Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP5683286B2 - Embankment structure and construction method thereof - Google Patents
[go: Go Back, main page]

JP5683286B2 - Embankment structure and construction method thereof - Google Patents

Embankment structure and construction method thereof Download PDF

Info

Publication number
JP5683286B2
JP5683286B2 JP2011006775A JP2011006775A JP5683286B2 JP 5683286 B2 JP5683286 B2 JP 5683286B2 JP 2011006775 A JP2011006775 A JP 2011006775A JP 2011006775 A JP2011006775 A JP 2011006775A JP 5683286 B2 JP5683286 B2 JP 5683286B2
Authority
JP
Japan
Prior art keywords
embankment
retaining wall
slope
precast concrete
lightweight
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2011006775A
Other languages
Japanese (ja)
Other versions
JP2012149385A (en
Inventor
文男 山田
文男 山田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsui Chemicals Industrial Products Ltd
Original Assignee
Mitsui Chemicals Industrial Products Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsui Chemicals Industrial Products Ltd filed Critical Mitsui Chemicals Industrial Products Ltd
Priority to JP2011006775A priority Critical patent/JP5683286B2/en
Publication of JP2012149385A publication Critical patent/JP2012149385A/en
Application granted granted Critical
Publication of JP5683286B2 publication Critical patent/JP5683286B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Retaining Walls (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Description

本発明は、壁面パネルを積み重ねて形成される擁壁が、盛土材の土圧の影響を受けて変形することを防止した盛土構造物及びその構築方法に関するものである。   The present invention relates to an embankment structure in which a retaining wall formed by stacking wall panels is prevented from being deformed by the influence of earth pressure of an embankment material, and a construction method thereof.

従来、この種の盛土構造物の構築方法としては、次のような方法が知られている。この構築方法は次の手順による(図8参照)。
(A)盛土予定地の前面地盤に、基礎ブロック1を打設し、この基礎ブロック1に連結部材2の下端を固定する工程を行い、
(B)上下方向に貫通孔を有する壁面パネル3を用い、その貫通孔を連結部材2に貫通させてから、壁面パネル3の上部で緊結する工程を行い、
(C)斜面地山側の斜面Sに、せん断防止ボルト7を打設する工程を行い、
(D)壁面パネル3と斜面地山との間に、石炭灰又は焼却灰、固結材、発泡剤及び水を混合して比重1以下とした流動化盛土材4bを充填し、この流動化盛土材4bの表面にクラック防止材6を敷設する工程を行い、
(E)盛土構造物Aの所定高さになるまで、上記の工程(B)〜(D)を順次繰り返して行うのである(特許文献1参照)。
Conventionally, the following method is known as a construction method of this type of embankment structure. This construction method is based on the following procedure (see FIG. 8).
(A) A step of placing the foundation block 1 on the front ground of the planned embankment and fixing the lower end of the connecting member 2 to the foundation block 1,
(B) Using the wall surface panel 3 having a through-hole in the vertical direction, passing the through-hole through the connecting member 2, and then tightening at the upper portion of the wall surface panel 3,
(C) A step of placing the shear prevention bolt 7 on the slope S on the slope ground is performed,
(D) Between the wall panel 3 and the slope ground, a fluidized embankment material 4b having a specific gravity of 1 or less by mixing coal ash or incinerated ash, a consolidated material, a foaming agent and water is filled and fluidized. Performing the process of laying the crack prevention material 6 on the surface of the embankment material 4b;
(E) The steps (B) to (D) are sequentially repeated until the predetermined height of the embankment structure A is reached (see Patent Document 1).

このような手順の盛土構造物の構築方法は、山間部において土の掘削量を削減し、また、石炭灰や焼却灰を盛土材として活用することによって、自然環境の破壊防止に寄与することができる。   The construction method of the embankment structure of such a procedure can contribute to the prevention of destruction of the natural environment by reducing the amount of soil excavation in the mountainous area and using coal ash and incineration ash as embankment materials. it can.

特開2002−242186号公報JP 2002-242186 A

この従来例の盛土構造物の構築方法においては、壁面パネルを積み重ねて形成される擁壁が、盛土材の土圧の影響を受けて経年変化し、膨出した状態にはらみ出すという問題点を有している。   In the conventional construction method of the embankment structure, the retaining wall formed by stacking wall panels changes over time under the influence of the earth pressure of the embankment material and protrudes into a bulging state. Have.

従って、従来例おいては、壁面パネルで形成される擁壁が、盛土材の土圧の影響を受けて変形することのない盛土構造物及びその構築方法を提供することに解決しなければならない課題を有している。   Therefore, in the conventional example, it must be solved to provide a banking structure in which the retaining wall formed by the wall panel is not deformed by the influence of the earth pressure of the banking material and a method for constructing the banking structure. Has a problem.

前記従来例の課題を解決するための本発明の要旨は、斜面地山の下部における基礎に複数のプレキャストコンクリートパネルが積み重ねられた擁壁が形成され、該擁壁と斜面との間には、気泡混合材から成る軽量盛土部が所要高さ形成され、該軽量盛土部が形成された前記斜面には、せん断防止ボルトが適宜間隔ごとに打設され、前記軽量盛土部の上部には、盛土材が投入された補強盛土部が形成され、該補強盛土部は、所定間隔ごとに補強材が埋設され、前記補強盛土部と前記擁壁との間には、砕石、砂利又は砂が充填され、前記補強盛土部には、擁壁から延設されたアンカー材を備えることである。   The gist of the present invention for solving the problems of the conventional example is that a retaining wall in which a plurality of precast concrete panels are stacked is formed on a foundation in a lower part of a slope ground, and a bubble is formed between the retaining wall and the slope. A light-weight embankment portion made of a mixed material is formed to a required height, and shear-proof bolts are placed at appropriate intervals on the slope on which the light-weight embankment portion is formed. Is formed, a reinforcing material is embedded at every predetermined interval, and between the reinforcing embankment and the retaining wall is filled with crushed stone, gravel or sand, The reinforcing embankment is provided with an anchor material extending from the retaining wall.

また、前記せん断防止ボルトの頭部には、所定間隔を開けて二枚の支圧板が設置され、該二枚の支圧板のうち、一方の支圧板は、前記せん断防止ボルトに緊張力が付与されて前記斜面に圧着され、他方の支圧板は、前記斜面から突出した位置に設置され、前記軽量盛土部内に埋設されて、該軽量盛土部と前記斜面地山とを一体的に形成すること、;
前記補強材は、ジオテキスタイル網状又は格子状の鋼材、金網、合成樹脂製や繊維製のシート材又は網材であること、;
前記アンカー材は、PC鋼線とダブルプレート支圧板とから成ること、;
を含むものである。
In addition, two bearing plates are installed at a predetermined interval on the head of the shear prevention bolt, and one of the two bearing plates gives tension to the shear prevention bolt. And the other bearing plate is installed at a position protruding from the slope, embedded in the lightweight embankment, and integrally forms the lightweight embankment and the slope ground. ,;
The reinforcing material is a geotextile , a mesh-like or lattice-like steel material, a wire mesh, a synthetic resin or fiber sheet material or mesh material;
The anchor material comprises a PC steel wire and a double plate bearing plate;
Is included.

更に、本発明の要旨は、斜面地山の下部における基礎にプレキャストコンクリートパネルで擁壁を形成する工程と、前記斜面地山にせん断防止ボルトを打設する工程と、前記擁壁と斜面との間に気泡混合材を打設する工程との各工程を繰り返して行い、所定高さの擁壁と気泡混合材から成る軽量盛土部とを形成してから、次に、前記プレキャストコンクリートパネルを更に積み重ねて擁壁を形成する工程と、前記軽量盛土部の上部において、補強材を敷設する工程と、前記擁壁に前記斜面地山側へ延びるアンカー材を設置する工程と、前記擁壁から適宜間隙部を形成するようにして盛土材を投入する工程と、前記適宜間隙部に砕石、砂利又は砂を充填する工程との各工程を繰り返して行い、所定高さの擁壁と盛土材を多段状に積層した補強盛土部とを形成することである。   Furthermore, the gist of the present invention is that a step of forming a retaining wall with a precast concrete panel on a foundation in a lower part of a slope ground, a step of placing a shear prevention bolt on the slope ground, and a space between the retaining wall and the slope And repeating the steps of placing the foam mixed material on the surface to form a retaining wall having a predetermined height and a lightweight embankment made of the foam mixed material, and then further stacking the precast concrete panels. Forming a retaining wall; laying a reinforcing material at the upper part of the lightweight embankment; installing an anchor material extending toward the slope ground on the retaining wall; The step of charging the embankment material so as to form the step and the step of filling the gaps with crushed stone, gravel or sand as needed are repeated, and the retaining wall and the embankment material having a predetermined height are formed in a multistage shape. Laminated reinforcement It is to form a part.

本発明に係る盛土構造物によれば、気泡混合材から成る軽量盛土部を設けたことによって、擁壁へ作用する土圧を軽減することができる。従って、擁壁が土圧の影響を受けて経年変化し、膨出した状態にはらみ出すという問題を防止できる。
また、補強材やアンカー材を備える補強盛土部を設けたことによって、地盤が沈下しても、擁壁が傾く等の悪影響が生じないという種々の優れた効果を奏する。
According to the embankment structure according to the present invention, the earth pressure acting on the retaining wall can be reduced by providing the light-weight embedding portion made of the bubble mixed material. Therefore, it is possible to prevent the problem that the retaining wall changes over time due to the influence of earth pressure and protrudes into a bulging state.
In addition, by providing the reinforcing embankment portion including the reinforcing material and the anchor material, there are various excellent effects that even if the ground sinks, there is no adverse effect such as tilting of the retaining wall.

せん断防止ボルトの頭部には、所定間隔を開けて二枚の支圧板が設置され、該二枚の支圧板のうち、一方の支圧板は、前記せん断防止ボルトに緊張力が付与されて前記斜面に圧着され、他方の支圧板は、前記斜面から突出した位置に設置され、前記軽量盛土部内に埋設されて、該軽量盛土部と前記斜面地山とを一体的に形成することによって、せん断防止ボルトの二枚の支圧板で、すべり土塊の補強をすることができるとともに、軽量盛土部と斜面地山との一体化を図ることができる。
即ち、一方の支圧板においては、せん断防止ボルトに緊張力が付与されて、当該一方の支圧板で定着されるので、すべり土塊の補強をして、せん断を防止することができる。
更に、他方の支圧板においては、斜面から突出した位置に設置され、軽量盛土部内に埋設されるので、軽量盛土部と斜面地山とが一体的に形成される。つまり、軽量盛土部と斜面地山との付着力の増強を図ることができるという種々の優れた効果を奏する。
Two bearing plates are installed on the head of the shear prevention bolt at a predetermined interval, and one of the two bearing plates has a tension force applied to the shear prevention bolt. The other pressure bearing plate is crimped to the slope, installed at a position protruding from the slope, embedded in the lightweight embankment, and integrally formed with the lightweight embankment and the slope ground. The two support pressure plates of the prevention bolt can reinforce the slip soil mass and can be integrated with the lightweight embankment and the slope ground.
That is, in one of the bearing plates, a tension force is applied to the shear prevention bolt and is fixed by the one bearing plate. Therefore, the sliding soil mass can be reinforced to prevent shearing.
Furthermore, since the other bearing plate is installed at a position protruding from the slope and is embedded in the lightweight embankment, the lightweight embankment and the slope ground are integrally formed. That is, there are various excellent effects that the adhesion force between the lightweight embankment and the slope ground can be increased.

補強材は、ジオテキスタイル網状又は格子状の鋼材、金網、合成樹脂製や繊維製のシート材又は網材であることによって、補強材と盛土材との間に働く摩擦力又は付着力により、盛土材の引張り抵抗を高めて、クラックの発生を効果的に防止し、補強盛土部のせん断強度を大きく向上させるという優れた効果を奏する。 Reinforcing materials are geotextiles , mesh-like or lattice-like steel materials, wire meshes, synthetic resin or fiber sheet materials or mesh materials, and the embankment is made by the frictional force or adhesive force acting between the reinforcing material and the embankment material. The tensile resistance of the material is increased, cracks are effectively prevented, and the shear strength of the reinforced embankment is greatly improved.

