Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP5849937B2 - Slab cutting method and slab cutting device in continuous casting machine - Google Patents
[go: Go Back, main page]

JP5849937B2 - Slab cutting method and slab cutting device in continuous casting machine - Google Patents

Slab cutting method and slab cutting device in continuous casting machine Download PDF

Info

Publication number
JP5849937B2
JP5849937B2 JP2012264722A JP2012264722A JP5849937B2 JP 5849937 B2 JP5849937 B2 JP 5849937B2 JP 2012264722 A JP2012264722 A JP 2012264722A JP 2012264722 A JP2012264722 A JP 2012264722A JP 5849937 B2 JP5849937 B2 JP 5849937B2
Authority
JP
Japan
Prior art keywords
cutting
slab
strand
continuous casting
casting machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2012264722A
Other languages
Japanese (ja)
Other versions
JP2014108449A (en
Inventor
荒井 淳
淳 荒井
宗徳 楠本
宗徳 楠本
樹人 松田
樹人 松田
佑馬 五十嵐
佑馬 五十嵐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Steel Corp
Original Assignee
JFE Steel Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JFE Steel Corp filed Critical JFE Steel Corp
Priority to JP2012264722A priority Critical patent/JP5849937B2/en
Publication of JP2014108449A publication Critical patent/JP2014108449A/en
Application granted granted Critical
Publication of JP5849937B2 publication Critical patent/JP5849937B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Continuous Casting (AREA)

Description

本発明は、鋳片を指定の重量で切断する連続鋳造機における鋳片切断方法および鋳片切断装置に関する。   The present invention relates to a slab cutting method and a slab cutting apparatus in a continuous casting machine that cuts a slab with a specified weight.

一般に、連続鋳造設備においては、鋳型に注入された溶鋼は周囲から冷却されることにより凝固し、シェルが形成される。シェルが形成された溶鋼は、鋳型直下から鉛直方向下方に引き抜かれ、水冷スプレーにより冷却されつつ水平方向に矯正され、平坦状のストランドとなる。このストランドは、下流で所定長さの鋳片に切断される。   In general, in a continuous casting facility, molten steel poured into a mold is solidified by cooling from the surroundings to form a shell. The molten steel in which the shell is formed is drawn vertically downward from directly under the mold, and is corrected in the horizontal direction while being cooled by water-cooled spray to form a flat strand. The strand is cut downstream into a slab of a predetermined length.

従来、鋳片の切断長は、指定された重量に応じて、公称単位重量とこの公称単位重量を補正する補正係数とから算出されている。ここで、公称単位重量とは、鋳型の断面積と溶鋼の成分で定まる比重とを用いて求められるストランドの単位長さ当たりの重量を意味する。ストランドの断面積は、鋳型から引き抜かれた直後には鋳型の断面積と同一とみなせるが、冷却された後には変化する。このため、補正係数(熱間補正係数)を用いて公称単位重量を切断直前のストランドの単位長さ当たりの重量に補正して、指定の重量に見合った切断長を算出して鋳片を切断している。   Conventionally, the cutting length of a slab is calculated from a nominal unit weight and a correction coefficient for correcting the nominal unit weight in accordance with a designated weight. Here, the nominal unit weight means the weight per unit length of the strand determined using the cross-sectional area of the mold and the specific gravity determined by the molten steel components. The cross-sectional area of the strand can be regarded as the same as the cross-sectional area of the mold immediately after being drawn out of the mold, but changes after being cooled. For this reason, the nominal unit weight is corrected to the weight per unit length of the strand just before cutting using a correction coefficient (hot correction coefficient), and the cutting length corresponding to the specified weight is calculated to cut the slab. doing.

上記補正係数は、単位時間当たりの鋳込み量に対する冷却水量や、ストランドが鋳型から引き抜かれてからストランドを切断するトーチカッタに到達するまでの時間(鋳込み時間)といった鋳込み条件の計測値に基づいて算出されている。また、特許文献1には、鋳込み条件が鋳造中に変化した場合に対応するよう、ストランドの冷却度合いを反映するストランドの連続鋳造機内の通過に要する時間(機内滞留時間)に基づいて、熱間補正係数により補正された切断長をさらに補正する技術が記載されている。   The correction coefficient is calculated based on the measured values of casting conditions such as the amount of cooling water with respect to the casting amount per unit time and the time from when the strand is pulled out of the mold until it reaches the torch cutter that cuts the strand (casting time). ing. Further, Patent Document 1 discloses a hot process based on the time required for passage of a strand in a continuous casting machine reflecting the degree of cooling of the strand (residence time in the machine) so as to correspond to a case where casting conditions change during casting. A technique for further correcting the cutting length corrected by the correction coefficient is described.

特開2012−24817号公報JP 2012-24817 A

ところで、連続鋳造機では、次工程で鋳片の重量が不足する事態の発生を防止するため、指定された重量に所定の重量(付加重量)を付加して鋳片を切断する重量補償を行っている。具体的には、付加重量を長さに換算して切断長に加えることにより重量補償を行っている。   By the way, in the continuous casting machine, in order to prevent the occurrence of a situation in which the weight of the slab is insufficient in the next process, weight compensation for cutting the slab by adding a predetermined weight (additional weight) to the specified weight is performed. ing. Specifically, weight compensation is performed by converting the added weight into a length and adding it to the cutting length.

しかしながら、トーチカッタに到達する鋳片の幅は一定ではなくばらつきがあるため、付加重量を長さに換算して重量補償を行う場合、付加重量に過不足が生じる場合があった。付加重量に過不足があると、鋳片の歩留まり率が低下してしまう。   However, since the width of the slab that reaches the torch cutter is not constant and varies, when the weight compensation is performed by converting the additional weight into a length, the additional weight may be excessive or insufficient. If the added weight is excessive or insufficient, the yield rate of the slab will decrease.

本発明は、上記に鑑みてなされたものであって、鋳片を精度高く指定の重量で切断可能な連続鋳造機における鋳片切断方法および鋳片切断装置を提供することを目的とする。   The present invention has been made in view of the above, and an object of the present invention is to provide a slab cutting method and a slab cutting apparatus in a continuous casting machine capable of cutting a slab with high precision and a specified weight.

上述した課題を解決し、目的を達成するために、本発明に係る連続鋳造機における鋳片切断方法は、連続鋳造機において、鋳型から引き抜かれたストランドを指定の重量を有する切断長の鋳片に切断する連続鋳造機における鋳片切断方法であって、切断対象の鋳片に対応する位置のストランドが前記連続鋳造機の内部を通過するのに要する機内滞留時間と、切断位置の直前で計測された前記ストランドの幅とに基づいて、前記切断長を補正する補正ステップと、前記補正ステップで補正された切断長に基づいてストランドを切断する切断ステップと、を含むことを特徴とする。   In order to solve the above-described problems and achieve the object, a slab cutting method in a continuous casting machine according to the present invention includes a slab having a specified length of a strand drawn from a mold in the continuous casting machine. A method for cutting a slab in a continuous casting machine that cuts into a continuous length, which is measured immediately before the cutting position and the residence time required for the strand at the position corresponding to the slab to be cut to pass through the inside of the continuous casting machine. And a correction step of correcting the cutting length based on the width of the strand, and a cutting step of cutting the strand based on the cutting length corrected in the correction step.

また、本発明に係る連続鋳造機における鋳片切断方法は、上記発明において、前記補正ステップは、前記機内滞留時間αと前記ストランドの幅増加率γとを次式(1)に代入することにより切断補正係数βを算出し、切断長に対して鋳片の温度変化に伴う該切断長の変化を補正する熱間補正係数と前記切断補正係数βとを乗じることにより切断長を補正するステップを含むことを特徴とする。

Figure 0005849937
In the slab cutting method in the continuous casting machine according to the present invention, in the above invention, the correction step includes substituting the in-machine residence time α and the width increase rate γ of the strand into the following equation (1). A step of calculating a cutting correction coefficient β and correcting the cutting length by multiplying the cutting length by the hot correction coefficient for correcting the change in the cutting length accompanying the change in the temperature of the slab and the cutting correction coefficient β. It is characterized by including.
Figure 0005849937

また、本発明に係る連続鋳造機における鋳片切断装置は、連続鋳造機において、鋳型から引き抜かれたストランドを指定の重量を有する切断長の鋳片に切断する連続鋳造機における鋳片切断装置であって、切断対象の鋳片に対応する位置のストランドが前記連続鋳造機の内部を通過するのに要する機内滞留時間と、切断位置の直前で計測された前記ストランドの幅とに基づいて、前記切断長を補正する補正手段と、前記補正手段により補正された切断長に基づいてストランドを切断する切断手段と、を備えることを特徴とする。   The slab cutting device in the continuous casting machine according to the present invention is a slab cutting device in a continuous casting machine that cuts a strand drawn from a mold into a slab having a specified cutting length in a continuous casting machine. Based on the in-machine residence time required for the strand at the position corresponding to the slab to be cut to pass through the continuous casting machine and the width of the strand measured immediately before the cutting position, It is characterized by comprising correction means for correcting the cutting length, and cutting means for cutting the strand based on the cutting length corrected by the correcting means.

本発明によれば、鋳片を精度高く指定の重量で切断することができる。   According to the present invention, a slab can be cut with a specified weight with high accuracy.

図1は、本発明の一実施形態に係る鋳片切断システムの概略構成を示す模式図である。FIG. 1 is a schematic diagram showing a schematic configuration of a slab cutting system according to an embodiment of the present invention. 図2は、本実施形態の鋳片切断処理手順を示すフローチャートである。FIG. 2 is a flowchart showing a slab cutting process procedure according to the present embodiment. 図3は、幅増加率を説明するための図である。FIG. 3 is a diagram for explaining the width increase rate. 図4は、機内滞留時間を用いて切断長を補正するシミュレーションを行ったときの付加重量の予測値と実績値との関係を示す図である。FIG. 4 is a diagram showing the relationship between the predicted value of the additional weight and the actual value when a simulation for correcting the cutting length using the in-machine residence time is performed. 図5は、図4に示す付加重量の予測値と実績値との重量差のヒストグラムである。FIG. 5 is a histogram of the weight difference between the predicted value and the actual value of the additional weight shown in FIG. 図6は、機内滞留時間および幅増加率を用いて切断長を補正するシミュレーションを行ったときの付加重量の予測値と実績値との関係を示す図である。FIG. 6 is a diagram showing the relationship between the predicted value of the added weight and the actual value when a simulation for correcting the cutting length using the residence time in the machine and the width increase rate is performed. 図7は、図6に示す付加重量の予測値と実績値との重量差のヒストグラムである。FIG. 7 is a histogram of the weight difference between the predicted value and the actual value of the additional weight shown in FIG.

以下、図面を参照して、本発明の一実施形態を詳細に説明する。なお、この実施の形態により本発明が限定されるものではない。また、図面の記載において、同一部分には同一の符号を付して示している。   Hereinafter, an embodiment of the present invention will be described in detail with reference to the drawings. In addition, this invention is not limited by this embodiment. Moreover, in description of drawing, the same code | symbol is attached | subjected and shown to the same part.

まず、図1を参照して本実施の形態の対象とする連続鋳造機における処理の流れについて説明する。図1に示すように、連続鋳造機においては、溶鋼鍋1からタンディッシュ2に供給された溶鋼は、鋳型3に注入されると、周囲から冷却されることにより凝固し、シェルが形成される。シェルが形成された溶鋼は、連続鋳造機の垂直部R1に沿って鋳型3直下から鉛直方向下方に引き抜かれ、ストランドSとなる。ストランドSは、多数のガイドロールが対向配置されているローラエプロン4を経て、このローラエプロン4に沿って配設されている図示しない水冷スプレーにより冷却されつつ連続鋳造機の湾曲部R2を経て水平方向に矯正され、連続鋳造機の水平部R3にて平坦状のストランドSとなる。このストランドSは、下流に配設されたトーチカッタ11で所定長さの鋳片に切断される。   First, with reference to FIG. 1, the flow of the process in the continuous casting machine which is the object of the present embodiment will be described. As shown in FIG. 1, in a continuous casting machine, when molten steel supplied from a molten steel pan 1 to a tundish 2 is poured into a mold 3, it is solidified by cooling from the surroundings to form a shell. . The molten steel in which the shell is formed is drawn from the position immediately below the mold 3 downward in the vertical direction along the vertical portion R1 of the continuous casting machine to become a strand S. The strand S passes through a roller apron 4 on which a large number of guide rolls are arranged so as to face each other, and is cooled by a water-cooled spray (not shown) disposed along the roller apron 4 while passing through a curved portion R2 of a continuous casting machine. It is corrected in the direction and becomes a flat strand S at the horizontal portion R3 of the continuous casting machine. This strand S is cut into a slab of a predetermined length by a torch cutter 11 disposed downstream.

次に、本実施の形態の鋳片切断システム10の概略構成について説明する。図1に示すように、鋳片切断システム10は、ストランドSを切断するトーチカッタ11と、トーチカッタ11の入側に配設されたメジャーロール5の位置を通過するストランドSの幅を逐次計測するスラブ幅計12と、鋳片の切断長を指定する情報などを保持するビジネスコンピュータ13と、連続鋳造用プロセスコンピュータ14とを有する。   Next, a schematic configuration of the slab cutting system 10 of the present embodiment will be described. As shown in FIG. 1, the slab cutting system 10 includes a torch cutter 11 that cuts the strand S and a slab that sequentially measures the width of the strand S that passes through the position of the measure roll 5 disposed on the entrance side of the torch cutter 11. It has a width meter 12, a business computer 13 that holds information for designating the cutting length of a slab, and a process computer 14 for continuous casting.

トーチカッタ11は、後述する鋳片切断システム10の切断指示に基づいて、メジャーロール5により実測された長さが切断指示とともに指定された切断長に一致した位置でストランドSを切断する。   The torch cutter 11 cuts the strand S at a position where the length actually measured by the measure roll 5 coincides with the cutting length designated together with the cutting instruction based on the cutting instruction of the slab cutting system 10 described later.

ビジネスコンピュータ13は、ワークステーションやパーソナルコンピュータなどの情報処理装置によって構成され、予定された鋳片の幅(呼称スラブ幅)や、指定重量に基づいて公称単位重量により算出された冷却された状態での鋳片の切断長(冷間値)を指定する情報や、冷却された状態での鋳片の切断長(冷間値)を加熱された状態での鋳片の切断長(熱間値)に補正するために鋳片のサイズ、鋼種、ストランド毎に設定された熱間補正係数などがメモリに記憶されている。   The business computer 13 is constituted by an information processing device such as a workstation or a personal computer, and is in a cooled state calculated by a nominal unit weight based on a predetermined slab width (named slab width) or a designated weight. Information to specify the cutting length (cold value) of the slab and the cutting length (hot value) of the slab in the heated state. The size of the slab, the steel type, the hot correction coefficient set for each strand, and the like are stored in the memory.

連続鋳造用プロセスコンピュータ14は、ワークステーションやパーソナルコンピュータなどの情報処理装置によって構成されている。連続鋳造用プロセスコンピュータ14は、情報処理装置内部のCPU等の演算処理装置がメモリに記憶された制御プログラムを実行することによって、データ読込部141、補正部142、および切断指示部143として機能する。これら各部の機能については後述する。   The continuous casting process computer 14 is constituted by an information processing apparatus such as a workstation or a personal computer. The continuous casting process computer 14 functions as a data reading unit 141, a correction unit 142, and a cutting instruction unit 143 when an arithmetic processing unit such as a CPU in the information processing apparatus executes a control program stored in the memory. . The functions of these units will be described later.

ここで、図2のフローチャートを参照して、鋳片切断システム10による鋳片切断処理手順について説明する。図2のフローチャートは、例えば、操作者により鋳片切断の指示入力があったタイミングで開始となり、鋳片切断処理はステップS1の処理に進む。   Here, with reference to the flowchart of FIG. 2, the slab cutting process procedure by the slab cutting system 10 will be described. The flowchart in FIG. 2 starts, for example, at a timing when an operator inputs an instruction for cutting a slab, and the slab cutting process proceeds to the process of step S1.

ステップS1の処理では、データ読込部141が、ビジネスコンピュータ13から切断長(冷間値)、熱間補正係数、および呼称スラブ幅を含む鋳片の情報を読み込む。これにより、ステップS1の処理は完了し、鋳片切断処理は、ステップS2の処理に進む。   In the process of step S <b> 1, the data reading unit 141 reads from the business computer 13 information on a slab including a cutting length (cold value), a hot correction coefficient, and a nominal slab width. Thereby, the process of step S1 is completed and a slab cutting process progresses to the process of step S2.

ステップS2の処理では、補正部142が、読み込まれた熱間補正係数に基づいて、読み込まれた切断長を熱間値に補正する。これにより、ステップS2の処理は完了し、鋳片切断処理は、ステップS3の処理に進む。   In the process of step S2, the correction unit 142 corrects the read cutting length to a hot value based on the read hot correction coefficient. Thereby, the process of step S2 is completed and the slab cutting process proceeds to the process of step S3.

ステップS3の処理では、補正部142が、別途計測された機内滞留時間と、スラブ幅計12により計測されたストランドSの幅から算出されたストランドSの幅増加率とに基づいて、ステップS2で補正された切断長(熱間値)を補正する。なお、このときの補正係数を切断補正係数βとする。これにより、ステップS3の処理は完了し、鋳片切断処理は、ステップS4の処理に進む。   In the process of step S3, the correction unit 142 determines in step S2 based on the residence time measured separately and the width increase rate of the strand S calculated from the width of the strand S measured by the slab width meter 12. The corrected cutting length (hot value) is corrected. The correction coefficient at this time is a cutting correction coefficient β. Thereby, the process of step S3 is completed and a slab cutting process progresses to the process of step S4.

ステップS4の処理では、切断指示部143が、ステップS3の処理で補正された切断長(補正切断長)の情報を含んだ切断指示の情報をトーチカッタ11に出力する。これにより、ステップS4の処理は完了し、一連の鋳片切断処理は終了する。   In the process of step S4, the cutting instruction unit 143 outputs cutting instruction information including information on the cutting length (corrected cutting length) corrected in the process of step S3 to the torch cutter 11. Thereby, the process of step S4 is completed and a series of slab cutting processes are complete | finished.

ここで、ステップS3の処理における切断補正係数βの算出方法について説明する。本実施形態では、連続鋳造機内でのストランドSの速度変動を考慮して、まず、連続鋳造機の鋳型3のメニスカス(界面)から最終ガイドロール位置に当たる機端Eまでの長さ(機長)を垂直部R1と湾曲部R2と水平部R3との3つの領域に分割し、ストランドSを所定長さ(例えば、10cm)で分割したブロックのそれぞれの先端が各領域に到達してから後端が各領域を通過し終わるまでに要した通過時間を計測し、切断対象の鋳片に相当する全ブロックの通過時間の平均値を各領域での滞留時間(α1,α2,α3(min))とする。この場合、ストランドSの機内滞留時間α(min)は、滞留時間α1〜α3の和で表される。補正部142は、各領域での滞留時間α1,α2,α3に基づいて、各領域での切断補正係数β1,β2,β3を次式(2)により算出する。   Here, a calculation method of the cutting correction coefficient β in the process of step S3 will be described. In this embodiment, considering the speed fluctuation of the strand S in the continuous casting machine, first, the length (machine length) from the meniscus (interface) of the mold 3 of the continuous casting machine to the machine end E corresponding to the final guide roll position is determined. Divided into three regions of vertical portion R1, curved portion R2 and horizontal portion R3, and the ends of the blocks obtained by dividing strand S by a predetermined length (for example, 10 cm) after reaching the respective regions The passage time required to pass through each region is measured, and the average value of passage times of all blocks corresponding to the slab to be cut is the residence time (α1, α2, α3 (min)) in each region. To do. In this case, the in-machine residence time α (min) of the strand S is represented by the sum of the residence times α1 to α3. The correction unit 142 calculates the cutting correction coefficients β1, β2, and β3 in each region by the following equation (2) based on the residence times α1, α2, and α3 in each region.

Figure 0005849937
Figure 0005849937

なお、滞留時間α1〜α3を計測する際には、ストランドSの分割ブロックの長さの間隔で各領域の始端から終端までの通過時間が計測される。したがって、切断対象の鋳片の機内滞留時間αは、ストランドSの分割ブロックの長さを切断対象の鋳片位置の誤差範囲として計測できる。   When the residence times α1 to α3 are measured, the passage time from the start end to the end of each region is measured at intervals of the length of the divided blocks of the strand S. Therefore, the in-machine residence time α of the slab to be cut can be measured as the error range of the position of the slab to be cut by the length of the divided block of the strand S.

また、補正部142は、スラブ幅計12で計測されたストランドSの幅(計測スラブ幅)と、データ読込部141がビジネスコンピュータ13から読み込んだ呼称スラブ幅とに基づいて、次式(3)で定義されるストランドSの幅増加率γ(%)を算出する。   Further, the correction unit 142 calculates the following equation (3) based on the width of the strand S (measured slab width) measured by the slab width meter 12 and the nominal slab width read by the data reading unit 141 from the business computer 13. The width increase rate γ (%) of the strand S defined by is calculated.

Figure 0005849937
Figure 0005849937

例えば、図3に示すように、呼称スラブ幅が2000mmであり、スラブ幅計12により計測された4箇所の計測スラブ幅が2020mm,2030mm,2010mm、2020mmであった場合に、ストランドSの幅増加率γは、計測スラブ幅の平均2020mmをこのストランドSの計測スラブ幅の代表値として、この計測スラブ幅の代表値を用いて1%と算出される。   For example, as shown in FIG. 3, when the nominal slab width is 2000 mm and the four measured slab widths measured by the slab width meter 12 are 2020 mm, 2030 mm, 2010 mm, and 2020 mm, the width of the strand S increases. The rate γ is calculated to be 1% using the representative value of the measured slab width, with an average of 2020 mm of the measured slab width as a representative value of the measured slab width of the strand S.

次に、補正部142は、上記式(3)で算出された幅増加率γに基づいて、切断補正係数β4を次式(4)により算出する。   Next, the correction unit 142 calculates the cutting correction coefficient β4 by the following equation (4) based on the width increase rate γ calculated by the above equation (3).

Figure 0005849937
Figure 0005849937

次に、補正部142は、上記式(2),(4)で算出されたβ1〜β4の和を切断補正係数βとして算出し、補正切断長を次式(5)により算出する。   Next, the correction unit 142 calculates the sum of β1 to β4 calculated by the above equations (2) and (4) as the cutting correction coefficient β, and calculates the corrected cutting length by the following equation (5).

Figure 0005849937
Figure 0005849937

以上、説明したように、本実施の形態の鋳片切断システム1によれば、補正部142が、機内滞留時間αに加えて切断直前に計測したストランドSの幅をも考慮して切断長を補正するので、鋳片を精度高く重量補償のための付加重量を含めた指定の重量で切断することができる。したがって、鋳片の歩留まり率を大幅に向上させることができる。   As described above, according to the slab cutting system 1 of the present embodiment, the correction unit 142 sets the cutting length in consideration of the width of the strand S measured immediately before cutting in addition to the in-machine residence time α. Since the correction is made, the slab can be cut with a specified weight including an additional weight for weight compensation with high accuracy. Therefore, the yield rate of slab can be improved significantly.

なお、上記実施の形態では機内滞留時間αを3つの領域での滞留時間(α1,α2,α3)の和と定義したが、分割する領域数は3つに限定されない。たとえば、分割せず機長の全体をストランドSの指定長さのブロックが通過する時間を機内滞留時間としてもよいし、機長を4つ以上に分割した領域のそれぞれでの滞留時間の和を機内滞留時間と定義してもよい。   In the above embodiment, the in-machine residence time α is defined as the sum of the residence times (α1, α2, α3) in three regions, but the number of regions to be divided is not limited to three. For example, the time during which the block of the specified length of the strand S passes through the entire length of the machine without being divided may be the residence time in the machine, or the sum of the residence times in each of the areas where the machine is divided into four or more is retained in the machine. It may be defined as time.

また、上記実施の形態では機内滞留時間αを計測する際の連続鋳造機内の終端を機端Eとしているが、ストランドSの凝固が完了する凝固完了位置より下流の機端Eまでの間の位置を特定し、この特定位置を連続鋳造機内の終端としてもよい。   Moreover, in the said embodiment, although the terminal end in the continuous casting machine at the time of measuring the residence time (alpha) in the machine is made into the machine end E, the position from the solidification completion position where the solidification of the strand S is completed to the machine end E downstream is completed. This specific position may be the end in the continuous casting machine.

(実施例)
図4は、機内滞留時間を用いて切断長を補正するシミュレーションを行ったときの付加重量の予測値と実績値との関係を示す図である。まず、多数の鋳片切断例について、説明変数を機内滞留時間(α1〜α3)とし、目的関数を付加重量の実績値として、付加重量の実績値と予測値との誤差が最小になるように回帰分析を行って、切断補正係数βを導出した。ここで、切断補正係数βは、上記式(2)のβ1,β2,β3の和で表すこととし、回帰分析により上記式(2)の係数a,b,c,d,e,f,g,h,lを求めることで導出した。そして、その他の263の鋳片切断例について、付加重量の実績値と、導出された切断補正係数βを用いて算出した付加重量の予測値との関係を図4に示した。なお、付加重量の実績値として、実測した付加重量(冷間値)を熱間補正係数で補正した熱間値を用いた。その結果、図4に示すように、付加重量の予測値と実績値とのばらつきσは0.32となった。また、図5は、この場合の付加重量の予測値と実績値との重量差(%)のヒストグラムである。
(Example)
FIG. 4 is a diagram showing the relationship between the predicted value of the additional weight and the actual value when a simulation for correcting the cutting length using the in-machine residence time is performed. First, for many slab cutting examples, the explanatory variable is the in-machine residence time (α1 to α3), the objective function is the actual value of the additional weight, and the error between the actual value of the additional weight and the predicted value is minimized. Regression analysis was performed to derive the cutting correction coefficient β. Here, the cutting correction coefficient β is expressed by the sum of β1, β2, and β3 in the above equation (2), and the coefficients a, b, c, d, e, f, and g in the above equation (2) are obtained by regression analysis. , H, l were derived. FIG. 4 shows the relationship between the actual value of the additional weight and the predicted value of the additional weight calculated using the derived cutting correction coefficient β for the other 263 slab cutting examples. As the actual value of the additional weight, a hot value obtained by correcting the actually measured additional weight (cold value) with a hot correction coefficient was used. As a result, as shown in FIG. 4, the variation σ between the predicted value and the actual value of the added weight was 0.32. FIG. 5 is a histogram of the weight difference (%) between the predicted value of the additional weight and the actual value in this case.

一方、図6は、本実施の形態による機内滞留時間および幅増加率を用いて切断長を補正するシミュレーションを行ったときの付加重量の予測値と実績値との関係を示す図である。まず、多数の鋳片切断例について、説明変数を機内滞留時間および幅増加率とし、目的関数を付加重量の実績値として、図4の場合と同様に、付加重量の実績値と予測値との誤差が最小になるように回帰分析を行って、切断補正係数βを導出した。ここで、切断補正係数βは、上記式(2)および(4)のβ1,β2,β3,β4の和で表すこととし、回帰分析により上記式(2)および(4)の係数a,b,c,d,e,f,g,h,l,jを求めることで導出した。そして、その他の263の鋳片切断例について、付加重量の実績値と、導出された切断補正係数βを用いて算出した付加重量の予測値との関係を図6に示した。その結果、図6に示すように、付加重量の予測値と実績値とのばらつきσは0.22となった。また、図7は、この場合の付加重量の予測値と実績値との重量差(%)のヒストグラムである。   On the other hand, FIG. 6 is a diagram showing the relationship between the predicted value of the additional weight and the actual value when a simulation for correcting the cutting length using the in-machine residence time and the width increase rate according to the present embodiment is performed. First, for a number of slab cutting examples, the explanatory variables are the in-machine residence time and the width increase rate, the objective function is the actual value of the additional weight, and the actual value of the additional weight and the predicted value are the same as in FIG. Regression analysis was performed to minimize the error, and a cutting correction coefficient β was derived. Here, the cutting correction coefficient β is expressed by the sum of β1, β2, β3, β4 in the above equations (2) and (4), and coefficients a and b in the above equations (2) and (4) are obtained by regression analysis. , C, d, e, f, g, h, l, j. FIG. 6 shows the relationship between the actual value of the additional weight and the predicted value of the additional weight calculated using the derived cutting correction coefficient β for the other 263 slab cutting examples. As a result, as shown in FIG. 6, the variation σ between the predicted value and the actual value of the additional weight was 0.22. FIG. 7 is a histogram of the weight difference (%) between the predicted value of the additional weight and the actual value in this case.

図6および図7に示すように、機内滞留時間と幅増加率とを用いて補正された切断長で切断された場合は、図4および図5に示す機内滞留時間のみにより補正された切断長で切断された場合より、付加重量の予測値と実績値とのばらつきが小さくなることが知見された。すなわち、切断補正係数βによる補正切断長の精度が向上していることがわかる。これにより、本実施の形態による切断補正係数βにより、精度高く指定の重量で切断できることが確認された。   As shown in FIG. 6 and FIG. 7, when the cutting length is corrected using the in-machine residence time and the width increase rate, the cutting length corrected only by the in-machine residence time shown in FIG. 4 and FIG. 5. It was found that the variation between the predicted value of the added weight and the actual value is smaller than that of the case of cutting at the point. That is, it can be seen that the accuracy of the corrected cutting length by the cutting correction coefficient β is improved. Thus, it was confirmed that the cutting can be performed with a specified weight with high accuracy by the cutting correction coefficient β according to the present embodiment.

以上、本発明者によってなされた発明を適用した実施の形態について説明したが、本実施形態による本発明の開示の一部をなす記述及び図面により本発明は限定されることはない。すなわち、本実施形態に基づいて当業者等によりなされる他の実施の形態、実施例および運用技術等は全て本発明の範疇に含まれる。   Although the embodiment to which the invention made by the present inventor is applied has been described above, the present invention is not limited by the description and the drawings that form a part of the disclosure of the present invention according to this embodiment. That is, other embodiments, examples, operational techniques, and the like made by those skilled in the art based on this embodiment are all included in the scope of the present invention.

1 溶鋼鍋
2 タンディッシュ
3 鋳型
4 ローラエプロン
5 メジャーロール
10 鋳片切断システム
11 トーチカッタ
12 スラブ幅計
13 ビジネスコンピュータ
14 連続鋳造プロセスコンピュータ
141 データ読込部
142 補正部
143 切断指示部
S ストランド
E 機端
DESCRIPTION OF SYMBOLS 1 Molten pan 2 Tundish 3 Mold 4 Roller apron 5 Major roll 10 Slab cutting system 11 Torch cutter 12 Slab width meter 13 Business computer 14 Continuous casting process computer 141 Data reading part 142 Correction part 143 Cutting instruction part S Strand E Machine end

Claims (2)

連続鋳造機において、鋳型から引き抜かれたストランドを指定の重量を有する切断長の鋳片に切断する連続鋳造機における鋳片切断方法であって、
切断対象の鋳片に対応する位置のストランドが前記連続鋳造機の内部を通過するのに要する機内滞留時間αと、切断位置の直前で計測された前記ストランドの幅の予定された鋳片の幅に対する幅増加率γとを次式(1)に代入することにより切断補正係数βを算出し、切断長に対して鋳片の温度変化に伴う該切断長の変化を補正する熱間補正係数と前記切断補正係数βとを乗じることにより、前記切断長を補正する補正ステップと、
前記補正ステップで補正された切断長に基づいて前記ストランドを切断する切断ステップと、
を含むことを特徴とする連続鋳造機における鋳片切断方法。
Figure 0005849937
In a continuous casting machine, a slab cutting method in a continuous casting machine for cutting a strand drawn from a mold into a slab of a cutting length having a specified weight,
The in-machine residence time α required for the strand at the position corresponding to the slab to be cut to pass through the inside of the continuous casting machine, and the expected width of the slab, which is the width of the strand measured immediately before the cutting position A cutting correction coefficient β is calculated by substituting the width increase rate γ with respect to the following equation (1), and a hot correction coefficient for correcting a change in the cutting length with a temperature change of the slab with respect to the cutting length: A correction step of correcting the cutting length by multiplying by the cutting correction coefficient β;
A cutting step of cutting the strand based on the cutting length corrected in the correcting step;
The slab cutting method in the continuous casting machine characterized by including.
Figure 0005849937
連続鋳造機において、鋳型から引き抜かれたストランドを指定の重量を有する切断長の鋳片に切断する連続鋳造機における鋳片切断装置であって、
切断対象の鋳片に対応する位置のストランドが前記連続鋳造機の内部を通過するのに要する機内滞留時間αと、切断位置の直前で計測された前記ストランドの幅の予定された鋳片の幅に対する幅増加率γとを次式(2)に代入することにより切断補正係数βを算出し、切断長に対して鋳片の温度変化に伴う該切断長の変化を補正する熱間補正係数と前記切断補正係数βとを乗じることにより、前記切断長を補正する補正手段と、
前記補正手段により補正された切断長に基づいて前記ストランドを切断する切断手段と、
を備えることを特徴とする連続鋳造機における鋳片切断装置。
Figure 0005849937
In a continuous casting machine, a slab cutting device in a continuous casting machine for cutting a strand drawn from a mold into a slab of a cutting length having a specified weight,
The in-machine residence time α required for the strand at the position corresponding to the slab to be cut to pass through the inside of the continuous casting machine, and the expected width of the slab, which is the width of the strand measured immediately before the cutting position A cutting correction coefficient β is calculated by substituting the width increase rate γ with respect to the following expression (2), and a hot correction coefficient for correcting a change in the cutting length with a temperature change of the slab with respect to the cutting length: Correction means for correcting the cutting length by multiplying the cutting correction coefficient β;
Cutting means for cutting the strand based on the cutting length corrected by the correcting means;
A slab cutting device in a continuous casting machine.
Figure 0005849937
JP2012264722A 2012-12-03 2012-12-03 Slab cutting method and slab cutting device in continuous casting machine Expired - Fee Related JP5849937B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2012264722A JP5849937B2 (en) 2012-12-03 2012-12-03 Slab cutting method and slab cutting device in continuous casting machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2012264722A JP5849937B2 (en) 2012-12-03 2012-12-03 Slab cutting method and slab cutting device in continuous casting machine

Publications (2)

Publication Number Publication Date
JP2014108449A JP2014108449A (en) 2014-06-12
JP5849937B2 true JP5849937B2 (en) 2016-02-03

Family

ID=51029400

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2012264722A Expired - Fee Related JP5849937B2 (en) 2012-12-03 2012-12-03 Slab cutting method and slab cutting device in continuous casting machine

Country Status (1)

Country Link
JP (1) JP5849937B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US12358045B2 (en) * 2020-05-22 2025-07-15 Tmeic Corporation Cutting position control device
CN114247861B (en) * 2020-09-23 2023-09-05 上海梅山钢铁股份有限公司 Optimized cutting method for mixed casting continuous casting slab of different steel types

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62212047A (en) * 1986-03-13 1987-09-18 Kobe Steel Ltd Slab cutting method for continuous casting
JPH0635034B2 (en) * 1988-12-06 1994-05-11 新日本製鐵株式会社 Cutting length control method for continuous casting equipment
JP2009285699A (en) * 2008-05-30 2009-12-10 Kobe Steel Ltd Method of appropriating continuous cast slab
JP5560992B2 (en) * 2010-07-23 2014-07-30 Jfeスチール株式会社 Billet cutting method

Also Published As

Publication number Publication date
JP2014108449A (en) 2014-06-12

Similar Documents

Publication Publication Date Title
KR101709623B1 (en) Method for controlling solidification completion position and device for controlling solidification completion position
CN103998161B (en) Slab in continuous casting solidify completion status method of estimation and continuous casing
JP5565200B2 (en) Finishing temperature control device in hot rolling
JP6825760B1 (en) In-mold solidification shell thickness estimation device, in-mold solidification shell thickness estimation method, and continuous steel casting method
JP5821463B2 (en) Billet cutting method
JP5849937B2 (en) Slab cutting method and slab cutting device in continuous casting machine
JP2013066905A5 (en)
JP5949315B2 (en) Manufacturing method of continuous cast slab
JP5560992B2 (en) Billet cutting method
CN113573826B (en) Device and method for estimating thickness of solidified shell in casting mold
JP6874730B2 (en) Hot rolling line controller
JP5742601B2 (en) Solidification completion position calculation method and solidification completion position calculation device
JP5884177B2 (en) Solidification completion position estimation method and solidification completion position estimation apparatus for continuous cast slab
JP5954044B2 (en) Manufacturing method of continuous cast slab
JP5958036B2 (en) Solidification state estimation device for slab and continuous casting method
JP5939002B2 (en) Solidification state estimation device, solidification state estimation method, and steel continuous casting method
JP6435988B2 (en) Breakout prediction method, breakout prevention method, solidified shell thickness measurement method, breakout prediction device and breakout prevention device in continuous casting
WO2021065342A1 (en) Device and method for estimating solidifying shell thickness in casting mold and continuous steel casting method
JP2009233703A (en) Continuous casting method
JP4828366B2 (en) Longitudinal detection method and continuous casting method based on mold heat flux
JP7632781B1 (en) Continuous casting method for steel
JP7073932B2 (en) Solidification completion position detection method for slabs and solidification completion position detection device for slabs
JP5861668B2 (en) Apparatus for estimating final solidification position of continuous cast slab and method for producing continuous cast slab
JP2016182625A (en) Steel shearing method
JP5768700B2 (en) Slab temperature estimation method and slab temperature estimation device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20140725

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20150313

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20150317

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20150512

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20150818

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20151015

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20151104

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20151117

R150 Certificate of patent or registration of utility model

Ref document number: 5849937

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees