JP5688769B2 - Caisson filling material input management system, method and computer program therefor - Google Patents
Caisson filling material input management system, method and computer program therefor Download PDFInfo
- Publication number
- JP5688769B2 JP5688769B2 JP2011176924A JP2011176924A JP5688769B2 JP 5688769 B2 JP5688769 B2 JP 5688769B2 JP 2011176924 A JP2011176924 A JP 2011176924A JP 2011176924 A JP2011176924 A JP 2011176924A JP 5688769 B2 JP5688769 B2 JP 5688769B2
- Authority
- JP
- Japan
- Prior art keywords
- filling material
- compartment
- caisson
- charging
- filling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Underground Or Underwater Handling Of Building Materials (AREA)
Description
本発明は、ケーソンに中詰材を投入する場合のケーソン中詰材投入管理システム、方法およびそのためのコンピュータ用プログラムに関する。 The present invention relates to a caisson filling material charging management system, a method, and a computer program therefor when charging a caisson.
従来、岸壁や護岸などの工事で水底に重力式ケーソンを設置する場合、ガット船を使用してケーソンの中空部に対し上部の開口から中詰砂を投入している。このとき、ガット船をケーソンに接舷して、オペレータの経験や感覚で中詰砂を投入するのが一般的であった。従来の方法によると、ガット船によるケーソンへの中詰砂の投入回数や投入済箇所については、オペレータの記憶や目視で確認しながら投入を行っていた。 Conventionally, when a gravity caisson is installed at the bottom of the water for construction such as a quay or revetment, padded sand is thrown into the hollow part of the caisson from the upper opening using a gut ship. At this time, it was common for the gut boat to be in contact with the caisson and to insert the padding sand with the experience and sense of the operator. According to the conventional method, the number of times of filling of the filled sand into the caisson by the gut ship and the places where the sand has been put in were carried out while checking with the operator's memory and visual inspection.
ところが、多数の隔室を持つ大型ケーソンについて、例えば、ガット船2隻で中詰砂の投入作業を行う場合、隔室毎の投入箇所の把握が難しいという問題があった。また、複数の隔室に均等に砂を投入しないとケーソンに偏荷重が発生してケーソンが傾く恐れが生じてしまうため、ケーソンに対する中詰砂の確実な投入管理が必要である。 However, for a large caisson having a large number of compartments, for example, when the filling operation of filling sand is performed with two gut ships, there is a problem that it is difficult to grasp the place of entry for each compartment. In addition, if sand is not thrown evenly into a plurality of compartments, an unbalanced load is generated on the caisson and the caisson may be tilted. Therefore, it is necessary to reliably control the filling of the inside sand into the caisson.
本発明は、上述のような従来技術の問題に鑑み、ケーソンの各隔室へ中詰砂を投入するとき、複数のガット船を使用した場合でも、ケーソンの隔室毎に中詰砂の投入量を正確に把握し中詰砂を均等に投入できるように管理可能なケーソン中詰材投入管理システム、方法およびそのためのコンピュータ用プログラムを提供することを目的とする。 In the present invention, in view of the problems of the prior art as described above, when filling sand into each compartment of the caisson, even when a plurality of gut ships are used, filling of the sand inside each compartment of the caisson is performed. It is an object of the present invention to provide a caisson filling material charging management system, a method, and a computer program therefor that can be managed so that the amount can be accurately grasped and the filling sand can be uniformly charged.
上記目的を達成するための本実施形態によるケーソン中詰材投入管理システムは、複数の隔室を有するケーソンの前記各隔室に中詰材を投入するときの管理システムであって、ブームおよび投入部を駆動して中詰材をケーソンの隔室に投入する中詰材投入手段を有する船と、前記中詰材の投入時における前記投入部の平面座標を計測する座標計測手段と、前記ケーソンの各隔室の平面座標および中詰材投入情報をそれぞれ記憶する情報処理手段と、を備え、前記情報処理手段は、前記中詰材の投入時に、その中詰材が投入された隔室を前記計測された投入部の平面座標に基づいて特定し、前記中詰材投入情報を前記特定された隔室と関連付けて記憶することを特徴とする。 In order to achieve the above object, the caisson filling material charging management system according to the present embodiment is a management system for loading the filling material into each of the compartments of the caisson having a plurality of compartments. A ship having an intermediate filling material input means for driving the internal portion into the caisson compartment, a coordinate measuring means for measuring a plane coordinate of the input portion when the intermediate filling material is input, and the caisson Information processing means for storing the plane coordinates of each compartment and the filling material charging information, respectively, and the information processing means includes a compartment into which the filling material is charged when the filling material is charged. It is specified on the basis of the measured plane coordinates of the charging portion, and the filling material charging information is stored in association with the specified compartment.
このケーソン中詰材投入管理システムによれば、ケーソンの各隔室へ中詰材を投入するとき、ケーソンの隔室毎に中詰砂の投入量を正確に把握し中詰砂を均等に投入できるように管理することができる。これにより、ケーソンにおける偏荷重や傾きの発生を防ぐことができる。 According to this caisson filling material input management system, when filling the filling material into each compartment of the caisson, the amount of filling sand is accurately grasped for each compartment of the caisson, and the filling sand is evenly charged. You can manage as you can. Thereby, generation | occurrence | production of the unbalanced load and inclination in a caisson can be prevented.
上記ケーソン中詰材投入管理システムにおいて前記船が複数の場合、前記船毎に前記情報処理手段を配置し、前記各情報処理手段は互いに接続されて前記中詰材投入情報を記憶して共有することにより、複数のガット船を使用した場合でも、ケーソンの隔室毎に中詰砂の投入量を正確に把握し中詰砂を均等に投入できるように管理できる。 When there are a plurality of ships in the caisson filling material input management system, the information processing means is arranged for each ship, and the information processing means are connected to each other to store and share the filling material input information. As a result, even when a plurality of gut ships are used, it is possible to accurately manage the amount of filled sand for each caisson compartment so that the filled sand can be evenly charged.
また、前記ケーソンの隔室の平面位置および前記中詰材投入情報を表示する表示手段を備え、前記表示手段は、前記中詰材の前記隔室への投入毎に累積された前記中詰材投入情報を表示することにより、隔室毎に累積された中詰材投入情報をオペレータ等が簡単に知ることができる。 In addition, a display means for displaying the plane position of the compartment of the caisson and the filling material charging information is provided, and the display means accumulates each time the filling material is charged into the compartment. By displaying the charging information, the operator or the like can easily know the filling material charging information accumulated for each compartment.
また、前記中詰材投入情報は、前記中詰材投入手段による中詰材の隔室への投入回数であり、前記表示手段は、前記隔室の平面位置に前記投入回数を表示し、前記投入回数が最も少ない隔室について表示をすることにより、オペレータ等が次に投入対象とする隔室を簡単に知ることができるので、投入作業が容易になる。また、投入回数が最も少ない隔室に中詰材を投入できるので、ケーソンにおける偏荷重や傾きの発生を防ぐことができる。 Further, the filling material charging information is the number of times the filling material is put into the compartment by the filling material feeding means, and the display means displays the number of fillings at the plane position of the compartment, By displaying the compartment with the smallest number of times of insertion, the operator or the like can easily know the compartment to be placed next, so that the loading operation is facilitated. Further, since the filling material can be introduced into the compartment with the smallest number of times of introduction, it is possible to prevent the occurrence of uneven load and inclination in the caisson.
また、前記中詰材投入手段による中詰材の各隔室への投入を所定の順序で行うように前記表示手段は前記中詰材を次に投入すべき隔室について表示をすることにより、オペレータ等が中詰材を次に投入すべき隔室を簡単に知ることができるので、投入作業が容易になる。また、各隔室への投入を所定の順序で行うことができるので、あらかじめケーソンにおける偏荷重や傾きが生じ難いような順序を決めておくことで、ケーソンにおける偏荷重や傾きの発生を防ぐことができる。 Further, the display means displays the compartment to which the filling material is to be charged next so that the filling material is charged into each compartment by the filling material charging means in a predetermined order. Since the operator or the like can easily know the compartment in which the filling material is to be input next, the input operation is facilitated. In addition, since the loading into each compartment can be performed in a predetermined order, it is possible to prevent the occurrence of uneven loads and inclinations in the caisson by determining the order in which the unbalanced loads and inclinations in the caisson are unlikely to occur in advance. Can do.
本実施形態によるケーソン中詰材投入管理方法は、複数の隔室を有するケーソンの各隔室に中詰材を投入するときの管理方法であって、船が有する中詰材投入手段がブームおよび投入部を駆動して中詰材をケーソンの隔室に投入する時、前記投入部の平面座標を計測するステップと、前記中詰材が投入された隔室を前記計測された投入部の平面座標に基づいて情報処理手段が特定するステップと、前記情報処理手段が中詰材投入情報を前記特定された隔室と関連付けて記憶するステップと、を含むことを特徴とする。 The caisson filling material charging management method according to the present embodiment is a management method when charging the filling material into each compartment of a caisson having a plurality of compartments, wherein the filling material throwing means possessed by the ship is a boom and When the filling unit is driven to feed the filling material into the compartment of the caisson, the step of measuring the plane coordinates of the filling unit, and the compartment into which the filling material has been placed is set to the plane of the measured filling unit. The information processing means specifying based on the coordinates; and the information processing means storing the filling material charging information in association with the specified compartment.
このケーソン中詰材投入管理方法によれば、ケーソンの各隔室へ中詰材を投入するとき、ケーソンの隔室毎に中詰砂の投入量を正確に把握し中詰砂を均等に投入できるように管理することができる。これにより、ケーソンにおける偏荷重や傾きの発生を防ぐことができる。 According to this caisson filling material input management method, when filling the filling material into each compartment of the caisson, the filling amount of filling sand is accurately grasped for each compartment of the caisson, and the filling sand is evenly charged. You can manage as you can. Thereby, generation | occurrence | production of the unbalanced load and inclination in a caisson can be prevented.
上記ケーソン中詰材投入管理方法において、前記船が複数あり各中詰材投入手段を用いて中詰材を投入する場合、前記船毎に前記情報処理手段を配置し、前記各情報処理手段は互いに接続され、前記記憶ステップにおいて前記各情報処理手段が別の船における中詰材投入情報を記憶して共有することで、複数のガット船を使用した場合でも、ケーソンの隔室毎に中詰砂の投入量を正確に把握し中詰砂を均等に投入できるように管理できる。 In the caisson filling material charging management method, when there are a plurality of the ships and the filling material is loaded using each filling material loading means, the information processing means is disposed for each ship, Even when a plurality of gut ships are used, the information processing means is connected to each other, and the information processing means stores and shares the information on filling of the filling materials in different ships in the storing step, so that the filling is performed for each caisson compartment. It can be managed so that the amount of sand input can be accurately grasped and the filled sand can be input uniformly.
また、前記情報処理手段が前記ケーソンの隔室の平面座標および前記中詰材投入情報を表示手段に表示させる表示ステップをさらに含み、前記中詰材の前記隔室への投入毎に累積された前記中詰材投入情報を表示することにより、隔室毎に累積された中詰材投入情報をオペレータ等が簡単に知ることができる。 The information processing means further includes a display step for causing the display means to display the plane coordinates of the caisson compartment and the filling material charging information on the display means, and the information processing means is accumulated every time the filling material is charged into the compartment. By displaying the filling material charging information, the operator or the like can easily know the filling material charging information accumulated for each compartment.
また、前記中詰材投入情報は、前記中詰材投入手段による中詰材の隔室への投入回数であり、前記表示ステップにおいて前記隔室の平面位置に前記投入回数を表示し、前記投入回数が最も少ない隔室について表示をすることにより、オペレータ等が次に投入対象とする隔室を簡単に知ることができるので、投入作業が容易になる。また、投入回数が最も少ない隔室に中詰材を投入できるので、ケーソンにおける偏荷重や傾きの発生を防ぐことができる。 The filling material charging information is the number of times the filling material is put into the compartment by the filling material feeding means. In the display step, the filling number is displayed at a plane position of the compartment, and the filling is performed. By displaying the compartment with the smallest number of times, the operator or the like can easily know the compartment to be placed next, so the filling operation is facilitated. Further, since the filling material can be introduced into the compartment with the smallest number of times of introduction, it is possible to prevent the occurrence of uneven load and inclination in the caisson.
また、前記中詰材投入手段による中詰材の各隔室への投入を所定の順序で行うように前記表示ステップにおいて前記中詰材を次に投入すべき隔室について表示をすることにより、オペレータ等が中詰材を次に投入すべき隔室を簡単に知ることができるので、投入作業が容易になる。また、各隔室への投入を所定の順序で行うことができるので、あらかじめケーソンにおける偏荷重や傾きが生じ難いような順序を決めておくことで、ケーソンにおける偏荷重や傾きの発生を防ぐことができる。 Further, by displaying the compartment to be charged next in the display step so as to perform the filling into each compartment of the filling material by the filling material input means in a predetermined order, Since the operator or the like can easily know the compartment in which the filling material is to be input next, the input operation is facilitated. In addition, since the loading into each compartment can be performed in a predetermined order, it is possible to prevent the occurrence of uneven loads and inclinations in the caisson by determining the order in which the unbalanced loads and inclinations in the caisson are unlikely to occur in advance. Can do.
また、本実施形態によるもう1つのケーソン中詰材投入管理方法は、複数の隔室を有するケーソンの各隔室に中詰材を投入するときの管理方法であって、上述の記載のケーソン中詰材投入管理システムを用いることを特徴とする。 Further, another caisson filling material input management method according to the present embodiment is a management method when charging the filling material into each compartment of a caisson having a plurality of compartments, and includes the above-described caisson medium. It is characterized by using a filling material input management system.
このケーソン中詰材投入管理方法によれば、ケーソンの各隔室へ中詰材を投入するとき、ケーソンの隔室毎に中詰砂の投入量を正確に把握し中詰砂を均等に投入できるように管理することができる。これにより、ケーソンにおける偏荷重や傾きの発生を防ぐことができる。 According to this caisson filling material input management method, when filling the filling material into each compartment of the caisson, the filling amount of filling sand is accurately grasped for each compartment of the caisson, and the filling sand is evenly charged. You can manage as you can. Thereby, generation | occurrence | production of the unbalanced load and inclination in a caisson can be prevented.
本実施形態によるコンピュータ用プログラムは、上述のケーソン中詰材投入管理方法における各ステップを情報処理手段に実行させるためのプログラムである。 The computer program according to the present embodiment is a program for causing the information processing means to execute each step in the above-described caisson filling material input management method.
このコンピュータ用プログラムによれば、ケーソンの各隔室へ中詰材を投入するとき、ケーソンの隔室毎に中詰砂の投入量を正確に把握し中詰砂を均等に投入できるように情報処理手段を作動させることができる。 According to this computer program, when filling the filling material into each compartment of the caisson, information is provided so that the amount of filling sand can be accurately grasped for each compartment of the caisson and the filling sand can be thrown evenly. The processing means can be activated.
本発明によれば、ケーソンの各隔室へ中詰砂を投入するとき、複数のガット船を使用した場合でも、ケーソンの隔室毎に中詰砂の投入量を正確に把握し中詰砂を均等に投入できるように管理可能なケーソン中詰材投入管理システム、方法およびそのためのコンピュータ用プログラムを提供することができる。 According to the present invention, when filling sand into each compartment of the caisson, even when a plurality of gut ships are used, it is possible to accurately grasp the amount of filling sand for each compartment of the caisson, It is possible to provide a caisson filling material input management system, method, and computer program therefor that can be managed so that they can be uniformly input.
以下、本発明を実施するための形態について図面を用いて説明する。図1は本実施形態によるケーソン中詰材投入管理システムを説明するための概略図である。図2は二隻のガット船に搭載される図1のケーソン中詰材投入管理システムを概略的に示すブロック図である。 Hereinafter, embodiments for carrying out the present invention will be described with reference to the drawings. FIG. 1 is a schematic diagram for explaining the caisson filling material input management system according to the present embodiment. FIG. 2 is a block diagram schematically showing the caisson filling material input management system of FIG. 1 mounted on two gut ships.
図1に示すように、複数の隔室Rを有する比較的大型のケーソンKSが護岸・岸壁工事などのために水底地盤Gに設置されると、各隔室Rには中詰砂などの中詰材がガット船GTなどを用いて投入される。図1のガット船GTは、グラブ付き揚貨装置を有する自航式石材運搬船で、中詰材などの投入手段として、旋回・伸縮可能なブームBMとその先端から吊り下げられ開閉可能な投入部であるグラブGBとを有する。ガット船GTのオペレータ室OPでの操縦によりブームBMの伸縮や旋回およびグラブGBの開閉が制御されて運搬されてきた中詰砂がケーソンKSの隔室Rに投入される。なお、ケーソンKSが設置される水底地盤Gは、あらかじめ捨石などにより基礎マウンドが構築される場合がある。 As shown in FIG. 1, when a relatively large caisson KS having a plurality of compartments R is installed on the bottom ground G for revetment and quay construction, etc. The filling material is introduced using a gut ship GT or the like. 1 is a self-propelled stone carrier ship having a grab lifting device, and as a charging means for filling materials, etc., a boom BM that can be swung / expanded and a closing part that is suspended from its tip and can be opened and closed. And grab GB. Filled sand that has been transported by controlling the expansion and contraction and turning of the boom BM and the opening and closing of the grab GB by maneuvering in the operator room OP of the gut ship GT is thrown into the compartment R of the caisson KS. In addition, the foundation mound may be constructed | assembled previously by the rubble etc. for the water bottom ground G in which the caisson KS is installed.
図1のケーソン中詰材投入管理システム10は、ガット船GTが運搬してきた中詰砂をブームBMとグラブGBとの操縦によりケーソンKSの隔室Rに投入するとき、その中詰砂の投入回数などの投入情報を管理し、また、中詰砂を投入すべき適切な隔室Rをオペレータ室OPに指示するようにしたものである。
The caisson filling material
図1のケーソン中詰材投入管理システム10は、図2のように、各種情報を入力し所定の情報処理を行い中詰砂の投入情報等を記憶する情報処理手段としてのパーソナルコンピュータ(パソコン、PC)11と、液晶表示モニタからなり各種情報を表示する表示部12と、別のガット船との間で投入情報等を共有するために無線アンテナ13aを介して情報通信を行う無線LAN13と、GPS本体14と、GPSアンテナ等からなりブームBMの先端やグラブGBの上部中央等に設けられるGPS受信部15と、グラブGBの開閉を検知するグラブ開閉センサ16と、を備える。
As shown in FIG. 2, the caisson filling material
グラブ開閉センサ16は、グラブGBの実際の開閉を検知する構成、または、グラブ開閉ワイヤの送り出しを検知する構成などとすることができるが、これらに限定されるものではない。
The grab opening /
図2は、別のガット船に搭載されるもう1つのケーソン中詰材投入管理システム10Aも示すが、ケーソン中詰材投入管理システム10と同様に、パーソナルコンピュータ(パソコン、PC)21と、表示部22と、無線LAN23と、GPS本体24と、GPS受信部25と、グラブ開閉センサ26と、を備える。
FIG. 2 also shows another caisson filling material
図3は、本実施形態におけるケーソンの複数の隔室と、ケーソンに接舷する2隻のガット船の位置とを概略的に示す平面図である。図4は、図2のケーソン中詰材投入管理システム10,10Aのパソコン(PC)11,21の概略的構成を示すブロック図である。
FIG. 3 is a plan view schematically showing a plurality of compartments of the caisson and the positions of two gut ships in contact with the caisson in the present embodiment. 4 is a block diagram showing a schematic configuration of the personal computers (PCs) 11 and 21 of the caisson filling material
図3のように、例えば、6列(A〜F)×5列(1〜5)の計30の隔室を有するような比較的大型のケーソンKSに対し中詰砂を投入する場合、2隻のガット船GT1,GT2を用いる。ガット船GT1,GT2の各ブームBM1,BM2はクレーンの回転中心r1,r2を中心に旋回し、所定位置でその先端から吊り下げられたグラブGB(図1)から中詰砂が隔室に投入されるが、ブーム長などの関係からガット船GT1一隻でケーソンKSのすべての隔室に投入できない場合があり、例えば、図3の破線aまでの範囲の隔室に対し中詰砂を投入可能である。同様にして、ガット船GT2についても中詰砂を投入可能な範囲が設定される。 As shown in FIG. 3, for example, when filling sand is introduced into a relatively large caisson KS having 30 compartments of 6 rows (A to F) × 5 rows (1 to 5), 2 Two gut ships GT1 and GT2 are used. The booms BM1 and BM2 of the gut ships GT1 and GT2 turn around the rotation centers r1 and r2 of the crane, and the filled sand is thrown into the compartment from the grab GB (FIG. 1) suspended from its tip at a predetermined position. However, due to boom length, etc., there is a case where one gut ship GT1 cannot be put into all the compartments of caisson KS. For example, filled sand is thrown into the compartments up to the broken line a in FIG. Is possible. Similarly, a range in which medium-filled sand can be input is set for the gut ship GT2.
図4のように、図1,図2のケーソン中詰材投入管理システム10のPC11は、各種制御を実行する中央演算処理装置(CPU)31と、無線LAN13等による各種情報の出入力のためのインターフェース部(I/F)32と、情報入力のためのマウス等のポインティングデバイスやキーボード等からなる入力部33と、各種情報を記憶するROMやRAM等からなる記憶部34と、ハードディスクやROM等の記憶装置から構成されOS(オペレーティングシステム)35aおよびケーソン中詰材投入管理ソフト35b等のソフトウエアを格納するソフトウエア格納部35と、制御の際にプログラムや各種情報を一時的に保存するRAM等からなるメモリ36と、を有する。
As shown in FIG. 4, the
図4の記憶部34は、図3の破線aで示すような一隻のガット船が投入可能な範囲にあるケーソンの各隔室の位置情報、ケーソンの各隔室の平面座標、投入情報としてケーソンの各隔室毎の中詰材投入回数や中詰材投入量などの各種情報を記憶する。
The
図1〜図4のように、2隻のガット船同士は、PC11,21が図2の破線のように、無線LAN13,23により互いに無線接続されることで、PC11,21の各記憶部に同じ投入情報等の各種情報を記憶することができ、投入情報の共有化を実現できる。
As shown in FIG. 1 to FIG. 4, the two gut ships are connected to each storage unit of the
また、GPS受信部15,25およびGPS本体14,24は、受信したGPS位置情報からグラブGBの平面座標情報を取得し、このグラブGBの平面座標情報と、記憶部34に記憶されたケーソンKSの隔室Rの平面座標情報とから、グラブGBのケーソンKSの隔室Rに対する平面位置を確定することができる。
Further, the
グラブGBを開放して中詰砂を投入すると、その中詰材投入をグラブ開閉センサ16が検知することで、グラブGBの平面位置と対応するケーソンKSの隔室Rに投入されたことを検知し、その中詰砂が投入された隔室Rについて中詰材投入1回がカウントされて記憶部34に記憶される。このようにして、中詰砂が投入されるたびにケーソンKSの各隔室毎に中詰材投入回数が記憶部34に記憶される。
When grab GB is opened and filled sand is inserted, grab opening /
なお、グラブGBがブームBMの旋回によりガット船GTの砂貯蔵部へ移動し、その位置で中詰砂をつかむために開放しても、そのグラブGBの平面位置と対応するケーソンKSの隔室は存在しないので、中詰材投入はカウントされない。また、グラブGBの容量(グラブGBが中詰砂を保持する容積)は既知であるので、中詰材投入回数から積算された中詰材投入量を算出することができる。 Even if the grab GB moves to the sand storage part of the gut ship GT by the turning of the boom BM and opens to grab the filled sand at that position, the compartment of the caisson KS corresponding to the planar position of the grab GB Since there is no medium, the filling material is not counted. Further, since the capacity of the grab GB (the volume in which the grab GB holds the filled sand) is known, the accumulated amount of filled medium can be calculated from the number of filled medium charges.
図5は図1,図2の表示部に表示される中詰材投入管理画面の例を示す図である。 FIG. 5 is a diagram showing an example of the filling material input management screen displayed on the display unit of FIGS. 1 and 2.
PC11,21の表示部12,22には、図5のように、中詰材投入管理画面として、ケーソンの複数の隔室の平面図が表示され、表示された各隔室に積算された中詰材投入回数が表示される。これにより、ケーソンの各隔室毎の中詰材投入回数を視覚的に知ることができる。
As shown in FIG. 5, a plan view of a plurality of compartments of the caisson is displayed on the
なお、図5のような中詰材投入管理画面に中詰材投入回数とともに積算された中詰材投入量(グラブGBの容量×中詰材投入回数)を表示するようにしてもよく、また、積算された中詰材投入量のみを表示するようにしてもよい。積算された中詰材投入量の表示は、複数のガット船を用い、ガット船毎にグラブの容量が異なる場合に適している。 It is also possible to display the accumulated filling material input amount (the capacity of the grab GB × the number of medium filling materials) as well as the number of filling materials input on the filling material input management screen as shown in FIG. Alternatively, only the accumulated filling material input amount may be displayed. The display of the accumulated filling material input amount is suitable when a plurality of gut ships are used and the glove capacity differs for each gut ship.
また、ケーソンの各隔室への均等な中詰砂の投入のために、パソコン11,21は、各隔室の中詰材投入回数の差を算出し、投入回数差が所定の値以上となったと判断すると、表示部12,22において投入回数のもっとも少ない隔室を選定し図の線bのようなフリッカ表示等により警告表示をする。これにより、オペレータ室OPのオペレータは、中詰材投入回数にバラツキがでてきたこと、および、ケーソンで偏荷重にならないように次に投入すべき隔室の位置を知ることができる。
In addition, in order to evenly insert the filling sand into each compartment of the caisson, the
なお、投入回数差が所定の値未満となると、フリッカ表示等による警告表示は止まる。また、画面表示した隔室を投入回数ごとに色分けし、中詰材投入回数を数値表示とあわせて色別表示してもよい。 When the difference in the number of times of insertion becomes less than a predetermined value, the warning display by flicker display stops. Further, the compartments displayed on the screen may be color-coded according to the number of times of charging, and the number of times of filling of the filling material may be displayed by color together with the numerical value display.
また、PC11,21は、ケーソンにおける偏荷重を考慮した中詰砂投入推奨位置を選定し、図5の破線cのようなマーキングで表示する。また、図5のように、GPS位置情報から得たブームBMの先端位置を図の線dのように表示することで、オペレータはブームBMの現在位置を把握することができる。
Further, the
また、PC11,21は、図3のようなケーソンにおいて各ガット船による中詰砂投入可能な隔室範囲が設定されると、その投入可能な隔室範囲(隔室の平面座標)を記憶部34に記憶させる。図5の破線cのようなマーキングで中詰砂投入推奨位置が選定されたとき、もし、そのガット船の投入可能範囲外であると、そのガット船の表示部には図5の破線cのようなマーキングは表示されず、投入可能範囲内であるガット船の表示部に表示される。
Further, when a compartment range in which the filling sand can be introduced by each gut ship is set in the caisson as shown in FIG. 3, the
図4のPC11のソフトウエア格納部35のケーソン中詰材投入管理ソフト35bには、ケーソン中詰材投入管理のためのプログラムがインストールされて格納されており、このプログラムがCPU31の制御により実行されることで、PC11は、図6,図7,図9等における各ステップを実行することができる。なお、PC21も、図4と同様に構成されている。
The caisson filling material
〈第1の動作〉
図1〜図5のケーソン中詰材投入管理システム10,10Aによる第1の動作について図6を参照して説明する。図6は、図1〜図5のケーソン中詰材投入管理システムによる第1の動作による各ステップ(S01〜S14)を説明するためのフローチャートである。
<First operation>
A first operation by the caisson filling material
まず、事前設定として、図1のように、使用するガット船GTのブームBM先端にGPS受信部15を設置し、オペレータ室OPにPC11やGPS本体14等を設置する。なお、もう1隻のガット船を使用する場合には、図2のGPS受信部25、PC21やGPS本体24等を同様に設置する。PC11,21のソフトウエア格納部35のケーソン中詰材投入管理ソフト35bにインストールされているケーソン中詰材投入管理プログラムを立ち上げ、ケーソンの平面座標やブーム長のデータをパソコン11,21へ入力し、記憶部34に記憶させる(S01)。
First, as a preset, as shown in FIG. 1, the
図3のように、ガット船GT1をケーソンKSに接舷して、ガット船GT1の位置決めを行う。このとき、パソコン11は、ブーム長から計算される図3の破線aのような投入可能範囲を表示部12の画面に表示する。ブーム長により投入可能範囲を決定し、クレーン回転中心r1,r2を原点とし、各隔室の平面座標を認識させ、記憶部34に記憶させる。
As shown in FIG. 3, the gut ship GT1 is brought into contact with the caisson KS to position the gut ship GT1. At this time, the
次に、PC11の表示部12に、新規の作業であるか否かを問う画面を表示する(S03)。新規作業の場合は、画面上で「新規」ボタンを押し、新規作業でない場合は前回のデータを更新する(S04)。
Next, a screen asking whether or not the work is a new work is displayed on the
次に、使用するガット船が、単独であるか2隻であるかを問う画面(「単独 or 2隻」を表示し、画面上で「単独」「2隻」のいずれかを選択する(S05)。 Next, a screen asking whether the gut boat to be used is single or two ("single or two boats" is displayed, and either "single" or "two boats" is selected on the screen (S05 ).
ガット船を2隻使用する場合は、PC11,21を無線LAN13,23で無線接続し、中詰砂の投入データを共有化する(S06)。
When two gut ships are used, the
次に、ガット船のPC11の表示部12の画面に表示される「投入開始」ボタンを押す(S07)。これにより、図5のような中詰材投入管理画面41がPC11の表示部12に表示される。
Next, the “loading start” button displayed on the screen of the
ガット船が中詰砂を運搬し、ブームBMとグラブGBを操縦してケーソンKSの隔室に対し中詰砂投入作業を行う(S08)。図5の表示部12の中詰材投入管理画面41にはケーソンの各隔室毎に中詰材投入回数が表示される。すなわち、中詰砂が投入されると、その投入をグラブ開閉センサ16が検知し、GPS位置情報から得たグラブGBの平面座標に基づいて投入を特定された隔室に、1が加算された中詰砂投入回数が表示される。
The gut ship carries the filled sand, steers the boom BM and the grab GB, and performs the filled sand input operation into the compartment of the caisson KS (S08). The filling material
図5の中詰材投入管理画面41には、ブームBMの先端位置が線dのように表示され、このとき、中詰砂投入回数が少ないため線bのようなフリッカ表示がされると、その隔室の位置にブームBMを移動させて中詰材の投入を行うことができる。このように、フリッカ表示等の警告表示をすることで投入回数の少ない隔室をオペレータに知らせ、その隔室にブームBMを誘導し、ケーソンKSにおいて偏荷重にならないように投入を行うことができる。
In the filling material
また、フリッカ表示がされない場合でも、図5のマーキングの線cによりケーソンKSにおける偏荷重を考慮した投入推奨位置を表示することで、オペレータは、その推奨位置の隔室に中詰砂の投入を行うことができる。 Even when the flicker is not displayed, the operator can input the filled sand into the compartment at the recommended position by displaying the recommended loading position in consideration of the unbalanced load in the caisson KS by the marking line c in FIG. It can be carried out.
次に、ガット船による中詰砂投入作業が終了すると、表示部12に、「ガット船の中詰砂がなくなる or 規定量入った」のいずれかを問う画面が表示される(S09)。未だ規定量に達せず、「中詰砂がなくなる」を選択すると、次に使用するガット船が、単独であるか2隻であるかを問う画面(「単独 or 2隻」が表示され、画面上で「単独」「2隻」のいずれかを選択する(S10)。なお、ケーソンの各隔室に中詰砂が規定量だけ入った場合は、作業終了となる(S14)。 Next, when the filling sand filling operation by the gut ship is completed, a screen asking whether "the gut ship filling sand is exhausted or a prescribed amount has been entered" is displayed on the display unit 12 (S09). If you have not reached the specified amount yet and select “No padded sand”, you will be asked whether you want to use one or two gut ships (single or two ships). In the above, either “single” or “two vessels” is selected (S10), and when the specified amount of filled sand enters each compartment of the caisson, the operation ends (S14).
ステップS10で単独のガット船を選択した場合は、ステップS06で無線LAN接続した共有化を解除する(S11)。 When a single gut ship is selected in step S10, sharing using wireless LAN connection is canceled in step S06 (S11).
次に、表示部12には、投入作業の「完了 or 継続」を問う画面が表示され(S12)、投入作業の「継続」を選択すると、ガット船は中詰砂の搬入をしてから(S13)、ステップS02に戻り、以降、同じ手順を繰り返す。また、投入作業が完了の場合、表示部12に表示された「完了」ボタンを押すことで、作業を終了する(S14)。
Next, the
以上のように、本実施形態のケーソン中詰材投入管理システムによれば、中詰砂の投入を行うガット船のグラブの平面座標をGPSから得て、グラブの平面座標と各隔室の平面座標とから、中詰材の投入をグラブ開閉センサ16が検知すると、投入された隔室を特定し、投入1回がカウントされ、自動的に中詰材投入回数が積算されて記憶される。
As described above, according to the caisson filling material input management system of the present embodiment, the plane coordinates of the glove of the gut ship that inputs the filling sand are obtained from the GPS, and the plane coordinates of the grabs and the plane of each compartment are obtained. When the grab opening /
従来、中詰材投入回数や投入済隔室の確認はオペレーターの記憶や目視に頼っていたが、大型ケーソンの場合、ガット船2隻で中詰材投入作業を行うため、投入隔室の把握が難しく、各隔室に均等に砂を投入できなかったのに対し、本実施形態によれば、2隻のガット船で中詰砂投入作業を行う場合、双方のPC11,21を無線接続して、ケーソンの各隔室毎の中詰材投入回数のデータを共有化して記憶し、ケーソン全体の中詰材投入回数を表示部に表示することで、ケーソンの各隔室に対する中詰材投入を正確かつ一元的に管理することができる。
Conventionally, the number of filling materials and the number of filled compartments have been checked by the operator's memory and visual inspection. However, in the case of a large caisson, the filling compartment is filled by two gut ships, so it is necessary to grasp the filling compartment. However, according to this embodiment, when filling sand filling work with two gut ships, both
ケーソンの各隔室毎に中詰材投入回数がばらついた場合、PCの表示部に、投入回数が少なく投入回数差の大きい隔室を警告表示やマーキング表示し、または、投入回数が少ない隔室をマーキング表示や警告表示することで、次に投入する隔室を簡単に知ることができるとともに、ケーソンに偏荷重が生じないように管理でき、ケーソンの傾きの発生を防ぐことができる。 If the number of filling materials varies for each compartment of the caisson, a warning display or marking is displayed on the display section of the PC with a small number of loadings and a large difference in the number of loadings. By marking and warning display, it is possible to easily know the next chamber to be introduced, and to manage the caisson so as not to generate an unbalanced load, thereby preventing the caisson from being tilted.
〈第2の動作〉
図1〜図5のケーソン中詰材投入管理システム10,10Aによる第2の動作について図7〜図10を参照して説明する。
<Second operation>
A second operation by the caisson filling material
図7は、図1〜図5のケーソン中詰材投入管理システムによる第2の動作における各ステップ(S21〜S32)を説明するためのフローチャートである。図8は、図7による動作においてケーソンの各隔室に中詰砂を投入する順序(1)〜(12)を説明するための図(a)〜(l)である。 FIG. 7 is a flowchart for explaining each step (S21 to S32) in the second operation by the caisson filling material input management system of FIGS. FIG. 8 is a diagram (a) to (l) for explaining the order (1) to (12) in which the filling sand is put into each compartment of the caisson in the operation according to FIG.
第2の動作は、複数の隔室を有するケーソンについて、中詰砂の隔室に対する投入順序を所定のルールで決定し、表示部に表示し、オペレータが表示部に表示された順序に従って中詰砂の投入作業を行うことで、投入作業を容易化したものである。この場合、ケーソンの各隔室への中詰砂の投入作業は、図6の第1の動作によって行うことができる。 In the second operation, for caissons having a plurality of compartments, the filling order of the filling sand compartments is determined according to a predetermined rule, displayed on the display unit, and filled by the operator according to the order displayed on the display unit. By performing the sand loading operation, the loading operation is simplified. In this case, the filling operation of the filling sand into each compartment of the caisson can be performed by the first operation of FIG.
ここで、中詰砂投入の対象となる隔室の選定について説明する。本実施形態における隔室の選定は、次のケース1〜4のいずれかに該当する。なお、最初の投入は任意に選定された隔室に対して行う。
Here, selection of the compartment which becomes the object of the filling sand filling will be described. The selection of the compartment in this embodiment corresponds to one of the following
ケース1(CASE1):前回投入した隔室の右の隔室
ケース2(CASE2):前回投入した隔室の対角位置にある隔室
ケース3(CASE3):前回投入した隔室の左の隔室
ケース4(CASE4):図9に示す「右回り演算式」により選定された隔室
Case 1 (CASE1):
図7を参照して第2の動作について説明すると、まず、事前設定として、ケーソンの隔室の数、ケーソンの寸法、投入規定回数をPC11に入力し、記憶部34に記憶させる(S21)。
The second operation will be described with reference to FIG. 7. First, as a preset, the number of caisson compartments, the size of the caisson, and the prescribed number of times of input are input to the
なお、本例では、ケーソンの隔室の数を図8のように縦3列、横4列の計12室としたが、これは一例であって、他の隔室構成であってよい。また、投入規定回数は、ケーソンの各隔室において所定量の中詰砂が投入されるべき容積と、グラブが中詰砂を保持する容積とから算出される中詰砂の総投入回数であり、投入回数が投入規定回数に達すれば、その隔室に対する中詰砂の投入が終了したと判断される。なお、投入回数ではなく、中詰砂の投入量で判断するようにしてもよい。 In this example, the number of caisson compartments is 12 in total in 3 rows and 4 rows as shown in FIG. 8, but this is only an example, and other compartment configurations may be used. In addition, the specified number of times of charging is the total number of times of filling of the filled sand calculated from the volume in which a predetermined amount of filled sand is charged in each compartment of the caisson and the volume in which the grab holds the filled sand. If the number of times of charging reaches the specified number of times of charging, it is determined that the charging of the filling sand into the compartment has been completed. In addition, you may make it judge not with the frequency | count of injection | throwing-in but with the input amount of filling sand.
次に、中詰砂をケーソンの任意の位置の隔室に投入する(S22)。例えば、図8(a)の(1)で示す隔室である。 Next, the filling sand is put into a compartment at an arbitrary position of the caisson (S22). For example, it is a compartment shown by (1) in FIG.
次に、前回の投入位置を基準にして、ケーソンの重心に対し偏心の少ない対角位置の隔室を選定する(S23)。そして、その選定された対角位置の隔室が投入済みであるかを判断し(S24)、投入が未だ済んでいない場合、その隔室の位置を、PC11の表示部12に表示された図5のような中詰材投入管理画面において、次に投入すべき隔室としてフリッカ表示する(S29)。
Next, with reference to the previous charging position, a compartment at a diagonal position with little eccentricity with respect to the center of gravity of the caisson is selected (S23). Then, it is determined whether or not the compartment at the selected diagonal position has been put in (S24). If the compartment has not been put in, the position of the compartment is displayed on the
次に、そのフリッカ表示により指定された隔室に中詰砂を投入する(S30)。図8(b)の(2)で示す隔室である。これがケース2の場合である。
Next, the filled sand is put into the compartment designated by the flicker display (S30). It is a compartment shown by (2) in FIG. This is the
次に、すべての隔室に対し中詰砂を1回投入したかを判断し(S31)、未だ投入していないのでステップS23,S24へ戻るが、対角位置の隔室には既に投入がされているから、次に、前回投入した隔室の右に空の隔室があるかを判断する(S25)。この隔室は空であるので、この隔室に対しフリッカ表示し(S29)、その隔室に中詰砂を投入する(S30)。図8(c)の(3)で示す隔室である。これがケース1の場合である。
Next, it is determined whether or not the filled sand has been introduced once for all the compartments (S31), and since it has not been introduced yet, the process returns to steps S23 and S24. Therefore, it is next determined whether or not there is an empty compartment to the right of the compartment introduced last time (S25). Since this compartment is empty, flickering is displayed for this compartment (S29), and filled sand is put into the compartment (S30). It is a compartment shown by (3) in FIG. This is the
次に、ステップS23,S24へ戻ると、前回投入した隔室の対角位置の隔室には投入されていないから、この隔室に対しフリッカ表示し(S29)、その隔室に中詰砂を投入する(S30)。図8(d)の(4)で示す隔室である。ケース2である。
Next, when returning to steps S23 and S24, since it has not been put into the compartment at the diagonal position of the previously put compartment, flicker display is given to this compartment (S29), and the filled sand in the compartment is displayed. (S30). This is a compartment indicated by (4) in FIG.
次に、ステップS23,S24,S25に戻ると、前回投入した隔室の右の隔室には既に投入がされているから、次に、前回投入した隔室の左に空の隔室があるかを判断する(S26)。この隔室は空であるので、この隔室に対しフリッカ表示し(S29)、その隔室に中詰砂を投入する(S30)。図8(e)の(5)で示す隔室である。これがケース3の場合である。
Next, when returning to steps S23, S24, and S25, since the right compartment of the previously introduced compartment has already been filled, there is an empty compartment to the left of the previously filled compartment. (S26). Since this compartment is empty, flickering is displayed for this compartment (S29), and filled sand is put into the compartment (S30). This is a compartment indicated by (5) in FIG. This is the
次に、ステップS23,S24へ戻ると、前回投入した隔室の対角位置の隔室には未だ投入されていないから、この隔室に対しフリッカ表示し(S29)、その隔室に中詰砂を投入する(S30)。図8(f)の(6)で示す隔室である。ケース2である。
Next, when returning to steps S23 and S24, since it has not been put in the compartment at the diagonal position of the previously put compartment, flicker is displayed for this compartment (S29), and the compartment is filled. Sand is thrown in (S30). This is a compartment indicated by (6) in FIG.
次に、ステップS23,S24,S25,S26に戻るが、前回投入した隔室の左の隔室には既に投入されているから、次に、「右回り演算式」で空の隔室を選定する(S27)。そして、この選定した隔室が空であるか否かを判断し(S28)、空であれば、この隔室に対しフリッカ表示し(S29)、その隔室に中詰砂を投入する(S30)。図8(g)の(7)で示す隔室である。これがケース4の場合である。
Next, the process returns to steps S23, S24, S25, and S26, but since the left compartment of the previously put compartment has already been introduced, an empty compartment is next selected by the “clockwise arithmetic expression”. (S27). Then, it is determined whether or not the selected compartment is empty (S28). If it is empty, flickering is displayed for this compartment (S29), and the filled sand is put into the compartment (S30). ). This is the compartment indicated by (7) in FIG. This is the
以降、同様にして、ケース1〜4による空の隔室の選定、フリッカ表示(S29)、中詰砂投入(S30)を繰り返し、その結果、順に、図8(h)〜(l)の(8)(9)(10)(11)(12)の隔室に中詰材が投入される。
Thereafter, in the same manner, the selection of empty compartments by
すべての隔室に対し中詰砂を1回投入したと判断されるので(S31)、次に、投入規定回数に達していないと判断されると(S32)、ステップS22に戻り、以降、同様にして、隔室選定、フリッカ表示、中詰材投入が投入規定回数に達するまで行われる(S32)。 Since it is determined that the filled sand has been introduced once for all the compartments (S31), and then it is determined that the prescribed number of times of injection has not been reached (S32), the process returns to step S22, and so on. Thus, compartment selection, flicker display, and filling of the filling material are performed until the specified number of times of filling is reached (S32).
以上のように、図7,図8のケーソン中詰材投入管理方法によれば、ケーソンの複数の隔室に対し中詰砂の投入順序をPCの表示部に表示し、次に投入すべき隔室をフリッカ表示などにより警告表示してオペレータに知らしめるので、オペレータの投入作業が容易となり、オペレータの負担が軽減する。 As described above, according to the caisson filling material input management method of FIGS. 7 and 8, the charging order of the filling sand is displayed on the display unit of the PC for the plurality of compartments of the caisson, and should be input next. Since the operator is informed by warning display of the compartment by flicker display or the like, the operator's input work becomes easy and the burden on the operator is reduced.
また、すべての隔室に中詰砂を1回投入してから、次の回の中詰砂を投入するので、投入回数差が1回を超えることがなく、ケーソンに対して偏荷重が少なくなるように中詰砂の投入を行うことができる。 In addition, since the filling sand is put into all the compartments once and then the filling sand is put in the next time, the difference in the number of filling does not exceed one time and the load on the caisson is small. Filling sand can be charged so that
また、中詰砂をステップS22,S23において、次の中詰材投入対象とする隔室を選定するに当たり、前回投入した隔室を基準にしてケーソンの重心に対して偏心の少ない対角位置の隔室をまず選定し、ケース2による対角位置の選定を優先するので、ケーソンに偏荷重や傾きが生じないように中詰砂を均等に投入することができる。
Further, in selecting the next compartment to be filled with the filling sand in steps S22 and S23, the diagonal position with little eccentricity with respect to the center of gravity of the caisson is selected with reference to the previously filled compartment. Since the compartment is selected first, and the selection of the diagonal position by the
次に、上述のステップS27,S28におけるケース4(CASE4)の「右回り演算式」による隔室の選定について図9,図10を参照して説明する。 Next, selection of a compartment based on the “clockwise arithmetic expression” in case 4 (CASE 4) in the above-described steps S27 and S28 will be described with reference to FIGS.
図9は図7の右回り演算式(ケース4)によるステップS27等を説明するための図である。図10は、図8のケーソンの各隔室の位置をあらわすために設定したXY座標系を示す図(a)および図9において使用する数値についての定義を示す表(b)である。 FIG. 9 is a diagram for explaining step S27 and the like based on the clockwise expression (case 4) of FIG. FIG. 10 is a diagram (a) showing an XY coordinate system set to represent the position of each compartment of the caisson of FIG. 8, and a table (b) showing the definitions of numerical values used in FIG.
図8(f)の(6)で示す隔室への中詰砂の投入に続いて投入すべき隔室は、上述のように、ステップS23〜S26で選定された隔室が既に投入済みと判断された場合、次のようにして選定される(ケース4)。 As described above, the compartment to be put in after the filling of the filled sand into the compartment shown in (6) of FIG. 8 (f) has already been put in the compartment selected in steps S23 to S26. If it is determined, it is selected as follows (Case 4).
図10(a)(b)のように、縦3列×横4列のケーソンの隔室について、XY座標を設定し、各隔室をXI(I=1,2,3,4),YI(I=1,2,3)であらわす。 As shown in FIGS. 10 (a) and 10 (b), XY coordinates are set for caisson compartments of 3 columns × 4 rows, and each compartment is designated as XI (I = 1, 2, 3, 4), YI. (I = 1, 2, 3)
はじめに、最後に投入された隔室(図8(f)の(6)で示す)のX位置がXI=1であるか否かを判断する(S41)。いま、図8(f)の(6)で示す隔室(XI=4,YI=1)の次の隔室を選定する場合であるので、XI=4である。したがって、XI=1ではないので、次に、XI=Xmであるか否かを判断する(S45)。Xmは、Xの最大値であるので、XI=4=Xmである。 First, it is determined whether or not the X position of the last inserted compartment (indicated by (6) in FIG. 8F) is XI = 1 (S41). Now, since it is a case where the next compartment of the compartment (XI = 4, YI = 1) shown in (6) of FIG. 8 (f) is selected, XI = 4. Therefore, since XI = 1 is not satisfied, it is next determined whether or not XI = Xm (S45). Since Xm is the maximum value of X, XI = 4 = Xm.
次に、YI=1であるか否かを判断する(S46)。YI=1であるので、次に、隔室がX=XI−1、Y=YIと選定される(S47)。すなわち、X=3,Y=1の隔室である。しかし、ここは、図8(f)の(3)で示す隔室であり、既に投入されているので(図7のS28)、図7のステップS27に戻る。すなわち、図9のステップS41に戻る。 Next, it is determined whether or not YI = 1 (S46). Since YI = 1, the compartment is then selected as X = XI-1, Y = YI (S47). That is, a compartment with X = 3 and Y = 1. However, since this is the compartment shown by (3) in FIG. 8 (f) and has already been put in (S28 in FIG. 7), the process returns to step S27 in FIG. That is, the process returns to step S41 in FIG.
そして、XI=1ではなく(S41)、XI=mではないので(S42)、次に、YI=1であるか否かを判断する(S49)。YI=1であるので、次に、隔室がX=XI−1、Y=YIと選定される(S50)。すなわち、X=2,Y=1の隔室である。しかし、ここは、図8(f)の(2)で示す隔室であり、既に投入されているので、ステップS41にふたたび戻る。 Then, not XI = 1 (S41) and XI = m is not satisfied (S42), and then it is determined whether YI = 1 (S49). Since YI = 1, the compartment is then selected as X = XI-1, Y = YI (S50). That is, it is a compartment of X = 2 and Y = 1. However, this is the compartment shown by (2) in FIG. 8 (f), and since it has already been put in, it returns to step S41 again.
同様に、ステップ41,S45,S49の判断がされ、隔室がX=XI−1、Y=YIと選定される(S50)。すなわち、XI=1,YI=1の隔室である。ここは、未だ投入されていないので、図8(g)の(7)で示す隔室に中詰材が投入される。
Similarly, determinations in
次に、別の場合について説明する。すなわち、(8)で示す隔室に投入された図8(h)において次の隔室を選定する場合である。ステップS41からはじめる。すなわち、最後に投入された隔室(図8(h)の(8)で示す)のX位置がXI=1であるか否かを判断する(S41)。 Next, another case will be described. That is, it is a case where the next compartment is selected in FIG. 8 (h) put into the compartment shown in (8). Starting from step S41. That is, it is determined whether or not the X position of the last inserted compartment (indicated by (8) in FIG. 8H) is XI = 1 (S41).
図8(h)の(8)で示す隔室は、XI=4,YI=3であるから、ステップS45,S46を経て、隔室がX=XI,Y=YI−1と選定される(S48)。すなわち、XI=4,YI=2の隔室である。ここは、未だ投入されていないので、図8(i)の(9)で示す隔室に中詰材が投入される。 Since the compartment indicated by (8) in FIG. 8H is XI = 4 and YI = 3, the compartment is selected as X = XI and Y = YI-1 through steps S45 and S46 ( S48). That is, it is a compartment with XI = 4 and YI = 2. Since this has not been put in yet, the filling material is put into the compartment indicated by (9) in FIG. 8 (i).
以上のように、ケーソンの隔室に対する中詰砂投入の選定をケーソンに偏荷重および傾きが生じないように行うことができる。また、図7,図9の隔室選定方法によれば、ケーソンの隔室の個数が変わった場合でも、対応することができ、汎用的に適用可能である。 As described above, it is possible to select the filling sand for the caisson compartment so that the caisson is not subjected to uneven load and inclination. Further, according to the compartment selection method of FIGS. 7 and 9, even when the number of caisson compartments is changed, it can be dealt with and can be applied universally.
以上のように本発明を実施するための形態について説明したが、本発明はこれらに限定されるものではなく、本発明の技術的思想の範囲内で各種の変形が可能である。例えば、図9の「右回り演算式」による隔室の選定は、一例であって、右回り(時計回り)に隔室を選定するが、本発明はこれに限定されず、例えば、左回り(反時計回り)に隔室を選定するようにしてもよい。 As described above, the modes for carrying out the present invention have been described. However, the present invention is not limited to these, and various modifications can be made within the scope of the technical idea of the present invention. For example, the selection of the compartment by the “clockwise arithmetic expression” in FIG. 9 is an example, and the compartment is selected clockwise (clockwise). However, the present invention is not limited to this. The compartment may be selected (counterclockwise).
また、注意を喚起する表示方法として、フリッカ表示(点滅表示)により説明したが、これに限定されず、赤色や黄色などの特定色による表示などであってもよい。 Further, although the display method for calling attention has been described with flicker display (blinking display), the display method is not limited to this, and display with a specific color such as red or yellow may be used.
また、オペレータ等に次に中詰砂を投入すべき隔室を知らせるためにその隔室の位置を表示部に表示する場合、この表示とともにまたはこの表示に代えて電子合成音を生成する合成音手段などを用いて音声により指示するようにしてもよい。 In addition, when displaying the position of the compartment on the display unit in order to notify the operator or the like of the next compartment to be filled with sand, the synthesized sound that generates an electronic synthesized sound together with or instead of this display You may make it instruct | indicate with an audio | voice using a means.
また、本実施形態では、中詰砂の運搬および投入のためにガット船(グラブ付き揚貨装置を有する自航式石材運搬船)を用いたが、本発明はこれに限定されず、例えば、ブームとグラブを有する台船(非自航式船)と、中詰砂を運搬するバージ船等の運搬船とを用いて、運搬船を台船に横付けして中詰砂の投入を行うようにしてもよい。 Further, in this embodiment, a gut ship (self-propelled stone carrier ship having a grab lifting device) is used for transporting and charging the filling sand, but the present invention is not limited to this, for example, a boom And using a barge with a grab (non-self-propelled ship) and a carrier ship such as a barge that transports padded sand, the carrier ship can be placed next to the barge and charged with padded sand. Good.
また、図6のステップS03,S04,S05,S07,S09,S10,S12,S14等における表示部12,22の画面構成例の図示は省略したが、それらは、本明細書の記載に基づいて適宜構成可能である。
Although illustration of screen configuration examples of the
本発明のケーソン中詰材投入管理システム・方法によれば、複数の隔室を有する比較的大型のケーソンを護岸・岸壁工事などのために水底地盤に設置してから各隔室に中詰材を投入するとき、ケーソンへの中詰材の確実な投入管理を実現でき、ケーソンに偏荷重や傾きが生じない。 According to the caisson filling material input management system / method of the present invention, a relatively large caisson having a plurality of compartments is installed on the water bottom ground for revetment and quay construction, etc., and then the filling material is placed in each compartment. When filling the caisson, it is possible to reliably control the filling of the filling material into the caisson, so that the caisson is free from uneven load and inclination.
10,10A ケーソン中詰材投入管理システム 11,21 パソコン、PC(情報処理手段) 12,22 表示部 14,24 GPS本体 15,25 GPS受信部 16,26 グラブ開閉センサ 34 記憶部 35 ソフトウエア格納部 41 中詰材投入管理画面 GB グラブ(投入部) GT ガット船 KS ケーソン R 隔室
10, 10A Caisson filling material
Claims (12)
ブームおよび投入部を駆動して中詰材をケーソンの隔室に投入する中詰材投入手段を有する船と、
前記中詰材の投入時における前記投入部の平面座標を計測する座標計測手段と、
前記ケーソンの各隔室の平面座標および中詰材投入情報をそれぞれ記憶する情報処理手段と、を備え、
前記情報処理手段は、前記中詰材の投入時に、その中詰材が投入された隔室を前記計測された投入部の平面座標に基づいて特定し、前記中詰材投入情報を前記特定された隔室と関連付けて記憶することを特徴とするケーソン中詰材投入管理システム。 A management system when charging the filling material into each compartment of a caisson having a plurality of compartments,
A ship having medium filling material charging means for driving the boom and the charging unit to load the medium packing material into the compartment of the caisson;
Coordinate measuring means for measuring the plane coordinates of the charging portion at the time of charging the filling material,
Information processing means for storing the plane coordinates and filling material input information of each compartment of the caisson, respectively,
The information processing means specifies the compartment into which the filling material is charged based on the measured plane coordinates of the charging portion when the filling material is charged, and specifies the filling material charging information. A caisson filling material input management system characterized by storing the information in association with a separate compartment.
前記表示手段は、前記中詰材の前記隔室への投入毎に累積された前記中詰材投入情報を表示する請求項1または2に記載のケーソン中詰材投入管理システム。 A display means for displaying a plane position of the compartment of the caisson and the filling material charging information;
The caisson filling material charging management system according to claim 1 or 2, wherein the display means displays the filling material charging information accumulated every time the filling material is charged into the compartment.
前記表示手段は、前記隔室の平面位置に前記投入回数を表示し、前記投入回数が最も少ない隔室について表示をする請求項3に記載のケーソン中詰材投入管理システム。 The filling material charging information is the number of times of filling the filling material into the compartment by the filling material charging means,
4. The caisson filling material charging management system according to claim 3, wherein the display means displays the number of times of charging at the plane position of the compartment, and displays the compartment having the smallest number of times of charging.
船が有する中詰材投入手段がブームおよび投入部を駆動して中詰材をケーソンの隔室に投入する時、前記投入部の平面座標を計測するステップと、
前記中詰材が投入された隔室を前記計測された投入部の平面座標に基づいて情報処理手段が特定するステップと、
前記情報処理手段が中詰材投入情報を前記特定された隔室と関連付けて記憶するステップと、を含むことを特徴とするケーソン中詰材投入管理方法。 It is a management method when charging a filling material into each compartment of a caisson having a plurality of compartments,
A step of measuring the plane coordinates of the charging unit when the packing material charging means of the ship drives the boom and the charging unit to load the packing material into the compartment of the caisson;
An information processing means identifying the compartment into which the filling material has been charged based on the measured plane coordinates of the charging portion;
A caisson filling material charging management method, comprising: storing the filling material charging information in association with the specified compartment.
前記記憶ステップにおいて前記各情報処理手段が別の船における中詰材投入情報を記憶して共有する請求項6に記載のケーソン中詰材投入管理方法。 In the case where there are a plurality of the ships and the medium filling material is introduced using each medium filling material input means, the information processing means is arranged for each ship, and the information processing means are connected to each other,
7. The caisson filling material charging management method according to claim 6, wherein each information processing means stores and shares filling material charging information in another ship in the storing step.
前記中詰材の前記隔室への投入毎に累積された前記中詰材投入情報を表示する請求項6または7に記載のケーソン中詰材投入管理方法。 The information processing means further includes a display step of causing the display means to display the plane coordinates of the compartment of the caisson and the filling material input information,
The caisson filling material charging management method according to claim 6 or 7, wherein the filling material charging information accumulated for each charging of the filling material into the compartment is displayed.
前記表示ステップにおいて前記隔室の平面位置に前記投入回数を表示し、前記投入回数が最も少ない隔室について表示をする請求項8に記載のケーソン中詰材投入管理方法。 The filling material charging information is the number of times of filling the filling material into the compartment by the filling material charging means,
9. The caisson filling material charging management method according to claim 8, wherein in the display step, the number of times of charging is displayed at a flat position of the compartment, and the compartment having the smallest number of times of charging is displayed.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2011176924A JP5688769B2 (en) | 2011-08-12 | 2011-08-12 | Caisson filling material input management system, method and computer program therefor |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2011176924A JP5688769B2 (en) | 2011-08-12 | 2011-08-12 | Caisson filling material input management system, method and computer program therefor |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2013040472A JP2013040472A (en) | 2013-02-28 |
| JP5688769B2 true JP5688769B2 (en) | 2015-03-25 |
Family
ID=47889092
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2011176924A Expired - Fee Related JP5688769B2 (en) | 2011-08-12 | 2011-08-12 | Caisson filling material input management system, method and computer program therefor |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP5688769B2 (en) |
Families Citing this family (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP5644734B2 (en) * | 2011-10-17 | 2014-12-24 | 株式会社本間組 | Input management device for filling materials in underwater structures |
| JP6192756B2 (en) * | 2016-02-05 | 2017-09-06 | 五洋建設株式会社 | Caisson filling material input management method and input management device |
| JP6667375B2 (en) * | 2016-06-09 | 2020-03-18 | 東洋建設株式会社 | Filling material input support system and filling material input support method |
| JP7225998B2 (en) * | 2019-03-22 | 2023-02-21 | 東京電力ホールディングス株式会社 | Mortar filling method |
Family Cites Families (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP4678789B2 (en) * | 2007-07-19 | 2011-04-27 | 国土交通省北海道開発局長 | Rubble throwing work support device and rubble throwing simulation work support device |
| JP5214493B2 (en) * | 2009-02-27 | 2013-06-19 | 五洋建設株式会社 | Measuring method, measuring device and underwater structure construction method for filling material in structure |
| JP5565957B2 (en) * | 2010-10-13 | 2014-08-06 | 五洋建設株式会社 | Construction management method and construction management device using 3D sonar |
| JP5644734B2 (en) * | 2011-10-17 | 2014-12-24 | 株式会社本間組 | Input management device for filling materials in underwater structures |
-
2011
- 2011-08-12 JP JP2011176924A patent/JP5688769B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JP2013040472A (en) | 2013-02-28 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP5688769B2 (en) | Caisson filling material input management system, method and computer program therefor | |
| EP3674487B1 (en) | Construction machine | |
| US8954243B2 (en) | Dynamic tip-off detection, display and location selection | |
| US20190161942A1 (en) | Controlling earthmoving machines | |
| ES2961912T3 (en) | Control earth moving machine | |
| KR20200030571A (en) | Working machine | |
| JP6406967B2 (en) | Shallow ground improvement work support system and shallow ground improvement work method | |
| US10358796B2 (en) | Operator assist features for excavating machines based on perception system feedback | |
| JP2021085179A (en) | Measurement device, operation support system, and construction machine | |
| GB2437629A (en) | Display for assisting lift truck operator | |
| JP2021085178A (en) | Measurement device and construction machine | |
| JP5644734B2 (en) | Input management device for filling materials in underwater structures | |
| WO2022091820A1 (en) | Construction work planning support device | |
| JP2021156051A (en) | Caisson construction assist system, information display device, information display program, and information display method | |
| JP7464094B1 (en) | Construction planning support device and program | |
| JP7100179B2 (en) | Position guidance and construction management system for heavy machinery | |
| KR20120036114A (en) | Display unit comprising an intuitive bucket interface | |
| RU2831614C2 (en) | Telescopic handler simulator | |
| CN121195296A (en) | Job simulator, job simulation program and job simulation method | |
| CN120628655A (en) | A method and system for detecting true ground pressure ratio of a rotary drilling rig and a rotary drilling rig | |
| JP2024104895A (en) | MEASURING DEVICE FOR CONSTRUCTION MACHINE, CONTROL DEVICE FOR CONSTRUCTION MACHINE, AND MANAGEMENT DEVICE FOR CONSTRUCTION MACHINE | |
| JP6667375B2 (en) | Filling material input support system and filling material input support method | |
| JP2022047182A (en) | Heavy machine construction management system | |
| WO2021085167A1 (en) | Work machine | |
| JP2000204603A (en) | Work quantity management system |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20140501 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20150116 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20150120 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20150122 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 5688769 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| LAPS | Cancellation because of no payment of annual fees |