Power generation amount calculation device, power generation amount calculation method, and power generation amount calculation program Download PDF

Info

Publication number
JP5712008B2
JP5712008B2 JP2011055860A JP2011055860A JP5712008B2 JP 5712008 B2 JP5712008 B2 JP 5712008B2 JP 2011055860 A JP2011055860 A JP 2011055860A JP 2011055860 A JP2011055860 A JP 2011055860A JP 5712008 B2 JP5712008 B2 JP 5712008B2
Authority
JP
Japan
Prior art keywords
power
voltage
value obtained
change
generation amount
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2011055860A
Other languages
Japanese (ja)
Other versions
JP2012195983A (en
Inventor
山下 光司
光司 山下
俊雄 井上
俊雄 井上
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Central Research Institute of Electric Power Industry
Original Assignee
Central Research Institute of Electric Power Industry
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Central Research Institute of Electric Power Industry filed Critical Central Research Institute of Electric Power Industry
Priority to JP2011055860A priority Critical patent/JP5712008B2/en
Publication of JP2012195983A publication Critical patent/JP2012195983A/en
Application granted granted Critical
Publication of JP5712008B2 publication Critical patent/JP5712008B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P80/00Climate change mitigation technologies for sector-wide applications
    • Y02P80/20Climate change mitigation technologies for sector-wide applications using renewable energy
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/12Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation
    • Y04S10/123Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation the energy generation units being or involving renewable energy sources

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Description

本発明は、発電量算出装置、発電量算出方法及び発電量算出プログラムに関する。   The present invention relates to a power generation amount calculation device, a power generation amount calculation method, and a power generation amount calculation program.

一般家庭や工場などの様々な場所に分散型電源が導入されている。分散型電源とは、例えば、太陽光発電システム(PV:Photovoltaic)、風力発電、燃料電池、マイクロガスタービン、エンジン発電などである。   Distributed power sources are installed in various places such as general homes and factories. The distributed power source is, for example, a photovoltaic power generation system (PV: Photovoltaic), wind power generation, fuel cell, micro gas turbine, engine power generation, or the like.

ここで、分散型電源による発電量は、電力会社から見ると、電力系統の負荷に埋もれている。例えば、分散型電源が一般家庭「A」に導入された場合を用いて、一般家庭「A」が消費する消費電力と、一般家庭「A」に電力会社により供給される電力とについて説明する。なお、一般家庭「A」に導入された分散型電源による発電量の絶対値は、「P1」であるものとして説明する。また、一般家庭「A」による消費電力の絶対値は、「P2」であるものとして説明する。   Here, the amount of power generated by the distributed power source is buried in the load of the power system when viewed from the electric power company. For example, the power consumption consumed by the general home “A” and the power supplied by the power company to the general home “A” will be described using a case where a distributed power source is introduced into the general home “A”. Note that the absolute value of the amount of power generated by the distributed power source installed in the general home “A” is assumed to be “P1”. Further, the absolute value of the power consumption by the general household “A” is assumed to be “P2”.

この場合、一般家庭「A」に電力会社により供給される電力は、一般家庭「A」が消費する消費電力のうち、分散型電源による発電量でまかない切れなかった分となる。具体的には、電力会社により一般家庭「A」に供給される電力は、一般家庭「A」により実際に消費される消費電力「P1」ではなく、「P2−P1」となる。言い換えると、電力会社から見た一般家庭「A」の消費電力は、「P2−P1」となる。すなわち、電力会社から見た一般家庭「A」の消費電力は、一般家庭「A」に導入された分散型電源による発電量の分、一般家庭「A」により実際に消費される消費電力よりも小さくなる。ここで、電力会社から見えるのは、一般家庭「A」の見かけ上の消費電力となる「P2−P1」となり、分散型電源による発電量「P2」が電力系統の負荷に埋もれている。   In this case, the electric power supplied to the general household “A” by the power company is the amount of power consumed by the general household “A” that cannot be exceeded by the amount of power generated by the distributed power source. Specifically, the power supplied to the general household “A” by the power company is “P2−P1”, not the power consumption “P1” actually consumed by the general household “A”. In other words, the power consumption of the general household “A” viewed from the power company is “P2−P1”. That is, the power consumption of the general household “A” viewed from the power company is more than the power consumption actually consumed by the general household “A” by the amount of power generated by the distributed power source installed in the general home “A”. Get smaller. Here, what the electric power company sees is “P2-P1”, which is the apparent power consumption of the general household “A”, and the power generation amount “P2” by the distributed power source is buried in the load of the power system.

なお、分散型電源による発電量を電力会社が算出する手法がある。例えば、分散型電源各々に通信制御装置を設け、分散型電源各々に設けられた通信制御装置が、分散型電源の発電量を電力会社に送信するシステムがある。   There is a method in which an electric power company calculates the amount of power generated by a distributed power source. For example, there is a system in which a communication control device is provided in each distributed power source, and the communication control device provided in each distributed power source transmits the power generation amount of the distributed power source to an electric power company.

特開2007−288877号公報JP 2007-288877 A

しかしながら、分散型電源の発電量を電力会社が簡単に把握できないという課題がある。例えば、上述した従来の技術では、一般家庭などに導入された分散型電源各々に通信制御装置を設けなければならず、分散型電源の発電量を電力会社が簡単に把握できない。   However, there is a problem that the power company cannot easily grasp the power generation amount of the distributed power source. For example, in the conventional technology described above, a communication control device must be provided for each distributed power source installed in a general household, and the power company cannot easily grasp the power generation amount of the distributed power source.

開示の技術は、上述に鑑みてなされたものであって、分散型電源の発電量を把握可能である発電量算出装置、発電量算出方法及び発電量算出プログラムを提供することを目的とする。   The disclosed technology has been made in view of the above, and an object thereof is to provide a power generation amount calculation device, a power generation amount calculation method, and a power generation amount calculation program capable of grasping the power generation amount of a distributed power source.

開示する発電量算出装置は、一つの態様において、電力網に供給される電力の電圧を変更する変更部を備える。また、発電量算出装置は、前記変更部により電圧が変更される電力網の有効電力を測定する測定部を備える。また、発電量算出装置は、分母が、前記電力網の定格電圧を分母として変更後の電圧を分子とする値を所定の電圧特性指数で乗算した値から、該定格電圧を分母として変更前の電圧を分子とする値を該電圧特性指数で乗算した値を減算した値となり、分子が、前記電力網の定格電圧を分母として変更前の電圧を分子とする値を所定の電圧特性指数で乗算した値に変更後に測定された有効電力を乗算した値から、該定格電圧を分母として変更後の電圧を分子とする値を該電圧特性指数で乗算した値に変更前に測定された有効電力を乗算した値を減算した値となる値を算出することで、前記電力網と接続された分散型電源による発電量を算出する発電量算出部を備える。 In one embodiment, the disclosed power generation amount calculation apparatus includes a changing unit that changes the voltage of the power supplied to the power grid. In addition, the power generation amount calculation device includes a measuring unit that measures the active power of the power network whose voltage is changed by the changing unit. Further, the power generation amount calculation device is configured such that the denominator is a voltage before the change using the rated voltage as a denominator and a value obtained by multiplying a value using the voltage after the change as a denominator by a predetermined voltage characteristic index. Is a value obtained by subtracting a value obtained by multiplying a value having a numerator by the voltage characteristic exponent, and a numerator is a value obtained by multiplying the rated voltage of the power network by a denominator and a value having a voltage before change by a predetermined voltage characteristic exponent From the value obtained by multiplying the active power measured after the change to the value obtained by multiplying the rated voltage as the denominator and the voltage characteristic index multiplied by the value after the change, the active power measured before the change is multiplied. A power generation amount calculation unit that calculates a power generation amount by a distributed power source connected to the power network by calculating a value that is a value obtained by subtracting the value is provided.

開示する発電量算出装置の一つの態様によれば、分散型電源の発電量を把握可能であるという効果を奏する。   According to one aspect of the disclosed power generation amount calculation device, there is an effect that the power generation amount of the distributed power source can be grasped.

図1は、実施例1に係る発電量算出装置の構成の一例を示すブロック図である。FIG. 1 is a block diagram illustrating an example of the configuration of the power generation amount calculation apparatus according to the first embodiment. 図2は、実施例1における電力網と、電圧が変更される点と、センサにより測定される点との関係の一例を示す図である。FIG. 2 is a diagram illustrating an example of a relationship between the power network, the point where the voltage is changed, and the point measured by the sensor in the first embodiment. 図3は、実施例1における電圧特性指数テーブルに記憶された情報の一例を示す図である。FIG. 3 is a diagram illustrating an example of information stored in the voltage characteristic index table according to the first embodiment. 図4は、電力網における実測値の一例を示す図である。FIG. 4 is a diagram illustrating an example of actually measured values in the power network. 図5は、実施例1に係る発電量算出装置による処理の一例を示すフローチャートである。FIG. 5 is a flowchart illustrating an example of processing performed by the power generation amount calculation apparatus according to the first embodiment. 図6は、発電量算出装置による一連の処理を実行するための発電量算出プログラムによる情報処理が、コンピュータを用いて具体的に実現されることを示す図である。FIG. 6 is a diagram illustrating that the information processing by the power generation amount calculation program for executing a series of processes by the power generation amount calculation device is specifically realized using a computer.

以下に、開示する発電量算出装置、発電量算出方法及び発電量算出プログラムの実施例について、図面に基づいて詳細に説明する。なお、本実施例により開示する発明が限定されるものではない。各実施例は、処理内容を矛盾させない範囲で適宜組み合わせることが可能である。   Hereinafter, embodiments of the disclosed power generation amount calculation device, power generation amount calculation method, and power generation amount calculation program will be described in detail with reference to the drawings. Note that the invention disclosed by this embodiment is not limited. Each embodiment can be appropriately combined within a range in which processing contents do not contradict each other.

[実施例1に係る発電量算出装置の構成]
図1は、実施例1に係る発電量算出装置の構成の一例を示すブロック図である。図1に示すように、発電量算出装置100は、以下に詳細に説明するように、電力網の電圧を変更し、変更前後の電圧と有効電力とに基づいて、電力網と接続された分散型電源による発電量を算出する。
[Configuration of power generation amount calculation apparatus according to Embodiment 1]
FIG. 1 is a block diagram illustrating an example of the configuration of the power generation amount calculation apparatus according to the first embodiment. As shown in FIG. 1, the power generation amount calculation device 100 changes the voltage of the power grid, and the distributed power source connected to the power grid based on the voltage before and after the change and the active power, as will be described in detail below. Calculate the amount of power generated by.

発電量算出装置100は、電力網に供給される電力の電圧を調整する調整装置200と、電力網に供給される電力の有効電力を測定するセンサ300と接続される。なお、図1に示す例では、発電量算出装置100と調整装置200とセンサ300とが別装置であり、発電量算出装置100が調整装置200及びセンサ300と接続される場合を示したが、これに限定されるものではない。例えば、調整装置200とセンサ300とのうち一方または両方が発電量算出装置100と統合されても良い。   The power generation amount calculation device 100 is connected to an adjustment device 200 that adjusts the voltage of the power supplied to the power network, and a sensor 300 that measures the effective power of the power supplied to the power network. In the example illustrated in FIG. 1, the power generation amount calculation device 100, the adjustment device 200, and the sensor 300 are separate devices, and the power generation amount calculation device 100 is connected to the adjustment device 200 and the sensor 300. It is not limited to this. For example, one or both of the adjustment device 200 and the sensor 300 may be integrated with the power generation amount calculation device 100.

調整装置200は、発電量算出装置100と接続される。調整装置200は、電力網に供給される電力の電圧を調整する。また、後述するように、制御部120により調整装置200の動作状態が変更されることで、電力網に供給される電力の電圧が変更される。   The adjustment device 200 is connected to the power generation amount calculation device 100. The adjustment device 200 adjusts the voltage of power supplied to the power network. As will be described later, the control unit 120 changes the operating state of the adjustment device 200, thereby changing the voltage of the power supplied to the power grid.

調整装置200は、例えば、電力網に設けられた変圧器のタップやスタティックコンデンサ(スタコン)などの任意の調相設備などが該当する。なお、調整装置200は、電力網に設けられた変圧器のタップや調相設備などに限定されるものではなく、任意の装置を用いて良い。具体的には、電力網に供給される電力の電圧を変更する機能を有する任意の設備を調整装置200として用いて良い。   The adjusting device 200 corresponds to, for example, an arbitrary phase adjusting facility such as a transformer tap or a static capacitor (stacon) provided in the power grid. The adjusting device 200 is not limited to a transformer tap or phase adjusting equipment provided in the power network, and any device may be used. Specifically, any equipment having a function of changing the voltage of power supplied to the power grid may be used as the adjustment device 200.

センサ300は、電力網の有効電力を測定する。なお、以下では、センサ300が、電力網に供給される有効電力と電圧とを測定する場合を例に説明する。   Sensor 300 measures the active power of the power grid. Hereinafter, a case where the sensor 300 measures active power and voltage supplied to the power grid will be described as an example.

図2は、実施例1における電力網と、電圧が変更される点と、センサにより測定される点との関係の一例を示す図である。図2は、電力系統図の一例である。図2に示すように、発電所401により発電された電力は、変電所402や変電所403により電圧が変更された上で、負荷404や負荷405、負荷406に送られる。なお、負荷404〜負荷406は、例えば、住宅地域、商業地域や工業地域などが該当する。また、図2に示す例では、負荷404〜負荷406には、それぞれ、分散型電源であるPV(太陽光発電システム、Photovoltaic)407やPV408、PV409が導入されている場合を示した。   FIG. 2 is a diagram illustrating an example of a relationship between the power network, the point where the voltage is changed, and the point measured by the sensor in the first embodiment. FIG. 2 is an example of a power system diagram. As shown in FIG. 2, the electric power generated by the power plant 401 is sent to the load 404, the load 405, and the load 406 after the voltage is changed by the substation 402 and the substation 403. Note that the loads 404 to 406 correspond to, for example, a residential area, a commercial area, an industrial area, and the like. In the example illustrated in FIG. 2, a case where PV (solar power generation system, Photovoltaic) 407, PV408, and PV409, which are distributed power sources, are introduced into the loads 404 to 406, respectively.

図2に示す電力系統図についてより詳細に説明する。図2に示す例では、発電所401により発電された電力は、送電線411を介して変電所402に送られる。ここで、変電所402は、例えば、発電所401から送られた電力の電圧を「66kV」に変更する。そして、変電所402は、電圧が「66kV」となる電力を送電線412や送電線413、配電線414、送電線415、送電線416などを介して送る。その後、例えば、変電所403は、送電線413を介して電圧が「66kV」の電力を変電所402から受信すると、受信した電力の電圧を「6.6kV」に変更する。そして、変電所403は、電圧が「6.6kV」となる電力を配電線414を介して負荷404〜負荷406などに送る。   The power system diagram shown in FIG. 2 will be described in more detail. In the example shown in FIG. 2, the electric power generated by the power plant 401 is sent to the substation 402 via the transmission line 411. Here, the substation 402 changes the voltage of the power sent from the power plant 401 to “66 kV”, for example. Then, the substation 402 sends power having a voltage of “66 kV” via the power transmission line 412, the power transmission line 413, the distribution line 414, the power transmission line 415, the power transmission line 416, and the like. Thereafter, for example, when the substation 403 receives electric power with a voltage of “66 kV” from the substation 402 via the transmission line 413, the substation 403 changes the voltage of the received electric power to “6.6 kV”. Then, the substation 403 sends electric power having a voltage of “6.6 kV” to the loads 404 to 406 and the like via the distribution line 414.

図2に示す電力系統図を用いて説明する場合には、調整装置200が、変電所402に設けられた場合を用いて説明する。ただし、これに限定されるものではなく、調整装置200は、任意の場所に設けられて良い。   In the description using the power system diagram shown in FIG. 2, the description will be made using the case where the adjustment device 200 is provided in the substation 402. However, it is not limited to this, and the adjustment apparatus 200 may be provided in arbitrary places.

図2において、センサ300が電圧を測定する箇所について説明する。センサ300が電圧を測定する点は、調整装置200により電圧が変更される電力が流れる箇所となる。図2に示す例では、調整装置200が変電所402に設けられている結果、図2の電力系統図において変電所402より負荷側の箇所となる。例えば、センサ300は、測定点501において電圧を測定する。   In FIG. 2, the location where the sensor 300 measures the voltage will be described. The point at which the sensor 300 measures the voltage is a location where electric power whose voltage is changed by the adjustment device 200 flows. In the example illustrated in FIG. 2, the adjustment device 200 is provided in the substation 402, and as a result, the location on the load side of the substation 402 in the power system diagram of FIG. 2. For example, the sensor 300 measures the voltage at the measurement point 501.

図2において、センサ300が有効電力を測定する箇所について説明する。センサ300が有効電力を測定する点は、センサ300により測定される電圧と同一の電圧となる電力が流れる箇所となる。測定点501においてセンサ300が電圧を測定する場合を用いて説明する。この場合、図2に示す例では、変電所402より負荷側であって、変電所403より発電所401側の箇所となる。例えば、センサ300は、測定点501や測定点502、測定点503、測定点504などにおいて、有効電力を測定する。   In FIG. 2, the location where the sensor 300 measures active power will be described. The point at which the sensor 300 measures the effective power is a location where electric power having the same voltage as the voltage measured by the sensor 300 flows. A case where the sensor 300 measures a voltage at the measurement point 501 will be described. In this case, in the example illustrated in FIG. 2, the position is on the load side from the substation 402 and on the power plant 401 side from the substation 403. For example, the sensor 300 measures active power at the measurement point 501, the measurement point 502, the measurement point 503, the measurement point 504, and the like.

図2において、分散型電源による発電量が算出される電力網について説明する。分散型電源による発電量が算出される電力網は、センサ300により測定された電圧や有効電力の電力が供給される範囲となる。例えば、測定点502においてセンサ300が有効電力を測定した場合には、分散型電源による発電量が算出される電力網は、図2の電力系統図において、測定点502より負荷側にある範囲601となる。また、同様に、測定点503や測定点504においてセンサ300が有効電力を測定した場合には、分散型電源による発電量が算出される電力網は、それぞれ、範囲602や範囲603となる。   In FIG. 2, a power network in which the amount of power generated by a distributed power source is calculated will be described. The power network in which the amount of power generated by the distributed power source is calculated is a range in which the voltage measured by the sensor 300 or the power of active power is supplied. For example, when the sensor 300 measures active power at the measurement point 502, the power network in which the amount of power generated by the distributed power source is calculated is a range 601 on the load side from the measurement point 502 in the power system diagram of FIG. Become. Similarly, when the sensor 300 measures active power at the measurement point 503 or the measurement point 504, the power networks from which the amount of power generated by the distributed power source is calculated are a range 602 and a range 603, respectively.

図1の説明に戻る。図1に示すように、発電量算出装置100は、入力部101と、出力部102と、記憶部110と、制御部120とを有する。入力部101は、制御部120と接続される。入力部101は、発電量算出装置100を利用する利用者から情報や指示を受け付け、受け付けた情報や指示を制御部120に入力する。入力部101は、キーボードやマウス、マイクなどが該当する。出力部102は、制御部120と接続される。出力部102は、制御部120から情報を受け付け、受け付けた情報を出力する。出力部102は、モニタやスピーカなどが該当する。なお、入力部101によって受け付けられる情報や指示の詳細や、出力部102によって出力される情報の詳細については、関係する各部について説明する際に適宜説明する。   Returning to the description of FIG. As illustrated in FIG. 1, the power generation amount calculation device 100 includes an input unit 101, an output unit 102, a storage unit 110, and a control unit 120. The input unit 101 is connected to the control unit 120. The input unit 101 receives information and instructions from a user who uses the power generation amount calculation apparatus 100 and inputs the received information and instructions to the control unit 120. The input unit 101 corresponds to a keyboard, a mouse, a microphone, or the like. The output unit 102 is connected to the control unit 120. The output unit 102 receives information from the control unit 120 and outputs the received information. The output unit 102 corresponds to a monitor or a speaker. The details of information and instructions received by the input unit 101 and the details of information output by the output unit 102 will be described as appropriate when each related unit is described.

記憶部110は、制御部120と接続される。記憶部110は、制御部120による各種処理に用いるデータを記憶する。記憶部110は、例えば、RAM(Random Access Memory)、フラッシュメモリ(Flash Memory)などの半導体メモリ素子、または、ハードディスクや光ディスクなどが該当する。図1に示す例では、記憶部110は、電圧特性指数テーブル111を有する。   The storage unit 110 is connected to the control unit 120. The storage unit 110 stores data used for various processes by the control unit 120. The storage unit 110 corresponds to, for example, a semiconductor memory device such as a RAM (Random Access Memory) or a flash memory, or a hard disk or an optical disk. In the example illustrated in FIG. 1, the storage unit 110 includes a voltage characteristic index table 111.

電圧特性指数テーブル111は、電力網の電圧特性指数を記憶する。電圧特性指数は、下記の負荷の電圧特性を示す(数1)におけるαを示す。   The voltage characteristic index table 111 stores the voltage characteristic index of the power grid. The voltage characteristic index indicates α in (Expression 1) indicating the voltage characteristic of the following load.

Figure 0005712008
Figure 0005712008

(数1)において、「P」は、電力網の電圧が定格電圧となる場合における負荷を示す。「V」は、電力網の定格電圧を示す。「P」は、電力網の電圧が「V」となる場合における負荷を示す。電圧特性指数は、例えば、有効電力や電圧、周波数を実測することで算出される。なお、電圧特性指数は、電力網内の負荷の電圧特性が定インピーダンス特性となる場合には「α=2」となり、同電圧特性が定電流特性となる場合には「α=1」となり、同電圧特性が定電力特性となる場合には「α=0」となる。 In (Equation 1), “P 0 ” indicates a load when the voltage of the power grid becomes the rated voltage. “V 0 ” indicates the rated voltage of the power grid. “P” indicates a load when the voltage of the power grid is “V”. The voltage characteristic index is calculated, for example, by actually measuring active power, voltage, and frequency. The voltage characteristic index is “α = 2” when the voltage characteristic of the load in the power grid is a constant impedance characteristic, and “α = 1” when the voltage characteristic is a constant current characteristic. When the voltage characteristic is a constant power characteristic, “α = 0”.

図3は、実施例1における電圧特性指数テーブルに記憶された情報の一例を示す図である。図3に示すように、電圧特性指数テーブル111は、電圧特性指数と、電圧特性指数を適用する対象となる電力網の条件を対応付けて記憶する。図3に示す例では、電圧特性指数テーブル111は、電圧特性指数「0」と条件「工場」とを対応付けて記憶する。また、電圧特性指数テーブル111は、電圧特性指数「2」と条件「住宅地」とを対応付けて記憶する。また、電圧特性指数テーブル111は、電圧特性指数「1」と条件「指定なし」とを対応付けて記憶する。   FIG. 3 is a diagram illustrating an example of information stored in the voltage characteristic index table according to the first embodiment. As shown in FIG. 3, the voltage characteristic index table 111 stores the voltage characteristic index and the conditions of the power network to which the voltage characteristic index is applied in association with each other. In the example illustrated in FIG. 3, the voltage characteristic index table 111 stores the voltage characteristic index “0” and the condition “factory” in association with each other. The voltage characteristic index table 111 stores the voltage characteristic index “2” and the condition “residential area” in association with each other. The voltage characteristic index table 111 stores the voltage characteristic index “1” and the condition “undesignated” in association with each other.

すなわち、電圧特性指数テーブル111は、工場を含む電力網に適用される電圧特性指数として「0」を記憶する。また、電圧特性指数テーブル111は、住宅地を含む電力網に適用される電圧特性指数として「2」を記憶する。また、電圧特性指数テーブル111は、利用者により指定されなかった場合に適用される電圧特性指数として「1」を記憶する。   That is, the voltage characteristic index table 111 stores “0” as the voltage characteristic index applied to the power network including the factory. Further, the voltage characteristic index table 111 stores “2” as a voltage characteristic index applied to a power network including a residential area. In addition, the voltage characteristic index table 111 stores “1” as a voltage characteristic index applied when not specified by the user.

すなわち、工場において用いられることが多いモータは、消費電力が一定となるようにする性質がある。この結果、工場を含む電力網内の負荷の電圧特性は、定電力特性に近い場合が多い。このことを踏まえ、この実施例では、電圧特性指数テーブル111は、工場を含む電力網に適用される電圧特性指数として「0」を記憶する。この数値は一例であり、電圧特性は整数に限らず、「0.5」を指定することも可能である。   In other words, a motor often used in a factory has a property of making power consumption constant. As a result, the voltage characteristic of the load in the power grid including the factory is often close to the constant power characteristic. Based on this, in this embodiment, the voltage characteristic index table 111 stores “0” as the voltage characteristic index applied to the power network including the factory. This numerical value is an example, and the voltage characteristic is not limited to an integer, and “0.5” can be designated.

また、この実施例では、住宅地を含む電力網では、電圧特性指数が「2」に近い場合が多いことを踏まえ、電圧特性指数テーブル111は、住宅地を含む電力網に適用される電圧特性指数として「2」を記憶する。また、一般的な電力網では工場や住宅地などの影響が平均化されて電圧特性指数が「1」に近くなることを踏まえ、電圧特性指数テーブル111は、利用者による指定がなかった場合に適用される電圧特性指数として「1」を記憶する。なお、負荷全体の特性は「1」に近いことが知られているため、工場、住宅などの区別ができたとしても、一律に同一の数値として「1」を設定する方法もある。   In this embodiment, the voltage characteristic index table 111 is used as a voltage characteristic index applied to the power network including the residential area because the voltage characteristic index is often close to “2” in the power network including the residential area. “2” is stored. In addition, the voltage characteristic index table 111 is applied when there is no designation by the user in view of the fact that the effects of factories and residential areas are averaged in a general power grid and the voltage characteristic index becomes close to “1”. "1" is stored as the voltage characteristic index. In addition, since it is known that the characteristics of the entire load are close to “1”, there is a method in which “1” is uniformly set as the same numerical value even if the factories and houses can be distinguished.

図1の説明に戻る。制御部120は、入力部101、出力部102及び記憶部110と接続される。制御部120は、各種の処理手順などを規定したプログラムを記憶する内部メモリを有し、種々の処理を制御する。制御部120は、例えば、ASIC(Application Specific Integrated Circuit)、FPGA(Field Programmable Gate Array)、CPU(Central Processing Unit)、MPU(Micro Processing Unit)などが該当する。図1に示す例では、制御部120は、変更部121と、測定部122と、発電量算出部123とを有する。   Returning to the description of FIG. The control unit 120 is connected to the input unit 101, the output unit 102, and the storage unit 110. The control unit 120 has an internal memory that stores a program that defines various processing procedures and the like, and controls various processes. The control unit 120 corresponds to, for example, an application specific integrated circuit (ASIC), a field programmable gate array (FPGA), a central processing unit (CPU), or a micro processing unit (MPU). In the example illustrated in FIG. 1, the control unit 120 includes a change unit 121, a measurement unit 122, and a power generation amount calculation unit 123.

変更部121は、電力網に供給される電力の電圧を変更する。具体的には、変更部121は、電力網に供給される電力の電圧を調整する調整装置200の動作状態を切り替えることで、電圧を変更する。例えば、変更部121は、電力網に設けられた変圧器のタップやスタコンなどの調相設備などを動作させたり動作させなかったり、調相設備を投入したり開放したりすることで、電力網の電圧を微少に変更する。   The changing unit 121 changes the voltage of power supplied to the power network. Specifically, the changing unit 121 changes the voltage by switching the operation state of the adjusting device 200 that adjusts the voltage of the power supplied to the power grid. For example, the changing unit 121 operates or does not operate a phase adjusting facility such as a transformer tap or a stacone provided in the power network, or turns on or off the phase adjusting facility, thereby changing the voltage of the power network. Is slightly changed.

