JP5700902B2 - Building construction information management system, building construction information management device, and terminal device - Google Patents
Building construction information management system, building construction information management device, and terminal device Download PDFInfo
- Publication number
- JP5700902B2 JP5700902B2 JP2007116559A JP2007116559A JP5700902B2 JP 5700902 B2 JP5700902 B2 JP 5700902B2 JP 2007116559 A JP2007116559 A JP 2007116559A JP 2007116559 A JP2007116559 A JP 2007116559A JP 5700902 B2 JP5700902 B2 JP 5700902B2
- Authority
- JP
- Japan
- Prior art keywords
- construction
- date
- schedule
- delivery date
- information
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000009435 building construction Methods 0.000 title claims description 14
- 238000010276 construction Methods 0.000 claims description 605
- 238000000034 method Methods 0.000 claims description 498
- 230000008569 process Effects 0.000 claims description 487
- 238000012384 transportation and delivery Methods 0.000 claims description 370
- 230000008859 change Effects 0.000 claims description 96
- 238000007726 management method Methods 0.000 claims description 83
- 239000000463 material Substances 0.000 claims description 82
- 238000012790 confirmation Methods 0.000 claims description 20
- 238000004891 communication Methods 0.000 claims description 16
- 238000004364 calculation method Methods 0.000 description 24
- 238000010586 diagram Methods 0.000 description 20
- 238000009415 formwork Methods 0.000 description 20
- 238000012545 processing Methods 0.000 description 16
- 238000003860 storage Methods 0.000 description 12
- 230000002787 reinforcement Effects 0.000 description 8
- 238000009434 installation Methods 0.000 description 6
- 238000009826 distribution Methods 0.000 description 5
- 238000009430 construction management Methods 0.000 description 3
- 238000013461 design Methods 0.000 description 3
- 238000000605 extraction Methods 0.000 description 3
- 230000010365 information processing Effects 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 3
- 230000003111 delayed effect Effects 0.000 description 2
- 230000006870 function Effects 0.000 description 2
- 238000007689 inspection Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000004078 waterproofing Methods 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 238000013459 approach Methods 0.000 description 1
- 239000004566 building material Substances 0.000 description 1
- 238000011960 computer-aided design Methods 0.000 description 1
- 230000001934 delay Effects 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 238000007781 pre-processing Methods 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 230000004044 response Effects 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Description
本発明は、住宅等の建築物の施工情報管理システムに関し、特に各施工工程に使用する部材の納材に関する情報を管理するシステムに関するものである。 The present invention relates to a construction information management system for a building such as a house, and more particularly to a system for managing information related to material delivery of members used in each construction process.
住宅等の建築物の施工には、構造部材、外装部材、内装部材、設備部材等の多くの部材が使用される。施工に使用する多くの部材をまとめて一度に施工現場に搬入すれば、部材の搬送効率を高めることが出来ると共に、部材の施工現場への納材遅れに伴う施工遅延も防止出来る。 Many members, such as a structural member, an exterior member, an interior member, and an equipment member, are used for construction of a building such as a house. If a large number of members used for construction are collectively brought into the construction site at one time, the conveyance efficiency of the members can be increased, and construction delay due to delay in delivery of the members to the construction site can be prevented.
しかし、戸建住宅等の施工においては敷地が狭く多くの部材を保管するスペースを確保出来ない場合が多く、現場内に一時保管しても野ざらしになるか、養生が不十分であるために資材部材の品質が低下する問題もある。そこで施工の進捗に合わせて必要な部材だけをその都度タイミングよく施工現場に納材(若しくは搬入)する、即ち、「ジャストインタイム方式」で納材することが要望されている。 However, in construction of detached houses, etc., there are many cases where the site is small and it is not possible to secure a space for storing many members, and even if temporarily stored on site, it will be wild or insufficient due to insufficient curing. There is also a problem that the quality of the member is lowered. Therefore, there is a demand for delivering (or carrying in) only the necessary members to the construction site in a timely manner in accordance with the progress of the construction, that is, delivering them by the “just-in-time method”.
しかしながら、例えば一般住宅の場合、構造部材である鉄骨や木材等、外装部材である外壁材、窓材、ドア材、庇、樋、屋根材等、内装部材である床材や内壁材等、設備部材であるバスユニット、キッチン設備、洗面設備等は施主の好みや要望により選択の範囲が多く、施工の進捗状況に合わせて納材指示を行うことは多くの手間とコストを要し、誤納材も多いという問題がある。 However, for example, in the case of ordinary houses, facilities such as structural members such as steel and wood, exterior wall materials that are exterior members, window materials, door materials, fences, fences, roofing materials, floor materials and interior wall materials that are interior members, etc. There are many choices for parts such as bath units, kitchen facilities, and bathroom facilities depending on the owner's preference and demand, and it is a lot of work and cost to instruct the delivery of materials according to the progress of construction, and it is incorrect delivery There is a problem that there are many materials.
そこで、これら多くの部材を間違いなく指定された期日に施工現場に納材させるため、コンピュータと通信回線を用いた「部材納品日指定システム」が特許文献1に提案されている。 Therefore, Patent Document 1 proposes a “member delivery date designation system” using a computer and a communication line in order to deliver these members to a construction site without fail on a designated date.
特許文献1のシステムでは、納材管理用のコンピュータシステムに建築物のCAD(Computer aided design;コンピュータを使って、設計やデザインをすること)データベース、部材データベース及び施工の工程日数データベースを接続し、それらデータベースを基に、施工に用いる各部材を施工開始日に合わせた納材日指定を行うように構成され(同公報の図6参照)ており、この指定された納材日を基に例えば管理部門若しくは購買部門が部材の調達先に発注と納材指示を行うことが出来る。 In the system of Patent Document 1, a computer CAD system for building management (computer aided design; computer design and design) database, member database, and construction process days database are connected. Based on these databases, each member used for construction is configured to designate a delivery date that matches the construction start date (see FIG. 6 of the same publication). Based on this designated delivery date, for example, The management department or the purchasing department can place orders and deliver materials to parts suppliers.
上記システムにおいて、例えば住宅メーカが顧客から住宅建設を受注すると、住宅メーカの施工管理部門では前記コンピュータシステムでその住宅の仕様に関する情報から各施工単位に用いる部材をCADデータベースや部材データベースを基に抽出し、それを施工単位毎に分類した部材一覧表を作成する。部材一覧表には例えば施工単位毎に用いる部材の名称、品番、数量等が指定される。 In the above system, for example, when a housing maker receives an order for housing construction from a customer, the construction management department of the housing maker uses the computer system to extract the members used for each construction unit from the information on the specifications of the housing based on the CAD database and the member database. Then, a member list is created by classifying them by construction unit. In the member list, for example, the name, product number, quantity, etc. of the member used for each construction unit are designated.
一方、住宅メーカの施工部門や住宅メーカの管理部門から施工委託された施工事業者等の施工側には前記コンピュータシステムと通信回線で接続された端末装置が設置され、その端末装置で前記コンピュータシステムのCADデータベースや部材データベース、引渡し日情報及び部材一覧表等を利用して複数の施工工程を含む施工工程表を作成する。更に施工工程毎にその施工開始日と施工終了日が指定され、各施工開始日を基に部材の納材日を指定する。指定された納材日は前記コンピュータシステムに記憶され、コンピュータシステムはその情報を基に住宅会社の購買部門や部材メーカ等の調達先に対して必要な部品の発注情報を通知する。 On the other hand, a terminal device connected to the computer system via a communication line is installed on the construction side of a construction company entrusted by the construction department of the housing maker or the management department of the housing maker, and the computer system A construction process table including a plurality of construction processes is created using the CAD database, member database, delivery date information, member list, and the like. Furthermore, the construction start date and the construction end date are designated for each construction process, and the material delivery date is designated based on each construction start date. The designated delivery date is stored in the computer system, and based on the information, the computer system notifies the procurement department of the housing company, the parts manufacturer, etc., of the necessary parts ordering information.
一方、建築物の建設計画を基にして、その施工に用いる部材の調達予定情報をインターネットで公開するシステムが特許文献2に記載されている。該システムによれば部材メーカ等の部材調達先は、その公開された部材の調達予定情報を見て製造計画を立てることが出来るとされている。 On the other hand, Patent Document 2 discloses a system that publishes procurement schedule information of members used for construction based on a construction plan of a building on the Internet. According to the system, a member supplier such as a member manufacturer can make a production plan by referring to the information on the scheduled procurement of the member.
しかしながら、前述の特許文献1に記載されたシステムによれば、前記のように施工側の端末装置で各施工工程に用いる部材の納材日をその施工開始日に間に合うように指定するので、それを基に住宅メーカのコンピュータシステムから調達先に部材を発注することが出来るものの、施工側の端末装置からコンピュータシステムへの部材の納材日通知に遅延があると、部材発注情報を調達先に通知する日と納材日が接近する場合があり、部材調達に時間的な余裕が無くなり、現場への建築部材の納品(納材)が遅れた結果として施工遅延が発生する可能性がある。 However, according to the system described in the above-mentioned patent document 1, since the delivery date of the member used for each construction process is designated in time for the construction start date, as described above, the construction side terminal device can Although it is possible to order parts from the housing manufacturer's computer system to the supplier based on the information, if there is a delay in the delivery date notification of the parts from the terminal device on the construction side to the computer system, the parts ordering information will be sent to the supplier. In some cases, the date of notification and the date of delivery may approach each other, and there will be no time for material procurement, and construction delays may occur as a result of the delay in delivery of building materials (delivery) to the site.
また特許文献2に記載された部材の調達予定公開システムによれば、前記のように、部材の調達先は公開された部材の調達予定情報を見て製造計画を立てることが出来るものの、その情報は確定された情報ではないので、それに基づいて製造計画を立てる際には必然的にリスクを伴う。そして調達予定情報が確定し発注情報になった時点では、部材の納材日に余裕が無く、納材日に間に合わないこともあり、そのような場合には前記特許文献1と同様な施工遅延が発生する可能性がある。 Further, according to the member procurement schedule disclosure system described in Patent Document 2, as described above, the supplier of a member can make a production plan by looking at the procurement schedule information of the released member. Is not definitive information, so there are inevitably risks when making a production plan based on it. And when the procurement schedule information is confirmed and becomes ordering information, there is no allowance for the delivery date of the member, and it may not be in time for the delivery date. In such a case, the construction delay similar to the above-mentioned Patent Document 1 May occur.
本発明は前記課題を解決するものであり、その目的とするところは、従来の部材の納材を管理するシステムの問題を解決するものであり、部材の納材遅延を起こさず、現場の進捗状況に合わせて調達に必要な期間を調整し、十分な余裕が確保出来る建築物の施工情報管理システムを提供せんとするものである。 The present invention solves the above-mentioned problems, and the object of the present invention is to solve the problem of the conventional system for managing the delivery of the members, without causing a delay in delivery of the members, and the progress of the field. We will adjust the time required for procurement according to the situation and provide a construction information management system for buildings that can secure sufficient margin.
前記目的を達成するための本発明に係る建築物の施工情報管理システムの第1の構成は、建築物の施工情報を管理する管理装置と、前記管理装置に通信回線で接続された端末装置を備え、前記端末装置は施工着手基点日を入力する入力手段を有し、前記管理装置は、複数の施工工程に関する情報を記憶した施工工程データベースと、各施工工程に使用する部材の納材期限を記憶する納材工程データベースと、前記施工工程データベースを用いて、前記端末装置から入力された施工着手基点日を基準とする施工工程毎の施工日程を決定する施工日程決定手段と、前記施工日程決定手段により決定した施工日程と前記納材工程データベースに記憶された部材の納材期限から、各施工工程に使用する部材の納材予定日を設定する納材予定日設定手段と、を有する建築物の施工情報管理システムにおいて、前記管理装置には、各施工工程に使用する部材について、前記納材予定日設定手段により設定された該部材の納材予定日から予め設定された期間だけ前の指定期限を設定する指定期限設定手段と、前記指定期限設定手段により設定された指定期限から更に予め設定された期限だけ前の予告期限を設定する予告期限設定手段と、前記予告期限設定手段により設定された予告期限に達したとき、当該予告期限に関連した部材の指定期限を前記端末装置に通知する指定期限通知手段とを有することを特徴とする。 In order to achieve the above object, a first configuration of a building construction information management system according to the present invention includes a management device that manages building construction information, and a terminal device connected to the management device via a communication line. The terminal device has an input means for inputting a construction start base date, and the management device stores a construction process database storing information on a plurality of construction processes, and a material delivery deadline for members used in each construction process. A delivery schedule database to be stored, a construction schedule determining means for determining a construction schedule for each construction process based on a construction start base date input from the terminal device using the construction process database, and the construction schedule determination The scheduled delivery date setting means for setting the scheduled delivery date of the member to be used for each construction process from the construction schedule determined by the means and the delivery date of the member stored in the delivery process database In the construction information management system for a building, the management device is preset for the member used for each construction process from the scheduled delivery date of the member set by the scheduled delivery date setting means. A designated deadline setting means for setting a designated deadline that is only before a period, a notice deadline setting means for setting a notice deadline that is further in advance from the designated deadline set by the designated deadline setting means, and the notice deadline When the notice deadline set by the setting means is reached, there is provided a designated deadline notifying means for notifying the terminal device of a designated deadline of a member related to the notice deadline.
尚、ここで「指定期限」とは、施工側が納材予定日を納材日として確定する期限を意味し、「予告期限」とは管理装置から端末装置に「指定期限」を通知する期限を意味するものである。 Here, the “designated deadline” means the deadline for the construction side to determine the scheduled delivery date as the delivery date, and the “notice deadline” means the deadline for notifying the terminal device of the “designated deadline”. That means.
また、本発明に係る建築物の施工情報管理システムの第2の構成は、前記第1の構成において、前記施工側の端末装置には、各施工工程に使用する部材の納材予定日を確定された納材日として前記管理装置に通知するための納材日確定入力手段が設けられることを特徴とする。 Moreover, the 2nd structure of the construction information management system of the building which concerns on this invention is a said 1st structure, The delivery date of the member used for each construction process is decided to the said terminal device of the construction side. A delivery date confirmation input means for notifying the management device of the received delivery date is provided.
また、本発明に係る建築物の施工情報管理システムの第3の構成は、前記第1、第2の構成において、前記端末装置には、前記施工日程または納材予定日の変更を前記管理装置に通知するための日程変更入力手段が設けられ、前記日程変更入力手段により前記施工日程または納材予定日が変更になったときに(以下、これら変更後の施工日程または納材日を「日程変更情報」という。)、前記日程変更情報に基づいて施工日程決定手段が当該他の施工工程(後工程)の施工日程の変更入力を許可することを特徴とする。 Moreover, the 3rd structure of the construction information management system of the building which concerns on this invention is a said 1st, 2nd structure, In the said terminal device, the said construction schedule or the scheduled delivery date is changed to the said management apparatus. The schedule change input means is provided for notification to the schedule, and when the construction schedule or the scheduled date of delivery is changed by the schedule change input means (hereinafter, the schedule of construction or delivery date after the change is referred to as “schedule It is characterized in that the construction schedule determining means permits the input of the construction schedule for the other construction process (post process) based on the schedule modification information.
上記第3の構成において、日程変更情報に基いて前記指定期限設定手段や前記予告期限設定手段により指定期限日や予告期限日を自動的に再設定することが出来る。 In the third configuration, the designated deadline date and the notice deadline date can be automatically reset by the designated deadline setting means and the notice deadline setting means based on the schedule change information.
また、指定期限設定手段および予告期限設定手段がそれぞれ指定期限日および納材予定日の変更入力を許可し、操作者が日程変更入力手段により指定期限日および納材予定日を変更することが出来る。 In addition, the designated deadline setting means and the notice deadline setting means allow the change input of the designated deadline date and the scheduled delivery date, respectively, and the operator can change the designated deadline date and the scheduled delivery date by the schedule change input means. .
更に、本発明に係る建築物の施工情報管理システムの第3の構成の他の態様として、前記管理装置の前記施工日程決定手段は、前記日程変更入力手段による日程変更情報に基づいて既に決定した施工日程のうち当該他の施工工程(後工程)の施工日程を自動的に変更するように構成することが出来る。 Furthermore, as another aspect of the third configuration of the building construction information management system according to the present invention, the construction schedule determination means of the management device has already been determined based on the schedule change information by the schedule change input means. It can comprise so that the construction schedule of the said other construction process (post process) among construction schedules may be changed automatically.
また、本発明に係る建築物の施工情報管理システムの第4の構成は、前記第1〜第3の構成において、単一の施工工程における納材すべき部材を総称する共通の納材工程名称を付し、または複数の施工工程における納材すべき部材の納材予定日が同じである場合には該複数の施工工程における前記各部材を総称する共通の納材工程名称を付し、前記共通の納材工程名称に含まれる部材に対する前記指定期限設定手段による指定期限の設定、前記予告期限設定手段による予告期限の設定、及び前記指定期限通知手段から前記端末装置への指定期限の通知は、前記共通の納材工程名称により行うように構成したことを特徴とする。 Moreover, the 4th structure of the construction information management system of the building which concerns on this invention is a common delivery process name which generically refers to the member which should be delivered in a single construction process in the said 1st-3rd structure. Or when a scheduled delivery date of members to be delivered in a plurality of construction processes is the same, a common delivery process name that collectively refers to each of the members in the plurality of construction processes is attached, Setting of the designated deadline by the designated deadline setting means, setting of the notice deadline by the notice deadline setting means, and notification of the designated deadline from the designated deadline notification means to the terminal device for members included in a common delivery process name The common material delivery process name is used.
また、本発明に係る建築物の施工情報管理システムの第5の構成は、前記第1〜第4の構成において、前記管理装置は、施工工程毎の施工日程、納材予定日、納材すべき部材に関する予告期限及び通知期限を含む施工工程表を作成する施工工程表作成手段を有することを特徴とする。 Moreover, the 5th structure of the construction information management system of the building which concerns on this invention is the said 1st-4th structure, In the said 1st-4th structure, the said management apparatus pays the construction schedule for every construction process, a scheduled delivery date, and delivers materials. It has a construction process table creating means for creating a construction process chart including a notice deadline and a notice deadline for a member to be processed.
また、本発明に係る建築物の施工情報管理システムの第6の構成は、前記第5の構成において、コンピュータシステム中に構成されるディスプレイまたは携帯端末装置のディスプレイに表示する表示手段、または該表示手段による表示を印刷する印刷手段を有し、該表示手段または印刷手段が、前記施工工程表作成手段により作成される施工工程表の各々の納材工程の開始日及び終了日を示す情報と共に該納材工程の納材予定日情報、納材すべき部材に関する予告期限情報、及び通知期限及び通知が送信済みか否かを示す情報を表示または印刷することを特徴とする。 Moreover, the 6th structure of the construction information management system of the building which concerns on this invention is a display means displayed on the display comprised in a computer system in the said 5th structure, or the display of a portable terminal device, or this display Printing means for printing the display by the means, and the display means or the printing means, together with information indicating the start date and the end date of each delivery process of the construction process table created by the construction process chart creation unit It is characterized by displaying or printing scheduled delivery date information of a delivery process, notice deadline information regarding a member to be delivered, and information indicating whether a notice deadline and a notice have been transmitted.
また、本発明に係る建築物の施工情報管理システムの第7の構成は、前記第6の構成において、前記表示手段が施工工程の施工日程のうち、変更が必要である施工日程と変更が必要でない施工日程を区別して表示することを特徴とする。 Further, in the seventh configuration of the construction information management system for a building according to the present invention, in the sixth configuration, the display means needs to be changed with the construction schedule that needs to be changed among the construction schedules of the construction process. It is characterized by distinguishing and displaying non-work schedules.
本発明に係る建築物の施工情報管理システムの第1の構成によれば、予告期限に達した時点で管理装置から施工側の端末装置に指定期限が自動的に通知されるので、施工側では納材予定日から十分な余裕期間を持って建築現場が進捗に応じた納材日の確定情報を管理装置に通知することが出来る。そのため各施工工程に使用する部品をその都度遅延することなくジャストインタイムで納材させることが可能になる。 According to the first configuration of the construction information management system for a building according to the present invention, the designated deadline is automatically notified from the management device to the terminal device on the construction side when the notice deadline is reached. The construction site can notify the management device of the confirmed information of the delivery date according to the progress with a sufficient margin from the scheduled delivery date. Therefore, it is possible to deliver the parts used in each construction process in just-in-time without delaying each time.
また、本発明に係る建築物の施工情報管理システムの第2の構成によれば、施工側の端末装置から管理装置に各施工工程に使用する部材の納材予定日を確定された納材日として通知するための前記端末装置に納材日確定入力手段を設けることが出来る。このように構成すると、施工側では施工着手基点日を入力する同じ端末装置を用いて各施工工程に使用する部材の納材予定日を確定された納材日として管理装置に迅速且つ誤り無く通知することが出来る。 Moreover, according to the 2nd structure of the construction information management system of the building which concerns on this invention, the delivery date by which the scheduled delivery date of the member used for each construction process was decided from the terminal device by the side of construction to a management apparatus. Can be provided with a delivery date confirmation input means. When configured in this way, the construction side uses the same terminal device that inputs the construction start base date, and notifies the management device of the scheduled delivery date of the member used for each construction process as a confirmed delivery date, without error. I can do it.
また、本発明に係る建築物の施工情報管理システムの第3の構成によれば、施工側の端末装置から管理装置に前記施工日程または納材予定日の変更を前記管理装置に通知するための日程変更入力手段が設けられ、前記日程変更入力手段により前記施工日程または納材予定日が変更になったときに(以下、これら変更後の施工日程または納材日を「日程変更情報」という。)、前記日程変更情報に基づいて施工日程決定手段が当該他の施工工程(後工程)の施工日程の変更入力を許可するように構成することが出来る。 Moreover, according to the 3rd structure of the construction information management system of the building which concerns on this invention, for notifying the management apparatus of the change of the said construction schedule or a scheduled delivery date from the terminal device by the side of construction to a management apparatus When a schedule change input means is provided, and the construction schedule or scheduled delivery date is changed by the schedule change input means (hereinafter, the changed schedule or delivery date is referred to as “schedule change information”). ), And based on the schedule change information, the construction schedule determination means can be configured to permit change input of the construction schedule of the other construction process (post-process).
このように構成すると、予測出来ない事態により現場の施工工程の少なくとも一部に遅延が発生したとき、それ以降の後工程の施工工程の日程変更が必要な場合に日程変更入力手段を用いて操作者が施工日程を調整し、変更入力することが出来、更新後の施工工程表が簡易に作成することが出来る。 With this configuration, when a delay occurs in at least a part of the construction process at the site due to an unpredictable situation, it is necessary to change the schedule of the subsequent construction process using the schedule change input means. The person can adjust the construction schedule and input the change, and the updated construction schedule can be created easily.
また、前記端末装置の前記施工日程決定手段は、前記日程変更入力手段による日程変更情報に基づいて既に決定した施工日程のうち当該他の施工工程(後工程)の施工日程を自動的に変更するように構成していれば、予測出来ない事態により施工工程の少なくとも一部に遅延が発生したとき、それ以降の施工工程の日程変更が必要な場合に自動的に施工日程が変更され、施工日程の変更された施工工程における納材すべき部材に関する指定期限、予告期限も自動的に変更することが可能になる。 Moreover, the said construction schedule determination means of the said terminal device changes automatically the construction schedule of the said other construction process (post process) among the construction schedules already determined based on the schedule change information by the said schedule change input means. If there is a delay in at least part of the construction process due to an unforeseen situation, the construction schedule will be automatically changed when it is necessary to change the schedule of the subsequent construction process. It is also possible to automatically change the designated deadline and notice deadline for members to be delivered in the changed construction process.
また、本発明に係る建築物の施工情報管理システムの第4の構成によれば、単一の施工工程における納材すべき部材を総称する共通の納材工程名称を付し、または複数の施工工程おける納材すべき部材の納材予定日が同じである場合には該複数の施工工程における前記各部材を総称する共通の納材工程名称を付し、前記共通の納材工程名称に含まれる部材に対する前記指定期限設定手段による指定期限の設定、前記予告期限設定手段による予告期限の設定、及び前記指定期限通知手段から前記端末装置への指定期限の通知は、前記共通の納材工程名称により行うように構成することが出来る。このように構成すると、同日に納材すべき部材の納材管理が容易になる。 Moreover, according to the 4th structure of the construction information management system of the building which concerns on this invention, it attaches the common delivery process name which names the member which should be delivered in a single construction process, or several construction When the scheduled delivery date of the members to be delivered in the process is the same, a common delivery process name that collectively refers to each of the members in the plurality of construction processes is attached, and is included in the common delivery process name The designated deadline setting means by the designated deadline setting means, the notice deadline setting by the notice deadline setting means, and the notification of the designated deadline from the designated deadline notification means to the terminal device are the common delivery process name It can be configured to do. If comprised in this way, the delivery management of the member which should be delivered on the same day will become easy.
また、前記各部材を総称する共通の納材工程名称を付す部材の設定の仕方を調整することにより建築現場へのトラック配送回数を制御することが出来、丁度良い按配に調整を図ることが出来る。資材の現場への調達をジャストインタイムを徹底し過ぎることによる物流頻度過多、これによるコスト増という問題を回避することが出来る。 In addition, the number of truck deliveries to the construction site can be controlled by adjusting the method of setting the members with common delivery process names that collectively refer to the respective members, and adjustments can be made with just the right distribution. . It is possible to avoid the problem of excessive distribution frequency due to excessive just-in-time procurement of materials at the site and cost increase due to this.
また、本発明に係る建築物の施工情報管理システムの第5の構成によれば、管理装置は、施工工程毎の施工日程、納材予定日、納材すべき部材に関する予告期限及び通知期限を含む施工工程表を作成する施工工程作成手段を有することが出来る。このように構成すると、施工日程や納材予定日と共に納材すべき部材に関する予告期限及び通知期限を含む施工工定表若しくは施工工程図等を自動的に作成することが出来る。これにより工程表と納材手配が一覧出来、現場施工管理が万全である。 Moreover, according to the 5th structure of the construction information management system of the building which concerns on this invention, the management apparatus has the notice deadline and notice deadline regarding the construction schedule for every construction process, a scheduled delivery date, and the member which should be delivered. It is possible to have a construction process creation means for creating a construction process table including the construction process table. If comprised in this way, the construction work schedule or construction process drawing etc. which include the notice time limit and the notice time limit regarding the member which should be delivered with a construction schedule and a scheduled delivery date can be created automatically. This makes it possible to list process schedules and materials arrangements, and to perform on-site construction management.
また、本発明に係る建築物の施工情報管理システムの第6の構成によれば、工程表を画面表示出来、または印刷物として視覚的に確認することが出来る。 Moreover, according to the 6th structure of the construction information management system of the building which concerns on this invention, a process chart can be screen-displayed or can be visually confirmed as printed matter.
また、本発明に係る建築物の施工情報管理システムの第7の構成によれば、前記工程表の画面表示や印刷物において、施工工程の変更により変更を検討すべき他の工程がどれであるかが明瞭に把握でき、各施工工程の作業開始日や作業終了日が当初の日程で良いかどうかを個別に検討することが出来る点で使い勝手が良い。 Moreover, according to the 7th structure of the construction information management system of the building which concerns on this invention, which is the other process which should consider a change by the change of a construction process in the screen display and printed matter of the said process table | surface It is easy to use because it can be grasped clearly and it can be individually examined whether the work start date and work end date of each construction process are the same as the original schedule.
次に図面に基づいて本発明に係る建築物の施工情報管理システムの最良の実施形態を説明する。図1は本発明に係る建築物の施工情報管理システムの構成を示すブロック図、図2は制御部に含まれる各手段の構成を示すブロック図、図3は外部記憶装置に格納された各データベースの構成を示すブロック図、図4は本システムを用いて納材情報を管理するフローチャート、図5は制御部により構成される指定期限通知手段による指定期限の予告方法を示すフローチャート、図6は勾配屋根付き住宅の施工パターンを選択して施工工事店端末装置の表示部に表示した図、図7は納材工程・部材参照データの一例を示す図、図8は選択した納材工程データベースを施工工事店端末装置に表示した一例を示す図、図9は図8の異なる納材工程名称に共通の納材工程名称を付与した一例を示す図、図10は躯体部材の部材名称の一例を示す図、図11(a)は施工日程決定ファイルの一例を示す図、図11(b)は施工日程決定参照データの一例を示す図、図11(c)は納材予定日参照データの一例を示す図、図11(d)は納材予定日ファイルの一例を示す図、図11(e)は指定期限、予告期限参照データの一例を示す図、図11(f)は指定期限日、予告期限日ファイルの一例を示す図、図12はプリントアウトした邸別(住宅別)の施工工程表の一例を示す図、図13は図12の部分拡大図、図14はプリントアウトした邸別(住宅別)の施工工程表の一例を示す図、図15は施工工程表作成参照データ(施工工程表のレイアウトフォーム)の一例を示す図、図16は指定期限通知手段による指定期限を通知した後、納材日程入力手段により納材予定日を変更入力する入力操作、及びデータ処理の様子の一例を示す図、図17は納材予定日の日程変更入力後に施工工程表を作成した場合の一例を示す図である。 Next, the best embodiment of the construction information management system for buildings according to the present invention will be described with reference to the drawings. FIG. 1 is a block diagram showing the construction of a building construction information management system according to the present invention, FIG. 2 is a block diagram showing the construction of each means included in the control unit, and FIG. 3 is each database stored in an external storage device. FIG. 4 is a flowchart for managing delivery information using this system, FIG. 5 is a flowchart showing a notice method of a designated deadline by a designated deadline notifying means constituted by a control unit, and FIG. 6 is a gradient. Fig. 7 shows an example of the delivery process / member reference data. Fig. 8 shows the selected delivery process database. FIG. 9 is a diagram showing an example displayed on the construction shop terminal device, FIG. 9 is a diagram showing an example in which a common delivery process name is assigned to different delivery process names in FIG. 8, and FIG. 10 is an example of a member name of a housing member. Figure 11 ( 11A is a diagram showing an example of a construction schedule determination file, FIG. 11B is a diagram showing an example of construction schedule determination reference data, FIG. 11C is a diagram showing an example of scheduled delivery date reference data, FIG. (D) is a diagram showing an example of a scheduled delivery date file, FIG. 11 (e) is a diagram showing an example of designated deadline and notice deadline reference data, and FIG. 11 (f) is an example of a designated deadline date and notice deadline date file. Fig. 12 is a diagram showing an example of the construction process table for each printed residence (by residence), Fig. 13 is a partially enlarged view of Fig. 12, and Fig. 14 is construction by printed residence (by residence). Fig. 15 shows an example of a process table, Fig. 15 shows an example of construction process table creation reference data (layout form of construction process table), and Fig. 16 inputs the delivery schedule after notifying the specified deadline by the specified deadline notification means An example of the input operation to change and input the scheduled date of delivery by means and the state of data processing is shown. FIGS. 17A and 17B are diagrams showing an example when the construction process table is created after the schedule change date input.
図1において、建築物の施工情報を管理する管理装置1はコンピュータシステムにより構成され、CPU(中央演算装置)2、記憶部9、入力部10、出力部11、表示手段となる表示部11a、通信部12及び外部記憶装置13を備えている。 In FIG. 1, a management device 1 that manages building construction information is configured by a computer system, and includes a CPU (central processing unit) 2, a storage unit 9, an input unit 10, an output unit 11, and a display unit 11 a that serves as a display means. A communication unit 12 and an external storage device 13 are provided.
CPU2は本システムにおける種々の制御を行うための制御部3を構成し、例えば図2に示すように、管理装置1に通信回線Tで接続された施工側の端末装置となる施工工事店端末装置14から入力された施工着手基準日を基準とする施工工程毎の施工日程を決定する施工日程決定手段4、該施工日程決定手段4により決定した施工日程と納材工程データベース17に記憶された部材の納材期限から各施工工程に使用する部材の納材予定日を設定する納材予定日設定手段5、各施工工程に使用する部材について該納材予定日設定手段5により設定された各部材の納材予定日から予め設定された期間だけ前の指定期限を設定する指定期限設定手段6、該指定期限設定手段6により設定された指定期限から更に予め設定された期限だけ前の予告期限を設定する予告期限設定手段7、該予告期限設定手段7により設定された予告期限に達したとき、当該予告期限に関連した部材の指定期限を集配センター端末装置15及び施工工事店端末装置14に通知する指定期限通知手段8、施工工程毎の施工日程、納材予定日、納材すべき部材に関する予告期限及び通知期限を含む施工工程表を作成する施工工程表作成手段8a、情報固定手段8b及び情報固定解除手段8c等の各手段を含む。 The CPU 2 constitutes a control unit 3 for performing various controls in the present system. For example, as shown in FIG. 2, the construction shop terminal device serving as a construction side terminal device connected to the management device 1 via the communication line T. The construction schedule determining means 4 for determining the construction schedule for each construction process based on the construction start reference date inputted from 14, the construction schedule determined by the construction schedule determining means 4 and the members stored in the delivery process database 17 The scheduled delivery date setting means 5 for setting the scheduled delivery date of the member to be used for each construction process from the delivery deadline of the material, and each member set by the scheduled delivery date setting means 5 for the member to be used for each construction process A designated deadline setting means 6 for setting a designated deadline that is a predetermined period before the scheduled date of delivery of the material, and a notice deadline that is a preset deadline before the designated deadline set by the designated deadline setting means 6 Setting When the notice deadline setting means 7 to be set and the notice deadline set by the notice deadline deadline setting means 7 have been reached, the designated deadline of the member related to the notice deadline is notified to the collection / delivery center terminal device 15 and the construction shop terminal device 14 Designated deadline notification means 8, construction schedule for each construction process, scheduled delivery date, construction schedule table creation means 8 a for creating a construction schedule including a notice deadline and a notice deadline for members to be delivered, information fixing means 8 b, Each means such as the information fixing release means 8c is included.