アンカー材は、PC鋼線とダブルプレート支圧板とから成ることによって、PC鋼線が補強盛土部の沈下に追従できることとなり、当該沈下に伴う擁壁の傾き等が生じない。
また、ダブルプレート支圧板の応力が、擁壁側と擁壁の反対側との両方に働くこととなり、安定した圧着効果が期待できる。
更に、アンカー材は擁壁から延設されるので、擁壁と補強盛土部との接合が良好で強固になるという種々の優れた効果を奏する。
Since the anchor material is composed of the PC steel wire and the double plate bearing plate, the PC steel wire can follow the settlement of the reinforced embankment, and the inclination of the retaining wall due to the settlement does not occur.
In addition, the stress of the double plate bearing plate acts on both the retaining wall side and the opposite side of the retaining wall, and a stable crimping effect can be expected.
Furthermore, since the anchor material is extended from the retaining wall, there are various excellent effects that the joining between the retaining wall and the reinforcing embankment is good and strong.

また、本発明に係る盛土構造物の構築方法によれば、気泡混合材から成る軽量盛土部を設けるので、擁壁へ作用する土圧を軽減することができる。従って、擁壁が土圧の影響を受けて経年変化し、膨出した状態にはらみ出すという問題を防止した盛土構造物を提供できる。
また、補強材やアンカー材を備える補強盛土部を設けるので、地盤が沈下しても、擁壁が傾く等の悪影響が生じない安定した盛土構造物を提供できるという種々の優れた効果を奏する。
Moreover, according to the construction method of the embankment structure which concerns on this invention, since the lightweight embankment part which consists of bubble mixing materials is provided, the earth pressure which acts on a retaining wall can be reduced. Therefore, it is possible to provide a banking structure that prevents the problem that the retaining wall changes with time due to the influence of earth pressure and protrudes into a bulging state.
Moreover, since the reinforced embankment part provided with a reinforcing material and an anchor material is provided, even if the ground sinks, there are various excellent effects that a stable embankment structure can be provided in which adverse effects such as tilting of the retaining wall do not occur.

本発明に係る盛土構造物11の断面図である。It is sectional drawing of the embankment structure 11 which concerns on this invention. 本発明に係る盛土構造物11の下部の断面図である。It is sectional drawing of the lower part of the embankment structure 11 which concerns on this invention. (1)プレキャストコンクリートパネル14の平面図である。(2)プレキャストコンクリートパネル14の正面図である。(1) It is a top view of the precast concrete panel 14. FIG. (2) It is a front view of the precast concrete panel 14. FIG. (1)(2)プレキャストコンクリートパネル14の縦方向の接合部分の断面図である。(1) (2) It is sectional drawing of the junction part of the vertical direction of the precast concrete panel 14. FIG. プレキャストコンクリートパネル14の横方向の接合部分の断面図である。It is sectional drawing of the junction part of the horizontal direction of the precast concrete panel. せん断防止ボルト18を打設した斜面16の断面図である。It is sectional drawing of the slope 16 in which the shear prevention bolt 18 was laid. プレキャストコンクリートパネル14の背面に設けられる補強盛土部20を説明する断面図である。It is sectional drawing explaining the reinforcement embankment part 20 provided in the back surface of the precast concrete panel 14. FIG. 従来例に係る盛土構造物Aの構築方法を説明するための断面図である。It is sectional drawing for demonstrating the construction method of the embankment structure A which concerns on a prior art example.

次に、本発明の実施の形態について図面を参照しながら説明する。まず、図1において、符号11は盛土構造物を示し、この盛土構造物11は、斜面地山12の下部における基礎13に複数のプレキャストコンクリートパネル14が積み重ねられて形成される擁壁15と、この擁壁15と斜面16との間に形成される所要高さの軽量盛土部17と、斜面16に打設されたせん断防止ボルト18と、軽量盛土部17の上部に盛土材19が多段状に積層されて形成される補強盛土部20と、補強盛土部20の境界部に埋設される補強材21と、補強盛土部20と擁壁15との間に充填される砕石、砂利又は砂22と、擁壁15から延設されるアンカー材23とから構成される。   Next, embodiments of the present invention will be described with reference to the drawings. First, in FIG. 1, the code | symbol 11 shows an embankment structure, and this embankment structure 11 is the retaining wall 15 formed by the several foundation 13 in the lower part of the slope natural ground 12, and the some precast concrete panel 14 being stacked, A light-weight embankment portion 17 having a required height formed between the retaining wall 15 and the slope 16, a shear prevention bolt 18 placed on the slope 16, and a bank material 19 on the upper portion of the light-weight embankment portion 17 are formed in a multi-stage shape. Reinforced embankment 20 formed by laminating, reinforcing material 21 embedded in the boundary of reinforced embankment 20, and crushed stone, gravel or sand 22 filled between reinforced embankment 20 and retaining wall 15. And an anchor member 23 extending from the retaining wall 15.

斜面地山12の下部に形成されるコンクリートの基礎13は、擁壁15を支持するものであり、現場打ちコンクリート又はプレキャストコンクリートにより形成され、1本又は2本の小口径支持杭29又は小口径アンカーによって地盤に固定されている。   The concrete foundation 13 formed in the lower part of the slope ground 12 supports the retaining wall 15, is formed of cast-in-place concrete or precast concrete, and has one or two small-diameter support piles 29 or small-diameters. It is fixed to the ground by anchors.

このコンクリートの基礎13には、図2に示すように、プレート24とナット25とで連結部材26の下端部26aが固着され、この下端部26aがフープ筋27を定着して埋設されている。   As shown in FIG. 2, a lower end portion 26 a of a connecting member 26 is fixed to the concrete foundation 13 with a plate 24 and a nut 25, and the lower end portion 26 a is embedded with a hoop bar 27 fixed.

連結部材26は、例えばネジ節異形鋼棒であり、基礎13に積み重ねられたプレキャストコンクリートパネル14の貫通孔28に挿入され、最上段のプレキャストコンクリートパネル14において所定の緊張力で緊張されて定着されている。なお、連結部材26は、ネジ節異形鋼棒の他に、PC鋼棒、PC鋼線、PC鋼撚り線などの高張力鋼材が使用される。   The connecting member 26 is, for example, a screw-shaped deformed steel bar, is inserted into the through hole 28 of the precast concrete panel 14 stacked on the foundation 13, and is tightened and fixed with a predetermined tension in the uppermost precast concrete panel 14. ing. The connecting member 26 is made of a high-tensile steel material such as a PC steel bar, a PC steel wire, or a PC steel stranded wire, in addition to the thread-shaped deformed steel bar.

プレキャストコンクリートパネル14は、軽量コンクリートで形成されており、大きさは縦が約1m程度で、横が約2m程度である。また、図3(1)(2)に示すように、背面の3箇所には補強リブ30、30aが形成されており、中央部の補強リブ30aには連結部材26を挿入する貫通孔28が形成されている。   The precast concrete panel 14 is made of lightweight concrete and has a size of about 1 m in length and about 2 m in width. Further, as shown in FIGS. 3 (1) and (2), reinforcing ribs 30 and 30a are formed at three locations on the back surface, and through holes 28 for inserting the connecting members 26 are formed in the central reinforcing rib 30a. Is formed.

貫通孔28の下部には、連結ナット31を収納するスペース32aが形成され、上部にはプレート33を収納するスペース32bがそれぞれ形成されている(図3(2)、図4(2)参照)。   A space 32a for accommodating the connecting nut 31 is formed in the lower part of the through hole 28, and a space 32b for accommodating the plate 33 is formed in the upper part (see FIGS. 3 (2) and 4 (2)). .

また、プレキャストコンクリートパネル14の上部には嵌合突起34が形成され、下部には嵌合凹溝35が形成されている。この嵌合凹溝35に対して、下側に位置したプレキャストコンクリートパネル14の嵌合突起34が嵌合されると共に、上部の嵌合突起34が、上側に位置したプレキャストコンクリートパネル14の嵌合凹溝35に嵌合されて、プレキャストコンクリートパネル14同士が積み重ねられ、これらが貫通孔28に挿入された連結部材26によってプレストレスを付与されて連結されている。   Further, a fitting projection 34 is formed on the upper part of the precast concrete panel 14, and a fitting groove 35 is formed on the lower part. The fitting projection 34 of the precast concrete panel 14 located on the lower side is fitted into the fitting groove 35 and the fitting projection 34 on the upper side is fitted to the precast concrete panel 14 located on the upper side. The precast concrete panels 14 are stacked by being fitted into the concave grooves 35, and these are connected by prestressing by a connecting member 26 inserted into the through hole 28.

更に、プレキャストコンクリートパネル14の一端部には半円形の嵌合突起36が形成され、他端部には半円形の嵌合凹溝37が形成されている。この嵌合凹溝37に、右隣に位置したプレキャストコンクリートパネル14の嵌合突起36が嵌合されると共に、嵌合突起36が左隣に位置したプレキャストコンクリートパネル14の嵌合凹溝37に嵌合されて、プレキャストコンクリートパネル14同士が横方向で接合され、この接合部分を中心に回動できるようになっている(図5参照)。   Further, a semicircular fitting protrusion 36 is formed at one end of the precast concrete panel 14 and a semicircular fitting groove 37 is formed at the other end. The fitting projection 36 of the precast concrete panel 14 located on the right side is fitted in the fitting groove 37 and the fitting projection 36 is fitted on the fitting groove 37 of the precast concrete panel 14 located on the left side. The precast concrete panels 14 are joined to each other in the lateral direction by being fitted to each other, and can be rotated around this joined portion (see FIG. 5).

このように複数のプレキャストコンクリートパネル14が上下左右に接合されて連結部材26でプレストレスが付与されることにより自立した擁壁15が形成される。また、プレキャストコンクリートパネル14同士が側面の接合部分で回動自在になっているので、地山の形状に沿った擁壁、例えば湾曲状の擁壁を形成することができるのである。   In this manner, the plurality of precast concrete panels 14 are joined vertically and horizontally and prestressed by the connecting member 26, whereby the self-supporting retaining wall 15 is formed. Further, since the precast concrete panels 14 are rotatable at the joint portions on the side surfaces, a retaining wall along the shape of the natural ground, for example, a curved retaining wall can be formed.

また、軽量盛土部17が形成されている位置において、プレキャストコンクリートパネル14の背面には、図2に示すように、補強鉄筋38が設けられている。つまり、プレキャストコンクリートパネル14の背面から延設される補強鉄筋38が、軽量盛土部17内に埋設されるので、擁壁15と軽量盛土部17との接合が強固なものになる。   Further, at the position where the lightweight embankment portion 17 is formed, a reinforcing steel bar 38 is provided on the back surface of the precast concrete panel 14 as shown in FIG. That is, since the reinforcing steel bar 38 extended from the back surface of the precast concrete panel 14 is embedded in the light weight embankment portion 17, the connection between the retaining wall 15 and the light weight embankment portion 17 becomes strong.

せん断防止ボルト18は、軽量盛土部17が形成されている斜面16に、適宜間隔ごとに打設されており、斜面16の掘削孔39に充填されたグラウト40内に圧入されて、所定の緊張力を付与して定着されている。このせん断防止ボルト18の頭部には、図6に示すように、所定間隔を開けて二枚の支圧板18a、18bが設けられている。   The shear prevention bolts 18 are provided at appropriate intervals on the slope 16 on which the lightweight embankment portion 17 is formed. The shear prevention bolts 18 are press-fitted into the grout 40 filled in the excavation holes 39 of the slope 16 and have a predetermined tension. It has been fixed with power. As shown in FIG. 6, two bearing plates 18 a and 18 b are provided at the head of the shear prevention bolt 18 at a predetermined interval.

二枚の支圧板18a、18bのうち、一方の支圧板18aは、せん断防止ボルト18に緊張力が付与されて、当該一方の支圧板18aで定着されるので、すべり土塊41の補強をして、せん断を防止することができる。
また、他方の支圧板18bは、斜面16から突出した位置に設置され、軽量盛土部17内に埋設されるので、軽量盛土部17と斜面地山12とが一体的に形成される。つまり、軽量盛土部17と斜面地山12との付着力の増強を図ることができるのである。
Of the two bearing plates 18a and 18b, one bearing plate 18a is applied with tension to the shear prevention bolt 18 and fixed by the one bearing plate 18a. Can prevent shearing.
Moreover, since the other bearing plate 18b is installed in the position which protruded from the slope 16, and is embed | buried in the lightweight embankment part 17, the lightweight embankment part 17 and the slope ground mountain 12 are formed integrally. That is, the adhesion force between the light weight embankment 17 and the slope ground 12 can be increased.

軽量盛土部17は、擁壁15と斜面16との間に気泡混合材17aを所要高さ打設して形成される。この気泡混合材17aは、具体的にはエアミルク又はエアモルタルであり、発泡させた気泡を混入して作られているので、軽量性、流動性が良好である。従って、擁壁15へ作用する土圧を軽減することができる。なお、軽量盛土部17を形成する高さは、盛土構造物11の全長高さの、約3分の1から2分の1程度が望ましい。   The lightweight embankment 17 is formed by placing a bubble mixing material 17a between the retaining wall 15 and the slope 16 at a required height. The bubble mixed material 17a is specifically air milk or air mortar, and is made by mixing foamed bubbles, so that it is lightweight and fluid. Therefore, the earth pressure acting on the retaining wall 15 can be reduced. In addition, about the height of the full length height of the embankment structure 11, about 1/3 to about 1/2 of the height which forms the lightweight embankment part 17 is desirable.

軽量盛土部17の上部には、盛土材19が多段状に積層された補強盛土部20が形成されている。盛土材19は、種々の土質の土及び混合土であり、擁壁15と斜面地山12との間に、補強材21を介在させて投入することにより、盛土材19が積層された補強盛土部20を形成する。   On the upper part of the lightweight embankment 17, a reinforced embankment 20 is formed in which embankment materials 19 are stacked in multiple stages. The embankment material 19 is soil of various soils and mixed soil, and is reinforced embankment in which the embankment material 19 is laminated by inserting a reinforcement material 21 between the retaining wall 15 and the slope ground 12. Part 20 is formed.

この盛土材19は、1段のプレキャストコンクリートパネル14ごとに投入され、盛土材19の上面及び前面を補強材21で覆うことにより積層され、1段ごとにプレキャストコンクリートパネル14からのアンカー材23が埋設されている(図7参照)。このように補強盛土部20は、上面と前面とがジオテキスタイルなどの補強材21で覆われた盛土材19が積層されて形成されている。   This embankment material 19 is thrown into each stage of the precast concrete panel 14 and laminated by covering the upper surface and the front surface of the embankment material 19 with the reinforcing material 21, and the anchor material 23 from the precast concrete panel 14 is provided for each stage. It is buried (see FIG. 7). In this way, the reinforced embankment portion 20 is formed by laminating the embankment material 19 whose upper surface and front surface are covered with a reinforcing material 21 such as a geotextile.

補強材21は、上述の網状のジオテキスタイルの他に、例えば網状又は格子状の鋼材、防錆した金網、合成樹脂や繊維性のシート材や網材などがあり、補強材21と盛土材19との間に働く摩擦力又は付着力により、盛土材19の引張り抵抗を高めて、盛土材19内のクラックの発生を効果的に防止すると共に、補強盛土部20全体のせん断強度を大きく向上させる。また補強材21はプレキャストコンクリートパネル14の背面に固定することもできる。 In addition to the above-described mesh-like geotextile, the reinforcement material 21 includes, for example , a mesh-like or lattice-like steel material, a rust-proof wire mesh, a synthetic resin, a fibrous sheet material or a mesh material, and the reinforcement material 21 and the embankment material 19. The tensile force of the embankment material 19 is increased by the frictional force or the adhesive force acting between them, and the occurrence of cracks in the embankment material 19 is effectively prevented, and the shear strength of the reinforced embankment portion 20 as a whole is greatly improved. . Further, the reinforcing member 21 can be fixed to the back surface of the precast concrete panel 14.

アンカー材23は、図1及び図7に示すように、PC鋼線42とダブルプレート支圧板43とから構成される。PC鋼線42は、補強盛土部20の沈下に追従できるので、当該沈下に伴う擁壁15の傾き等が生じない。また、ダブルプレート支圧板43は、その応力が、擁壁15側と擁壁15の反対側との両方に働くので、安定した圧着効果が期待できる。更に、アンカー材23は、擁壁15、即ちプレキャストコンクリートパネル14の背面から延設されるので、擁壁15と補強盛土部20との接合が良好で強固になる。   As shown in FIGS. 1 and 7, the anchor member 23 is composed of a PC steel wire 42 and a double plate bearing plate 43. Since the PC steel wire 42 can follow the settlement of the reinforced embankment 20, the retaining wall 15 is not inclined due to the settlement. Moreover, since the stress acts on both the retaining wall 15 side and the opposite side of the retaining wall 15, the double plate bearing plate 43 can be expected to have a stable crimping effect. Furthermore, since the anchor material 23 extends from the retaining wall 15, that is, from the back surface of the precast concrete panel 14, the joining of the retaining wall 15 and the reinforcing embankment portion 20 is good and strong.

また、盛土材19は、プレキャストコンクリートパネル14の背面との間、すなわち補強材21で覆われた前面との間に適宜間隙部44をもって投入され、この適宜間隙部44に砕石、砂利又は砂22が充填されている。すなわち盛土材19をプレキャストコンクリートパネル14の背面に接する箇所まで投入せずに、砕石、砂利又は砂22を投入する適宜間隙部44を形成する位置まで投入するものであり、この砕石、砂利又は砂22を介してプレキャストコンクリートパネル14の背面に接している。この砕石、砂利又は砂22は、排水を良好にする効果がある。   Further, the embankment material 19 is appropriately inserted with a gap 44 between the back surface of the precast concrete panel 14, that is, between the front surface covered with the reinforcing material 21, and the crushed stone, gravel or sand 22 is appropriately inserted into the gap portion 44. Is filled. In other words, the embankment material 19 is not thrown into the position in contact with the back surface of the precast concrete panel 14, but is thrown up to a position where an appropriate gap 44 is formed to throw in the crushed stone, gravel or sand 22. 22 is in contact with the back surface of the precast concrete panel 14. The crushed stone, gravel or sand 22 has an effect of improving drainage.

以上のように構成される盛土構造物11は、気泡混合材17aから成る軽量盛土部17を設けたので、擁壁15へ作用する土圧を軽減することができる。従って、擁壁15が土圧の影響を受けて経年変化し、膨出した状態にはらみ出すという問題を防止できる。また、補強材21やアンカー材23を備える補強盛土部20を設けたので、地盤が沈下しても、擁壁15が傾く等の悪影響が生じない。   Since the embankment structure 11 comprised as mentioned above provided the lightweight embankment part 17 which consists of bubble mixing material 17a, the earth pressure which acts on the retaining wall 15 can be reduced. Accordingly, it is possible to prevent the problem that the retaining wall 15 changes with time due to the influence of earth pressure and protrudes into a bulging state. Moreover, since the reinforcement embankment part 20 provided with the reinforcing material 21 and the anchor material 23 is provided, even if the ground sinks, there is no adverse effect such as tilting of the retaining wall 15.

次に、盛土構造物11の構築方法について説明する。まず、盛土予定地の斜面地山12における下部に埋設孔45を削孔し、この埋設孔45にグラウトを注入した後、小口径支持杭29又は小口径アンカーを圧入する。そして、このグラウトの養生期間中に基礎13を現場打ちコンクリートまたはプレキャストコンクリートで構築すると共に、基礎13の孔部46に小口径支持杭29の頭部を突出させてから、これを緊張・定着して基礎13に固定する(図2参照)。   Next, the construction method of the embankment structure 11 will be described. First, a buried hole 45 is drilled in the lower part of the slope ground 12 of the planned embankment, and after grout is injected into the buried hole 45, a small-diameter support pile 29 or a small-diameter anchor is press-fitted. And during the curing period of the grout, the foundation 13 is constructed with cast-in-place concrete or precast concrete, and the head of the small-diameter support pile 29 is projected into the hole 46 of the foundation 13, and then this is tensioned and fixed. And fixed to the base 13 (see FIG. 2).

そして、基礎13から突出させた連結部材26の一部に、他の連結部材26を連結して、当該連結部材26を、プレキャストコンクリートパネル14の貫通孔28を貫通できる長さにする。この連結部材26にプレキャストコンクリートパネル14の貫通孔28を挿入して、プレキャストコンクリートパネル14を基礎13に設置した後、連結部材26を緊張定着してプレキャストコンクリートパネル14を基礎13上に定着する。この手順を順次繰り返して横方向に連続的に接合した1段目のプレキャストコンクリートパネル14(擁壁15)を形成する。   Then, another connecting member 26 is connected to a part of the connecting member 26 protruding from the foundation 13 so that the connecting member 26 has a length that can penetrate the through hole 28 of the precast concrete panel 14. After inserting the through hole 28 of the precast concrete panel 14 into the connecting member 26 and installing the precast concrete panel 14 on the foundation 13, the connecting member 26 is tensioned and fixed to fix the precast concrete panel 14 on the foundation 13. This procedure is sequentially repeated to form the first-stage precast concrete panel 14 (retaining wall 15) continuously joined in the lateral direction.

この1段目のプレキャストコンクリートパネル14の背面における補強リブ30aに、補強鉄筋38を接合して、斜面地山12側に配置する。   Reinforcing bars 38 are joined to the reinforcing ribs 30a on the back surface of the first-stage precast concrete panel 14 and arranged on the slope ground 12 side.

その後、斜面地山12にせん断防止ボルト18を打設する。まず、斜面地山12に適宜間隔ごとに掘削孔39を削孔し、この掘削孔39にモルタルなどのグラウト40を充填する。そして、このグラウト40内にせん断防止ボルト18を圧入すると共に、頭部を掘削孔39の開口部から突出させる。そして、この突出した頭部をグラウト40の硬化後に所定の力で緊張し、一方の支圧板18aで斜面16に圧着し、他方の支圧板18bが斜面16から離れた位置に設置される。   Thereafter, a shear prevention bolt 18 is placed on the slope ground 12. First, excavation holes 39 are drilled in the slope ground 12 at appropriate intervals, and the grout 40 such as mortar is filled in the excavation holes 39. Then, the shear prevention bolt 18 is press-fitted into the grout 40 and the head is projected from the opening of the excavation hole 39. The protruding head is tensioned with a predetermined force after the grout 40 is cured, and is crimped to the inclined surface 16 by one supporting plate 18a, and the other supporting plate 18b is installed at a position away from the inclined surface 16.

そして、プレキャストコンクリートパネル14(擁壁15)と斜面16との間に気泡混合材17aを、当該プレキャストコンクリートパネル14の上部まで打設する。   Then, a bubble mixed material 17 a is placed between the precast concrete panel 14 (retaining wall 15) and the slope 16 to the top of the precast concrete panel 14.

以上のような、プレキャストコンクリートパネル14の設置、補強鉄筋38の配置、せん断防止ボルト18の打設、気泡混合材17aの打設の各作業を繰り返すことで、途中高さの擁壁15と気泡混合材17aから成る軽量盛土部17とが形成される。   By repeating the operations of installing the precast concrete panel 14, placing the reinforcing reinforcing bars 38, placing the shear prevention bolts 18, and placing the bubble mixed material 17 a as described above, the intermediate-height retaining wall 15 and the bubbles are placed. A lightweight embankment portion 17 made of the mixed material 17a is formed.

次に、軽量盛土部17の上部に設ける補強盛土部20の形成について説明する。まず、上述のプレキャストコンクリートパネル14の設置手順と同様な手順で、プレキャストコンクリートパネル14の上部に次段のプレキャストコンクリートパネル14を積み重ねてから、軽量盛土部17の上部に補強材21を敷設する。   Next, formation of the reinforcement embankment part 20 provided in the upper part of the lightweight embankment part 17 is demonstrated. First, the next-stage precast concrete panel 14 is stacked on top of the precast concrete panel 14 in the same manner as the above-described precast concrete panel 14 installation procedure, and then the reinforcing material 21 is laid on the lightweight embankment portion 17.

補強材21は、前述したように、ジオテキスタイル等であり、また、補強材21をプレキャストコンクリートパネル14の背面に固定することも可能である。   As described above, the reinforcing material 21 is a geotextile or the like, and the reinforcing material 21 can be fixed to the back surface of the precast concrete panel 14.

そして、プレキャストコンクリートパネル14の背面には、アンカー材23を設置する。アンカー材23は、前述したように、PC鋼線42とダブルプレート支圧板43とから構成される。   And the anchor material 23 is installed in the back surface of the precast concrete panel 14. FIG. The anchor material 23 is composed of the PC steel wire 42 and the double plate bearing plate 43 as described above.

プレキャストコンクリートパネル14(擁壁15)と斜面16との間に、擁壁15から適宜間隙部44を形成するようにして盛土材19を投入し、該盛土材19を当該プレキャストコンクリートパネル14の上部まで打設する。更に、適宜間隙部44に砕石、砂利又は砂22を充填する。   Between the precast concrete panel 14 (retaining wall 15) and the slope 16, the embankment material 19 is thrown from the retaining wall 15 so as to appropriately form a gap 44, and the embedding material 19 is placed on the top of the precast concrete panel 14 To hit. Further, the gap 44 is appropriately filled with crushed stone, gravel or sand 22.

以上のような、プレキャストコンクリートパネル14の設置、補強材21の敷設、アンカー材23の設置、盛土材19を投入、砕石、砂利又は砂22の充填の各作業を繰り返すことで、所定高さの擁壁15と盛土材19を多段状に積層した補強盛土部20とを形成することができて、自立した擁壁15を備える盛土構造物11が構築されるのである。   By repeating the operations of installing the precast concrete panel 14, laying the reinforcing material 21, installing the anchor material 23, inserting the embankment material 19, and filling the crushed stone, gravel or sand 22, a predetermined height is obtained. The reinforced embankment part 20 which laminated | stacked the retaining wall 15 and the embankment material 19 in multistage shape can be formed, and the embankment structure 11 provided with the self-supporting retaining wall 15 is constructed | assembled.

A 盛土構造物
C アスファルト路盤
R 擁壁
S 斜面
1 基礎ブロック
2 連結部材
3 壁面パネル
4 盛土材
4b 流動化盛土材
5 アンカー部材
6 クラック防止材
7 せん断ボルト
7a せん断ボルトの頭部
8 補強材
11 盛土構造物
12 斜面地山
13 基礎
14 プレキャストコンクリートパネル
15 擁壁
16 斜面
17 軽量盛土部
17a 気泡混合材
18 せん断防止ボルト
18a、18b 支圧板
19 盛土材
20 補強盛土部
21 補強材
22 砕石、砂利又は砂
23 アンカー材
24 プレート
25 ナット
26 連結部材
26a 下端部
27 フープ筋
28 貫通孔
29 小口径支持杭
30、30a 補強リブ
31 連結ナット
32a、32b スペース
33 プレート
34 嵌合突起
35 嵌合凹溝
36 嵌合突起
37 嵌合凹溝
38 補強鉄筋
39 掘削孔
40 グラウト
41 すべり土塊
42 PC鋼線
43 ダブルプレート支圧板
44 適宜間隙部
45 埋設孔
46 孔部
A embankment structure C asphalt roadbed R retaining wall S slope 1 foundation block 2 connecting member 3 wall panel 4 embankment material 4b fluidized embankment material 5 anchor member 6 crack prevention material 7 shear bolt 7a shear bolt head 8 reinforcement material 11 embankment Structure 12 Slope ground 13 Base 14 Precast concrete panel 15 Retaining wall 16 Slope 17 Lightweight embankment 17a Air bubble mixture 18 Shear prevention bolt 18a, 18b Bearing plate 19 Embankment 20 Reinforced embankment 21 Reinforcement 22 Crushed stone, gravel or sand 23 Anchor material 24 Plate 25 Nut 26 Connecting member 26a Lower end 27 Hoop muscle 28 Through hole 29 Small-diameter support pile 30, 30a Reinforcement rib 31 Connecting nut 32a, 32b Space 33 Plate 34 Fitting projection 35 Fitting groove 36 Fitting Protrusion 37 Fitting groove 38 Reinforcement Muscle 39 borehole 40 grout 41 sliding clod 42 PC steel wire 43 double plate Bearing plate 44 appropriately gap 45 burying holes 46 holes

Claims (5)

斜面地山の下部における基礎に複数のプレキャストコンクリートパネルが積み重ねられた擁壁が形成され、
該擁壁と斜面との間には、気泡混合材から成る軽量盛土部が所要高さ形成され、
該軽量盛土部が形成された前記斜面には、せん断防止ボルトが適宜間隔ごとに打設され、
前記軽量盛土部の上部には、盛土材が投入された補強盛土部が形成され、
該補強盛土部は、所定間隔ごとに補強材が埋設され、
前記補強盛土部と前記擁壁との間には、砕石、砂利又は砂が充填され、
前記補強盛土部には、擁壁から延設されたアンカー材を備えること
を特徴とする盛土構造物。
A retaining wall is formed by stacking multiple precast concrete panels on the foundation at the bottom of the slope ground,
Between the retaining wall and the slope, a lightweight embankment made of a bubble mixture is formed at the required height,
On the slope where the lightweight embankment is formed, shear prevention bolts are appropriately placed at intervals,
In the upper part of the lightweight embankment, a reinforced embankment is formed in which embankment material is added,
The reinforcing embankment is embedded with a reinforcing material at predetermined intervals,
Between the reinforcing embankment and the retaining wall, crushed stone, gravel or sand is filled,
The reinforced embankment is provided with an anchor material extending from a retaining wall.
前記せん断防止ボルトの頭部には、所定間隔を開けて二枚の支圧板が設置され、
該二枚の支圧板のうち、一方の支圧板は、前記せん断防止ボルトに緊張力が付与されて前記斜面に圧着され、
他方の支圧板は、前記斜面から突出した位置に設置され、前記軽量盛土部内に埋設されて、該軽量盛土部と前記斜面地山とを一体的に形成すること
を特徴とする請求項1に記載の盛土構造物。
On the head of the shear prevention bolt, two bearing plates are installed at a predetermined interval,
Of the two bearing plates, one bearing plate is pressure-bonded to the inclined surface by applying tension to the shear prevention bolt,
The other bearing plate is installed at a position protruding from the slope, embedded in the lightweight embankment, and integrally formed with the lightweight embankment and the slope ground. The embankment structure described.
前記補強材は、ジオテキスタイル網状又は格子状の鋼材、金網、合成樹脂製や繊維製のシート材又は網材であること
を特徴とする請求項1に記載の盛土構造物。
The embankment structure according to claim 1, wherein the reinforcing material is a geotextile , a mesh-like or lattice-like steel material, a wire mesh, a synthetic resin-made or fiber-made sheet material or a mesh material.
前記アンカー材は、PC鋼線とダブルプレート支圧板とから成ること
を特徴とする請求項1に記載の盛土構造物。
The embankment structure according to claim 1, wherein the anchor material is composed of a PC steel wire and a double plate bearing plate.
斜面地山の下部における基礎にプレキャストコンクリートパネルで擁壁を形成する工程と、前記斜面地山にせん断防止ボルトを打設する工程と、前記擁壁と斜面との間に気泡混合材を打設する工程との各工程を繰り返して行い、所定高さの擁壁と気泡混合材から成る軽量盛土部とを形成してから、
次に、前記プレキャストコンクリートパネルを更に積み重ねて擁壁を形成する工程と、前記軽量盛土部の上部において、補強材を敷設する工程と、前記擁壁に前記斜面地山側へ延びるアンカー材を設置する工程と、前記擁壁から適宜間隙部を形成するようにして盛土材を投入する工程と、前記適宜間隙部に砕石、砂利又は砂を充填する工程との各工程を繰り返して行い、所定高さの擁壁と盛土材を多段状に積層した補強盛土部とを形成すること
を特徴とする盛土構造物の構築方法。
Forming a retaining wall with a precast concrete panel on the foundation at the bottom of the slope ground, placing a shear prevention bolt on the slope ground, and placing a bubble mixture between the retaining wall and the slope After repeating each step with the process, forming a retaining wall of a predetermined height and a lightweight embankment made of a bubble mixture,
Next, a step of further stacking the precast concrete panels to form a retaining wall, a step of laying a reinforcing material at the upper part of the lightweight embankment, and an anchor material extending to the slope ground are installed on the retaining wall. A predetermined height is obtained by repeating each of the process, the step of charging the embedding material so as to appropriately form a gap portion from the retaining wall, and the step of filling the gap portion with crushed stone, gravel or sand. A method for constructing an embankment structure, comprising forming a retaining wall and a reinforced embankment part in which embankment materials are laminated in a multistage manner.
JP2011006775A 2011-01-17 2011-01-17 Embankment structure and construction method thereof Expired - Fee Related JP5683286B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2011006775A JP5683286B2 (en) 2011-01-17 2011-01-17 Embankment structure and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2011006775A JP5683286B2 (en) 2011-01-17 2011-01-17 Embankment structure and construction method thereof

Publications (2)

Publication Number Publication Date
JP2012149385A JP2012149385A (en) 2012-08-09
JP5683286B2 true JP5683286B2 (en) 2015-03-11

Family

ID=46791883

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2011006775A Expired - Fee Related JP5683286B2 (en) 2011-01-17 2011-01-17 Embankment structure and construction method thereof

Country Status (1)

Country Link
JP (1) JP5683286B2 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6476483B2 (en) * 2014-02-20 2019-03-06 フリー工業株式会社 Embankment resistor and construction method of embankment structure
JP2015183366A (en) * 2014-03-20 2015-10-22 ヒロセ株式会社 Structure and construction method for banking structure
JP6151337B2 (en) * 2015-11-25 2017-06-21 株式会社ポラス暮し科学研究所 Construction method for block pile foundation and block pile foundation
CN113389220B (en) * 2021-07-02 2022-07-19 中国电建集团成都勘测设计研究院有限公司 Rock slope non-excavation road shoulder retaining wall and construction method thereof
CN113565129A (en) * 2021-08-19 2021-10-29 甘肃省交通规划勘察设计院股份有限公司 High-performance concrete arc-shaped assembled gravity retaining wall and construction method
JP7741678B2 (en) * 2021-09-24 2025-09-18 株式会社淺沼組 rammed earth structure

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002242186A (en) * 2001-02-15 2002-08-28 Free Kogyo Kk Construction method of embankment structure
JP2005232858A (en) * 2004-02-20 2005-09-02 Free Kogyo Kk Road widening method and method of preventing stone from falling
JP2006063595A (en) * 2004-08-26 2006-03-09 Geo System Co Ltd Reinforced soil structure
JP4499547B2 (en) * 2004-12-21 2010-07-07 積水化成品工業株式会社 Lightweight embankment structure and composite embankment structure consisting of it and reinforced earth wall structure
JP2007277880A (en) * 2006-04-05 2007-10-25 Nishi Nippon Spc Kk Fill structure and its construction method
JP5113342B2 (en) * 2006-04-25 2013-01-09 西日本エス・ピー・シー株式会社 Embankment structure
JP4599384B2 (en) * 2007-10-15 2010-12-15 西日本エス・ピー・シー株式会社 Embankment structure and construction method thereof

Also Published As

Publication number Publication date
JP2012149385A (en) 2012-08-09

Similar Documents

Publication Publication Date Title
JP4599384B2 (en) Embankment structure and construction method thereof
JP5683286B2 (en) Embankment structure and construction method thereof
KR101530871B1 (en) Retaining Wall Having Natural Rock And Construction Method Thereof
JP4599423B2 (en) Embankment structure and construction method thereof
KR102234513B1 (en) Block type reinforcement retaining wall structure and constructing method for the same
JP5688508B2 (en) Embankment structure and construction method thereof
KR102476068B1 (en) Retaining wall structure with multidirectional anchor fixtures and construction method thereof
KR102652422B1 (en) Panel type retaining wall construction method using coupler and panel type retaining wall
KR101006963B1 (en) Prefabricated retaining wall structure using reinforcement and pile and construction method
JP5113342B2 (en) Embankment structure
KR100313721B1 (en) Method for designing synthetic underground retaining wall by temporary soil protection structure and working process of underground retaining wall of structure
JP5777435B2 (en) Reinforcement method for foundations for small buildings
KR102560642B1 (en) Composite pile using micro pile and its construction method
JP2007277880A (en) Fill structure and its construction method
KR102652442B1 (en) Panel type retaining wall construction method using cover frame and panel type retaining wall
JP4533371B2 (en) Embankment structure and construction method thereof
JP4697875B2 (en) Lightweight embankment blocks and lightweight embankment structures
KR102490872B1 (en) Reinforced earth retaining wall and construction method using tensile force of steel rod piles
AU2012202472B2 (en) Earth Retention and Piling Systems
KR102617795B1 (en) Retaining wall system combine H-piles with steel reinforcement structure
JP2005350884A (en) Method for widening road and the like, and wall surface panel
KR20050050732A (en) Anchor for ground and retaining wall structure using anchor
JP5526217B1 (en) Construction resistor and embankment structure
KR102150531B1 (en) Retaining wall structure using vertical underground insert and its construction method
KR101020217B1 (en) Rock construction using anchor and construction method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20140115

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20140822

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20140909

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20140910

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20141211

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20150113

R150 Certificate of patent or registration of utility model

Ref document number: 5683286

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees