Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP5960490B2 - Power supply system for photovoltaic power generation apparatus, and information processing terminal device, washing / drying machine and refrigerator used therefor - Google Patents
[go: Go Back, main page]

JP5960490B2 - Power supply system for photovoltaic power generation apparatus, and information processing terminal device, washing / drying machine and refrigerator used therefor - Google Patents

Power supply system for photovoltaic power generation apparatus, and information processing terminal device, washing / drying machine and refrigerator used therefor Download PDF

Info

Publication number
JP5960490B2
JP5960490B2 JP2012102193A JP2012102193A JP5960490B2 JP 5960490 B2 JP5960490 B2 JP 5960490B2 JP 2012102193 A JP2012102193 A JP 2012102193A JP 2012102193 A JP2012102193 A JP 2012102193A JP 5960490 B2 JP5960490 B2 JP 5960490B2
Authority
JP
Japan
Prior art keywords
time
power
predetermined
surplus
determined
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2012102193A
Other languages
Japanese (ja)
Other versions
JP2013070593A (en
Inventor
晃二 古寺
晃二 古寺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sharp Corp
Original Assignee
Sharp Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sharp Corp filed Critical Sharp Corp
Priority to JP2012102193A priority Critical patent/JP5960490B2/en
Publication of JP2013070593A publication Critical patent/JP2013070593A/en
Application granted granted Critical
Publication of JP5960490B2 publication Critical patent/JP5960490B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B10/00Integration of renewable energy sources in buildings
    • Y02B10/10Photovoltaic [PV]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B10/00Integration of renewable energy sources in buildings
    • Y02B10/20Solar thermal
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]
    • Y02B30/70Efficient control or regulation technologies, e.g. for control of refrigerant flow, motor or heating
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B40/00Technologies aiming at improving the efficiency of home appliances, e.g. induction cooking or efficient technologies for refrigerators, freezers or dish washers
    • Y02B40/18Technologies aiming at improving the efficiency of home appliances, e.g. induction cooking or efficient technologies for refrigerators, freezers or dish washers using renewables, e.g. solar cooking stoves, furnaces or solar heating
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/242Home appliances
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/242Home appliances
    • Y04S20/244Home appliances the home appliances being or involving heating ventilating and air conditioning [HVAC] units

Landscapes

  • Main Body Construction Of Washing Machines And Laundry Dryers (AREA)
  • Detail Structures Of Washing Machines And Dryers (AREA)
  • Control Of Washing Machine And Dryer (AREA)
  • Devices That Are Associated With Refrigeration Equipment (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Description

本発明は、太陽光発電装置の給電システム、ならびに、太陽光発電装置にネットワーク接続された情報処理端末装置、洗濯乾燥機および冷蔵庫に関する。   The present invention relates to a power feeding system for a solar power generation device, and an information processing terminal device, a washing / drying machine, and a refrigerator that are network-connected to the solar power generation device.

近年、一般家庭に太陽光発電装置が取り付けられる件数が増加している。家庭内では、取り付けられた太陽光発電装置の発電力を使用して家電機器を作動させている。このように、太陽光発電装置を利用することにより、地球温暖化対策の一助を担うことができる。また、家庭内で使用される電力をできるだけ太陽光発電装置で賄うためには、太陽光発電装置の発電量を増加させる必要がある。一方、太陽光発電装置が発生させる電力を無駄なく使用することにより、家庭内で使用される電力のうちの多くを太陽光発電装置で賄うことができる。   In recent years, the number of solar power generation devices installed in ordinary households has increased. At home, home appliances are operated using the power generated by the attached photovoltaic power generation device. In this manner, by using the solar power generation device, it is possible to take a part in helping to counter global warming. Moreover, in order to cover the electric power used in the home with the solar power generator as much as possible, it is necessary to increase the power generation amount of the solar power generator. On the other hand, by using the electric power generated by the solar power generation apparatus without waste, most of the electric power used in the home can be covered by the solar power generation apparatus.

特開平4−130507号公報(特許文献1)には、太陽光発電装置が発生させた電力を効率よく利用することが可能な太陽電池駆動式機器が記載されている。特開平4−130507号公報(特許文献1)に記載された太陽電池駆動式機器は、太陽電池と、家電機器としての主機器および従機器とを備えている。主機器と従機器とは、太陽電池が発生させた電力を使用する機器である。太陽電池駆動式機器は、主機器の作動が停止している場合または太陽電池の発電量に余剰が生じる場合に、太陽電池の発電力を利用することによって従機器を作動させる。   Japanese Patent Application Laid-Open No. 4-130507 (Patent Document 1) describes a solar cell driven device that can efficiently use the power generated by a solar power generation device. A solar cell drive type device described in Japanese Patent Laid-Open No. 4-130507 (Patent Document 1) includes a solar cell, a main device as a home appliance, and a sub device. The main device and the slave device are devices that use the power generated by the solar cell. When the operation of the main device is stopped or the surplus in the amount of power generated by the solar cell occurs, the solar cell driven device operates the slave device by using the power generated by the solar cell.

一方、一般家庭で使用される空調機器、冷蔵庫、照明機器、または、洗濯機等の各種の家電機器には、地球温暖化対策として、電力消費量を低減させること(つまり、省エネ化)が要求されている。また、各種の家電機器と情報処理端末装置とをネットワークで接続することにより、各種の家電機器と情報処理端末装置とが通信可能であるように構成されたネットワーク技術、または、ネットワーク技術に対応した家電機器が開発されている。このような技術によれば、情報処理端末装置は、各家電機器の消費電力および動作モード等の情報を収集し、且つ、収集した情報に基づいて各家電機器を制御する。   On the other hand, various household electrical appliances such as air conditioners, refrigerators, lighting devices, and washing machines used in general households are required to reduce power consumption (that is, to save energy) as a measure against global warming. Has been. In addition, by connecting various home appliances and information processing terminal devices via a network, network technology configured to enable communication between various home appliances and information processing terminal devices, or network technology Home appliances are being developed. According to such a technique, the information processing terminal device collects information such as the power consumption and the operation mode of each home appliance, and controls each home appliance based on the collected information.

ネットワーク技術に対応した家電機器の一例として、洗濯乾燥機は、洗濯または乾燥の終了時期を使用者から要求されるとしても、要求された洗濯または乾燥の終了時期が達成されるように運転を開始し、且つ、運転していればよい。また、使用者から要求される洗濯または乾燥の終了時期は、洗濯乾燥機に衣類等が投入されてからすぐ後ではなく、比較的先である場合が多い。このように、洗濯乾燥機が実際に作動しなければならない時間帯は、他の種類の家電機器のものに比べて、あまり制約を受けない。   As an example of home appliances that support network technology, a laundry dryer starts operation so that the requested end time for washing or drying is achieved even if the end time for washing or drying is requested by the user. And it is only necessary to drive. In addition, the end time of washing or drying requested by the user is often relatively early rather than immediately after clothes or the like are put into the washing / drying machine. In this way, the time period during which the washing / drying machine must actually operate is not so limited as compared with that of other types of home appliances.

洗濯乾燥機において、特に洗濯に加えて乾燥が実施される場合には、洗濯乾燥機の役割がすべて果たされるため、洗濯乾燥機が実際に作動しなければならない時間帯は、洗濯だけが実施される場合に比べてさらに制約を受けない。そのため、太陽光発電装置の発電量に余剰が生じる時間帯に洗濯乾燥機を作動させることにより、使用者は、太陽光発電装置が発生させる電力を無駄なく使用することができる。このように、洗濯乾燥機は、太陽光発電装置の発電量に余剰が生じる時間帯に作動させたいという使用者の要望に対して、比較的高い自由度を有している。しかしながら、洗濯乾燥機において、洗濯に加えて乾燥が実施される場合には、使用される電力は増加する。   In the washing and drying machine, especially when drying is performed in addition to washing, the role of the washing and drying machine is fulfilled. Therefore, only the washing is carried out during the time when the washing and drying machine must actually operate. There are no further restrictions compared to the case. Therefore, the user can use the electric power generated by the solar power generation device without waste by operating the washing and drying machine in a time zone when the power generation amount of the solar power generation device is excessive. As described above, the washing / drying machine has a relatively high degree of freedom with respect to the user's desire to operate in a time zone in which surplus in the amount of power generated by the photovoltaic power generation apparatus occurs. However, in a washing / drying machine, when drying is performed in addition to washing, electric power used increases.

特開2007−236538号公報(特許文献2)には、電気料金重視の度合いや生活リズムを考慮して使用者がその場に応じた最適な時間帯で自動運転させることのできる全自動洗濯乾燥機が記載されている。特開2007−236538号公報(特許文献2)に記載された全自動洗濯乾燥機は、洗濯する衣類の重量を検出する衣類重量検出手段と、検出した衣類重量に基づいて全工程に必要な運転所要時間を予想する運転所要時間予想手段と、電力単価の安い優先時間帯を記憶しておく優先時間帯記憶手段と、運転所要時間予想手段が予想した運転所要時間と優先時間帯とに基づき、優先時間帯の利用の仕方で区分けした複数の運転モードについて各モードの運転開始時刻と運転終了予想時刻を算出して使用者に提示する運転時間帯算出手段と、運転時間帯算出手段が提示した情報に基づいて使用者が選択した運転モードについての算出された運転開始時刻に運転を開始して全工程を連続して実行する洗濯乾燥手段とを備えている。   Japanese Patent Application Laid-Open No. 2007-236538 (Patent Document 2) describes a fully automatic washing and drying method that allows a user to automatically drive in an optimal time zone according to the situation in consideration of the importance of electricity charges and life rhythm. The machine is listed. Japanese Patent Application Laid-Open No. 2007-236538 (Patent Document 2) describes a fully automatic washing / drying machine that detects the weight of clothes to be washed, and a necessary operation for all processes based on the detected weight of clothes. Based on the operation required time prediction means for predicting the required time, the priority time zone storage means for storing the priority time zone where the unit price of electricity is low, and the operation required time and the priority time zone predicted by the operation required time prediction means, Driving time zone calculating means for calculating the driving start time and expected driving end time of each mode and presenting it to the user for a plurality of driving modes divided according to how to use the priority time zone, and driving time zone calculating means presented Washing and drying means for starting the operation at the calculated operation start time for the operation mode selected by the user based on the information and continuously executing all the steps.

特開2007−236538号公報(特許文献2)に記載された全自動洗濯乾燥機によれば、使用者は、その場に応じた最適な運転モードを選択することにより、電気料金を節約したり、生活リズムを守ったりすることができる。また、特開2007−236538号公報(特許文献2)に記載された全自動洗濯乾燥機は、燃料電気コジェネレーションシステム、太陽電池コジェネレーションシステム等の補助給電装置の発電電力量に関する情報を受ける通信装置を備えている。運転モードには、通信装置が受信した発電電力量が所定値を超えた時に運転を開始する特殊なモードが含まれている。洗濯乾燥手段は、特殊なモードが使用者によって選択された場合には、通信装置が受信した発電電力量が所定値を超えた時に運転を開始して全工程を連続して実行する。このように、電力単価の安いコジェネレーションシステムの発電電力を利用できる特殊なモードが設けられていることにより、特開2007−236538号公報(特許文献2)に記載された全自動洗濯乾燥機は、電気料金の節約をさらに図ることができる。   According to the fully automatic washer / dryer described in Japanese Patent Application Laid-Open No. 2007-236538 (Patent Document 2), the user can save electricity charges by selecting an optimal operation mode according to the situation. , Can keep the rhythm of life. Moreover, the fully automatic washing dryer described in Unexamined-Japanese-Patent No. 2007-236538 (patent document 2) is communication which receives the information regarding the electric power generation amount of auxiliary power supply apparatuses, such as a fuel electric cogeneration system and a solar cell cogeneration system. Equipment. The operation mode includes a special mode in which operation is started when the amount of generated power received by the communication device exceeds a predetermined value. When a special mode is selected by the user, the washing and drying means starts operation when the amount of generated power received by the communication device exceeds a predetermined value and continuously executes all the steps. Thus, the fully automatic washing and drying machine described in JP 2007-236538 A (Patent Document 2) is provided by providing a special mode in which the generated power of the cogeneration system with a low unit price of electric power can be used. In addition, the electricity bill can be further saved.

特開平4−130507号公報JP-A-4-130507 特開2007−236538号公報JP 2007-236538 A

一般的に、太陽光発電装置の発電量は、一日の時間帯および天気の影響によって刻々と変化する。また、家庭内で使用する家電機器の消費電力も刻々と変化する。例えば、任意の時点において、太陽光発電装置が十分に大きい量を発電しているとしても、当該時点から幾らかの時間が経過した後には、発電量が減少しているような場合が想定される。そのため、各家電機器によって消費される電力量と、太陽光発電装置の発電量との差も刻々と変化する。一方、家電機器のうちの洗濯乾燥機を実際に運転させることを考慮する場合には、洗濯を開始してから乾燥が完了するまでの連続した時間帯において、洗濯乾燥機には一定の電力が必要である。   Generally, the amount of power generated by a solar power generation device changes every moment due to the influence of the time of day and the weather. In addition, the power consumption of home appliances used in the home changes every moment. For example, even if the photovoltaic power generator is generating a sufficiently large amount at any point in time, it is assumed that the amount of power generation has decreased after some time has passed since that point. The Therefore, the difference between the amount of power consumed by each home appliance and the amount of power generated by the solar power generator also changes every moment. On the other hand, when taking into account the actual operation of a washing / drying machine among household electrical appliances, a constant power is supplied to the washing / drying machine in a continuous time period from the start of washing to the completion of drying. is necessary.

特開平4−130507号公報(特許文献1)に記載された太陽電池駆動式機器において、太陽電池駆動式機器は、主機器の作動が停止している場合または太陽電池の発電量に余剰が生じる場合に、太陽電池が発生させた電力を利用することによって従機器を作動させている。しかしながら、特開平4−130507号公報(特許文献1)に記載された太陽電池駆動式機器は、任意の時点の主機器の作動の状態および太陽電池の発電量に応じて当該従機器を作動させている。   In the solar cell drive type device described in JP-A-4-130507 (Patent Document 1), the solar cell drive type device has a surplus in the amount of power generated by the solar cell when the operation of the main device is stopped. In some cases, the slave device is operated by using the electric power generated by the solar cell. However, the solar cell drive type device described in Japanese Patent Application Laid-Open No. 4-130507 (Patent Document 1) operates the slave device according to the operation state of the main device at an arbitrary time and the power generation amount of the solar cell. ing.

また、特開2007−236538号公報(特許文献2)に記載された全自動洗濯乾燥機において、洗濯乾燥手段は、特殊なモードが使用者によって選択された場合には、通信装置が受信した発電電力量が所定値を超えた時に運転を開始して全工程を連続して実行する。しかしながら、発電電力量が所定値を超えたことが判断されることによって当該全自動洗濯乾燥機の運転が開始された後に発電電力量が所定値以下に低下したとしても、運転は中止されずに、そのまま最後の工程が終了するまで運転が継続される。ただし、運転が継続されている間に、商用電源から供給される電力または補助給電装置が発電させた電力のどちらが用いられるかは不明である。このように、特開2007−236538号公報(特許文献2)に記載された全自動洗濯乾燥機においても、任意の時点の補助給電装置の発電電力量が当該全自動洗濯乾燥機の洗濯開始に係る判断に用いられている。   Further, in the fully automatic washing and drying machine described in Japanese Patent Application Laid-Open No. 2007-236538 (Patent Document 2), the washing and drying unit is configured to generate power received by the communication device when a special mode is selected by the user. When the electric energy exceeds a predetermined value, the operation is started and all the processes are continuously executed. However, even if the generated power amount falls below a predetermined value after the operation of the fully automatic washing and drying machine is started by determining that the generated power amount has exceeded a predetermined value, the operation is not stopped. The operation is continued until the last step is finished. However, it is unclear whether the electric power supplied from the commercial power source or the electric power generated by the auxiliary power feeding device is used while the operation is continued. As described above, also in the fully automatic washing and drying machine described in Japanese Patent Application Laid-Open No. 2007-236538 (Patent Document 2), the amount of power generated by the auxiliary power supply device at an arbitrary time is the start of washing of the fully automatic washing and drying machine. It is used for such judgment.

上述のように、洗濯乾燥機を実際に運転させることを考慮する場合には、洗濯を開始してから乾燥が完了するまでの連続した時間帯において、洗濯乾燥機に一定の電力が必要である。すなわち、任意の時点においてのみ、太陽光発電装置の発電量を情報処理装置が把握することによっては、洗濯乾燥機を運転させる際に太陽光発電装置が発生させた電力を効率的に利用しているとはいえない。   As described above, when considering the actual operation of the washing / drying machine, the washing / drying machine needs a certain amount of power in a continuous time period from the start of washing to the completion of drying. . In other words, the information processing device grasps the power generation amount of the solar power generation device only at an arbitrary point of time, thereby efficiently using the power generated by the solar power generation device when operating the washing dryer. I can't say.

また、冷蔵庫において実際に除霜動作が行われることを考慮する場合には、除霜動作が開始されてから終了するまでの連続した時間帯において、冷蔵庫に一定の電力が必要である。すなわち、任意の時点においてのみ、太陽光発電装置の発電量を情報処理装置が把握することによっては、除霜動作が行われる際に太陽光発電装置が発生させた電力を効率的に利用しているとはいえない。   When considering that the defrosting operation is actually performed in the refrigerator, constant power is required for the refrigerator in the continuous time period from the start of the defrosting operation to the end thereof. That is, only at an arbitrary time point, the information processing device grasps the power generation amount of the solar power generation device, thereby efficiently using the power generated by the solar power generation device when the defrosting operation is performed. I can't say.

さらに、洗濯乾燥機および冷蔵庫等といった複数の家電機器を、太陽光発電装置の発電量に余剰が生じる時間帯に合わせて作動させる場合には、太陽光発電装置の発電力と、それら複数の家電機器の作動のために消費される電力とを考慮する必要がある。   Furthermore, when operating a plurality of home appliances such as a washing and drying machine and a refrigerator in accordance with a time zone in which the power generation amount of the solar power generation device is surplus, the power generation of the solar power generation device and the plurality of home appliances It is necessary to consider the power consumed for the operation of the equipment.

そこで、本発明の目的は、太陽光発電装置が発生させた電力を効率的に利用することが可能な太陽光発電装置の給電システム、ならびに、それに用いられる情報処理端末装置、洗濯乾燥機および冷蔵庫を提供することである。   SUMMARY OF THE INVENTION An object of the present invention is to provide a power supply system for a solar power generation apparatus that can efficiently use the power generated by the solar power generation apparatus, and an information processing terminal device, a washing / drying machine, and a refrigerator used therefor. Is to provide.

本発明に従った太陽光発電装置の給電システムは、太陽光発電装置と、所定の家電機器と所定の家電機器以外の他の家電機器とを含む複数の家電機器と、情報処理端末装置とを備えている。複数の家電機器は、少なくとも太陽光発電装置が発電させた電力によって作動する。情報処理端末装置は、複数の家電機器と太陽光発電装置とが通信可能であるようにネットワーク接続されている。   A power supply system for a solar power generation device according to the present invention includes a solar power generation device, a plurality of home appliances including a predetermined home appliance and other home appliances other than the predetermined home appliance, and an information processing terminal device. I have. The plurality of home appliances are operated by at least electric power generated by the solar power generation device. The information processing terminal device is network-connected so that a plurality of home appliances and the solar power generation device can communicate with each other.

情報処理端末装置は、太陽光発電装置の過去の発電電力量の時間的推移の情報と、他の家電機器の過去の消費電力量の時間的推移の情報とから発電電力に余剰が生じる時間帯を推定する。また、情報処理端末装置は、推定された時間帯の結果を電力余剰時間帯情報として記憶し、所定の家電機器が実際に作動する時間の情報として所定の家電機器から受け取る作動時間情報と、電力余剰時間帯情報とに基づいて所定の家電機器の運転開始時刻を決定する。   The information processing terminal device is a time zone in which surplus power is generated from the information on the temporal transition of the past power generation amount of the photovoltaic power generation apparatus and the information on the temporal transition of the past power consumption amount of other home appliances. Is estimated. In addition, the information processing terminal device stores the estimated time zone result as power surplus time zone information, and receives the operation time information received from the predetermined home appliance as information on the time when the predetermined home appliance is actually operated, and the power Based on the surplus time zone information, the operation start time of a predetermined home appliance is determined.

本発明によれば、太陽光発電装置の過去の発電電力量の時間的推移の情報と、他の家電機器の過去の消費電力量の時間的推移の情報とから、太陽光発電装置の発電電力に余剰が生じる時間帯を推定する。また、情報処理端末装置は、電力余剰時間帯情報と作動時間情報とに基づき、所定の家電機器の運転開始時刻を決定する。このように、本発明によれば、任意の時点の太陽光発電装置の発電電力量のみが、所定の家電機器の運転を開始させるための判断に用いられることが無く、且つ、所定の家電機器を、太陽光発電装置の発電電力に余剰が生じる時間帯に作動させることができる。すなわち、本発明に従った太陽光発電装置の給電システムは、太陽光発電装置が発生させた電力を効率的に利用することができる。   According to the present invention, from the information on the temporal transition of the past power generation amount of the photovoltaic power generation apparatus and the information on the temporal transition of the past power consumption amount of other home appliances, the generated power of the photovoltaic power generation apparatus Estimate the time zone when surplus occurs. Further, the information processing terminal device determines the operation start time of a predetermined home appliance based on the power surplus time zone information and the operation time information. Thus, according to the present invention, only the amount of power generated by the solar power generation device at an arbitrary time point is not used for the determination for starting the operation of the predetermined home appliance, and the predetermined home appliance Can be operated in a time zone in which surplus power is generated in the photovoltaic power generation apparatus. That is, the power feeding system for the solar power generation device according to the present invention can efficiently use the power generated by the solar power generation device.

本発明に従った太陽光発電装置の給電システムは、情報処理端末装置によって決定された運転開始時刻、または、運転開始時刻と作動時間情報とに対応した所定の家電機器の運転完了時刻を、情報処理端末装置または所定の家電機器に表示させることが好ましい。   The power feeding system of the solar power generation device according to the present invention provides information on the operation start time determined by the information processing terminal device or the operation completion time of a predetermined home appliance corresponding to the operation start time and the operation time information. It is preferable to display on a processing terminal device or a predetermined home appliance.

この構成によれば、情報処理端末装置または所定の家電機器の使用者に対して、所定の家電機器の運転開始時刻または運転完了時刻を視認させることができる。このように、この構成によれば、情報処理端末装置または所定の家電機器の利便性の向上が図られている。   According to this configuration, the user of the information processing terminal device or the predetermined home appliance can visually recognize the operation start time or the operation completion time of the predetermined home appliance. Thus, according to this configuration, the convenience of the information processing terminal device or the predetermined home appliance is improved.

本発明に従った洗濯乾燥機は、当該太陽光発電装置の給電システムに用いられる所定の家電機器としての洗濯乾燥機であることが好ましい。本発明に従った洗濯乾燥機は、制御部と、被洗浄対象物を収容する収容槽とを備えていることが好ましい。   The washing / drying machine according to the present invention is preferably a washing / drying machine as a predetermined home appliance used in the power feeding system of the photovoltaic power generation apparatus. It is preferable that the washing / drying machine according to the present invention includes a control unit and a storage tank for storing the object to be cleaned.

制御部は、収容槽に収容される被洗浄対象物の容量を検知する容量検知部と、当該洗濯乾燥機の複数の運転モードと、容量検知部によって検知された被洗浄対象物の容量または各運転モードに応じて設定された作動時間情報とを記憶する記憶部と、記憶部に記憶された作動時間情報のうち、容量検知部によって検知された被洗浄対象物の容量または各運転モードに対応した作動時間情報を情報処理端末装置に送信する情報送信部とを有していることが好ましい。   The control unit includes a capacity detection unit that detects the capacity of the object to be cleaned accommodated in the storage tank, a plurality of operation modes of the washing / drying machine, a capacity of the object to be cleaned detected by the capacity detection unit, or each Corresponding to the capacity of the object to be cleaned or each operation mode detected by the capacity detection unit among the operation time information stored in the storage unit and the operation time information set according to the operation mode It is preferable to have an information transmitting unit that transmits the operating time information to the information processing terminal device.

この構成によれば、被洗浄対象物の容量と、当該洗濯乾燥機の運転モードとに応じて設定される作動時間の情報が、情報処理端末装置に送信される。これにより、情報処理端末装置は、送信された作動時間情報と、記憶した電力余剰時間帯情報とに基づき、当該洗濯乾燥機の運転開始時刻を決定することができる。このように、この構成によれば、当該洗濯乾燥機の運転開始時刻を、容量と運転モードとに応じて決定することができるため、当該洗濯乾燥機の利便性が向上する。   According to this structure, the information of the operation time set according to the capacity of the object to be cleaned and the operation mode of the washing / drying machine is transmitted to the information processing terminal device. Thereby, the information processing terminal device can determine the operation start time of the washing and drying machine based on the transmitted operation time information and the stored power surplus time zone information. Thus, according to this structure, since the operation start time of the washing / drying machine can be determined according to the capacity and the operation mode, the convenience of the washing / drying machine is improved.

本発明に従った洗濯乾燥機は、情報処理端末装置によって決定された運転開始時刻、または、運転開始時刻と作動時間情報とに対応した当該洗濯乾燥機の運転完了時刻を表示する表示部をさらに備えていることが好ましい。   The washing and drying machine according to the present invention further includes a display unit that displays the operation start time determined by the information processing terminal device or the operation completion time of the washing and drying machine corresponding to the operation start time and the operation time information. It is preferable to provide.

この構成によれば、容量と運転モードとに応じて決定された当該洗濯乾燥機の運転開始時刻または運転完了時刻を、使用者に視認させることができる。このように、この構成によれば、当該洗濯乾燥機の利便性の向上が図られている。   According to this configuration, the user can visually recognize the operation start time or the operation completion time of the washing / drying machine determined according to the capacity and the operation mode. Thus, according to this configuration, the convenience of the washing / drying machine is improved.

本発明に従った情報処理端末装置は、当該太陽光発電装置の給電システムに用いられる情報処理端末装置であることが好ましい。また、本発明に従った情報処理端末装置は、推定部と、記憶部と、情報受信部と、判定部と、決定部とを有していることが好ましい。   The information processing terminal device according to the present invention is preferably an information processing terminal device used for the power feeding system of the solar power generation device. In addition, the information processing terminal device according to the present invention preferably includes an estimation unit, a storage unit, an information reception unit, a determination unit, and a determination unit.

本発明に従った情報処理端末装置において、推定部は、太陽光発電装置の過去の発電電力量の時間的推移の情報と、他の家電機器の過去の消費電力量の時間的推移の情報とから発電電力に余剰が生じる時間帯を推定することが好ましい。記憶部は、推定部によって推定された時間帯の結果を電力余剰時間帯情報として記憶することが好ましい。情報受信部は、所定の家電機器から作動時間情報を受け取ることが好ましい。判定部は、情報受信部が受け取った作動時間情報と、記憶部が記憶した電力余剰時間帯情報とに基づき、所定の家電機器の所定の作動時間に消費される電力を賄うことが可能な電力余剰時間帯が存在するか否かを判定することが好ましい。決定部は、判定部の判定結果に基づいて、所定の家電機器の運転開始時刻を決定することが好ましい。   In the information processing terminal device according to the present invention, the estimation unit includes information on the temporal transition of the past power generation amount of the solar power generation device and information on the temporal transition of the past power consumption amount of the other home appliances. From this, it is preferable to estimate a time zone in which surplus power is generated. The storage unit preferably stores the result of the time zone estimated by the estimation unit as power surplus time zone information. The information receiving unit preferably receives operating time information from a predetermined home appliance. Based on the operating time information received by the information receiving unit and the power surplus time zone information stored in the storage unit, the determination unit can provide power that can cover the power consumed during the predetermined operating time of a predetermined home appliance. It is preferable to determine whether or not a surplus time zone exists. The determining unit preferably determines the operation start time of the predetermined home appliance based on the determination result of the determining unit.

この構成によれば、推定部と記憶部と情報受信部と判定部と決定部との作動により、所定の家電機器の運転開始時刻または運転完了時刻を決定することができる。これにより、所定の家電機器は、太陽光発電装置の余剰電力を効率的に用いたうえで作動することができる。   According to this configuration, the operation start time or operation completion time of a predetermined home appliance can be determined by the operations of the estimation unit, the storage unit, the information reception unit, the determination unit, and the determination unit. Thereby, a predetermined household electrical appliance can operate | move, after using the surplus electric power of a solar power generation device efficiently.

本発明に従った情報処理端末装置において、情報受信部は、作動時間情報として、使用者が希望する運転完了希望時刻の情報を所定の家電機器からさらに受け取ることが好ましい。判定部は、情報受信部が受け取った運転完了希望時刻の情報を含む作動時間情報と、記憶部が記憶した電力余剰時間帯情報とに基づき、所定の家電機器の所定の作動時間に消費される電力を賄うことが可能な電力余剰時間帯が運転完了希望時刻までに存在するか否かを判定することが好ましい。   In the information processing terminal device according to the present invention, it is preferable that the information receiving unit further receives information on a desired operation completion time desired by the user from a predetermined home appliance as the operation time information. The determination unit is consumed for a predetermined operation time of a predetermined home appliance based on the operation time information including the information of the operation completion desired time received by the information reception unit and the power surplus time zone information stored by the storage unit. It is preferable to determine whether or not there is a power surplus time zone in which power can be covered by the desired operation completion time.

この構成によれば、当該情報処理端末装置は、所定の家電機器に対して、太陽光発電装置の発電電力の余剰分を使用させたうえで、使用者が希望する時刻までに運転を終了させることができる。   According to this configuration, the information processing terminal device causes the predetermined home appliance to use the surplus power generated by the solar power generation device, and then terminates the operation by a time desired by the user. be able to.

本発明に従った情報処理端末装置は、決定部によって決定された運転開始時刻、または、運転開始時刻と作動時間情報とに対応した所定の家電機器の運転完了時刻を、所定の家電機器に表示させることが好ましい。   The information processing terminal device according to the present invention displays the operation start time determined by the determination unit or the operation completion time of the predetermined home appliance corresponding to the operation start time and the operation time information on the predetermined home appliance. It is preferable to make it.

この構成によれば、推定部と記憶部と情報受信部と判定部と決定部との作動によって決定された所定の家電機器の運転開始時刻または運転完了時刻を、所定の家電機器の使用者に視認させることができる。このように、この構成によれば、所定の家電機器の利便性の向上が図られている。   According to this configuration, the operation start time or the operation completion time of the predetermined home appliance determined by the operation of the estimation unit, the storage unit, the information reception unit, the determination unit, and the determination unit is given to the user of the predetermined home appliance. It can be visually recognized. Thus, according to this structure, the convenience of a predetermined household appliance is improved.

本発明に従った情報処理端末装置は、判定部により、所定の家電機器の所定の作動時間に消費される電力を賄うことが可能な電力余剰時間帯が存在しないことが判定される場合には、当該所定の家電機器に、作動時間が短縮された運転を実行させることが好ましい。   In the information processing terminal device according to the present invention, when the determination unit determines that there is no power surplus time zone that can cover the power consumed during the predetermined operation time of the predetermined home appliance. It is preferable to cause the predetermined home appliance to perform an operation with a reduced operating time.

この構成によれば、所定の家電機器の作動に係る消費電力を抑えることができる。そのため、太陽光発電装置の発電電力のうち、余剰分を有効に使用することができる。   According to this structure, the power consumption which concerns on the action | operation of a predetermined household appliance can be suppressed. Therefore, the surplus part can be used effectively among the generated electric power of the solar power generation device.

本発明に従った洗濯乾燥機は、当該情報処理端末装置と通信可能であるようにネットワーク接続された所定の家電機器としての洗濯乾燥機であることが好ましい。本発明に従った洗濯乾燥機は、制御部と、被洗浄対象物を収容する収容槽とを備えていることが好ましい。   The washing / drying machine according to the present invention is preferably a washing / drying machine as a predetermined home appliance connected to the network so as to be communicable with the information processing terminal device. It is preferable that the washing / drying machine according to the present invention includes a control unit and a storage tank for storing the object to be cleaned.

本発明に従った洗濯乾燥機において、制御部は、容量検知部と、記憶部と、情報送信部とを有していることが好ましい。容量検知部は、収容槽に収容される被洗浄対象物の容量を検知することが好ましい。記憶部は、当該洗濯乾燥機の複数の運転モードと、容量検知部によって検知された被洗浄対象物の容量または各運転モードに応じて設定された作動時間情報とを記憶することが好ましい。情報送信部は、記憶部に記憶された作動時間情報のうち、容量検知部によって検知された被洗浄対象物の容量または各運転モードに対応した作動時間情報を情報処理端末装置に送信することが好ましい。   In the washing and drying machine according to the present invention, the control unit preferably includes a capacity detection unit, a storage unit, and an information transmission unit. It is preferable that a capacity | capacitance detection part detects the capacity | capacitance of the to-be-cleaned target object accommodated in a storage tank. The storage unit preferably stores a plurality of operation modes of the washing / drying machine and the operation time information set according to the volume of the object to be cleaned detected by the capacity detection unit or each operation mode. The information transmission unit may transmit, to the information processing terminal device, the operation time information corresponding to the volume of the object to be cleaned detected by the capacity detection unit or each operation mode among the operation time information stored in the storage unit. preferable.

本発明に従った洗濯乾燥機は、情報処理端末装置の判定部により、当該洗濯乾燥機の所定の作動時間に消費される電力を賄うことが可能な電力余剰時間帯が存在しないことが判定される場合には、作動時間が短縮された運転を実行することが好ましい。   In the washing and drying machine according to the present invention, it is determined by the determination unit of the information processing terminal device that there is no surplus power time zone that can cover the power consumed during the predetermined operation time of the washing and drying machine. In this case, it is preferable to execute an operation with a shortened operation time.

この構成によれば、当該洗濯乾燥機において、運転の開始から完了までの時間が短縮されるため、当該洗濯乾燥機の作動に係る消費電力を抑えることができる。このように、太陽光発電装置の発電電力のうち、余剰分を有効に使用することができる。   According to this configuration, since the time from the start to the completion of the operation is shortened in the washing and drying machine, it is possible to suppress the power consumption related to the operation of the washing and drying machine. Thus, the surplus part can be used effectively among the generated electric power of the solar power generation device.

本発明に従った情報処理端末装置を備えた太陽光発電装置の給電システムは、複数の家電機器が使用する電力を、商用電源から供給される電力と太陽光発電装置が発電させた電力とのいずれかまたは両方に切り替える電源切替装置をさらに備えていることが好ましい。   A power supply system for a solar power generation apparatus including an information processing terminal device according to the present invention uses power supplied from a commercial power source and power generated by a solar power generation apparatus for power used by a plurality of home appliances. It is preferable to further include a power supply switching device that switches to either or both.

本発明に従った情報処理端末装置において、決定部は、判定部により、所定の家電機器の所定の作動時間に消費される電力を賄うことが可能な電力余剰時間帯が存在しないことが判定される場合には、所定の作動時間に消費される電力と、太陽光発電装置の発電電力の余剰分との差の電力が、商用電源から所定の家電機器に供給されるように、商用電源から供給される電力と太陽光発電装置が発電させた電力とを電源切替装置に切り替えさせることが好ましい。   In the information processing terminal device according to the present invention, the determination unit determines, by the determination unit, that there is no power surplus time zone that can cover the power consumed during the predetermined operation time of the predetermined home appliance. In the case where the power is consumed from the commercial power source, the difference between the power consumed during the predetermined operation time and the surplus power generated by the photovoltaic power generation device is supplied from the commercial power source to the predetermined home appliance. It is preferable to switch the supplied power and the power generated by the solar power generation device to the power switching device.

この構成によれば、太陽光発電装置の発電電力の余剰分は、所定の家電機器の作動に使用され、且つ、所定の家電機器には、太陽光発電装置の発電電力の余剰分が不足する時間帯だけ商用電源から電力が供給される。このように、本発明に従った情報処理端末装置は、所定の家電機器に、太陽光発電装置の発電電力の余剰分を効率よく使用させることができる。また、所定の家電機器の運転を、運転開始時刻から確実に開始することができる。あるいは、所定の家電機器の運転を、運転完了時刻までに確実に完了することができる。   According to this configuration, the surplus of the generated power of the solar power generation device is used for the operation of the predetermined home appliance, and the predetermined home appliance lacks the surplus of the generated power of the solar power generation device. Power is supplied from the commercial power source only during the time period. Thus, the information processing terminal device according to the present invention can cause a predetermined home appliance to efficiently use the surplus power generated by the solar power generation device. In addition, the operation of the predetermined home appliance can be surely started from the operation start time. Alternatively, it is possible to reliably complete the operation of the predetermined home appliance by the operation completion time.

本発明に従った情報処理端末装置においては、商用電源から供給される電力の時間帯には、通常の時間帯の電力単価よりも安い電力単価が設定された時間帯である深夜時間帯が含まれていることが好ましい。また、本発明に従った情報処理端末装置において、決定部は、判定部により、所定の家電機器の所定の作動時間に消費される電力を賄うことが可能な電力余剰時間帯が存在しないことが判定される場合には、所定の家電機器に商用電源から電力が供給されるように、商用電源から供給される電力と太陽光発電装置が発電させた電力とを電源切替装置に切り替えさせ、且つ、所定の家電機器に深夜時間帯の電力を使用させることが好ましい。   In the information processing terminal device according to the present invention, the time zone of power supplied from the commercial power source includes a midnight time zone, which is a time zone in which a power unit price lower than the power unit price in the normal time zone is set. It is preferable that Moreover, in the information processing terminal device according to the present invention, the determination unit may not have a power surplus time zone in which the determination unit can cover the power consumed during the predetermined operation time of the predetermined home appliance. If determined, the power switching device switches the power supplied from the commercial power source and the power generated by the solar power generation device so that the power is supplied from the commercial power source to the predetermined home appliance, and It is preferable to let a predetermined home appliance use power in the midnight time zone.

この構成によれば、所定の家電機器の所定の作動時間に消費される電力を賄うことが可能な電力余剰時間帯が存在しない場合に、所定の家電機器は、商用電源から供給される電力として、電力単価が比較的安い深夜時間帯の電力を使用することができる。このようにすることにより、電気料金の節約が可能である。   According to this configuration, when there is no power surplus time zone that can cover the power consumed during the predetermined operation time of the predetermined home appliance, the predetermined home appliance is used as the power supplied from the commercial power source. Therefore, it is possible to use electric power in the midnight time zone where the power unit price is relatively low. In this way, electricity charges can be saved.

本発明に従った冷蔵庫は、当該太陽光発電装置の給電システムに用いられる所定の家電機器としての冷蔵庫であることが好ましい。好ましくは、作動時間情報は、当該冷蔵庫が実際に除霜動作として作動する時間の情報として当該冷蔵庫から受け取る除霜動作時間の情報であり、運転開始時刻は、当該冷蔵庫の除霜動作の開始時刻であり、除霜動作時間の情報が、過去の除霜動作時間の情報に基づいて当該冷蔵庫によって推定された除霜動作時間の情報である。   The refrigerator according to the present invention is preferably a refrigerator as a predetermined home appliance used in the power feeding system of the solar power generation device. Preferably, the operation time information is information on a defrost operation time received from the refrigerator as information on a time at which the refrigerator actually operates as a defrost operation, and the operation start time is the start time of the defrost operation of the refrigerator. The defrosting operation time information is information on the defrosting operation time estimated by the refrigerator based on the past defrosting operation information.

この構成によれば、情報処理端末装置は、過去の除霜動作時間の情報に基づいて冷蔵庫によって推定された除霜動作時間の情報を受け取る。また、情報処理端末装置は、除霜動作時間の情報と、電力余剰時間帯情報とに基づいて、冷蔵庫の除霜動作の開始時刻を決定する。したがって、この構成によれば、冷蔵庫は、太陽光発電装置の発電電力の余剰分を用いて除霜動作を行うことができる。   According to this configuration, the information processing terminal device receives information on the defrosting operation time estimated by the refrigerator based on the information on the past defrosting operation time. Further, the information processing terminal device determines the start time of the defrosting operation of the refrigerator based on the information on the defrosting operation time and the power surplus time zone information. Therefore, according to this configuration, the refrigerator can perform the defrosting operation using the surplus of the generated power of the solar power generation device.

本発明に従った冷蔵庫は、過去の除霜動作時間の情報に基づいて除霜動作の開始制限時刻を推定し、さらに、推定した開始制限時刻に除霜動作時間を加算することによって除霜動作の完了制限時刻を算出することが好ましい。   The refrigerator according to the present invention estimates the defrosting operation start time limit based on the past defrosting operation time information, and further adds the defrosting operation time to the estimated start time limit, thereby removing the defrosting operation. It is preferable to calculate a completion time limit.

この構成によれば、情報処理端末装置は、除霜動作時間の情報と、除霜動作の完了制限時刻の情報とを受け取る。そのため、冷蔵庫は、遅くとも冷却動作に悪影響が及ぼされる可能性がある時点までに、太陽光発電装置の発電電力の余剰分を用いた除霜動作を開始することができる。したがって、この構成によれば、太陽光発電装置の発電電力の余剰分を用いて除霜動作が行われる場合に、除霜動作の開始時刻が時間的に後方向に変更されるときであっても、冷蔵庫の冷却動作への影響が小さく抑えられる。   According to this configuration, the information processing terminal device receives the defrosting operation time information and the defrosting operation completion time limit information. Therefore, the refrigerator can start the defrosting operation using the surplus power generated by the solar power generation device by the time when the cooling operation may be adversely affected at the latest. Therefore, according to this configuration, when the defrosting operation is performed using the surplus power generated by the solar power generation device, the start time of the defrosting operation is changed backward in time. However, the influence on the cooling operation of the refrigerator can be reduced.

本発明に従った冷蔵庫は、当該冷蔵庫の除霜動作時間に消費される電力を賄うことが可能な電力余剰時間帯が存在しない場合には、情報処理端末装置によって推定された余剰が生じる時間帯のうちの最長の時間帯において今回の除霜動作を行い、且つ、次回の除霜動作の開始時期を通常の状態よりも繰り上げることが好ましい。   In the refrigerator according to the present invention, when there is no power surplus time zone that can cover the power consumed during the defrosting operation time of the refrigerator, the time zone in which the surplus estimated by the information processing terminal device occurs It is preferable that the current defrosting operation is performed in the longest time zone, and the start time of the next defrosting operation is advanced from the normal state.

この構成によれば、冷蔵庫の除霜動作時間に消費される電力を賄うことが可能な電力余剰時間帯が存在しない場合には、情報処理端末装置によって推定された余剰が生じる時間帯のうちの最長の時間帯において今回の除霜動作が行われる。このように、余剰が生じる時間帯のうちの最長の時間帯において除霜動作が行われる場合には、除霜が不十分である事態が発生することが予想される。除霜が不十分である場合には、冷蔵庫の冷却動作に悪影響が及ぼされる可能性がある。   According to this configuration, when there is no power surplus time zone that can cover the power consumed during the defrosting operation time of the refrigerator, of the time zone in which the surplus estimated by the information processing terminal device occurs This defrosting operation is performed in the longest time zone. Thus, when the defrosting operation is performed in the longest time zone in which surplus occurs, it is expected that a situation where defrosting is insufficient will occur. If the defrosting is insufficient, the cooling operation of the refrigerator may be adversely affected.

しかしながら、この構成によれば、冷蔵庫の除霜動作時間に消費される電力を賄うことが可能な電力余剰時間帯が存在しない場合に、余剰が生じる時間帯のうちの最長の時間帯において除霜動作が行われるときには、次回の除霜動作の開始時期が通常の状態よりも繰り上げられる。このように、次回の除霜動作の開始時期が早められることにより、冷却動作に及ぼされる悪影響を予防することができる。   However, according to this configuration, when there is no power surplus time zone that can cover the power consumed during the defrosting operation time of the refrigerator, defrosting is performed in the longest time zone in which surplus occurs. When the operation is performed, the start time of the next defrosting operation is advanced from the normal state. As described above, the start time of the next defrosting operation is advanced, so that an adverse effect on the cooling operation can be prevented.

本発明に従った太陽光発電装置の給電システムにおいて、情報処理端末装置は、好ましくは、複数の所定の家電機器について、互いに異なる所定の家電機器のそれぞれの作動時期の少なくとも一部同士が重なるように、複数の所定の家電機器の運転開始時刻を同時に決定する。   In the power feeding system of the solar power generation device according to the present invention, the information processing terminal device is preferably configured such that, for a plurality of predetermined home appliances, at least some of the operation timings of the different predetermined home appliances overlap each other. In addition, the operation start times of a plurality of predetermined home appliances are determined simultaneously.

このようにすることにより、太陽光発電装置が発生させた電力において比較的大量に余剰が生じる時間帯に、複数の所定の家電機器をまとめて作動させることができる。そのため、複数の所定の家電機器をまとめて作動させる時間帯以外の時間帯において発電量に別に余剰が生じている場合には、当該時間帯に別の機器等を作動させることができる。このように、この構成によれば、太陽光発電装置が発生させた電力を効率よく利用することができる。   Thus, a plurality of predetermined home appliances can be collectively operated in a time zone in which a surplus is generated in a relatively large amount in the electric power generated by the solar power generation device. Therefore, when there is a surplus in the amount of power generation in a time zone other than the time zone in which a plurality of predetermined home appliances are operated collectively, another device or the like can be operated in the time zone. Thus, according to this structure, the electric power which the solar power generation device generated can be used efficiently.

本発明に従った太陽光発電装置の給電システムにおいて、情報処理端末装置は、好ましくは、複数の所定の家電機器を同時に作動させることが可能な程度に発電電力に余剰が生じる電力余剰時間帯が存在することが判断される場合に、複数の所定の家電機器のうち全ての家電機器の作動時間が、発電電力に余剰が生じる電力余剰時間帯の時間以下であることが判断されるときには、互いに異なる所定の家電機器のそれぞれの作動時期の少なくとも一部同士が重なるように複数の所定の家電機器のそれぞれの運転開始時刻を決定する。
In the power feeding system of the solar power generation device according to the present invention, the information processing terminal device preferably has a power surplus time zone in which surplus in generated power is generated to such an extent that a plurality of predetermined home appliances can be operated simultaneously. When it is determined that the operation time of all the household electrical appliances among the plurality of predetermined household electrical appliances is determined to be less than or equal to the time of the power surplus time zone where surplus in the generated power occurs, The operation start times of the plurality of predetermined home appliances are determined so that at least a part of the operation times of the different predetermined home appliances overlap each other.

このようにすることにより、太陽光発電装置が発生させた電力において比較的大量に余剰が生じる時間帯に、複数の所定の家電機器をまとめて作動させることができる。そのため、太陽光発電装置が発生させた電力を効率よく利用することができる。   Thus, a plurality of predetermined home appliances can be collectively operated in a time zone in which a surplus is generated in a relatively large amount in the electric power generated by the solar power generation device. Therefore, the electric power generated by the solar power generation device can be used efficiently.

本発明に従った太陽光発電装置の給電システムにおいて、情報処理端末装置は、好ましくは、運転開始時刻が既に決定された少なくとも一つの第1の所定の家電機器と、第1の所定の家電機器の運転開始時刻が決定された後から運転開始時刻が決定される第2の所定の家電機器とについて、既に決定された第1の所定の家電機器の運転開始時刻を変更するように、且つ、第1の所定の家電機器の作動時期の一部と第2の所定の家電機器の作動時期の一部とが重なるように、第1の所定の家電機器の運転開始時刻および第2の所定の家電機器の運転開始時刻を決定する。   In the power supply system of the solar power generation device according to the present invention, the information processing terminal device preferably includes at least one first predetermined household electrical appliance whose operation start time has already been determined, and the first predetermined household electrical appliance. For the second predetermined home appliance for which the operation start time is determined after the operation start time is determined, the operation start time of the first predetermined home appliance already determined is changed, and The operation start time of the first predetermined household electrical appliance and the second predetermined household so that a part of the operation timing of the first predetermined household electrical appliance overlaps with a part of the operation timing of the second predetermined household electrical appliance. The operation start time of the home appliance is determined.

情報処理端末装置は、好ましくは、第1の所定の家電機器の運転開始時刻が既に決定された後に、第2の所定の家電機器の運転開始時刻を決定する場合に、既に決定された第1の所定の家電機器の運転開始時刻を変更せずに第2の所定の家電機器の所定の作動時間に消費される電力を賄うことが可能な電力余剰時間帯が存在しないことが判断されるときであって、第1の所定の家電機器と第2の所定の家電機器とを同時に作動させることが可能な程度に発電電力に余剰が生じる電力余剰時間帯が存在することが判断され、且つ、第1の所定の家電機器と第2の所定の家電機器とのうち全ての家電機器の作動時間が、発電電力に余剰が生じる電力余剰時間帯の時間以下であることが判断されるときには、既に決定された第1の所定の家電機器の運転開始時刻を変更するように、且つ、第1の所定の家電機器の作動時期の一部と第2の所定の家電機器の作動時期の一部とが重なるように、第1の所定の家電機器の運転開始時刻および第2の所定の家電機器の運転開始時刻を決定する。
The information processing terminal device is preferably configured to determine the first predetermined household electrical appliance when the first predetermined household electrical appliance operation start time is already determined and then the second predetermined household electrical appliance operation start time. When it is determined that there is no power surplus time zone that can cover the power consumed during the predetermined operating time of the second predetermined home appliance without changing the operation start time of the predetermined home appliance And it is determined that there is a power surplus time zone in which surplus in generated power is generated to the extent that the first predetermined home appliance and the second predetermined home appliance can be operated simultaneously, and When it is determined that the operation time of all the home appliances out of the first predetermined home appliance and the second predetermined home appliance is equal to or less than the time of the power surplus time zone in which surplus in generated power occurs. Of the determined first predetermined home appliance The first predetermined home appliance so as to change the turn start time and so that a part of the operation timing of the first predetermined home appliance overlaps a part of the operation timing of the second predetermined home appliance. The operation start time of the device and the operation start time of the second predetermined home appliance are determined.

この構成によれば、既に決定された第1の所定の家電機器の運転開始時刻を変更することにより、第1の所定の家電機器と第2の所定の家電機器とを電力余剰時間帯において作動させることができる。そのため、太陽光発電装置が発生させた電力を効率的に利用することができる。   According to this configuration, the first predetermined home appliance and the second predetermined home appliance are operated in the power surplus time zone by changing the operation start time of the first predetermined home appliance already determined. Can be made. Therefore, the electric power generated by the solar power generation device can be used efficiently.

本発明に従った太陽光発電装置の給電システムにおいて、情報処理端末装置は、好ましくは、複数の所定の家電機器について、互いに異なる所定の家電機器のそれぞれの作動時期が重ならないように、複数の所定の家電機器の運転開始時刻を同時に決定する。   In the power feeding system of the solar power generation device according to the present invention, the information processing terminal device preferably has a plurality of predetermined home appliances so that the operation timings of the different predetermined home appliances do not overlap each other. The operation start time of a predetermined home appliance is determined at the same time.

このようにすることにより、電力余剰時間帯において発電力の余剰分が比較的小さくても、電力余剰時間帯が比較的長いときには、当該電力余剰時間帯の発電力の余剰分を第1の所定の家電機器および第2の所定の家電機器の作動に費やすことができる。そのため、太陽光発電装置が発生させた電力を効率的に利用することができる。   By doing in this way, even if the surplus of the generated power in the power surplus time zone is relatively small, if the power surplus time zone is relatively long, the surplus of the generated power in the power surplus time zone is set to the first predetermined amount. Can be spent on the operation of the home appliance and the second predetermined home appliance. Therefore, the electric power generated by the solar power generation device can be used efficiently.

本発明に従った太陽光発電装置の給電システムにおいて、情報処理端末装置は、好ましくは、複数の所定の家電機器を同時に作動させることが可能な程度に発電電力に余剰が生じる電力余剰時間帯が存在しないことが判断される場合に、複数の所定の家電機器のそれぞれの作動時間を合わせた時間が、発電電力に余剰が生じる電力余剰時間帯の時間以下であることが判断されるときには、互いに異なる所定の家電機器のそれぞれの作動時期が重ならないように、複数の所定の家電機器のそれぞれの運転開始時刻を決定する。   In the power feeding system of the solar power generation device according to the present invention, the information processing terminal device preferably has a power surplus time zone in which surplus in generated power is generated to such an extent that a plurality of predetermined home appliances can be operated simultaneously. When it is determined that it does not exist, when it is determined that the combined time of each of the plurality of predetermined home appliances is equal to or less than the time of the power surplus time zone in which surplus in generated power occurs, The operation start times of the plurality of predetermined home appliances are determined so that the operation times of the different predetermined home appliances do not overlap.

このように判断されるときは、電力余剰時間帯において発電力の余剰分が比較的小さくても、電力余剰時間帯が比較的長いときである。したがって、この構成によれば、電力余剰時間帯において発電力の余剰分が比較的小さくても、電力余剰時間帯が比較的長いときには、当該電力余剰時間帯の発電力の余剰分を第1の所定の家電機器および第2の所定の家電機器の作動に費やすことができる。そのため、太陽光発電装置が発生させた電力を効率的に利用することができる。   The determination is made when the power surplus time zone is relatively long even if the surplus of the generated power is relatively small in the power surplus time zone. Therefore, according to this configuration, even if the surplus of the generated power is relatively small in the power surplus time zone, when the power surplus time zone is relatively long, the surplus power generated in the power surplus time zone is It can be spent on the operation of the predetermined home appliance and the second predetermined home appliance. Therefore, the electric power generated by the solar power generation device can be used efficiently.

本発明に従った太陽光発電装置の給電システムにおいて、情報処理端末装置は、好ましくは、運転開始時刻が既に決定された少なくとも一つの第1の所定の家電機器と、第1の所定の家電機器の運転開始時刻が決定された後から運転開始時刻が決定される第2の所定の家電機器とについて、既に決定された第1の所定の家電機器の運転開始時刻を変更するように、且つ、第1の所定の家電機器の作動時期と第2の所定の家電機器の作動時期とが重ならないように、第1の所定の家電機器の運転開始時刻および第2の所定の家電機器の運転開始時刻を決定する。   In the power supply system of the solar power generation device according to the present invention, the information processing terminal device preferably includes at least one first predetermined household electrical appliance whose operation start time has already been determined, and the first predetermined household electrical appliance. For the second predetermined home appliance for which the operation start time is determined after the operation start time is determined, the operation start time of the first predetermined home appliance already determined is changed, and The operation start time of the first predetermined home appliance and the start of operation of the second predetermined home appliance so that the operation timing of the first predetermined home appliance does not overlap with the operation timing of the second predetermined home appliance. Determine the time.

情報処理端末装置は、好ましくは、第1の所定の家電機器の運転開始時刻が既に決定された後に、第2の所定の家電機器の運転開始時刻を決定する場合に、既に決定された第1の所定の家電機器の運転開始時刻を変更せずに第2の所定種の家電機器の所定の作動時間に消費される電力を賄うことが可能な電力余剰時間帯が存在しないことが判断されるときであって、第1の所定の家電機器と第2の所定の家電機器とを同時に作動させることが可能な程度に発電電力に余剰が生じる電力余剰時間帯が存在しないことが判断され、且つ、複数の所定の家電機器のそれぞれの作動時間を合わせた時間が、発電電力に余剰が生じる電力余剰時間帯の時間以下であることが判断されるときには、既に決定された第1の所定の家電機器の運転開始時刻を変更するように、且つ、第1の所定の家電機器の作動時期と第2の所定の家電機器の作動時期とが重ならないように、第1の所定の家電機器の運転開始時刻および第2の所定の家電機器の運転開始時刻を決定する。   The information processing terminal device is preferably configured to determine the first predetermined household electrical appliance when the first predetermined household electrical appliance operation start time is already determined and then the second predetermined household electrical appliance operation start time. It is determined that there is no power surplus time zone that can cover the power consumed during the predetermined operating time of the second predetermined type of home appliance without changing the operation start time of the predetermined home appliance. It is determined that there is no power surplus time zone in which surplus in generated power is generated to the extent that the first predetermined home appliance and the second predetermined home appliance can be operated simultaneously, and When it is determined that the time obtained by combining the operating times of the plurality of predetermined home appliances is equal to or less than the time of the power surplus time zone in which surplus in generated power occurs, the first predetermined home appliance already determined Change the operation start time of the device. And the operation start time of the first predetermined home appliance and the second predetermined time so that the operation timing of the first predetermined home appliance does not overlap with the operation timing of the second predetermined home appliance. The operation start time of the home appliance is determined.

この構成によれば、既に決定された第1の所定の家電機器の運転開始時刻を変更することにより、第1の所定の家電機器と第2の所定の家電機器とを電力余剰時間帯において作動させることができる。そのため、太陽光発電装置が発生させた電力を効率的に利用することができる。   According to this configuration, the first predetermined home appliance and the second predetermined home appliance are operated in the power surplus time zone by changing the operation start time of the first predetermined home appliance already determined. Can be made. Therefore, the electric power generated by the solar power generation device can be used efficiently.

本発明に従った太陽光発電装置の給電システムにおいて、情報処理端末装置は、好ましくは、複数の所定の家電機器のそれぞれの運転開始時刻を所定の優先順位に従って決定する。   In the power feeding system of the solar power generation device according to the present invention, the information processing terminal device preferably determines each operation start time of a plurality of predetermined home appliances according to a predetermined priority.

この構成によれば、電力余剰時間帯において発電力の余剰分が比較的小さい場合、または、電力余剰時間帯が比較的短い場合であっても、各所定の家電機器の作動の優先順位に従って、太陽光発電装置が発生させた電力を効率的に利用することができる。   According to this configuration, even if the surplus of generated power is relatively small in the power surplus time zone, or even when the power surplus time zone is relatively short, according to the priority of operation of each predetermined home appliance, The electric power generated by the solar power generation device can be used efficiently.

本発明に従った太陽光発電装置の給電システムにおいて、情報処理端末装置は、好ましくは、複数の所定の家電機器を同時に作動させることが可能な程度に発電電力に余剰が生じる電力余剰時間帯が存在することが判断される場合に、複数の所定の家電機器のうち全ての家電機器の作動時間が、発電電力に余剰が生じる電力余剰時間帯の時間よりも長いことが判断されるときには、互いに異なる所定の家電機器のそれぞれの作動時期が重ならないように、複数の所定の家電機器のそれぞれの運転開始時刻を所定の優先順位に従って決定する。
In the power feeding system of the solar power generation device according to the present invention, the information processing terminal device preferably has a power surplus time zone in which surplus in generated power is generated to such an extent that a plurality of predetermined home appliances can be operated simultaneously. When it is determined that the operation time of all the household electrical appliances among the plurality of predetermined household electrical appliances is longer than the time of the power surplus time zone in which surplus in the generated power occurs, The operation start times of the plurality of predetermined home appliances are determined according to a predetermined priority order so that the operation times of the different predetermined home appliances do not overlap.

このように判断されるときは、電力余剰時間帯において発電力の余剰分が比較的大きく、且つ、電力余剰時間帯が比較的短いときである。したがって、この構成によれば、電力余剰時間帯において発電力の余剰分が比較的大きく、且つ、電力余剰時間帯が比較的短いときには、当該電力余剰時間帯の発電力の余剰分を第1の所定の家電機器および第2の所定の家電機器のうちの優先順位が高いほうの作動に費やすことができる。これにより、各所定の家電機器の作動の優先順位に従って、太陽光発電装置が発生させた電力を効率的に利用することができる。   The determination is made when the surplus power generation is relatively large in the power surplus time zone and the power surplus time zone is relatively short. Therefore, according to this configuration, when the surplus of the generated power is relatively large in the power surplus time zone and the power surplus time zone is relatively short, the surplus power generated in the power surplus time zone is It can be spent on the higher priority operation of the predetermined home appliance and the second predetermined home appliance. Thereby, the electric power generated by the photovoltaic power generation apparatus can be efficiently used according to the priority order of operation of each predetermined home appliance.

本発明に従った太陽光発電装置の給電システムにおいて、情報処理端末装置は、好ましくは、運転開始時刻が既に決定された少なくとも一つの第1の所定の家電機器と、第1の所定の家電機器の運転開始時刻が決定された後から運転開始時刻が決定される第2の所定の家電機器とについて、既に決定された第1の所定の家電機器の運転開始時刻を取り消したうえで、第1の所定の家電機器の運転開始時刻または第2の所定の家電機器の運転開始時刻を所定の優先順位に従って決定する。   In the power supply system of the solar power generation device according to the present invention, the information processing terminal device preferably includes at least one first predetermined household electrical appliance whose operation start time has already been determined, and the first predetermined household electrical appliance. After canceling the operation start time of the first predetermined home appliance already determined for the second predetermined home appliance for which the operation start time is determined after the operation start time is determined, the first The operation start time of the predetermined home appliance or the operation start time of the second predetermined home appliance is determined according to a predetermined priority.

情報処理端末装置は、好ましくは、第1の所定の家電機器の運転開始時刻が既に決定された後に、第2の所定の家電機器の運転開始時刻を決定する場合に、既に決定された第1の所定の家電機器の運転開始時刻を変更せずに第2の所定の家電機器の所定の作動時間に消費される電力を賄うことが可能な電力余剰時間帯が存在しないことが判断されるときであって、第1の所定の家電機器と第2の所定の家電機器とを同時に作動させることが可能な程度に発電電力に余剰が生じる電力余剰時間帯が存在することが判断され、且つ、複数の所定の家電機器のうち全ての家電機器の作動時間が、発電電力に余剰が生じる電力余剰時間帯の時間よりも長いことが判断されるときには、既に決定された第1の所定の家電機器の運転開始時刻を取り消したうえで、第1の所定の家電機器の運転開始時刻または第2の所定の家電機器の運転開始時刻を所定の優先順位に従って決定する。
The information processing terminal device is preferably configured to determine the first predetermined household electrical appliance when the first predetermined household electrical appliance operation start time is already determined and then the second predetermined household electrical appliance operation start time. When it is determined that there is no power surplus time zone that can cover the power consumed during the predetermined operating time of the second predetermined home appliance without changing the operation start time of the predetermined home appliance And it is determined that there is a power surplus time zone in which surplus in generated power is generated to the extent that the first predetermined home appliance and the second predetermined home appliance can be operated simultaneously, and When it is determined that the operation time of all of the home appliances among the plurality of predetermined home appliances is longer than the time of the power surplus time zone in which surplus in the generated power occurs, the first predetermined home appliance already determined Canceled the start time of Ede, determines the starting time of the first operation start time of a predetermined home appliance or a second predetermined home appliance according to a predetermined priority order.

この構成によれば、電力余剰時間帯において発電力の余剰分が比較的大きく、且つ、電力余剰時間帯が比較的短いときには、既に決定された第1の所定の家電機器の運転開始時刻を取り消すことにより、当該電力余剰時間帯の発電力の余剰分を第1の所定の家電機器および第2の所定の家電機器のうちの優先順位が高いほうの作動に費やすことができる。これにより、各所定の家電機器の作動の優先順位に従って、太陽光発電装置が発生させた電力を効率的に利用することができる。   According to this configuration, when the surplus of the generated power is relatively large in the power surplus time zone and the power surplus time zone is relatively short, the operation start time of the first predetermined home appliance already determined is canceled. Thus, the surplus power generated in the power surplus time zone can be spent on the higher priority operation of the first predetermined home appliance and the second predetermined home appliance. Thereby, the electric power generated by the photovoltaic power generation apparatus can be efficiently used according to the priority order of operation of each predetermined home appliance.

本発明に従った太陽光発電装置の給電システムにおいて、情報処理端末装置は、好ましくは、複数の所定の家電機器を同時に作動させることが可能な程度に発電電力に余剰が生じる電力余剰時間帯が存在しないことが判断される場合に、複数の所定の家電機器のそれぞれの作動時間を合わせた時間が、発電電力に余剰が生じる電力余剰時間帯の時間よりも長いことが判断されるときには、互いに異なる複数の所定の家電機器のそれぞれの作動時期が重ならないように、複数の所定の家電機器のそれぞれの運転開始時刻を所定の優先順位に従って決定する。   In the power feeding system of the solar power generation device according to the present invention, the information processing terminal device preferably has a power surplus time zone in which surplus in generated power is generated to such an extent that a plurality of predetermined home appliances can be operated simultaneously. When it is determined that they do not exist, when it is determined that the combined time of each of the plurality of predetermined home appliances is longer than the time of the power surplus time zone in which surplus power is generated, The operation start times of the plurality of predetermined home appliances are determined according to a predetermined priority order so that the operation times of the different predetermined home appliances do not overlap.

このように判断されるときは、電力余剰時間帯において発電力の余剰分が比較的小さく、且つ、電力余剰時間帯が比較的短いときである。したがって、この構成によれば、電力余剰時間帯において発電力の余剰分が比較的小さく、且つ、電力余剰時間帯が比較的短いときには、当該電力余剰時間帯の発電力の余剰分を一の所定の家電機器および別の所定の家電機器のうちの優先順位が高いほうの作動に費やすことができる。これにより、各所定の家電機器の作動の優先順位に従って、太陽光発電装置が発生させた電力を効率的に利用することができる。   The determination is made when the surplus of generated power is relatively small in the power surplus time zone and the power surplus time zone is relatively short. Therefore, according to this configuration, when the surplus of the generated power is relatively small in the power surplus time zone and the power surplus time zone is relatively short, the surplus of the generated power in the power surplus time zone is set to one predetermined amount. Can be spent on the higher priority operation of the other home appliances and another predetermined home appliance. Thereby, the electric power generated by the photovoltaic power generation apparatus can be efficiently used according to the priority order of operation of each predetermined home appliance.

本発明に従った太陽光発電装置の給電システムにおいて、情報処理端末装置は、好ましくは、運転開始時刻が既に決定された少なくとも一つの第1の所定の家電機器と、第1の所定の家電機器の運転開始時刻が決定された後から運転開始時刻が決定される第2の所定の家電機器とについて、互いに異なる複数の所定の家電機器のそれぞれの作動時期が重ならないように、複数の所定の家電機器のそれぞれの運転開始時刻を所定の優先順位に従って決定する。   In the power supply system of the solar power generation device according to the present invention, the information processing terminal device preferably includes at least one first predetermined household electrical appliance whose operation start time has already been determined, and the first predetermined household electrical appliance. With respect to the second predetermined home appliance for which the operation start time is determined after the operation start time has been determined, a plurality of predetermined home appliances that are different from each other are not overlapped with each other. Each operation start time of the home appliance is determined according to a predetermined priority order.

情報処理端末装置は、好ましくは、第1の所定の家電機器の運転開始時刻が既に決定された後に、第2の所定の家電機器の運転開始時刻を決定する場合に、既に決定された第1の所定の家電機器の運転開始時刻を変更せずに第2の所定の家電機器の所定の作動時間に消費される電力を賄うことが可能な電力余剰時間帯が存在しないことが判断されるときであって、第1の所定の家電機器と第2の所定の家電機器とを同時に作動させることが可能な程度に発電電力に余剰が生じる電力余剰時間帯が存在しないことが判断され、且つ、複数の所定の家電機器のそれぞれの作動時間を合わせた時間が、発電電力に余剰が生じる電力余剰時間帯の時間よりも長いことが判断されるときには、互いに異なる複数の所定の家電機器のそれぞれの作動時期が重ならないように、複数の所定の家電機器のそれぞれの運転開始時刻を所定の優先順位に従って決定する。   The information processing terminal device is preferably configured to determine the first predetermined household electrical appliance when the first predetermined household electrical appliance operation start time is already determined and then the second predetermined household electrical appliance operation start time. When it is determined that there is no power surplus time zone that can cover the power consumed during the predetermined operating time of the second predetermined home appliance without changing the operation start time of the predetermined home appliance And it is determined that there is no power surplus time zone in which surplus in generated power is generated to the extent that the first predetermined home appliance and the second predetermined home appliance can be operated simultaneously, and When it is determined that the time obtained by combining the operation times of the plurality of predetermined home appliances is longer than the time of the power surplus time zone in which surplus in the generated power occurs, each of the plurality of predetermined home appliances different from each other The operation time is Not do so, to determine the respective operation start time of a plurality of predetermined home appliance according to a predetermined priority order.

この構成によれば、電力余剰時間帯において発電力の余剰分が比較的小さく、且つ、電力余剰時間帯が比較的短いときには、既に決定された第1の所定の家電機器の運転開始時刻を取り消すことにより、当該電力余剰時間帯の発電力の余剰分を第1の所定の家電機器および第2の所定の家電機器のうちの優先順位が高いほうの作動に費やすことができる。これにより、各所定の家電機器の作動の優先順位に従って、太陽光発電装置が発生させた電力を効率的に利用することができる。   According to this configuration, when the surplus of the generated power is relatively small in the power surplus time zone and the power surplus time zone is relatively short, the operation start time of the first predetermined home appliance already determined is canceled. Thus, the surplus power generated in the power surplus time zone can be spent on the higher priority operation of the first predetermined home appliance and the second predetermined home appliance. Thereby, the electric power generated by the photovoltaic power generation apparatus can be efficiently used according to the priority order of operation of each predetermined home appliance.

本発明に従った太陽光発電装置の給電システムにおいて、所定の優先順位は、好ましくは、予めユーザによって設定される。   In the power supply system for the solar power generation device according to the present invention, the predetermined priority order is preferably set in advance by the user.

このようにすることにより、ユーザによって設定された順に沿って、太陽光発電装置が発生させた電力の余剰分を所定の家電機器から順に効率よく利用することができる。   By doing in this way, the surplus of the electric power which the solar power generation device generated can be efficiently used in order from a predetermined household appliance along the order set by the user.

本発明に従った太陽光発電装置の給電システムにおいて、所定の優先順位は、好ましくは、複数の所定の家電機器において、所定の作動時間に消費される電力が大きい機器から小さい機器の順である。   In the power supply system of the solar power generation device according to the present invention, the predetermined priority order is preferably the order from the device that consumes the large amount of power consumed in a predetermined operation time to the device that is small in a plurality of predetermined home appliances. .

このようにすることにより、消費電力が大きい順に沿って、太陽光発電装置が発生させた電力の余剰分を所定の家電機器から順に効率よく利用することができる。   By doing in this way, the surplus of the electric power which the solar power generation device generated can be efficiently used in order from predetermined household appliances in order with large power consumption.

本発明に従った太陽光発電装置の給電システムにおいて、情報処理端末装置は、好ましくは、発電電力に余剰が生じる電力余剰時間帯の起点に所定の家電機器の運転開始時刻が略一致するように、あるいは、発電電力に余剰が生じる電力余剰時間帯の終点に所定の家電機器の運転完了時刻が略一致するように、所定の家電機器の運転開始時刻を決定する。   In the power supply system of the solar power generation device according to the present invention, the information processing terminal device is preferably configured so that the operation start time of a predetermined home appliance substantially coincides with the starting point of the power surplus time zone in which surplus in the generated power occurs. Alternatively, the operation start time of the predetermined home appliance is determined so that the operation completion time of the predetermined home appliance substantially coincides with the end point of the power surplus time zone in which surplus in generated power occurs.

この構成によれば、電力余剰時間帯の起点から所定の家電機器の作動を開始させる場合には、当該所定の家電機器の運転終了後の比較的長い時間帯において、発電電力の余剰分を残すことができる。一方、電力余剰時間帯の終点に所定の家電機器の運転終了時間を合わせる場合には、当該所定の家電機器の運転開始前の比較的長い時間帯において、発電電力の余剰分を残すことができる。このように、この構成によれば、後に運転開始時刻が決定される所定の家電機器が電力余剰時間帯における発電量の余剰分を利用しやすくなる。そのため、太陽光発電装置が発生させた電力を効率的に利用することができる。   According to this configuration, when starting the operation of a predetermined home appliance from the starting point of the power surplus time zone, the surplus generated power is left in a relatively long time zone after the operation of the predetermined home appliance is completed. be able to. On the other hand, when the operation end time of a predetermined home appliance is matched with the end point of the power surplus time zone, the surplus generated power can be left in a relatively long time zone before the start of operation of the predetermined home appliance. . Thus, according to this configuration, it becomes easy for a predetermined home appliance whose operation start time is determined later to use the surplus of the power generation amount in the power surplus time zone. Therefore, the electric power generated by the solar power generation device can be used efficiently.

本発明に従った太陽光発電装置の給電システムにおいて、情報処理端末装置は、好ましくは、所定の家電機器の特性に応じて所定の家電機器の運転開始時刻を決定する。   In the power feeding system of the solar power generation device according to the present invention, the information processing terminal device preferably determines the operation start time of the predetermined home appliance according to the characteristics of the predetermined home appliance.

このようにすることにより、所定の家電機器の特性に応じて、発電電力に余剰が生じる電力余剰時間帯の起点に所定の家電機器の運転開始時刻が略一致するように、または、発電電力に余剰が生じる電力余剰時間帯の終点に所定の家電機器の運転完了時刻が略一致するように、所定の家電機器の運転開始時刻を決定することができる。このように、この構成によれば、太陽光発電装置が発生させた電力を効率的に利用することができ、且つ、電力余剰時間帯において所定の家電機器を当該家電機器の特性に応じて運転させることができる。   By doing in this way, depending on the characteristics of the predetermined home appliance, the operation start time of the predetermined home appliance substantially coincides with the starting point of the power surplus time zone in which surplus in the generated power occurs, or the generated power The operation start time of the predetermined home appliance can be determined so that the operation completion time of the predetermined home appliance substantially coincides with the end point of the power surplus time zone in which surplus occurs. As described above, according to this configuration, the power generated by the photovoltaic power generation apparatus can be efficiently used, and a predetermined home appliance is operated in accordance with the characteristics of the home appliance in the power surplus time zone. Can be made.

本発明に従った太陽光発電装置の給電システムにおいて、所定の家電機器は、好ましくは洗濯乾燥機である。本発明に従った太陽光発電装置の給電システムにおいて、情報処理端末装置は、好ましくは、発電電力に余剰が生じる電力余剰時間帯の終点に洗濯乾燥機の運転完了時刻が略一致するように、洗濯乾燥機の運転開始時刻を決定する。   In the power feeding system of the solar power generation device according to the present invention, the predetermined home appliance is preferably a washing / drying machine. In the power feeding system of the solar power generation device according to the present invention, the information processing terminal device is preferably such that the operation completion time of the washing / drying machine substantially coincides with the end point of the power surplus time zone in which surplus in the generated power occurs. The operation start time of the washing / drying machine is determined.

洗濯乾燥機の運転は、ユーザが希望した時刻に対してなるべく近い時間に完了させることが好ましい。この構成のように、発電電力に余剰が生じる電力余剰時間帯の終点に洗濯乾燥機の運転完了時刻が略一致するように、情報処理端末装置が洗濯乾燥機の運転開始時刻を決定することにより、ユーザが希望した時刻に近い時間に、洗濯乾燥機の運転を完了させることができる。すなわち、この構成によれば、洗濯乾燥機の利便性を向上させることができる。   The operation of the washing / drying machine is preferably completed at a time as close as possible to the time desired by the user. As in this configuration, the information processing terminal device determines the operation start time of the washing / drying machine so that the operation completion time of the washing / drying machine substantially coincides with the end point of the power surplus time zone in which surplus in generated power occurs. The operation of the washing / drying machine can be completed at a time close to the time desired by the user. That is, according to this configuration, the convenience of the washing / drying machine can be improved.

以上のように、本発明によれば、太陽光発電装置が発生させた電力を効率的に利用することが可能な太陽光発電装置の給電システム、ならびに、それに用いられる情報処理端末装置、洗濯乾燥機および冷蔵庫を提供することができる。   As described above, according to the present invention, a power feeding system for a solar power generation apparatus that can efficiently use the power generated by the solar power generation apparatus, and an information processing terminal device used in the power feeding system, washing and drying A machine and refrigerator can be provided.

本発明に従った太陽光発電装置の給電システムの構成の一例を示すブロック図である。It is a block diagram which shows an example of a structure of the electric power feeding system of the solar power generation device according to this invention. 本発明に従った太陽光発電装置の給電システムに含まれる洗濯乾燥機の全体を示す斜視図である。It is a perspective view which shows the whole washing-drying machine included in the electric power feeding system of the solar power generation device according to this invention. 本発明に従った太陽光発電装置の給電システムに含まれる洗濯乾燥機の内部の構成を示す概略図である。It is the schematic which shows the structure inside the washing dryer included in the electric power feeding system of the solar power generation device according to this invention. 本発明に従った太陽光発電装置の給電システムに含まれる洗濯乾燥機の表示部の一例を示す正面図である。It is a front view which shows an example of the display part of the washing dryer included in the electric power feeding system of the solar power generation device according to this invention. 本発明に従った太陽光発電装置の給電システムに含まれる洗濯乾燥機の操作部の一例を示す正面図である。It is a front view which shows an example of the operation part of the washing dryer included in the electric power feeding system of the solar power generation device according to this invention. 本発明に従った太陽光発電装置の給電システムに含まれる洗濯乾燥機の制御部の一例を示すブロック図である。It is a block diagram which shows an example of the control part of the washing dryer included in the electric power feeding system of the solar power generation device according to this invention. 本発明に従った太陽光発電装置の給電システムに含まれる情報処理端末装置の制御部の一例を示すブロック図である。It is a block diagram which shows an example of the control part of the information processing terminal device contained in the electric power feeding system of the solar power generation device according to this invention. 本発明に従った太陽光発電装置の給電システムに含まれる洗濯乾燥機が処理する制御のフローチャートである。It is a flowchart of the control which the washing dryer included in the electric power feeding system of the solar power generation device according to this invention processes. 本発明に従った太陽光発電装置の給電システムに含まれる洗濯乾燥機が処理する制御のフローチャートである。It is a flowchart of the control which the washing dryer included in the electric power feeding system of the solar power generation device according to this invention processes. 本発明に従った太陽光発電装置の給電システムに含まれる情報処理端末装置が処理する制御のフローチャートである。It is a flowchart of the control which the information processing terminal device contained in the electric power feeding system of the solar power generation device according to this invention processes. 本発明に従った太陽光発電装置の給電システムに含まれる情報処理端末装置が処理する制御のフローチャートである。It is a flowchart of the control which the information processing terminal device contained in the electric power feeding system of the solar power generation device according to this invention processes. 本発明に従った太陽光発電装置の給電システムに含まれる冷蔵庫の構成を概略的に示す断面図である。It is sectional drawing which shows roughly the structure of the refrigerator contained in the electric power feeding system of the solar power generation device according to this invention. 本発明に従った太陽光発電装置の給電システムに含まれる冷蔵庫の制御部の一例を示すブロック図である。It is a block diagram which shows an example of the control part of the refrigerator contained in the electric power feeding system of the solar power generation device according to this invention. 本発明に従った太陽光発電装置の給電システムに含まれる冷蔵庫が処理する制御のフローチャートである。It is a flowchart of the control which the refrigerator contained in the electric power feeding system of the solar power generation device according to this invention processes. 本発明に従った太陽光発電装置の給電システムに含まれる情報処理端末装置が処理する別の制御のフローチャートである。It is a flowchart of another control which the information processing terminal device contained in the electric power feeding system of the solar power generation device according to this invention processes. 本発明に従った太陽光発電装置の給電システムに含まれる情報処理端末装置が処理する別の制御のフローチャートである。It is a flowchart of another control which the information processing terminal device contained in the electric power feeding system of the solar power generation device according to this invention processes. 本発明に従った太陽光発電装置の給電システムに含まれる情報処理端末装置が処理するさらに別の制御のフローチャートである。It is a flowchart of another control which the information processing terminal device contained in the electric power feeding system of the solar power generation device according to this invention processes. 本発明に従った太陽光発電装置の給電システムに含まれる情報処理端末装置が処理するさらに別の制御の一部のフローチャートである。It is a part flowchart of another control which the information processing terminal device contained in the electric power feeding system of the solar power generation device according to this invention processes. 本発明に従った太陽光発電装置の給電システムに含まれる情報処理端末装置が処理するさらに別の制御の別の一部のフローチャートである。It is another partial flowchart of another control which the information processing terminal device contained in the electric power feeding system of the solar power generation device according to this invention processes. 本発明に従った太陽光発電装置の給電システムに含まれる情報処理端末装置が処理するフローチャートの一つであって、既に決定された第1の所定の家電機器の運転開始時刻を変更または取り消すように、第1の所定の家電機器の運転開始時刻および第2の所定の家電機器の運転開始時刻を決定するための処理を示すフローチャートである。It is one of the flowcharts which the information processing terminal device contained in the electric power feeding system of the solar power generation device according to this invention processes, Comprising: The operation start time of the 1st predetermined household appliance already determined is changed or canceled It is a flowchart which shows the process for determining the operation start time of a 1st predetermined household appliance, and the operation start time of a 2nd predetermined household appliance.

以下、本発明の実施の形態を図面に基づいて説明する。   Hereinafter, embodiments of the present invention will be described with reference to the drawings.

(第1実施形態)
図1に、本発明に従った太陽光発電装置の給電システムの一例としての給電システム1を示す。給電システム1は、太陽光発電装置2と電源切替装置3と情報処理端末装置100とを備えている。また、給電システム1は、複数の家電機器として、冷蔵庫5とテレビ6とエアコン7と照明装置8と洗濯乾燥機900とを備えている。複数の家電機器には、これらの他に、例えば、扇風機、除湿機、加湿器、または、イオン発生器等の図示しない他の家電機器が含まれていてもよい。また、複数の家電機器には、これら冷蔵庫5とテレビ6とエアコン7と照明装置8とのいずれかが含まれていなくてもよい。また、図示しないが、複数の家電機器には、同種の家電機器が複数含まれていてもよい(例えば、図1において、複数の冷蔵庫5が図示されていてもよい)。給電システム1において、洗濯乾燥機900は、所定の家電機器の一例である。冷蔵庫5とテレビ6とエアコン7と照明装置8とは他の家電機器の一例である。
(First embodiment)
FIG. 1 shows a power feeding system 1 as an example of a power feeding system for a photovoltaic power generator according to the present invention. The power feeding system 1 includes a solar power generation device 2, a power supply switching device 3, and an information processing terminal device 100. Moreover, the electric power feeding system 1 is provided with the refrigerator 5, the television 6, the air conditioner 7, the illuminating device 8, and the washing-drying machine 900 as several household appliances. In addition to these, other home appliances (not shown) such as a fan, a dehumidifier, a humidifier, or an ion generator may be included in the plurality of home appliances. Further, the plurality of home appliances may not include any of the refrigerator 5, the television 6, the air conditioner 7, and the lighting device 8. In addition, although not illustrated, the plurality of home appliances may include a plurality of similar home appliances (for example, a plurality of refrigerators 5 may be illustrated in FIG. 1). In the power supply system 1, the washing / drying machine 900 is an example of a predetermined home appliance. The refrigerator 5, the television 6, the air conditioner 7, and the lighting device 8 are examples of other home appliances.

複数の家電機器は、太陽光発電装置2が発電させた電力または商用電源4から供給される電力によって作動する。電源切替装置3は、複数の家電機器および情報処理端末装置100が使用する電力を、商用電源4から供給される電力と太陽光発電装置2が発電させた電力とのいずれかまたは両方に切り替える。   The plurality of home appliances are operated by electric power generated by the solar power generation device 2 or electric power supplied from the commercial power source 4. The power supply switching device 3 switches the power used by the plurality of home appliances and the information processing terminal device 100 to one or both of the power supplied from the commercial power supply 4 and the power generated by the solar power generation device 2.

情報処理端末装置100は、複数の家電機器と太陽光発電装置2とが通信可能であるようにネットワーク接続されている。また、情報処理端末装置100は、電源切替装置3と通信可能であるようにネットワーク接続されている。図1中の実線によって示される情報処理端末装置100とその他の構成との接続は、情報処理端末装置100とその他の構成との通信を表している。図1中の点線は、太陽光発電装置2または商用電源4から、情報処理端末装置100とその他の構成とに供給される電力を表している。   The information processing terminal device 100 is network-connected so that a plurality of home appliances and the solar power generation device 2 can communicate with each other. Further, the information processing terminal device 100 is network-connected so as to be communicable with the power supply switching device 3. The connection between the information processing terminal device 100 and the other configuration indicated by the solid line in FIG. 1 represents communication between the information processing terminal device 100 and the other configuration. A dotted line in FIG. 1 represents power supplied from the solar power generation device 2 or the commercial power supply 4 to the information processing terminal device 100 and other components.

なお、情報処理端末装置100は、図示しないネットワークサーバを介して、後述するように、スマートフォン10等の携帯情報端末から所定の情報を含む信号を受け取る。図1においては、この信号の入力を実線にて簡略化して示す。   In addition, the information processing terminal device 100 receives a signal including predetermined information from a portable information terminal such as the smartphone 10 through a network server (not shown) as described later. In FIG. 1, the input of this signal is simplified and shown by a solid line.

図2に、洗濯乾燥機900の全体を示す。図2に示すように、洗濯乾燥機900は、外箱901を備えている。外箱901は、洗濯乾燥機900の本体の外形を形成している。外箱901は略直方体形状を有している。   FIG. 2 shows the entire washing / drying machine 900. As shown in FIG. 2, the washing / drying machine 900 includes an outer box 901. The outer box 901 forms the outer shape of the main body of the washing / drying machine 900. The outer box 901 has a substantially rectangular parallelepiped shape.

図3に示すように、洗濯乾燥機900は、水槽931と、収容槽の一例としての回転ドラム932と、モータ943とを備えている。回転ドラム932は、水平方向または水平方向から傾斜した方向に延びる回転軸線を中心に回転する。回転ドラム932の内部の空間は、乾燥室930として機能する。   As shown in FIG. 3, the washing / drying machine 900 includes a water tank 931, a rotating drum 932 as an example of a storage tank, and a motor 943. The rotary drum 932 rotates around a rotation axis extending in the horizontal direction or in a direction inclined from the horizontal direction. A space inside the rotating drum 932 functions as a drying chamber 930.

水槽931と回転ドラム932とは、それぞれ有底筒形状を有している。回転ドラム932は、水槽931の内部の空間に収容されている。回転ドラム932は、被乾燥対象物としての洗濯物Wを収納する。回転ドラム932の底部の外側面には、駆動軸944が固定されている。モータ943は、水槽931の底部の外側面に取り付けられている。モータ943は、駆動軸944に連結されている。   The water tank 931 and the rotating drum 932 each have a bottomed cylindrical shape. The rotating drum 932 is accommodated in the space inside the water tank 931. The rotating drum 932 stores the laundry W as an object to be dried. A drive shaft 944 is fixed to the outer surface of the bottom of the rotating drum 932. The motor 943 is attached to the outer surface of the bottom of the water tank 931. The motor 943 is connected to the drive shaft 944.

図2に示すように、外箱901の前面の略中央には外扉902が取り付けられている。外扉902を開くことにより、水槽931(図3参照)の前部の開口と回転ドラム932(図3参照)の前部の開口とを通じて、回転ドラム932に洗濯物Wを投入、または、回転ドラム932から洗濯物Wを取り出すことができる。外扉902は、透明状の窓903を有している。これにより、洗濯乾燥機900の使用者は、外箱901の外方から回転ドラム932の内部を視認することができる。   As shown in FIG. 2, an outer door 902 is attached to the approximate center of the front surface of the outer box 901. By opening the outer door 902, the laundry W is put into the rotating drum 932 or rotated through the front opening of the water tank 931 (see FIG. 3) and the opening of the rotating drum 932 (see FIG. 3). The laundry W can be taken out from the drum 932. The outer door 902 has a transparent window 903. Thereby, the user of the washing / drying machine 900 can visually recognize the inside of the rotating drum 932 from the outside of the outer box 901.

外箱901の前部には、洗剤ケース905が配置されている。使用者は、洗濯に必要な洗剤、漂白剤、または、柔軟剤等を洗剤ケース905に投入する。図3に示すように、洗濯乾燥機900は、給水部933を備えている。給水部933の内部の空間と洗剤ケース905(図2参照)の内部の空間とは接続されている。給水部933の下部と水槽931の上部との間には、給水ダクト934が延びている。洗濯乾燥機900に供給される水は、図示しない給水口から給水部933に流入する。洗剤ケース905または給水部933に溜められた洗剤等を含む水または洗剤等を含まない水は、給水ダクト934を流通することによって水槽931の内部に流入する。一方、水槽931の下部には、排水口(図示せず)が形成されている。水槽931の内部に溜められた水は、洗濯乾燥機900の外部と水槽931との間に延びる排水ダクト(図示せず)に流出する。   A detergent case 905 is disposed at the front of the outer box 901. The user puts a detergent, a bleaching agent, a softener or the like necessary for washing into the detergent case 905. As shown in FIG. 3, the washing / drying machine 900 includes a water supply unit 933. The space inside the water supply unit 933 and the space inside the detergent case 905 (see FIG. 2) are connected. A water supply duct 934 extends between the lower part of the water supply part 933 and the upper part of the water tank 931. Water supplied to the washing / drying machine 900 flows into the water supply unit 933 from a water supply port (not shown). Water containing the detergent or the like stored in the detergent case 905 or the water supply unit 933 or water not containing the detergent flows into the water tank 931 by flowing through the water supply duct 934. On the other hand, a drain port (not shown) is formed in the lower part of the water tank 931. The water stored in the water tank 931 flows out to a drainage duct (not shown) extending between the outside of the washing / drying machine 900 and the water tank 931.

図3に示すように、洗濯乾燥機900は、熱源部940と送風機941と空気循環経路942とを備えている。乾燥室930には、熱源部940で加熱された空気が供給される。送風機941は、熱源部940で加熱された空気を乾燥室930へ送風する。   As shown in FIG. 3, the washing / drying machine 900 includes a heat source unit 940, a blower 941, and an air circulation path 942. Air dried by the heat source unit 940 is supplied to the drying chamber 930. The blower 941 blows the air heated by the heat source unit 940 to the drying chamber 930.

図2に示すように、表示部910と操作部920とが、外箱901の前面の上部に配置されている。後述するように、操作920は、複数の操作ボタンを有している。洗濯乾燥機900の使用者が操作部920の各操作ボタンを操作することにより、洗い行程、すすぎ行程、脱水行程、および、乾燥行程が順次行われたり、各行程がそれぞれ単独で行われたり、設定された運転モードに応じて各行程が行われたりする。   As shown in FIG. 2, the display unit 910 and the operation unit 920 are disposed on the upper part of the front surface of the outer box 901. As will be described later, the operation 920 has a plurality of operation buttons. When the user of the washing / drying machine 900 operates each operation button of the operation unit 920, a washing process, a rinsing process, a dehydration process, and a drying process are sequentially performed, or each process is performed independently. Each process is performed according to the set operation mode.

図4には、表示部910の一例を示す。表示部910は、表題部911と、時刻表示部912と、ランプ913a,913b,913c,913dを有している。表題部911には、例えば使用者の選択に基づいて、後述するように運転開始時刻または運転完了時刻のいずれかの文字が表示される。時刻表示部912には、運転開始時刻または運転完了時刻のいずれかのうち、使用者の選択に応じて情報処理端末装置100(図1参照)によって決定された時刻が表示される。   FIG. 4 shows an example of the display unit 910. The display unit 910 includes a title unit 911, a time display unit 912, and lamps 913a, 913b, 913c, and 913d. In the title part 911, for example, based on the selection of the user, either a driving start time or a driving completion time is displayed as will be described later. The time display unit 912 displays the time determined by the information processing terminal device 100 (see FIG. 1) according to the user's selection, either the operation start time or the operation completion time.

このようにして、給電システム1(図1参照)は、情報処理端末装置100によって決定された運転開始時刻、または、運転開始時刻と作動時間情報とに対応した洗濯乾燥機900の運転完了時刻を、洗濯乾燥機900に表示させることができる。   In this way, the power feeding system 1 (see FIG. 1) determines the operation start time determined by the information processing terminal device 100 or the operation completion time of the washing / drying machine 900 corresponding to the operation start time and the operation time information. Can be displayed on the washing and drying machine 900.

ランプ913aは、洗濯乾燥機900(図3参照)において、少なくとも、洗濯行程が行われている場合、または、洗濯行程を含む運転モードが選択されている場合に点灯する。同様に、ランプ913bは、洗濯乾燥機900において、少なくとも、すすぎ行程が行われている場合、または、すすぎ行程を含む運転モードが選択されている場合に点灯する。ランプ913cは、洗濯乾燥機900において、少なくとも、脱水行程が行われている場合、または、脱水行程を含む運転モードが選択されている場合に点灯する。ランプ913dは、洗濯乾燥機900において、少なくとも、乾燥行程が行われている場合、または、乾燥行程を含む運転モードが選択されている場合に点灯する。   The lamp 913a is lit in the washing / drying machine 900 (see FIG. 3) at least when the washing process is performed or when the operation mode including the washing process is selected. Similarly, the lamp 913b is lit in the washing / drying machine 900 at least when the rinsing process is performed or when the operation mode including the rinsing process is selected. The lamp 913c lights up in the washing / drying machine 900 at least when the dehydration process is performed or when the operation mode including the dehydration process is selected. The lamp 913d lights up in the washing / drying machine 900 at least when the drying process is performed or when the operation mode including the drying process is selected.

図5には、操作部920の一例を示す。操作部920は、複数の操作ボタンとして、メインスイッチボタン925と、スタートボタン921と、コース選択ボタン922と、モード選択ボタン923と、おまかせボタン924とを有している。また、操作部920は、時刻選択ボタン926,927と、OKボタン928と、キャンセルボタン929とを有している。使用者は、モード選択ボタン923を押下することにより、洗濯乾燥機900の運転モードを選択することができる。また、使用者は、コース選択ボタン922を押下することにより、洗濯乾燥機900の各行程のうち、必要とする行程を選択することができる。使用者は、時刻選択ボタン926,927を押下することにより、洗濯乾燥機900の運転を完了させる希望の時刻として、運転完了希望時刻を設定することができる。   FIG. 5 shows an example of the operation unit 920. The operation unit 920 includes a main switch button 925, a start button 921, a course selection button 922, a mode selection button 923, and an automatic button 924 as a plurality of operation buttons. The operation unit 920 includes time selection buttons 926 and 927, an OK button 928, and a cancel button 929. The user can select the operation mode of the washing / drying machine 900 by pressing the mode selection button 923. Further, the user can select a required stroke among the strokes of the washing / drying machine 900 by pressing the course selection button 922. The user can set a desired operation completion time as a desired time for completing the operation of the washing / drying machine 900 by pressing the time selection buttons 926 and 927.

図3に示すように、洗濯乾燥機900は、制御部950を備えている。図6には、制御部950の一例を示す。制御部950は、容量検知部957とモード検知部956とを有する情報受信部955と、記憶部951と、情報送信部953と、情報抽出部954と、タイマ952とを有している。タイマ952は、時計としての機能を有している。   As shown in FIG. 3, the washing / drying machine 900 includes a control unit 950. FIG. 6 shows an example of the control unit 950. The control unit 950 includes an information reception unit 955 having a capacity detection unit 957 and a mode detection unit 956, a storage unit 951, an information transmission unit 953, an information extraction unit 954, and a timer 952. The timer 952 has a clock function.

容量検知部957は、回転ドラム932に収容される洗濯物Wの容量を検知する。なお、洗濯物Wの容量は、図示しないセンサによって検知される水槽931内の水の水位または水の重量に基づき、検知または算出されるものであってもよい。また、洗濯乾燥機900は、回転ドラム932に収容される洗濯物Wの重量を検知または測定する重量センサを備えていてもよい。また、洗濯乾燥機900の操作部920(図5参照)に、洗濯物Wの容量を選択するための容量選択ボタンが配置されていてもよい。情報受信部955は、これらいずれかのセンサからの信号を受け取ることにより、または、受け取った信号に基づいて演算することにより、洗濯物Wの容量を検知することができる。   The capacity detection unit 957 detects the capacity of the laundry W stored in the rotary drum 932. The capacity of the laundry W may be detected or calculated based on the water level or the water weight in the water tank 931 detected by a sensor (not shown). In addition, the laundry dryer 900 may include a weight sensor that detects or measures the weight of the laundry W accommodated in the rotary drum 932. In addition, a capacity selection button for selecting the capacity of the laundry W may be disposed on the operation unit 920 (see FIG. 5) of the laundry dryer 900. The information receiving unit 955 can detect the capacity of the laundry W by receiving a signal from any one of these sensors or by calculating based on the received signal.

使用者によるモード選択ボタン923の操作によって選択された運転モードは、モード検知部956によって検知される。また、使用者によるコース選択ボタン922の操作によって選択された洗濯コースも、モード検知部956によって検知されていてもよい。   The operation mode selected by the operation of the mode selection button 923 by the user is detected by the mode detection unit 956. In addition, the washing course selected by the user operating the course selection button 922 may be detected by the mode detection unit 956.

記憶部951は、洗濯乾燥機900の複数の運転モードと、容量検知部957によって検知された洗濯物Wの容量または各運転モードに応じて設定された作動時間の情報とを記憶する。情報抽出部954は、記憶部951に記憶された作動時間情報のうち、容量検知部957によって検知された洗濯物Wの容量または各運転モードに対応した作動時間情報を抽出する。情報送信部953は、情報抽出部954によって抽出された情報を、情報処理端末装置100に送信する。   The storage unit 951 stores a plurality of operation modes of the washing / drying machine 900 and the capacity of the laundry W detected by the capacity detection unit 957 or information on the operation time set according to each operation mode. The information extraction unit 954 extracts the operation time information corresponding to the capacity of the laundry W detected by the capacity detection unit 957 or each operation mode from the operation time information stored in the storage unit 951. The information transmission unit 953 transmits the information extracted by the information extraction unit 954 to the information processing terminal device 100.

図7に情報処理端末装置100の制御部120の構成を示す。情報処理端末装置100の制御部120は、記憶部124と、情報受信部121と、判定部126と、決定部127と、タイマ125とを有している。情報受信部121と演算部123とは、推定部の一例である。タイマ125は、時計としての機能を有している。   FIG. 7 shows the configuration of the control unit 120 of the information processing terminal device 100. The control unit 120 of the information processing terminal device 100 includes a storage unit 124, an information reception unit 121, a determination unit 126, a determination unit 127, and a timer 125. The information reception unit 121 and the calculation unit 123 are an example of an estimation unit. The timer 125 has a function as a clock.

情報受信部121は、洗濯乾燥機900から作動時間情報を受け取る。また、情報受信部121は、太陽光発電装置2の発電電力量の時間的推移の情報と、他の家電機器(例えば、冷蔵庫5とテレビ6とエアコン7と照明装置8(図1参照))の消費電力量の時間的推移の情報とを受け取る。演算部123は、情報受信部121が受け取った、太陽光発電装置2の過去の発電電力量の時間的推移の情報と、他の家電機器の過去の消費電力量の時間的推移の情報とから、発電電力に余剰が生じる時間帯を推定する。なお、演算部123による電力余剰時間帯の推定については、後述する。   The information receiving unit 121 receives operating time information from the washing / drying machine 900. The information receiving unit 121 also includes information on the temporal transition of the amount of power generated by the solar power generation device 2 and other home appliances (for example, the refrigerator 5, the television 6, the air conditioner 7, and the lighting device 8 (see FIG. 1)). And information on temporal transition of power consumption. The calculation unit 123 is based on the information on the temporal transition of the past power generation amount of the photovoltaic power generation apparatus 2 and the information on the temporal transition of the past power consumption amount of other home appliances received by the information reception unit 121. Estimate the time zone when surplus in generated power occurs. The estimation of the power surplus time zone by the calculation unit 123 will be described later.

記憶部124は、演算部123によって推定された時間帯の結果を電力余剰時間帯情報として記憶する。判定部126は、情報受信部121が受け取った作動時間情報と、記憶部124が記憶した電力余剰時間帯情報とに基づき、洗濯乾燥機900の所定の作動時間に消費される電力を賄うことが可能な電力余剰時間帯が存在するか否かを判定する。決定部127は、判定部126の判定結果に基づいて、洗濯乾燥機900の運転開始時刻を決定する。   The memory | storage part 124 memorize | stores the result of the time slot estimated by the calculating part 123 as electric power surplus time slot | zone information. The determination unit 126 can cover the power consumed during the predetermined operation time of the washing / drying machine 900 based on the operation time information received by the information reception unit 121 and the power surplus time zone information stored by the storage unit 124. It is determined whether a possible power surplus time zone exists. The determination unit 127 determines the operation start time of the washing / drying machine 900 based on the determination result of the determination unit 126.

情報送信部122から、太陽光発電装置2、電源切替装置、または、洗濯乾燥機900を含む複数の家電機器には、それぞれに必要な情報についての信号が出力されている。洗濯乾燥機900に対しては、情報送信部122は、決定部127によって決定された運転開始時刻についての情報を送信する。   From the information transmission part 122, the signal regarding information required for each of the plurality of household electric appliances including the solar power generation device 2, the power supply switching device, or the washing and drying machine 900 is output. For the washing / drying machine 900, the information transmission unit 122 transmits information about the operation start time determined by the determination unit 127.

次に、洗濯乾燥機900によって処理される制御について、フローチャートを用いて説明する。図8に示すように、ステップS101において、使用者によって洗濯物が回転ドラム932(図3参照)に投入される。ステップS102において、操作部920(図5参照)のモード選択ボタン923またはコース選択ボタン922が操作されることにより、洗濯乾燥機900の運転モードまたは洗濯コースがそれぞれ選択される。運転モードの例としては、洗い行程、すすぎ行程、および、脱水行程を含む洗濯のみを行うモードであるか、洗濯に加えて乾燥行程まで行うモードであるか、洗い行程、すすぎ行程、脱水行程、および、乾燥行程のいずれかの行程が通常の運転よりも長く設定されたモードであるか、洗い行程、すすぎ行程、脱水行程、および、乾燥行程のいずれかの行程が通常の運転よりも短く設定されたモードであるか、または、お風呂の残り湯を使うモードであるか、といった複数のモードが含まれる。   Next, the control processed by the washing / drying machine 900 will be described using a flowchart. As shown in FIG. 8, in step S101, the laundry is put into the rotating drum 932 (see FIG. 3) by the user. In step S102, an operation mode or a washing course of the washing / drying machine 900 is selected by operating the mode selection button 923 or the course selection button 922 of the operation unit 920 (see FIG. 5). Examples of operation modes include a washing process, a rinsing process, and a mode that performs only washing including a dehydration process, or a mode that performs a drying process in addition to washing, a washing process, a rinsing process, a dehydration process, And any one of the drying strokes is set to a mode longer than the normal operation, or any one of the washing stroke, the rinsing stroke, the dehydration stroke, and the drying stroke is set shorter than the normal operation. A plurality of modes are included such as whether the mode is a mode that has been set or a mode that uses remaining hot water in the bath.

ステップS103において、時刻選択ボタン926,927が操作されることによって運転完了希望時刻が入力されたか否かが判定される。ステップS103において、運転完了希望時刻が入力されていることが判定される場合には、ステップS104に進む。ステップS104において、入力された運転完了希望時刻が記憶部951に保存される。一方、ステップS103において、運転完了希望時刻が入力されていないことが判定される場合には、ステップS105に進む。   In step S103, it is determined whether or not the operation completion desired time is input by operating the time selection buttons 926 and 927. If it is determined in step S103 that the desired operation completion time has been input, the process proceeds to step S104. In step S104, the input operation completion desired time is stored in the storage unit 951. On the other hand, when it is determined in step S103 that the operation completion desired time is not input, the process proceeds to step S105.

ステップS105において、スタートボタン921(図5参照)が操作されたか否かが判定される。スタートボタン921が押下されていることが判定される場合には、ステップS115に進む。スタートボタン921が押下されたということは、使用者が情報処理端末装置100(図6参照)と洗濯乾燥機900とを通信させずに、洗濯行程等の運転の開始を使用者が選択したことを意味する。   In step S105, it is determined whether or not the start button 921 (see FIG. 5) has been operated. If it is determined that the start button 921 is pressed, the process proceeds to step S115. The fact that the start button 921 has been pressed means that the user has selected the start of the operation such as the washing process without causing the information processing terminal device 100 (see FIG. 6) and the washing / drying machine 900 to communicate with each other. Means.

一方、ステップS105において、スタートボタン921が操作されていないことが判定される場合には、ステップS106に進む。ステップS106において、おまかせボタン924が操作されているか否かが判定される。おまかせボタン924が押下されていることが判定される場合には、ステップS107に進む。おまかせボタン924が押下されたということは、後述するように、情報処理端末装置100(図6参照)と洗濯乾燥機900とを通信させることにより、太陽光発電装置2の発電電力量の余剰分を用いて洗濯乾燥機900を作動させること、または、電力単価が安い深夜時間帯に洗濯乾燥機900を作動させること等を、使用者が希望したことを意味する。   On the other hand, if it is determined in step S105 that the start button 921 is not operated, the process proceeds to step S106. In step S106, it is determined whether or not the automatic button 924 is operated. If it is determined that the automatic button 924 is pressed, the process proceeds to step S107. The fact that the automatic button 924 has been pressed means that, as will be described later, the information processing terminal device 100 (see FIG. 6) and the washing / drying machine 900 communicate with each other to surplus the amount of power generated by the solar power generation device 2. This means that the user desires to operate the laundry dryer 900 using, or to operate the laundry dryer 900 in the midnight time zone when the unit price of electricity is low.

ステップS106において、おまかせボタン924が押下されていないことが判定される場合には、ステップS105に戻る。   If it is determined in step S106 that the automatic button 924 has not been pressed, the process returns to step S105.

ステップS107において、洗濯物の容量を測定する為の処理が行われる。ステップS107の処理は、洗濯物の容量に適した洗剤の量を決定するために必要な処理であって、且つ、ステップS102において選択された洗濯コースと運転モードと洗濯物の容量とに基づき、洗濯乾燥機900が実際に作動する時間が決定される。ステップS107の処理が完了した後には、洗濯物の容量に応じた洗剤量が表示部910(図4参照)に表示される。使用者は、ステップS107以降、ステップS114(図9参照)までに洗剤を投入すればよい。   In step S107, processing for measuring the capacity of the laundry is performed. The process in step S107 is a process necessary for determining the amount of detergent suitable for the laundry volume, and is based on the laundry course, the operation mode, and the laundry volume selected in step S102. The time for the laundry dryer 900 to actually operate is determined. After the process of step S107 is completed, the amount of detergent corresponding to the laundry capacity is displayed on the display unit 910 (see FIG. 4). The user may put the detergent after step S107 and before step S114 (see FIG. 9).

ステップS107に続いて、ステップS108が行われる。ステップS108において、洗濯物の容量または各運転モードに応じて設定され且つ記憶部951(図6参照)に記憶された作動時間情報が、情報処理端末装置100に送信される。さらに、ステップS104において運転完了希望時刻情報が記憶部951に記憶されている場合には、ステップS108において、運転完了希望時刻の情報を含む作動時間情報が情報処理端末装置100に送信される。   Subsequent to step S107, step S108 is performed. In step S108, the operating time information set according to the laundry capacity or each operation mode and stored in the storage unit 951 (see FIG. 6) is transmitted to the information processing terminal device 100. Furthermore, when the operation completion desired time information is stored in the storage unit 951 in step S104, the operation time information including the information on the operation completion desired time is transmitted to the information processing terminal device 100 in step S108.

なお、運転完了希望時刻は、使用者が操作部920(図5参照)の時刻選択ボタン926,927を操作することによって設定されることに限定されない。例えば、より操作性の高いスマートフォン10(図7参照)等の携帯情報端末から、運転完了希望時刻についての情報が情報処理端末装置100に送信されていてもよい。スマートフォン10等の携帯情報端末が利用される場合には、ステップS102において運転モード等が選択された後であっても、運転完了希望時刻についての情報は、ステップS117までに情報処理端末装置100に送信されていればよい。また、スマートフォン10の操作によって、ステップS102において各運転モード等が選択されていてもよい。このように、情報処理端末装置100は、スマートフォン10から運転完了希望時刻についての情報を受け取ることができる。   Note that the desired operation completion time is not limited to being set by the user operating time selection buttons 926 and 927 of operation unit 920 (see FIG. 5). For example, information about the desired driving completion time may be transmitted to the information processing terminal device 100 from a portable information terminal such as the smart phone 10 (see FIG. 7) having higher operability. When a portable information terminal such as the smartphone 10 is used, the information about the operation completion desired time is stored in the information processing terminal device 100 by step S117 even after the operation mode or the like is selected in step S102. It only needs to be sent. Moreover, each operation mode etc. may be selected in step S102 by operation of the smart phone 10. In this way, the information processing terminal device 100 can receive information about the desired driving completion time from the smartphone 10.

また、情報処理端末装置100は、運転完了希望時刻についての情報を、ステップS102において運転モード等が選択された後であっても、ステップS117までに複数回受け取っていてもよい。つまり、一度選択された運転完了希望時刻は、当該運転開始希望時刻が到来するまでに変更が可能なものであってもよい。このように、情報処理端末装置100は、スマートフォン10または洗濯乾燥機900から、運転完了希望時刻についての情報を複数回受け取ることができる。   Further, the information processing terminal device 100 may receive information about the desired operation completion time a plurality of times until step S117 even after the operation mode or the like is selected in step S102. That is, the operation completion desired time once selected may be changed before the operation start desired time arrives. In this way, the information processing terminal device 100 can receive information about the desired operation completion time from the smartphone 10 or the washing / drying machine 900 a plurality of times.

ステップS108に続いて、ステップS110(図9参照)において洗濯乾燥機900(図3参照)の運転開始時刻が設定される。後述するように、運転開始時刻は、情報処理端末装置100(図7参照)によって設定される。ステップS110の後のステップS111において、情報処理端末装置100から運転開始時刻の情報が送信され、制御部950の情報受信部955が当該運転開始時刻の情報を受信する。   Subsequent to step S108, the operation start time of the washing / drying machine 900 (see FIG. 3) is set in step S110 (see FIG. 9). As will be described later, the operation start time is set by the information processing terminal device 100 (see FIG. 7). In step S111 after step S110, information on the operation start time is transmitted from the information processing terminal device 100, and the information receiving unit 955 of the control unit 950 receives the information on the operation start time.

ステップS111に続いて、ステップS112において運転完了時刻または運転開始時刻が表示部910(図4参照)の時刻表示部912に表示される。時刻表示部912に表示される時刻が運転開始時刻であるか運転完了時刻であるかは、表題部911に表示される文字等の情報により、それぞれ区別される。表題部911に表示される時刻は、例えばモード選択ボタン923が操作されるごとに、運転完了時刻と運転開始時刻とが切り替えられる。ただし、表題部911に表示される運転完了時刻と運転開始時刻とは、図示しない他のボタンが操作されることによって切り替えられていてもよく、または、おまかせボタン924もしくはコース選択ボタン922が操作されることによって切り替えられていてもよい。このように、洗濯乾燥機900(図6参照)の表示部910は、情報処理端末装置100によって決定された運転開始時刻、または、運転開始時刻と作動時間情報とに対応した洗濯乾燥機900の運転完了時刻を表示する。   Subsequent to step S111, in step S112, the operation completion time or the operation start time is displayed on the time display unit 912 of the display unit 910 (see FIG. 4). Whether the time displayed on the time display unit 912 is the operation start time or the operation completion time is distinguished by information such as characters displayed on the title unit 911. The time displayed on the title section 911 is switched between the operation completion time and the operation start time each time the mode selection button 923 is operated, for example. However, the operation completion time and the operation start time displayed on the title part 911 may be switched by operating other buttons (not shown), or the automatic button 924 or the course selection button 922 is operated. May be switched. As described above, the display unit 910 of the washing / drying machine 900 (see FIG. 6) displays the operation start time determined by the information processing terminal device 100, or the washing / drying machine 900 corresponding to the operation start time and the operation time information. Displays the operation completion time.

洗濯乾燥機900の使用者は、時刻表示部912に表示された時刻を確認することにより、選択した運転モードおよび洗濯コースにて洗濯乾燥機900が運転した後に、表示された運転完了時刻に運転が完了されること、または、表示された運転開始時刻に運転が開始されることについて、了承するか否かを選択することができる。   The user of the washing / drying machine 900 confirms the time displayed on the time display unit 912 to drive at the displayed operation completion time after the washing / drying machine 900 is operated in the selected operation mode and washing course. Whether or not to accept the completion of the operation or the start of the operation at the displayed operation start time can be selected.

使用者は、時刻表示部912に表示された運転完了時刻または運転開始時刻を了承しない場合には、キャンセルボタン929(図5参照)を操作する(ステップS113参照)。これにより、使用者は、洗濯乾燥機900の運転を即座に開始させることができる。一方、使用者は、時刻表示部912に表示された運転完了時刻または運転開始時刻を了承する場合には、OKボタン928(図5参照)を操作する(ステップS116参照)。これにより、使用者は、了承した運転開始時刻にて運転を開始させることができ、または、了承した運転完了時刻までに運転を完了させることができる。   When the user does not approve the operation completion time or the operation start time displayed on the time display unit 912, the user operates the cancel button 929 (see FIG. 5) (see step S113). Thereby, the user can start the operation of the washing and drying machine 900 immediately. On the other hand, when the user approves the operation completion time or the operation start time displayed on the time display unit 912, the user operates the OK button 928 (see FIG. 5) (see step S116). Thereby, the user can start driving at the approved driving start time, or can complete driving by the approved driving completion time.

本実施形態では、キャンセルボタン929が押下された場合は、即座に洗濯行程等の運転が開始される。しかしながら、作動時間分のすべての電力を賄うことが可能な電力余剰時間帯が複数存在する場合、または、電力余剰時間帯に洗濯乾燥機900の作動時間を複数設定することが可能である位に、推定される電力余剰時間帯が比較的長い場合には、使用者によって、複数のうちのいずれかの運転開始時刻が選択および決定されていてもよい。このような場合には、表示された運転開始時刻または運転完了時刻に対してキャンセルボタン929が押下されることにより、他の運転開始時刻または運転完了時刻が表示されることにしてもよい。このように情報処理端末装置100と洗濯乾燥機900とが構成されている場合には、使用者は、より都合のよい時間帯を選択することができる。   In the present embodiment, when the cancel button 929 is pressed, an operation such as a washing process is started immediately. However, when there are a plurality of power surplus time zones that can cover all the power for the operation time, or when it is possible to set a plurality of operation times of the washing and drying machine 900 in the power surplus time zone. When the estimated power surplus time zone is relatively long, any one of a plurality of operation start times may be selected and determined by the user. In such a case, another operation start time or operation completion time may be displayed by pressing the cancel button 929 with respect to the displayed operation start time or operation completion time. Thus, when the information processing terminal device 100 and the washing / drying machine 900 are configured, the user can select a more convenient time zone.

ステップS116の後には、運転開始時刻が到来するまで洗濯乾燥機900は待機状態となる。ステップS117において運転開始時刻が到来していることが判定される場合には、ステップS114に進む。ステップS114では、ステップS102にて選択された運転モードの運転が開始される。   After step S116, the washing / drying machine 900 is in a standby state until the operation start time comes. If it is determined in step S117 that the operation start time has arrived, the process proceeds to step S114. In step S114, operation in the operation mode selected in step S102 is started.

ところで、ステップS115においては、洗濯物の容量を測定する為の処理が、ステップS107と同様に行われる。ステップS115の処理が完了した後には、洗濯物の容量に応じた洗剤量が表示部910(図4参照)に表示される。使用者は、ステップS115以降、ステップS114(図9参照)までに洗剤を投入すればよい。   By the way, in step S115, the process for measuring the capacity | capacitance of the laundry is performed similarly to step S107. After the process of step S115 is completed, the amount of detergent corresponding to the laundry capacity is displayed on the display unit 910 (see FIG. 4). The user may put the detergent after step S115 and before step S114 (see FIG. 9).

本実施形態において、ステップS115の後にはステップS114に移行することにより、ステップS115の後に洗濯乾燥機900の運転が即座に開始されている。ただし、ステップS103において運転完了希望時刻が入力されていることが判定される場合には、当該運転希望時刻が到来するまで運転の開始が待機されていてもよい。つまり、ステップS115とステップS114との間には、ステップS117と同様のステップが設けられていてもよい。このようにすることにより、洗濯乾燥機900において、一般的な予約運転を実現することができる。   In this embodiment, the operation of the washing and drying machine 900 is immediately started after step S115 by shifting to step S114 after step S115. However, when it is determined in step S103 that the desired operation completion time has been input, the start of operation may be waited until the desired operation time arrives. That is, a step similar to step S117 may be provided between step S115 and step S114. In this way, a general reserved operation can be realized in the washing / drying machine 900.

続いて、洗濯乾燥機900の運転を開始する時刻を設定するための制御、つまり、情報処理端末装置100によって処理される制御について、フローチャートを用いて説明する。図10に示すように、ステップS201において、情報処理端末装置100の情報受信部121(図7参照)は、洗濯乾燥機900の情報送信部953(図6参照)から情報処理端末装置100に送信された作動時間情報を受け取る。さらに、ステップS103(図8参照)において運転完了希望時刻が入力されていることが判定される場合には、情報受信部121は、作動時間情報として、使用者が希望する運転完了希望時刻の情報を情報送信部953(図6参照)からさらに受け取る。   Next, the control for setting the time for starting the operation of the washing / drying machine 900, that is, the control processed by the information processing terminal device 100 will be described using a flowchart. As shown in FIG. 10, in step S201, the information receiving unit 121 (see FIG. 7) of the information processing terminal device 100 transmits the information to the information processing terminal device 100 from the information transmitting unit 953 (see FIG. 6) of the washing and drying machine 900. Received operating time information. Furthermore, when it is determined in step S103 (see FIG. 8) that the operation completion desired time has been input, the information receiving unit 121 provides information on the operation completion desired time desired by the user as the operation time information. Is further received from the information transmission unit 953 (see FIG. 6).

ステップS201に続いて、ステップS202において運転完了希望時刻の情報を情報送信部953から受け取っているか否かが判定される。つまり、ステップS202において、運転完了希望時刻が設定されているか否かが判定される。ステップS202において運転完了希望時刻が設定されていることが判定される場合には、ステップS203に進む。ステップS202において運転完了希望時刻が設定されていないことが判定される場合には、ステップS209に進む。   Subsequent to step S201, it is determined in step S202 whether or not information on the desired operation completion time has been received from the information transmission unit 953. That is, in step S202, it is determined whether or not the desired operation completion time is set. If it is determined in step S202 that the desired operation completion time is set, the process proceeds to step S203. If it is determined in step S202 that the desired operation completion time is not set, the process proceeds to step S209.

ステップS203では、洗濯乾燥機900から作動時間情報が送信されてきた時点を基準として、その時点から運転完了希望時刻までの太陽光発電装置2が発電する電力の時間的推移が推定される。情報処理端末装置100は、太陽光発電装置2の発電電力を常時監視することにより、過去の一定の期間の発電電力の時間的推移をデータとして蓄積している。過去の一定の期間の発電電力の時間的推移の平均値が、蓄積されたデータに基づいて演算部123によって算出されることにより、現在から運転完了希望時刻までの発電電力の時間的推移が推定される。   In step S203, the time transition of the electric power generated by the photovoltaic power generation apparatus 2 from that time to the operation completion desired time is estimated with reference to the time when the operation time information is transmitted from the washing / drying machine 900. The information processing terminal device 100 accumulates the temporal transition of the generated power during a certain past period as data by constantly monitoring the generated power of the solar power generation device 2. The average value of the temporal transition of the generated power over a certain period in the past is calculated by the calculation unit 123 based on the accumulated data, so that the temporal transition of the generated power from the present to the desired operation completion time is estimated. Is done.

過去の一定の期間としては、例えば、一週間であってもよく、一月であってもよい。また、過去の一定の期間が例えば一月である場合には、発電電力の時間的推移のデータが曜日毎に区別されていてもよい。あるいは、情報処理端末装置100は、例えば外部のインターネットを介して天気情報を取得し、且つ、過去の一定の期間のうちに同様の天気であった数日分の時間的推移の平均値を算出することにより、現在から運転完了希望時刻までの発電電力の時間的推移を推定していてもよい。   For example, the certain period in the past may be one week or one month. In addition, when the certain period in the past is, for example, January, the data of the temporal transition of the generated power may be distinguished for each day of the week. Alternatively, the information processing terminal device 100 acquires weather information via, for example, the external Internet, and calculates an average value of temporal transitions for several days that were the same weather during a certain period in the past. By doing so, the temporal transition of the generated power from the present time to the desired operation completion time may be estimated.

続いて、ステップS204では、洗濯乾燥機900から作動時間情報が送信されてきた時点を基準として、その時点から運転完了希望時刻までの他の家電機器が使用する電力の時間的推移が推定される。情報処理端末装置100は、洗濯乾燥機900を除く他の家電機器の使用電力を常時監視することにより、過去の一定の期間において他の家電機器が使用する電力の時間的推移をデータとして蓄積している。過去の一定の期間において他の家電機器が使用する電力の時間的推移の平均値が、蓄積されたデータに基づいて演算部123によって算出されることにより、現在から運転完了希望時刻までの使用電力の時間的推移が推定される。   Subsequently, in step S204, with reference to the time point when the operation time information has been transmitted from the washing / drying machine 900, the time transition of the power used by other home appliances from that point to the operation completion desired time is estimated. . The information processing terminal device 100 accumulates the time transition of the power used by the other home appliances as data in the past certain period by constantly monitoring the power used by the other home appliances excluding the washing and drying machine 900. ing. The average value of the temporal transition of the power used by other home appliances in a certain past period is calculated by the calculation unit 123 based on the accumulated data, so that the power used from the present to the desired operation completion time Is estimated.

なお、当日が平日である場合には、過去の一定の期間のうちに平日であった数日分の時間的推移の平均値が算出されることにより、平日としての現在から運転完了希望時刻までの使用電力の時間的推移が推定されていてもよい。同様に、当日が休日である場合には、過去の一定の期間のうちに休日であった数日分の時間的推移の平均値が算出されることにより、休日としての現在から運転完了希望時刻までの使用電力の時間的推移が推定されていてもよい。さらには、平日と休日との区別だけでなく、曜日毎に区別された使用電力の時間的推移が推定されていてもよい。   In addition, when the day is a weekday, the average value of the time transition for several days that were a weekday in a certain period in the past is calculated, so that from the current weekday to the desired completion time The temporal transition of the used power may be estimated. Similarly, when the current day is a holiday, the desired time of completion of operation from the present day as a holiday is calculated by calculating the average value of the temporal transition of several days that were a holiday during a certain period in the past. The temporal transition of the power consumption up to may be estimated. Furthermore, not only the distinction between weekdays and holidays, but also the temporal transition of the used power distinguished for each day of the week may be estimated.

一方、ステップS209では、洗濯乾燥機900から作動時間情報が送信されてきた時点を基準として、その時点から例えば24時間後までの太陽光発電装置2が発電する電力の時間的推移が推定される。なお、推定される時間的推移は、現在から24時間後に限定されず、他の時間であってもよい。本実施形態のように、現在から24時間後という時間が設定されていることにより、洗濯物が回転ドラム932に投入されて(図8のステップS101参照)から、遅くとも1日以内に洗濯乾燥機900の運転を完了させることが可能である。   On the other hand, in step S209, the time transition of the power generated by the solar power generation device 2 is estimated from the time point, for example, 24 hours later, based on the time point when the operation time information is transmitted from the washing / drying machine 900. . Note that the estimated temporal transition is not limited to 24 hours from the present time, and may be another time. Since the time of 24 hours after the current time is set as in the present embodiment, the laundry dryer is put into the rotating drum 932 (see step S101 in FIG. 8) and within one day at the latest. It is possible to complete 900 operations.

続いて、ステップS210では、洗濯乾燥機900から作動時間情報が送信されてきた時点を基準として、その時点から24時間後までの他の家電機器が使用する電力の時間的推移が推定される。   Subsequently, in step S210, with reference to the time point at which the operation time information has been transmitted from the washing / drying machine 900, the temporal transition of power used by other home appliances from that point to 24 hours later is estimated.

これらステップS203〜ステップS204と、ステップS209〜ステップS210のように、情報処理端末装置100(図7参照)は、太陽光発電装置2の過去の発電電力量の時間的推移の情報と、冷蔵庫5とテレビ6とエアコン7と照明装置8との過去の消費電力量の時間的推移の情報とから、太陽光発電装置2の発電電力に余剰が生じる時間帯を推定する。また、情報処理端末装置100の記憶部124は、推定された時間帯の結果を電力余剰時間帯情報として記憶する。   Like these step S203-step S204 and step S209-step S210, the information processing terminal device 100 (refer FIG. 7) is the information of the time transition of the past electric power generation amount of the solar power generation device 2, and refrigerator 5 And the time zone when surplus in the generated power of the solar power generation device 2 is estimated from the information of the temporal transition of the past power consumption of the television 6, the air conditioner 7, and the lighting device 8. Moreover, the memory | storage part 124 of the information processing terminal device 100 memorize | stores the result of the estimated time slot | zone as electric power surplus time slot | zone information.

なお、ここでいう“過去”とは、洗濯乾燥機900から作動時間情報が送信されてきた時点よりも前の時点のことである。あるいは、“過去”とは、情報処理端末装置100が電力余剰時間帯を推定する時点よりも前の時点のことであってもよい。   Here, “the past” refers to a time point before the time point when the operation time information is transmitted from the washing / drying machine 900. Alternatively, the “past” may be a time point before the time point when the information processing terminal device 100 estimates the power surplus time zone.

ステップS204に続いて、ステップS205では、推定された太陽光発電装置2の発電電力の時間的推移と、推定された他の家電機器の使用電力の時間的推移とが演算部123(図7参照)によって比較されることにより、発電電力に余剰が生じる時間帯としての電力余剰時間帯が推定される。   Subsequent to step S204, in step S205, the estimated temporal transition of the generated power of the photovoltaic power generation apparatus 2 and the estimated temporal transition of the used electric power of the other household electrical appliance are calculated (see FIG. 7). ) Is estimated, a power surplus time zone as a time zone in which surplus power is generated is estimated.

ステップS205に続いて、ステップS206(図11参照)では、運転モード等に応じた洗濯乾燥機900の作動時間分の電力余剰時間帯が存在するか否かが判定される。洗濯乾燥機900が運転している最中には、所定の電力が必要である。そのため、ステップS206において、運転モード等に応じて必要とされる所定の時間分の電力を賄うことが可能な電力余剰時間帯が存在するかどうかが判定される。ステップS206において、作動時間分のすべての電力を賄うことが可能な電力余剰時間帯が存在することが判定される場合には、ステップS207に進む。一方、作動時間分のすべての電力を賄うことが可能な電力余剰時間帯が存在しないことが判定される場合には、ステップS211に進む。   Subsequent to step S205, in step S206 (see FIG. 11), it is determined whether there is a power surplus time zone corresponding to the operation time of the washing / drying machine 900 corresponding to the operation mode or the like. While the washing / drying machine 900 is in operation, predetermined power is required. Therefore, in step S206, it is determined whether or not there is a power surplus time zone that can cover power for a predetermined time required according to the operation mode or the like. If it is determined in step S206 that there is a power surplus time zone that can cover all power for the operating time, the process proceeds to step S207. On the other hand, if it is determined that there is no power surplus time zone that can cover all power for the operating time, the process proceeds to step S211.

ステップS206において、情報処理端末装置100の判定部126(図7参照)は、情報受信部121が受け取った運転完了希望時刻の情報を含む作動時間情報と、記憶部124が記憶した電力余剰時間帯情報とに基づき、洗濯乾燥機900の運転モード等に応じた作動時間に消費される電力を賄うことが可能な電力余剰時間帯が運転完了希望時刻までに存在するか否かを判定する。ただし、ステップS202において運転完了希望時刻が設定されていないことが判定される場合には、情報受信部121が受け取る作動時間情報には、運転完了希望時刻の情報が含まれていなくてもよい。   In step S <b> 206, the determination unit 126 (see FIG. 7) of the information processing terminal device 100 operates the operation time information including information on the desired operation completion time received by the information reception unit 121 and the power surplus time zone stored by the storage unit 124. Based on the information, it is determined whether or not there is a power surplus time zone that can cover the power consumed during the operation time according to the operation mode of the washing / drying machine 900 by the operation completion desired time. However, if it is determined in step S202 that the desired operation completion time is not set, the operation time information received by the information receiving unit 121 may not include information on the desired operation completion time.

ステップS207では、洗濯乾燥機900の運転開始時刻が決定される。ステップS207において決定される運転開始時刻によれば、運転モード等に応じた作動時間分のすべての電力を賄うことができる電力余剰時間帯において、洗濯乾燥機900の運転の開始から完了までを達成することができる。   In step S207, the operation start time of the washing / drying machine 900 is determined. According to the operation start time determined in step S207, the operation from the start to the completion of the operation of the washing / drying machine 900 is achieved in the power surplus time zone that can cover all the electric power for the operation time according to the operation mode and the like. can do.

このように、情報処理端末装置100は、洗濯乾燥機900が実際に作動する時間の情報として洗濯乾燥機900から受け取る作動時間情報と、記憶した電力余剰時間帯情報とに基づいて洗濯乾燥機900の運転開始時刻を決定する。   As described above, the information processing terminal device 100 is based on the operating time information received from the washing / drying machine 900 as information on the time during which the washing / drying machine 900 actually operates, and the stored power surplus time zone information. The operation start time is determined.

なお、作動時間分のすべての電力を賄うことが可能な電力余剰時間帯が複数存在する場合、または、電力余剰時間帯に洗濯乾燥機900の作動時間を複数設定することが可能である位に、推定される電力余剰時間帯が比較的長い場合であって、運転完了希望時刻が設定されていないときには、例えば複数のうちの最も早い時刻が運転開始時刻として決定される。ただし、このとき、例えば複数のうちの最も遅い時刻が選択されていてもよい。このように、作動時間分のすべての電力を賄うことが可能な電力余剰時間帯が複数存在する場合、または、電力余剰時間帯に洗濯乾燥機900の作動時間を複数設定することが可能である位に、推定される電力余剰時間帯が比較的長い場合には、複数のうちのいずれかの運転開始時刻が、図9に示すステップS112とステップS113とステップS116とにおいて使用者によって選択および決定されていてもよい。なお、運転完了希望時刻が設定されている場合には、当該運転完了希望時刻を満足させる運転開始時刻が選択される。   In addition, when there are a plurality of power surplus time zones that can cover all the power for the operation time, or when it is possible to set a plurality of operation times of the washing dryer 900 in the power surplus time zone. When the estimated power surplus time zone is relatively long and the operation completion desired time is not set, for example, the earliest time among a plurality of times is determined as the operation start time. However, at this time, for example, the latest time among a plurality of times may be selected. As described above, when there are a plurality of power surplus time zones that can cover all the power for the operation time, or it is possible to set a plurality of operation times of the washing dryer 900 in the power surplus time zone. In the case where the estimated power surplus time zone is relatively long, any one of the plurality of operation start times is selected and determined by the user in step S112, step S113, and step S116 shown in FIG. May be. In addition, when the operation completion desired time is set, the operation start time that satisfies the operation completion desired time is selected.

一方、ステップS211では、複数の家電機器のうちの少なくとも洗濯乾燥機900が深夜電力等の電気料金が比較的安い時間帯の電力を使用するように情報処理端末装置100が予め設定されているか否かが判定される。給電システム1において、商用電源4から供給される電力の時間帯には、通常の時間帯の電力単価よりも安い電力単価が設定された時間帯である深夜時間帯が含まれている。   On the other hand, in step S211, whether or not the information processing terminal device 100 is set in advance so that at least the washing / drying machine 900 among the plurality of home appliances uses power in a time zone in which the electricity rate such as midnight power is relatively low. Is determined. In the power supply system 1, the time zone of power supplied from the commercial power supply 4 includes a midnight time zone, which is a time zone in which a power unit price lower than the power unit price in the normal time zone is set.

洗濯乾燥機900が深夜電力を使用するように情報処理端末装置100が設定されている場合には、ステップS212に進む。ステップS212では、深夜時間帯に基づいて運転開始時刻が決定される。ステップS212において決定される運転開始時刻は、深夜時間帯において洗濯乾燥機900の作動が開始される時刻である。ステップS212において決定される運転開始時刻によれば、洗濯乾燥機900の運転が深夜時間帯から開始される。あるいは、ステップS212において決定される運転開始時刻は、可能な限り多くの電力余剰時間帯の電力を利用したうえで深夜時間帯の電力を利用するものである。   When the information processing terminal device 100 is set so that the washing / drying machine 900 uses midnight power, the process proceeds to step S212. In step S212, the operation start time is determined based on the midnight time zone. The operation start time determined in step S212 is a time at which the operation of the washer / dryer 900 is started in the midnight time zone. According to the operation start time determined in step S212, the operation of the washer / dryer 900 is started from midnight. Alternatively, the operation start time determined in step S212 uses the power in the midnight time zone after using as much power as possible in the power surplus time zone.

情報処理端末装置100の決定部127(図7参照)は、判定部126により、洗濯乾燥機900の運転モード等に応じた作動時間に消費される電力を賄うことが可能な電力余剰時間帯が存在しないことが判定される場合(ステップS206参照)には、当該作動時間に消費される電力と、太陽光発電装置2の発電電力の余剰分との差の電力が、商用電源4から洗濯乾燥機900に供給されるように、商用電源4から供給される電力と太陽光発電装置2が発電させた電力とを電源切替装置3に切り替えさせるための信号を情報送信部122に送信する。電源切替装置3は、当該信号に基づく信号を情報送信部122から受け取る。これにより、運転モード等に応じた作動時間に消費される電力と、太陽光発電装置2の発電電力の余剰分との差の電力が、商用電源4から洗濯乾燥機900に供給されるように、商用電源4から供給される電力と太陽光発電装置2が発電させた電力とが、電源切替装置3によって切り替えられる。   The determination unit 127 (see FIG. 7) of the information processing terminal device 100 has a power surplus time zone in which the determination unit 126 can cover the power consumed during the operation time according to the operation mode of the washing / drying machine 900 or the like. If it is determined that the power does not exist (see step S206), the difference between the power consumed during the operation time and the surplus power generated by the solar power generation device 2 is washed and dried from the commercial power source 4. A signal for switching the power supplied from the commercial power supply 4 and the power generated by the solar power generation device 2 to the power supply switching device 3 is transmitted to the information transmission unit 122 so as to be supplied to the machine 900. The power supply switching device 3 receives a signal based on the signal from the information transmission unit 122. Thereby, the power of the difference between the power consumed during the operation time corresponding to the operation mode and the surplus power generated by the solar power generation device 2 is supplied from the commercial power supply 4 to the washing and drying machine 900. The electric power supplied from the commercial power source 4 and the electric power generated by the solar power generation device 2 are switched by the power source switching device 3.

また、ステップS206(図11参照)においてNOと判定され、且つ、ステップS211(図11参照)においてYESと判定される場合には、決定部127は、洗濯乾燥機900に深夜時間帯の電力を使用させるための信号を情報送信部122に送信する。電源切替装置3は、当該信号に基づく信号を情報送信部122から受け取る。電源切替装置3は、遅くとも太陽光発電装置2の発電電力の余剰分が不足する時点から、洗濯乾燥機900を含む家電機器に商用電源4から電力が供給されるように、二つの電力を切り替える。   In addition, when it is determined NO in step S206 (see FIG. 11) and YES is determined in step S211 (see FIG. 11), the determination unit 127 supplies the washing and drying machine 900 with power in the midnight time zone. A signal for use is transmitted to the information transmitter 122. The power supply switching device 3 receives a signal based on the signal from the information transmission unit 122. The power supply switching device 3 switches between the two powers so that power is supplied from the commercial power source 4 to the home appliances including the washer / dryer 900 from the time when the surplus of the generated power of the solar power generation device 2 is insufficient at the latest. .

一方、ステップS211の判定において、深夜電力を使用しないように情報処理端末装置100が設定されている場合には、ステップS213に進む。ステップS213では、電力余剰時間帯の電力を最も効率よく消費する時間帯に基づいて運転開始時刻が決定される。ステップS213において決定される運転開始時刻によれば、可能な限り多くの電力余剰時間帯の電力を利用したうえで、不足する分を商用電源4から賄うことができる。   On the other hand, if it is determined in step S211 that the information processing terminal device 100 is set not to use late-night power, the process proceeds to step S213. In step S213, the operation start time is determined based on the time zone in which the power in the power surplus time zone is consumed most efficiently. According to the operation start time determined in step S213, the commercial power source 4 can cover the shortage while using as much power as possible in the power surplus time zone.

ステップS208では、ステップS207、ステップS212、または、ステップS213にて決定された運転開始時刻の情報が、情報処理端末装置100から洗濯乾燥機900に送信される(図7参照)。   In step S208, the information on the operation start time determined in step S207, step S212, or step S213 is transmitted from the information processing terminal device 100 to the washing and drying machine 900 (see FIG. 7).

ステップS208において情報処理端末装置100から送信される運転開始時刻の情報は、洗濯乾燥機900の情報受信部955(図6参照)によって受信される(図9のステップS111参照)。上述のように、ステップS112(図9参照)において、洗濯乾燥機900(図6参照)の表示部910には、情報処理端末装置100によって決定された運転開始時刻、または、運転開始時刻と作動時間情報とに対応した洗濯乾燥機900の運転完了時刻が表示される。このように、情報処理端末装置100は、決定部127(図7参照)によって決定された運転開始時刻、または、運転開始時刻と作動時間情報とに対応した洗濯乾燥機900の運転完了時刻を、洗濯乾燥機900に表示させることができる。   The information of the operation start time transmitted from the information processing terminal device 100 in step S208 is received by the information receiving unit 955 (see FIG. 6) of the washing / drying machine 900 (see step S111 in FIG. 9). As described above, in step S112 (see FIG. 9), the operation start time determined by the information processing terminal device 100 or the operation start time and the operation are displayed on the display unit 910 of the washing and drying machine 900 (see FIG. 6). The operation completion time of the washer / dryer 900 corresponding to the time information is displayed. In this way, the information processing terminal device 100 determines the operation start time determined by the determination unit 127 (see FIG. 7) or the operation completion time of the washing / drying machine 900 corresponding to the operation start time and the operation time information. It can be displayed on the washing / drying machine 900.

なお、図示は省略するが、図11に示すステップS206において、洗濯乾燥機900の所定の作動時間に消費される電力を賄うことが可能な電力余剰時間帯が存在しないことが判定される場合には、情報処理端末装置100は、洗濯乾燥機900に作動時間が短縮された運転を実行させることにしてもよい。   Although illustration is omitted, when it is determined in step S206 shown in FIG. 11 that there is no surplus power time zone that can cover the power consumed during the predetermined operation time of the washing / drying machine 900. The information processing terminal device 100 may cause the washing / drying machine 900 to execute an operation with a reduced operation time.

例えば、洗濯コースのうち、乾燥行程を省略することにより、洗濯乾燥機900の作動時間を短縮することができる。また例えば、洗濯行程もしくはすすぎ行程の時間を短縮すること、または、すすぎ行程の回数を減らすことにより、洗濯乾燥機900の作動時間を短縮することができる。このようにして、洗濯乾燥機900は、情報処理端末装置100の判定部126(図7参照)により、洗濯乾燥機900の所定の作動時間に消費される電力を賄うことが可能な電力余剰時間帯が存在しないことが判定される場合には、作動時間が短縮された運転を実行することができる。なお、洗濯乾燥機900において、表示部910(図6参照)は、そのような運転モードまたは洗濯コースが変更された運転の内容を表示していてもよい。   For example, the operation time of the washing / drying machine 900 can be shortened by omitting the drying process in the washing course. Further, for example, the operation time of the washing / drying machine 900 can be shortened by reducing the time of the washing process or the rinsing process, or reducing the number of times of the rinsing process. In this way, the washer / dryer 900 is able to cover the power consumed during the predetermined operation time of the washer / dryer 900 by the determination unit 126 (see FIG. 7) of the information processing terminal device 100. When it is determined that there is no belt, an operation with a shortened operation time can be executed. In the washing / drying machine 900, the display unit 910 (see FIG. 6) may display the contents of the operation in which such an operation mode or the washing course is changed.

以上のように、給電システム1は、太陽光発電装置2と、洗濯乾燥機900と冷蔵庫5とテレビ6とエアコン7と照明装置8とを含む複数の家電機器と、情報処理端末装置100とを備えている。冷蔵庫5とテレビ6とエアコン7と照明装置8とは、他の家電機器の一例である。複数の家電機器は、少なくとも太陽光発電装置2が発電させた電力によって作動する。情報処理端末装置100は、複数の家電機器と太陽光発電装置2とが通信可能であるようにネットワーク接続されている。   As described above, the power feeding system 1 includes the solar power generation device 2, the washing / drying machine 900, the refrigerator 5, the television 6, the air conditioner 7, the lighting device 8, and the information processing terminal device 100. I have. The refrigerator 5, the TV 6, the air conditioner 7, and the lighting device 8 are examples of other home appliances. The plurality of home appliances are operated by at least electric power generated by the solar power generation device 2. The information processing terminal device 100 is network-connected so that a plurality of home appliances and the solar power generation device 2 can communicate with each other.

情報処理端末装置100は、太陽光発電装置2の過去の発電電力量の時間的推移の情報と、他の家電機器の過去の消費電力量の時間的推移の情報とから発電電力に余剰が生じる時間帯を推定する。また、情報処理端末装置100は、推定された時間帯の結果を電力余剰時間帯情報として記憶し、洗濯乾燥機900が実際に作動する時間の情報として洗濯乾燥機900から受け取る作動時間情報と、電力余剰時間帯情報とに基づいて洗濯乾燥機900の運転開始時刻を決定する。   The information processing terminal device 100 generates surplus in the generated power from the information on the temporal transition of the past power generation amount of the photovoltaic power generation apparatus 2 and the information on the temporal transition of the past power consumption amount of other home appliances. Estimate the time zone. In addition, the information processing terminal device 100 stores the estimated time zone result as power surplus time zone information, and receives the operation time information from the washing / drying machine 900 as information on the time when the washing / drying machine 900 is actually operated, The operation start time of the washing / drying machine 900 is determined based on the power surplus time zone information.

給電システム1によれば、太陽光発電装置2の過去の発電電力量の時間的推移の情報と、他の家電機器の過去の消費電力量の時間的推移の情報とから、太陽光発電装置2の発電電力に余剰が生じる時間帯を推定する。また、情報処理端末装置100は、電力余剰時間帯情報と作動時間情報とに基づき、洗濯乾燥機900の運転開始時刻を決定する。このように、給電システム1によれば、任意の時点の太陽光発電装置2の発電電力量のみが、洗濯乾燥機900の運転を開始させるための判断に用いられることが無く、且つ、洗濯乾燥機900を、太陽光発電装置2の発電電力に余剰が生じる時間帯に作動させることができる。   According to the power feeding system 1, the solar power generation device 2 is obtained from the information on the temporal transition of the past power generation amount of the solar power generation device 2 and the information on the temporal transition of the past power consumption amount of other home appliances. Estimate the time zone in which surplus power is generated. Moreover, the information processing terminal device 100 determines the operation start time of the washing / drying machine 900 based on the power surplus time zone information and the operation time information. Thus, according to the power feeding system 1, only the amount of power generated by the solar power generation device 2 at an arbitrary time is not used for the determination for starting the operation of the washing / drying machine 900, and the washing / drying is performed. The machine 900 can be operated in a time zone in which surplus power is generated in the photovoltaic power generation apparatus 2.

このようにすることにより、太陽光発電装置2が発生させた電力を効率的に利用することが可能な給電システム1を提供することができる。   By doing in this way, the electric power feeding system 1 which can use efficiently the electric power which the solar power generation device 2 generated can be provided.

給電システム1は、情報処理端末装置100によって決定された運転開始時刻、または、運転開始時刻と作動時間情報とに対応した洗濯乾燥機900の運転完了時刻を、洗濯乾燥機900に表示させる。   The power feeding system 1 causes the laundry dryer 900 to display the operation start time determined by the information processing terminal device 100 or the operation completion time of the laundry dryer 900 corresponding to the operation start time and the operation time information.

この構成によれば、洗濯乾燥機900の使用者に対して、洗濯乾燥機900の運転開始時刻または運転完了時刻を視認させることができる。このように、この構成によれば、洗濯乾燥機900の利便性の向上が図られている。   According to this configuration, the user of the washing / drying machine 900 can visually recognize the operation start time or the operation completion time of the washing / drying machine 900. Thus, according to this configuration, the convenience of the washing / drying machine 900 is improved.

洗濯乾燥機900は、給電システム1に用いられる所定の家電機器としての洗濯乾燥機である。洗濯乾燥機900は、制御部950と、洗濯物Wを収容する回転ドラム932とを備えている。   The washing / drying machine 900 is a washing / drying machine as a predetermined home appliance used in the power supply system 1. The washing / drying machine 900 includes a control unit 950 and a rotating drum 932 that houses the laundry W.

制御部950は、回転ドラム932に収容される洗濯物Wの容量を検知する容量検知部957と、洗濯乾燥機900の複数の運転モードと、容量検知部957によって検知された洗濯物Wの容量または各運転モードに応じて設定された作動時間情報とを記憶する記憶部951と、記憶部951に記憶された作動時間情報のうち、容量検知部957によって検知された洗濯物Wの容量または各運転モードに対応した作動時間情報を情報処理端末装置100に送信する情報送信部953とを有している。   The control unit 950 includes a capacity detection unit 957 that detects the capacity of the laundry W accommodated in the rotary drum 932, a plurality of operation modes of the laundry dryer 900, and the capacity of the laundry W detected by the capacity detection unit 957. Or the storage part 951 which memorize | stores the operation time information set according to each driving | operation mode, and the capacity | capacitance of the laundry W detected by the capacity | capacitance detection part 957 among the operation time information memorize | stored in the memory | storage part 951, or each An information transmission unit 953 that transmits operation time information corresponding to the operation mode to the information processing terminal device 100.

この構成によれば、洗濯物Wの容量と、洗濯乾燥機900の運転モードとに応じて設定される作動時間の情報が、情報処理端末装置100に送信される。これにより、情報処理端末装置100は、送信された作動時間情報と、記憶した電力余剰時間帯情報とに基づき、洗濯乾燥機900の運転開始時刻を決定することができる。このように、この構成によれば、洗濯乾燥機900の運転開始時刻を、容量と運転モードとに応じて決定することができるため、洗濯乾燥機900の利便性が向上する。   According to this configuration, information on the operation time set according to the capacity of the laundry W and the operation mode of the washing / drying machine 900 is transmitted to the information processing terminal device 100. Thereby, the information processing terminal device 100 can determine the operation start time of the washing / drying machine 900 based on the transmitted operation time information and the stored power surplus time zone information. Thus, according to this structure, since the operation start time of the washing / drying machine 900 can be determined according to the capacity and the operation mode, the convenience of the washing / drying machine 900 is improved.

洗濯乾燥機900は、情報処理端末装置100によって決定された運転開始時刻、または、運転開始時刻と作動時間情報とに対応した洗濯乾燥機900の運転完了時刻を表示する表示部910を備えている。   The washing / drying machine 900 includes a display unit 910 that displays the operation start time determined by the information processing terminal device 100 or the operation completion time of the washing / drying machine 900 corresponding to the operation start time and the operation time information. .

この構成によれば、容量と運転モードとに応じて決定された洗濯乾燥機900の運転開始時刻または運転完了時刻を、使用者に視認させることができる。このように、この構成によれば、洗濯乾燥機900の利便性の向上が図られている。   According to this configuration, the user can visually recognize the operation start time or operation completion time of the washing / drying machine 900 determined according to the capacity and the operation mode. Thus, according to this configuration, the convenience of the washing / drying machine 900 is improved.

情報処理端末装置100は、給電システム1に用いられる情報処理端末装置である。また、情報処理端末装置100は、情報受信部121と演算部123とを含む推定部と、記憶部124と、情報受信部121と、判定部126と、決定部127とを有している。   The information processing terminal device 100 is an information processing terminal device used for the power feeding system 1. In addition, the information processing terminal device 100 includes an estimation unit including an information reception unit 121 and a calculation unit 123, a storage unit 124, an information reception unit 121, a determination unit 126, and a determination unit 127.

情報処理端末装置100において、推定部は、太陽光発電装置2の過去の発電電力量の時間的推移の情報と、他の家電機器の過去の消費電力量の時間的推移の情報とから発電電力に余剰が生じる時間帯を推定する。記憶部124は、推定部によって推定された時間帯の結果を電力余剰時間帯情報として記憶する。情報受信部121は、洗濯乾燥機900から作動時間情報を受け取る。判定部126は、情報受信部121が受け取った作動時間情報と、記憶部124が記憶した電力余剰時間帯情報とに基づき、洗濯乾燥機900の運転モード等に応じた作動時間に消費される電力を賄うことが可能な電力余剰時間帯が存在するか否かを判定する。決定部127は、判定部126の判定結果に基づいて、洗濯乾燥機900の運転開始時刻を決定する。   In the information processing terminal device 100, the estimation unit generates generated power from the information on the temporal transition of the past power generation amount of the photovoltaic power generation apparatus 2 and the information on the temporal transition of the past power consumption amount of other home appliances. Estimate the time zone when surplus occurs. The memory | storage part 124 memorize | stores the result of the time slot | zone estimated by the estimation part as electric power surplus time slot | zone information. The information receiving unit 121 receives operating time information from the washing / drying machine 900. Based on the operation time information received by the information reception unit 121 and the power surplus time zone information stored by the storage unit 124, the determination unit 126 uses the power consumed during the operation time according to the operation mode of the washer / dryer 900 and the like. It is determined whether or not there is a power surplus time zone that can cover the cost. The determination unit 127 determines the operation start time of the washing / drying machine 900 based on the determination result of the determination unit 126.

この構成によれば、記憶部124と情報受信部121と演算部123と判定部126と決定部127との作動により、洗濯乾燥機900の運転開始時刻または運転完了時刻を決定することができる。これにより、洗濯乾燥機900は、太陽光発電装置2の余剰電力を効率的に用いたうえで作動することができる。   According to this configuration, the operation start time or operation completion time of the washer / dryer 900 can be determined by the operations of the storage unit 124, the information reception unit 121, the calculation unit 123, the determination unit 126, and the determination unit 127. Thereby, the washing / drying machine 900 can operate | move, after using the surplus electric power of the solar power generation device 2 efficiently.

情報処理端末装置100において、情報受信部121は、作動時間情報として、使用者が希望する運転完了希望時刻の情報を洗濯乾燥機900から受け取っている。判定部126は、情報受信部121が受け取った運転完了希望時刻の情報を含む作動時間情報と、記憶部124が記憶した電力余剰時間帯情報とに基づき、洗濯乾燥機900の運転モード等に応じた作動時間に消費される電力を賄うことが可能な電力余剰時間帯が運転完了希望時刻までに存在するか否かを判定する。   In the information processing terminal device 100, the information receiving unit 121 receives information on the operation completion desired time desired by the user from the washing / drying machine 900 as operation time information. Based on the operation time information including the information on the desired operation completion time received by the information reception unit 121 and the power surplus time zone information stored in the storage unit 124, the determination unit 126 responds to the operation mode of the washing and drying machine 900 and the like. It is determined whether or not there is a power surplus time zone that can cover the power consumed during the operation time before the operation completion desired time.

この構成によれば、情報処理端末装置100は、洗濯乾燥機900に対して、太陽光発電装置2の発電電力の余剰分を使用させたうえで、使用者が希望する時刻までに運転を終了させることができる。   According to this configuration, the information processing terminal device 100 causes the washing and drying machine 900 to use the surplus power generated by the solar power generation device 2 and then finishes the operation by the time desired by the user. Can be made.

情報処理端末装置100は、決定部127によって決定された運転開始時刻、または、運転開始時刻と作動時間情報とに対応した洗濯乾燥機900の運転完了時刻を、洗濯乾燥機900に表示させる。   The information processing terminal device 100 causes the laundry dryer 900 to display the operation start time determined by the determination unit 127 or the operation completion time of the laundry dryer 900 corresponding to the operation start time and the operation time information.

この構成によれば、記憶部124と情報受信部121と演算部123と判定部126と決定部127との作動によって決定された洗濯乾燥機900の運転開始時刻または運転完了時刻を、洗濯乾燥機900の使用者に視認させることができる。このように、この構成によれば、洗濯乾燥機900の利便性の向上が図られている。   According to this configuration, the operation start time or operation completion time of the washer / dryer 900 determined by the operations of the storage unit 124, the information receiving unit 121, the calculation unit 123, the determination unit 126, and the determination unit 127 is set as the washer / dryer. 900 users can visually recognize it. Thus, according to this configuration, the convenience of the washing / drying machine 900 is improved.

情報処理端末装置100は、判定部126により、洗濯乾燥機900の運転モード等に応じた作動時間に消費される電力を賄うことが可能な電力余剰時間帯が存在しないことが判定される場合には、洗濯乾燥機900に、作動時間が短縮された運転を実行させる。   When the information processing terminal device 100 determines by the determination unit 126 that there is no power surplus time zone that can cover the power consumed during the operation time according to the operation mode of the washing / drying machine 900 or the like. Causes the washer / dryer 900 to execute an operation with a reduced operating time.

この構成によれば、洗濯乾燥機900の作動に係る消費電力を抑えることができる。そのため、太陽光発電装置2の発電電力のうち、余剰分を有効に使用することができる。   According to this configuration, power consumption related to the operation of the washing / drying machine 900 can be suppressed. Therefore, the surplus part can be used effectively among the generated electric power of the solar power generation device 2.

洗濯乾燥機900は、情報処理端末装置100と通信可能であるようにネットワーク接続された所定の家電機器としての洗濯乾燥機である。洗濯乾燥機900は、制御部950と、洗濯物Wを収容する回転ドラム932とを備えている。   The washing / drying machine 900 is a washing / drying machine as a predetermined home appliance connected to the information processing terminal device 100 so as to be communicable with the information processing terminal device 100. The washing / drying machine 900 includes a control unit 950 and a rotating drum 932 that houses the laundry W.

洗濯乾燥機900において、制御部950は、容量検知部957と、記憶部951と、情報送信部953とを有している。容量検知部957は、回転ドラム932に収容される洗濯物Wの容量を検知する。記憶部951は、洗濯乾燥機900の複数の運転モードと、容量検知部957によって検知された洗濯物Wの容量または各運転モードに応じて設定された作動時間情報とを記憶する。情報送信部953は、記憶部951に記憶された作動時間情報のうち、容量検知部957によって検知された洗濯物Wの容量または各運転モードに対応した作動時間情報を情報処理端末装置100に送信する。   In the washing / drying machine 900, the control unit 950 includes a capacity detection unit 957, a storage unit 951, and an information transmission unit 953. The capacity detection unit 957 detects the capacity of the laundry W stored in the rotary drum 932. The storage unit 951 stores a plurality of operation modes of the washing / drying machine 900 and the capacity of the laundry W detected by the capacity detection unit 957 or the operation time information set according to each operation mode. The information transmission unit 953 transmits, to the information processing terminal device 100, the operation time information corresponding to the capacity of the laundry W detected by the capacity detection unit 957 or each operation mode among the operation time information stored in the storage unit 951. To do.

洗濯乾燥機900は、情報処理端末装置100の判定部126により、洗濯乾燥機900の運転モード等に応じた作動時間に消費される電力を賄うことが可能な電力余剰時間帯が存在しないことが判定される場合には、作動時間が短縮された運転を実行する。   In the washing / drying machine 900, there is no surplus power time zone in which the determination unit 126 of the information processing terminal device 100 can cover the power consumed during the operation time according to the operation mode of the washing / drying machine 900. If it is determined, an operation with a reduced operation time is executed.

この構成によれば、洗濯乾燥機900において、運転の開始から完了までの時間が短縮されるため、洗濯乾燥機900の作動に係る消費電力を抑えることができる。このように、太陽光発電装置2の発電電力のうち、余剰分を有効に使用することができる。   According to this configuration, in the washing / drying machine 900, since the time from the start to the completion of the operation is shortened, power consumption related to the operation of the washing / drying machine 900 can be suppressed. Thus, the surplus part can be used effectively among the generated electric power of the solar power generation device 2.

情報処理端末装置100を備えた給電システム1は、複数の家電機器が使用する電力を、商用電源4から供給される電力と太陽光発電装置2が発電させた電力とのいずれかまたは両方に切り替える電源切替装置3を備えている。   The power supply system 1 including the information processing terminal device 100 switches the power used by the plurality of home appliances to one or both of the power supplied from the commercial power supply 4 and the power generated by the solar power generation device 2. A power supply switching device 3 is provided.

情報処理端末装置100において、決定部127は、判定部126により、洗濯乾燥機900の運転モード等に応じた所定の作動時間に消費される電力を賄うことが可能な電力余剰時間帯が存在しないことが判定される場合には、所定の作動時間に消費される電力と、太陽光発電装置2の発電電力の余剰分との差の電力が、商用電源4から洗濯乾燥機900に供給されるように、商用電源4から供給される電力と太陽光発電装置2が発電させた電力とを電源切替装置3に切り替えさせる。   In the information processing terminal device 100, the determination unit 127 does not have an excess power time zone in which the determination unit 126 can cover the power consumed during a predetermined operation time according to the operation mode of the washing / drying machine 900. If it is determined, the difference power between the power consumed during the predetermined operation time and the surplus power generated by the solar power generation device 2 is supplied from the commercial power source 4 to the washing and drying machine 900. As described above, the power supply switching device 3 is switched between the power supplied from the commercial power supply 4 and the power generated by the solar power generation device 2.

この構成によれば、太陽光発電装置2の発電電力の余剰分は、洗濯乾燥機900の作動に使用され、且つ、洗濯乾燥機900には、太陽光発電装置2の発電電力の余剰分が不足する時間帯だけ商用電源4から電力が供給される。このように、情報処理端末装置100は、太陽光発電装置2の発電電力の余剰分を洗濯乾燥機900に効率よく使用させることができる。また、洗濯乾燥機900の運転を、運転開始時刻から確実に開始することができる。あるいは、洗濯乾燥機900の運転を、運転完了時刻までに確実に完了することができる。   According to this configuration, the surplus power generated by the solar power generation device 2 is used for the operation of the washer / dryer 900, and the surplus power generated by the solar power generator 2 is stored in the washer / dryer 900. Electric power is supplied from the commercial power source 4 only during the shortage time period. As described above, the information processing terminal device 100 can cause the washing / drying machine 900 to efficiently use the surplus of the generated power of the solar power generation device 2. In addition, the operation of the washer / dryer 900 can be reliably started from the operation start time. Alternatively, the operation of the washer / dryer 900 can be reliably completed by the operation completion time.

情報処理端末装置100においては、商用電源4から供給される電力の時間帯には、通常の時間帯の電力単価よりも安い電力単価が設定された時間帯である深夜時間帯が含まれている。また、情報処理端末装置100において、決定部127は、判定部126により、洗濯乾燥機900の運転モード等に応じた所定の作動時間に消費される電力を賄うことが可能な電力余剰時間帯が存在しないことが判定される場合には、洗濯乾燥機900に商用電源4から電力が供給されるように、商用電源4から供給される電力と太陽光発電装置2が発電させた電力とを電源切替装置3に切り替えさせ、且つ、洗濯乾燥機900に深夜時間帯の電力を使用させる。   In the information processing terminal device 100, the time zone of power supplied from the commercial power supply 4 includes a midnight time zone, which is a time zone in which a power unit price lower than the normal unit price of power is set. . Further, in the information processing terminal device 100, the determination unit 127 has a power surplus time zone in which the determination unit 126 can cover the power consumed during a predetermined operation time according to the operation mode of the washing / drying machine 900. When it is determined that the power does not exist, the power supplied from the commercial power supply 4 and the power generated by the solar power generation device 2 are supplied as power to the washing and drying machine 900 so that the power is supplied from the commercial power supply 4. The switching device 3 is switched, and the washing and drying machine 900 is made to use the power in the midnight time zone.

この構成によれば、洗濯乾燥機900の所定の作動時間に消費される電力を賄うことが可能な電力余剰時間帯が存在しない場合に、洗濯乾燥機900は、商用電源4から供給される電力として、電力単価が比較的安い深夜時間帯の電力を使用することができる。このようにすることにより、電気料金の節約が可能である。   According to this configuration, when there is no power surplus time zone that can cover the power consumed during the predetermined operation time of the washing / drying machine 900, the washing / drying machine 900 is supplied with electric power supplied from the commercial power supply 4. As a result, it is possible to use the power in the midnight time zone where the power unit price is relatively low. In this way, electricity charges can be saved.

本実施形態において、所定の家電機器の一例は洗濯乾燥機900である。しかしながら、所定の家電機器は、乾燥機能を有していない洗濯機であってもよい。さらに、所定の家電機器は、冷蔵庫5であってもよく、エアコン7、扇風機、除湿機、または、加湿器等の他の家電機器であってもよい。   In this embodiment, an example of the predetermined home appliance is a washing / drying machine 900. However, the predetermined home appliance may be a washing machine that does not have a drying function. Furthermore, the predetermined home appliance may be the refrigerator 5, or another home appliance such as an air conditioner 7, a fan, a dehumidifier, or a humidifier.

さらには、情報処理端末装置100は、推定される太陽光発電装置2の発電電力の余剰分と複数の家電機器の消費電力量との差に応じて、制御対象とする複数の家電機器の中から一部または全部の家電機器を選択していてもよい。複数の家電機器の複数を情報処理端末装置100が選択する場合には、選択された複数の家電機器の消費電力量と、推定される太陽光発電装置2の発電電力の余剰分との差に応じて、複数の家電機器のそれぞれに余剰分の電力が順次供給されることと、複数の家電機器のいずれかまたはすべてに余剰分の電力が同時に供給されることとを切り替えるように、選択された複数の家電機器を情報処理端末装置100が制御することができる。このようにすることにより、給電システム1において、太陽光発電装置2が発生させた電力を効率よく利用することができる。   Furthermore, the information processing terminal device 100 is configured to control among the plurality of home appliances to be controlled according to the difference between the estimated surplus of the generated power of the solar power generation device 2 and the power consumption of the plurality of home appliances. Some or all of the home appliances may be selected. When the information processing terminal device 100 selects a plurality of home appliances, the difference between the power consumption of the selected home appliances and the estimated surplus power generated by the solar power generation device 2 Accordingly, it is selected to switch between sequentially supplying surplus power to each of the plurality of home appliances and simultaneously supplying surplus power to any or all of the plurality of home appliances. The information processing terminal device 100 can control a plurality of home appliances. By doing in this way, in the electric power feeding system 1, the electric power which the solar power generation device 2 generated can be utilized efficiently.

なお、洗濯乾燥機900の回転ドラム932の回転軸線は、略鉛直上下方向に延びていてもよい。   The rotation axis of the rotary drum 932 of the washing / drying machine 900 may extend in a substantially vertical vertical direction.

本実施形態において、情報処理端末装置100は、図4に示すような表示部を備えていてもよい。   In the present embodiment, the information processing terminal device 100 may include a display unit as shown in FIG.

本実施形態において、洗濯乾燥機900の作動時間とは、所定の家電機器としての洗濯乾燥機900が実際に作動する時間のことである。作動時間とは、洗濯行程、すすぎ行程、脱水行程、または、乾燥行程のうち、最初の行程が開始されてから運転が完了するまでの時間のことである。さらに、作動時間情報とは、洗濯乾燥機900が実際に作動する時間の情報である。作動時間情報は、洗濯乾燥機900の情報送信部953から送信される情報であって、情報処理端末装置100の情報受信部121が受け取っている。   In this embodiment, the operation time of the washing / drying machine 900 is a time during which the washing / drying machine 900 as a predetermined home appliance actually operates. The operation time is the time from the start of the first stroke to the completion of the operation among the washing stroke, the rinsing stroke, the dewatering stroke, or the drying stroke. Furthermore, the operation time information is information on a time during which the washing / drying machine 900 is actually operated. The operation time information is information transmitted from the information transmission unit 953 of the washing / drying machine 900 and is received by the information reception unit 121 of the information processing terminal device 100.

選択される洗濯コースに応じて洗濯乾燥機900が実際に作動する時間が異なるため、作動時間は、選択される洗濯コースに応じて異なる。また、各行程に掛かる時間が使用者によって適宜選択される場合には、選択された各行程の時間に応じて作動時間が異なる。さらに、洗濯乾燥機900において、運転モードごとに洗濯行程、すすぎ行程、脱水行程、または、乾燥行程の時間が異なることにより、作動時間は、例えば運転モードごとに異なる。また、洗濯物Wの容量によっても、水槽931(図3参照)に供給される水の量が異なるため、作動時間は異なる。   Since the time during which the washing / drying machine 900 actually operates differs depending on the selected laundry course, the operation time varies depending on the selected laundry course. In addition, when the time required for each stroke is appropriately selected by the user, the operation time varies depending on the time of each selected stroke. Furthermore, in the washing / drying machine 900, the operation time differs depending on, for example, each operation mode because the time of the washing process, the rinsing process, the dehydration process, or the drying process differs for each operation mode. Moreover, since the quantity of the water supplied to the water tank 931 (refer FIG. 3) changes with the capacity | capacitances of the laundry W, the operation time differs.

なお、洗濯乾燥機900において制御部950が配置される位置は、特に限定されない。図3に示す制御部950は、概略的に示されるものであって、上述のように所望の機能を奏するものであればよい。   In addition, the position where the control part 950 is arrange | positioned in the washing dryer 900 is not specifically limited. The control unit 950 shown in FIG. 3 is shown schematically and may be any unit that exhibits a desired function as described above.

(第2実施形態)
第2実施形態において、所定の家電機器の一例は冷蔵庫5である。他の家電機器の例は、冷蔵庫5を除いた家電機器である。図示しないが、複数の家電機器には、同種の家電機器が複数含まれていてもよい(例えば、テレビ6が複数台あってもよい)。以下に説明するように、太陽光発電装置2の発電電力に余剰が生じる時間帯に冷蔵庫5の除霜動作が行われることにより、給電システム1において、太陽光発電装置2が発生させた電力を効率よく利用することができる。なお、冷蔵庫5において除霜動作が行われることとは、除霜動作を行うように冷蔵庫5が運転することと言い換えることができる。
(Second Embodiment)
In the second embodiment, an example of the predetermined home appliance is the refrigerator 5. Examples of other home appliances are home appliances excluding the refrigerator 5. Although not illustrated, the plurality of home appliances may include a plurality of similar home appliances (for example, a plurality of televisions 6 may be provided). As will be described below, the defrosting operation of the refrigerator 5 is performed in a time zone in which surplus in the generated power of the solar power generation device 2 occurs, so that the power generated by the solar power generation device 2 is generated in the power feeding system 1. It can be used efficiently. In addition, performing defrost operation in the refrigerator 5 can be paraphrased as operating the refrigerator 5 so as to perform defrost operation.

図12に、ネットワーク技術に対応した家電機器の一例としての冷蔵庫5の全体を示す。冷蔵庫5は、冷蔵の機能に加えて、冷凍の機能を有している。なお、図12において、断面を示すハッチングは省略されている。   FIG. 12 shows the entire refrigerator 5 as an example of home appliances compatible with network technology. The refrigerator 5 has a refrigeration function in addition to a refrigeration function. In FIG. 12, hatching indicating a cross section is omitted.

図12に示すように、冷蔵庫5は、全体が断熱箱体51で覆われている。冷蔵庫5の上段に冷蔵室510が配置され、中段に製氷室503が配置され、下段に冷凍室505が配置されている。また、冷蔵室510の下部にはチルド温度帯(約−3℃)に維持されたチルド室514が配置されている。冷凍室505の内部は、製氷室503の内部に連通している。また、冷凍室505の内部は、冷凍室505に収容される食品等の貯蔵物を冷凍保存することが可能であるように構成されている。冷凍室505と製氷室503とには、貯蔵物を収納する収納ケース511が配置されている。冷蔵室510には、貯蔵物を載置する複数の収納棚512が配置されている。   As shown in FIG. 12, the entire refrigerator 5 is covered with a heat insulating box 51. A refrigerator compartment 510 is arranged in the upper stage of the refrigerator 5, an ice making room 503 is arranged in the middle stage, and a freezing room 505 is arranged in the lower stage. Further, a chilled chamber 514 maintained at a chilled temperature zone (about −3 ° C.) is disposed at the lower part of the refrigerator compartment 510. The inside of the freezer compartment 505 communicates with the inside of the ice making room 503. In addition, the inside of the freezer compartment 505 is configured so that stored items such as food stored in the freezer compartment 505 can be stored frozen. In the freezer compartment 505 and the ice making room 503, a storage case 511 for storing stored items is arranged. In the refrigerator compartment 510, a plurality of storage shelves 512 on which stored items are placed are arranged.

冷凍室505の背後には、冷気通路521が配置されている。冷蔵室510の背後には冷気通路521と連通する冷気通路522が配置されている。冷蔵庫5の断熱箱体51内において、冷気通路521の下方には圧縮機523が配置されている。冷気通路521内には圧縮機523に接続された蒸発器524が配置されている。圧縮機523が駆動されることにより、図示しない凝縮器と膨張器と蒸発器524とを冷媒が循環する。冷媒は、例えばイソブタンである。冷媒の循環により、冷凍サイクルが運転される。冷凍サイクルが運転されることにより、冷凍サイクルの低温側である蒸発器524において、冷気通路521を流通する空気と、冷媒とが熱交換することにより、冷気が生成される。このようにして、冷気を生成する冷凍サイクルが、圧縮機523と蒸発器524と凝縮器(図示せず)と膨張器(図示せず)とによって構成される。   A cool air passage 521 is disposed behind the freezer compartment 505. A cold air passage 522 communicating with the cold air passage 521 is disposed behind the refrigerator compartment 510. In the heat insulation box 51 of the refrigerator 5, a compressor 523 is disposed below the cold air passage 521. An evaporator 524 connected to the compressor 523 is disposed in the cold air passage 521. When the compressor 523 is driven, the refrigerant circulates through a condenser, an expander, and an evaporator 524 (not shown). The refrigerant is, for example, isobutane. The refrigeration cycle is operated by the circulation of the refrigerant. When the refrigeration cycle is operated, in the evaporator 524 on the low temperature side of the refrigeration cycle, heat is exchanged between the air flowing through the cold air passage 521 and the refrigerant, thereby generating cold air. Thus, the refrigerating cycle which produces | generates cold air is comprised by the compressor 523, the evaporator 524, the condenser (not shown), and the expander (not shown).

冷気通路521内には、送風機525が配置されている。冷気通路522内には、送風機526が配置されている。蒸発器524で生成された冷気は、送風機525が駆動されることにより、冷気通路521を介して冷凍室505と製氷室503とに供給される。また、蒸発器524で生成された冷気は、送風機526が駆動されることにより、冷気通路522を介して冷蔵室510に供給される。   A blower 525 is disposed in the cold air passage 521. A blower 526 is disposed in the cold air passage 522. The cold air generated by the evaporator 524 is supplied to the freezing room 505 and the ice making room 503 through the cold air passage 521 when the blower 525 is driven. The cool air generated by the evaporator 524 is supplied to the refrigerating chamber 510 through the cool air passage 522 when the blower 526 is driven.

また、冷蔵庫5は、加熱手段としてのヒータ527を備えている。ヒータ527は、例えば熱輻射式のガラス管ヒータによって構成されている。ただし、ヒータ527の構成は、特に限定されず、他の原理等を利用したものであってもよい。   The refrigerator 5 includes a heater 527 as a heating unit. The heater 527 is constituted by, for example, a thermal radiation type glass tube heater. However, the configuration of the heater 527 is not particularly limited, and other heaters may be used.

以上のような構成により、冷蔵庫5は、一般的な冷蔵庫と同様に、主に食品を保存するために、圧縮機523と蒸発器524等を利用して、冷蔵室510と冷凍室505とを冷却している。冷蔵室510と冷凍室505とを冷却する冷却動作のうち、例えば冷蔵室510を冷却する場合は、冷蔵室510の温度を低温に保つために、冷蔵室510の温度が所定の温度以上に達するときに開始され、且つ、他の所定の温度以下に達するときに停止される。冷却動作は、冷蔵庫5が消費する電力のうちの多くの部分を占めている。   With the above-described configuration, the refrigerator 5 uses the compressor 523, the evaporator 524, and the like to store the food, mainly in the same manner as a general refrigerator, so that the refrigerator room 510 and the freezer room 505 are separated. It is cooling. Among the cooling operations for cooling the refrigerator compartment 510 and the freezer compartment 505, for example, when the refrigerator compartment 510 is cooled, the temperature of the refrigerator compartment 510 reaches a predetermined temperature or higher in order to keep the temperature of the refrigerator compartment 510 at a low temperature. Sometimes it is started and stopped when it reaches below another predetermined temperature. The cooling operation occupies most of the power consumed by the refrigerator 5.

また、冷蔵庫5は、除霜という動作によって蒸発器524に付いた霜を取り除く。除霜動作は、ヒータ527の熱を用いて霜を取り除く動作である。除霜動作は、冷蔵庫5が消費する電力のうちの比較的多くの部分を占めている。   Further, the refrigerator 5 removes frost attached to the evaporator 524 by an operation called defrosting. The defrosting operation is an operation for removing frost using the heat of the heater 527. The defrosting operation occupies a relatively large portion of the power consumed by the refrigerator 5.

一般的な従来の冷蔵庫の除霜動作の開始条件は、例えば、冷却動作が行われた時間の積算値が所定の値であること、または、前回の除霜動作が終了してから所定の時間が経過した後であること等である。除霜動作の終了から開始までの時間間隔と、除霜動作に掛かる作動時間とは、当該冷蔵庫の性能、容量、または、使用条件等に依存する。しかし、一般的には、除霜動作は、1日または2日に1回程度行われている。また、除霜動作に掛かる作動時間は、一般的には数十分程度である。つまり、一般的な従来の冷蔵庫においては、数十分程度を要する除霜動作が、1日から2日に1回行われている。このように、除霜動作に掛かる作動時間は、除霜動作の終了から開始までの時間間隔に比べて、極めて短い。   A general conventional refrigerator defrosting operation start condition is, for example, that the integrated value of the time during which the cooling operation is performed is a predetermined value, or a predetermined time after the previous defrosting operation ends. It is after the elapse of time. The time interval from the end to the start of the defrosting operation and the operation time required for the defrosting operation depend on the performance, capacity, use conditions, etc. of the refrigerator. However, in general, the defrosting operation is performed about once a day or every two days. Moreover, the operation time required for the defrosting operation is generally about several tens of minutes. That is, in a general conventional refrigerator, a defrosting operation that requires several tens of minutes is performed once every two days. Thus, the operation time required for the defrosting operation is extremely short compared to the time interval from the end to the start of the defrosting operation.

例えば、除霜動作が終了されてから次回開始されるまでの時間間隔が短縮される場合には、霜があまり多量に発生していない状態において除霜動作が開始される。しかしながら、このような場合には霜があまり多量に発生していない状態であるため、除霜動作の作動時間を短縮することができる。   For example, when the time interval from the end of the defrosting operation to the start of the next time is shortened, the defrosting operation is started in a state where a large amount of frost is not generated. However, since the frost is not generated in such a large amount in such a case, the operation time of the defrosting operation can be shortened.

逆に、除霜動作が終了されてから次回開始されるまでの時間間隔が延長される場合には、除霜が必要な量以上の霜が発生している状態において除霜動作が開始されないことにより、冷却動作に悪影響を及ぼす可能性がある。したがって、冷却動作に悪影響を及ぼさない程度に、除霜動作が終了されてから次回の除霜動作が開始されるまでの時間間隔を延長することは可能である。   On the contrary, when the time interval from the end of the defrosting operation to the next start is extended, the defrosting operation must not be started in a state where more frost is required than the defrosting amount. This may adversely affect the cooling operation. Therefore, it is possible to extend the time interval from the end of the defrosting operation to the start of the next defrosting operation to such an extent that the cooling operation is not adversely affected.

一方、冷却動作の作動時間は、冷却動作が行われていない時間に対して長い。また、冷却動作は、冷蔵庫5の内部の温度に直接的に影響を与える動作であるため、冷却動作の開始時期の変更は容易に実現できない。   On the other hand, the operation time of the cooling operation is longer than the time when the cooling operation is not performed. In addition, since the cooling operation is an operation that directly affects the temperature inside the refrigerator 5, the change of the start timing of the cooling operation cannot be easily realized.

このように、冷蔵庫5において除霜動作の開始時期が変更される場合であっても、冷蔵庫5はあまり大きな影響を受けることが無い。つまり、冷蔵庫5において除霜動作の開始時期を変更することは、冷蔵庫5が効率的に電力を消費するために、有効な手段である。   Thus, even if the start time of the defrosting operation is changed in the refrigerator 5, the refrigerator 5 is not significantly affected. That is, changing the start time of the defrosting operation in the refrigerator 5 is an effective means for the refrigerator 5 to efficiently consume power.

以下に説明するように、冷蔵庫5は、太陽光発電装置2の発電量に余剰が生じる時間帯に合わせて、除霜動作の開始時期を変更させることができるように構成されている。   As will be described below, the refrigerator 5 is configured to be able to change the start time of the defrosting operation in accordance with a time zone in which surplus in the amount of power generated by the solar power generation device 2 occurs.

図13に示すように、冷蔵庫5は、制御部550を備えている。制御部550は、情報受信部551と、記憶部552と、演算部553と、タイマ554と、情報送信部555と、動作制御部556と、作動状態検知部559とを有している。タイマ554は、時計としての機能を有している。   As shown in FIG. 13, the refrigerator 5 includes a control unit 550. The control unit 550 includes an information reception unit 551, a storage unit 552, a calculation unit 553, a timer 554, an information transmission unit 555, an operation control unit 556, and an operation state detection unit 559. The timer 554 has a function as a clock.

情報受信部551は、情報処理端末装置100から送信される信号を受信する。記憶部552には、少なくとも、過去の除霜動作時間の情報と、過去に行われた冷却動作の時間の情報とが格納されている。演算部553は、情報受信部551が受信した情報と、タイマ554によって計測された時間と、記憶部552に格納された情報とに基づいて、冷蔵庫5の制御に必要な数値を算出する。また、冷蔵庫5の運転に必要な制御についての判定は、判定部の機能を有する演算部553によって判断されている。   The information receiving unit 551 receives a signal transmitted from the information processing terminal device 100. The storage unit 552 stores at least information on the past defrosting operation time and information on the time of the cooling operation performed in the past. The calculating unit 553 calculates a numerical value necessary for controlling the refrigerator 5 based on the information received by the information receiving unit 551, the time measured by the timer 554, and the information stored in the storage unit 552. Moreover, the determination about the control required for the driving | operation of the refrigerator 5 is determined by the calculating part 553 which has a function of a determination part.

後述するように、演算部553は、過去の除霜動作時間と、前回の除霜動作の終了時から現時点までの時間間隔とに基づき、今回の除霜動作の作動時間を推定値として算出する。さらに、演算部553は、少なくとも過去の除霜動作時間に基づいて、除霜動作の開始制限時刻を算出する。また、演算部553は、推定された今回の除霜動作時間を開始制限時刻に加算することにより、除霜動作の完了制限時刻を算出する。   As will be described later, the calculation unit 553 calculates the operation time of the current defrosting operation as an estimated value based on the past defrosting operation time and the time interval from the end of the previous defrosting operation to the current time. . Furthermore, the calculating part 553 calculates the start time limit of a defrost operation based on at least the past defrost operation time. In addition, the calculation unit 553 calculates the completion restriction time of the defrosting operation by adding the estimated current defrosting operation time to the start restriction time.

演算部553の演算結果は、記憶部552に格納される。動作制御部556は、記憶部552に格納された演算結果等の情報に基づいて、冷却動作と除霜動作とが行われるように、圧縮機523と蒸発器524とヒータ527と送風機525と送風機526とを制御する。動作制御部556は、冷却動作を制御する冷却動作制御部557と、除霜動作を制御する除霜動作制御部558とを有している。   The calculation result of the calculation unit 553 is stored in the storage unit 552. The operation control unit 556 includes a compressor 523, an evaporator 524, a heater 527, a blower 525, and a blower so that a cooling operation and a defrosting operation are performed based on information such as a calculation result stored in the storage unit 552. 526 is controlled. The operation control unit 556 includes a cooling operation control unit 557 that controls the cooling operation, and a defrosting operation control unit 558 that controls the defrosting operation.

作動状態検知部559は、除霜動作または冷却動作について、動作制御部556の制御の状態を検知している。作動状態検知部559が検知した結果についての情報は、記憶部552に格納される。   The operation state detection unit 559 detects the control state of the operation control unit 556 for the defrosting operation or the cooling operation. Information about the result detected by the operating state detection unit 559 is stored in the storage unit 552.

一方、情報送信部555は、演算部553の演算結果としての除霜動作時間の情報と、完了制限時刻の情報とを情報処理端末装置100に送信する。   On the other hand, the information transmission unit 555 transmits the information on the defrosting operation time and the information on the completion time limit as the calculation result of the calculation unit 553 to the information processing terminal device 100.

なお、過去の冷却動作の時間の積算値(後述するTi)、および、前回の除霜動作が終了してから現在までに経過した所定の時間(後述するTp)は、動作制御部556の制御を作動状態検知部559が検知し、且つ、動作制御部556の制御の状態が継続された時間を演算部553が演算することにより、算出される。算出された時間の積算値(Ti)、および、所定の時間(Tp)の情報は、記憶部552に格納されている。   In addition, the integrated value (Ti described later) of the past cooling operation and the predetermined time (Tp described later) after the last defrosting operation is completed are controlled by the operation control unit 556. Is calculated by the operation unit 553 calculating the time during which the operation state detection unit 559 detects the operation state and the operation control unit 556 continues the control state. The integrated value (Ti) of the calculated time and information on the predetermined time (Tp) are stored in the storage unit 552.

情報受信部551は、情報処理端末装置100から送信される除霜動作の開始時刻の情報と、推定された電力余剰時間帯の情報とを受信する。情報受信部551が受信した情報に基づき、冷蔵庫5において除霜動作が行われる。   The information receiving unit 551 receives information on the start time of the defrosting operation transmitted from the information processing terminal device 100 and information on the estimated power surplus time zone. A defrosting operation is performed in the refrigerator 5 based on the information received by the information receiving unit 551.

また、情報受信部551が受信する情報に、推定された電力余剰時間帯が除霜動作時間よりも短い場合に電力余剰時間帯が存在しない旨を冷蔵庫5に通知させるための情報が含まれているか否かは、演算部553によって判定される。電力余剰時間帯が存在しない旨を通知するための情報が含まれていることが演算部553によって判定される場合には、次回の除霜動作の開始時期を繰り上げるための情報が記憶部552に格納される。   In addition, the information received by the information receiving unit 551 includes information for notifying the refrigerator 5 that the power surplus time zone does not exist when the estimated power surplus time zone is shorter than the defrosting operation time. Whether or not there is is determined by the calculation unit 553. When the calculation unit 553 determines that information for notifying that the power surplus time zone does not exist is included in the storage unit 552, information for advancing the start time of the next defrosting operation is stored in the storage unit 552. Stored.

一方、図7に示すように、情報処理端末装置100は、制御部120を備えている。制御部120の情報受信部121は、冷蔵庫5から、作動時間情報として、今回の除霜動作時間の情報を受け取る。また、情報受信部121は、太陽光発電装置2の発電電力量の時間的推移の情報と、他の家電機器(例えば、テレビ6とエアコン7と照明装置8と洗濯乾燥機900(図1参照))の消費電力量の時間的推移の情報とを受け取る。   On the other hand, as illustrated in FIG. 7, the information processing terminal device 100 includes a control unit 120. The information receiving unit 121 of the control unit 120 receives information on the current defrosting operation time from the refrigerator 5 as the operation time information. The information receiving unit 121 also includes information on the temporal transition of the amount of power generated by the solar power generation device 2 and other home appliances (for example, the TV 6, the air conditioner 7, the lighting device 8, and the washing and drying machine 900 (see FIG. 1). )) And information on temporal transition of power consumption.

演算部123は、情報受信部121が受け取った、太陽光発電装置2の過去の発電電力量の時間的推移の情報と、他の家電機器の過去の消費電力量の時間的推移の情報とに基づいて、発電電力に余剰が生じる時間帯を推定する。このように、情報処理端末装置100は、太陽光発電装置2の過去の発電電力量の時間的推移の情報と、他の家電機器の過去の消費電力量の時間的推移の情報とから発電電力に余剰が生じる時間帯を推定する。   The calculation unit 123 receives the information on the temporal transition of the past power generation amount of the photovoltaic power generation apparatus 2 and the information on the temporal transition of the past power consumption amount of the other home appliances received by the information reception unit 121. Based on this, a time zone in which surplus power is generated is estimated. In this way, the information processing terminal device 100 generates power from the information on the temporal transition of the past power generation amount of the solar power generation apparatus 2 and the information on the temporal transition of the past power consumption amount of other home appliances. Estimate the time zone when surplus occurs.

記憶部124は、演算部123によって推定された時間帯の結果を電力余剰時間帯情報として記憶する。判定部126は、情報受信部121が受け取った除霜動作時間の情報と、記憶部124が記憶した電力余剰時間帯情報とに基づき、冷蔵庫5の除霜動作時間に消費される電力を賄うことが可能な電力余剰時間帯が存在するか否かを判定する。ただし、冷蔵庫5の除霜動作時間に消費される電力を賄うことが可能な電力余剰時間帯が存在するか否かの判定には、情報受信部121が受け取った除霜動作時間の情報および除霜動作の完了制限時刻の情報が考慮されていてもよい。すなわち、冷蔵庫5から受け取る作動時間情報には、今回の除霜動作時間の情報と、今回の除霜動作の完了制限時刻の情報とが含まれていてもよい。除霜動作の完了制限時刻については、後述する。   The memory | storage part 124 memorize | stores the result of the time slot estimated by the calculating part 123 as electric power surplus time slot | zone information. The determination unit 126 covers the power consumed during the defrosting operation time of the refrigerator 5 based on the information on the defrosting operation time received by the information receiving unit 121 and the power surplus time zone information stored in the storage unit 124. It is determined whether there is a power surplus time zone that can be used. However, in determining whether or not there is a power surplus time zone that can cover the power consumed during the defrosting operation time of the refrigerator 5, information on the defrosting operation time received by the information receiving unit 121 and the removal Information on the time limit for completion of the frost operation may be taken into consideration. That is, the operating time information received from the refrigerator 5 may include information on the current defrosting operation time and information on the completion time limit for the current defrosting operation. The completion time limit for the defrosting operation will be described later.

決定部127は、判定部126の判定結果に基づき、除霜動作の開始時刻を決定する。情報送信部122は、冷蔵庫5に対して、決定部127によって決定された除霜動作の開始時刻についての情報を送信する。   The determination unit 127 determines the start time of the defrosting operation based on the determination result of the determination unit 126. The information transmission unit 122 transmits information about the start time of the defrosting operation determined by the determination unit 127 to the refrigerator 5.

このように、情報処理端末装置100は、推定された時間帯の結果を電力余剰時間帯情報として記憶する。また、情報処理端末装置100は、冷蔵庫5が実際に作動する時間の情報のうち、除霜動作として作動する時間の情報であって冷蔵庫5から受け取る除霜動作時間の情報と、電力余剰時間帯情報とに基づいて、冷蔵庫5の運転開始時刻としての除霜動作の開始時刻を決定する。   Thus, the information processing terminal device 100 stores the estimated time zone result as the power surplus time zone information. Moreover, the information processing terminal device 100 is information on the time to operate as the defrosting operation among the information on the time when the refrigerator 5 is actually operated, and information on the defrosting operation time received from the refrigerator 5 and the power surplus time zone Based on the information, the start time of the defrosting operation as the operation start time of the refrigerator 5 is determined.

次に、冷蔵庫5によって処理される制御について、フローチャートを用いて説明する。図14に示すように、ステップS301において、除霜動作が必要な状態であるかどうかかが判定される。従来の一般的な冷凍冷蔵庫では、通常、上述の冷却動作が行われた時間の積算値が所定の値以上に達したかどうか、または、前回の除霜動作が終了してから所定の時間以上経過したかどうかのいずれかの条件が満たされた場合に、除霜動作が必要であることが判定されている。当該冷凍冷蔵庫の蒸発器に付く霜の量は、蒸発器等の冷凍サイクルを運転させる構成の性能に応じて、予め実験等によって検証されている。除霜動作が必要な状態であるかどうかの判定に用いられる上記の所定の積算値または上記の所定の時間は、このような検証結果に基づき、当該冷凍冷蔵庫の演算手段によって算出されている。   Next, the control processed by the refrigerator 5 is demonstrated using a flowchart. As shown in FIG. 14, it is determined in step S301 whether or not a defrosting operation is necessary. In a conventional general refrigerator-freezer, usually, the integrated value of the time during which the above cooling operation is performed has reached a predetermined value or more, or a predetermined time or more after the last defrosting operation is completed. It is determined that the defrosting operation is necessary when any of the conditions for whether or not it has passed is satisfied. The amount of frost attached to the evaporator of the refrigerator-freezer has been verified in advance by experiments or the like according to the performance of the configuration for operating the refrigeration cycle such as the evaporator. The predetermined integrated value or the predetermined time used for determining whether or not the defrosting operation is necessary is calculated by the calculation means of the refrigerator-freezer based on such a verification result.

一方、冷蔵庫5においては、ステップS301の判定のように、従来の冷凍冷蔵庫とは異なる判定が実行されている。ステップS301においては、冷蔵庫5の冷却動作が行われた時間の積算値が所定の値(ここでは例えばTiと示す)以上であるか否か、または、前回の除霜動作の終了後から現在までに、所定の時間(ここでは例えばTpと示す)が経過したか否かが判定される。冷蔵庫5においては、除霜動作を開始させる時刻を変更もしくは調整するための許容範囲を広げるために、ステップS301の判定に用いられる冷却動作が行われた時間の積算値(Ti)、および、前回の除霜動作が終了してから現在までに経過した所定の時間(Tp)は、それぞれ、従来の一般的な冷凍冷蔵庫で使用している上記積算値、および、上記所定の時間よりも短く設定されている。ステップS301の判定に用いられる閾値としての積算値(Ti)と、所定の時間(Tp)とは、それぞれ記憶部552に格納されている。   On the other hand, in the refrigerator 5, the determination different from the conventional freezer refrigerator is performed like determination of step S301. In step S301, whether or not the integrated value of the time when the cooling operation of the refrigerator 5 is performed is equal to or greater than a predetermined value (in this case, for example, Ti), or from the end of the previous defrosting operation to the present. In addition, it is determined whether or not a predetermined time (indicated here as Tp, for example) has elapsed. In the refrigerator 5, in order to expand the allowable range for changing or adjusting the time to start the defrosting operation, the integrated value (Ti) of the time when the cooling operation used in the determination of step S301 is performed, and the previous time The predetermined time (Tp) elapsed from the end of the defrosting operation to the present time is set shorter than the integrated value used in the conventional general refrigerator-freezer and the predetermined time, respectively. Has been. The integrated value (Ti) as the threshold value used for the determination in step S301 and the predetermined time (Tp) are stored in the storage unit 552, respectively.

このようにすることにより、従来の冷凍冷蔵庫に比べて、除霜動作が開始される時期を時間的に前の方向にずらすことが可能である。また、除霜動作が必要であることが、従来の冷凍冷蔵庫に比べて予め前もって判定されることにより、除霜動作が開始される時期が判定時から時間的に後方向に延びる場合であっても、除霜動作が必要な量以上の霜が蓄積している状態に至るまでの時間に余裕を持たせることができる。このように、冷蔵庫5のステップS301の判定によれば、除霜動作を行うことが可能な時間帯を広げることができる。   By doing in this way, compared with the conventional refrigerator-freezer, it is possible to shift the time at which defrosting operation is started in the previous direction in terms of time. Moreover, it is a case where it is determined in advance that the defrosting operation is necessary in advance compared to the conventional refrigerator-freezer, so that the time when the defrosting operation is started extends backward from the time of determination. In addition, it is possible to provide an allowance for the time required to reach a state where more frost than the amount necessary for the defrosting operation is accumulated. Thus, according to determination of step S301 of the refrigerator 5, the time slot | zone which can perform a defrost operation can be extended.

なお、前回の除霜動作が終了してから現在までに経過した所定の時間(Tp)は、後述するステップS307の判定の結果に応じて、さらに短縮される場合がある。   Note that the predetermined time (Tp) that has passed since the last defrosting operation has ended may be further shortened depending on the result of determination in step S307 described later.

ステップS302では、前回を含む過去の除霜動作時間と、前回の除霜動作の終了時から現時点までの時間間隔とに基づき、今回の除霜動作の作動時間が演算部553(図13参照)によって算出される。このときの演算部553の算出値は、推定値である。   In step S302, based on the past defrosting operation time including the previous time and the time interval from the end of the previous defrosting operation to the current time, the operation time of the current defrosting operation is the calculation unit 553 (see FIG. 13). Is calculated by At this time, the calculated value of the calculation unit 553 is an estimated value.

なお、除霜動作の作動時間とは、除霜動作が開始されてから終了するまでの除霜動作に掛かる時間のことである。図14に示すように、所定の作動時間としての除霜動作の作動時間を、除霜動作時間と称する。ステップS302において推定される今回の除霜動作時間は、少なくとも過去の除霜動作時間に基づいて推定されるものであればよい。   The operation time of the defrosting operation is the time required for the defrosting operation from the start of the defrosting operation to the end thereof. As shown in FIG. 14, the operation time of the defrosting operation as the predetermined operation time is referred to as a defrosting operation time. The current defrosting operation time estimated in step S302 only needs to be estimated based on at least the past defrosting operation time.

ステップS303では、除霜動作の開始制限時刻と、除霜動作の完了制限時刻とが、演算部553の演算によって推定される。除霜動作の開始制限時刻は、少なくとも過去の除霜動作時間に基づいて推定される。   In step S <b> 303, the start restriction time of the defrosting operation and the completion restriction time of the defrosting operation are estimated by calculation of the calculation unit 553. The start time limit for the defrosting operation is estimated based on at least the past defrosting operation time.

なお、除霜動作の開始制限時刻とは、除霜動作の開始時期の限界を意味しており、冷蔵庫5の除霜動作の開始時期を従来の冷凍冷蔵庫の除霜動作の開始時期よりも時間的に後ろ方向に延ばすために設定される時刻のことである。例えば、当該開始制限時刻よりも後に除霜動作が開始される場合には、冷蔵庫5において冷却動作に悪影響が及ぼされる可能性がある。すなわち、冷蔵庫5において冷却動作に所定もしくは特定の悪影響が現れない状態を維持するためには、遅くとも当該開始制限時刻までに除霜動作が開始されなければならない。このように、開始制限時刻とは、蒸発器524等の冷凍サイクルを運転する構成の性能および冷蔵庫5の容量に応じて設定される所定の時刻であって、冷蔵庫5の冷却動作が良好に継続されるように除霜動作の開始時期の限界として設定される時刻のことである。   The defrosting operation start time limit means the limit of the start time of the defrosting operation, and the start time of the defrosting operation of the refrigerator 5 is longer than the start time of the defrosting operation of the conventional refrigerator-freezer. This is the time set to extend backwards. For example, when the defrosting operation is started after the start limit time, the cooling operation in the refrigerator 5 may be adversely affected. That is, in order to maintain a state in which no predetermined or specific adverse effect appears in the cooling operation in the refrigerator 5, the defrosting operation must be started at the latest by the start limit time. As described above, the start limit time is a predetermined time set according to the performance of the refrigeration cycle such as the evaporator 524 and the capacity of the refrigerator 5, and the cooling operation of the refrigerator 5 continues well. It is the time set as the limit of the start time of the defrosting operation.

一方、除霜動作の完了制限時刻は、推定された開始制限時刻に、ステップS302において推定された除霜動作時間を加算することによって算出される。   On the other hand, the defrosting operation completion time limit is calculated by adding the defrosting operation time estimated in step S302 to the estimated start time limit.

ステップS304では、ステップS302において算出された除霜動作時間の情報と、ステップS303において算出された完了制限時刻の情報とが情報処理端末装置100に送信される。このようにして、冷蔵庫5は、冷蔵庫5が実際に作動する時間の情報のうちの過去の除霜動作時間の情報に基づいて今回の除霜動作時間を推定し、且つ、推定された今回の除霜動作時間の情報を情報処理端末装置100に送信する。また、冷蔵庫5は、今回の除霜動作の完了制限時刻の情報を情報処理端末100に送信する。   In step S304, the information on the defrosting operation time calculated in step S302 and the information on the completion time limit calculated in step S303 are transmitted to the information processing terminal device 100. In this way, the refrigerator 5 estimates the current defrosting operation time based on the information on the past defrosting operation time among the information on the time when the refrigerator 5 actually operates, and the estimated current time Information on the defrosting operation time is transmitted to the information processing terminal device 100. In addition, the refrigerator 5 transmits information on the time limit for completion of the current defrosting operation to the information processing terminal 100.

ステップS304に続いて、ステップS305において除霜動作の開始時刻が設定される。後述するように、除霜動作の開始時刻は、情報処理端末装置100(図7参照)によって設定される。ステップS305の後のステップS306において、情報処理端末装置100から除霜動作の開始時刻の情報が送信され、冷蔵庫5の情報受信部551が当該開始時刻の情報を受信する。また、ステップS306において、情報処理端末装置100から電力余剰時間帯の情報が送信され、冷蔵庫5の情報受信部551が当該電力余剰時間帯の情報を受信する。   Subsequent to step S304, the start time of the defrosting operation is set in step S305. As will be described later, the start time of the defrosting operation is set by the information processing terminal device 100 (see FIG. 7). In step S306 after step S305, information on the start time of the defrosting operation is transmitted from the information processing terminal device 100, and the information receiving unit 551 of the refrigerator 5 receives the information on the start time. In step S306, information on the power surplus time zone is transmitted from the information processing terminal device 100, and the information receiving unit 551 of the refrigerator 5 receives the information on the power surplus time zone.

後述するように、情報処理端末装置100には、電力余剰時間帯が除霜動作時間よりも短い場合に電力余剰時間帯が存在しない旨を冷蔵庫5に通知することを設定させることができる。このように、電力余剰時間帯の情報には、電力余剰時間帯が存在しない旨を通知させるための情報が含まれていてもよい。電力余剰時間帯の情報に、電力余剰時間帯が存在しない旨の情報を含ませるか否かは、情報処理端末装置100の設定および制御に基づいている。   As will be described later, the information processing terminal device 100 can be set to notify the refrigerator 5 that the power surplus time zone does not exist when the power surplus time zone is shorter than the defrosting operation time. As described above, the information on the power surplus time zone may include information for notifying that the power surplus time zone does not exist. Whether or not to include information indicating that the power surplus time zone does not exist in the information on the power surplus time zone is based on the setting and control of the information processing terminal device 100.

ステップS307では、電力余剰時間帯が存在しない旨を通知するための情報が含まれているかどうかが判定される。電力余剰時間帯が存在しない旨を通知するための情報が含まれていることが判定される場合にはステップS308に進み、電力余剰時間帯が存在しない旨を通知するための情報が含まれていないことが判定される場合にはステップS309に進む。なお、ステップS307の判定は、電力余剰時間帯が存在しない旨の通知があったか否かであってもよい。   In step S307, it is determined whether or not information for notifying that there is no power surplus time zone is included. When it is determined that the information for notifying that the power surplus time zone does not exist is included, the process proceeds to step S308, and the information for notifying that the power surplus time zone does not exist is included. If it is determined that there is not, the process proceeds to step S309. Note that the determination in step S307 may be whether or not there is a notification that there is no power surplus time zone.

ステップS308では、次回の除霜動作の開始時期を繰り上げるためのフラグがセットされる。このフラグは、過去の除霜動作の時間の情報として、ステップS301の判定に用いられる。フラグが立ち上げられている場合には、除霜動作を開始させる時期が、通常の状態よりも早められる。なお、通常の状態とは、冷蔵庫5の除霜動作時間に消費される電力のすべてを賄うことが可能な電力余剰時間帯が存在しない場合のことであって、フラグが立ち上げられていない状態のことである。   In step S308, a flag for raising the start time of the next defrosting operation is set. This flag is used for the determination in step S301 as information on the time of the past defrosting operation. When the flag is raised, the timing for starting the defrosting operation is made earlier than in the normal state. In addition, a normal state is a case where there is no power surplus time zone that can cover all of the power consumed during the defrosting operation time of the refrigerator 5, and the flag is not raised. That's it.

ステップS306では、ステップS305の制御に基づき、除霜動作の開始時刻の情報と、除霜動作時間の情報とが情報処理端末装置100から送信される。情報処理端末装置100によって処理される制御によって決定される除霜動作の開始時刻の情報と除霜動作時間の情報とによれば、冷蔵庫5は、太陽光発電装置2(図7参照)の発電電力の余剰分を用いて除霜動作を行うことができる。しかしながら、情報処理端末装置100から送信された除霜動作時間の情報に応じた除霜動作時間において除霜動作が行われる場合には、蒸発器524が十分に除霜されない事態が発生する可能性がある。そのため、ステップS308の制御に応じて次回の除霜動作の開始時期を早めることにより、冷却動作に及ぼされる悪影響を予防することができる。また、次回の除霜動作の開始時期が早められる場合には、次回の除霜動作時間が通常よりも短縮されることにより、次回の除霜動作に使用される電力の大部分を、太陽光発電装置2の発電電力の余剰分によって賄うことができる。   In step S306, based on the control in step S305, information on the start time of the defrosting operation and information on the defrosting operation time are transmitted from the information processing terminal device 100. According to the information on the start time of the defrosting operation and the information on the defrosting operation time determined by the control processed by the information processing terminal device 100, the refrigerator 5 generates power from the solar power generation device 2 (see FIG. 7). The defrosting operation can be performed using the surplus power. However, when the defrosting operation is performed in the defrosting operation time according to the information on the defrosting operation time transmitted from the information processing terminal device 100, there is a possibility that the evaporator 524 is not sufficiently defrosted. There is. Therefore, the adverse effect on the cooling operation can be prevented by advancing the start time of the next defrosting operation in accordance with the control in step S308. In addition, when the start time of the next defrosting operation is advanced, the next defrosting operation time is shortened from the normal time, so that most of the electric power used for the next defrosting operation is reduced to sunlight. This can be covered by the surplus of power generated by the power generation device 2.

このように、冷蔵庫5の除霜動作時間に消費される電力を賄うことが可能な電力余剰時間帯が存在しない場合には、冷蔵庫5は、次回の除霜動作の開始時期を通常の状態よりも繰り上げる。   Thus, when there is no power surplus time zone that can cover the power consumed during the defrosting operation time of the refrigerator 5, the refrigerator 5 starts the start time of the next defrosting operation from the normal state. Also advance.

ステップS309では、除霜動作の開始時刻が到来するまで除霜動作の待機状態が継続する。ステップS309において除霜動作の開始時刻が到来していることが判定される場合には、ステップS310に進む。ステップS310では、今回の除霜動作が開始される。なお、後述するように、冷蔵庫5の除霜動作時間に消費される電力を賄うことが可能な電力余剰時間帯が存在しない場合には、情報処理端末装置100によって推定された余剰が生じる時間帯のうちの最長の時間帯において今回の除霜動作が行われる。   In step S309, the standby state of the defrosting operation continues until the start time of the defrosting operation arrives. If it is determined in step S309 that the start time of the defrosting operation has arrived, the process proceeds to step S310. In step S310, the current defrosting operation is started. In addition, as will be described later, when there is no power surplus time zone that can cover the power consumed during the defrosting operation time of the refrigerator 5, the time zone in which the surplus estimated by the information processing terminal device 100 occurs The defrosting operation of this time is performed in the longest time zone.

続いて、除霜動作を開始する時刻を設定するための制御、つまり、情報処理端末装置100によって処理される制御について、フローチャートを用いて説明する。図15に示すように、ステップS401において、情報処理端末装置100の情報受信部121(図7参照)は、冷蔵庫5の情報送信部555(図13参照)から情報処理端末装置100に送信された除霜動作時間の情報を受け取る。また、情報受信部121は、ステップS303(図14参照)において算出された完了制限時刻の情報を情報送信部555からさらに受け取る。   Subsequently, the control for setting the time to start the defrosting operation, that is, the control processed by the information processing terminal device 100 will be described using a flowchart. As shown in FIG. 15, in step S <b> 401, the information reception unit 121 (see FIG. 7) of the information processing terminal device 100 is transmitted from the information transmission unit 555 (see FIG. 13) of the refrigerator 5 to the information processing terminal device 100. Receives information on defrosting operation time. Further, the information receiving unit 121 further receives information on the completion time limit calculated in step S303 (see FIG. 14) from the information transmitting unit 555.

ステップS402では、冷蔵庫5から除霜動作時間の情報が送信されてきた時点を基準として、その時点から完了制限時刻までの太陽光発電装置2が発電する電力の時間的推移が推定される。情報処理端末装置100は、太陽光発電装置2の発電電力を常時監視することにより、過去の一定の期間の発電電力の時間的推移をデータとして蓄積している。過去の一定の期間の発電電力の時間的推移の平均値が、蓄積されたデータに基づいて演算部123(図7参照)によって算出されることにより、現在から運転完了希望時刻までの発電電力の時間的推移が推定される。過去の一定の期間の例としては、洗濯乾燥機900に対する制御と同様である。   In step S402, the time transition of the electric power generated by the photovoltaic power generation apparatus 2 from the time point to the completion limit time is estimated with reference to the time point when the defrosting operation time information is transmitted from the refrigerator 5. The information processing terminal device 100 accumulates the temporal transition of the generated power during a certain past period as data by constantly monitoring the generated power of the solar power generation device 2. The average value of the temporal transition of the generated power during a certain past period is calculated by the calculation unit 123 (see FIG. 7) based on the accumulated data, so that the generated power from the present time to the desired operation completion time is calculated. Temporal transition is estimated. An example of the past fixed period is the same as the control for the washer / dryer 900.

続いて、ステップS403では、冷蔵庫5から除霜動作時間の情報および完了制限時刻の情報が送信されてきた時点を基準として、その時点から完了制限時刻までの他の家電機器が使用する電力の時間的推移が推定される。情報処理端末装置100は、冷蔵庫5を除く他の家電機器の使用電力を常時監視することにより、過去の一定の期間において他の家電機器が使用する電力の時間的推移をデータとして蓄積している。過去の一定の期間において他の家電機器が使用する電力の時間的推移の平均値が、蓄積されたデータに基づいて演算部123によって算出されることにより、現在から完了制限時刻までの使用電力の時間的推移が推定される。過去の一定の期間において他の家電機器が使用する電力の時間的推移をデータは、平日と休日との区別だけでなく、曜日毎に区別されていてもよい。   Subsequently, in step S403, based on the time point when the defrosting operation time information and the completion restriction time information are transmitted from the refrigerator 5, the time of power used by other home appliances from that point to the completion restriction time. Transition is estimated. The information processing terminal device 100 accumulates data on the temporal transition of the power used by other home appliances during a certain period in the past by constantly monitoring the power used by other home appliances other than the refrigerator 5. . The average value of the temporal transition of the power used by other home appliances in a certain period in the past is calculated by the calculation unit 123 based on the accumulated data. Temporal transition is estimated. Data on the temporal transition of power used by other home appliances in a certain past period may be distinguished not only for weekdays and holidays but also for each day of the week.

なお、ステップS402とステップS403とでいう“過去”とは、冷蔵庫5から除霜動作時間の情報が送信されてきた時点よりも前の時点のことである。あるいは、“過去”とは、情報処理端末装置100が電力余剰時間帯を推定する時点よりも前の時点のことであってもよい。   The “past” in step S402 and step S403 is a time point before the time point when the defrosting operation time information is transmitted from the refrigerator 5. Alternatively, the “past” may be a time point before the time point when the information processing terminal device 100 estimates the power surplus time zone.

ステップS404では、推定された太陽光発電装置2の発電電力の時間的推移と、推定された他の家電機器の使用電力の時間的推移とが演算部123(図7参照)によって比較されることにより、発電電力に余剰が生じる時間帯としての電力余剰時間帯が推定される。   In step S404, the estimated time transition of the generated power of the solar power generation device 2 and the estimated time transition of the power consumption of other home appliances are compared by the calculation unit 123 (see FIG. 7). Thus, a power surplus time zone is estimated as a time zone in which surplus power is generated.

ステップS404に続いて、ステップS405では、除霜動作時間分の電力余剰時間帯が存在するか否かが判定される。冷蔵庫5において除霜動作が行われている最中には、除霜動作が開始されてから完了するまでの連続した時間帯において、所定の電力が必要である。そのため、ステップS405において、今回の除霜動作に必要とされる所定の時間分の電力を賄うことが可能な電力余剰時間帯が存在するかどうかが判定される。ステップS404において、除霜動作時間分のすべての電力を賄うことが可能な電力余剰時間帯が存在することが判定される場合には、ステップS406に進む。   Subsequent to step S404, in step S405, it is determined whether or not there is a power surplus time zone for the defrosting operation time. While the defrosting operation is being performed in the refrigerator 5, predetermined power is required in a continuous time zone from the start of the defrosting operation to the completion thereof. Therefore, in step S405, it is determined whether or not there is a power surplus time zone that can cover the power for a predetermined time required for the current defrosting operation. If it is determined in step S404 that there is a power surplus time zone that can cover all power for the defrosting operation time, the process proceeds to step S406.

ステップS406では、除霜動作の開始時刻が決定される。ステップS406において決定される開始時刻によれば、推定された今回の除霜動作時間分のすべての電力を賄うことができる電力余剰時間帯において、除霜動作の開始から完了までを達成することができる。   In step S406, the start time of the defrosting operation is determined. According to the start time determined in step S406, it is possible to achieve from the start to the completion of the defrosting operation in the power surplus time zone in which all the power for the estimated current defrosting operation time can be covered. it can.

なお、ステップS406では、除霜動作時間分のすべての電力を賄うことができる電力余剰時間帯が複数存在する場合、または、電力余剰時間帯に除霜動作時間を複数設定することが可能である位に、推定される電力余剰時間帯が比較的長い場合には、電力余剰時間帯の中において冷蔵庫5の外方の気温が最も低いことが予想される時間帯の時刻が選択されていてもよい。   In step S406, when there are a plurality of power surplus time zones that can cover all the power for the defrosting operation time, or a plurality of defrosting operation times can be set in the power surplus time zone. In the case where the estimated power surplus time zone is relatively long, the time in the time zone where the temperature outside the refrigerator 5 is expected to be the lowest in the power surplus time zone is selected. Good.

除霜動作が行われる場合は、ヒータ527(図12参照)の作動によって冷蔵庫5の内部の温度が上昇してしまうため、除霜動作の前後に冷却動作が行われている。冷蔵庫5の外方の気温が比較的低い場合には、冷却動作において消費される電力を抑制することができる。このように、冷蔵庫5の外方の気温が低い時間帯の時刻から除霜動作を開始させることができる場合には、冷蔵庫5が消費する電力を削減することができる。   When the defrosting operation is performed, the temperature inside the refrigerator 5 increases due to the operation of the heater 527 (see FIG. 12), and thus the cooling operation is performed before and after the defrosting operation. When the temperature outside the refrigerator 5 is relatively low, power consumed in the cooling operation can be suppressed. Thus, when the defrosting operation can be started from the time of the time zone when the temperature outside the refrigerator 5 is low, the power consumed by the refrigerator 5 can be reduced.

一方、ステップS405において、除霜動作時間分のすべての電力を賄うことが可能な電力余剰時間帯が存在しないことが判定される場合には、ステップS451(図16参照)に進む。   On the other hand, when it is determined in step S405 that there is no power surplus time zone that can cover all power for the defrosting operation time, the process proceeds to step S451 (see FIG. 16).

情報処理端末装置100には、推定された電力余剰時間帯が除霜動作時間よりも短い場合に電力余剰時間帯が存在しない旨を冷蔵庫5に通知することを設定させることができる。このように、電力余剰時間帯の情報には、電力余剰時間帯が存在しない旨を通知させるための情報が含まれていてもよい。電力余剰時間帯の情報に、電力余剰時間帯が存在しない旨の情報を含ませるか否かは、情報処理端末装置100の設定および制御に基づいている。   The information processing terminal device 100 can be set to notify the refrigerator 5 that the power surplus time zone does not exist when the estimated power surplus time zone is shorter than the defrosting operation time. As described above, the information on the power surplus time zone may include information for notifying that the power surplus time zone does not exist. Whether or not to include information indicating that the power surplus time zone does not exist in the information on the power surplus time zone is based on the setting and control of the information processing terminal device 100.

ステップS451では、電力余剰時間帯が存在しない旨を冷蔵庫5に通知するための設定が有効であるか否かが判定される。情報処理端末装置100の使用者は、電力余剰時間帯が存在しない旨を冷蔵庫5に通知させるか否かについて、情報処理端末装置100に予め設定させることができる。ステップS451においてYESであることが判定される場合にはステップS452に進み、NOであることが判定される場合にはステップS461(図15参照)に進む。   In step S451, it is determined whether or not the setting for notifying the refrigerator 5 that there is no power surplus time zone is valid. The user of the information processing terminal device 100 can cause the information processing terminal device 100 to set in advance whether to notify the refrigerator 5 that there is no surplus power time zone. If it is determined as YES in step S451, the process proceeds to step S452, and if it is determined NO, the process proceeds to step S461 (see FIG. 15).

ステップS452では、電力余剰時間帯の電力を最も効率よく消費する時間帯に基づいて除霜動作の開始時刻と除霜動作時間とが決定される。なお、ステップS452において決定される除霜動作時間は、ステップS302(図14参照)において算出された除霜動作時間以下の時間である。このようにして、冷蔵庫5の除霜動作時間に消費される電力を賄うことが可能な電力余剰時間帯が存在しない場合には、情報処理端末装置100によって推定された余剰が生じる時間帯のうちの最長の時間帯において今回の除霜動作が行われる。   In step S452, the start time of the defrosting operation and the defrosting operation time are determined based on the time zone in which the power in the power surplus time zone is consumed most efficiently. Note that the defrosting operation time determined in step S452 is a time equal to or shorter than the defrosting operation time calculated in step S302 (see FIG. 14). Thus, when there is no power surplus time zone that can cover the power consumed during the defrosting operation time of the refrigerator 5, among the time zones in which the surplus estimated by the information processing terminal device 100 occurs This defrosting operation is performed in the longest time zone.

ステップS453では、ステップS452において決定された除霜動作時間が、冷蔵庫5の除霜動作として最低限の機能を果たすことが可能な基準の時間以上であるか否かが判定される。ステップS453において、基準時間以上であることが判定される場合にはステップS454に進み、基準時間未満であることが判定される場合にはステップS455に進む。   In step S453, it is determined whether or not the defrosting operation time determined in step S452 is equal to or longer than a reference time in which a minimum function can be performed as the defrosting operation of the refrigerator 5. If it is determined in step S453 that the time is equal to or longer than the reference time, the process proceeds to step S454. If it is determined that the time is less than the reference time, the process proceeds to step S455.

ステップS454では、除霜動作の開始時刻の情報と、除霜動作時間の情報と、電力余剰時間帯が存在しないことを通知するための情報とが、情報処理端末装置100から冷蔵庫5に送信される(図7参照)。   In step S454, information on the start time of the defrosting operation, information on the defrosting operation time, and information for notifying that there is no power surplus time zone are transmitted from the information processing terminal device 100 to the refrigerator 5. (See FIG. 7).

一方、ステップS455では、ステップ452において算出によって決定された除霜動作の開始時刻と除霜動作時間とのうち、除霜動作の開始時刻の情報が冷蔵庫5に送信される。なお、ステップS455では、太陽光発電装置2の発電電力の余剰分だけを仮に使用したうえで除霜動作が行われる場合に不足する量の電力が、商用電源4から供給される電力によって補われるように、情報処理端末装置100から電源切替装置3に所定の信号が送信される。   On the other hand, in step S455, information on the start time of the defrosting operation among the start time and the defrosting operation time determined by the calculation in step 452 is transmitted to the refrigerator 5. In step S455, the amount of power that is insufficient when the defrosting operation is performed after using only the surplus of the generated power of the solar power generation device 2 is supplemented by the power supplied from the commercial power source 4. As described above, a predetermined signal is transmitted from the information processing terminal device 100 to the power supply switching device 3.

情報処理端末装置100の決定部127(図7参照)は、判定部126により、ステップS453においてNOであることが判定される場合には、今回の除霜動作時間に消費される電力と、太陽光発電装置2の発電電力の余剰分との差の電力が、商用電源4から冷蔵庫5に供給されるように、商用電源4から供給される電力と太陽光発電装置2が発電させた電力とを電源切替装置3に切り替えさせるための信号を情報送信部122に送信する。電源切替装置3は、当該信号に基づく信号を情報送信部122から受け取る。これにより、太陽光発電装置2の発電電力の余剰分だけを仮に使用したうえで除霜動作が行われる場合に不足する量の電力を、商用電源4から冷蔵庫5に供給することができる。   When the determination unit 126 determines NO in step S453 by the determination unit 126, the determination unit 127 (see FIG. 7) of the information processing terminal device 100 uses the power consumed during the current defrosting operation time and the sun. The power supplied from the commercial power supply 4 and the power generated by the solar power generation apparatus 2 so that the difference power from the surplus power generated by the photovoltaic power generation apparatus 2 is supplied from the commercial power supply 4 to the refrigerator 5 Is transmitted to the information transmission unit 122 to switch the power supply switching device 3. The power supply switching device 3 receives a signal based on the signal from the information transmission unit 122. Thereby, after temporarily using only the surplus of the generated electric power of the solar power generation device 2, an amount of electric power that is insufficient when the defrosting operation is performed can be supplied from the commercial power supply 4 to the refrigerator 5.

ステップS451(図16参照)において電力余剰時間帯が存在しない旨を冷蔵庫5に通知するための設定が有効でないことが判定される場合には、ステップS461(図15参照)に進む。ステップS461では、複数の家電機器のうちの少なくとも冷蔵庫5が深夜電力等の電気料金が比較的安い時間帯の電力を使用するように情報処理端末装置100が予め設定されているか否かが判定される。ステップS461において、冷蔵庫5が深夜電力を使用するように情報処理端末装置100が設定されていることが判定される場合には、ステップS462に進む。   When it is determined in step S451 (see FIG. 16) that the setting for notifying the refrigerator 5 that the power surplus time zone does not exist is not valid, the process proceeds to step S461 (see FIG. 15). In step S461, it is determined whether or not the information processing terminal device 100 is set in advance so that at least the refrigerator 5 among the plurality of home appliances uses power in a time zone in which the electricity rate such as midnight power is relatively low. The If it is determined in step S461 that the information processing terminal device 100 is set so that the refrigerator 5 uses midnight power, the process proceeds to step S462.

ステップS462では、ステップS404において推定された電力余剰時間帯に、電気料金の安い深夜時間帯が含まれているかどうかが判定される。ステップS462において、電力余剰時間帯に深夜時間帯が含まれていることが判定される場合にはステップS463に進む。   In step S462, it is determined whether or not the power surplus time zone estimated in step S404 includes a midnight time zone with a low electricity bill. If it is determined in step S462 that the power surplus time zone includes the midnight time zone, the process proceeds to step S463.

ステップS463では、深夜時間帯に基づいて除霜動作の開始時刻が決定される。ステップS463において決定される開始時刻によれば、除霜動作が深夜時間帯から開始される。   In step S463, the start time of the defrosting operation is determined based on the midnight time zone. According to the start time determined in step S463, the defrosting operation is started from midnight.

一方、ステップS462の判定において電力余剰時間帯に深夜時間帯が含まれていないことが判定される場合、または、ステップS461の判定において深夜電力を使用しないように情報処理端末装置100が設定されている場合には、ステップS464に進む。ステップS464では、電力余剰時間帯の電力を最も効率よく消費する時間帯に基づいて除霜動作の開始時刻が決定される。ステップS463またはステップS464において決定される除霜動作の開始時刻によれば、冷蔵庫5の除霜動作時間に消費される電力を賄うことが可能な電力余剰時間帯が存在しない場合には、情報処理端末装置100によって推定された余剰が生じる時間帯のうちの最長の時間帯において今回の除霜動作が行われる。   On the other hand, when it is determined in step S462 that the power surplus time zone does not include the midnight time zone, or in step S461, the information processing terminal device 100 is set not to use midnight power. If yes, the process proceeds to step S464. In step S464, the start time of the defrosting operation is determined based on the time zone in which the power in the power surplus time zone is consumed most efficiently. According to the start time of the defrosting operation determined in step S463 or step S464, if there is no power surplus time zone that can cover the power consumed during the defrosting operation time of the refrigerator 5, information processing is performed. The current defrosting operation is performed in the longest time zone among the time zones in which the surplus estimated by the terminal device 100 occurs.

なお、ステップS464では、太陽光発電装置2の発電電力の余剰分だけを仮に使用したうえで除霜動作が行われる場合に不足する量の電力が、商用電源4から供給される電力によって補われるように、情報処理端末装置100から電源切替装置3に所定の信号が送信される。このように、ステップS464において決定される除霜動作の開始時刻によれば、可能な限り多くの電力余剰時間帯の電力を利用したうえで、不足する分を商用電源4から賄うことができる。   In step S464, the amount of power that is insufficient when the defrosting operation is performed after using only the surplus of the generated power of the solar power generation device 2 is supplemented by the power supplied from the commercial power source 4. As described above, a predetermined signal is transmitted from the information processing terminal device 100 to the power supply switching device 3. As described above, according to the start time of the defrosting operation determined in step S464, it is possible to cover the shortage from the commercial power supply 4 while using as much power as possible in the power surplus time zone.

ステップS407では、ステップS406、ステップS463、または、ステップS464にて決定された除霜動作の開始時刻の情報が、情報処理端末装置100から冷蔵庫5に送信される(図13参照)。   In step S407, information on the start time of the defrosting operation determined in step S406, step S463, or step S464 is transmitted from the information processing terminal device 100 to the refrigerator 5 (see FIG. 13).

以上のように、給電システム1は、太陽光発電装置2と、洗濯乾燥機900と冷蔵庫5とテレビ6とエアコン7と照明装置8とを含む複数の家電機器と、情報処理端末装置100とを備えている。洗濯乾燥機900とテレビ6とエアコン7と照明装置8とは、他の家電機器の一例である。複数の家電機器は、少なくとも太陽光発電装置2が発電させた電力によって作動する。情報処理端末装置100は、複数の家電機器と太陽光発電装置2と通信可能であるようにネットワーク接続されている。   As described above, the power feeding system 1 includes the solar power generation device 2, the washing / drying machine 900, the refrigerator 5, the television 6, the air conditioner 7, the lighting device 8, and the information processing terminal device 100. I have. The washer / dryer 900, the television 6, the air conditioner 7, and the lighting device 8 are examples of other home appliances. The plurality of home appliances are operated by at least electric power generated by the solar power generation device 2. The information processing terminal device 100 is network-connected so that it can communicate with a plurality of home appliances and the solar power generation device 2.

情報処理端末装置100は、太陽光発電装置2の過去の発電電力量の時間的推移の情報と、他の家電機器の過去の消費電力量の時間的推移の情報とから発電電力に余剰が生じる時間帯を推定する。また、情報処理端末装置100は、推定された時間帯の結果を電力余剰時間帯情報として記憶し、冷蔵庫5が実際に除霜動作として作動する時間の情報として冷蔵庫5から受け取る除霜動作時間の情報と、電力余剰時間帯情報とに基づき、冷蔵庫5の除霜動作の開始時刻を決定する。   The information processing terminal device 100 generates surplus in the generated power from the information on the temporal transition of the past power generation amount of the photovoltaic power generation apparatus 2 and the information on the temporal transition of the past power consumption amount of other home appliances. Estimate the time zone. Further, the information processing terminal device 100 stores the estimated time zone result as the power surplus time zone information, and the defrosting operation time received from the refrigerator 5 as information on the time when the refrigerator 5 actually operates as the defrosting operation. Based on the information and the power surplus time zone information, the start time of the defrosting operation of the refrigerator 5 is determined.

給電システム1によれば、太陽光発電装置2の過去の発電電力量の時間的推移の情報と、他の家電機器の過去の消費電力量の時間的推移の情報とから、太陽光発電装置2の発電電力に余剰が生じる時間帯を推定する。また、情報処理端末装置100は、電力余剰時間帯情報と、作動時間情報としての除霜動作時間の情報とに基づき、冷蔵庫5の運転としての除霜動作の開始時刻を決定する。このように、給電システム1によれば、任意の時点の太陽光発電装置2の発電電力量のみが、冷蔵庫5の除霜動作を開始させるための判断に用いられることが無く、且つ、冷蔵庫5の除霜動作を、太陽光発電装置2の発電電力に余剰が生じる時間帯に作動させることができる。   According to the power feeding system 1, the solar power generation device 2 is obtained from the information on the temporal transition of the past power generation amount of the solar power generation device 2 and the information on the temporal transition of the past power consumption amount of other home appliances. Estimate the time zone in which surplus power is generated. Further, the information processing terminal device 100 determines the start time of the defrosting operation as the operation of the refrigerator 5 based on the power surplus time zone information and the information on the defrosting operation time as the operation time information. Thus, according to the power feeding system 1, only the amount of power generated by the solar power generation device 2 at an arbitrary point in time is not used for the determination for starting the defrosting operation of the refrigerator 5, and the refrigerator 5 This defrosting operation can be operated in a time zone where surplus power is generated in the generated power of the solar power generation device 2.

このようにすることにより、太陽光発電装置2が発生させた電力を効率的に利用することが可能な給電システム1を提供することができる。   By doing in this way, the electric power feeding system 1 which can use efficiently the electric power which the solar power generation device 2 generated can be provided.

冷蔵庫5は、太陽光発電装置2の給電システムに用いられる所定の家電機器としての冷蔵庫である。作動時間情報は、冷蔵庫5が実際に除霜動作として作動する時間の情報として冷蔵庫5から受け取る除霜動作時間の情報であり、運転開始時刻は、冷蔵庫5の除霜動作の開始時刻であり、除霜動作時間の情報が、過去の除霜動作時間の情報に基づいて冷蔵庫5によって推定された除霜動作時間の情報である。   The refrigerator 5 is a refrigerator as a predetermined home appliance used in the power feeding system of the solar power generation device 2. The operating time information is information on the defrosting operation time received from the refrigerator 5 as information on the time when the refrigerator 5 actually operates as the defrosting operation, and the operation start time is the start time of the defrosting operation of the refrigerator 5, The information on the defrosting operation time is information on the defrosting operation time estimated by the refrigerator 5 based on the information on the past defrosting operation time.

この構成によれば、情報処理端末装置100は、過去の除霜動作時間の情報に基づいて冷蔵庫5によって推定された除霜動作時間の情報を受け取る。また、情報処理端末装置100は、除霜動作時間の情報と、電力余剰時間帯情報とに基づいて、冷蔵庫5の除霜動作の開始時刻を決定する。したがって、この構成によれば、冷蔵庫5は、太陽光発電装置2の発電電力の余剰分を用いて除霜動作を行うことができる。   According to this configuration, the information processing terminal device 100 receives information on the defrosting operation time estimated by the refrigerator 5 based on the information on the past defrosting operation time. Moreover, the information processing terminal device 100 determines the start time of the defrosting operation of the refrigerator 5 based on the information on the defrosting operation time and the power surplus time zone information. Therefore, according to this configuration, the refrigerator 5 can perform the defrosting operation using the surplus power generated by the solar power generation device 2.

冷蔵庫5は、過去の除霜動作時間の情報に基づいて除霜動作の開始制限時刻を推定し、さらに、推定した開始制限時刻に除霜動作時間を加算することによって除霜動作の完了制限時刻を算出する。   The refrigerator 5 estimates the defrosting operation start time limit based on the past defrosting operation time information, and further adds the defrosting operation time to the estimated start time limit, thereby completing the defrosting operation completion time limit. Is calculated.

この構成によれば、情報処理端末装置100は、除霜動作時間の情報と、除霜動作の完了制限時刻の情報とを受け取る。そのため、冷蔵庫5は、遅くとも冷却動作に悪影響が及ぼされる可能性がある時点までに、太陽光発電装置2の発電電力の余剰分を用いた除霜動作を開始することができる。したがって、この構成によれば、太陽光発電装置2の発電電力の余剰分を用いて除霜動作が行われる場合に、除霜動作の開始時刻が時間的に後方向に変更されるときであっても、冷蔵庫5の冷却動作への影響が小さく抑えられる。   According to this configuration, the information processing terminal device 100 receives information on the defrosting operation time and information on the completion time of the defrosting operation. Therefore, the refrigerator 5 can start the defrosting operation using the surplus power generated by the solar power generation device 2 by the time when the cooling operation may be adversely affected at the latest. Therefore, according to this configuration, when the defrosting operation is performed using the surplus power generated by the solar power generation device 2, the start time of the defrosting operation is changed backward in time. However, the influence on the cooling operation of the refrigerator 5 can be reduced.

冷蔵庫5は、冷蔵庫5の除霜動作時間に消費される電力を賄うことが可能な電力余剰時間帯が存在しない場合には、情報処理端末装置100によって推定された余剰が生じる時間帯のうちの最長の時間帯において今回の除霜動作を行い、且つ、次回の除霜動作の開始時期を通常の状態よりも繰り上げる。   When there is no power surplus time zone that can cover the power consumed during the defrosting operation time of the refrigerator 5, the refrigerator 5 has a time zone in which surplus estimated by the information processing terminal device 100 occurs. The current defrosting operation is performed in the longest time zone, and the start time of the next defrosting operation is advanced from the normal state.

この構成によれば、冷蔵庫5の除霜動作時間に消費される電力を賄うことが可能な電力余剰時間帯が存在しない場合には、情報処理端末装置100によって推定された余剰が生じる時間帯のうちの最長の時間帯において今回の除霜動作が行われる。このように、余剰が生じる時間帯のうちの最長の時間帯において除霜動作が行われる場合には、除霜が不十分である事態が発生することが予想される。除霜が不十分である場合には、冷蔵庫5の冷却動作に悪影響が及ぼされる可能性がある。   According to this configuration, when there is no power surplus time zone that can cover the power consumed during the defrosting operation time of the refrigerator 5, the time zone in which the surplus estimated by the information processing terminal device 100 occurs is generated. The current defrosting operation is performed in the longest time zone. Thus, when the defrosting operation is performed in the longest time zone in which surplus occurs, it is expected that a situation where defrosting is insufficient will occur. If the defrosting is insufficient, the cooling operation of the refrigerator 5 may be adversely affected.

しかしながら、この構成によれば、冷蔵庫5の除霜動作時間に消費される電力を賄うことが可能な電力余剰時間帯が存在しない場合に、余剰が生じる時間帯のうちの最長の時間帯において除霜動作が行われるときには、次回の除霜動作の開始時期が通常の状態よりも繰り上げられる。このように、次回の除霜動作の開始時期が早められることにより、冷却動作に及ぼされる悪影響を予防することができる。   However, according to this configuration, when there is no power surplus time zone that can cover the power consumed during the defrosting operation time of the refrigerator 5, the power is removed in the longest time zone in which surplus occurs. When the frost operation is performed, the start time of the next defrost operation is advanced from the normal state. As described above, the start time of the next defrosting operation is advanced, so that an adverse effect on the cooling operation can be prevented.

上述のように、ステップS464とステップS452とにおいては、電力余剰時間帯の電力を最も効率よく消費する(言い換えると、太陽光発電装置2の発電電力を最も多く消費する)時間帯に基づいて除霜動作の開始時刻が決定されている。ただし、ステップS464とステップS452とにおいては、冷蔵庫5の外方の気温が最も低いことが予想される時間帯の時刻が選択されることにより、除霜動作の開始時刻が決定されていてもよい。   As described above, in step S464 and step S452, the power in the power surplus time zone is consumed most efficiently (in other words, the power generated by the photovoltaic power generator 2 is consumed most). The start time of the frost operation is determined. However, in step S464 and step S452, the start time of the defrosting operation may be determined by selecting the time of the time zone in which the temperature outside the refrigerator 5 is expected to be the lowest. .

なお、冷蔵庫5において、上述した除霜動作は、ヒータ527(図12参照)がオンされている状態のことを意味している。ただし、除霜動作には、ヒータ527をオンする前と、ヒータ527をオンしてからオフした後とにおいて行われる冷却動作が含まれていてもよい。   In the refrigerator 5, the defrosting operation described above means that the heater 527 (see FIG. 12) is turned on. However, the defrosting operation may include a cooling operation performed before the heater 527 is turned on and after the heater 527 is turned on.

(第3実施形態)
第3実施形態は、所定の家電機器の数が複数、すなわち一例として2の場合である。また、第3実施形態において、二つの所定の家電機器は、互いに異なる種類の家電機器である。複数の所定の家電機器の一例は、以下において説明される機器Aとしての冷蔵庫5と、機器Bとしての洗濯乾燥機900とである。以下においては、複数の所定の家電機器の運転開始時刻を決定するための制御について説明する。なお、複数の所定の家電機器の数は、3以上であってもよい。あるいは、複数の所定の家電機器の組み合わせは、洗濯乾燥機900と冷蔵庫5とに限定されず、別の機器を含む他の組み合わせであってもよい。また、複数の所定の家電機器の組み合わせは、同種の家電機器が複数含まれていてもよい(例えば、機器Aとしての家電機器と、機器Bとしての家電機器と、他の家電機器とが、それぞれ冷蔵庫5であってもよい)。
(Third embodiment)
The third embodiment is a case where the number of predetermined home appliances is plural, that is, 2 as an example. In the third embodiment, the two predetermined home appliances are different types of home appliances. An example of a plurality of predetermined home appliances is a refrigerator 5 as the device A and a washing / drying machine 900 as the device B described below. In the following, control for determining the operation start times of a plurality of predetermined home appliances will be described. Note that the number of the plurality of predetermined home appliances may be three or more. Alternatively, the combination of a plurality of predetermined home appliances is not limited to the washer / dryer 900 and the refrigerator 5, and may be other combinations including other devices. Moreover, the combination of a plurality of predetermined home appliances may include a plurality of home appliances of the same type (for example, home appliances as device A, home appliances as device B, and other home appliances, Each may be a refrigerator 5).

第3実施形態において、洗濯乾燥機900の構成と冷蔵庫5の構成とは、それぞれ第1実施形態と第2実施形態とに示すものと同様であるとして、説明を省略する。また、第3実施形態において、情報処理端末装置100の構成は、第1実施形態に示す構成と、第2実施形態に示す構成とを含む。さらに、第3実施形態において、情報処理端末装置100と洗濯乾燥機900との間に実行される制御と、情報処理端末装置100と冷蔵庫5との間に実行される制御とは、それぞれ第1実施形態に示す制御と第2実施形態に示す制御とを含む。   In 3rd Embodiment, the structure of the washing-drying machine 900 and the structure of the refrigerator 5 are the same as what is shown to 1st Embodiment and 2nd Embodiment, respectively, and description is abbreviate | omitted. In the third embodiment, the configuration of the information processing terminal device 100 includes the configuration shown in the first embodiment and the configuration shown in the second embodiment. Furthermore, in 3rd Embodiment, the control performed between the information processing terminal device 100 and the washing / drying machine 900 and the control performed between the information processing terminal device 100 and the refrigerator 5 are respectively 1st. The control shown in the embodiment and the control shown in the second embodiment are included.

以下においては、図17〜20を用いて、複数の所定の家電機器が機器Aと機器Bとによって構成される場合について説明している。ただし、複数の家電機器の数が3以上であっても、および/または、複数の所定の家電機器の組み合わせが例えば冷蔵庫5と洗濯乾燥機900と以外の別の組み合わせであっても、図17〜20に示すフローチャートに従って、各所定の家電機器の運転開始時刻が情報処理端末装置100(図7参照)によって決定される。   Below, the case where a some predetermined | prescribed household appliance is comprised with the apparatus A and the apparatus B is demonstrated using FIGS. However, even if the number of the plurality of home appliances is 3 or more and / or the combination of the plurality of predetermined home appliances is another combination other than the refrigerator 5 and the washing / drying machine 900, for example, FIG. ˜20, the information processing terminal device 100 (see FIG. 7) determines the operation start time of each predetermined home appliance.

図17に示すように、ステップS1001において、情報処理端末装置100の情報受信部121(図7参照)は、機器Aの作動情報と機器Bの作動情報とを受信する。作動情報とは、機器が洗濯乾燥機900である場合は、洗濯乾燥機900の運転完了希望時刻の情報と作動時間情報とが含まれる。機器が冷蔵庫5である場合は、除霜動作時間の情報と完了制限時刻とが含まれる。   As illustrated in FIG. 17, in step S <b> 1001, the information receiving unit 121 (see FIG. 7) of the information processing terminal device 100 receives the operation information of the device A and the operation information of the device B. In the case where the device is the washing / drying machine 900, the operation information includes information on the operation completion desired time and the operation time information of the washing / drying machine 900. When the device is the refrigerator 5, information on the defrosting operation time and the completion time limit are included.

ステップS1002において、現時点から機器Aと機器Bとの運転完了希望時刻および完了制限時刻までの太陽光発電装置の発電電力の時間的推移が推定される。なお、以下において、運転完了希望時刻と完了制限時刻とを合わせて完了時刻と呼ぶ。なお、現時点とは、例えば、情報処理端末装置100の情報受信部121(図7参照)に作動情報が送信されてきた時点(ステップS1001が実行された時点)をいう。   In step S1002, the temporal transition of the generated power of the photovoltaic power generation apparatus from the present time to the operation completion desired time and the completion limit time of the devices A and B is estimated. In the following, the desired operation completion time and the completion restriction time are collectively referred to as a completion time. Note that the current time refers to, for example, the time when the operation information is transmitted to the information receiving unit 121 (see FIG. 7) of the information processing terminal device 100 (the time when step S1001 is executed).

ステップS1003において、現時点から完了時刻までの機器Aと機器Bとを除いた家電機器の使用電力の時間的推移が推定される。ステップS1004においては、ステップS1002において算出によって推定された発電電力の時間的推移と、ステップS1003において算出によって推定された使用電力の時間的推移を用いて、電力余剰時間帯(太陽光発電装置2の発電電力に余剰が生じる時間帯)を算出する。   In step S1003, the temporal transition of the power consumption of the home appliances excluding the devices A and B from the current time to the completion time is estimated. In step S1004, using the time transition of the generated power estimated by the calculation in step S1002 and the time transition of the used power estimated by the calculation in step S1003, the power surplus time zone (of the solar power generation device 2) Time) when surplus in generated power occurs.

ステップS1005において、機器Aと機器Bとを同時に作動させることが可能な電力余剰時間帯が存在するかどうかが判定される。言い換えると、情報処理端末装置100(図7参照)は、機器Aと機器Bとを同時に作動させることが可能な程度の量の余剰が発電電力に生じる電力余剰時間帯が存在するかどうかを判断する。ステップS1005において、YESと判断される場合にはステップS1006に進み、NOと判断される場合にはステップS1007に進む。   In step S1005, it is determined whether there is a power surplus time zone in which device A and device B can be operated simultaneously. In other words, the information processing terminal device 100 (see FIG. 7) determines whether there is a power surplus time zone in which a surplus of an amount that can operate the devices A and B simultaneously occurs in the generated power. To do. If YES is determined in step S1005, the process proceeds to step S1006. If NO is determined, the process proceeds to step S1007.

なお、ステップS1005においては、太陽光発電装置2の発生電力のうち、比較的大きな余剰電力が生じる時間帯が存在するかどうかが判定されている。比較的大きな余剰電力が生じる時間帯が存在しない場合には、機器Aと機器Bとを同時に作動させることが不可能であるため、機器Aの作動期間と機器Bの作動期間とが重ならないように、それぞれの機器の運転開始時刻を決定する必要がある。   In step S1005, it is determined whether there is a time zone in which a relatively large surplus power is generated among the power generated by the solar power generation device 2. When there is no time zone in which relatively large surplus power is generated, it is impossible to operate the device A and the device B at the same time, so that the operation period of the device A and the operation period of the device B do not overlap. In addition, it is necessary to determine the operation start time of each device.

ステップS1006においては、機器Aと機器Bとを同時に作動させることを前提として機器Aと機器Bとの作動時間分の電力余剰時間帯が存在するかを判定する。言い換えると、情報処理端末装置100(図7参照)は、ステップS1005のYESの判断に用いられた電力余剰時間帯において、機器Aと機器Bとのいずれか長い方の作動時間が、当該時間帯の時間以下であるかどうかを判定する。ステップS1006において、YESと判断される場合にはステップS1009に進む。ステップS1009の詳細については、図19を用いて後述する。一方、ステップS1006において、NOと判断される場合には、ステップS1010に進む。ステップS1010の詳細については、図18を用いて後述する。   In step S <b> 1006, it is determined whether there is a power surplus time period corresponding to the operation time of the device A and the device B on the assumption that the device A and the device B are operated simultaneously. In other words, the information processing terminal device 100 (see FIG. 7) determines whether the longer operation time of the device A or the device B in the power surplus time zone used for the determination of YES in step S1005 is the time zone. It is determined whether or not the time is less than or equal to. If YES is determined in step S1006, the process proceeds to step S1009. Details of step S1009 will be described later with reference to FIG. On the other hand, if NO is determined in step S1006, the process proceeds to step S1010. Details of step S1010 will be described later with reference to FIG.

ステップS1007においては、機器Aと機器Bとを同時に作動させないことを前提として機器Aと機器Bとの作動時間分の電力余剰時間帯が存在するかを判定する。ステップS1007において、機器Aと機器Bとの作動時間の合計が電力余剰時間帯の長さ以下であるかが判定される。ステップS1007において、YESと判断される場合にはステップS1008に進み、NOと判断される場合にはステップS1010に進む。なお、ステップS1007においてNOと判断されることは、余剰電力を用いて機器Aと機器Bとの両方を作動させることが不可能であることを意味する。   In step S1007, it is determined whether there is a power surplus time zone corresponding to the operating time of the device A and the device B on the assumption that the device A and the device B are not operated simultaneously. In step S1007, it is determined whether or not the total operating time of the devices A and B is equal to or less than the length of the power surplus time zone. If YES is determined in step S1007, the process proceeds to step S1008, and if NO is determined, the process proceeds to step S1010. Note that the determination of NO in step S1007 means that it is impossible to operate both device A and device B using surplus power.

ステップS1008において、機器Aの作動期間と機器Bの作動期間が重ならないように機器Aと機器Bとを作動させることが可能な電力余剰時間帯が存在するかどうかが判定される。言い換えると、比較的長い一つの電力余剰時間帯において、当該時間帯の時間の長さが、機器Aと機器Bとの作動時間の合計よりも長いかどうかが判定される。ステップS1008において、YESと判断される場合にはステップS1009に進み、NOと判断される場合にはステップS1010に進む。   In step S1008, it is determined whether there is a power surplus time zone in which the device A and the device B can be operated so that the operation period of the device A and the operation period of the device B do not overlap. In other words, in one relatively long power surplus time zone, it is determined whether or not the length of the time zone is longer than the total operating time of the devices A and B. If YES is determined in step S1008, the process proceeds to step S1009, and if NO is determined, the process proceeds to step S1010.

後述するように、ステップS1009またはステップS1010において機器A,Bの運転開始時刻が決定された後には、ステップS1011において、機器A,Bに運転開始時刻の情報が送信される。   As described later, after the operation start times of the devices A and B are determined in step S1009 or step S1010, information on the operation start times is transmitted to the devices A and B in step S1011.

次に、図18を用いて、太陽光発電装置2の発電電力の余剰電力を利用する権限を優先順位に従って各機器へ割り当てるための処理(すなわち、図17に示すステップS1010)について説明する。まず、ステップS1101において、ユーザによって各機器の優先順位が予め設定されているかどうかが判断される。ステップS1101において、YESと判断される場合にはステップS1102に進み、NOと判断される場合にはステップS1103に進む。   Next, a process for assigning the authority to use surplus power generated by the photovoltaic power generation apparatus 2 to each device according to the priority order (that is, step S1010 shown in FIG. 17) will be described with reference to FIG. First, in step S1101, it is determined whether the priority order of each device is set in advance by the user. If YES is determined in step S1101, the process proceeds to step S1102, and if NO is determined, the process proceeds to step S1103.

ステップS1102において、ユーザによって予め設定された各機器の優先順位に従って、太陽光発電装置2の余剰電力の利用権が機器Aと機器Bとに与えられる。一方、ステップS1103において、各機器の特性に応じた優先順位に従って、機器Aと機器Bとに利用権が与えられる。   In step S1102, the right to use the surplus power of the photovoltaic power generation apparatus 2 is given to the device A and the device B according to the priority order of each device preset by the user. On the other hand, in step S1103, the right of use is given to the devices A and B according to the priority order corresponding to the characteristics of each device.

ステップS1102またはステップS1103に続いて、ステップS1104において、利用権が与えられた機器に対して、この機器の作動時間分の電力余剰時間帯が存在するかどうかが判定される。さらに、当該判定に基づいて、この機器の運転開始時刻が決定される。具体的には、例えば、利用権が与えられた機器が洗濯乾燥機900である場合には、図9に示すステップS110の定義済み処理(図10〜11参照)、または、利用権が与えられた機器が冷蔵庫5である場合には、図14に示すステップS305の定義済み処理(図15〜16参照)が、ステップS1104において実行される。ステップS1104においては、機器Aの作動時期と機器Bの作動時期とが重ならないように、機器A,Bの運転開始時刻が決定される。   Subsequent to step S1102 or step S1103, in step S1104, it is determined whether or not a power surplus time zone corresponding to the operation time of the device exists for the device to which the usage right is given. Further, the operation start time of this device is determined based on the determination. Specifically, for example, when the device to which the usage right is given is the washing / drying machine 900, the predefined processing in step S110 shown in FIG. 9 (see FIGS. 10 to 11) or the usage right is given. If the device is the refrigerator 5, the predefined process (see FIGS. 15 to 16) in step S305 shown in FIG. 14 is executed in step S1104. In step S1104, the operation start times of the devices A and B are determined so that the operation timing of the device A and the operation timing of the device B do not overlap.

なお、例えば機器Aとしての冷蔵庫5の除霜動作は、冷蔵庫5の冷却動作の品質に大きく影響する。一方、機器Bとしての洗濯乾燥機900の作動は、ユーザが希望する運転完了時刻までに所定の運転が完了していればよいため、洗濯乾燥機900の運転開始時刻は、冷蔵庫5の除霜動作の開始時刻に比べて制約を受けない。このように、各機器の特性に応じた利用権の優先順位としては、例えば洗濯乾燥機900と冷蔵庫5との例について、冷蔵庫5の方が洗濯乾燥機900よりも優先順位が高く設定されている。このような各機器の特性に応じた優先順位の情報は、予めデータ化され且つ情報処理端末装置100の記憶部124(図7参照)に格納されている。   For example, the defrosting operation of the refrigerator 5 as the device A greatly affects the quality of the cooling operation of the refrigerator 5. On the other hand, since the operation of the washing / drying machine 900 as the device B only needs to be completed by the operation completion time desired by the user, the operation start time of the washing / drying machine 900 is the defrosting of the refrigerator 5. There are no restrictions compared to the start time of the operation. As described above, as the priority order of the usage rights corresponding to the characteristics of each device, for example, in the example of the washing / drying machine 900 and the refrigerator 5, the refrigerator 5 has a higher priority order than the washing / drying machine 900. Yes. Such priority order information corresponding to the characteristics of each device is preliminarily converted into data and stored in the storage unit 124 (see FIG. 7) of the information processing terminal device 100.

なお、冷蔵庫5および洗濯乾燥機900と、それら冷蔵庫5および洗濯乾燥機900とは別の家電機器とを含む機器について、優先順位は、例えば以下のように設定される。ただし、上記のステップS1101からS1102に示すように、複数の所定の家電機器において、ユーザが設定する優先順位が優先的に用いられる。   In addition, about the apparatus containing the refrigerator 5 and the washing-drying machine 900, and household appliances different from these refrigerator 5 and the washing-drying machine 900, a priority is set as follows, for example. However, as shown in steps S1101 to S1102 above, the priority order set by the user is preferentially used in a plurality of predetermined home appliances.

1番目には、制限時間が存在する機器、換言すると、完了時刻が課せられる機器、または、運転開始時刻が課せられる機器には優先的に順序が割り当てられる。つまり、1番目の要件として、制限時間が存在するかどうかが考慮される。また、2番目には、連続的に作動する必要がある機器であって、消費電力が大きい機器且つ作動時間が長い機器に対して、優先的に順序が割り当てられる。つまり、2番目の要件として、連続的に作動する必要がある機器について、消費電力が大きく且つ作動時間が長いかどうかが考慮される。   First, an order is preferentially assigned to a device having a time limit, in other words, a device to which a completion time is imposed or a device to which an operation start time is imposed. That is, whether the time limit exists is considered as the first requirement. Second, an order is preferentially assigned to a device that needs to operate continuously, and that consumes a large amount of power and has a long operation time. That is, as a second requirement, whether the power consumption is large and the operation time is long is considered for a device that needs to operate continuously.

さらに、3番目に、作動時間が長い機器に対して、優先的に順序が割り当てられる。4番目に、消費電力が大きい機器に対して、優先的に順序が割り当てられる。これらのように、3番目の要件として作動時間が長いかどうかが考慮され、4番目の要件として消費電力が大きいかどうかが考慮される。   Thirdly, an order is preferentially assigned to devices with a long operation time. Fourth, an order is preferentially assigned to a device with high power consumption. As described above, whether the operation time is long is considered as the third requirement, and whether the power consumption is large is considered as the fourth requirement.

消費電力が大きい機器とは、例えば、エアコン7(図1参照)、洗濯乾燥機900、炊飯器、電気温水器等である。消費電力が小さい機器とは、例えば、ロボットクリーナ、空気清浄機等である。   A device with large power consumption is, for example, an air conditioner 7 (see FIG. 1), a washing / drying machine 900, a rice cooker, an electric water heater, or the like. Devices with low power consumption are, for example, robot cleaners, air cleaners, and the like.

作動時間が短い機器とは、例えば、電気ポット等である。作動時間が長い機器とは、例えば、洗濯乾燥機900、電気温水器、エアコン7等である。   An apparatus with a short operation time is, for example, an electric pot. Devices with a long operation time are, for example, a washing / drying machine 900, an electric water heater, an air conditioner 7, and the like.

連続的に作動する必要がある機器の例は、洗濯乾燥機900、炊飯器等である。一方、連続的に作動する必要がなく作動の途中で停止してもよい機器の例は、電気ポット、冷蔵庫5の除霜動作、エアコン7、ロボットクリーナ、電気温水器等である。   Examples of devices that need to operate continuously are a washing dryer 900, a rice cooker, and the like. On the other hand, examples of devices that do not need to operate continuously and may be stopped during operation include an electric pot, a defrosting operation of the refrigerator 5, an air conditioner 7, a robot cleaner, and an electric water heater.

完了時刻が課せられる機器の例は、洗濯乾燥機900、炊飯器等である。運転開始時刻が課せられる機器の例は、エアコン7等である。   Examples of devices to which the completion time is imposed are a washing / drying machine 900, a rice cooker, and the like. An example of a device to which the operation start time is imposed is an air conditioner 7 or the like.

次に、図19を用いて、機器A,Bの運転開始時刻を決定するための処理(すなわち、図17に示すステップS1009)について説明する。   Next, the process for determining the operation start times of the devices A and B (that is, step S1009 shown in FIG. 17) will be described using FIG.

ステップS1201において、機器Aと機器Bとの作動時間に消費される全ての電力を賄うことが可能な複数の電力余剰時間帯が存在するかどうかが判定される。例えば、ステップS1005およびステップS1006においてYESと判断されるような電力余剰時間帯が、2以上存在しているかどうかが判定される。あるいは、ステップS1008においてYESと判断されるような電力余剰時間帯が、2以上存在しているかどうかが判定される。ステップS1201において、YESと判断される場合にはステップS1202に進み、NOと判断される場合にはステップS1203に進む。   In step S <b> 1201, it is determined whether there are a plurality of power surplus time zones that can cover all the power consumed during the operation time of the devices A and B. For example, it is determined whether there are two or more power surplus time zones that are determined to be YES in steps S1005 and S1006. Alternatively, it is determined whether there are two or more power surplus time zones that are determined to be YES in step S1008. If YES is determined in step S1201, the process proceeds to step S1202, and if NO is determined, the process proceeds to step S1203.

ステップS1202において、機器Aの特性および機器Bの特性に応じて、複数の電力余剰時間帯のうちの最も早い時間帯、または、最も遅い時間帯に合わせるように、機器A,Bの運転開始時刻が決定される。このとき、機器A,Bが作動する期間である電力余剰時間帯の起点に機器Aもしくは機器Bの運転開始時刻が略一致するように、または、電力余剰時間帯の終点に機器Aもしくは機器Bの完了時刻が略一致するように、機器A,Bの運転開始時刻が決定されることが好ましい。   In step S1202, the operation start times of the devices A and B are adjusted so as to match the earliest time zone or the latest time zone among the plurality of power surplus time zones according to the characteristics of the device A and the characteristics of the device B. Is determined. At this time, the operation start time of the device A or the device B substantially coincides with the starting point of the power surplus time zone during which the devices A and B are operating, or the device A or the device B reaches the end point of the power surplus time zone. Preferably, the operation start times of the devices A and B are determined so that the completion times of

機器A,Bのそれぞれの特性によって、機器A,Bのうち、早めに運転を完了する必要があるいずれかの機器の運転開始時刻は、機器A,Bが作動する期間である電力余剰時間帯の起点に当該機器の運転開始時刻が略一致するように決定される。一方、機器A,Bのうち、遅めに運転を完了する必要があるいずれかの機器の運転開始時刻は、機器A,Bが作動する期間である電力余剰時間帯の終点に当該機器の運転開始時刻が略一致するように決定される。   Depending on the characteristics of each of the devices A and B, the operation start time of any of the devices A and B that need to be completed earlier is the power surplus time period in which the devices A and B are operating. Is determined so that the operation start time of the device substantially coincides with the starting point. On the other hand, among the devices A and B, the operation start time of any device that needs to be completed later is the end of the power surplus time zone, which is the period during which the devices A and B operate, The start times are determined so as to substantially match.

ただし、機器A,Bにおいて、それぞれの特性に差が無い場合(つまり、機器A,Bの両方が早めに運転を完了する必要がある機器である場合、または、機器A,Bの両方が遅めに運転を完了する必要がある機器である場合)には、上記の2番目の要件である機器Aと機器Bとの消費電力の大きさの違いに基づいて、機器A,Bの運転開始時刻が決定される。あるいは、図17に示すステップS1005、S1007、および、S1008を経由してから実行されるステップS1009においても、機器Aと機器Bとの消費電力の大きさの違いに基づいて、機器A,Bの運転開始時刻が決定される。例えば、機器Aと機器Bとが共に早めに運転を完了する必要がある機器である場合は、消費電力の大きさが大きい機器の運転が先に開始される。機器Aと機器Bとが共に遅めに運転を完了する必要がある機器である場合は、消費電力の大きさが小さい機器の運転が先に開始される。このようにすることによって、機器A,Bが作動する期間である電力余剰時間帯において、余剰した電力をより多く残すことができる。   However, when there is no difference between the characteristics of the devices A and B (that is, both the devices A and B are devices that need to complete operation earlier, or both the devices A and B are delayed). Device A and B start operation based on the difference in power consumption between device A and device B, which is the second requirement above. Time is determined. Alternatively, also in step S1009 executed after passing through steps S1005, S1007, and S1008 shown in FIG. 17, based on the difference in power consumption between device A and device B, devices A and B The operation start time is determined. For example, when both the device A and the device B are devices that need to complete operation early, the operation of the device with large power consumption is started first. When both the device A and the device B are devices that need to complete the operation later, the operation of the device with low power consumption is started first. By doing in this way, more surplus electric power can be left in the electric power surplus time zone which is the period when apparatus A and B operate.

ステップS1203において、唯一存在する電力余剰時間帯において、機器A,Bの運転開始時刻が決定される。このときも、ステップS1202と同様に、機器A,Bが作動する期間である電力余剰時間帯の起点に機器Aもしくは機器Bの運転開始時刻が略一致するように、または、電力余剰時間帯の終点に機器Aもしくは機器Bの完了時刻が略一致するように、機器A,Bの運転開始時刻が決定されることが好ましい。   In step S1203, the operation start times of the devices A and B are determined in the only power surplus time zone. At this time, as in step S1202, the operation start time of the device A or the device B substantially coincides with the starting point of the power surplus time zone, which is the period in which the devices A and B operate, or the power surplus time zone It is preferable that the operation start times of the devices A and B are determined so that the completion time of the device A or the device B substantially coincides with the end point.

なお、最も早い時間帯または最も遅い時間帯において機器Aおよび機器Bを作動させることにより、例えば複数の所定の家電機器に含まれない他の所定の機器、または、運転開始時刻が再決定される機器Aもしくは機器Bに、比較的長い電力余剰時間帯の時間を残すことができる。また、機器A,Bが作動する期間である電力余剰時間帯において、最も早い時刻または最も遅い時刻に機器Aの運転開始時刻と機器Bの運転開始時刻とが決定されることにより、例えば複数の所定の家電機器に含まれない他の所定の機器、または、運転開始時刻が再決定される機器Aもしくは機器Bに、比較的長い電力余剰時間帯の時間を残すことができる。   In addition, by operating the device A and the device B in the earliest time zone or the latest time zone, for example, another predetermined device that is not included in the plurality of predetermined home appliances or the operation start time is redetermined. The device A or device B can have a relatively long power surplus time period. In addition, in the power surplus time zone in which the devices A and B are operating, by determining the operation start time of the device A and the operation start time of the device B at the earliest time or the latest time, for example, a plurality of times A relatively long power surplus time zone can be left in another predetermined device that is not included in the predetermined home appliance, or in the device A or the device B whose operation start time is determined again.

具体的には、洗濯乾燥機900について、運転完了希望時刻に最も近い時刻は、例えば最も遅い時間帯の終点である。これに鑑み、洗濯乾燥機900の運転開始時刻は、最も遅い時間帯の終点に運転完了時刻が略一致するように、決定されることが好ましい。このような機器の特性に応じた運転開始時刻の決定の要件については、予めデータ化され且つ情報処理端末装置100の記憶部124(図7参照)に格納されていることが好ましい。   Specifically, for the washing / drying machine 900, the time closest to the operation completion desired time is, for example, the end point of the latest time zone. In view of this, the operation start time of the washer / dryer 900 is preferably determined so that the operation completion time substantially coincides with the end point of the latest time zone. The requirement for determining the operation start time according to the characteristics of the device is preferably preliminarily converted into data and stored in the storage unit 124 (see FIG. 7) of the information processing terminal device 100.

ところで、複数の家電機器の運転を開始させる時刻を決定する時期は、すべての家電機器について同時ではなく、例えば家電機器ごとに異なる場合がある。そのため、太陽光発電装置2の発電電力に余剰が生じる時間帯において、複数の所定の家電機器のうち一の所定の家電機器を運転させるように、一の所定の家電機器の運転開始時刻が先に決定される場合には、太陽光発電装置2の発電電力の余剰分を一の所定の家電機器とは別の、他の所定の家電機器が効率的に利用することができるように、一の所定の家電機器の運転開始時刻が決定されることが好ましい。   By the way, the time which determines the time which starts the driving | operation of several household appliances may not be simultaneous about all the household appliances, for example, may differ for every household appliances. Therefore, the operation start time of one predetermined home appliance is first so that one predetermined home appliance among a plurality of predetermined home appliances is operated in a time zone in which surplus power is generated in the solar power generation device 2. In order to be able to efficiently use the surplus of the generated power of the photovoltaic power generation apparatus 2 by another predetermined household electrical appliance different from the one predetermined household electrical appliance. It is preferable that the operation start time of the predetermined home appliance is determined.

しかしながら、太陽光発電装置2の発電電力の余剰分が不足し、または、太陽光発電装置2の発電電力に余剰が生じる時間が比較的短い場合には、運転開始時刻が後に決定される別の家電機器が、太陽光発電装置の発電力の余剰分を利用することができないような事態が生じる。一方、運転開始時刻が先に決定された家電機器の作動が開始される前には、運転開始時刻を変更することは可能である。そのため、一の所定の家電機器の運転開始時刻が決定された後に、別の所定の家電機器の運転開始時刻が決定される場合には、決定された一の所定の家電機器の運転時刻を変更することによって、一の所定の家電機器と別の所定の家電機器との双方に、太陽光発電装置2の発電電力の余剰分を利用させるように運転させることができる。   However, when the surplus of the generated power of the solar power generation device 2 is insufficient or the time during which the surplus power is generated in the solar power generation device 2 is relatively short, another operation start time is determined later. There arises a situation in which home appliances cannot use the surplus power generated by the solar power generation device. On the other hand, the operation start time can be changed before the operation of the home appliance whose operation start time is determined first is started. Therefore, when the operation start time of another predetermined household electrical appliance is determined after the operation start time of one predetermined household electrical appliance is determined, the operation time of the determined one predetermined household electrical appliance is changed. By doing, it can be made to drive | operate so that the surplus part of the generated electric power of the solar power generation device 2 may be utilized by both one predetermined household appliances and another predetermined household appliances.

以下、図20を用いて、第1の所定の家電機器の運転開始時刻が既に決定されていた状態において、第2の所定の家電機器の運転開始時刻を決定するための処理について、説明する。   Hereinafter, a process for determining the operation start time of the second predetermined home appliance in the state where the operation start time of the first predetermined home appliance has already been determined will be described using FIG.

なお、第1の所定の家電機器とは、所定の家電機器のうち、運転開始時刻が先に決定されていた機器のことである。第2の所定の家電機器とは、所定の家電機器のうち、運転開始時刻が先に決定されていた第1の所定の家電機器よりも後に、運転開始時刻が決定される機器のことである。以下においては、機器Aが第1の所定の家電機器であり、機器Bが第2の所定の家電機器である例について述べる。   Note that the first predetermined home appliance is a device whose operation start time has been determined first among predetermined home appliances. The second predetermined home appliance is a device in which the operation start time is determined after the first predetermined home appliance in which the operation start time is determined first among the predetermined home appliances. . In the following, an example in which the device A is a first predetermined household electrical appliance and the device B is a second predetermined household electrical appliance will be described.

ステップS1301において、機器Aの運転開始時刻が決定される。なお、ステップS1301が実行される時点において、機器Aは運転開始時刻を迎えていない。このように、機器Aの運転開始時刻が既に決定され、且つ、機器Aは運転開始時刻を迎えていない状態において、例えばステップS1302〜S1305が実行される。ステップS1302において、情報処理端末装置100の情報受信部121(図7参照)は、機器Bの作動情報を受信する。   In step S1301, the operation start time of the device A is determined. At the time when step S1301 is executed, the device A has not reached the operation start time. Thus, for example, steps S1302 to S1305 are executed in a state where the operation start time of the device A has already been determined and the device A has not reached the operation start time. In step S1302, the information receiving unit 121 (see FIG. 7) of the information processing terminal device 100 receives the operation information of the device B.

続いて、ステップS1303において、既に決定された機器Aの運転開始時刻を変更せずに機器Bの所定の作動時間に消費される電力の量を賄うことが可能な電力余剰時間帯が存在するかどうかが判定される。ステップS1303において、YESと判断される場合にはステップS1304に進み、NOと判断される場合にはステップS1002(図17参照)に進む。   Subsequently, in step S1303, whether there is a surplus power time zone that can cover the amount of power consumed during the predetermined operating time of the device B without changing the operation start time of the device A that has already been determined. Whether it is determined. If YES is determined in step S1303, the process proceeds to step S1304. If NO is determined, the process proceeds to step S1002 (see FIG. 17).

ステップS1304においては、該当する電力余剰時間帯において機器Bが作動するように、機器Bの運転開始時刻が決定される。なお、ステップS1304において実行される制御は、ステップS1009(図17参照)において機器Bに実行される制御と同様である。すなわち、ステップS1304は、ステップS1009(図17参照)つまり図19に示すフローチャートに従って実行される。   In step S1304, the operation start time of device B is determined so that device B operates in the corresponding power surplus time zone. Note that the control executed in step S1304 is the same as the control executed for device B in step S1009 (see FIG. 17). That is, step S1304 is executed according to step S1009 (see FIG. 17), that is, the flowchart shown in FIG.

ステップS1304に続いて、ステップS1305において、機器Bに運転開始時刻の情報が送信される。なお、ステップS1305において、変更されていない運転開始時刻の情報が、機器Aに改めて送信されていてもよい。   Subsequent to step S1304, information about the operation start time is transmitted to device B in step S1305. In step S1305, information on the operation start time that has not been changed may be transmitted to the device A again.

ステップS1303においてNOと判断される場合には、ステップS1002(図17参照)に進む。図17に示すステップS1002以降のステップにおいて、例えば過去に送信された機器Aの作動情報に基づいて、機器Aの運転開始時刻が再度決定される。これと同時に、機器Bの運転開始時刻は、ステップS1302(図20参照)において送信された機器Bの作動情報に基づいて、ステップS1002以降のステップにおいて決定される。ステップS1002以降のステップにおいて運転開始時刻が決定された機器Bには、ステップS1009において決定された運転開始時刻が通知される。   If NO is determined in step S1303, the process proceeds to step S1002 (see FIG. 17). In the steps after step S1002 shown in FIG. 17, for example, the operation start time of the device A is determined again based on the operation information of the device A transmitted in the past. At the same time, the operation start time of the device B is determined in steps after step S1002 based on the operation information of the device B transmitted in step S1302 (see FIG. 20). The device B whose operation start time has been determined in the steps after step S1002 is notified of the operation start time determined in step S1009.

なお、実行される制御がステップS1303からステップS1002に進む場合において、現時点とは、例えば、情報処理端末装置100の情報受信部121(図7参照)に、機器Bの作動情報が送信されてきた時点(ステップS1302が実行された時点)であってもよい。あるいは、この現時点とは、ステップS1303の実行が開始もしくは終了した時点であってもよい。   Note that when the control to be executed proceeds from step S1303 to step S1002, the current time is, for example, that the operation information of the device B has been transmitted to the information receiving unit 121 (see FIG. 7) of the information processing terminal device 100. It may be a time point (a time point when step S1302 is executed). Alternatively, this current time may be the time when the execution of step S1303 starts or ends.

ステップS1002以降のステップにおいて運転開始時刻が再度決定された機器Aには、改めて決定された運転開始時刻が通知される。機器Aは、当初決定されていた運転開始時刻から改めて決定された運転開始時刻に対応することができるように構成されている。そのため、当初決定されていた運転開始時刻が変更される場合であっても、機器Aは、改めて決定された運転開始時刻から運転を開始することができる。   The device A whose operation start time is determined again in the steps after step S1002 is notified of the newly determined operation start time. The device A is configured to be able to cope with the operation start time newly determined from the operation start time that was initially determined. Therefore, even if the operation start time that was initially determined is changed, the device A can start operation from the operation start time that is newly determined.

なお、複数の所定の家電機器は、所定の作動時間に消費される電力量を賄うことが可能な電力余剰時間帯が存在しない場合には、消費電力の不足分を補うように、商用電源4(図1参照)から供給される電力を利用していてもよい。所定の作動時間に消費される電力量を賄うことが可能な電力余剰時間帯が存在しない場合とは、具体的に、電力余剰時間帯が比較的短い場合、または、余剰電力の発電電力量が比較的小さい場合等である。   The plurality of predetermined home appliances have a commercial power source 4 so as to compensate for the shortage of power consumption when there is no surplus power time zone that can cover the amount of power consumed during a predetermined operation time. Electric power supplied from (see FIG. 1) may be used. The case where there is no power surplus time zone that can cover the amount of power consumed during a predetermined operating time means that, specifically, when the power surplus time zone is relatively short, or the power generation amount of surplus power is This is the case when it is relatively small.

以上のように、太陽光発電装置2の給電システム1において、情報処理端末装置100は、複数の所定の家電機器について、互いに異なる所定の家電機器のそれぞれの作動時期の少なくとも一部同士が重なるように、複数の所定の家電機器の運転開始時刻を同時に決定する。   As described above, in the power feeding system 1 of the solar power generation device 2, the information processing terminal device 100 causes at least a part of the operation timings of different predetermined home appliances to overlap each other for a plurality of predetermined home appliances. In addition, the operation start times of a plurality of predetermined home appliances are determined simultaneously.

このようにすることにより、太陽光発電装置2が発生させた電力において比較的大量に余剰が生じる時間帯に、複数の所定の家電機器をまとめて作動させることができる。そのため、複数の所定の家電機器をまとめて作動させる時間帯以外の時間帯において発電量に別に余剰が生じている場合には、当該時間帯に別の機器等を作動させることができる。このように、この構成によれば、太陽光発電装置2が発生させた電力を効率よく利用することができる。   By doing in this way, a plurality of predetermined home appliances can be collectively operated in a time zone in which a relatively large amount of surplus occurs in the electric power generated by the solar power generation device 2. Therefore, when there is a surplus in the amount of power generation in a time zone other than the time zone in which a plurality of predetermined home appliances are operated collectively, another device or the like can be operated in the time zone. Thus, according to this structure, the electric power which the solar power generation device 2 generated can be used efficiently.

太陽光発電装置2の給電システム1において、情報処理端末装置100は、複数の所定の家電機器を同時に作動させることが可能な程度に発電電力に余剰が生じる電力余剰時間帯が存在することが判断される場合に、複数の所定の家電機器のうち全ての家電機器の作動時間が、発電電力に余剰が生じる電力余剰時間帯の時間以下であることが判断されるときには、互いに異なる所定の家電機器のそれぞれの作動時期の少なくとも一部同士が重なるように複数の所定の家電機器のそれぞれの運転開始時刻を決定する。
In the power feeding system 1 of the solar power generation device 2, the information processing terminal device 100 determines that there is a power surplus time period in which surplus in generated power exists to the extent that a plurality of predetermined home appliances can be operated simultaneously. When it is determined that the operation time of all the household electrical appliances among the plurality of predetermined household electrical appliances is equal to or less than the time of the power surplus time zone in which surplus in generated power occurs, the predetermined household electrical appliances different from each other The operation start times of each of the plurality of predetermined home appliances are determined so that at least a part of each of the operation times overlaps.

このようにすることにより、太陽光発電装置2が発生させた電力において比較的大量に余剰が生じる時間帯に、複数の所定の家電機器をまとめて作動させることができる。そのため、太陽光発電装置2が発生させた電力を効率よく利用することができる。   By doing in this way, a plurality of predetermined home appliances can be collectively operated in a time zone in which a relatively large amount of surplus occurs in the electric power generated by the solar power generation device 2. Therefore, the electric power generated by the solar power generation device 2 can be efficiently used.

太陽光発電装置2の給電システムにおいて、情報処理端末装置100は、運転開始時刻が既に決定された機器Aと、機器Aの運転開始時刻が決定された後から運転開始時刻が決定される機器Bとについて、既に決定された機器Aの運転開始時刻を変更するように、且つ、機器Aの作動時期の一部と機器Bの作動時期の一部とが重なるように、機器Aの運転開始時刻および機器Bの運転開始時刻を決定する。   In the power feeding system of the solar power generation device 2, the information processing terminal device 100 includes the device A whose operation start time has already been determined and the device B whose operation start time is determined after the operation start time of the device A is determined. The operation start time of the device A is changed so that the operation start time of the device A that has already been determined is changed, and a part of the operation time of the device A and a part of the operation time of the device B overlap. And the operation start time of the apparatus B is determined.

情報処理端末装置100は、機器Aの運転開始時刻が既に決定された後に、機器Bの運転開始時刻を決定する場合に、既に決定された機器Aの運転開始時刻を変更せずに機器Bの所定の作動時間に消費される電力を賄うことが可能な電力余剰時間帯が存在しないことが判断されるときであって、機器Aと機器Bとを同時に作動させることが可能な程度に発電電力に余剰が生じる電力余剰時間帯が存在することが判断され、且つ、機器Aと機器Bとのうち全ての家電機器の作動時間が、発電電力に余剰が生じる電力余剰時間帯の時間以下であることが判断されるときには、既に決定された機器Aの運転開始時刻を変更するように、且つ、機器Aの作動時期の一部と機器Bの作動時期の一部とが重なるように、機器Aの運転開始時刻および機器Bの運転開始時刻を決定する。
When determining the operation start time of the device B after the operation start time of the device A has already been determined, the information processing terminal device 100 does not change the already determined operation start time of the device A. When it is determined that there is no power surplus time zone that can cover the power consumed during the predetermined operating time, the generated power is such that the devices A and B can be operated simultaneously. It is determined that there is a power surplus time zone in which surplus occurs, and the operating time of all household electrical appliances of device A and device B is less than or equal to the time of the power surplus time zone in which surplus in generated power occurs When it is determined, the device A is changed so that the operation start time of the device A already determined is changed, and a part of the operation timing of the device A and a part of the operation time of the device B are overlapped. Start time and equipment B To determine the operation start time.

この構成によれば、既に決定された機器Aの運転開始時刻を変更することにより、機器Aと機器Bとを電力余剰時間帯において作動させることができる。そのため、太陽光発電装置2が発生させた電力を効率的に利用することができる。   According to this configuration, the device A and the device B can be operated in the power surplus time zone by changing the operation start time of the device A that has already been determined. Therefore, the electric power generated by the solar power generation device 2 can be used efficiently.

太陽光発電装置2の給電システム1において、情報処理端末装置100は、複数の所定の家電機器について、互いに異なる所定の家電機器のそれぞれの作動時期が重ならないように、複数の所定の家電機器の運転開始時刻を同時に決定する。   In the power feeding system 1 of the solar power generation device 2, the information processing terminal device 100 includes a plurality of predetermined home appliances so that the operation timings of different predetermined home appliances do not overlap with each other. The operation start time is determined at the same time.

このようにすることにより、電力余剰時間帯において発電力の余剰分が比較的小さくても、電力余剰時間帯が比較的長いときには、当該電力余剰時間帯の発電力の余剰分を第1の所定の家電機器および第2の所定の家電機器の作動に費やすことができる。そのため、太陽光発電装置2が発生させた電力を効率的に利用することができる。   By doing in this way, even if the surplus of the generated power in the power surplus time zone is relatively small, if the power surplus time zone is relatively long, the surplus of the generated power in the power surplus time zone is set to the first predetermined amount. Can be spent on the operation of the home appliance and the second predetermined home appliance. Therefore, the electric power generated by the solar power generation device 2 can be used efficiently.

太陽光発電装置2の給電システム1において、情報処理端末装置100は、複数の所定の家電機器を同時に作動させることが可能な程度に発電電力に余剰が生じる電力余剰時間帯が存在しないことが判断される場合に、複数の所定の家電機器のそれぞれの作動時間を合わせた時間が、発電電力に余剰が生じる電力余剰時間帯の時間以下であることが判断されるときには、互いに異なる所定の家電機器のそれぞれの作動時期が重ならないように、複数の所定の家電機器のそれぞれの運転開始時刻を決定する。   In the power feeding system 1 of the solar power generation device 2, the information processing terminal device 100 determines that there is no power surplus time zone in which surplus in generated power is present to the extent that a plurality of predetermined home appliances can be operated simultaneously. When it is determined that the time obtained by combining the operating times of a plurality of predetermined home appliances is equal to or less than the time of the power surplus time zone where surplus in generated power occurs, the predetermined home appliances different from each other The operation start times of each of the plurality of predetermined home appliances are determined so that the respective operation timings do not overlap.

このように判断されるときは、電力余剰時間帯において発電力の余剰分が比較的小さくても、電力余剰時間帯が比較的長いときである。したがって、この構成によれば、電力余剰時間帯において発電力の余剰分が比較的小さくても、電力余剰時間帯が比較的長いときには、当該電力余剰時間帯の発電力の余剰分を第1の所定の家電機器および第2の所定の家電機器の作動に費やすことができる。そのため、太陽光発電装置2が発生させた電力を効率的に利用することができる。   The determination is made when the power surplus time zone is relatively long even if the surplus of the generated power is relatively small in the power surplus time zone. Therefore, according to this configuration, even if the surplus of the generated power is relatively small in the power surplus time zone, when the power surplus time zone is relatively long, the surplus power generated in the power surplus time zone is It can be spent on the operation of the predetermined home appliance and the second predetermined home appliance. Therefore, the electric power generated by the solar power generation device 2 can be used efficiently.

太陽光発電装置2の給電システム1において、情報処理端末装置100は、運転開始時刻が既に決定された機器Aと、機器Aの運転開始時刻が決定された後から運転開始時刻が決定される機器Bとについて、既に決定された機器Aの運転開始時刻を変更するように、且つ、機器Aの作動時期と機器Bの作動時期とが重ならないように、機器Aの運転開始時刻および機器Bの運転開始時刻を決定する。   In the power feeding system 1 of the solar power generation device 2, the information processing terminal device 100 includes the device A whose operation start time has already been determined and the device whose operation start time is determined after the operation start time of the device A is determined. As for B, the operation start time of the device A and the operation time of the device B are changed so that the operation start time of the device A already determined is changed and the operation timing of the device A and the operation timing of the device B are not overlapped. Determine the operation start time.

情報処理端末装置100は、機器Aの運転開始時刻が既に決定された後に、機器Bの運転開始時刻を決定する場合に、既に決定された機器Aの運転開始時刻を変更せずに機器Bの所定の作動時間に消費される電力を賄うことが可能な電力余剰時間帯が存在しないことが判断されるときであって、機器Aと機器Bとを同時に作動させることが可能な程度に発電電力に余剰が生じる電力余剰時間帯が存在しないことが判断され、且つ、複数の所定の家電機器のそれぞれの作動時間を合わせた時間が、発電電力に余剰が生じる電力余剰時間帯の時間以下であることが判断されるときには、既に決定された機器Aの運転開始時刻を変更するように、且つ、機器Aの作動時期と機器Bの作動時期とが重ならないように、機器Aの運転開始時刻および機器Bの運転開始時刻を決定する。   When determining the operation start time of the device B after the operation start time of the device A has already been determined, the information processing terminal device 100 does not change the already determined operation start time of the device A. When it is determined that there is no power surplus time zone that can cover the power consumed during the predetermined operating time, the generated power is such that the devices A and B can be operated simultaneously. It is determined that there is no power surplus time zone in which surplus occurs, and the combined time of each of the plurality of predetermined home appliances is equal to or less than the time of the power surplus time zone in which surplus in generated power occurs When it is determined that the operation start time of the device A is changed so that the operation start time of the device A which has already been determined is changed and the operation timing of the device A and the operation timing of the device B do not overlap. machine To determine the operation start time of.

この構成によれば、既に決定された機器Aの運転開始時刻を変更することにより、機器Aと機器Bとを電力余剰時間帯において作動させることができる。そのため、太陽光発電装置2が発生させた電力を効率的に利用することができる。   According to this configuration, the device A and the device B can be operated in the power surplus time zone by changing the operation start time of the device A that has already been determined. Therefore, the electric power generated by the solar power generation device 2 can be used efficiently.

太陽光発電装置2の給電システム1において、情報処理端末装置100は、複数の所定の家電機器のそれぞれの運転開始時刻を所定の優先順位に従って決定する。   In the power feeding system 1 of the solar power generation device 2, the information processing terminal device 100 determines the operation start times of a plurality of predetermined home appliances according to a predetermined priority order.

この構成によれば、電力余剰時間帯において発電力の余剰分が比較的小さい場合、または、電力余剰時間帯が比較的短い場合であっても、各所定の家電機器の作動の優先順位に従って、太陽光発電装置2が発生させた電力を効率的に利用することができる。   According to this configuration, even if the surplus of generated power is relatively small in the power surplus time zone, or even when the power surplus time zone is relatively short, according to the priority of operation of each predetermined home appliance, The electric power generated by the solar power generation device 2 can be used efficiently.

太陽光発電装置2の給電システム1において、情報処理端末装置100は、複数の所定の家電機器を同時に作動させることが可能な程度に発電電力に余剰が生じる電力余剰時間帯が存在することが判断される場合に、複数の所定の家電機器のうち全ての家電機器の作動時間が、発電電力に余剰が生じる電力余剰時間帯の時間よりも長いことが判断されるときには、互いに異なる所定の家電機器のそれぞれの作動時期が重ならないように、複数の所定の家電機器のそれぞれの運転開始時刻を所定の優先順位に従って決定する。
In the power feeding system 1 of the solar power generation device 2, the information processing terminal device 100 determines that there is a power surplus time period in which surplus in generated power exists to the extent that a plurality of predetermined home appliances can be operated simultaneously. When it is determined that the operation time of all of the home appliances among the plurality of predetermined home appliances is longer than the time of the power surplus time zone in which surplus in the generated power occurs, different predetermined home appliances The operation start times of a plurality of predetermined home appliances are determined in accordance with a predetermined priority order so that the respective operation timings do not overlap.

このように判断されるときは、電力余剰時間帯において発電力の余剰分が比較的大きく、且つ、電力余剰時間帯が比較的短いときである。したがって、この構成によれば、電力余剰時間帯において発電力の余剰分が比較的大きく、且つ、電力余剰時間帯が比較的短いときには、当該電力余剰時間帯の発電力の余剰分を第1の所定の家電機器および第2の所定の家電機器のうちの優先順位が高いほうの作動に費やすことができる。これにより、各所定の家電機器の作動の優先順位に従って、太陽光発電装置2が発生させた電力を効率的に利用することができる。   The determination is made when the surplus power generation is relatively large in the power surplus time zone and the power surplus time zone is relatively short. Therefore, according to this configuration, when the surplus of the generated power is relatively large in the power surplus time zone and the power surplus time zone is relatively short, the surplus power generated in the power surplus time zone is It can be spent on the higher priority operation of the predetermined home appliance and the second predetermined home appliance. Thereby, according to the priority of the operation | movement of each predetermined household appliance, the electric power which the solar power generation device 2 generated can be utilized efficiently.

太陽光発電装置2の給電システム1において、情報処理端末装置100は、運転開始時刻が既に決定された機器Aと、機器Aの運転開始時刻が決定された後から運転開始時刻が決定される機器Bとについて、既に決定された機器Aの運転開始時刻を取り消したうえで、機器Aの運転開始時刻または機器Bの運転開始時刻を所定の優先順位に従って決定する。   In the power feeding system 1 of the solar power generation device 2, the information processing terminal device 100 includes the device A whose operation start time has already been determined and the device whose operation start time is determined after the operation start time of the device A is determined. For B, after canceling the operation start time of the device A that has already been determined, the operation start time of the device A or the operation start time of the device B is determined according to a predetermined priority order.

情報処理端末装置100は、機器Aの運転開始時刻が既に決定された後に、機器Bの運転開始時刻を決定する場合に、既に決定された機器Aの運転開始時刻を変更せずに機器Bの所定の作動時間に消費される電力を賄うことが可能な電力余剰時間帯が存在しないことが判断されるときであって、機器Aと機器Bとを同時に作動させることが可能な程度に発電電力に余剰が生じる電力余剰時間帯が存在することが判断され、且つ、複数の所定の家電機器のうち全ての家電機器の作動時間が、発電電力に余剰が生じる電力余剰時間帯の時間よりも長いことが判断されるときには、既に決定された機器Aの運転開始時刻を取り消したうえで、機器Aの運転開始時刻または機器Bの運転開始時刻を所定の優先順位に従って決定する。
When determining the operation start time of the device B after the operation start time of the device A has already been determined, the information processing terminal device 100 does not change the already determined operation start time of the device A. When it is determined that there is no power surplus time zone that can cover the power consumed during the predetermined operating time, the generated power is such that the devices A and B can be operated simultaneously. It is determined that there is a power surplus time zone in which surplus occurs, and the operation time of all the home appliances among a plurality of predetermined home appliances is longer than the time of the power surplus time zone in which surplus in generated power occurs When it is determined, the operation start time of the device A already determined is canceled, and then the operation start time of the device A or the operation start time of the device B is determined according to a predetermined priority order.

この構成によれば、電力余剰時間帯において発電力の余剰分が比較的大きく、且つ、電力余剰時間帯が比較的短いときには、既に決定された機器Aの運転開始時刻を取り消すことにより、当該電力余剰時間帯の発電力の余剰分を機器Aおよび機器Bのうちの優先順位が高いほうの作動に費やすことができる。これにより、機器Aと機器Bとの作動の優先順位に従って、太陽光発電装置2が発生させた電力を効率的に利用することができる。   According to this configuration, when the surplus of generated power is relatively large in the power surplus time zone and the power surplus time zone is relatively short, the power start time is canceled by canceling the already determined operation start time of the device A. The surplus power generated in the surplus time zone can be spent on the higher priority operation of the devices A and B. Thereby, according to the priority of the operation | movement with the apparatus A and the apparatus B, the electric power which the solar power generation device 2 generated can be utilized efficiently.

太陽光発電装置2の給電システム1において、情報処理端末装置100は、複数の所定の家電機器を同時に作動させることが可能な程度に発電電力に余剰が生じる電力余剰時間帯が存在しないことが判断される場合に、複数の所定の家電機器のそれぞれの作動時間を合わせた時間が、発電電力に余剰が生じる電力余剰時間帯の時間よりも長いことが判断されるときには、互いに異なる所定の家電機器のそれぞれの作動時期が重ならないように、複数の所定の家電機器のそれぞれの運転開始時刻を所定の優先順位に従って決定する。   In the power feeding system 1 of the solar power generation device 2, the information processing terminal device 100 determines that there is no power surplus time zone in which surplus in generated power is present to the extent that a plurality of predetermined home appliances can be operated simultaneously. When it is determined that the combined operating time of a plurality of predetermined home appliances is longer than the time of the power surplus time zone in which surplus in generated power is generated, different predetermined home appliances The operation start times of a plurality of predetermined home appliances are determined in accordance with a predetermined priority order so that the respective operation timings do not overlap.

このように判断されるときは、電力余剰時間帯において発電力の余剰分が比較的小さく、且つ、電力余剰時間帯が比較的短いときである。したがって、この構成によれば、電力余剰時間帯において発電力の余剰分が比較的小さく、且つ、電力余剰時間帯が比較的短いときには、当該電力余剰時間帯の発電力の余剰分を一の所定の家電機器および別の所定の家電機器のうちの優先順位が高いほうの作動に費やすことができる。これにより、各所定の家電機器の作動の優先順位に従って、太陽光発電装置2が発生させた電力を効率的に利用することができる。   The determination is made when the surplus of generated power is relatively small in the power surplus time zone and the power surplus time zone is relatively short. Therefore, according to this configuration, when the surplus of the generated power is relatively small in the power surplus time zone and the power surplus time zone is relatively short, the surplus of the generated power in the power surplus time zone is set to one predetermined amount. Can be spent on the higher priority operation of the other home appliances and another predetermined home appliance. Thereby, according to the priority of the operation | movement of each predetermined household appliance, the electric power which the solar power generation device 2 generated can be utilized efficiently.

太陽光発電装置2の給電システム1において、情報処理端末装置100は、運転開始時刻が既に決定された機器Aと、機器Aの運転開始時刻が決定された後から運転開始時刻が決定される機器Bとについて、機器Aと機器Bとのそれぞれの作動時期が重ならないように、機器Aの運転開始時刻と機器Bの運転開始時刻とを所定の優先順位に従って決定する。   In the power feeding system 1 of the solar power generation device 2, the information processing terminal device 100 includes the device A whose operation start time has already been determined and the device whose operation start time is determined after the operation start time of the device A is determined. For B, the operation start time of device A and the operation start time of device B are determined according to a predetermined priority order so that the operation timings of device A and device B do not overlap.

情報処理端末装置100は、機器Aの運転開始時刻が既に決定された後に、機器Bの運転開始時刻を決定する場合に、既に決定された機器Aの運転開始時刻を変更せずに機器Bの所定の作動時間に消費される電力を賄うことが可能な電力余剰時間帯が存在しないことが判断されるときであって、機器Aと機器Bとを同時に作動させることが可能な程度に発電電力に余剰が生じる電力余剰時間帯が存在しないことが判断され、且つ、機器Aと機器Bとのそれぞれの作動時間を合わせた時間が、発電電力に余剰が生じる電力余剰時間帯の時間よりも長いことが判断されるときには、機器Aと機器Bとのそれぞれの作動時期が重ならないように、機器Aの運転開始時刻と機器Bの運転開始時刻とを所定の優先順位に従って決定する。   When determining the operation start time of the device B after the operation start time of the device A has already been determined, the information processing terminal device 100 does not change the already determined operation start time of the device A. When it is determined that there is no power surplus time zone that can cover the power consumed during the predetermined operating time, the generated power is such that the devices A and B can be operated simultaneously. It is determined that there is no power surplus time zone in which surplus occurs, and the sum of the operating times of the devices A and B is longer than the time of the power surplus time zone in which surplus power is generated Is determined, the operation start time of the device A and the operation start time of the device B are determined according to a predetermined priority order so that the operation timings of the device A and the device B do not overlap each other.

この構成によれば、電力余剰時間帯において発電力の余剰分が比較的小さく、且つ、電力余剰時間帯が比較的短いときには、既に決定された機器Aの運転開始時刻を取り消すことにより、当該電力余剰時間帯の発電力の余剰分を機器Aおよび機器Bのうちの優先順位が高いほうの作動に費やすことができる。これにより、機器Aと機器Bとの作動の優先順位に従って、太陽光発電装置2が発生させた電力を効率的に利用することができる。   According to this configuration, when the surplus of the generated power is relatively small in the power surplus time zone and the power surplus time zone is relatively short, the power start time is canceled by canceling the already determined operation start time of the device A. The surplus power generated in the surplus time zone can be spent on the higher priority operation of the devices A and B. Thereby, according to the priority of the operation | movement with the apparatus A and the apparatus B, the electric power which the solar power generation device 2 generated can be utilized efficiently.

太陽光発電装置2の給電システム1において、所定の優先順位は、予めユーザによって設定される。   In the power feeding system 1 of the solar power generation device 2, the predetermined priority order is set in advance by the user.

このようにすることにより、ユーザによって設定された順に沿って、太陽光発電装置2が発生させた電力の余剰分を所定の家電機器から順に効率よく利用することができる。   By doing in this way, the surplus of the electric power which the solar power generation device 2 generated can be efficiently used in order from a predetermined household appliance along the order set by the user.

太陽光発電装置2の給電システム1において、所定の優先順位は、複数の所定の家電機器において、所定の作動時間に消費される電力が大きい機器から小さい機器の順である。   In the power feeding system 1 of the solar power generation device 2, the predetermined priority order is an order from a device having a large power consumption to a device having a small amount of power consumed during a predetermined operation time in a plurality of predetermined home appliances.

このようにすることにより、消費電力が大きい順に沿って、太陽光発電装置2が発生させた電力の余剰分を所定の家電機器から順に効率よく利用することができる。   By doing in this way, the surplus of the electric power which the solar power generation device 2 generate | occur | produced can be utilized efficiently in an order from predetermined household appliances along the order with big power consumption.

太陽光発電装置2の給電システム1において、情報処理端末装置100は、発電電力に余剰が生じる電力余剰時間帯の起点に所定の家電機器の運転開始時刻が略一致するように、あるいは、発電電力に余剰が生じる電力余剰時間帯の終点に所定の家電機器の運転完了時刻が略一致するように、所定の家電機器の運転開始時刻を決定する。   In the power feeding system 1 of the solar power generation device 2, the information processing terminal device 100 allows the operation start time of a predetermined home appliance to substantially coincide with the starting point of the power surplus time zone in which surplus in the generated power occurs, or the generated power The operation start time of the predetermined home appliance is determined so that the operation completion time of the predetermined home appliance substantially coincides with the end point of the power surplus time zone in which surplus occurs.

この構成によれば、電力余剰時間帯の起点から所定の家電機器の作動を開始させる場合には、当該所定の家電機器の運転終了後の比較的長い時間帯において、発電電力の余剰分を残すことができる。一方、電力余剰時間帯の終点に所定の家電機器の運転終了時間を合わせる場合には、当該所定の家電機器の運転開始前の比較的長い時間帯において、発電電力の余剰分を残すことができる。このように、この構成によれば、後に運転開始時刻が決定される所定の家電機器が電力余剰時間帯における発電量の余剰分を利用しやすくなる。そのため、太陽光発電装置2が発生させた電力を効率的に利用することができる。   According to this configuration, when starting the operation of a predetermined home appliance from the starting point of the power surplus time zone, the surplus generated power is left in a relatively long time zone after the operation of the predetermined home appliance is completed. be able to. On the other hand, when the operation end time of a predetermined home appliance is matched with the end point of the power surplus time zone, the surplus generated power can be left in a relatively long time zone before the start of operation of the predetermined home appliance. . Thus, according to this configuration, it becomes easy for a predetermined home appliance whose operation start time is determined later to use the surplus of the power generation amount in the power surplus time zone. Therefore, the electric power generated by the solar power generation device 2 can be used efficiently.

太陽光発電装置2の給電システム1において、情報処理端末装置100は、所定の家電機器の特性に応じて所定の家電機器の運転開始時刻を決定する。   In the power feeding system 1 of the solar power generation device 2, the information processing terminal device 100 determines the operation start time of a predetermined home appliance according to the characteristics of the predetermined home appliance.

このようにすることにより、所定の家電機器の特性に応じて、発電電力に余剰が生じる電力余剰時間帯の起点に所定の家電機器の運転開始時刻が略一致するように、または、発電電力に余剰が生じる電力余剰時間帯の終点に所定の家電機器の運転完了時刻が略一致するように、所定の家電機器の運転開始時刻を決定することができる。このように、この構成によれば、太陽光発電装置2が発生させた電力を効率的に利用することができ、且つ、電力余剰時間帯において所定の家電機器を当該家電機器の特性に応じて運転させることができる。   By doing in this way, depending on the characteristics of the predetermined home appliance, the operation start time of the predetermined home appliance substantially coincides with the starting point of the power surplus time zone in which surplus in the generated power occurs, or the generated power The operation start time of the predetermined home appliance can be determined so that the operation completion time of the predetermined home appliance substantially coincides with the end point of the power surplus time zone in which surplus occurs. Thus, according to this structure, the electric power generated by the solar power generation device 2 can be efficiently used, and a predetermined home appliance is used in accordance with the characteristics of the home appliance in the power surplus time zone. Can be driven.

太陽光発電装置2の給電システム1において、所定の家電機器は、洗濯乾燥機900である。太陽光発電装置2の給電システム1において、情報処理端末装置100は、発電電力に余剰が生じる電力余剰時間帯の終点に洗濯乾燥機900の運転完了時刻が略一致するように、洗濯乾燥機900の運転開始時刻を決定する。   In the power feeding system 1 of the solar power generation device 2, the predetermined home appliance is a washing / drying machine 900. In the power feeding system 1 of the solar power generation device 2, the information processing terminal device 100 is configured so that the operation completion time of the washing / drying machine 900 substantially coincides with the end point of the power surplus time zone in which the generated power is surplus. The operation start time is determined.

洗濯乾燥機900の運転は、ユーザが希望した時刻に対してなるべく近い時間に完了させる。この構成のように、発電電力に余剰が生じる電力余剰時間帯の終点に洗濯乾燥機900の運転完了時刻が略一致するように、情報処理端末装置100が洗濯乾燥機900の運転開始時刻を決定することにより、ユーザが希望した時刻に近い時間に、洗濯乾燥機900の運転を完了させることができる。すなわち、この構成によれば、洗濯乾燥機900の利便性を向上させることができる。   The operation of the washer / dryer 900 is completed as close as possible to the time desired by the user. As in this configuration, the information processing terminal device 100 determines the operation start time of the washer / dryer 900 so that the operation completion time of the washer / dryer 900 substantially coincides with the end point of the surplus power time zone in which surplus power generation occurs. Thus, the operation of the washer / dryer 900 can be completed at a time close to the time desired by the user. That is, according to this configuration, the convenience of the washing / drying machine 900 can be improved.

以上に開示された実施の形態はすべての点で例示であって制限的なものではないと考慮されるべきである。本発明の範囲は、以上の実施の形態ではなく、特許請求の範囲によって示され、特許請求の範囲と均等の意味および範囲内でのすべての修正と変形を含むものである。   The embodiment disclosed above should be considered as illustrative in all points and not restrictive. The scope of the present invention is shown not by the above embodiments but by the scope of claims, and includes all modifications and variations within the meaning and scope equivalent to the scope of claims.

1:給電システム、2:太陽光発電装置、3:電源切替装置、5:冷蔵庫、100:情報処理端末装置、121:情報受信部、122:情報送信部、123:演算部、124:記憶部、126:判定部、127:決定部、900:洗濯乾燥機、910:表示部、932:回転ドラム、950:制御部、951:記憶部、953:情報送信部、957:容量検知部
1: Power feeding system, 2: Solar power generation device, 3: Power supply switching device, 5: Refrigerator, 100: Information processing terminal device, 121: Information receiving unit, 122: Information transmitting unit, 123: Calculation unit, 124: Storage unit , 126: determination unit, 127: determination unit, 900: washing dryer, 910: display unit, 932: rotating drum, 950: control unit, 951: storage unit, 953: information transmission unit, 957: capacity detection unit

Claims (30)

太陽光発電装置と、
少なくとも前記太陽光発電装置が発電させた電力によって作動し、所定の家電機器と前記所定の家電機器以外の他の家電機器とを含む複数の家電機器と、
前記複数の家電機器と前記太陽光発電装置とが通信可能であるようにネットワーク接続され、前記太陽光発電装置の過去の発電電力量の時間的推移の情報と、前記他の家電機器の過去の消費電力量の時間的推移の情報とから発電電力に余剰が生じる時間帯を推定し、推定された時間帯の結果を電力余剰時間帯情報として記憶し、前記所定の家電機器が実際に作動する時間の情報として前記所定の家電機器から受け取る作動時間情報と、前記電力余剰時間帯情報とに基づいて前記所定の家電機器の運転開始時刻を決定する情報処理端末装置とを備えた、太陽光発電装置の給電システム。
A solar power generator,
A plurality of household electrical appliances that operate with at least the electric power generated by the solar power generation device, and include predetermined household electrical appliances and other household electrical appliances other than the predetermined household electrical appliances;
The plurality of home appliances and the solar power generation device are connected to a network so that they can communicate, information on the temporal transition of the past power generation amount of the solar power generation device, and the past of the other home appliances Estimate a time zone in which surplus in generated power is generated from information on temporal transition of power consumption, store the estimated time zone result as power surplus time zone information, and the predetermined home appliance actually operates Photovoltaic power generation comprising an information processing terminal device that determines an operation start time of the predetermined household electrical appliance based on operating time information received from the predetermined household electrical appliance as time information and the power surplus time zone information Equipment power supply system.
前記情報処理端末装置によって決定された前記運転開始時刻、または、前記運転開始時刻と前記作動時間情報とに対応した前記所定の家電機器の運転完了時刻を、前記情報処理端末装置または前記所定の家電機器に表示させる、
請求項1に記載の太陽光発電装置の給電システム。
The operation start time determined by the information processing terminal device or the operation completion time of the predetermined home appliance corresponding to the operation start time and the operation time information is set as the information processing terminal device or the predetermined home appliance. Display on the device,
The power feeding system of the solar power generation device according to claim 1.
請求項1または請求項2に記載の太陽光発電装置の給電システムに用いられる前記所定の家電機器としての洗濯乾燥機であって、
制御部と、被洗浄対象物を収容する収容槽とを備え、
前記制御部は、
前記収容槽に収容される被洗浄対象物の容量を検知する容量検知部と、
当該洗濯乾燥機の複数の運転モードと、前記容量検知部によって検知された被洗浄対象物の容量または前記各運転モードに応じて設定された前記作動時間情報とを記憶する記憶部と、
前記記憶部に記憶された前記作動時間情報のうち、前記容量検知部によって検知された被洗浄対象物の容量または前記各運転モードに対応した前記作動時間情報を前記情報処理端末装置に送信する情報送信部とを有している、洗濯乾燥機。
A washing / drying machine as the predetermined home appliance used in the power feeding system of the solar power generation device according to claim 1 or 2,
A control unit and a storage tank for storing the object to be cleaned;
The controller is
A capacity detecting unit for detecting the capacity of the object to be cleaned contained in the containing tank;
A storage unit that stores a plurality of operation modes of the washing and drying machine, and a capacity of an object to be cleaned detected by the capacity detection unit or the operation time information set according to each operation mode;
Information for transmitting the operation time information corresponding to the volume of the object to be cleaned detected by the capacity detection unit or the operation modes among the operation time information stored in the storage unit to the information processing terminal device A washer / dryer having a transmitter.
前記情報処理端末装置によって決定された前記運転開始時刻、または、前記運転開始時刻と前記作動時間情報とに対応した当該洗濯乾燥機の運転完了時刻を表示する表示部をさらに備えた、請求項3に記載の洗濯乾燥機。   The display unit for displaying the operation start time determined by the information processing terminal device or the operation completion time of the washing / drying machine corresponding to the operation start time and the operation time information is further provided. The washing dryer as described in. 請求項1または請求項2に記載の太陽光発電装置の給電システムに用いられる情報処理端末装置であって、
前記太陽光発電装置の過去の発電電力量の時間的推移の情報と、前記他の家電機器の過去の消費電力量の時間的推移の情報とから発電電力に余剰が生じる時間帯を推定する推定部と、
前記推定部によって推定された時間帯の結果を前記電力余剰時間帯情報として記憶する記憶部と、
前記所定の家電機器から前記作動時間情報を受け取る情報受信部と、
前記情報受信部が受け取った前記作動時間情報と、前記記憶部が記憶した前記電力余剰時間帯情報とに基づき、前記所定の家電機器の所定の作動時間に消費される電力を賄うことが可能な電力余剰時間帯が存在するか否かを判定する判定部と、
前記判定部の判定結果に基づいて、前記所定の家電機器の運転開始時刻を決定する決定部とを有する、情報処理端末装置。
An information processing terminal device used in the power feeding system of the solar power generation device according to claim 1 or 2,
Estimation for estimating a time zone in which surplus in generated power occurs from information on temporal transition of past power generation amount of the photovoltaic power generation apparatus and information on temporal transition of past power consumption amount of the other home appliances And
A storage unit that stores the result of the time zone estimated by the estimation unit as the power surplus time zone information;
An information receiver that receives the operating time information from the predetermined home appliance;
Based on the operation time information received by the information receiving unit and the power surplus time zone information stored by the storage unit, it is possible to cover power consumed during a predetermined operation time of the predetermined home appliance. A determination unit that determines whether or not a power surplus time zone exists;
An information processing terminal device comprising: a determination unit that determines an operation start time of the predetermined home appliance based on a determination result of the determination unit.
前記情報受信部は、前記作動時間情報として、使用者が希望する運転完了希望時刻の情報を前記所定の家電機器からさらに受け取り、
前記判定部は、前記情報受信部が受け取った運転完了希望時刻の情報を含む前記作動時間情報と、前記記憶部が記憶した前記電力余剰時間帯情報とに基づき、前記所定の家電機器の所定の作動時間に消費される電力を賄うことが可能な電力余剰時間帯が前記運転完了希望時刻までに存在するか否かを判定する、請求項5に記載の情報処理端末装置。
The information receiving unit further receives, as the operation time information, information on a desired operation completion time desired by a user from the predetermined home appliance,
The determination unit, based on the operation time information including information on the desired operation completion time received by the information reception unit, and the power surplus time zone information stored in the storage unit, The information processing terminal device according to claim 5, wherein it is determined whether or not a power surplus time zone that can cover the power consumed during the operation time exists by the desired operation completion time.
前記決定部によって決定された前記運転開始時刻、または、前記運転開始時刻と前記作動時間情報とに対応した前記所定の家電機器の運転完了時刻を、前記所定の家電機器に表示させる、請求項5または請求項6に記載の情報処理端末装置。   The operation start time determined by the determination unit or the operation completion time of the predetermined home appliance corresponding to the operation start time and the operation time information is displayed on the predetermined home appliance. Or the information processing terminal device according to claim 6. 前記判定部により、前記所定の家電機器の所定の作動時間に消費される電力を賄うことが可能な電力余剰時間帯が存在しないことが判定される場合には、前記所定の家電機器に、作動時間が短縮された運転を実行させる、
請求項5から請求項7までのいずれか1項に記載の情報処理端末装置。
When it is determined by the determination unit that there is no power surplus time zone that can cover power consumed during a predetermined operation time of the predetermined home appliance, the predetermined home appliance is activated. To run a run with reduced time,
The information processing terminal device according to any one of claims 5 to 7.
請求項5から請求項8までのいずれか1項に記載の情報処理端末装置と通信可能であるようにネットワーク接続された前記所定の家電機器としての洗濯乾燥機であって、
制御部と、被洗浄対象物を収容する収容槽とを備え、
前記制御部は、
前記収容槽に収容される被洗浄対象物の容量を検知する容量検知部と、
当該洗濯乾燥機の複数の運転モードと、前記容量検知部によって検知された被洗浄対象物の容量または前記各運転モードに応じて設定された前記作動時間情報とを記憶する記憶部と、
前記記憶部に記憶された前記作動時間情報のうち、前記容量検知部によって検知された被洗浄対象物の容量または前記各運転モードに対応した前記作動時間情報を前記情報処理端末装置に送信する情報送信部とを有し、
前記情報処理端末装置の前記判定部により、当該洗濯乾燥機の所定の作動時間に消費される電力を賄うことが可能な電力余剰時間帯が存在しないことが判定される場合には、作動時間が短縮された運転を実行する、洗濯乾燥機。
A washing / drying machine as the predetermined home appliance connected to the network so as to be communicable with the information processing terminal device according to any one of claims 5 to 8,
A control unit and a storage tank for storing the object to be cleaned;
The controller is
A capacity detecting unit for detecting the capacity of the object to be cleaned contained in the containing tank;
A storage unit that stores a plurality of operation modes of the washing and drying machine, and a capacity of an object to be cleaned detected by the capacity detection unit or the operation time information set according to each operation mode;
Information for transmitting the operation time information corresponding to the volume of the object to be cleaned detected by the capacity detection unit or the operation modes among the operation time information stored in the storage unit to the information processing terminal device A transmission unit,
When the determination unit of the information processing terminal device determines that there is no power surplus time zone that can cover the power consumed during the predetermined operation time of the washing and drying machine, the operation time A washing and drying machine that performs shortened driving.
当該太陽光発電装置の給電システムは、前記複数の家電機器が使用する電力を、商用電源から供給される電力と前記太陽光発電装置が発電させた電力とのいずれかまたは両方に切り替える電源切替装置をさらに備え、
前記決定部は、前記判定部により、前記所定の家電機器の所定の作動時間に消費される電力を賄うことが可能な電力余剰時間帯が存在しないことが判定される場合には、前記所定の作動時間に消費される電力と、前記太陽光発電装置の発電電力の余剰分との差の電力が、商用電源から前記所定の家電機器に供給されるように、商用電源から供給される電力と前記太陽光発電装置が発電させた電力とを前記電源切替装置に切り替えさせる、
請求項5から請求項7までのいずれか1項に記載の情報処理端末装置。
The power supply system of the solar power generation device is a power supply switching device that switches power used by the plurality of home appliances to one or both of power supplied from a commercial power source and power generated by the solar power generation device. Further comprising
When the determination unit determines that there is no power surplus time zone that can cover power consumed during a predetermined operation time of the predetermined home appliance, the determination unit Power supplied from a commercial power source so that a difference between the power consumed during the operation time and the surplus power generated by the solar power generation device is supplied from a commercial power source to the predetermined home appliance The power generated by the solar power generation device is switched to the power switching device,
The information processing terminal device according to any one of claims 5 to 7.
商用電源から供給される電力の時間帯には、通常の時間帯の電力単価よりも安い電力単価が設定された時間帯である深夜時間帯が含まれ、
前記決定部は、前記判定部により、前記所定の家電機器の所定の作動時間に消費される電力を賄うことが可能な電力余剰時間帯が存在しないことが判定される場合には、前記所定の家電機器に商用電源から電力が供給されるように、商用電源から供給される電力と前記太陽光発電装置が発電させた電力とを前記電源切替装置に切り替えさせ、且つ、前記所定の家電機器に深夜時間帯の電力を使用させる、
請求項10に記載の情報処理端末装置。
The time zone of power supplied from the commercial power source includes the midnight time zone, which is the time zone in which the unit price of electricity is set lower than the unit price of electricity in the normal time zone,
When the determination unit determines that there is no power surplus time zone that can cover power consumed during a predetermined operation time of the predetermined home appliance, the determination unit The electric power supplied from the commercial power supply and the electric power generated by the solar power generation device are switched to the power supply switching device so that the electric power is supplied from the commercial power supply to the home appliance, and the predetermined home appliance is To use the power of late-night hours,
The information processing terminal device according to claim 10.
請求項1に記載の太陽光発電装置の給電システムに用いられる前記所定の家電機器としての冷蔵庫であって、
前記作動時間情報は、当該冷蔵庫が実際に除霜動作として作動する時間の情報として当該冷蔵庫から受け取る除霜動作時間の情報であり、
前記運転開始時刻は、当該冷蔵庫の除霜動作の開始時刻であり、
前記除霜動作時間の情報が、過去の除霜動作時間の情報に基づいて当該冷蔵庫によって推定された除霜動作時間の情報である、冷蔵庫。
A refrigerator as the predetermined home appliance used in the power feeding system of the photovoltaic power generator according to claim 1,
The operating time information is information on a defrosting operation time received from the refrigerator as information on a time at which the refrigerator actually operates as a defrosting operation,
The operation start time is the start time of the defrosting operation of the refrigerator,
The refrigerator in which the information on the defrosting operation time is information on the defrosting operation time estimated by the refrigerator based on the information on the past defrosting operation time.
当該冷蔵庫は、過去の除霜動作時間の情報に基づいて除霜動作の開始制限時刻を推定し、さらに、推定した前記開始制限時刻に前記除霜動作時間を加算することによって除霜動作の完了制限時刻を算出する、請求項12に記載の冷蔵庫。   The refrigerator estimates the defrosting operation start time based on the past defrosting operation time information, and further completes the defrosting operation by adding the defrosting operation time to the estimated start time limit. The refrigerator according to claim 12, wherein the time limit is calculated. 当該冷蔵庫は、当該冷蔵庫の除霜動作時間に消費される電力を賄うことが可能な電力余剰時間帯が存在しない場合には、前記情報処理端末装置によって推定された余剰が生じる時間帯のうちの最長の時間帯において今回の除霜動作を行い、且つ、次回の除霜動作の開始時期を通常の状態よりも繰り上げる、請求項12または請求項13に記載の冷蔵庫。   If there is no power surplus time zone that can cover the power consumed during the defrosting operation time of the refrigerator, the refrigerator is out of the time zone in which the surplus estimated by the information processing terminal device occurs The refrigerator according to claim 12 or 13, wherein the present defrosting operation is performed in the longest time zone, and the start time of the next defrosting operation is advanced from a normal state. 前記情報処理端末装置は、複数の前記所定の家電機器について、互いに異なる前記所定の家電機器のそれぞれの作動時期の少なくとも一部同士が重なるように、複数の前記所定の家電機器の運転開始時刻を同時に決定する、
請求項1に記載の太陽光発電装置の給電システム。
The information processing terminal device sets the operation start times of the plurality of predetermined household electrical appliances so that at least some of the operation times of the predetermined household electrical appliances different from each other overlap each other for the plurality of predetermined household electrical appliances. Decide at the same time,
The power feeding system of the solar power generation device according to claim 1.
前記情報処理端末装置は、複数の前記所定の家電機器を同時に作動させることが可能な程度に発電電力に余剰が生じる電力余剰時間帯が存在することが判断される場合に、複数の前記所定の家電機器のうち全ての家電機器の作動時間が、発電電力に余剰が生じる電力余剰時間帯の時間以下であることが判断されるときには、互いに異なる前記所定の家電機器のそれぞれの作動時期の少なくとも一部同士が重なるように複数の前記所定の家電機器のそれぞれの運転開始時刻を決定する、
請求項15に記載の太陽光発電装置の給電システム。
The information processing terminal device, when it is determined that there is a power surplus time zone in which surplus in generated power is generated to such an extent that a plurality of the predetermined home appliances can be operated simultaneously, When it is determined that the operation time of all the home appliances among the home appliances is equal to or less than the time of the power surplus time zone in which the generated power is surplus, at least one of the operation timings of the predetermined home appliances different from each other Determining the operation start time of each of the plurality of predetermined home appliances so that the parts overlap each other;
The power feeding system of the solar power generation device according to claim 15.
運転開始時刻が既に決定された少なくとも一つの第1の前記所定の家電機器と、第1の前記所定の家電機器の運転開始時刻が決定された後から運転開始時刻が決定される第2の前記所定の家電機器とについて、前記情報処理端末装置は、
第1の前記所定の家電機器の運転開始時刻が既に決定された後に、第2の前記所定の家電機器の運転開始時刻を決定する場合に、既に決定された第1の前記所定の家電機器の運転開始時刻を変更せずに第2の前記所定の家電機器の所定の作動時間に消費される電力を賄うことが可能な電力余剰時間帯が存在しないことが判断されるときであって、第1の前記所定の家電機器と第2の前記所定の家電機器とを同時に作動させることが可能な程度に発電電力に余剰が生じる電力余剰時間帯が存在することが判断され、且つ、第1の前記所定の家電機器と第2の前記所定の家電機器とのうち全ての家電機器の作動時間が、発電電力に余剰が生じる電力余剰時間帯の時間以下であることが判断されるときには、既に決定された第1の前記所定の家電機器の運転開始時刻を変更するように、且つ、第1の前記所定の家電機器の作動時期の一部と第2の前記所定の家電機器の作動時期の一部とが重なるように、第1の前記所定の家電機器の運転開始時刻および第2の前記所定の家電機器の運転開始時刻を決定する、
請求項15または請求項16に記載の太陽光発電装置の給電システム。
At least one first predetermined home appliance whose operation start time has already been determined, and the second start operation time determined after the operation start time of the first predetermined home appliance has been determined About the predetermined home appliance, the information processing terminal device
When the operation start time of the second predetermined household electrical appliance is determined after the operation start time of the first predetermined household electrical appliance is already determined, the first predetermined household electrical appliance already determined is determined. When it is determined that there is no power surplus time zone that can cover the power consumed during the predetermined operation time of the second predetermined home appliance without changing the operation start time, It is determined that there is a power surplus time zone in which surplus in generated power exists to the extent that the predetermined home appliance of 1 and the second home appliance can be operated simultaneously, and the first When it is determined that the operation time of all the household electrical appliances of the predetermined household electrical appliance and the second predetermined household electrical appliance is equal to or less than the time of the power surplus time zone in which surplus in generated power occurs The first predetermined home appliance So that the operation start time of the first predetermined household electrical appliance is changed and a part of the operation timing of the second predetermined household electrical appliance overlaps with a part of the operation timing of the second predetermined household electrical appliance. Determining the operation start time of the predetermined home appliance and the operation start time of the second predetermined home appliance;
The power feeding system of the solar power generation device according to claim 15 or claim 16.
前記情報処理端末装置は、複数の前記所定の家電機器について、互いに異なる前記所定の家電機器のそれぞれの作動時期が重ならないように、複数の前記所定の家電機器の運転開始時刻を同時に決定する、
請求項1に記載の太陽光発電装置の給電システム。
The information processing terminal device simultaneously determines the operation start times of the plurality of predetermined household electrical appliances so that the operation times of the predetermined household electrical appliances different from each other do not overlap with each other for the plurality of predetermined household electrical appliances.
The power feeding system of the solar power generation device according to claim 1.
前記情報処理端末装置は、複数の前記所定の家電機器を同時に作動させることが可能な程度に発電電力に余剰が生じる電力余剰時間帯が存在しないことが判断される場合に、複数の前記所定の家電機器のそれぞれの作動時間を合わせた時間が、発電電力に余剰が生じる電力余剰時間帯の時間以下であることが判断されるときには、互いに異なる前記所定の家電機器のそれぞれの作動時期が重ならないように、複数の前記所定の家電機器のそれぞれの運転開始時刻を決定する、
請求項18に記載の太陽光発電装置の給電システム。
The information processing terminal device, when it is determined that there is no power surplus time zone in which the generated power is surplus to the extent that the plurality of the predetermined home appliances can be operated simultaneously, When it is determined that the combined operation time of the home appliances is equal to or less than the time of the power surplus time zone in which the generated power is surplus, the operation timings of the predetermined home appliances different from each other do not overlap. So as to determine the operation start time of each of the plurality of predetermined home appliances,
The electric power feeding system of the solar power generation device of Claim 18.
運転開始時刻が既に決定された少なくとも一つの第1の前記所定の家電機器と、第1の前記所定の家電機器の運転開始時刻が決定された後から運転開始時刻が決定される第2の前記所定の家電機器とについて、前記情報処理端末装置は、
第1の前記所定の家電機器の運転開始時刻が既に決定された後に、第2の前記所定の家電機器の運転開始時刻を決定する場合に、既に決定された第1の前記所定の家電機器の運転開始時刻を変更せずに第2の前記所定の家電機器の所定の作動時間に消費される電力を賄うことが可能な電力余剰時間帯が存在しないことが判断されるときであって、第1の前記所定の家電機器と第2の前記所定の家電機器とを同時に作動させることが可能な程度に発電電力に余剰が生じる電力余剰時間帯が存在しないことが判断され、且つ、複数の前記所定の家電機器のそれぞれの作動時間を合わせた時間が、発電電力に余剰が生じる電力余剰時間帯の時間以下であることが判断されるときには、既に決定された第1の前記所定の家電機器の運転開始時刻を変更するように、且つ、第1の前記所定の家電機器の作動時期と第2の前記所定の家電機器の作動時期とが重ならないように、第1の前記所定の家電機器の運転開始時刻および第2の前記所定の家電機器の運転開始時刻を決定する、請求項18または請求項19に記載の太陽光発電装置の給電システム。
At least one first predetermined home appliance whose operation start time has already been determined, and the second start operation time determined after the operation start time of the first predetermined home appliance has been determined About the predetermined home appliance, the information processing terminal device
When the operation start time of the second predetermined household electrical appliance is determined after the operation start time of the first predetermined household electrical appliance is already determined, the first predetermined household electrical appliance already determined is determined. When it is determined that there is no power surplus time zone that can cover the power consumed during the predetermined operation time of the second predetermined home appliance without changing the operation start time, It is determined that there is no power surplus time zone in which surplus in generated power is generated to such an extent that the one predetermined household electrical appliance and the second predetermined household electrical appliance can be operated simultaneously, and a plurality of When it is determined that the time obtained by combining the operating times of the predetermined home appliances is equal to or less than the time of the power surplus time zone in which the generated power is surplus, the first predetermined home appliance already determined Change operation start time And the operation start time of the first predetermined home appliance and the first time so that the operation timing of the first predetermined home appliance does not overlap with the operation timing of the second predetermined home appliance. 20. The power feeding system for a solar power generation apparatus according to claim 18 or 19, wherein an operation start time of the predetermined household electrical appliance is determined.
前記情報処理端末装置は、複数の前記所定の家電機器のそれぞれの運転開始時刻を所定の優先順位に従って決定する、請求項18に記載の太陽光発電装置の給電システム。   The said information processing terminal device is the electric power feeding system of the solar power generation device of Claim 18 which determines each driving | operation start time of several said predetermined household appliances according to a predetermined priority. 前記情報処理端末装置は、複数の前記所定の家電機器を同時に作動させることが可能な程度に発電電力に余剰が生じる電力余剰時間帯が存在することが判断される場合に、複数の前記所定の家電機器のうち全ての家電機器の作動時間が、発電電力に余剰が生じる電力余剰時間帯の時間よりも長いことが判断されるときには、互いに異なる前記所定の家電機器のそれぞれの作動時期が重ならないように、複数の前記所定の家電機器のそれぞれの運転開始時刻を所定の優先順位に従って決定する、
請求項21に記載の太陽光発電装置の給電システム。
The information processing terminal device, when it is determined that there is a power surplus time zone in which surplus in generated power is generated to such an extent that a plurality of the predetermined home appliances can be operated simultaneously, When it is determined that the operation time of all the home appliances out of the home appliances is longer than the time of the power surplus time zone in which surplus in generated power occurs, the respective operation times of the predetermined home appliances different from each other do not overlap So as to determine the operation start time of each of the plurality of predetermined home appliances according to a predetermined priority order,
The power feeding system of the solar power generation device according to claim 21.
運転開始時刻が既に決定された少なくとも一つの第1の前記所定の家電機器と、第1の前記所定の家電機器の運転開始時刻が決定された後から運転開始時刻が決定される第2の前記所定の家電機器とについて、前記情報処理端末装置は、
第1の前記所定の家電機器の運転開始時刻が既に決定された後に、第2の前記所定の家電機器の運転開始時刻を決定する場合に、既に決定された第1の前記所定の家電機器の運転開始時刻を変更せずに第2の前記所定の家電機器の所定の作動時間に消費される電力を賄うことが可能な電力余剰時間帯が存在しないことが判断されるときであって、第1の前記所定の家電機器と第2の前記所定の家電機器とを同時に作動させることが可能な程度に発電電力に余剰が生じる電力余剰時間帯が存在することが判断され、且つ、複数の前記所定の家電機器のうち全ての家電機器の作動時間が、発電電力に余剰が生じる電力余剰時間帯の時間よりも長いことが判断されるときには、既に決定された第1の前記所定の家電機器の運転開始時刻を取り消したうえで、第1の前記所定の家電機器の運転開始時刻または第2の前記所定の家電機器の運転開始時刻を所定の優先順位に従って決定する、請求項21または請求項22に記載の太陽光発電装置の給電システム。
At least one first predetermined home appliance whose operation start time has already been determined, and the second start operation time determined after the operation start time of the first predetermined home appliance has been determined About the predetermined home appliance, the information processing terminal device
When the operation start time of the second predetermined household electrical appliance is determined after the operation start time of the first predetermined household electrical appliance is already determined, the first predetermined household electrical appliance already determined is determined. When it is determined that there is no power surplus time zone that can cover the power consumed during the predetermined operation time of the second predetermined home appliance without changing the operation start time, It is determined that there is an electric power surplus time zone in which surplus in generated power is generated to the extent that the predetermined electric home appliance of one and the second predetermined electric home appliance can be operated simultaneously, and a plurality of the electric appliances When it is determined that the operation time of all the household electrical appliances among the predetermined household electrical appliances is longer than the time of the power surplus time zone in which surplus in the generated power occurs, the first predetermined household electrical appliance that has already been determined Canceled operation start time 23. The photovoltaic power generation according to claim 21 or claim 22, wherein the operation start time of the first predetermined home appliance or the operation start time of the second predetermined home appliance is determined according to a predetermined priority. Equipment power supply system.
前記情報処理端末装置は、複数の前記所定の家電機器を同時に作動させることが可能な程度に発電電力に余剰が生じる電力余剰時間帯が存在しないことが判断される場合に、複数の前記所定の家電機器のそれぞれの作動時間を合わせた時間が、発電電力に余剰が生じる電力余剰時間帯の時間よりも長いことが判断されるときには、互いに異なる前記所定の家電機器のそれぞれの作動時期が重ならないように、複数の前記所定の家電機器のそれぞれの運転開始時刻を所定の優先順位に従って決定する、
請求項21または請求項22に記載の太陽光発電装置の給電システム。
The information processing terminal device, when it is determined that there is no power surplus time zone in which the generated power is surplus to the extent that the plurality of the predetermined home appliances can be operated simultaneously, When it is determined that the combined operation time of the home appliances is longer than the time of the power surplus time zone in which surplus in generated power occurs, the respective operation timings of the predetermined home appliances different from each other do not overlap So as to determine the operation start time of each of the plurality of predetermined home appliances according to a predetermined priority order,
The power feeding system of the solar power generation device according to claim 21 or claim 22.
運転開始時刻が既に決定された少なくとも一つの第1の前記所定の家電機器と、第1の前記所定の家電機器の運転開始時刻が決定された後から運転開始時刻が決定される第2の前記所定の家電機器とについて、前記情報処理端末装置は、
第1の前記所定の家電機器の運転開始時刻が既に決定された後に、第2の前記所定の家電機器の運転開始時刻を決定する場合に、既に決定された第1の前記所定の家電機器の運転開始時刻を変更せずに第2の前記所定の家電機器の所定の作動時間に消費される電力を賄うことが可能な電力余剰時間帯が存在しないことが判断されるときであって、第1の前記所定の家電機器と第2の前記所定の家電機器とを同時に作動させることが可能な程度に発電電力に余剰が生じる電力余剰時間帯が存在しないことが判断され、且つ、複数の前記所定の家電機器のそれぞれの作動時間を合わせた時間が、発電電力に余剰が生じる電力余剰時間帯の時間よりも長いことが判断されるときには、互いに異なる前記所定の家電機器のそれぞれの作動時期が重ならないように、複数の前記所定の家電機器のそれぞれの運転開始時刻を所定の優先順位に従って決定する、
請求項21または請求項22に記載の太陽光発電装置の給電システム。
At least one first predetermined home appliance whose operation start time has already been determined, and the second start operation time determined after the operation start time of the first predetermined home appliance has been determined About the predetermined home appliance, the information processing terminal device
When the operation start time of the second predetermined household electrical appliance is determined after the operation start time of the first predetermined household electrical appliance is already determined, the first predetermined household electrical appliance already determined is determined. When it is determined that there is no power surplus time zone that can cover the power consumed during the predetermined operation time of the second predetermined home appliance without changing the operation start time, It is determined that there is no power surplus time zone in which surplus in generated power is generated to such an extent that the one predetermined household electrical appliance and the second predetermined household electrical appliance can be operated simultaneously, and a plurality of When it is determined that the time obtained by combining the operation times of the predetermined home appliances is longer than the time of the power surplus time zone in which surplus in the generated power occurs, the respective operation timings of the predetermined home appliances different from each other If heavy In odd, to determine the respective operation start time of the plurality of the predetermined home appliance according to a predetermined priority order,
The power feeding system of the solar power generation device according to claim 21 or claim 22.
前記所定の優先順位は、予めユーザによって設定される、
請求項21から請求項25までのいずれか1項に記載の太陽光発電装置の給電システム。
The predetermined priority is set in advance by a user,
The power feeding system for a solar power generation apparatus according to any one of claims 21 to 25.
前記所定の優先順位は、複数の前記所定の家電機器において、所定の作動時間に消費される電力が大きい機器から小さい機器の順である、
請求項21から請求項25までのいずれか1項に記載の太陽光発電装置の給電システム。
In the plurality of predetermined home appliances, the predetermined priority order is an order from a device having a large power consumed in a predetermined operation time to a device having a small power.
The power feeding system for a solar power generation apparatus according to any one of claims 21 to 25.
前記情報処理端末装置は、発電電力に余剰が生じる電力余剰時間帯の起点に前記所定の家電機器の運転開始時刻が略一致するように、あるいは、発電電力に余剰が生じる電力余剰時間帯の終点に前記所定の家電機器の運転完了時刻が略一致するように、前記所定の家電機器の運転開始時刻を決定する、請求項1または請求項15から請求項27までのいずれか1項に記載の太陽光発電装置の給電システム。   The information processing terminal device is configured such that an operation start time of the predetermined home appliance substantially coincides with a starting point of a power surplus time zone where surplus in generated power occurs, or an end point of a power surplus time zone where surplus in generated power occurs The operation start time of the predetermined home appliance is determined so that the operation completion time of the predetermined home appliance substantially coincides with the predetermined home appliance, and the operation start time of the predetermined home appliance is determined according to any one of claims 15 to 27. Photovoltaic power supply system. 前記情報処理端末装置は、前記所定の家電機器の特性に応じて前記所定の家電機器の運転開始時刻を決定する、請求項28に記載の太陽光発電装置の給電システム。   The power supply system for a solar power generation device according to claim 28, wherein the information processing terminal device determines an operation start time of the predetermined home appliance according to characteristics of the predetermined home appliance. 前記所定の家電機器は洗濯乾燥機であって、
前記情報処理端末装置は、発電電力に余剰が生じる電力余剰時間帯の終点に前記洗濯乾燥機の運転完了時刻が略一致するように、前記洗濯乾燥機の運転開始時刻を決定する、
請求項28に記載の太陽光発電装置の給電システム。
The predetermined home appliance is a washing and drying machine,
The information processing terminal device determines the operation start time of the washing / drying machine so that the operation completion time of the washing / drying machine substantially coincides with an end point of a power surplus time zone in which surplus in generated power occurs.
A power feeding system for a solar power generation device according to claim 28.
JP2012102193A 2011-07-14 2012-04-27 Power supply system for photovoltaic power generation apparatus, and information processing terminal device, washing / drying machine and refrigerator used therefor Active JP5960490B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2012102193A JP5960490B2 (en) 2011-07-14 2012-04-27 Power supply system for photovoltaic power generation apparatus, and information processing terminal device, washing / drying machine and refrigerator used therefor

Applications Claiming Priority (5)

Application Number Priority Date Filing Date Title
JP2011155758 2011-07-14
JP2011155758 2011-07-14
JP2011195289 2011-09-07
JP2011195289 2011-09-07
JP2012102193A JP5960490B2 (en) 2011-07-14 2012-04-27 Power supply system for photovoltaic power generation apparatus, and information processing terminal device, washing / drying machine and refrigerator used therefor

Publications (2)

Publication Number Publication Date
JP2013070593A JP2013070593A (en) 2013-04-18
JP5960490B2 true JP5960490B2 (en) 2016-08-02

Family

ID=48475633

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2012102193A Active JP5960490B2 (en) 2011-07-14 2012-04-27 Power supply system for photovoltaic power generation apparatus, and information processing terminal device, washing / drying machine and refrigerator used therefor

Country Status (1)

Country Link
JP (1) JP5960490B2 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101554291B1 (en) * 2013-06-24 2015-09-18 (주) 대광솔라 AC/Solar power combined supply control device for LED channel signboard
JP6161723B2 (en) * 2013-11-18 2017-07-12 三菱電機株式会社 Controller, energy management system, power equipment, energy management method, and program
JP6657004B2 (en) * 2016-04-26 2020-03-04 京セラ株式会社 Power management apparatus and control method thereof
DE102016112249A1 (en) * 2016-07-05 2018-01-11 Dr. Ing. H.C. F. Porsche Aktiengesellschaft Method for distributing energy in a home energy supply system
WO2022013926A1 (en) * 2020-07-13 2022-01-20 三菱電機株式会社 Refrigerator
WO2025105071A1 (en) * 2023-11-15 2025-05-22 パナソニックIpマネジメント株式会社 Refrigerator control system, refrigerator, and program

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4679395B2 (en) * 2006-03-07 2011-04-27 株式会社東芝 Fully automatic washing dryer
JP2011061992A (en) * 2009-09-10 2011-03-24 Panasonic Electric Works Co Ltd Power control system and electric apparatus
JP5623730B2 (en) * 2009-11-20 2014-11-12 大阪瓦斯株式会社 Energy usage improvement support device
JP2012172915A (en) * 2011-02-22 2012-09-10 Mitsubishi Heavy Ind Ltd Electric water heater system, heating means control device, control method, and program
JP5756916B2 (en) * 2011-04-28 2015-07-29 パナソニックIpマネジメント株式会社 CONTROL DEVICE, DEVICE CONTROL METHOD, AND CONTROL PROGRAM THEREOF

Also Published As

Publication number Publication date
JP2013070593A (en) 2013-04-18

Similar Documents

Publication Publication Date Title
JP5960490B2 (en) Power supply system for photovoltaic power generation apparatus, and information processing terminal device, washing / drying machine and refrigerator used therefor
US8234018B2 (en) Energy management of appliance cycle longer than low rate period
US10142820B2 (en) Consumer appliance with a detachable tablet
JP4679395B2 (en) Fully automatic washing dryer
JP6563255B2 (en) refrigerator
CN105737510B (en) The control method of refrigerator, system and there is its refrigerator
CN106292553A (en) Household electrical appliance
CA3122130C (en) Refrigerator and method and device for controlling refrigeration thereof
JP6385638B2 (en) refrigerator
JP2008075964A (en) Defrosting device of cooling device
JP2014105933A (en) Refrigerator
KR20220105711A (en) Refrigerator and control method thereof
WO2015062664A1 (en) Refrigerator with improved energy management mode and method for controlling the refrigerator
JP2007240079A (en) Cooling storage cabinet
CN111878935B (en) Control method of sink kitchen air conditioner
JP2022140721A (en) Refrigerator, refrigerator control method, and refrigerator control program
CN102854379A (en) System and method for auxiliary measuring of power consumption of electrical appliance
CA3122129C (en) Refrigerator and method and device for controlling refrigeration thereof
JP2007240027A (en) Electric appliance and defrosting control device for refrigerator
JP2002062034A (en) refrigerator
CN113776269A (en) refrigerator control method
KR101988305B1 (en) Refrigerator and Controlling Method for the same
WO2022013926A1 (en) Refrigerator
CN116839301B (en) Refrigerator and defrosting control method thereof
US12429278B2 (en) Method of controlling operation of an appliance

Legal Events

Date Code Title Description
RD03 Notification of appointment of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7423

Effective date: 20131129

RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20131206

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20150318

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20160129

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20160209

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20160331

RD03 Notification of appointment of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7423

Effective date: 20160331

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20160531

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20160623

R150 Certificate of patent or registration of utility model

Ref document number: 5960490

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150