変更部121は、分散型電源による発電量を算出する算出タイミングとなると、有効電力を測定する旨を測定部122に送り、有効電力を測定した旨を測定部122から受信すると、電力網に供給される電力の電圧を変更する。そして、変更部121は、電力網に供給される電力の電圧を変更した後に、電圧を変更した旨を測定部122に送る。なお、算出タイミングとは、例えば、利用者により算出する指示が入力部101に入力されたタイミングや、任意のタイミングが該当する。   At the calculation timing for calculating the amount of power generated by the distributed power source, the changing unit 121 sends the fact that the active power is measured to the measuring unit 122, and receives the fact that the active power is measured from the measuring unit 122, and then is supplied to the power network. Change the power voltage. Then, after changing the voltage of the power supplied to the power network, the changing unit 121 sends a message indicating that the voltage has been changed to the measuring unit 122. Note that the calculation timing corresponds to, for example, a timing when an instruction to be calculated by the user is input to the input unit 101 or an arbitrary timing.

ここで、変更部121による電圧の変更について補足する。電力を供給する電力会社は、変電所や発電所などにおいて、電力の電圧を調整する調整装置を有する。この結果、実施例1においては、もともと電力会社が備える設備を用いて電圧を微小に変更することで、以下に詳細に説明するように、電力網と接続された分散型電源による現在の発電量が算出可能となる。   Here, it supplements about the change of the voltage by the change part 121. FIG. An electric power company that supplies electric power has an adjustment device that adjusts the voltage of the electric power at a substation or a power plant. As a result, in the first embodiment, the current power generation amount by the distributed power source connected to the power grid is reduced as described in detail below by changing the voltage minutely using the facilities originally provided by the electric power company. It can be calculated.

測定部122は、変更部121により電圧が変更される電力網の有効電力を測定する。具体的には、測定部122は、センサ300を制御することで、変更部121により電圧が変更される前後において、電力網の有効電力と電圧とを測定する。   The measuring unit 122 measures the active power of the power network whose voltage is changed by the changing unit 121. Specifically, the measurement unit 122 controls the sensor 300 to measure the active power and voltage of the power grid before and after the voltage is changed by the changing unit 121.

例えば、測定部122は、測定する旨を変更部121から受信すると、有効電力と電圧とを測定する。その後、測定部122は、電圧を変更した旨を変更部121から受信すると、有効電力と電圧とを測定し、有効電力を測定した旨を変更部121に送信する。ここで、測定する旨を変更部121から受信した際に測定した有効電力と電圧とは、電圧の変更前の有効電力と電圧とになる。また、電圧を変更した旨を変更部121から受信した際に測定した有効電力と電圧とは、電圧の変更後の有効電力と電圧とになる。ただし、測定部122による測定タイミングはこれに限定されるものではない。測定部122は、常に有効電力と電圧とを測定しても良い。   For example, when the measurement unit 122 receives a message to be measured from the change unit 121, the measurement unit 122 measures active power and voltage. After that, when receiving the fact that the voltage has been changed from the changing unit 121, the measuring unit 122 measures the active power and the voltage, and transmits the fact that the active power has been measured to the changing unit 121. Here, the active power and the voltage measured when the effect of measurement is received from the changing unit 121 are the active power and the voltage before the change of the voltage. Moreover, the active power and voltage measured when the fact that the voltage has been changed is received from the changing unit 121 are the effective power and voltage after the change of the voltage. However, the measurement timing by the measurement unit 122 is not limited to this. The measurement unit 122 may always measure active power and voltage.

発電量算出部123は、電力網と接続された分散型電源による発電量として、変更部121による変更前後において、電圧の変化量に対して測定部122により測定された有効電力の変化量が大きい場合には、有効電力の変化量が小さい場合と比較して小さい値を算出する。また、発電量算出部123は、電力網と接続された分散型電源による発電量として、変更部121による電圧の変化量に対して測定部122により測定された有効電力の変化量が小さい場合には、有効電力の変化量が大きい場合と比較して大きい値を算出する。   When the amount of change in active power measured by the measurement unit 122 is larger than the amount of change in voltage before and after the change by the change unit 121, the amount of power generated by the distributed power source connected to the power grid is large. In this case, a smaller value is calculated as compared with the case where the change amount of the active power is small. In addition, the power generation amount calculation unit 123, when the amount of change in active power measured by the measurement unit 122 is smaller than the amount of change in voltage by the change unit 121 as the power generation amount by the distributed power source connected to the power grid, A large value is calculated as compared with the case where the amount of change in the active power is large.

具体的には、発電量算出部123は、下記の(数2)に基づいて、電力網と接続された分散型電源による発電量を算出する。(数2)において、「PPV」は、分散型電源による発電量を示す。「V」は、変更部121による変更前の電圧を示す。「V」は、変更部121による変更後の電圧を示す。「P」は、変更部121による変更前の有効電力(負荷)を示す。また、「P」は、変更部121による変更後の有効電力(負荷)を示す。「α」は、電圧特性指数を示す。なお、「P」や「P」は、電力会社から見た有効電力であり、分散型電源による発電量を含む値となる。また、以下では、負荷の消費を「正」の値とし、発電量を「負」の値として説明する。 Specifically, the power generation amount calculation unit 123 calculates the power generation amount by the distributed power source connected to the power network based on the following (Equation 2). In (Expression 2), “P PV ” indicates the amount of power generated by the distributed power source. “V 1 ” indicates a voltage before being changed by the changing unit 121. “V 2 ” indicates the voltage after being changed by the changing unit 121. “P 1 ” indicates active power (load) before being changed by the changing unit 121. “P 2 ” indicates active power (load) after being changed by the changing unit 121. “Α” represents a voltage characteristic index. Note that “P 1 ” and “P 2 ” are active power viewed from the electric power company, and are values including the amount of power generated by the distributed power source. In the following description, the load consumption is assumed to be a “positive” value, and the power generation amount is assumed to be a “negative” value.

Figure 0005712008
Figure 0005712008

すなわち、(数2)に示すように、発電量算出部123は、分母が、電力網の定格電圧を分母として変更後の電圧を分子とする値を所定の電圧特性指数で乗算した値から、該定格電圧を分母として変更前の電圧を分子とする値を該電圧特性指数で乗算した値を減算した値となり、分子が、電力網の定格電圧を分母として変更前の電圧を分子とする値を所定の電圧特性指数で乗算した値に変更後に測定された有効電力を乗算した値から、該定格電圧を分母として変更後の電圧を分子とする値を該電圧特性指数で乗算した値に変更前に測定された有効電力を乗算した値を減算した値となる値を算出することで、分散型電源の発電量を算出する。   That is, as shown in (Equation 2), the power generation amount calculation unit 123 uses a value obtained by multiplying the denominator by a predetermined voltage characteristic index by a value obtained by using the rated voltage of the power grid as a denominator and the voltage after the change as a numerator. The value obtained by multiplying the voltage characteristic index by the value with the rated voltage as the denominator and the voltage before the change as the numerator is subtracted, and the numerator is a value with the rated voltage of the power grid as the denominator and the voltage before the change as the numerator. From the value obtained by multiplying the value multiplied by the voltage characteristic index of the active power measured after the change, the value obtained by multiplying the voltage after the change by the rated voltage as the denominator and the value obtained by multiplying the voltage characteristic index by the voltage characteristic index The power generation amount of the distributed power source is calculated by calculating a value obtained by subtracting the value obtained by multiplying the measured active power.

ここで、(数2)の導き方について更に説明する。まず、負荷の電圧特性は、上述した(数1)により示される。ここで、電力網の電圧が「V」から「V」に変化したとする。また、電圧の変化にともなって、分散型電源による発電量を含む負荷の値が「P」から「P」に変化したとする。 Here, how to derive (Equation 2) will be further described. First, the voltage characteristic of the load is expressed by the above (Equation 1). Here, it is assumed that the voltage of the power grid has changed from “V 1 ” to “V 2 ”. Further, it is assumed that the load value including the amount of power generated by the distributed power source changes from “P 1 ” to “P 2 ” with the change in voltage.

この場合、分散型電源による発電量を含まない負荷の変化は、(数3)や(数4)により示される。(数3)や(数4)において、「PPV」は、分散型電源の発電量を示す。上述したように、負荷の消費を「正」の値とし、発電量を「負」の値とした場合には、分散型電源による発電量を含まない負荷は、「PPV」を「P」あるいは「P」と加算することで算出される。なお、「P」は、分散型電源による発電量を含まない定格電圧時における負荷を示す。 In this case, a change in load that does not include the amount of power generated by the distributed power source is expressed by (Equation 3) or (Equation 4). In (Equation 3) and (Equation 4), “P PV ” indicates the power generation amount of the distributed power source. As described above, when the load consumption is a “positive” value and the power generation amount is a “negative” value, the load that does not include the power generation amount by the distributed power source is changed to “P PV ” as “P 1 ”. "Or" P 2 ". “P 0 ” indicates the load at the rated voltage not including the amount of power generated by the distributed power source.

Figure 0005712008
Figure 0005712008

Figure 0005712008
Figure 0005712008

ここで、(数3)と(数4)とから、不明な値となる「P0」を消去することで、(数5)が導かれる。   Here, from (Equation 3) and (Equation 4), (Equation 5) is derived by deleting “P0” which is an unknown value.

Figure 0005712008
Figure 0005712008

また、(数5)において、右辺と左辺の分母をなくす変形をすることで、(数6)が導かれる。   Further, in (Equation 5), (Equation 6) is derived by performing a transformation that eliminates the denominators of the right side and the left side.

Figure 0005712008
Figure 0005712008

また、(数6)を整理すると、(数7)を経て上述した(数2)が導かれる。   Further, by arranging (Equation 6), (Equation 2) described above is derived through (Equation 7).

Figure 0005712008
Figure 0005712008

図4は、電力網における実測値の一例を示す図である。図4に示す実測値は、電力系統シミュレータで太陽光発電用PCS(Power Conditioning System)を合計9台(各相3台)接続し、さらに、30kWの抵抗負荷を接続して太陽光発電を含む系統負荷を模擬したときに得られた実測値となる。   FIG. 4 is a diagram illustrating an example of actually measured values in the power network. The actual measured values shown in FIG. 4 include photovoltaic power generation by connecting a total of nine PCS (Power Conditioning System) for photovoltaic power generation (three units for each phase) with a power system simulator and further connecting a 30 kW resistive load. This is the actual measurement obtained when the system load is simulated.

図4では、横軸を時間軸とし、電力網の電圧と、電力網における系統負荷と、太陽光発電による発電量と、抵抗負荷とを示した。なお、電力網における系統負荷は、電力会社から見た有効電力を示す。また、抵抗負荷は、負荷により実際に消費される消費電力を示す。ここで、電力会社から見えるのは、電力網の電圧と、電力網における系統負荷とである。太陽光発電による発電量と、抵抗負荷とについては、説明の便宜上、併せて記載した。なお、各図の横軸は共通する。なお、図4の「電力網における系統負荷」は、「太陽光発電による発電量」と「抵抗負荷」とを合わせたものとなる。なお、図4に示す例では、太陽光発電による発電量を「正」の値として記載しており、図4の「電力網における系統負荷」は、「抵抗負荷」から「太陽光発電による発電量」を減算した値となる。   In FIG. 4, the horizontal axis is the time axis, and the voltage of the power grid, the system load in the power grid, the amount of power generated by solar power generation, and the resistance load are shown. In addition, the system load in an electric power network shows the active power seen from the electric power company. The resistance load indicates the power consumption actually consumed by the load. Here, what the electric power company can see is the voltage of the power grid and the system load in the power grid. The amount of power generated by solar power generation and the resistance load are shown together for convenience of explanation. In addition, the horizontal axis of each figure is common. The “system load in the power grid” in FIG. 4 is a combination of “amount of power generated by photovoltaic power generation” and “resistance load”. In the example shown in FIG. 4, the amount of power generated by solar power generation is described as a “positive” value, and “system load in the power grid” in FIG. 4 is changed from “resistance load” to “power generation amount by solar power generation”. "Is subtracted.

図4に示す例では、スタティックコンデンサを「2s」頃に投入し、「22s」頃に開放した場合を示した。また、変圧器のタップを「22s」以降電圧上げ方向に動作させ、「43s」、「61s」、「78s」、「85s」において動作させるタップを変更した場合を示した。   In the example shown in FIG. 4, the static capacitor is inserted at about “2 s” and opened at about “22 s”. Moreover, the case where the tap of the transformer is operated in the direction of increasing the voltage after “22 s” and the tap operated at “43 s”, “61 s”, “78 s”, and “85 s” is changed is shown.

図4の「太陽光発電による発電量」に示すように、太陽光発電による発電量は、電力網の電圧が変化したとしても、電圧変化の過渡時を除いて変更することなく、ほぼ一定となる。一方、図4の「抵抗負荷」に示すように、抵抗負荷は、電力網の電圧が変化することで変動する。   As shown in “Power generation by photovoltaic power generation” in FIG. 4, even if the voltage of the power grid changes, the power generation by solar power generation is almost constant without being changed except during a voltage change transient. . On the other hand, as shown in “resistive load” in FIG. 4, the resistive load varies as the voltage of the power grid changes.

すなわち、分散型電源を導入すると、分散型電源による発電量に応じて電力会社から見た見かけ上の負荷(消費電力)が減少することになり、電力網の有効電力が変化する。ここで、電力会社が供給する電力の電圧を変化させると、分散型電源の発電量は日射量が変化しない場合に過渡時以外は変化しない一方、家庭にて消費される消費電力は変化する。これらに着目し、実施例1に係る発電量算出装置100は、電力網により提供される電力の電圧を変更させる構成を採用した上で、電圧の変更前後における電圧の変化量に対する有効電力の変化量に基づいて、電力網と接続された分散型電源による発電量を算出する。具体的には、発電量算出装置100は、電力網の電圧を変更し、変更前後の電圧と有効電力とに基づいて、電力網と接続された分散型電源による発電量を算出する。さらに詳細には、発電量算出装置100は、(数2)に基づいて、電力網と接続された分散型電源による発電量を算出する。   That is, when a distributed power source is introduced, the apparent load (power consumption) seen by the power company is reduced according to the amount of power generated by the distributed power source, and the effective power of the power network changes. Here, when the voltage of the electric power supplied by the electric power company is changed, the power generation amount of the distributed power source does not change except during a transient when the amount of solar radiation does not change, while the power consumption consumed at home changes. Focusing on these points, the power generation amount calculation apparatus 100 according to the first embodiment employs a configuration that changes the voltage of the power provided by the power grid, and then the amount of change in active power relative to the amount of change in voltage before and after the change in voltage. Based on the above, the amount of power generated by the distributed power source connected to the power grid is calculated. Specifically, the power generation amount calculation apparatus 100 changes the voltage of the power grid, and calculates the power generation amount by the distributed power source connected to the power grid based on the voltage before and after the change and the active power. More specifically, the power generation amount calculation apparatus 100 calculates the power generation amount by the distributed power source connected to the power network based on (Equation 2).

図4に示す値を用いて、発電量算出部123が分散型電源による発電量を算出する手法の一例について説明する。図4に示すように、以下では、変更部121による変更前の電圧「V」を「189.19V」とし、変更部121による変更後の電圧「V」を「192.3V」とする。また、変更部121による変更前の有効電力「P」を「−1.84kW」とし、変更部121による変更後の有効電力「P」を「−0.958kW」とする。また、利用者により条件「住宅地」が入力部101に入力された場合を用いて説明する。 An example of a method in which the power generation amount calculation unit 123 calculates the power generation amount by the distributed power source will be described using the values shown in FIG. As shown in FIG. 4, hereinafter, the voltage “V 1 ” before the change by the changing unit 121 is “189.19 V”, and the voltage “V 2 ” after the change by the changing unit 121 is “192.3 V”. . Further, the effective power “P 1 ” before the change by the changing unit 121 is set to “−1.84 kW”, and the effective power “P 2 ” after the change by the changing unit 121 is set to “−0.958 kW”. The case where the condition “residential area” is input to the input unit 101 by the user will be described.

この場合、発電量算出部123は、電圧特性指数テーブル111を条件「住宅地」で検索することで電圧特性指数「2」を取得する。そして、発電量算出部123は、下記の(数8)に示すように、(数2)の「V」に「189.19V」を代入し、「V」に「192.3V」を代入し、「P」に「−1.84kW」を代入し、「P」に「−0.958kW」を代入し、「α」に「2」を代入する。この結果、発電量算出部123は、分散型電源による発電量として、「28.5kW」を算出する。図4を見るとわかるように、太陽光発電による実際の発電量は「28.7kW」であり、高精度に分散型電源による発電量が算出されたことがわかる。 In this case, the power generation amount calculation unit 123 acquires the voltage characteristic index “2” by searching the voltage characteristic index table 111 with the condition “residential area”. Then, as shown in the following (Equation 8), the power generation amount calculation unit 123 substitutes “189.19V” for “V 1 ” in (Equation 2), and “192.3V” for “V 2 ”. Then, “−1.84 kW” is substituted for “P 1 ”, “−0.958 kW” is substituted for “P 2 ”, and “2” is substituted for “α”. As a result, the power generation amount calculation unit 123 calculates “28.5 kW” as the power generation amount by the distributed power source. As can be seen from FIG. 4, the actual power generation amount by solar power generation is “28.7 kW”, which indicates that the power generation amount by the distributed power source was calculated with high accuracy.

Figure 0005712008
Figure 0005712008

なお、発電量算出部123は、電圧特性指数として利用者により特定の値が指定された場合には、指定された値を用いて分散型電源による発電量を算出する。また、発電量算出部123は、利用者により条件が指定された場合には、指定された条件に合致する電圧特性指数を電圧特性指数テーブル111から読み出し、読み出した電圧特性指数を用いて分散型電源による発電量を算出する。また、発電量算出部123は、利用者により電圧特性指数が指定されなかった場合には、図3の条件「指定なし」に示すように、電圧特性指数として「1」を用いて分散型電源による発電量を算出する。   Note that, when a specific value is designated by the user as the voltage characteristic index, the power generation amount calculation unit 123 calculates the power generation amount by the distributed power source using the specified value. In addition, when a condition is specified by the user, the power generation amount calculation unit 123 reads a voltage characteristic index that matches the specified condition from the voltage characteristic index table 111, and uses the read voltage characteristic index to perform a distributed type. Calculate the amount of power generated by the power supply. Further, when the voltage characteristic index is not specified by the user, the power generation amount calculation unit 123 uses “1” as the voltage characteristic index as shown in the condition “not specified” in FIG. Calculate the amount of power generated by.

なお、発電量算出装置100は、例えば、パーソナルコンピュータやワークステーション、PDA(Personal Data Assistance)などの任意の除法処理端末を用いて実現して良い。例えば、PDAなどの情報処理装置に、図1に示した制御部120の各機能を搭載することで実現しても良い。   The power generation amount calculation apparatus 100 may be realized using an arbitrary division processing terminal such as a personal computer, a workstation, or a PDA (Personal Data Assistance). For example, it may be realized by mounting each function of the control unit 120 shown in FIG. 1 on an information processing apparatus such as a PDA.

[実施例1に係る発電量算出装置による処理]
図5は、実施例1に係る発電量算出装置による処理の一例を示すフローチャートである。図5に示すように、制御部120は、算出タイミングとなると(ステップS101肯定)、以下に説明する一連の処理を実行する。なお、算出タイミングとは、例えば、利用者により算出する指示が入力部101に入力されたタイミングや、任意のタイミングが該当する。
[Processing by the power generation amount calculation apparatus according to the first embodiment]
FIG. 5 is a flowchart illustrating an example of processing performed by the power generation amount calculation apparatus according to the first embodiment. As shown in FIG. 5, the control unit 120 executes a series of processes described below at the calculation timing (Yes in step S <b> 101). Note that the calculation timing corresponds to, for example, a timing when an instruction to be calculated by the user is input to the input unit 101 or an arbitrary timing.

すなわち、図5に示すように、算出タイミングとなると(ステップS101肯定)、測定部122は、変更部121による変更前の有効電力負荷と電圧とを測定する(ステップS102)。例えば、測定部122は、算出タイミングとなって変更部121から測定する旨を受信すると、電圧の変更前における有効電力負荷と電圧とを測定する。また、この際、測定部122は、有効電力負荷と電圧とを測定すると、有効電力を測定した旨を変更部121に送信する。   That is, as shown in FIG. 5, when the calculation timing comes (Yes at Step S101), the measurement unit 122 measures the active power load and voltage before the change by the changing unit 121 (Step S102). For example, when the measurement unit 122 receives the measurement timing from the changing unit 121 at the calculation timing, the measuring unit 122 measures the active power load and the voltage before the voltage change. At this time, when the measuring unit 122 measures the active power load and the voltage, the measuring unit 122 transmits to the changing unit 121 that the active power has been measured.

そして、変更部121は、電力網の電圧を変更する(ステップS103)。例えば、変更部121は、有効電力を測定した旨を測定部122から受信すると、調整装置200の動作状態を切り替えることで、電圧を変更する。また、この際、変更部121は、電圧を変更すると、電圧を変更した旨を変更部121に送信する。   And the change part 121 changes the voltage of an electric power grid (step S103). For example, when the change unit 121 receives from the measurement unit 122 that the active power has been measured, the change unit 121 changes the voltage by switching the operation state of the adjustment device 200. At this time, when the voltage is changed, the changing unit 121 transmits to the changing unit 121 that the voltage has been changed.

そして、測定部122は、変更部121による変更後の有効電力負荷と電圧とを測定する(ステップS104)。例えば、測定部122は、電圧を変更した旨を受信すると、電圧の変更後における有効電力負荷と電圧とを測定する。   And the measurement part 122 measures the active power load and voltage after the change by the change part 121 (step S104). For example, when receiving the fact that the voltage has been changed, the measurement unit 122 measures the active power load and the voltage after the change of the voltage.

そして、発電量算出部123は、電力網と接続された分散型電源の発電量を算出する(ステップS105)。例えば、利用者により指定された電圧特性指数を電圧特性指数テーブル111から取得し、測定部122により測定された有効電力と電圧とを上述した数2に代入することで、電力網と接続された分散型電源の発電量を算出する。   Then, the power generation amount calculation unit 123 calculates the power generation amount of the distributed power source connected to the power network (step S105). For example, by obtaining the voltage characteristic index designated by the user from the voltage characteristic index table 111 and substituting the effective power and voltage measured by the measurement unit 122 into the above-described formula 2, the dispersion connected to the power network Calculate the power generation amount of the mold power source.

そして、発電量算出部123は、算出結果を出力部102から出力する(ステップS106)。例えば、算出結果が「28.5kW」である場合には、発電量算出部123は、電力網と接続された分散型電源の発電量として「28.5kW」を出力する。   And the electric power generation amount calculation part 123 outputs a calculation result from the output part 102 (step S106). For example, when the calculation result is “28.5 kW”, the power generation amount calculation unit 123 outputs “28.5 kW” as the power generation amount of the distributed power source connected to the power network.

なお、上記の処理手順は、上記の順番に限定されるものではなく、処理内容を矛盾させない範囲で適宜変更しても良い。例えば、算出タイミングか否かに関係なく、変更前における有効電力や電圧を測定しても良い。   In addition, said process procedure is not limited to said order, You may change suitably in the range which does not contradict a process content. For example, the active power or voltage before the change may be measured regardless of whether the calculation timing is reached.

[実施例1に係る発電量算出装置による効果]
上述したように、実施例1によれば、発電量算出装置100は、電力網に供給される電力の電圧を変更する。また、発電量算出装置100は、電圧が変更される電力網の有効電力を測定する。また、発電量算出装置100は、電力網と接続された分散型電源による発電量として、変更前後において、電圧の変化量に対して測定された有効電力の変化量が大きい場合には、有効電力の変化量が小さい場合と比較して小さい値を算出する。また、発電量算出装置100は、変更前後において、電圧の変化量に対して測定された有効電力の変化量が小さい場合には、有効電力の変化量が大きい場合と比較して大きい値を算出する。この結果、電力網と接続された分散型電源による発電量を簡単に把握可能である。
[Effects of power generation amount calculation apparatus according to Embodiment 1]
As described above, according to the first embodiment, the power generation amount calculation apparatus 100 changes the voltage of the power supplied to the power grid. Moreover, the power generation amount calculation apparatus 100 measures the active power of the power network whose voltage is changed. In addition, the power generation amount calculation apparatus 100 calculates the active power when the amount of change in active power measured with respect to the amount of change in voltage before and after the change is large as the amount of power generated by the distributed power source connected to the power grid. A small value is calculated as compared with the case where the amount of change is small. In addition, before and after the change, the power generation amount calculation apparatus 100 calculates a larger value when the change amount of the active power measured with respect to the change amount of the voltage is smaller than when the change amount of the active power is large. To do. As a result, it is possible to easily grasp the amount of power generated by the distributed power source connected to the power grid.

すなわち、分散型電源を導入すると、分散型電源による発電量に応じて電力会社から見た見かけ上の負荷(消費電力)が減少することになり、電力網の有効電力が変化する。ここで、例えば、電力会社から見た一般家庭「A」の見かけ上の負荷は、分散型電源による発電量と家庭にて消費される消費電力とを合わせたものとなる。電力会社が供給する電力の電圧を変化させると、分散型電源の発電量はあまり変化しない一方、家庭にて消費される消費電力は変化する。これらに着目し、電力網により提供される電力の電圧を変更させる構成を採用した上で、電圧の変更前後における電圧と有効電力との変化量に基づいて、電力網と接続された分散型電源による発電量を算出する。この結果、電力網と接続された分散型電源による発電量を電力会社が簡単に把握可能である。例えば、各分散型電源に通信装置を設けたりすることなく、電力会社の設備を用いて、一般家庭各々に導入された分散型電源の発電量を合計値として簡単に推定可能である。   That is, when a distributed power source is introduced, the apparent load (power consumption) seen by the power company is reduced according to the amount of power generated by the distributed power source, and the effective power of the power network changes. Here, for example, the apparent load of the general home “A” as seen from the power company is a combination of the amount of power generated by the distributed power source and the power consumed at home. When the voltage of the power supplied by the power company is changed, the amount of power generated by the distributed power source does not change much, while the power consumption consumed at home changes. Focusing on these points, adopting a configuration that changes the voltage of the power provided by the power grid, and then generating power from the distributed power source connected to the power grid based on the amount of change between the voltage and active power before and after the voltage change. Calculate the amount. As a result, the power company can easily grasp the amount of power generated by the distributed power source connected to the power network. For example, without providing a communication device for each distributed power source, the power generation amount of the distributed power source installed in each general household can be easily estimated as a total value using facilities of an electric power company.

また、実施例1によれば、発電量算出装置100は、分母が、電力網の定格電圧を分母として変更後の電圧を分子とする値を所定の電圧特性指数で乗算した値から、該定格電圧を分母として変更前の電圧を分子とする値を該電圧特性指数で乗算した値を減算した値となり、分子が、電力網の定格電圧を分母として変更前の電圧を分子とする値を所定の電圧特性指数で乗算した値に変更後に測定された有効電力を乗算した値から、該定格電圧を分母として変更後の電圧を分子とする値を該電圧特性指数で乗算した値に変更前に測定された有効電力を乗算した値を減算した値となる値を算出することで、分散型電源の発電量を算出する。この結果、分散型電源による発電量を簡単に高精度に算出可能である。   In addition, according to the first embodiment, the power generation amount calculation apparatus 100 uses the rated voltage based on the value obtained by multiplying the denominator by a predetermined voltage characteristic index with a value obtained by changing the voltage after the change with the rated voltage of the power grid as the denominator. Is the value obtained by subtracting the value obtained by multiplying the voltage characteristic index by the voltage characteristic index with the voltage before change as the denominator, and the numerator is the predetermined voltage with the voltage before change as the denominator. Measured before the change from the value multiplied by the characteristic index multiplied by the active power measured after the change to the value multiplied by the voltage characteristic index with the rated voltage as the denominator and the voltage after the change as the numerator. The power generation amount of the distributed power source is calculated by calculating a value that is a value obtained by subtracting the value obtained by multiplying the active power. As a result, the amount of power generated by the distributed power source can be calculated easily and with high accuracy.

また、実施例1によれば、発電量算出装置100は、利用者により条件が何ら指定されなかった場合に、電圧特性指数として1を用いて算出する。すなわち、平均的な電力網であれば、電圧特性指数が「1」となることに着目し、電圧特性指数として1を用いて算出するので、分散型電源による発電量を簡単に高精度に算出可能である。   Further, according to the first embodiment, the power generation amount calculation apparatus 100 calculates the voltage characteristic index using 1 when no condition is specified by the user. In other words, in the case of an average power network, paying attention to the fact that the voltage characteristic index is “1” and calculating using 1 as the voltage characteristic index, the power generation amount by the distributed power source can be calculated easily and with high accuracy. It is.

また、実施例1によれば、発電量算出装置100は、電力網に供給される電力の電圧を調整する調整装置200の動作状態を切り替えることで、電圧を変更する。ここで、調整装置は、変電所などに一般的に設けられている結果、発電量算出装置100によれば、電力会社の既存の設備を用いて、分散型電源による発電量を簡単に算出可能である。   Further, according to the first embodiment, the power generation amount calculation device 100 changes the voltage by switching the operation state of the adjustment device 200 that adjusts the voltage of the power supplied to the power grid. Here, as a result of the adjustment device being generally provided in a substation or the like, the power generation amount calculation device 100 can easily calculate the power generation amount by the distributed power source using the existing facilities of the power company. It is.

さて、これまで本発明の実施例について説明したが、本発明は上述した実施例以外にも、その他の実施例にて実施されても良い。そこで、以下では、その他の実施例を示す。   Although the embodiments of the present invention have been described so far, the present invention may be implemented in other embodiments besides the above-described embodiments. Therefore, other embodiments will be described below.

[変更前後の電圧]
例えば、上述した実施例では、測定部122が有効電力と電圧とを測定する場合について説明したが、これに限定されるものではない。例えば、変更前後における電圧が予めわかっている場合には、測定部122は、有効電力を測定する一方、電圧を測定しなくても良い。
[Voltage before and after change]
For example, in the above-described embodiment, the case where the measurement unit 122 measures active power and voltage has been described. However, the present invention is not limited to this. For example, when the voltage before and after the change is known in advance, the measurement unit 122 does not need to measure the voltage while measuring the active power.

[システム構成]
また、本実施例において説明した各処理のうち、自動的に行われるものとして説明した処理の全部または一部を手動的に行うこともでき、あるいは、手動的に行われるものとして説明した処理の全部または一部を公知の方法で自動的に行うこともできる。この他、上述文書中や図面中で示した処理手順、制御手順、具体的名称、各種のデータやパラメータを含む情報については(図1〜図5、数2など)、特記する場合を除いて任意に変更することができる。
[System configuration]
In addition, among the processes described in the present embodiment, all or part of the processes described as being automatically performed can be performed manually, or the processes described as being performed manually can be performed. All or a part can be automatically performed by a known method. In addition, the processing procedures, control procedures, specific names, and information including various data and parameters shown in the above-mentioned documents and drawings (FIGS. 1 to 5, Equation 2, etc.), unless otherwise specified. It can be changed arbitrarily.

また、図示した各装置の各構成要素は機能概念的なものであり、必ずしも物理的に図示の如く構成されていることを要しない。すなわち、各装置の分散・統合の具体的形態は図示のものに限られず、その全部または一部を、各種の負荷や使用状況などに応じて、任意の単位で機能的または物理的に分散・統合して構成することができる。例えば、図1に示す例において、記憶部110を発電量算出装置100の外部装置としてネットワーク経由で接続するようにしても良い。   Further, each component of each illustrated apparatus is functionally conceptual, and does not necessarily need to be physically configured as illustrated. In other words, the specific form of distribution / integration of each device is not limited to that shown in the figure, and all or a part thereof may be functionally or physically distributed or arbitrarily distributed in arbitrary units according to various loads or usage conditions. Can be integrated and configured. For example, in the example illustrated in FIG. 1, the storage unit 110 may be connected as an external device of the power generation amount calculation device 100 via a network.

[プログラム]
図6は、発電量算出装置による一連の処理を実行するための発電量算出プログラムによる情報処理が、コンピュータを用いて具体的に実現されることを示す図である。図6に例示するように、コンピュータ3000は、例えば、メモリ3010と、CPU(Central Processing Unit)3020とを有する。コンピュータ3000の各部はバス3100によって接続される。
[program]
FIG. 6 is a diagram illustrating that the information processing by the power generation amount calculation program for executing a series of processes by the power generation amount calculation device is specifically realized using a computer. As illustrated in FIG. 6, the computer 3000 includes, for example, a memory 3010 and a CPU (Central Processing Unit) 3020. Each part of the computer 3000 is connected by a bus 3100.

メモリ3010は、図6に例示するように、ROM3011及びRAM3012を含む。ROM3011は、例えば、BIOS(Basic Input Output System)等のブートプログラムを記憶する。   The memory 3010 includes a ROM 3011 and a RAM 3012 as illustrated in FIG. The ROM 3011 stores a boot program such as BIOS (Basic Input Output System).

ここで、図6に例示するように、ハードディスクドライブ3080は、例えば、OS3081、アプリケーションプログラム3082、プログラムモジュール3083、プログラムデータ3084を記憶する。すなわち、開示の技術に係る発電量算出プログラムは、コンピュータによって実行される指令が記述されたプログラムモジュール3083として、例えばハードディスクドライブ3080に記憶される。具体的には、上記実施例で説明した変更部121や測定部122、発電量算出部123と同様の情報処理を実行する手順各々が記述されたプログラムモジュールが、ハードディスクドライブ3080に記憶される。   Here, as illustrated in FIG. 6, the hard disk drive 3080 stores, for example, an OS 3081, an application program 3082, a program module 3083, and program data 3084. That is, the power generation amount calculation program according to the disclosed technology is stored in, for example, the hard disk drive 3080 as the program module 3083 in which a command to be executed by the computer is described. Specifically, a program module describing each procedure for executing information processing similar to that performed by the changing unit 121, the measuring unit 122, and the power generation amount calculating unit 123 described in the above embodiment is stored in the hard disk drive 3080.

また、上記実施例で説明した電圧特性指数テーブル111に記憶されるデータのように、発電量算出プログラムによる情報処理に用いられるデータは、プログラムデータ3084として、例えばハードディスクドライブ3080に記憶される。そして、CPU3020が、ハードディスクドライブ3080に記憶されたプログラムモジュール3083やプログラムデータ3084を必要に応じてRAM3012に読み出し、各種の手順を実行する。   Further, like data stored in the voltage characteristic index table 111 described in the above embodiment, data used for information processing by the power generation amount calculation program is stored as program data 3084 in, for example, the hard disk drive 3080. The CPU 3020 reads the program module 3083 and program data 3084 stored in the hard disk drive 3080 to the RAM 3012 as necessary, and executes various procedures.

なお、発電量算出プログラムに係るプログラムモジュール3083やプログラムデータ3084は、ハードディスクドライブ3080に記憶される場合に限られない。例えば、プログラムモジュール3083やプログラムデータ3084は、着脱可能な記憶媒体に記憶されても良い。この場合、CPU3020は、ディスクドライブなどの着脱可能な記憶媒体を介してデータを読み出す。また、同様に、更新プログラムに係るプログラムモジュール3083やプログラムデータ3084は、ネットワーク(LAN(Local Area Network)、WAN(Wide Area Network)等)を介して接続された他のコンピュータに記憶されても良い。この場合、CPU3020は、ネットワークインタフェースを介して他のコンピュータにアクセスすることで各種データを読み出す。   Note that the program module 3083 and the program data 3084 related to the power generation amount calculation program are not limited to being stored in the hard disk drive 3080. For example, the program module 3083 and the program data 3084 may be stored in a removable storage medium. In this case, the CPU 3020 reads data via a removable storage medium such as a disk drive. Similarly, the program module 3083 and program data 3084 related to the update program may be stored in another computer connected via a network (LAN (Local Area Network), WAN (Wide Area Network), etc.). . In this case, the CPU 3020 reads various data by accessing another computer via the network interface.

[その他]
なお、上述した発電量算出プログラムは、インターネットなどのネットワークを介して配布することができる。また、発電量算出プログラムは、ハードディスク、フレキシブルディスク(FD)、CD−ROM、MO、DVDなどのコンピュータで読み取り可能な記録媒体に記録され、コンピュータによって記録媒体から読み出されることによって実行することもできる。
[Others]
The above-described power generation amount calculation program can be distributed via a network such as the Internet. The power generation amount calculation program can be executed by being recorded on a computer-readable recording medium such as a hard disk, a flexible disk (FD), a CD-ROM, an MO, and a DVD, and being read from the recording medium by the computer. .

100 発電量算出装置
101 入力部
102 出力部
110 記憶部
111 電圧特性指数テーブル
120 制御部
121 変更部
122 測定部
123 発電量算出部
200 調整装置
300 センサ
401 発電所
402、403 変電所
404〜406 負荷
411〜413 送電線
414 配電線
501〜504 測定点
DESCRIPTION OF SYMBOLS 100 Power generation amount calculation apparatus 101 Input part 102 Output part 110 Storage part 111 Voltage characteristic index table 120 Control part 121 Change part 122 Measurement part 123 Power generation amount calculation part 200 Adjustment apparatus 300 Sensor 401 Power plant 402,403 Substation 404-406 Load 411-413 Transmission line 414 Distribution line 501-504 Measurement point

Claims (5)

電力網に供給される電力の電圧を変更する変更部と、
前記変更部により電圧が変更される電力網の有効電力を測定する測定部と、
分母が、前記電力網の定格電圧を分母として変更後の電圧を分子とする値を所定の電圧特性指数で乗算した値から、該定格電圧を分母として変更前の電圧を分子とする値を該電圧特性指数で乗算した値を減算した値となり、分子が、前記電力網の定格電圧を分母として変更前の電圧を分子とする値を所定の電圧特性指数で乗算した値に変更後に測定された有効電力を乗算した値から、該定格電圧を分母として変更後の電圧を分子とする値を該電圧特性指数で乗算した値に変更前に測定された有効電力を乗算した値を減算した値となる値を算出することで、前記電力網と接続された分散型電源の発電量を算出する発電量算出部と
を備えた発電量算出装置。
A changing unit for changing the voltage of the power supplied to the power grid;
A measuring unit for measuring the active power of the power grid whose voltage is changed by the changing unit;
From the value obtained by multiplying the denominator by a predetermined voltage characteristic index with a value obtained by using the rated voltage of the power grid as a denominator and the voltage after the change as a numerator, a value using the rated voltage as a denominator and the voltage before the change as the numerator The value obtained by subtracting the value multiplied by the characteristic index, and the numerator is the active power measured after the change to a value obtained by multiplying the rated voltage of the power network by the denominator and the value obtained by multiplying the voltage before the change by the predetermined voltage characteristic index A value obtained by subtracting a value obtained by multiplying a value obtained by multiplying the voltage characteristic index by the voltage characteristic index and a value obtained by multiplying the active power measured before the change by a value obtained by multiplying the value obtained by multiplying by the voltage characteristic index. by calculating the power generation amount calculating device that includes a power generation amount calculating unit which calculates a power generation amount of distributed power sources connected to the power network.
前記発電量算出部は、前記電圧特性指数として1を用いることを特徴とする請求項に記載の発電量算出装置。 The power generation amount calculation device according to claim 1 , wherein the power generation amount calculation unit uses 1 as the voltage characteristic index. 前記変更部は、前記電力網に供給される電力の電圧を調整する調整装置の動作状態を切り替えることで、該電圧を変更することを特徴とする請求項1又は2に記載の発電量算出装置。 The changing unit, by switching the operating state of the adjusting device for adjusting the voltage of the power supplied to the power grid, the power generation amount calculating device according to claim 1 or 2, characterized in that to change the voltage. コンピュータに
電力網に供給される電力の電圧を変更する変更手順と、
前記変更手順により電圧が変更される電力網の有効電力を測定する測定手順と、
分母が、前記電力網の定格電圧を分母として変更後の電圧を分子とする値を所定の電圧特性指数で乗算した値から、該定格電圧を分母として変更前の電圧を分子とする値を該電圧特性指数で乗算した値を減算した値となり、分子が、前記電力網の定格電圧を分母として変更前の電圧を分子とする値を所定の電圧特性指数で乗算した値に変更後に測定された有効電力を乗算した値から、該定格電圧を分母として変更後の電圧を分子とする値を該電圧特性指数で乗算した値に変更前に測定された有効電力を乗算した値を減算した値となる値を算出することで、前記電力網と接続された分散型電源による発電量を算出する発電量算出手順と
を実行させるための発電量算出プログラム。
A change procedure to change the voltage of the power supplied to the computer to the computer,
A measurement procedure for measuring the active power of the power grid whose voltage is changed by the change procedure;
From the value obtained by multiplying the denominator by a predetermined voltage characteristic index with a value obtained by using the rated voltage of the power grid as a denominator and the voltage after the change as a numerator, a value using the rated voltage as a denominator and the voltage before the change as the numerator The value obtained by subtracting the value multiplied by the characteristic index, and the numerator is the active power measured after the change to a value obtained by multiplying the rated voltage of the power network by the denominator and the value obtained by multiplying the voltage before the change by the predetermined voltage characteristic index A value obtained by subtracting a value obtained by multiplying a value obtained by multiplying the voltage characteristic index by the voltage characteristic index and a value obtained by multiplying the active power measured before the change by a value obtained by multiplying the value obtained by multiplying by the voltage characteristic index. by calculating the power generation amount calculating program for executing the power generation amount calculating step of calculating an amount of power generation by the connected distributed power source and the power network.
電力網に供給される電力の電圧を変更する変更ステップと、
前記変更ステップにより電圧が変更される電力網の有効電力を測定する測定ステップと、
分母が、前記電力網の定格電圧を分母として変更後の電圧を分子とする値を所定の電圧特性指数で乗算した値から、該定格電圧を分母として変更前の電圧を分子とする値を該電圧特性指数で乗算した値を減算した値となり、分子が、前記電力網の定格電圧を分母として変更前の電圧を分子とする値を所定の電圧特性指数で乗算した値に変更後に測定された有効電力を乗算した値から、該定格電圧を分母として変更後の電圧を分子とする値を該電圧特性指数で乗算した値に変更前に測定された有効電力を乗算した値を減算した値となる値を算出することで、前記電力網と接続された分散型電源による発電量を算出する発電量算出ステップと
を含んだことを特徴とする発電量算出方法。
A change step for changing the voltage of the power supplied to the power grid;
A measuring step of measuring the active power of the power grid whose voltage is changed by the changing step;
From the value obtained by multiplying the denominator by a predetermined voltage characteristic index with a value obtained by using the rated voltage of the power grid as a denominator and the voltage after the change as a numerator, a value using the rated voltage as a denominator and the voltage before the change as the numerator The value obtained by subtracting the value multiplied by the characteristic index, and the numerator is the active power measured after the change to a value obtained by multiplying the rated voltage of the power network by the denominator and the value obtained by multiplying the voltage before the change by the predetermined voltage characteristic index A value obtained by subtracting a value obtained by multiplying a value obtained by multiplying the voltage characteristic index by the voltage characteristic index and a value obtained by multiplying the active power measured before the change by a value obtained by multiplying the value obtained by multiplying by the voltage characteristic index. by calculating the power generation amount calculating method characterized by including a power generation amount calculating step of calculating a power generation amount of the connected distributed power source and the power network.
JP2011055860A 2011-03-14 2011-03-14 Power generation amount calculation device, power generation amount calculation method, and power generation amount calculation program Expired - Fee Related JP5712008B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2011055860A JP5712008B2 (en) 2011-03-14 2011-03-14 Power generation amount calculation device, power generation amount calculation method, and power generation amount calculation program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2011055860A JP5712008B2 (en) 2011-03-14 2011-03-14 Power generation amount calculation device, power generation amount calculation method, and power generation amount calculation program

Publications (2)

Publication Number Publication Date
JP2012195983A JP2012195983A (en) 2012-10-11
JP5712008B2 true JP5712008B2 (en) 2015-05-07

Family

ID=47087420

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2011055860A Expired - Fee Related JP5712008B2 (en) 2011-03-14 2011-03-14 Power generation amount calculation device, power generation amount calculation method, and power generation amount calculation program

Country Status (1)

Country Link
JP (1) JP5712008B2 (en)

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4431529B2 (en) * 2005-08-31 2010-03-17 関西電力株式会社 Method and program for determining output capacity range of power supply device
JP2012095478A (en) * 2010-10-28 2012-05-17 Kansai Electric Power Co Inc:The Output estimation method and output estimation device for photovoltaic power generation
JP2012191777A (en) * 2011-03-11 2012-10-04 Nissin Electric Co Ltd Method for estimating generated amount of power in photovoltaic power generation system

Also Published As

Publication number Publication date
JP2012195983A (en) 2012-10-11

Similar Documents

Publication Publication Date Title
Sun et al. Adaptive decoupled power control method for inverter connected DG
Preece et al. Risk-based small-disturbance security assessment of power systems
JP2012200111A (en) Voltage rise suppression device and dispersed power supply interconnection system
Varshney et al. Performance characteristics and reliability assessment of self‐excited induction generator for wind power generation
Sajadi et al. Small-signal stability analysis of large-scale power systems in response to variability of offshore wind power plants
CN108292842A (en) Power Sharing in DC Microgrids
WO2016203587A1 (en) Simulated signal generation device, simulated signal generation method, and computer program
JP6925123B2 (en) How to control renewable energy power generation system, reactive power controller or renewable energy power generation system
KR101761023B1 (en) Simulation apparatus and method of battery and simulation system using the same
JP2017070116A (en) Power control system and power control method
Elkholy et al. The influence of transmission-line parameters and its load on losses and power quality at the load-connection point
JP5556289B2 (en) Distributed power supply and distributed power supply control method
Zhou et al. Estimation of the short circuit ratio and the optimal controller gains selection of a VSC system
CN109474027B (en) A droop control method, device and converter
JP2015015780A (en) Voltage control method of power distribution system
Chassin et al. Load modeling and calibration techniques for power system studies
García-Ceballos et al. Iterative Approach for Tuning Multiple Converter‐Integrated DER in Microgrids
JP5712008B2 (en) Power generation amount calculation device, power generation amount calculation method, and power generation amount calculation program
US20160047851A1 (en) Computer-aided ascertainment of the impedance of an electrical energy network
Zaker et al. Equivalent model parameter estimation of grid‐connected fuel cell‐based microgrid
Zhang Continuation power flow in distribution system analysis
CN116131277B (en) Modeling method and system of electrochemical energy storage power station suitable for dynamic simulation of large power grid
CA3094117A1 (en) Harmonics measurement in power grids
Auld et al. Load-following active power filter for a solid oxide fuel cell supported load
Panwar et al. Steady-state modeling and simulation of a distribution feeder with distributed energy resources in a real-time digital simulation environment

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20131217

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20140812

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20140826

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20150303

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20150309

R150 Certificate of patent or registration of utility model

Ref document number: 5712008

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees