitutes a part of the flange portion 18, a flange 132 provided at one end of the shaft portion 131, and the other end of the shaft portion 131. A mounting portion 16 provided and a winch base 133 provided on the top of the mounting portion 16 are provided. As shown in FIG. 13, four through holes 132 a are formed in the flange 132.

上述した第2部材120のフランジ123の貫通孔123aと第3部材130のフランジ132の貫通孔132aとにボルト(図示せず)を挿通し、これらのボルトにナット(図示せず)を締結することで第2部材120と第3部材130とを連結することができる。   Bolts (not shown) are inserted into the through holes 123a of the flange 123 of the second member 120 and the through holes 132a of the flange 132 of the third member 130, and nuts (not shown) are fastened to these bolts. Thus, the second member 120 and the third member 130 can be coupled.

図12および図14に示すように、取付部16は、略台形柱状の基部134と、基部134の下端に設けられた第1のL型フランジ135と、基部134の両側に取り付けられた第2のL型フランジ136とを有している。   As shown in FIGS. 12 and 14, the attachment portion 16 includes a substantially trapezoidal columnar base portion 134, a first L-shaped flange 135 provided at the lower end of the base portion 134, and second portions attached to both sides of the base portion 134. L-shaped flange 136.

第1のL型フランジ135は、垂直方向に延びる垂直部135aと、水平方向に延びる水平部135bとを有しており、垂直部135aが基部134に固定されている。図12に示すように、水平部135bの上面と基部134の下面との間には隙間Gが形成されている。図15に示すように、この隙間Gには、天蓋520の外周部にある枠リング521を挿入することができるようになっており、枠リング521を挿入すると、第1のL型フランジ135の水平部135bが枠リング521に係合し、取付部16が天蓋520の外周部に固定される。このように、本実施例における第1のL型フランジ135は、天蓋520の枠リング521に係合可能な係合部として機能する。   The first L-shaped flange 135 has a vertical portion 135 a extending in the vertical direction and a horizontal portion 135 b extending in the horizontal direction, and the vertical portion 135 a is fixed to the base portion 134. As shown in FIG. 12, a gap G is formed between the upper surface of the horizontal portion 135 b and the lower surface of the base portion 134. As shown in FIG. 15, a frame ring 521 on the outer periphery of the canopy 520 can be inserted into the gap G. When the frame ring 521 is inserted, the first L-shaped flange 135 The horizontal portion 135b engages with the frame ring 521, and the attachment portion 16 is fixed to the outer peripheral portion of the canopy 520. Thus, the first L-shaped flange 135 in this embodiment functions as an engaging portion that can engage with the frame ring 521 of the canopy 520.

第2のL型フランジ136は、垂直方向に延びる垂直部136aと、水平方向に延びる水平部136bとを有しており、垂直部136aが基部134に固定されている。水平部136bの下面は天蓋520の外周部(枠リング521)に接触するようになっている。上述した第1のL型フランジ135の係合による取付部16の固定が十分でない場合には、この第2のL型フランジ136により取付部16の固定を補強することができる。すなわち、図16に示すように、第2のL型フランジ136の水平部136bと天蓋520の枠リング521とをクランプ137などにより挟み込むことにより、取付部16を天蓋520の外周部に固定することができる。また、第2のL型フランジ136の水平部136bは、枠リング521を上述した隙間Gに挿入する際に枠リング521をガイドする役割も有する。   The second L-shaped flange 136 has a vertical portion 136 a extending in the vertical direction and a horizontal portion 136 b extending in the horizontal direction, and the vertical portion 136 a is fixed to the base portion 134. The lower surface of the horizontal portion 136b is in contact with the outer peripheral portion (frame ring 521) of the canopy 520. When the fixing of the attaching portion 16 by the engagement of the first L-shaped flange 135 is not sufficient, the fixing of the attaching portion 16 can be reinforced by the second L-shaped flange 136. That is, as shown in FIG. 16, the mounting portion 16 is fixed to the outer peripheral portion of the canopy 520 by sandwiching the horizontal portion 136b of the second L-shaped flange 136 and the frame ring 521 of the canopy 520 with a clamp 137 or the like. Can do. Further, the horizontal portion 136b of the second L-shaped flange 136 also serves to guide the frame ring 521 when the frame ring 521 is inserted into the gap G described above.

このような構成の吊下治具10において、ウィンチ12からのワイヤロープ14を第2のガイド部材22および第1のガイド部材20に通し、端部を立坑内壁調査装置1に接続する。天蓋520の扉524を開き、昇降口から吊下治具10の竿部18を立坑501内に斜め下方に挿入する。そして、取付部16の第1のL型フランジ135を天蓋520の枠リング521に係合させることにより、吊下治具10を天蓋520の外周部に固定する。必要に応じて、クランプやシャコマンなどの工具を用いて第2のL型フランジ136を天蓋520の外周部に固定してもよい。このようにして設置された吊下治具10のウィンチ12を駆動させることにより立坑内壁調査装置1を立坑501内で昇降させることができる。   In the suspension jig 10 having such a configuration, the wire rope 14 from the winch 12 is passed through the second guide member 22 and the first guide member 20, and the end portion is connected to the shaft inner wall survey apparatus 1. The door 524 of the canopy 520 is opened, and the flange portion 18 of the hanging jig 10 is inserted obliquely downward into the shaft 501 from the elevator port. Then, the hanging jig 10 is fixed to the outer periphery of the canopy 520 by engaging the first L-shaped flange 135 of the mounting portion 16 with the frame ring 521 of the canopy 520. If necessary, the second L-shaped flange 136 may be fixed to the outer periphery of the canopy 520 using a tool such as a clamp or a shacoman. By driving the winch 12 of the suspension jig 10 thus installed, the shaft inner wall survey device 1 can be raised and lowered within the shaft 501.

上述したように、本実施例によれば、第1のL型フランジ135を天蓋520の枠リング521に係合させることにより取付部16を天蓋520の外周部に固定することができるので、吊下治具10の天蓋520への取付が極めて容易である。また、第1のL型フランジ135と枠リング521との係合だけでは吊下治具10の固定が不十分である場合には、クランプやシャコマンなどの工具を用いて第2のL型フランジ136を強固に天蓋520の外周部に固定することができる。   As described above, according to the present embodiment, the attachment portion 16 can be fixed to the outer peripheral portion of the canopy 520 by engaging the first L-shaped flange 135 with the frame ring 521 of the canopy 520. Attachment of the lower jig 10 to the canopy 520 is extremely easy. Further, when the suspension jig 10 is not sufficiently fixed only by the engagement between the first L-shaped flange 135 and the frame ring 521, the second L-shaped flange is used by using a tool such as a clamp or a shakoman. 136 can be firmly fixed to the outer periphery of the canopy 520.

図17は、本発明の他の実施例に係る吊下治具210を模式的に示す図である。本実施例は、第2のガイド部材222の滑車の径を大きくしたもので、立坑内壁調査装置1からのワイヤロープ14が、竿部18の先端に設けられた第1のガイド部材20の滑車の上面にガイドされ、第2のガイド部材222の滑車の上面にガイドされるように構成されている。本実施例においても、第1のガイド部材20と第2のガイド部材222との間のワイヤロープ14の延長方向軸線と、第2のガイド部材222からウィンチ12に至るまでのワイヤロープ14の延長方向軸線とがずれるように構成されている。   FIG. 17 is a diagram schematically showing a hanging jig 210 according to another embodiment of the present invention. In the present embodiment, the diameter of the pulley of the second guide member 222 is increased, and the wire rope 14 from the shaft inner wall investigation device 1 is a pulley of the first guide member 20 provided at the tip of the flange 18. The second guide member 222 is guided to the upper surface of the pulley, and is guided to the upper surface of the pulley. Also in the present embodiment, the wire rope 14 extends in the extending direction between the first guide member 20 and the second guide member 222 and the wire rope 14 extends from the second guide member 222 to the winch 12. It is comprised so that a direction axis line may shift | deviate.

図18は、本発明の他の実施例に係る吊下治具310を模式的に示す図である。本実施例においては、第2のガイド部材322が設けられた位置で竿部318が折れ曲がっている。立坑内壁調査装置1からのワイヤロープ14は、竿部318の先端に設けられた第1のガイド部材20の滑車の上面にガイドされ、第2のガイド部材322の滑車の上面にガイドされるように構成されている。本実施例においても、第1のガイド部材20と第2のガイド部材322との間のワイヤロープ14の延長方向軸線と、第2のガイド部材322からウィンチ12に至るまでのワイヤロープ14の延長方向軸線がずれるように構成されている。   FIG. 18 is a diagram schematically showing a hanging jig 310 according to another embodiment of the present invention. In the present embodiment, the collar portion 318 is bent at the position where the second guide member 322 is provided. The wire rope 14 from the shaft inner wall investigation device 1 is guided by the upper surface of the pulley of the first guide member 20 provided at the tip of the collar portion 318 and is guided by the upper surface of the pulley of the second guide member 322. It is configured. Also in the present embodiment, the wire rope 14 extends in the extending direction between the first guide member 20 and the second guide member 322, and the wire rope 14 extends from the second guide member 322 to the winch 12. It is comprised so that a direction axis line may shift.

上述した実施例においては、ガイド部材20,22として滑車を用いた例について説明したが、ガイド部材20,22はワイヤロープ14をガイドする機能があればどのようなものであってもよい。例えば、図19に示すような環状ガイド部材420や、図20に示すような螺旋状ガイド部材421を用いることもできる。図20に示す螺旋状ガイド部材421は、ワイヤロープ14の両端が固定された後であっても容易にワイヤロープ14を螺旋状ガイド部材421に通すことができる。   In the embodiment described above, an example in which pulleys are used as the guide members 20 and 22 has been described. However, the guide members 20 and 22 may be any members as long as they have a function of guiding the wire rope 14. For example, an annular guide member 420 as shown in FIG. 19 or a spiral guide member 421 as shown in FIG. 20 can be used. The spiral guide member 421 shown in FIG. 20 can easily pass the wire rope 14 through the spiral guide member 421 even after both ends of the wire rope 14 are fixed.

また、上述した実施例においては、吊下治具10の取付部16を天蓋520の外周部にある枠リング521に取り付ける例について説明したが、これに限られるものではない。例えば、吊下治具10の取付部16を立坑201(ライナープレート510)の上端部に直接取り付けられるように構成してもよい。   Moreover, in the Example mentioned above, although the example which attaches the attachment part 16 of the hanging jig | tool 10 to the frame ring 521 in the outer peripheral part of the canopy 520 was demonstrated, it is not restricted to this. For example, you may comprise so that the attaching part 16 of the hanging jig | tool 10 may be directly attached to the upper end part of the shaft 201 (liner plate 510).

また、上述した実施例においては、ワイヤロープ14にウィンチ12を接続して立坑内壁調査装置1を昇降させる例について説明したが、必ずしもウィンチ12を用いる必要はない。例えば、人力によりワイヤロープ14を引っ張ってもよい。   Moreover, in the Example mentioned above, although the winch 12 was connected to the wire rope 14 and the example which raises / lowers the shaft inner wall investigation apparatus 1 was demonstrated, the winch 12 does not necessarily need to be used. For example, the wire rope 14 may be pulled by human power.

これまで本発明の好ましい実施例について説明したが、本発明は上述の実施例に限定されず、その技術的思想の範囲内において種々異なる形態にて実施されてよいことは言うまでもない。   Although the preferred embodiments of the present invention have been described so far, it is needless to say that the present invention is not limited to the above-described embodiments and may be implemented in various forms within the scope of the technical idea thereof.

G 隙間
1 立坑内壁調査装置
10 吊下治具
12 ウィンチ
14 ワイヤロープ(線条体)
16 取付部
18 竿部
20 第1のガイド部材
22 第2のガイド部材
110 第1部材
111 軸部
112 フランジ
120 第2部材
121 軸部
122,123 フランジ
130 第3部材
131 軸部
132 フランジ
133 ウィンチ台
134 基部
135 第1のL型フランジ(係合部)
135a 垂直部
135b 水平部
136 第2のL型フランジ
136a 垂直部
136b 水平部
137 クランプ
210 吊下治具
222 第2のガイド部材
310 吊下治具
318 竿部
322 第2のガイド部材
420 環状ガイド部材
421 螺旋状ガイド部材
500 集水井
501 立坑
501a (立坑の)内壁
505 梯子
510 ライナープレート
520 天蓋
521 枠リング
522 梁材
523 エキスパンドメタル
524 扉
524a 把手
G Gap 1 Vertical shaft inner wall survey device 10 Suspension jig 12 Winch 14 Wire rope (striated body)
Reference Signs List 16 Attaching portion 18 Hook portion 20 First guide member 22 Second guide member 110 First member 111 Shaft portion 112 Flange 120 Second member 121 Shaft portion 122, 123 Flange 130 Third member 131 Shaft portion 132 Flange 133 Winch stand 134 Base 135 First L-shaped flange (engagement portion)
135a Vertical portion 135b Horizontal portion 136 Second L-shaped flange 136a Vertical portion 136b Horizontal portion 137 Clamp 210 Suspension jig 222 Second guide member 310 Suspension jig 318 Gutter 322 Second guide member 420 Annular guide member 421 Spiral guide member 500 Drainage well 501 Vertical shaft 501a (Vertical shaft) inner wall 505 Ladder 510 Liner plate 520 Canopy 521 Frame ring 522 Beam material 523 Expanded metal 524 Door 524a Handle

Claims (7)

立坑の内壁を調査する立坑内壁調査装置を立坑内に吊り下げる吊下治具であって、
前記立坑の上端部の開口を覆う天蓋の外周部または前記立坑の上端部に取付可能な取付部と、
前記取付部から延びる竿部と、
一端が前記立坑内壁調査装置に接続される線条体を前記竿部の先端でガイドする第1のガイド部材とを備え、
前記竿部は、前記取付部を前記天蓋の外周部または前記立坑の上端部に取り付けたときに前記天蓋に形成された昇降口を通って斜め下方に傾斜するように構成されている
ことを特徴とする立坑内壁調査装置の吊下治具。
A hanging jig for suspending a shaft inner wall investigation device for investigating the inner wall of a shaft,
An outer peripheral portion of the canopy covering the opening of the upper end portion of the shaft or an attachment portion attachable to the upper end portion of the shaft;
A flange extending from the mounting portion;
A first guide member, one end of which is connected to the shaft inner wall investigation device, the first guide member that guides the striated body at the tip of the flange portion;
The eaves portion is configured to be inclined obliquely downward through an elevator port formed in the canopy when the attachment portion is attached to an outer peripheral portion of the canopy or an upper end portion of the shaft. The hanging jig of the shaft inner wall investigation device.
前記取付部は、前記天蓋の外周部または前記立坑の上端部に係合可能な係合部を備えたことを特徴とする請求項1に記載の立坑内壁調査装置の吊下治具。   The suspension jig of the shaft inner wall investigation device according to claim 1, wherein the attachment portion includes an engagement portion that can be engaged with an outer peripheral portion of the canopy or an upper end portion of the shaft. 前記竿部は、該竿部の長手方向で結合される複数の部材からなることを特徴とする請求項1または2に記載の立坑内壁調査装置の吊下治具。   The hanging jig for a shaft inner wall investigation device according to claim 1 or 2, wherein the eaves part comprises a plurality of members coupled in the longitudinal direction of the eaves part. 前記第1のガイド部材と前記取付部との間で前記線条体をガイドする第2のガイド部材をさらに備えたことを特徴とする請求項1から3のいずれか一項に記載の立坑内壁調査装置の吊下治具。   The shaft inner wall according to any one of claims 1 to 3, further comprising a second guide member that guides the linear body between the first guide member and the attachment portion. Suspension jig for investigation equipment. 前記第2のガイド部材は、前記第1のガイド部材と該第2のガイド部材との間の前記線条体の軸線と、該第2のガイド部材から前記線条体の他端までの軸線とをずらすように構成されていることを特徴とする請求項4に記載の立坑内壁調査装置の吊下治具。   The second guide member includes an axis line of the linear body between the first guide member and the second guide member, and an axis line from the second guide member to the other end of the linear body. The suspension jig of the shaft inner wall investigation device according to claim 4, wherein the suspension jig is configured so as to be shifted from each other. 前記竿部は、前記第2のガイド部材が設けられた位置で折れ曲がっていることを特徴とする請求項4または5に記載の立坑内壁調査装置の吊下治具。   6. The hanging jig for a shaft inner wall investigation device according to claim 4 or 5, wherein the flange portion is bent at a position where the second guide member is provided. 前記取付部は、水平方向に延び、前記天蓋の外周部の上面に接触するフランジを有することを特徴とする請求項1から6のいずれか一項に記載の立坑内壁調査装置の吊下治具。   The suspension jig for a shaft inner wall investigation device according to any one of claims 1 to 6, wherein the attachment portion includes a flange that extends in a horizontal direction and contacts a top surface of an outer peripheral portion of the canopy. .
JP2011148795A 2011-07-05 2011-07-05 Suspension jig for shaft inner wall inspection device Expired - Fee Related JP5635458B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2011148795A JP5635458B2 (en) 2011-07-05 2011-07-05 Suspension jig for shaft inner wall inspection device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2011148795A JP5635458B2 (en) 2011-07-05 2011-07-05 Suspension jig for shaft inner wall inspection device

Publications (2)

Publication Number Publication Date
JP2013014950A JP2013014950A (en) 2013-01-24
JP5635458B2 true JP5635458B2 (en) 2014-12-03

Family

ID=47687858

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2011148795A Expired - Fee Related JP5635458B2 (en) 2011-07-05 2011-07-05 Suspension jig for shaft inner wall inspection device

Country Status (1)

Country Link
JP (1) JP5635458B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6089069B2 (en) * 2015-05-29 2017-03-01 株式会社興和 Vertical shaft inspection device and vertical shaft inspection method
JP7001482B2 (en) * 2018-01-22 2022-01-19 日鉄建材株式会社 Water level measurement sensor mounting structure in the catchment well, and water level measurement sensor mounting method
JP2023121450A (en) * 2022-02-21 2023-08-31 Jfe建材株式会社 Coated steel material, manufacturing method of coated steel material, earth retaining member, connecting metal fitting, and earth retaining structure

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006265878A (en) * 2005-03-23 2006-10-05 Saiyuuki:Kk Lining method of circular shaft and its lining device
JP5264623B2 (en) * 2009-06-05 2013-08-14 日鐵住金建材株式会社 Measuring device fixing device for surveying inner wall of shaft

Also Published As

Publication number Publication date
JP2013014950A (en) 2013-01-24

Similar Documents

Publication Publication Date Title
JP5635458B2 (en) Suspension jig for shaft inner wall inspection device
JP5665054B2 (en) Vertical shaft inner wall inspection device
JP2010216128A (en) Pile locking device and pile locking method
CN108560525B (en) Side slope protection monitoring devices's benchmark detects structure
JP5351750B2 (en) Intermediate slab for pump installed manhole
JP5351382B2 (en) Method for assembling shaft scaffolding and method for removing shaft scaffolding
JP5032255B2 (en) Rockfall protection and avalanche prevention facility
CN214143717U (en) A pipe device for pouring into concrete
EP3209597B1 (en) Winch and method of use
CN104459922A (en) Automatic ground pulley collimation device and method
JP2012188889A (en) Flotation preventing structure and method for manhole
JP3107458U (en) Work floor for shaft construction and its mounting device
JP6353332B2 (en) Construction method of vertical pipe with spiral guideway
JP5324366B2 (en) Work safety device in sewer system
JP7001482B2 (en) Water level measurement sensor mounting structure in the catchment well, and water level measurement sensor mounting method
JP2001323768A (en) Hammer grab cover device
JP2008285919A (en) Fence
JP2008180032A (en) Steel tower, rainwater draining device, and refuse remover
KR102712733B1 (en) Apparatus for working environment marine observation buoy
CN220414299U (en) Device for preventing pipe well from being buried by precipitation
JP5099544B2 (en) Ready-made concrete pile lifting equipment
CN110130420B (en) A kind of self-reaction force load box and slag discharge method convenient for slag discharge
CN222823180U (en) A recyclable sludge collection well device
CN211816488U (en) Deep horizontal displacement deviational survey pipe installation auxiliary device of underground continuous wall
CN210263496U (en) PC outer wall attached with tool type protective frame body

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20140418

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20140903

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20141007

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20141016

R150 Certificate of patent or registration of utility model

Ref document number: 5635458

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees