Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP5829434B2 - Suspension jig and wing ring lifting method - Google Patents
[go: Go Back, main page]

JP5829434B2 - Suspension jig and wing ring lifting method - Google Patents

Suspension jig and wing ring lifting method Download PDF

Info

Publication number
JP5829434B2
JP5829434B2 JP2011121419A JP2011121419A JP5829434B2 JP 5829434 B2 JP5829434 B2 JP 5829434B2 JP 2011121419 A JP2011121419 A JP 2011121419A JP 2011121419 A JP2011121419 A JP 2011121419A JP 5829434 B2 JP5829434 B2 JP 5829434B2
Authority
JP
Japan
Prior art keywords
arm
blade ring
slide guide
recess
feed screw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2011121419A
Other languages
Japanese (ja)
Other versions
JP2012246123A (en
Inventor
嘉明 杉本
嘉明 杉本
卓 上野山
卓 上野山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Power Ltd
Original Assignee
Mitsubishi Hitachi Power Systems Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Hitachi Power Systems Ltd filed Critical Mitsubishi Hitachi Power Systems Ltd
Priority to JP2011121419A priority Critical patent/JP5829434B2/en
Publication of JP2012246123A publication Critical patent/JP2012246123A/en
Application granted granted Critical
Publication of JP5829434B2 publication Critical patent/JP5829434B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Description

本発明は、蒸気タービン、ガスタービン、圧縮機等の回転機械の構成部材である翼環を加工する工程において翼環を吊り上げるための吊り治具及翼環の吊上げ方法に関するものである。 The present invention relates to a lifting jig for lifting a blade ring and a method for lifting a blade ring in a step of processing a blade ring that is a constituent member of a rotary machine such as a steam turbine, a gas turbine, and a compressor.

回転機械である蒸気タービン、ガスタービン、圧縮機等の構成部材である翼環は、複数の工程を経て製作される。一つの工程が終了して次の工程に翼環を移動させる際には、図12に示すように、まず、翼環50の下に板木3を設置して隙間を設け、次に、この隙間にゴム板4を通して翼環50の下面を覆うように配置し、その後、ゴム板4を挟んだ状態でワイヤーロープ5を翼環50に巻いて、最後にワイヤーロープ5を絞ってクレーンのフックに接続し、翼環50を吊り上げている。   A blade ring which is a constituent member of a steam turbine, a gas turbine, a compressor, or the like that is a rotating machine is manufactured through a plurality of processes. When one wing is completed and the wing ring is moved to the next step, as shown in FIG. 12, first, the board 3 is placed under the wing ring 50 to provide a gap. Place the rubber plate 4 in the gap so as to cover the lower surface of the wing ring 50, then wind the wire rope 5 around the wing ring 50 with the rubber plate 4 sandwiched, and finally squeeze the wire rope 5 to hook the crane And the wing ring 50 is lifted.

一方、翼環を吊り上げるためのものではないが、吊り治具を介して運搬対象物を吊り上げる場合がある。 On the other hand, although not intended to lift the blade ring, there is a case where the object to be transported is lifted through a lifting jig.

例えば、特許文献1には、運搬対象物を吊り上げるための吊り治具が開示されている。この吊り治具は、図13に示すように、棒状のフレーム201と、フレーム201に沿って摺動可能な一対のアーム202と、一対のアーム202の下端にそれぞれ互いに対向するように設けられた爪203と、一対のアーム202をフレーム201沿って摺動させる駆動手段204と、を備えている。
この吊り治具200の駆動手段204は、フレーム201の上面に配置され、一対のアーム202に螺合している送りねじ205と、送りねじ205の一端に接続された電動機207とから構成されている。この電動機207で送りねじ205を回転させることで一対のアーム202を互いに近づけて、一対のアーム202間に配置されている筒状の運搬対象物内に爪203を挿入し、この爪203を運搬対象物に引っ掛けて運搬対象物を吊り上げる。
For example, Patent Literature 1 discloses a hanging jig for lifting an object to be transported. As shown in FIG. 13, the hanging jig is provided so as to face each other at the rod-shaped frame 201, the pair of arms 202 that can slide along the frame 201, and the lower ends of the pair of arms 202. A claw 203 and driving means 204 for sliding the pair of arms 202 along the frame 201 are provided.
The driving means 204 of the suspension jig 200 is composed of a feed screw 205 disposed on the upper surface of the frame 201 and screwed into a pair of arms 202, and an electric motor 207 connected to one end of the feed screw 205. Yes. By rotating the feed screw 205 by the electric motor 207, the pair of arms 202 are brought close to each other, and the claw 203 is inserted into a cylindrical conveyance object disposed between the pair of arms 202, and the claw 203 is conveyed. Hang on the object to lift the object to be transported.

また、例えば、特許文献2には、水平方向に延びるフレームと、フレームに沿って摺動可能な一対のアームと、一対のアームの下端にそれぞれ互いに対向するように設けられた板状のフランジと、一対のアームをフレームに沿って摺動させる駆動手段と、を備えた吊り治具が開示されている。
この吊り治具の駆動手段は、フレームの長手方向に伸縮自在で、伸縮により一対のアームを互いに近づけたり、離したりするシリンダを備えている。このシリンダで一対のアームを互いに近づけて、一対のフランジを運搬対象物に当接させて吊り上げる。
Further, for example, Patent Document 2 discloses a frame extending in the horizontal direction, a pair of arms slidable along the frame, and a plate-like flange provided to face each other at the lower ends of the pair of arms. A suspension jig comprising a drive means for sliding a pair of arms along the frame is disclosed.
The suspension jig driving means is provided with a cylinder that is extendable in the longitudinal direction of the frame and moves the pair of arms closer to and away from each other by extension and contraction. With this cylinder, the pair of arms are brought close to each other, and the pair of flanges are brought into contact with the object to be transported and lifted.

また、例えば、特許文献3には、フレームと、フレームに沿って摺動可能な一対のアームと、一対のアームの下端にそれぞれ互いに対向するように設けられた凸状の把持部材と、一対のアームを互いに近づけたり、離れたりする向きに移動させるための操作レバーと、を備えた吊り治具が開示されている。
この操作レバーで一対のアームを互いに近づけて、凸状の把持部材を運搬対象物の凹部に挿入したら、操作レバーを所定の位置に設けられている溝に嵌合して操作レバーを固定し、把持部材を運搬対象物に引っ掛けて運搬対象物を吊り上げる。
Further, for example, in Patent Document 3, a frame, a pair of arms slidable along the frame, a convex gripping member provided to face each other at the lower ends of the pair of arms, and a pair of arms There is disclosed a suspension jig including an operation lever for moving the arms in directions toward and away from each other.
After the pair of arms are brought close to each other with this operation lever and the convex gripping member is inserted into the concave portion of the object to be transported, the operation lever is fitted into a groove provided at a predetermined position to fix the operation lever, The gripping member is hooked on the transport object and the transport object is lifted.

特開2010−173754号公報JP 2010-173754 A 特開昭62−36294号公報JP-A 62-36294 実開平6−47283号公報Japanese Utility Model Publication No. 6-47283

しかしながら、ワイヤーロープを翼環に巻いて翼環を吊り上げる方法では、翼環の下に板木を設けたり、翼環とワイヤーロープとの間にゴム板を挟んだりする手間がかかるので、吊り上げるための準備に時間がかかってしまう。   However, in the method of lifting the wing ring by winding the wire rope around the wing ring, it takes time to install a wooden board under the wing ring or sandwich a rubber plate between the wing ring and the wire rope. It takes time to prepare.

また、特許文献1に記載の吊り治具では、爪部を筒状の運搬対象物内に挿入して引っ掛けた状態で吊り上げるため、筒状でない翼環には適用できない。
そして、特許文献2に記載の吊り治具では、板状のフランジを翼環に当接させて吊り上げるため、突起部がある翼環には適用できない。
さらに、特許文献1及び特許文献2に記載の吊り治具では、電動機やシリンダ等の駆動手段を備えることで重量が増大するため、人がこれらの吊り治具を運搬することは困難である。
Further, the suspension jig described in Patent Document 1 cannot be applied to a non-cylindrical blade ring because the hook is lifted in a state of being inserted and hooked into a cylindrical transport object.
The suspension jig described in Patent Document 2 cannot be applied to a blade ring having a projection because the plate-like flange is lifted by contacting the blade ring.
Furthermore, in the suspension jigs described in Patent Document 1 and Patent Document 2, since the weight is increased by providing driving means such as an electric motor and a cylinder, it is difficult for a person to carry these suspension jigs.

また、特許文献3に記載の吊り治具では、凸状の把持部材を運搬対象物の凹部に挿入して引っ掛けた状態で吊り上げるため、凹部を有していない翼環には適用できない。また、操作レバーを固定する溝が1カ所しか設けられていないため、一対の把持部材間の距離は常に一定となる。したがって、形状や大きさが異なる複数種類の運搬対象物を搬送する場合には対応できない。   In addition, the suspension jig described in Patent Document 3 cannot be applied to a blade ring that does not have a concave portion because the convex gripping member is inserted into the concave portion of the object to be transported and lifted. Further, since only one groove for fixing the operation lever is provided, the distance between the pair of gripping members is always constant. Therefore, it is not possible to transport a plurality of types of transport objects having different shapes and sizes.

そこで、本発明は、形状及び大きさの異なる翼環を手間をかけずに吊り上げることが可能な軽量の吊り治具及び翼環の吊上げ方法を提供することを目的とするものである。 Accordingly, an object of the present invention is to provide a lightweight lifting jig and a method for lifting a blade ring that can lift a blade ring having a different shape and size without taking time and effort.

上述した課題を解決する本発明に係る吊り治具は、
回転機械の翼環を楊重装置に対して取り付けるための一対の吊り治具ユニットを備えた吊り治具であって、
前記吊り治具ユニットの各々は、
スライドガイドと、
前記スライドガイドに摺動自在に取り付けられる第1摺動部を一端側に有し、前記翼環の内側シュラウドに設けられた突起部が引っ掛かる第1凹部を他端部に有する第1アームと、
前記スライドガイドに摺動自在に取り付けられる第2摺動部を一端側に有し、前記翼環の外側シュラウドに設けられた突起部が引っ掛かる第2凹部を他端側に有し、前記第1アームと対向するように設けられる第2アームと、
前記スライドガイドに沿って設けられ、前記第1アーム及び第2アームの少なくとも一方に形成されたねじ穴に螺合する送りねじと、を備え、
前記吊り治具ユニットの各々は、前記送りねじの回転によって前記第1アーム及び前記第2アームの前記少なくとも一方を前記スライドガイドに沿って移動させて、前記第1アームと前記第2アームとの間の距離を調整するように構成され、
前記一対の吊り治具ユニットは、前記翼環の周方向にて互いに異なる位置において、各々の前記吊り治具ユニットの前記スライドガイドが前記翼環の径方向に沿うように設けられることを特徴とする。
The hanging jig according to the present invention for solving the above-described problems is
A hanging jig comprising a pair of hanging jig units for attaching a blade ring of a rotating machine to a hoisting device,
Each of the hanging jig units is
A slide guide,
A first arm having a first sliding portion slidably attached to the slide guide on one end side, and a first recess on the other end on which a protrusion provided on the inner shroud of the blade ring is hooked;
A second sliding portion that is slidably attached to the slide guide is provided on one end side, and a second recess is provided on the other end side on which a protrusion provided on the outer shroud of the blade ring is hooked. A second arm provided to face the arm;
A feed screw provided along the slide guide and screwed into a screw hole formed in at least one of the first arm and the second arm;
Each of the suspension jig units moves the at least one of the first arm and the second arm along the slide guide by the rotation of the feed screw, so that the first arm and the second arm Configured to adjust the distance between ,
The pair of suspension jig units are provided at positions different from each other in the circumferential direction of the blade ring so that the slide guides of the suspension jig units are along the radial direction of the blade ring. To do.

上記吊り治具によれば、第1アームの第1凹部及び第2アームの第2凹部内に、翼環の内側シュラウドの突起部及び外側シュラウドの突起部をそれぞれ引っ掛けて翼環を吊り上げるので、従来のワイヤーロープで吊り上げる際に、翼環の下に板木をかませたり、ワイヤーロープと翼環との間にゴム板を挟んだりする手間を省くことができ、作業効率が向上する。
また、送りねじを回転させることで、第1アーム及び第2アームの移動量を調整することができるので、形状や大きさの異なる翼環を吊り上げることができる。
さらに、吊り治具は、第1アーム及び第2アームを送りねじで摺動させる機能を備えた簡素な機構とすることで、軽量化が可能となり、人が吊り治具を手で運搬することができる。
According to the suspension jig, the blade ring is lifted by hooking the projection part of the inner shroud and the projection part of the outer shroud in the first recess of the first arm and the second recess of the second arm. When lifting with a conventional wire rope, it is possible to save the trouble of pinching a wooden board under the wing ring or sandwiching a rubber plate between the wire rope and the wing ring, thereby improving work efficiency.
Moreover, since the amount of movement of the first arm and the second arm can be adjusted by rotating the feed screw, it is possible to lift the blade rings having different shapes and sizes.
Furthermore, the suspension jig is a simple mechanism having a function of sliding the first arm and the second arm with a feed screw, so that the weight can be reduced and the person can carry the suspension jig by hand. Can do.

また、前記第1摺動部は、前記第1アームの前記一端側に形成され、前記スライドガイドが貫通する貫通穴であり、
前記第2摺動部は、前記第2アームの前記一端側に形成され、前記スライドガイドが貫通する貫通穴としてもよい。
Further, the first sliding portion is a through hole formed on the one end side of the first arm and through which the slide guide passes,
The second sliding portion may be a through hole formed on the one end side of the second arm and through which the slide guide passes.

このように、第1摺動部及び第2摺動部をそれぞれ貫通穴とすることで、第1アーム及び第2アームはスライドガイドに沿って摺動することができる。   Thus, the 1st arm and the 2nd arm can slide along a slide guide by making the 1st sliding part and the 2nd sliding part into a penetration hole, respectively.

また、前記スライドガイドの長手方向に沿った前記送りねじの前記スライドガイドに対する移動を規制する移動規制部を更に備えることとしてもよい。   Moreover, it is good also as providing the movement control part which controls the movement with respect to the said slide guide of the said feed screw along the longitudinal direction of the said slide guide.

上記移動規制部によれば、送りねじがスライドガイドに対して不動となるため、送りねじを回転させたときに、第1アーム及び第2アームの少なくとも一方をスライドガイドに沿って確実に移動させることができる。   According to the movement restricting portion, since the feed screw is immovable with respect to the slide guide, when the feed screw is rotated, at least one of the first arm and the second arm is reliably moved along the slide guide. be able to.

また、前記ねじ穴は、前記第1アーム及び前記第2アームの両方に形成され、
前記送りねじは、
前記第1アームの前記ねじ穴及び前記第2アームのねじ穴のいずれか一方に螺合する左ねじ部と、
前記第1アームの前記ねじ穴及び前記第2アームのねじ穴の他方に螺合する右ねじ部と、
前記左ねじ部と前記右ねじとの間に設けられ、前記左ねじ部及び前記右ねじ部とは直径が異なる異径部とを有し、
前記移動規制部は、一端が前記スライドガイドに固定され、他端が前記異径部に嵌合されて、前記異径部を前記スライドガイドに回転自在に支持することとしてもよい。
Further, the screw hole is formed in both the first arm and the second arm,
The feed screw is
A left-hand thread portion screwed into any one of the screw hole of the first arm and the screw hole of the second arm;
A right-hand thread portion screwed into the other of the screw hole of the first arm and the screw hole of the second arm;
Provided between the left-hand thread part and the right-hand thread, the left-hand thread part and the right-hand thread part have different diameter parts having different diameters,
The movement restricting portion may have one end fixed to the slide guide and the other end fitted to the different diameter portion so that the different diameter portion is rotatably supported by the slide guide.

このように、送りねじの左ねじ部が第1アーム及び第2アームのねじ穴のいずれか一方に螺合し、送りねじの右ねじ部が第1アーム及び第2アームのねじ穴の他方に螺合しているため、送りねじを回転させることで、第1アーム及び第2アームを互いに近づく向きへ移動させたり、離れる向きへ移動させたりすることができる。   As described above, the left screw portion of the feed screw is screwed into one of the screw holes of the first arm and the second arm, and the right screw portion of the feed screw is screwed to the other of the screw holes of the first arm and the second arm. Since they are screwed together, the first arm and the second arm can be moved toward each other or moved away from each other by rotating the feed screw.

また、前記第1アームの前記第2アームに対向する面には、前記第1凹部と前記第1貫通穴との間の位置に前記第2アームから遠ざかる方向に窪んだ窪み部が形成されており、
前記第2アームの前記第1アームに対向する面には、前記第2凹部と前記第2貫通穴との間の位置に前記第1アームから遠ざかる方向に窪んだ窪み部が形成されていることとしてもよい。
The surface of the first arm that faces the second arm is formed with a recessed portion that is recessed in a direction away from the second arm at a position between the first recess and the first through hole. And
On the surface of the second arm facing the first arm, a recess is formed that is recessed in a direction away from the first arm at a position between the second recess and the second through hole. It is good.

このように、第1アームと第2アームとの互いに対向する面にそれぞれ窪み部を設けることで、吊り上げられた翼環と第1アームとの間、及び翼環と第2アームとの間にそれぞれ隙間が形成されるため、翼環と第1アームと、及び翼環と第2アームとの干渉を防止することができる。   In this manner, by providing the recessed portions on the mutually opposing surfaces of the first arm and the second arm, between the lifted blade ring and the first arm and between the blade ring and the second arm. Since gaps are respectively formed, interference between the blade ring and the first arm and between the blade ring and the second arm can be prevented.

また、前記送りねじの端部に穴が形成されていることとしてもよい。   Moreover, it is good also as the hole being formed in the edge part of the said feed screw.

このように、送りねじの端部に穴が形成されているので、当該穴に六角棒スパナ等の工具を係合することで、送りねじを容易に回転させることができる。   Thus, since the hole is formed in the edge part of a feed screw, a feed screw can be easily rotated by engaging tools, such as a hexagon stick spanner, in the said hole.

また、前記穴は、前記送りねじの端部に連結されたキャップに形成されていることとしてもよい。   Moreover, the said hole is good also as being formed in the cap connected with the edge part of the said feed screw.

送りねじは長尺なので、当該送りねじの端部に穴を加工することが困難であるが、別体のキャップを用いることで、送りねじの端部に穴を容易に設けることができる。
また、送りねじの径よりも大きな径を有するキャップを用いることで、送りねじに直接穴を設けるよりもさらに大きなトルクをかけることが可能となる。
Since the feed screw is long, it is difficult to process a hole at the end of the feed screw. However, by using a separate cap, a hole can be easily provided at the end of the feed screw.
Further, by using a cap having a diameter larger than the diameter of the feed screw, it is possible to apply a larger torque than when a hole is directly provided in the feed screw.

また、前記スライドガイドに取り付けられたアイボルトを更に備えることとしてもよい。   Moreover, it is good also as providing the eyebolt attached to the said slide guide.

このように、アイボルトが設けられることで、フック等の吊り具の脱着が容易となる。   As described above, by providing the eyebolts, it is possible to easily attach and detach the hanger such as a hook.

また、本発明に係る翼環の吊上げ方法は、
吊り治具を用いて回転機械の翼環を吊上げる方法であって、
前記吊り治具は、
スライドガイドと、
前記スライドガイドに摺動自在に取り付けられる第1摺動部を一端側に有し、前記翼環の内側シュラウドに設けられた突起部が引っ掛かる第1凹部を他端部に有する第1アームと、
前記スライドガイドに摺動自在に取り付けられる第2摺動部を一端側に有し、前記翼環の外側シュラウドに設けられた突起部が引っ掛かる第2凹部を他端側に有し、前記第1アームと対向するように設けられる第2アームと、
前記スライドガイドに沿って設けられ、前記第1アーム及び第2アームの少なくとも一方に形成されたねじ穴に螺合する送りねじと、を含み、
前記翼環吊上げ方法は、
前記送りねじの回転によって前記第1アーム及び前記第2アームの前記少なくとも一方を前記スライドガイドに沿って移動させて、前記第1アームと前記第2アームとの間の距離を調整して、前記翼環の前記内側シュラウド及び前記外側シュラウドに設けられた前記突起部をそれぞれ前記第1アームの前記第1凹部及び前記第2アームの前記第2凹部に引っ掛けるステップと、
前記翼環の前記内側シュラウド及び前記外側シュラウドに設けられた前記突起部をそれぞれ前記第1アームの前記第1凹部及び前記第2アームの前記第2凹部に引っ掛けた状態で翼環を吊り上げるステップを備える
ことを特徴とする
Moreover, the method for lifting the blade ring according to the present invention is as follows.
A method of lifting a blade ring of a rotating machine using a hanging jig,
The hanging jig is
A slide guide,
A first arm having a first sliding portion slidably attached to the slide guide on one end side, and a first recess on the other end on which a protrusion provided on the inner shroud of the blade ring is hooked;
A second sliding portion that is slidably attached to the slide guide is provided on one end side, and a second recess is provided on the other end side on which a protrusion provided on the outer shroud of the blade ring is hooked. A second arm provided to face the arm;
A feed screw provided along the slide guide and screwed into a screw hole formed in at least one of the first arm and the second arm;
The blade ring lifting method is:
The at least one of the first arm and the second arm is moved along the slide guide by the rotation of the feed screw to adjust the distance between the first arm and the second arm, and Hooking the protrusions provided on the inner shroud and the outer shroud of the blade ring to the first recess of the first arm and the second recess of the second arm, respectively;
A step of lifting the blade ring in a state where the protrusions provided on the inner shroud and the outer shroud of the blade ring are hooked on the first recess and the second recess of the second arm, respectively. Prepare
It is characterized by that .

上記翼環の加工方法によれば、翼環の内側シュラウド及び外側シュラウドに設けられている両突起部をそれぞれ第1アームの第1凹部及び第2アームの第2凹部に引っ掛けることで、翼環を吊り上げることができる。これにより、翼環を第1工作機械へ搬送することができる。
また、第1アーム及び第2アームで翼環を直接吊り上げることで、従来のワイヤーロープで吊り上げる際に、翼環の下に板木をかませたり、ワイヤーロープと翼環との間にゴム板を挟んだりする手間を省くことができ、作業効率が向上する。
さらに、送りねじを回転させることで、第1アーム及び第2アームの移動量を調整することができるので、形状や大きさの異なる翼環を吊り上げることができる。
According to the above blade ring processing method, both the protrusions provided on the inner shroud and the outer shroud of the blade ring are hooked on the first recess of the first arm and the second recess of the second arm, respectively. Can be lifted. Thereby, a blade ring can be conveyed to a 1st machine tool.
Also, by lifting the wing ring directly with the first arm and the second arm, when lifting with a conventional wire rope, a board is put under the wing ring, or a rubber plate is placed between the wire rope and the wing ring. Can save time and effort and improve work efficiency.
Furthermore, since the amount of movement of the first arm and the second arm can be adjusted by rotating the feed screw, it is possible to lift the blade rings having different shapes and sizes.

また、前記第1工作機械にて前記翼環の前記内側シュラウドの内周面及び前記外側シュラウドの外周面のうち何れか一方を加工するとともに、当該加工する面に設けられている前記突起部を切断し、
加工された前記翼環を、前記内側シュラウドの外周面及び前記外側シュラウドの内周面が、前記翼環の径方向に直交する方向に沿って上方に向かうにしたがって羽根側に倒れ、前記翼環の径方向に直交する方向に対して傾斜するように配し、
二股に分岐した一対の脚を有する二股部及び前記二股部の上に延設されて吊り具装着用の吊り穴が形成された被吊上げ部を有する治具本体と、前記二股部の一対の脚のうち一方の第1脚に固定される第1当接部材と、前記二股部の一対の脚のうち他方の第2脚に形成された貫通ねじ穴に螺合する送りねじと、当該送りねじの前記第1脚に近い端部に固定される第2当接部材とを備えた他の吊り治具の当該送りねじの回転によって、前記第2当接部材を移動させて、前記一対の脚間に配置された前記内側シュラウド及び前記外側シュラウドの何れか一方を前記第2当接部材で前記第1当接部材に押し付けながら前記翼環を吊り上げて、前記翼環を第2工作機械まで搬送することとしてもよい。
Moreover, while processing either one of the inner peripheral surface of the inner shroud and the outer peripheral surface of the outer shroud of the blade ring with the first machine tool, the protrusion provided on the surface to be processed Cut and
The machined blade ring falls to the blade side as the outer peripheral surface of the inner shroud and the inner peripheral surface of the outer shroud move upward along the direction perpendicular to the radial direction of the blade ring, and the blade ring It is arranged so as to be inclined with respect to the direction orthogonal to the radial direction of
A jig body having a bifurcated portion having a pair of legs bifurcated and a lifted portion extending on the bifurcated portion and having a hanging hole for attaching a lifting tool, and the pair of legs of the bifurcated portion A first contact member fixed to one of the first legs, a feed screw that is screwed into a through screw hole formed in the other second leg of the pair of legs of the bifurcated portion, and the feed screw The second abutting member is moved by rotation of the feed screw of another suspension jig provided with a second abutting member fixed to an end portion close to the first leg of the pair of legs. The blade ring is lifted while pressing either the inner shroud or the outer shroud disposed therebetween against the first contact member with the second contact member, and the blade ring is transported to the second machine tool. It is good to do.

上記翼環の加工方法によれば、翼環の内側シュラウドの外周面及び外側シュラウドの内周面の何れか一方に第1当接部材を当接させて翼環を吊り上げると、内側シュラウドの外周面の上端部又は外側シュラウドの内周面の上端部が、第1当接部材の上方を羽根側に超えて位置することとなる。これにより、内側シュラウドの外周面の上端部又は外側シュラウドの内周面の上端部が第1当接部材に引っ掛かった状態となることで、翼環を吊り上げることができる。したがって、内側シュラウド及び外側シュラウドに突起部が無い翼環を吊り上げて第2工作機械へ搬送することができる。   According to the blade ring processing method, when the blade ring is lifted by bringing the first contact member into contact with either the outer peripheral surface of the inner shroud of the blade ring or the inner peripheral surface of the outer shroud, the outer periphery of the inner shroud The upper end portion of the surface or the upper end portion of the inner peripheral surface of the outer shroud is positioned above the first contact member beyond the blade side. Thereby, the blade ring can be lifted by the state where the upper end portion of the outer peripheral surface of the inner shroud or the upper end portion of the inner peripheral surface of the outer shroud is caught by the first contact member. Therefore, it is possible to lift the blade ring having no projections on the inner shroud and the outer shroud and to convey the blade ring to the second machine tool.

本発明によれば、形状及び大きさの異なる翼環を少ない手間で吊り上げることができる。   According to the present invention, blade rings having different shapes and sizes can be lifted with little effort.

本発明の実施形態に係る吊り治具の一部を断面で示す正面図である。It is a front view which shows a part of suspension jig concerning the embodiment of the present invention in section. 本発明の実施形態に係る吊り治具を示す側面図である。It is a side view which shows the hanging jig which concerns on embodiment of this invention. 図1のA−A´断面図である。It is AA 'sectional drawing of FIG. 吊り治具で翼環を吊り上げた状態を示す正面図である。It is a front view which shows the state which lifted the wing ring with the hanging jig. 図4のB矢視図である。It is a B arrow view of FIG. 図4のC矢視図である。It is C arrow line view of FIG. 吊り治具で翼環を吊り上げた状態を示す斜視図である。It is a perspective view which shows the state which lifted the wing ring with the hanging jig. 反転した翼環を示す斜視図である。It is a perspective view which shows the inverted blade ring. 他の吊り治具を示す正面図である。It is a front view which shows another hanging jig. 他の吊り治具で翼環を吊り上げた状態を示す斜視図である。It is a perspective view which shows the state which lifted the blade ring with the other hanging jig | tool. 吊り治具の他の実施例を示す正面図である。It is a front view which shows the other Example of a hanging jig. 従来のワイヤーロープで翼環を吊り上げる方法を示す図である。It is a figure which shows the method of lifting a blade ring with the conventional wire rope. 従来の吊り治具を示す正面図である。It is a front view which shows the conventional hanging jig.

以下、本発明に係る吊り治具について図面を用いて詳細に説明する。なお、以下の説明では、圧縮機に設けられた翼環を吊り治具で吊り上げる場合について説明するが、これに限定されるものではなく、蒸気タービンやガスタービンに設けられる翼環にも適用することができる。また、静翼及び動翼の何れにも適用可能である。
なお、以下の実施例に記載されている構成部品の寸法、材質、形状、その相対配置などは特に特定的な記載がない限り、この発明の範囲をそれのみに限定する趣旨ではなく、単なる説明例にすぎない。
Hereinafter, the hanging jig according to the present invention will be described in detail with reference to the drawings. In the following description, the case where the blade ring provided in the compressor is lifted by a lifting jig will be described. However, the present invention is not limited to this, and the blade ring is also applied to a steam turbine or a gas turbine. be able to. Further, it can be applied to both a stationary blade and a moving blade.
It should be noted that the dimensions, materials, shapes, relative arrangements, and the like of the components described in the following examples are not intended to limit the scope of the present invention unless otherwise specified, but are merely illustrative. It is just an example.

図1は、本発明の実施形態に係る吊り治具の一部を断面で示す正面図である。また、図2は、本発明の実施形態に係る吊り治具を示す側面図である。
図1及び図2に示すように、圧縮機の静翼用の翼環を吊り上げる吊り治具2は、互いに対向して配置された一対のアーム10、20と、一対のアーム10、20を貫通するスライドガイド6と、スライドガイド6に沿って設けられた送りねじ30と、スライドガイド6の上面に取り付けられたアイボルト8とを備えている。
FIG. 1 is a front view showing a part of a hanging jig according to an embodiment of the present invention in cross section. FIG. 2 is a side view showing the hanging jig according to the embodiment of the present invention.
As shown in FIG. 1 and FIG. 2, a hanging jig 2 for lifting a blade ring for a stationary blade of a compressor penetrates a pair of arms 10 and 20 disposed opposite to each other and a pair of arms 10 and 20. The slide guide 6 is provided, a feed screw 30 provided along the slide guide 6, and an eyebolt 8 attached to the upper surface of the slide guide 6.

一対のアーム10、20のうち第1アーム10は、第1貫通穴11を一端部に有し、翼環の内側シュラウドに設けられた突起部が引っ掛かる第1凹部13を他端部に有している。また、第2アーム20は、第2貫通穴21を一端部に有し、翼環の外側シュラウドに設けられた突起部が引っ掛かる第2凹部23を他端部に有している。   The first arm 10 of the pair of arms 10 and 20 has a first through hole 11 at one end and a first recess 13 at the other end where a projection provided on the inner shroud of the blade ring is caught. ing. Moreover, the 2nd arm 20 has the 2nd through-hole 21 in one end part, and has the 2nd recessed part 23 in which the projection part provided in the outer shroud of the wing ring is hooked in the other end part.

第1アーム10の第1凹部13及び第2アーム20の第2凹部23は共に貫通穴である。なお、第1凹部13及び第2凹部23は貫通穴に限定されるものではなく、窪みでもよい。   Both the first recess 13 of the first arm 10 and the second recess 23 of the second arm 20 are through holes. In addition, the 1st recessed part 13 and the 2nd recessed part 23 are not limited to a through-hole, A hollow may be sufficient.

第1アーム10の第2アーム20に対向する面14には、第1凹部13と第1貫通穴11との間の位置に第2アーム20から遠ざかる方向に窪んだ窪み部15が形成されている。また、第2アーム20にも、第1アーム10と同様に、第2アーム20の第1アーム10に対向する面24には、第2凹部23と第2貫通穴21との間の位置に第1アーム10から遠ざかる方向に窪んだ窪み部25が形成されている。   The surface 14 of the first arm 10 that faces the second arm 20 is formed with a recess 15 that is recessed in a direction away from the second arm 20 at a position between the first recess 13 and the first through hole 11. Yes. Similarly to the first arm 10, the second arm 20 has a surface 24 facing the first arm 10 on the surface 24 between the second recess 23 and the second through hole 21. A recessed portion 25 that is recessed in a direction away from the first arm 10 is formed.

スライドガイド6は、第1アーム10の第1貫通穴11及び第2アーム20の第2貫通穴21に挿通されている。そして、第1アーム10及び第2アーム20はスライドガイド6に沿って摺動自在である。   The slide guide 6 is inserted through the first through hole 11 of the first arm 10 and the second through hole 21 of the second arm 20. The first arm 10 and the second arm 20 are slidable along the slide guide 6.

スライドガイド6は、角柱形状を有し、アイボルト8を螺合するためのねじ穴61が設けられている。   The slide guide 6 has a prismatic shape and is provided with a screw hole 61 for screwing the eyebolt 8.

送りねじ30は、第1アーム10及び第2アーム20にそれぞれ形成された第1ねじ穴12及び第2ねじ穴22に螺合している。この送りねじ30は、第1アーム10の第1ねじ穴12に螺合する左ねじ部31と、第2アーム20の第2ねじ穴22に螺合する右ねじ部33と、左ねじ部31と右ねじとの間に設けられ、左ねじ部31及び右ねじ部33よりも直径が小さい異径部32とを有している。   The feed screw 30 is screwed into a first screw hole 12 and a second screw hole 22 formed in the first arm 10 and the second arm 20, respectively. The feed screw 30 includes a left screw portion 31 that is screwed into the first screw hole 12 of the first arm 10, a right screw portion 33 that is screwed into the second screw hole 22 of the second arm 20, and a left screw portion 31. And a different diameter portion 32 having a diameter smaller than that of the left screw portion 31 and the right screw portion 33.

送りねじ30の回転によって第1アーム10及び第2アーム20をスライドガイド6に沿って摺動させて、第1アーム10と第2アーム20との間の距離を調整することができる。具体的には、第2アーム20側から第1アーム10を向かって見た状態で送りねじ30を反時計回りに回転させると、第1アーム10及び第2アーム20は互いに近づく向きへ移動する。一方、送りねじ30を時計回りに回転させると、第1アーム10及び第2アーム20は互いに離れる向きへ移動する。   The distance between the first arm 10 and the second arm 20 can be adjusted by sliding the first arm 10 and the second arm 20 along the slide guide 6 by the rotation of the feed screw 30. Specifically, when the feed screw 30 is rotated counterclockwise with the first arm 10 viewed from the second arm 20 side, the first arm 10 and the second arm 20 move toward each other. . On the other hand, when the feed screw 30 is rotated clockwise, the first arm 10 and the second arm 20 are moved away from each other.

また、送りねじ30の両端には、穴付キャップ34がピン36にてそれぞれ連結されている。なお、送りねじ30の各端部に穴を形成してもよい。   In addition, caps 34 with holes are respectively connected to both ends of the feed screw 30 by pins 36. A hole may be formed at each end of the feed screw 30.

スライドガイド6には、送りねじ30の異径部32に嵌合された移動規制部40が取り付けられている。   A movement restricting portion 40 fitted to the different diameter portion 32 of the feed screw 30 is attached to the slide guide 6.

図3は、図1のA−A´断面図である。図3に示すように、移動規制部40は凹部42を有し、かつ、移動規制部40の上面には円盤状の突起部41が設けられている。この突起部41がスライドガイド6に形成された位置決め用穴62に嵌合するとともに、スライドガイド6に形成された座ぐり穴63(図1参照)内に設けられたボルト64により、移動規制部40はスライドガイド6に固定されている。
移動規制部40の凹部42内に送りねじ30の異径部32が嵌めこまれており、移動規制部40はこの異径部32をスライドガイド6に回転自在に支持している。この移動規制部40によって、スライドガイド6の長手方向に沿った送りねじ30のスライドガイド6に対する移動を規制することができる。
3 is a cross-sectional view taken along the line AA ′ of FIG. As shown in FIG. 3, the movement restricting portion 40 has a recess 42, and a disc-shaped protrusion 41 is provided on the upper surface of the movement restricting portion 40. The projection 41 is fitted in a positioning hole 62 formed in the slide guide 6 and is moved by a bolt 64 provided in a counterbore 63 (see FIG. 1) formed in the slide guide 6. 40 is fixed to the slide guide 6.
A different diameter portion 32 of the feed screw 30 is fitted in the recess 42 of the movement restricting portion 40, and the movement restricting portion 40 rotatably supports the different diameter portion 32 on the slide guide 6. The movement restricting portion 40 can restrict the movement of the feed screw 30 with respect to the slide guide 6 along the longitudinal direction of the slide guide 6.

図4は、一対のアーム10、20が翼環に当接した状態を示す正面図である。また、図5及び図6は、それぞれ図4のB矢視図及びC矢視図である。
図4〜図6に示すように、一対のアーム10、20を翼環50に当接させる際は、送りねじ30の第2アーム20側の端部に接続されているキャップ34の穴に六角ボルト等の工具を差し込んで、送りねじ30を反時計回りに回転させることによって、一対のアーム10、20を互いに近づく向きに移動させる。そして、第1アーム10及び第2アーム20の各凹部13、23内に、内側シュラウド51の内周面52及び外側シュラウド55の外周面57にそれぞれ設けられている突起部58、58を挿入する。このとき、各シュラウド51、55に設けられている突起部58、58の高さはそれぞれ異なるので、両突起部58、58が、各凹部13、23内に挿入されればよい。
なお、外側シュラウド55及び内側シュラウド51にそれぞれ設けられている突起部58、58のうち、低い位置に設けられている外側シュラウド55の突起部58が、第2アーム20の第2凹部23の内周下面26に接触するように第2アーム20を配してもよい。このとき、高い位置に設けられている内側シュラウド51の突起部58は第1アーム10の第1凹部13の内周下面16に接触していなくても第1凹部13内に挿入されていればよい。
なお、各シュラウド51、55に設けられている突起部58、58の高さ位置が同じ場合は、両突起部58、58が、それぞれ第1凹部13の内周下面16及び第2凹部23の内周下面26に接触するように吊り治具2の高さを調整することが望ましい。
FIG. 4 is a front view showing a state in which the pair of arms 10 and 20 are in contact with the blade ring. FIGS. 5 and 6 are views as seen from the arrow B and the arrow C in FIG. 4, respectively.
As shown in FIGS. 4 to 6, when the pair of arms 10 and 20 are brought into contact with the blade ring 50, hexagons are formed in the holes of the cap 34 connected to the end of the feed screw 30 on the second arm 20 side. By inserting a tool such as a bolt and rotating the feed screw 30 counterclockwise, the pair of arms 10 and 20 are moved toward each other. Then, the protrusions 58 and 58 provided on the inner peripheral surface 52 of the inner shroud 51 and the outer peripheral surface 57 of the outer shroud 55 are inserted into the recesses 13 and 23 of the first arm 10 and the second arm 20, respectively. . At this time, since the heights of the projections 58 and 58 provided on the shrouds 51 and 55 are different from each other, both the projections 58 and 58 may be inserted into the recesses 13 and 23.
Of the protrusions 58 and 58 provided on the outer shroud 55 and the inner shroud 51, the protrusion 58 of the outer shroud 55 provided at a lower position is the inner part of the second recess 23 of the second arm 20. You may arrange | position the 2nd arm 20 so that the surrounding lower surface 26 may be contacted. At this time, if the protrusion 58 of the inner shroud 51 provided at a high position is not in contact with the inner peripheral lower surface 16 of the first recess 13 of the first arm 10, it is inserted into the first recess 13. Good.
If the heights of the projections 58 and 58 provided on the shrouds 51 and 55 are the same, the projections 58 and 58 are respectively formed on the inner peripheral lower surface 16 of the first recess 13 and the second recess 23. It is desirable to adjust the height of the hanging jig 2 so as to contact the inner peripheral lower surface 26.

そして、第1アーム10及び第2アーム20をそれぞれ内側シュラウド51の内周面52及び外側シュラウド55の外周面57に当接させる。   Then, the first arm 10 and the second arm 20 are brought into contact with the inner peripheral surface 52 of the inner shroud 51 and the outer peripheral surface 57 of the outer shroud 55, respectively.

一対のアーム10、20の互いに対向する面14、24にはそれぞれ窪み部15、25が形成されているので、内側シュラウド51の内周面52及び外側シュラウド55の外周面57はそれぞれ各凹部13、23の周辺部分にのみ当接している。したがって、第1アーム10と内側シュラウド51の内周面52との間、及び第2アーム20と外側シュラウド55の外周面57との間にはそれぞれ隙間Sが形成される。   Since the recesses 15 and 25 are formed in the mutually opposing surfaces 14 and 24 of the pair of arms 10 and 20, the inner peripheral surface 52 of the inner shroud 51 and the outer peripheral surface 57 of the outer shroud 55 are respectively formed in the recesses 13. , 23 abuts only on the peripheral portion. Accordingly, gaps S are formed between the first arm 10 and the inner peripheral surface 52 of the inner shroud 51 and between the second arm 20 and the outer peripheral surface 57 of the outer shroud 55.

そして、吊り治具2を上昇させると、各シュラウド51、55に設けられている突起部58、58が、それぞれ第1凹部13及び第2凹部に引っ掛かることで翼環50を吊り上げることができる。   When the suspension jig 2 is raised, the projections 58 and 58 provided on the shrouds 51 and 55 are hooked on the first recess 13 and the second recess, respectively, so that the blade ring 50 can be lifted.

上述した構成からなる吊り治具2は、送りねじ30で一対のアーム10、20を移動させるという簡素な機構のため、軽量化が可能であり、人が手で持ち運ぶことができる。   Since the suspension jig 2 having the above-described configuration is a simple mechanism in which the pair of arms 10 and 20 are moved by the feed screw 30, the weight can be reduced and a person can carry it by hand.

次に、吊り治具2を使って、翼環50を加工する工作機械へ翼環50を搬送する方法について説明する。   Next, a method for conveying the blade ring 50 to the machine tool for processing the blade ring 50 using the hanging jig 2 will be described.

まず、作業員が、翼環50の載置されている場所に複数の吊り治具2を持って移動する。なお、吊り治具2をクレーン等の揚重装置に吊った状態で吊り治具2を搬送してもよい。
次に、分割された円弧状の翼環50の両端部にそれぞれ吊り治具2を取り付ける。
First, an operator moves to the place where the blade ring 50 is placed with a plurality of hanging jigs 2. In addition, you may convey the hanging jig 2 in the state which suspended the hanging jig 2 on the lifting apparatuses, such as a crane.
Next, the hanging jigs 2 are attached to both ends of the divided arcuate blade ring 50, respectively.

図7は、吊り治具2で翼環50を吊り上げた状態を示す斜視図である。
図7に示すように、吊り治具2の取付けは、上述したように、送りねじ30を回転させることによって、一対のアーム10、20を互いに近づく向きに移動させて、内側シュラウド51の内周面52及び外側シュラウド55の外周面57にそれぞれ設けられている突起部58、58を、第1アーム10及び第2アーム20の各凹部13、23内にそれぞれ挿入し、第1アーム10及び第2アーム20をそれぞれ内側シュラウド51の内周面52及び外側シュラウド55の外周面57に当接させる。
FIG. 7 is a perspective view showing a state in which the blade ring 50 is lifted by the hanging jig 2.
As shown in FIG. 7, the suspension jig 2 is attached by rotating the feed screw 30 to move the pair of arms 10 and 20 toward each other, as described above, so that the inner periphery of the inner shroud 51 is moved. The protrusions 58 and 58 provided on the outer peripheral surface 57 of the surface 52 and the outer shroud 55 are respectively inserted into the recesses 13 and 23 of the first arm 10 and the second arm 20, respectively. The two arms 20 are brought into contact with the inner peripheral surface 52 of the inner shroud 51 and the outer peripheral surface 57 of the outer shroud 55, respectively.

次に、クレーン等の揚重装置のフック70をアイボルト8に掛けて、翼環50の内側シュラウド51及び外側シュラウド55に設けられた突起部58、58をそれぞれ第1アーム10の第1凹部13及び第2アーム20の第2凹部23に引っ掛けた状態で翼環50を吊り上げる。   Next, a hook 70 of a lifting device such as a crane is hung on the eyebolt 8, and the protrusions 58 and 58 provided on the inner shroud 51 and the outer shroud 55 of the blade ring 50 are respectively connected to the first recess 13 of the first arm 10. And the blade ring 50 is lifted in a state of being hooked on the second recess 23 of the second arm 20.

吊り上げた状態で翼環50が安定していることを確認したら、翼環50を第1工作機械まで搬送する。
第1の工作機械では、内側シュラウド51の内周面52を加工するとともに、この内周面52に設けられている突起部58を切断する。
When it is confirmed that the blade ring 50 is stable in the lifted state, the blade ring 50 is transported to the first machine tool.
In the first machine tool, the inner peripheral surface 52 of the inner shroud 51 is processed, and the protrusions 58 provided on the inner peripheral surface 52 are cut.

図8は、反転した翼環50を示す斜視図である。
図8に示すように、内周面52の加工が終了したら、翼環50を反転させる。
反転した翼環50の内側シュラウド51の外周面53及び外側シュラウド55の内周面56は、翼環50の径方向に直交する方向に沿って上方に向かうにしたがって内側シュラウド51と外側シュラウド55との間に設けられている羽根54側に倒れ、翼環50の径方向に直交する方向に対して傾斜している。なお、以下の説明では、上方に向かうにしたがって羽根54側に倒れている内側シュラウド51の外周面53側の上端部を傾斜端部59という。
FIG. 8 is a perspective view showing the inverted blade ring 50.
As shown in FIG. 8, when the processing of the inner peripheral surface 52 is completed, the blade ring 50 is reversed.
The outer peripheral surface 53 of the inner shroud 51 of the inverted blade ring 50 and the inner peripheral surface 56 of the outer shroud 55 are directed upward along the direction orthogonal to the radial direction of the blade ring 50, and the inner shroud 51 and the outer shroud 55 Is inclined to the blade 54 side provided between the blade ring 50 and the blade ring 50. In the following description, the upper end portion on the outer peripheral surface 53 side of the inner shroud 51 that is inclined toward the blade 54 as it goes upward is referred to as an inclined end portion 59.

次に、他の吊り治具を用いて翼環50の内側シュラウド51を把持して吊り上げる。以下では、まず、他の吊り治具の構造を説明し、その後、他の吊り治具を用いて翼環50を吊り上げる方法について説明する。   Next, the inner shroud 51 of the blade ring 50 is gripped and lifted using another hanging jig. In the following, the structure of another suspension jig will be described first, and then a method for lifting the blade ring 50 using another suspension jig will be described.

図9は、他の吊り治具を示す正面図である。
図9に示すように、他の吊り治具100は、二股に分岐した一対の脚111を有する治具本体102と、一対の脚111のうち一方の第1脚112に固定される第1当接部材104と、一対の脚111のうち他方の第2脚113に形成された貫通ねじ穴114に螺合する送りねじ108と、当該送りねじ108の第1脚112に近い端部に固定される第2当接部材106とを備えている。
FIG. 9 is a front view showing another hanging jig.
As shown in FIG. 9, another hanging jig 100 includes a jig main body 102 having a pair of legs 111 branched into two branches and a first contact fixed to one first leg 112 of the pair of legs 111. The contact member 104, a feed screw 108 that is screwed into a through screw hole 114 formed in the other second leg 113 of the pair of legs 111, and an end portion of the feed screw 108 near the first leg 112 are fixed. The second contact member 106 is provided.

治具本体102は、二股に分岐した一対の脚111を有する二股部110と、当該二股部110の上に延設されて吊り具装着用の吊り穴121が形成された被吊上げ部120とから構成されている。   The jig body 102 includes a bifurcated portion 110 having a pair of legs 111 branched into a bifurcated portion, and a lifted portion 120 that extends on the bifurcated portion 110 and has a hanging hole 121 for attaching a lifting tool. It is configured.

被吊上げ部120は、第2脚113側から第1脚112側に向かう方向に沿って第1脚112から突出するように延在している。
この被吊上げ部120に形成されている吊り穴121は、第1脚112から突出した部分及び二股部110の上方部分に複数形成されている。
The lifted portion 120 extends so as to protrude from the first leg 112 along the direction from the second leg 113 side to the first leg 112 side.
A plurality of suspension holes 121 formed in the suspended portion 120 are formed in a portion protruding from the first leg 112 and an upper portion of the bifurcated portion 110.

第1脚112に固定されている第1当接部材104は、第1脚112に形成されたねじ穴115に螺合している第1当ボルトである。この第1当ボルトの頭部は、第1脚112の第2脚113に対向する面116側に設けられている。   The first contact member 104 fixed to the first leg 112 is a first abutting bolt that is screwed into a screw hole 115 formed in the first leg 112. The head of the first contact bolt is provided on the surface 116 side of the first leg 112 facing the second leg 113.

また、第2当接部材106は、送りねじ108の軸方向に沿って送りねじ108に形成されたねじ穴109に螺合して送りねじ108に固定される第2当ボルトである。第2当接部材106と第1当接部材104とは互いに対向するように配置されている。   The second contact member 106 is a second abutting bolt that is fixed to the feed screw 108 by screwing into a screw hole 109 formed in the feed screw 108 along the axial direction of the feed screw 108. The second contact member 106 and the first contact member 104 are arranged to face each other.

そして、送りねじ108の第1脚112と反対側の端部には、送りねじ108を回転させるためのハンドル107が設けられている。このハンドル107で送りねじ108を回転させることで、第2当接部材106を送りねじ108の軸方向に沿って移動させて、第2当接部材106と第1当接部材104との間の距離を調整することができる。   A handle 107 for rotating the feed screw 108 is provided at the end of the feed screw 108 opposite to the first leg 112. By rotating the feed screw 108 with the handle 107, the second abutting member 106 is moved along the axial direction of the feed screw 108, and the second abutting member 106 and the first abutting member 104 are moved. The distance can be adjusted.

さらに、一対の脚111の互いに対向する面116、117側で、かつ、一対の脚111のそれぞれの付け根部118、119に逃げ溝122が形成されている。そして、この逃げ溝122は、各脚112、113の付け根に沿うように形成されている。   Furthermore, relief grooves 122 are formed on the surfaces 116 and 117 of the pair of legs 111 facing each other and at the bases 118 and 119 of the pair of legs 111. The escape groove 122 is formed along the roots of the legs 112 and 113.

図10は、他の吊り治具100で翼環50を把持する状態を示す斜視図である。
図10に示すように、上述した構成からなる他の吊り治具100で翼環50の内側シュラウド51を把持する際は、内側シュラウド51と外側シュラウド55との間に第1脚112を差し込み、続いて、ハンドル107で送りねじ108を時計回りに回転させることによって、第2当接部材106を第1当接部材104に向かって移動させる。そして、第1当接部材104及び第2当接部材106をそれぞれ内側シュラウド51の外周面53及び内周面52に当接させて翼環50を把持する。
FIG. 10 is a perspective view showing a state in which the blade ring 50 is gripped by another hanging jig 100.
As shown in FIG. 10, when the inner shroud 51 of the blade ring 50 is gripped by the other suspension jig 100 having the above-described configuration, the first leg 112 is inserted between the inner shroud 51 and the outer shroud 55, Subsequently, the feed screw 108 is rotated clockwise by the handle 107 to move the second contact member 106 toward the first contact member 104. Then, the first abutting member 104 and the second abutting member 106 are brought into contact with the outer peripheral surface 53 and the inner peripheral surface 52 of the inner shroud 51 to grip the blade ring 50.

このとき、上述したように、第1脚112の付け根部118に逃げ溝122が形成されているため、内側シュラウド51と二股部110とは干渉しない。   At this time, as described above, since the escape groove 122 is formed in the base portion 118 of the first leg 112, the inner shroud 51 and the bifurcated portion 110 do not interfere with each other.

上述した構成からなる他の吊り治具100は、翼環50の内側シュラウド51及び外側シュラウド55のいずれか一方を把持する(詳細は後述する)機能を有していればよいため、軽量化が可能であり、人が手で持ち運ぶことができる。   The other suspension jig 100 having the above-described configuration only needs to have a function of gripping either one of the inner shroud 51 and the outer shroud 55 of the blade ring 50 (details will be described later). Yes, it can be carried around by hand.

次に、他の吊り治具100を用いて翼環50を吊り上げる方法について説明する。   Next, a method for lifting the blade ring 50 using another hanging jig 100 will be described.

まず、作業員が、翼環50の載置されている場所に複数の他の吊り治具100を持って移動する。なお、他の吊り治具100をクレーン等に吊った状態で搬送してもよい。   First, an operator moves to a place where the blade ring 50 is placed with a plurality of other hanging jigs 100. In addition, you may convey the other hanging jig | tool 100 in the state suspended by the crane etc.

次に、図10に示すように、円弧状の内側シュラウド51の両端部にそれぞれ他の吊り治具100を取り付ける。
他の吊り治具100の取付けは、上述したように、ハンドル107を回転させることによって、.第1当接部材104及び第2当接部材106をそれぞれ内側シュラウド51の外周面53及び内周面52に当接させて翼環50を把持する。
Next, as shown in FIG. 10, other hanging jigs 100 are attached to both ends of the arc-shaped inner shroud 51, respectively.
As described above, the other suspension jigs 100 are attached by rotating the handle 107 so that the first contact member 104 and the second contact member 106 are moved to the outer peripheral surface 53 and the inner peripheral surface of the inner shroud 51, respectively. The blade ring 50 is held in contact with the blade 52.

また、治具本体102の吊り穴121にシャックル124を取り付ける。このとき、翼環50及び他の吊り治具100の重心の鉛直方向直上に位置する吊り穴121を選択する。すなわち、吊り上げる翼環50の形状等に応じてシャックル124を取り付ける吊り穴121を選択する。   Further, the shackle 124 is attached to the suspension hole 121 of the jig body 102. At this time, the suspension hole 121 located immediately above the center of gravity of the blade ring 50 and the other suspension jig 100 is selected. That is, the suspension hole 121 for attaching the shackle 124 is selected according to the shape of the blade ring 50 to be lifted.

次に、クレーン等の揚重装置のフック70をシャックル124に掛けて、他の吊り治具100及び翼環50を吊り上げる。このとき、翼環50及び他の吊り治具100の重心の鉛直方向直上で吊っているため、翼環50は水平に吊られる。吊り上げた状態で翼環50が安定していることを確認したら、翼環50を第2工作機械まで搬送する。   Next, the hook 70 of a lifting device such as a crane is hung on the shackle 124, and the other lifting jig 100 and the blade ring 50 are lifted. At this time, since the blade ring 50 is hung just above the center of gravity of the suspending jig 100 in the vertical direction, the wing ring 50 is hung horizontally. When it is confirmed that the blade ring 50 is stable in the lifted state, the blade ring 50 is transported to the second machine tool.

なお、他の吊り治具100で翼環50の内側シュラウド51を把持して翼環50を吊り上げる場合について説明したが、内側シュラウド51に限定されるものではなく、外側シュラウド55を把持して吊り上げる場合にも適用可能である。   In addition, although the case where the inner shroud 51 of the blade ring 50 was held and the blade ring 50 was lifted by the other lifting jig 100 was described, the present invention is not limited to the inner shroud 51, and the outer shroud 55 is held and lifted. It is also applicable to cases.

上述したように、本実施形態における吊り治具2によれば、送りねじ30を回転させて、スライドガイド6に沿って第1アーム10及び第2アーム20を互いに近づく方向へ移動させることで、内側シュラウド51及び外側シュラウド55に設けられている各突起部58、58をそれぞれ第1凹部13及び第2凹部23に引っ掛けて、翼環50を吊り上げることができる。   As described above, according to the hanging jig 2 in the present embodiment, by rotating the feed screw 30 and moving the first arm 10 and the second arm 20 toward each other along the slide guide 6, The blade ring 50 can be lifted by hooking the projections 58 and 58 provided on the inner shroud 51 and the outer shroud 55 to the first recess 13 and the second recess 23, respectively.

送りねじ30の左ねじ部31が第1アーム10の第1ねじ穴12に螺合し、送りねじ30の右ねじ部33が第2アーム20の第2ねじ穴22に螺合しているため、送りねじ30を回転させることで、第1アーム10及び第2アーム20を互いに近づく向きへ移動させたり、離れる向きへ移動させたりすることができる。   The left screw portion 31 of the feed screw 30 is screwed into the first screw hole 12 of the first arm 10, and the right screw portion 33 of the feed screw 30 is screwed into the second screw hole 22 of the second arm 20. By rotating the feed screw 30, the first arm 10 and the second arm 20 can be moved toward each other or moved away from each other.

また、送りねじ30は、移動規制部40を有しているので、送りねじ30を回転させたときに、送りねじ30がスライドガイド6に沿って移動することなく、第1アーム10及び第2アーム20をスライドガイド6に沿って確実に移動させることができる。   In addition, since the feed screw 30 has the movement restricting portion 40, the feed screw 30 does not move along the slide guide 6 when the feed screw 30 is rotated, and the first arm 10 and the second arm 30. The arm 20 can be reliably moved along the slide guide 6.

そして、吊り治具2で翼環50を直接吊り上げることで、従来のワイヤーロープで吊り上げる際に、翼環50の下に板木をかませたり、ワイヤーロープと翼環50との間にゴム板を挟んだりする手間を省くことができ、作業効率が向上する。   Then, by lifting the blade ring 50 directly with the lifting jig 2, when lifting with the conventional wire rope, a board is put under the blade ring 50, or a rubber plate is interposed between the wire rope and the blade ring 50. Can save time and effort and improve work efficiency.

さらに、一対のアーム10、20の互いに対向する面14、24には、それぞれ窪み部15、25が設けられていることで、吊り上げられた翼環50と各アーム10、20との間に隙間Sが形成されるので、翼環50と各アーム10、20との干渉を防止することができる。   Further, the recesses 15 and 25 are provided in the mutually opposing surfaces 14 and 24 of the pair of arms 10 and 20, respectively, so that a gap is provided between the lifted blade ring 50 and the arms 10 and 20. Since S is formed, interference between the blade ring 50 and the arms 10 and 20 can be prevented.

送りねじ30の端部に連結されたキャップ34に穴が形成されているので、当該穴に六角棒スパナ等の工具を係合することで、送りねじ30を容易に回転させることができる。
また、送りねじ30の径よりも大きな径を有するキャップ34を用いることで、送りねじ30に直接穴を設けるよりもさらに大きなトルクをかけることが可能となる。
また、送りねじ30は長尺なので、送りねじ30の端部に穴を加工することが困難であるが、別体のキャップ34を用いることで、送りねじ30の端部に穴を容易に設けることができる。
Since a hole is formed in the cap 34 connected to the end portion of the feed screw 30, the feed screw 30 can be easily rotated by engaging a tool such as a hexagonal bar wrench in the hole.
Further, by using the cap 34 having a diameter larger than the diameter of the feed screw 30, it is possible to apply a larger torque than when the feed screw 30 is directly provided with a hole.
Further, since the feed screw 30 is long, it is difficult to process a hole at the end of the feed screw 30, but a hole is easily provided at the end of the feed screw 30 by using a separate cap 34. be able to.

そして、スライドガイド6の上面にアイボルト8が設けられているので、フック70の脱着が容易である。
さらに、翼環50の加工方法によれば、翼環50の内側シュラウド51及び外側シュラウド55に設けられている両突起部58、58をそれぞれ吊り治具2の第1凹部13及び第2凹部23に引っ掛けることで翼環50を吊り上げて、翼環50を第1工作機械まで搬送することができる。
Since the eyebolt 8 is provided on the upper surface of the slide guide 6, the hook 70 can be easily attached and detached.
Furthermore, according to the processing method of the blade ring 50, the first recess 13 and the second recess 23 of the suspension jig 2 are respectively connected to the protrusions 58, 58 provided on the inner shroud 51 and the outer shroud 55 of the blade ring 50. The blade ring 50 can be lifted by being hooked on the blade, and the blade ring 50 can be conveyed to the first machine tool.

また、第1工作機械で加工されて内側シュラウド51の突起部58が無くなった翼環50を、他の吊り治具100で内側シュラウド51を把持することで翼環50を吊り上げることができる。これにより、第1工作機械によって加工された翼環50を第2工作機械へ搬送することができる。   Further, the blade ring 50 can be lifted by gripping the inner shroud 51 with the other lifting jig 100 after the blade ring 50 that has been processed by the first machine tool and has no protrusions 58 of the inner shroud 51. Thereby, the blade ring 50 machined by the first machine tool can be conveyed to the second machine tool.

次に、吊り治具の他の実施例について説明する。以下の説明において、上記の実施例に対応する部分には同一の符号を付して説明を省略し、主に相違点について説明する。   Next, another embodiment of the hanging jig will be described. In the following description, portions corresponding to the above-described embodiment are denoted by the same reference numerals, description thereof is omitted, and differences are mainly described.

図11は、吊り治具の他の実施例を示す正面図である。
図11に示すように、吊り治具80は、アイボルト8と、スライドガイド6と、一対のアーム82と、送りねじ90とを備えている。
FIG. 11 is a front view showing another embodiment of the hanging jig.
As shown in FIG. 11, the hanging jig 80 includes an eyebolt 8, a slide guide 6, a pair of arms 82, and a feed screw 90.

一対のアーム82のうち第1アーム84は、スライドガイド6の端部に溶接等により固定されている。また、第1アーム84の窪み部15には、送りねじ90の端部を支持するための第3凹部86が形成されている。そして、この第3凹部86内には送りねじ30の端部に係合される移動規制部88が設けられている。   Of the pair of arms 82, the first arm 84 is fixed to the end of the slide guide 6 by welding or the like. A third recess 86 for supporting the end of the feed screw 90 is formed in the recess 15 of the first arm 84. A movement restricting portion 88 that is engaged with the end portion of the feed screw 30 is provided in the third recess 86.

送りねじ90は、第2アーム20の第2ねじ穴22に螺合する右ねじ部92と、ねじが形成されていない円柱部94とを有している。ねじが形成されていない円柱部94は、第3凹部86内に嵌合されて送りねじ90の軸方向への移動を制限する移動規制部88に回転自在に支持されている。本実施例では、移動規制部88として円すいころ軸受を用いた。一方、送りねじ90の右ねじ部92は、第2アーム20に形成された第2ねじ穴22に螺合している。   The feed screw 90 has a right-hand thread portion 92 that is screwed into the second screw hole 22 of the second arm 20 and a cylindrical portion 94 that is not formed with a screw. The cylindrical portion 94 on which no screw is formed is rotatably supported by a movement restricting portion 88 that is fitted in the third recess 86 and restricts the movement of the feed screw 90 in the axial direction. In this embodiment, a tapered roller bearing is used as the movement restricting portion 88. On the other hand, the right screw portion 92 of the feed screw 90 is screwed into the second screw hole 22 formed in the second arm 20.

送りねじ90の回転によって第2アーム20を第1アーム84側へ向かってスライドガイド6に沿って摺動させて、第1アーム84と第2アーム20との間の距離を調整することができる。具体的には、送りねじ90を反時計回りに回転させると、第2アーム20は第1アーム84に近づく向きへ移動する。一方、送りねじ90を時計回りに回転させると、第2アーム20は第1アーム84から離れる向きへ移動する。
吊り治具80によれば、送りねじ90の円柱部94が、移動規制部88に支持されているため、送りねじ90を回転させたときに、送りねじ90がスライドガイド6に沿って移動することなく、第2アーム20をスライドガイド6に沿って確実に移動させることができる。
The distance between the first arm 84 and the second arm 20 can be adjusted by sliding the second arm 20 along the slide guide 6 toward the first arm 84 by the rotation of the feed screw 90. . Specifically, when the feed screw 90 is rotated counterclockwise, the second arm 20 moves in a direction approaching the first arm 84. On the other hand, when the feed screw 90 is rotated clockwise, the second arm 20 moves away from the first arm 84.
According to the suspension jig 80, the cylindrical portion 94 of the feed screw 90 is supported by the movement restricting portion 88, so that the feed screw 90 moves along the slide guide 6 when the feed screw 90 is rotated. Therefore, the second arm 20 can be reliably moved along the slide guide 6.

2 吊り治具
3 板木
4 ゴム板
5 ワイヤーロープ
6 スライドガイド
8 アイボルト
10 第1アーム
11 第1貫通穴
12 第1ねじ穴
13 第1凹部
14 面
15 窪み部
16 第1凹部の内周下面
20 第2アーム
21 第2貫通穴
22 第2ねじ穴
23 第2凹部
24 面
25 窪み部
26 第2凹部の内周下面
30 送りねじ
31 左ねじ部
32 異径部
33 右ねじ部
34 キャップ
36 ピン
40 移動規制部
41 突起部
42 凹部
50 翼環
51 内側シュラウド
52 内周面
53 外周面
54 羽根
55 外側シュラウド
56 内周面
57 外周面
58 突起部
59 傾斜端部
61 ねじ穴
62 位置決め用穴
63 座ぐり穴
64 ボルト
70 フック
80 吊り治具
82 一対のアーム
84 第1アーム
86 第3凹部
88 移動規制部
90 送りねじ
92 右ねじ部
94 円柱部
100 他の吊り治具
102 治具本体
104 第1当接部材
106 第2当接部材
107 ハンドル
108 送りねじ
109 ねじ穴
110 二股部
111 一対の脚
112 第1脚
113 第2脚
114 貫通ねじ穴
115 ねじ穴
116 面
117 面
118 付け根部
119 付け根部
120 被吊上げ部
121 吊り穴
122 逃げ溝
124 シャックル
200 吊り治具
201 フレーム
202 一対のアーム
203 爪
204 駆動手段
205 送りねじ
207 電動機
S 隙間
2 Suspension jig 3 Plate 4 Rubber plate 5 Wire rope 6 Slide guide 8 Eye bolt 10 First arm 11 First through hole 12 First screw hole 13 First recess 14 Surface 15 Depression 16 Inner lower surface 20 of the first recess Second arm 21 Second through hole 22 Second screw hole 23 Second concave portion 24 Surface 25 Depressed portion 26 Inner lower surface 30 of second concave portion Feed screw 31 Left screw portion 32 Different diameter portion 33 Right screw portion 34 Cap 36 Pin 40 Movement restricting portion 41 Protruding portion 42 Recess 50 Blade ring 51 Inner shroud 52 Inner peripheral surface 53 Outer peripheral surface 54 Blade 55 Outer shroud 56 Inner peripheral surface 57 Outer peripheral surface 58 Protruding portion 59 Inclined end portion 61 Screw hole 62 Positioning hole 63 Counterbore Hole 64 Bolt 70 Hook 80 Suspension jig 82 Pair of arms 84 First arm 86 Third recess 88 Movement restricting portion 90 Feed screw 92 Right thread portion 94 Column portion 100 Suspending jig 102 jig main body 104 first abutting member 106 second abutting member 107 handle 108 feed screw 109 screw hole 110 fork part 111 pair of legs 112 first leg 113 second leg 114 through screw hole 115 screw hole 116 surface 117 surface 118 root portion 119 root portion 120 suspended portion 121 suspension hole 122 escape groove 124 shackle 200 suspension jig 201 frame 202 pair of arms 203 claw 204 driving means 205 feed screw 207 motor S clearance

Claims (9)

回転機械の翼環を楊重装置に対して取り付けるための一対の吊り治具ユニットを備えた吊り治具であって、
前記吊り治具ユニットの各々は、
スライドガイドと、
前記スライドガイドに摺動自在に取り付けられる第1摺動部を一端側に有し、前記翼環の内側シュラウドに設けられた突起部が引っ掛かる第1凹部を他端部に有する第1アームと、
前記スライドガイドに摺動自在に取り付けられる第2摺動部を一端側に有し、前記翼環の外側シュラウドに設けられた突起部が引っ掛かる第2凹部を他端側に有し、前記第1アームと対向するように設けられる第2アームと、
前記スライドガイドに沿って設けられ、前記第1アーム及び第2アームの少なくとも一方に形成されたねじ穴に螺合する送りねじと、を備え、
前記吊り治具ユニットの各々は、前記送りねじの回転によって前記第1アーム及び前記第2アームの前記少なくとも一方を前記スライドガイドに沿って移動させて、前記第1アームと前記第2アームとの間の距離を調整するように構成され、
前記一対の吊り治具ユニットは、前記翼環の周方向にて互いに異なる位置において、各々の前記吊り治具ユニットの前記スライドガイドが前記翼環の径方向に沿うように設けられることを特徴とする吊り治具。
A hanging jig comprising a pair of hanging jig units for attaching a blade ring of a rotating machine to a hoisting device,
Each of the hanging jig units is
A slide guide,
A first arm having a first sliding portion slidably attached to the slide guide on one end side, and a first recess on the other end on which a protrusion provided on the inner shroud of the blade ring is hooked;
A second sliding portion that is slidably attached to the slide guide is provided on one end side, and a second recess is provided on the other end side on which a protrusion provided on the outer shroud of the blade ring is hooked. A second arm provided to face the arm;
A feed screw provided along the slide guide and screwed into a screw hole formed in at least one of the first arm and the second arm;
Each of the suspension jig units moves the at least one of the first arm and the second arm along the slide guide by the rotation of the feed screw, so that the first arm and the second arm Configured to adjust the distance between ,
The pair of suspension jig units are provided at positions different from each other in the circumferential direction of the blade ring so that the slide guides of the suspension jig units are along the radial direction of the blade ring. A hanging jig.
前記第1摺動部は、前記第1アームの前記一端側に形成され、前記スライドガイドが貫通する貫通穴であり、
前記第2摺動部は、前記第2アームの前記一端側に形成され、前記スライドガイドが貫通する貫通穴であることを特徴とする請求項1に記載の吊り治具。
The first sliding portion is a through hole formed on the one end side of the first arm and through which the slide guide passes,
The suspension jig according to claim 1, wherein the second sliding portion is a through hole formed on the one end side of the second arm and through which the slide guide passes.
前記スライドガイドの長手方向に沿った前記送りねじの前記スライドガイドに対する移動を規制する移動規制部を更に備えることを特徴とする請求項1又は2に記載の吊り治具。   The suspension jig according to claim 1, further comprising a movement restricting portion that restricts movement of the feed screw with respect to the slide guide along a longitudinal direction of the slide guide. 前記ねじ穴は、前記第1アーム及び前記第2アームの両方に形成され、
前記送りねじは、
前記第1アームの前記ねじ穴及び前記第2アームのねじ穴のいずれか一方に螺合する左ねじ部と、
前記第1アームの前記ねじ穴及び前記第2アームのねじ穴の他方に螺合する右ねじ部と、
前記左ねじ部と前記右ねじとの間に設けられ、前記左ねじ部及び前記右ねじ部とは直径が異なる異径部とを有し、
前記移動規制部は、一端が前記スライドガイドに固定され、他端が前記異径部に嵌合されて、前記異径部を前記スライドガイドに回転自在に支持することを特徴とする請求項1〜3のうち何れか一項に記載の吊り治具。
The screw hole is formed in both the first arm and the second arm,
The feed screw is
A left-hand thread portion screwed into any one of the screw hole of the first arm and the screw hole of the second arm;
A right-hand thread portion screwed into the other of the screw hole of the first arm and the screw hole of the second arm;
Provided between the left-hand thread part and the right-hand thread, the left-hand thread part and the right-hand thread part have different diameter parts having different diameters,
2. The movement restricting portion has one end fixed to the slide guide and the other end fitted to the different diameter portion, and rotatably supports the different diameter portion on the slide guide. The hanging jig according to any one of?
前記第1アームの前記第2アームに対向する面には、前記第1凹部と前記第1貫通穴との間の位置に前記第2アームから遠ざかる方向に窪んだ窪み部が形成されており、
前記第2アームの前記第1アームに対向する面には、前記第2凹部と前記第2貫通穴との間の位置に前記第1アームから遠ざかる方向に窪んだ窪み部が形成されていることを特徴とする請求項1〜4のうち何れか一項に記載の吊り治具。
On the surface of the first arm that faces the second arm, a recess is formed that is recessed in a direction away from the second arm at a position between the first recess and the first through hole.
On the surface of the second arm facing the first arm, a recess is formed that is recessed in a direction away from the first arm at a position between the second recess and the second through hole. The hanging jig according to any one of claims 1 to 4, wherein:
前記送りねじの端部に穴が形成されていることを特徴とする請求項1〜5のうち何れか一項に記載の吊り治具。   The suspension jig according to any one of claims 1 to 5, wherein a hole is formed in an end portion of the feed screw. 前記穴は、前記送りねじの端部に連結されたキャップに形成されていることを特徴とする請求項6に記載の吊り治具。   The suspension jig according to claim 6, wherein the hole is formed in a cap connected to an end of the feed screw. 前記スライドガイドに取り付けられたアイボルトを更に備えることを特徴とする請求項1〜7のうち何れか一項に記載の吊り治具。   The suspension jig according to any one of claims 1 to 7, further comprising an eyebolt attached to the slide guide. 吊り治具を用いて回転機械の翼環を吊上げる方法であって、A method of lifting a blade ring of a rotating machine using a hanging jig,
前記吊り治具は、The hanging jig is
スライドガイドと、A slide guide,
前記スライドガイドに摺動自在に取り付けられる第1摺動部を一端側に有し、前記翼環の内側シュラウドに設けられた突起部が引っ掛かる第1凹部を他端部に有する第1アームと、A first arm having a first sliding portion slidably attached to the slide guide on one end side, and a first recess on the other end on which a protrusion provided on the inner shroud of the blade ring is hooked;
前記スライドガイドに摺動自在に取り付けられる第2摺動部を一端側に有し、前記翼環の外側シュラウドに設けられた突起部が引っ掛かる第2凹部を他端側に有し、前記第1アームと対向するように設けられる第2アームと、A second sliding portion that is slidably attached to the slide guide is provided on one end side, and a second recess is provided on the other end side on which a protrusion provided on the outer shroud of the blade ring is hooked. A second arm provided to face the arm;
前記スライドガイドに沿って設けられ、前記第1アーム及び第2アームの少なくとも一方に形成されたねじ穴に螺合する送りねじと、を含み、A feed screw provided along the slide guide and screwed into a screw hole formed in at least one of the first arm and the second arm;
前記翼環吊上げ方法は、The blade ring lifting method is:
前記送りねじの回転によって前記第1アーム及び前記第2アームの前記少なくとも一方を前記スライドガイドに沿って移動させて、前記第1アームと前記第2アームとの間の距離を調整して、前記翼環の前記内側シュラウド及び前記外側シュラウドに設けられた前記突起部をそれぞれ前記第1アームの前記第1凹部及び前記第2アームの前記第2凹部に引っ掛けるステップと、The at least one of the first arm and the second arm is moved along the slide guide by the rotation of the feed screw to adjust the distance between the first arm and the second arm, and Hooking the protrusions provided on the inner shroud and the outer shroud of the blade ring to the first recess of the first arm and the second recess of the second arm, respectively;
前記翼環の前記内側シュラウド及び前記外側シュラウドに設けられた前記突起部をそれぞれ前記第1アームの前記第1凹部及び前記第2アームの前記第2凹部に引っ掛けた状態で翼環を吊り上げるステップを備えるA step of lifting the blade ring in a state where the protrusions provided on the inner shroud and the outer shroud of the blade ring are hooked on the first recess and the second recess of the second arm, respectively. Prepare
ことを特徴とする翼環の吊上げ方法。A method of lifting a wing ring characterized by the above.
JP2011121419A 2011-05-31 2011-05-31 Suspension jig and wing ring lifting method Active JP5829434B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2011121419A JP5829434B2 (en) 2011-05-31 2011-05-31 Suspension jig and wing ring lifting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2011121419A JP5829434B2 (en) 2011-05-31 2011-05-31 Suspension jig and wing ring lifting method

Publications (2)

Publication Number Publication Date
JP2012246123A JP2012246123A (en) 2012-12-13
JP5829434B2 true JP5829434B2 (en) 2015-12-09

Family

ID=47466974

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2011121419A Active JP5829434B2 (en) 2011-05-31 2011-05-31 Suspension jig and wing ring lifting method

Country Status (1)

Country Link
JP (1) JP5829434B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105621232A (en) * 2016-02-17 2016-06-01 浙江德润重工机械有限公司 Lifting tool for shaft type forgings

Families Citing this family (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6238056B2 (en) 2013-11-26 2017-11-29 三菱日立パワーシステムズ株式会社 Dummy ring assembly for removing a vane segment and a method for removing a vane segment using the same
CN104444778B (en) * 2014-11-28 2017-01-04 机械科学研究总院青岛分院 A kind of coil of strip lifting device
CN104477759B (en) * 2014-11-28 2017-05-03 泉州市力歌体育用品有限公司 Hoisting tool
CN105967062A (en) * 2016-07-18 2016-09-28 河南省重业起重机有限公司 Crane traveling trolley with adjustable traveling distance
CN108773763B (en) * 2018-06-13 2019-07-12 怀宁县明慧竹业有限公司 A kind of food steamer hoisting bracket
CN108483242A (en) * 2018-06-19 2018-09-04 上海艾港风电科技发展有限公司 web handling apparatus
CN109578150A (en) * 2018-12-29 2019-04-05 中国船舶重工集团公司第七0三研究所 A kind of UGT6001 gas turbine inlet adjustable guide vane driving mechanism
CN111217235B (en) * 2020-03-30 2024-05-24 中国二十二冶集团有限公司 A building board lifting fixture
CN113562632A (en) * 2021-07-28 2021-10-29 中国十七冶集团有限公司 Rapid and accurate hoisting device and hoisting method for prefabricated staircase
CN113979330A (en) * 2021-10-19 2022-01-28 云南滇东雨汪能源有限公司 Hoisting device for electromechanical installation of coal mine
CN114572118B (en) * 2022-03-15 2023-08-01 浙江极氪智能科技有限公司 Touch panel device
CN114803815B (en) * 2022-04-14 2023-06-16 中国长江三峡集团有限公司 Novel multipurpose adjustable hanging beam and lifting method
CN114852844B (en) * 2022-04-29 2023-03-31 四川省交通建设集团股份有限公司 Lifting hook for hoisting box girder steel reinforcement framework
WO2024228242A1 (en) * 2023-05-01 2024-11-07 三井金属鉱業株式会社 Suspension jig for molten metal filtration unit
CN116946867A (en) * 2023-06-12 2023-10-27 国家电投集团黄河上游水电开发有限责任公司 Device for assisting cathode carbon block in discharging and de-grooving

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58170374U (en) * 1982-04-27 1983-11-14 鈴木 宏侑 Lifting clamp holder
JPS63230910A (en) * 1987-03-19 1988-09-27 Hitachi Ltd Batch conveyance method of multiple diaphragms and jig for bulk conveyance
JPH0416776U (en) * 1990-05-31 1992-02-12
JPH061379U (en) * 1992-06-13 1994-01-11 博 工藤 Cylindrical heavy lifting equipment
JP2856024B2 (en) * 1993-04-28 1999-02-10 日立プラント建設株式会社 Lifting device for turbine rotor
JPH07144874A (en) * 1993-11-22 1995-06-06 Ishikawajima Harima Heavy Ind Co Ltd Trolley device and hanging hardware
JPH10196402A (en) * 1997-01-08 1998-07-28 Toshiba Corp Gas turbine combustor suspension apparatus and operation method thereof
JPH10194665A (en) * 1997-01-08 1998-07-28 Toshiba Corp Suspension device
JP3600793B2 (en) * 2000-12-28 2004-12-15 栄一 磯部 Drum hanging equipment
JP5468270B2 (en) * 2009-01-27 2014-04-09 中国電力株式会社 Empty case suspension device for pole transformer

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105621232A (en) * 2016-02-17 2016-06-01 浙江德润重工机械有限公司 Lifting tool for shaft type forgings

Also Published As

Publication number Publication date
JP2012246123A (en) 2012-12-13

Similar Documents

Publication Publication Date Title
JP5829434B2 (en) Suspension jig and wing ring lifting method
JP5854646B2 (en) Suspension jig and wing ring lifting method
CN201376841Y (en) Sling for engine cylinder cover to process fuel injector hole
JP5755203B2 (en) Wire rope gripper
CN108821098B (en) Lifting appliance with safety hanging plate and capable of lifting two steel rails simultaneously
CN103331629A (en) Machining turnover fixture
CN205676002U (en) A kind of coil steel spreader
JP4030022B1 (en) Hanging jig
CN105858459A (en) I-beam clamp
CN103818840A (en) Hoisting part and hoisting method
CN108689296A (en) A kind of automobile assembly line radiator hoisting clamp
CN102357832A (en) Lifting appliance for production line for machining engine body of diesel engine
CN108608446B (en) Three-paw device of oil pump shell machining transfer robot
CN206051280U (en) A kind of lifting device
CN104176628A (en) Sling
CN105174026B (en) Aircraft wing dismounting lifting retaining clip
CN204490346U (en) A kind of wire rope adjustor
CN109290777A (en) A trailing arm assembly automatic production line
JP2018043817A (en) Lifting tool
CN203367860U (en) Overhead ground wire suspension clamp replacement tool
CN205772845U (en) A kind of conveyance tool
CN104609305A (en) Steel wire rope adjusting device
CN223397304U (en) Hoisting tool for shaft forgings
CN204711613U (en) The positioning tool of exhaust branch pipe
CN222204561U (en) Gate crane for overhauling spillway arc gate servomotor

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20140519

A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A712

Effective date: 20150122

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20150219

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20150227

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20150409

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20150925

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20151022

R150 Certificate of patent or registration of utility model

Ref document number: 5829434

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350