記憶部9はROM(読み出し専用メモリ)、RAM(随時読み書き可能なメモリ)等により構成され、システムに必要な制御プログラムを格納すると共に、種々の制御を実行する際のバッファーメモリとして機能する。入力部10はキーボードやマウス等により構成され、本システムにおける種々の制御に必要な各種条件の入力や操作を行う。 The storage unit 9 includes a ROM (read only memory), a RAM (memory that can be read and written as needed), and the like. The storage unit 9 stores a control program necessary for the system and functions as a buffer memory when executing various controls. The input unit 10 includes a keyboard, a mouse, and the like, and inputs and operates various conditions necessary for various controls in this system.
出力部11は印刷手段であるプリンタ等で構成され、本システムで作成される図12〜図14に示す施工工程表等をプリントアウトし、表示部11aはディスプレー等により構成され、本システムの実行に際して必要な情報を表示する。通信部12はインターネットや専用回線等の通信回線Tと各施工側の施工工事店端末装置14や集配センターの端末装置15等と通信を行うものである。 The output unit 11 is composed of a printer or the like as a printing means, and prints out the construction process charts and the like shown in FIGS. 12 to 14 created by the system, and the display unit 11a is composed of a display and the like, and executes the system. At this time, necessary information is displayed. The communication unit 12 communicates with the communication line T such as the Internet or a dedicated line, the construction shop terminal device 14 on each construction side, the terminal device 15 of the collection / delivery center, and the like.
更に外部記憶装置13は、図3に示すように、複数の施工工程に関する情報を記憶した施工工程データベース16、各施工工程に使用する部材の納材期限を記憶する納材工程データベース17、部材データベース17a、施工日程・納材工程データベース18及び納材工程・部材データベース18a等を含む大量のデータを格納する。施工工程データベース16は施工日程決定参照データを含み、施工日程・納材工程データベース18は施工日程決定ファイル、納材予定日ファイル、指定期限予告期限ファイルを含む。 Further, as shown in FIG. 3, the external storage device 13 includes a construction process database 16 that stores information related to a plurality of construction processes, a delivery process database 17 that stores the delivery deadlines of members used in each construction process, and a member database. A large amount of data including a construction schedule / delivery process database 18 and a delivery process / member database 18a is stored. The construction process database 16 includes construction schedule determination reference data, and the construction schedule / delivery process database 18 includes a construction schedule determination file, a scheduled delivery date file, and a designated deadline notice deadline file.
住宅会社や建設会社の施工部門又はそれらから施工を委託された専門の施工業者等の施工側には、上記のように管理装置1と通信回線Tで接続された施工工事店端末装置14が設けられ、住宅会社や建設会社の流通部門またはそれらから流通を委託された専門の流通業者が設置した集配センターには、同様に管理装置1と通信回線Tで接続された集配センター端末装置15が設けられる。尚、集配センターは例えば部材メーカと施工現場間の部材流通を効率化するために設けられる。 On the construction side of the construction department of a housing company or a construction company or a specialized construction contractor entrusted with the construction, a construction shop terminal device 14 connected to the management device 1 through the communication line T as described above is provided. In addition, a collection / distribution center terminal device 15 similarly connected to the management apparatus 1 by the communication line T is provided in a collection / distribution center set up by a distribution department of a housing company or a construction company or a special distributor entrusted with distribution by them. It is done. The collection / delivery center is provided, for example, to improve the efficiency of member distribution between the member manufacturer and the construction site.
各端末装置14,15はパーソナルコンピュータまたは専用の端末装置により構成され、それらはCPU(中央演算処理装置)、キーボード等の入力部、プリンタ等の出力部、ディスプレー等の表示部及び通信回線Tを介した管理装置1との間で通信を行うための通信部が設けられる。尚、施工側の施工工事店端末装置14は1つまたは図1に示すように複数設けられる。 Each terminal device 14 and 15 is composed of a personal computer or a dedicated terminal device, which includes a CPU (Central Processing Unit), an input unit such as a keyboard, an output unit such as a printer, a display unit such as a display, and a communication line T. A communication unit for performing communication with the management apparatus 1 is provided. Incidentally, one or a plurality of construction work shop terminal devices 14 on the construction side are provided as shown in FIG.
次に、図1に示す施工情報管理システムを用いて建築物の施工情報管理を行う方法を説明する。尚、以下の説明は、住宅メーカが規格化された戸建住宅、若しくはそれに準じた戸建住宅を施工する場合を例にしているが、本システムはそれ以外の一般住宅やマンション等の集合住宅にも同様に適用出来る。 Next, a method for managing construction information of a building using the construction information management system shown in FIG. 1 will be described. The following explanation is an example of a case where a housing manufacturer constructs a standardized detached house or a detached house according to the standard, but this system is a collective house such as other general houses and condominiums. The same applies to.
図4は本システムを用いて納材情報を管理するフローチャートである。例えば施工工事店端末装置14の入力手段を操作して管理装置1にアクセスし、本システムのメニュー画面(図示せず)から「施工工程作成」をクリックすることにより、図4に示す「開始」状態になり、各ステップを順次進めることが可能になる。 FIG. 4 is a flowchart for managing delivery information using this system. For example, by operating the input means of the construction work shop terminal device 14 to access the management device 1 and clicking “Create construction process” from the menu screen (not shown) of this system, “Start” shown in FIG. It becomes a state and it becomes possible to advance each step sequentially.
先ずステップS1において、施工工事店端末装置14から図3に示す管理装置1の施工工程データベース16を呼び出し、そこに格納されている複数(例えば60程度)の施工工程パターンから施工すべき住宅に適合する施工工程パターンを抽出する。 First, in step S 1 , the construction process database 16 of the management apparatus 1 shown in FIG. 3 is called from the construction shop terminal device 14, and a house to be constructed is constructed from a plurality of (for example, about 60) construction process patterns stored therein. Extract suitable construction process patterns.
施工工程データベース16には、例えば勾配屋根(寄棟、切妻)付き住宅、コンクリート陸屋根住宅、3階建住宅等の規格化された各種住宅毎に、工事着手から完成までに必要な各施工工程が定義若しくは規定されているので、それらの中から図示しない選択手段により適合する施工工程を抽出(選択)する。 In the construction process database 16, for each standardized house such as a house with a sloped roof (boarding, gable), a concrete flat roof house, a three-story house, etc., each construction process necessary from the start of construction to completion is provided. Since it is defined or stipulated, a suitable construction process is extracted (selected) by selecting means (not shown).
施工工程データベース16には、施工日程決定参照データが記憶されており、施工工程名称として大工程、大工程で括られた中工程、職種名、前の中工程、着手可能日、標準工期等のデータ項目で構成されている。 The construction process database 16 stores construction schedule determination reference data, such as a large process as a construction process name, a middle process, a job title, a previous middle process, a start date, a standard construction period, etc. Consists of data items.
大工程、大工程で括られた中工程は、施工工程パターン毎に工事着手から完成までの各施工工程の順序にしたがって並べられている。 The middle process, which is bundled into the large process and the large process, is arranged according to the order of each construction process from construction start to completion for each construction process pattern.
当該各施工工程(中工程)を完成するのに必要な期間として標準工期(日数で定義したもの)がデータ項目として規定されると共に、当該施工工程の各施工工程(中工程)の作業着手日を決定するための演算処理のために、当該施工工程より前の施工工程(前の中工程)の作業終了日から当該施工工程の作業の開始までの余裕を持たせるために加算する日数(着手可能日)がデータ項目に含まれている。 The standard construction period (defined in days) is defined as a data item as the period required to complete each construction process (medium process), and the work start date for each construction process (medium process) in the construction process The number of days to be added in order to provide a margin from the work end date of the construction process prior to the construction process (previous middle process) to the start of work of the construction process (starting) Possible date) is included in the data item.
図6は例として勾配屋根付き住宅の施工日程データベースの施工日程決定参照データの例を施工工事店端末装置14の表示部に表示したものである。建物の形態に応じた施工パターンに応じて選択出来るものである。 FIG. 6 shows an example of the construction schedule determination reference data in the construction schedule database for a house with a sloped roof on the display unit of the construction shop terminal device 14 as an example. It can be selected according to the construction pattern according to the form of the building.
この施工日程決定参照データには各施工工程が示され、図6に示す工事種別20のデータがあり、大工程名称欄20aと、大工程名称欄20aの大工程名称で括られた中工程名称欄20b、着手可能日欄21、標準工期欄22の各データが互いに関連付けられて示されている。工事種別20の例えば大工程欄20aに示された「躯体工事」には、中工程名称欄20bに示された「躯体工事、小屋組(屋根パネル)、特殊開口…、躯体検査」の各施工工程が含まれる。着手可能日欄21は当該住宅の施工着手基点日を基準として各施工工程の施工着手が可能になるまでの日数を示し、各セル内の「−(マイナス)」表示は施工着手基点日よりも前の場合を表す。標準工期欄22は当該施工工程に必要な標準的な工期を示し、例えば「躯体工事」は8日、「小屋組」は1日が標準工期であることを示す。 Each construction process is shown in this construction schedule determination reference data, and there is data of construction type 20 shown in FIG. 6, and the middle process name enclosed by the large process name column 20a and the large process name column 20a. The data in the column 20b, the start date column 21, and the standard work schedule column 22 are shown in association with each other. For example, the “framework” shown in the large process column 20a of the construction type 20 includes each of the “framework, hut assembly (roof panel), special opening…, frame inspection” shown in the middle process name column 20b. A process is included. The possible start date column 21 indicates the number of days until the construction start of each construction process becomes possible on the basis of the construction start base date of the house, and the “-(minus)” display in each cell is more than the construction start base date. Represents the previous case. The standard construction period column 22 indicates a standard construction period necessary for the construction process. For example, “frame construction” indicates that the standard construction period is 8 days, and “hut group” indicates that the standard construction period is 1 day.
そして、施工工事店端末装置14から図6の標準工期欄22に設けられた選択部23を順次クリックすることにより必要な施工工程が順次抽出される。このように抽出された施工日数付きの一連の施工工程は、図3に示す施工日程・納材工程データベース18に格納される。 Then, necessary construction steps are sequentially extracted by sequentially clicking the selection section 23 provided in the standard construction period column 22 of FIG. A series of construction processes with construction days extracted in this way are stored in the construction schedule / delivery process database 18 shown in FIG.
そして、各施工工程を抽出すると、各施工工程の順序、各施工工程を完成するのに必要な期間、当該施工工程より前の施工工程の完了後から当該工施工程の開始日までの日数が自動的に且つ適正に設定若しくは選択される。 And when each construction process is extracted, the order of each construction process, the period necessary to complete each construction process, the number of days from the completion of the construction process before the construction process to the start date of the construction process It is set or selected automatically and appropriately.
次に図4のステップS2において、施工工事店端末装置14の入力手段により施工着手基点日(当該住宅の施工を開始する基点日)を入力すると、ステップS3では、図2に示す施工日程決定手段4により図3に示す施工日程・納材工程データベース18の施工日数付きの各施工工程にそれぞれ施工日程である作業開始日、作業完了日が自動的に付与される。 In step S 2 in FIG. 4, when entering the construction undertaken origin date by the input means of the construction work store terminal device 14 (base date to start construction of the house), in step S 3, the construction schedule shown in FIG. 2 The determination means 4 automatically assigns a work start date and a work completion date, which are work schedules, to each work process with the work days in the work schedule / delivery process database 18 shown in FIG.
尚、この付与は図2に示す制御部3により構成される施工日程決定手段4によって自動的に実行され、施工日程決定ファイルとして保存される。 This assignment is automatically executed by the construction schedule determination means 4 configured by the control unit 3 shown in FIG. 2, and is stored as a construction schedule determination file.
図11(a)は、演算処理結果の施工日程決定ファイルの一例であり、図11(b)は、各施工工程の作業着手日と作業終了日を演算するための施工日程決定参照データの一例である。 FIG. 11 (a) is an example of the construction schedule determination file of the calculation processing result, and FIG. 11 (b) is an example of the construction schedule determination reference data for calculating the work start date and the work end date of each construction process. It is.
図11(a)に示すように、大工程名称欄30dに示される「基礎工事」において、先ず、入力部10に有する施工着手基点日を入力する入力手段により、2005年9月4日を入力する(図11(a)の施工着手基点日欄29参照)。この値を使用して、図11(a)に示す「遣り方・地業」の作業着手日が演算される。 As shown in FIG. 11 (a), in the “foundation work” shown in the large process name column 30d, first, 4th September, 2005 is entered by the input means for entering the construction start point date in the input unit 10. (Refer to the construction start point date column 29 in FIG. 11 (a)). Using this value, the work start date of “how to spend / local work” shown in FIG. 11A is calculated.
即ち、当該施工工程の作業着手日は、以下の演算式1により演算される。 That is, the work start date of the construction process is calculated by the following calculation formula 1.
[演算式1]
当該施工工程の作業着手日=施工着手基点日(着工日)または前の施工工程(前の中工程)の作業終了日(初日不算入)+着手可能日
[Calculation Formula 1]
Work start date of the relevant construction process = work start base date (start date) or work end date of the previous construction process (previous middle process) (not counting the first day) + available start date
図11(a)に示す施工工程(中工程)名称欄30aの名称が「遣り方・地業」の前の施工工程(前の中工程)は、施工着手基点日の入力値を使用する。したがって、作業着手日は、施工着手基点日(着工日)+着手可能日であり、9月4日(施工開始基準日)に0日を初日不算入で加算して、9月4日と算出される(図11(a)の施工工程(中工程)名称欄30aの名称が「遣り方・地業」の作業着手日欄30b参照)。 The construction process (previous middle process) before the name in the construction process (medium process) name column 30a shown in FIG. Therefore, the work start date is the construction start base date (start date) + the start possible date, and is calculated as September 4 by adding 0 days to September 4 (construction start date), not including the first day. (See the work start date column 30b in which the name in the construction process (medium process) name column 30a in FIG.
また、作業終了日は、以下の演算式1により演算される。 The work end date is calculated by the following calculation formula 1.
[演算式2]
作業終了日=作業着手日(初日算入)+標準工期
[Calculation formula 2]
Work end date = work start date (included on the first day) + standard work schedule
したがって、図11(a)の施工工程(中工程)名称欄30aの名称が「遣り方・地業」の作業終了日は、作業着手日である9月4日に初日算入で、図11(b)の施工工程(中工程)名称欄31aの名称が「遣り方・地業」の標準工期欄31cに記載された標準工期1日を加算して9月4日と算出される(図11(a)の施工工程(中工程)名称欄30aの名称が「遣り方・地業」の作業終了日欄30c参照)。 Therefore, the work end date in the construction process (medium process) name column 30a of FIG. 11 (a) is “Schedule / Groundwork”, which is counted as the first day on September 4th, which is the work start date. The name of the construction process (middle process) name column 31a of b) is calculated to be September 4 by adding the standard construction period 1 day described in the standard construction period column 31c of "How to spend / Groundwork" (FIG. 11). (Refer to the work end date column 30c in which the name in the construction process (medium process) name column 30a of (a) is "how to spend / geographic work").
図11(a)の施工工程(中工程)名称欄30aの名称が「配筋・型枠」の場合は、作業着手日は、「遣り方・地業」の作業終了日である9月4日に、図11(b)の施工工程(中工程)名称欄31aの名称が「配筋・型枠」の前の中工程からの着手可能日欄31bに記載された着手可能日である1日を初日不算入で加算して9月5日である(図11(a)の施工工程(中工程)名称欄30aの名称が「配筋・型枠」の作業着手日欄30b参照)。 When the name in the construction process (medium process) name column 30a in FIG. 11A is “reinforcement / formwork”, the work start date is the work end date of “how to work / geo” September 4 The name of the construction process (medium process) name column 31a in FIG. 11 (b) is the possible start date described in the possible start date column 31b from the middle process before "bar arrangement / formwork" 1 The day is added with the first day not counted, and it is September 5 (refer to the work start date column 30b in which the name of the construction process (medium process) name column 30a in FIG. 11A is “reinforcement / formwork”).
同様に、図11(a)の施工工程(中工程)名称欄30aの名称が「配筋・型枠」の作業終了日は、図11(a)の施工工程(中工程)名称欄30aの名称が「配筋・型枠」の作業着手日欄30bに記載された作業着手日である9月5日に初日算入で、図11(b)の施工工程(中工程)名称欄31aの名称が「配筋・型枠」の標準工期欄31cに記載された標準工期5日を加算して9月9日と算出される(図11(a)の施工工程(中工程)名称欄30aの名称が「配筋・型枠」の作業終了日欄30c参照)。 Similarly, the work end date in the construction process (middle process) name field 30a of FIG. 11 (a) is “reinforcement / formwork” is the same as the construction process (medium process) name field 30a of FIG. 11 (a). The name of the construction process (middle process) name column 31a in FIG. 11 (b), including the first day on September 5th, which is the work start date described in the work start date column 30b with the name “bar arrangement / formwork” Is calculated to be September 9 by adding the standard construction period 5 days described in the standard construction period column 31c of the “bar arrangement / formwork” (in the construction process (medium process) name column 30a in FIG. 11A). (Refer to the work end date column 30c whose name is “bar arrangement / formwork”).
図11(a)の施工工程(中工程)名称欄30aの名称が「脱型埋め戻し」では、作業着手日は、前の施工工程(前の中工程)である「コンクリート打設」の作業終了日9月12日に、図11(b)の施工工程(中工程)名称欄31aの名称が「脱型埋め戻し」の前の中工程からの着手可能日欄31bに記載された着手可能日である5日を初日不算入で加算して、9月17日が算出される(図11(a)の施工工程(中工程)名称欄30aの名称が「脱型埋め戻し」の作業終了日欄30c参照)。 When the name of the construction process (middle process) name column 30a in FIG. 11 (a) is "demolding backfilling", the work start date is the work of "concrete placing" which is the previous construction process (previous middle process) On the end date, September 12, the construction process (medium process) name column 31a in FIG. 11 (b) can be started as described in the possible start date column 31b from the middle process before "demold backfilling". 5th, which is the day, is added with the first day not included, and September 17 is calculated (the work in the construction process (middle process) name column 30a in FIG. 11 (a) is “demolded backfill”) Day column 30c).
同様に、図11(a)の施工工程(中工程)名称欄30aの名称が「脱型埋め戻し」の作業終了日は、図11(a)の施工工程(中工程)名称欄30aの名称が「脱型埋め戻し」の作業着手日欄30bに記載された作業着手日である9月17日に初日算入で、図11(b)の施工工程(中工程)名称欄31aの名称が「脱型埋め戻し」の標準工期欄31cに記載された標準工期1日を加算して9月17日が算出される(図11(a)の施工工程(中工程)名称欄30aの名称が「脱型埋め戻し」の作業終了日欄30c参照)。 Similarly, the work end date in which the name of the construction process (middle process) name field 30a in FIG. 11 (a) is “demolding backfill” is the name of the construction process (medium process) name field 30a in FIG. 11 (a). Is included on the first day of September 17th, which is the work start date described in the work start date column 30b of “demolding backfill”, and the name of the construction process (medium process) name column 31a in FIG. The standard construction period 1 day described in the standard construction period column 31c of “demolding backfill” is added to calculate September 17 (the name of the construction process (medium process) name column 30a in FIG. 11A is “ (Refer to the work end date column 30c of “demolding backfill”)
これらの演算処理結果は、図3に示して後述する施工日程・納材工程データベース18に記憶される施工日程決定ファイルに格納される。 These calculation processing results are stored in a construction schedule determination file stored in a construction schedule / delivery process database 18 shown in FIG.
尚、本演算処理では、システム内のある図示しないカレンダーデータ(時計情報)を参照して、日曜日を考慮している。即ち、例えば、建設現場の近隣の騒音迷惑になることを配慮して、作業着手日から作業終了日の間に日曜日がある場合には、当該日は作業を行わないことから、上記演算処理の各式において「加算する日数」に更に「休み加算」として「1日」を加える。例えば、作業着手日自身が日曜日に重なったときは、作業着手日が1日延期され、作業着手日の翌日から作業終了日に日曜日に重なったときは、作業終了日が1日延期される。土曜日と日曜日を連休とするならば、「休み加算」値を「2日」とすれば良い。 In this calculation process, Sunday is taken into consideration with reference to calendar data (clock information) (not shown) in the system. That is, for example, in consideration of noise in the vicinity of the construction site, if there is a Sunday between the work start date and the work end date, the work is not performed on that day. In each equation, “1 day” is added to “days to be added” as “break addition”. For example, when the work start date itself overlaps with Sunday, the work start date is postponed by one day, and when the work start date overlaps with Sunday from the day after the work start date, the work end date is postponed by one day. If Saturdays and Sundays are consecutive holidays, the “rest addition” value may be “2 days”.
このように各施工工程が抽出され、施工着手日が入力されると、制御部3は図2に示す施工工程表作成手段8aにより、予め決められた形式で、図12〜図14に示す施工工程表を作成するようになっており、それを施工工事店端末装置14に表示させて前記抽出した各施工工程の内容及び日程等の確認を行うことが出来る。 When each construction process is extracted in this way and the construction start date is input, the control unit 3 performs the construction shown in FIGS. 12 to 14 in a predetermined format by the construction process table creating means 8a shown in FIG. A process chart is created, and it can be displayed on the construction shop terminal device 14 to check the contents and schedule of each extracted construction process.
次に図4のステップS4において、図2に示す納材予定日設定手段5が、抽出した各施工工程に使用する部材の施工現場への納材予定日を設定する。ここで、「納材予定日」と呼ぶのは、納材日確定入力手段により納材日を確定する指示がされたもの(「納材日」)と区別するためである。また、その設定後に施工工程日程が変更された場合に納材予定日も変更されることがあることを考慮しているためである。 In step S 4 in FIG. 4, is paid material date setting means 5 shown in FIG. 2, the extracted setting the pay material date to construction site of the member to be used in each construction step. Here, the term “scheduled delivery date” is used to distinguish it from the instruction (“delivery date”) for which the delivery date confirmation input unit has instructed the delivery date. Moreover, it is because it considers that a scheduled delivery date may be changed when a construction process schedule is changed after the setting.
上記納材予定日の設定は施工工事店端末装置14から管理装置1の外部記憶装置13に設けられた図3に示す納材工程データベース17を呼び出して行う。納材工程データベース17には複数(例えば30程度)の納材工程パターンである納材予定日参照データが格納されている。 The scheduled delivery date is set by calling the delivery process database 17 shown in FIG. 3 provided in the external storage device 13 of the management device 1 from the construction shop terminal device 14. The delivery process database 17 stores scheduled delivery date reference data that are a plurality of delivery process patterns (for example, about 30).
このように複数の納材工程パターンが用意されているのは、例えばコンクリート住宅と木造住宅、または勾配屋根付き住宅と勾配屋根無し住宅とでは使用する部材に相違があるので、部材を抽出し易いように複数のパターンに区分して格納しているのである。 A plurality of material delivery process patterns are prepared in this manner because, for example, there is a difference in members used in a concrete house and a wooden house, or a house with a sloped roof and a house without a sloped roof. Thus, it is divided into a plurality of patterns and stored.
納材予定日参照データは、施工日決定参照データ、指定期限日参照データ、予告期限日参照データ等共通するインデックスの番号の並び順番が関連付けられ、定義されている。 The scheduled delivery date reference data is defined by associating the arrangement order of common index numbers such as construction date determination reference data, designated due date reference data, and notice due date reference data.
尚、場合によっては、納材予定日参照データは、複数の納材工程パターンに区分して設けず、1つの納材予定日参照データにまとめてデータベース化しても良い。 In some cases, the scheduled delivery date reference data may not be divided into a plurality of delivery process patterns and provided as a database in one scheduled delivery date reference data.
各納材工程パターンである納材予定日参照データには前記施工工程パターンに準じて工事着手から完成までに必要とする納材工程が定義若しくは規定され、各部材毎にそれを使用する施工工程(中工程)の作業着手日(部材の使用開始日)から何日前に納材すべきかの期限(納材要求日数)が日数で設定されている。 The delivery date reference data that is each delivery process pattern defines or regulates the delivery process required from the start of construction to completion according to the construction process pattern, and the construction process that uses it for each member The deadline (the number of days required for material delivery) of how many days before the work start date (start date of use of the member) for the (middle process) is set in days.
尚、この納材工程データベース17には、後述するように、各部材毎に指定期限から納材予定日までの日数と予告期限から指定期限までの日数も定義若しくは規定されている。 In the material delivery process database 17, as will be described later, the number of days from the designated deadline to the scheduled delivery date and the number of days from the notice deadline to the designated deadline are defined or defined for each member.
各施工工程に使用する部材の施工現場への納材予定日を設定するには、前記納材工程パターンの中から前記施工工程パターンに適合する納材工程パターンを選択し、次に各施工工程で使用する部材を選択することにより行われる。 In order to set the scheduled delivery date of the parts used in each construction process to the construction site, select a delivery process pattern that matches the construction process pattern from the delivery process pattern, and then each construction process This is done by selecting the member to be used.
尚、本実施形態では前記のように勾配屋根付き住宅の施工工程パターンを選択したので、納材工程パターンもそれに使用される部材を満たすものを選択する。 In addition, in this embodiment, since the construction process pattern of the house with a gradient roof was selected as mentioned above, the thing which satisfies the member used for it is also selected as a delivery process pattern.
図8及び図9は選択した納材工程データベース17の納材予定日参照データを携帯端末装置となる施工工事店端末装置14のディスプレイに表示する表示手段に表示した例である。表示された納材工程パターンには図8及び図9の施工工程(中工程)名称欄24に示す施工工程と、納材工程名称欄25に示されるその施工工程に使用する各部材、起算日区分欄26に示される個々の施工工程の起算日区分(当該施工工程(中工程)の作業着手日)と、納材要求日数欄27に示される作業着手日(部材の使用開始日)から何日前に納材すべきかの納材要求日数(期限)と、選択部28との各データが互いに関連付けられて示されている。 FIGS. 8 and 9 are examples in which the scheduled delivery date reference data of the selected delivery process database 17 is displayed on the display means for displaying on the display of the construction shop terminal device 14 serving as a portable terminal device. The displayed material delivery process pattern includes the construction process shown in the construction process (medium process) name column 24 of FIGS. 8 and 9, the members used in the construction process shown in the delivery process name column 25, and the date of calculation From the start date classification of each construction process shown in the classification column 26 (work start date of the construction process (medium process)) and the work start date (starting date of use of the member) shown in the delivery request days column 27 The delivery request days (time limit) as to whether delivery should be made before the date and each data of the selection unit 28 are shown in association with each other.
そして、図8及び図9において、使用する部材の選択部28をクリックすることにより、当該部材の施工現場への納材予定日が自動的に設定される。尚、この設定は図2に示す制御部3により構成される納材予定日設定手段5によって実行される。 8 and 9, when the member selection unit 28 to be used is clicked, the scheduled delivery date of the member to the construction site is automatically set. This setting is executed by the scheduled delivery date setting unit 5 configured by the control unit 3 shown in FIG.
そして、設定された納材予定日は図3に示す施工日程・納材工程データベース18に記憶された納材予定日ファイルに自動的に付与される。即ち、当該施工工程(中工程)の納材予定日は、以下の演算式3による演算処理により算出される。 The set scheduled delivery date is automatically given to the scheduled delivery date file stored in the construction schedule / delivery process database 18 shown in FIG. That is, the scheduled delivery date of the construction process (intermediate process) is calculated by the arithmetic processing according to the following arithmetic expression 3.
[演算式3]
施工工程の納材予定日=起算日区分(初日不算入)+納材要求日数
[Calculation Formula 3]
Scheduled date of delivery of construction process = starting date division (not counting the first day) + number of days required for delivery
図11(c)は、施工工程(中工程)名称欄24の値「配筋・型枠」に関連する納材工程名称欄25の値「基礎鉄筋」の納材予定日の演算処理のための納材予定日参照データの一例であり、図11(d)は演算処理後に生成される納材予定日ファイルの一例である。 Fig. 11 (c) shows the calculation process for the scheduled date of delivery of the value "basic rebar" in the delivery process name column 25 related to the value "reinforcement / formwork" in the construction process (medium process) name column 24 FIG. 11D shows an example of a scheduled delivery date file generated after the calculation process.
図11(c)に示すインデックス値「2」、即ち、「配筋・型枠」の当該施工工程(中工程)の作業着手日である図11(a)の施工工程(中工程)名称欄30aの名称が「配筋・型枠」の作業着手日欄30bに記載された9月5日に、図11(c)の納材要求日数欄27に示す納材要求日数0日が加算されて、図11(d)の納材予定日欄32aに示される納材予定日として9月5日が算出される。 The index value “2” shown in FIG. 11 (c), that is, the construction process (medium process) name column of FIG. 11 (a) that is the work start date of the construction process (medium process) of “bar arrangement / formwork” On the 5th of September, which is described in the work start date column 30b whose name is “bar arrangement / formwork” 30a, the requested delivery date 0 shown in the required delivery date column 27 of FIG. 11C is added. Thus, September 5 is calculated as the scheduled delivery date shown in the scheduled delivery date column 32a of FIG.
尚、図11(c)に示す納材予定日参照データのうち、「配筋・型枠」の起算日区分欄26に示される起算日区分(当該施工工程(中工程)の作業着手日)の値は、「当該施工工程(中工程)の作業着手日」と定義されている。 In addition, among the scheduled delivery date reference data shown in FIG. 11 (c), the start date classification (work start date of the construction process (medium process)) shown in the start date section 26 of “bar arrangement / formwork” Is defined as “work start date of the construction process (medium process)”.
図11(c)に示す納材予定日参照データのインデックスの値「2」と、同一の図11(a)に示す施工日程決定ファイルのインデックス値「2」の作業着手日欄30bに示される「作業着手日」を引用して、図11(c)の施工工程(中工程)名称欄24に示す施工工程(中工程)名称の値「配筋・型枠」の作業着手日の演算結果を格納している。 The index value “2” of the scheduled date of delivery date reference data shown in FIG. 11C and the index value “2” of the construction schedule determination file shown in FIG. Calculation result of the work start date for the value of the construction process (middle process) name shown in the construction process (middle process) name column 24 of FIG. Is stored.
尚、図11(c)の施工工程(中工程)名称欄24に示す施工工程(中工程)の値自身をインデックスとして「作業着手日」を引用しても良い。 It should be noted that the “work start date” may be cited using the value of the construction process (medium process) shown in the construction process (medium process) name column 24 in FIG.
次に図4に示すステップS5,S6において、各施工工程に使用する部材の指定期限と、その予告期限を設定する。ステップS5における部材の指定期限設定は図2に示す制御部3により構成される指定期限設定手段6で行われる。ステップS6における部材の予告期限設定は図2に示す制御部3により構成される予告期限設定手段7で行われる。 Next, in steps S 5 and S 6 shown in FIG. 4, a designated deadline for the member used in each construction process and its notice deadline are set. Specified period of members set in step S 5 is performed at specified time limit setting means 6 constituted by the control unit 3 shown in FIG. Notice period of members set in step S 6 is carried out in advance notice time limit setting means 7 constituted by the control unit 3 shown in FIG.
前記のように各施工工程で使用する部材の納材予定日が設定されると、図2に示す指定期限設定手段6は、図3に示す納材工程データベース17中に納材工程(部材の束)毎に定義されている指定期限の日数を抽出し、各納材工程(部材の束)に対し、その指定期限を自動的に設定(付与)する。 When the scheduled delivery date of the member to be used in each construction process is set as described above, the designated deadline setting means 6 shown in FIG. 2 stores the delivery process (the member process) in the delivery process database 17 shown in FIG. The number of days of the designated deadline defined for each bundle is extracted, and the designated deadline is automatically set (granted) for each material delivery process (a bundle of members).
また、このように各部材毎の指定期限が設定されると、図2に示す予告期限設定手段7は、図3に示す納材工程データベース17中に部材毎に定義された予告期限の日数を抽出し、各納材工程(部材)に対し、予告期限を自動的に設定(付与)する。 When the designated deadline for each member is set in this way, the notice deadline setting means 7 shown in FIG. 2 sets the number of days for the notice deadline defined for each member in the material delivery process database 17 shown in FIG. Extract and automatically set (grant) a notice deadline for each delivery process (member).
図示しないシステムカレンダーデータ(時計情報)と、基準日から遡って実働で何日前に期限が設定されるように定義した図3に示す納材工程データベース17と、を参照して制御部3に搭載された演算処理機能により演算処理した情報を使用する。 Installed in the controller 3 with reference to system calendar data (clock information) (not shown) and a material delivery process database 17 shown in FIG. 3 which is defined so that the deadline is set in advance from the reference date. Information processed by the calculated processing function is used.
ここで、図2に示す指定期限設定手段6は以下の演算式4により指定期限日を算出し、予告期限設定手段7は以下の演算式5により予告期限日を算出する。 Here, the designated deadline setting means 6 shown in FIG. 2 calculates the designated deadline date by the following calculation formula 4, and the notice deadline setting means 7 calculates the notice deadline date by the following calculation formula 5.
[演算式4]
指定期限日=納材予定日(初日不算入)−指定日数
[演算式5]
予告期限日=納材予定日(初日不算入)−予告日数
[Calculation Formula 4]
Designated deadline date = scheduled date of delivery (not counting the first day)-designated number of days [calculation formula 5]
Notice deadline date = scheduled date of delivery (not counted on the first day)-number of notice days
図11(f)は、中工程「配筋・型枠」に関連する納材工程名称欄34aに示される納材工程名称が「基礎鉄筋」の指定期限日の算出の演算処理結果を予告期限日欄34bに示し、予告期限日の算出の演算処理結果を指定期限日欄34cに示した一例であり、それぞれ図3に示す施工日程・納材工程データベース18の指定期限日ファイル・予告期限日ファイルに格納されている。この演算処理では、図11(d)に示す納材予定日ファイルのインデックス値「2」の納材予定日欄32aに示される納材予定日を引用する。 FIG. 11 (f) shows the calculation processing result of the calculation of the designated due date when the material delivery process name shown in the material delivery process name column 34a related to the middle process “bar arrangement / formwork” is “basic rebar”. It is an example shown in the date column 34b and the calculation processing result of calculation of the notice deadline date is shown in the designated deadline date column 34c, respectively, and the designated deadline date file and notice deadline date of the construction schedule / delivery process database 18 shown in FIG. Stored in a file. In this calculation process, the scheduled delivery date shown in the scheduled delivery date column 32a of the index value “2” of the scheduled delivery date file shown in FIG.
図3に示す納材工程データベース17に記憶される図11(e)に示す指定期限日、予告期限日参照データからインデックス値「2」に対応する指定日数欄33b及び予告日数欄33aに示される指定日数及び予告日数を引用すると共に、前記[演算式4]と[演算式5]により指定期限日及び予告期限日の値をそれぞれ算出する。 From the designated deadline date and notice deadline date reference data shown in FIG. 11 (e) stored in the material delivery process database 17 shown in FIG. 3, the designated date field 33b and the notice day number field 33a corresponding to the index value “2” are shown. The specified number of days and the number of advance notice days are quoted, and the values of the designated deadline date and the advance notice deadline are calculated by the above [Calculation Formula 4] and [Calculation Formula 5].
この場合は、納材予定日として図11(d)の納材予定日欄32aに示された9月5日が引用され、指定日数として図11(e)の指定日数欄33bに示す「−6日」、予告日数として図11(e)の予告日数欄33aに示す「−12日」が代入され、指定期限日として図11(f)の指定期限日欄34cに示す8月30日、予告期限日として予告期限日欄34bに示す8月25日がそれぞれ算出される。 In this case, September 5 shown in the scheduled delivery date column 32a of FIG. 11D is cited as the scheduled delivery date, and “−” shown in the designated days column 33b of FIG. “6 days”, “−12 days” shown in the notice days column 33a of FIG. 11E is substituted as the notice days, and August 30 shown in the designated deadlines column 34c of FIG. August 25 shown in the notice deadline column 34b is calculated as the notice deadline date.
これまでの図4に示す各ステップS1〜S6で図3に示す施工日程・納材工程データベース18に住宅毎の工事着手から完成までに必要とする大工程と施工工程(中工程)が施工日程決定ファイルに格納され、各施工工程に使用される部材の納材予定日ファイル、指定期限ファイル、予告期限ファイルがそれぞれ格納されている。 In the steps S 1 to S 6 shown in FIG. 4 so far, the construction schedule / delivery process database 18 shown in FIG. 3 includes large processes and construction processes (intermediate processes) required from the start of construction for each house to completion. It is stored in the construction schedule determination file, and a scheduled delivery date file, a designated deadline file, and a notice deadline file for members used in each construction process are stored.
次に図4に示すステップS7において、施工工程表作成の処理を行うが、先ず前処理として、施工日程決定ファイル、納材予定ファイル、および指定期限日・予告期限日ファイル内のデータを無闇に変更されると管理上の不都合が生じるため、これらの各ファイル内の各データを更新不可と扱う必要があるが、本システムでは、図2に示す情報固定手段8bにより各ファイルの各データに対して、更新不可の属性情報を与える処理がなされる情報固定処理を行う(ステップS8)。尚、情報固定手段8bは、管理装置1に含まれる。 In step S 7 shown in FIG. 4, performs the processing of creating construction process chart, as the first pre-processing, construction schedule determined file, pay material schedule file, and the data for the specified expiration date, announcement due date file thoughtlessly However, in this system, it is necessary to treat each data in each file as non-updatable. However, in this system, each data in each file is processed by the information fixing means 8b shown in FIG. On the other hand, an information fixing process is performed in which a process for providing non-updatable attribute information is performed (step S 8 ). The information fixing unit 8b is included in the management device 1.
次に図2に示す制御部3により構成される施工工程表作成手段8aにより施工工程毎の施工日程、納材予定日、納材すべき部材に関する予告期限日及び通知期限日を含む図12〜図14に示す施工工程表が作成される。 Next, the construction schedule table creation means 8a configured by the control unit 3 shown in FIG. 2 includes a construction schedule, a scheduled delivery date, a notice deadline date and a notice deadline date for a member to be delivered. The construction process chart shown in FIG. 14 is created.
例えば施工工事店端末装置14から「施工工程表作成」指令を出すと、図2に示す施工工程表作成手段8aは図3に示す施工日程・納材工程データベース18に格納された施工日程ファイル、納材予定ファイル及び指定期限ファイル、予告期限ファイルを読み込んで、予めデータの配置(レイアウトフォーム)が設定された図15に示す施工工程表作成参照データを引用して、図12〜図14に示す一定の形式の施工工程表を自動的に作成する。 For example, when the “construction process table creation” command is issued from the construction shop terminal device 14, the construction process table creation means 8 a shown in FIG. 2 performs the construction schedule file stored in the construction schedule / delivery process database 18 shown in FIG. 12 to 14 are shown by quoting the construction process table creation reference data shown in FIG. 15 in which the data delivery schedule file, the specified deadline file, and the notice deadline file are read and the data arrangement (layout form) is set in advance. Automatically create a certain format construction schedule.
施工工程表作成は、先ず、図3に示す施工工程データベース16にある施工日程決定参照データの大工程と施工工程(中工程)(図6参照)と、納材工程データベース17にある納材予定日参照データの施工工程(中工程)(図11参照)と、納材工程の名称同士を関連付けて、即ち、インデックス値同士を照合して施工工程(中工程)と、納材工程名称とを関連付ける方法でも良いし、施工工程(中工程)をそのままインデックスに使用して関連付ける方法でも良い。 The construction process table is created first by referring to the large process of construction schedule determination reference data in the construction process database 16 shown in FIG. 3, the construction process (medium process) (see FIG. 6), and the delivery schedule in the delivery process database 17. The construction process (medium process) (see FIG. 11) of the date reference data is associated with the names of the delivery process, that is, the construction process (middle process) and the delivery process name are collated by comparing the index values. A method of associating may be used, or a method of associating the construction process (medium process) as it is with the index may be used.
そして、図6に示すように施工工程(中工程)の並び順に並べ、納材工程は関連付いた施工工程(中工程)と次の施工工程(中工程)の間に表示するようにしている。例えば、図12及び図13に示すように、「配筋・型枠」の下に1行挿入し、Lマーク35の表示により関連付けられた「基礎鉄筋DX」の納材工程を表示する。 Then, as shown in FIG. 6, the construction process (medium process) is arranged in the order of arrangement, and the delivery process is displayed between the associated construction process (medium process) and the next construction process (medium process). . For example, as shown in FIG. 12 and FIG. 13, one line is inserted under “bar arrangement / formwork”, and the delivery process of “foundation reinforcing bar DX” associated with the display of the L mark 35 is displayed.
そして、納材工程名称と部材データは、図3に示す外部記憶装置13に設けられる部材データベース17aに記憶される納材工程名称と部材名称と数量とが対応付けて関連付けられた納材工程・部材参照データを参照して該当する納材工程の部材を全て同時に配送されるように通知手段が部材メーカの各端末装置に通知する演算処理が行われ、納材工程名称に関連付く納材日に適時に施工現場への資材・部材の配送が行われることとなる。部材データベース17aは部材データ、納材工程・部材参照データを含む。 The material delivery process name and the member data are associated with the material delivery process name, the member name, and the quantity stored in the member database 17a provided in the external storage device 13 shown in FIG. The delivery date associated with the delivery process name is performed by the notification means notifying each terminal device of the member maker so that all members of the delivery process corresponding to the member reference data are delivered simultaneously. The materials and parts will be delivered to the construction site in a timely manner. The member database 17a includes member data, a material delivery process / member reference data.
図7は、納材工程・部材参照データの一例である。このように作成された図12〜図14に示す施工工程表は、例えば施工工事店端末装置14(または管理装置1や集配センター端末装置15)で表示またはプリントアウトすることが出来る。 FIG. 7 is an example of a material delivery process / member reference data. The construction process charts shown in FIGS. 12 to 14 created as described above can be displayed or printed out by, for example, the construction shop terminal device 14 (or the management device 1 or the collection / delivery center terminal device 15).
即ち、管理装置1のコンピュータシステム中に構成されるディスプレイまたは施工工事店端末装置14や集配センター端末装置15等の携帯端末装置のディスプレイに表示する表示手段及び/または該表示手段による表示を印刷する印刷手段を有し、該表示手段または印刷手段が、施工工程表作成手段8aにより作成される図12〜図14に示す施工工程表の各々の納材工程の開始日及び終了日を示す情報と共に該納材工程の納材予定日情報、納材すべき部材に関する予告期限情報、予告期限の通知期限情報及び通知が送信済みか否かを示す情報を表示するようになっている、またはこれらの情報を印刷するようになっている。 That is, the display means displayed on the display configured in the computer system of the management apparatus 1 or the display of the portable terminal device such as the construction shop terminal device 14 or the collection / delivery center terminal device 15 and / or the display by the display means is printed. It has a printing means, and the display means or the printing means together with information indicating the start date and the end date of each delivery process in the construction process table shown in FIGS. 12 to 14 created by the construction process chart creation unit 8a The scheduled delivery date information of the material delivery process, the advance notice deadline information on the material to be delivered, the notice deadline information of the notice deadline, and the information indicating whether the notice has been transmitted, or these are displayed. The information is printed.
図12〜図14はプリントアウトした邸別(住宅別)の施工工程表の一部である。図12〜図14の施工工程表の縦軸には施工日程ファイルから引用して、各施工工程が大工程、中工程(本発明でいう施工工程)が示され、横軸には施工工程(中工程)毎に工事業者、作業着手日、作業終了日、標準工期に基く施工に必要な日数及びカレンダーの欄が示されている。 FIG. 12 to FIG. 14 are a part of the construction process charts by residence (by residence) printed out. The construction process table of FIGS. 12 to 14 is quoted from the construction schedule file, each construction process is shown as a large process, a middle process (construction process referred to in the present invention), and the horizontal axis is a construction process ( For each middle stage), the column of the construction contractor, work start date, work end date, days required for construction based on the standard work schedule, and a calendar column are shown.
また、納材予定日ファイル、指定期限・予告期限ファイルから引用して、カレンダーの欄には部材毎に予告期限日(図13に示す封筒マークアイコン)、指定期限日(図13に示す左向き矢印マークアイコン)、納材予定日(図13に示す下向き矢印マークアイコン)、及び中工程毎の作業期間(図13に示す横帯マークアイコン)が示されている。これらアイコンも、図3に示す外部記憶装置13の施工工程表データベース19に記憶される施工工程表作成参照データに格納されており、図2に示す制御部3の施工工程表作成手段8aが適宜参照して表示される。施工工程表データベース19は施工工程表作成参照データを含む。 In addition, quoted from the scheduled delivery date file and the designated deadline / preliminary deadline file, the calendar column displays the deadline date (envelope mark icon shown in FIG. 13) and designated deadline date (left-pointing arrow shown in FIG. 13) for each member. Mark icon), scheduled delivery date (downward arrow mark icon shown in FIG. 13), and work period for each intermediate process (horizontal band mark icon shown in FIG. 13). These icons are also stored in the construction process table creation reference data stored in the construction process table database 19 of the external storage device 13 shown in FIG. 3, and the construction process table creation means 8a of the control unit 3 shown in FIG. Displayed by reference. The construction process table database 19 includes construction process table creation reference data.
管理装置1のコンピュータや施工工事店端末装置14や集配センター端末装置15等の携帯端末装置の表示手段による画面表示も図12〜図14と同様なバーチャートやマークを使用して行うことにより、システムの使用者に直感的に分かり易く、誤認も少ない。 By using the same bar charts and marks as in FIGS. 12 to 14, screen display by the display means of the mobile terminal device such as the computer of the management device 1 and the construction shop terminal device 14 and the collection / delivery center terminal device 15 is performed. It is easy for the system user to understand intuitively and there are few misidentifications.
図12〜図14に示す施工工程表により、施工側、管理装置1を管理する例えば住宅メーカの管理部門または集配センター側において、住宅別に施工及びそれに使用する部材の納材に関する情報を前もって知ることが出来る。 Based on the construction process charts shown in FIGS. 12 to 14, the construction side and the management device 1 managing the management apparatus 1, for example, knowing in advance information on construction and delivery of members used for each house on the management department or collection / delivery center side of the housing manufacturer I can do it.
尚、図2に示す施工工程表作成手段8aにより作成される施工工程表は図12〜図14のような表形式に限らず、図形形式であっても良い。 The construction process table created by the construction process chart creating means 8a shown in FIG. 2 is not limited to the table format as shown in FIGS.
次に、図5のフローチャート及び図10を参照して図2に示す制御部3により構成される指定期限通知手段8による指定期限の予告方法を説明する。 Next, referring to the flowchart of FIG. 5 and FIG. 10, a notice method of the designated deadline by the designated deadline notifying means 8 constituted by the control unit 3 shown in FIG. 2 will be described.
図5において、予告すべき対象が存在する場合は、管理装置1は図5に示すフローチャートの「開始」状態になっている。その状態で図2に示す指定期限通知手段8は、ステップS10において各部材の予告期限日をスキャンし監視している。 In FIG. 5, when there is a target to be notified, the management apparatus 1 is in the “start” state of the flowchart shown in FIG. Specifies deadline notification means 8 shown in this state in FIG. 2 monitors by scanning the announcement expiration date of each member in the step S 10.
次にステップS11において、何れかの部材が予告期限日に達したと判断すると、ステップS12で指定期限通知手段8は管理装置1から施工工事店端末装置14及び集配センター端末装置15にその旨を自動的に通知する。先の施工工程(中工程)の「配筋・型枠」に対応する納材工程の「基礎鉄筋」では、システムカレンダーデータ(時計情報)と各部材の予告期限日を照合して、予告期限日(8月25日12:00PM)に電子メールを自動発信する。 In step S 11, when any one of the member is determined to have reached the advance notice due date, its designated time limit notifying means 8 Installations local terminal device from the management device 1 14 and the distribution center terminal device 15 in step S 12 Notify automatically. In the “basic rebar” of the delivery process corresponding to the “bar arrangement / formwork” of the previous construction process (medium process), the system calendar data (clock information) and the notice deadline date of each member are collated. E-mail is automatically transmitted on the day (August 25, 12:00 PM).
例えば、「基礎鉄筋の納材予定日を予定日に確定する期限は8月30日です。」等のメールによる予告(予告メール)をする。ここで、8月30日は、指定期限日、予告期限日ファイルの指定期限日のデータを引用している。予告がなされた納材工程「基礎鉄筋」の納材予定日と指定期限日は、図11(d)に示す先の納材予定日ファイルと、図11(f)の指定期限日、予告期限日ファイルとが同一のインデックス値「2」によって関連付けられているために、お互いのファイルのデータが引用可能になっていることによる。 For example, an advance notice (notice e-mail) such as “The deadline for determining the scheduled date of delivery of the basic rebar is August 30” is given. Here, on August 30th, data on the designated deadline date of the designated deadline date and notice deadline date file is cited. The scheduled delivery date and designated deadline date of the delivery process “basic rebar” for which the advance notice has been made are the previous scheduled delivery date file shown in FIG. 11 (d), the designated deadline date and the notice deadline in FIG. 11 (f). This is because the data of each file can be cited because the day file is associated with the same index value “2”.
また、図11(f)の指定期限日、予告期限日ファイルには、確定・未確定属性(フラグ)として「○(予定)」の値が格納されており、やはり同一のインデックス値「2」によって納材予定日ファイルと関連付けられて、納材予定日欄32aに示される納材予定日が未確定データとして認識されるようになっている。 In addition, the designated deadline date and notice deadline date file of FIG. 11F stores a value of “O (planned)” as a confirmed / unconfirmed attribute (flag), and the same index value “2” is also used. Thus, the scheduled delivery date shown in the scheduled delivery date column 32a is recognized as unconfirmed data in association with the scheduled delivery date file.
尚、図2に示す指定期限通知手段8はFAX(ファクシミリ装置)等の他の通知手段を駆動して、指定期限を施工工事店端末装置14及び集配センター端末装置15に自動的に通知(予告通知)することも出来る。 The designated deadline notifying means 8 shown in FIG. 2 drives other notifying means such as a FAX (facsimile apparatus), and automatically notifies the designated construction deadline terminal device 14 and the collection / delivery center terminal device 15 (notice) Notification).
予告メールや予告通知を受けた施工側は、指定期限である8月30日までに、その時点で当該部材の施工工程に変更が生じていなければ、施工工事店端末装置14の納材日確定入力手段14bを使用して当該部材の「納材予定日」を「納材日」として確定する入力をし、確定情報を管理装置1に返信の通知する。 The construction side that has received the notice mail or notice will confirm the delivery date of the terminal 14 of the construction shop terminal if there is no change in the construction process of the member by that time, August 30 Using the input means 14b, an input for confirming the “scheduled delivery date” of the member as the “delivery date” is made, and the confirmed information is notified to the management apparatus 1 as a reply.
この施工工事店端末装置14は、施工工事店の事務所に備えられるネットワーク内のパーソナルコンピュータ(以下、「パソコン」という)か、工事現場等の出先から操作するための携帯電話機でも良い。 The construction shop terminal device 14 may be a personal computer (hereinafter referred to as “PC”) in a network provided in the office of the construction shop or a mobile phone for operation from a construction site or the like.
即ち、当該部材を建設現場に納入してもらいたい場合、図5のステップS13において、既に設定されている「納材予定日」を表示手段の表示にて確認するか又は日程変更入力手段14aにより新「納材予定日」の入力を行って、当該部材が所望の納材予定日であることを確認した後、操作者は納材日確定入力手段14bにより表示画面に表示されている「納材予定日」を「納材日」として確定する指示の入力をする。 In other words, if you want to supply the member to the construction site, in step S 13 shown in FIG. 5, already set to "pay material Date" have to check on the display of the display means or schedule change input means 14a After inputting the new “scheduled date of delivery” and confirming that the member is the desired scheduled date of delivery, the operator displays “ An instruction to confirm the “delivery scheduled date” as “delivery date” is input.
そして、ステップS14において、管理装置1の制御部3は納材日を確定する指示が入力(確定入力)がされたか否かを判定し、確定入力がされたと判定した場合には、更にステップS15において、確定入力された「納材日」が当該部材の作業開始日に間に合うかをチェックし、間に合う判定した場合は、ステップS16に進む。尚、前記ステップS15において間に合わないと判定した場合は、前記ステップS13に戻り、新「納材予定日」の再入力を行い、再度ステップS14、S15の処理を行う。 Then, in step S 14, when the control unit 3 of the management device 1 where it is determined that the instruction to determine the accommodated material date is determined whether or not the input (confirmation input) was deterministic input further step in S 15, if it is determined the input "pay material date" is check in time for the work start date of the member was determined in time, the process proceeds to step S 16. Incidentally, if it is determined not in time at the step S 15, the process returns to the step S 13, and re-enter the new "pay material date", the process of step S 14, S 15 again.
即ち、施工工事店端末装置14には、納材予定日または各施工日程の少なくとも一部の変更を管理装置1に通知するための日程変更入力手段14aが設けられ、該日程変更入力手段14aにより施工日程または納材予定日が変更になったときに施工日程決定手段4が当該他の施工工程の施工日程の変更入力を許可するものである。 In other words, the construction shop terminal device 14 is provided with a schedule change input means 14a for notifying the management apparatus 1 of a change in at least a part of the scheduled delivery date or each construction schedule, and by the schedule change input means 14a. When the construction schedule or the scheduled delivery date is changed, the construction schedule determination means 4 permits the input of the modification of the construction schedule for the other construction process.
次にステップS16において納材日確定情報を受けた管理装置1は、ステップS14において「納材予定日」を「納材日」として確定する指示の入力がされたことに基づき、図2に示す制御部3により構成される納材予定日設定手段5に当該部材の「納材予定日」を確定された「納材日」として認識させる指令を出し、該納材予定日設定手段5がその指令に基づく情報処理を実行する。 Then the management apparatus 1 receives the pay material date determination information in step S 16, based in the step S 14 to "pay material date" that is the input of an instruction that is determined as "pay material date", 2 A command for causing the scheduled delivery date setting means 5 configured by the control unit 3 to recognize the “scheduled delivery date” of the member as the determined “delivery date” is issued, and the scheduled delivery date setting means 5 Performs information processing based on the command.
ここで、図11(d)に示す先の納材予定日ファイルと指定期限日、予告期限日ファイルが同一のインデックス値「2」により関連付けられ、納材予定日と確定・未確定属性(フラグ)が関連付いている。この確定・未確定属性(フラグ)に「●(確定)」の値が格納されている場合、納材予定日が確定した納材日のデータとして認識される。 Here, the previous scheduled delivery date file shown in FIG. 11 (d) is associated with the designated due date and notice deadline date file by the same index value “2”, and the scheduled delivery date and the confirmed / indeterminate attribute (flag) ) Is associated. When the value of “● (confirmed)” is stored in this confirmed / unconfirmed attribute (flag), it is recognized as data of the date of delivery when the scheduled date of delivery is confirmed.
このようにして当該部材の「納材予定日」が確定された「納材日」として認識される情報処理がなされると、図2に示す制御部3の施工工程表作成手段8aにより、図12〜図14の「納材予定日」が例えば黒色の下向き矢印マークのアイコンであったとすると(図13参照)、それが「納材日」を表す赤色の下向き矢印マークのアイコンに自動的に切り換えられて区別される。アイコンも施工工程表作成参照データに定義されて記憶されている。 In this way, when information processing that is recognized as the “delivery date” in which the “delivery date” of the member is determined is performed, the construction process table creation means 8a of the control unit 3 shown in FIG. If the “Delivery Schedule Date” in FIGS. 12 to 14 is, for example, a black down arrow icon (see FIG. 13), it will automatically change to a red down arrow icon representing “Delivery Date”. Switched and distinguished. Icons are also defined and stored in the construction process table creation reference data.
尚、上述の通り施工側の施工工事店端末装置14には、各施工工程に使用する部材の納材予定日を確定された納材日として通信部12を経由して管理装置1に通知するための納材日確定入力手段14bが設けられているが、施工側では施工工事店端末装置14を使用せず、管理装置1を管理する部門に対し、例えばFAXや電話で当該部材の「納材予定日」を「納材日」として確定する旨の通知を行うことも出来る。その場合は管理装置1の入力部10の納材日確定入力手段10bから表示画面に表示されている当該部材の「納材予定日」を確定入力した「納材日」として確定する指示の入力操作を行うようにしても良い。 In addition, as described above, the construction side shop terminal device 14 on the construction side notifies the management device 1 via the communication unit 12 of the scheduled delivery date of the member used for each construction process as the confirmed delivery date. However, the construction side does not use the construction shop terminal device 14 and does not use the construction shop terminal device 14, but the department that manages the management device 1 is notified by “FAX” or telephone, for example. It can also be notified that the “scheduled date” is determined as the “delivery date”. In that case, input of an instruction to confirm the “delivery date” of the member displayed on the display screen from the delivery date confirmation input means 10b of the input unit 10 of the management device 1 as the “delivery date” that has been entered. An operation may be performed.
次に前記ステップS17において、図2に示す制御部3の指定期限通知手段8は監視すべき全ての部材について「納材予定日」を「納材日」として確定したか否かを判定し、確定していない部材がある場合は前記ステップS10に戻り、前記ステップS10〜S17を繰り返し、全ての部材が確定した場合は監視動作を終了する。 Next in step S 17, and determines whether the determined specified time limit notifying means 8 of the control section 3 shown in Figure 2 for all the members to be monitored to "pay material date" as the "pay material date" , if there is a member which is not finalized is returned to the step S 10, repeating the steps S 10 to S 17, if all of the members was determined to end the monitoring operation.
一方、前記ステップS12からS13において、各部材についての納材予定日の確認を促す予告メールや予告通知がされた時点で、当該部材を使用する施工工程に遅延が生じており、使用する部材の納材予定日を遅らせたい場合は、施工側では施工工事店端末装置14から日程変更入力手段14aを使用して当該部材の納材予定日を新「納材予定日」に変更する入力と、納材日確定入力手段14bを使用してこの新「納材予定日」を「納材日」として確定する指示の入力をし、この確定情報を管理装置1に返信通知する。 On the other hand, in S 13 from the step S 12, when the notice mail or advance notice has been to prompt confirmation of paid material date for each member, and cause a delay in the construction process using the member, using When it is desired to delay the scheduled delivery date of a member, the construction side uses the schedule change input means 14a from the construction shop terminal device 14 to change the scheduled delivery date of the member to a new “scheduled delivery date”. The delivery date confirmation input means 14b is used to input an instruction to confirm this new “delivery scheduled date” as the “delivery date”, and this confirmed information is sent back to the management apparatus 1.
図16は図2に示す指定期限通知手段8の予告メール(または予告通知)により、指定期限を通知した後、日程変更入力手段14aにより納材予定日を新「納材予定日」に変更入力する入力操作、納材日確定入力手段14bにより確定する指示の入力をする操作及びこれらのデータ処理の様子(表示画面)の一例を示す図である。 In FIG. 16, after the designated deadline is notified by the notice mail (or notice notice) of the designated deadline notifying means 8 shown in FIG. 2, the scheduled delivery date is changed and input to the new scheduled delivery date by the schedule change input means 14a. It is a figure which shows an example of input operation to perform, operation which inputs the instruction | indication fixed by the delivery date fixed input means 14b, and the mode (display screen) of these data processing.
先ず、予告期限日データとシステムカレンダーデータ(時計情報)とを照合処理をする。本例では、先ず、時刻参照:予告期限日である20××年8月25日の設定時刻である正午(12:00PM)にメールシステムが起動し、予告メールが発信されるように設定されている(メール通知)。 First, the preliminary date data and system calendar data (clock information) are collated. In this example, first, the time reference: 20xx which is the deadline for advance notice, the mail system starts at noon (12:00 PM) which is the set time on August 25, year, and the notice mail is set to be transmitted. (Email notification).
このとき、図11(d)の納材予定日欄32aに示される「9月5日」が、図16の右上表(表示画面)のように納材指定日欄36に示されている。ここで、操作者が納材指定日36に示された納材予定日のまま、施工現場に納材をしたい場合、予告メールに対して「予告OK」という文字情報をメールで返信をする(図16(a))。 At this time, “September 5” shown in the scheduled delivery date field 32a in FIG. 11D is shown in the designated delivery date field 36 as shown in the upper right table (display screen) in FIG. Here, when the operator wants to deliver to the construction site with the scheduled delivery date shown in the designated delivery date 36, the operator sends a reply with the text information “Notice OK” to the notice email ( FIG. 16 (a)).
これにより、納材予定日である「9月5日」は、確定した納材日として、納材指定日欄36に表示される。このとき、ステップS12における「予告OK」の入力指令を受けて、図4のステップS4において、納材予定日設定手段5が確定・未確定フラグを「○予定」から「●確定」に置換し、図16(b)の画面表示の予告フラグが「●固定」に変わる。 As a result, “September 5”, which is the scheduled date of delivery, is displayed in the delivery designation date column 36 as the confirmed delivery date. At this time, in response to an input instruction of “notice OK” in step S 12 , the scheduled delivery date setting means 5 changes the confirmed / unconfirmed flag from “○ scheduled” to “● confirmed” in step S 4 of FIG. The notice flag on the screen display in FIG. 16B changes to “fixed”.
一方、施工現場の進捗が遅れたために操作者が施工現場に納材を遅らせたい場合、納材指定日36の変更を指示するために、予告メールに対して、「予告NG」と入力し(図16(c))、更に「9月8日」に入力すると、図16(d)のように納材指定日欄36に「9月8日」が示される。これにより、納材予定日「9月5日」は、「9月8日」に置換され、図4のステップS4で納材予定日設定手段5が確定・未確定フラグを「○予定」から「●確定」に置換し、図16の画面表示の予告フラグが「●固定」に変わる。 On the other hand, if the operator wants to delay delivery to the construction site because the progress at the construction site has been delayed, in order to instruct the change of the delivery designation date 36, enter “Notice NG” ( In FIG. 16 (c)), when “September 8” is further entered, “September 8” is displayed in the delivery designation date column 36 as shown in FIG. 16D. Thus, pay material date "September 5" is replaced by "8 September", pay material date setting means 5 is a definite-unconfirmed flag in step S 4 in FIG. 4, "○ Event" Is replaced with “● confirmed”, and the notice flag on the screen display in FIG. 16 changes to “fixed”.
ここで、図5のステップS14において、管理装置1の制御部3は納材予定日を納材日として確定する指示が入力(確定入力)がされてないと判定した場合には、ステップS18に進んで情報固定解除手段8cにより各施工日程等の情報固定解除を行い、図4のステップS3に戻る。 Here, if it is determined in step S 14 of FIG 5, the control unit 3 of the management device 1 and an instruction to determine the accommodated material date as paid material date input (confirmation input) not been, the step S proceed to 18 performs information unpinning like the construction schedule by information unlocking means 8c, the flow returns to step S 3 in Fig.
ステップS16において、前記施工日程や納材予定日の変更入力の通知を受けた管理装置1は、図2に示す制御部3の施工日程決定手段4に施工工程の施工日程の変更入力を許可する指令を出し、図4のステップS3に戻って、情報固定解除手段8cは、施工日程ファイルの情報固定を解除する情報処理をして、施工日程等の日付の変更入力を可能な状態にする(変更入力許容モード)。 In step S 16, the working schedule and managing apparatus 1 which has received the notification of the change input in paying material date is allowed to change the input of the construction schedule of the construction process in construction schedule determining means 4 of the control section 3 shown in FIG. 2 issues a command to, the process returns to step S 3 in Fig. 4, information unlocking means 8c is a processing to release the information fixed construction schedule file, the ready to change the input date, such as construction schedule Yes (change input permission mode).
即ち、前記端末装置1には、前記施工日程または納材予定日の変更を前記管理装置1に通知するための日程変更入力手段14aが設けられ、前記日程変更入力手段14aにより前記施工日程または納材予定日が変更になったときに、前記日程変更情報に基づいて情報固定解除手段8cが当該他の施工工程(後工程)の施工日程の変更入力を許可する。 That is, the terminal device 1 is provided with a schedule change input means 14a for notifying the management apparatus 1 of a change in the construction schedule or scheduled delivery date, and the schedule change input means 14a allows the construction schedule or delivery date to be changed. When the scheduled material date is changed, the information fixing / releasing means 8c permits change input of the construction schedule of the other construction process (post process) based on the schedule change information.
そして、本システムの操作者は、日程変更入力手段14aにより変更が必要な施工日程である作業開始日や作業終了日を適宜所望のデータ(日付)に変更入力する。 Then, the operator of this system changes and inputs the work start date and the work end date, which are work schedules that need to be changed, to the desired data (date) by the schedule change input means 14a.
ここで、日程変更入力手段14aは、施工日程や納材予定日が変更されることにより変更が必要になる他の施工工程に対して、その施工日程の作業開始日や作業終了日を一つずつ対話的に変更入力するものであり、例えば、図1の施工工事店端末装置14や入力部10に設けられるものである。 Here, the schedule change input means 14a has one work start date and one work end date for the construction schedule for other construction processes that need to be changed by changing the construction schedule or scheduled delivery date. For example, the change is input interactively, for example, in the construction shop terminal device 14 or the input unit 10 of FIG.
そうすると、施工日程決定手段4は、施工工程(中工程)の施工日程決定ファイルの作業開始日及び作業終了日を日程変更入力手段14aにより変更入力された施工日程のデータ(日付)に置き換える。 Then, the construction schedule determination means 4 replaces the work start date and the work end date of the construction schedule determination file of the construction process (medium process) with the data (date) of the construction schedule changed and input by the schedule change input means 14a.
尚、変更入力許容モードにおいて表示部11aの表示手段が、前記後工程(施工工程の施工日程)のうち、変更が必要になる施工工程(施工日程)と変更の必要ない施工工程(施工日程)とを画面上にて色分け等視覚的に区別して表示することが好ましい。 In addition, in the change input permission mode, the display means of the display unit 11a includes a construction process (construction schedule) that needs to be changed and a construction process (construction schedule) that does not need to be changed among the post-process (construction schedule of the construction process). Are preferably visually distinguished on the screen by color coding or the like.
例えば、施工工程の「躯体工事」が遅延して、「躯体部材」の納材予定日を変更する通知を受けた場合、「施工工程変更抽出データ」を参照して、「防水下地工事」や「防水工事」の施工工程を抽出する処理をする。 For example, if the construction process “framework” is delayed and a notice is received to change the scheduled delivery date of the “frame member”, refer to the “construction process change extraction data” and “waterproof foundation work” Processing to extract the construction process of “waterproofing”.
ここで、施工工程変更抽出データは、日程変更入力手段14aにより納材予定日が変更された納材工程に対応する施工工程と、その影響を受ける後工程の施工工程との関連が示されたデータである。例えば、先の施工工程が終了しなければ、後工程の作業をすることが出来ない関係(クリティカルパス)にあるものを規定している。 Here, the construction process change extraction data shows the relationship between the construction process corresponding to the delivery process whose delivery date has been changed by the schedule change input means 14a and the construction process of the subsequent process affected by the delivery process. It is data. For example, if the previous construction process is not completed, the one that is in a relationship (critical path) in which the subsequent process cannot be performed is defined.
尚、「施工工程変更抽出データ」は、施工工程データベース16に含めて記憶しておけば良い。 The “construction process change extraction data” may be included in the construction process database 16 and stored.
次に、図4のステップS4において、日程変更入力手段14aにより納材予定日が変更入力されている場合は、納材予定日設定手段5がもとの納材予定日をその変更入力がされた納材予定日のデータを置き換える処理をする。 Next, in step S 4 in FIG. 4, when the paid member date has been changed input by rescheduling the input means 14a, pay material date setting means 5 is the change input the original Osamezai Date The data for the scheduled date of delivery is replaced.
更に、図4のステップS5〜S6において、指定期限設定手段6や予告期限設定手段7が、指定期限日や予告期限日の変更入力を許可し、適宜日程変更入力手段14aにより必要な変更入力を行うことが出来る。 Further, in step S 5 to S 6 in FIG. 4, designated date setting means 6 and notice date setting means 7, permits the change input for a specified expiration date and notice due date, required changes by a suitable schedule change input unit 14a Input can be made.
そして、最後にステップS7において、納材予定日や施工日程が更新された施工工程表を作成することが出来、ステップS8においてこの内容でよければ操作者の入力指示により情報処理固定手段8bが、置換されたデータ(日付)の情報固定処理を行う。尚、ステップS7とステップS8の順番は逆であっても良い。 And, Finally, in step S 7, pay material Date and construction schedules can be used to create a construction process chart that has been updated, information processing fixed means 8b by the input instruction of the operator If you are satisfied with this content in step S 8 Performs information fixing processing of the replaced data (date). The order of Step S 7 and step S 8 may be reversed.
図17は変更後の施工工程表を作成し、表示部11aに画面表示したものである。この例では、基礎工事の配筋・型枠施工日程が当初9月5日から9月9日までの作業日程であったが、納品日を9月8日に変更したことに伴い、作業日程を9月8日から9月9日に変更したものである。これは、本システムの操作者が配筋・型枠の施工日程の作業開始日を入力部10が有する日程変更入力手段14aにより変更入力したものである。 FIG. 17 shows the construction process table after the change, and is displayed on the screen on the display unit 11a. In this example, the reinforcement and formwork schedule for the foundation work was originally the work schedule from September 5 to September 9, but due to the change of the delivery date to September 8, the work schedule Is changed from September 8 to September 9. In this case, the operator of this system changes and inputs the work start date of the bar arrangement / formwork construction schedule by the schedule change input means 14a which the input unit 10 has.
この場合に、図17で、変更が必要になる施工工程(中工程)の名称欄(「配筋・型枠」、後工程である「アンカー検査」、「コンクリート打設」)37が赤色に表示され、これにより視覚的な識別をして、操作者に変更の検討を促している。 In this case, in FIG. 17, the name column (“bar arrangement / formwork”, “anchor inspection” and “concrete placing”) 37 of the construction process (middle process) that needs to be changed is red. Displayed, thereby visually identifying and prompting the operator to consider changes.
これは、表示部11aの表示手段が、施工工程「配筋・型枠」に対応する納材工程「基礎配筋」の納材予定日が変更されているので、「施工工程変更抽出データ」を参照して、変更が必要になる施工工程(中工程)を抽出して表示の制御をしたものである。 This is because the display means of the display unit 11a has changed the scheduled delivery date of the delivery process “basic reinforcement” corresponding to the construction process “reinforcement / formwork”. The construction process (medium process) that needs to be changed is extracted and the display is controlled.
尚、図5のステップS16において、日程変更入力手段10a,14aにより施工日程が変更されるのを受けて、図4のステップS3に戻って施工日程決定手段4は施工工程の変更を自動的に情報処理することも可能である。 The automatic in step S 16 in FIG. 5, the schedule change input unit 10a, receives the construction schedule is changed by 14a, construction schedule determining means 4 returns to step S 3 in FIG. 4 is a modified construction process It is also possible to process information.
即ち、施工工事店端末装置14には、施工日程または納材予定日の変更を管理装置1に通知するための日程変更入力手段14aが設けられ、該管理装置1の施工日程決定手段4は、該日程変更入力手段14aによる日程変更情報に基づいて既に決定した施工日程のうち当該他の施工工程(後工程)の施工日程を自動的に変更することも出来る。 In other words, the construction shop terminal device 14 is provided with a schedule change input means 14a for notifying the management apparatus 1 of a change in construction schedule or scheduled delivery date, and the construction schedule determination means 4 of the management apparatus 1 The construction schedule of the other construction process (post-process) among the construction schedules already determined based on the schedule change information by the schedule change input means 14a can be automatically changed.
この自動処理は、変更された施工日程や納材予定日に基づき、その後となる施工工程について施工日程決定手段4により、もう一度新規設定するものである。 This automatic processing is to newly set a new construction process again by the construction schedule determination means 4 based on the changed construction schedule and scheduled delivery date.
他の施工工程の日程が変更されると、図4のステップS4〜S6及びそれに使用される部材の納材予定日、指定期限及び予告期限も変わることがあるが、その場合は図2に示す納材予定日設定手段5、指定期限設定手段6、予告期限設定手段7はそれぞれその変更に対応して動作する。 When dates other construction process is changed, FIG step S 4 to S 6 and member housed material date of used therein, but may vary also specified date and notice date, case 2 The scheduled delivery date setting means 5, designated deadline setting means 6, and advance notice deadline setting means 7 shown in FIG.
そして、変更になった施工工程以降の施工工程について、施工日程ファイル、納材予定ファイル、指定期限ファイル及び予告期限ファイルが更新データに置換される。このデータに従い、図4のステップS7の処理が行われ、施工工程表を再度作成することが出来る。 And about the construction process after the construction process changed, a construction schedule file, a delivery schedule file, a designated time limit file, and a notice time limit file are replaced by update data. In accordance with this data, the process of step S 7 of FIG. 4 is performed, it is possible to create a construction process chart again.
これまで説明した実施形態では、各施工工程(「配筋・型枠」)に使用される部材(「基礎鉄筋」)毎に納材予定日、指定期限及び予告期限が設定され、その予告期限に応じて指定期限通知手段8により施工工事店端末装置14に指定期限を通知している。 In the embodiment described so far, the scheduled date of delivery, the designated deadline and the notice deadline are set for each member ("basic rebar") used in each construction process ("bar arrangement and formwork"). Accordingly, the designated deadline notifying means 8 notifies the construction shop terminal device 14 of the designated deadline.
しかし本システムはこれに限らず、単一の施工工程に対して納材すべき部材を総称する共通の納材工程名称を付すことが出来、更に複数の施工工程に対して納材すべき部材の納材予定日が同じである場合には、複数の施工工程における各部材を総称する共通の納材工程名称を付し、図2に示す指定期限設定手段6による指定期限の設定、予告期限設定手段7による予告期限の設定、及び指定期限通知手段8から施工工事店端末装置14への指定期限の通知を前記納材工程名称毎にまとめて行うことも出来る。 However, this system is not limited to this, and it is possible to attach a common material delivery process name that collectively refers to members that should be delivered to a single construction process, and to deliver materials to multiple construction processes. When the scheduled delivery date is the same, a common delivery process name that collectively refers to each member in a plurality of construction processes is attached, and a designated deadline is set by the designated deadline setting means 6 shown in FIG. It is also possible to collectively set the notice deadline by the setting means 7 and notify the designated deadline from the designated deadline notifying means 8 to the construction shop terminal device 14 for each material delivery process name.
例えば、工業化住宅等の設計モジュールの採用され、構成部品の寸法が規格化された住宅等では、「躯体工事」では、「躯体部材」の構成部材は、柱、梁、壁板、床板が含まれている。これらは、1つの納材予定日が決定されれば、現場搬入順序が予め決定されている。ほかに「防水工事」や「木工工事」もそうである。 For example, in a housing etc. where the design module of an industrialized house etc. is adopted and the dimensions of the component parts are standardized, the structural members of the “frame member” include pillars, beams, wall boards and floor boards. It is. In these cases, if one scheduled delivery date is determined, the site delivery order is determined in advance. The same applies to “waterproofing” and “woodwork”.
この場合は図2に示す指定期限設定手段6による指定期限の設定、予告期限設定手段7による予告期限の設定、及び指定期限通知手段8から施工工事店端末装置14への指定期限の通知の各動作は、個々の部材名の代わりに前記共通の納材工程名称をインデックスとして用いて実行する。 In this case, each of the designated deadline setting by the designated deadline setting means 6 shown in FIG. 2, the advance notice deadline setting by the advance notice deadline setting means 7, and the designated deadline notification from the designated deadline notification means 8 to the construction shop terminal device 14. The operation is executed using the common material delivery process name as an index instead of individual member names.
即ち、単一の施工工程における納材すべき部材を総称する共通の納材工程名称を付し、または複数の施工工程における納材すべき部材の納材予定日が同じである場合には該複数の施工工程における各部材を総称する共通の納材工程名称を付し、共通の納材工程名称に含まれる部材に対する指定期限設定手段6による指定期限の設定、予告期限設定手段7による予告期限の設定、及び指定期限通知手段8から施工工事店端末装置14への指定期限の通知は、共通の納材工程名称により行う。 That is, a common delivery process name that collectively refers to members to be delivered in a single construction process is attached, or when the scheduled delivery dates of members to be delivered in multiple construction processes are the same A common delivery process name that collectively refers to each member in a plurality of construction processes is attached, setting of a designated deadline by the designated deadline setting means 6 for a member included in the common delivery process name, and a notice deadline by the notice deadline setting means 7 The notification of the designated deadline from the designated deadline notifying means 8 to the construction shop terminal device 14 is performed by a common material delivery process name.
例えば、図8の納材工程名称欄25に示されたオリジナル家具25a、手摺棒25bについて単一の施工工程における納材すべき部材を総称する共通の納材工程名称として、図9の納材工程名称欄25に示された家具・手摺類25cとして付し、該家具・手摺類25cに含まれる部材に対する指定期限設定手段6による指定期限の設定、予告期限設定手段7による予告期限の設定、及び指定期限通知手段8から施工工事店端末装置14への指定期限の通知を家具・手摺類25cにより行うことが出来る。 For example, for the original furniture 25a and handrail bar 25b shown in the delivery process name column 25 in FIG. 8, the common delivery process name for the members to be delivered in a single construction process is shown in FIG. Attached as furniture / handrails 25c shown in the process name column 25, setting a designated deadline by the designated deadline setting means 6 for the members included in the furniture / handrails 25c, setting a notice deadline by the notice deadline setting means 7, The designated deadline notification means 8 can notify the construction shop terminal device 14 of the designated deadline by the furniture / handrail 25c.
この例では、図8及び図9の施工工程(中工程)名称欄24に示される「家具設置」の施工工程と「階段手摺設置」の施工工程で納材すべき部材を納材工程名称欄25に示される同一の「家具・手摺類25c(システム上の工程名称では「箱物設置」)の納材予定日に設定したものである。 In this example, the material to be delivered in the construction process of “furniture installation” and the construction process of “stairs rail installation” shown in the construction process (middle process) name field 24 of FIGS. 25 is set to the scheduled date of delivery of the same “furniture / handrail 25c (shown as“ box installation ”in the process name on the system)” shown in FIG.
この例では、図8に示す納材工程名称欄25に示される「オリジナル家具25a」、「手摺棒25b」の2つの納材工程名称が、図9に示す納材工程名称欄25に示される「家具・手摺類25c」の共通の納材工程名称に集約することが出来る。 In this example, two material delivery process names “original furniture 25a” and “handrail bar 25b” shown in the material delivery process name field 25 shown in FIG. 8 are shown in the material delivery process name field 25 shown in FIG. It can be integrated into the common delivery process name of “Furniture / Handrail 25c”.
この例では、図8に示す納材工程名称欄25に実際には省略して図示しなかった32個の納材工程名称があり、最大32回のトラック配送回数になるが、納材予定日が同じである納材工程は、施工工程(中工程)名称欄24に示される例えば「内部造作」、「外階段」、「家具設置」、「階段手摺設置」、「配筋・型枠」を、納材工程名称欄25において共通の納材工程名称にすることで、最大27回のトラック配送回数に減らす設定も出来る。 In this example, there are 32 material delivery process names that are not actually shown in the material delivery process name column 25 shown in FIG. 8 and the maximum number of times of truck delivery is 32 times. The delivery process with the same is shown in the construction process (middle process) name column 24, for example, “inner construction”, “outer staircase”, “furniture installation”, “stair railing installation”, “bar arrangement / formwork” Is set to a common material delivery process name in the material delivery process name column 25, so that it can be set to be reduced to a maximum of 27 truck delivery times.
図12〜図14の施工工程表には上記のように共通の納材工程名称を付して納材管理を行う例が示されている。図12〜図14における納材工程名称は[中工程]の欄を利用して記入され、冒頭にLマーク35を付すことにより共通の納材工程名称であることを表しており、例えば、図12〜図14に示された「配筋・型枠−基礎鉄筋DX」、「躯体工事−躯体部材」、「防水下地−防水材1回目」、「防水−防水材2回目」、「軒天−軒天」、「金物−金物」が共通の納材工程名称に設定された一例である。 The construction process charts of FIGS. 12 to 14 show examples in which delivery management is performed by assigning a common delivery process name as described above. The material delivery process names in FIGS. 12 to 14 are entered using the “intermediate process” column, and an L mark 35 is added at the beginning to indicate a common material delivery process name. 12 ~ 14 "Reinforcement / formwork-Foundation rebar DX", "Construction work-Housing member", "Waterproof substrate-Waterproof material first time", "Waterproof-Waterproof material second time", "Eiten -Etenten "and" Hardware-Hardware "are examples in which common delivery process names are set.
本発明の活用例として、建設工事の工事管理、現場納材管理に利用可能である。 As an application example of the present invention, it can be used for construction management of construction work and on-site delivery management.
1…管理装置
2…CPU(中央演算装置)
3…制御部
4…施工日程決定手段
5…納材予定日設定手段
6…指定期限設定手段
7…予告期限設定手段
8…指定期限通知手段
8a…施工工程表作成手段
8b…情報固定手段
8c…情報固定解除手段
9…記憶部
10…入力部
10a…日程変更入力手段
10b…納材日確定入力手段
11…出力部
11a…表示部
12…通信部
13…外部記憶装置
14…施工工事店端末装置
14a…日程変更入力手段
14b…納材日確定入力手段
15…集配センター端末装置
16…施工工程データベース
17…納材工程データベース
17a…部材データベース
18…施工日程・納材工程データベース
18a…納材工程・部材データベース
19…施工工程表データベース
20…工事種別
20a…大工程欄
20b…施工工程(中工程)欄
21…着手可能日欄
22…標準工期欄
23…選択部
24…施工工程(中工程)名称欄
25…納材工程名称欄
25a…オリジナル家具
25b…手摺棒
25c…家具・手摺類
26…起算日区分欄
27…納材要求日数欄
28…選択部
29…施工着手基点日欄
30a…施工工程(中工程)名称欄
30b…作業着手日欄
30c…作業終了日欄
30d…大工程名称欄
31a…施工工程(中工程)名称欄
31b…前の中工程からの着手可能日欄
31c…標準工期欄
32a…納材予定日欄
33a…予告日数欄
33b…指定日数欄
34a…納材工程名称欄
34b…予告期限日欄
34c…指定期限日欄
35…Lマーク
36…納材指定日欄
37…名称欄
T…通信回線
DESCRIPTION OF SYMBOLS 1 ... Management apparatus 2 ... CPU (central processing unit)
DESCRIPTION OF SYMBOLS 3 ... Control part 4 ... Construction schedule determination means 5 ... Scheduled delivery date setting means 6 ... Designated time limit setting means 7 ... Notice time limit setting means 8 ... Designated time limit notification means 8a ... Construction process table creation means 8b ... Information fixing means 8c ... Information fixing release means 9 ... storage unit
10 ... Input section
10a ... Schedule change input means
10b ... Delivery date confirmation input means
11 ... Output section
11a ... Display section
12 ... Communication Department
13 ... External storage device
14… Construction construction shop terminal equipment
14a ... Schedule change input means
14b ... Delivery date confirmation input means
15 ... collection and delivery center terminal equipment
16 ... Construction process database
17 ... Delivery process database
17a… Parts database
18 ... Construction schedule / delivery process database
18a ... Delivery process / material database
19 ... Construction process schedule database
20 ... Construction type
20a ... Large process column
20b ... Construction process (medium process) column
21 ... Startable date column
22 ... Standard work schedule column
23 ... Selection part
24 ... Construction process (medium process) name column
25 ... Delivery process name column
25a ... Original furniture
25b ... handrail stick
25c… Furniture and handrails
26 ... Date of calculation column
27 ... Date of requested delivery column
28… Selection part
29… Start date for starting construction
30a ... Construction process (medium process) name column
30b ... Work start date column
30c… Work end date column
30d ... Large process name column
31a ... Construction process (medium process) name column
31b: Available date from previous middle process
31c ... Standard work schedule column
32a ... Delivery date column
33a… Number of days for notice
33b ... Specified days field
34a ... Delivery process name column
34b… Notice deadline column
34c ... Designated deadline column
35 ... L mark
36 ... Delivery date column
37 ... Name field T ... Communication line
Claims (7)
施工工程の施工着手基点日を入力する入力手段と、
施工工程データベースに記憶された施工工程に関する情報及び前記入力手段により入力された施工着手基点日を用いて、施工着手基点日を基準とする施工工程ごとの施工日程を決定する施工日程決定手段と、
前記施工日程決定手段により決定した施工日程、及び納材工程データベースに記憶された施工工程に使用する部材の納材期限を用いて、施工工程に使用する部材の納材予定日を設定する納材予定日設定手段と、
施工工程の納材予定日の確定を指示する納材日確定入力手段と、
納材予定日または施工日程の変更を入力するための日程変更入力手段と、
納材予定日または施工日程のデータに対して、変更不可の属性情報を与える処理がなされる情報固定を行う情報固定手段と、
納材予定日または施工日程のデータに対して、変更入力を可能とする情報固定解除手段と、を有し、
前記情報固定手段は、前記施工日程決定手段によって決定された前記施工日程のデータ、前記納材予定日設定手段により設定された納材予定日のデータ、または、前記日程変更入力手段による納材予定日もしくは施工日程の日付の変更入力に基づいて変更された納材予定日のデータもしくは施工日程のデータ、の少なくともいずれかを情報固定し、
前記情報固定解除手段は、前記納材日確定入力手段により納材予定日を納材日として確定する入力がされていない場合、前記情報固定手段によって情報固定された納材予定日のデータまたは施工日程のデータの変更入力を可能とする、ことを特徴とする建築物の施工情報管理システム。 A building construction information management system for managing building construction information,
An input means for inputting the construction start base date of the construction process;
Using the input construction undertaken origin date the information about the construction process database remembers been construction process and the input means, the construction schedule determining means for determining the construction schedule of each construction step of a reference construction undertaken origin Date ,
The delivery material which sets the scheduled delivery date of the member used for the construction process using the construction schedule determined by the construction schedule determination means and the delivery date of the member used for the construction process stored in the delivery process database Scheduled date setting means,
A delivery date confirmation input means for instructing confirmation of a scheduled delivery date of the construction process;
A schedule change input means for entering a change in the scheduled delivery date or construction schedule,
Information fixing means for fixing information that is processed to give non-changeable attribute information to scheduled delivery date or construction schedule data;
Information fixed release means that enables change input to the scheduled delivery date or construction schedule data,
The information fixing means is the construction schedule data determined by the construction schedule determination means, the scheduled delivery date data set by the scheduled delivery date setting means, or the scheduled delivery date by the schedule change input means Fix the information of at least one of the scheduled delivery date data or construction schedule data that is changed based on the date or construction date change input,
If the information fixing release means has not been entered by the delivery date confirmation input means to confirm the scheduled delivery date as the delivery date, the scheduled delivery date data fixed by the information fixing means or construction A construction information management system for buildings, which makes it possible to input changes to schedule data .
施工工程の施工着手基点日を入力する入力手段と、
施工工程データベースに記憶された施工工程に関する情報及び前記入力手段により入力された施工着手基点日を用いて、施工着手基点日を基準とする施工工程ごとの施工日程を決定する施工日程決定手段と、
前記施工日程決定手段により決定した施工日程、及び納材工程データベースに記憶された施工工程に使用する部材の納材期限を用いて、施工工程に使用する部材の納材予定日を設定する納材予定日設定手段と、
施工工程に使用する部材について、前記納材予定日設定手段により設定された該部材の納材予定日から予め設定された期間だけ前の指定期限日を設定する指定期限設定手段と、
施工工程に使用する部材について、前記指定期限設定手段により設定された指定期限日から更に予め設定された期間だけ前の予告期限日を設定する予告期限設定手段と、
施工工程の施工日程とともに、該施工工程に使用する部材の納材予定日、予告期限日、及び指定期限日を表示する施工工程表を作成する施工工程表作成手段と、
施工工程の納材予定日の確定を指示する納材日確定入力手段と、
納材予定日または施工日程の変更を入力するための日程変更入力手段と、
納材予定日または施工日程のデータに対して、変更不可の属性情報を与える処理がなされる情報固定を行う情報固定手段と、
納材予定日または施工日程のデータに対して、変更入力を可能とする情報固定解除手段と、を有し、
前記納材予定日設定手段は、前記日程変更入力手段により入力された変更後の施工工程の納材予定日または施工日程を使用して当該施工工程の後工程である他の施工工程の納材予定日を変更し、
または、前記指定期限設定手段は、前記日程変更入力手段により入力された変更後の施工工程の納材予定日または施工日程に基づいて当該施工工程の後工程である他の施工工程の指定期限日を変更し、
または、予告期限設定手段は、前記日程変更入力手段により入力された変更後の施工工程の納材予定日または施工日程に基づいて当該施工工程の後工程である他の施工工程の予告期限日を変更し、
前記情報固定手段は、前記施工日程決定手段によって決定された前記施工日程のデータ、前記納材予定日設定手段により設定された納材予定日のデータ、または、前記日程変更入力手段による納材予定日もしくは施工日程の日付の変更入力に基づいて変更された納材予定日のデータもしくは施工日程のデータ、の少なくともいずれかを情報固定し、
前記情報固定解除手段は、前記納材日確定入力手段により納材予定日を納材日として確定する入力がされていない場合、前記情報固定手段によって情報固定された納材予定日のデータまたは施工日程のデータの変更入力を可能とすることを特徴とする建築物の施工情報管理システム。 A building construction information management system for managing building construction information,
An input means for inputting the construction start base date of the construction process;
Using the input construction undertaken origin date the information about the construction process database remembers been construction process and the input means, the construction schedule determining means for determining the construction schedule of each construction step of a reference construction undertaken origin Date ,
The delivery material which sets the scheduled delivery date of the member used for the construction process using the construction schedule determined by the construction schedule determination means and the delivery date of the member used for the construction process stored in the delivery process database Scheduled date setting means,
For a member used in the construction process, a designated deadline setting means for setting a designated deadline date that is a period previously set from a scheduled delivery date of the member set by the scheduled delivery date setting means,
The members used in construction step, a notice time limit setting means for setting the set specified deadline further preset period between just before notice due date from by the specified time limit setting means,
Along with the construction schedule of the construction process, a construction process chart creating means for creating a construction schedule that displays the scheduled delivery date of the member used in the construction process, the notice deadline date, and the designated deadline date;
A delivery date confirmation input means for instructing confirmation of a scheduled delivery date of the construction process;
A schedule change input means for entering a change in the scheduled delivery date or construction schedule,
Information fixing means for fixing information that is processed to give non-changeable attribute information to scheduled delivery date or construction schedule data;
Information fixed release means that enables change input to the scheduled delivery date or construction schedule data,
The scheduled delivery date setting means uses the scheduled delivery date or the construction schedule of the construction process after the change input by the schedule change input means, and the delivery material of another construction process that is a subsequent process of the construction process. Change the scheduled date,
Alternatively, the designated deadline setting means is a designated deadline date of another construction process that is a subsequent process of the construction process based on a scheduled delivery date or construction schedule of the construction process after the change input by the schedule change input means. Change
Alternatively, the notice deadline setting means sets the notice deadline date of another construction process that is a subsequent process of the construction process based on the scheduled delivery date or construction schedule of the construction process after the change input by the schedule change input means. change,
The information fixing means is the construction schedule data determined by the construction schedule determination means, the scheduled delivery date data set by the scheduled delivery date setting means, or the scheduled delivery date by the schedule change input means Fix the information of at least one of the scheduled delivery date data or construction schedule data that is changed based on the date or construction date change input,
If the information fixing release means has not been entered by the delivery date confirmation input means to confirm the scheduled delivery date as the delivery date, the scheduled delivery date data fixed by the information fixing means or construction A construction information management system for buildings, which makes it possible to input changes to schedule data .
前記施工日程決定手段により決定した施工日程、及び納材工程データベースに記憶された施工工程に使用する部材の納材期限を用いて、施工工程に使用する部材の納材予定日を設定する納材予定日設定手段と、
納材予定日または施工日程のデータに対して、変更不可の属性情報を与える処理がなされる情報固定を行う情報固定手段と、
納材予定日または施工日程のデータに対して、変更入力を可能とする情報固定解除手段と、を有し、
前記情報固定手段は、前記施工日程決定手段によって決定された前記施工日程のデータ、前記納材予定日設定手段により設定された納材予定日のデータ、または、納材予定日または施工日程の変更を入力するための日程変更入力手段による納材予定日もしくは施工日程の日付の変更入力に基づいて変更された納材予定日のデータもしくは施工日程のデータ、の少なくともいずれかを情報固定し、
前記情報固定解除手段は、施工工程の前記納材予定日の確定を指示する納材日確定入力手段により納材予定日を納材日として確定する入力がされていない場合、前記情報固定手段によって情報固定された納材予定日のデータまたは施工日程のデータの変更入力を可能とする、ことを特徴とする建築物の施工情報管理装置。 A construction information management device of a building, using the input construction undertaken origin date by the input means for inputting a construction undertaken origin date information and construction processes related construction process is remembers the construction process database, construction started Construction schedule determination means for determining a construction schedule for each construction process based on the base date,
The delivery material which sets the scheduled delivery date of the member used for the construction process using the construction schedule determined by the construction schedule determination means and the delivery date of the member used for the construction process stored in the delivery process database Scheduled date setting means,
Information fixing means for fixing information that is processed to give non-changeable attribute information to scheduled delivery date or construction schedule data;
Information fixed release means that enables change input to the scheduled delivery date or construction schedule data,
The information fixing means is data of the construction schedule determined by the construction schedule determination means, data of scheduled delivery date set by the scheduled delivery date setting means, or change of scheduled delivery date or construction schedule Fixed the information of at least one of the scheduled delivery date data or the construction schedule data changed based on the scheduled delivery date or the construction schedule date change input by the schedule change input means for entering
If the information fixing release means is not input to fix the scheduled delivery date as the delivery date by the delivery date confirmation input means for instructing the confirmation of the scheduled delivery date of the construction process, the information fixing means A construction construction information management device for buildings, which makes it possible to change and input data on scheduled delivery dates or construction schedule data .
施工工程の前記施工着手基点日を入力する前記入力手段と、
施工工程の前記納材予定日の確定を指示する前記納材日確定入力手段と、
前記納材予定日または前記施工日程の変更を入力するための前記日程変更入力手段と、を有する、ことを特徴とする端末装置。 A terminal device connected to the building construction information management device according to claim 6 by a communication line,
The input means for inputting the construction start base date of the construction process;
The delivery date confirmation input means for instructing confirmation of the scheduled delivery date of the construction process;
And a schedule change input means for inputting a change in the scheduled delivery date or the construction schedule.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2007116559A JP5700902B2 (en) | 2006-05-26 | 2007-04-26 | Building construction information management system, building construction information management device, and terminal device |
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2006147452 | 2006-05-26 | ||
| JP2006147452 | 2006-05-26 | ||
| JP2007116559A JP5700902B2 (en) | 2006-05-26 | 2007-04-26 | Building construction information management system, building construction information management device, and terminal device |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2008004075A JP2008004075A (en) | 2008-01-10 |
| JP5700902B2 true JP5700902B2 (en) | 2015-04-15 |
Family
ID=39008366
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2007116559A Active JP5700902B2 (en) | 2006-05-26 | 2007-04-26 | Building construction information management system, building construction information management device, and terminal device |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP5700902B2 (en) |
Families Citing this family (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR100968708B1 (en) | 2010-04-08 | 2010-07-06 | 지에스건설 주식회사 | System and method to creation of the construction project schedule |
| JP6040538B2 (en) * | 2012-02-09 | 2016-12-07 | 株式会社大林組 | Server device and information management system |
| JP6325876B2 (en) * | 2014-04-10 | 2018-05-16 | 日本ソフトウェアマネジメント株式会社 | Work management device, school lunch management device, school lunch management method, and school lunch management program |
| KR102030273B1 (en) * | 2018-04-17 | 2019-10-08 | 권영근 | Steel trading system |
| CN109726457A (en) * | 2018-12-17 | 2019-05-07 | 深圳市中行建设工程顾问有限公司 | A kind of overall process intelligence engineering supervisory information managing and control system |
| KR102353408B1 (en) * | 2019-09-03 | 2022-01-19 | 현대건설(주) | Management system and method for constructing precast concrete |
| JP7256963B2 (en) * | 2019-09-27 | 2023-04-13 | 積水ハウス株式会社 | Building construction method |
| JP7467996B2 (en) * | 2020-03-09 | 2024-04-16 | 積水ハウス株式会社 | Process chart system and information processing device |
| JP7605016B2 (en) * | 2021-05-19 | 2024-12-24 | 積水ハウス株式会社 | Information processing device and program |
| CN116205473B (en) * | 2023-05-06 | 2023-07-28 | 绿城乐居建设管理集团有限公司 | A construction scheduling scheme optimization method and storage medium |
Family Cites Families (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2000001988A (en) * | 1998-06-17 | 2000-01-07 | Daiken Trade & Ind Co Ltd | Process management support device for building construction and computer-readable recording medium recording process management support program for building construction |
| JP2002063440A (en) * | 2000-06-08 | 2002-02-28 | Sharp Corp | Order issuing apparatus, order issuing system, order issuing method, order issuing program, and computer-readable recording medium recording order issuing program |
| JP2002024326A (en) * | 2000-07-10 | 2002-01-25 | Sekisui House Ltd | Schedule control system corresponding to temporarily and determined scheduled date |
| JP2002180665A (en) * | 2000-09-28 | 2002-06-26 | Tokyu Home Corp | Process control system for house construction |
| JP2002312426A (en) * | 2001-04-18 | 2002-10-25 | Csk Corp | Goods delivery plan preparation method for building materials, system thereof, and recording medium |
-
2007
- 2007-04-26 JP JP2007116559A patent/JP5700902B2/en active Active
Also Published As
| Publication number | Publication date |
|---|---|
| JP2008004075A (en) | 2008-01-10 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP5700902B2 (en) | Building construction information management system, building construction information management device, and terminal device | |
| AU2015101964A4 (en) | Construction management system | |
| US20100198652A1 (en) | System for the Management of Construction Projects | |
| Hammad et al. | Developing a novel framework to manage schedule contingency using theory of constraints and earned schedule method | |
| US8244569B2 (en) | Non-destructive element splitting using location-based construction planning models | |
| EP1643335A2 (en) | System and method for designing building structures with associated estimates and schedules | |
| JP2009139996A (en) | Construction management system | |
| US20060074609A1 (en) | System and method for determining variance in building structures | |
| AU760109B2 (en) | Method and system for efficiently transacting an order and for communicating order information between a construction contractor and a construction material supplier | |
| Riley | Modeling the space behavior of construction activities | |
| JP7774278B2 (en) | Process chart creation system and program | |
| JPH0589211A (en) | Integrated production managing system for building | |
| Bielefeld | Basics construction scheduling | |
| JP7467996B2 (en) | Process chart system and information processing device | |
| WO2013084112A1 (en) | Online building | |
| JP2019028893A (en) | Payment propriety determination device, payment propriety determination method and payment propriety determination program | |
| JP2022178143A (en) | Information processing device and program | |
| US20070239410A1 (en) | Location-based construction planning and scheduling system | |
| JP2004234338A (en) | Project management system integrating material procurement / construction planning | |
| JP7700525B2 (en) | Information management system, information management method, and information management program | |
| JP2006099537A (en) | Progress management system | |
| JP2000226937A (en) | Schedule control table and preparation system therefor | |
| JPH07247688A (en) | Construction plan management system based on three-dimensional data | |
| Aziz | Practical Construction Planning and Control Using Microsoft Project: An Illustrative Guide | |
| JP2004220408A (en) | Notice system for ordering building materials |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| RD02 | Notification of acceptance of power of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7422 Effective date: 20080131 |
|
| RD04 | Notification of resignation of power of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7424 Effective date: 20090807 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A821 Effective date: 20090812 |
|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20100413 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20111228 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20120207 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20120406 |
|
| RD03 | Notification of appointment of power of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7423 Effective date: 20120406 |
|
| A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20121002 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20121228 |
|
| A911 | Transfer to examiner for re-examination before appeal (zenchi) |
Free format text: JAPANESE INTERMEDIATE CODE: A911 Effective date: 20130109 |
|
| A912 | Re-examination (zenchi) completed and case transferred to appeal board |
Free format text: JAPANESE INTERMEDIATE CODE: A912 Effective date: 20130308 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20140725 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20141107 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20150217 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 5700902 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |