Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP5797975B2 - Prestressed ballast track - Google Patents
[go: Go Back, main page]

JP5797975B2 - Prestressed ballast track - Google Patents

Prestressed ballast track Download PDF

Info

Publication number
JP5797975B2
JP5797975B2 JP2011183429A JP2011183429A JP5797975B2 JP 5797975 B2 JP5797975 B2 JP 5797975B2 JP 2011183429 A JP2011183429 A JP 2011183429A JP 2011183429 A JP2011183429 A JP 2011183429A JP 5797975 B2 JP5797975 B2 JP 5797975B2
Authority
JP
Japan
Prior art keywords
ballast
rod
track
prestressed
prestress
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2011183429A
Other languages
Japanese (ja)
Other versions
JP2013044189A (en
Inventor
勝己 村本
勝己 村本
祐 櫻井
祐 櫻井
阿部 正直
正直 阿部
正俊 飯尾
正俊 飯尾
豪 荒木
豪 荒木
内村 太郎
太郎 内村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Railway Technical Research Institute
Original Assignee
Railway Technical Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Railway Technical Research Institute filed Critical Railway Technical Research Institute
Priority to JP2011183429A priority Critical patent/JP5797975B2/en
Publication of JP2013044189A publication Critical patent/JP2013044189A/en
Application granted granted Critical
Publication of JP5797975B2 publication Critical patent/JP5797975B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Railway Tracks (AREA)

Description

本発明は、プレストレスト・バラスト軌道に関するものである。   The present invention relates to a prestressed ballast track.

従来よりバラスト軌道は、路盤上に敷かれたバラスト上にまくらぎを敷設し、このまくらぎの上にレールを配置した構造をなしている。
このようなバラスト軌道では、列車荷重によるアップリフト等が発生することで、バラストへの拘束力が低下するため、軌道沈下が生じ易い。
Conventionally, a ballast track has a structure in which a sleeper is laid on a ballast laid on a roadbed, and a rail is disposed on the sleeper.
In such a ballast track, an uplift or the like due to a train load is generated, so that the restraining force on the ballast is reduced, and the track is likely to sink.

これに対して、例えば特許文献1には、まくらぎと路盤とに固定されるプレストレス部材を設け、これらまくらぎと路盤との間のバラストに対してプレストレス部材によるプレストレスを与えることで該バラストを拘束するプレストレスト・バラスト軌道が開示されている。
また、この他、特許文献2には、レールと路盤との間に固定されるプレストレス部材を設け、上記同様、バラストに対してプレストレスを与えるプレストレスト・バラスト軌道が開示されている。
On the other hand, for example, in Patent Document 1, a prestress member fixed to the sleeper and the roadbed is provided, and prestress is applied to the ballast between the sleeper and the roadbed by the prestress member. A prestressed ballast track that restrains the ballast is disclosed.
In addition, Patent Document 2 discloses a prestressed ballast track that provides a prestress member fixed between a rail and a roadbed and applies prestress to the ballast as described above.

特許3798210号公報Japanese Patent No. 3798210 特開2008−291420号公報JP 2008-291420 A

しかしながら、上記特許文献1、2のプレストレスト・バラスト軌道は、バラストを拘束することによる軌道沈下抑制効果を得ることができるものの、プレストレスが時間の経過とともに低下してしまい、その結果、軌道沈下抑制効果が消失してしまうという問題があった。
即ち、上記プレストレスト・バラスト軌道では、プレストレス部材によるまくらぎやレールの拘束構造の剛性が高すぎるため、列車の走行に伴ってバラストに塑性変形が生じた場合には該塑性変形に追従して拘束を継続することができず、バラストへの拘束力が消失してしまう。
However, although the prestressed ballast orbit of Patent Documents 1 and 2 can obtain the effect of suppressing the orbital settlement by restraining the ballast, the prestress decreases with the passage of time, and as a result, the orbital settlement is suppressed. There was a problem that the effect disappeared.
That is, in the prestressed ballast track, the rigidity of the sleeper and rail restraint structure by the prestress member is too high, so if the ballast undergoes plastic deformation as the train travels, the restraint follows the plastic deformation. Cannot be continued, and the binding force to the ballast is lost.

この発明はこのような課題に鑑みてなされたものであって、軌道沈下抑制効果を長期間にわたって維持することができるプレストレスト・バラスト軌道を提供することを目的とする。   The present invention has been made in view of such problems, and an object of the present invention is to provide a prestressed ballast track that can maintain the effect of suppressing track settlement over a long period of time.

前記課題を解決するため、本発明は以下の手段を提案している。
即ち、本発明に係るプレストレスト・バラスト軌道は、軌道における路盤とまくらぎとにわたって配されたプレストレス部材によって、前記まくらぎと前記路盤との間のバラストにプレストレスを付与するプレストレスト・バラスト軌道構造において、前記プレストレス部材が、前記プレストレスを付与する方向に弾性を有し、前記まくらぎを前記路盤側に向かって付勢することを特徴とする。
In order to solve the above problems, the present invention proposes the following means.
That is, the prestressed ballast track according to the present invention is a prestressed ballast track structure in which prestress is applied to the ballast between the sleeper and the roadbed by a prestress member arranged over the roadbed and sleeper in the track. in the prestressing member has elasticity in a direction of imparting the prestress, characterized by biasing to isosamples towards the sleepers on the roadbed side.

このような特徴のプレストレスト・バラスト軌道によれば、プレストレス部材がその弾性によりバラストの塑性変形に追従して該バラストを拘束する。即ち、プレストレス部材がまくらぎと路盤との間においてバラストを弾性拘束した構造とされているため、バラストが塑性変形した場合であってもバラストに対するプレストレスの消失を回避することができる。   According to the prestressed ballast track having such a feature, the prestress member follows the plastic deformation of the ballast by its elasticity and restrains the ballast. That is, since the prestress member has a structure in which the ballast is elastically constrained between the sleeper and the roadbed, it is possible to avoid the disappearance of the prestress with respect to the ballast even when the ballast is plastically deformed.

また、本発明に係るプレストレスト・バラスト軌道においては、前記プレストレス部材が、下端が前記路盤に固定された緊張部材と、該緊張部材の上端側に接続され、上下方向に弾性変位可能とされるとともに前記まくらぎを下方に向かって押圧する拘束部材とを備えることが好ましい。   Further, in the prestressed ballast track according to the present invention, the prestress member is connected to a tension member having a lower end fixed to the roadbed and an upper end side of the tension member, and can be elastically displaced in the vertical direction. In addition, it is preferable to include a restraining member that presses the sleeper downward.

このようにプレストレス部材が弾性変形可能にまくらぎを下方に向かって押圧することによって、バラストの塑性変形に適切に追従しながら該バラストを拘束することができる。   By pressing the sleeper downward so that the prestress member can be elastically deformed in this manner, the ballast can be restrained while appropriately following the plastic deformation of the ballast.

さらに、本発明に係るプレストレスト・バラスト軌道においては、前記拘束部材が、前記軌道の延在方向に離間して配置された少なくとも二つの前記まくらぎ上にわたって配置されたバネ部材であることが好ましい。   Furthermore, in the prestressed ballast track according to the present invention, it is preferable that the restraining member is a spring member disposed over at least two sleepers that are spaced apart in the extending direction of the track.

これによれば、バネ部材の付勢力によってプレストレス部材がプレストレスを付与する方向に弾性を有した構造となる。したがって、簡易な構造でもってバラストの塑性変形に適切に追従しながら該バラストを拘束することができ、設置コストやメンテナンスコストを低く抑えることができる。   According to this, it becomes a structure which has elasticity in the direction in which a prestress member gives prestress by the biasing force of a spring member. Therefore, the ballast can be restrained while appropriately following the plastic deformation of the ballast with a simple structure, and the installation cost and the maintenance cost can be kept low.

また、本発明に係るプレストレスト・バラスト軌道においては、前記拘束部材が、前記軌道の延在方向に離間して配置された少なくとも二つの前記まくらぎ上にわたって配置された梁部材と、該梁部材と各まくらぎとの間に介在された付勢部材とを備えているものであってもよい。   Further, in the prestressed ballast raceway according to the present invention, the restraint member is disposed over at least two sleepers disposed apart from each other in the extending direction of the raceway, and the beam member An urging member interposed between each sleeper may be provided.

これによれば、付勢部材によってプレストレス部材がプレストレスを付与する方向に弾性を有した構造となる。したがって、バラストの塑性変形に適切に追従しながら該バラストを確実に拘束することができる。   According to this, it becomes a structure which has elasticity in the direction in which a prestress member gives prestress by a biasing member. Therefore, the ballast can be reliably restrained while appropriately following the plastic deformation of the ballast.

また、本発明に係るプレストレスト・バラスト軌道においては、前記緊張部材が、下方側に配置された第一ロッド材と、該第一ロッド材の上方側に配置された第二ロッド材と、前記第一ロッド材と前記第二ロッド材とを上下方向に弾性変位可能に接続する連結部とを有し、前記拘束部材が、前記第二ロッド材に接続されるとともに、前記軌道の延在方向に離間して配置された少なくとも二つのまくらぎ上にわたって配置された梁部材を有するものであってもよい。   Further, in the prestressed ballast track according to the present invention, the tension member includes a first rod material disposed on the lower side, a second rod material disposed on the upper side of the first rod material, and the first A connecting portion that connects the one rod member and the second rod member so as to be elastically displaceable in the vertical direction, and the restraining member is connected to the second rod member and extends in the extending direction of the track. You may have the beam member arrange | positioned over the at least 2 sleeper arrange | positioned spaced apart.

これによれば、ロッド自体が上下方向に弾性を有することで、プレストレス部材がプレストレスを付与する方向に弾性を有した構造となる。したがって、バラストの塑性変形に適切に追従しながら該バラストを確実に拘束することができる。   According to this, since the rod itself has elasticity in the vertical direction, the prestress member has a structure having elasticity in the direction in which prestress is applied. Therefore, the ballast can be reliably restrained while appropriately following the plastic deformation of the ballast.

さらに、本発明に係るプレストレスト・バラスト軌道においては、前記緊張部材の下端がアンカー部を介して前記路盤に固定されており、該アンカー部は、前記路盤に形成された凹部の底面に敷設され、前記緊張部材の下端が接続された板部材と、前記凹部内における前記板部材上に充填されたコンクリートとを備えていることが好ましい。   Furthermore, in the prestressed ballast track according to the present invention, the lower end of the tension member is fixed to the roadbed via an anchor portion, and the anchor portion is laid on the bottom surface of a recess formed in the roadbed, It is preferable to include a plate member to which the lower end of the tension member is connected and concrete filled on the plate member in the recess.

これによって、緊張部材の下端を路盤に対して確実に固定することができるため、プレストレス部材によるバラストへの拘束力の付与をより確実に行うことができる。また、緊張部材を介して板部材に伝達されるまくらぎからの反力は、該板部材によってコンクリート、バラストに上方向への力として伝達される。これにより、バラストに付与される拘束力を向上させることができる。   Thereby, since the lower end of the tension member can be reliably fixed to the roadbed, it is possible to more reliably apply the restraining force to the ballast by the prestress member. The reaction force from the sleeper transmitted to the plate member via the tension member is transmitted as an upward force to the concrete and the ballast by the plate member. Thereby, the restraint force given to a ballast can be improved.

また、本発明に係るプレストレスト・バラスト軌道においては、前記板部材が、繊維強化プラスチックであることが好ましい。   In the prestressed ballast track according to the present invention, the plate member is preferably a fiber reinforced plastic.

これにより、例えば板部材として鋼材等を用いる場合に比べて該板部材の重量を軽減することができるため、重機の使用が困難な現場での施工性を向上させることができる。   Thereby, since the weight of this board member can be reduced compared with the case where steel materials etc. are used as a board member, for example, workability in the field where it is difficult to use a heavy machine can be improved.

本発明のプレストレスト・バラスト軌道によれば、プレストレス部材が弾性変形することでバラストの塑性変形に追従するため、該バラストに対する拘束力の消失を回避することができる。したがって、軌道沈下抑制効果を長期間にわたって維持することが可能となる。   According to the prestressed ballast track of the present invention, since the prestress member elastically deforms to follow the plastic deformation of the ballast, it is possible to avoid the disappearance of the restraining force on the ballast. Therefore, the orbital settlement suppression effect can be maintained for a long time.

第一実施形態に係るプレストレスト・バラスト軌道の軌道延在方向を含む断面図である。It is sectional drawing containing the track extension direction of the prestressed ballast track | orbit concerning 1st embodiment. 第一実施形態に係るプレストレスト・バラスト軌道の軌道延在方向に直交する断面図である。It is sectional drawing orthogonal to the track extension direction of the prestressed ballast track | orbit concerning 1st embodiment. 図1におけるプレストレス部材の一部拡大図である。It is a partially expanded view of the prestress member in FIG. 図3のA−A断面図である。It is AA sectional drawing of FIG. 第二実施形態に係るプレストレスト・バラスト軌道におけるプレストレス部材の一部拡大図である。It is a partial enlarged view of the prestress member in the prestressed ballast track | orbit concerning 2nd embodiment. 図5のA−A断面図である。It is AA sectional drawing of FIG. 第三実施形態に係るプレストレスト・バラスト軌道におけるプレストレス部材の一部拡大図である。It is a partially expanded view of the prestressed member in the prestressed ballast track according to the third embodiment. 図7のA−A断面図である。It is AA sectional drawing of FIG. 変形例に係るプレストレスト・バラスト軌道の軌道延在方向に直交する断面図である。It is sectional drawing orthogonal to the track extension direction of the prestressed ballast track | orbit concerning a modification. 変形例に係るプレストレスト・バラスト軌道の軌道延在方向に直交する断面図である。It is sectional drawing orthogonal to the track extension direction of the prestressed ballast track | orbit concerning a modification. 変形例に係るプレストレスト・バラスト軌道の軌道延在方向に直交する断面図である。It is sectional drawing orthogonal to the track extension direction of the prestressed ballast track | orbit concerning a modification.

以下、本発明の第一実施形態について図面を参照して詳細に説明する。
図1に示すように、本実施形態のプレストレスト・バラスト軌道100は、路盤1上に敷かれたバラスト3上に、軌道幅方向に延在する角柱状をなすまくらぎ4が軌道延在方向に間隔をあけて複数設置されており、これらまくらぎ4上に一対のレール5が軌道延在方向に沿って敷設されることで構成されている。そして、このプレストレスト・バラスト軌道100には、まくらぎ4と路盤1との間にわたって配置されるプレストレス部材10と、該プレストレス部材10を路盤1に対して固定するアンカー部60とが設けられている。
Hereinafter, a first embodiment of the present invention will be described in detail with reference to the drawings.
As shown in FIG. 1, a prestressed ballast track 100 according to this embodiment includes a sleeper 4 having a prism shape extending in a track width direction on a ballast 3 laid on a roadbed 1 in a track extending direction. A plurality of rails 5 are installed at intervals, and a pair of rails 5 are laid on the sleepers 4 along the track extending direction. The prestressed ballast track 100 is provided with a prestress member 10 disposed between the sleeper 4 and the roadbed 1 and an anchor portion 60 for fixing the prestressed member 10 to the roadbed 1. ing.

プレストレス部材10は、図1から図4に示すように、ロッド(緊張部材)20及び拘束部材30から構成されており、隣り合う一対のまくらぎ4と路盤1との間において上下方向にわたるようにして複数が設けられている。本実施形態においては、隣り合う一対のまくらぎ4に一のプレストレス部材10が対応するように複数のプレストレス部材10が設けられている。換言すれば、プレストレス部材10は、軌道延在方向に間隔をあけて複数配置されたまくらぎ4の間に一つ置きに設けられている。   As shown in FIGS. 1 to 4, the prestress member 10 includes a rod (tension member) 20 and a restraining member 30, and extends between the pair of adjacent sleepers 4 and the roadbed 1. A plurality are provided. In the present embodiment, a plurality of prestress members 10 are provided so that one prestress member 10 corresponds to a pair of adjacent sleepers 4. In other words, every other pre-stress member 10 is provided between the sleepers 4 that are arranged at intervals in the track extending direction.

ロッド20は、例えば金属やカーボン等からなる棒状の部材であって、隣り合う一対のまくらぎ4の中間の位置における軌道幅方向中央において、路盤1と一対のまくらぎ4の間とにわたって上下方向に延在するように設けられている。
このロッド20は、その下端がアンカー部60を介して路盤1に固定されるとともに、この下端からバラスト3内を通過するように上方に向かって延在し、その上端は一対のまくらぎ4の上面よりも上方に突出するように配置されている。
The rod 20 is a rod-shaped member made of, for example, metal, carbon, or the like, and vertically extending across the roadbed 1 and the pair of sleepers 4 at the center in the track width direction at the middle position between the pair of adjacent sleepers 4. It is provided so that it may extend.
The rod 20 has a lower end fixed to the roadbed 1 via the anchor portion 60 and extends upward from the lower end so as to pass through the ballast 3. The upper end of the rod 20 is a pair of sleepers 4. It arrange | positions so that it may protrude upwards from the upper surface.

また、このロッド20の上端側の外周面には雄ネジ(図示省略)が形成されており、当該雄ネジには内周面に雌ネジを有するロックナット21が螺合されている。これによって、ロックナット21はロッド20の上端側において該ロッド20の外周面から外周側に張り出すように固定されている。なお、このロックナット21は、ロッド20に対して相対回転させた際のみ該ロッド20に対して上下方向に相対移動可能とされている。   A male screw (not shown) is formed on the outer peripheral surface on the upper end side of the rod 20, and a lock nut 21 having a female screw on the inner peripheral surface is screwed to the male screw. Thus, the lock nut 21 is fixed so as to protrude from the outer peripheral surface of the rod 20 to the outer peripheral side on the upper end side of the rod 20. The lock nut 21 is movable relative to the rod 20 in the vertical direction only when the lock nut 21 is rotated relative to the rod 20.

拘束部材30は、ロッド20の上端側に接続されてまくらぎ4を下方に向かって押圧する役割を有しており、詳しくは図3及び図4に示すように、バネ部材31から構成されている。このバネ部材31は、付与される押圧力によって設定値以内で変位するバネ定数を有している。   The restraining member 30 is connected to the upper end side of the rod 20 and has a role of pressing the sleeper 4 downward. Specifically, as shown in FIGS. 3 and 4, the restraining member 30 includes a spring member 31. Yes. The spring member 31 has a spring constant that is displaced within a set value by the applied pressing force.

このバネ部材31は、それぞれ水平面に沿って延びる矩形板状をなしており、上下方向に撓むように弾性変形可能とされている。また、これらバネ部材31の長手方向の中央には上下方向に貫通してロッド20の外径よりも大きい内径を有する孔部33がそれぞれ形成されている。このバネ部材31の各孔部33は、互いに上下方向に連通状態とされており、上方から下方に向かってロッド20が挿通されている。
これによって、バネ部材31の上面にはロックナット21が当接しており、該ロックナット21によってバネ部材31からなる拘束部材30のロッド20に対する上方向への相対移動が規制されている。
Each of the spring members 31 has a rectangular plate shape extending along a horizontal plane, and is elastically deformable so as to bend in the vertical direction. Further, at the center in the longitudinal direction of these spring members 31, holes 33 having an inner diameter larger than the outer diameter of the rod 20 are formed penetrating in the vertical direction. The holes 33 of the spring member 31 are in communication with each other in the vertical direction, and the rod 20 is inserted from the upper side to the lower side.
Thus, the lock nut 21 is in contact with the upper surface of the spring member 31, and the relative movement of the restraining member 30 made of the spring member 31 in the upward direction with respect to the rod 20 is restricted by the lock nut 21.

さらに、バネ部材31からなる拘束部材30は、軌道延在方向にバネ部材31の長手方向、即ち、拘束部材30の長手方向を沿わせて配置されている。これによって、拘束部材30はその長手方向の両端側が一対のまくらぎ4の上面に接触するようにして、これら一対のまくらぎ4の上面にわたって配置されている。   Further, the restraining member 30 formed of the spring member 31 is disposed along the longitudinal direction of the spring member 31 in the track extending direction, that is, the longitudinal direction of the restraining member 30. As a result, the restraining member 30 is disposed over the upper surfaces of the pair of sleepers 4 such that both ends in the longitudinal direction are in contact with the upper surfaces of the pair of sleepers 4.

なお、本実施形態では、バネ部材31の下面における長手方向両端側、即ち、当該下面におけるまくらぎ4に対向する部分には、図3に示すように、下方に向かって円筒面状に突出する円筒座32がそれぞれ設けられている。これら一対の円筒座32はまくらぎ4の上面に接触しており、即ち、拘束部材30は円筒座32を介してまくらぎ4に接触している。   In the present embodiment, as shown in FIG. 3, the both ends of the spring member 31 on the lower surface in the longitudinal direction, that is, the portions facing the sleepers 4 on the lower surface protrude downward in a cylindrical surface shape. A cylindrical seat 32 is provided. The pair of cylindrical seats 32 are in contact with the upper surface of the sleeper 4, that is, the restraining member 30 is in contact with the sleeper 4 through the cylindrical seat 32.

このようなプレストレス部材10の拘束部材30は、ロッド20との接続箇所となるバネ部材31の長手方向中央を支点として、長手方向両側の部分が上下方向に弾性変位可能とされている。即ち、プレストレス部材10は、拘束部材30が弾性変位可能とされることによって、該プレストレス部材10自体が上下方向への弾性を有した構造をなしている。   Such a restraining member 30 of the prestress member 10 is configured such that portions on both sides in the longitudinal direction can be elastically displaced in the vertical direction with the center in the longitudinal direction of the spring member 31 serving as a connection point with the rod 20 serving as a fulcrum. That is, the prestress member 10 has a structure in which the restraint member 30 is elastically displaceable so that the prestress member 10 itself has elasticity in the vertical direction.

また、拘束部材30は、まくらぎ4との接触箇所を介して該まくらぎ4を下方に向かって押圧している。即ち、拘束部材30は、ロックナット21によってロッド20に対する上方向への移動が規制されることによって、該ロッド20との接続箇所となるバネ部材31の長手方向中央に比べて長手方向両端側の部分が上方に向かって弾性変形している。これにより、ロックナット21から拘束部材30に加えられる押圧力と拘束部材30自体の弾性力によって、まくらぎ4が下方に向かって押圧されている。   Further, the restraining member 30 presses the sleeper 4 downward through a contact portion with the sleeper 4. That is, the restraining member 30 is restricted from moving upward with respect to the rod 20 by the lock nut 21, so that the restraining member 30 is located at both ends in the longitudinal direction as compared with the longitudinal center of the spring member 31 that is a connection point with the rod 20. The portion is elastically deformed upward. As a result, the sleeper 4 is pressed downward by the pressing force applied from the lock nut 21 to the restraining member 30 and the elastic force of the restraining member 30 itself.

なお、拘束部材30によるまくらぎ4の押圧力を増加させるには、ロックナット21を回転させて下方に変位させればよい。これにより、ロックナット21から拘束部材30に付与される押圧力の増加に加えて、拘束部材30の長手方向両端側の部分がさらに上方に向かって弾性変形することによる弾性力の増加によって、まくらぎ4への押圧力を増加させることができる。   In order to increase the pressing force of the sleeper 4 by the restraining member 30, the lock nut 21 may be rotated and displaced downward. As a result, in addition to an increase in the pressing force applied from the lock nut 21 to the restraining member 30, an increase in the elastic force due to the elastic deformation of the portions on both ends in the longitudinal direction of the restraining member 30 further upward causes a pillow. The pressing force to the gap 4 can be increased.

アンカー部60は、図1及び図2に示すように、路盤1に形成された凹部2内に設けられている。即ち、路盤1の上面における軌道幅方向中央には下方に向かって窪む凹部2が軌道延在方向に間隔をあけて複数形成されており、これら凹部2のそれぞれにアンカー部60が設けられている。なお、本実施形態においては一のプレストレス部材10に対応する一対のまくらぎ4の下方に一の凹部2が形成されており、即ち、一対のまくらぎ4の直下に凹部2が形成されている。   As shown in FIGS. 1 and 2, the anchor portion 60 is provided in a recess 2 formed in the roadbed 1. That is, a plurality of recesses 2 that are recessed downward are formed in the center of the upper surface of the roadbed 1 in the track width direction at intervals in the track extending direction, and an anchor portion 60 is provided in each of these recesses 2. Yes. In the present embodiment, one recess 2 is formed below the pair of sleepers 4 corresponding to one prestress member 10, that is, the recess 2 is formed immediately below the pair of sleepers 4. Yes.

なお、本実施形態では、凹部2の軌道幅方向の寸法が、まくらぎ4の軌道幅方向の寸法と略同一に設定されているが、当該凹部2の軌道幅方向の寸法は任意に設定することができる。また、凹部2の軌道延在方向の寸法は、平面視にて一対のまくらぎ4が凹部2の範囲内に収容される程度の大きさに設定されていることが好ましい。   In this embodiment, the dimension of the recess 2 in the track width direction is set to be substantially the same as the dimension of the sleeper 4 in the track width direction, but the dimension of the recess 2 in the track width direction is arbitrarily set. be able to. Moreover, it is preferable that the dimension in the track extending direction of the recess 2 is set to a size that allows the pair of sleepers 4 to be accommodated within the range of the recess 2 in plan view.

アンカー部60は、凹部2の底面に敷設された板部材61を有している。この板部材61は、例えば繊維強化プラスチック(FRP)によって構成される平板状の部材であって、凹部2の底面の幅方向中央に敷設されている。また、板部材61は、プレストレス部材10のロッド20の下端と互いに固定されている。   The anchor part 60 has a plate member 61 laid on the bottom surface of the recess 2. The plate member 61 is a flat plate member made of, for example, fiber reinforced plastic (FRP), and is laid at the center in the width direction of the bottom surface of the recess 2. Further, the plate member 61 is fixed to the lower end of the rod 20 of the prestress member 10.

なお、ロッド20と板部材61との固定は、板部材61に設けられた凹部にロッド20の下端が嵌合することによるものであってもよいし、ロッド20の下端外周面に形成された雄ネジが板部材61に形成された凹孔の雌ネジに螺合することによるものであってもよい。また、ロッド20と板部材61とは必ずしも互いに固定されている必要はなく、ロッド20と板部材61とが互いに当接することにより接続された構成であってもよい。   The rod 20 and the plate member 61 may be fixed by fitting the lower end of the rod 20 into a recess provided in the plate member 61 or formed on the outer peripheral surface of the lower end of the rod 20. The male screw may be engaged with a female screw in a concave hole formed in the plate member 61. Further, the rod 20 and the plate member 61 do not necessarily have to be fixed to each other, and the rod 20 and the plate member 61 may be connected by abutting each other.

さらに、凹部2内における板部材61の上方には、該凹部2内全域を埋めるようにコンクリート62が充填されており、該コンクリート62にロッド20及び板部材61が一体に固定されている。即ち、本実施形態においては、凹部2に敷設された板部材61と該凹部2に充填されたコンクリート62からアンカー部60が構成されており、これによってロッド20の下端が路盤1に対して強固に固定されている。なお、コンクリート62としては、例えば砕石又は発生材と急硬性モルタルとの混合体から構成されていることが好ましい。   Further, concrete 62 is filled above the plate member 61 in the recess 2 so as to fill the entire area of the recess 2, and the rod 20 and the plate member 61 are fixed integrally to the concrete 62. In other words, in the present embodiment, the anchor portion 60 is configured by the plate member 61 laid in the recess 2 and the concrete 62 filled in the recess 2, whereby the lower end of the rod 20 is strong against the roadbed 1. It is fixed to. In addition, as the concrete 62, it is preferable to be comprised from the mixture of a crushed stone or a generating material, and a rapid hardening mortar, for example.

以上のような構成のプレストレスト・バラスト軌道100においては、アンカー部60を介して路盤1に固定されたロッド20の上端に接続された拘束部材30が、該拘束部材30に接触するまくらぎ4を下方に向かって押圧をする。この際、まくらぎ4からバラスト3に与えられる押圧力は該バラスト3を上下方向に圧縮する拘束力として作用し、これによって、バラスト3に対してプレストレスが付与される。そして、このプレストレスによってバラスト3が拘束されることにより、軌道沈下を抑制することができる。   In the prestressed ballast track 100 having the above-described configuration, the restraint member 30 connected to the upper end of the rod 20 fixed to the roadbed 1 via the anchor portion 60 includes the sleeper 4 that contacts the restraint member 30. Press downward. At this time, the pressing force applied from the sleeper 4 to the ballast 3 acts as a restraining force for compressing the ballast 3 in the vertical direction, and thereby prestress is applied to the ballast 3. And orbital settlement can be controlled by restraining ballast 3 by this prestress.

また、本実施形態のプレストレスト・バラスト軌道100では、プレストレス部材10における拘束部材30が上下方向、即ち、プレストレスが付与される方向に弾性変位可能とされているため、列車の走行によりバラスト3に塑性変形が生じた場合であっても拘束部材30が当該塑性変形に追従して弾性変形する。   Further, in the prestressed ballast track 100 of the present embodiment, the restraint member 30 in the prestress member 10 is elastically displaceable in the vertical direction, that is, the direction in which the prestress is applied. Even when plastic deformation occurs, the restraining member 30 elastically deforms following the plastic deformation.

即ち、本実施形態では、バラスト3に塑性変形が生じた場合であっても、拘束部材30のバネ部材31の長手方向両端側の弾性変位が緩むものの該バネ部材31によるまくらぎ4の下方に向かっての押圧は継続される。
このように、プレストレス部材10がまくらぎ4と路盤1との間においてバラスト3を弾性拘束するため、バラスト3が塑性変形した場合であっても該バラスト3に対するプレストレスの消失を回避することができる。
That is, in this embodiment, even when plastic deformation occurs in the ballast 3, the elastic displacement at both ends in the longitudinal direction of the spring member 31 of the restraining member 30 is loosened, but below the sleeper 4 by the spring member 31. The pressing toward is continued.
In this way, since the prestress member 10 elastically restrains the ballast 3 between the sleeper 4 and the roadbed 1, even if the ballast 3 is plastically deformed, the disappearance of the prestress on the ballast 3 is avoided. Can do.

また、拘束部材30として一対のまくらぎ4にわたって配置されるバネ部材31を採用していることにより、簡易な構造でもってバラスト3の塑性変形に適切に追従しながら該バラスト3を拘束することができる。これにより、設置コストやメンテナンスコストを低く抑えることができる。   Further, by adopting the spring member 31 disposed over the pair of sleepers 4 as the restraining member 30, the ballast 3 can be restrained while appropriately following the plastic deformation of the ballast 3 with a simple structure. it can. Thereby, installation cost and maintenance cost can be suppressed low.

さらに、本実施形態では、凹部2に敷設された板部材61と該板部材61上に充填されたコンクリート62とから構成されているため、ロッド20の下端を路盤1に対して確実に固定することができる。   Furthermore, in this embodiment, since it is comprised from the plate member 61 laid in the recessed part 2 and the concrete 62 with which it filled with this plate member 61, the lower end of the rod 20 is fixed with respect to the roadbed 1 reliably. be able to.

また、押圧力が作用する一対のまくらぎ4の直下に板部材61が配置されているため、拘束部材30からまくらぎ4に付与される押圧力の反力は、ロッド20を介して板部材61に伝達される。このように板部材61に伝達された反力は、コンクリート62を介してバラスト3に上方向への力として付与される。これによって、バラスト3に付与される拘束力を向上させることができ、即ち、プレストレス部材10によるプレストレスを該バラスト3に対して確実かつ効果的に付与することができる。よって、軌道沈下抑制効果をより高く得ることができる。   Further, since the plate member 61 is disposed directly below the pair of sleepers 4 on which the pressing force acts, the reaction force of the pressing force applied from the restraining member 30 to the sleepers 4 is transmitted via the rod 20 to the plate member. 61. The reaction force transmitted to the plate member 61 in this manner is applied as an upward force to the ballast 3 through the concrete 62. Thereby, the restraining force applied to the ballast 3 can be improved, that is, the prestress by the prestress member 10 can be reliably and effectively applied to the ballast 3. Therefore, the orbital settlement suppression effect can be obtained higher.

また、アンカー部60の板部材61の材料として繊維強化プラスチックを用いているため、例えば鋼材等を用いる場合に比べて該板部材61の重量を軽減することができ、重機の使用が困難な現場での施工性を向上させることができる。   Further, since fiber reinforced plastic is used as the material of the plate member 61 of the anchor portion 60, the weight of the plate member 61 can be reduced compared to the case of using, for example, steel, etc., and it is difficult to use heavy machinery. It is possible to improve the workability at.

なお、バネ部材31としては、板バネを用いることが好ましい。また、複数枚の板バネを締着シート等によってまとめることで、一のバネ部材31として用いてもよい。   As the spring member 31, a leaf spring is preferably used. Further, a plurality of plate springs may be used as one spring member 31 by collecting them with a fastening sheet or the like.

次に本発明の第二実施形態について図5及び図6を参照して説明する。第二実施形態では第一実施形態と同様の構成要素には同一の符号を付して詳細な説明を省略する。本実施形態のプレストレスト・バラスト軌道100は、プレストレス部材10における拘束部材30の構成について第一実施形態と相違する。
第二実施形態の拘束部材30は、図5及び図6に示すように、ロッド20の上端に接続された梁部材41と、該梁部材41に設けられた一対の付勢部材45とを備えている。
Next, a second embodiment of the present invention will be described with reference to FIGS. In the second embodiment, the same components as those in the first embodiment are denoted by the same reference numerals, and detailed description thereof is omitted. The prestressed ballast track 100 of the present embodiment is different from the first embodiment in the configuration of the restraining member 30 in the prestress member 10.
As shown in FIGS. 5 and 6, the restraining member 30 of the second embodiment includes a beam member 41 connected to the upper end of the rod 20 and a pair of urging members 45 provided on the beam member 41. ing.

梁部材41は、水平方向に延在するとともに内部が中空状とされた鋼管であって、その延在方向略中央の下部には、該梁部材41の内部と下方とを連通するロッド挿通孔42が形成されている。このロッド挿通孔42にはロッド20が上下方向に挿通されており、ロックナット21は梁部材41の内部においてロッド20の上端側外周面に固定されている。このロックナット21が梁部材41の内部における下面に当接することで、梁部材41のロッド20に対する上方向への相対移動が規制されている。   The beam member 41 is a steel pipe that extends in the horizontal direction and has a hollow inside, and a rod insertion hole that communicates the inside and the bottom of the beam member 41 at the lower portion of the center in the extending direction. 42 is formed. The rod 20 is inserted in the rod insertion hole 42 in the vertical direction, and the lock nut 21 is fixed to the outer peripheral surface on the upper end side of the rod 20 inside the beam member 41. When the lock nut 21 abuts on the lower surface inside the beam member 41, the upward relative movement of the beam member 41 with respect to the rod 20 is restricted.

なお、ロックナット21のロッド20に対する回転の作業性を担保すべく、梁部材41の延在方向略中央の上部に該梁部材41の内部と上方とを連通する孔が形成されていてもよい。この孔を介して梁部材41内に工具を挿入することで、ロックナット21をロッド20に対して容易に相対回転させることができる。   In order to secure the workability of rotation of the lock nut 21 with respect to the rod 20, a hole that communicates the inside and the top of the beam member 41 may be formed in the upper portion of the beam member 41 in the extending direction. . The lock nut 21 can be easily rotated relative to the rod 20 by inserting a tool into the beam member 41 through the hole.

この梁部材41はその延在方向を軌道延在方向に沿わせて配置されており、これによって梁部材41の両端は一対のまくらぎ4の上方に間隔をあけて配置されている。また、梁部材41の下部における一対のまくらぎ4の直上に当たる箇所には、該梁部材41の内部と下方とを連通する付勢部材挿通孔(図示省略)がそれぞれ形成されている。   The beam member 41 is arranged with its extending direction along the track extending direction, whereby both ends of the beam member 41 are arranged above the pair of sleepers 4 with a space therebetween. Further, biasing member insertion holes (not shown) for communicating the inside and the lower part of the beam member 41 are formed at locations in the lower part of the beam member 41 that are directly above the pair of sleepers 4.

さらに、これら付勢部材挿通孔の直上、即ち、一対のまくらぎ4の直上における梁部材41の内部の上面には、バネ受けガイド44が設けられている。このバネ受けガイド44は、梁部材41の内部の上面から下方に向かって突出する筒状をなしており、付勢部材挿通孔から梁部材41外部に露出することのないよう、該梁部材41内に収納されている。   Further, a spring receiving guide 44 is provided on the upper surface inside the beam member 41 immediately above the biasing member insertion holes, that is, directly above the pair of sleepers 4. The spring receiving guide 44 has a cylindrical shape that protrudes downward from the upper surface inside the beam member 41, so that the beam member 41 is not exposed to the outside of the beam member 41 through the biasing member insertion hole. It is stored inside.

付勢部材45は、梁部材41とまくらぎ4との間に介在されてまくらぎ4を下方に向かって押圧する役割を有しており、受台46、軸部材47及びバネ部材48から構成されている。このバネ部材48は、第一実施形態と同様、付与される押圧力によって設定値以内で変位するバネ定数を有するものである。
受台46は、付勢部材挿通孔の直下においてまくらぎ4上に載置される板状の部材である。
The urging member 45 is interposed between the beam member 41 and the sleeper 4 and has a role of pressing the sleeper 4 downward, and includes a pedestal 46, a shaft member 47, and a spring member 48. Has been. As in the first embodiment, the spring member 48 has a spring constant that is displaced within a set value by the applied pressing force.
The cradle 46 is a plate-like member that is placed on the sleeper 4 immediately below the urging member insertion hole.

また、軸部材47は、受台46の上面に固定された下端から上方向に延びて付勢部材挿通孔を介して梁部材41内に挿入され、その上端はバネ受けガイド44の内部に収納されるように配置されている。これによって、軸部材47及びこれに一体に固定された受台46は、バネ受けガイド44に案内されるようにして梁部材41に対して上下方向に相対移動可能とされている。
バネ部材48は、軸部材47の外周側に該軸部材47と同軸に配置されており、下端が受台46の上面に一体に固定され、上端がバネ受けガイド44の下方側を向く端面に一体に固定されている。
The shaft member 47 extends upward from the lower end fixed to the upper surface of the cradle 46 and is inserted into the beam member 41 through the biasing member insertion hole. The upper end of the shaft member 47 is housed in the spring receiving guide 44. Are arranged to be. As a result, the shaft member 47 and the receiving base 46 fixed integrally therewith can be moved relative to the beam member 41 in the vertical direction so as to be guided by the spring receiving guide 44.
The spring member 48 is disposed coaxially with the shaft member 47 on the outer peripheral side of the shaft member 47, and has a lower end integrally fixed to the upper surface of the receiving base 46 and an upper end facing the lower side of the spring receiving guide 44. It is fixed integrally.

このような拘束部材30では、ロックナット21のロッド20に対する相対位置の調整により梁部材41の上下方向位置が決定され、該梁部材41の延在方向両側に設けられた付勢部材45を介してまくらぎ4の下方に向かって押圧力が作用する。即ち、押圧力は、梁部材41のバネ受ガイドから該バネ受けガイド44に当接するバネ部材48、該バネ部材48が当接する受台46を介してまくらぎ4に対して伝達される。また、この際、バネ部材48は圧縮状態とされており、該バネ部材48の弾性に従って付勢部材45自体が上下方向に弾性変位可能とされている。   In such a restraining member 30, the vertical position of the beam member 41 is determined by adjusting the relative position of the lock nut 21 with respect to the rod 20, and via the urging members 45 provided on both sides in the extending direction of the beam member 41. A pressing force acts downward of the sleeper 4. That is, the pressing force is transmitted from the spring receiving guide of the beam member 41 to the sleeper 4 via the spring member 48 that contacts the spring receiving guide 44 and the receiving base 46 that the spring member 48 contacts. At this time, the spring member 48 is in a compressed state, and the urging member 45 itself can be elastically displaced in the vertical direction in accordance with the elasticity of the spring member 48.

このようにして、本実施形態においては、拘束部材30の付勢部材45が上下方向に弾性変位する構成とされており、これによって、プレストレス部材10自体が上下方向に弾性を有した構造をなしている。   Thus, in this embodiment, the urging member 45 of the restraining member 30 is configured to be elastically displaced in the vertical direction, whereby the prestress member 10 itself has a structure having elasticity in the vertical direction. There is no.

以上のような構成のプレストレスト・バラスト軌道100においては、第一実施形態同様、プレストレス部材10の拘束部材30からまくらぎ4に伝達される押圧力は該バラスト3を上下方向に圧縮する拘束力として作用する。これによって、バラスト3に対してプレストレスが付与される。そして、このプレストレスによってバラスト3が拘束されることにより、軌道沈下を抑制することができる。   In the prestressed ballast track 100 configured as described above, as in the first embodiment, the pressing force transmitted from the restraining member 30 of the prestress member 10 to the sleeper 4 is the restraining force that compresses the ballast 3 in the vertical direction. Acts as As a result, prestress is applied to the ballast 3. And orbital settlement can be controlled by restraining ballast 3 by this prestress.

また、本実施形態のプレストレスト・バラスト軌道100では、プレストレス部材10の拘束部材30における付勢部材45がプレストレスが付与される方向、即ち、上下方向に弾性変位可能とされているため、列車の走行によりバラスト3に塑性変形が生じた場合であっても拘束部材30が当該塑性変形に追従して弾性変形する。したがって、バラスト3に塑性変形が生じた場合であっても、拘束部材30における付勢部材45のバネ部材48の圧縮状態が緩和されるもののまくらぎ4の下方に向かっての押圧は継続される。   In the prestressed ballast track 100 of the present embodiment, the biasing member 45 of the restraining member 30 of the prestress member 10 is elastically displaceable in the direction in which prestress is applied, that is, in the vertical direction. Even when the ballast 3 is plastically deformed due to the traveling, the restraining member 30 is elastically deformed following the plastic deformation. Therefore, even when plastic deformation occurs in the ballast 3, although the compression state of the spring member 48 of the biasing member 45 in the restraining member 30 is eased, the downward pressing of the sleeper 4 is continued. .

よって、第一実施形態と同様、プレストレス部材10がまくらぎ4と路盤1との間においてバラスト3を弾性拘束するため、バラスト3が塑性変形した場合であっても該バラスト3に対するプレストレスの消失を回避することができる。
なお、バネ部材48としては、コイルバネを用いることが好ましい。また、該バネ部材48として皿バネ等の他のバネ要素を用いてもよい。
Therefore, as in the first embodiment, since the prestress member 10 elastically restrains the ballast 3 between the sleeper 4 and the roadbed 1, even when the ballast 3 is plastically deformed, the prestress of the ballast 3 is reduced. Disappearance can be avoided.
Note that a coil spring is preferably used as the spring member 48. Further, other spring elements such as a disc spring may be used as the spring member 48.

次に本発明の第三実施形態について図7及び図8を参照して説明する。第三実施形態では第一実施形態と同様の構成要素には同一の符号を付して詳細な説明を省略する。
第三実施形態のプレストレスト・バラスト軌道100は、プレストレス部材10を構成するロッド20及び梁部材51について第一及び第二実施形態とは相違する。
Next, a third embodiment of the present invention will be described with reference to FIGS. In the third embodiment, the same components as those in the first embodiment are denoted by the same reference numerals, and detailed description thereof is omitted.
The prestressed ballast track 100 of the third embodiment is different from the first and second embodiments with respect to the rod 20 and the beam member 51 that constitute the prestress member 10.

第三実施形態のロッド20は、第一ロッド材22、第二ロッド材23及び連結部70とから構成されている。
第一ロッド材22はロッド20の下端側を構成する部材であって、該第一ロッド材22の下端はアンカー部60を介して路盤1に固定されている。また、第二ロッド材23はロッド20の上端側を構成する部材であって、連結部70を介して第一ロッド材22の上方側に配置されている。これら第一ロッド材22及び第二ロッド材23は、ロッド20の形状に従って上下方向に延在している。この第二ロッド材23の上端外周面にロックナット21が固定一体化されている。
The rod 20 of the third embodiment includes a first rod material 22, a second rod material 23, and a connecting portion 70.
The first rod member 22 is a member constituting the lower end side of the rod 20, and the lower end of the first rod member 22 is fixed to the roadbed 1 via the anchor portion 60. The second rod member 23 is a member constituting the upper end side of the rod 20, and is disposed on the upper side of the first rod member 22 via the connecting portion 70. The first rod member 22 and the second rod member 23 extend in the vertical direction according to the shape of the rod 20. A lock nut 21 is fixed and integrated with the outer peripheral surface of the upper end of the second rod member 23.

連結部70は、第一ロッド材22と第二ロッド材23とを上下方向に相対変位可能に接続する役割を有している。
この連結部70は、上下に延びて内部が中空とされた筒状をなすケーシング71を備えている。このケーシング71は、上端が閉塞される一方、下端にはケーシング71内外を上下方向に連通するロッド材挿通孔(図示省略)が形成されている。このロッド材挿通孔には第一ロッド材22の上端側が下方から上方に向かって挿通されている。ケーシング71の上端には、第二ロッド材23の下端が強固に固定一体化されている。
The connection part 70 has the role which connects the 1st rod material 22 and the 2nd rod material 23 so that relative displacement is possible to an up-down direction.
The connecting portion 70 includes a cylindrical casing 71 that extends vertically and has a hollow interior. The casing 71 is closed at the upper end, and has a rod material insertion hole (not shown) that communicates the inside and outside of the casing 71 in the vertical direction at the lower end. In the rod material insertion hole, the upper end side of the first rod material 22 is inserted from below to above. The lower end of the second rod member 23 is firmly fixed and integrated with the upper end of the casing 71.

また、連結部70は、ケーシング71内において第一ロッド材22の上端側外周面に固定されるナット部材73を備えている。このナット部材73の外径はロッド材挿通孔の内径よりも大きく設定されており、これによりナット部材73はケーシング71内から脱出不能とされている。そして、このナット部材73が、ケーシング71の上端及び下端に当接することで、第一ロッド材22と第二ロッド材23との上下方向への相対移動範囲が規制されている。   In addition, the connecting portion 70 includes a nut member 73 that is fixed to the outer peripheral surface on the upper end side of the first rod member 22 in the casing 71. The outer diameter of the nut member 73 is set to be larger than the inner diameter of the rod material insertion hole, so that the nut member 73 cannot escape from the casing 71. The nut member 73 is brought into contact with the upper end and the lower end of the casing 71, so that the relative movement range in the vertical direction between the first rod member 22 and the second rod member 23 is restricted.

さらに、連結部70は、ケーシング71内におけるナット部材73と該ケーシング71の下端との間に介在されたバネ部材74を備えている。このバネ部材74は、その上端がナット部材73に当接するとともに下端がケーシング71の下端に当接し、圧縮状態とされている。これによって、第一ロッド材22をケーシング71に対して下方に付勢することで、該ケーシング71に固定一体化された第二ロッド材23を下方に向かって付勢している。このバネ部材74は、第一、二実施形態と同様、付与される押圧力によって設定値以内で変位するバネ定数を有するものである。
なお、バネ部材74としては、第一ロッド22の外周側に同軸に配置されるコイルバネを採用することが好ましい。また、該バネ部材74として皿バネ等の他のバネ要素を用いてもよい。
Further, the connecting portion 70 includes a spring member 74 interposed between the nut member 73 in the casing 71 and the lower end of the casing 71. The spring member 74 is in a compressed state with its upper end in contact with the nut member 73 and lower end in contact with the lower end of the casing 71. Thus, the first rod member 22 is urged downward with respect to the casing 71, and the second rod member 23 fixed and integrated with the casing 71 is urged downward. As in the first and second embodiments, the spring member 74 has a spring constant that is displaced within a set value by the applied pressing force.
In addition, as the spring member 74, it is preferable to employ a coil spring disposed coaxially on the outer peripheral side of the first rod 22. Further, as the spring member 74, another spring element such as a disc spring may be used.

梁部材51は、水平方向に延在するとともに内部が中空状とされた鋼管であって、その延在方向略中央の下部には、該梁部材51の内部と下方とを連通するロッド挿通孔52が形成されている。このロッド挿通孔52には第二ロッド材23が上下方向に挿通されており、ロックナット21は梁部材51の内部において第二ロッド材23の上端側外周面に固定されている。このロックナット21が梁部材51の内部における下面に当接することで、梁部材51の第二ロッド材23に対する上方向への相対移動が規制されている。
この梁部材51は、ロッド20の弾性変位に従って上下方向に弾性変位可能とされた状態でまくらぎ4を下方に向かって押圧している。
The beam member 51 is a steel pipe that extends in the horizontal direction and has a hollow inside, and a rod insertion hole that communicates the inside and the bottom of the beam member 51 at the lower portion of the center in the extending direction. 52 is formed. The second rod member 23 is inserted in the rod insertion hole 52 in the vertical direction, and the lock nut 21 is fixed to the upper end side outer peripheral surface of the second rod member 23 inside the beam member 51. When the lock nut 21 abuts on the lower surface inside the beam member 51, the upward relative movement of the beam member 51 with respect to the second rod member 23 is restricted.
The beam member 51 presses the sleeper 4 downward while being elastically displaceable in the vertical direction in accordance with the elastic displacement of the rod 20.

以上のような構成のプレストレスト・バラスト軌道100においては、第二ロッド材23が連結部70によって下方に付勢される際に該第二ロッド材23に接続された梁部材51も下方に付勢されることによって、該梁部材51に当接するまくらぎ4には下方に向かっての押圧力が付与される。このようにまくらぎ4に伝達される押圧力は該バラスト3を上下方向に圧縮する拘束力として作用する。これによって、バラスト3に対してプレストレスが付与される。そして、このプレストレスによってバラスト3が拘束されることにより、軌道沈下を抑制することができる。   In the prestressed ballast track 100 configured as described above, when the second rod member 23 is urged downward by the connecting portion 70, the beam member 51 connected to the second rod member 23 is also urged downward. As a result, a downward pressing force is applied to the sleeper 4 in contact with the beam member 51. Thus, the pressing force transmitted to the sleeper 4 acts as a restraining force that compresses the ballast 3 in the vertical direction. As a result, prestress is applied to the ballast 3. And orbital settlement can be controlled by restraining ballast 3 by this prestress.

そして、本実施形態のプレストレスト・バラスト軌道100では、梁部材51が第二ロッド材23に従って上下方向に弾性変位可能とされているため、列車の走行によりバラスト3に塑性変形が生じた場合であっても梁部材51が当該塑性変形に追従する。したがって、バラスト3に塑性変形が生じた場合であっても、拘束部材30における連結部70のバネ部材74の圧縮状態が緩和されるもののまくらぎ4の下方に向かっての押圧は継続される。   In the prestressed ballast track 100 of the present embodiment, since the beam member 51 is elastically displaceable in the vertical direction according to the second rod member 23, the ballast 3 is plastically deformed by the traveling of the train. However, the beam member 51 follows the plastic deformation. Therefore, even when plastic deformation occurs in the ballast 3, although the compression state of the spring member 74 of the connecting portion 70 in the restraining member 30 is relaxed, the downward pressing of the sleeper 4 is continued.

よって、第一、第二実施形態と同様、プレストレス部材10がまくらぎ4と路盤1との間においてバラスト3を弾性拘束するため、バラスト3が塑性変形した場合であっても該バラスト3に対するプレストレスの消失を回避することができる。   Therefore, as in the first and second embodiments, the prestress member 10 elastically restrains the ballast 3 between the sleeper 4 and the roadbed 1, so even if the ballast 3 is plastically deformed, Loss of prestress can be avoided.

以上、本発明の実施形態について詳細に説明したが、本発明の技術的思想を逸脱しない限り、これらに限定されることはなく、多少の設計変更等も可能である。
例えば、図9に示すように、凹部2の軌道幅方向の寸法は、例えば一対のレール5の間隔よりも小さく設定されていてもよい。この場合は、アンカー部60の板部材61は、例えば凹部2の底面全域を覆うように該底面に敷設される。
また、この他、例えば路盤1に形成された凹部2が、軌道の幅方向外側に向かうに従って漸次上方に傾斜する傾斜面を有していてもよい。これによって、凹部2内のコンクリート62は、凹部2の傾斜面に従って、上方に向かうに従って軌道の幅方向外側に広がるように充填される。この場合、板部材61に与えられる反力を、コンクリート62を介して軌道幅方向の広範囲にわたって下方からバラスト3に作用させることができる。よって、バラスト3に対してプレストレス部材10に基づくプレストレスを広範囲にわたって付与することができる。
As mentioned above, although embodiment of this invention was described in detail, unless it deviates from the technical idea of this invention, it is not limited to these, A some design change etc. are possible.
For example, as shown in FIG. 9, the dimension of the recess 2 in the track width direction may be set smaller than the interval between the pair of rails 5, for example. In this case, the plate member 61 of the anchor portion 60 is laid on the bottom surface so as to cover the entire bottom surface of the recess 2, for example.
In addition, for example, the recess 2 formed in the roadbed 1 may have an inclined surface that gradually inclines upward toward the outer side in the width direction of the track. Thereby, the concrete 62 in the recess 2 is filled so as to spread outward in the width direction of the track as it goes upward along the inclined surface of the recess 2. In this case, the reaction force applied to the plate member 61 can be applied to the ballast 3 from below through the concrete 62 over a wide range in the track width direction. Therefore, prestress based on the prestress member 10 can be applied to the ballast 3 over a wide range.

さらに、プレストレスト・バラスト軌道100において、例えば図10及び図11にそれぞれ示すように、軟弱地盤改良の改良体をアンカー部60として使用してもよい。
図10のプレストレスト・バラスト軌道100では、凹部2が実施形態で示した場合に比べて深く形成されており、当該凹部2内に満たされた攪拌混合杭62aにロッド20が直接的に固定されている。
また、図11のプレストレスト・バラスト軌道100では、凹部2を形成することなく、路盤の内部に空間2aを形成し、当該空間2aにロッド20を挿入するととともに該空間2aに薬液注入固化体62bが充填されている。即ち、ロッド20は、薬液注入固化体62bによって固定されている。
これらの場合であっても実施形態と同様、ロッド20を確実に固定することができる。
Furthermore, in the prestressed ballast track 100, as shown in FIGS. 10 and 11, for example, a soft ground improvement may be used as the anchor portion 60.
In the prestressed ballast track 100 in FIG. 10, the recess 2 is formed deeper than in the embodiment, and the rod 20 is directly fixed to the stirring and mixing pile 62 a filled in the recess 2. Yes.
Further, in the prestressed ballast track 100 of FIG. 11, the space 2a is formed inside the roadbed without forming the concave portion 2, and the rod 20 is inserted into the space 2a and the liquid injection solidified body 62b is inserted into the space 2a. Filled. That is, the rod 20 is fixed by the chemical injection solidified body 62b.
Even in these cases, the rod 20 can be reliably fixed as in the embodiment.

さらに、路盤1が高架橋等のコンクリート路盤の場合には、躯体から直接的にロッド20を立ち上げる構造としてもよい。   Furthermore, when the roadbed 1 is a concrete roadbed such as a viaduct, a structure in which the rod 20 is raised directly from the frame may be employed.

また、実施形態においてはロッド20の上端側の外周面にロックナット21を設けた構成としたが、拘束部材30の少なくとも上方向への相対移動を規制することができるならばロックナット21に限られず、他の部材であってもよい。   In the embodiment, the lock nut 21 is provided on the outer peripheral surface on the upper end side of the rod 20. However, the lock nut 21 is limited to the lock nut 21 as long as the relative movement of the restraining member 30 can be restricted at least in the upward direction. However, other members may be used.

1 路盤
2 凹部
2a 空間
3 バラスト
4 まくらぎ
5 レール
10 プレストレス部材
20 ロッド(緊張部材)
21 ロックナット
22 第一ロッド材
23 第二ロッド材
30 拘束部材
31 バネ部材
32 円筒座
33 孔部
41 梁部材
42 ロッド挿通孔
44 バネ受けガイド
45 付勢部材
46 受台
47 軸部材
48 バネ部材
51 梁部材
52 ロッド挿通孔
60 アンカー部
61 板部材
62 コンクリート
70 連結部
71 ケーシング
73 ナット部材
74 バネ部材
100 プレストレスト・バラスト軌道
DESCRIPTION OF SYMBOLS 1 Subbase 2 Recess 2a Space 3 Ballast 4 Sleeper 5 Rail 10 Prestress member 20 Rod (tension member)
21 Lock nut 22 First rod member 23 Second rod member 30 Restraining member 31 Spring member 32 Cylindrical seat 33 Hole 41 Beam member 42 Rod insertion hole 44 Spring receiving guide 45 Energizing member 46 Receiving base 47 Shaft member 48 Spring member 51 Beam member 52 Rod insertion hole 60 Anchor portion 61 Plate member 62 Concrete 70 Connection portion 71 Casing 73 Nut member 74 Spring member 100 Prestressed ballast track

Claims (7)

軌道における路盤とまくらぎとにわたって配されたプレストレス部材によって、前記まくらぎと前記路盤との間のバラストにプレストレスを付与するプレストレスト・バラスト軌道において、
前記プレストレス部材が、前記プレストレスを付与する方向に弾性を有し、前記まくらぎを前記路盤側に向かって付勢することを特徴とするプレストレスト・バラスト軌道。
In a prestressed ballast track that applies prestress to the ballast between the sleeper and the roadbed by a prestress member arranged over the roadbed and sleeper in the track,
Said prestressing member, said prestressing resilient in a direction to impart, prestressed track ballast, wherein the biasing to isosamples towards the sleepers on the roadbed side.
前記プレストレス部材が、
下端が前記路盤に固定された緊張部材と、
該緊張部材の上端側に接続され、上下方向に弾性変位可能とされるとともに前記まくらぎを下方に向かって押圧する拘束部材とを備えることを特徴とする請求項1に記載のプレストレスト・バラスト軌道。
The prestress member is
A tension member having a lower end fixed to the roadbed;
The prestressed ballast track according to claim 1, further comprising: a restraining member connected to an upper end side of the tension member and capable of elastic displacement in the vertical direction and pressing the sleeper downward. .
前記拘束部材が、前記軌道の延在方向に離間して配置された少なくとも二つの前記まくらぎ上にわたって配置されたバネ部材であることを特徴とする請求項2に記載のプレストレスト・バラスト軌道。   The prestressed ballast track according to claim 2, wherein the restraining member is a spring member disposed over at least two of the sleepers that are spaced apart in the extending direction of the track. 前記拘束部材が、
前記軌道の延在方向に離間して配置された少なくとも二つの前記まくらぎ上にわたって配置された梁部材と、
該梁部材と各まくらぎとの間に介在された付勢部材とを有することを特徴とする請求項2に記載のプレストレスト・バラスト軌道。
The restraining member is
A beam member disposed over at least two of the sleepers disposed apart from each other in the extending direction of the track;
The prestressed ballast track according to claim 2, further comprising an urging member interposed between the beam member and each sleeper.
前記緊張部材が、
下方側に配置された第一ロッド材と、
該第一ロッド材の上方側に配置された第二ロッド材と、
前記第一ロッド材と前記第二ロッド材とを上下方向に弾性変位可能に接続する連結部とを有し、
前記拘束部材が、
前記第二ロッド材に接続されるとともに、前記軌道の延在方向に離間して配置された少なくとも二つのまくらぎ上にわたって配置された梁部材を有することを特徴とする請求項2に記載のプレストレスト・バラスト軌道。
The tension member is
A first rod member disposed on the lower side;
A second rod material disposed on the upper side of the first rod material;
A connecting portion for connecting the first rod material and the second rod material so as to be elastically displaceable in the vertical direction;
The restraining member is
3. The prestressed member according to claim 2, further comprising a beam member connected to the second rod member and disposed on at least two sleepers disposed apart from each other in the extending direction of the track. -Ballast trajectory.
前記緊張部材の下端がアンカー部を介して前記路盤に固定されており、
該アンカー部は、
前記路盤に形成された凹部の底面に敷設され、前記緊張部材の下端が接続された板部材と、
前記凹部内における前記板部材上に充填されたコンクリートとを備えていることを特徴とする請求項2から5のいずれか一項に記載のプレストレスト・バラスト軌道。
The lower end of the tension member is fixed to the roadbed via an anchor portion,
The anchor portion is
A plate member laid on the bottom surface of the recess formed in the roadbed and connected to the lower end of the tension member;
The prestressed ballast track according to any one of claims 2 to 5, further comprising concrete filled on the plate member in the recess.
前記板部材が、繊維強化プラスチックであることを特徴とする、請求項6に記載のプレストレスト・バラスト軌道。   The prestressed ballast track according to claim 6, wherein the plate member is a fiber reinforced plastic.
JP2011183429A 2011-08-25 2011-08-25 Prestressed ballast track Expired - Fee Related JP5797975B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2011183429A JP5797975B2 (en) 2011-08-25 2011-08-25 Prestressed ballast track

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2011183429A JP5797975B2 (en) 2011-08-25 2011-08-25 Prestressed ballast track

Publications (2)

Publication Number Publication Date
JP2013044189A JP2013044189A (en) 2013-03-04
JP5797975B2 true JP5797975B2 (en) 2015-10-21

Family

ID=48008305

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2011183429A Expired - Fee Related JP5797975B2 (en) 2011-08-25 2011-08-25 Prestressed ballast track

Country Status (1)

Country Link
JP (1) JP5797975B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101625841B1 (en) * 2014-02-25 2016-06-01 한국철도기술연구원 Concrete sleeper for embedding apparatus for automatically correcting differential settlement of railway track using oil pressure, and correcting method for the same

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS50135702A (en) * 1974-04-10 1975-10-28
JP3440423B2 (en) * 1994-10-21 2003-08-25 清水建設株式会社 Track structure for track laying
JP3798210B2 (en) * 2000-02-09 2006-07-19 財団法人鉄道総合技術研究所 Prestress ballast track structure
JP4921236B2 (en) * 2007-04-27 2012-04-25 東海旅客鉄道株式会社 Ballast stopper, roadbed track
JP4855336B2 (en) * 2007-05-22 2012-01-18 公益財団法人鉄道総合技術研究所 Prestress ballast track structure

Also Published As

Publication number Publication date
JP2013044189A (en) 2013-03-04

Similar Documents

Publication Publication Date Title
KR101749913B1 (en) Railway rail fastening apparatus
NZ561705A (en) A rail track tie
KR20120002915A (en) Roller device for advanced rail
CA2910914A1 (en) Concrete sleeper and solid carriageway
JP5797975B2 (en) Prestressed ballast track
JP2011525948A (en) Rail fixing device to track sleepers
KR101575743B1 (en) Vibration damper utilizing wedges
US10704205B2 (en) Holddown assembly for railway rail
JP6337014B2 (en) Railway rail fixing device
CN101970757B (en) Device for fastening the track to the support
JP5973936B2 (en) Prestressed ballast track
KR101774384B1 (en) Vibration proof fixture for railroad
KR20150043785A (en) Rail fastening system with casing for shearing load guidance
KR200429970Y1 (en) Multifunctional anchor socket for bridge bearing
KR101293331B1 (en) Elastic device and mechanism to control horizontal displacement utilizing a horizontal component of elastic force and bridge bearing using the same
JP4236670B2 (en) Fall bridge prevention structure
JP6245857B2 (en) Supporting device for construction materials between bridges
JP6692685B2 (en) Rail fastening mechanism and leaf spring clip used therefor
CN203700879U (en) Shear hinge and rail structure
JP4980995B2 (en) Rail fastening structure and fastening method
JP2001279603A (en) Frame type sleeper, frame type track structure, and construction method of frame type track
KR101005105B1 (en) Rail lock
RU112203U1 (en) UPPER WAY DEVICE
KR20110131401A (en) Separation prevention device of insulation pad for rail
KR100577967B1 (en) Bearing device for structures

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20140613

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20150204

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20150303

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20150428

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20150804

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20150820

R150 Certificate of patent or registration of utility model

Ref document number: 5797975

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees