Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP5720864B2 - Drug supply device - Google Patents
[go: Go Back, main page]

JP5720864B2 - Drug supply device - Google Patents

Drug supply device Download PDF

Info

Publication number
JP5720864B2
JP5720864B2 JP2014557649A JP2014557649A JP5720864B2 JP 5720864 B2 JP5720864 B2 JP 5720864B2 JP 2014557649 A JP2014557649 A JP 2014557649A JP 2014557649 A JP2014557649 A JP 2014557649A JP 5720864 B2 JP5720864 B2 JP 5720864B2
Authority
JP
Japan
Prior art keywords
medicine
circulating water
control unit
water
amount
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2014557649A
Other languages
Japanese (ja)
Other versions
JPWO2014155569A1 (en
Inventor
敏人 渡部
敏人 渡部
元 佐藤
元 佐藤
洋幸 光本
洋幸 光本
健輔 岩本
健輔 岩本
敦行 真鍋
敦行 真鍋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Miura Co Ltd
Original Assignee
Miura Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Miura Co Ltd filed Critical Miura Co Ltd
Application granted granted Critical
Publication of JP5720864B2 publication Critical patent/JP5720864B2/en
Publication of JPWO2014155569A1 publication Critical patent/JPWO2014155569A1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28HEAT EXCHANGE IN GENERAL
    • F28FDETAILS OF HEAT-EXCHANGE AND HEAT-TRANSFER APPARATUS, OF GENERAL APPLICATION
    • F28F25/00Component parts of trickle coolers
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/008Control or steering systems not provided for elsewhere in subclass C02F
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/44Treatment of water, waste water, or sewage by dialysis, osmosis or reverse osmosis
    • C02F1/441Treatment of water, waste water, or sewage by dialysis, osmosis or reverse osmosis by reverse osmosis
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2103/00Nature of the water, waste water, sewage or sludge to be treated
    • C02F2103/02Non-contaminated water, e.g. for industrial water supply
    • C02F2103/023Water in cooling circuits
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2209/00Controlling or monitoring parameters in water treatment
    • C02F2209/05Conductivity or salinity
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2209/00Controlling or monitoring parameters in water treatment
    • C02F2209/40Liquid flow rate
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2303/00Specific treatment goals
    • C02F2303/04Disinfection
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2303/00Specific treatment goals
    • C02F2303/08Corrosion inhibition
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2303/00Specific treatment goals
    • C02F2303/22Eliminating or preventing deposits, scale removal, scale prevention
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28HEAT EXCHANGE IN GENERAL
    • F28FDETAILS OF HEAT-EXCHANGE AND HEAT-TRANSFER APPARATUS, OF GENERAL APPLICATION
    • F28F25/00Component parts of trickle coolers
    • F28F2025/005Liquid collection; Liquid treatment; Liquid recirculation; Addition of make-up liquid

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Water Supply & Treatment (AREA)
  • Chemical & Material Sciences (AREA)
  • Organic Chemistry (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Feeding, Discharge, Calcimining, Fusing, And Gas-Generation Devices (AREA)

Description

本発明は、産業用設備に設けられた循環水系に薬剤を供給する薬剤供給装置に関する。   The present invention relates to a drug supply device that supplies a drug to a circulating water system provided in an industrial facility.

従来、商業ビル、工業プラント等には、循環水系を有する各種の産業用設備が設置されている。例えば、循環水系を有する産業用設備として冷却塔が知られている。この冷却塔には、空調機や冷凍機に組み込まれた熱交換器等の被冷却装置が接続されている。循環水系には、これら装置を冷却するための冷却水が循環する。冷却水は、冷却塔で冷却されながら、循環水系を循環する(以下、循環する冷却水を「循環水」ともいう)。すなわち、循環水は、循環水系を介して冷却塔と被冷却装置との間を循環する。   Conventionally, various industrial facilities having a circulating water system are installed in commercial buildings, industrial plants, and the like. For example, a cooling tower is known as an industrial facility having a circulating water system. The cooling tower is connected to a cooled apparatus such as a heat exchanger incorporated in an air conditioner or a refrigerator. Cooling water for cooling these devices circulates in the circulating water system. The cooling water circulates in the circulating water system while being cooled by the cooling tower (hereinafter, the circulating cooling water is also referred to as “circulating water”). That is, the circulating water circulates between the cooling tower and the apparatus to be cooled through the circulating water system.

循環水が冷却塔で冷却される際に、循環水の一部は蒸発する。そのため、循環水を継続的に循環させると、循環水の濃縮度が徐々に高くなり、水質が悪化する。そこで、循環水の水質を改善するために、ブローダウン処理が実行される。ブローダウン処理は、外部から定期的に新鮮な補給水を供給すると共に、濃縮度の高い循環水の一部を外部に排出して循環水を希釈する処理である。また、ブローダウン処理が実行された際には、循環水又は補給水に、スケール防止剤や防食剤等の薬剤を供給する処理(以下、「薬注処理」ともいう)も実行される。   When the circulating water is cooled by the cooling tower, a part of the circulating water evaporates. Therefore, when circulating water is continuously circulated, the concentration of circulating water gradually increases and the water quality deteriorates. Therefore, blow-down processing is performed to improve the quality of the circulating water. The blow-down process is a process for periodically supplying fresh makeup water from the outside and diluting the circulating water by discharging a part of the highly concentrated circulating water to the outside. In addition, when the blow-down process is executed, a process of supplying a chemical such as a scale inhibitor or an anticorrosive agent to the circulating water or makeup water (hereinafter also referred to as “medicine injection process”) is also executed.

従来、循環水又は補給水に供給する薬剤の無駄を少なくする技術が提案されている。例えば、ブローダウン処理中には薬注処理を実行せず、ブローダウン処理の終了後に、ブローダウン処理の実行時間に比例した薬剤の投入量で薬注処理する薬注制御装置が提案されている(特許文献1,2参照)。   Conventionally, a technique for reducing waste of chemicals supplied to circulating water or makeup water has been proposed. For example, there has been proposed a chemical injection control device that does not execute chemical injection processing during blow-down processing, and performs chemical injection processing with a dose of chemical proportional to the execution time of blow-down processing after the completion of blow-down processing. (See Patent Documents 1 and 2).

特開平11−63746号公報Japanese Patent Laid-Open No. 11-63746 特開2011−247447号公報JP 2011-247447 A

上述した従来の薬注制御装置では、ブローダウン処理の実行中、薬注処理は実行されない。薬注処理は、ブローダウン処理の終了後に実行される。その薬注処理を実行している間に、次のブローダウン処理が実行されることがある。その場合、従来の薬注制御装置では、薬注処理が引き続き実行されるため、次のブローダウン処理の実行中に供給された薬剤が、直ちに循環水の一部と共に系外に排出される場合がある。そのため、従来の薬注制御装置では、薬剤の無駄が発生する可能性があった。   In the conventional chemical injection control device described above, the chemical injection process is not executed during the blow-down process. The chemical injection process is executed after the blow-down process is completed. While the medicine injection process is being executed, the next blow-down process may be executed. In that case, in the conventional chemical injection control device, since the chemical injection processing is continuously executed, the medicine supplied during the execution of the next blow-down processing is immediately discharged out of the system together with a part of the circulating water. There is. Therefore, in the conventional medicine injection control device, there is a possibility that the medicine is wasted.

従って、本発明は、停止させた薬注処理の実行中に開始されるブローダウン処理により、薬剤が無駄に消費されるのを抑制できる薬剤供給装置を提供することを目的とする。   Therefore, an object of this invention is to provide the chemical | medical agent supply apparatus which can suppress that a chemical | medical agent is consumed wastefully by the blowdown process started during execution of the stopped chemical injection process.

本発明は、循環水が循環する循環水系に供給された補給水の水量を検出し、検出水量値として出力する流量検出手段と、前記循環水系に薬剤を供給する薬剤供給処理を実行可能な薬剤供給手段と、前記流量検出手段から出力された検出水量値に比例した投入量の薬剤が前記循環水系に供給されるように、前記薬剤供給手段において前記薬剤供給処理を実行させる薬剤供給制御部と、前記薬剤供給処理において前記薬剤供給手段から前記循環水系に供給されなかった薬剤の投入量分を記憶する記憶部と、を備え、前記薬剤供給制御部は、(i)補給水を前記循環水系に供給しながら、当該循環水系を流通する循環水の一部を外部に排出するブローダウン処理の実行期間中であれば、前記薬剤供給処理の実行を待機させ、前記ブローダウン処理の終了後に、当該ブローダウン処理の実行期間中に検出された検出水量値に比例した投入量の薬剤が前記循環水系に供給されるように、前記薬剤供給手段において前記薬剤供給処理を実行させ、(ii)当該薬剤供給処理の実行中に、次のブローダウン処理が実行された場合には、前記薬剤供給処理の実行を中断させ、当該薬剤供給処理において前記循環水系に供給されなかった薬剤の投入量分を前記記憶部に記憶させると共に、前記次のブローダウン処理の終了後に、前記記憶部に記憶させた薬剤の投入量分と、前記次のブローダウン処理の実行期間中に検出された検出水量値に比例した薬剤の投入量とを合計した量の薬剤が前記循環水系に供給されるように、前記薬剤供給手段において前記薬剤供給処理を実行させる、薬剤供給装置に関する。   The present invention detects flow rate of makeup water supplied to a circulating water system through which circulating water circulates, and outputs a flow rate detecting means for outputting the detected water volume value, and a drug capable of executing a drug supply process for supplying a drug to the circulating water system A supply means, and a medicine supply control section for causing the medicine supply means to execute the medicine supply process so that an input amount of the medicine proportional to the detected water amount value output from the flow rate detection means is supplied to the circulating water system; A storage unit that stores an amount of medicine that has not been supplied from the medicine supply means to the circulating water system in the medicine supply process, and the medicine supply control unit (i) supplies makeup water to the circulating water system. If it is during the execution period of the blow-down process that discharges a part of the circulating water flowing through the circulating water system to the outside, the execution of the chemical supply process is waited, and the blow-down process After the completion, the medicine supply means executes the medicine supply process so that an amount of medicine proportional to the detected water amount detected during the blow-down process is supplied to the circulating water system, ii) When the next blow-down process is executed during the execution of the drug supply process, the execution of the drug supply process is interrupted, and the drug that has not been supplied to the circulating water system in the drug supply process is input. An amount of medicine is stored in the storage unit, and after the completion of the next blow-down process, the amount of medicine input stored in the storage unit and detection detected during the execution period of the next blow-down process The present invention relates to a medicine supply device that causes the medicine supply means to execute the medicine supply process so that a total amount of medicine that is added to the amount of medicine proportional to the amount of water is supplied to the circulating water system. .

また、前記薬剤供給制御部は、薬剤の投入量を式(1)に基づいて算出することが好ましい。
W=V×C÷N÷D (1)
W:薬剤の投入量
V:補給水の検出水量値
C:循環水中の薬剤の維持濃度
N:循環水の濃縮倍率
D:薬剤の密度
Moreover, it is preferable that the said chemical | medical agent supply control part calculates the injection amount of a chemical | medical agent based on Formula (1).
W = V × C ÷ N ÷ D (1)
W: amount of drug input V: detected water amount value of makeup water C: maintenance concentration of drug in circulating water N: concentration rate of circulating water D: density of drug

また、前記循環水系は、供給された補給水を含む循環水を冷却し、冷却した循環水を被冷却装置へ供給する冷却塔に接続されると共に、循環水の電気伝導率を検出し、第1検出電気伝導率値として出力する第1電気伝導率検出手段と、補給水の電気伝導率を検出し、第2検出電気伝導率値として出力する第2電気伝導率検出手段と、を備えており、前記薬剤供給制御部は、前記第1電気伝導率検出手段から出力された第1検出電気伝導率及び前記第2電気伝導率検出手段から出力された第2検出電気伝導率を取得して、循環水の前記濃縮倍率を式(2)に基づいて算出することが好ましい。
N=E1÷E2 (2)
E1:第1検出電気伝導率値
E2:第2検出電気伝導率値
The circulating water system is connected to a cooling tower that cools the circulating water including the supplied makeup water and supplies the cooled circulating water to the apparatus to be cooled, detects the electrical conductivity of the circulating water, 1st electrical conductivity detection means which outputs as 1 detection electrical conductivity value, and 2nd electrical conductivity detection means which detects electrical conductivity of make-up water and outputs as 2nd detection electrical conductivity value The medicine supply control unit obtains the first detected electric conductivity output from the first electric conductivity detecting means and the second detected electric conductivity output from the second electric conductivity detecting means. The concentration rate of the circulating water is preferably calculated based on the formula (2).
N = E1 ÷ E2 (2)
E1: First detected electric conductivity value E2: Second detected electric conductivity value

また、前記薬剤供給制御部は、前記循環水系を循環水が循環し、且つ補給水が当該循環水系へ供給されない期間が予め設定された許容期間を超過した場合には、前記薬剤供給手段に、補給水の水量と関係なく、予め設定された投入量の前記薬剤供給処理を実行させることが好ましい。   In addition, when the circulating water is circulated through the circulating water system and the period during which the makeup water is not supplied to the circulating water system exceeds a preset allowable period, the chemical supply control unit, Regardless of the amount of makeup water, it is preferable to execute the medicine supply process with a preset input amount.

また、前記薬剤供給手段は、前記薬剤供給処理において、前記循環水系に供給される薬剤として殺菌剤を供給することが好ましい。   Moreover, it is preferable that the said chemical | medical agent supply means supplies a disinfectant as a chemical | medical agent supplied to the said circulating water system in the said chemical | medical agent supply process.

本発明によれば、停止させた薬注処理の実行中に開始されるブローダウン処理により、薬剤が無駄に消費されるのを抑制できる薬剤供給装置を提供することができる。   ADVANTAGE OF THE INVENTION According to this invention, the chemical | medical agent supply apparatus which can suppress that a chemical | medical agent is consumed wastefully by the blowdown process started during execution of the stopped chemical injection process can be provided.

実施形態の冷却システム1を示す概略構成図である。It is a schematic structure figure showing cooling system 1 of an embodiment. 実施形態の冷却システム1の制御に係る機能ブロック図である。It is a functional block diagram concerning control of cooling system 1 of an embodiment. 薬剤供給装置300の概略構成図である。1 is a schematic configuration diagram of a medicine supply device 300. FIG. 薬剤供給装置300において薬注処理を実行するタイミングを示すタイムチャートである。6 is a time chart showing the timing of executing a medicine injection process in the medicine supply device 300. 薬剤供給装置300において補助薬注処理を実行する場タイミングを示すタイムチャートである。It is a time chart which shows the place timing which performs an auxiliary | assistant medicine injection process in the chemical | medical agent supply apparatus. システム制御ユニット100においてブロー処理を実行する場合の処理手順を示すフローチャートである。4 is a flowchart showing a processing procedure when a blow process is executed in the system control unit 100. 薬剤供給装置300において薬注処理を実行する場合の処理手順を示すフローチャートである。5 is a flowchart showing a processing procedure when a medicine injection process is executed in the medicine supply device 300. 薬剤供給装置300において補助薬注処理を実行する場合の処理手順を示すフローチャートである。It is a flowchart which shows the process sequence in the case of performing an auxiliary | assistant medicine injection process in the chemical | medical agent supply apparatus 300. FIG. 薬剤供給装置300において補助薬注処理を実行する場合の処理手順を示すフローチャートである。It is a flowchart which shows the process sequence in the case of performing an auxiliary | assistant medicine injection process in the chemical | medical agent supply apparatus 300. FIG.

以下、図面を参照して、本発明の実施形態を説明する。この実施形態では、本発明に係る薬剤供給装置を適用した冷却システムについて説明する。図1は、本実施形態の冷却システム1を示す概略構成図である。図2は、冷却システム1の制御に係る機能ブロック図である。図3は、薬剤供給装置300の概略構成図である。   Hereinafter, embodiments of the present invention will be described with reference to the drawings. In this embodiment, a cooling system to which the medicine supply device according to the present invention is applied will be described. FIG. 1 is a schematic configuration diagram showing a cooling system 1 of the present embodiment. FIG. 2 is a functional block diagram relating to the control of the cooling system 1. FIG. 3 is a schematic configuration diagram of the medicine supply device 300.

図1に示すように、本実施形態の冷却システム1は、空調機や冷凍機に組み込まれた熱交換器等の被冷却装置131を冷却するために、循環水W2(冷却水)を循環させるシステムである。冷却システム1の運転中、循環水W2は、冷却塔120で冷却されながら循環して用いられる。循環水W2は、蒸発、飛散及びブローダウン処理(後述)等により減少した分が外部から補給される。本実施形態において、産業用設備としての冷却塔120は、いわゆる開放式冷却塔である。   As shown in FIG. 1, the cooling system 1 of the present embodiment circulates circulating water W2 (cooling water) in order to cool a cooled device 131 such as a heat exchanger incorporated in an air conditioner or a refrigerator. System. During operation of the cooling system 1, the circulating water W <b> 2 is circulated and used while being cooled by the cooling tower 120. The circulating water W2 is replenished from the outside by the evaporation, scattering, blowdown processing (described later), and the like. In the present embodiment, the cooling tower 120 as an industrial facility is a so-called open type cooling tower.

本実施形態の冷却システム1は、主な構成として、冷却塔120と、被冷却装置131と、第1電気伝導率検出手段としての第1電気伝導率センサ(以下、「第1ECセンサ」ともいう)133と、薬剤供給装置300と、第2電気伝導率検出手段としての第2電気伝導率センサ(以下、「第2ECセンサ」ともいう)139と、システム制御ユニット100と、を備える。また、冷却システム1は、主なラインとして、循環水ラインL110と、補給水ラインL120と、を備える。「ライン」とは、流路、経路、管路等の流体の流通が可能なラインの総称である。図1では、電気的な接続の経路を破線で示している。   The cooling system 1 of the present embodiment includes, as main components, a cooling tower 120, a cooled device 131, and a first electrical conductivity sensor (hereinafter referred to as “first EC sensor”) as first electrical conductivity detection means. ) 133, a medicine supply device 300, a second electrical conductivity sensor (hereinafter also referred to as “second EC sensor”) 139 as a second electrical conductivity detection unit, and a system control unit 100. The cooling system 1 includes a circulating water line L110 and a makeup water line L120 as main lines. “Line” is a general term for lines capable of flowing fluid such as flow paths, paths, and pipelines. In FIG. 1, the path of electrical connection is indicated by a broken line.

冷却塔120は、補給水W1が供給されると共に、この補給水W1を循環水W2として被冷却装置131へ供給し、被冷却装置131から回収(返送)される循環水W2を冷却する設備である。冷却塔120は、塔本体121と、貯留部122と、を備える。冷却塔120及び循環水ラインL110は、循環水系を構成する。   The cooling tower 120 is a facility for supplying the makeup water W1, supplying the makeup water W1 as the circulating water W2 to the cooled device 131, and cooling the circulating water W2 collected (returned) from the cooled device 131. is there. The cooling tower 120 includes a tower main body 121 and a storage unit 122. The cooling tower 120 and the circulating water line L110 constitute a circulating water system.

塔本体121は、冷却塔120の外郭を形成する筐体である。塔本体121は、散水部、ファン、開口部、ルーバー、充填材等からなる循環水冷却部(不図示)を有する。循環水W2は、循環水冷却部により冷却され、貯留部122に落下する。   The tower main body 121 is a casing that forms an outer shell of the cooling tower 120. The tower main body 121 has a circulating water cooling unit (not shown) including a watering unit, a fan, an opening, a louver, a filler, and the like. The circulating water W2 is cooled by the circulating water cooling unit and falls into the storage unit 122.

貯留部122は、循環水冷却部で冷却された循環水W2を貯留する部位である。貯留部122は、塔本体121の下部に設けられている。貯留部122の底部には、循環水ラインL110の循環水供給ラインL111(後述)が接続されている。貯留部122に貯留された循環水W2は、循環水供給ラインL111を介して被冷却装置131へ供給される。なお、貯留部122には、ブローダウン処理において使用される給水栓137及びオーバーフロー口138が設けられている。   The storage part 122 is a site | part which stores the circulating water W2 cooled by the circulating water cooling part. The storage part 122 is provided in the lower part of the tower main body 121. A circulating water supply line L111 (described later) of the circulating water line L110 is connected to the bottom of the storage unit 122. The circulating water W2 stored in the storage unit 122 is supplied to the cooled apparatus 131 via the circulating water supply line L111. The storage unit 122 is provided with a water tap 137 and an overflow port 138 that are used in the blow-down process.

循環水ラインL110は、冷却塔120と被冷却装置131との間で循環水W2を循環させるラインである。循環水ラインL110は、循環水供給ラインL111と、循環水回収ラインL112と、を有する。   The circulating water line L110 is a line that circulates the circulating water W2 between the cooling tower 120 and the apparatus to be cooled 131. The circulating water line L110 includes a circulating water supply line L111 and a circulating water recovery line L112.

循環水供給ラインL111は、貯留部122と被冷却装置131との間を接続する。貯留部122内の循環水W2は、循環水供給ラインL111を介して被冷却装置131に供給される。   The circulating water supply line L111 connects between the storage unit 122 and the apparatus to be cooled 131. The circulating water W2 in the storage unit 122 is supplied to the cooled device 131 via the circulating water supply line L111.

循環水供給ラインL111の途中には、循環水ポンプ132が設けられている。循環水ポンプ132は、循環水ラインL110(循環水供給ラインL111、循環水回収ラインL112)の上流側から下流側へ向けて、循環水W2を送り出すことができる。循環水ポンプ132は、システム制御ユニット100と電気的に接続されている。循環水ポンプ132の運転(駆動及び停止)は、システム制御ユニット100から出力されるポンプ運転信号により制御される。   A circulating water pump 132 is provided in the middle of the circulating water supply line L111. The circulating water pump 132 can send out the circulating water W2 from the upstream side to the downstream side of the circulating water line L110 (the circulating water supply line L111, the circulating water recovery line L112). The circulating water pump 132 is electrically connected to the system control unit 100. The operation (drive and stop) of the circulating water pump 132 is controlled by a pump operation signal output from the system control unit 100.

循環水回収ラインL112は、被冷却装置131と塔本体121との間を接続するラインである。被冷却装置131において熱交換により加温された循環水W2は、循環水回収ラインL112を介して塔本体121の循環水冷却部(不図示)に回収される。   The circulating water recovery line L112 is a line that connects between the cooled device 131 and the tower body 121. The circulating water W2 heated by heat exchange in the apparatus to be cooled 131 is recovered by the circulating water cooling unit (not shown) of the tower body 121 through the circulating water recovery line L112.

被冷却装置131は、循環水W2による冷却が必要な熱交換器等の各種装置である。被冷却装置131は、例えば、各種の化学プラントのターボ冷凍機や吸収冷凍機、建築物の空調用冷却機、食品工場の冷水製造機や真空冷却機等である。   The to-be-cooled device 131 is various devices such as a heat exchanger that needs to be cooled by the circulating water W2. The apparatus to be cooled 131 is, for example, a turbo chiller or an absorption chiller for various chemical plants, an air conditioner chiller for buildings, a cold water production machine or a vacuum chiller for food factories, and the like.

被冷却装置131において、循環水流路の一方の端部には、循環水供給ラインL111の下流側の端部が接続されている。また、被冷却装置131において、循環水流路の他方の端部には、循環水回収ラインL112の上流側の端部が接続されている。   In the cooled device 131, the downstream end of the circulating water supply line L111 is connected to one end of the circulating water flow path. In the cooled device 131, the upstream end of the circulating water recovery line L112 is connected to the other end of the circulating water flow path.

第1ECセンサ133は、貯留部122内の循環水W2の水質を測定して、第1検出電気伝導率値として出力する装置である。第1ECセンサ133は、システム制御ユニット100と電気的に接続されている。第1ECセンサ133で測定された第1検出電気伝導率値(以下、「第1電気伝導率EC」ともいう)は、システム制御ユニット100へ送信される。第1ECセンサ133は、リアルタイムで循環水W2の電気伝導率を測定し、システム制御ユニット100へ第1電気伝導率ECを送信する。なお、第1ECセンサ133で測定された第1電気伝導率ECは、システム制御ユニット100を介して薬剤供給装置300にも送信される。The first EC sensor 133 is a device that measures the quality of the circulating water W2 in the storage unit 122 and outputs it as a first detected electrical conductivity value. The first EC sensor 133 is electrically connected to the system control unit 100. The first detected electrical conductivity value measured by the first EC sensor 133 (hereinafter also referred to as “first electrical conductivity EC 1 ”) is transmitted to the system control unit 100. The first EC sensor 133 measures the electric conductivity of the circulating water W2 in real time, and transmits the first electric conductivity EC 1 to the system control unit 100. The first electrical conductivity EC 1 measured at the 1EC sensor 133 is also transmitted to the medicine supply apparatus 300 via the system control unit 100.

薬剤供給装置300は、貯留部122内の循環水W2に、スケール防止剤、防食剤、殺菌剤等の薬剤を供給する薬注処理を実行可能な装置である。薬剤供給装置300は、薬剤供給ラインL140を介して貯留部122に接続されている。薬剤供給装置300は、システム制御ユニット100と電気的に接続されている。薬剤供給装置300の構成については、後に詳細に説明する。   The medicine supply device 300 is a device capable of performing a chemical injection process for supplying medicine such as a scale inhibitor, an anticorrosive agent, and a bactericidal agent to the circulating water W2 in the storage unit 122. The medicine supply device 300 is connected to the storage unit 122 via a medicine supply line L140. The medicine supply device 300 is electrically connected to the system control unit 100. The configuration of the medicine supply device 300 will be described in detail later.

スケール防止剤は、水中でのスケールの成長、或いは配管表面等へのスケールの堆積を防止するために用いられる化合物である。防食剤は、主に配管系等における全面腐食、或いはピッチング等の部分腐食の発生を抑制するために用いられる化合物である。殺菌剤は、水中における微生物の繁殖を抑制するために用いられる化合物であり、スライムコントロール剤とも呼ばれる。本実施形態では、スケール防止剤、防食剤、及び殺菌剤を総称して「薬剤」又は「薬剤W3」という。   The scale inhibitor is a compound used to prevent scale growth in water or scale deposition on a pipe surface or the like. The anticorrosive is a compound mainly used for suppressing the occurrence of general corrosion in the piping system or the like, or partial corrosion such as pitting. A disinfectant is a compound used to suppress the growth of microorganisms in water and is also called a slime control agent. In the present embodiment, the scale inhibitor, anticorrosive, and bactericidal agent are collectively referred to as “drug” or “drug W3”.

スケール防止剤、防食剤、及び殺菌剤は、例えば一液型のマルチ薬剤として提供され、薬剤タンク330、薬剤供給ポンプ350及び薬剤供給ラインL140(いずれも後述)から貯留部122に供給される。
なお、薬剤供給装置300の構成については、後に詳細に説明する。
The scale inhibitor, anticorrosive, and bactericidal agent are provided as, for example, a one-pack type multi-drug, and are supplied to the storage unit 122 from a drug tank 330, a drug supply pump 350, and a drug supply line L140 (all described later).
The configuration of the medicine supply device 300 will be described in detail later.

薬剤供給ラインL140は、薬剤W3を貯留部122へ供給するラインである。薬剤供給ラインL140の上流側の端部は、薬剤供給ポンプ350(後述)の吐出口に接続されている。薬剤供給ラインL140の下流側の端部は、貯留部122に接続されている。   The medicine supply line L140 is a line that supplies the medicine W3 to the storage unit 122. The upstream end of the medicine supply line L140 is connected to a discharge port of a medicine supply pump 350 (described later). The downstream end of the medicine supply line L140 is connected to the storage unit 122.

また、冷却塔120には、補給水ラインL120が接続されている。補給水ラインL120は、補給水W1を貯留部122へ補給するラインである。補給水ラインL120は、上流側に第1補給水ラインL121を備え、下流側に第2補給水ラインL122及び第3補給水ラインL123を備える。第1補給水ラインL121は、水道水や工業用水等の補給水W1の供給源(不図示)に接続されている。補給水ラインL120は、分岐部J3において、第2補給水ラインL122及び第3補給水ラインL123に分岐している。分岐部J3は、接続部J4(後述)と冷却塔120との間に配置されている。   In addition, a makeup water line L120 is connected to the cooling tower 120. The makeup water line L120 is a line for replenishing the reservoir 122 with the makeup water W1. The makeup water line L120 includes a first makeup water line L121 on the upstream side, and a second makeup water line L122 and a third makeup water line L123 on the downstream side. The first makeup water line L121 is connected to a supply source (not shown) of makeup water W1 such as tap water and industrial water. The makeup water line L120 is branched into the second makeup water line L122 and the third makeup water line L123 at the branch portion J3. The branch portion J3 is disposed between the connection portion J4 (described later) and the cooling tower 120.

第1補給水ラインL121には、流量センサ135が接続されている。流量センサ135は、第1補給水ラインL121を流通する補給水W1の単位時間当たりの流量を検出する機器である。流量センサ135は、接続部J4において第1補給水ラインL121に接続されている。接続部J4は、接続部J5(後述)と分岐部J3との間に配置されている。流量センサ135として、例えば、流路ハウジング内に軸流羽根車又は接線羽根車(不図示)を配置したパルス発信式の流量センサを用いることができる。   A flow sensor 135 is connected to the first makeup water line L121. The flow sensor 135 is a device that detects the flow rate per unit time of the makeup water W1 that flows through the first makeup water line L121. The flow sensor 135 is connected to the first makeup water line L121 at the connection portion J4. The connection portion J4 is disposed between the connection portion J5 (described later) and the branch portion J3. As the flow rate sensor 135, for example, a pulse transmission type flow rate sensor in which an axial flow impeller or a tangential impeller (not shown) is disposed in the flow path housing can be used.

本実施形態で用いられるパルス発信式の流量センサは、偶数枚の羽根の先端部分がN極とS極とに交互に着磁された羽根車を備える。パルス発信式の流量センサは、この羽根車の回転をホールICで検出することにより、補給水W1の流速に比例した時間幅のパルス信号を出力する。ホールICは、電圧レギュレータ、ホール素子、増幅回路、シュミットトリガ回路、出力トランジスタ等がパッケージ化された電子回路である。この電子回路は、羽根車の回転運動に伴う磁束変化に応答して、羽根車が1回転する毎に矩形波のパルス信号を検出水量値として出力する。羽根車が1回転するときの流量[L/パルス]は、流量センサの設計仕様により決まる。そのため、薬剤供給装置300の薬注制御部311(後述)は、流量センサ135から出力されるパルス信号に基づいて、補給水W1の補給水量[L]を算出することができる。   The pulse transmission type flow sensor used in the present embodiment includes an impeller in which the tip portions of even-numbered blades are alternately magnetized to N and S poles. The pulse transmission type flow rate sensor outputs a pulse signal having a time width proportional to the flow rate of the makeup water W1 by detecting the rotation of the impeller with the Hall IC. The Hall IC is an electronic circuit in which a voltage regulator, a Hall element, an amplifier circuit, a Schmitt trigger circuit, an output transistor, and the like are packaged. This electronic circuit outputs a rectangular wave pulse signal as a detected water amount value every time the impeller rotates once in response to a change in magnetic flux accompanying the rotational movement of the impeller. The flow rate [L / pulse] when the impeller rotates once is determined by the design specification of the flow rate sensor. Therefore, a medicine injection control unit 311 (described later) of the medicine supply device 300 can calculate the makeup water amount [L] of the makeup water W1 based on the pulse signal output from the flow sensor 135.

例えば、流量センサ135において、羽根車が1回転するときの流量を1[L]としたときに、流量センサ135から出力されたパルス信号の数が3パルスであれば、補給水W1の補給水量は3[L]となる。   For example, in the flow rate sensor 135, when the flow rate when the impeller rotates once is 1 [L], if the number of pulse signals output from the flow rate sensor 135 is 3 pulses, the makeup water amount of the makeup water W1 Becomes 3 [L].

流量センサ135は、薬剤供給装置300を構成する機器の一つである。流量センサ135は、薬剤供給装置300と電気的に接続されている。流量センサ135から出力されたパルス信号は、薬剤供給装置300へ送信される。   The flow sensor 135 is one of the devices constituting the medicine supply device 300. The flow sensor 135 is electrically connected to the medicine supply device 300. The pulse signal output from the flow sensor 135 is transmitted to the medicine supply device 300.

また、第1補給水ラインL121には、第2ECセンサ139が接続されている。第2ECセンサ139は、第1補給水ラインL121を流通する補給水W1の水質を測定して、第2検出電気伝導率値として出力する装置である。第2ECセンサ139は、接続部J5において第1補給水ラインL121に接続されている。接続部J5は、補給水W1の供給源(不図示)と接続部J4との間に配置されている。第2ECセンサ139は、システム制御ユニット100と電気的に接続されている。第2ECセンサ139で測定された第2検出電気伝導率値(以下、「第2電気伝導率EC」ともいう)は、システム制御ユニット100へ送信される。第2ECセンサ139は、リアルタイムで補給水W1の電気伝導率を測定し、システム制御ユニット100へ第2電気伝導率ECを送信する。なお、第2ECセンサ139で測定された第2電気伝導率ECは、システム制御ユニット100を介して薬剤供給装置300にも送信される。A second EC sensor 139 is connected to the first makeup water line L121. The second EC sensor 139 is a device that measures the water quality of the makeup water W1 flowing through the first makeup water line L121 and outputs it as a second detected electrical conductivity value. The second EC sensor 139 is connected to the first makeup water line L121 at the connection portion J5. The connecting portion J5 is disposed between the supply source (not shown) of the makeup water W1 and the connecting portion J4. The second EC sensor 139 is electrically connected to the system control unit 100. The second detected electrical conductivity value measured by the second EC sensor 139 (hereinafter also referred to as “second electrical conductivity EC 2 ”) is transmitted to the system control unit 100. The 2EC sensor 139, an electrical conductivity of supplementary water W1 is measured in real time, and transmits the system control unit 100 to the second electrical conductivity EC 2. Note that the second electrical conductivity EC 2 measured at the 2EC sensor 139 is also transmitted to the medicine supply apparatus 300 via the system control unit 100.

第2補給水ラインL122の下流側の端部は、塔本体121に接続されている。第2補給水ラインL122において、分岐部J3と冷却塔120との間には、補給水バルブ136が設けられている。   The downstream end of the second makeup water line L122 is connected to the tower body 121. In the second makeup water line L122, a makeup water valve 136 is provided between the branch portion J3 and the cooling tower 120.

補給水バルブ136は、第2補給水ラインL122を開閉することができる。第2補給水ラインL122を開くことにより、補給水W1を貯留部122に強制的に供給することができる。補給水バルブ136は、システム制御ユニット100と電気的に接続されている。補給水バルブ136の開閉状態は、システム制御ユニット100(ブローダウン処理制御部200)から出力されるバルブ駆動信号により制御される。補給水バルブ136を開状態とすることにより、第2補給水ラインL122を開くことができる。補給水バルブ136を閉状態とすることにより、第2補給水ラインL122を閉じることができる。   The makeup water valve 136 can open and close the second makeup water line L122. By opening the second makeup water line L122, the makeup water W1 can be forcibly supplied to the storage section 122. The makeup water valve 136 is electrically connected to the system control unit 100. The open / close state of the makeup water valve 136 is controlled by a valve drive signal output from the system control unit 100 (blow-down process control unit 200). By making the makeup water valve 136 open, the second makeup water line L122 can be opened. The second makeup water line L122 can be closed by closing the makeup water valve 136.

第3補給水ラインL123の下流側の端部は、塔本体121に接続されている。第3補給水ラインL123の下流側の端部には、給水栓137が設けられている。給水栓137は、貯留部122内の循環水W2の水位(すなわち、水量)を管理するボールタップ式の給水設備である。循環水W2の蒸発及び飛散により貯留部122の水位が低下すると、給水栓137のボールタップが作動し、第3補給水ラインL123を流通する補給水W1が貯留部122に補給される。   The downstream end of the third makeup water line L123 is connected to the tower body 121. A water faucet 137 is provided at the downstream end of the third makeup water line L123. The water tap 137 is a ball tap type water supply facility that manages the water level (that is, the amount of water) of the circulating water W <b> 2 in the storage unit 122. When the water level in the storage unit 122 decreases due to evaporation and scattering of the circulating water W2, the ball tap of the water tap 137 operates, and the supply water W1 flowing through the third supply water line L123 is supplied to the storage unit 122.

排水ラインL130は、貯留部122の内部に略垂直に取り付けられている。排水ラインL130は、貯留部122から更に下方に延びている。排水ラインL130の上流側の端部は、循環水W2のオーバーフロー口138を形成する。オーバーフロー口138は、給水栓137の管理水位よりも上方に開口する。一方、排水ラインL130の下流側の端部は、貯留部122の外部に通じている。排水ラインL130は、後述するブローダウン処理において、補給水バルブ136が開状態となり、補給水W1を強制的に供給した場合に、貯留部122から溢れた循環水W2を系外に排出するラインである。   The drain line L <b> 130 is attached substantially vertically inside the storage unit 122. The drain line L <b> 130 extends further downward from the storage unit 122. The upstream end of the drain line L130 forms an overflow port 138 for the circulating water W2. The overflow port 138 opens above the control water level of the water tap 137. On the other hand, the downstream end of the drain line L130 communicates with the outside of the reservoir 122. The drainage line L130 is a line that discharges the circulating water W2 overflowing from the storage unit 122 when the makeup water valve 136 is opened and the makeup water W1 is forcibly supplied in a blow-down process described later. is there.

上記構成において、補給水バルブ136を開状態とすることにより、補給水W1を冷却塔120に補給しながら、循環水W2の一部を冷却塔120から外部に排出するブローダウン処理を実行することができる。   In the above configuration, the blow-down process for discharging a part of the circulating water W2 from the cooling tower 120 to the outside while supplying the makeup water W1 to the cooling tower 120 by opening the makeup water valve 136 is performed. Can do.

次に、図2を参照して、冷却システム1の制御に係る機能について説明する。   Next, functions related to the control of the cooling system 1 will be described with reference to FIG.

システム制御ユニット100は、冷却システム1における各部の動作を制御する。図2に示すように、システム制御ユニット100は、例えば、循環水ポンプ132、薬剤供給装置300、及び補給水バルブ136と電気的に接続される。   The system control unit 100 controls the operation of each part in the cooling system 1. As shown in FIG. 2, the system control unit 100 is electrically connected to, for example, the circulating water pump 132, the medicine supply device 300, and the makeup water valve 136.

また、システム制御ユニット100は、冷却システム1の各測定装置と電気的に接続され、これら測定装置から測定情報を受信する。例えば、システム制御ユニット100は、測定装置としての第1ECセンサ133、第2ECセンサ139、及び流量センサ135と電気的に接続される。システム制御ユニット100において、各測定装置から受信した最新の測定情報は、適宜、メモリ210に記憶される。   The system control unit 100 is electrically connected to each measurement device of the cooling system 1 and receives measurement information from these measurement devices. For example, the system control unit 100 is electrically connected to a first EC sensor 133, a second EC sensor 139, and a flow sensor 135 as measurement devices. In the system control unit 100, the latest measurement information received from each measurement apparatus is stored in the memory 210 as appropriate.

システム制御ユニット100は、ブローダウン処理制御部200と、メモリ210と、を備える。システム制御ユニット100におけるブローダウン処理制御部200の機能は、CPU及び内部メモリ含むマイクロプロセッサ(不図示)により実現される。   The system control unit 100 includes a blow-down process control unit 200 and a memory 210. The function of the blowdown processing control unit 200 in the system control unit 100 is realized by a microprocessor (not shown) including a CPU and an internal memory.

ブローダウン処理制御部200は、第1ECセンサ133で検出された循環水W2の第1電気伝導率ECが、予め設定された上限閾値ECb1以上となった場合に、補給水バルブ136を制御して循環水W2のブローダウン処理を実行させる。上限閾値ECb1は、例えば、スケール防止剤及び防食剤の効果の持続性を担保できる濃縮倍数を考慮して決定される。Blowdown processing control unit 200, when the first electrical conductivity EC 1 circulating water W2 detected by the 1EC sensor 133, reaches a preset upper threshold EC b1 above, controls the makeup water valve 136 Then, the blow-down process of the circulating water W2 is executed. The upper threshold EC b1 is determined in consideration of, for example, a concentration factor that can ensure the durability of the effects of the scale inhibitor and the anticorrosive.

ブローダウン処理制御部200は、ブローダウン処理として、循環水W2の排水及び補給水W1の補給を同時に(又は連続して)実施する。具体的には、ブローダウン処理制御部200は、第1電気伝導率EC≧上限閾値ECb1となった場合、すなわち循環水W2の水質が悪化した場合に、補給水バルブ136を開状態として、第2補給水ラインL122を通じて新鮮な補給水W1を貯留部122に強制的に補給する。補給水W1が補給されると、貯留部122の水位が上昇するため、オーバーフロー口138から溢れた循環水W2が排水ラインL130を通じて外部に排出される。すなわち、ブローダウン処理が実行されると、濃縮の進んだ循環水W2の一部は、補給水W1と入れ替わる。そのため、循環水ラインL110を流通する循環水W2は、全体として第1電気伝導率ECが低下する。The blow-down process control unit 200 performs drainage of the circulating water W2 and replenishment of the makeup water W1 simultaneously (or continuously) as the blow-down process. Specifically, the blow-down process control unit 200 opens the makeup water valve 136 when the first electrical conductivity EC 1 ≧ the upper limit threshold EC b1 , that is, when the quality of the circulating water W2 deteriorates. The fresh supply water W1 is forcibly supplied to the storage unit 122 through the second supply water line L122. When the replenishing water W1 is replenished, the water level of the storage unit 122 rises, so that the circulating water W2 overflowing from the overflow port 138 is discharged to the outside through the drain line L130. In other words, when the blow-down process is executed, a part of the circulating water W2 that has been concentrated is replaced with the makeup water W1. Therefore, circulating water W2 which flows through the circulating water line L110, the first electrical conductivity EC 1 is lowered as a whole.

そして、ブローダウン処理制御部200は、補給水バルブ136を開状態とした後、第1電気伝導率EC≦下限閾値ECb2となった場合、すなわち循環水W2の水質が回復した場合に、補給水バルブ136を閉状態として、補給水W1の補給を停止させる。なお、当然ながら、ブローダウン処理の開始点である上限閾値ECb1とブローダウン処理の終了点である下限閾値ECb2との関係は、上限閾値ECb1>下限閾値ECb2である。Then, the blow-down processing control unit 200 opens the makeup water valve 136 and then the first electrical conductivity EC 1 ≦ the lower limit threshold EC b2 , that is, when the water quality of the circulating water W2 is restored, The replenishment water valve 136 is closed to stop the replenishment of the replenishment water W1. Naturally, the relationship between the upper limit threshold EC b1 that is the start point of the blow-down process and the lower limit threshold EC b2 that is the end point of the blow-down process is such that the upper limit threshold EC b1 > the lower limit threshold EC b2 .

ブローダウン処理制御部200は、ブローダウン処理を実行する際に、薬剤供給装置300に外部停止信号(インターロック信号)を出力する。外部停止信号は、ブローダウン処理の実行(開始)を通知するための信号である。また、ブローダウン処理制御部200は、ブローダウン処理が終了した際に、薬剤供給装置300への外部停止信号の出力を停止する。   The blow-down process control unit 200 outputs an external stop signal (interlock signal) to the medicine supply device 300 when executing the blow-down process. The external stop signal is a signal for notifying execution (start) of blowdown processing. Further, the blow-down process control unit 200 stops outputting an external stop signal to the medicine supply device 300 when the blow-down process is completed.

メモリ210は、ブローダウン処理等に関する各種のデータを記憶する記憶装置である。例えば、メモリ210には、第1ECセンサ133で測定された第1電気伝導率EC(更新値)、第2ECセンサ139で測定された第2電気伝導率EC(更新値)、ブローダウン処理の開始点である上限閾値ECb1(設定値)、ブローダウン処理の終了点である下限閾値ECb2(設定値)、ブローダウン処理を実行させるための制御プログラム等が記憶される。The memory 210 is a storage device that stores various data relating to blowdown processing and the like. For example, the memory 210 includes a first electrical conductivity EC 1 (updated value) measured by the first EC sensor 133, a second electrical conductivity EC 2 (updated value) measured by the second EC sensor 139, and a blow-down process. The upper limit threshold EC b1 (set value) that is the start point of the lower limit threshold EC b2 (set value) that is the end point of the blow-down process, a control program for executing the blow-down process, and the like are stored.

次に、図3を参照して、薬剤供給装置300の構成について詳細に説明する。
図3に示すように、薬剤供給装置300は、主な構成として、薬注制御ユニット310と、流量センサ135と、薬剤タンク330と、薬剤供給ポンプ350と、を備える。このうち、薬剤タンク330及び薬剤供給ポンプ350は、本発明における薬剤供給手段を構成する。
Next, the configuration of the medicine supply device 300 will be described in detail with reference to FIG.
As shown in FIG. 3, the medicine supply device 300 includes a medicine injection control unit 310, a flow rate sensor 135, a medicine tank 330, and a medicine supply pump 350 as main components. Among these, the medicine tank 330 and the medicine supply pump 350 constitute the medicine supply means in the present invention.

まず、薬剤供給装置300の制御系の構成について説明する。薬注制御ユニット310は、薬剤供給制御部としての薬注制御部311と、計時部312と、メモリ320と、を備える。薬注制御ユニット310における薬注制御部311及び計時部312の各機能は、CPU及び内部メモリ含むマイクロプロセッサ(不図示)により実現される。なお、本実施形態において、システム制御ユニット100は、薬剤供給装置300に搭載されており、システム制御ユニット100と薬注制御ユニット310の間で各種の測定値や制御状態等の情報を共有する。   First, the configuration of the control system of the medicine supply device 300 will be described. The chemical injection control unit 310 includes a chemical injection control unit 311 as a chemical supply control unit, a timer unit 312, and a memory 320. Each function of the chemical injection control unit 311 and the time measuring unit 312 in the chemical injection control unit 310 is realized by a microprocessor (not shown) including a CPU and an internal memory. In the present embodiment, the system control unit 100 is mounted on the medicine supply device 300 and shares information such as various measurement values and control states between the system control unit 100 and the medicine injection control unit 310.

薬注制御部311は、流量センサ135から出力されたパルス信号に基づいて補給水W1の補給水量を算出する。そして、薬注制御部311は、算出した補給水W1の補給水量に比例した投入量の薬剤W3が循環水W2に供給されるように、薬剤供給ポンプ350において薬注処理(流量薬注処理)を実行させる。   The chemical injection control unit 311 calculates the makeup water amount of the makeup water W <b> 1 based on the pulse signal output from the flow sensor 135. The chemical injection control unit 311 then performs a chemical injection process (flow rate chemical injection process) in the chemical supply pump 350 so that an input amount of the chemical W3 proportional to the calculated supplemental water amount of the supplementary water W1 is supplied to the circulating water W2. Is executed.

具体的には、薬注制御部311は、流量センサ135から出力されるパルス信号の数をカウントする。そして、薬注制御部311は、カウントしたパルス信号の数(以下、「パルス信号数」ともいう)が所定のパルス信号数に達する毎に、そのパルス信号数(補給水量)に比例した投入量の薬剤W3が循環水W2に供給されるように、薬剤供給ポンプ350(後述)にポンプ駆動信号を出力する(分周制御)。これにより、薬剤供給装置300において、薬注処理が実行される。   Specifically, the medicine injection control unit 311 counts the number of pulse signals output from the flow sensor 135. Then, every time the number of counted pulse signals (hereinafter also referred to as “number of pulse signals”) reaches a predetermined number of pulse signals, the medicine injection control unit 311 inputs the amount proportional to the number of pulse signals (the amount of makeup water). A pump drive signal is output to the medicine supply pump 350 (described later) so that the medicine W3 is supplied to the circulating water W2 (frequency division control). Thereby, in the medicine supply device 300, the medicine injection process is executed.

なお、薬注制御部311において、流量センサ135からパルス信号が一つ出力される毎に、所定量の薬剤が循環水W2に供給されるように、薬注処理を複数回繰り返し実行してもよい(カウンタ制御)。   In addition, every time one pulse signal is output from the flow sensor 135 in the medicinal control unit 311, the medicating process is repeatedly performed a plurality of times so that a predetermined amount of chemical is supplied to the circulating water W <b> 2. Good (counter control).

薬注制御部311は、算出した薬剤の投入量に対応したパルス幅を有するポンプ駆動信号を薬剤供給ポンプ350に出力する。これにより、薬剤供給ポンプ350では、薬注制御部311から出力されたポンプ駆動信号のパルス幅の期間(運転時間)に亘って、指定されたストローク数で薬剤の投入が実行される。この動作により、薬剤タンク330から必要量の薬剤W3が循環水W2に供給される。   The medicine injection control unit 311 outputs a pump drive signal having a pulse width corresponding to the calculated amount of medicine to be supplied to the medicine supply pump 350. Thereby, in the medicine supply pump 350, the medicine is supplied with the designated number of strokes over the period (operation time) of the pulse width of the pump drive signal output from the medicine injection control unit 311. By this operation, a required amount of medicine W3 is supplied from the medicine tank 330 to the circulating water W2.

薬注制御部311は、ブローダウン処理制御部200(システム制御ユニット100)によるブローダウン処理が実行中であれば、ブローダウン処理が終了するまで薬注処理の実行を待機する。そして、薬注制御部311は、ブローダウン処理の終了後に、ブローダウン処理の実行期間中に検出された補給水量に比例した投入量の薬剤W3が循環水W2に供給されるように、薬注処理を実行する。   If the blow-down process by the blow-down process control unit 200 (system control unit 100) is being executed, the chemical-feed control unit 311 waits for the execution of the drug-feed process until the blow-down process is completed. The medicinal injection control unit 311 then dispenses the medicinal injection so that an amount of the medicine W3 proportional to the amount of makeup water detected during the execution period of the blowdown process is supplied to the circulating water W2 after the blowdown process is completed. Execute the process.

薬注制御部311は、ブローダウン処理制御部200から外部停止信号が出力されたときに、ブローダウン処理が開始(実行)されたと判定する。また、薬注制御部311は、ブローダウン処理制御部200から外部停止信号の出力が停止したときに、ブローダウン処理が終了したと判定する。   When the external stop signal is output from the blow-down process control unit 200, the medicine injection control unit 311 determines that the blow-down process has been started (executed). Moreover, the chemical injection control part 311 determines with the blowdown process having been complete | finished, when the output of an external stop signal from the blowdown process control part 200 stops.

また、薬注制御部311は、待機させた薬注処理の実行中に、次のブローダウン処理が実行された場合には、薬注処理の実行を中断する。ここで、薬注制御部311は、中断した薬注処理において循環水W2に供給されなかった薬剤の投入量分をメモリ320に記憶させる。また、薬注制御部311は、次のブローダウン処理の実行期間中に、流量センサ135から出力されるパルス信号の数をパルス信号数Pとしてカウントする。これにより、薬注制御部311は、次のブローダウン処理の終了後に、そのブローダウン処理の実行期間中における補給水量を算出することができる。   Moreover, the chemical injection control part 311 interrupts execution of a chemical injection process, when the next blow down process is performed during execution of the chemical injection process made to wait. Here, the medicinal injection control unit 311 causes the memory 320 to store the amount of the medicine that has not been supplied to the circulating water W2 in the interrupted medicating process. In addition, the medicine injection control unit 311 counts the number of pulse signals output from the flow rate sensor 135 as the number of pulse signals P during the next blow-down process. Thereby, the chemical injection control part 311 can calculate the amount of replenishment water in the execution period of the blowdown process after the completion | finish of the next blowdown process.

そして、薬注制御部311は、次のブローダウン処理の終了後に、メモリ320に記憶させた薬剤の投入量分と、次のブローダウン処理の実行期間中に検出されたパルス信号数P(補給水量)に比例した薬剤の投入量分とを合計した量(以下、「合計量」ともいう)の薬剤W3が循環水W2に供給されるように、薬剤W3の合計量に対応したパルス幅を有するポンプ駆動信号を薬剤供給ポンプ350に出力する。   Then, after the next blow-down process is completed, the medicine injection control unit 311 stores the amount of medicine stored in the memory 320 and the number of pulse signals P (replenishment) detected during the execution period of the next blow-down process. The pulse width corresponding to the total amount of the drug W3 is set so that the total amount of the drug W3 (hereinafter also referred to as “total amount”) proportional to the amount of water) is supplied to the circulating water W2. A pump drive signal having the same is output to the medicine supply pump 350.

薬注制御部311は、補給水量[L]に比例した薬剤の投入量W[mL]を、下記の式(1)に基づいて算出する。
W=V×C÷N÷D (1)
W:薬剤の投入量[mL]
V:補給水W1の検出水量値[L]
C:循環水W2中の薬剤の維持濃度[mL/L]
N:循環水W2の濃縮倍率[−]
D:薬剤の密度[mg/mL]
ここで、薬剤の維持濃度とは、単位補給水量当たりの薬剤量である。
The medicinal injection control unit 311 calculates a dose W [mL] of the medicine proportional to the replenishment water amount [L] based on the following equation (1).
W = V × C ÷ N ÷ D (1)
W: Amount of drug input [mL]
V: Detected water amount value of makeup water W1 [L]
C: Maintenance concentration of drug in circulating water W2 [mL / L]
N: Concentration magnification of circulating water W2 [−]
D: Drug density [mg / mL]
Here, the maintenance concentration of the drug is the amount of drug per unit replenishment water amount.

また、薬注制御部311は、式(1)における循環水W2の濃縮倍率Nを、下記の式(2)に基づいて算出する。
N=E1÷E2 (2)
N:循環水W2の濃縮倍率[−]
E1:第1検出電気伝導率値[mS/m]
E2:第2検出電気伝導率値[mS/m]
Moreover, the chemical injection control part 311 calculates the concentration magnification N of the circulating water W2 in Formula (1) based on the following formula (2).
N = E1 ÷ E2 (2)
N: Concentration magnification of circulating water W2 [−]
E1: First detected electric conductivity value [mS / m]
E2: Second detected electric conductivity value [mS / m]

なお、第1検出電気伝導率値E1は、第1ECセンサ133から出力される循環水W2の第1電気伝導率ECである。また、第2検出電気伝導率値E2は、第2ECセンサ139から出力される補給水W1の第2電気伝導率ECである。第1電気伝導率EC及び第2電気伝導率ECは、システム制御ユニット100を介して薬剤供給装置300に送信される。The first detection electric conductivity value E1 is a first electrical conductivity EC 1 of the circulating water W2 outputted from the 1EC sensor 133. The second detection electric conductivity value E2 is a second electrical conductivity EC 2 makeup water W1 outputted from the first 2EC sensor 139. The first electrical conductivity EC 1 and the second electrical conductivity EC 2 are transmitted to the medicine supply device 300 via the system control unit 100.

スケール防止剤や防食剤等の薬剤は、適正な濃度を循環水W2中に維持し続けることが必要である。薬剤濃度の変動が大きい場合には、十分な効果が得られない。従って、循環水W2の薬注管理では、薬剤が効果を発揮する薬剤維持濃度以上に保つことが必要である。従来の薬注管理における薬剤の必要量は、循環水W2中で薬剤が最も濃縮されていない状態、すなわち循環水W2の濃縮倍率が最も低い状態に基づいて決定されていた。言い換えると、従来の薬注管理における薬剤の必要量は、固定値として運用されていた。しかしながら、循環水W2及び補給水W1の電気伝導率は、いずれも経時的に変動するため、循環水W2の濃縮倍率は一定値でない。そのため、従来の薬注管理では、循環水W2の濃縮倍率が上昇した場合には、薬剤濃度は薬剤維持濃度を超過してしまう。そのため、従来の薬注管理では、超過分の薬剤が無駄になる可能性があった。これに対して、本実施形態の薬注制御部311は、循環水W2の濃縮倍率の変化に追従して、薬剤の必要量を調整する。   Agents such as scale inhibitors and anticorrosive agents need to keep an appropriate concentration in the circulating water W2. When the variation of the drug concentration is large, a sufficient effect cannot be obtained. Accordingly, in the chemical injection management of the circulating water W2, it is necessary to keep the drug concentration higher than the drug maintenance concentration at which the drug exhibits an effect. The required amount of drug in conventional chemical injection management has been determined based on a state where the drug is not most concentrated in the circulating water W2, that is, a state where the concentration rate of the circulating water W2 is the lowest. In other words, the required amount of medicine in conventional drug administration has been operated as a fixed value. However, since the electrical conductivity of the circulating water W2 and the makeup water W1 both vary with time, the concentration rate of the circulating water W2 is not a constant value. Therefore, in the conventional chemical injection management, when the concentration rate of the circulating water W2 is increased, the drug concentration exceeds the drug maintenance concentration. Therefore, in the conventional chemical injection management, there is a possibility that the excess medicine is wasted. On the other hand, the chemical injection control unit 311 of the present embodiment adjusts the required amount of the medicine following the change in the concentration rate of the circulating water W2.

まず、循環水W2の電気伝導率(第1電気伝導率EC)が変動する場合について、その効果を説明する。本実施形態の冷却システム1において、冷却塔120の運転中における循環水W2の第1電気伝導率ECは、ブローダウン処理制御部200によって上限閾値ECb1から下限閾値ECb2の間で推移するように管理される。例えば、薬剤維持濃度が200mg/L、上限閾値ECb1が120mS/m、下限閾値ECb2が100mS/mに設定され、薬剤の密度が1.15mg/mL、補給水W1の電気伝導率が20mS/mである場合を仮定する。循環水W2の濃縮が進み、第1電気伝導率EC=上限閾値ECb1となった時点では、循環水W2の濃縮倍率は6であり、薬剤の必要量は29mL/Lとなる。一方、ブローダウン処理が実行され、第1電気伝導率EC=下限閾値ECb2となった時点では、循環水W2の濃縮倍率は5であり、薬剤の必要量は35mL/Lとなる。つまり、薬注制御部311は、循環水W2の濃縮倍率が5〜6の範囲で変化するのに追従して、薬剤の必要量を35〜29mL/Lの範囲で調整する。そのため、本実施形態の冷却システム1によれば、薬剤維持濃度を200mg/Lに保ちながら、薬剤の無駄な使用を抑制することができる。First, the electrical conductivity of the circulation water W2 (first electric conductivity EC 1) is a case in which fluctuations, explaining its effect. In the cooling system 1 of the present embodiment, the first electrical conductivity EC 1 of the circulating water W2 during operation of the cooling tower 120, transitions between the upper threshold EC b1 lower limit threshold EC b2 by blowdown processing control unit 200 To be managed. For example, the drug maintenance concentration is set to 200 mg / L, the upper threshold EC b1 is set to 120 mS / m, the lower threshold EC b2 is set to 100 mS / m, the drug density is 1.15 mg / mL, and the electrical conductivity of the makeup water W1 is 20 mS. Assume the case of / m. When the concentration of the circulating water W2 progresses and the first electric conductivity EC 1 = the upper limit threshold EC b1 is reached, the concentration rate of the circulating water W2 is 6, and the required amount of the drug is 29 mL / L. On the other hand, when the blow-down process is executed and the first electrical conductivity EC 1 = the lower limit threshold EC b2 is reached, the concentration rate of the circulating water W2 is 5, and the required amount of the drug is 35 mL / L. That is, the medicinal injection control unit 311 adjusts the required amount of the medicine in the range of 35 to 29 mL / L following the change in the concentration rate of the circulating water W2 in the range of 5 to 6. Therefore, according to the cooling system 1 of the present embodiment, wasteful use of the drug can be suppressed while maintaining the drug maintenance concentration at 200 mg / L.

次に、補給水W1の第2電気伝導率ECが変動する場合について、その効果を説明する。補給水W1の第2電気伝導率ECは、工業用水や地下水等を補給水W1に用いている場合、季節的な要因(例えば、降雨量)等により変化する。また、補給水W1の第2電気伝導率ECは、工業用水や地下水等に、再利用水(例えば、洗浄に用いた純水)をブレンドして補給水W1としている場合、再利用水の回収率等により変化する。Next, when the second electrical conductivity EC 2 makeup water W1 is varied, it will be described the effects. Second electrical conductivity EC 2 makeup water W1 is the case of using industrial water and groundwater in the makeup water W1, seasonal factors (e.g., rainfall) varies with such. The second electrical conductivity EC 2 makeup water W1 is the industrial water and groundwater, reuse water (e.g., pure water used for washing) When a blend of being a makeup water W1, the reuse water It varies depending on the recovery rate.

例えば、薬剤維持濃度が200mg/Lに設定され、薬剤の密度が1.15mg/mL、循環水W2の電気伝導率が110mS/m、補給水W1の電気伝導率の変動範囲が15〜25mS/mである場合を仮定する。補給水W1の水質が良好で、第2電気伝導率EC=15mS/mとなった時点では、循環水W2の濃縮倍率は7.3であり、薬剤の必要量は24mL/Lとなる。For example, the drug maintenance concentration is set to 200 mg / L, the drug density is 1.15 mg / mL, the electrical conductivity of the circulating water W2 is 110 mS / m, and the fluctuation range of the electrical conductivity of the makeup water W1 is 15 to 25 mS / m. Assume that m. When the quality of the makeup water W1 is good and the second electrical conductivity EC 2 is 15 mS / m, the concentration rate of the circulating water W2 is 7.3, and the required amount of the drug is 24 mL / L.

一方、補給水W1の水質が悪化し、第2電気伝導率EC=25mS/mとなった時点では、循環水W2の濃縮倍率は4.4であり、薬剤の必要量は40mL/Lとなる。つまり、薬注制御部311は、循環水W2の濃縮倍率が4.4〜7.3の範囲で変化するのに追従して、薬剤の必要量を40〜24mL/Lの範囲で調整する。そのため、本実施形態の冷却システム1によれば、薬剤維持濃度を200mg/Lに保ちながら、薬剤の無駄な使用を抑制することができる。On the other hand, when the water quality of the makeup water W1 deteriorates and the second electrical conductivity EC 2 = 25 mS / m, the concentration rate of the circulating water W2 is 4.4, and the required amount of the drug is 40 mL / L. Become. That is, the medicinal injection control unit 311 adjusts the required amount of the drug in the range of 40 to 24 mL / L following the change in the concentration rate of the circulating water W2 in the range of 4.4 to 7.3. Therefore, according to the cooling system 1 of the present embodiment, wasteful use of the drug can be suppressed while maintaining the drug maintenance concentration at 200 mg / L.

なお、薬注制御部311において、式(2)による濃縮倍率Nの算出は、循環水W2の第1検出電気伝導率値E1(第1電気伝導率EC)が予め設定された規定値以上(例えば、下限閾値ECb2以上)の場合に適用される。例えば、冷却システム1を設置した直後の運転開始時や、循環水W2を全部入れ替えた場合等においては、第1電気伝導率ECと第2電気伝導率ECとがほぼ等しくなる。そのときに、式(2)で算出した濃縮倍率に基づいて薬剤維持濃度を達成しようとすると、式(1)により算出される薬剤の投入量が過剰に多くなる。そのため、薬注制御部311は、第1電気伝導率ECが予め設定された規定値未満の場合には、薬剤の基礎投入濃度と循環水系の保有水量に基づいて設定された所定の基礎投入量を一括して薬注する。In addition, in the medicinal injection control unit 311, the calculation of the concentration factor N by the expression (2) is such that the first detected electrical conductivity value E1 (first electrical conductivity EC 1 ) of the circulating water W2 is equal to or greater than a preset specified value. This is applied in the case of (for example, the lower threshold EC b2 or more). For example, the start of operation and immediately after installing the cooling system 1, in such case of replacing the circulating water W2 total of first conductivity EC 1 and the second electrical conductivity EC 2 is substantially equal. At that time, if an attempt is made to achieve the drug maintenance concentration based on the concentration rate calculated by the equation (2), the amount of the drug to be calculated calculated by the equation (1) becomes excessively large. Therefore, when the first electrical conductivity EC 1 is less than a preset specified value, the medicine injection control unit 311 determines a predetermined basic input set based on the basic input concentration of the medicine and the amount of water held in the circulating water system. Dosage in bulk.

また、薬注制御部311は、冷却塔120の運転中であり、且つ補給水W1が冷却塔120へ供給されない期間(後述する滞留時間T)が予め設定された許容期間を超過した場合には、薬剤供給ポンプ350において薬注処理(以下、「補助薬注処理」ともいう)を実行させる。補助薬注処理においては、予め設定された投入量の薬剤W3が循環水W2に供給される。本実施形態では、補助薬注処理において、循環水W2に殺菌剤を供給する。なお、補助薬注処理において、通常の薬注処理と同じくスケール防止剤、防食剤及び殺菌剤を併用して供給してもよい。In addition, the chemical injection control unit 311 is in operation of the cooling tower 120, and when the period during which the makeup water W1 is not supplied to the cooling tower 120 (residence time T T described later) exceeds a preset allowable period. Causes the medicine supply pump 350 to execute a medicine injection process (hereinafter also referred to as “auxiliary medicine injection processing”). In the auxiliary medicine injection process, a preset amount of medicine W3 is supplied to the circulating water W2. In the present embodiment, a bactericidal agent is supplied to the circulating water W2 in the auxiliary drug injection process. In addition, in a supplementary chemical injection process, you may supply together with a scale inhibitor, an anticorrosive, and a bactericidal agent similarly to a normal chemical injection process.

薬注制御部311は、システム制御ユニット100から循環水ポンプ132へ出力されるポンプ運転信号に基づいて、冷却塔120の運転状態を判定する。すなわち、薬注制御部311は、システム制御ユニット100から循環水ポンプ132へポンプ運転信号が出力されている場合には、冷却塔120が運転中であると判定する。また、薬注制御部311は、システム制御ユニット100から循環水ポンプ132へポンプ運転信号が出力されていない場合には、冷却塔120が運転停止中であると判定する。なお、ポンプ運転信号は、システム制御ユニット100から薬注制御部311にも送信される。   The chemical injection control unit 311 determines the operation state of the cooling tower 120 based on the pump operation signal output from the system control unit 100 to the circulating water pump 132. That is, the chemical injection control unit 311 determines that the cooling tower 120 is in operation when a pump operation signal is output from the system control unit 100 to the circulating water pump 132. In addition, when the pump operation signal is not output from the system control unit 100 to the circulating water pump 132, the chemical injection control unit 311 determines that the cooling tower 120 is stopped. The pump operation signal is also transmitted from the system control unit 100 to the chemical injection control unit 311.

補給水W1が冷却塔120へ供給されない期間(以下、「滞留時間T」ともいう)は、計時部312(後述)により計時される。薬注制御部311は、流量センサ135からパルス信号を受信してから経過した時間を、計時部312に滞留時間Tとして計時させる。そして、薬注制御部311は、計時部312の計時する滞留時間Tが予め設定された許容滞留時間Tを超過した場合に、所定の投入量の薬剤が循環水W2に供給されるように薬注処理を実行する。A period during which the makeup water W1 is not supplied to the cooling tower 120 (hereinafter also referred to as “residence time T T ”) is measured by a timer unit 312 (described later). Dosing control unit 311, the time elapsed from the reception of the pulse signal from the flow rate sensor 135, thereby counting the residence time T T to the clock unit 312. The dosing control unit 311, when counting residence time T T of the timer unit 312 exceeds a preset allowable residence time T W, so that the drug prescribed charging amount is supplied to the circulating water W2 The chemical injection process is executed.

薬注制御部311は、流量センサ135からパルス信号を受信しない場合には、流量センサ135においてパルス信号が出力されていないことを計時部312に通知して、滞留時間Tの計時をスタートさせる。また、薬注制御部311は、計時部312の計時する滞留時間Tが予め設定された許容滞留時間Tを超過する前に、流量センサ135から次のパルス信号を受信した場合には、流量センサ135においてパルス信号が出力されたことを計時部312に通知して、計時部312における滞留時間Tの計時をリセットさせる。If no pulse signal is received from the flow sensor 135, the chemical injection control unit 311 notifies the time measuring unit 312 that the pulse signal is not output from the flow sensor 135 and starts measuring the residence time T T. . Also, dosing control unit 311 before clocking residence time T T of the timer unit 312 exceeds a preset allowable residence time T W, when the flow rate sensor 135 receives the next pulse signal, The time sensor 312 is notified that the pulse signal has been output from the flow sensor 135, and the time measurement of the residence time T T in the time measurement unit 312 is reset.

薬注制御部311は、補助薬注処理を実行している間に、ブローダウン処理が実行された場合には、補助薬注処理の実行を終了する。なお、この場合において、ブローダウン処理の実行期間中における補給水量に比例した薬剤の投入量は、先に説明した薬注処理と同じく、上述した式(1)、(2)に基づいて算出される。   When the blow-down process is executed while the auxiliary drug injection process is being executed, the chemical injection control unit 311 ends the execution of the auxiliary drug injection process. In this case, the amount of the medicine that is proportional to the amount of replenishing water during the execution period of the blow-down process is calculated based on the above-described formulas (1) and (2), similar to the medicine injection process described above. The

計時部312は、補給水W1が冷却塔120へ供給されない期間を、滞留時間Tとして計時する。具体的には、計時部313は、流量センサ135においてパルス信号が出力されていないことを薬注制御部311から通知されると、滞留時間Tの計時をスタートする。また、計時部313は、流量センサ135においてパルス信号が出力されたことを薬注制御部311から通知されると、滞留時間Tの計時をストップする。計時部312は、計時した滞留時間Tをメモリ320に記憶させる。また、計時部312は、滞留時間Tの計時中に補給水W1が冷却塔120へ供給され、流量センサ135においてパルス信号が出力されたことを薬注制御部311から通知されると、計時した滞留時間Tをリセットする(例えば、後述する図8のステップST306)。Timing unit 312, a period in which makeup water W1 is not supplied to the cooling tower 120, for measuring the residence time T T. Specifically, the time measuring unit 313 starts measuring the residence time T T when notified from the drug injection control unit 311 that no pulse signal is output from the flow sensor 135. Further, timer unit 313 is notified from the chemical feeding, chemical dosing control unit 311 that the pulse signal is outputted at a flow rate sensor 135, to stop the counting of the retention time T T. The timer unit 312 stores the measured residence time T T in the memory 320. Further, timer unit 312, makeup water W1 in measurement of the residence time T T is supplied to the cooling tower 120, the pulse signal in the flow rate sensor 135 is notified that the output from the chemical feeding, chemical dosing control unit 311, a timer reset residence time T T of the (e.g., step ST306 of FIG. 8 to be described later).

メモリ320は、薬注処理に関する各種のデータを記憶する記憶装置である。例えば、メモリ320には、薬注制御部311でカウントされるパルス信号数P、中断させた薬注処理又は補助薬注処理において循環水W2に供給されなかった薬剤の投入量分、計時部312で計時された滞留時間T、薬注処理及び補助薬注処理を実行させるための制御プログラム等が記憶される。The memory 320 is a storage device that stores various data related to the chemical injection process. For example, in the memory 320, the number P of pulse signals counted by the medicinal injection control unit 311, the amount of medicine that has not been supplied to the circulating water W <b> 2 in the interrupted medicinal treatment process or the auxiliary medicinal treatment process, the time measuring unit 312. The control program for causing the residence time T T measured in step S1, the chemical injection process, and the auxiliary chemical injection process to be executed is stored.

次に、図3に示す薬剤供給装置300において、循環水W2に薬剤W3を供給するライン及びその周辺設備の構成について説明する。   Next, in the medicine supply device 300 shown in FIG. 3, the configuration of a line for supplying the medicine W3 to the circulating water W2 and its peripheral equipment will be described.

薬剤タンク330は、内部に薬剤を貯留可能な容器である。薬剤タンク330の内部には、レベルセンサ340が設けられている。また、薬剤タンク330には、薬剤供給ポンプ350が接続されている。   The medicine tank 330 is a container that can store medicine inside. A level sensor 340 is provided inside the medicine tank 330. In addition, a medicine supply pump 350 is connected to the medicine tank 330.

レベルセンサ340は、薬剤タンク330内の薬剤の液位(すなわち、液量)を検出する機器である。レベルセンサ340は、薬注制御ユニット310と電気的に接続されている。レベルセンサ340は、薬剤タンク330内の薬剤の液位に応じたレベル信号を出力する。レベルセンサ340から出力されたレベル信号は、薬注制御ユニット310に送信される。薬注制御ユニット310は、レベル信号が満水液位Aから減少して、設定液位Bに満たなくなると、例えば、警報器に警報を一定時間発生させて、管理者に薬剤の補充を促す。   The level sensor 340 is a device that detects the liquid level (that is, the liquid amount) of the medicine in the medicine tank 330. Level sensor 340 is electrically connected to chemical injection control unit 310. The level sensor 340 outputs a level signal corresponding to the liquid level of the medicine in the medicine tank 330. The level signal output from the level sensor 340 is transmitted to the chemical injection control unit 310. When the level signal decreases from the full water level A and does not reach the set liquid level B, the chemical injection control unit 310 generates an alarm for a certain period of time, for example, and prompts the administrator to replenish the medicine.

薬剤供給ポンプ350は、薬剤タンク330内の薬剤W3を、薬剤供給ラインL140を介して貯留部122に向けて送出する装置である。本実施形態の薬剤供給ポンプ350は、電磁駆動ダイアフラム式の定量ポンプである。薬剤供給ポンプ350として、電磁駆動ダイアフラム式の定量ポンプを用いた場合、ダイアフラム弁(不図示)が往復運動することにより、薬剤W3が断続的に薬剤供給ラインL140へ押し込まれる。その結果、薬剤供給ラインL140の上流側では圧力が上昇するため、薬剤W3は、薬剤供給ラインL140の下流側から貯留部122に吐出される。   The drug supply pump 350 is a device that sends the drug W3 in the drug tank 330 toward the storage unit 122 via the drug supply line L140. The drug supply pump 350 of this embodiment is an electromagnetically driven diaphragm type metering pump. When an electromagnetically driven diaphragm type metering pump is used as the medicine supply pump 350, the medicine W3 is intermittently pushed into the medicine supply line L140 by reciprocating a diaphragm valve (not shown). As a result, since the pressure increases on the upstream side of the medicine supply line L140, the medicine W3 is discharged from the downstream side of the medicine supply line L140 to the storage unit 122.

薬剤供給ポンプ350は、ダイアフラム弁の1ストローク当たりの吐出量[mL/ストローク]を所定値に設定し、且つストローク数[ストローク/分]を増減することにより、薬剤の吐出流量[mL/分]を調節できる。ストローク数とは、単位時間当たりにダイアフラム弁が往復運動する回数をいい、1往復が1ストロークに相当する。薬剤供給ポンプ350は、薬注制御部311(薬注制御ユニット310)と電気的に接続されている。薬剤供給ポンプ350は、薬注制御部311からポンプ駆動信号(パルス信号)が出力されると、そのパルス幅の期間(以下、「運転時間」ともいう)に亘って、指定されたストローク数での薬剤の投入を実行する。   The medicine supply pump 350 sets the discharge amount [mL / stroke] per stroke of the diaphragm valve to a predetermined value and increases / decreases the number of strokes [stroke / min], thereby discharging the medicine discharge flow rate [mL / min]. Can be adjusted. The number of strokes refers to the number of times the diaphragm valve reciprocates per unit time, and one reciprocation corresponds to one stroke. The chemical supply pump 350 is electrically connected to the chemical injection control unit 311 (chemical injection control unit 310). When a pump drive signal (pulse signal) is output from the medicine injection control unit 311, the medicine supply pump 350 has a specified number of strokes over a period of the pulse width (hereinafter also referred to as “operation time”). The injection of the drug is executed.

なお、本実施形態では、スケール防止剤、防食剤、及び殺菌剤を配合した一液型のマルチ薬剤を、一つの薬剤供給装置300から貯留部122に供給する例について説明する。化合物の特性により一液に配合することが困難な場合には、スケール防止剤、防食剤、及び殺菌剤を、それぞれ個別の薬剤供給装置から貯留部122に供給してもよい。   In the present embodiment, an example will be described in which a one-component multi-drug containing a scale inhibitor, an anticorrosive, and a bactericide is supplied from one drug supply device 300 to the storage unit 122. When it is difficult to mix in one liquid due to the characteristics of the compound, a scale inhibitor, an anticorrosive, and a bactericidal agent may be supplied to the storage unit 122 from individual drug supply devices.

薬剤供給ラインL140には、フローチェッカ141及びチェックバルブ142が設けられている。   The medicine supply line L140 is provided with a flow checker 141 and a check valve 142.

フローチェッカ141は、薬剤供給ラインL140における薬剤W3の流通状態を検出する機器である。フローチェッカ141は、薬注制御ユニット310と電気的に接続されている。フローチェッカ141は、薬剤供給ラインL140を薬剤W3が適正に流通していないことを検出した場合、薬注制御ユニット310に検出信号を送信する。例えば、薬剤供給ラインL140に気泡や固形物が混入し、一時的に薬剤W3の流通が滞った場合には、フローチェッカ141から薬注制御ユニット310に閉塞検出信号が送信される。フローチェッカ141は、薬剤供給ラインL140において、薬剤タンク330とチェックバルブ142との間に設けられている。   The flow checker 141 is a device that detects the distribution state of the medicine W3 in the medicine supply line L140. The flow checker 141 is electrically connected to the medicine injection control unit 310. When the flow checker 141 detects that the medicine W3 is not properly distributed through the medicine supply line L140, the flow checker 141 transmits a detection signal to the medicine injection control unit 310. For example, when bubbles or solids are mixed in the medicine supply line L140 and the circulation of the medicine W3 is temporarily delayed, a blockage detection signal is transmitted from the flow checker 141 to the medicine injection control unit 310. The flow checker 141 is provided between the medicine tank 330 and the check valve 142 in the medicine supply line L140.

チェックバルブ142は、薬剤の流通方向を規制する弁である。チェックバルブ142は、薬剤タンク330から貯留部122に向けて薬剤W3が圧送されるときには、弁体が開き、貯留部122から逆流が起こったときには、弁体が閉じる。チェックバルブ142は、薬剤供給ラインL140と貯留部122との接続部分に設けられている。   The check valve 142 is a valve that regulates the flow direction of the medicine. The check valve 142 opens when the medicine W3 is pumped from the medicine tank 330 toward the storage section 122, and closes when the backflow occurs from the storage section 122. The check valve 142 is provided at a connection portion between the medicine supply line L140 and the storage unit 122.

次に、上述した薬剤供給装置300において、薬注処理及び補助薬注処理を実行するタイミングについて説明する。   Next, the timing when the medicine supply device 300 described above executes the medicine injection process and the auxiliary medicine injection process will be described.

まず、薬注処理(流量比例薬注)を実行する場合における薬注制御部311の動作について、図4を参照して説明する。図4(A)は、薬注処理(流量比例薬注)を実行する場合のタイムチャートである。図4(B)は、ブローダウン処理により薬注処理を待機させた場合のタイムチャートである。図4(C)は、待機させた薬注処理を実行中に次のブローダウン処理が実行された場合のタイムチャートである。   First, the operation of the chemical injection control unit 311 when executing chemical injection processing (flow rate proportional chemical injection) will be described with reference to FIG. FIG. 4 (A) is a time chart when the chemical injection process (flow rate proportional chemical injection) is executed. FIG. 4B is a time chart when the chemical injection process is made to wait by the blow-down process. FIG. 4C is a time chart in the case where the next blow-down process is executed while the standby chemical injection process is being executed.

なお、図4及び図5(後述)おいて、「流量パルス」は、流量センサ135から出力されるパルス信号を示す。「薬注動作」は、薬剤供給ポンプ350(薬剤供給装置300)の運転時間を示す。「ブローダウン動作」は、ブローダウン処理中における補給水バルブ136の開時間を示す。また、図4及び図5に示す波形は、それぞれの時間間隔を概念的な長さで示しており、実際の時間間隔とは対応していない。また、薬注動作においては、循環水W2に供給される薬剤の投入量を、その投入量に比例したパルス幅で示す。   In FIG. 4 and FIG. 5 (described later), “flow rate pulse” indicates a pulse signal output from the flow rate sensor 135. The “medicine injection operation” indicates the operation time of the drug supply pump 350 (drug supply apparatus 300). “Blowdown operation” indicates the open time of the makeup water valve 136 during the blowdown process. Further, the waveforms shown in FIGS. 4 and 5 show the respective time intervals with a conceptual length, and do not correspond to the actual time intervals. In addition, in the medicine injection operation, the amount of medicine to be supplied to the circulating water W2 is indicated by a pulse width proportional to the amount of introduction.

図4(A)に示すように、流量センサ135から出力されるパルス信号(流量パルス)が所定のパルス信号数(例えば、3パルス)に達する毎に、薬注制御部311は、薬剤供給ポンプ350へポンプ駆動信号を出力して、薬注処理(薬注動作)を実行させる。   As shown in FIG. 4A, every time the pulse signal (flow rate pulse) output from the flow rate sensor 135 reaches a predetermined number of pulse signals (for example, 3 pulses), the drug injection control unit 311 A pump drive signal is output to 350, and a chemical injection process (chemical injection operation) is executed.

次に、図4(B)に示すように、ブローダウン処理Aが実行された場合、薬注制御部311は、ブローダウン処理Aが終了するまで、薬剤供給ポンプ350へのポンプ駆動信号の出力を停止して、薬注処理の実行を待機させる。薬注制御部311は、ブローダウン処理Aの実行期間中に流量センサ135から出力されるパルス信号数Pをカウントする。そして、薬注制御部311は、ブローダウン処理Aの終了後に、カウントしたパルス信号数P(補給水量q)に比例した薬剤の投入量Qが循環水W2へ供給されるように、薬剤の投入量Qに対応したパルス幅を有するポンプ駆動信号を薬剤供給ポンプ350へ出力する。これにより、薬剤供給装置300において、薬注処理aが実行される。Next, as shown in FIG. 4B, when the blow-down process A is executed, the medicine injection control unit 311 outputs a pump drive signal to the medicine supply pump 350 until the blow-down process A is completed. Is stopped, and the execution of the chemical injection process is waited. Dosing control unit 311 counts the number of pulse signals P 1 output from the flow sensor 135 during execution of the blowdown process A. Then, the medicine injection control unit 311 is configured so that, after the blow-down process A is completed, the medicine input amount Q 1 proportional to the counted number of pulse signals P 1 (make-up water amount q 1 ) is supplied to the circulating water W2. a pump drive signal having a pulse width corresponding to the input amount to Q 1 drug output to drug supply pump 350. Thereby, in the medicine supply device 300, the medicine injection process a is executed.

なお、図4(B)に示すように、薬注制御部311は、薬注処理aの実行中に、流量センサ135からパルス信号が出力された場合、そのパルス信号数(補給水量q)に比例した薬剤の投入量Qが循環水W2へ供給されるように、薬剤の投入量Qに対応したパルス幅を有するポンプ駆動信号を薬剤供給ポンプ350へ出力する。このため、薬注処理aでは、薬剤の投入量Q+Qに対応したパルス幅を有するポンプ駆動信号が薬剤供給ポンプ350へ出力される。As shown in FIG. 4B, when a pulse signal is output from the flow rate sensor 135 during the execution of the chemical injection process a, the chemical injection control unit 311 counts the number of pulse signals (replenishment water amount q 3 ). is input amount Q 3 proportional to drug to be supplied to the circulating water W2, it outputs a pump drive signal having a pulse width corresponding to the input amount Q 3 of the drug to the drug supply pump 350. For this reason, in the medicine injection process a, a pump drive signal having a pulse width corresponding to the input amount Q 1 + Q 3 of the medicine is output to the medicine supply pump 350.

次に、図4(C)に示すように、図4(B)で待機させた薬注処理aを実行させている間に、次のブローダウン処理Bが実行された場合、薬注制御部311は、ブローダウン処理Bが終了するまで、薬剤供給ポンプ350への駆動信号の出力を停止して、薬注処理aの実行を中断させる。薬注制御部311は、ブローダウン処理Bの実行期間中に流量センサ135から出力されるパルス信号数Pをカウントする。また、薬注制御部311は、中断させた薬注処理aにおいて循環水W2に供給されなかった薬剤の投入量Qをメモリ320に記憶させる。Next, as shown in FIG. 4 (C), when the next blow-down process B is executed while the medicine injection process a waited in FIG. 4 (B) is being executed, the medicine injection control unit 311 stops the output of the drive signal to the medicine supply pump 350 until the blow-down process B ends, and interrupts the execution of the medicine injection process a. Dosing control unit 311 counts the number of pulse signals P 2 output from the flow sensor 135 during execution of the blowdown process B. Also, dosing control unit 311 stores the input amount Q X of drug that is not supplied to the circulating water W2 in the dosing process a which is interrupted in the memory 320.

そして、薬注制御部311は、ブローダウン処理Bの終了後に、メモリ320に記憶させていた、薬注処理aにおいて循環水W2に供給されなかった薬剤の投入量分Qと、ブローダウン処理Bの実行期間中に検出されたパルス信号数P(補給水量q)に比例した薬剤の投入量分Q(算出値)とを合計した量(及び薬剤の投入量Q)の薬剤W3が循環水W2に供給されるように、薬剤の投入量分Q+Q+Qに対応したパルス幅を有するポンプ駆動信号を薬剤供給ポンプ350へ出力する。これにより、薬剤供給装置300において、薬注処理a´が実行(再開)される。The dosing control unit 311, after the end of the blowdown process B, had been stored in the memory 320, and a charged amount Q X of drug that is not supplied to the circulating water W2 in the dosing process a, blowdown process The amount of medicine (and the amount of medicine input Q 3 ) summed with the amount of medicine input Q 2 (calculated value) proportional to the number of pulse signals P 2 (the amount of makeup water q 2 ) detected during the execution period of B A pump drive signal having a pulse width corresponding to the input amount of drug Q X + Q 2 + Q 3 is output to the drug supply pump 350 so that W3 is supplied to the circulating water W2. Thereby, in the medicine supply device 300, the medicine injection process a ′ is executed (resumed).

次に、補助薬注処理を実行する場合における薬注制御部311の動作について、図5を参照して説明する。図5は、薬剤供給装置300において、補助薬注処理を実行するタイミングを示すタイムチャートである。図5では、流量センサ135から出力されるパルス信号(流量パルス)を省略する。   Next, operation | movement of the chemical injection control part 311 in the case of performing an auxiliary chemical injection process is demonstrated with reference to FIG. FIG. 5 is a time chart showing the timing of executing the auxiliary medicine injection process in the medicine supply device 300. In FIG. 5, the pulse signal (flow rate pulse) output from the flow rate sensor 135 is omitted.

図5に示すように、冷却塔120の運転期間中において、ブローダウン処理Aの終了後、補給水W1が冷却塔120へ供給されない期間、すなわち流量センサ135からパルス信号が出力されない期間(滞留時間T)が予め設定された許容滞留時間Tを超過したとする。この場合、薬注制御部311は、薬剤供給ポンプ350にポンプ駆動信号を出力して、補助薬注処理bを実行させる。補助薬注処理では、予め設定された投入量Qの薬剤が循環水W2に供給されるように、薬注制御部311から薬剤供給ポンプ350にポンプ駆動信号が出力される。As shown in FIG. 5, during the operation period of the cooling tower 120, after the blow-down process A is completed, the period during which the makeup water W1 is not supplied to the cooling tower 120, that is, the period during which no pulse signal is output from the flow sensor 135 (residence time). Suppose that T T ) exceeds a preset allowable residence time T W. In this case, the medicine injection control unit 311 outputs a pump driving signal to the medicine supply pump 350 to execute the auxiliary medicine injection processing b. In the auxiliary drug injection process, a pump drive signal is output from the drug injection control unit 311 to the drug supply pump 350 so that a preset amount of drug Q S is supplied to the circulating water W2.

また、補助薬注処理bの実行中に、ブローダウン処理Bが実行された場合、薬注制御部311は、投入量Qの薬剤供給の完了を待たずに、薬剤供給ポンプ350へのポンプ駆動信号の出力を停止して、補助薬注処理bの実行を終了させる。薬注制御部311は、ブローダウン処理Bの実行期間中に流量センサ135から出力されるパルス信号数Pをカウントする。そして、薬注制御部311は、ブローダウン処理Bの終了後に、ブローダウン処理Bの実行期間中に検出されたパルス信号数P(補給水量q)に比例した投入量Qの薬剤W3が循環水W2に供給されるように、薬剤W3の投入量Qに対応したパルス幅を有するポンプ駆動信号を薬剤供給ポンプ350に出力する。これにより、薬注処理(流量比例薬注)b´が実行される。Further, during execution of auxiliary chemical feed process b, if the blow-down process B is executed, dosing control unit 311, without waiting for the completion of the drug supply input amount Q S, the pump to the drug supply pump 350 The output of the drive signal is stopped and the execution of the auxiliary medicine injection process b is ended. Dosing control unit 311 counts the number of pulse signals P 4 which is output from the flow sensor 135 during execution of the blowdown process B. Then, the medicine injection control unit 311, after the end of the blowdown process B, the medicine W3 with the input amount Q 4 proportional to the number of pulse signals P 4 (make-up water amount q 4 ) detected during the execution period of the blowdown process B. There outputs to be supplied to the circulating water W2, the pump drive signal having a pulse width corresponding to the input amount Q 4 drug W3 in drug supply pump 350. Thereby, the chemical injection process (flow rate proportional chemical injection) b ′ is executed.

ここで、薬注制御部311は、終了させた補助薬注処理bにおいて循環水W2に供給されなかった薬剤の投入量分Qについては、薬注処理を実行させない。補助薬注処理は、循環水W2の長時間の滞留に伴う薬効の低下や喪失を補うものとして実行される。ブローダウン処理Bが実行されれば、その後の薬注処理b´により新規の薬剤が供給され、循環水W2中の薬剤が入れ替わる。そのため、ブローダウン処理Bの終了後に、薬注処理b´で必要となる投入量Qを超えて薬剤を投入しても無駄となる。従って、薬剤の投入量分Qについては、薬注処理を実行させない。Here, dosing control unit 311, for charged amount Q X of not supplied to the circulating water W2 in was terminated adjuvants Note process b agents, it does not perform the dosing process. The supplementary chemical injection process is executed as a supplement to the decrease or loss of the medicinal effect associated with the long-term retention of the circulating water W2. When the blow-down process B is executed, a new medicine is supplied by the subsequent chemical injection process b ', and the medicine in the circulating water W2 is replaced. Therefore, after the end of the blowdown process B, it is also useless to put the drug beyond the input amount Q 4 required in dosing process b'. Thus, for charged amount Q X agents, it does not perform the dosing process.

次に、本実施形態の冷却システム1において実行されるブローダウン処理及び薬注処理の動作を、図6〜図9に示すフローチャートを参照して説明する。   Next, the operation | movement of the blowdown process and chemical injection process performed in the cooling system 1 of this embodiment is demonstrated with reference to the flowchart shown to FIGS.

まず、ブローダウン処理について説明する。図6は、システム制御ユニット100においてブローダウン処理を実行する場合の処理手順を示すフローチャートである。図6に示すフローチャートの処理は、メモリ210に記憶された制御プログラムに基づいて、ブローダウン処理制御部200により実行される。また、図6に示すフローチャートの処理は、冷却システム1の運転中において、繰り返し実行される。   First, the blowdown process will be described. FIG. 6 is a flowchart showing a processing procedure when blow-down processing is executed in the system control unit 100. The process of the flowchart shown in FIG. 6 is executed by the blow-down process control unit 200 based on the control program stored in the memory 210. 6 is repeatedly executed during operation of the cooling system 1.

図6に示すステップST101において、ブローダウン処理制御部200は、第1ECセンサ133で測定された循環水W2の第1電気伝導率EC、及びブローダウン処理の開始点である上限閾値ECb1をメモリ210から取得する。In step ST101 shown in FIG. 6, the blow-down process control unit 200 sets the first electrical conductivity EC 1 of the circulating water W2 measured by the first EC sensor 133 and the upper limit threshold EC b1 that is the start point of the blow-down process. Obtained from the memory 210.

ステップST102において、ブローダウン処理制御部200は、第1電気伝導率ECが上限閾値ECb1以上か否かを判定する。このステップST102において、ブローダウン処理制御部200により、第1電気伝導率EC≧上限閾値ECb1である(YES)と判定された場合には、循環水W2の濃縮度が所定の濃縮度に達したため、処理はステップST103へ移行する。また、ステップST102において、ブローダウン処理制御部200により、第1電気伝導率EC<上限閾値ECb1である(NO)と判定された場合には、循環水W2の濃縮度が所定の濃縮度に達していないため、処理はステップST101へ戻る。In step ST102, the blow-down process control unit 200 determines whether or not the first electrical conductivity EC 1 is equal to or higher than the upper limit threshold EC b1 . In step ST102, when the blow-down process control unit 200 determines that the first electrical conductivity EC 1 ≧ the upper limit threshold EC b1 (YES), the concentration of the circulating water W2 is set to a predetermined concentration. Therefore, the process proceeds to step ST103. In Step ST102, when the blowdown processing control unit 200 determines that the first electrical conductivity EC 1 <the upper limit threshold EC b1 (NO), the concentration of the circulating water W2 is a predetermined concentration. Therefore, the process returns to step ST101.

ステップST103(ステップST102:YES)において、ブローダウン処理制御部200は、補給水バルブ136を開状態として、ブローダウン処理を開始する。   In step ST103 (step ST102: YES), the blow-down process control unit 200 opens the makeup water valve 136 and starts the blow-down process.

ステップST103においてブローダウン処理が実行されることにより、補給水W1が貯留部122に強制的に補給される一方、貯留部122内の循環水W2の一部が排水ラインL130から外部に排出される。そのため、循環水W2の第1電気伝導率ECは、徐々に低下する。By performing the blow-down process in step ST103, the makeup water W1 is forcibly replenished to the storage unit 122, while a part of the circulating water W2 in the storage unit 122 is discharged to the outside from the drain line L130. . Therefore, the first electrical conductivity EC 1 of the circulating water W2 is gradually decreased.

ステップST104において、ブローダウン処理制御部200は、第1ECセンサ133で測定された循環水W2の第1電気伝導率EC、及びブローダウン処理の終了点である下限閾値ECb2をメモリ210から取得する。In step ST104, the blow-down process control unit 200 acquires from the memory 210 the first electrical conductivity EC 1 of the circulating water W2 measured by the first EC sensor 133 and the lower limit threshold EC b2 that is the end point of the blow-down process. To do.

ステップST105において、ブローダウン処理制御部200は、第1電気伝導率ECが下限閾値ECb2以下か否かを判定する。このステップST105において、ブローダウン処理制御部200により、第1電気伝導率EC≦下限閾値ECb2である(YES)と判定された場合には、循環水W2の濃縮度が十分に低下したと考えられるため、処理はステップST106へ移行する。また、ステップST105において、ブローダウン処理制御部200により、第1電気伝導率EC>下限閾値ECb2である(NO)と判定された場合には、循環水W2の濃縮度が未だ低下していないと考えられるため、処理はステップST104へ戻る。In step ST105, the blow-down process control unit 200 determines whether or not the first electrical conductivity EC 1 is equal to or lower than the lower limit threshold EC b2 . In this step ST105, when it is determined by the blow-down process control unit 200 that the first electrical conductivity EC 1 ≦ the lower limit threshold EC b2 (YES), the concentration of the circulating water W2 is sufficiently reduced. Since it is considered, the process proceeds to step ST106. In step ST105, if the blow-down process control unit 200 determines that the first electric conductivity EC 1 > the lower limit threshold EC b2 (NO), the concentration of the circulating water W2 is still decreasing. Therefore, the process returns to step ST104.

ステップST106(ステップST105:YES)において、ブローダウン処理制御部200は、補給水バルブ136を閉状態として、ブローダウン処理を終了する。これにより、本フローチャートの処理は終了する(ステップST101へリターンする)。   In step ST106 (step ST105: YES), the blow-down process control unit 200 closes the makeup water valve 136 and ends the blow-down process. Thereby, the process of this flowchart is complete | finished (it returns to step ST101).

次に、薬注処理(流量比例薬注)について説明する。図7は、薬剤供給装置300において薬注処理を実行する場合の処理手順を示すフローチャートである。図7に示すフローチャートの処理は、メモリ320に記憶された制御プログラムに基づいて、薬注制御部311により実行される。また、図7に示すフローチャートの処理は、冷却システム1の運転中において、繰り返し実行される。   Next, the chemical injection process (flow rate proportional chemical injection) will be described. FIG. 7 is a flowchart showing a processing procedure when a medicine injection process is executed in the medicine supply device 300. The process of the flowchart shown in FIG. 7 is executed by the medicine injection control unit 311 based on the control program stored in the memory 320. Further, the process of the flowchart shown in FIG. 7 is repeatedly executed during the operation of the cooling system 1.

図7に示すステップST201において、薬注制御部311は、流量センサ135から所定数のパルス信号を受信したか否か(カウントしたパルス信号が所定数になったか否か)を判定する。このステップST201において、薬注制御部311により、所定数のパルス信号を受信した(YES)と判定された場合に、処理はステップST202へ移行する。また、ステップST201において、薬注制御部311により、所定数のパルス信号を受信していない(NO)と判定された場合に、処理はステップST201へ戻る。   In step ST201 shown in FIG. 7, the medicinal injection control unit 311 determines whether or not a predetermined number of pulse signals have been received from the flow sensor 135 (whether or not the counted pulse signals have reached a predetermined number). In this step ST201, when it determines with the chemical injection control part 311 having received the predetermined number of pulse signals (YES), a process transfers to step ST202. Moreover, in step ST201, when it determines with the chemical injection control part 311 not receiving the predetermined number of pulse signals (NO), a process returns to step ST201.

なお、薬注制御部311は、流量センサ135から出力されるパルス信号が所定数に達していない間にブローダウン処理が実行された場合には、それまでのカウント数をメモリ210に記憶する。そして、ブローダウン処理後の薬注処理において、そのパルス信号数(補給水量)に比例した薬剤の投入量分を、ステップST207(後述)で算出した投入量分に加算する(図7に示すフローチャートでは記載を省略)。   In addition, when the blow-down process is executed while the pulse signal output from the flow sensor 135 has not reached the predetermined number, the medicine injection control unit 311 stores the count number up to that time in the memory 210. Then, in the chemical injection process after the blow-down process, the amount of the medicine that is proportional to the number of pulse signals (the amount of replenishment water) is added to the amount of injection calculated in step ST207 (described later) (the flowchart shown in FIG. 7). Is omitted).

ステップST202(ステップST201:YES)において、薬注制御部311は、ブローダウン処理が開始(実行)されたか否かを判定する。薬注制御部311は、ブローダウン処理制御部200から出力される外部停止信号の有無により、ブローダウン処理が開始されたか否かを判定することができる。   In step ST202 (step ST201: YES), the medicine injection control unit 311 determines whether or not the blow-down process has been started (executed). The medicinal injection control unit 311 can determine whether the blow-down process has been started based on the presence or absence of an external stop signal output from the blow-down process control unit 200.

このステップST202において、薬注制御部311により、ブローダウン処理が開始された(YES)と判定された場合に、処理はステップST204へ移行する。この場合に、薬注処理の実行は待機状態となる。また、ステップST202において、薬注制御部311により、ブローダウン処理が開始されていない(NO)と判定された場合に、処理はステップST203へ移行する。   In this step ST202, when it determines with the chemical injection control part 311 having started the blowdown process (YES), a process transfers to step ST204. In this case, execution of the medicine injection process is in a standby state. Moreover, in step ST202, when it determines with the chemical injection control part 311 not having started the blowdown process (NO), a process transfers to step ST203.

ステップST203(ステップST202:NO)において、薬注制御部311は、ステップST201で取得したパルス信号に基づいて薬剤の投入量を算出し、その投入量に対応したパルス幅を有するポンプ駆動信号を薬剤供給ポンプ350に出力する。これにより、薬剤供給ポンプ350において、薬注処理が実行される。このステップST203における薬注処理が終了すると、本フローチャートの処理は終了する(ステップST201へリターンする)。   In step ST203 (step ST202: NO), the medicinal injection control unit 311 calculates the dose of the drug based on the pulse signal acquired in step ST201, and the pump drive signal having a pulse width corresponding to the dose is set as the drug. Output to the supply pump 350. Thereby, the medicine injection process is executed in the medicine supply pump 350. When the medicine injection process in step ST203 ends, the process of this flowchart ends (returns to step ST201).

なお、ステップST203において薬注処理を実行している間に、ブローダウン処理が開始された場合には、後述するステップST204の処理へ移行する。その場合に、ステップST203において実行された薬注処理はキャンセルされる。   In addition, when the blow-down process is started while the medicine injection process is being performed in step ST203, the process proceeds to step ST204 described later. In that case, the medicine injection process performed in step ST203 is cancelled.

一方、ステップST204(ステップST202:YES)において、薬注制御部311は、流量センサ135から出力されたパルス信号数Pをカウントする(Pのカウントをスタート)。   On the other hand, in step ST204 (step ST202: YES), the medicine injection control unit 311 counts the number P of pulse signals output from the flow sensor 135 (starts counting P).

ステップST205において、薬注制御部311は、ブローダウン処理が終了したか否かを判定する。このステップST205において、薬注制御部311により、ブローダウン処理が終了した(YES)と判定された場合に、処理はステップST206へ移行する。また、ステップST205において、薬注制御部311により、ブローダウン処理が終了していない(NO)と判定された場合に、処理はステップST205へ戻る。   In step ST205, the medicine injection control unit 311 determines whether or not the blow-down process has been completed. In step ST205, when the chemical injection control unit 311 determines that the blow-down process has ended (YES), the process proceeds to step ST206. In step ST205, when the chemical injection control unit 311 determines that the blow-down process has not ended (NO), the process returns to step ST205.

ステップST206(ステップST205:YES)において、薬注制御部311は、カウントしたパルス信号数Pをメモリ320に記憶すると共に、パルス信号数Pのカウント値をリセットする。   In step ST206 (step ST205: YES), the medicine injection control unit 311 stores the counted pulse signal number P in the memory 320 and resets the count value of the pulse signal number P.

ステップST207において、薬注制御部311は、カウントしたパルス信号数Pをメモリ320から読み出し、パルス信号数Pに比例した薬剤の投入量分を算出し、その投入量分に対応したパルス幅を有するポンプ駆動信号を薬剤供給ポンプ350に出力する。これにより、薬剤供給ポンプ350において、薬注処理が実行される。   In step ST207, the medicinal injection control unit 311 reads the counted number of pulse signals P from the memory 320, calculates the amount of the drug to be injected in proportion to the number of pulse signals P, and has a pulse width corresponding to the amount of input. A pump drive signal is output to the medicine supply pump 350. Thereby, the medicine injection process is executed in the medicine supply pump 350.

ステップST208において、薬注制御部311は、薬注処理が終了したか否かを判定する。このステップST208において、薬注制御部311により、薬注処理が終了した(YES)と判定された場合に、本フローチャートの処理は終了する(ステップST201へリターンする)。また、ステップST208において、薬注処理が終了していない(NO)と判定された場合に、処理はステップST209へ移行する。   In step ST208, the chemical injection control unit 311 determines whether or not the chemical injection processing has ended. In this step ST208, when it is determined by the chemical injection control unit 311 that the chemical injection process has been completed (YES), the processing of this flowchart ends (returns to step ST201). Moreover, in step ST208, when it determines with the chemical injection process not being complete | finished (NO), a process transfers to step ST209.

ステップST209(ステップST208:NO)において、薬注制御部311は、ブローダウン処理が開始(実行)されたか否かを判定する。薬注制御部311は、ブローダウン処理制御部200から出力される外部停止信号の有無により、ブローダウン処理が開始されたか否かを判定することができる。   In step ST209 (step ST208: NO), the medicine injection control unit 311 determines whether or not the blow-down process has been started (executed). The medicinal injection control unit 311 can determine whether the blow-down process has been started based on the presence or absence of an external stop signal output from the blow-down process control unit 200.

このステップST209において、薬注制御部311により、ブローダウン処理が開始された(YES)と判定された場合に、処理はステップST210へ移行する。また、ステップST209において、薬注制御部311により、ブローダウン処理が開始されていない(NO)と判定された場合に、処理はステップST208へ戻る。   In this step ST209, when it determines with the chemical injection control part 311 having started the blowdown process (YES), a process transfers to step ST210. In step ST209, when the chemical injection control unit 311 determines that the blow-down process has not been started (NO), the process returns to step ST208.

ステップST210(ステップST209:YES)において、薬注制御部311は、薬剤供給ポンプ350へのポンプ駆動信号の出力を停止して、薬注処理を中断させる。また、薬注制御部311は、中断させた薬注処理において循環水W2に供給されなかった薬剤の投入量分をメモリ320に記憶させる。   In step ST210 (step ST209: YES), the medicine injection control unit 311 stops the output of the pump drive signal to the medicine supply pump 350 and interrupts the medicine injection process. In addition, the medicinal injection control unit 311 stores in the memory 320 the amount of medicine that has not been supplied to the circulating water W2 in the interrupted medicating process.

ステップST211において、薬注制御部311は、流量センサ135から出力されたパルス信号数Pをカウントする(Pのカウントをスタート)。   In step ST211, the medicine injection control unit 311 counts the number P of pulse signals output from the flow sensor 135 (starts counting P).

ステップST212において、薬注制御部311は、ブローダウン処理が終了したか否かを判定する。このステップST212において、薬注制御部311により、ブローダウン処理が終了した(YES)と判定された場合に、処理はステップST213へ移行する。また、ステップST212において、薬注制御部311により、ブローダウン処理が終了していない(NO)と判定された場合に、処理はステップST212へ戻る。   In step ST212, the chemical injection control unit 311 determines whether or not the blow-down process has ended. In this step ST212, when the chemical injection control unit 311 determines that the blow-down process has ended (YES), the process proceeds to step ST213. In step ST212, when the chemical injection control unit 311 determines that the blow-down process has not ended (NO), the process returns to step ST212.

ステップST213(ステップST212:YES)において、薬注制御部311は、カウントしたパルス信号数Pをメモリ320に記憶すると共に、パルス信号数Pのカウント値をリセットする。   In step ST213 (step ST212: YES), the medicine injection control unit 311 stores the counted number of pulse signals P in the memory 320 and resets the count value of the number of pulse signals P.

ステップST214において、薬注制御部311は、中断させた薬注処理において循環水W2に供給されなかった薬剤の投入量分をメモリ320から読み出す。また、薬注制御部311は、カウントしたパルス信号数Pをメモリ320から読み出し、パルス信号数Pに比例した薬剤の投入量分を算出する。そして、薬注制御部311は、中断させた薬注処理において循環水W2に供給されなかった薬剤の投入量分と、ブローダウン処理の実行期間中に検出されたパルス信号数Pに比例した薬剤の投入量分とを合計した量の薬剤W3が循環水W2に供給されるように、薬剤の合計量に対応したパルス幅を有するポンプ駆動信号を薬剤供給ポンプ350に出力する。これにより、薬剤供給ポンプ350において薬注処理が実行(再開)される。このステップST214における薬注処理が終了すると、本フローチャートの処理は終了する(ステップST201へリターンする)。   In step ST214, the medicinal injection control unit 311 reads from the memory 320 the amount of the medicine that has not been supplied to the circulating water W2 in the interrupted medicinal injection process. In addition, the medicine injection control unit 311 reads the counted number of pulse signals P from the memory 320, and calculates the amount of medicine input proportional to the number of pulse signals P. And the chemical injection control part 311 is the chemical | drug | medicine proportional to the input amount of the chemical | medical agent which was not supplied to circulating water W2 in the interrupted chemical injection process, and the pulse signal number P detected during the execution period of blowdown processing. A pump drive signal having a pulse width corresponding to the total amount of the drug is output to the drug supply pump 350 so that the total amount of the drug W3 is supplied to the circulating water W2. Thereby, the medicine injection process is executed (restarted) in the medicine supply pump 350. When the medicine injection process in step ST214 is completed, the process of this flowchart ends (returns to step ST201).

次に、補助薬注処理について説明する。図8及び図9は、薬剤供給装置300において補助薬注処理を実行する場合の処理手順を示すフローチャートである。図8及び図9に示すフローチャートの処理は、メモリ320に記憶された制御プログラムに基づいて、薬注制御部311及び計時部312により実行される。また、図8及び図9に示すフローチャートの処理は、冷却システム1の運転中において、繰り返し実行される。   Next, the auxiliary drug injection process will be described. FIG. 8 and FIG. 9 are flowcharts showing a processing procedure in the case where the auxiliary drug injection process is executed in the medicine supply device 300. The processing of the flowcharts shown in FIGS. 8 and 9 is executed by the medicine injection control unit 311 and the time measuring unit 312 based on the control program stored in the memory 320. 8 and 9 are repeatedly executed during the operation of the cooling system 1.

図8に示すステップST301において、薬注制御部311は、循環水ポンプ132へのポンプ運転信号の出力があるか否か(冷却塔120の運転中か否か)を判定する。このステップST301において、薬注制御部311により、循環水ポンプ132へのポンプ運転信号の出力がある(YES)と判定された場合に、処理はステップST302へ移行する。また、ステップST301において、薬注制御部311により、循環水ポンプ132へのポンプ運転信号の出力がない(NO)と判定された場合に、処理はステップST301へ戻る。   In step ST301 shown in FIG. 8, the chemical injection control unit 311 determines whether there is an output of a pump operation signal to the circulating water pump 132 (whether the cooling tower 120 is in operation). In step ST301, when the chemical injection control unit 311 determines that there is an output of a pump operation signal to the circulating water pump 132 (YES), the process proceeds to step ST302. Moreover, in step ST301, when the chemical injection control unit 311 determines that there is no pump operation signal output to the circulating water pump 132 (NO), the process returns to step ST301.

ステップST302において、薬注制御部311は、流量センサ135からのパルス信号の出力がないか否かを判定する。このステップST302において、薬注制御部311により、流量センサ135からのパルス信号の出力がない(YES)と判定された場合に、処理はステップST303へ移行する。また、ステップST302において、薬注制御部311により、流量センサ135からのパルス信号の出力がある(NO)と判定された場合に、処理はステップST302へ戻る。   In step ST302, the medicine injection control unit 311 determines whether or not there is no pulse signal output from the flow sensor 135. In this step ST302, when the chemical injection control unit 311 determines that there is no pulse signal output from the flow sensor 135 (YES), the process proceeds to step ST303. In step ST302, when the chemical injection control unit 311 determines that there is a pulse signal output from the flow sensor 135 (NO), the process returns to step ST302.

ステップST303(ステップST302:YES)において、計時部312は、滞留時間Tの計時をスタートする。滞留時間Tは、流量センサ135からパルス信号が出力されていない期間である。Step ST 303: (Step ST 302 YES), time counting unit 312 starts counting the residence time T T. The residence time T T is the period of the pulse signal from the flow rate sensor 135 is not outputted.

ステップST303において、薬注制御部311は、計時部312で計時されている滞留時間Tが許容滞留時間Tを超過したか否かを判定する。なお、薬注制御部311は、許容滞留時間Tをメモリ320から取得する。このステップST304において、薬注制御部311により、滞留時間T>許容滞留時間Tである(YES)と判定された場合に、処理はステップST307へ移行する。また、ステップST304において、薬注制御部311により、滞留時間T≦許容滞留時間Tである(NO)と判定された場合に、処理はステップST305へ移行する。In step ST 303, dosing control unit 311, the residence time T T, which is kept by time keeping unit 312 determines whether or not exceeded the allowable residence time T W. Incidentally, dosing control unit 311 obtains the allowable residence time T W from the memory 320. In this step ST304, when the chemical injection control unit 311 determines that the residence time T T > the allowable residence time T W (YES), the process proceeds to step ST307. Further, in step ST 304, the dosing control unit 311, when it is determined that the residence time T T ≦ allowable residence time T W (NO), the process proceeds to step ST 305.

ステップST305(ステップST304:NO)において、薬注制御部311は、流量センサ135からのパルス信号の出力があるか否かを判定する。このステップST305において、薬注制御部311により、流量センサ135からのパルス信号の出力がある(YES)と判定された場合に、処理はステップST306へ移行する。また、ステップST305において、薬注制御部311により、流量センサ135からのパルス信号の出力がない(NO)と判定された場合に、処理はステップST304へ戻る。   In step ST305 (step ST304: NO), the medicine injection control unit 311 determines whether or not there is a pulse signal output from the flow sensor 135. In this step ST305, when it determines with the chemical injection control part 311 having the output of the pulse signal from the flow sensor 135 (YES), a process transfers to step ST306. In step ST305, when the chemical injection control unit 311 determines that there is no pulse signal output from the flow sensor 135 (NO), the process returns to step ST304.

ステップST306(ステップST305:YES)において、薬注制御部311は、計時部312による滞留時間Tの計時をリセットさせる。これにより、本フローチャートの処理は終了する(ステップST301へリターンする)。滞留時間Tが許容滞留時間Tに達する前に流量センサ135からのパルス信号の出力があった場合(すなわち、補給水W1の供給があった場合)には、補助薬注処理を実行しないためである。Step ST 306: (Step ST 305 YES), dosing control unit 311 resets the counting of the retention time T T by timing unit 312. Thereby, the process of this flowchart is complete | finished (it returns to step ST301). In the case the residence time T T there is an output of the pulse signals from the flow sensor 135 before reaching the allowable residence time T W (i.e., when there is a supply of makeup water W1), does not execute an auxiliary chemical feed processing Because.

一方、ステップST307(ステップST304:YES)において、薬注制御部311は、予め設定された投入量の薬剤W3が循環水W2に供給されるように、薬剤供給ポンプ350にポンプ駆動信号を出力して、補助薬注処理を実行させる。   On the other hand, in step ST307 (step ST304: YES), the medicine injection control unit 311 outputs a pump drive signal to the medicine supply pump 350 so that a preset amount of medicine W3 is supplied to the circulating water W2. Then, the auxiliary drug injection process is executed.

次に、図9に示すステップST308において、薬注制御部311は、ブローダウン処理が開始(実行)されたか否かを判定する。このステップST308において、薬注制御部311により、ブローダウン処理が開始された(YES)と判定された場合に、処理はステップST309へ移行する。また、ステップST308において、薬注制御部311により、ブローダウン処理が開始されていない(NO)と判定された場合に、処理はステップST314へ移行する。   Next, in step ST308 shown in FIG. 9, the medicine injection control unit 311 determines whether or not the blow-down process has been started (executed). In this step ST308, when it determines with the chemical injection control part 311 having started the blowdown process (YES), a process transfers to step ST309. Moreover, in step ST308, when the chemical injection control part 311 determines with the blowdown process not being started (NO), a process transfers to step ST314.

ステップST309(ステップST308:YES)において、薬注制御部311は、薬剤供給ポンプ350へのポンプ駆動信号の出力を停止して、補助薬注処理を強制終了させる。これにより、本フローチャートの処理は終了する(ステップST306へ移行する)。   In step ST309 (step ST308: YES), the medicine injection control unit 311 stops the output of the pump drive signal to the medicine supply pump 350 and forcibly ends the auxiliary medicine injection processing. Thereby, the process of this flowchart is complete | finished (it transfers to step ST306).

一方、ステップST310(ステップST308:NO)において、薬注制御部311は、補助薬注処理が終了したか否かを判定する。このステップST310において、薬注制御部311により、補助薬注処理が終了した(YES)と判定された場合に、本フローチャートの処理は終了する(ステップST306へ移行する)。このように、補助薬注処理の実行期間中にブローダウン処理が実行されなければ、補助薬注処理を途中で終了することなく、本フローチャートの処理は終了する。   On the other hand, in step ST310 (step ST308: NO), the chemical injection control unit 311 determines whether or not the auxiliary chemical injection processing has ended. In this step ST310, when it is determined by the chemical injection control unit 311 that the auxiliary chemical injection processing has been completed (YES), the processing of this flowchart ends (the process proceeds to step ST306). Thus, if the blow-down process is not executed during the execution period of the auxiliary drug injection process, the process of the present flowchart ends without ending the auxiliary drug injection process halfway.

また、ステップST310において、薬注制御部311により、補助薬注処理が終了していない(NO)と判定された場合に、処理はステップST308へ戻る。   In step ST310, when the chemical injection control unit 311 determines that the auxiliary chemical injection processing has not ended (NO), the process returns to step ST308.

上述した本実施形態の薬剤供給装置300によれば、例えば、以下のような効果を奏する。   According to the medicine supply device 300 of the present embodiment described above, for example, the following effects can be obtained.

薬剤供給装置300は、ブローダウン処理の実行中は薬注処理の実行を待機(停止)させ、その薬注処理の実行中に次のブローダウン処理が実行されたときには、薬注処理の実行を中断(停止)させる。そのため、ブローダウン処理と薬注処理とが同時期に実行されることが回避され、次のブローダウン処理の実行中に供給された薬剤が、直ちに循環水W2の一部と共に系外に排出されることがない。従って、薬剤供給装置300によれば、停止させた薬注処理の実行中に開始される次のブローダウン処理により、薬剤が無駄に消費されるのを抑制することができる。   The medicine supply device 300 waits (stops) the execution of the chemical injection process during the blow-down process, and executes the chemical injection process when the next blow-down process is executed during the execution of the chemical injection process. Suspend (stop). Therefore, it is avoided that the blow-down process and the chemical injection process are performed at the same time, and the medicine supplied during the execution of the next blow-down process is immediately discharged out of the system together with a part of the circulating water W2. There is nothing to do. Therefore, according to the medicine supply device 300, it is possible to suppress the wasteful consumption of the medicine by the next blow-down process started during the execution of the stopped medicine injection process.

また、薬剤供給装置300は、ブローダウン処理により薬注処理を中断させた場合には、そのブローダウン処理の終了後に薬注処理を再開させて、中断させた薬注処理により供給されなかった薬剤の投入量分と、ブローダウン処理の実行期間中における補給水量に比例した薬剤の投入量とを合計した量の薬剤を循環水W2に供給させる。従って、薬剤供給装置300によれば、停止させた薬注処理の実行中に次のブローダウン処理が実行された場合でも、そのブローダウン処理の終了後に、必要量の薬剤W3を速やかに循環水W2に供給することができる。   Further, when the medicine supply process is interrupted by the blow-down process, the medicine supply device 300 restarts the medicine injection process after the blow-down process is finished, and the medicine is not supplied by the interrupted medicine injection process. Is added to the circulating water W2 in an amount that is the sum of the amount of charged and the amount of chemical that is proportional to the amount of makeup water during the blow-down process. Therefore, according to the medicine supply device 300, even when the next blow-down process is executed during the execution of the stopped chemical injection process, the necessary amount of the medicine W3 is quickly circulated after the blow-down process is completed. Can be supplied to W2.

また、薬剤供給装置300は、冷却塔120の運転中であり、且つ補給水W1が冷却塔120へ供給されない滞留時間Tが許容滞留時間Tを超過した場合には、薬剤供給ポンプ350において補助薬注処理を実行させる。そのため、薬剤供給装置300は、被冷却装置131の負荷が低い場合等において、循環水系内での薬効を効果的に維持することができる。When the cooling tower 120 is in operation and the residence time T T during which the makeup water W1 is not supplied to the cooling tower 120 exceeds the allowable residence time T W , the medicine supply device 300 operates in the medicine supply pump 350. The supplementary medicine injection process is executed. Therefore, the medicine supply device 300 can effectively maintain the medicinal effect in the circulating water system when the load on the apparatus to be cooled 131 is low.

また、薬剤供給装置300は、補助薬注処理において、薬剤供給装置300から循環水W2に殺菌剤が供給される。一般に、冷却塔120の運転中に補給水W1が冷却塔120へ供給されない時間が長く続いた場合、スケール防止剤や防食剤の消耗は少ないが、菌類の増殖により殺菌剤の消耗は多くなる。しかし、薬剤供給装置300においては、冷却塔120の運転中に補給水W1が冷却塔120へ供給されない時間が長く続いた場合には、補助薬注処理において循環水W2に殺菌剤が供給されるため、循環水系のスライム障害を効果的に抑制することができる。   In addition, the medicine supply device 300 supplies the bactericide from the medicine supply device 300 to the circulating water W2 in the auxiliary medicine injection process. In general, when the replenishment water W1 is not supplied to the cooling tower 120 for a long time during the operation of the cooling tower 120, the consumption of the scale inhibitor and the anticorrosive agent is small, but the consumption of the bactericide increases due to the growth of fungi. However, in the medicine supply device 300, when the replenishment water W1 is not supplied to the cooling tower 120 for a long time during the operation of the cooling tower 120, the sterilizing agent is supplied to the circulating water W2 in the auxiliary medicine injection process. Therefore, slime failure in the circulating water system can be effectively suppressed.

また、薬剤供給装置300は、循環水W2の濃縮倍率の変化に追従して、薬剤の必要量を調整する。そのため、薬剤供給装置は、冷却塔120の運転中に補給水W1及び循環水W2の電気伝導率が変動しても、循環水W2中の薬剤濃度を適切な薬剤維持濃度に保ちながら、薬剤の無駄な消費を抑制することができる。   Moreover, the chemical | medical agent supply apparatus 300 adjusts the required quantity of a chemical | medical agent following the change of the concentration rate of the circulating water W2. Therefore, even if the electrical conductivity of the makeup water W1 and the circulating water W2 fluctuates during the operation of the cooling tower 120, the chemical supply device maintains the chemical concentration in the circulating water W2 at an appropriate chemical maintenance concentration. Wasteful consumption can be suppressed.

以上、本発明の好適な実施形態について説明したが、本発明は上述した実施形態に限定されることなく、以下のように種々の形態で実施することができる。   As mentioned above, although preferred embodiment of this invention was described, this invention is not limited to embodiment mentioned above, It can implement with a various form as follows.

本実施形態では、循環水系を有する産業用設備として、循環水ラインL110を有する冷却塔120を例に説明した。この例に限らず、循環水系を有する産業用設備は、例えば、ボイラ装置や逆浸透膜装置であってもよい。   In this embodiment, the cooling tower 120 which has the circulating water line L110 was demonstrated to the example as industrial equipment which has a circulating water system. Not only this example but industrial equipment which has a circulating water system may be a boiler device and a reverse osmosis membrane device, for example.

ボイラ装置の場合、例えば、多管式の貫流ボイラでは、ボイラ本体で発生した気水混合物を上部ヘッダに連結された気水分離器で蒸気と飽和水とに分離し、飽和水を降水管(循環水系)により下部ヘッダに戻すように構成されている。従って、この種のボイラ装置において、循環水系を流通する水の一部を排出すると共に、外部から供給される補給水をボイラ本体に導入する処理を、ブローダウン処理と看做すことができる。   In the case of a boiler device, for example, in a multi-tube type once-through boiler, the steam-water mixture generated in the boiler body is separated into steam and saturated water by a steam-water separator connected to the upper header, and the saturated water is separated into a precipitation pipe ( It is configured to return to the lower header by a circulating water system. Therefore, in this type of boiler apparatus, the process of discharging a part of the water flowing through the circulating water system and introducing the makeup water supplied from the outside into the boiler body can be regarded as a blow-down process.

また、逆浸透膜装置の場合、一次側の膜表面での流速を確保するため、一般に、膜モジュールの外に排出される濃縮水の一部を、濃縮水返送ライン(循環水系)を介して加圧ポンプの原水吸込側に戻す、クロスフロー方式が採用されている。従って、クロスフロー方式の逆浸透膜装置において、循環水系を流通する濃縮水の一部を排出すると共に、外部から供給される原水を逆浸透膜装置に導入する処理を、ブローダウン処理と看做すことができる。   In the case of a reverse osmosis membrane device, in order to secure the flow velocity on the primary membrane surface, in general, a part of the concentrated water discharged outside the membrane module is passed through a concentrated water return line (circulating water system). A cross-flow system is used to return to the raw water suction side of the pressure pump. Therefore, in the cross-flow type reverse osmosis membrane device, a process of discharging a part of the concentrated water flowing through the circulating water system and introducing the raw water supplied from the outside into the reverse osmosis membrane device is regarded as a blow-down process. I can do it.

本実施形態では、薬剤を貯留部122に供給する例について説明した。しかし、薬剤を循環水系(塔本体121及び循環水ラインL110)に供給することができれば、薬剤を供給する位置はこの例に限定されない。例えば、薬剤を塔本体121の散水部(不図示)に供給してもよいし、循環水供給ラインL111又は循環水回収ラインL112に供給してもよい。また、薬剤を補給水W1に供給してもよいし、補給水W1及び循環水W2の両方に供給してもよい。   In this embodiment, the example which supplies a chemical | medical agent to the storage part 122 was demonstrated. However, the position for supplying the drug is not limited to this example as long as the drug can be supplied to the circulating water system (the tower main body 121 and the circulating water line L110). For example, the chemical may be supplied to a watering part (not shown) of the tower main body 121, or may be supplied to the circulating water supply line L111 or the circulating water recovery line L112. Further, the medicine may be supplied to the makeup water W1, or may be supplied to both the makeup water W1 and the circulating water W2.

本実施形態では、第1ECセンサ133を貯留部122に配置する例について説明した。これに限らず、第1ECセンサ133を循環水回収ラインL112に配置してもよい。また、本実施形態では、第1ECセンサ133で検出された第1電気伝導率ECが上限閾値ECb1以上となった場合にブローダウン処理を実行する例について説明した。このほか、冷却塔120の蒸発損失量を検出し、検出した蒸発損失量に基づいて循環水W2の濃縮度を推定することにより、ブローダウン処理の実行の可否を判定するようにしてもよい。In this embodiment, the example which arrange | positions the 1st EC sensor 133 in the storage part 122 was demonstrated. Not limited to this, the first EC sensor 133 may be disposed in the circulating water recovery line L112. In the present embodiment, the example in which the blow-down process is executed when the first electrical conductivity EC 1 detected by the first EC sensor 133 is equal to or higher than the upper limit threshold EC b1 has been described. In addition, the evaporative loss amount of the cooling tower 120 may be detected, and the concentration of the circulating water W2 may be estimated based on the detected evaporative loss amount to determine whether or not the blowdown process can be performed.

本実施形態では、ブローダウン処理として、補給水W1を強制的に冷却塔120へ供給することにより、循環水W2の一部を冷却塔120から系外に排出する例(強制補給)について説明した。このほかのブローダウン処理として、例えば、排水ラインL130に排水バルブを設け、この排水バルブを開いて循環水W2を冷却塔120から強制的に系外に排出することにより、補給水W1を冷却塔120へ供給させてもよい(強制排水)。この場合、排水ラインL130の上流側の端部は、貯留部122(図1参照)の底部に接続される。   In the present embodiment, as the blow-down process, an example (forcible replenishment) in which part of the circulating water W2 is discharged out of the system from the cooling tower 120 by forcibly supplying the makeup water W1 to the cooling tower 120 has been described. . As another blow-down process, for example, a drain valve is provided in the drain line L130, and the drain valve is opened to forcibly discharge the circulating water W2 from the cooling tower 120 to the outside of the system, thereby supplying the makeup water W1 to the cooling tower. 120 may be supplied (forced drainage). In this case, the upstream end of the drain line L130 is connected to the bottom of the reservoir 122 (see FIG. 1).

また、ブローダウン処理として、循環水W2の一部を循環水ラインL110から系外に排出してもよい。また、ブローダウン処理として、循環水W2の一部を冷却塔120及び循環水ラインL110の両方から系外に排出してもよい。   Moreover, you may discharge | release a part of circulating water W2 out of the system from the circulating water line L110 as a blowdown process. Moreover, you may discharge | emit a part of circulating water W2 out of the system from both the cooling tower 120 and the circulating water line L110 as a blowdown process.

本実施形態では、薬剤供給装置300の薬剤供給ポンプ350として、電磁駆動ダイアフラム式の定量ポンプを用いる例について説明した。この例に限らず、薬剤供給ポンプ350として、プランジャーポンプ、ベローズポンプ等の定量吐出ポンプを用いてもよい。   In the present embodiment, an example in which an electromagnetically driven diaphragm type metering pump is used as the medicine supply pump 350 of the medicine supply apparatus 300 has been described. Not limited to this example, a fixed amount discharge pump such as a plunger pump or a bellows pump may be used as the medicine supply pump 350.

本実施形態では、冷却塔120を開放式冷却塔として構成した例について示した。この例に限らず、冷却塔120を密閉式冷却塔として構成してもよい。   In the present embodiment, an example in which the cooling tower 120 is configured as an open cooling tower has been described. Not limited to this example, the cooling tower 120 may be configured as a hermetic cooling tower.

本発明は、その精神又は主要な特徴から逸脱することなく、他のいろいろな形で実施することができる。そのため、上記の実施形態若しくは実施例は、あらゆる点で単なる例示に過ぎず、限定的に解釈してはならない。本発明の範囲は、請求の範囲によって示すものであって、明細書本文には何ら拘束されない。更に、請求の範囲の均等範囲に属する変形や変更は、全て本発明の範囲内のものである。   The present invention can be implemented in various other forms without departing from the spirit or main features thereof. Therefore, the above-described embodiments or examples are merely examples in all respects and should not be interpreted in a limited manner. The scope of the present invention is indicated by the scope of claims, and is not restricted by the text of the specification. Further, all modifications and changes belonging to the equivalent scope of the claims are within the scope of the present invention.

1 冷却システム
100 システム制御ユニット
120 冷却塔
122 貯留部
133 第1ECセンサ(第1電気伝導率センサ)
135 流量センサ(流量検出手段)
136 補給水バルブ
137 給水栓
138 オーバーフロー口
139 第2ECセンサ(第2電気伝導率センサ)
201 ブローダウン処理制御部
210 メモリ
300 薬剤供給装置
310 薬注制御ユニット
311 薬注制御部(薬剤供給制御部)
312 計時部
320 メモリ(記憶部)
330 薬剤タンク(薬剤供給手段)
350 薬剤供給ポンプ(薬剤供給手段)
L110 循環水ライン
L120 補給水ライン
L130 排水ライン
L140 薬剤供給ライン
W1 補給水
W2 循環水
W3 薬剤
DESCRIPTION OF SYMBOLS 1 Cooling system 100 System control unit 120 Cooling tower 122 Storage part 133 1st EC sensor (1st electric conductivity sensor)
135 Flow rate sensor (flow rate detection means)
136 Supply water valve 137 Water tap 138 Overflow port 139 Second EC sensor (second electrical conductivity sensor)
201 Blowdown processing control unit 210 Memory 300 Drug supply device 310 Drug injection control unit 311 Drug injection control unit (drug supply control unit)
312 Timekeeping unit 320 Memory (storage unit)
330 Drug tank (Drug supply means)
350 Drug supply pump (drug supply means)
L110 Circulating water line L120 Supplementary water line L130 Drainage line L140 Chemical supply line W1 Supplementary water W2 Circulating water W3 Chemical

Claims (5)

循環水が循環する循環水系に供給された補給水の水量を検出し、検出水量値として出力する流量検出手段と、
前記循環水系に薬剤を供給する薬剤供給処理を実行可能な薬剤供給手段と、
前記流量検出手段から出力された検出水量値に比例した投入量の薬剤が前記循環水系に供給されるように、前記薬剤供給手段において前記薬剤供給処理を実行させる薬剤供給制御部と、
前記薬剤供給処理において前記薬剤供給手段から前記循環水系に供給されなかった薬剤の投入量分を記憶する記憶部と、を備え、
前記薬剤供給制御部は、(i)補給水を前記循環水系に供給しながら、当該循環水系を流通する循環水の一部を外部に排出するブローダウン処理の実行期間中であれば、前記薬剤供給処理の実行を待機させ、前記ブローダウン処理の終了後に、当該ブローダウン処理の実行期間中に検出された検出水量値に比例した投入量の薬剤が前記循環水系に供給されるように、前記薬剤供給手段において前記薬剤供給処理を実行させ、(ii)当該薬剤供給処理の実行中に、次のブローダウン処理が実行された場合には、前記薬剤供給処理の実行を中断させ、当該薬剤供給処理において前記循環水系に供給されなかった薬剤の投入量分を前記記憶部に記憶させると共に、前記次のブローダウン処理の終了後に、前記記憶部に記憶させた薬剤の投入量分と、前記次のブローダウン処理の実行期間中に検出された検出水量値に比例した薬剤の投入量とを合計した量の薬剤が前記循環水系に供給されるように、前記薬剤供給手段において前記薬剤供給処理を実行させる、
薬剤供給装置。
A flow rate detecting means for detecting the amount of makeup water supplied to the circulating water system through which the circulating water circulates and outputting as a detected water amount value;
A medicine supply means capable of executing a medicine supply process for supplying a medicine to the circulating water system;
A medicine supply control unit that causes the medicine supply means to execute the medicine supply process so that an input amount of medicine proportional to the detected water amount value output from the flow rate detection means is supplied to the circulating water system;
A storage unit that stores an amount of medicine that has not been supplied from the medicine supply means to the circulating water system in the medicine supply process;
The drug supply control unit (i) supplies the make-up water to the circulating water system while the blow-down process for discharging a part of the circulating water flowing through the circulating water system to the outside is performed. Waiting for the execution of the supply process, and after completion of the blow-down process, the amount of medicine proportional to the detected water amount value detected during the execution period of the blow-down process is supplied to the circulating water system. (Ii) When the next blow-down process is executed during the execution of the medicine supply process, the medicine supply process is interrupted and the medicine supply process is interrupted. The amount of the medicine that has not been supplied to the circulating water system in the processing is stored in the storage unit, and the amount of the medicine that is stored in the storage unit after the completion of the next blow-down process, In the medicine supply means, the medicine supply means supplies the medicine in an amount that is the sum of the amount of medicine input proportional to the detected water amount detected during the next blow-down process. To execute the process,
Drug supply device.
前記薬剤供給制御部は、薬剤の投入量を式(1)に基づいて算出する、
請求項1に記載の薬剤供給装置。
W=V×C÷N÷D (1)
W:薬剤の投入量
V:補給水の検出水量値
C:循環水中の薬剤の維持濃度
N:循環水の濃縮倍率
D:薬剤の密度
The medicine supply control unit calculates the dosage of medicine based on the formula (1).
The drug supply device according to claim 1.
W = V × C ÷ N ÷ D (1)
W: amount of drug input V: detected water amount value of makeup water C: maintenance concentration of drug in circulating water N: concentration rate of circulating water D: density of drug
前記循環水系は、
供給された補給水を含む循環水を冷却し、冷却した循環水を被冷却装置へ供給する冷却塔に接続されると共に、
循環水の電気伝導率を検出し、第1検出電気伝導率値として出力する第1電気伝導率検出手段と、
補給水の電気伝導率を検出し、第2検出電気伝導率値として出力する第2電気伝導率検出手段と、を備えており、
前記薬剤供給制御部は、前記第1電気伝導率検出手段から出力された第1検出電気伝導率及び前記第2電気伝導率検出手段から出力された第2検出電気伝導率を取得して、循環水の前記濃縮倍率を式(2)に基づいて算出する、
請求項2に記載の薬剤供給装置。
N=E1÷E2 (2)
E1:第1検出電気伝導率値
E2:第2検出電気伝導率値
The circulating water system is
The circulating water including the supplied makeup water is cooled, and connected to a cooling tower that supplies the cooled circulating water to the apparatus to be cooled.
First electrical conductivity detection means for detecting the electrical conductivity of the circulating water and outputting it as a first detected electrical conductivity value;
Second electrical conductivity detection means for detecting the electrical conductivity of the makeup water and outputting as a second detected electrical conductivity value;
The medicine supply control unit obtains the first detected electric conductivity output from the first electric conductivity detecting means and the second detected electric conductivity output from the second electric conductivity detecting means, and circulates the medicine supply control section. Calculating the concentration ratio of water based on equation (2),
The drug supply device according to claim 2.
N = E1 ÷ E2 (2)
E1: First detected electric conductivity value E2: Second detected electric conductivity value
前記薬剤供給制御部は、前記循環水系を循環水が循環し、且つ補給水が当該循環水系へ供給されない期間が予め設定された許容期間を超過した場合には、前記薬剤供給手段に、補給水の水量と関係なく、予め設定された投入量の前記薬剤供給処理を実行させる、
請求項1〜3のいずれか一項に記載の薬剤供給装置。
The medicine supply control unit may supply makeup water to the medicine supply means when circulating water circulates in the circulating water system and a period in which makeup water is not supplied to the circulating water system exceeds a preset allowable period. Regardless of the amount of water, the medicine supply process of a preset input amount is executed.
The medicine supply device according to any one of claims 1 to 3.
前記薬剤供給手段は、前記薬剤供給処理において、前記循環水系に供給される薬剤として殺菌剤を供給する、
請求項4に記載の薬剤供給装置。
The drug supply means supplies a bactericide as a drug supplied to the circulating water system in the drug supply process.
The medicine supply device according to claim 4.
JP2014557649A 2013-03-27 2013-03-27 Drug supply device Active JP5720864B2 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2013/059034 WO2014155569A1 (en) 2013-03-27 2013-03-27 Drug supply device

Publications (2)

Publication Number Publication Date
JP5720864B2 true JP5720864B2 (en) 2015-05-20
JPWO2014155569A1 JPWO2014155569A1 (en) 2017-02-16

Family

ID=51622646

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2014557649A Active JP5720864B2 (en) 2013-03-27 2013-03-27 Drug supply device

Country Status (2)

Country Link
JP (1) JP5720864B2 (en)
WO (1) WO2014155569A1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6455201B2 (en) * 2015-02-09 2019-01-23 三浦工業株式会社 Water treatment system
JP6520365B2 (en) * 2015-05-11 2019-05-29 三浦工業株式会社 Chemical feeder

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2540386Y2 (en) * 1988-09-22 1997-07-02 鹿島建設株式会社 Cooling tower equipment
JP2002187263A (en) * 2000-12-20 2002-07-02 Canon Inc Ink jet recording device equipped with ink supply device
JP2009030936A (en) * 2007-07-30 2009-02-12 Kurita Water Ind Ltd Cooling water system chemical injection control method and apparatus
JP5206308B2 (en) * 2008-10-17 2013-06-12 三浦工業株式会社 Circulating water system operation control device and circulating water system operating method
JP5736607B2 (en) * 2010-05-24 2015-06-17 株式会社イワキ Chemical injection control method and chemical injection control device
JP5545541B2 (en) * 2010-07-29 2014-07-09 株式会社リコー Image forming apparatus

Also Published As

Publication number Publication date
WO2014155569A1 (en) 2014-10-02
JPWO2014155569A1 (en) 2017-02-16

Similar Documents

Publication Publication Date Title
JP5206308B2 (en) Circulating water system operation control device and circulating water system operating method
JP2014061494A (en) Water treatment system
JP5720864B2 (en) Drug supply device
US20070207053A1 (en) Salt dispensing system
JP2015089547A (en) Chemical agent supplying device
JP5720865B2 (en) Drug supply device
JP5920141B2 (en) Water treatment system
US11866915B2 (en) Liquid concentrate dosing systems
ES2594558T3 (en) Procedure for the operation of a dosing pump and associated dosing device
JP6123401B2 (en) Drug supply device
JP5983246B2 (en) Water treatment system
JP2014061495A (en) Water treatment system
JP2014092302A (en) Water treatment system
JP6750278B2 (en) Water treatment system
JP2013128927A (en) Chemicals feeding control method of circulating water system and chemicals feeding control device of circulating water system
JP6084385B2 (en) Circulating water system chemical injection control method and circulating water system chemical injection control apparatus
JP5799717B2 (en) Water treatment system
JP2014061496A (en) Water treatment system
JP7331472B2 (en) diagnostic equipment
JP6455201B2 (en) Water treatment system
JP2005061680A (en) Water supply/discharge control device for cooling tower
JP5811621B2 (en) Water treatment system
JP2014062695A (en) Water processing system
US12139429B2 (en) Scaling treatment systems for water heaters
JP7310334B2 (en) Maintenance management device

Legal Events

Date Code Title Description
TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20150224

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20150309

R150 Certificate of patent or registration of utility model

Ref document number: 5720864

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250