Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP5840410B2 - Supervisory control system - Google Patents
[go: Go Back, main page]

JP5840410B2 - Supervisory control system - Google Patents

Supervisory control system Download PDF

Info

Publication number
JP5840410B2
JP5840410B2 JP2011171171A JP2011171171A JP5840410B2 JP 5840410 B2 JP5840410 B2 JP 5840410B2 JP 2011171171 A JP2011171171 A JP 2011171171A JP 2011171171 A JP2011171171 A JP 2011171171A JP 5840410 B2 JP5840410 B2 JP 5840410B2
Authority
JP
Japan
Prior art keywords
control station
monitoring control
monitoring
unit
time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2011171171A
Other languages
Japanese (ja)
Other versions
JP2012079292A (en
Inventor
裕司 砂盃
裕司 砂盃
聡 山森
聡 山森
内村 恭司
恭司 内村
翔 武田
翔 武田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Original Assignee
Toshiba Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp filed Critical Toshiba Corp
Priority to JP2011171171A priority Critical patent/JP5840410B2/en
Publication of JP2012079292A publication Critical patent/JP2012079292A/en
Application granted granted Critical
Publication of JP5840410B2 publication Critical patent/JP5840410B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Safety Devices In Control Systems (AREA)
  • Hardware Redundancy (AREA)
  • Debugging And Monitoring (AREA)

Description

本発明の実施形態は、監視制御システムに関する。   Embodiments described herein relate generally to a monitoring control system.

従来、空港内に設置された各種監視制御対象設備、例えば、灯火設備、受変電設備、発電設備、無停電電源設備、空調設備等を監視制御する監視制御システムが導入されている。このような監視制御システムについては、障害対策として、同じ構成の装置を予め2系統用意しておき、冗長化されることが望ましい。   2. Description of the Related Art Conventionally, a monitoring control system for monitoring and controlling various types of monitoring control target equipment installed in an airport, such as lighting equipment, power receiving / transforming equipment, power generation equipment, uninterruptible power supply equipment, air conditioning equipment, and the like has been introduced. For such a monitoring control system, it is desirable that two systems having the same configuration are prepared in advance and made redundant as a countermeasure against a failure.

監視制御システムの冗長化方式としては、ホットスタンバイ方式及びコールドスタンバイ方式が知られている。ホットスタンバイ方式は、一方の系(稼動系)を作動させ、他方の系(待機系)は稼動系と同じ動作を行いながら待機状態としておき、稼動系に障害が発生すると即座に待機系に処理を引き継ぐ方式である。コールドスタンバイ方式は、一方の系(稼動系)を作動させ、他方の系(待機系)は電源を停止しておき、稼動系に障害が発生してから、待機系を起動して処理を引き継ぐ方式である。   A hot standby system and a cold standby system are known as redundancy systems for the monitoring control system. In the hot standby system, one system (active system) is activated, and the other system (standby system) is put into a standby state while performing the same operation as the active system. When a failure occurs in the active system, it is immediately processed as a standby system. It is a method that takes over. In the cold standby method, one system (active system) is activated, the other system (standby system) is powered off, and after a failure occurs in the active system, the standby system is activated to take over processing. It is a method.

ホットスタンバイ方式の場合、稼動系に加えて待機系の電力を常に消費するために、これらの稼動系及び待機系がそれぞれ複数のサーバ群で構成される大規模システムになる程、消費電力が増大し、運用コストの増大を招くといった課題がある。コールドスタンバイ方式の場合、稼動系に障害が発生した場合に、稼動系で蓄積したデータを速やかに待機系に引き継ぐことができず、待機系の起動に際して長い起動時間を要するため、監視制御機能の停止時間が長く、信頼性の低下を招くといった課題がある。   In the case of the hot standby method, in order to constantly consume standby system power in addition to the active system, the power consumption increases as these active systems and standby systems each consist of multiple server groups. However, there is a problem that operation costs increase. In the case of the cold standby method, if a failure occurs in the active system, the data accumulated in the active system cannot be immediately transferred to the standby system, and a long startup time is required to start up the standby system. There is a problem that the downtime is long and the reliability is lowered.

特開2008−60808号公報JP 2008-60808 A

本実施形態の目的は、信頼性の低下を招くことなく、運用コストを低減することが可能な監視制御システムを提供することにある。   An object of the present embodiment is to provide a monitoring control system capable of reducing the operation cost without causing a decrease in reliability.

本実施形態によれば、
第1サーバ群を備えた第1監視制御局と、前記第1サーバ群と同等構成の第2サーバ群を備え且つ前記第1監視制御局とネットワークを介して接続された第2監視制御局と、を備えた監視制御システムにおいて、前記第1監視制御局は、空港の運用開始時刻及び運用終了時刻を規定した運用時間スケジュールを管理するスケジュール管理部と、前記スケジュール管理部により運用開始時刻であると判断された場合に前記第2監視制御局を起動し、前記スケジュール管理部により運用終了時刻であると判断された場合に前記第2監視制御局を停止する起動・停止処理部と、を備えたことを特徴とする監視制御システムが提供される。
According to this embodiment,
A first monitoring control station including a first server group; a second monitoring control station including a second server group having a configuration equivalent to that of the first server group and connected to the first monitoring control station via a network; , The first monitoring control station is an operation start time by a schedule management unit that manages an operation time schedule that defines an operation start time and an operation end time of an airport, and the schedule management unit. A start / stop processing unit that starts the second monitoring control station when it is determined, and stops the second monitoring control station when the schedule management unit determines that the operation end time is reached. A monitoring control system characterized by the above is provided.

本実施形態によれば、
第1サーバ群を備えた第1監視制御局と、前記第1サーバ群と同等構成の第2サーバ群を備え且つ前記第1監視制御局とネットワークを介して接続された第2監視制御局と、を備えた監視制御システムにおいて、前記第1監視制御局は、監視制御システムの状態を監視するのに必要な監視信号を収集するシステム状態監視部と、前記システム状態監視部によって収集された監視信号に基づいて前記第1監視制御局のダウンの予兆の有無を判断するダウン予兆判断部と、運用時間内に前記第2監視制御局を起動し、運用時間外に前記第2監視制御局を停止するとともに、運用時間外において、前記ダウン予兆判断部によりダウンの予兆があると判断されたのに基づいて停止中の前記第2監視制御局を起動する起動・停止処理部と、を備えたことを特徴とする監視制御システムが提供される。
According to this embodiment,
A first monitoring control station including a first server group; a second monitoring control station including a second server group having a configuration equivalent to that of the first server group and connected to the first monitoring control station via a network; The first monitoring control station includes a system state monitoring unit that collects monitoring signals necessary for monitoring the state of the monitoring control system, and the monitoring collected by the system state monitoring unit. A down sign determining unit for determining whether or not there is a sign of down of the first monitoring control station based on a signal; and starting the second monitoring control station within an operation time, and activating the second monitoring control station outside an operation time And a start / stop processing unit that starts the second monitoring control station that is stopped based on the fact that the down sign determination unit determines that there is a down sign outside the operation time. about Monitoring control system according to claim is provided.

図1は、本実施形態における監視制御システムの構成を概略的に示す図である。FIG. 1 is a diagram schematically showing a configuration of a monitoring control system in the present embodiment. 図2は、図1に示した代表処理サーバの処理部の構成を概略的に示す図である。FIG. 2 is a diagram schematically showing a configuration of a processing unit of the representative processing server shown in FIG. 図3は、本実施形態における監視制御システムの動作を説明するためのフローチャートである。FIG. 3 is a flowchart for explaining the operation of the monitoring control system in the present embodiment. 図4は、監視制御システムの第2構成例において、第1監視制御局を構成する代表処理サーバの処理部の構成を概略的に示す図である。FIG. 4 is a diagram schematically showing the configuration of the processing unit of the representative processing server that constitutes the first monitoring control station in the second configuration example of the monitoring control system. 図5は、監視制御システムの第2構成例における動作を説明するためのフローチャートである。FIG. 5 is a flowchart for explaining the operation in the second configuration example of the monitoring control system.

以下、本実施形態について、図面を参照しながら詳細に説明する。なお、各図において、同一又は類似した機能を発揮する構成要素には同一の参照符号を付し、重複する説明は省略する。   Hereinafter, the present embodiment will be described in detail with reference to the drawings. In each figure, the same reference numerals are given to components that exhibit the same or similar functions, and duplicate descriptions are omitted.

図1は、本実施形態における監視制御システムの第1構成例を概略的に示す図である。   FIG. 1 is a diagram schematically illustrating a first configuration example of a monitoring control system according to the present embodiment.

すなわち、本監視制御システムは、空港内に設置された灯火設備、受変電設備、発電設備、無停電電源設備、空調設備等の各種監視制御対象設備Xを監視制御するものである。このような監視制御システムは、第1監視制御局10、及び、第2監視制御局20を備えている。これらの第1監視制御局10及び第2監視制御局20は、ネットワークを介して接続されている。また、これらの第1監視制御局10及び第2監視制御局20には、ネットワークを介して、監視制御子局30…、端末装置40…などが接続されている。   In other words, the present monitoring control system monitors and controls various types of monitoring control target equipment X such as lighting equipment, power receiving / transforming equipment, power generation equipment, uninterruptible power supply equipment, and air conditioning equipment installed in the airport. Such a supervisory control system includes a first supervisory control station 10 and a second supervisory control station 20. The first monitoring control station 10 and the second monitoring control station 20 are connected via a network. The first monitoring control station 10 and the second monitoring control station 20 are connected to a monitoring control slave station 30..., A terminal device 40.

監視制御子局30は、監視制御対象設備Xとの間で監視制御信号を授受する。このような監視制御子局30は、監視制御対象設備Xの個数に応じて1個以上設置されている。監視制御子局30と監視制御対象設備Xとの間での監視制御信号の授受には、例えば、監視制御子局30が監視制御対象設備Xにおける電流、電圧、温度などの各種計測データを受信することや、監視制御子局30が監視制御対象設備Xにおける故障などの状態変化を検出することなどが含まれる。   The supervisory control slave station 30 exchanges supervisory control signals with the supervisory control target equipment X. One or more such monitoring control slave stations 30 are installed according to the number of monitoring control target equipment X. For sending and receiving monitoring control signals between the monitoring control slave station 30 and the monitoring control target equipment X, for example, the monitoring control slave station 30 receives various measurement data such as current, voltage and temperature in the monitoring control target equipment X. And the monitoring control slave station 30 detecting a state change such as a failure in the monitoring control target equipment X.

例えば、監視制御対象設備Xの状態変化の検出は、以下のようにして行われる。監視制御対象設備Xは、監視制御項目に応じた個数の接点を有している。これらの接点のそれぞれは、監視制御子局30の入力基板に電気的に接続されている。監視制御対象設備Xにおいて、故障などの状態変化が生じた場合には、対応する接点が閉じ、電気的な閉回路が形成される。この例では、閉回路を流れる電気が上記の監視制御信号に相当する。監視制御子局30では、閉回路に電気が流れた際に、監視制御対象設備Xにおいて状態変化が発生した監視制御項目が判断される。   For example, the state change of the monitoring control target equipment X is detected as follows. The monitoring control target equipment X has the number of contacts according to the monitoring control items. Each of these contacts is electrically connected to the input board of the supervisory control slave station 30. When a state change such as a failure occurs in the monitoring control target equipment X, the corresponding contact is closed, and an electrical closed circuit is formed. In this example, electricity flowing through the closed circuit corresponds to the monitoring control signal. In the supervisory control slave station 30, when electricity flows through the closed circuit, the supervisory control item in which the state change has occurred in the supervisory control target equipment X is determined.

また、この監視制御子局30は、第1監視制御局10との間で監視制御信号を授受する。第1監視制御局10と監視制御子局30との間での監視制御信号の授受には、例えば、第1監視制御局10が監視制御子局30から監視制御対象設備Xの各種計測データや監視制御対象設備Xの状態変化の履歴を受信することなどが含まれる。なお、監視制御子局30は、第1監視制御局10及び第2監視制御局20との双方の間で監視制御信号を授受しても良い。第1監視制御局10に障害が発生した場合等には、監視制御子局30は、第2監視制御局20との間で監視制御信号を授受する。   The monitoring control slave station 30 exchanges monitoring control signals with the first monitoring control station 10. For the transfer of the monitoring control signal between the first monitoring control station 10 and the monitoring control slave station 30, for example, the first monitoring control station 10 receives various measurement data of the monitoring control target equipment X from the monitoring control slave station 30, It includes receiving a history of state changes of the monitoring control target equipment X. Note that the supervisory control slave station 30 may exchange a supervisory control signal between both the first supervisory control station 10 and the second supervisory control station 20. When a failure occurs in the first supervisory control station 10, the supervisory control slave station 30 exchanges supervisory control signals with the second supervisory control station 20.

端末装置40は、監視員に情報提供を行ったり、監視員による操作入力を受け付けたりするものである。この端末装置40は、第1監視制御局10との間で各種情報を授受する。第1監視制御局10と端末装置40との間での情報の授受には、例えば、端末装置40が第1監視制御局10から監視制御対象設備Xの各種計測データや監視制御対象設備Xの状態変化の履歴を受信すること、第1監視制御局10が端末装置40から入力された情報を受信することなどが含まれる。なお、端末装置40は、第1監視制御局10及び第2監視制御局20との双方の間で監視制御信号を授受しても良い。第1監視制御局10に障害が発生した場合等には、端末装置40は、第2監視制御局20との間で各種情報を授受する。   The terminal device 40 provides information to a monitor or accepts an operation input by the monitor. The terminal device 40 exchanges various information with the first monitoring control station 10. For the exchange of information between the first monitoring control station 10 and the terminal device 40, for example, the terminal device 40 receives various measurement data of the monitoring control target facility X from the first monitoring control station 10 and the monitoring control target facility X. This includes receiving a history of state changes, receiving information input from the terminal device 40 by the first monitoring control station 10, and the like. Note that the terminal device 40 may transmit and receive a monitoring control signal between both the first monitoring control station 10 and the second monitoring control station 20. When a failure occurs in the first monitoring control station 10, the terminal device 40 exchanges various information with the second monitoring control station 20.

このような端末装置40は、1個以上設置されている。端末装置40は、処理部41、記録部42、入力部43、表示部44、通信部45などを備えて構成されている。処理部41は、各種演算処理を行うものである。記録部42は、各種データを蓄積するものである。入力部43は、監視員による操作入力、具体的には、後述する空港の運用開始時刻及び運用終了時刻を規定する運用時間スケジュール(基本運用時間スケジュール及び運用時間延長スケジュールを含む)の入力、緊急便の離着陸に対応するための緊急便対応モードの設定操作及び解除操作、第1監視制御局10から第2監視制御局20へのデータの等値化処理を行う等値化スケジュールの入力、後述する第2構成例においてダウンの予兆の有無を判断するのに必要な閾値の設定などを受け付ける。表示部44は、入力部43を介して入力された情報、第1監視制御局10や第2監視制御局20から受信した情報(監視制御対象設備Xの計測データや状態変化の履歴などを含む)などを表示する。通信部45は、ネットワーク経由で第1監視制御局10や第2監視制御局20などと情報を授受する。   One or more such terminal devices 40 are installed. The terminal device 40 includes a processing unit 41, a recording unit 42, an input unit 43, a display unit 44, a communication unit 45, and the like. The processing unit 41 performs various arithmetic processes. The recording unit 42 accumulates various data. The input unit 43 is an operation input by an observer, specifically, an input of an operation time schedule (including a basic operation time schedule and an operation time extension schedule) that defines an operation start time and an operation end time of an airport, which will be described later, Operation for setting and canceling emergency flight response mode to cope with takeoff and landing of flights, input of an equalization schedule for performing equalization processing of data from the first monitoring control station 10 to the second monitoring control station 20, described later In the second configuration example, setting of a threshold necessary for determining the presence or absence of a down sign is accepted. The display unit 44 includes information input via the input unit 43 and information received from the first monitoring control station 10 and the second monitoring control station 20 (including measurement data of the monitoring control target equipment X and a history of state changes). ) Etc. are displayed. The communication unit 45 exchanges information with the first monitoring control station 10 and the second monitoring control station 20 via the network.

第1監視制御局10及び第2監視制御局20は、監視制御子局30との間で授受される監視制御信号を処理・蓄積し各種演算処理を行う。また、これらの第1監視制御局10及び第2監視制御局20は、端末装置40との間で授受される各種情報を処理・蓄積し各種演算処理を行う。   The first supervisory control station 10 and the second supervisory control station 20 process and store supervisory control signals exchanged with the supervisory control slave station 30 and perform various arithmetic processes. Further, the first monitoring control station 10 and the second monitoring control station 20 process and store various information exchanged with the terminal device 40 and perform various arithmetic processes.

第1監視制御局10は、第1サーバ群を備えている。この第1サーバ群は、各種処理を行うための複数のサーバ群、すなわち、第1処理サーバ10−1、…第n処理サーバ10−nと、それらを統括する代表処理サーバ100とで構成されている(但し、nは正の整数である)。これらの第1処理サーバ10−1乃至第n処理サーバ10−nは、例えば、アプリケーションサーバ、データベースサーバ、WEBサーバなどである。
第2監視制御局20は、第1サーバ群と同等構成の第2サーバ群(第1処理サーバ20−1、…第n処理サーバ20−n、及び、代表処理サーバ200)を備えている。
The first monitoring control station 10 includes a first server group. The first server group includes a plurality of server groups for performing various processes, that is, a first processing server 10-1,..., An nth processing server 10-n, and a representative processing server 100 that controls them. (Where n is a positive integer). These first processing server 10-1 to n-th processing server 10-n are, for example, an application server, a database server, a WEB server, or the like.
The second monitoring control station 20 includes a second server group (first processing server 20-1,... Nth processing server 20-n, and representative processing server 200) having the same configuration as the first server group.

このような構成の第1監視制御局10及び第2監視制御局20は、監視制御子局30に対して、「親局」と称される場合がある。本実施形態における監視制御システムは、これらの2つの親局により冗長化されている。なお、ここに示す例に限らず、親局は、3つ以上設置されても良い。   The first monitoring control station 10 and the second monitoring control station 20 having such a configuration may be referred to as “parent station” with respect to the monitoring control slave station 30. The supervisory control system in this embodiment is made redundant by these two master stations. Note that the present invention is not limited to the example shown here, and three or more master stations may be installed.

第1監視制御局10の代表処理サーバ100と、第2監視制御局20の代表処理サーバ200とは、同一構成であり、同一機能を有している。ここでは、代表処理サーバ100の構成について説明し、代表処理サーバ200の説明は省略する。代表処理サーバ100は、処理部1、記録部2、通信部3などを備えて構成されている。処理部1は、各種演算処理を行うものであり、その詳細については後述する。記録部2は、各種データを蓄積するものである。通信部3は、ネットワーク経由で監視制御子局30や端末装置40などと情報を授受する。この代表処理サーバ100は、第1処理サーバ10−1乃至第n処理サーバ10−nとの間でも情報の授受を行う。   The representative processing server 100 of the first monitoring control station 10 and the representative processing server 200 of the second monitoring control station 20 have the same configuration and the same function. Here, the configuration of the representative processing server 100 will be described, and the description of the representative processing server 200 will be omitted. The representative processing server 100 includes a processing unit 1, a recording unit 2, a communication unit 3, and the like. The processing unit 1 performs various arithmetic processes, and details thereof will be described later. The recording unit 2 accumulates various data. The communication unit 3 exchanges information with the monitoring control slave station 30 and the terminal device 40 via the network. The representative processing server 100 also exchanges information with the first processing server 10-1 to the n-th processing server 10-n.

第1監視制御局10の第1処理サーバ10−1乃至第n処理サーバ10−nと、第2監視制御局20の第1処理サーバ20−1乃至第n処理サーバ20−nとは、同一構成である。ここでは、第1処理サーバ10−1の構成について説明し、他の処理サーバの説明は省略する。第1処理サーバ10−1は、処理部11、記録部12、通信部13などを備えて構成されている。処理部11は、各種演算処理を行うものである。記録部12は、各種データを蓄積するものである。通信部13は、ネットワーク経由で監視制御子局30や端末装置40などと情報を授受する。   The first processing server 10-1 to n-th processing server 10-n of the first monitoring control station 10 and the first processing server 20-1 to n-th processing server 20-n of the second monitoring control station 20 are the same. It is a configuration. Here, the configuration of the first processing server 10-1 will be described, and description of other processing servers will be omitted. The first processing server 10-1 includes a processing unit 11, a recording unit 12, a communication unit 13, and the like. The processing unit 11 performs various arithmetic processes. The recording unit 12 accumulates various data. The communication unit 13 exchanges information with the monitoring control slave station 30 and the terminal device 40 via the network.

図2は、図1に示した代表処理サーバの処理部の構成を概略的に示す図である。なお、ここでは、代表処理サーバ100の処理部1の構成について説明するが、代表処理サーバ200の処理部1についても同一構成であり、その説明を省略する。   FIG. 2 is a diagram schematically showing a configuration of a processing unit of the representative processing server shown in FIG. In addition, although the structure of the process part 1 of the representative process server 100 is demonstrated here, it is the same structure also about the process part 1 of the representative process server 200, The description is abbreviate | omitted.

処理部1は、スケジュール管理部1Aと、緊急便対応管理部1Bと、起動・停止処理部1Cと、等値化処理部1Dとによって構成されている。これらのスケジュール管理部1A、緊急便対応管理部1B、起動・停止処理部1C、及び、等値化処理部1Dの間では、各種情報の授受が行われる。   The processing unit 1 includes a schedule management unit 1A, an emergency flight response management unit 1B, a start / stop processing unit 1C, and an equalization processing unit 1D. Various information is exchanged among these schedule management unit 1A, emergency flight response management unit 1B, start / stop processing unit 1C, and equalization processing unit 1D.

スケジュール管理部1Aは、空港の運用開始時刻及び運用終了時刻を規定した運用時間スケジュールを管理する。より具体的には、スケジュール管理部1Aは、端末装置40から送信された基本運用時間スケジュール及び運用時間延長スケジュールに基づいて、運用時間スケジュールを管理する。このようなスケジュール管理部1Aは、例えば、内部時計を備えており、現在時刻が運用開始時刻になったか否か、あるいは、現在時刻が運用終了時刻になったか否かなどを判断する。   The schedule management unit 1A manages an operation time schedule that defines an operation start time and an operation end time of an airport. More specifically, the schedule management unit 1A manages the operation time schedule based on the basic operation time schedule and the operation time extension schedule transmitted from the terminal device 40. Such a schedule management unit 1A includes an internal clock, for example, and determines whether or not the current time has become the operation start time, or whether or not the current time has become the operation end time.

基本運用時間スケジュールは、通常時に空港を運用状態とする運用時間、つまり、運用開始時刻及び運用終了時刻を規定したものである。このような基本運用時間スケジュールは、端末装置40の入力部43などを介して監視員によって入力され、例えば、記録部2に保存されている。   The basic operation time schedule defines an operation time during which an airport is in an operating state at normal times, that is, an operation start time and an operation end time. Such a basic operation time schedule is input by a monitor through the input unit 43 of the terminal device 40 and stored in the recording unit 2, for example.

運用時間延長スケジュールは、遅延便発生などにより、基本運用時間スケジュールの運用終了時刻が予定よりも延長される場合に、延長後の運用終了時刻を規定したものである。このような運用時間延長スケジュールは、端末装置40の入力部43などを介して監視員によって入力され、例えば、記録部2に保存されている(場合によっては、運用開始時刻を前倒しする場合もあり、その場合には、運用時間延長スケジュールは、前倒し後の運用開始時刻を規定したものとなる)。   The operation time extension schedule defines the extended operation end time when the operation end time of the basic operation time schedule is extended from the schedule due to the occurrence of delayed flights or the like. Such an operation time extension schedule is input by a monitor through the input unit 43 of the terminal device 40 and stored in the recording unit 2, for example (in some cases, the operation start time may be advanced. In that case, the operation time extension schedule defines the operation start time after the advance).

緊急便対応管理部1Bは、空港の運用時間外に緊急便の離着陸に対応するための緊急便対応モードの設定及び解除を管理する。より具体的には、緊急便対応管理部1Bは、空港が非運用状態である場合に、端末装置40から送信された緊急便対応モードの設定指示を受け付け、緊急便対応モードに設定される。また、この緊急便対応管理部1Bは、緊急便対応モードに設定された状態において、端末装置40から送信された緊急便対応モードの解除指示を受け付け、緊急便対応モードから解除される。   The emergency flight response management unit 1B manages the setting and release of the emergency flight response mode for responding to takeoff and landing of emergency flights outside the airport operating hours. More specifically, the emergency flight response management unit 1B receives an emergency flight response mode setting instruction transmitted from the terminal device 40 when the airport is in a non-operating state, and is set to the emergency flight response mode. Further, in the state where the emergency flight response mode is set, the emergency flight response management unit 1B receives the emergency flight response mode cancel instruction transmitted from the terminal device 40, and is canceled from the emergency flight response mode.

起動・停止処理部1Cは、スケジュール管理部1Aにより現在時刻が運用開始時刻(基本運用時間スケジュールで規定された時刻、または、運用時間延長スケジュールで規定された前倒し後の時刻)であると判断された場合に第2監視制御局20を起動し、また、スケジュール管理部1Aにより現在時刻が運用終了時刻(基本運用時間スケジュールで規定された時刻、または、運用時間延長スケジュールで規定された延長後の時刻)であると判断された場合に第2監視制御局20を停止する。   In the start / stop processing unit 1C, the schedule management unit 1A determines that the current time is the operation start time (the time specified in the basic operation time schedule or the time after the advance specified in the operation time extension schedule). The second monitoring control station 20 is started, and the schedule management unit 1A sets the current time to the operation end time (the time specified in the basic operation time schedule or the extended time specified in the operation time extension schedule). The second supervisory control station 20 is stopped when it is determined that it is (time).

また、この起動・停止処理部1Cは、緊急便対応管理部1Bにより緊急便対応モードに設定された場合に第2監視制御局20を起動し、また、緊急便対応管理部1Bにより緊急便対応モードが解除された場合に第2監視制御局20を停止する。   The activation / deactivation processing unit 1C activates the second monitoring control station 20 when the emergency flight response management unit 1B sets the emergency flight response mode, and the emergency flight response management unit 1B responds to the emergency flight. When the mode is canceled, the second monitoring control station 20 is stopped.

等値化処理部1Dは、第1監視制御局10から第2監視制御局20へのデータの等値化処理を運用時間内に少なくとも1回行う。より具体的には、等値化処理部1Dは、例えば、内部時計を備えており、端末装置40から送信された等値化スケジュールに基づいて、現在時刻が等値化時刻になった場合に、等値化処理を行う。この等値化処理は、第1監視制御局10で蓄積されたファイリングデータ(例えば、監視制御対象設備Xの故障日時、稼動日時などの動作履歴や、監視制御対象設備Xの各種計測データなど)や、各種設定値データ(例えば、空調設備の設定温度などの監視制御対象設備Xを監視制御するための各種パラメータなど)を第2監視制御局20にコピー(等値化)する処理である。   The equalization processing unit 1D performs the data equalization processing from the first monitoring control station 10 to the second monitoring control station 20 at least once within the operation time. More specifically, the equalization processing unit 1D includes, for example, an internal clock, and when the current time becomes the equalization time based on the equalization schedule transmitted from the terminal device 40. The equalization process is performed. This equalization processing is performed by filing data accumulated in the first monitoring control station 10 (for example, operation history such as failure date / time and operation date / time of the monitoring control target equipment X, various measurement data of the monitoring control target equipment X, etc.) In addition, it is a process of copying (equalizing) various set value data (for example, various parameters for monitoring and controlling the facility X to be monitored such as the set temperature of the air conditioning facility) to the second monitoring control station 20.

本実施形態では、第1監視制御局10は、システムを立ち上げてからほぼ常時稼動する「稼動系」に対応し、第2監視制御局20は、空港の運用状況により要求されるシステム信頼性のレベルに応じて起動・停止する「待機系」に対応する。すなわち、空港が運用状態である場合(つまり、要求されるシステムの信頼性が高レベルである場合)には、第1監視制御局10に加えて、第2監視制御局20も起動させて待機状態とし、第1監視制御局10に障害等が発生した場合に即座に第2監視制御局20にて自動的に処理が引き継がれる。つまり、運用時は、ホットスタンバイ状態となっている。一方で、空港が非運用状態である場合(つまり、要求されるシステムの信頼性が低レベルである場合)には、第1監視制御局10が稼動している一方で、第2監視制御局20は停止している。つまり、非運用時は、コールドスタンバイ状態となっている。   In the present embodiment, the first supervisory control station 10 corresponds to an “active system” that operates almost always after the system is started up, and the second supervisory control station 20 is required for system reliability required by the operating status of the airport. Corresponds to the "standby system" that starts and stops according to the level. That is, when the airport is in operation (that is, when the required system reliability is high), in addition to the first monitoring control station 10, the second monitoring control station 20 is also activated to stand by. When a failure or the like occurs in the first monitoring control station 10, the second monitoring control station 20 automatically takes over the processing immediately. That is, it is in a hot standby state during operation. On the other hand, when the airport is in a non-operating state (that is, when the required system reliability is low), the first monitoring control station 10 is operating, while the second monitoring control station 10 is operating. 20 is stopped. That is, when not operating, it is in a cold standby state.

以下に、本実施形態における監視制御システムの動作についてより具体的に説明する。   Below, operation | movement of the monitoring control system in this embodiment is demonstrated more concretely.

図3は、本実施形態における監視制御システムの動作を説明するためのフローチャートである。   FIG. 3 is a flowchart for explaining the operation of the monitoring control system in the present embodiment.

まず、第1監視制御局10において、スケジュール管理部1Aにより、現在時刻が基本運用時間スケジュール(例えば、7:30〜20:30)内の時刻であるか否かが判断される(ステップST1)。すなわち、スケジュール管理部1Aは、記録部2に保存されている空港の基本運用時間スケジュールを参照し、内部時計の現在時刻と対比する。ここでは、運用開始時刻が例えば7:30であり、運用終了時刻が例えば20:30である場合について説明する。   First, in the first monitoring control station 10, the schedule management unit 1A determines whether or not the current time is within the basic operating time schedule (for example, 7:30 to 20:30) (step ST1). . That is, the schedule management unit 1A refers to the basic operation time schedule of the airport stored in the recording unit 2 and compares it with the current time of the internal clock. Here, a case will be described in which the operation start time is, for example, 7:30 and the operation end time is, for example, 20:30.

スケジュール管理部1Aにより、現在時刻が基本運用時間スケジュール外の時刻であると判断された場合には(ステップST1、No)、現在時刻が運用時間延長スケジュール内の時刻であるか否かが判断される(ステップST2)。すなわち、スケジュール管理部1Aは、記録部2に運用時間延長スケジュールが保存されているか否かを判断するとともに、運用時間延長スケジュールが保存されている場合にはその運用時間延長スケジュールを参照し、内部時計の現在時刻と対比する。   When the schedule management unit 1A determines that the current time is outside the basic operation time schedule (No in step ST1), it is determined whether or not the current time is within the operation time extension schedule. (Step ST2). That is, the schedule management unit 1A determines whether or not the operation time extension schedule is stored in the recording unit 2, and refers to the operation time extension schedule when the operation time extension schedule is stored. Contrast with the current time of the clock.

スケジュール管理部1Aにより、現在時刻が運用時間延長スケジュール外の時刻であると判断された場合(運用時間延長スケジュールが保存されていない場合も含む)には(ステップST2、No)、緊急便対応管理部1Bにより、緊急便対応モードが設定されているか否かが判断される(ステップST3)。すなわち、現在時刻が基本運用時間スケジュール外であり且つ運用時間延長スケジュール外である場合には、空港は非運用状態にある。このような状態において、緊急便対応管理部1Bは、緊急便対応モードに設定されているか否かを判断する。   When the schedule management unit 1A determines that the current time is outside the operating time extension schedule (including the case where the operating time extension schedule is not stored) (step ST2, No), emergency flight response management The part 1B determines whether or not the emergency flight response mode is set (step ST3). That is, when the current time is outside the basic operation time schedule and outside the operation time extension schedule, the airport is in a non-operation state. In such a state, the emergency flight response management unit 1B determines whether or not the emergency flight response mode is set.

スケジュール管理部1Aにより、現在時刻が基本運用時間スケジュール内の時刻であると判断された場合(ステップST1、Yes)、あるいは、現在時刻が運用時間延長スケジュール内の時刻であると判断された場合(ステップST2、Yes)、あるいは、緊急便対応管理部1Bにより、緊急便対応モードが設定されていると判断された場合には(ステップST3、Yes)、空港が運用状態にある場合に相当し、起動・停止処理部1Cにより、第2監視制御局(待機系)20が起動中であるか否かが判断される(ステップST4)。   When the schedule management unit 1A determines that the current time is a time within the basic operation time schedule (step ST1, Yes), or when the current time is determined to be a time within the operation time extension schedule ( Step ST2, Yes), or when the emergency flight response management unit 1B determines that the emergency flight response mode is set (Yes in Step ST3), this corresponds to a case where the airport is in an operating state. The start / stop processing unit 1C determines whether or not the second monitoring control station (standby system) 20 is being started (step ST4).

起動・停止処理部1Cにより、第2監視制御局(待機系)20が起動中ではないと判断された場合には(ステップST4、No)、第2監視制御局20を起動する(ステップST5)。これにより、空港が運用状態にある場合には、第1監視制御局10に加えて第2監視制御局20が起動し、ホットスタンバイ状態となる。   When the activation / deactivation processing unit 1C determines that the second monitoring control station (standby system) 20 is not activated (No in step ST4), the second monitoring control station 20 is activated (step ST5). . As a result, when the airport is in the operating state, the second monitoring control station 20 is activated in addition to the first monitoring control station 10 to enter the hot standby state.

そして、第2監視制御局20を起動(ステップST5)した後、あるいは、起動・停止処理部1Cにより、第2監視制御局(待機系)20が起動中であると判断された場合には(ステップST4、Yes)、等値化処理部1Dにより、現在時刻が等値化の設定時刻であるか否かが判断される(ステップST6)。すなわち、等値化処理部1Dは、等値化スケジュールを参照し、内部時計の現在時刻と対比する。   Then, after starting the second monitoring control station 20 (step ST5), or when the start / stop processing unit 1C determines that the second monitoring control station (standby system) 20 is starting ( In step ST4, Yes), the equalization processing unit 1D determines whether or not the current time is the equalization setting time (step ST6). That is, the equalization processing unit 1D refers to the equalization schedule and compares it with the current time of the internal clock.

等値化処理部1Dにより、現在時刻が等値化の設定時刻であると判断された場合に(ステップST6、Yes)、等値化処理を行い(ステップST7)、再びステップST1に戻る。また、等値化処理部1Dにより、現在時刻が等値化の設定時刻ではないと判断された場合にも(ステップST6、No)、同様に、再びステップST1に戻る。   When the equalization processing unit 1D determines that the current time is the set time for equalization (step ST6, Yes), equalization processing is performed (step ST7), and the process returns to step ST1 again. Also, when the equalization processing unit 1D determines that the current time is not the equalization setting time (No in step ST6), the process returns to step ST1 again.

一方、緊急便対応管理部1Bにより、緊急便対応モードが設定されていないあるいは緊急便対応モードが解除されたと判断された場合には(ステップST3、No)、起動・停止処理部1Cにより、第2監視制御局(待機系)20が起動中であるか否かが判断される(ステップST8)。   On the other hand, when the emergency flight response management unit 1B determines that the emergency flight response mode is not set or the emergency flight response mode is canceled (No in step ST3), the start / stop processing unit 1C 2. It is determined whether or not the monitoring control station (standby system) 20 is being activated (step ST8).

起動・停止処理部1Cにより、第2監視制御局(待機系)20が起動中ではないと判断された場合には(ステップST8、No)、再びステップST1に戻る。また、起動・停止処理部1Cにより、第2監視制御局(待機系)20が起動中であると判断された場合には(ステップST8、Yes)、第2監視制御局20を停止する(ST9)。これにより、空港が非運用状態にある場合には、第1監視制御局10のみが稼動し、コールドスタンバイ状態となる。   If the activation / deactivation processing unit 1C determines that the second monitoring control station (standby system) 20 is not activated (No in step ST8), the process returns to step ST1 again. If the activation / deactivation processing unit 1C determines that the second monitoring control station (standby system) 20 is activated (Yes in step ST8), the second monitoring control station 20 is deactivated (ST9). ). As a result, when the airport is in a non-operating state, only the first monitoring control station 10 operates and enters a cold standby state.

本実施形態によれば、基本運用時間スケジュール、運用時間延長スケジュール、及び、緊急便対応モードの設定の有無により、空港が運用状態にあるか非運用状態にあるかを判断し、運用状態にあるときには第1監視制御局(稼動系)10のみならず第2監視制御局(待機系)20を起動しておくことにより、稼動系故障時の速やかな処理引継ぎが可能となる。これにより、システムの信頼性の低下を防止することができる。また、非運用状態にあるときには、第2監視制御局20を停止しておくことにより、消費電力の低減が可能となる。これにより、システムの運用コストを低減することができる。   According to the present embodiment, it is determined whether the airport is in an operating state or a non-operating state based on the presence / absence of a basic operating time schedule, an operating time extension schedule, and an emergency flight response mode. Sometimes, by activating not only the first monitoring control station (active system) 10 but also the second monitoring control station (standby system) 20, it is possible to quickly take over processing when the operating system fails. Thereby, the fall of the reliability of a system can be prevented. Further, when in a non-operating state, power consumption can be reduced by stopping the second monitoring control station 20. Thereby, the operating cost of the system can be reduced.

また、本実施形態によれば、運用状態にあるときに、第1監視制御局10から第2監視制御局20に定期的にデータの等値化処理を行うことにより、待機系である第2監視制御局20に処理が引き継がれた際に、稼動系である第1監視制御局10と同等の運用が可能となる。   In addition, according to the present embodiment, the second monitoring control station 10 performs the data equalization processing periodically from the first monitoring control station 10 to the second monitoring control station 20 when in the operating state, so that the second system that is the standby system. When the process is taken over by the monitoring control station 20, an operation equivalent to that of the first monitoring control station 10 which is an active system is possible.

次に、本実施形態における監視制御システムの第2構成例について説明する。なお、以下に説明する監視制御システムの第2構成例は、図1に示した第1構成例と基本的な構成は同一である。   Next, a second configuration example of the monitoring control system in the present embodiment will be described. The second configuration example of the monitoring control system described below has the same basic configuration as the first configuration example shown in FIG.

図4は、監視制御システムの第2構成例において、第1監視制御局10を構成する代表処理サーバ100の処理部1の構成を概略的に示す図である。   FIG. 4 is a diagram schematically illustrating the configuration of the processing unit 1 of the representative processing server 100 configuring the first monitoring control station 10 in the second configuration example of the monitoring control system.

処理部1は、第1構成例で説明した起動・停止処理部1C及び等値化処理部1Dに加えて、システム状態監視部1Eと、ダウン予兆判断部1Fと、を備えている。なお、ここでは図示していないが、処理部1は、さらに、第1構成例で説明したスケジュール管理部1A及び緊急便対応管理部1Bを備えていても良く、この場合には、第1構成例で説明した動作を組み合わせることが可能である。   The processing unit 1 includes a system state monitoring unit 1E and a down sign determination unit 1F in addition to the start / stop processing unit 1C and the equalization processing unit 1D described in the first configuration example. Although not shown here, the processing unit 1 may further include the schedule management unit 1A and the emergency flight response management unit 1B described in the first configuration example. In this case, the first configuration It is possible to combine the operations described in the examples.

システム状態監視部1Eは、監視制御システムの状態、つまり、第1監視制御局10が備える第1サーバ群、第2監視制御局20が備える第2サーバ群、監視制御局30、端末装置40などの状態を監視するのに必要な監視信号を収集する。システム状態監視部1Eが収集する監視信号とは、例えば、処理サーバの処理部が備えているCPUの温度(処理部が複数のCPUを備えている場合にはそれぞれのCPUの温度)、CPUの演算スピード(CPUが複数のコアを有する場合にはそれぞれのコアの演算スピード)、処理サーバの記録部が備えている揮発性メモリへの書込の可否(記録部が複数の揮発性メモリを備えている場合にはそれぞれの揮発性メモリへの書込の可否)、揮発性メモリの使用率(記録部が複数の揮発性メモリを備えている場合にはそれぞれの揮発性メモリの使用率)、処理サーバが備えている不揮発性メモリへの書込の可否(記録部が複数の不揮発性メモリを備えている場合にはそれぞれの不揮発性メモリへの書込の可否)、不揮発性メモリの空き容量(記録部が複数の不揮発性メモリを備えている場合にはそれぞれの不揮発性メモリの空き容量)、処理サーバの通信部が備えているポートでの通信障害の有無(通信部が複数のポートを備えている場合にはそれぞれのポートでの通信障害の有無)などに関する信号が含まれる。システム状態監視部1Eでは、ほぼ常時、監視信号を収集している。   The system state monitoring unit 1E includes the state of the monitoring control system, that is, the first server group included in the first monitoring control station 10, the second server group included in the second monitoring control station 20, the monitoring control station 30, the terminal device 40, and the like. Collect monitoring signals necessary to monitor the status of The monitoring signal collected by the system state monitoring unit 1E is, for example, the temperature of the CPU provided in the processing unit of the processing server (if the processing unit includes a plurality of CPUs, the temperature of each CPU), Calculation speed (when the CPU has a plurality of cores, the calculation speed of each core), whether to write to the volatile memory provided in the recording unit of the processing server (the recording unit includes a plurality of volatile memories) If it is possible to write to each volatile memory), volatile memory usage (if the recording unit has multiple volatile memories, each volatile memory usage), Whether to write to the non-volatile memory provided in the processing server (if the recording unit has multiple non-volatile memories, whether to write to each non-volatile memory), free space of the non-volatile memory ( If the recording unit is equipped with multiple non-volatile memories, the capacity of each non-volatile memory), whether there is a communication failure at the port of the communication unit of the processing server (the communication unit has multiple ports) In the case of communication failure at each port). The system state monitoring unit 1E collects monitoring signals almost always.

ダウン予兆判断部1Fは、システム状態監視部1Eによって収集された監視信号に基づいて第1監視制御局10のダウン(障害発生)の予兆の有無を判断する。また、このダウン予兆判断部1Fは、システム状態監視部1Eによって収集された監視信号と、端末装置40の入力部43などにより設定された閾値とを比較して、ダウンの予兆の有無を判断する場合もある。ここでのダウンの予兆とは、第1監視制御局10が直ちにダウンする異常ではないが、いずれダウンに至る可能性が極めて高い状態に相当する。   The down sign determination unit 1F determines whether or not there is a sign of a down (failure occurrence) of the first monitoring control station 10 based on the monitoring signal collected by the system state monitoring unit 1E. Further, the down sign determination unit 1F compares the monitoring signal collected by the system state monitoring unit 1E with the threshold set by the input unit 43 of the terminal device 40, and determines whether there is a down sign. In some cases. Here, the sign of down is not an abnormality in which the first monitoring control station 10 goes down immediately, but corresponds to a state where the possibility of going down is extremely high.

この第2構成例では、第1監視制御局10の第1サーバ群を構成する各処理サーバは、冗長化されている。例えば、第1処理サーバ10−1は、処理部11が複数のCPUを備え、記録部12が複数の揮発性メモリ及び複数の不揮発性メモリを備え、通信部13が複数のポートを備えており、他の処理サーバについても同様である。このため、各処理サーバにおいて、例え一つの機器(例えば、2つのCPUのうちの一方のCPU)に異常が発生したとしても、同等の機能を有する他の機器(例えば、2つのCPUのうちの他方のCPU)がバックアップするため、直ちにダウンすることはない。しかしながら、このような機器の異常が発生した状態は、いずれ第1監視制御局10のダウンに至る可能性が極めて高い状態である。   In this second configuration example, each processing server constituting the first server group of the first monitoring control station 10 is made redundant. For example, in the first processing server 10-1, the processing unit 11 includes a plurality of CPUs, the recording unit 12 includes a plurality of volatile memories and a plurality of nonvolatile memories, and the communication unit 13 includes a plurality of ports. The same applies to other processing servers. For this reason, even if an abnormality occurs in one device (for example, one of the two CPUs) in each processing server, another device (for example, one of the two CPUs) having an equivalent function. Since the other CPU) backs up, it does not go down immediately. However, the state in which such a device abnormality has occurred is a state in which there is an extremely high possibility that the first monitoring control station 10 will eventually go down.

このような第2構成例において、ダウン予兆判断部1Fは、CPUの温度が設定された閾値を超えた場合、CPUの一つのコアの演算スピードが設定された閾値よりも低下した場合、複数の揮発性メモリのうちの一つの揮発性メモリへの書込が不可となった場合、複数の揮発性メモリのうちの一つの揮発性メモリの使用率が設定された閾値を超えた場合、複数の不揮発性メモリのうちの一つの不揮発性メモリへの書込が不可となった場合、複数の不揮発性メモリのうちの一つの不揮発性メモリの空き容量が設定された閾値よりも低下した場合、複数のポートのうちの一つのポートで通信障害が発生した場合などに、第1監視制御局10のダウンの予兆が有るものと判断する。   In such a second configuration example, when the CPU temperature exceeds a set threshold value, the down sign determination unit 1F has a plurality of cases where the calculation speed of one core of the CPU is lower than the set threshold value. When writing to one of the volatile memories becomes impossible, when the usage rate of one of the volatile memories exceeds a set threshold value, If writing to one of the non-volatile memories becomes impossible, if the free capacity of one of the non-volatile memories falls below a set threshold, multiple When a communication failure occurs in one of the ports, it is determined that there is a sign that the first monitoring control station 10 is down.

起動・停止処理部1Cは、上記の第1構成例と同様に、運用時間内に第2監視制御局20を起動し、運用時間外に第2監視制御局20を停止する。また、この起動・停止処理部1Cは、運用時間外において、ダウン予兆判断部1Fによりダウンの予兆があると判断されたのに基づいて、停止中の第2監視制御局20を起動する。なお、起動・停止処理部1Cは、運用時間内においては第2監視制御局20を起動しており、ダウン予兆判断部1Fによりダウンの予兆があると判断された場合には、第2監視制御局20を起動した状態を維持する。   Similarly to the first configuration example, the start / stop processing unit 1C starts the second monitoring control station 20 within the operation time and stops the second monitoring control station 20 outside the operation time. In addition, the start / stop processing unit 1C starts the second monitoring control station 20 that is stopped based on the fact that the down sign determination unit 1F determines that there is a down sign outside the operation time. The start / stop processing unit 1C activates the second monitoring control station 20 within the operation time, and if it is determined by the down sign determining unit 1F that there is a down sign, the second monitoring control station 1C The state where the station 20 is activated is maintained.

等値化処理部1Dは、第1監視制御局10から第2監視制御局20へのデータの等値化処理を行う。より具体的には、等値化処理部1Dは、例えば、内部時計を備えており、端末装置40から送信された等値化スケジュールに基づいて、現在時刻が等値化時刻になった場合に、等値化処理を行う。具体的な等値化処理については、上記の第1構成例と同様であるため、説明を省略する。   The equalization processing unit 1D performs data equalization processing from the first monitoring control station 10 to the second monitoring control station 20. More specifically, the equalization processing unit 1D includes, for example, an internal clock, and when the current time becomes the equalization time based on the equalization schedule transmitted from the terminal device 40. The equalization process is performed. Since the specific equalization process is the same as that in the first configuration example, the description thereof is omitted.

このような本実施形態の第2構成例においても、第1監視制御局10は、システムを立ち上げてからほぼ常時稼動する「稼動系」に対応し、第2監視制御局20は、運用時間内に起動して待機状態とし、運用時間外に停止している「待機系」に対応する。   Also in the second configuration example of the present embodiment, the first supervisory control station 10 corresponds to an “active system” that operates almost continuously after the system is started up, and the second supervisory control station 20 The system is activated in the standby state, and corresponds to the “standby system” that is stopped outside the operation hours.

以下に、本実施形態における監視制御システムの動作についてより具体的に説明する。   Below, operation | movement of the monitoring control system in this embodiment is demonstrated more concretely.

図5は、本実施形態における監視制御システムの動作を説明するためのフローチャートである。   FIG. 5 is a flowchart for explaining the operation of the monitoring control system in the present embodiment.

まず、第1監視制御局(稼動系)10において、等値化処理部1Dは、現在時刻が等値化の設定時刻であるか否かを判断する(ステップST11)。すなわち、等値化処理部1Dは、等値化スケジュールを参照し、内部時計の現在時刻と対比する。等値化処理部1Dにより、現在時刻が等値化の設定時刻であると判断された場合に(ステップST11、Yes)、起動・停止処理部1Cは、第2監視制御局(待機系)20が停止中であるか否かを判断する(ステップST12)。   First, in the first monitoring control station (active system) 10, the equalization processing unit 1D determines whether or not the current time is a set time for equalization (step ST11). That is, the equalization processing unit 1D refers to the equalization schedule and compares it with the current time of the internal clock. When the equalization processing unit 1D determines that the current time is the set time for equalization (step ST11, Yes), the start / stop processing unit 1C includes the second monitoring control station (standby system) 20 Is determined to be stopped (step ST12).

起動・停止処理部1Cにより、第2監視制御局(待機系)20が停止中であると判断された場合には(ステップST12、Yes)、起動・停止処理部1Cは、第2監視制御局(待機系)20を起動する(ステップST13)。起動・停止処理部1Cにより第2監視制御局(待機系)20が停止中ではない(つまり、起動中である)と判断された場合(ステップST12、No)、あるいは、ステップST13において起動・停止処理部1Cにより第2監視制御局(待機系)20が起動された後に、等値化処理部1Dは、等値化処理を行う(ステップST14)。   If the start / stop processing unit 1C determines that the second monitoring control station (standby system) 20 is stopped (step ST12, Yes), the start / stop processing unit 1C (Standby system) 20 is activated (step ST13). When it is determined by the activation / deactivation processing unit 1C that the second monitoring control station (standby system) 20 is not deactivated (that is, activated) (No in step ST12), or activated / deactivated in step ST13. After the second monitoring control station (standby system) 20 is activated by the processing unit 1C, the equalization processing unit 1D performs equalization processing (step ST14).

等値化処理部1Dにより、現在時刻が等値化の設定時刻ではないと判断された場合(ステップST11、No)、あるいは、ステップST14において等値化処理部1Dにより等値化処理が行われた後に、ダウン予兆判断部1Fは、システム状態監視部1Eによって収集された監視信号に基づいて、監視制御システムにおける異常の有無を判断する(ステップST15)。   When the equalization processing unit 1D determines that the current time is not the equalization setting time (step ST11, No), or the equalization processing unit 1D performs equalization processing in step ST14. Thereafter, the down sign determination unit 1F determines whether there is an abnormality in the monitoring control system based on the monitoring signals collected by the system state monitoring unit 1E (step ST15).

ダウン予兆判断部1Fにより、監視制御システムにおいて異常が発生したと判断された場合には(ステップST15、Yes)、ダウン予兆判断部1Fは、その異常が第1監視制御局(稼動系)10のダウンの予兆であるか否かを判断する(ステップST16)。ダウン予兆判断部1Fにより、ダウンの予兆であると判断された場合には(ステップST16、Yes)、起動・停止処理部1Cは、第2監視制御局(待機系)20が停止中であるか否かを判断する(ステップST17)。   If the down sign determining unit 1F determines that an abnormality has occurred in the monitoring control system (Yes in step ST15), the down sign determining unit 1F indicates that the abnormality is in the first monitoring control station (active system) 10. It is determined whether or not it is a sign of down (step ST16). If the down sign determining unit 1F determines that the down sign is present (Yes in step ST16), the start / stop processing unit 1C determines whether the second monitoring control station (standby system) 20 is stopped. It is determined whether or not (step ST17).

起動・停止処理部1Cにより、第2監視制御局(待機系)20が停止中であると判断された場合には(ステップST17、Yes)、起動・停止処理部1Cは、第2監視制御局(待機系)20を起動する(ステップST18)。起動・停止処理部1Cにより第2監視制御局(待機系)20が停止中ではない(つまり、起動中である)と判断された場合(ステップST17、No)、再びステップST11に戻る。これにより、第1監視制御局10に加えて第2監視制御局20が起動し、ホットスタンバイ状態となる。   When the start / stop processing unit 1C determines that the second monitoring control station (standby system) 20 is stopped (step ST17, Yes), the start / stop processing unit 1C (Standby system) 20 is activated (step ST18). When the activation / deactivation processing unit 1C determines that the second monitoring control station (standby system) 20 is not stopped (that is, activated) (step ST17, No), the process returns to step ST11 again. Thereby, in addition to the 1st monitoring control station 10, the 2nd monitoring control station 20 starts, and it will be in a hot standby state.

一方、ダウン予兆判断部1Fにより、監視制御システムに異常が発生したと判断されたものの第1監視制御局(稼動系)10のダウンの予兆ではないと判断された場合(例えば、処理サーバのファンの故障、監視制御子局の故障などの異常が発生した場合)には(ステップST16、No)、起動・停止処理部1Cは、第2監視制御局(待機系)20が起動中であるか否かを判断する(ステップST19)。   On the other hand, when the down sign determining unit 1F determines that an abnormality has occurred in the monitoring control system, but it is determined not to be a down sign of the first monitoring control station (active system) 10 (for example, a fan of the processing server) When an abnormality such as a failure of the monitoring control slave station or the like occurs (No in step ST16), the start / stop processing unit 1C determines whether the second monitoring control station (standby system) 20 is starting up. It is determined whether or not (step ST19).

起動・停止処理部1Cにより、第2監視制御局(待機系)20が起動中であると判断された場合には(ステップST19、Yes)、起動・停止処理部1Cは、第2監視制御局(待機系)20を停止する(ステップST20)。起動・停止処理部1Cにより第2監視制御局(待機系)20が起動中ではない(つまり、停止中である)と判断された場合(ステップST19、No)、再びステップST11に戻る。これにより、第1監視制御局10のみが稼動し、コールドスタンバイ状態となる。   When the activation / deactivation processing unit 1C determines that the second monitoring control station (standby system) 20 is activated (step ST19, Yes), the activation / deactivation processing unit 1C (Standby system) 20 is stopped (step ST20). When the activation / deactivation processing unit 1C determines that the second monitoring control station (standby system) 20 is not activated (that is, deactivated) (No in step ST19), the process returns to step ST11 again. As a result, only the first supervisory control station 10 operates and enters a cold standby state.

このような第2構成例によれば、運用時間内においては、第1監視制御局(稼動系)10のみならず第2監視制御局(待機系)20を起動しておくことにより、第1監視制御局10の障害発生時に、第1監視制御局10から第2監視制御局20へと速やかに処理を引継ぐことが可能となる。また、運用時間外においては、第1監視制御局10が起動している一方で、第2監視制御局20は停止しているが、第1監視制御局10にダウンの予兆が有ると判断した場合には第2監視制御局20を起動しておくことにより、例え第1監視制御局10に障害が発生したとしても、第1監視制御局10から第2監視制御局20へと速やかに処理を引継ぐことが可能となる。したがって、待機系の消費電力の低減が可能となるとともに、システムの信頼性を向上することが可能となる。   According to such a second configuration example, the first monitoring control station (active system) 10 as well as the second monitoring control station (standby system) 20 is activated during the operation time, so that the first When a failure occurs in the monitoring control station 10, it is possible to immediately take over the processing from the first monitoring control station 10 to the second monitoring control station 20. In addition, outside the operation hours, the first monitoring control station 10 is activated, while the second monitoring control station 20 is stopped, but it is determined that the first monitoring control station 10 has a sign of down. In this case, by activating the second monitoring control station 20, even if a failure occurs in the first monitoring control station 10, the first monitoring control station 10 promptly processes it to the second monitoring control station 20. Can be taken over. Therefore, the power consumption of the standby system can be reduced, and the reliability of the system can be improved.

また、第1監視制御局10から第2監視制御局20に定期的にデータの等値化処理を行うことにより、第2監視制御局20に処理が引き継がれた際に、第1監視制御局10と同等の運用が可能となる。   In addition, by performing the data equalization processing periodically from the first monitoring control station 10 to the second monitoring control station 20, when the processing is handed over to the second monitoring control station 20, the first monitoring control station 20 Operation equivalent to 10 is possible.

以上説明したように、本実施形態によれば、信頼性の低下を招くことなく、運用コストを低減することが可能な監視制御システムを提供することが可能となる。   As described above, according to the present embodiment, it is possible to provide a monitoring control system capable of reducing the operation cost without causing a decrease in reliability.

なお、この発明は、上記実施形態そのものに限定されるものではなく、その実施の段階ではその要旨を逸脱しない範囲で構成要素を変形して具体化できる。また、上記実施形態に開示されている複数の構成要素の適宜な組み合せにより種々の発明を形成できる。例えば、実施形態に示される全構成要素から幾つかの構成要素を削除してもよい。更に、異なる実施形態に亘る構成要素を適宜組み合せてもよい。   In addition, this invention is not limited to the said embodiment itself, In the stage of implementation, it can change and implement a component within the range which does not deviate from the summary. Further, various inventions can be formed by appropriately combining a plurality of constituent elements disclosed in the embodiment. For example, some components may be deleted from all the components shown in the embodiment. Furthermore, you may combine suitably the component covering different embodiment.

上述した本実施形態において、第1監視制御局10及び第2監視制御局20は、同一地域に設置されても良いし、遠隔地に設置されても良い。   In the present embodiment described above, the first monitoring control station 10 and the second monitoring control station 20 may be installed in the same area or in a remote place.

また、第1監視制御局10と第2監視制御局20との間で運用時間内に等値化処理を行うタイミングや頻度については、特に問わない。等値化処理の頻度が高いほど、第1監視制御局10に障害が発生した際に第2監視制御局20に引き継がれるデータ量は多くなり(つまり、失われるデータ量が少なくなり)、第2監視制御局20において、より第1監視制御局10と同等の処理が可能となる。   Further, the timing and frequency at which the equalization processing is performed within the operation time between the first monitoring control station 10 and the second monitoring control station 20 are not particularly limited. The higher the frequency of equalization processing, the larger the amount of data taken over by the second monitoring control station 20 when a failure occurs in the first monitoring control station 10 (that is, the lesser amount of data is lost). In the second monitoring control station 20, processing equivalent to that of the first monitoring control station 10 can be performed.

但し、第1監視制御局10と第2監視制御局20とが遠隔地に設置された場合、等値化処理の際にネットワークに多大な負荷がかかるおそれがある。このため、等値化処理を行うタイミングや頻度については、ネットワークの負荷を考慮して適宜設定されることが望ましい。   However, when the first monitoring control station 10 and the second monitoring control station 20 are installed in a remote place, there is a possibility that a great load is applied to the network during the equalization process. For this reason, it is desirable to appropriately set the timing and frequency of performing the equalization processing in consideration of the network load.

10…第1監視制御局
100…代表処理サーバ
1…処理部
1A…スケジュール管理部
1B…緊急便対応管理部
1C…起動・停止処理部
1D…等値化処理部
1E…システム状態監視部
1F…ダウン予兆判断部
2…記録部
3…通信部
10−1〜10−n…処理サーバ
20…第2監視制御局
30…監視制御子局
40…端末装置
DESCRIPTION OF SYMBOLS 10 ... 1st monitoring control station 100 ... Representative processing server 1 ... Processing part 1A ... Schedule management part 1B ... Emergency flight response management part 1C ... Start / stop processing part 1D ... Equalization processing part 1E ... System state monitoring part 1F ... Down sign determination unit 2 ... recording unit 3 ... communication unit 10-1 to 10-n ... processing server 20 ... second monitoring control station 30 ... monitoring control slave station 40 ... terminal device

Claims (4)

第1サーバ群を備えた第1監視制御局と、前記第1サーバ群と同等構成の第2サーバ群を備え且つ前記第1監視制御局とネットワークを介して接続された第2監視制御局と、を備えた監視制御システムにおいて、
前記第1監視制御局は、
運用開始時刻及び運用終了時刻を規定した運用時間スケジュールを管理するスケジュール管理部と、
前記スケジュール管理部により運用開始時刻であると判断された場合に前記第2監視制御局を起動し、前記スケジュール管理部により運用終了時刻であると判断された場合に前記第2監視制御局を停止する起動・停止処理部と、
運用時間外に緊急便の離着陸に対応するための緊急便対応モードの設定及び解除を管理する緊急便対応管理部と、
を備え、
前記起動・停止処理部は、前記緊急便対応管理部により緊急便対応モードに設定された場合に前記第2監視制御局を起動し、前記緊急便対応管理部により緊急便対応モードが解除された場合に前記第2監視制御局を停止することを特徴とす監視制御システム。
A first monitoring control station including a first server group; a second monitoring control station including a second server group having a configuration equivalent to that of the first server group and connected to the first monitoring control station via a network; In a supervisory control system comprising
The first supervisory control station
A schedule management unit that manages an operation time schedule that defines an operation start time and an operation end time;
The second monitoring control station is activated when the schedule management unit determines that the operation start time is reached, and the second monitoring control station is stopped when the schedule management unit determines that the operation end time is determined. A start / stop processing unit to
An emergency flight response management unit that manages the setting and release of an emergency flight response mode for responding to takeoff and landing of emergency flights outside the operating hours ;
With
The activation / deactivation processing unit activates the second monitoring control station when the emergency flight response management unit sets the emergency flight response mode, and the emergency flight response management unit releases the emergency flight response mode. supervisory control systems that characterized by stopping the second monitoring control station when.
第1サーバ群を備えた第1監視制御局と、前記第1サーバ群と同等構成の第2サーバ群を備え且つ前記第1監視制御局とネットワークを介して接続された第2監視制御局と、を備えた監視制御システムにおいて、
前記第1監視制御局は、
運用開始時刻及び運用終了時刻を規定した運用時間スケジュールを管理するスケジュール管理部と、
前記スケジュール管理部により運用開始時刻であると判断された場合に前記第2監視制御局を起動し、前記スケジュール管理部により運用終了時刻であると判断された場合に前記第2監視制御局を停止する起動・停止処理部と、
視制御システムの状態を監視するのに必要な監視信号を収集するシステム状態監視部と、前記システム状態監視部によって収集された監視信号に基づいて前記第1監視制御局のダウンの予兆の有無を判断するダウン予兆判断部と、を備え、
前記起動・停止処理部は、前記ダウン予兆判断部によりダウンの予兆があると判断されたのに基づいて、停止中の前記第2監視制御局を起動することを特徴とす監視制御システム。
A first monitoring control station including a first server group; a second monitoring control station including a second server group having a configuration equivalent to that of the first server group and connected to the first monitoring control station via a network; In a supervisory control system comprising
The first supervisory control station
A schedule management unit that manages an operation time schedule that defines an operation start time and an operation end time;
The second monitoring control station is activated when the schedule management unit determines that the operation start time is reached, and the second monitoring control station is stopped when the schedule management unit determines that the operation end time is determined. A start / stop processing unit to
And system state monitoring unit for collecting monitoring signals required to monitor the state of the monitoring control system, the presence or absence of a sign of the down of the first monitoring and control station based on the monitoring signals collected by the system state monitoring unit A down sign determination unit for determining
The starting and ending processor, the down sign determination section based on the it is determined that there is a sign down by supervisory control systems that characterized in that activates the second monitoring control station stopped.
第1サーバ群を備えた第1監視制御局と、前記第1サーバ群と同等構成の第2サーバ群を備え且つ前記第1監視制御局とネットワークを介して接続された第2監視制御局と、を備えた監視制御システムにおいて、
前記第1監視制御局は、
監視制御システムの状態を監視するのに必要な監視信号を収集するシステム状態監視部と、
前記システム状態監視部によって収集された監視信号に基づいて前記第1監視制御局のダウンの予兆の有無を判断するダウン予兆判断部と、
運用時間内に前記第2監視制御局を起動し、運用時間外に前記第2監視制御局を停止するとともに、運用時間外において、前記ダウン予兆判断部によりダウンの予兆があると判断されたのに基づいて停止中の前記第2監視制御局を起動する起動・停止処理部と、
を備えたことを特徴とする監視制御システム。
A first monitoring control station including a first server group; a second monitoring control station including a second server group having a configuration equivalent to that of the first server group and connected to the first monitoring control station via a network; In a supervisory control system comprising
The first supervisory control station
A system status monitoring unit for collecting monitoring signals necessary for monitoring the status of the monitoring control system;
A down sign determining unit that determines whether or not there is a down sign of the first monitoring control station based on a monitoring signal collected by the system state monitoring unit;
The second monitoring control station is activated within the operation time, the second monitoring control station is stopped outside the operation time, and the down sign determination unit determines that there is a down sign outside the operation time. A start / stop processing unit that starts the second monitoring control station that is stopped based on
A supervisory control system characterized by comprising:
さらに、前記ダウン予兆判断部によりダウンの予兆の有無を判断するのに必要な閾値の設定を受け付ける入力部を備え、
前記ダウン予兆判断部は、前記入力部により設定された閾値と前記システム状態監視部によって収集された監視信号とを比較して、ダウンの予兆の有無を判断することを特徴とする請求項またはに記載の監視制御システム。
Furthermore, an input unit for receiving a setting of a threshold necessary for determining whether or not there is a down sign by the down sign determination unit,
The down sign determination unit compares the monitoring signal collected by the system state monitor with the set threshold value by the input unit, according to claim, characterized in that to determine whether the sign of down 2 or 4. The supervisory control system according to 3 .
JP2011171171A 2010-09-08 2011-08-04 Supervisory control system Active JP5840410B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2011171171A JP5840410B2 (en) 2010-09-08 2011-08-04 Supervisory control system

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2010201406 2010-09-08
JP2010201406 2010-09-08
JP2011171171A JP5840410B2 (en) 2010-09-08 2011-08-04 Supervisory control system

Publications (2)

Publication Number Publication Date
JP2012079292A JP2012079292A (en) 2012-04-19
JP5840410B2 true JP5840410B2 (en) 2016-01-06

Family

ID=46239400

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2011171171A Active JP5840410B2 (en) 2010-09-08 2011-08-04 Supervisory control system

Country Status (1)

Country Link
JP (1) JP5840410B2 (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6096423B2 (en) * 2012-05-23 2017-03-15 日本電気通信システム株式会社 Communication system and redundant switching method for communication system
JP6007988B2 (en) * 2012-09-27 2016-10-19 日本電気株式会社 Standby system apparatus, operational system apparatus, redundant configuration system, and load distribution method
JP6070282B2 (en) * 2013-03-04 2017-02-01 富士通株式会社 Virtual machine management apparatus, method and program
JP2015049703A (en) * 2013-09-02 2015-03-16 日立アプライアンス株式会社 Control equipment with self-monitoring function
JP6317974B2 (en) * 2014-03-28 2018-04-25 アズビル株式会社 Data collection system
JP2020137229A (en) * 2019-02-18 2020-08-31 株式会社東芝 Power receiving and transforming system
JP2024169881A (en) * 2023-05-26 2024-12-06 株式会社日立製作所 Redundant system and method for controlling redundant system

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05130656A (en) * 1991-11-05 1993-05-25 Hitachi Ltd Method for switching duplexed control processor driving operation mode and control processing method for plural controlled device by duplexed control processor
JPH1088530A (en) * 1996-09-19 1998-04-07 Toshiba Corp Lighting monitoring control device and lighting power control device of airport
JP2008093752A (en) * 2006-10-06 2008-04-24 Masayuki Murakami Robot control system
JP5129705B2 (en) * 2008-09-24 2013-01-30 株式会社日立ソリューションズ Emergency disaster warning transfer system

Also Published As

Publication number Publication date
JP2012079292A (en) 2012-04-19

Similar Documents

Publication Publication Date Title
JP5840410B2 (en) Supervisory control system
US8850237B2 (en) Data processing system power distribution using UPS units selectively coupled to loads by reserve bus based on the load states
US8230258B2 (en) Control method of system monitoring device, program, and computer system
US20080281475A1 (en) Fan control scheme
US20070216229A1 (en) UPS methods, systems and computer program products providing adaptive availability
JP5234115B2 (en) Information processing apparatus, processing unit switching method, and processing unit switching program
JP3537281B2 (en) Shared disk type multiplex system
JP6130520B2 (en) MULTISYSTEM SYSTEM AND MULTISYSTEM SYSTEM MANAGEMENT METHOD
JP4438010B2 (en) Relay device, relay method, and relay control program
CN120723521B (en) Server and control methods
US10374426B2 (en) Enhanced power signaling system
CN204406385U (en) The management devices of computer system
US20060075085A1 (en) Method and a system for ensuring a bus and a control server
JP2012128573A (en) Duplex system and building management system using the same
JP4655718B2 (en) Computer system and control method thereof
CN111522698A (en) Automatic switching system and method of front-end processor
JP5364642B2 (en) Train operation management system
US20020183869A1 (en) Using fault tolerance mechanisms to adapt to elevated temperature conditions
JP2009026182A (en) Program execution system and execution apparatus
US7661024B2 (en) Bus terminator/monitor/bridge systems and methods
US20160292471A1 (en) Rfid communication system and method for controlling same
JP2005301438A (en) Distributed monitoring and control system
JP2012027790A (en) Electronic apparatus and control program thereof
JP5115710B2 (en) Multiple configuration control apparatus, multiple configuration control method, and multiple configuration control program
CN105278651A (en) Redundancy control system

Legal Events

Date Code Title Description
RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20131205

RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20131212

RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20131219

RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20131226

RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20140109

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20140723

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20150423

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20150512

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20150713

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20151013

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20151111

R151 Written notification of patent or utility model registration

Ref document number: 5840410

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R151

R154 Certificate of patent or utility model (reissue)

Free format text: JAPANESE INTERMEDIATE CODE: R154