JP5885603B2 - Construction method of Yamadome wall - Google Patents
[go: Go Back, main page]

JP5885603B2 - Construction method of Yamadome wall - Google Patents

Construction method of Yamadome wall Download PDF

Info

Publication number
JP5885603B2
JP5885603B2 JP2012151918A JP2012151918A JP5885603B2 JP 5885603 B2 JP5885603 B2 JP 5885603B2 JP 2012151918 A JP2012151918 A JP 2012151918A JP 2012151918 A JP2012151918 A JP 2012151918A JP 5885603 B2 JP5885603 B2 JP 5885603B2
Authority
JP
Japan
Prior art keywords
retaining wall
wall
ground improvement
steel pipe
mountain retaining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2012151918A
Other languages
Japanese (ja)
Other versions
JP2014015716A (en
Inventor
和宏 林
和宏 林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP2012151918A priority Critical patent/JP5885603B2/en
Publication of JP2014015716A publication Critical patent/JP2014015716A/en
Application granted granted Critical
Publication of JP5885603B2 publication Critical patent/JP5885603B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Description

本発明は、山留壁の構築方法に関する。詳しくは、狭隘な作業空間における簡易な山留壁の構築方法に関する。   The present invention relates to a method for constructing a mountain retaining wall. Specifically, the present invention relates to a method for constructing a simple mountain retaining wall in a narrow work space.

従来より、既存建物の地下の一部を残して建物を新築したり、既存建物の地下に躯体を増築したりする場合がある。この場合、例えば、既存建物の地下躯体の一部を山留壁として利用するとともに、この地下躯体に連続して新たに山留壁を構築する(特許文献1参照)。   Conventionally, there are cases where a part of the basement of an existing building is left to build a new building, or a building is added to the basement of an existing building. In this case, for example, a part of the underground building of the existing building is used as a mountain retaining wall, and a new mountain retaining wall is constructed continuously from the underground building (see Patent Document 1).

すなわち、特許文献1では、既存躯体の床下部分にソイルセメント連続壁等の山留壁を造成し、既存建物の梁などにより山留壁が造成できない山留壁の間隙部分に円柱形状の地盤改良体を構築し、この地盤改良体も山留壁の一部として用いる。
この山留壁の間隙部分の地盤改良体は、以下のようにして構築する。まず、小型の掘削装置を既存建物の地下に設置する。この掘削装置は、ロッドを回転させつつ押し込むことで削孔するものである。掘削装置を駆動してロッドで削孔した後、このロッドを引き上げながら、ロッドの先端からセメントミルクを吐出して、セメントミルクと土とを攪拌し、地盤改良体を構築する。
That is, in Patent Document 1, a mountain retaining wall such as a soil cement continuous wall is created in the lower part of the existing frame, and a cylindrical ground improvement is made in the gap part of the mountain retaining wall where the mountain retaining wall cannot be created by beams of the existing building. The body is constructed, and this ground improvement body is also used as a part of the mountain wall.
The ground improvement body of the gap part of this mountain retaining wall is constructed as follows. First, a small excavator is installed in the basement of an existing building. This excavator drills a hole by pushing it while rotating the rod. After driving the excavator and drilling holes with the rod, while lifting the rod, the cement milk is discharged from the tip of the rod, the cement milk and the soil are stirred, and a ground improvement body is constructed.

既存建物の梁と干渉する部分については、既存建物の梁に地盤改良用の孔をドリリングし、この孔を利用するか、あるいは、梁の両側から山留壁未施工部分のエリアの地盤改良を行う。さらに、必要に応じて地盤改良体と山留壁との隙間に薬液による地盤固結剤を注入して、止水性など山留壁の要求品質を完成する。   For the part that interferes with the beam of the existing building, drill the hole for ground improvement in the beam of the existing building and use this hole, or improve the ground of the area where the mountain retaining wall is not installed from both sides of the beam. Do. Furthermore, if necessary, a ground solidifying agent using a chemical solution is injected into the gap between the ground improvement body and the mountain retaining wall to complete the required quality of the mountain retaining wall such as water stoppage.

この特許文献1の方法では、ソイルセメント連続壁等の山留壁を造るための準備としてディープウェル等で地下水位を下げ、山留壁予定部の既存躯体の全ての床および耐圧版を解体し、地下水の常水位より高い位置まで流動化処理土を打設することが必要であり、大がかりな工事となる。   In the method of Patent Document 1, the groundwater level is lowered by a deep well or the like in preparation for building a mountain retaining wall such as a soil cement continuous wall, and all floors and pressure plates of the existing frame of the mountain retaining wall planned part are dismantled. Therefore, it is necessary to place the fluidized soil to a position higher than the normal water level of groundwater, which is a large-scale construction.

特開2010−281038号公報JP 2010-281038 A

しかしながら、新築建物と既存建物の建物深さの差があまり大きくなく、追加して掘削する深さがおよそ1m以下の場合で、地下水位がそれほど高くなく地盤の状態もさほど悪くない場合には、ソイルセメント連続壁のように剛性が高く止水性能の高い山留壁までは必要ない場合がある。   However, if the difference between the building depth of the new building and the existing building is not so large, and the depth of additional drilling is about 1m or less, the groundwater level is not so high and the ground condition is not so bad, There is a case that it is not necessary to have a mountain wall with high rigidity and high water stopping performance like a soil cement continuous wall.

本発明は、例えば既存建物の地下躯体の一部を山留壁として利用する場合に、この地下躯体に連続して新たに簡易な山留壁を構築する方法を提供することを目的とする。   An object of the present invention is to provide a method for constructing a new simple mountain retaining wall continuously to the underground structure when, for example, a part of the underground structure of an existing building is used as the mountain retaining wall.

請求項1に記載の山留壁の構築方法は、地下階を有する既存建物を解体して、前記地下階より深い地下階を有する新築建物を構築するための山留壁の構築方法であって、当該山留壁は、前記既存建物の地下躯体の外壁部分の下、かつ当該外壁部分に連続して構築され、前記既存建物の最下層の床面から掘削装置(例えば、後述の掘削装置10)を駆動して地盤に削孔するステップ(例えば、後述のステップS2)と、前記掘削装置を駆動してロッドを引き抜きながら地盤改良体(例えば、後述の地盤改良体22、27)を構築するステップ(例えば、後述のステップS3)と、前記ロッドよりも小径でねじ継手により互いに連結可能な鋼管(例えば、後述のガス管50)を用意し、前記掘削装置を駆動して、前記鋼管を継ぎ足して延長しながら当該鋼管を前記地盤改良体に挿入するステップ(例えば、後述のステップS4)と、を備えることを特徴とする。 The method for constructing a mountain retaining wall according to claim 1 is a method for constructing a mountain retaining wall for dismantling an existing building having an underground floor and constructing a new building having an underground floor deeper than the underground floor. The mountain retaining wall is constructed continuously below the outer wall portion of the underground building of the existing building and continuously to the outer wall portion, and a drilling device (for example, a drilling device 10 described later) is formed from the bottom surface of the existing building. ) To drill holes in the ground (for example, step S2 to be described later), and to construct ground improvement bodies (for example, ground improvement bodies 22 and 27 to be described later) while driving the excavator and pulling out the rods. Step (for example, step S3 to be described later) and a steel pipe (for example, a gas pipe 50 to be described later) having a diameter smaller than that of the rod and connectable to each other are prepared, and the excavator is driven to add the steel pipe. Extend Inserting the steel pipe to the ground improvement (e.g., step S4 described later), characterized in that it comprises a a.

この発明によれば、鋼管をねじ継手により連結したものを地盤改良体に挿入して、親杭や芯材として利用する。例えば、ロッドで止水性のある薬液を注入して地盤改良体を構築し、この地盤改良体に挿入した鋼管を親杭として、親杭横矢板工法による山留壁を構築する。あるいは、ロッドからセメントミルクを吐出して土と攪拌することで柱状の地盤改良体を構築し、この地盤改良体に挿入した鋼管を芯材として、ソイルセメント連続壁による山留壁を構築する。
したがって、既存建物の地下躯体などの狭隘な作業空間であっても、所定長さの鋼管を1本ずつ取り扱うだけでよいので、地盤改良体に鋼管を確実に挿入して、地下躯体に連続して山留壁を構築できる。
また、I形鋼やH形鋼ではなく鋼管を用いても、必要な山留壁の自立高さがそれほど高くない場合には、十分な断面剛性を確保して簡易な構造の山留壁を構築できるので、実用的である。
また、止水性のある薬液の注入やソイルセメント連続壁により、ある程度の止水性も期待できる。
According to this invention, what connected the steel pipe by the screw joint is inserted in a ground improvement body, and it utilizes as a parent pile or a core material. For example, a ground improvement body is constructed by injecting a chemical solution having a water-stopping property with a rod, and a steel wall inserted by the ground improvement body is used as a parent pile to construct a mountain retaining wall by a parent pile lateral sheet pile method. Alternatively, a cement-like ground improvement body is constructed by discharging cement milk from the rod and stirring with the soil, and a mountain retaining wall made of a soil cement continuous wall is constructed with the steel pipe inserted into the ground improvement body as a core material.
Therefore, even in a narrow work space such as an underground structure of an existing building, it is only necessary to handle one steel pipe of a predetermined length at a time, so that the steel pipe is securely inserted into the ground improvement body and connected to the underground structure. Can build a mountain wall.
In addition, even if steel pipes are used instead of I-shaped steel and H-shaped steel, if the required self-supporting height of the retaining wall is not so high, a sufficient retaining rigidity can be secured and a simplified retaining wall can be provided. Since it can be constructed, it is practical.
In addition, a certain degree of water-stopping can be expected by injection of a chemical solution having water-stopping properties and a soil cement continuous wall.

請求項2に記載の山留壁の構築方法は、前記鋼管は、配管用炭素鋼鋼管(例えば、後述のガス管50)であることを特徴とする。   The mountain retaining wall construction method according to claim 2 is characterized in that the steel pipe is a carbon steel pipe for piping (for example, a gas pipe 50 described later).

ここで、配管用炭素鋼鋼管としては、例えばJIS G 3452に規定された配管用炭素鋼鋼管が挙げられる。   Here, as a carbon steel pipe for piping, the carbon steel pipe for piping prescribed | regulated to JISG3452 is mentioned, for example.

この発明によれば、例えば、配管用炭素鋼鋼管のうちいわゆるガス管を鋼管として用いる。ガス管は市販品であるため、山留壁の施工コストを大幅に低下できる。
また、ガス管であれば、ガス管同士をレンチで容易にねじ継手により連結できるうえに、サイズも豊富であるので、ロッドよりも小径のものを容易に入手できるから、施工性を向上できる。
According to this invention, for example, a so-called gas pipe is used as a steel pipe among carbon steel pipes for piping. Since the gas pipe is a commercial product, the construction cost of the retaining wall can be greatly reduced.
Moreover, if it is a gas pipe, since gas pipes can be easily connected with a threaded joint with a wrench and there are also abundant sizes, since a thing with a smaller diameter than a rod can be obtained easily, workability | operativity can be improved.

本発明によれば、鋼管をねじ継手により連結したものを地盤改良体に挿入して、親杭や芯材として利用する。例えば、ロッドで止水性のある薬液を注入して地盤改良体を構築し、この地盤改良体に挿入した鋼管を親杭として、親杭横矢板工法による山留壁を構築する。あるいは、ロッドからセメントミルクを吐出して土と攪拌することで柱状の地盤改良体を構築し、この地盤改良体に挿入した鋼管を芯材として、ソイルセメント連続壁による山留壁を構築する。したがって、既存建物の地下躯体などの狭隘な作業空間であっても、所定長さの鋼管を1本ずつ取り扱うだけでよいので、地盤改良体に鋼管を確実に挿入して、地下躯体に連続して山留壁を構築できる。また、I形鋼やH形鋼ではなく鋼管を用いても、必要な山留壁の自立高さがそれほど高くない場合には、十分な断面剛性を確保して簡易な構造の山留壁を構築できるので、実用的である。また、薬液注入やソイルセメント連続壁により、ある程度の止水性も期待できる。   According to this invention, what connected the steel pipe by the screw joint is inserted in a ground improvement body, and it utilizes as a parent pile or a core material. For example, a ground improvement body is constructed by injecting a chemical solution having a water-stopping property with a rod, and a steel wall inserted by the ground improvement body is used as a parent pile to construct a mountain retaining wall by a parent pile lateral sheet pile method. Alternatively, a cement-like ground improvement body is constructed by discharging cement milk from the rod and stirring with the soil, and a mountain retaining wall made of a soil cement continuous wall is constructed with the steel pipe inserted into the ground improvement body as a core material. Therefore, even in a narrow work space such as an underground structure of an existing building, it is only necessary to handle one steel pipe of a predetermined length at a time, so that the steel pipe is securely inserted into the ground improvement body and connected to the underground structure. Can build a mountain wall. In addition, even if steel pipes are used instead of I-shaped steel and H-shaped steel, if the required self-supporting height of the retaining wall is not so high, a sufficient retaining rigidity can be secured and a simplified retaining wall can be provided. Since it can be constructed, it is practical. In addition, a certain amount of water-stopping can be expected by chemical solution injection and soil cement continuous wall.

本発明の第1実施形態に係る山留壁の構築方法が適用された新築建物の構築方法を説明するための断面図(その1)である。It is sectional drawing (the 1) for demonstrating the construction method of the new building to which the construction method of the mountain wall which concerns on 1st Embodiment of this invention was applied. 前記実施形態に係る新築建物の構築方法を説明するための断面図(その2)である。It is sectional drawing (the 2) for demonstrating the construction method of the new building which concerns on the said embodiment. 図1のA−A断面図である。It is AA sectional drawing of FIG. 図2のB−B断面図である。It is BB sectional drawing of FIG. 前記実施形態に係る山留壁の構築方法のフローチャートである。It is a flowchart of the construction method of the mountain retaining wall which concerns on the said embodiment. 前記実施形態に係る新築建物の構築方法の掘削装置の配置図である。It is a layout of the excavator of the construction method of the new building which concerns on the said embodiment. 前記実施形態に係る掘削装置のロッドの外管および内管の分解斜視図である。It is a disassembled perspective view of the outer tube and inner tube of the rod of the excavator according to the embodiment. 前記実施形態に係る掘削装置により挿入する鋼管の分解斜視図である。It is a disassembled perspective view of the steel pipe inserted by the excavation apparatus which concerns on the said embodiment. 本発明の第2実施形態に係る山留壁の構築方法で構築された山留壁の断面図である。It is sectional drawing of the mountain retaining wall constructed | assembled with the construction method of the mountain retaining wall which concerns on 2nd Embodiment of this invention.

以下、本発明の実施形態を図面に基づいて説明する。なお、以下の実施形態の説明にあたって、同一構成要件については同一符号を付し、その説明を省略もしくは簡略化する。
〔第1実施形態〕
図1および図2は、本発明の第1実施形態に係る山留壁の構築方法が適用された新築建物2の構築方法を説明するための断面図である。
すなわち、新築建物2の構築方法は、図1に示す既存建物1を解体して、新たに図2中破線で示す新築建物2を構築する方法である。
Hereinafter, embodiments of the present invention will be described with reference to the drawings. In the following description of the embodiments, the same constituent elements are denoted by the same reference numerals, and the description thereof is omitted or simplified.
[First Embodiment]
1 and 2 are cross-sectional views for explaining a construction method for a new building 2 to which a mountain wall construction method according to the first embodiment of the present invention is applied.
That is, the construction method of the new building 2 is a method of dismantling the existing building 1 shown in FIG. 1 and newly constructing a new building 2 indicated by a broken line in FIG.

新築建物2は、既存建物1と比べて、地下階の各フロアの面積は狭いが、地下階の深さは深くなっている。よって、既存建物1の地下躯体3の外壁部分4の下に、外壁部分4に連続して山留壁20を構築し、この山留壁20と外壁部分4の一部とを新築建物2を構築するための山留壁として利用する。本実施形態では、山留壁20を親杭横矢板工法により構築する。   Compared with the existing building 1, the new building 2 has a smaller floor area, but the depth of the basement is deeper. Therefore, a mountain retaining wall 20 is constructed continuously from the outer wall portion 4 below the outer wall portion 4 of the underground building 3 of the existing building 1, and the new building 2 is connected to the mountain retaining wall 20 and a part of the outer wall portion 4. Use as a mountain wall for construction. In this embodiment, the mountain retaining wall 20 is constructed by the parent pile horizontal sheet pile method.

新築建物2の構築方法は、具体的には以下のようになる。
まず、図1に示すように、既存建物1は、地下2階までの地下躯体3を有している。そこで、地下躯体3の地下2階レベルの床面5に小型の掘削装置10を設置し、この掘削装置10を用いて、図3にも示すように、床面5から下方に延びる親杭体21を水平方向に連続して構築する。
The construction method of the new building 2 is specifically as follows.
First, as shown in FIG. 1, the existing building 1 has an underground skeleton 3 up to the second floor. Therefore, a small excavation device 10 is installed on the floor surface 5 at the second basement level of the underground frame 3, and the parent pile body extending downward from the floor surface 5 as shown in FIG. 3 using this excavation device 10. 21 is constructed continuously in the horizontal direction.

図3は、図1のA−A断面図である。
親杭体21は、止水性のある薬液を注入することで地盤改良して構築された略円柱形状の地盤改良体22と、この地盤改良体22の略中心に挿入された親杭23と、で構成される。
隣り合う地盤改良体22同士は部分的に重なり合っており、これにより地盤改良体22は水平方向に連続している。
3 is a cross-sectional view taken along the line AA in FIG.
The parent pile body 21 includes a substantially cylindrical ground improvement body 22 constructed by improving the ground by injecting a chemical solution having a water-stopping property, and a parent pile 23 inserted in the approximate center of the ground improvement body 22; Consists of.
Adjacent ground improvement bodies 22 partially overlap each other, whereby the ground improvement bodies 22 are continuous in the horizontal direction.

次に、図2に示すように、地下躯体3の外壁部分4を残して解体し、外壁部分4に加えて山留壁20を山留壁として利用して、新築建物2の床付面まで掘削し、新築建物2を構築する。ここで、掘削時には、図4に示すように、親杭体21も掘削して親杭23を露出させ、この親杭23の裏側に横矢板24を嵌め込んで、山留壁20を構築する。このとき、地盤改良体22は、薬液注入により構築された地盤改良体なので、ある程度の止水性を期待でき、しかも掘削が容易となる。   Next, as shown in FIG. 2, the outer wall portion 4 of the underground building 3 is left to be dismantled, and the mountain retaining wall 20 is used as a mountain retaining wall in addition to the outer wall portion 4 to the floor surface of the new building 2. Excavate and build a new building 2. Here, at the time of excavation, as shown in FIG. 4, the main pile body 21 is also excavated to expose the main pile 23, and a cross pile 24 is fitted to the back side of the main pile 23 to construct the mountain retaining wall 20. . At this time, since the ground improvement body 22 is the ground improvement body constructed | assembled by chemical | medical solution injection | pouring, a certain amount of water stop can be anticipated, and also excavation becomes easy.

以下、親杭体21を連続して構築する手順について、図5のフローチャートを参照しながら説明する。
まず、ステップS1では、図6に示すように、小型の掘削装置10を初期位置にセットする。
掘削装置10は、筒状のロッド11を回転させつつ下方に押し込んだり引き抜いたりするものである。
ロッド11は、二重管であり、筒状の外管30と、この外管30の内部に収納された内管40と、を備える。
Hereinafter, the procedure for continuously constructing the parent pile body 21 will be described with reference to the flowchart of FIG.
First, in step S1, as shown in FIG. 6, the small excavator 10 is set at the initial position.
The excavator 10 pushes and pulls down the cylindrical rod 11 while rotating it.
The rod 11 is a double tube, and includes a cylindrical outer tube 30 and an inner tube 40 accommodated in the outer tube 30.

図7(a)は、外管30の分解斜視図である。
外管30は、継手部材32により複数連結された筒状の外管本体33と、この外管本体33の先端に取付けられた先端ビット34と、を有する。
図7(b)は、内管40の分解斜視図である。
内管40は、継手部材42により複数連結された筒状の内管本体43と、この内管本体43の先端に取付けられた先端ビット44と、を有する。
FIG. 7A is an exploded perspective view of the outer tube 30.
The outer tube 30 includes a cylindrical outer tube main body 33 connected by a plurality of joint members 32, and a tip bit 34 attached to the tip of the outer tube main body 33.
FIG. 7B is an exploded perspective view of the inner tube 40.
The inner tube 40 has a cylindrical inner tube main body 43 connected by a plurality of joint members 42, and a tip bit 44 attached to the tip of the inner tube main body 43.

ステップS2では、掘削装置10を駆動して地盤に削孔する。このとき、継手部材32、42を用いて、ロッド11を継ぎ足すことで、ロッド11を徐々に延長し、ロッド11の先端が所定深さに到達するようにする。   In step S2, the excavator 10 is driven to drill holes in the ground. At this time, the rod 11 is extended by using the joint members 32 and 42 so that the rod 11 is gradually extended so that the tip of the rod 11 reaches a predetermined depth.

ステップS3では、掘削装置10を駆動して、ロッド11の先端から、止水性のある薬液として水ガラス系の2液混合タイプの薬液を注入しながら、削孔した孔からロッド11を徐々に引き抜いて取り外し、地盤改良体22を構築する。このとき、ロッド11の上端側から順に取り外すことで、ロッド11の長さを徐々に短くする。   In step S3, the excavator 10 is driven, and the rod 11 is gradually pulled out from the drilled hole while injecting a water glass-based two-liquid mixed type chemical from the tip of the rod 11 as a water-stopping chemical. The ground improvement body 22 is constructed. At this time, the length of the rod 11 is gradually shortened by removing it sequentially from the upper end side of the rod 11.

ステップS4では、掘削装置10を駆動して、削孔した孔を通して、鋼管としてのガス管50を地盤改良体22に挿入して親杭23とする。
図8は、ガス管50の分解斜視図である。
ガス管50は、JIS G 3452に規定された配管用炭素鋼鋼管であり、ロッド11よりもやや小径で、ねじによる継手部材51により互いに連結可能となっている。
In step S <b> 4, the excavator 10 is driven, and the gas pipe 50 as a steel pipe is inserted into the ground improvement body 22 through the drilled hole to form the parent pile 23.
FIG. 8 is an exploded perspective view of the gas pipe 50.
The gas pipe 50 is a carbon steel pipe for piping as defined in JIS G 3452. The gas pipe 50 is slightly smaller in diameter than the rod 11 and can be connected to each other by a joint member 51 using a screw.

よって、既に挿入したガス管50の上端に、ねじによる継手部材51を用いて新たにガス管50を継ぎ足すことで、親杭23を徐々に延長し、この親杭23の下端が削孔した孔の深さに到達するようにする。   Therefore, by newly adding the gas pipe 50 to the upper end of the already inserted gas pipe 50 by using the joint member 51 with a screw, the parent pile 23 is gradually extended, and the lower end of the parent pile 23 is drilled. Try to reach the depth of the hole.

ステップS5では、全ての親杭体21が完成したか否かを判定し、この判定がYesである場合には終了し、Noである場合には、ステップS6に移る。
ステップS6では、掘削装置10を次の位置にセットし、ステップS2に戻る。
In step S5, it is determined whether or not all the parent pile bodies 21 are completed. If this determination is Yes, the process ends. If it is No, the process proceeds to step S6.
In step S6, the excavator 10 is set to the next position, and the process returns to step S2.

本実施形態によれば、以下のような効果がある。
(1)ガス管50を連結したものを地盤改良体22に挿入して、親杭23として利用した。したがって、既存建物1の地下2階のように狭隘な作業空間であっても、所定長さの鋼管を1本ずつ取り扱うだけでよいので、地盤改良体22にガス管50を確実に挿入して、地下躯体3の外壁部分4に連続して山留壁20を構築できる。
例えば図6に示すように、地下2階で作業員Aが両手でガス管50を把持しているが、階高よりも十分に短いガス管50を使用することにより、狭隘な作業空間であっても、十分に取り扱い可能となっている。
また、I形鋼やH形鋼ではなくガス管50を用いても、必要な山留壁の自立高さがそれほど高くない場合には、十分な断面剛性を確保して簡易な構造の山留壁20を構築できるので、実用的である。
また、止水性のある薬液の注入により地盤改良体22を構築したので、ある程度の止水性も期待できる。
According to this embodiment, there are the following effects.
(1) The gas pipe 50 connected was inserted into the ground improvement body 22 and used as the parent pile 23. Therefore, even in a narrow work space like the second floor of the existing building 1, it is only necessary to handle one steel pipe of a predetermined length at a time, so that the gas pipe 50 is securely inserted into the ground improvement body 22. The mountain retaining wall 20 can be constructed continuously to the outer wall portion 4 of the underground frame 3.
For example, as shown in FIG. 6, the worker A holds the gas pipe 50 with both hands on the second basement floor, but by using the gas pipe 50 that is sufficiently shorter than the floor height, the work space is narrow. However, it can be handled sufficiently.
In addition, even if the gas pipe 50 is used instead of the I-shaped steel or the H-shaped steel, if the required self-standing height of the retaining wall is not so high, the retaining wall having a simple structure with sufficient sectional rigidity is ensured. Since the wall 20 can be constructed, it is practical.
Moreover, since the ground improvement body 22 was constructed | assembled by injection | pouring of the chemical | medical solution with a water stop, a certain amount of water stop is also expectable.

(2)亜鉛めっきを施した鋼管、いわゆるガス管50を用いて親杭23とした。ガス管は市販品であるため、山留壁20の施工コストを大幅に低下できる。
また、ガス管であれば、ガス管同士をレンチで容易にねじ継手により連結できるうえに、サイズも豊富であるので、ロッド11よりも小径のものを容易に入手できるから、施工性を向上できる。
(2) The parent pile 23 was formed using a galvanized steel pipe, so-called gas pipe 50. Since the gas pipe is a commercial product, the construction cost of the mountain retaining wall 20 can be greatly reduced.
Moreover, if it is a gas pipe, since gas pipes can be easily connected with a threaded joint with a wrench, and there are also abundant sizes, since a thing with a smaller diameter than the rod 11 can be obtained easily, workability can be improved. .

〔第2実施形態〕
図9は、本発明の第2実施形態に係る山留壁の構築方法が適用された山留壁20Aの断面図である。
本実施形態では、山留壁20Aをソイルセメント連続壁により構築する点が、第1実施形態と異なる。
すなわち、地下躯体3の地下2階レベルの床面5に掘削装置10を設置し、この掘削装置10を用いて、床面5から下方に延びるエレメント26を水平方向に連続して構築して、ソイルセメント連続壁の山留壁20Aとする。
[Second Embodiment]
FIG. 9 is a cross-sectional view of a mountain retaining wall 20A to which the mountain retaining wall construction method according to the second embodiment of the present invention is applied.
The present embodiment is different from the first embodiment in that the mountain retaining wall 20A is constructed by a soil cement continuous wall.
That is, the excavation device 10 is installed on the floor surface 5 of the underground second floor level of the underground frame 3, and the element 26 extending downward from the floor surface 5 is continuously constructed in the horizontal direction using the excavation device 10. It is set as the mountain retaining wall 20A of a soil cement continuous wall.

エレメント26は、セメントミルクと土とを攪拌することで地盤改良して構築された略円柱形状の地盤改良体27と、この柱状の地盤改良体27の略中心に挿入された芯材28と、で構成される。
隣り合う地盤改良体27同士は部分的に重なり合っており、これにより地盤改良体27は水平方向に連続している。
The element 26 includes a substantially cylindrical ground improvement body 27 constructed by improving the ground by stirring cement milk and soil, and a core material 28 inserted at the approximate center of the columnar ground improvement body 27, Consists of.
Adjacent ground improvement bodies 27 partially overlap each other, whereby the ground improvement bodies 27 are continuous in the horizontal direction.

また、本実施形態の山留壁20Aを構築する手順は、図5のフローチャートのステップS3、S4が、第1実施形態と異なる。
すなわち、ステップS3では、掘削装置10を駆動して、ロッド11の先端からセメントミルクを吐出してセメントミルクと土とを攪拌しながら、削孔した孔からロッド11を徐々に引き抜いて取り外し、地盤改良体27を構築する。
また、ステップS4では、掘削装置10を駆動して、削孔した孔を通して、鋼管としてのガス管50を地盤改良体27に挿入して、ガス管50を地盤改良体27の芯材28とする。
Further, the procedure for constructing the mountain retaining wall 20A of the present embodiment is different from the first embodiment in steps S3 and S4 of the flowchart of FIG.
That is, in step S3, the excavator 10 is driven to discharge the cement milk from the tip of the rod 11 and stir the cement milk and the soil, and then gradually pull out and remove the rod 11 from the drilled hole. An improved body 27 is constructed.
In step S4, the excavator 10 is driven to insert the gas pipe 50 as a steel pipe into the ground improvement body 27 through the drilled hole, and the gas pipe 50 is used as the core material 28 of the ground improvement body 27. .

本実施形態によれば、上述の(1)、(2)と同様の効果がある。
また、第1実施形態と比べて、地盤改良体27の間隔が狭くなるため、地盤改良体27の本数が増大することになるが、横矢板が不要であり、掘削作業を少なくできる。
According to the present embodiment, there are the same effects as the above (1) and (2).
Moreover, since the space | interval of the ground improvement body 27 becomes narrow compared with 1st Embodiment, the number of the ground improvement bodies 27 will increase, However, a side sheet pile is unnecessary and can reduce excavation work.

なお、本発明は前記実施形態に限定されるものではなく、本発明の目的を達成できる範囲での変形、改良等は本発明に含まれるものである。   It should be noted that the present invention is not limited to the above-described embodiment, and modifications, improvements, etc. within a scope that can achieve the object of the present invention are included in the present invention.

1…既存建物
2…新築建物
3…地下躯体
4…外壁部分
5…床面
10…掘削装置
11…ロッド
20、20A…山留壁
21…親杭体
22…薬液注入による地盤改良体
23…親杭
24…横矢板
26…エレメント
27…ソイルセメント連続壁の地盤改良体
28…芯材
30…外管
32…継手部材
33…外管本体
34…先端ビット
40…内管
42…継手部材
43…内管本体
44…先端ビット
50…ガス管(配管用炭素鋼鋼管)
51…継手部材
DESCRIPTION OF SYMBOLS 1 ... Existing building 2 ... New building 3 ... Underground frame 4 ... Outer wall part 5 ... Floor surface 10 ... Excavator 11 ... Rod 20, 20A ... Yamato wall 21 ... Parent pile body 22 ... Ground improvement body by chemical injection 23 ... Parent Pile 24 ... Cross sheet pile 26 ... Element 27 ... Soil cement continuous wall ground improvement body 28 ... Core material 30 ... Outer pipe 32 ... Joint member 33 ... Outer pipe body 34 ... Tip bit 40 ... Inner pipe 42 ... Joint member 43 ... Inside Pipe body 44 ... Tip bit 50 ... Gas pipe (carbon steel pipe for piping)
51. Joint member

Claims (2)

地下階を有する既存建物を解体して、前記地下階より深い地下階を有する新築建物を構築するための山留壁の構築方法であって、
当該山留壁は、前記既存建物の地下躯体の外壁部分の下、かつ当該外壁部分に連続して構築され、
前記既存建物の最下層の床面から掘削装置を駆動して地盤に削孔するステップと、
前記掘削装置を駆動してロッドを引き抜きながら、地盤改良体を構築するステップと、
前記ロッドよりも小径でねじ継手により互いに連結可能な鋼管を用意し、前記掘削装置を駆動して、前記鋼管を継ぎ足して延長しながら当該鋼管を前記地盤改良体に挿入するステップと、を備えることを特徴とする山留壁の構築方法。
A method for constructing a mountain wall for dismantling an existing building having a basement floor and constructing a new building having a basement floor deeper than the basement floor,
The mountain retaining wall is constructed continuously under and on the outer wall portion of the underground structure of the existing building,
Drilling a drilling device from the bottom floor of the existing building to drill holes in the ground;
Constructing a ground improvement body while driving the excavator and pulling out the rod;
Providing a steel pipe having a diameter smaller than that of the rod and connectable to each other by a threaded joint, and driving the excavator to insert the steel pipe into the ground improvement body while extending and extending the steel pipe. A method of constructing a mountain wall characterized by
前記鋼管は、配管用炭素鋼鋼管であることを特徴とする請求項1に記載の山留壁の構築方法。   The said steel pipe is a carbon steel pipe for piping, The construction method of the mountain retaining wall of Claim 1 characterized by the above-mentioned.
JP2012151918A 2012-07-05 2012-07-05 Construction method of Yamadome wall Active JP5885603B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2012151918A JP5885603B2 (en) 2012-07-05 2012-07-05 Construction method of Yamadome wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2012151918A JP5885603B2 (en) 2012-07-05 2012-07-05 Construction method of Yamadome wall

Publications (2)

Publication Number Publication Date
JP2014015716A JP2014015716A (en) 2014-01-30
JP5885603B2 true JP5885603B2 (en) 2016-03-15

Family

ID=50110645

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2012151918A Active JP5885603B2 (en) 2012-07-05 2012-07-05 Construction method of Yamadome wall

Country Status (1)

Country Link
JP (1) JP5885603B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6673695B2 (en) * 2015-12-25 2020-03-25 株式会社竹中工務店 Construction method of mountain retaining wall and mountain retaining wall
JP7240667B2 (en) * 2019-02-22 2023-03-16 株式会社安藤・間 Reinforced soil structure and soil structure reinforcement method

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0611995B2 (en) * 1988-08-04 1994-02-16 前田建設工業株式会社 Construction method of vertical hole in underground structure
JPH02266021A (en) * 1988-12-20 1990-10-30 Kawasaki Steel Corp Earth anchor and its executing method
JP3586020B2 (en) * 1995-09-29 2004-11-10 東横技研株式会社 How to plant retaining walls and plantable retaining walls
JP2003041573A (en) * 2001-08-01 2003-02-13 Tone Geo Tech Co Ltd Soil-cement column row wall and its construction method

Also Published As

Publication number Publication date
JP2014015716A (en) 2014-01-30

Similar Documents

Publication Publication Date Title
KR100891949B1 (en) Low depth simple earthquake structure suitable for water and sewage construction
JP2013136922A (en) Earth retaining wall supporting method, earth retaining wall supporting structure, and underground skeleton constructing method
KR101676814B1 (en) CFT pile Construction Method and the Shoring Method using the same file
CN103603358B (en) A kind of multi-platform building enclosure and constructional method
JP2013079511A (en) Construction method of earth-retaining timbering, and earth-retaining timbering
KR101901392B1 (en) A Micropile and Retaining Wall Method by using Micropile
KR101674656B1 (en) CIP retaining wall with steel tube
KR100935006B1 (en) Temporary retaining wall structure for water supply and drainage works in high depth
JP2011106229A (en) Method for constructing temporary pile
JP5885603B2 (en) Construction method of Yamadome wall
KR101195235B1 (en) Underground structure construction method using composite pile
KR20110052321A (en) Steel pipe pile for mud wall and mud wall construction method
JP2013015015A (en) Structure and construction method for earth retaining wall
JP5681039B2 (en) Mountain fastening method
KR101266112B1 (en) Non-open cut excavation construction method for underground structure using wire saw apparatus
JP5512600B2 (en) Retaining wall extension method and retaining wall structure
JP2018044339A (en) How to dismantle existing underground structures
JP6730121B2 (en) Underground wall construction method
JP2007308951A (en) Method of constructing outer peripheral column by inverted construction method
JP2010059622A (en) Underground structure and method for constructing the same
JP2009068203A (en) Earth retaining wall composed of horizontal sheathing with soldier beam, and cut-off structure, construction method and cut-off method for the earth retaining wall
JP2011106230A (en) Method for constructing earth retaining wall
KR20100117826A (en) Construction method of earth retaining wall
CN114875894A (en) Cast-in-place pile structure based on pebble stratum and construction method thereof
JP5940358B2 (en) How to install and remove Yamadome wall core

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20141217

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20150902

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20150908

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20150915

RD05 Notification of revocation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7425

Effective date: 20150915

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20160202

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20160209

R150 Certificate of patent or registration of utility model

Ref document number: 5885603

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250