Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP5856910B2 - Girder installation method - Google Patents
[go: Go Back, main page]

JP5856910B2 - Girder installation method - Google Patents

Girder installation method Download PDF

Info

Publication number
JP5856910B2
JP5856910B2 JP2012135802A JP2012135802A JP5856910B2 JP 5856910 B2 JP5856910 B2 JP 5856910B2 JP 2012135802 A JP2012135802 A JP 2012135802A JP 2012135802 A JP2012135802 A JP 2012135802A JP 5856910 B2 JP5856910 B2 JP 5856910B2
Authority
JP
Japan
Prior art keywords
girder
filling
provisional
girders
track
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2012135802A
Other languages
Japanese (ja)
Other versions
JP2014001516A (en
Inventor
西谷 仁志
仁志 西谷
拓也 小倉
拓也 小倉
康治 青木
康治 青木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP2012135802A priority Critical patent/JP5856910B2/en
Publication of JP2014001516A publication Critical patent/JP2014001516A/en
Application granted granted Critical
Publication of JP5856910B2 publication Critical patent/JP5856910B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Machines For Laying And Maintaining Railways (AREA)

Description

本発明は、桁部材の設置方法に関する。   The present invention relates to a method for installing a girder member.

従来の桁部材の設置方法として、例えば特許文献1に挙げるものが知られている。特許文献1に係る方法は、複数の仮受杭を打設する工程と、当該仮受杭の上端部に仮受桁を設ける工程と、当該仮受部に桁部材を設置する工程と、桁部材にレールを設けて軌道を敷設する工程と、を有している。この方法においては、仮受桁の上面に桁部材の下面が(直接又は間接的に)支持されるように、桁部材を設置している。   As a conventional girder member installation method, for example, one disclosed in Patent Document 1 is known. The method according to Patent Document 1 includes a step of placing a plurality of provisional piles, a step of providing a provisional girder at the upper end of the provisional pile, a step of installing a girder member in the provisional portion, and a girder Providing a rail on the member and laying a track. In this method, the girder member is installed so that the lower surface of the girder member is supported (directly or indirectly) on the upper surface of the provisional girder.

特許第4136959号公報Japanese Patent No. 4136959

ここで、軌道直下に構造物を構築する際、当該構造物の内空を所定の用途に利用する場合があるため、当該内空を大きく確保することが従来より求められていた。上述の桁部材の設置方法を採用する場合に確保できる内空よりも、更に大きい内空を確保できる方法が要求されていた。   Here, when constructing a structure directly under the track, the inner space of the structure may be used for a predetermined application, and thus it has been conventionally required to secure a large inner space. There has been a demand for a method that can secure a larger interior space than the interior space that can be secured when the above-described girder member installation method is employed.

本発明は、このような課題を解決するためになされたものであり、軌道直下の内空を大きく確保することができる桁部材の設置方法を提供することを目的とする。   The present invention has been made to solve such a problem, and an object of the present invention is to provide a method for installing a girder member that can secure a large internal space directly below the track.

本発明に係る桁部材の設置方法は、軌道が敷設される桁部材の設置方法であって、複数の仮受杭を打設する工程と、仮受杭の上端部に、軌道と交わる方向に延びると共に、側部に張出部を有する仮受桁を設ける工程と、仮受桁の上面より低い位置に受面を形成する張出部の当該受面に桁部材を設置する工程と、仮受桁の上面よりも高い位置に配置される桁部材の上面に、軌道を敷設する工程と、を備えることを特徴とする。   The girder member installation method according to the present invention is a girder member installation method in which a track is laid, and a step of placing a plurality of temporary support piles and a direction intersecting the track at the upper end portion of the temporary support piles. A step of providing a temporary support girder having a protruding portion on the side and a step of installing a girder member on the receiving surface of the protruding portion that forms a receiving surface at a position lower than the upper surface of the temporary receiving girder; And a step of laying a track on the upper surface of the beam member arranged at a position higher than the upper surface of the receiving beam.

本発明に係る桁部材の設置方法では、仮受桁の側部に、当該仮受桁の上面より低い位置に受面を形成する張出部が設けられている。このように、仮受桁の上面より低い位置に形成された張出部の受面に、桁部材が設置されている。また、仮受桁の上面よりも高い位置に桁部材の上面が配置されており、当該上面に軌道を敷設するため、軌道が仮受桁と干渉することや、仮受桁との接触によるショートなどが防止されている。例えば、仮受桁の上面に桁部材を設置する場合、桁部材の下方には仮受桁の上下方向の全長に対応するスペースを少なくとも確保する必要がある。しかしながら、張出部に桁部材を設置することによって、仮受桁を上方へ設置することができる。従って、仮受桁を上方へ設置した分だけ、高架軌道直下の内空を大きく確保することができる。   In the installation method of the girder member according to the present invention, an overhang portion that forms a receiving surface at a position lower than the upper surface of the temporary receiving girder is provided on the side portion of the temporary receiving girder. Thus, the girder member is installed on the receiving surface of the overhang portion formed at a position lower than the upper surface of the provisional receiving girder. In addition, the upper surface of the girder member is arranged at a position higher than the upper surface of the provisional girder, and the track is laid on the upper surface. Etc. are prevented. For example, when installing a girder member on the upper surface of the provisional girder, it is necessary to secure at least a space corresponding to the total length in the vertical direction of the provisional girder below the girder member. However, the provisional girder can be installed upward by installing the girder member in the overhanging portion. Therefore, a large inner space directly below the elevated track can be secured by the amount of provisional girder installed upward.

本発明に係る桁部材の設置方法において、桁部材は、矩形板状に形成されていることが好ましい。例えば桁部材に切欠きなどが設けられていたり変則的な形状をしている場合、軌道の線形変更を阻害する場合があるが、桁部材を矩形板状とすることで、このような線形変更が行い易くなる。   In the girder member installation method according to the present invention, the girder member is preferably formed in a rectangular plate shape. For example, if the girder member is notched or has an irregular shape, the linear change of the trajectory may be hindered, but such a linear change can be made by making the girder member a rectangular plate shape. Is easier to do.

本発明に係る桁部材の設置方法において、桁部材の下方に構造物を構築する工程と、構造物の上面と桁部材との間に角型防振装置を配置する工程と、を更に備えることが好ましい。構造物の上面と桁部材との間に角型防振装置を配置することで、効率的に桁部材の振動を抑制することができる。   The girder member installation method according to the present invention further comprises the steps of constructing a structure below the girder member and disposing a square vibration isolator between the upper surface of the structure and the girder member. Is preferred. By arranging the square vibration isolator between the upper surface of the structure and the girder member, vibration of the girder member can be efficiently suppressed.

本発明によれば、軌道直下の内空を大きく確保することができる。   According to the present invention, it is possible to secure a large internal space directly below the track.

架設構造物の一部を示す斜視図である。It is a perspective view which shows a part of construction structure. 図1に示す架設構造物を幅方向から見た図である。It is the figure which looked at the construction structure shown in FIG. 1 from the width direction. 図3は、図1に示す架設構造物を長さ方向から見た図である。FIG. 3 is a view of the erection structure shown in FIG. 1 as viewed from the length direction. 図4は、図1に示す架設構造物を上側から見た図である。FIG. 4 is a view of the erection structure shown in FIG. 1 as viewed from above. 本設後の構造物を上側から見た図である。It is the figure which looked at the structure after this installation from the upper side. 図5に示すVI−VI線に沿った断面図である。FIG. 6 is a cross-sectional view taken along line VI-VI shown in FIG. 5. 図5に示すVII−VII線に沿った断面図である。It is sectional drawing along the VII-VII line shown in FIG. 変形例に係るふく進止め構造を適用された構造物を上側から見た図である。It is the figure which looked at the structure to which the anti-advancing structure which concerns on a modification was applied from the upper side. 図8に示すIX−IX線に沿った断面図である。It is sectional drawing along the IX-IX line | wire shown in FIG. 図8に示すX−X線に沿った断面図である。It is sectional drawing along the XX line shown in FIG. 変形例に係る構造物を示す図である。It is a figure which shows the structure which concerns on a modification.

以下、図面を参照しながら、本発明の好適な実施形態について詳細に説明する。なお、以下の説明では、同一又は相当要素には同一符号を付し、重複する説明は省略する。また、「上」、「下」の語は、鉛直方向の上方、下方にそれぞれ対応するものである。   Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the drawings. In the following description, the same or equivalent elements will be denoted by the same reference numerals, and redundant description will be omitted. The terms “upper” and “lower” correspond to the upper and lower parts in the vertical direction, respectively.

高架軌道の直下に構造物200を構築する際、PC桁(桁部材)2及び当該PC桁上に延びる軌道3を支持するための架設構造物100を構築した後、構造物200を本設する。なお、本実施形態では、軌道3の方向を「長さ方向D1」、軌道3と直交する水平方向(軌道と交わる方向)を「幅方向D2」、鉛直方向を「上下方向D3」と称する。   When constructing the structure 200 directly below the elevated track, after constructing the installation structure 100 for supporting the PC girder (girder member) 2 and the track 3 extending on the PC girder, the structure 200 is installed. . In the present embodiment, the direction of the track 3 is referred to as “length direction D1”, the horizontal direction orthogonal to the track 3 (direction intersecting the track) is referred to as “width direction D2”, and the vertical direction is referred to as “vertical direction D3”.

まず、図1〜図4を参照して、架設構造物100の構成について説明する。図1は、架設構造物100の一部を示す斜視図である。図2は、図1に示す架設構造物100を幅方向D2から見た図である。図3は、図1に示す架設構造物100を長さ方向D1から見た図である。図4は、図1に示す架設構造物100を上側から見た図である。なお、図2及び図3では、本設の構造物200が点線で示されている。本実施形態では、二つの軌道3が設けられているが、図1は、一方の軌道3のみを示している。   First, the configuration of the erection structure 100 will be described with reference to FIGS. FIG. 1 is a perspective view showing a part of the erection structure 100. FIG. 2 is a view of the erected structure 100 shown in FIG. 1 as viewed from the width direction D2. FIG. 3 is a view of the erected structure 100 shown in FIG. 1 as viewed from the length direction D1. FIG. 4 is a view of the erected structure 100 shown in FIG. 1 as viewed from above. 2 and 3, the main structure 200 is indicated by a dotted line. In this embodiment, two tracks 3 are provided, but FIG. 1 shows only one track 3.

図1〜図4に示すように、架設構造物100は、地面GDに打設されて上下方向に延びる複数の仮受杭11と、幅方向D2に延びる仮受桁12と、を主に備えている。また、仮受桁12にはブラケット(張出部)13が設けられており、当該ブラケット13を介してPC桁2が仮受桁12に支持される。PC桁2の上面2aには、軌道3を構成する一対のレール4が、長さ方向D1に沿って平行に延びた状態で設けられている。   As shown in FIGS. 1 to 4, the erection structure 100 mainly includes a plurality of provisional piles 11 that are placed on the ground GD and extend in the vertical direction, and provisional girders 12 that extend in the width direction D <b> 2. ing. In addition, the provisional girder 12 is provided with a bracket (projecting portion) 13, and the PC girder 2 is supported by the provisional girder 12 via the bracket 13. A pair of rails 4 constituting the track 3 are provided on the upper surface 2a of the PC girder 2 so as to extend in parallel along the length direction D1.

本実施形態では、仮受杭11は、幅方向D2に三本設けられている。幅方向D2に隣合う仮受杭11同士は、補強梁14及び補強斜梁16で連結されている。内側の仮受杭11は、両外側の仮受杭11同士の間の略中央位置に配置されている。軌道3は、当該内側の仮受杭11の左右に設けられる。各仮受杭11の上端部11aには、仮受桁12が架け渡されている。仮受桁12は、上フランジ部、下フランジ部及びウェブ部を有するH型鋼である。下フランジ部が仮受杭11の上端部11aに固定される。このような仮受杭11及び仮受桁12の組み合わせが、長さ方向D1に所定間隔で設けられる。長さ方向D1に隣り合う仮受杭11同士は、補強梁14及び補強斜梁16で連結されている。   In the present embodiment, three provisional piles 11 are provided in the width direction D2. The temporary piles 11 adjacent to each other in the width direction D <b> 2 are connected by a reinforcing beam 14 and a reinforcing oblique beam 16. The inner temporary pile 11 is disposed at a substantially central position between the outer temporary piles 11. The track 3 is provided on the left and right sides of the inside temporary pile 11. A temporary receiving girder 12 is bridged on the upper end portion 11 a of each temporary receiving pile 11. The temporary support beam 12 is an H-shaped steel having an upper flange portion, a lower flange portion, and a web portion. The lower flange portion is fixed to the upper end portion 11 a of the temporary receiving pile 11. Such a combination of the provisional pile 11 and the provisional girder 12 is provided at predetermined intervals in the length direction D1. The temporary piles 11 adjacent to each other in the length direction D <b> 1 are connected by a reinforcing beam 14 and a reinforcing oblique beam 16.

仮受桁12の両側の側部12a(本実施形態ではウェブ部の側面)からは、長さ方向D1に張り出したブラケット13が設けられている。ブラケット13は、少なくとも上フランジ部及び下フランジ部の張出部よりも外側まで張り出している。ブラケット13は、仮受桁12の上面12bよりも低い位置に、PC桁2を受けるための水平に広がる受面13aを形成している。受面13aは、少なくとも仮受桁12の上下方向D3の中央よりも下側に配置されることが好ましい。ブラケット13の幅方向D2における位置及び大きさは、少なくとも少なくともPC桁2が設けられる位置に受面13aを形成することができれば特に限定されない。なお、本実施形態では、仮受桁12の略全長に亘って延びている。   Brackets 13 projecting in the length direction D1 are provided from the side portions 12a (side surfaces of the web portion in this embodiment) on both sides of the temporary support beam 12. The bracket 13 projects to the outer side at least from the projecting portions of the upper flange portion and the lower flange portion. The bracket 13 forms a horizontally extending receiving surface 13 a for receiving the PC beam 2 at a position lower than the upper surface 12 b of the provisional receiving beam 12. It is preferable that the receiving surface 13a is disposed at least below the center of the provisional receiving beam 12 in the vertical direction D3. The position and size of the bracket 13 in the width direction D2 are not particularly limited as long as the receiving surface 13a can be formed at least at a position where the PC girder 2 is provided. In the present embodiment, the provisional beam 12 extends over substantially the entire length.

PC桁2は、長さ方向D1に延びる矩形板状に形成されている。PC桁2は、水平に広がる上面2a及び下面2cと、長さ方向D1に互いに平行となるように対向する一対の端面2bと、幅方向に互いに平行となるように対向する一対の側面2dと、を有している。PC桁2は、上方から見て長さ方向D1に長尺な長方形をなしており、端面2b及び側面2dには途中に切欠き部などは形成されておらず、真っ直ぐな直線状の辺を描いている(図4参照)。PC桁2は、長さ方向D1に隣り合う仮受桁12同士の間に架け渡されている。PC桁2は、長さ方向D1における端面2b付近の下面2cが、ブラケット13の受面13a上に設置される。設置作業時の位置調整のため、PC桁2の端面2bは、仮受桁12の上フランジ部及び下フランジ部の先端部から離間するように配置されることが好ましい。PC桁2の上面2aは、仮受桁12の上面12bよりも高い位置に配置される。PC桁の上面2aには、長さ方向D1に沿って互いに平行に延びる一対のレール4が設けられている。レール4は、一のPC桁2の端面2bと隣のPC桁2の端面2bとの間に形成される隙間の上方を通過している。当該隙間の位置において、レール4は、仮受桁12の上面12bから上方へ離間した位置に配置されている。これにより、金属製のレール4が、金属製の仮受桁12と接触することによるショートなどが防止される。   The PC girder 2 is formed in a rectangular plate shape extending in the length direction D1. The PC girder 2 includes an upper surface 2a and a lower surface 2c that spread horizontally, a pair of end surfaces 2b that face each other in parallel in the length direction D1, and a pair of side surfaces 2d that face each other in parallel in the width direction. ,have. The PC girder 2 has a long rectangle in the length direction D1 when viewed from above, and the end face 2b and the side face 2d are not formed with cutouts in the middle, and straight straight sides are formed. It is drawn (see FIG. 4). The PC girder 2 is bridged between provisional girders 12 adjacent in the length direction D1. In the PC girder 2, the lower surface 2 c near the end surface 2 b in the length direction D <b> 1 is installed on the receiving surface 13 a of the bracket 13. The end face 2b of the PC girder 2 is preferably arranged so as to be separated from the tip end portions of the upper flange portion and the lower flange portion of the provisional girder 12 for position adjustment during installation work. The upper surface 2 a of the PC girder 2 is arranged at a position higher than the upper surface 12 b of the provisional girder 12. A pair of rails 4 extending in parallel with each other along the length direction D1 are provided on the upper surface 2a of the PC girder. The rail 4 passes above the gap formed between the end surface 2b of one PC girder 2 and the end surface 2b of the adjacent PC girder 2. At the position of the gap, the rail 4 is disposed at a position spaced upward from the upper surface 12 b of the provisional girder 12. Thereby, the short circuit etc. by the metal rail 4 contacting with the metal temporary support beam 12 are prevented.

次に、図5〜図7を参照して、本設後の構造物200の構成について説明する。図5は、本設後の構造物200を上側から見た図である。図6は、図5に示すVI−VI線に沿った断面図である。図7は、図5に示すVII−VII線に沿った断面図である。図5〜図7(及び図2も参照)に示すように、本設後の構造物200は、主に、鉄筋コンクリート造のスラブ201、及び柱202を備えている。スラブ201の上面201aは、仮設時に設けられたPC桁2及びレール4を、そのままの位置関係にて支持している。スラブ201の上面201aと、PC桁2の下面2cとの間には、平板状の台座部21が形成されている。この台座部21は、スラブ201の上面201aと、PC桁2の下面2cとの間にCAモルタルなどの充填材を充填することによって形成される。台座部21の幅方向D2における大きさは、PC桁2の幅方向D2における大きさよりも大きい。すなわち、台座部21の側面21dは、PC桁2の側面2dよりも幅方向D2における外側に配置される。本実施形態では、台座部21の長さ方向D1における端面21bは、PC桁2の端面2bよりも長さ方向D1の内側へ配置されている。また、本実施形態では、台座部21の端面21bは、ブラケット13の先端部よりも長さ方向D1の内側へ配置されている。すなわち、一の台座部21の端面21bと、当該台座部21と仮受桁12を挟んで反対側に設けられる他の台座部21の端面21bとの間には、PC桁2の端面2b同士の間の隙間よりも大きな隙間が形成される。当該隙間に仮受桁12及び両側のブラケット13が配置される。   Next, the structure of the structure 200 after the main installation will be described with reference to FIGS. FIG. 5 is a view of the structure 200 after the main installation as viewed from above. 6 is a cross-sectional view taken along line VI-VI shown in FIG. 7 is a cross-sectional view taken along line VII-VII shown in FIG. As shown in FIGS. 5 to 7 (and also refer to FIG. 2), the structure 200 after the main installation mainly includes a slab 201 and a column 202 made of reinforced concrete. The upper surface 201a of the slab 201 supports the PC girder 2 and the rail 4 provided at the time of temporary installation in the same positional relationship. A flat pedestal 21 is formed between the upper surface 201 a of the slab 201 and the lower surface 2 c of the PC girder 2. The pedestal portion 21 is formed by filling a filler such as CA mortar between the upper surface 201a of the slab 201 and the lower surface 2c of the PC girder 2. The size of the pedestal 21 in the width direction D2 is larger than the size of the PC girder 2 in the width direction D2. That is, the side surface 21d of the pedestal portion 21 is disposed on the outer side in the width direction D2 than the side surface 2d of the PC girder 2. In the present embodiment, the end surface 21b in the length direction D1 of the pedestal portion 21 is disposed on the inner side in the length direction D1 than the end surface 2b of the PC girder 2. Further, in the present embodiment, the end surface 21 b of the pedestal portion 21 is disposed on the inner side in the length direction D <b> 1 than the distal end portion of the bracket 13. That is, between the end surface 21b of one base part 21, and the end surface 2b of the PC girder 2 between the said base part 21 and the end surface 21b of the other base part 21 provided in the other side on both sides of the provisional girder 12 A gap larger than the gap between them is formed. The temporary support beam 12 and the brackets 13 on both sides are arranged in the gap.

PC桁2は、ふく進止め構造30によって支持されている。ふく進止め構造30は、PC桁2の所定箇所に充填材を充填することによって形成されている。ふく進止め構造30を形成するために用いられる充填材として、例えば、コンクリートが挙げられる。なお、ふく進止め構造30の構成を説明するために、一のPC桁2を「第1のPC桁2A」と称し、当該第1のPC桁2Aと長さ方向D1に隣り合う他のPC桁2を「第2のPC桁2B」と称して説明を行う。なお、第1のPC桁2A及び第2のPC桁2Bに対するふく進止め構造30についてのみ説明するが、他の組み合わせに係るPC桁2に対しても同様の構成が適用される。   The PC girder 2 is supported by a stopper structure 30. The stopper structure 30 is formed by filling a predetermined portion of the PC beam 2 with a filler. An example of the filler used to form the advance stop structure 30 is concrete. In order to describe the configuration of the stopper structure 30, one PC girder 2 is referred to as “first PC girder 2A” and another PC adjacent to the first PC girder 2A in the length direction D1. The explanation will be made by referring to the digit 2 as “second PC digit 2B”. Note that only the anti-advancing structure 30 for the first PC girder 2A and the second PC girder 2B will be described, but the same configuration is applied to the PC girder 2 related to other combinations.

ふく進止め構造30は、第1のPC桁2Aの端面2bと第2のPC桁2Bの端面2bとの間に設けられる隙間に充填材を充填することによって形成される第1の充填部31と、第1のPC桁2Aの側面2d及び第2のPC桁2Bの側面2dに沿って充填材を充填することによって形成される第2の充填部32と、第1のPC桁2A及び第2のPC桁2Bの下面2cとスラブ201の上面201aとの間に充填材を充填することによって形成される第3の充填部33と、を備えている。   The stopper structure 30 includes a first filling portion 31 formed by filling a gap provided between the end surface 2b of the first PC beam 2A and the end surface 2b of the second PC beam 2B. A second filling portion 32 formed by filling a filler along the side surface 2d of the first PC beam 2A and the side surface 2d of the second PC beam 2B, and the first PC beam 2A and the second PC beam 2A. And a third filling portion 33 formed by filling a filler between the lower surface 2c of the second PC girder 2B and the upper surface 201a of the slab 201.

第1の充填部31は、第1のPC桁2A及び第2のPC桁2Bの端面2bを支持することによって、PC桁2A,2Bの長さ方向D1における移動を規制することができる。第2の充填部32は、第1のPC桁2A及び第2のPC桁2Bの側面2dを支持することによって、PC桁2A,2Bの幅方向D2における移動を規制することができる。第1の充填部31及び第2の充填部32の上面は、PC桁2の上面2aまで達している。第2の充填部32及び第3の充填部33の長さ方向D1における端面は、台座部21の端面21bまで達している。このように、第2の充填部32は、台座部21の端面21bの位置で途切れているため、当該第2の充填部32(及び第3の充填部33)は、PC桁2A,2Bの側面2dのうち、端面2b側の一部にのみ形成される。なお、本実施形態においては、仮設時に用いられた仮受桁12及びブラケット13が残されたまま、各充填部31,32,33が形成される。このとき、図5に示す一点鎖線CTのラインにて仮受桁12及びブラケット13は切断され、各充填部31,32に埋まっていない部分は、取り除かれる。   The first filling portion 31 can restrict the movement of the PC girders 2A and 2B in the length direction D1 by supporting the end faces 2b of the first PC girders 2A and the second PC girders 2B. The second filling portion 32 can regulate the movement of the PC girders 2A and 2B in the width direction D2 by supporting the side surfaces 2d of the first PC girders 2A and the second PC girders 2B. The upper surfaces of the first filling portion 31 and the second filling portion 32 reach the upper surface 2 a of the PC girder 2. The end surfaces of the second filling portion 32 and the third filling portion 33 in the length direction D1 reach the end surface 21b of the pedestal portion 21. Thus, since the 2nd filling part 32 has interrupted in the position of end face 21b of pedestal part 21, the 2nd filling part 32 (and 3rd filling part 33) is the PC girders 2A and 2B. Of the side surface 2d, it is formed only on a part of the end surface 2b side. In the present embodiment, the filling portions 31, 32, and 33 are formed while leaving the temporary support beam 12 and the bracket 13 used during temporary installation. At this time, the provisional girder 12 and the bracket 13 are cut along the alternate long and short dash line CT shown in FIG. 5, and the portions not buried in the filling portions 31 and 32 are removed.

次に、図1〜図7を参照して、本実施形態に係る構造物100,200の構築方法について説明する。当該構築方法には、PC桁2の設置方法及び、PC桁2のふく進止め構造30の構築方法が含まれている。なお、以下の手順は一例にすぎず、下記の手順のみに限定されるものではない。例えば、各工程の順序を適宜入れ替えてもよい。また、一部の箇所について工程が終了したら、他の箇所で同じ工程を行っているのと同時並行で、当該一部の箇所について次の工程へ移行してもよい(例えば、全ての箇所についての仮受杭11を打設し終わってから仮受桁12を設けてもよく、一部の箇所についての仮受杭11を打設し終わったら、他の箇所で仮受杭11を打設している途中でも、打設し終わった箇所に仮受桁12を設けてもよい)。また、一部の工程を省略したり、他の工程を追加で実行してもよい。   Next, with reference to FIGS. 1-7, the construction method of the structures 100 and 200 which concern on this embodiment is demonstrated. The construction method includes a method for installing the PC girder 2 and a method for constructing the advance stop structure 30 for the PC girder 2. Note that the following procedure is merely an example, and is not limited to the following procedure. For example, the order of each process may be changed as appropriate. In addition, when the process is completed for a part of the part, the process may be transferred to the next process for the part of the part at the same time as the same process is performed in the other part (for example, for all the parts The provisional girder 12 may be provided after the provisional pile 11 has been placed, and when the provisional pile 11 has been placed in some places, the provisional piles 11 are placed in other places. A temporary girder 12 may be provided at the place where the driving has been completed, even during the process. Some steps may be omitted or other steps may be additionally executed.

まず、図1〜図4に示すように、軌道上から複数の仮受杭11を打設する工程を実行する。次に、打設された仮受杭11の上端部11aに、幅方向D2に延びる仮受桁12を設ける工程を実行する。この仮受桁12の側部12aには、当該仮受桁12の上面12bよりも低い位置に受面13aを形成するブラケット13が設けられている。すなわち、工場にてH桁にブラケット13を溶接しておき、予めブラケット13が設けられた仮受桁12を仮受杭11に設置する。   First, as shown in FIGS. 1 to 4, a step of placing a plurality of temporary piles 11 from the track is executed. Next, the process of providing the provisional girder 12 extended in the width direction D2 in the upper end part 11a of the placed provisional pile 11 is performed. A bracket 13 that forms a receiving surface 13 a is provided at a position lower than the upper surface 12 b of the temporary receiving beam 12 on the side portion 12 a of the temporary receiving beam 12. That is, the bracket 13 is welded to the H girders at the factory, and the provisional girders 12 provided with the brackets 13 in advance are installed on the temporary piles 11.

ブラケット13の受面13aにPC桁2を設置する工程を実行する。ブラケット13の受面13aに設置されたPC桁2は、当該受面13a上にて位置の調整が行われる。PC桁2の上面2aは、仮受桁12の上面12bよりも高い位置に配置されている。PC桁2の端面2bと、隣り合うPC桁2の端面2bとの間には、当該端面2b同士が対向して隙間が設けられる。その後、PC桁2の上面2aにレール4を設置することにより、軌道3を敷設する工程を実行する。同時に、掘削を進め、並行して継材(ブレース)仮設を行うことで、図1〜図4に示す状態の架設構造物100が完成する。   A step of installing the PC girder 2 on the receiving surface 13a of the bracket 13 is executed. The position of the PC girder 2 installed on the receiving surface 13a of the bracket 13 is adjusted on the receiving surface 13a. The upper surface 2 a of the PC girder 2 is arranged at a position higher than the upper surface 12 b of the provisional girder 12. A gap is provided between the end surface 2b of the PC girder 2 and the end surface 2b of the adjacent PC girder 2 so that the end surfaces 2b face each other. Then, the process of laying the track 3 is performed by installing the rail 4 on the upper surface 2 a of the PC girder 2. At the same time, the excavation is advanced and the joint material (brace) is temporarily installed in parallel, whereby the construction structure 100 in the state shown in FIGS. 1 to 4 is completed.

次に、図5〜図7に示すように、柱202を形成し、梁・スラブ201を形成することで構造物200を本設する工程を実行する。次に、仮受桁12で支持されていたPC桁3を、スラブ201の上面201aによる支持に移し替える工程を実行する。本実施形態では、PC桁3の下面2cとスラブ201の上面201aとの間に充填材を充填することによって、台座部21を形成する工程を実行する。   Next, as shown in FIGS. 5 to 7, the step of forming the structure 200 by forming the pillar 202 and forming the beam / slab 201 is executed. Next, a step of transferring the PC girder 3 supported by the provisional girder 12 to support by the upper surface 201a of the slab 201 is executed. In this embodiment, the process of forming the base part 21 is performed by filling a filler between the lower surface 2c of the PC beam 3 and the upper surface 201a of the slab 201.

次に、ふく進止め構造30を設ける工程を実行する。具体的には、第1のPC桁2Aの端面2bと第2のPC桁2Bの端面2bとの間の隙間に充填材を充填することによって第1の充填部31を形成する工程を実行する。また、第1のPC桁2A及び第2のPC桁2Bの側面2dに沿って充填材を充填することによって第2の充填部32を形成する工程を実行する。また、第1のPC桁2A及び第2のPC桁2Bの下面2cとスラブ201の上面201aとの間に充填材を充填することによって第3の充填部33を形成する。各充填部31〜33を形成することにより、仮受桁12は当該充填部31〜33内に埋められる。   Next, the step of providing the advance stop structure 30 is executed. Specifically, a step of forming the first filling portion 31 by filling the gap between the end surface 2b of the first PC beam 2A and the end surface 2b of the second PC beam 2B is executed. . Moreover, the process of forming the 2nd filling part 32 is performed by filling a filler along the side surface 2d of the 1st PC beam 2A and the 2nd PC beam 2B. Further, the third filling portion 33 is formed by filling a filler between the lower surface 2c of the first PC beam 2A and the second PC beam 2B and the upper surface 201a of the slab 201. By forming the filling portions 31 to 33, the provisional girder 12 is buried in the filling portions 31 to 33.

その後、架設構造物100を構成する部材を撤去する。ここでは、仮受杭11や補強梁14や補強斜梁16等を撤去する。なお、図6に示す太線CTのラインにて仮受杭11を切断し、埋まっている部分はそのまま残し、埋まっていない部分を撤去する。以上によって、本設後の構造物200にPC桁2及び軌道3が支持される。   Then, the member which comprises the construction structure 100 is removed. Here, the temporary pile 11, the reinforcing beam 14, the reinforcing oblique beam 16, and the like are removed. In addition, the provisional pile 11 is cut | disconnected by the line of the thick line CT shown in FIG. 6, The part which is buried is left as it is, and the part which is not buried is removed. As described above, the PC girder 2 and the track 3 are supported by the structure 200 after the main installation.

次に、本実施形態に係るPC桁2の設置方法、ふく進止め構造30及びその構築方法の作用・効果について説明する。   Next, the operation and effect of the installation method of the PC girder 2, the anti-advance structure 30 and the construction method thereof according to the present embodiment will be described.

本実施形態に係るPC桁2の設置方法は、仮受桁12の側部12aに、当該仮受桁12の上面12bより低い位置に受面13aを形成するブラケット13が設けられている。このように、仮受桁12の上面12bより低い位置に形成されたブラケット13の受面13aに、PC桁2が設置されている。また、仮受桁12の上面12bよりも高い位置にPC桁2の上面2aが配置されており、当該上面2aに軌道3を敷設するため、軌道3を構成するレール4が仮受桁12と干渉することや、仮受桁12との接触によるショートなどが防止されている。例えば、図2に示す比較例に係る架設構造物300のように、仮受桁12の上面にPC桁2を設置する場合、PC桁2の下方には仮受桁12の上下方向の全長に対応するスペースを確保する必要がある。これに伴って、本設後の構造物の内空の高さ方向の大きさ(図中L2で示されるものとする)を小さくする必要が生じる。しかしながら、本実施形態に係る設置方法で構成された架設構造物100においては、ブラケット13にPC桁2を設置することによって、仮受桁12の上面12bとブラケット13の受面13aとの間の寸法分だけ、仮受桁12を上方へ設置することができる。従って、当該寸法分だけ、高架軌道直下の内空を大きく確保することができる。すなわち、本実施形態に係る設置方法によって構成された本設の構造物200の内空の高さ方向の大きさをL1とした場合、比較例に係る内空の大きさL2よりも、仮受桁12の上面12bとブラケット13の受面13aとの間の寸法分だけ、大きくすることができる。また、杭の支障により、桁を支障しながら施工することも可能である。   In the PC girder 2 installation method according to the present embodiment, a bracket 13 that forms a receiving surface 13 a at a position lower than the upper surface 12 b of the temporary receiving beam 12 is provided on the side portion 12 a of the temporary receiving beam 12. Thus, the PC beam 2 is installed on the receiving surface 13 a of the bracket 13 formed at a position lower than the upper surface 12 b of the provisional receiving beam 12. Further, the upper surface 2a of the PC girder 2 is arranged at a position higher than the upper surface 12b of the provisional girder 12, and the track 4 is laid on the upper surface 2a. Interference and short-circuiting due to contact with the provisional girder 12 are prevented. For example, when the PC girder 2 is installed on the upper surface of the provisional girder 12 as in the construction structure 300 according to the comparative example shown in FIG. 2, the vertical length of the provisional girder 12 is below the PC girder 2. It is necessary to secure the corresponding space. Along with this, it is necessary to reduce the size (indicated by L2 in the drawing) of the inner space of the structure after the main installation. However, in the installation structure 100 configured by the installation method according to the present embodiment, by installing the PC girder 2 on the bracket 13, the space between the upper surface 12 b of the temporary receiving girder 12 and the receiving surface 13 a of the bracket 13 is set. The provisional girder 12 can be installed upward by the size. Therefore, it is possible to secure a large internal space directly below the elevated track by the dimension. That is, when the size of the interior sky of the main structure 200 configured by the installation method according to this embodiment is L1, the provisional receipt is larger than the size L2 of the interior sky according to the comparative example. The size can be increased by the dimension between the upper surface 12 b of the beam 12 and the receiving surface 13 a of the bracket 13. It is also possible to perform construction while hindering the girder due to the hindrance of the pile.

本実施形態に係るPC桁2の設置方法において、PC桁2は、矩形板状に形成されている。例えばPC桁2に切欠きなどが設けられていたり変則的な形状をしている場合、軌道3の線形変更の阻害となる場合があるが、PC桁2を矩形板状とすることで、このような線形変更が行い易くなる。   In the PC girder 2 installation method according to the present embodiment, the PC girder 2 is formed in a rectangular plate shape. For example, when the PC girder 2 is notched or has an irregular shape, it may interfere with the linear change of the trajectory 3, but by making the PC girder 2 into a rectangular plate shape, It becomes easy to perform such a linear change.

また、本実施形態に係るPC桁2のふく進止め構造30の構築方法では、第1のPC桁2Aと第2のPC桁2Bとの間に、長さ方向D1における端面2b同士が対向して隙間が設けられる。このような隙間に充填材を充填することにより、第1の充填部31が形成される。当該第1の充填部31によって各PC桁2A,2Bの端面2bが支持されて長さ方向D1におけるPC桁2A,2Bの移動が規制される。また、第1のPC桁2A及び第2のPC桁2Bの各側面2dに沿って充填材を充填することにより、第2の充填部32が形成される。当該第2の充填部32によって各PC桁2A,2Bの側面2dが支持されて幅方向D2におけるPC桁2A,2Bの移動が規制される。以上によって、PC桁2A,2B間に隙間が形成される場合であっても、十分な性能を発揮するふく進止め構造30を構築することが可能となる。   Further, in the construction method of the stop structure 30 for the PC girder 2 according to the present embodiment, the end surfaces 2b in the length direction D1 face each other between the first PC girder 2A and the second PC girder 2B. A gap is provided. The first filling portion 31 is formed by filling such a gap with a filler. The end surfaces 2b of the PC girders 2A and 2B are supported by the first filling portion 31, and the movement of the PC girders 2A and 2B in the length direction D1 is restricted. Moreover, the 2nd filling part 32 is formed by filling a filler along each side surface 2d of the 1st PC beam 2A and the 2nd PC beam 2B. The second filling portion 32 supports the side surfaces 2d of the PC girders 2A and 2B and restricts the movement of the PC girders 2A and 2B in the width direction D2. As described above, even when a gap is formed between the PC girders 2A and 2B, it is possible to construct the swivel stop structure 30 that exhibits sufficient performance.

本実施形態に係るふく進止め構造30の構築方法において、第2の充填部32は、第1のPC桁2A及び第2のPC桁2Bの各側面2dのうち、端面2b側の一部にのみ形成されている。これによって、充填材の量を低減することができる。   In the construction method of the swivel stop structure 30 according to the present embodiment, the second filling portion 32 is formed on a part of the side surface 2d of the first PC beam 2A and the second PC beam 2B on the end surface 2b side. Only formed. Thereby, the amount of the filler can be reduced.

本発明に係るふく進止め構造30の構築方法において、仮受桁12の両側部12aにブラケット13が設けられ、当該ブラケット13のそれぞれに、第1のPC桁2A及び第2のPC桁2Bが設置されている。これによって上述で説明した効果が得られる。更に、このようなブラケット13を用いた設置方法を採用することにより、第1のPC桁2Aの端面2bと第2のPC桁2Bの端面2bとの間に、少なくとも仮受桁12の長手方向D1における大きさ以上の隙間ができるが、第1の充填部31及び第2の充填部32によって、十分にふく進止めの性能を発揮することができる。   In the construction method of the advance stop structure 30 according to the present invention, brackets 13 are provided on both side portions 12a of the temporary support beam 12, and the first PC beam 2A and the second PC beam 2B are provided on each of the brackets 13, respectively. is set up. As a result, the effects described above can be obtained. Further, by adopting such an installation method using the bracket 13, at least the longitudinal direction of the provisional beam 12 is provided between the end surface 2b of the first PC beam 2A and the end surface 2b of the second PC beam 2B. Although a gap larger than the size in D1 is formed, the first filling portion 31 and the second filling portion 32 can sufficiently exhibit the performance of the advance stop.

本実施形態に係るふく進止め構造30は、各PC桁2A,2Bの端面2b同士の間に設けられる隙間に充填材を充填することにより形成される第1の充填部31を有している。当該第1の充填部31によって各PC桁2A,2Bの端面2bが支持されて長さ方向D1におけるPC桁2A,2Bの移動が規制される。また、ふく進止め構造30は、第1のPC桁2A及び第2のPC桁2Bの各側面2dに沿って充填材を充填することにより形成される第2の充填部32を有している。当該第2の充填部32によって各PC桁2A,2Bの側面2dが支持されて幅方向D2におけるPC桁2A,2Bの移動が規制される。以上によって、PC桁2A,2B間に隙間が形成される場合であっても、ふく進止め構造30は十分な性能を発揮することができる。   The advance stop structure 30 according to the present embodiment includes a first filling portion 31 formed by filling a gap provided between the end faces 2b of the PC girders 2A and 2B. . The end surfaces 2b of the PC girders 2A and 2B are supported by the first filling portion 31, and the movement of the PC girders 2A and 2B in the length direction D1 is restricted. Further, the stopper structure 30 has a second filling portion 32 formed by filling a filler along each side surface 2d of the first PC beam 2A and the second PC beam 2B. . The second filling portion 32 supports the side surfaces 2d of the PC girders 2A and 2B and restricts the movement of the PC girders 2A and 2B in the width direction D2. As described above, even when a gap is formed between the PC girders 2A and 2B, the anti-advancing structure 30 can exhibit sufficient performance.

本発明は、上述の実施形態に限定されるものではない。例えば、上述のふく進止め構造30に代えて、図8〜図10に示すようなふく進止め構造40を採用してもよい。ふく進止め構造40は、第2の充填部42が、第1のPC桁2A及び第2のPC桁2Bの各側面2dの長さ方向D1における全領域に亘って形成されている。なお、長さ方向D1における全領域とは、側面2d自体の全領域を指している語ではなく、上下方向D3においては充填部42が形成されない部分があってもよい。図10に示すように、第2の充填部42は、側面2dのうち下側の領域においては、長さ方向D1の全体に亘って形成されているが、上側の領域には形成されていない。   The present invention is not limited to the embodiment described above. For example, instead of the above-described wrapping stop structure 30, a wrapping stop structure 40 as shown in FIGS. 8 to 10 may be employed. In the stopper structure 40, the second filling portion 42 is formed over the entire region in the length direction D1 of each side surface 2d of the first PC beam 2A and the second PC beam 2B. Note that the entire region in the length direction D1 is not a word indicating the entire region of the side surface 2d itself, and there may be a portion where the filling portion 42 is not formed in the vertical direction D3. As shown in FIG. 10, the second filling portion 42 is formed over the entire length direction D1 in the lower region of the side surface 2d, but is not formed in the upper region. .

図8〜図10の構造では、仮受桁12及びブラケット13は撤去されている。ふく進止め構造40は、第1のPC桁2Aの端面2bと第2のPC桁2Bの端面2bとの間に設けられる隙間に充填材を充填することによって形成される第1の充填部41と、第1のPC桁2Aの側面2d及び第2のPC桁2Bの側面2dに沿って充填材を充填することによって形成される第2の充填部42と、を備えている。第1の充填部41及び第2の充填部42は、PC桁2A,2B及び台座部21を取り囲むように形成されている。   In the structure of FIGS. 8 to 10, the temporary support beam 12 and the bracket 13 are removed. The stopper structure 40 has a first filling portion 41 formed by filling a gap provided between the end surface 2b of the first PC beam 2A and the end surface 2b of the second PC beam 2B. And a second filling portion 42 formed by filling a filler along the side surface 2d of the first PC beam 2A and the side surface 2d of the second PC beam 2B. The first filling portion 41 and the second filling portion 42 are formed so as to surround the PC girders 2A and 2B and the pedestal portion 21.

第1の充填部41は、第1のPC桁2A及び第2のPC桁2Bの端面2bを支持することによって、PC桁2A,2Bの長さ方向D1における移動を規制することができる。第2の充填部42は、第1のPC桁2A及び第2のPC桁2Bの側面2dを支持することによって、PC桁2A,2Bの幅方向D2における移動を規制することができる。第1の充填部41及び第2の充填部42の上面は、PC桁2の側面2dの上下方向D3における略中央まで達している。第2の充填部42は、側面2dの長さ方向D1の全領域に亘って形成されている。すなわち、第2の充填部42は、途中で途切れることなく延びて、第1のPC桁2Aの反対側(第2のPC桁2Bとは反対側)の端面2bに設けられている第1の充填部41まで達している。なお、本実施形態においては、仮設時に用いられた仮受桁12及びブラケット13は除去された状態で、各充填部41,42が形成される。   The first filling portion 41 can regulate the movement of the PC girders 2A and 2B in the length direction D1 by supporting the end faces 2b of the first PC girders 2A and the second PC girders 2B. The second filling portion 42 can regulate the movement of the PC girders 2A and 2B in the width direction D2 by supporting the side surfaces 2d of the first PC girders 2A and the second PC girders 2B. The upper surfaces of the first filling portion 41 and the second filling portion 42 reach substantially the center in the vertical direction D3 of the side surface 2d of the PC girder 2. The second filling portion 42 is formed over the entire region in the length direction D1 of the side surface 2d. That is, the second filling portion 42 extends without interruption in the middle, and is provided on the end surface 2b on the opposite side of the first PC girder 2A (opposite side of the second PC girder 2B). The filling portion 41 is reached. In the present embodiment, the filling portions 41 and 42 are formed in a state where the temporary support beam 12 and the bracket 13 used for temporary installation are removed.

ふく進止め構造40は、次のような手順によって構築される。ここでは、第2のPC桁2Bの側面2dに第2の充填部42を形成するところから説明する。まず、第2のPC桁2Bの下面2c側(ただし、端面2b付近の領域を除く)に台座部21を形成すると共に、スラブ201の上面201aに第2のPC桁2Bの側面2d(ただし、端面2b付近の領域を除く)に沿った長尺の第2の充填部42を形成する。ただし、この段階では、PC桁2A,2B間の仮受桁12及び両ブラケット13を撤去する必要があるので、当該仮受桁12及び両ブラケット13が充填材で埋まらないようにしておく。すなわち、台座部21及び第2の充填部42を、(第2のPC桁2Bを支持する)ブラケット13の先端部の手前で途切れた状態としておく。   The advance stop structure 40 is constructed by the following procedure. Here, it demonstrates from the place which forms the 2nd filling part 42 in the side 2d of the 2nd PC beam 2B. First, the pedestal 21 is formed on the lower surface 2c side of the second PC girder 2B (excluding the region near the end surface 2b), and the side surface 2d of the second PC girder 2B (however, A long second filling portion 42 is formed along a region excluding the region in the vicinity of the end face 2b. However, at this stage, it is necessary to remove the provisional girder 12 and both brackets 13 between the PC girders 2A and 2B, so that the provisional girder 12 and both brackets 13 are not filled with the filler. That is, the pedestal portion 21 and the second filling portion 42 are in a state of being interrupted in front of the front end portion of the bracket 13 (supporting the second PC girder 2B).

次は、PC桁2A,2B間の仮受桁12及び両ブラケット13付近の領域に対する充填材の充填はひとまず行わず、第1のPC桁2Aの下面2c側(ただし、両端面2b付近の領域を除く)に台座部21を形成すると共に、スラブ201の上面201aに第2のPC桁2Bの側面2d(ただし、両端面2b付近の領域を除く)に沿った長尺の第2の充填部42を形成する。この段階では、台座部21及び第2の充填部42を、一方の端面2b(第2のPC桁2Bと対向する端面2b)のブラケット13の先端部の手前で途切れると共に、他方の端面2b(第2のPC桁2Bとは反対側の端面2b)のブラケット13の先端部の手前で途切れた状態としておく。このように、PC桁2の両端面2b付近で途切れた状態の台座部21及び第2の充填部42を各PC桁2について形成しておく。   Next, the filling material is not filled in the area near the temporary support beam 12 and both brackets 13 between the PC beams 2A and 2B, and the lower surface 2c side of the first PC beam 2A (however, the region near both end surfaces 2b) And a long second filling portion along the side surface 2d of the second PC girder 2B (excluding the region in the vicinity of both end surfaces 2b) on the upper surface 201a of the slab 201. 42 is formed. At this stage, the pedestal portion 21 and the second filling portion 42 are interrupted in front of the front end portion of the bracket 13 on one end surface 2b (the end surface 2b facing the second PC girder 2B), and the other end surface 2b ( The second PC girder 2B is left in an interrupted state in front of the front end of the bracket 13 on the end surface 2b) opposite to the second PC girder 2B. Thus, the base part 21 and the second filling part 42 in a state of being interrupted in the vicinity of both end faces 2b of the PC girder 2 are formed for each PC girder 2.

次は、PC桁2A,2B間の仮受桁12及び両ブラケット13を撤去する。その後、当該部分にて途切れていた第2の充填部42を形成すると共に、PC桁2A,2B間の隙間に第1の充填部41を形成する。同様に、他の仮受桁12及び両ブラケット13についても、撤去した後、当該部分に充填部41,42を形成する。以上によって、各PC桁2に対してふく進止め構造40を構築する。   Next, the provisional girder 12 and both brackets 13 between the PC girders 2A and 2B are removed. Thereafter, the second filling portion 42 that is interrupted at the portion is formed, and the first filling portion 41 is formed in the gap between the PC girders 2A and 2B. Similarly, after the other temporary support beam 12 and both brackets 13 are removed, filling portions 41 and 42 are formed in the portions. In this way, the advance stop structure 40 is constructed for each PC girder 2.

このようなふく進止め構造40において、第2の充填部42は、第1のPC桁2A及び第2のPC桁2Bの各側面2dの長さ方向D1における全領域に亘って形成されている。これによって、第2の充填部42がしっかりと側面2dを支持することができる。   In such a stopper structure 40, the second filling portion 42 is formed over the entire region in the length direction D1 of each side surface 2d of the first PC beam 2A and the second PC beam 2B. . Thus, the second filling portion 42 can firmly support the side surface 2d.

また、上述の実施形態では、スラブ201の上面201aとPC桁2の下面2cとの間に充填材の充填による台座部21を形成する工程が実行されていたが、これに代えて、図11に示すように、角型防振装置60を配置する工程を実行してもよい。この角型防振装置60は、PC桁2の下面2cに取り付けられたプレート62にボルト締結によって固定され、台座モルタル64を介してスラブ201の上面201aに取り付けられたプレート62にボルト締結によって固定されている。   In the above-described embodiment, the step of forming the pedestal portion 21 by filling the filler between the upper surface 201a of the slab 201 and the lower surface 2c of the PC girder 2 is performed, but instead of this, FIG. As shown in FIG. 4, a step of arranging the square vibration isolator 60 may be executed. This square vibration isolator 60 is fixed to a plate 62 attached to the lower surface 2c of the PC girder 2 by bolt fastening, and is fixed to the plate 62 attached to the upper surface 201a of the slab 201 via bolt mortar 64 by bolt fastening. Has been.

2…PC桁(桁部材)、2A…第1のPC桁、2B…第2のPC桁、3…軌道、4…レール、11…仮受杭、12…仮受桁、13…ブラケット(張出部)、30,40…ふく進止め構造、31,41…第1の充填部、32,42…第2の充填部、60…角型防振装置、100…架設構造物、200…本設の構造物、201…スラブ。   2 ... PC girder (girder member), 2A ... 1st PC girder, 2B ... 2nd PC girder, 3 ... Track, 4 ... Rail, 11 ... Tentative pile, 12 ... Tentative girder, 13 ... Bracket (Tension) (Exit part), 30, 40 ... full stop structure, 31, 41 ... first filling part, 32, 42 ... second filling part, 60 ... square vibration isolator, 100 ... installation structure, 200 ... book Structure, 201 ... slab.

Claims (3)

軌道が敷設される桁部材の設置方法であって、
複数の仮受杭を打設する工程と、
前記仮受杭の上端部に、前記軌道と交わる方向に延びると共に、側部に張出部を有する仮受桁を設ける工程と、
前記仮受桁の上面より低い位置に受面を形成する前記張出部の当該受面に前記桁部材を設置する工程と、
前記仮受桁の上面よりも高い位置に配置される前記桁部材の上面に、前記軌道を敷設する工程と、を備えることを特徴とする桁部材の設置方法。
A method for installing a girder member on which a track is laid,
A process of placing a plurality of provisional piles;
A process of providing a temporary support girder extending in a direction intersecting with the track on the upper end of the temporary support pile and having a protruding portion on a side part;
Installing the girder member on the receiving surface of the projecting portion that forms a receiving surface at a position lower than the upper surface of the temporary support beam;
And a step of laying the track on the upper surface of the girder member arranged at a position higher than the upper surface of the temporary support girder.
前記桁部材は、矩形板状に形成されていることを特徴とする請求項1記載の桁部材の設置方法。   The said girder member is formed in the rectangular plate shape, The installation method of the girder member of Claim 1 characterized by the above-mentioned. 前記桁部材の下方に構造物を構築する工程と、
前記構造物の上面と前記桁部材との間に角型防振装置を配置する工程と、を更に備える請求項1又は2記載の桁部材の設置方法。
Building a structure below the beam member;
The installation method of the girder member of Claim 1 or 2 further equipped with the process of arrange | positioning a square-type vibration isolator between the upper surface of the said structure, and the said girder member.
JP2012135802A 2012-06-15 2012-06-15 Girder installation method Expired - Fee Related JP5856910B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2012135802A JP5856910B2 (en) 2012-06-15 2012-06-15 Girder installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2012135802A JP5856910B2 (en) 2012-06-15 2012-06-15 Girder installation method

Publications (2)

Publication Number Publication Date
JP2014001516A JP2014001516A (en) 2014-01-09
JP5856910B2 true JP5856910B2 (en) 2016-02-10

Family

ID=50034935

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2012135802A Expired - Fee Related JP5856910B2 (en) 2012-06-15 2012-06-15 Girder installation method

Country Status (1)

Country Link
JP (1) JP5856910B2 (en)

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59206501A (en) * 1983-05-10 1984-11-22 東急建設株式会社 Route banking changing construction method
JP3028157B2 (en) * 1992-07-17 2000-04-04 東急建設株式会社 Railroad viaduct structure
JP3168084B2 (en) * 1992-12-07 2001-05-21 日本エラスター株式会社 Floating slab construction method and floating slab support structure
JP5530149B2 (en) * 2009-10-09 2014-06-25 東日本旅客鉄道株式会社 Structure and assembly method of temporary construction girder for railway

Also Published As

Publication number Publication date
JP2014001516A (en) 2014-01-09

Similar Documents

Publication Publication Date Title
JP5406563B2 (en) Composite beam, building, and composite beam construction method
JP5314356B2 (en) Composite beam, composite beam construction method, and fireproof building
JP5730728B2 (en) Column base structure
KR101638093B1 (en) Rahmen using hinge type pc wall and method for constructing the same
JP2007077630A (en) Continuous girder using precast main-girder segment, and its erection method
JP5951375B2 (en) Steel tower reinforcement structure
CN113957993B (en) An assembly system and its construction method
JP5856910B2 (en) Girder installation method
KR102309544B1 (en) Connecting structure of beam and column of a building and method of manufacturing using the same
JP5856911B2 (en) Cloth stop structure and its construction method
KR20160081710A (en) Tunnel elephant foot reinforcement beam construction method for tunnel stabilizing
JP2014218858A (en) Temporary earthquake-resisting structure of existing frame during base isolation construction, and construction method thereof
JP6849491B2 (en) Exposed column base structure of steel columns and its construction method
JP5613466B2 (en) Concrete wall mounting structure
JP5155776B2 (en) Composite beam
JP6271247B2 (en) Construction girder and construction method of construction girder
JP4650255B2 (en) Steel slab reinforcement structure and existing steel slab reinforcement method
JP6174984B2 (en) Steel beam
JP5872332B2 (en) Seismic reinforcement method for buildings
JP2016145458A (en) Joint structure between reinforced column and steel beam
JP2016014273A (en) Pile foundation structure
JP6300228B2 (en) Flat slab structure
JP6190292B2 (en) Seismic isolation method for existing structures
JP5483059B2 (en) Steel pipe erection stand and steel pipe erection structure using the same
JP2018162574A (en) Joint structure of column and beam, and building equipped with joint structure of column and beam

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20141114

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20150821

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20150901

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20151208

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20151214

R150 Certificate of patent or registration of utility model

Ref document number: 5856910

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees