JP5964068B2 - A frame structure for forming a frame and a frame construction method using the frame structure - Google Patents
[go: Go Back, main page]

JP5964068B2 - A frame structure for forming a frame and a frame construction method using the frame structure - Google Patents

A frame structure for forming a frame and a frame construction method using the frame structure Download PDF

Info

Publication number
JP5964068B2
JP5964068B2 JP2012021606A JP2012021606A JP5964068B2 JP 5964068 B2 JP5964068 B2 JP 5964068B2 JP 2012021606 A JP2012021606 A JP 2012021606A JP 2012021606 A JP2012021606 A JP 2012021606A JP 5964068 B2 JP5964068 B2 JP 5964068B2
Authority
JP
Japan
Prior art keywords
frame
reinforcing bar
slope
support
frame structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2012021606A
Other languages
Japanese (ja)
Other versions
JP2013159935A (en
Inventor
潮 木嶋
潮 木嶋
Original Assignee
株式会社e−works
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社e−works filed Critical 株式会社e−works
Priority to JP2012021606A priority Critical patent/JP5964068B2/en
Publication of JP2013159935A publication Critical patent/JP2013159935A/en
Application granted granted Critical
Publication of JP5964068B2 publication Critical patent/JP5964068B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Description

本発明は、急傾斜法面等を補強するための法枠の構築手法に関するものであって、特に法枠構成用の枠構造体並びにこれを用いた施工方法に係るものである。   The present invention relates to a method for constructing a frame for reinforcing steep slopes and the like, and particularly to a frame structure for constructing a frame and a construction method using the frame structure.

急傾斜地における法面には、崩落防止ための法枠を構築することが行われている。この手法は、例えば1mから数m四方を単位として、平面視で井桁状であり、断面形状を例えばドーム状としたコンクリートの堰状枠体を構築するものであって、この法枠は芯材として強度部材となる枠構造体を具えている。この枠構造体は、おおよその外形仕上げの目安となる上覆い枠状の網枠体と、この網枠体の長手方向に添って組み合わされる構造鉄筋と、この構造鉄筋を支持する支持アンカとを具えている。   On slopes with steep slopes, a framework for preventing collapse is being constructed. This method is to construct a concrete weir-like frame with a cross-sectional shape, for example, a dome shape, in a plan view, for example, in units of 1 m to several m square, and this method frame is a core material The frame structure used as a strength member is provided. The frame structure includes an upper covering frame-shaped net frame that is a rough outline for finishing, a structural rebar combined along the longitudinal direction of the net frame, and a support anchor that supports the structural rebar. It has.

ところで、従来は例えば下記特許文献1に開示されているように、これら網枠体と構造鉄筋と支持アンカとを有機的に結合させるための構造の案出が充分ではなく、特に構造鉄筋を配置する際の作業性や、網枠体の正確な整形のし易さ等については、充分な工夫がなされていない。
具体的には、支持アンカに構造鉄筋を支持させるにしても、別途部材を介して取り付ける必要があったり、支持部材下方に鉄筋をあてがってその状態でいわゆる番線によって両者を緊縛する手法であったりして、その作業性は必ずしも良いとは言えない。また網枠体の断面形状を正確に設定するための工夫についても充分になされていない。
By the way, conventionally, for example, as disclosed in Patent Document 1 below, it is not sufficient to devise a structure for organically coupling the mesh frame, the structural reinforcing bar, and the support anchor, and in particular, the structural reinforcing bar is arranged. However, sufficient work has not been done on the workability at the time of carrying out the process, the ease of accurate shaping of the net frame, and the like.
Specifically, even if the structural anchor is supported by the support anchor, it is necessary to attach it via a separate member, or a method in which the reinforcing bar is attached below the support member and both are bound by a so-called wire in that state. The workability is not always good. In addition, the device for accurately setting the cross-sectional shape of the net frame has not been sufficiently devised.

特開2010−001692号公報JP 2010-001692 A

本発明は、これらの種々の背景を考慮してなされたものであって、特にアンカ並びに別途用意されるスペーサとの工夫により、構造鉄筋と、スペーサと、支持アンカと、網枠との有機的な組み合わせを案出し、もって施工作業を円滑に行えるようにした新規な法面成形用の枠構造体並びにこれを用いた施工方法の開発を試みたものである。   The present invention has been made in consideration of these various backgrounds, and in particular, the organic reinforcing bar, the spacer, the support anchor, and the net frame are devised by devising an anchor and a separately prepared spacer. The present inventors have devised a novel combination and tried to develop a new frame structure for slope forming that can smoothly perform the construction work and a construction method using the frame structure.

請求項1記載の法面成形用の枠構造体は、上覆い状に配設される網枠体と、この網枠体の長手方向に添って組み合わされる構造鉄筋と、この構造鉄筋を支持する支持アンカと、この構造鉄筋にクリップ係合するとともに網枠体の断面形状を規制するスペーサとを具え、前記スペーサについては、施工基盤面にほぼ沿う向きに配設される規制杆と、この規制杆の両端近くに設けられ、網枠体の側胴部に沿って配設されて網枠体の形状を規制する整形片と、前記規制杆における整形片より内側部位に設けられ前記構造鉄筋に対する抜け止めキャッチ構造を有するクリップ片とを具えていることを特徴として成るものである。 A frame structure for forming a slope according to claim 1 supports a mesh frame disposed in an over-cover shape, a structural reinforcing bar combined along the longitudinal direction of the mesh frame, and the structural reinforcing bar. A support anchor and a spacer that clip-engages with the structural reinforcing bar and restricts the cross-sectional shape of the net frame, and the spacer includes a restriction rod disposed in a direction substantially along the construction base surface, and the restriction A shaping piece provided near both ends of the rod and disposed along the side body portion of the mesh frame body to regulate the shape of the mesh frame body; A clip piece having a retaining catch structure is provided .

請求項記載の法面成形用の枠構造体は、前記請求項記載の要件に加え、前記支持アンカについては、打設支柱部と、打設支柱部から側方に張り出すように形成した鉄筋支持杆とを具え、且つ打設支柱部には打設寸法を案内する打設案内部が形成され、また鉄筋支持杆は、支持する構造鉄筋を所定の高さに設定できるようにするための支承部を具えたことを特徴として成るものである。 A frame structure for forming a slope according to claim 2 is formed such that, in addition to the requirements of claim 1 , the support anchor is formed so as to project laterally from the placement strut portion and the placement strut portion. And a placement guide portion for guiding the placement dimensions is formed on the placement support column, and the reinforcement support rod allows the structural reinforcement to be supported to be set at a predetermined height. It is characterized by having a support part for the purpose.

請求項記載の法面成形用の枠構造体を用いた法枠施工方法は、法面対し法枠を施工する方法であって、前記請求項1、のいずれか記載の法面成形用の枠構造体を用いて、まず支持アンカにおける打設支柱部を法面に対し所定の位置に打ち込み、次いで支持アンカにおける鉄筋支持杆の支承部に構造鉄筋を上載せ状態に配置し、次いで構造鉄筋に対しスペーサをクリップ係合させ、更に網枠体をこれらの上に被せてスペーサにおける整形片によりその断面形状を規制された状態として枠構造体を法面に構成し、この枠構造体を基準にしてコンクリートを打設することにより法枠を構成するようにしたことを特徴として成るものである。 A method for constructing a frame using a frame structure for forming a slope according to claim 3 is a method for constructing a frame against a slope, and the method for forming a slope according to claim 1 or 2 . First, the struts of the supporting anchors are driven into a predetermined position with respect to the slope, and then the structural reinforcing bars are placed on the support portions of the reinforcing bar support rods of the supporting anchors. The spacer is clip-engaged with the reinforcing bars, and the frame structure is formed on the slope as a state in which the cross-sectional shape is regulated by the shaping piece in the spacer by covering the mesh frame body on these. It is characterized in that the legal frame is constructed by placing concrete as a reference.

まず請求項1記載の発明によれば、支持アンカに設けられた納め部に構造鉄筋を仮載置した状態でスペーサをクリップ係合させて、構造鉄筋の位置決めを行い、更にこれら部材を覆うように網枠体を被せ、前記スペーサで網枠体の断面形状を規制することにより、法枠構造体が迅速且つ正確に構築し得る。加えて、スペーサの整形片により、網枠体が正確に断面形状を整えると共にクリップ片により、スペーサと構造鉄筋とが正確に位置決めされるものであり、且つその組み付けにあたっての作業性もよい。 First, according to the first aspect of the present invention, the structural reinforcing bars are clip-engaged in a state where the structural reinforcing bars are temporarily placed in the receiving portion provided in the support anchor, and the structural reinforcing bars are positioned, and further, these members are covered. The frame structure can be quickly and accurately constructed by covering the frame with the mesh frame and regulating the cross-sectional shape of the mesh frame with the spacer. In addition , the cross-sectional shape of the net frame body is accurately adjusted by the shaping piece of the spacer, and the spacer and the structural reinforcing bar are accurately positioned by the clip piece, and the workability in assembling is good.

また請求項記載の発明によれば、構造鉄筋の高さ方向の配設位置が正確に設定される。 According to the second aspect of the present invention, the arrangement position of the structural reinforcing bars in the height direction is accurately set.

また請求項記載の発明によれば、作業性の良い施工が可能となると共に、構造鉄筋を配設するための作業も行いやすく、結果的に結束作業を正確に行うことができ、更に網枠体の設置も正確且つ迅速に行うことができ、予め設計され法枠が実現するように、枠構造体を正確な位置並びに形状に形成することができる。 According to the invention of claim 3, construction with good workability is possible, work for arranging the structural reinforcing bars is easy, and as a result, the binding work can be performed accurately, The frame body can be installed accurately and quickly, and the frame structure can be formed in an accurate position and shape so as to realize a pre-designed frame.

本発明の法面成形用の枠構造体の設置状態を示す説明図である。It is explanatory drawing which shows the installation state of the frame structure for slope forming of this invention. 同上枠構造体の分解斜視図である。It is a disassembled perspective view of a frame structure same as the above. 同上枠構造体の施工手順を示す説明図である。It is explanatory drawing which shows the construction procedure of a frame structure same as the above. 同上枠構造体の施工手順を示す説明図である。It is explanatory drawing which shows the construction procedure of a frame structure same as the above. 同上枠構造体における網枠体の他の実施例を複数示す正面図である。It is a front view which shows two or more other examples of the net frame in the same frame structure. 同上枠構造体におけるスペーサの他の実施例を複数示す正面図である。It is a front view which shows multiple other examples of the spacer in a frame structure same as the above. 同上枠構造体における支持アンカの他の実施例を複数示す正面図である。It is a front view which shows several other Examples of the support anchor in a frame structure same as the above.

本発明を実施するための形態は、以下述べる実施例をその一つとするものであると共に、この技術思想に基づく種々の改良した実施例をも含むものである。   The mode for carrying out the present invention includes an embodiment described below, and includes various improved embodiments based on this technical idea.

以下、本発明を図示の実施例に基づいて具体的に説明する。
まず本発明の法面成形用の枠構造体が施工される法面Gについて説明する。図1に示すように急傾斜の法面Gに対して、例えば1mから数m四方を単位として、平面視井桁状として、法枠Aが施工されるものであり、これによって法面Gの崩落等を防ぐ。またその法枠内は、コンクリートで被覆したり、自然植生を設けて自然景観を発現させるような用い方がされる。
Hereinafter, the present invention will be specifically described based on illustrated embodiments.
First, the slope G on which the frame structure for slope molding of the present invention is constructed will be described. As shown in FIG. 1, for a steep slope G, for example, a frame A is constructed as a plane girder in units of 1 m to several m squares. Prevent etc. In addition, the inside of the legal framework is used such as covering with concrete or providing natural vegetation to express a natural landscape.

この法枠Aは、枠構造体1を構造用芯材とすると共にこれを覆うようにコンクリートCが打設され、断面ドーム状乃至は半円状、楕円状あるいは矩形状の堰状の構築構造となる。   This frame A has a frame structure 1 as a structural core and is provided with concrete C so as to cover it, and has a dome-like, semicircular, elliptical or rectangular weir-like construction structure. It becomes.

以下この枠構造体1について説明する。
このものは、図2において各部材を分解して示すように上面を例えばドーム状等とした上覆い枠状の網枠体2と、網枠体2の長手方向に添って設けられる構造鉄筋3と、この構造鉄筋3に対し、クリップ係合すると共に前記網枠体2の断面形状を規制するスペーサ4と、前記構造鉄筋3を主として支持し、更に網枠体2を間接的または直接的に支持することとなる支持アンカ5とを主要部材とする。この支持アンカ5と構造鉄筋3とは、例えば結束番線6を利用して固定されているほか、支持アンカ5と網枠体2との間も結束番線6によって固定される場合もある。
以下、これらの部材について説明する。
Hereinafter, the frame structure 1 will be described.
As shown in FIG. 2, each member is disassembled, and an upper cover frame-shaped net frame 2 having an upper surface, for example, a dome shape, and a structural reinforcing bar 3 provided along the longitudinal direction of the net frame 2. And a spacer 4 that engages the clip with the structural reinforcing bar 3 and regulates the cross-sectional shape of the mesh frame 2, supports the structural reinforcing bar 3 mainly, and indirectly or directly supports the mesh frame 2. The support anchor 5 to be supported is a main member. The support anchor 5 and the structural reinforcing bar 3 are fixed by using, for example, a binding number wire 6, and the support anchor 5 and the net frame 2 may also be fixed by the binding number wire 6.
Hereinafter, these members will be described.

網枠体2は、例えば金網状の部材で構成されるものであり、断面方向を経線状に形成するドーム要素線21と、これと直交する方向に緯線状に組み合わされる長手要素線22とによって網状の構造体を構成している。なおこの各ドーム要素線21と長手要素線22は、一例として相互の組み合わせを考慮して波形状屈曲線を用いるのが好ましい。またこのようなドーム要素線21と長手要素線22とにより構成される網目のサイズは、コンクリートCを打設する際にコンクリートCが充分に枠構造体1内に通過しうるような寸法とする。
この実施例では、網枠体2を頂部2A、側胴部2B、接地部2Cとに上下方向に分けたとき、側胴部2Bの下方から接地部2Cにかけては、網目が細かく形成され、一方それより上方の側胴部2B、頂部2Aは、荒く形成されている。また長手方向で見た場合、ドーム要素線21の配設ピッチは、均等間隔であってもよいし、一部不等間隔であってもよい。
The net frame 2 is constituted by, for example, a wire net-like member, and includes a dome element line 21 having a cross-sectional direction formed in a meridian shape and a longitudinal element line 22 combined in a parallel line shape in a direction orthogonal thereto. A net-like structure is formed. As each dome element line 21 and the longitudinal element line 22, it is preferable to use a corrugated bend line in consideration of the mutual combination as an example. Further, the size of the mesh formed by the dome element line 21 and the longitudinal element line 22 is set such that the concrete C can sufficiently pass through the frame structure 1 when the concrete C is placed. .
In this embodiment, when the mesh frame 2 is divided into the top part 2A, the side body part 2B, and the grounding part 2C in the vertical direction, a fine mesh is formed from below the side body part 2B to the grounding part 2C. The upper side body portion 2B and the top portion 2A are roughly formed. When viewed in the longitudinal direction, the arrangement pitch of the dome element lines 21 may be evenly spaced or partially unequal.

次に構造鉄筋3は、枠構造体1の例えば下方に2本、上方に1本、あるいは下方に2本、上方に2本等適宜、枠構造体1の長手方向に添うように網枠体2のおおむね内側に設けられるものであり、これらを上部鉄筋31、下部鉄筋32として区別する。通常使用される構造鉄筋は、8mmから13mm径程度であり、長さは使い勝手を考慮して、1800mmから3600mm程度である。   Next, the structural reinforcing bars 3 are, for example, two frames below, one above, two below, two above, and the like of the frame structure 1 so as to follow the longitudinal direction of the frame structure 1 as appropriate. 2 are provided roughly inside, and are distinguished as an upper reinforcing bar 31 and a lower reinforcing bar 32. The structural reinforcing bars usually used have a diameter of about 8 mm to 13 mm, and the length is about 1800 mm to 3600 mm in consideration of usability.

次にスペーサ4について説明する。
このものは、一例として鉄等の金属線材によって構成されたものであって、前記スペーサ4は、施工基盤面にほぼ沿う向きに配設される規制杆41と、この規制杆41の両端近くに設けられ、網枠体2の側胴部2Bに沿って配設されて網枠体の形状を規制する整形片42と、前記規制杆41における整形片42より内側部位に設けられる抜け止めキャッチ構造を有するクリップ片43とを具えているものである。
この規制杆41が網枠体2の大まかな寸法を規制するものであり、この両端部の整形片42は、一例として枠構造体1がドーム状乃至は三角形状の断面であることに因み、上
窄まり状に傾斜した形状に形成されている。
またクリップ片43は充分な弾性を具えた線材が適用され、図2、図3(d)ii、iii に拡大して示すように、ほぼ縦長円形状であり、直線状の固定部43aから変形誘導部32bを経て、更に下方の逆爪部43cまでが一体部材で構成されている。そして逆爪部43cの外側には、係止誘導部43dを構成すると共にその内側を係止部43eとする。
Next, the spacer 4 will be described.
This is constituted by a metal wire material such as iron as an example, and the spacer 4 is provided with a restriction rod 41 arranged in a direction substantially along the construction base surface and near both ends of the restriction rod 41. A shaped piece 42 provided along the side body portion 2B of the mesh frame body 2 to restrict the shape of the mesh frame body, and a retaining catch structure provided at a position inside the shaped piece 42 in the restriction rod 41 And a clip piece 43 having.
The restricting rod 41 restricts the rough size of the net frame 2, and the shaping pieces 42 at both ends are, for example, because the frame structure 1 has a dome shape or a triangular cross section. It is formed in a shape that is inclined in a constricted shape.
Further, the clip piece 43 is made of a wire material having sufficient elasticity, and as shown in FIG. 2, FIG. 3 (d) ii, iii, is enlarged substantially vertically and is deformed from the linear fixing portion 43a. Through the guide portion 32b, the lower claw portion 43c below is formed as an integral member. And the latching guidance part 43d is comprised in the outer side of the reverse nail | claw part 43c, and the inner side is made into the latching | locking part 43e.

次に構造鉄筋3を支持する支持アンカ5について説明する。
このものは、例えば異形鉄筋等を利用して構成したものであり、打設支柱部51を一例としてその中心に一本設ける。
この打設支柱部51は、一例として直線状部材であり、打設側(法面Gに打ち込まれる側)は、適宜先端を尖らせる。そして、その中間位置に打設支柱部51から一例として正面視翼状に左右に張り出すように鉄筋支持杆52を設ける。この鉄筋支持杆52は、一例として打設支柱部51と同一素材の異形鉄筋を用いて構成されるものであって、前記打設支柱部51との固着部を打設寸法を案内するための打設案内部52aとする。更に鉄筋支持杆52は、左右斜め上方に立ち上がるように形成され、先端は左右に水平に伸びるような正面視翼状となる形状を採り、ここを鉄筋受部53とする。
Next, the support anchor 5 that supports the structural reinforcing bar 3 will be described.
This is constructed using, for example, a deformed reinforcing bar or the like, and one placing post 51 is provided at the center as an example.
This placement support | pillar part 51 is a linear member as an example, and the driving | running side (side driven into the slope G) sharpens a front-end | tip suitably. And the reinforcing bar support rod 52 is provided in the intermediate position so that it may protrude from the placing support | pillar part 51 to the left and right like a front view wing shape as an example. As an example, the reinforcing bar support rod 52 is formed by using a deformed reinforcing bar made of the same material as that of the placing support column 51, and is used to guide the placement size of the fixing portion with the placing support column 51. Let it be a placement guide 52a. Further, the reinforcing bar support rod 52 is formed so as to rise obliquely upward to the left and right, and has a tip-like shape that extends horizontally to the left and right.

本発明は、このような構成をするものであり、次のようにして枠構造体1を構成するための施工を行い、更にはそこにコンクリートCを流し込んで法枠Aを形成する。 The present invention is configured as described above. The construction for constructing the frame structure 1 is performed as follows, and concrete C is poured into the frame structure 1 to form the frame A.

〔1.準備段階〕
準備段階としては、適宜施工する工事箇所に設けた遣り方坑や、これに張った水糸等により施工基準位置を明確化した後、これを案内として、適宜の間隔ごとに枠構造体1における支持アンカ5を法面Gに打設する。
このとき、法面G自体が岩盤状で固い場合には、予め岩盤をドリルD等によって下孔Hを穿孔しておき、その打設が行いやすくした上で、ハンマや振動ハンマ等で打設する。
もちろん、カケヤあるいはハンマ等による打設が下孔Hを形成せずに当初から、可能な程度の法面Gの基盤状態であれば、適宜手作業等により支持アンカ5を一定間隔ごとに打設してゆく(図3(a)(b))。このとき打設深さは打設案内部52aが接地するまでを目安とすることが好ましい。
[1. (Preparation stage)
As a preparatory stage, after clarifying the construction reference position by means of a drilling pit provided at the construction site to be constructed as appropriate, or a water thread stretched on this, the guide structure is used as a guide, and the frame structure 1 is arranged at appropriate intervals. The support anchor 5 is driven on the slope G.
At this time, if the slope G itself is rock-like and hard, the bedrock is drilled in advance with a drill D or the like in advance to facilitate the placement, and is then placed with a hammer or vibration hammer. To do.
Of course, if anchoring or hammering is not necessary to form the pilot hole H and the base state of the slope G is as much as possible from the beginning, the supporting anchor 5 is driven at regular intervals as appropriate by manual operation or the like. (FIGS. 3A and 3B). At this time, it is preferable that the placement depth is determined until the placement guide portion 52a comes into contact with the ground.

〔2.構造鉄筋の組み合わせ〕
次に構造鉄筋3を、支持アンカ5に対して、支持させるために組み合わせるものであり、支持アンカ5における鉄筋受部53に構造鉄筋3を載せるようにしてゆく。このように支持アンカ5における鉄筋受部53へ構造鉄筋3を仮置き状態とした後、必要があれば適宜結束番線6を用いて支持アンカ5の鉄筋支持杆52に対して構造鉄筋3(下部鉄筋32)を仮固定してゆく(図3(c))。
[2. (Combination of structural reinforcing bars)
Next, the structural rebar 3 is combined to support the support anchor 5, and the structural rebar 3 is placed on the reinforcing bar receiving portion 53 of the support anchor 5. After the structural rebar 3 is temporarily placed in the reinforcing bar receiving portion 53 of the support anchor 5 as described above, the structural rebar 3 (lower part) is attached to the rebar support rod 52 of the support anchor 5 using the binding wire 6 as necessary. The rebar 32) is temporarily fixed (FIG. 3C).

〔3.スペーサの係合〕
このように仮置き状態とされた、一対の下部鉄筋32に対し、図3(d)i 〜iii に示すようにまずスペーサ4をクリップ係合させる。この作業は、スペーサ4を下部鉄筋32の上方から押し当て、クリップ片43の位置において、スペーサ4におけるクリップ片43の係止誘導部43dの傾斜と変形誘導部43bの外側への撓みとを助けとして、係止部43e内に下部鉄筋32を保持し、且つ逆爪部43cの作用で、その抜け出しを阻止する。
因みにこのとき前記下部鉄筋32は、支持アンカ5における鉄筋受部53が、ほぼ水平に伸びた形状であるから、その仮保持位置をずらし易く止められている。これによりスペーサ4により設定された寸法に従った下部鉄筋32の固定が図られる。
なお下部鉄筋32と鉄筋受部53とは、スペーサ4により正確な位置決めが図られた後結束番線6を本締めして固定される。またスペーサ4の配設位置は、支持アンカ5の1ピッチ毎に1本〜3本程度の等間隔とする。
[3. (Engagement of spacer)
The spacers 4 are first clip-engaged with the pair of lower reinforcing bars 32 in the temporarily placed state as shown in FIGS. In this operation, the spacer 4 is pressed from above the lower reinforcing bar 32, and at the position of the clip piece 43, the inclination of the locking guide portion 43d of the clip piece 43 in the spacer 4 and the outward deflection of the deformation guide portion 43b are assisted. As described above, the lower reinforcing bar 32 is held in the locking portion 43e, and the reverse claw portion 43c prevents the withdrawal thereof.
Incidentally, at this time, the lower reinforcing bar 32 has a shape in which the reinforcing bar receiving portion 53 of the support anchor 5 extends substantially horizontally, so that the temporary holding position is easily stopped. Thereby, fixation of the lower reinforcement 32 according to the dimension set by the spacer 4 is achieved.
Note that the lower reinforcing bars 32 and reinforcing bar receiving portion 53, after the correct positioning is achieved by the spacer 4, is fixed unity track number 6 and tightened. The spacers 4 are arranged at regular intervals of about 1 to 3 for each pitch of the support anchors 5.

〔4.網枠体の設置〕
このような状態に設置された各部材に対し、これらを覆うように網枠体2を配設する。
このとき既に構造鉄筋3(下部鉄筋32)に対してスペーサ4がクリップ係合して設けられていることから、図4(e)(f)に示すように網枠体2を被せれば、その整形片42が網枠体2の側胴部2Bの内側に添うように組み合わされ、網枠体2の形状を整えるように作用する。この状態で網枠体2とスペーサ4(整形片42)とを結束番線6で固定する。
なおスペーサ4と網枠体2とは、このような組み合わせに限られず、例えば図4(e)左側拡大図に示すようにスペーサ4における整形片42を上部が網枠体2の側胴部2Bから外側に抜け出すような状態に網枠体2を被せることができる。この操作は、網枠体2の胴幅を狭めるように扱いながら、整形片の上部の網目からくぐらせるようにする。この状態で整形片42は、網枠体2の側胴部2Bに接する状態となって、網枠体2の正確な断面形状を実現させる。
[4. (Installation of net frame)
For each member installed in such a state, the net frame 2 is disposed so as to cover them.
At this time, since the spacer 4 is already provided in clip engagement with the structural reinforcing bar 3 (lower reinforcing bar 32), if the mesh frame 2 is put on as shown in FIGS. The shaping pieces 42 are combined so as to follow the inside of the side body portion 2B of the net frame body 2 and act to adjust the shape of the net frame body 2. In this state, the mesh frame 2 and the spacer 4 (shaped piece 42) are fixed by the binding wire 6.
The spacer 4 and the mesh frame 2 are not limited to such a combination. For example, as shown in the left side enlarged view of FIG. The net frame 2 can be covered in such a state as to come out from the outside. This operation is made to pass through the mesh at the upper part of the shaped piece while handling the body frame 2 so as to narrow the body width. In this state, the shaping piece 42 comes into contact with the side body portion 2B of the net frame 2 to realize an accurate cross-sectional shape of the net frame 2.

また網枠体2は、例えばドーム状であって上部中心が一部凹陥して上部受け部23を有するものの場合、この部位を利用して上部鉄筋31を配設することができる。また支持アンカ5の打設支柱部51の頂部が上部受け部23を貫いている場合には結束番線6によって固定し両者の組み立てを図る。また同様に結束番線6を利用して、上部受け部23に配置された上部鉄筋31と、網枠体2との間、あるいは上部鉄筋31と、支持アンカ5の頂部との間を緊縛する。   Further, in the case where the net frame 2 is, for example, a dome shape and the upper center is partially recessed and has the upper receiving portion 23, the upper rebar 31 can be disposed using this portion. Further, when the top portion of the placing support column portion 51 of the support anchor 5 penetrates the upper receiving portion 23, the support anchor 5 is fixed by the binding number wire 6 and the both are assembled. Similarly, the binding wire 6 is used to bind between the upper rebar 31 arranged in the upper receiving portion 23 and the net frame 2 or between the upper rebar 31 and the top of the support anchor 5.

このような工程を経て枠構造体1を構成した後には、コンクリートCを枠構造体1に対し、吹付け施工していく。コンクリートCの粘度は、この際枠構造体1の存在により、流動が阻まれる程度の粘度に設定されており、吹付け時には、網枠体2の側胴部2Bから上方にかけての大きな網目からコンクリートCが流し込まれる一方、接地部2C近くは網目が細かく、従ってコンクリートCの流出が阻まれ、枠構造体1内側に留まる。その後、枠構造体1をコンクリートCがほぼ覆った段階で必要に応じて、図4(h)に示すようにコテSを用いた手作業等によりその表面の仕上処理が行われ法枠Aを構成する。   After constructing the frame structure 1 through such steps, the concrete C is sprayed onto the frame structure 1. At this time, the viscosity of the concrete C is set to such a level that the flow is prevented by the presence of the frame structure 1, and when spraying, the concrete C While C is poured, the mesh is fine in the vicinity of the grounding portion 2C, so that the concrete C is prevented from flowing out and stays inside the frame structure 1. After that, when the frame structure 1 is almost covered with the concrete C, the surface finish processing is performed by manual work using a trowel S as shown in FIG. Configure.

〔他の実施の形態〕
本発明は以上述べた実施の形態を一つの基本的な技術思想とするものであるが、更に次のような改変が考えられる。
これら各改変は、網枠体2、スペーサ4、支持アンカ5においてそれぞれなされるものであるが、これらを順列組み合わせ的に選択して枠構造体1が構成される。
まず網枠体2は、図5(a)に示すように単純なドーム状としたもの、また図5(b)に示すように上部受け部23を幅広に設定したもの、更には法枠Aを矩形状断面とするためのほぼ門型断面としたもの等、種々の変形が可能である。
[Other Embodiments]
The present invention is based on the embodiment described above as one basic technical idea, but the following modifications can be considered.
Each of these modifications is made in the net frame body 2, the spacer 4, and the support anchor 5, but these are selected in a permutation combination to constitute the frame structure 1.
First, the net frame 2 has a simple dome shape as shown in FIG. 5A, a wide upper receiving portion 23 as shown in FIG. 5B, and a frame A. Various modifications such as a substantially gate-shaped cross section for forming a rectangular cross section are possible.

またスペーサ4におけるクリップ片43は、別部材を適用せずに例えば図6(a)に示すように規制杆41の一部をループ状に曲成して形成することも出来る。また図6(b)に示すように鈎針状のものや、図6(c)に示すように係止誘導部43dを上方に向けたもの等が変形例として挙げられる。
更にスペーサ4は、必ずしも線材で構成することに限られず図6(d)(e)に示すようなプレス打抜き鋼板によって形成することが可能である。
Further, the clip piece 43 in the spacer 4 can be formed by bending a part of the regulation rod 41 in a loop shape as shown in FIG. Further, as a modified example, a hook-shaped one as shown in FIG. 6 (b), a one with the engagement guiding portion 43d facing upward as shown in FIG. 6 (c), and the like can be given.
Furthermore, the spacer 4 is not necessarily composed of a wire, and can be formed of a press-punched steel plate as shown in FIGS. 6 (d) and 6 (e).

次に支持アンカ5の変形例について説明する。
まず図7(a)に示すものは、打設案内部52aを鉄筋支持杆52とは別の部材で形成したものである。また図7(b)(c)に示すものは、鉄筋支持杆52を上下2段に配したものであり、この場合には網枠体2が上部鉄筋31を支持するための構造を具えていない場合に有効である。
この場合上部鉄筋31を2本支持するもの(図7(b))、1本支持するもの(図7(c))の2つのタイプが考慮し得る。
Next, a modified example of the support anchor 5 will be described.
First, what is shown in FIG. 7A is one in which the placement guide portion 52 a is formed of a member different from the reinforcing bar support rod 52. 7B and 7C show a structure in which the rebar support rods 52 are arranged in two upper and lower stages. In this case, the net frame 2 has a structure for supporting the upper rebar 31. It is effective when there is not.
In this case, two types, one supporting two upper reinforcing bars 31 (FIG. 7B) and one supporting one (FIG. 7C), can be considered.

また図示を省略するが、鉄筋支持杆52を異形鉄筋で構成せず、プレス打抜き鋼板等で構成してもよい。   Although not shown, the reinforcing bar support rod 52 may be formed of a stamped steel plate or the like without using a deformed reinforcing bar.

G 法面
A 法枠
C コンクリート
D ドリル
H 下孔
S コテS

1 枠構造体
2 網枠体
3 構造鉄筋
4 スペーサ
5 支持アンカ
6 結束番線

2 網枠体
2A 頂部
2B 側胴部
2C 接地部
21 ドーム要素線
22 長手要素線
23 上部受け部

3 構造鉄筋
31 上部鉄筋
32 下部鉄筋

4 スペーサ
41 規制杆
42 整形片
43 クリップ片
43a 固定部
43b 変形誘導部
43c 逆爪部
43d 係止誘導部
43e 係止部

5 支持アンカ
51 打設支柱部
52 鉄筋支持杆
52a 打設案内部
53 鉄筋受部
G Slope A Slope C Concrete D Drill H Pilot hole S Solder S

DESCRIPTION OF SYMBOLS 1 Frame structure 2 Net frame 3 Structural reinforcement 4 Spacer 5 Support anchor 6 Binding number wire

2 Net frame 2A Top 2B Side body 2C Grounding part 21 Dome element line 22 Long element line 23 Upper receiving part

3 Structural rebar 31 Upper rebar 32 Lower rebar

4 spacer 41 regulating rod 42 shaping piece 43 clip piece 43a fixing portion 43b deformation guiding portion 43c reverse claw portion 43d locking guiding portion 43e locking portion

5 Support anchor 51 Placing support 52 Reinforcing bar support rod 52a Placing guide 53 Reinforcing bar receiving part

Claims (3)

上覆い状に配設される網枠体と、この網枠体の長手方向に添って組み合わされる構造鉄筋と、この構造鉄筋を支持する支持アンカと、この構造鉄筋にクリップ係合するとともに網枠体の断面形状を規制するスペーサとを具え、前記スペーサは、施工基盤面にほぼ沿う向きに配設される規制杆と、この規制杆の両端近くに設けられ、網枠体の側胴部に沿って配設されて網枠体の形状を規制する整形片と、前記規制杆における整形片より内側部位に設けられ前記構造鉄筋に対する抜け止めキャッチ構造を有するクリップ片とを具えていることを特徴とする法面成形用の枠構造体。
A mesh frame disposed in an upper cover shape, a structural reinforcing bar combined along the longitudinal direction of the mesh frame, a support anchor that supports the structural reinforcing bar, a clip engagement with the structural reinforcing bar, and a mesh frame A spacer for regulating the cross-sectional shape of the body, and the spacer is provided in a direction substantially along the construction base surface, and is provided near both ends of the regulation rod, and is provided on a side body portion of the net frame body. A shaping piece that is disposed along the shaping frame and regulates the shape of the net frame, and a clip piece that is provided at an inner side of the shaping piece in the regulating rod and has a retaining catch structure for the structural reinforcing bar. A frame structure for slope forming.
前記支持アンカは、打設支柱部と、打設支柱部から側方に張り出すように形成した鉄筋支持杆とを具え、且つ打設支持部には打設寸法を案内する打設案内部が形成され、また鉄筋支持杆は、支持する構造鉄筋を所定の高さに設定できるようにするための支承部を具えたことを特徴とする前記請求項記載の法面成形用の枠構造体。
The support anchor includes a placing post portion and a reinforcing bar support rod formed so as to project laterally from the placing support portion, and the placing support portion includes a placing guide portion that guides a placement dimension. is formed, also rebar supporting rod is the framing structure for the slope shaping of claim 1, wherein the equipped with bearings for such a structure rebar supporting can be set at a predetermined height .
法面対し法枠を施工する方法であって、前記請求項1、のいずれか記載の法面成形用の枠構造体を用いて、まず支持アンカにおける打設支柱部を法面に対し所定の位置に打ち込み、次いで支持アンカにおける鉄筋支持杆の支承部に構造鉄筋を上載せ状態に配置し、次いで構造鉄筋に対しスペーサをクリップ係合させ、更に網枠体をこれらの上に被せてスペーサにおける整形片によりその断面形状を規制された状態として枠構造体を法面に構成し、この枠構造体を基準にしてコンクリートを打設することにより法枠を構成するようにしたことを特徴とする法面成形用の枠構造体を用いた法枠施工方法。 A method for constructing a slope frame against a slope, wherein the cast strut portion of the support anchor is first defined with respect to the slope using the slope-forming frame structure according to claim 1 or 2. Next, the structural rebar is placed on the support portion of the reinforcing bar support rod in the support anchor, and then the spacer is clip-engaged with the structural rebar, and the mesh frame is placed over these spacers. The frame structure is configured as a slope with the cross-sectional shape being regulated by the shaping piece in No. 1 , and the frame is constructed by placing concrete on the basis of the frame structure. A frame construction method using a frame structure for slope forming.
JP2012021606A 2012-02-03 2012-02-03 A frame structure for forming a frame and a frame construction method using the frame structure Active JP5964068B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2012021606A JP5964068B2 (en) 2012-02-03 2012-02-03 A frame structure for forming a frame and a frame construction method using the frame structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2012021606A JP5964068B2 (en) 2012-02-03 2012-02-03 A frame structure for forming a frame and a frame construction method using the frame structure

Publications (2)

Publication Number Publication Date
JP2013159935A JP2013159935A (en) 2013-08-19
JP5964068B2 true JP5964068B2 (en) 2016-08-03

Family

ID=49172438

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2012021606A Active JP5964068B2 (en) 2012-02-03 2012-02-03 A frame structure for forming a frame and a frame construction method using the frame structure

Country Status (1)

Country Link
JP (1) JP5964068B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113358149B (en) * 2021-05-27 2023-02-24 焦桂权 Equipment fixing structure for monitoring hydraulic engineering ring geological environment
CN115573360A (en) * 2022-11-15 2023-01-06 山西交通控股集团有限公司吕梁南高速公路分公司 A Prestressed Anchor Cable Frame-Composite Mesh Pad Supporting Structure and Its Construction Method
CN117051985B (en) * 2023-06-28 2025-08-22 江苏省华建建设股份有限公司 A method for constructing a wing-shaped hyperbolic blade surface

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59173742U (en) * 1983-04-28 1984-11-20 建設基礎エンジニアリング株式会社 Spacing holder for legal frame
JP2813506B2 (en) * 1992-03-14 1998-10-22 株式会社水戸グリーンサービス Ground reinforcement method
JP2605350Y2 (en) * 1993-10-25 2000-07-10 ライト工業株式会社 Reinforcing bar jig
JP3119291B2 (en) * 1995-02-16 2000-12-18 日本植生株式会社 Construction method of cast-in-place frame
JPH09184142A (en) * 1995-12-29 1997-07-15 Takaaki Yamane Form in slope reinforcing method
JP5399845B2 (en) * 2009-09-30 2014-01-29 株式会社小財スチール Leg frame anchor

Also Published As

Publication number Publication date
JP2013159935A (en) 2013-08-19

Similar Documents

Publication Publication Date Title
CN106133245B (en) Construction method of ground anchor and ground anchor
JP2017523330A5 (en)
JP5663334B2 (en) Anchor frame and construction method of foundation structure using it
KR101249408B1 (en) Bar Support for Mass Reinforced Concrete Member and Method of Upper Bar Arrangement Using the Same
JP5964068B2 (en) A frame structure for forming a frame and a frame construction method using the frame structure
KR20170125768A (en) Separable fixing support bracket and cantilever bridge construction method therewith
JP6362141B2 (en) Reinforcing bar reinforced frame, hoop, and reinforcing bar
KR20220099010A (en) Foundation construction method with anchorage plate
CN109837924B (en) Construction method for intersection part of lattice column and main body structure of foundation pit support
JP6369870B2 (en) Reinforcing bar assembly equipment
JP6632290B2 (en) Steel column leg structure and steel column leg construction method
JP6192972B2 (en) Calvert
KR100773340B1 (en) Fixing Plate for Column Reinforcement
CN212835949U (en) Steel column connection structure
KR101091600B1 (en) Sidewall PC formwork and construction method using the same
KR20100004374U (en) Walls supporter of a truss type
CN106592623B (en) Pit structure installation method
KR20120133871A (en) Support for a upper reinforcing bar of footings
JP2019065641A (en) Rock fall guard fence
JP2012067441A (en) Installation method for anchor bolt
JP6192204B2 (en) Pre-assembled reinforcing bar installation method
KR101955246B1 (en) the seismic reinforcing steel insertable type jet grouting structure and the construction method thereof
JP2015007317A (en) Column reinforcement device
JP3863894B2 (en) Inspection coil for on-site casting frame formation
JP3193466U (en) Corner metal fittings, metal fittings, seismic devices

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20150127

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20151022

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20151117

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20160118

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20160607

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20160629

R150 Certificate of patent or registration of utility model

Ref document number: 5964068

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250