Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP5796456B2 - Abnormality diagnosis apparatus and abnormality diagnosis method for electromagnetic field generator in continuous casting facility, and continuous casting method - Google Patents
[go: Go Back, main page]

JP5796456B2 - Abnormality diagnosis apparatus and abnormality diagnosis method for electromagnetic field generator in continuous casting facility, and continuous casting method - Google Patents

Abnormality diagnosis apparatus and abnormality diagnosis method for electromagnetic field generator in continuous casting facility, and continuous casting method Download PDF

Info

Publication number
JP5796456B2
JP5796456B2 JP2011239067A JP2011239067A JP5796456B2 JP 5796456 B2 JP5796456 B2 JP 5796456B2 JP 2011239067 A JP2011239067 A JP 2011239067A JP 2011239067 A JP2011239067 A JP 2011239067A JP 5796456 B2 JP5796456 B2 JP 5796456B2
Authority
JP
Japan
Prior art keywords
electromagnetic field
electromagnetic coil
electromagnetic
abnormality diagnosis
continuous casting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2011239067A
Other languages
Japanese (ja)
Other versions
JP2013094809A (en
Inventor
盛行 宮原
盛行 宮原
裕樹 黒岡
裕樹 黒岡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Steel Corp
Original Assignee
JFE Steel Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JFE Steel Corp filed Critical JFE Steel Corp
Priority to JP2011239067A priority Critical patent/JP5796456B2/en
Publication of JP2013094809A publication Critical patent/JP2013094809A/en
Application granted granted Critical
Publication of JP5796456B2 publication Critical patent/JP5796456B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Continuous Casting (AREA)

Description

本発明は、連続鋳造用鋳型の背面や連続鋳造機の二次冷却帯に配置され、鋳片の未凝固部である溶鋼に電磁場を印加するための電磁場発生装置を備える連続鋳造設備において、電磁場発生装置の異常を診断する異常診断装置及び異常診断方法、並びに連続鋳造方法に関する。   The present invention relates to a continuous casting facility provided with an electromagnetic field generator for applying an electromagnetic field to a molten steel which is an unsolidified portion of a slab, which is disposed on a back surface of a continuous casting mold or a secondary cooling zone of a continuous casting machine. The present invention relates to an abnormality diagnosing device, an abnormality diagnosing method, and a continuous casting method for diagnosing an abnormality in a generator.

鋼の連続鋳造においては、鋳型内に注入された溶鋼に含まれている非金属介在物やガス気泡を積極的に鋳型内の溶鋼表面に浮上させて除去し、これらの少ない清浄性に優れた鋳片を得るために、鋳型内の溶鋼に移動磁場を働かせて攪拌する交流型の電磁場発生装置や、鋳型内の溶鋼に静磁場を働かせて溶鋼流速を減速する直流型の電磁場発生装置が広く用いられている。また、移動磁場を働かせることによってデンドライト凝固組織が溶断されて凝固組織が微細化され、それに伴って鋳片の中心偏析が改善することから、二次冷却帯に移動磁場発生用の交流型の電磁場発生装置を設置することも行われている。なお、交流型の電磁場発生装置は、その機能から電磁攪拌装置とも呼ばれている。   In continuous casting of steel, non-metallic inclusions and gas bubbles contained in the molten steel injected into the mold are positively levitated and removed on the molten steel surface in the mold, and these are excellent in cleanliness. In order to obtain slabs, there are a wide variety of AC electromagnetic field generators that stir the moving steel in the mold by applying a moving magnetic field, and DC type electromagnetic field generators that reduce the flow velocity of the molten steel by applying a static magnetic field to the molten steel in the mold. It is used. In addition, since the dendritic solidified structure is melted by moving the moving magnetic field and the solidified structure is refined, and the center segregation of the slab is improved accordingly, an AC electromagnetic field for generating the moving magnetic field is generated in the secondary cooling zone. Installation of generators is also done. Note that the AC electromagnetic field generator is also called an electromagnetic stirring device because of its function.

電磁場発生装置は、移動磁場発生用の交流型であれ、また静磁場発生用の直流型であれ、鉄心(「ヨーク」ともいう)と、この鉄心を巻回するコイルとで形成される電磁コイルを備える。コイルは、大電流を流す必要があることから、その内部を冷却水が流れる水冷銅管によって形成されており、当該コイルには、一般的に、電力供給用のブスバー及び給水用配管との接続用のコイル口出し部が設けられている。   The electromagnetic field generator is an electromagnetic coil formed of an iron core (also referred to as a “yoke”) and a coil around which the iron core is wound, whether it is an AC type for generating a moving magnetic field or a DC type for generating a static magnetic field. Is provided. Since the coil needs to pass a large current, it is formed by a water-cooled copper pipe through which cooling water flows. Generally, the coil is connected to a bus bar for supplying power and a pipe for supplying water. A coil lead-out portion is provided.

このコイル口出し部及びその周辺の亀裂・損傷を防止するために、コイル口出し部の少なくとも一部を可撓性導体で構成した電磁コイル等も提案されているが、電磁コイルの損傷はコイル口出し部に限るものではないため、設備異常を完全に無くすことはできていなかった。
そこで、電磁場発生装置の異常を診断する方法として、例えば特許文献1に記載の技術がある。この技術は、電磁場発生装置の電磁コイルから所定の強度の電磁場を印加して溶鋼を連続鋳造しているときに電磁コイルへ供給される電力を測定し、測定された供給電力の時系列変化を監視するものである。ここでは、コイル劣化に伴う電磁コイルの抵抗の低下によって生ずる供給電力の変化から、電磁コイルの異常を診断している。
In order to prevent cracks and damage of the coil lead-out portion and its periphery, an electromagnetic coil or the like in which at least a part of the coil lead-out portion is configured by a flexible conductor has been proposed. However, it was not possible to completely eliminate the equipment abnormality.
Thus, as a method for diagnosing an abnormality in the electromagnetic field generator, there is a technique described in Patent Document 1, for example. This technology measures the electric power supplied to an electromagnetic coil when a molten steel is continuously cast by applying an electromagnetic field of a predetermined intensity from an electromagnetic coil of an electromagnetic field generator, and measures the time series change of the measured supply power. It is something to monitor. Here, the abnormality of the electromagnetic coil is diagnosed from the change in the supplied power caused by the decrease in the resistance of the electromagnetic coil accompanying the coil deterioration.

特開2009−39775号公報JP 2009-39775 A

しかしながら、上記特許文献1に記載の連続鋳造設備における電磁場発生装置の異常診断方法にあっては、コイル抵抗の異常は検出できるが、コイル抵抗に異常がなく絶縁抵抗にのみ異常があった場合には、異常を検出できない。これはコイル抵抗と絶縁抵抗がその異常状態によって相関するからである。
絶縁抵抗は電路と大地との絶縁性(電流が漏れない性能)のことであり、銅管の抵抗を意味しない。絶縁低下のみ異常が発生する場合としては、電磁コイルの内部の亀裂等の要因ではなく、コイル銅管そのものが劣化したり、吸湿して絶縁が低下したりした場合が想定され、この場合はコイル抵抗自体には変化はない。
However, in the abnormality diagnosis method for the electromagnetic field generator in the continuous casting facility described in Patent Document 1, an abnormality in the coil resistance can be detected, but there is no abnormality in the coil resistance and there is an abnormality only in the insulation resistance. Cannot detect anomalies. This is because the coil resistance and the insulation resistance correlate depending on the abnormal state.
Insulation resistance refers to the insulation between the electric circuit and the ground (the ability to prevent current leakage), and does not mean the resistance of the copper tube. The case where an abnormality occurs only due to a decrease in insulation is not a factor such as a crack inside the electromagnetic coil, but it is assumed that the coil copper tube itself has deteriorated or the insulation has decreased due to moisture absorption. There is no change in the resistance itself.

電磁コイルの絶縁抵抗は、絶縁抵抗計を用いることで測定可能である。しかしながら、絶縁測定は試験電圧を印加した際の電流から絶縁抵抗に換算するものであるため、電磁場発生電圧と干渉しないタイミングで測定する必要があり、連続して鋳造する連続鋳造機では、電磁コイルを交換するピッチ(約2ヶ月)に依存されていた。つまり、絶縁抵抗の管理は電磁コイルを交換するピッチで行うしかなかった。   The insulation resistance of the electromagnetic coil can be measured by using an insulation resistance meter. However, since the insulation measurement is to convert the current when the test voltage is applied to the insulation resistance, it is necessary to measure at a timing that does not interfere with the electromagnetic field generation voltage. Dependent on the pitch to replace (about 2 months). That is, the insulation resistance can only be managed at a pitch at which the electromagnetic coil is replaced.

そのため、操業中に絶縁抵抗が急激に低下すると、突発的に電磁コイルの交換が発生したり、完全に絶縁が0となるまで印加し続けた結果、コイルそのものが焼損し、コイルの巻替に至ったりするという問題があった。
そこで、本発明は、連続鋳造機に設置された電磁場発生装置の電磁コイルの絶縁診断を短周期で実施可能とする、連続鋳造設備における電磁場発生装置の異常診断装置、異常診断方法及び連続鋳造方法を提供することを課題としている。
Therefore, if the insulation resistance suddenly decreases during operation, the electromagnetic coil may suddenly be replaced, or as a result of continuing to apply until the insulation is completely zero, the coil itself will burn out and coil rewinding will occur. There was a problem of reaching.
Accordingly, the present invention provides an electromagnetic field generator abnormality diagnosis device, abnormality diagnosis method, and continuous casting method in a continuous casting facility that enables insulation diagnosis of electromagnetic coils of an electromagnetic field generator installed in a continuous casting machine to be performed in a short cycle. It is an issue to provide.

上記課題を解決するために、本発明に係る連続鋳造設備における電磁場発生装置の異常診断装置は、連続鋳造機で鋳造する鋳片内部の溶鋼に電磁場を印加するための電磁コイルを備える電磁場発生装置の電路と大地との絶縁性の異常を診断する、連続鋳造設備における電磁場発生装置の異常診断装置であって、前記電磁コイルに一定の直流電圧を印加する異常診断用電源と、鋳片が前記電磁コイルによる電磁場印加領域から抜けたことを検出する鋳片抽出検出手段と、前記鋳片抽出検出手段で鋳片が前記電磁場印加領域から抜けたことを検出したとき、前記電磁コイルと当該電磁コイルに電磁場発生用の電流を供給する電磁場発生用電源との接続を切断し、前記電磁コイルと前記異常診断用電源との接続に切り替える接続切替手段と、前記接続切替手段で前記電磁コイルと前記異常診断用電源とを接続し、前記電磁コイルに前記直流電圧を印加した状態で、前記電磁コイルの銅管の抵抗を測定するのではなく、前記電路と前記大地との絶縁抵抗値を測定し、前記電磁コイルの絶縁抵抗値の異常を診断する異常診断手段と、を備えることを特徴としている。 In order to solve the above problems, an abnormality diagnosis device for an electromagnetic field generator in a continuous casting facility according to the present invention includes an electromagnetic field generator including an electromagnetic coil for applying an electromagnetic field to molten steel inside a slab cast by a continuous casting machine. An abnormality diagnosis device for an electromagnetic field generator in a continuous casting facility for diagnosing an insulation abnormality between the electric circuit and the ground of the abnormality, wherein the abnormality diagnosis power source for applying a constant DC voltage to the electromagnetic coil, A slab extraction detecting means for detecting that the slab has been removed from the electromagnetic field application area, and a slab extraction detecting means for detecting that the slab has been removed from the electromagnetic field application area by the slab extraction detecting means. A connection switching means for cutting off the connection to the electromagnetic field generating power source for supplying an electromagnetic field generating current to the electromagnetic coil and switching to the connection between the electromagnetic coil and the abnormality diagnosis power source; And said power source and the abnormality diagnosis of the electromagnetic coil is connected by the switching means, wherein while applying the DC voltage to the electromagnetic coil, rather than measuring the resistance of the copper tube of the electromagnetic coil, wherein said path earth And an abnormality diagnosis means for diagnosing an abnormality in the insulation resistance value of the electromagnetic coil.

このように、連続鋳造機では鋳造を一旦中断する鋳込間が存在することを利用し、鋳片が電磁コイルによる電磁場印加領域から抜けたことを検出したとき、その時点から所定時間(5分〜15分)が鋳込間となると判断して絶縁試験を開始する。すなわち、電磁場発生装置による電磁場発生が不要な期間に絶縁試験を行うことができ、電磁場発生装置が発生する電磁場と干渉することなく適切に絶縁試験を行うことができる。   As described above, in the continuous casting machine, when it is detected that the casting slab is removed from the electromagnetic field application region by the electromagnetic coil by utilizing the existence of the casting interval in which casting is temporarily interrupted, a predetermined time (5 minutes) from that point is detected. ~ 15 minutes) is determined to be during casting, and the insulation test is started. That is, the insulation test can be performed during a period when the generation of the electromagnetic field by the electromagnetic field generator is unnecessary, and the insulation test can be appropriately performed without interfering with the electromagnetic field generated by the electromagnetic field generator.

また、1日数回必ず発生する鋳込間に絶縁試験を行うので、数回/1日の短スパンで絶縁試験を行うことができる。その結果、電磁コイルの絶縁低下を適切に予測し、絶縁回復処置を行うことができる。さらに、鋳込間となるタイミングを検知して自動で絶縁試験を開始することができるので、絶縁試験を行うための人手を要することがなく効率的である。
さらに、上記において、前記鋳片抽出検出手段は、前記電磁場印加領域の直下流側に設けられたピンチロールの回転速度に基づいて、鋳片の後端部が当該ピンチロールを通過したことを検出し、これをもって鋳片が前記電磁場印加領域から抜けたことを検出することを特徴としている。
In addition, since the insulation test is performed between castings that occur several times a day, the insulation test can be performed in a short span of several times / day. As a result, it is possible to appropriately predict the insulation decrease of the electromagnetic coil and perform insulation recovery treatment. Furthermore, since the insulation test can be automatically started by detecting the timing between casting, it is efficient without requiring manpower for performing the insulation test.
Further, in the above, the slab extraction detecting means detects that the rear end portion of the slab has passed through the pinch roll based on the rotational speed of the pinch roll provided immediately downstream of the electromagnetic field application region. In this way, it is detected that the slab has escaped from the electromagnetic field application region.

このように、ピンチロールが回転している状態から停止したとき、鋳片の後端部が当該ピンチロールを通過し、後続の鋳片が移送されていないと判断することができることを利用し、電磁コイルによる電磁場印加領域の直下流側に設けられたピンチロールの回転速度に基づいて、鋳片の後端部が当該電磁場印加領域の直下流側に設けられたピンチロールを通過したことを検出する。したがって、比較的簡易な手法で、適切に絶縁試験の開始タイミングを検出することができる。   Thus, when the pinch roll is stopped from the rotating state, the rear end of the slab passes through the pinch roll, and it can be determined that the subsequent slab is not transferred, Based on the rotational speed of the pinch roll provided immediately downstream of the electromagnetic field application region by the electromagnetic coil, it is detected that the rear end portion of the slab has passed the pinch roll provided immediately downstream of the electromagnetic field application region. To do. Therefore, the start timing of the insulation test can be appropriately detected by a relatively simple method.

また、上記において、溶鋼が前記電磁場印加領域に装入されたことを検出する溶鋼装入検出手段と、前記溶鋼装入検出手段で溶鋼が前記電磁場印加領域に装入されたことを検出したとき、前記電磁コイルと前記異常診断用電源との接続を切断し、前記電磁コイルと前記電磁場発生用電源との接続を復帰する接続復帰手段と、を備えることを特徴としている。   Further, in the above, when detecting that the molten steel is inserted into the electromagnetic field application region, and molten steel charging detection means for detecting that the molten steel is charged into the electromagnetic field application region, And a connection return means for disconnecting the connection between the electromagnetic coil and the power supply for abnormality diagnosis and returning the connection between the electromagnetic coil and the power supply for generating electromagnetic field.

このように、溶鋼が電磁コイルによる電磁場印加領域に装入されたことを検出したとき、鋳込間が終了した判断して絶縁試験を終了し、電磁場発生装置による電磁場発生を自動的に再開する。したがって、通常操業において鋳造する鋳片内部の溶鋼に適切に電磁場を印加することができる。
さらにまた、上記において、前記溶鋼装入検出手段は、前記電磁場印加領域の直下流側に設けられたピンチロールの回転速度に基づいて、ダミーバーの先端部が当該ピンチロールに到達したことを検出し、これをもって溶鋼が前記電磁場印加領域に装入されたことを検出することを特徴としている。
In this way, when it is detected that molten steel has been inserted into the electromagnetic field application region by the electromagnetic coil, it is determined that the casting interval has ended, the insulation test is terminated, and the electromagnetic field generation by the electromagnetic field generator is automatically resumed. . Therefore, an electromagnetic field can be appropriately applied to the molten steel inside the slab cast in normal operation.
Furthermore, in the above, the molten steel charging detection means detects that the tip of the dummy bar has reached the pinch roll based on the rotational speed of the pinch roll provided immediately downstream of the electromagnetic field application region. Thus, it is characterized in that it is detected that molten steel is inserted into the electromagnetic field application region.

このように、ピンチロールが停止している状態から回転を始めたとき、鋳片が移相されていない状態から、ダミーバーの先端部が当該ピンチロールを通過したと判断することができることを利用し、電磁コイルによる電磁場印加領域の直下流側に設けられたピンチロールの回転速度に基づいて、中断していた鋳造が再開されたことを検出する。したがって、比較的簡易な手法で、適切に絶縁試験の終了タイミングを検出することができる。
また、上記において、前記電磁コイルは、連続鋳造機の鋳型に配置されていることを特徴としている。
これにより、通常操業時には鋳型内の鋳片内部の溶鋼に電磁場を印加し、鋳片が鋳型から抜けたことを検出したとき、その時点から所定時間が鋳込間となると判断して絶縁試験を行うことができる。
Thus, when the rotation is started from the state where the pinch roll is stopped, it is possible to determine that the tip of the dummy bar has passed through the pinch roll from the state where the slab is not phase-shifted. Based on the rotational speed of the pinch roll provided immediately downstream of the electromagnetic field application region by the electromagnetic coil, it is detected that the suspended casting has been resumed. Therefore, the end timing of the insulation test can be appropriately detected by a relatively simple method.
In the above, the electromagnetic coil is arranged in a mold of a continuous casting machine.
As a result, during normal operation, an electromagnetic field is applied to the molten steel inside the slab in the mold, and when it is detected that the slab has come out of the mold, it is determined that the predetermined time is between castings, and the insulation test is performed. It can be carried out.

さらに、上記において、前記異常診断手段は、前記異常診断用電源からの直流電圧印加時に前記電磁コイルに流れる微小電流を検出する微小電流検出手段と、前記異常診断用電源の直流電圧値と前記微小電流検出手段で検出した微小電流値とに基づいて、前記電磁コイルの絶縁抵抗値を測定する絶縁抵抗測定手段と、を備え、前記絶縁抵抗測定手段で測定した絶縁抵抗値の変化を監視することで、前記電磁コイルの絶縁抵抗値の異常を診断することを特徴としている。
このように、直流電圧印加時に電磁コイルに流れる微小電流を検出し、直流電圧値との演算により絶縁抵抗値を求めるので、一般の電気機器と比較して許容最低絶縁抵抗値が著しく低い電磁波発生装置の電磁コイルの絶縁試験を適切に行うことができる。
Further, in the above, the abnormality diagnosis means includes a minute current detection means for detecting a minute current flowing through the electromagnetic coil when a direct current voltage is applied from the abnormality diagnosis power supply, a direct current voltage value of the abnormality diagnosis power supply, and the minute current. Insulation resistance measurement means for measuring an insulation resistance value of the electromagnetic coil based on a minute current value detected by the current detection means, and monitoring a change in the insulation resistance value measured by the insulation resistance measurement means Thus, an abnormality in the insulation resistance value of the electromagnetic coil is diagnosed.
In this way, a minute current flowing through the electromagnetic coil when a DC voltage is applied is detected, and an insulation resistance value is obtained by calculation with the DC voltage value. Therefore, an electromagnetic wave with an extremely low allowable minimum insulation resistance value compared to ordinary electrical equipment is generated. An insulation test of the electromagnetic coil of the apparatus can be appropriately performed.

また、本発明に係る連続鋳造設備における電磁場発生装置の異常診断方法は、連続鋳造機で鋳造する鋳片内部の溶鋼に電磁場を印加するための電磁コイルを備える電磁場発生装置の異常を診断する、連続鋳造設備における電磁場発生装置の電路と大地との絶縁性の異常診断方法であって、前記連続鋳造機の操業中で前記電磁場発生装置による電磁場の印加が不要となる電磁場非印加期間に、前記電磁コイルと当該電磁コイルに電磁場発生用の電流を供給する電磁場発生用電源との接続を切断し、異常診断用電源から前記電磁コイルに一定の直流電圧を印加し、前記電磁コイルの銅管の抵抗を測定するのではなく、前記電路と前記大地との絶縁抵抗値を測定し、前記電磁コイルの絶縁抵抗値の異常を診断することを特徴としている。 Further, the abnormality diagnosis method for an electromagnetic field generator in a continuous casting facility according to the present invention diagnoses an abnormality in an electromagnetic field generator provided with an electromagnetic coil for applying an electromagnetic field to molten steel inside a slab cast by a continuous casting machine. A method for diagnosing an abnormality in the insulation between the electric path and ground of an electromagnetic field generator in a continuous casting facility, wherein the electromagnetic field is not applied during the operation of the continuous casting machine, and the electromagnetic field is not applied during the electromagnetic field non-application period. Disconnect the electromagnetic coil and the electromagnetic field generating power source that supplies the electromagnetic coil with a current for generating an electromagnetic field, apply a certain DC voltage from the abnormality diagnosis power source to the electromagnetic coil, and connect the copper coil of the electromagnetic coil Instead of measuring resistance, an insulation resistance value between the electric circuit and the ground is measured to diagnose an abnormality in the insulation resistance value of the electromagnetic coil.

このように、電磁場発生装置による電磁場発生が不要な期間に絶縁試験を行うので、電磁場発生装置が発生する電磁場と干渉することなく精度良く絶縁試験を行うことができる。また、1日数回必ず発生する鋳込間に絶縁試験を行うことができるので、数回/1日の短スパンで絶縁試験を行うことができ、電磁コイルの管理を十分に行うことができる。   As described above, since the insulation test is performed during a period in which the generation of the electromagnetic field by the electromagnetic field generator is unnecessary, the insulation test can be accurately performed without interfering with the electromagnetic field generated by the electromagnetic field generator. In addition, since an insulation test can be performed between castings that occur several times a day, the insulation test can be performed in a short span of several times / day, and the electromagnetic coil can be sufficiently managed.

さらにまた、本発明に係る連続鋳造方法は、鋳型内の鋳片内部の溶鋼に電磁場発生装置の電磁コイルから電磁場を印加しながら連続鋳造する連続鋳造方法であって、先行鋳片が前記鋳型から抽出された時点で前記電磁場発生装置による電磁場印加を停止し、前記電磁コイルに一定の直流電圧を印加し、前記電磁コイルの銅管の抵抗を測定するのではなく、前記電磁場発生装置の電路と大地との絶縁抵抗値を測定し、前記電磁コイルの絶縁抵抗値の異常診断を行い、その後、後行鋳片の溶鋼が前記鋳型に装入されたら、前記電磁場発生装置による電磁場印加を再開して前記後行鋳片の溶鋼を鋳造することを特徴としている。 Furthermore, the continuous casting method according to the present invention is a continuous casting method in which continuous casting is performed while applying an electromagnetic field from an electromagnetic coil of an electromagnetic field generator to molten steel inside a slab in a mold, wherein the preceding slab is removed from the mold. At the time of extraction, the application of the electromagnetic field by the electromagnetic field generator is stopped, a constant DC voltage is applied to the electromagnetic coil, and the resistance of the copper tube of the electromagnetic coil is not measured. Measure the insulation resistance value with the earth , perform an abnormality diagnosis of the insulation resistance value of the electromagnetic coil, and then resume the application of the electromagnetic field by the electromagnetic field generator when the molten steel of the subsequent slab is inserted into the mold. And casting the molten steel of the subsequent slab.

このように、先行鋳片を鋳造してから後行鋳片を鋳造するまでの鋳込間に、自動的に電磁コイルの絶縁試験を行うことができる。したがって、鋳型の交換時に電磁コイルの絶縁試験を行う場合と比較して、絶縁試験を行うスパンを大幅に短縮することができ、電磁コイルの管理を十分に行うことができる。   Thus, the insulation test of the electromagnetic coil can be automatically performed during casting from casting the preceding slab to casting the subsequent slab. Therefore, compared with the case where the insulation test of the electromagnetic coil is performed at the time of exchanging the mold, the span for performing the insulation test can be greatly shortened, and the management of the electromagnetic coil can be sufficiently performed.

本発明によれば、連続鋳造機による通常操業(鋳造)が一旦中断するタイミング(鋳込間)で、電磁場発生装置を構成する電磁コイルの絶縁抵抗値の異常を自動で診断するので、電磁コイルから印加する電磁場と干渉することなく、精度良く絶縁試験を行うことができる。また、数回/1日程度の短スパンで電磁コイルの異常診断を行うことができるので、電磁コイルの絶縁低下を適切に予測して適切な絶縁回復処置を施すことが出来ると共に、過剰なメンテナンスを抑止することができ、適正な管理が可能となる。   According to the present invention, since the normal operation (casting) by the continuous casting machine is temporarily interrupted (between castings), an abnormality in the insulation resistance value of the electromagnetic coil constituting the electromagnetic field generator is automatically diagnosed. The insulation test can be performed with high accuracy without interfering with the electromagnetic field applied from. In addition, since it is possible to diagnose the abnormality of the electromagnetic coil in a short span of several times / day, it is possible to properly predict the insulation deterioration of the electromagnetic coil and take appropriate insulation recovery measures, and excessive maintenance. Can be suppressed and appropriate management becomes possible.

本実施形態における電磁場発生装置の異常診断装置が設置された連続鋳造設備の側面図である。It is a side view of the continuous casting installation in which the abnormality diagnosis apparatus of the electromagnetic field generator in this embodiment was installed. 絶縁試験可能期間を示す図である。It is a figure which shows an insulation test possible period. ライントラッキングを説明する図である。It is a figure explaining line tracking. 電磁場発生装置及びその異常診断装置の構成を示すブロック図である。It is a block diagram which shows the structure of an electromagnetic field generator and its abnormality diagnosis apparatus. 絶縁抵抗測定例を説明する図である。It is a figure explaining the example of insulation resistance measurement. 本実施形態の効果を示す図である。It is a figure which shows the effect of this embodiment.

以下、本発明の実施の形態を図面に基づいて説明する。
図1は、本実施形態における電磁場発生装置の異常診断装置が設置された連続鋳造設備の側面図である。
図中、符号1は連続鋳造機である。連続鋳造機1は、溶鋼2が満たされたタンディッシュ3を備える。タンディッシュ3はモールド(鋳型)4の上部に配置されており、モールド4とほぼ同じ高さで鋳造床5が水平に延びている。タンディッシュ3からモールド4内へ注入された溶鋼2は、モールド4の側面より冷却されることで、表面から凝固してシェルを形成しつつ、ピンチロール6によって下方に引き抜かれ鋳片7となる。連続的に抽出された鋳片7は、トーチカー8によって所定長に切断される。
Hereinafter, embodiments of the present invention will be described with reference to the drawings.
FIG. 1 is a side view of a continuous casting facility in which an abnormality diagnosis device for an electromagnetic field generator in this embodiment is installed.
In the figure, reference numeral 1 denotes a continuous casting machine. The continuous casting machine 1 includes a tundish 3 filled with molten steel 2. The tundish 3 is disposed on an upper part of a mold (mold) 4, and a casting floor 5 extends horizontally at substantially the same height as the mold 4. The molten steel 2 poured into the mold 4 from the tundish 3 is cooled from the side surface of the mold 4, and is solidified from the surface to form a shell, and is drawn downward by the pinch roll 6 to become a slab 7. . The slab 7 extracted continuously is cut into a predetermined length by the torch car 8.

鋳造床5上はダミーバーカー9が走行可能となっており、当該鋳造床5上にはダミーバー巻上装置10が設置されている。ダミーバー11はチェーンリンク構造となっており、鋳造の始めにモールド4に装入される。そして、鋳造が開始されたあと、ダミーバー11がガイドロールセグメントの最終位置に到達すると、ダミーバー11はダミーバー巻上装置10によって吊り上げられ、ダミーバーカー9に載せられるようになっている。   A dummy barker 9 can run on the casting floor 5, and a dummy bar hoisting device 10 is installed on the casting floor 5. The dummy bar 11 has a chain link structure, and is inserted into the mold 4 at the beginning of casting. When the dummy bar 11 reaches the final position of the guide roll segment after casting is started, the dummy bar 11 is lifted by the dummy bar hoisting device 10 and placed on the dummy barker 9.

また、モールド4には、モールド4内の溶鋼2(鋳片内部の溶鋼)に電磁場を印加するための電磁コイル15が設置されている。この電磁コイル15は後述する電磁場発生装置を構成するものであり、水冷銅管によって形成されている。
電磁場発生装置としては、モールド内の溶鋼や鋳片の未凝固相を攪拌するための移動磁場を印加する交流型の電磁場発生装置や、溶鋼の流れを制動するための静磁場を印加する直流型の電磁場発生装置がある。本実施形態においては何れも適用可能であるが、ここでは直流型の電磁場発生装置を適用した場合について説明する。
The mold 4 is provided with an electromagnetic coil 15 for applying an electromagnetic field to the molten steel 2 in the mold 4 (molten steel in the slab). The electromagnetic coil 15 constitutes an electromagnetic field generator described later, and is formed of a water-cooled copper pipe.
As an electromagnetic field generator, an AC type electromagnetic field generator that applies a moving magnetic field to stir the unsolidified phase of molten steel or slab in a mold, or a DC type that applies a static magnetic field to brake the flow of molten steel There is an electromagnetic field generator. Any of the embodiments can be applied, but here, a case where a DC type electromagnetic field generator is applied will be described.

異常診断装置20は、電磁コイル15の絶縁抵抗を測定し、絶縁抵抗が低下する異常が発生していないかを診断する。電磁コイル15の絶縁抵抗の低下は、コイル銅管そのものが劣化したり、吸湿して絶縁が低下したりすることで発生し得る。この異常診断装置20は、連続鋳造機1の操業中で電磁場発生装置による電磁場印加が不要となる期間に、自動で電磁コイル15の絶縁抵抗を測定し、異常を診断する(以下、これを絶縁試験と称す)。   The abnormality diagnosis device 20 measures the insulation resistance of the electromagnetic coil 15 and diagnoses whether an abnormality that reduces the insulation resistance has occurred. The decrease in the insulation resistance of the electromagnetic coil 15 can occur when the coil copper tube itself deteriorates or when moisture is absorbed to reduce insulation. This abnormality diagnosis device 20 automatically measures the insulation resistance of the electromagnetic coil 15 and diagnoses an abnormality during the operation of the continuous casting machine 1 during which the electromagnetic field generator does not need to be applied (hereinafter, this is insulated). Called the test).

連続鋳造設備1では、鋼種が変更となる場合、タンディッシュ3の交換等により鋳造を一旦中断する。このように鋳造を一旦中断するタイミングは、1日数回、1回あたり5分〜15分程度必ず発生する。この期間を鋳込間と呼ぶ。鋳込間は、鋳造を行っていない期間であるため、電磁場発生装置による電磁場発生の必要がない。したがって、この鋳込間を利用すれば、電磁場発生装置の電磁コイル15の絶縁抵抗を測定し、異常診断を行うことができる。   In the continuous casting equipment 1, when the steel type is changed, the casting is temporarily interrupted by replacing the tundish 3 or the like. In this way, the timing of once interrupting casting always occurs several times a day for about 5 to 15 minutes per time. This period is called casting. Since casting is a period in which casting is not performed, it is not necessary to generate an electromagnetic field by the electromagnetic field generator. Therefore, if this gap is used, the insulation resistance of the electromagnetic coil 15 of the electromagnetic field generator can be measured and an abnormality diagnosis can be performed.

図2は、異常診断装置20で絶縁試験を行う絶縁試験期間を示す図である。鋳造を一旦中断した場合、先行鋳片7aを鋳造した後、所定期間の鋳込間を設けて後行鋳片7bが鋳造されることになる。また、連続鋳造機1では、鋳造開始時に、先ずダミーバー11を装入し、その後溶鋼2を注入して鋳片7を生成する。そのため、ライン上では、この図2に示すように、先行鋳片7aが搬送された後、所定間隔をおいてダミーバー11が搬送され、ダミーバー11と間隔をあけずに後行鋳片7bが搬送されることになる。   FIG. 2 is a diagram illustrating an insulation test period during which the abnormality diagnosis apparatus 20 performs an insulation test. When casting is interrupted, after casting the preceding slab 7a, a subsequent casting slab 7b is cast with a predetermined period of casting. Further, in the continuous casting machine 1, at the start of casting, the dummy bar 11 is first charged, and then the molten steel 2 is injected to generate the cast piece 7. Therefore, on the line, as shown in FIG. 2, after the preceding cast slab 7 a is transported, the dummy bar 11 is transported at a predetermined interval, and the succeeding cast slab 7 b is transported without being spaced from the dummy bar 11. Will be.

電磁場発生装置による電磁場の印加は、鋳造を行っている期間(モールド4内に溶鋼2が満たされている期間)のみ行えばよい。すなわち、それ以外の期間(モールド4内に溶鋼2が満たされていない期間、及びモールド4内にダミーバー11が装入されている期間)は電磁場非印加期間(絶縁試験可能期間)となる。   The application of the electromagnetic field by the electromagnetic field generator may be performed only during the casting period (the period when the molten steel 2 is filled in the mold 4). That is, the other period (period in which the molten steel 2 is not filled in the mold 4 and period in which the dummy bar 11 is inserted in the mold 4) is an electromagnetic field non-application period (insulation test possible period).

本実施形態では、図2に示す電磁場非印加期間(絶縁試験可能期間)のうち、電磁コイル15による電磁場印加領域であるモールド4内から先行鋳片7aが抜けてからモールド4内にダミーバー11が装入されるまでの期間を、絶縁試験期間とする。絶縁試験期間となるタイミングは、モールド4の直下流側に配置された第1のピンチロール6の回転速度に基づいて、ライントラッキングすることで検出する。第1のピンチロール6の回転速度は、当該第1のピンチロール6に設置された回転検出器(PLG)12が出力する速度パルスによって検出可能である。   In the present embodiment, in the electromagnetic field non-application period (insulation test possible period) shown in FIG. 2, the dummy bar 11 is inserted into the mold 4 after the preceding slab 7 a is removed from the mold 4, which is an electromagnetic field application region by the electromagnetic coil 15. The period until charging is the insulation test period. The timing of the insulation test period is detected by line tracking based on the rotation speed of the first pinch roll 6 arranged immediately downstream of the mold 4. The rotation speed of the first pinch roll 6 can be detected by a speed pulse output from the rotation detector (PLG) 12 installed in the first pinch roll 6.

モールド4内から先行鋳片7aが抜けきって、図3(a)に示すように先行鋳片7aの後端部が第1のピンチロール6を通過すると、第1のピンチロール6の回転は停止する。したがって、第1のピンチロール6の回転が停止したとき、先行鋳片7aがモールド4を抜けたと判断し、このタイミングを絶縁試験開始タイミングとする。
また、モールド4内に後行鋳片7bの溶鋼2を装入するために、モールド4内にダミーバー11を装入した場合、図3(b)に示すようにダミーバー11の先端部が第1のピンチロール6に到達すると、第1のピンチロール6は停止した状態から回転を始める。したがって、第1のピンチロール6が回転を始めたとき、ダミーバー11がモールド4に装入されたと判断し、このタイミングを絶縁試験終了タイミングとする。
When the preceding slab 7a is completely removed from the mold 4 and the rear end of the preceding slab 7a passes through the first pinch roll 6 as shown in FIG. 3A, the rotation of the first pinch roll 6 is Stop. Therefore, when the rotation of the first pinch roll 6 is stopped, it is determined that the preceding slab 7a has passed through the mold 4, and this timing is set as the insulation test start timing.
Further, when the dummy bar 11 is inserted into the mold 4 in order to insert the molten steel 2 of the subsequent cast slab 7b into the mold 4, the tip of the dummy bar 11 is the first as shown in FIG. When the first pinch roll 6 is reached, the first pinch roll 6 starts rotating from a stopped state. Therefore, when the first pinch roll 6 starts to rotate, it is determined that the dummy bar 11 is inserted into the mold 4, and this timing is set as the insulation test end timing.

以下、異常診断装置20の構成について具体的に説明する。
図4は、電磁場発生装置及びその異常診断装置20の構成を示すブロック図である。
この図4において、符号16は電磁場発生装置であり、電磁コイル15と電磁場発生用電源装置17とを備える。電磁場発生用電源装置17は、連続鋳造機1から離れた電気室等に設置されており、鋳造条件に応じた所定の直流電流を、電磁場発生用の電流として電磁コイル15に供給するものである。
Hereinafter, the configuration of the abnormality diagnosis apparatus 20 will be specifically described.
FIG. 4 is a block diagram showing the configuration of the electromagnetic field generator and its abnormality diagnosis device 20.
In FIG. 4, reference numeral 16 denotes an electromagnetic field generator, which includes an electromagnetic coil 15 and an electromagnetic field generating power supply device 17. The electromagnetic field generating power supply device 17 is installed in an electric chamber or the like away from the continuous casting machine 1 and supplies a predetermined direct current corresponding to casting conditions to the electromagnetic coil 15 as an electromagnetic field generating current. .

異常診断装置20は、直流電圧発生器21と、接続切替スイッチ22と、ライン制御装置23と、電流センサ24と、信号処理装置25とを備える。
直流電圧発生器21は、信号処理装置25が出力する試験開始信号が入力されてから、信号処理装置25が出力する試験終了信号が入力されるまでの絶縁試験期間中、電磁コイル15に印加する絶縁抵抗試験用の試験電圧として、一定値(例えば、500V)の直流電圧を発生する。
また、接続切替スイッチ22は、信号処理装置25が出力する接続切替信号に応じて、電磁コイル15と電磁場発生用電源装置17との接続と、電磁コイル15と直流電圧発生器21との接続とを切り替える。
The abnormality diagnosis device 20 includes a DC voltage generator 21, a connection changeover switch 22, a line control device 23, a current sensor 24, and a signal processing device 25.
The DC voltage generator 21 is applied to the electromagnetic coil 15 during the insulation test period from when the test start signal output from the signal processing device 25 is input to when the test end signal output from the signal processing device 25 is input. A DC voltage having a constant value (for example, 500 V) is generated as a test voltage for the insulation resistance test.
The connection changeover switch 22 is connected to the electromagnetic coil 15 and the electromagnetic field generating power supply device 17 and to the electromagnetic coil 15 and the DC voltage generator 21 in accordance with the connection switching signal output from the signal processing device 25. Switch.

ライン制御装置23は、回転検出器(PLG)12で検出した第1のピンチロール6の回転速度を入力し、鋳片7のトラッキングを行う。そして、そのトラッキングにより絶縁試験開始タイミング及び絶縁試験終了タイミングを検出し、これらのタイミングを表すライントラッキング信号を信号処理装置25に出力する。
電流センサ24は、直流電圧発生器21から電磁コイル15に直流電圧を印加しているときに、電磁コイル15に流れる微小電流を検出する。この電流センサ24の測定範囲は0〜100mAに設定されている。
The line control device 23 inputs the rotation speed of the first pinch roll 6 detected by the rotation detector (PLG) 12 and tracks the slab 7. Then, the insulation test start timing and insulation test end timing are detected by the tracking, and a line tracking signal representing these timings is output to the signal processing device 25.
The current sensor 24 detects a minute current flowing through the electromagnetic coil 15 when a DC voltage is applied from the DC voltage generator 21 to the electromagnetic coil 15. The measurement range of the current sensor 24 is set to 0 to 100 mA.

信号処理装置25は、ライン制御装置23からのライントラッキング信号を入力し、絶縁試験開始タイミングで、直流電圧発生器21に試験開始信号を出力すると共に、接続切替スイッチ22に、電磁コイル15と電磁場発生用電源装置17との接続から電磁コイル15と直流電圧発生器21との接続に切り替えるための接続切替信号を出力する。同様に、信号処理装置25は、絶縁試験終了タイミングでは、直流電圧発生器21に試験終了信号を出力すると共に、接続切替スイッチ22に、電磁コイル15と直流電圧発生器21との接続から接続電磁コイル15と電磁場発生用電源装置17との接続に切り替えるための接続切替信号を出力する。   The signal processing device 25 inputs the line tracking signal from the line control device 23, outputs a test start signal to the DC voltage generator 21 at the insulation test start timing, and connects the electromagnetic coil 15 and the electromagnetic field to the connection changeover switch 22. A connection switching signal for switching from the connection with the generating power supply device 17 to the connection between the electromagnetic coil 15 and the DC voltage generator 21 is output. Similarly, the signal processing device 25 outputs a test end signal to the DC voltage generator 21 at the insulation test end timing, and connects to the connection changeover switch 22 from the connection between the electromagnetic coil 15 and the DC voltage generator 21. A connection switching signal for switching the connection between the coil 15 and the electromagnetic field generating power supply device 17 is output.

また、信号処理装置25は、絶縁試験開始タイミングで、試験開始信号及び接続切替信号を出力した後、電磁コイル15と直流電圧発生器21とが確実に接続されたと判断できる所定時間が経過したら、電流センサ24で検出した電流を取得し、電磁コイル15の絶縁抵抗を測定する。   In addition, after the signal processing device 25 outputs the test start signal and the connection switching signal at the insulation test start timing, when a predetermined time has elapsed in which it can be determined that the electromagnetic coil 15 and the DC voltage generator 21 are securely connected, The current detected by the current sensor 24 is acquired, and the insulation resistance of the electromagnetic coil 15 is measured.

絶縁抵抗は、電流センサ24の測定電流と直流電圧発生器21の印加電圧とに基づいて、印加電圧[V]/測定電流[A]の演算を行うことで測定する。また、絶縁抵抗の測定時間は1分程度とする。すなわち、図5(a)に示すように、試験電圧DC500Vを1分間、電磁コイル15に印加し、そのとき図5(b)に示すように電磁コイル15に流れる微小電流を電流センサ24で測定し、絶縁抵抗を求める。本実施形態では、電流センサ24の測定範囲を0〜100mA(0.1A)としているため、試験電圧がDC500Vの場合、絶縁抵抗の測定範囲は0.005MΩ(5kΩ)〜∞となる。   The insulation resistance is measured by calculating the applied voltage [V] / measured current [A] based on the measured current of the current sensor 24 and the applied voltage of the DC voltage generator 21. The insulation resistance measurement time is about 1 minute. That is, as shown in FIG. 5A, a test voltage DC500V is applied to the electromagnetic coil 15 for 1 minute, and a minute current flowing through the electromagnetic coil 15 at that time is measured by the current sensor 24 as shown in FIG. 5B. And obtain the insulation resistance. In this embodiment, since the measurement range of the current sensor 24 is 0 to 100 mA (0.1 A), when the test voltage is DC 500 V, the measurement range of the insulation resistance is 0.005 MΩ (5 kΩ) to ∞.

そして、信号処理装置25は、測定した絶縁抵抗値が電磁コイル15の焼損注意域の介入閾値Ra(例えば、0.02MΩ)以下であるか否かを判定する。このとき、絶縁抵抗値が焼損注意域の介入閾値Raを上回っている場合には、絶縁低下が発生していない正常状態であると判断して鋳造を継続する。一方、絶縁抵抗値が焼損注意域の介入閾値Ra以下である場合には、絶縁低下が発生しており、このまま使用すると焼損のおそれがあると判断して、所定の絶縁回復処置を行う。   Then, the signal processing device 25 determines whether or not the measured insulation resistance value is equal to or less than the intervention threshold Ra (for example, 0.02 MΩ) of the burnout caution area of the electromagnetic coil 15. At this time, if the insulation resistance value exceeds the intervention threshold Ra in the burnout caution area, it is determined that the insulation is not lowered and the casting is continued. On the other hand, when the insulation resistance value is equal to or lower than the intervention threshold Ra in the burnout caution area, the insulation is lowered, and it is determined that there is a possibility of burnout if it is used as it is, and a predetermined insulation recovery treatment is performed.

一般的な電機機器である電動機の最低許容絶縁抵抗は、(印加される電圧×1/1000)MΩで表され、400V用の電動機の場合では0.4MΩである。一方、電磁場発生装置16の電磁コイル15はコイル銅管が水冷されているため、常に銅管の内部は純水で満たされており、許容最低絶縁抵抗は0.02MΩ程度である。そこで、ここでは、焼損注意域の介入閾値Raを、電磁コイル15の許容最低絶縁抵抗値である0.02MΩに設定する。   The minimum allowable insulation resistance of a motor that is a general electric device is represented by (applied voltage × 1/1000) MΩ, and is 0.4 MΩ in the case of a 400 V motor. On the other hand, since the coil copper pipe of the electromagnetic coil 15 of the electromagnetic field generator 16 is water-cooled, the inside of the copper pipe is always filled with pure water, and the allowable minimum insulation resistance is about 0.02 MΩ. Therefore, here, the burnout caution area intervention threshold Ra is set to 0.02 MΩ, which is the allowable minimum insulation resistance value of the electromagnetic coil 15.

なお、ここでは測定した絶縁抵抗値が焼損注意域の介入閾値Ra以下であるか否かを判定しているが、過去の一定期間の絶縁抵抗測定データに基づいて次回の絶縁試験時における絶縁抵抗値を予測し、予測した絶縁抵抗値が焼損注意域の介入閾値Ra以下であるか否かを判定するようにしてもよい。
上記において、直流電圧発生器21が異常診断用電源に対応し、接続切替スイッチ22が接続切替手段および接続復帰手段に対応し、ライン制御装置23が鋳片抽出検出手段および溶鋼装入検出手段に対応し、電流センサ24が微小電流検出手段に対応し、信号処理装置25が異常診断手段および絶縁抵抗測定手段に対応している。
Here, it is determined whether or not the measured insulation resistance value is equal to or less than the intervention threshold Ra in the burnout caution area. However, the insulation resistance at the next insulation test is based on the insulation resistance measurement data for a certain period in the past. A value may be predicted, and it may be determined whether or not the predicted insulation resistance value is equal to or less than the intervention threshold Ra in the burnout caution area.
In the above, the DC voltage generator 21 corresponds to the abnormality diagnosis power source, the connection changeover switch 22 corresponds to the connection changeover means and the connection return means, and the line control device 23 corresponds to the slab extraction detection means and the molten steel charging detection means. Correspondingly, the current sensor 24 corresponds to the minute current detection means, and the signal processing device 25 corresponds to the abnormality diagnosis means and the insulation resistance measurement means.

次に、本実施形態における連続鋳造方法について説明する。
連続鋳造機1のモールド4には、電磁場発生装置16の電磁コイル15が設けられており、通常操業においては、電磁コイル15によってモールド4内に注入された溶鋼2に電磁場を印加しながら当該溶鋼2を鋳造する。すなわち、通常操業時は、異常診断装置20の接続切替スイッチ22が、図4の実線で示す状態となって、電磁コイル15と電磁場発生用電源装置17とが接続されている。
Next, the continuous casting method in this embodiment is demonstrated.
The mold 4 of the continuous casting machine 1 is provided with an electromagnetic coil 15 of an electromagnetic field generator 16. In normal operation, the molten steel 2 is applied to the molten steel 2 injected into the mold 4 by the electromagnetic coil 15. 2 is cast. That is, during normal operation, the connection changeover switch 22 of the abnormality diagnosis device 20 is in the state shown by the solid line in FIG. 4, and the electromagnetic coil 15 and the electromagnetic field generating power supply device 17 are connected.

このように通常操業を行っている状態から、例えば鋼種変更のためにタンディッシュ3を交換する場合には、鋳造が一旦中断され、5分〜15分程度の鋳込間を設けた後で鋳造が再開される。この鋳込間は、連続鋳造設備や操業する鋼種構成により異なるが、1日数回は必ず発生する。
このとき、鋳造の中断に際し、モールド4内から溶鋼2が凝固して形成された鋳片7が抜けきり、当該鋳片7の後端部がモールド4の直下流側に設けられた第1のピンチロール6を通過すると、第1のピンチロール6の回転が停止する。すると、ライン制御装置23は、回転検出器(PLG)12の速度パルスからこれを検出し、鋳片7の後端部が第1のピンチロール6を通過したことを表すライントラッキング信号を信号処理装置25に出力する。
In the case where the tundish 3 is exchanged for the purpose of changing the steel type, for example, when the tundish 3 is changed from the state where the normal operation is performed in this way, the casting is temporarily interrupted and the casting is performed after providing a casting interval of about 5 to 15 minutes. Is resumed. This casting time varies depending on the continuous casting equipment and the steel type configuration to be operated, but always occurs several times a day.
At this time, when the casting is interrupted, the cast piece 7 formed by solidification of the molten steel 2 from the inside of the mold 4 is completely removed, and the rear end portion of the cast piece 7 is provided on the downstream side of the mold 4. When the pinch roll 6 is passed, the rotation of the first pinch roll 6 is stopped. Then, the line control device 23 detects this from the speed pulse of the rotation detector (PLG) 12 and performs signal processing on the line tracking signal indicating that the rear end portion of the slab 7 has passed through the first pinch roll 6. Output to the device 25.

信号処理装置25は、このライントラッキング信号を取得すると、接続切替スイッチ22に対して、接続切替スイッチ22を図4の破線で示す状態に切り替えるための接続切替信号を出力する。これにより、電磁コイル15と電磁場発生用電源装置17との接続は切断され、電磁コイル15と直流電圧発生器21とが接続される。また、同時に信号処理装置25は、直流電圧発生器21に対して試験開始信号を出力する。これにより、直流電圧発生器21から電磁コイル15に対して、試験電圧として1分間、500Vの直流電圧が印加される。   When the signal processing device 25 acquires the line tracking signal, the signal processing device 25 outputs a connection switching signal for switching the connection switching switch 22 to a state indicated by a broken line in FIG. As a result, the connection between the electromagnetic coil 15 and the electromagnetic field generating power supply device 17 is disconnected, and the electromagnetic coil 15 and the DC voltage generator 21 are connected. At the same time, the signal processing device 25 outputs a test start signal to the DC voltage generator 21. As a result, a DC voltage of 500 V is applied as a test voltage for 1 minute from the DC voltage generator 21 to the electromagnetic coil 15.

次に信号処理装置25は、直流電圧印加時に電流センサ24で検出した微小電流を取得し、直流電圧値と電流センサ24で検出した微小電流値とに基づいて、演算により電磁コイル15の絶縁抵抗値を求める。
そして、1分間の測定時間が経過した後、測定された絶縁抵抗値が、電磁コイル15の焼損注意域の介入閾値Ra(例えば、0.02MΩ)以下であるか否かを判定する。このとき、測定された絶縁抵抗値が閾値Raを上回っている場合には、電磁コイル15に絶縁低下は発生しておらず、そのまま使用可能であると判断する。
Next, the signal processing device 25 acquires a minute current detected by the current sensor 24 when a DC voltage is applied, and calculates the insulation resistance of the electromagnetic coil 15 based on the DC voltage value and the minute current value detected by the current sensor 24. Find the value.
Then, after the measurement time of 1 minute has elapsed, it is determined whether or not the measured insulation resistance value is equal to or less than the intervention threshold Ra (for example, 0.02 MΩ) in the burnout caution area of the electromagnetic coil 15. At this time, if the measured insulation resistance value exceeds the threshold value Ra, it is determined that the insulation reduction has not occurred in the electromagnetic coil 15 and that it can be used as it is.

その後、鋳造を再開するべくダミーバー11をモールド4に装入し、当該ダミーバー11の先端部が第1のピンチロール6に到達すると、第1のピンチロール6が停止した状態から回転し始める。すると、ライン制御装置23は、回転検出器(PLG)12の速度パルスからこれを検出し、ダミーバー11の先端部が第1のピンチロール6を通過したことを表すライントラッキング信号を信号処理装置25に出力する。   Thereafter, the dummy bar 11 is inserted into the mold 4 to resume casting, and when the leading end of the dummy bar 11 reaches the first pinch roll 6, the first pinch roll 6 starts to rotate from the stopped state. Then, the line control device 23 detects this from the speed pulse of the rotation detector (PLG) 12 and outputs a line tracking signal indicating that the tip of the dummy bar 11 has passed through the first pinch roll 6 to the signal processing device 25. Output to.

信号処理装置25は、このライントラッキング信号を取得すると、接続切替スイッチ22に対して、接続切替スイッチ22を図4の実線で示す状態に切り替えるための接続切替信号を出力する。これにより、電磁コイル15と直流電圧発生器21との接続は切断され、電磁コイル15と電磁場発生用電源装置17とが接続される。これにより、電磁場発生用電源装置17から電磁コイル15に対して直流電流が供給可能な状態となる。   When the signal processing device 25 acquires this line tracking signal, the signal processing device 25 outputs a connection switching signal for switching the connection switching switch 22 to the state indicated by the solid line in FIG. Thereby, the connection between the electromagnetic coil 15 and the DC voltage generator 21 is disconnected, and the electromagnetic coil 15 and the electromagnetic field generating power supply device 17 are connected. As a result, a DC current can be supplied from the electromagnetic field generating power supply device 17 to the electromagnetic coil 15.

このように、鋳込間を利用して電磁コイル15の絶縁抵抗測定を実施する。これにより、例えばモールド4を交換するタイミングでしか電磁コイル15の絶縁抵抗測定が行えなかった場合には2ヶ月に1回の測定であったの対し、1日数回の測定が可能となる。そのため、電磁コイル15を短スパンで管理することができる。
したがって、電磁コイル15の絶縁抵抗値が、電磁コイル15の焼損注意域に介入した時点で絶縁回復処置を行うことができ、電磁コイル15が焼損に至るのを防止することができる。
In this way, the insulation resistance of the electromagnetic coil 15 is measured using the space between the castings. Thereby, for example, when the insulation resistance measurement of the electromagnetic coil 15 can be performed only at the timing of replacing the mold 4, the measurement can be performed several times a day, whereas the measurement is performed once every two months. Therefore, the electromagnetic coil 15 can be managed with a short span.
Therefore, when the insulation resistance value of the electromagnetic coil 15 intervenes in the burnout caution area of the electromagnetic coil 15, the insulation recovery treatment can be performed, and the electromagnetic coil 15 can be prevented from being burned.

また、ライントラッキングにより自動で鋳込間となるタイミングを検知し、このタイミングで電磁コイル15と電磁場発生用電源装置17との接続と、電磁コイル15と直流電圧発生器21との接続とを自動で切り替えるので、5分〜15分という短い鋳込間でも電磁コイル15の絶縁試験が可能となる。   Moreover, the timing which becomes between casting is detected automatically by line tracking, and the connection between the electromagnetic coil 15 and the electromagnetic field generating power supply device 17 and the connection between the electromagnetic coil 15 and the DC voltage generator 21 are automatically detected at this timing. Therefore, the insulation test of the electromagnetic coil 15 can be performed even during casting as short as 5 to 15 minutes.

ライントラッキングにより自動で鋳込間となるタイミングを検知しても、この鋳込間にハンディー式絶縁抵抗計を使って人手によって絶縁抵抗測定を行おうとすると、感電防止のためのコイル電源装置の遮断等、絶縁抵抗測定開始から終了までを15分で実施することは非常に困難である。また、1日に数回しかない鋳込間に併せて測定者を配置することは非効率である。本実施形態では、電磁場の発生が不要となるタイミングで、人手を介さず自動で絶縁抵抗測定を開始するので、連続鋳造における僅かな鋳込間隔で効率良く絶縁試験が可能となる。   Even if the time between castings is automatically detected by line tracking, if you try to measure insulation resistance manually using a hand-held insulation resistance meter between castings, the coil power supply is shut off to prevent electric shock. It is very difficult to carry out the measurement from the start to the end of insulation resistance measurement in 15 minutes. In addition, it is inefficient to place a measurer between castings that are only several times a day. In this embodiment, since the insulation resistance measurement is automatically started at the timing when the generation of the electromagnetic field is not necessary, without manual intervention, the insulation test can be efficiently performed with a small casting interval in continuous casting.

また、絶縁試験開始タイミングを鋳片7がモールド4から抜けきるタイミングとし、鋳片7の後端部が第1のピンチロール6を通過したことをもって鋳片7がモールド4から抜けきったことを検出する。このように、ライントラッキングにより適切に鋳込間となるタイミングを検出することができる。同様に、絶縁試験終了タイミングを後行鋳片の溶鋼2がモールド4に装入されるタイミングとし、ダミーバー11の先端部が第1のピンチロール6に到達したことをもって後行鋳片の溶鋼2がモールド4に装入されたことを検出する。このように、ライントラッキングにより適切に鋳込間が終了するタイミングを検出することができる。   Further, the insulation test start timing is the timing at which the slab 7 comes off the mold 4, and the slab 7 has come off from the mold 4 when the rear end portion of the slab 7 has passed through the first pinch roll 6. To detect. In this way, it is possible to detect the timing at which casting is properly performed by line tracking. Similarly, the end timing of the insulation test is set to the timing at which the molten steel 2 of the subsequent cast piece is inserted into the mold 4, and the molten steel 2 of the subsequent cast piece is obtained when the leading end of the dummy bar 11 reaches the first pinch roll 6. Is detected in the mold 4. In this way, it is possible to detect the timing at which the casting interval is appropriately terminated by line tracking.

このとき、第1のピンチロール6の回転速度に基づいて、鋳片7の後端部が第1のピンチロール6を通過したことやダミーバー11の先端部が第1のピンチロール6に到達したことを検出するので、比較的簡易な手法で適切に絶縁試験開始タイミング及び絶縁試験終了タイミングを検出することができる。また、一般にピンチロールに設置されている回転検出器(PLG)を用いるので、新たにライントラッキング用のセンサ等を設ける必要がない。   At this time, based on the rotational speed of the first pinch roll 6, the rear end portion of the slab 7 has passed through the first pinch roll 6, and the leading end portion of the dummy bar 11 has reached the first pinch roll 6. Therefore, the insulation test start timing and the insulation test end timing can be appropriately detected by a relatively simple method. In addition, since a rotation detector (PLG) generally installed on a pinch roll is used, there is no need to newly provide a line tracking sensor or the like.

さらに、絶縁抵抗測定に際し、測定範囲を0〜100mAに設定した微小電流センサを用いて、試験電圧DC500V印加時の微小電流を測定する。そのため、0.005MΩ(5kΩ)という非常に低い絶縁抵抗値の測定が可能となり、電磁コイル15での最低許容絶縁抵抗0.02MΩを適切に監視することができる。   Furthermore, when measuring the insulation resistance, a minute current when a test voltage of DC 500 V is applied is measured using a minute current sensor whose measurement range is set to 0 to 100 mA. Therefore, it is possible to measure a very low insulation resistance value of 0.005 MΩ (5 kΩ), and the minimum allowable insulation resistance 0.02 MΩ in the electromagnetic coil 15 can be appropriately monitored.

電磁場発生装置の電磁コイルの絶縁抵抗測定には、従来から市販のデジタル式絶縁抵抗計ではなく、アナログ式絶縁抵抗計を用いていた。市販のデジタル絶縁抵抗計は、ある一定の絶縁抵抗値以上あるかどうか、すなわち健全性の判定の目的に製作されており、絶縁抵抗が低い領域を測定するニーズが少ない。そのため、市販のデジタル絶縁抵抗計の測定範囲は0.1MΩ〜100MΩ程度の範囲に設定されており、電磁コイルの絶縁抵抗を監視するには不適切である。ところが、アナログ式絶縁抵抗計は、デジタル式絶縁抵抗計に比べて絶縁抵抗の測定精度が悪いため、電磁コイルの絶縁抵抗を適切に監視するのは困難である。   For measuring the insulation resistance of the electromagnetic coil of the electromagnetic field generator, an analog insulation resistance meter has been used instead of a commercially available digital insulation resistance meter. Commercially available digital insulation resistance meters are manufactured for the purpose of determining whether there is a certain insulation resistance value or more, that is, soundness, and there is little need to measure a region with low insulation resistance. Therefore, the measurement range of a commercially available digital insulation resistance meter is set to a range of about 0.1 MΩ to 100 MΩ, which is inappropriate for monitoring the insulation resistance of the electromagnetic coil. However, since the analog insulation resistance meter has a lower measurement accuracy of the insulation resistance than the digital insulation resistance meter, it is difficult to appropriately monitor the insulation resistance of the electromagnetic coil.

これに対して、本実施形態では、電磁コイル測定用の絶縁抵抗計として、直流電圧発生器21を用いて試験電圧を印加し、微小電流(0〜100mA)を測定可能な電流センサ24を用いて直流電圧印加時の微小電流を測定する構成を採用する。これにより、電磁コイル15の絶縁抵抗値が最低許容絶縁抵抗0.02MΩを上回っているか否かを、精度良く監視することができる。   On the other hand, in the present embodiment, a current sensor 24 that can measure a minute current (0 to 100 mA) by applying a test voltage using the DC voltage generator 21 as an insulation resistance meter for measuring an electromagnetic coil is used. Adopts a configuration that measures a minute current when a DC voltage is applied. Thereby, it can be accurately monitored whether or not the insulation resistance value of the electromagnetic coil 15 exceeds the minimum allowable insulation resistance of 0.02 MΩ.

さらに、絶縁試験により得られた絶縁抵抗測定データを長期管理することで、操業中に絶縁抵抗が低下するのを適切に予兆することができるので、計画的な電磁場発生装置16の交換作業が可能となる。その結果、突発的に電磁コイル15の交換が発生したり、完全に絶縁が0となってコイルそのものが焼損したりするという問題を回避することができると共に、過剰なメンテナンスを抑止することができる。   In addition, long-term management of the insulation resistance measurement data obtained by the insulation test makes it possible to appropriately predict that the insulation resistance will decrease during operation, so that the planned electromagnetic field generator 16 can be replaced. It becomes. As a result, it is possible to avoid the problem that the electromagnetic coil 15 is suddenly replaced or the insulation itself becomes 0 and the coil itself is burned out, and excessive maintenance can be suppressed. .

図6は、本実施形態の効果を示す図である。
この図6に示すように、モールド4を交換するタイミングで電磁コイル15の絶縁試験を行う従来の方法では、絶縁試験を行うピッチがα(1回/2ヶ月ピッチ)である。そのため、この従来の方法では、ピッチαで取得される絶縁抵抗測定データをもとに、電磁コイルの絶縁低下を予測することになる。
FIG. 6 is a diagram showing the effect of this embodiment.
As shown in FIG. 6, in the conventional method in which the insulation test of the electromagnetic coil 15 is performed at the timing when the mold 4 is replaced, the pitch at which the insulation test is performed is α (1 time / 2 months pitch). For this reason, in this conventional method, the insulation reduction of the electromagnetic coil is predicted based on the insulation resistance measurement data acquired at the pitch α.

絶縁抵抗測定データa1を取得した時点で次回の絶縁抵抗測定データa2を予測したとき、予測した絶縁抵抗値が焼損注意域の介入閾値Ra(0.02MΩ)を上回っている場合には、そのまま電磁コイルの使用を継続しても問題ないと判断されてしまう。しかしながら、絶縁抵抗測定データa1を取得した後、何らかの理由により絶縁抵抗が急激に低下することも考えられ、この場合、次回の絶縁試験を行うタイミングとなる前に絶縁抵抗値が焼損警告域に突入してしまう。すると、絶縁回復処置が間に合わず、最悪の場合コイルそのものが焼損し、コイルの巻替に至ってしまうおそれがある。   When the next insulation resistance measurement data a2 is predicted when the insulation resistance measurement data a1 is acquired, if the predicted insulation resistance value exceeds the intervention threshold Ra (0.02 MΩ) of the burnout caution area, the electromagnetic Even if the coil is continuously used, it is determined that there is no problem. However, after obtaining the insulation resistance measurement data a1, it is possible that the insulation resistance suddenly decreases for some reason. In this case, the insulation resistance value enters the burnout warning area before the next insulation test is performed. Resulting in. As a result, the insulation recovery process is not in time, and in the worst case, the coil itself may burn out, leading to coil rewinding.

これに対し、本実施形態では、通常操業中における鋳込間となるタイミングで電磁コイル15の絶縁試験を行うことができるため、当該絶縁試験を行うピッチはβ(数回/1日ピッチ)となり、従来のα(1回/2ヶ月ピッチ)に比べて大幅に短縮される。
そのため、仮に絶縁抵抗測定データb1を取得した後、何らかの理由により絶縁抵抗が急激に低下し始めたとしても、短スパンで絶縁試験を行っているため、絶縁抵抗測定データb2が焼損注意域の介入閾値Ra(0.02MΩ)以下となったときに絶縁回復処置を施すことができる。このように、電磁コイルが焼損に至る前に絶縁回復処置を施すことができるため、電磁コイルの再使用が可能となる。
On the other hand, in this embodiment, since the insulation test of the electromagnetic coil 15 can be performed at a timing between casting during normal operation, the pitch for performing the insulation test is β (several times / one day pitch). Compared with the conventional α (1 time / 2 months pitch), it is greatly shortened.
For this reason, even if the insulation resistance measurement data b1 is acquired, the insulation resistance measurement data b2 is an intervention in the burnout caution area because the insulation test is performed in a short span even if the insulation resistance starts to drop sharply for some reason. When the threshold value Ra (0.02 MΩ) or less is reached, insulation recovery treatment can be performed. Thus, since the insulation recovery treatment can be performed before the electromagnetic coil is burned out, the electromagnetic coil can be reused.

さらに、電磁コイルの絶縁低下を適切に予測し、計画的に電磁場発生装置の交換作業を行うことができるので、突発的に交換作業が必要となるのを回避することができ、連続鋳造機の稼働率の低下を最小限にすることができる。
以上のように、電磁コイル15の絶縁試験を行った後は、後行鋳片の溶鋼2がモールド4に装入されたタイミングで電磁コイル15からモールド4内の溶鋼2に電磁場を印加し、当該電磁場を印加しながら後行鋳片の鋳造を行う。ここで、電磁コイル15から電磁場を印加するタイミングは、例えば、絶縁試験終了タイミングを基準として決定する。
Furthermore, since the insulation reduction of the electromagnetic coil can be appropriately predicted and the electromagnetic field generator can be replaced systematically, it is possible to avoid the need for sudden replacement, and the continuous casting machine A decrease in operating rate can be minimized.
As described above, after the insulation test of the electromagnetic coil 15 is performed, an electromagnetic field is applied from the electromagnetic coil 15 to the molten steel 2 in the mold 4 at the timing when the molten steel 2 of the subsequent slab is inserted into the mold 4. The subsequent casting is cast while applying the electromagnetic field. Here, the timing at which the electromagnetic field is applied from the electromagnetic coil 15 is determined based on, for example, the insulation test end timing.

ダミーバー11は、その寸法が既知である。そのため、ダミーバー11の搬送速度が分かれば、ダミーバー11の先端部が第1のピンチロール6に到達したタイミングをもとに、後行鋳片の先端部が第1のピンチロール6に到達するタイミング、即ち後行鋳片の溶鋼2がモールド4内に装入されるタイミングを求めることができる。
このように、後行鋳片の溶鋼2がモールド4に装入されるタイミングで電磁コイル15から電磁場を印加するようにすることで、不必要な電磁場印加を回避することができる。
The dimensions of the dummy bar 11 are known. Therefore, if the conveyance speed of the dummy bar 11 is known, the timing at which the tip of the succeeding cast slab reaches the first pinch roll 6 based on the timing at which the tip of the dummy bar 11 reaches the first pinch roll 6. That is, the timing at which the molten steel 2 of the subsequent slab is inserted into the mold 4 can be obtained.
Thus, unnecessary electromagnetic field application can be avoided by applying the electromagnetic field from the electromagnetic coil 15 at the timing when the molten steel 2 of the subsequent cast slab is inserted into the mold 4.

なお、上記本実施形態においては、電磁場発生装置16の電磁コイル15をモールド4に配置する場合について説明したが、モールド4の下流側の二次冷却帯に電磁コイルを配置したものにも本発明を適用することができる。この場合、鋳片7が電磁コイル15による電磁場印加領域を抜けたタイミングを絶縁試験開始タイミングとし、ダミーバー11が上記電磁場印加領域に装入されたタイミングを絶縁試験終了タイミングとする。そして、これら絶縁試験開始タイミング及び絶縁試験終了タイミングは、上記電磁場印加領域の直下流側に設けられたピンチロールの回転速度に基づいて検出する。   In the present embodiment, the case where the electromagnetic coil 15 of the electromagnetic field generator 16 is disposed in the mold 4 has been described. However, the present invention is also applied to a case where the electromagnetic coil is disposed in the secondary cooling zone on the downstream side of the mold 4. Can be applied. In this case, the timing at which the slab 7 exits the electromagnetic field application region by the electromagnetic coil 15 is the insulation test start timing, and the timing at which the dummy bar 11 is inserted into the electromagnetic field application region is the insulation test end timing. The insulation test start timing and insulation test end timing are detected based on the rotation speed of a pinch roll provided immediately downstream of the electromagnetic field application region.

1…連続鋳造機、2…溶鋼、3…タンディッシュ、4…モールド、5…鋳造床、6…ピンチロール、7…鋳片、7a…先行鋳片、7b…後行鋳片、8…トーチカー、9…ダミーバーカー、10…ダミーバー巻上装置、11…ダミーバー、12…回転検出器(PLG)、15…電磁コイル、16…電磁場発生装置、17…電磁場発生用電源装置、20…異常診断装置、21…直流電圧発生器(異常診断用電源)、22…接続切替スイッチ、23…ライン制御装置、24…電流センサ、25…信号処理装置   DESCRIPTION OF SYMBOLS 1 ... Continuous casting machine, 2 ... Molten steel, 3 ... Tundish, 4 ... Mold, 5 ... Cast floor, 6 ... Pinch roll, 7 ... Cast slab, 7a ... Pre-cast slab, 7b ... Subsequent slab, 8 ... Torch car DESCRIPTION OF SYMBOLS 9 ... Dummy barker, 10 ... Dummy bar hoisting device, 11 ... Dummy bar, 12 ... Rotation detector (PLG), 15 ... Electromagnetic coil, 16 ... Electromagnetic field generator, 17 ... Power supply device for electromagnetic field generation, 20 ... Abnormality diagnostic device , 21 ... DC voltage generator (abnormality diagnosis power supply), 22 ... connection changeover switch, 23 ... line control device, 24 ... current sensor, 25 ... signal processing device

Claims (8)

連続鋳造機で鋳造する鋳片内部の溶鋼に電磁場を印加するための電磁コイルを備える電磁場発生装置の異常を診断する、連続鋳造設備における電磁場発生装置の電路と大地との絶縁性の異常診断装置であって、
前記電磁コイルに一定の直流電圧を印加する異常診断用電源と、
鋳片が前記電磁コイルによる電磁場印加領域から抜けたことを検出する鋳片抽出検出手段と、
前記鋳片抽出検出手段で鋳片が前記電磁場印加領域から抜けたことを検出したとき、前記電磁コイルと当該電磁コイルに電磁場発生用の電流を供給する電磁場発生用電源との接続を切断し、前記電磁コイルと前記異常診断用電源との接続に切り替える接続切替手段と、
前記接続切替手段で前記電磁コイルと前記異常診断用電源とを接続し、前記電磁コイルに前記直流電圧を印加した状態で、前記電磁コイルの銅管の抵抗を測定するのではなく、前記電路と前記大地との絶縁抵抗値を測定し、前記電磁コイルの絶縁抵抗値の異常を診断する異常診断手段と、を備えることを特徴とする連続鋳造設備における電磁場発生装置の異常診断装置。
Diagnosis of abnormality of electromagnetic field generator equipped with electromagnetic coil for applying electromagnetic field to molten steel inside slab cast by continuous casting machine, abnormality diagnosis device for insulation between electric path and ground of electromagnetic field generator in continuous casting equipment Because
An abnormality diagnosis power source for applying a constant DC voltage to the electromagnetic coil;
A slab extraction detecting means for detecting that the slab has escaped from the electromagnetic field application region by the electromagnetic coil,
When the slab extraction detecting means detects that the slab has escaped from the electromagnetic field application region, disconnects the electromagnetic coil and the electromagnetic field generating power source that supplies the electromagnetic coil with a current for generating an electromagnetic field, Connection switching means for switching to connection between the electromagnetic coil and the abnormality diagnosis power supply;
Rather than measuring the resistance of the copper coil of the electromagnetic coil in a state where the electromagnetic coil and the abnormality diagnosis power source are connected by the connection switching means and the DC voltage is applied to the electromagnetic coil, the electric circuit and An abnormality diagnosis device for an electromagnetic field generator in a continuous casting facility , comprising: an abnormality diagnosis unit that measures an insulation resistance value with respect to the ground and diagnoses an abnormality in an insulation resistance value of the electromagnetic coil.
前記鋳片抽出検出手段は、
前記電磁場印加領域の直下流側に設けられたピンチロールの回転速度に基づいて、鋳片の後端部が当該ピンチロールを通過したことを検出し、これをもって鋳片が前記電磁場印加領域から抜けたことを検出することを特徴とする請求項1に記載の連続鋳造設備における電磁場発生装置の異常診断装置。
The slab extraction detecting means is
Based on the rotational speed of the pinch roll provided immediately downstream of the electromagnetic field application region, it is detected that the rear end portion of the slab has passed the pinch roll, and with this, the slab comes out of the electromagnetic field application region. The abnormality diagnosis device for an electromagnetic field generator in a continuous casting facility according to claim 1, wherein the abnormality is detected.
溶鋼が前記電磁場印加領域に装入されたことを検出する溶鋼装入検出手段と、
前記溶鋼装入検出手段で溶鋼が前記電磁場印加領域に装入されたことを検出したとき、前記電磁コイルと前記異常診断用電源との接続を切断し、前記電磁コイルと前記電磁場発生用電源との接続を復帰する接続復帰手段と、を備えることを特徴とする請求項1又は2に記載の連続鋳造設備における電磁場発生装置の異常診断装置。
Molten steel charging detection means for detecting that molten steel is charged in the electromagnetic field application region;
When it is detected by the molten steel charging detection means that molten steel is charged in the electromagnetic field application region, the connection between the electromagnetic coil and the abnormality diagnosis power supply is cut off, and the electromagnetic coil and the electromagnetic field generating power supply An abnormality diagnosis device for an electromagnetic field generator in a continuous casting facility according to claim 1, further comprising: a connection return means for returning the connection.
前記溶鋼装入検出手段は、
前記電磁場印加領域の直下流側に設けられたピンチロールの回転速度に基づいて、ダミーバーの先端部が当該ピンチロールに到達したことを検出し、これをもって溶鋼が前記電磁場印加領域に装入されたことを検出することを特徴とする請求項3に記載の連続鋳造設備における電磁場発生装置の異常診断装置。
The molten steel charging detection means includes
Based on the rotational speed of the pinch roll provided immediately downstream of the electromagnetic field application region, it is detected that the tip of the dummy bar has reached the pinch roll, and with this, the molten steel is inserted into the electromagnetic field application region. The abnormality diagnosis device for an electromagnetic field generator in a continuous casting facility according to claim 3, wherein the abnormality is detected.
前記電磁コイルは、連続鋳造機の鋳型に配置されていることを特徴とする請求項1〜4の何れか1項に記載の連続鋳造設備における電磁場発生装置の異常診断装置。   The said electromagnetic coil is arrange | positioned at the casting_mold | template of a continuous casting machine, The abnormality diagnosis apparatus of the electromagnetic field generator in the continuous casting installation of any one of Claims 1-4 characterized by the above-mentioned. 前記異常診断手段は、
前記異常診断用電源からの直流電圧印加時に前記電磁コイルに流れる微小電流を検出する微小電流検出手段と、
前記異常診断用電源の直流電圧値と前記微小電流検出手段で検出した微小電流値とに基づいて、前記電磁コイルの絶縁抵抗値を測定する絶縁抵抗測定手段と、を備え、
前記絶縁抵抗測定手段で測定した絶縁抵抗値の変化を監視することで、前記電磁コイルの絶縁抵抗値の異常を診断することを特徴とする請求項1〜5の何れか1項に記載の連続鋳造設備における電磁場発生装置の異常診断装置。
The abnormality diagnosis means includes
A minute current detecting means for detecting a minute current flowing in the electromagnetic coil when a DC voltage is applied from the abnormality diagnosis power source;
Insulation resistance measuring means for measuring an insulation resistance value of the electromagnetic coil based on a DC voltage value of the abnormality diagnosis power source and a minute current value detected by the minute current detecting means,
The continuity according to any one of claims 1 to 5, wherein an abnormality of the insulation resistance value of the electromagnetic coil is diagnosed by monitoring a change in an insulation resistance value measured by the insulation resistance measuring means. An abnormality diagnosis device for an electromagnetic field generator in a casting facility.
連続鋳造機で鋳造する鋳片内部の溶鋼に電磁場を印加するための電磁コイルを備える電磁場発生装置の異常を診断する、連続鋳造設備における電磁場発生装置の電路と大地との絶縁性の異常診断方法であって、
前記連続鋳造機の操業中で前記電磁場発生装置による電磁場の印加が不要となる電磁場非印加期間に、前記電磁コイルと当該電磁コイルに電磁場発生用の電流を供給する電磁場発生用電源との接続を切断し、異常診断用電源から前記電磁コイルに一定の直流電圧を印加し、前記電磁コイルの銅管の抵抗を測定するのではなく、前記電路と前記大地との絶縁抵抗値を測定し、前記電磁コイルの絶縁抵抗値の異常を診断することを特徴とする連続鋳造設備における電磁場発生装置の異常診断方法。
Diagnosis of abnormality of electromagnetic field generator equipped with electromagnetic coil for applying electromagnetic field to molten steel inside slab casted by continuous casting machine, method for diagnosing abnormality of insulation between electric circuit and ground of electromagnetic field generator in continuous casting equipment Because
During operation of the continuous casting machine, during the electromagnetic field non-application period in which application of the electromagnetic field by the electromagnetic field generator is not required, connection between the electromagnetic coil and an electromagnetic field generating power source for supplying an electromagnetic field generating current to the electromagnetic coil is performed. Cutting, applying a constant DC voltage from the power supply for abnormality diagnosis to the electromagnetic coil, and measuring the resistance of the copper coil of the electromagnetic coil, measuring the insulation resistance value between the electric circuit and the ground, An abnormality diagnosis method for an electromagnetic field generator in a continuous casting facility, characterized by diagnosing an abnormality in an insulation resistance value of an electromagnetic coil.
鋳型内の鋳片内部の溶鋼に電磁場発生装置の電磁コイルから電磁場を印加しながら連続鋳造する連続鋳造方法であって、
先行鋳片が前記鋳型から抽出された時点で前記電磁場発生装置による電磁場印加を停止し、前記電磁コイルに一定の直流電圧を印加し、前記電磁コイルの銅管の抵抗を測定するのではなく、前記電磁場発生装置の電路と大地との絶縁抵抗値を測定し、前記電磁コイルの絶縁抵抗値の異常診断を行い、その後、後行鋳片の溶鋼が前記鋳型に装入されたら、前記電磁場発生装置による電磁場印加を再開して前記後行鋳片の溶鋼を鋳造することを特徴とする連続鋳造方法。
A continuous casting method of continuously casting while applying an electromagnetic field from an electromagnetic coil of an electromagnetic field generator to molten steel inside a slab in a mold,
When the preceding slab is extracted from the mold, the electromagnetic field application by the electromagnetic field generator is stopped, a constant DC voltage is applied to the electromagnetic coil, and the resistance of the copper coil of the electromagnetic coil is not measured, Measure the insulation resistance value between the electric circuit and the ground of the electromagnetic field generator , perform an abnormality diagnosis of the insulation resistance value of the electromagnetic coil, and then, when the molten steel of the subsequent slab is inserted into the mold, the electromagnetic field generation A continuous casting method, wherein the application of an electromagnetic field by the apparatus is resumed to cast the molten steel of the subsequent cast slab.
JP2011239067A 2011-10-31 2011-10-31 Abnormality diagnosis apparatus and abnormality diagnosis method for electromagnetic field generator in continuous casting facility, and continuous casting method Expired - Fee Related JP5796456B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2011239067A JP5796456B2 (en) 2011-10-31 2011-10-31 Abnormality diagnosis apparatus and abnormality diagnosis method for electromagnetic field generator in continuous casting facility, and continuous casting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2011239067A JP5796456B2 (en) 2011-10-31 2011-10-31 Abnormality diagnosis apparatus and abnormality diagnosis method for electromagnetic field generator in continuous casting facility, and continuous casting method

Publications (2)

Publication Number Publication Date
JP2013094809A JP2013094809A (en) 2013-05-20
JP5796456B2 true JP5796456B2 (en) 2015-10-21

Family

ID=48617336

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2011239067A Expired - Fee Related JP5796456B2 (en) 2011-10-31 2011-10-31 Abnormality diagnosis apparatus and abnormality diagnosis method for electromagnetic field generator in continuous casting facility, and continuous casting method

Country Status (1)

Country Link
JP (1) JP5796456B2 (en)

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4932428B2 (en) * 2005-10-26 2012-05-16 新日本製鐵株式会社 Continuous casting mold
JP2009039775A (en) * 2007-08-10 2009-02-26 Jfe Steel Kk Abnormality diagnosis method for electromagnetic field generator

Also Published As

Publication number Publication date
JP2013094809A (en) 2013-05-20

Similar Documents

Publication Publication Date Title
US8405339B2 (en) System and method for detecting fault in an AC machine
KR101504975B1 (en) Apparatus for measuring leakage current and method for operating the same
CN103645244A (en) Nondestructive inspection device and method for continuous casting and rolling production line
JPWO2020179698A1 (en) Continuous casting method for slab slabs
JP5796456B2 (en) Abnormality diagnosis apparatus and abnormality diagnosis method for electromagnetic field generator in continuous casting facility, and continuous casting method
JPS6353903B2 (en)
JP2009039775A (en) Abnormality diagnosis method for electromagnetic field generator
JP2012245531A (en) Method for determining abnormality in roll gap of rolls in continuous casting machine
CN105445363B (en) Monitor the electromagnetic force method of continuous casting billet oscillation mark
JP5672909B2 (en) Molten steel flow velocity measuring method, molten steel flow velocity measuring apparatus, and continuous casting operation method
JPS58148063A (en) Method for predicting cracking of ingot in continuous casting
CN111536103A (en) A kind of continuous casting machine hydraulic equipment fault detection method and device
JP2012166979A (en) Electromagnetic casting method and electromagnetic casting apparatus of polycrystalline silicon
JP6398413B2 (en) Slag outflow detection method from ladle and slag outflow suppression method
KR100950396B1 (en) Slag outflow detection device using long nozzle type vibration sensor
JP3308950B2 (en) Pinch detection method of induction heating device
CN104801687B (en) The monitoring method of electrolytic aluminium continuous casting line critical component service life
CN114715110A (en) Method and device for detecting short circuit fault in eddy current braking system
JP2014063628A (en) Deterioration symptom detection method and device for battery power supply
CN202793642U (en) Transformer iron core temperature on-line monitoring system
JP2010253504A (en) Method for detecting slab seam in continuous casting
CN208787723U (en) A kind of thermal weld stress control system
JP5915589B2 (en) Temperature measurement method for continuous casting mold
JPS61279351A (en) Method and mold for continuous casting
Langer et al. New approaches to breakout prediction

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20140825

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20150515

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20150526

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20150619

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20150721

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20150803

R150 Certificate of patent or registration of utility model

Ref document number: 5796456

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees