Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP5928944B2 - Improvement method of abutment chest wall - Google Patents
[go: Go Back, main page]

JP5928944B2 - Improvement method of abutment chest wall - Google Patents

Improvement method of abutment chest wall Download PDF

Info

Publication number
JP5928944B2
JP5928944B2 JP2012076582A JP2012076582A JP5928944B2 JP 5928944 B2 JP5928944 B2 JP 5928944B2 JP 2012076582 A JP2012076582 A JP 2012076582A JP 2012076582 A JP2012076582 A JP 2012076582A JP 5928944 B2 JP5928944 B2 JP 5928944B2
Authority
JP
Japan
Prior art keywords
chest wall
new
abutment
traffic
existing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2012076582A
Other languages
Japanese (ja)
Other versions
JP2013204362A (en
Inventor
野島 昭二
昭二 野島
宮永 憲一
憲一 宮永
隆行 松井
隆行 松井
和昭 横山
和昭 横山
正範 鈴木
正範 鈴木
茂喜 刈山
茂喜 刈山
宏之 石塚
宏之 石塚
康雄 上阪
康雄 上阪
隆生 中谷
隆生 中谷
嘉昭 伊川
嘉昭 伊川
卓 徳光
卓 徳光
英宏 内野
英宏 内野
光秀 吉田
光秀 吉田
匡紀 杉江
匡紀 杉江
晃彦 管谷
晃彦 管谷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
West Nippon Expressway Co Ltd
Central Nippon Expressway Co Ltd
Original Assignee
West Nippon Expressway Co Ltd
Central Nippon Expressway Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by West Nippon Expressway Co Ltd, Central Nippon Expressway Co Ltd filed Critical West Nippon Expressway Co Ltd
Priority to JP2012076582A priority Critical patent/JP5928944B2/en
Publication of JP2013204362A publication Critical patent/JP2013204362A/en
Application granted granted Critical
Publication of JP5928944B2 publication Critical patent/JP5928944B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Description

この発明は、道路橋や鉄道橋の橋梁端部と橋台部胸壁の間の狭隘な隙間を拡幅する橋台部胸壁の改良工法に関するものである。   The present invention relates to an improved construction method for an abutment chest wall that widens a narrow gap between a bridge end of a road bridge or a railway bridge and the abutment chest wall.

一般に、橋台と橋桁の間は、年間や日々の温度変化による橋桁の伸縮や回転、橋桁を通行する車両等による回転を拘束しないように隙間が設けてある。この隙間の幅は橋梁の規模により異なり、数センチから数十センチ程度が普通である。また、橋台と橋桁の間は橋桁の伸縮を妨げないで、かつ車両の通行を妨げない伸縮装置が設置されており、この装置から雨水等が橋桁の端部や支承部、下部工へ漏水しないように止水機能が付与されている。
しかし、経時変化による伸縮装置の老朽化や構造上の欠陥等により、伸縮装置の止水機能が失われ、橋桁の端部や支承部へ雨水等が漏水する場合が発生する。この漏水が繰り返されると、鋼桁やコンクリート橋桁中の鋼材が腐食するなどの橋梁の機能低下が進行する。特に、寒冷地では、冬季の漏水に凍結防止剤の成分が多量に含まれるために鋼材の腐食が急激に進行し、橋梁端部が急速に劣化する。
また、PC(Prestressed Concrete)橋に於いては、橋桁の端部にPC鋼材の定着部が集中しているため、この部位の健全性を確保することが橋梁の耐用寿命を全うする為に、極めて重要である。
そこで、特許文献1に記載されたように、橋梁の遊間幅の狭い箇所の漏水を補修する方法が提案されている。もしくは、特許文献2に記載されたように、狭隘な隙間から直接劣化部をはつり、橋桁端部を補修する装置及び方法が提案されている。また、橋梁の橋台部背面に空間を確保する考え方は、特許文献3に記載されている。
In general, a gap is provided between the abutment and the bridge girder so as not to constrain the expansion and contraction and rotation of the bridge girder due to annual or daily temperature changes, and rotation caused by vehicles passing through the bridge girder. The width of this gap varies depending on the size of the bridge, and is usually several centimeters to several tens of centimeters. In addition, there is an extension device installed between the abutment and the bridge girder that does not hinder the expansion and contraction of the bridge girder and does not block the passage of the vehicle. Rainwater does not leak from this device to the end of the bridge girder, the support section, or the substructure. The water stop function is given.
However, due to aging and structural defects of the expansion / contraction device due to changes over time, the water stop function of the expansion / contraction device is lost, and rainwater or the like leaks to the end or support portion of the bridge girder. If this water leakage is repeated, the deterioration of the bridge function such as the corrosion of steel members in steel girders and concrete bridge girders proceeds. In particular, in cold regions, the water leakage during the winter season contains a large amount of antifreeze components, so that the corrosion of the steel material proceeds rapidly and the edge of the bridge deteriorates rapidly.
In addition, in PC (Prestressed Concrete) bridges, the anchorage of PC steel is concentrated at the end of the bridge girder. To ensure the soundness of this part, the service life of the bridge is completed. Very important.
Therefore, as described in Patent Document 1, a method for repairing water leakage at a portion having a narrow gap between bridges has been proposed. Alternatively, as described in Patent Document 2, there has been proposed an apparatus and a method for repairing a bridge girder end by directly penetrating a deteriorated portion from a narrow gap. Further, Patent Document 3 describes the idea of securing a space on the back surface of the abutment portion of the bridge.

特開2008−69596号公報JP 2008-69596 A 特開2007−218048号公報Japanese Patent Laid-Open No. 2007-218048 特許4167149号公報Japanese Patent No. 4167149

しかし、従来の橋梁構造では、橋台と既設橋との遊間が狭く、点検、補修が困難であると云う欠点が存在した。
また、特許文献1に記載されたよう、狭い遊間に膨潤性止水チューブを挿入し、チューブの復元力によって漏水を補修する方法では、単に漏水を一時的に止めるだけで、既に劣化した部分を回復することはできない。
また、特許文献2に記載されたような、補修する装置及び方法では、以前のままの寸法ではつり箇所に樹脂シート、スペーサを設置して、コンクリートを再注入するものであって、橋梁背面の空間を拡大するものではない。そのため、補修工事後の効果の確認や点検を十分に行うことができない。
特許文献3は橋台部背面の空間を拡大するものであるが、その拡大した空間に新しい橋梁の橋台を建設し橋梁を架替えるものである。その空間は橋梁の使用を停止した後、土留め壁と引っ張り補強材を用いて確保する。また、その空間に新しい橋台を建設したあとは、既設橋台は撤去され新しい橋梁が建設される。本発明とは、施工時の交通規制の条件や空間の確保方法および確保の目的が異なる。
However, the conventional bridge structure has a drawback that the gap between the abutment and the existing bridge is narrow and that inspection and repair are difficult.
In addition, as described in Patent Document 1, a method of inserting a swellable water stop tube between narrow play and repairing the water leak by the restoring force of the tube simply stops the water leak temporarily and removes the already deteriorated portion. It cannot be recovered.
Moreover, in the apparatus and method for repair as described in Patent Document 2, a resin sheet and a spacer are installed at a suspended portion with the same dimensions as before, and concrete is reinjected. It does not expand the space. For this reason, it is not possible to sufficiently check and inspect the effects after repair work.
Patent document 3 enlarges the space on the back of the abutment, but constructs a new abutment for the bridge in the expanded space and replaces the bridge. The space will be secured using earth retaining walls and tensile reinforcement after the use of the bridge is stopped. After a new abutment is built in the space, the existing abutment will be removed and a new bridge will be built. The present invention is different from the present invention in traffic regulation conditions during construction, space securing methods, and securing purposes.

この発明は、点検、補修に必要な空間を橋梁背面に確保し、橋梁端部の劣化した部分の補修・補強施工を容易にし、施工を実施した箇所に近接して補修・補強工事後の効果を確認するために為されたもので、プレキャスト部材を使用すると短期間で工事を終了できるとともに、現場の状況に応じて部分的な車線規制などの通行帯の規制や昼間の規制、夜間の規制、昼夜間の規制などの時間帯の規制や通行帯と時間帯の規制の組み合わせなど様々な交通規制に適用可能な橋台部胸壁の改良工法を提供するものである。   This invention secures the space necessary for inspection and repair on the back of the bridge, facilitates repair and reinforcement work for the deteriorated part of the bridge end, and effects after repair and reinforcement work close to the place where the work was carried out The use of pre-cast members can be completed in a short period of time, and traffic lane restrictions such as partial lane restrictions, daytime restrictions, and nighttime restrictions according to the conditions at the site. It is intended to provide an improved method for abutment chest wall that can be applied to various traffic regulations, such as daytime and nighttime regulations and combinations of traffic zones and time zone regulations.

この発明は、以下のような内容である。
(1)本発明の橋台部胸壁の改良工法は、交通遮断時に既設胸壁の背面を掘削する掘削工程と、前記既設胸壁を取り壊す既設胸壁撤去工程と、前記掘削工程で掘削した範囲で前記既設胸壁の位置より後退した位置に新設胸壁を設置し、橋梁端部と胸壁との間に空間を確保する胸壁設置工程と、前記胸壁設置工程で新設胸壁を設置した後に、新設胸壁の背面で掘削した範囲を埋戻す埋戻し工程と、前記橋梁端部に伸縮装置受けを設置するとともに、前記胸壁の上に新渡し版を架け渡し、前記伸縮装置受けと新渡し版の間に伸縮装置を設置し、前記新渡し版の上に再舗装や路線の復旧など路面を復旧する路面復旧工程と、からなることを特徴とする。
(2)(1)に記載の橋台部胸壁の改良工法において、前記掘削工程の前に既設道路の一部の舗装、踏掛版を撤去し、撤去した道路に支持ブロックを設置するとともに、支持ブロックと橋台部胸壁の間に仮設渡し版を設置して交通を確保する交通確保工程を備え、前記掘削工程の交通遮断時に前記仮設渡し版を取り外した後、前記既設胸壁の背面土を掘削することを特徴とする。
(3)(1)または(2)に記載の橋台部胸壁の改良工法において、前記胸壁設置工程における新設胸壁は、予め製作したプレキャスト部材であることを特徴とする。
(4)(1)〜(3)に記載の橋台部胸壁の改良工法において、前記胸壁設置工程における新設胸壁の断面は逆T字に類似した形状をしたことを特徴とする。
(5)(1)〜(4)に記載の橋台部胸壁の改良工法において、前記埋戻し工程において、埋め戻す材料は土とセメント、水などを混合した改良土を使用することを特徴とする。
(6)(1)〜(5)に記載の橋台部胸壁の改良工法における、前記路面復旧工程において、設置する伸縮装置は、伸縮装置の経年劣化により漏水の可能性が生じた場合でも橋桁端部で直接漏れないように、橋桁端部から現場や構造物の状況に応じて離した位置に設置することを特徴とする。
The present invention has the following contents.
(1) The improvement method of the abutment part chest wall according to the present invention includes an excavation process for excavating a back surface of the existing chest wall when traffic is interrupted, an existing chest wall removal process for tearing down the existing chest wall, and the existing chest wall within a range excavated in the excavation process A new chest wall was installed at a position retreated from the position of the chest wall to secure a space between the bridge end and the chest wall, and after installing the new chest wall in the chest wall installation step, drilled on the back of the new chest wall A backfilling process for refilling the area, and an extension device receiver installed at the bridge end, a new delivery plate is installed on the chest wall, and an extension device is installed between the extension device receiver and the new delivery plate. And a road surface restoration process for restoring the road surface such as re-paving and route restoration on the new delivery version.
(2) In the improved construction method of the abutment battlements as described in (1), a part of the existing road is removed before the excavation process, and a support block is installed on the removed road. Providing a traffic securing step for securing traffic by installing a temporary delivery plate between the abutment part chest wall and excavating the back soil of the existing chest wall after removing the temporary delivery plate at the time of traffic interruption in the excavation process It is characterized by.
(3) In the improvement method of the abutment part chest wall described in (1) or (2), the new chest wall in the chest wall installation step is a precast member manufactured in advance.
(4) In the improvement method of the abutment part chest wall described in (1) to (3), the cross section of the new chest wall in the chest wall installation step has a shape similar to an inverted T-shape.
(5) In the improvement method of the abutment part chest wall as described in (1) to (4), in the backfilling step, the backfilling material uses improved soil in which soil, cement, water, etc. are mixed. .
(6) (1) to (5) definitive an improvement method of abutment portions chest wall according to, in the road restoration step, stretching apparatus to be installed, even if the possibility of water leakage caused by aging of the extension device girders It is characterized by being installed at a position separated from the end of the bridge girder according to the situation of the site or structure so that it does not leak directly at the end.

この発明の橋台部胸壁の改良工法によれば、交通遮断時に既設胸壁の背面を掘削する掘削工程と、前記既設胸壁を取り壊す既設胸壁撤去工程と、前記掘削工程で掘削した範囲で前記既設胸壁の位置より後退した位置に新設胸壁を設置し、橋梁端部と胸壁との間に空間を確保する胸壁設置工程と、前記胸壁設置工程で新設胸壁を設置した後に、新設胸壁の背面で掘削した範囲を埋戻す埋戻し工程と、前記橋梁端部に伸縮装置受けを設置するとともに、前記胸壁の上に新渡し版を架け渡し、前記伸縮装置受けと新渡し版の間に伸縮装置を設置し、前記新渡し版の上に再舗装や路線の復旧など路面を復旧する路面復旧工程とからなるので、狭隘な橋台と既設橋との遊間を拡張して作業員が入れるようにして点検、補修を可能とするとともに、工事に要する交通遮断期間を短縮することができる。
また、前記掘削工程の前に既設道路の一部の舗装、踏掛版を撤去し、撤去した道路に支持ブロックを設置するとともに、支持ブロックと橋台部胸壁の間に仮設渡し版を設置して交通を確保する交通確保工程を備え、前記掘削工程の交通遮断時に前記仮設渡し版を取り外した後、前記既設胸壁の背面土を掘削するので、既設道路の交通遮断期間を短くすることができる。
また、前記胸壁設置工程における新設胸壁は、予め製作したプレキャスト部材であるので、施工期間を短縮する必要がある場合の前記胸壁設置工程における新設胸壁は、予め製作したプレキャスト部材を使用することにより、部材を小型で薄く構成でき、運搬、架設作業が容易となり、また現場での前記胸壁コンクリート打設も不要となり、現場での作業期間を短縮することができる。
また、前記胸壁設置工程における新設胸壁の断面は逆T字に類似した形状をしたので、運搬、架設時に安定した状態となり各作業が安全に短時間で施工可能となる。
また、前記埋戻し工程において、埋め戻す材料は土とセメント、水などを混合した改良土を使用するので、地盤沈下や地震動等に対する高い抵抗性、容易な施工性と、優れた経済性を有している。
また、前記路面復旧工程において、設置する伸縮装置は、伸縮装置の経年劣化により漏水の可能性が生じた場合でも橋桁端部で直接漏れないように、橋桁端部から現場や構造物の状況に応じて離した位置に設置するので、橋桁の寿命を確実に延長することができる。
According to the improvement method of the abutment part chest wall of the present invention, the excavation step of excavating the back of the existing chest wall at the time of traffic interruption, the existing chest wall removal step of breaking the existing chest wall, and the existing chest wall within the range excavated in the excavation step The new chest wall is installed at a position retreated from the position, the chest wall installation process to secure a space between the bridge end and the chest wall, and the area drilled on the back of the new chest wall after installing the new chest wall in the chest wall installation process And a backfilling process for backfilling, and installing a telescopic device receiver on the bridge end, bridging a new delivery plate on the chest wall, installing a telescopic device between the telescopic device receiver and the new delivery plate, Since it consists of a road surface restoration process that restores the road surface, such as re-paving and route restoration on the new delivery version, inspection and repairs are made so that workers can enter by expanding the gap between the narrow abutment and the existing bridge. And make it possible Traffic cut-off period that can be shortened.
Prior to the excavation process, part of the existing road was removed from the pavement and stepping plates, a support block was installed on the removed road, and a temporary transfer plate was installed between the support block and the abutment chest wall. A traffic securing step is secured, and after removing the temporary transfer plate at the time of traffic interruption in the excavation step, the back soil of the existing chest wall is excavated, so the traffic interruption period on the existing road can be shortened.
In addition, since the new chest wall in the chest wall installation process is a precast member manufactured in advance, the new chest wall in the chest wall installation process when the construction period needs to be shortened by using a precast member manufactured in advance, The member can be made small and thin, and transportation and erection work can be facilitated, and the chest wall concrete placement on site is not required, and the work period on site can be shortened.
In addition, since the cross section of the new chest wall in the chest wall installation process has a shape similar to an inverted T-shape, it is in a stable state during transportation and erection, and each work can be performed safely and in a short time.
In the backfilling process, the backfilling material uses improved soil mixed with soil, cement, water, etc., so it has high resistance to ground subsidence and earthquake motion, easy workability, and excellent economic efficiency. doing.
In addition, in the road surface restoration process , the telescopic device to be installed can be changed from the end of the bridge girder to the situation of the site or structure so that it does not leak directly even if there is a possibility of water leakage due to aging of the telescopic device. Because it is installed at a separate position accordingly, the life of the bridge girder can be reliably extended.

図1は、本発明の一実施の形態である橋台部胸壁の改良工法における施工前の橋梁端部を示す説明図である。FIG. 1 is an explanatory view showing an end of a bridge before construction in an improved method for abutment chest wall according to an embodiment of the present invention. 図2は、本発明の一実施の形態である橋台部胸壁の改良工法における、交通規制等により支持ブロックが必要な場合の施工後の橋梁端部を示す説明図である。FIG. 2 is an explanatory diagram showing a bridge end portion after construction when a support block is necessary due to traffic regulation or the like in the improved method of abutment chest wall according to an embodiment of the present invention. 図3は、本発明の一実施の形態である橋台部胸壁の改良工法における、交通を遮断する規制等で支持ブロックが不要な場合の施工後の橋梁端部を示す説明図である。FIG. 3 is an explanatory diagram showing a bridge end portion after construction when a support block is not required due to traffic blocking or the like in the improved method of abutment chest wall according to an embodiment of the present invention. 図4は、図1の道路部の断面構成図である。FIG. 4 is a cross-sectional configuration diagram of the road portion in FIG. 1. 図5は、追い越し車線側を施工している時の支持ブロックの位置を示す断面構成図である。FIG. 5 is a cross-sectional configuration diagram showing the position of the support block when the overtaking lane side is being constructed. 図6は、同橋台部胸壁の改良工法における道路部に仮設渡し版を設置した状態を示す説明図である。FIG. 6 is an explanatory view showing a state in which a temporary transfer plate is installed on the road portion in the improved method of the abutment chest wall. 図7は、走行車線、追い越し車線の両車線に支持ブロック、仮設渡し版を設置した道路部の断面構成図である。FIG. 7 is a cross-sectional configuration diagram of a road portion in which a support block and a temporary delivery plate are installed in both the traveling lane and the overtaking lane. 図8は、仮設渡し版を分割した例を示す説明図である。FIG. 8 is an explanatory diagram showing an example in which the temporary delivery version is divided. 図9は、仮設渡し版を取り外して一次掘削を実施する場合の要領を示す説明図である。FIG. 9 is an explanatory diagram showing a point when the temporary excavation plate is removed and primary excavation is performed. 図10は、仮設渡し版を取り外して二次掘削を実施する場合の要領を示す説明図である。FIG. 10 is an explanatory diagram showing a point in the case where the temporary excavation plate is removed and the secondary excavation is performed. 図11は、二次掘削する際に法面の崩落防止が必要な時の対策例を示す説明図である。FIG. 11 is an explanatory diagram showing a countermeasure example when it is necessary to prevent the slope from collapsing during secondary excavation. 図12は、二次掘削が完了した場合を示す説明図である。FIG. 12 is an explanatory diagram showing a case where the secondary excavation is completed. 図13は、胸壁設置工程を示す説明図である。FIG. 13 is an explanatory view showing a chest wall installation step. 図14は、既設の橋台部胸壁を撤去した後を示す説明図である。FIG. 14 is an explanatory view showing the state after the existing abutment chest wall is removed. 図15は、新設胸壁の結合状態を示す説明図である。FIG. 15 is an explanatory view showing a combined state of the new chest wall. 図16は、埋戻し工程を示す説明図である。FIG. 16 is an explanatory view showing the backfilling step. 図17は、埋戻し工程の完了を示す説明図である。FIG. 17 is an explanatory diagram showing the completion of the backfilling process. 図18は、同橋台部胸壁の改良工法における新渡し版の設置、再舗装、伸縮装置の設置を行う路面復旧工程を示す説明図である。FIG. 18 is an explanatory view showing a road surface restoration process for installing a new delivery plate, re-paving, and installing an expansion / contraction device in the improvement method of the abutment chest wall. 図19は、同橋台部胸壁の改良工法における新胸壁の他の種類を示す説明図である。FIG. 19 is an explanatory view showing another type of the new chest wall in the improvement method of the abutment chest wall. 図20は、同橋台部胸壁の改良工法における新胸壁の他の種類を示す説明図である。FIG. 20 is an explanatory view showing another type of the new chest wall in the improvement method of the abutment chest wall. 図21は、同橋台部胸壁の改良工法における新胸壁の他の種類を示す説明図である。FIG. 21 is explanatory drawing which shows the other kind of new chest wall in the improvement method of the abutment part chest wall. 図22は、新渡し版を新設胸壁に設置した例を示す説明図である。FIG. 22 is an explanatory view showing an example in which a new delivery version is installed on a new chest wall.

以下、一実施の形態を示す図面に基づいて、本発明を詳細に説明する。図1は本発明の一実施の形態である橋台部胸壁の改良工法における施工前の既設橋梁の橋桁端部および胸壁改良部を示す側面の説明図、図2は、たとえば夜間のみ交通を規制して施工し昼間は通行を解放する等により工事を実施した場合の施工後の橋梁端部を示す側面図である。ここで、本発明の橋台部胸壁の改良工法10は、交通遮断時に既設胸壁(橋台部胸壁14)の背面を掘削する掘削工程17と、前記既設胸壁を取り壊す既設胸壁撤去工程19と、前記掘削工程17で掘削した範囲で前記既設胸壁14の位置より後退した位置に新設胸壁20を設置し、橋梁端部と胸壁との間に空間を確保する胸壁設置工程18と、前記胸壁設置工程18で新設胸壁を設置した後に、新設胸壁の背面で掘削した範囲を埋戻す埋戻し工程22と、前記橋梁端部に伸縮装置受け28を設置するとともに、前記胸壁の上に新渡し版26を架け渡し、前記伸縮装置受け28と新渡し版26の間に伸縮装置を設置し、前記新渡し版26の上に再舗装や路線の復旧など路面を復旧する路面復旧工程27とから構成されている。   Hereinafter, the present invention will be described in detail with reference to the drawings illustrating an embodiment. FIG. 1 is an explanatory view of a side surface showing an end portion of a bridge girder and a chest wall improvement portion before construction in the improvement method of an abutment chest wall according to an embodiment of the present invention, and FIG. 2 regulates traffic only at night, for example. It is a side view which shows the bridge edge part after construction when construction is carried out by carrying out construction and releasing traffic during the daytime. Here, the abutment chest wall improvement method 10 according to the present invention includes an excavation step 17 for excavating the back of the existing chest wall (abutment portion chest wall 14) when traffic is interrupted, an existing chest wall removal step 19 for breaking the existing chest wall, and the excavation step. A new chest wall 20 is installed at a position retreated from the position of the existing chest wall 14 within the range excavated in step 17, and a chest wall installation step 18 for securing a space between the bridge end and the chest wall; After the new chest wall is installed, a backfilling step 22 for backfilling the excavated area on the back of the new chest wall, an expansion device receiver 28 is installed at the end of the bridge, and a new delivery plate 26 is installed on the chest wall. A telescopic device is installed between the telescopic device receiver 28 and the new delivery plate 26, and a road surface restoration step 27 is performed on the new delivery plate 26 to restore the road surface, such as re-paving and line restoration.

新設胸壁20はプレキャスト構造、場所打ちコンクリート構造があり現場の条件を考慮して選定することができる。夜間のみ交通を規制して施工し昼間は通行を解放する等の条件のように短期間で工事を完了したい場合の新設胸壁20は予め他の場所で製作するプレキャストとする。図3は、本発明の一実施の形態である橋台部胸壁の改良工法における、片側通行帯の区間もしくは両側通行帯の区間を昼夜間にわたり交通を規制して施工するなど該施工区間の交通を遮断する規制が可能で支持ブロック13が不要な場合の施工後の橋梁端部を示す側面図である。ただし、施工時の条件等により新渡し版26を支持する必要がある場合は、支持ブロック13を設けることもある。交通確保工程16のうち交通解放に必要な工程以外の、既設構造物の一部の舗装11、踏掛版12を撤去した後、掘削工程17により橋台部胸壁14の背面の盛土を掘削範囲21で掘削を行う。掘削を行った箇所に新設胸壁支持版29および新設胸壁20を設置するとともに、橋台部胸壁14を撤去し、掘削範囲21に地盤改良工程30による地盤改良土31を埋め戻し、伸縮装置25と伸縮装置受け28を設置する伸縮装置設置工程40とともに、新渡し版26を設置しその上に再舗装や路線等を復旧する路面復旧工程27とから構成されている。
新設胸壁20の製作はプレキャスト構造、場所打ちコンクリート構造があり現場の条件を考慮して選定する。交通の解放の必要がない場合や施工期間の制約が少ない場合は、前記胸壁設置工程における新設胸壁20や支持ブロック13を場所打ちコンクリートとすると経済的にも有利となる。
The new chest wall 20 has a precast structure and a cast-in-place concrete structure, and can be selected in consideration of on-site conditions. The new chest wall 20 in the case where it is desired to complete the construction in a short period of time, such as when traffic is restricted only at night and the traffic is released during the day, is precast that is manufactured in advance elsewhere. FIG. 3 shows the traffic of the construction section such as the construction of one side lane or the side lane in the improved construction method of the abutment part chest wall according to one embodiment of the present invention by restricting the traffic day and night. It is a side view which shows the bridge edge part after construction in case the restriction | limiting to interrupt | block is possible and the support block 13 is unnecessary. However, if it is necessary to support the new delivery plate 26 due to conditions during construction, the support block 13 may be provided. After removing the pavement 11 and the stepping plate 12 of the existing structure other than the steps necessary for releasing the traffic in the traffic securing process 16, the excavation process 17 removes the embankment on the back of the abutment chest wall 14 in the excavation range 21. Do excavation. The new chest wall support plate 29 and the new chest wall 20 are installed at the location where excavation is performed, the abutment part chest wall 14 is removed, the ground improvement soil 31 by the ground improvement process 30 is backfilled in the excavation area 21, and the expansion device 25 is expanded and contracted. In addition to the telescopic device installation process 40 for installing the device receiver 28, a new delivery plate 26 is installed, and a road surface restoration process 27 for restoring pavement, routes, and the like thereon.
The production of the new chest wall 20 has a precast structure and a cast-in-place concrete structure, and is selected in consideration of on-site conditions. When it is not necessary to release traffic or there are few restrictions on the construction period, it is economically advantageous to use cast-in-place concrete for the new chest wall 20 and the support block 13 in the chest wall installation process.

前記図2の交通規制の条件で説明する。交通確保工程16は、施工途中の車両の通行を確保するものである。新たに設置した支持ブロック13と既設の橋台部胸壁14および橋梁端部の間に仮設渡し版15を設置して交通を確保する。また、図4は施工前の道路の断面構成図である。交通確保工程16は、既設道路の一部、片側の車線ずつ施工することにより交通を確保する。例えば、追い越し車線側を先に施工する場合は、追い越し車線側の舗装11、及び踏掛版12を撤去し、撤去した道路部分に支持ブロック13を設置して、支持ブロック13と橋台部胸壁14の間に仮設渡し版15を設置する(図5〜8参照)。仮設渡し版15は支持ブロック13と橋台部胸壁14、および橋桁端部で支持される。橋桁端部に発生する橋桁の回転量や伸縮量が大きくなることが予想される場合は、橋桁端部の支持部に可動部を設けることもある。
夜間のみ交通規制を実施して施工する場合などのように片側車線の施工が一晩で完了しない場合は、支持ブロック13の範囲の舗装11、及び踏掛版12を撤去し、支持ブロック13を設置したあと舗装11を復旧して、昼間は交通解放を行う。追い越し車線側を施工している間でも、車両は走行車線側を通行することが可能で車両の通行を完全に停止することはない。
The description will be made under the traffic regulation conditions of FIG. The traffic securing step 16 secures traffic of the vehicle during construction. A temporary transfer plate 15 is installed between the newly installed support block 13 and the existing abutment chest wall 14 and the end of the bridge to secure traffic. FIG. 4 is a cross-sectional configuration diagram of the road before construction. The traffic securing process 16 secures traffic by constructing a part of an existing road and a lane on one side. For example, when constructing the overtaking lane side first, the pavement 11 and the stepping plate 12 on the overtaking lane side are removed, the support block 13 is installed on the removed road portion, and the support block 13 and the abutment part chest wall 14 are A temporary delivery plate 15 is installed between them (see FIGS. 5 to 8). The temporary delivery plate 15 is supported by the support block 13, the abutment part chest wall 14, and the end of the bridge girder. When it is expected that the amount of rotation and expansion / contraction of the bridge girder generated at the end of the bridge girder will increase, a movable part may be provided on the support part of the end of the bridge girder.
If the construction of one side lane is not completed overnight, such as when implementing traffic regulation only at night, remove the pavement 11 and the stepping plate 12 in the range of the support block 13 and install the support block 13 After that, the pavement 11 is restored and traffic is released in the daytime. Even while the overtaking lane side is being constructed, the vehicle can pass through the traveling lane side, and the traffic of the vehicle is not completely stopped.

図5に仮設渡し版15を設置した後の支持ブロック位置の断面図を示し、図6に仮設渡し版15を設置した後の側面図を示す。追い越し車線側の仮設渡し版15を設置し交通規制を実施する車線の切り替えを行い、走行車線側を施工する。走行車線側の施工では、同様に支持ブロック13を設置して、支持ブロック13と橋台部胸壁14の間に仮設渡し版15を設置する。この施工の間は車両は先に施工した仮設渡し版15上を通行する。このように、片側車線ごとに施工することにより、車両の通行を確保できる。図7に各車線に支持ブロック13及び仮設渡し版15を設置後の支持ブロック13位置の断面図を示す。   FIG. 5 shows a cross-sectional view of the support block position after the temporary delivery plate 15 is installed, and FIG. 6 shows a side view after the temporary delivery plate 15 is installed. A temporary transfer plate 15 on the overtaking lane side is installed to switch the lane for traffic regulation, and the traveling lane side is constructed. In the construction on the traveling lane side, the support block 13 is similarly installed, and the temporary delivery plate 15 is installed between the support block 13 and the abutment part chest wall 14. During this construction, the vehicle passes over the temporary delivery plate 15 previously constructed. Thus, the traffic of the vehicle can be ensured by constructing each lane. FIG. 7 shows a cross-sectional view of the position of the support block 13 after the support block 13 and the temporary transfer plate 15 are installed in each lane.

仮設渡し版15は、通行する交通の荷重に耐え、走行性を確保する構造となっているため、橋台部胸壁の改良工法施工時に該当施工区間を通行する交通の安全性が確保できる。また、仮設渡し版15の構造は支持ブロック13と橋台部胸壁14の支間長などを考慮してコンクリート構造、鋼構造、鋼とコンクリートの合成構造から選定する。仮設渡し版15は重量を考慮して分割することもあり、図8に仮設渡し版15を4分割した例を示す。仮設渡し版15を分割する数は交通規制の状態や仮設渡し版15の重量等を考慮して変更が可能である。   Since the temporary delivery plate 15 has a structure that can withstand the load of traffic that travels and secures traveling performance, it is possible to secure the safety of traffic that passes through the corresponding construction section when the abutment chest wall is improved. The structure of the temporary delivery plate 15 is selected from a concrete structure, a steel structure, and a composite structure of steel and concrete in consideration of the span length between the support block 13 and the abutment chest wall 14. The temporary delivery plate 15 may be divided in consideration of weight, and FIG. 8 shows an example in which the temporary delivery plate 15 is divided into four. The number of division of the temporary delivery plate 15 can be changed in consideration of the traffic regulation state, the weight of the temporary delivery plate 15 and the like.

掘削工程17においては、先ず、夜間等に交通を遮断した後、支持ブロック13と橋台部胸壁14の間に、交通を確保するために掛け渡していた仮設渡し版15を取り外し、その下を掘削する(図9参照)。また、掘削のための施工時間が制限されている場合や、一度に掘削すると地盤が崩壊する可能性がある場合は数次に分けて掘削を行うことができる。本実施例では、一次掘削と二次掘削の2度に分けて掘削する場合について説明する。また、本工法で計画している一次掘削及び二次掘削は、走行車線と追い越し車線の両車線側について同様に実施する。図10は、二次掘削する場合について説明する。ここで、二次掘削始点は支持ブロック13に作用する荷重と掘削する地盤の状態、及び埋戻し工程に使用する材料の性能を考慮して決定する。図11は、地盤の状態から二次掘削する法面の崩落防止が必要な場合であり、二次掘削始点近傍に地盤崩壊防止版23を設置する。図12は、一次掘削及び二次掘削が完了した状態を示す。二次掘削は、両車線側についても同様に実施する。施工時に仮設渡し版15は必要に応じて取り外して施工する。   In the excavation process 17, first, traffic is interrupted at night, etc., and then the temporary delivery plate 15 that has been bridged to secure traffic is removed between the support block 13 and the abutment chest wall 14, and the bottom is excavated. (See FIG. 9). Moreover, when the construction time for excavation is limited, or when there is a possibility that the ground will collapse when excavated at once, excavation can be performed in several steps. In the present embodiment, a case where excavation is divided into two times of primary excavation and secondary excavation will be described. In addition, the primary excavation and secondary excavation planned in this construction method will be carried out in the same way on both the driving lane and the overtaking lane. FIG. 10 illustrates the case of secondary excavation. Here, the secondary excavation start point is determined in consideration of the load acting on the support block 13, the state of the ground to be excavated, and the performance of the material used in the backfilling process. FIG. 11 shows a case where it is necessary to prevent the slope of the secondary excavation from collapsing from the ground state, and a ground collapse prevention plate 23 is installed in the vicinity of the secondary excavation starting point. FIG. 12 shows a state where the primary excavation and the secondary excavation are completed. Secondary excavation will be carried out on both lanes in the same way. At the time of construction, the temporary delivery plate 15 is removed and installed as necessary.

胸壁設置工程18は、図13に示すように新設胸壁20を新設胸壁支持版29の上に載置するとともに、新設胸壁固定具36で橋台に固着して、橋梁端部と胸壁との間に空間を確保する。
既設胸壁撤去工程19は、図14に示すように橋台に新設胸壁20を新設胸壁固定具36で固着した後、既設胸壁14を撤去する。既設胸壁14を撤去することにより、新設胸壁20と橋梁端部との間に点検・調査および補修・補強用の空間39が確保できる。
In the chest wall installation step 18, as shown in FIG. 13, the new chest wall 20 is placed on the new chest wall support plate 29, and is fixed to the abutment with the new chest wall fixture 36, and between the bridge end and the chest wall. Secure space.
In the existing chest wall removal step 19, as shown in FIG. 14, after the new chest wall 20 is fixed to the abutment with the new chest wall fixture 36, the existing chest wall 14 is removed. By removing the existing chest wall 14, a space 39 for inspection / investigation and repair / reinforcement can be secured between the new chest wall 20 and the bridge end.

地盤改良工程30は、掘削を行った箇所に新設胸壁支持版29および新設胸壁20を設置するとともに、橋台部胸壁14を撤去し、掘削範囲21に地盤改良土31を埋め戻す。図13は、新設胸壁20の設置時の側面の状態を示す。二次掘削を行った箇所に新設胸壁20を設置する箇所の地盤調整を行い、新設胸壁支持版29を敷設した上に新設胸壁20を設置する。施工時に仮設渡し版15は必要に応じて取り外して施工する。設置後に新設胸壁固定具36を用いて既設橋台に固定する。地盤の状態が良好で新設胸壁20を設置した後に地盤の沈下などが発生する可能性が小さい時は新設胸壁支持版29の敷設は不要である。あるいは、新設胸壁支持版29に代えて均しコンクリートや均しモルタルなどを施工してもよい。新設胸壁固定具36は、施工の対象とする構造物の状況や施工時や完成後の安全性が確保できる場合は使用しないこと、もしくは鋼製プレートやボルトなどを使用した簡便な装置に変更することもある。   In the ground improvement process 30, the new chest wall support plate 29 and the new chest wall 20 are installed at the location where excavation is performed, the abutment part chest wall 14 is removed, and the ground improvement soil 31 is backfilled in the excavation range 21. FIG. 13 shows the state of the side surface when the new chest wall 20 is installed. The ground adjustment of the place where the new chest wall 20 is installed at the place where the secondary excavation has been performed is performed, and the new chest wall 20 is installed after the new chest wall support plate 29 is laid. At the time of construction, the temporary delivery plate 15 is removed and installed as necessary. After installation, it is fixed to the existing abutment using the new chest wall fixture 36. When the ground condition is good and the possibility of ground subsidence occurring after the installation of the new chest wall 20 is small, the installation of the new chest wall support plate 29 is unnecessary. Alternatively, leveled concrete or leveled mortar may be applied instead of the new chest wall support plate 29. The new chest wall fixture 36 should not be used when the situation of the structure to be constructed and the safety at the time of construction or after completion can be secured, or it can be changed to a simple device using steel plates or bolts. Sometimes.

新設胸壁20は工場で運搬可能な大きさに分割されて製造される。新設胸壁20を設置したあとPC鋼材を用いて、分割されたブロックを一体化する。新設胸壁20が仮設渡し版15の荷重を支持できる状態になったあと、橋台部胸壁14を撤去する。図14に橋台部胸壁14を撤去した後の状態を示す。新設胸壁20の断面形状は逆T字形のほかに、コ字形をしたものやL字形がある。逆T字形が適しているが、条件によってはコ字形やL字形でも施工が可能な場合もある。図15に新設胸壁20のブロックを結合用PC鋼材38を用いて一体化した状態を示す。新設胸壁20の一体化は、ブロック同士を一体化する場合、既設橋台ウイング37も新設胸壁20と合わせて結合用PC鋼材38で一体化することもできる。新設胸壁20の大きさや背面の埋戻す材料などの施工条件によっては、結合用PC鋼材38以外の、例えば鉄筋などで連結することもできる。   The new chest wall 20 is manufactured by being divided into sizes that can be transported in a factory. After the new chest wall 20 is installed, the divided blocks are integrated using PC steel. After the new chest wall 20 can support the load of the temporary delivery plate 15, the abutment part chest wall 14 is removed. FIG. 14 shows a state after the abutment chest wall 14 is removed. The cross-sectional shape of the new chest wall 20 includes an inverted T-shape, a U-shape, and an L-shape. Inverted T-shape is suitable, but depending on conditions, construction may be possible even in U-shape or L-shape. FIG. 15 shows a state in which the block of the new chest wall 20 is integrated using the PC steel material 38 for coupling. When integrating the new chest wall 20, when the blocks are integrated, the existing abutment wing 37 can also be integrated with the PC wall material 38 for coupling together with the new chest wall 20. Depending on the construction conditions such as the size of the new chest wall 20 and the backfill material, it is possible to connect with a steel bar other than the connecting PC steel 38, for example.

埋戻し工程22は、前記の新設胸壁20背面の掘削を行った箇所に地盤改良土31を埋め戻す。夜間等に交通を遮断して支持ブロック13と橋台部胸壁14の間に掛け渡した仮設渡し版15を取り外し、埋戻しを行う。ここで、埋戻しに使用する地盤改良土31は、通行する車両の影響により沈下しない材料を選定する必要がある。例えば、原料土とセメントと水、原料土とセメントと水および気泡を混合して埋戻しに使用する。また、地盤改良土31は、施工期間等の施工条件を考慮して、撤去した埋戻し土が十分に締め固める事が可能であればそのまま利用できる。その他に、セメント系固化材を混合した改良土や土、セメント、水および気泡を混合した気泡混合軽量土、セメントと砂を混合したモルタル、発泡スチロール等を使用することができる。本改良工法の完了後の使用状態により、埋戻し工程22は地盤改良土31と仮設渡し版15の間に隙間を設けて完了することもある。図16、17は仮設渡し版15の間に隙間を設けない埋戻し工程22を説明する図である。   In the backfilling step 22, the ground improvement soil 31 is backfilled in the place where the back of the new chest wall 20 has been excavated. The traffic is interrupted at night or the like, and the temporary delivery plate 15 spanned between the support block 13 and the abutment part chest wall 14 is removed and backfilled. Here, as the ground improvement soil 31 used for backfilling, it is necessary to select a material that does not sink due to the influence of a passing vehicle. For example, raw material soil, cement and water, raw material soil, cement, water and air bubbles are mixed and used for backfilling. Further, the ground improvement soil 31 can be used as it is if the removed backfill soil can be sufficiently compacted in consideration of the construction conditions such as the construction period. In addition, improved soil and soil mixed with cement-based solidifying material, cement, water-mixed lightweight soil mixed with water and bubbles, mortar mixed with cement and sand, foamed polystyrene, and the like can be used. Depending on the state of use after the completion of this improvement method, the backfilling step 22 may be completed with a gap between the ground improvement soil 31 and the temporary delivery plate 15. 16 and 17 are diagrams for explaining the backfilling step 22 in which no gap is provided between the temporary delivery plates 15.

伸縮装置設置工程40において、伸縮装置受け28と伸縮装置25を設置する、再舗装工程27において、新渡し版26を設置しその上に再舗装等により路面を復旧する(図18参照)。新渡し版26は製造する方法により、予め他の場所で製作するプレキャスト構造と埋設型枠と場所打ちコンクリートを組みあわせたハーフプレキャスト構造に分類される。また、新渡し版26は構造により、PC構造、鉄筋コンクリート構造、鋼とコンクリートの合成構造などに分類される。
伸縮装置設置工程40において、設置する伸縮装置25は、伸縮装置の経年劣化により漏水が生じた場合でも橋梁端部が濡れないように、伸縮装置受け28を介して、橋桁端部から離した位置に設置する。橋梁の伸縮量が小さく伸縮装置25を設けなくても良い場合は、伸縮装置25と伸縮装置受け28を設けることなく、新渡し版26と橋体を直接接合すればよい。伸縮装置受け28は製造する方法により、予め他の場所で製作するプレキャスト構造と埋設型枠と場所打ちコンクリートを組みあわせたハーフプレキャスト構造、場所打ちコンクリート構造に分類される。
In the expansion / contraction device installation step 40, the expansion / contraction device receiver 28 and the expansion / contraction device 25 are installed. In the re-paving step 27, the new delivery plate 26 is installed and the road surface is restored by re-paving or the like (see FIG. 18). The new delivery plate 26 is classified into a precast structure manufactured in advance elsewhere, a half precast structure in which embedded formwork and cast-in-place concrete are combined, depending on the manufacturing method. Further, the new delivery plate 26 is classified according to the structure into a PC structure, a reinforced concrete structure, a composite structure of steel and concrete, and the like.
In the telescopic device installation step 40, the telescopic device 25 to be installed is located away from the end of the bridge girder via the telescopic device receiver 28 so that the bridge end does not get wet even when water leaks due to aging of the telescopic device. Install in. When the expansion / contraction amount of the bridge is small and the expansion / contraction device 25 does not need to be provided, the new delivery plate 26 and the bridge body may be directly joined without providing the expansion / contraction device 25 and the expansion / contraction device receiver 28. The expansion device receiver 28 is classified according to the manufacturing method into a precast structure manufactured in advance elsewhere, a half precast structure in which an embedded formwork and cast-in-place concrete are combined, and cast-in-place concrete structure.

以上のように構成された橋台部胸壁の改良工法10は、本実施例に示す夜間のみ交通を規制して施工し昼間は通行を解放する厳しい条件でも、工事に要する期間、交通を完全に遮断することなく、短期間に狭隘な橋台と既設橋との遊間を拡張して作業員が入れる空間39を確保できる。確保する空間は高さが1000mm以上、幅は人が進入するのみの場合は500mm以上、維持管理の作業を実施する場合は好ましくは1000mm以上、より好ましくは1500mm以上2500mm以下とする。この点検・調査および補修・補強用の空間39を活用することにより、これまで劣化が激しくとも維持管理業務が不可能であった橋梁端部の点検、補修を可能とし、橋梁の供用期間を延長することができる。   The construction method 10 of the abutment chest wall configured as described above is to completely block traffic during the time required for construction even under severe conditions in which traffic is restricted only during nighttime and traffic is released during the daytime. Without this, the space 39 between the narrow abutment and the existing bridge can be expanded in a short time to secure a space 39 for a worker to enter. The space to be secured has a height of 1000 mm or more, a width of 500 mm or more when only a person enters, and a maintenance management work of preferably 1000 mm or more, more preferably 1500 mm or more and 2500 mm or less. By utilizing this inspection / investigation and repair / reinforcement space 39, it is possible to inspect and repair bridge ends that have been impossible to maintain even if they have been severely deteriorated, and extend the service period of the bridge. can do.

以上の実施例では、新設胸壁20は逆T字に類した形状で説明したが、この他にも図19〜22に示す形状を適用することができる。
図19に示すのは、新設胸壁20の断面形状を逆T字状に加えて、底壁20aと並行に上端に頂壁20bを設けたものである。このように構成した場合、頂壁20bの上に新渡し版26を載せた際、安定して保持することができる。
図20〜図21に示すのは、新設胸壁20の断面形状が略コ字状に形成された実施例である。本実施の形態では、コ字状部分を点検・調査および補修・補強用の空間39として使用できる。また、図21に示す例では、橋台の上に直接新設胸壁20を載せている。また、図22に示す例では、新渡し版26を新設胸壁20の頂壁20bに接続することも出来る。
In the above embodiment, the new chest wall 20 has been described as having a shape similar to an inverted T shape, but other shapes shown in FIGS. 19 to 22 can be applied.
In FIG. 19, the cross-sectional shape of the new chest wall 20 is added to an inverted T shape, and a top wall 20b is provided at the upper end in parallel with the bottom wall 20a. When comprised in this way, when the new delivery plate 26 is mounted on the top wall 20b, it can hold | maintain stably.
20 to 21 show an embodiment in which the cross-sectional shape of the new chest wall 20 is formed in a substantially U shape. In the present embodiment, the U-shaped portion can be used as a space 39 for inspection / inspection and repair / reinforcement. In the example shown in FIG. 21, the new chest wall 20 is placed directly on the abutment. In the example shown in FIG. 22, the new delivery plate 26 can be connected to the top wall 20 b of the new chest wall 20.

更に、本発明は上述の実施例に限定されることなく、特許請求の範囲の記載に基づいて種々の設計変更が可能である。   Furthermore, the present invention is not limited to the above-described embodiments, and various design changes can be made based on the description of the scope of claims.

10 橋台部胸壁の改良工法
11 舗装
12 踏掛版
13 支持ブロック
14 橋台部胸壁(既設胸壁)
15 仮設渡し版
16 交通確保工程
17 掘削工程
18 胸壁設置工程
19 既設胸壁撤去工程
20 新設胸壁
20a 底壁
20b 頂壁
21 掘削範囲
22 埋戻し工程
23 地盤崩壊防止版
25 伸縮装置
26 新渡し版
27 路面復旧工程
28 伸縮装置受け
29 新設胸壁支持版
30 地盤改良工程
31 地盤改良土
32 壁高欄・路側帯
33 中央分離帯・路側帯
34 走行車線
35 追い越し車線
36 新設胸壁固定具
37 既設橋台ウイング
38 結合用PC鋼材
39 点検・調査および補修・補強用の空間
40 伸縮装置設置工程
10 Improvement method of abutment chest wall 11 Pavement 12 Foot plate 13 Support block 14 Abutment chest wall (existing chest wall)
DESCRIPTION OF SYMBOLS 15 Temporary delivery plate 16 Traffic securing process 17 Excavation process 18 Chest wall installation process 19 Existing chest wall removal process 20 New chest wall 20a Bottom wall 20b Top wall 21 Excavation range 22 Backfill process 23 Ground collapse prevention plate 25 Expansion device 26 New delivery plate 27 Road surface Restoration process 28 Retracting device holder 29 New chest wall support plate 30 Ground improvement process 31 Ground improvement soil 32 Wall railing / roadside belt 33 Median strip / roadside belt 34 Driving lane 35 Passing lane 36 New chest wall fixture 37 Existing abutment wing 38 For connection PC steel 39 Inspection / inspection and repair / reinforcement space 40 Telescopic device installation process

Claims (6)

交通遮断時に既設胸壁の背面を掘削する掘削工程と、
前記既設胸壁を取り壊す既設胸壁撤去工程と、
前記掘削工程で掘削した範囲で前記既設胸壁の位置より後退した位置に新設胸壁を設置し、橋梁端部と胸壁との間に空間を確保する胸壁設置工程と、
前記胸壁設置工程で新設胸壁を設置した後に、新設胸壁の背面で掘削した範囲を埋戻す埋戻し工程と、
前記橋梁端部に伸縮装置受けを設置するとともに、前記胸壁の上に新渡し版を架け渡し、前記伸縮装置受けと新渡し版の間に伸縮装置を設置し、前記新渡し版の上に再舗装や路線の復旧など路面を復旧する路面復旧工程と、
からなることを特徴とする橋台部胸壁の改良工法。
An excavation process for excavating the back of the existing chest wall when traffic is interrupted;
An existing chest wall removing step of demolishing the existing chest wall;
A chest wall installation step of installing a new chest wall at a position retreated from the position of the existing chest wall in the range excavated in the excavation step, and securing a space between the bridge end and the chest wall;
After installing the new chest wall in the chest wall installation step, a backfilling step of backfilling the area excavated on the back of the new chest wall;
A telescopic device receiver is installed at the end of the bridge, and a new delivery plate is installed on the chest wall, and an expansion device is installed between the telescopic device receiver and the new delivery plate, and is re-mounted on the new delivery plate. Road surface restoration process to restore the road surface, such as paving and route restoration,
A method for improving the abutment chest wall characterized by comprising:
前記掘削工程の前に既設道路の一部の舗装、踏掛版を撤去し、撤去した道路に支持ブロックを設置するとともに、支持ブロックと橋台部胸壁の間に仮設渡し版を設置して交通を確保する交通確保工程を備え、
前記掘削工程の交通遮断時に前記仮設渡し版を取り外した後、前記既設胸壁の背面土を掘削することを特徴とする請求項1に記載の橋台部胸壁の改良工法。
Prior to the excavation process, part of the existing road was removed from the pavement and stepping plates, and a support block was installed on the removed road, and a temporary transfer plate was installed between the support block and the abutment chest wall to secure traffic. With a traffic securing process
The method for improving an abutment chest wall according to claim 1, wherein after the temporary transfer plate is removed at the time of traffic interruption in the excavation process, the back soil of the existing chest wall is excavated.
前記胸壁設置工程における新設胸壁は、予め製作したプレキャスト部材であることを特徴とする請求項1または2に記載の橋台部胸壁の改良工法。   The improvement method of the abutment part chest wall according to claim 1 or 2, wherein the new chest wall in the chest wall installation step is a precast member manufactured in advance. 前記胸壁設置工程における新設胸壁の断面は逆T字に類似した形状をしたことを特徴とする請求項1〜3の何れか1に記載の橋台部胸壁の改良工法。   The method for improving an abutment chest wall according to any one of claims 1 to 3, wherein a cross-section of the new chest wall in the chest wall installation step has a shape similar to an inverted T-shape. 前記埋戻し工程において、埋め戻す材料は土とセメント、水などを混合した改良土を使用することを特徴とする請求項1〜4の何れか1に記載の橋台部胸壁の改良工法。   5. The improvement method for an abutment chest wall according to claim 1, wherein, in the backfilling step, the backfilling material uses an improved soil in which soil, cement, water, and the like are mixed. 前記路面復旧工程において、伸縮装置は、伸縮装置の経年劣化により漏水の可能性が生じた場合でも橋桁端部で直接漏れないように、橋桁端部から離した位置に設置することを特徴とする請求項1〜5の何れか1に記載の橋台部胸壁の改良工法。 In the road surface restoration step , the telescopic device is installed at a position away from the bridge girder end so that it does not leak directly at the bridge girder end even if there is a possibility of water leakage due to aging of the telescopic device. The improvement method of the abutment part chest wall of any one of Claims 1-5.
JP2012076582A 2012-03-29 2012-03-29 Improvement method of abutment chest wall Active JP5928944B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2012076582A JP5928944B2 (en) 2012-03-29 2012-03-29 Improvement method of abutment chest wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2012076582A JP5928944B2 (en) 2012-03-29 2012-03-29 Improvement method of abutment chest wall

Publications (2)

Publication Number Publication Date
JP2013204362A JP2013204362A (en) 2013-10-07
JP5928944B2 true JP5928944B2 (en) 2016-06-01

Family

ID=49523748

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2012076582A Active JP5928944B2 (en) 2012-03-29 2012-03-29 Improvement method of abutment chest wall

Country Status (1)

Country Link
JP (1) JP5928944B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106894324A (en) * 2017-01-12 2017-06-27 中交第二公路勘察设计研究院有限公司 Highway embankment and the anti-jump car device of abutment joining section Fuliang

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104727232B (en) * 2015-02-26 2016-06-08 北京公联信达智能交通技术有限责任公司 Repair the local facture again of U-shaped abutment longitudinal cracking
CN105113384A (en) * 2015-09-23 2015-12-02 福州大学 Z-shaped bridge end transition slab structure and construction method thereof
CN106087758A (en) * 2016-08-06 2016-11-09 桂林理工大学 A kind of construction method of the road and bridge attachment structure for slowing down bumping at bridge-head
CN109322238B (en) * 2018-12-10 2019-11-22 山东大学 A seamless bridge of ultra-high toughness cement-based composite material and its construction method
CN113605235A (en) * 2020-07-08 2021-11-05 苏交科集团股份有限公司 Composite abutment construction method
DE102021204003A1 (en) * 2021-04-21 2022-10-27 Maurer Engineering Gmbh Method for replacing a transition structure, transition structure for bridging a structural joint in a structure and structure with a transition structure

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59116409U (en) * 1982-12-29 1984-08-06 石川島建材工業株式会社 pedestal for tokake version
JPS6260605U (en) * 1985-09-30 1987-04-15
JP3621291B2 (en) * 1999-05-20 2005-02-16 株式会社ピーエス三菱 Expansion joint structure of bridge
JP2004003277A (en) * 2002-04-26 2004-01-08 Gaeart Kumagai Co Ltd Expansion joint for road
JP4167149B2 (en) * 2003-08-25 2008-10-15 財団法人鉄道総合技術研究所 Construction method of abutment accompanying bridge reconstruction
JP3917146B2 (en) * 2004-04-21 2007-05-23 誠 植村 Laying method and removing method of lining plate in open shield method
JP4020918B2 (en) * 2005-02-24 2007-12-12 朝日エンヂニヤリング株式会社 Bridge structure of girder bridge
JP2009209591A (en) * 2008-03-05 2009-09-17 Nippon Kyoryo Kensetsu Kyokai Subsidence prevention measures for floor system
JP5166333B2 (en) * 2009-03-19 2013-03-21 三井住友建設株式会社 Telescopic device support structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106894324A (en) * 2017-01-12 2017-06-27 中交第二公路勘察设计研究院有限公司 Highway embankment and the anti-jump car device of abutment joining section Fuliang

Also Published As

Publication number Publication date
JP2013204362A (en) 2013-10-07

Similar Documents

Publication Publication Date Title
JP5928944B2 (en) Improvement method of abutment chest wall
KR101344063B1 (en) The construction method of steel-concrete underpass
KR101288601B1 (en) Underpass using precast concrete pile and bottom slab and method for constructing the same
KR101364805B1 (en) Underground structure construction method with unit wall block
KR101363878B1 (en) Temporary construction and originally construction the outer layer of a 2-layer wall type underground road building method
KR100814388B1 (en) How to raise a bridge while driving
KR101167511B1 (en) Underpass using precast concrete pile and method for constructing the same
KR20160089215A (en) Non-abutment bridge structure using precast concrete retaining wall and pile, and method for constructing this same
JP5015049B2 (en) Pier extension method
JP4765965B2 (en) Revetment integrated ramen bridge and its construction method
CN114922226A (en) Method for staged construction of underpass
JP6177468B1 (en) Installation or replacement of tunnel inverts in service
KR100847726B1 (en) Prestressed Concrete Pavement Structure and Construction Method
JP4406577B2 (en) Digging road
KR101761477B1 (en) Construction method of jointless bridge with reinforced earth retaining wall and spread bearing block
KR101439400B1 (en) A hinged base structure of arch-shaped composite structure with the precast concrete pannel and the steel frame using the open trench tunnel and method for constructing arch-shaped open trench tunnel
JP5915074B2 (en) How to form an underground space under a ground transportation
JP6144726B2 (en) Rehabilitation method for mountain road tunnels on expressway and suspension pier for rehabilitation method
KR101701220B1 (en) Road expansion structure and construction method thereof
JP6166454B1 (en) Construction method of artificial ground on semi-underground road
KR100510092B1 (en) A one-piece type arch-shaped structure with the precast concrete pannel and the steel frame under the earth, and method for manufacturing it
JP2006112086A (en) Bridge structure and its replacement method
JP2005220526A (en) Overhead crossing and its construction method
CN115821714A (en) Corrugated steel-concrete superposed arch bridge and construction method thereof
KR101288602B1 (en) Underpass using precast concrete pile and method for constructing the same

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20150119

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20150225

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20151028

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20151110

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20151218

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20160329

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20160415

R150 Certificate of patent or registration of utility model

Ref document number: 5928944

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313117

R371 Transfer withdrawn

Free format text: JAPANESE INTERMEDIATE CODE: R371

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313117

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350