Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP5968832B2 - Operation support system for work-in-process storage equipment - Google Patents
[go: Go Back, main page]

JP5968832B2 - Operation support system for work-in-process storage equipment - Google Patents

Operation support system for work-in-process storage equipment Download PDF

Info

Publication number
JP5968832B2
JP5968832B2 JP2013128099A JP2013128099A JP5968832B2 JP 5968832 B2 JP5968832 B2 JP 5968832B2 JP 2013128099 A JP2013128099 A JP 2013128099A JP 2013128099 A JP2013128099 A JP 2013128099A JP 5968832 B2 JP5968832 B2 JP 5968832B2
Authority
JP
Japan
Prior art keywords
work
storage
support system
progress
process material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2013128099A
Other languages
Japanese (ja)
Other versions
JP2015005002A (en
Inventor
楢崎 博司
博司 楢崎
道明 村上
道明 村上
圭一 山下
圭一 山下
茂行 吉田
茂行 吉田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kobe Steel Ltd
Original Assignee
Kobe Steel Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kobe Steel Ltd filed Critical Kobe Steel Ltd
Priority to JP2013128099A priority Critical patent/JP5968832B2/en
Publication of JP2015005002A publication Critical patent/JP2015005002A/en
Application granted granted Critical
Publication of JP5968832B2 publication Critical patent/JP5968832B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • General Factory Administration (AREA)
  • Warehouses Or Storage Devices (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

本発明は、圧延後の圧延材(仕掛材)を一時的に保管する仕掛材保管設備における作業を支援する操業支援システムに関する。   The present invention relates to an operation support system that supports work in a work-in-process storage facility that temporarily stores rolled material (work-in-process material) after rolling.

複数の受注を一つにまとめたうえで、圧延設備にて圧延された圧延材は、それに含まれる複数の製品に切り分けるために切断設備に送られ、その後製品の仕様に従って下工程である手入れ工程(熱処理工程、検査工程など)に送られる。また、圧延設備から排出された圧延材は、切断設備での切断前に保管場所で一時的に保管される。保管場所に保管された圧延材は次の処理を待つ「仕掛材」であり、この仕掛材のうち、どの仕掛材から切断処理し下工程に送るかは、主に、納期や生産性等を考慮して決定する必要がある。   Rolled materials rolled in a rolling facility after combining multiple orders are sent to the cutting facility to divide into multiple products included in the rolling equipment, and then the maintenance process is a lower process according to the product specifications (Heat treatment process, inspection process, etc.). Further, the rolled material discharged from the rolling equipment is temporarily stored in a storage place before being cut by the cutting equipment. Rolled material stored in the storage location is a “work in progress material” waiting for the next processing. Among these work in progress materials, which work in progress material is cut and sent to the lower process mainly depends on delivery date, productivity, etc. It is necessary to decide in consideration.

具体的には、仕掛材には下工程(手入れ工程)にて作業を完了すべき納期が定められており、この納期内に処理を完了するように適正に仕掛材を選択して切断し下工程に搬送する。また、下工程において素早く仕掛材が処理できるように、切断処理及び下工程への仕掛材の送り順を決定して全体の生産性、即ち、スループットを向上させるのがよい。
一方、保管場所には、複数の保管場所(載置場所)が設定され、各載置場所に仕掛材が山積状態にされる。
Specifically, the work-in-process material has a delivery date that should be completed in the lower process (care process), and the work-in-process material is properly selected and cut so that the processing is completed within this delivery date. Transport to process. Further, in order to process the work in progress quickly in the lower process, it is preferable to improve the overall productivity, that is, the throughput by determining the cutting process and the order of sending the work in progress to the lower process.
On the other hand, a plurality of storage locations (mounting locations) are set as the storage locations, and work-in-process materials are piled up at each mounting location.

山積状態の仕掛材の中で下側に位置する仕掛材(優先仕掛材)を優先的に切断処理場所に搬送する必要がある場合は、クレーン等によって優先仕掛材上に積み上げられた他の仕掛材(普通仕掛材という)を別の載置場所に移すという「配替作業」を行う。そして、配替作業に優先仕掛材をクレーンで取り出して切断処理場所に送り、切断後下工程に送る。また、他に優先仕掛材を取り出す方法として、配替作業を行わずに、優先仕掛材がある載置場所に山積みされている仕掛材の全てを他の載置場所の仕掛材よりも優先的に順次切断処理し、出来るだけ早く優先仕掛材を取り出すという「優先取り出し作業」を行うこともある。   If it is necessary to preferentially transport the work-in-process material (priority work-in-process material) located on the lower side among the work-in-process materials in the piled state, other work in progress stacked on the priority work-in-process material by a crane or the like “Replacement work” is performed in which the material (ordinary work-in-process material) is moved to another place. Then, the priority work-in-process material is taken out with a crane and sent to the cutting processing place for the replacement work, and sent to the lower process after cutting. In addition, as another method of taking out the priority work in progress, all work in progress stacked in the place where the priority work in progress is placed is prioritized over the work in progress at other places without performing the replacement work. In some cases, a “priority picking work” is performed in which cutting is sequentially performed and the priority work-in-process material is picked up as soon as possible.

配替作業においては、普通仕掛材をどの載置場所に移せば効率的であるか、周りの状況も考慮しなければならないことに加え、配替作業自体の時間も掛かることから、上にある仕掛材を順番に処理していく「優先取り出し作業」に比べて段取りの時間が多くなる。
一方、「優先取り出し作業」では「配替作業」に比べて段取り時間を短くすることができるものの、1つの載置場所(第1載置場所)に集中して搬送作業を行っている場合、新たな仕掛材が、これとは別の載置場所(第2載置場所)に積み上げられ、第2載置場所に先に到着した仕掛材の上に、後から来た仕掛材が上積みされる。つまり、第1載置場所の仕掛材を処理している間に、第2載置場所に新しい仕掛材が積み上げられるため、先に第2載置場所に到着した仕掛材が下側に位置してしまうことがある。
In the replacement work, it is above because it is efficient to move the work-in-process materials to where the work in progress, and the surrounding situation must be taken into consideration, as well as the time of the replacement work itself. Compared with the “priority picking work” in which work-in-progress materials are processed in order, the setup time increases.
On the other hand, in the “priority pick-up work”, the setup time can be shortened compared to the “replacement work”, but when the transport work is concentrated on one placement place (first placement place), New work-in-process materials are stacked at a different mounting location (second mounting location), and the work-in-process materials coming later are stacked on the work-in-process materials that have arrived first at the second mounting location. The That is, while the work-in-process material at the first loading place is being processed, a new work-in-process material is stacked at the second loading place, so that the work-in-process material that has previously arrived at the second loading place is positioned on the lower side. May end up.

このように、複数の載置場所から構成される保管場所から下工程へ仕掛材を搬送するためには、上述したような様々な状況等を考慮する必要があり、圧延設備から保管場所への仕掛材の受け入れや保管場所から下工程への仕掛材の切断処理、搬送は非常に難しく、これらの作業は、仕掛材を搬送する搬送クレーンを操作するオペレータの判断に委ねられているのが実情である。   As described above, in order to transport the work in progress from the storage location constituted by a plurality of placement locations to the lower process, it is necessary to consider various situations as described above, and from the rolling equipment to the storage location. It is very difficult to accept the work in progress and to cut and transport the work in progress from the storage location to the lower process, and the actual situation is that these operations are left to the judgment of the operator who operates the transport crane that transports the work in progress. It is.

生産現場における複雑な工程を管理する技術として特許文献1〜3に示すものがある。
特許文献1は、工程情報(仕掛、進捗、納期)の表示に関する技術であって、作業者が入力する実績に応じて、現状を更新すると同時に将来の進捗予測を行ないその情報を表示し、生産管理者が、当初の生産計画のどこでどの程度遅れ/進みが発生しているかを容易に把握するものである。
As techniques for managing complicated processes at production sites, there are techniques shown in Patent Documents 1 to 3.
Patent Document 1 is a technology related to the display of process information (in-process, progress, delivery date), and updates the current status according to the results input by the worker, and at the same time, predicts future progress and displays the information for production. The administrator easily grasps where and how much delay / advance has occurred in the initial production plan.

特許文献2は、製品の特性や工程能力により、通過する工程パターンにばらつきがある場合、どの工程を通過するかを予測したうえで製造工期を計算し、それを最小にするような生産計画を作成するものである。特許文献3は、製鋼から精製までの全体での負荷を平準化する技術である。   In Patent Document 2, when there are variations in the process pattern to be passed due to the characteristics and process capability of the product, the process schedule is calculated after predicting which process will be passed, and a production plan that minimizes it is calculated. To create. Patent Document 3 is a technique for leveling the overall load from steelmaking to refining.

特開平04−347769号公報Japanese Patent Laid-Open No. 04-347769 特開2010−271941号公報JP 2010-219441 A 特開2012−146124号公報JP 2012-146124 A

さて、実際の操業では、仕掛材の納期が様々な事情により予め定められた納期よりも早くなる場合がある。このような場合も、上述した「配替作業」を行うか、或いは、「優先取り出し作業」を行う。あるいは、圧延工程の遅延により、同一納期であっても、実質作業時間余裕は減少し、納期が早くなったのと同様の状況にいたる場合もある。
しかしながら、上述したように配替作業や優先搬送作業を行っている間にも、圧延が終了した圧延材が新規に保管場所に到着することになるため、保管場所全体の様々な状況を考慮して、保管作業、配替作業、優先取り出し作業、搬送作業での作業手順を適正に決めなければ、保管場所に納期の余裕の無い仕掛材が増加してしまうことになる。
In the actual operation, the delivery date of the work-in-process material may be earlier than the predetermined delivery date due to various circumstances. Even in such a case, the “replacement work” described above or the “priority extraction work” is performed. Alternatively, due to a delay in the rolling process, even if the delivery date is the same, the substantial work time margin may be reduced, leading to the same situation as when the delivery date is accelerated.
However, since the rolled material that has finished rolling arrives at the storage location anew during the replacement work and the priority transport operation as described above, the various conditions of the entire storage location are considered. If work procedures for storage work, transfer work, priority pick-up work, and transport work are not properly determined, the number of work-in-process materials that have no delivery time will increase at the storage location.

例えば、配替作業による段取り時間の増加によってスループットが低下し、作業がおいつかず、結果、納期に余裕の無い仕掛材が増加し、至急材(予定より納期が短くなってしまった仕掛材)の増加、配替作業等の増加につながり、ますますスループットが低下するという悪循環に陥る可能性がある。また、短納期の優先仕掛材が増加した場合は、前工程(圧延設備など)を止めて「仕掛材の一掃」をする必要があり、この一掃作業は、全体の生産性を大きく低下させることがあった。   For example, throughput decreases due to an increase in setup time due to relocation work, work is unsuccessful, and as a result, work-in-process materials with insufficient delivery time increase, and urgent materials (work-in-process materials whose delivery time has become shorter than planned) This leads to an increase in the number of jobs and an increase in replacement work, and may lead to a vicious circle in which the throughput further decreases. In addition, when the priority work-in-progress material with short delivery time increases, it is necessary to stop the previous process (rolling equipment, etc.) and “clean up the work-in-process material.” This clean-up operation greatly reduces the overall productivity. was there.

特許文献1は、保管場所における仕掛材の全体の山積み状況や納期を素早く把握というものではなく仕掛材の優先を判断するための情報を提供するものになっていないため、このような技術を用いても上述した問題を解消することができないのが実情である。また、特許文献2及び3は、生産計画を立案するのみで実際の操業状況を示すものではなく特に納期が変更になった場合など上述した問題を解消することができないのが実情である。   Patent Document 1 uses such a technique because it does not provide information for determining the priority of work-in-progress rather than quickly grasping the overall pile status and delivery date of work-in-process materials at a storage location. However, the fact is that the above-mentioned problems cannot be solved. In addition, Patent Documents 2 and 3 do not indicate the actual operation status only by making a production plan, and in particular, it is impossible to solve the above-described problems such as when the delivery date is changed.

そこで、本発明は上記問題点を鑑み、保管場所における仕掛材の情報を提供することによって、効率の良い作業手順を素早く決定することができる仕掛材保管設備の操業支援システムを提供することを目的とする。   In view of the above problems, the present invention has an object to provide an operation support system for a work-in-process storage facility that can quickly determine an efficient work procedure by providing information on work-in-process materials at a storage location. And

上述の目的を達成するため、本発明においては以下の技術的手段を講じた。
本発明に係る仕掛材保管設備の操業支援システムは、圧延後の仕掛材を保管場所に一時的に保管すると共に、前記保管場所から前記仕掛材を取り出して切断処理後に下工程に搬送する仕掛材保管設備の操業を支援する操業支援システムであって、前記操業支援システムは、オペレータが確認可能な表示器を有し、前記表示器は、前記保管場所に保管された仕掛材の載置状態を表示すると共に、各仕掛材に対する納期を識別可能に表示するように構成されていることを特徴とする。
In order to achieve the above-described object, the present invention takes the following technical means.
The operation support system of the work in progress material storage facility according to the present invention temporarily stores the work in progress material after rolling in a storage place, and takes out the work in progress material from the storage place and transports it to a lower process after cutting processing. An operation support system for supporting the operation of storage equipment, the operation support system having an indicator that can be confirmed by an operator, and the indicator indicates a loading state of work-in-process materials stored in the storage location. It is configured to display the delivery date for each work-in-process material in an identifiable manner.

好ましくは、前記表示器は、前記仕掛材の納期を色分けして表示するとよい。
好ましくは、前記表示器は、前記保管場所に保管された仕掛材のうち、下工程で同じ作業を行う仕掛材を識別可能に表示するとよい。
好ましくは、前記表示器は、仕掛材の納期状況を時間経過と共に表示するとよい。
Preferably, the display device displays the delivery date of the work-in-process material in different colors.
Preferably, the indicator may display a work-in-process material that performs the same operation in a lower process among work-in-process materials stored in the storage location so as to be identifiable.
Preferably, the display device displays a delivery status of the work-in-process material with the passage of time.

本発明の仕掛材保管設備の操業支援システムによれば、保管場所における仕掛材の情報を提供することによって、効率の良い作業手順を素早く決定することができる。   According to the operation support system for a work in progress storage facility of the present invention, it is possible to quickly determine an efficient work procedure by providing information on work in progress at a storage location.

仕掛材保管設備の操業支援システムの概念図を示したものである。The conceptual diagram of the operation support system of a work-in-process storage facility is shown. 支援モニタの状況表示画面の一例を示した図である。It is the figure which showed an example of the status display screen of a support monitor. 支援モニタに表示される検索画面の一例を示した図である。It is the figure which showed an example of the search screen displayed on a support monitor. 支援モニタに表示される納期状況画面の一例を示した図である。It is the figure which showed an example of the delivery date situation screen displayed on a support monitor.

以下、本発明に係る仕掛材保管設備の操業支援システムの実施の形態を、図をもとに説明する。
図1は、本実施形態の操業支援システムを示した模式図である。
図1に示す如く、仕掛材保管設備1は、圧延材Wを圧延する圧延設備2の下流側に配備されている。圧延設備2は、例えば、加熱炉に装入された圧延材Wを、粗圧延機及び仕上げ圧延機等によって圧延する。圧延後の圧延材(仕掛材)Wは、冷却床(図示省略)を通過することで冷却され、冷却後の仕掛材Wは、仕掛材保管設備1の保管場所5に載置されることになる。
DESCRIPTION OF EMBODIMENTS Hereinafter, an embodiment of an operation support system for work-in-process storage facilities according to the present invention will be described with reference to the drawings.
FIG. 1 is a schematic diagram showing the operation support system of the present embodiment.
As shown in FIG. 1, the work-in-process storage facility 1 is arranged on the downstream side of the rolling facility 2 that rolls the rolled material W. For example, the rolling equipment 2 rolls the rolled material W charged in a heating furnace with a roughing mill, a finish rolling mill, or the like. The rolled material (work-in-process material) W after rolling is cooled by passing through a cooling bed (not shown), and the work-in-process material W after cooling is placed in the storage place 5 of the work-in-process storage facility 1. Become.

仕掛材保管設備1は、冷却床で冷却後の仕掛材Wを保管すると共に、仕掛材Wを切断して下工程に搬送するもので、仕掛材Wを保管する保管場所5、仕掛材Wを搬送する搬送クレーン3と、仕掛材Wを所定の長さに切断するガス切断装置4とを備えている。
搬送クレーン3は、冷却床の仕掛材Wを取り出して当該仕掛材Wを予め定められた保管場所5に搬送すると共に、保管場所5の仕掛材Wをガス切断装置4へ向けて搬送する。ガス切断装置4は、納品する製品の寸法に応じて仕掛材Wを切断する。保管場所5は、冷却床とガス切断装置4との間の所定位置に設けられ、この保管場所5上を搬送クレーン3が移動する。この保管場所5には、複数の載置場所5A、5B、・・・が設定されている。各載置場所5A、5B、・・・においては、仕掛材Wが下側から上側に向けて順に山積みすることができるようになっている。
The work-in-process storage facility 1 stores the work-in-process material W after being cooled in the cooling floor, cuts the work-in-process material W and transports it to the lower process, and stores the work-in-process material W in the storage place 5 and the work-in-process material W. A transport crane 3 for transporting and a gas cutting device 4 for cutting the work-in-process material W into a predetermined length are provided.
The transport crane 3 takes out the work-in-process material W of the cooling floor and transports the work-in-process material W to a predetermined storage place 5 and also transports the work-in-process material W in the storage place 5 toward the gas cutting device 4. The gas cutting device 4 cuts the work-in-process material W according to the dimensions of the product to be delivered. The storage place 5 is provided at a predetermined position between the cooling floor and the gas cutting device 4, and the transport crane 3 moves on the storage place 5. In this storage place 5, a plurality of placement places 5A, 5B,... Are set. In each mounting place 5A, 5B,..., The work-in-process material W can be stacked in order from the lower side to the upper side.

このような仕掛材保管設備1においては、オペレータが搬送クレーン3を操作することにより、冷却床を通過して冷却された仕掛材Wを搬送クレーン3によって吊り上げ、当該仕掛材Wを保管場所5に移動して、保管場所5内の各載置場所5A、5B、・・・に仕掛材Wを降ろす保管作業を行う。保管作業において、仕掛材Wをどの載置場所5A、5B、・・・に載置するかは、特段の指示の無い場合にはオペレータの判断により行う。一方、保管場所5に保管された仕掛材Wは、仕掛材Wの納期に基づいて保管場所5から取り出してガス切断装置4に送られ切断された後、それぞれの製品仕様に応じて下工程である手入れ工程(研磨、表面手入れ、熱処理、UT検査等)に送られる。   In such a work-in-process storage facility 1, when the operator operates the transport crane 3, the work-in-process W cooled through the cooling floor is lifted by the transport crane 3, and the work-in-process W W is stored in the storage place 5. It moves, and the storage operation | work which takes down the work-in-process material W to each mounting place 5A, 5B, ... in the storage place 5 is performed. In the storage operation, the placement location 5A, 5B,... On which the work-in-process material W is placed is determined by the operator unless otherwise specified. On the other hand, the work-in-process material W stored in the storage place 5 is taken out from the storage place 5 based on the delivery date of the work-in-process material W, sent to the gas cutting device 4 and cut, and then in a lower process according to each product specification. It is sent to a certain care process (polishing, surface care, heat treatment, UT inspection, etc.).

本発明では、仕掛材Wの山積み状況や納期等を表示することで、圧延設備2から保管場所5への仕掛材Wの保管作業や仕掛材を下工程に移す搬送作業がスムーズに進むようにしたものである。
以下、本実施形態の仕掛材保管設備の操業支援システムの詳細を述べることにする。また、説明を分かり易くするために、保管場所5における仕掛材の載置場所は4つとして説明を進める。図1及び2において左側から順に、第1載置場所5A、第2載置場所5B、第3載置場所5C、第4載置場所5Dとする。
In the present invention, the storage status of the work-in-process material W from the rolling facility 2 to the storage location 5 and the transfer work of transferring the work-in-process material to the lower process are smoothly advanced by displaying the piled-up status and the delivery date of the work-in-process material W. It is a thing.
Hereinafter, details of the operation support system for the work-in-process storage facility according to this embodiment will be described. Further, in order to make the description easy to understand, the description will be made assuming that there are four work material placement places in the storage place 5. 1 and 2, in order from the left side, a first mounting location 5A, a second mounting location 5B, a third mounting location 5C, and a fourth mounting location 5D.

仕掛材保管設備の操業支援システム1は、載置場所5A、5B、5C、5Dに保管された仕掛材Wの山積み状態を表示すると共に、各仕掛材Wの納期を表示する表示器(支援モニタ)10を備えている。
図2に示すように、支援モニタ10は、液晶モニタやCRTモニタで構成されている。この支援モニタ10は、搬送クレーン3を操作する操作室に設置され、オペレータMは常にこの支援モニタ11を視聴可能な状態となっている。また、支援モニタ10は、搬送クレーン3の操作室だけでなく、様々な工程を一括管理するコントロール室にも設置され、工程を管理する管理責任者等も視聴可能な状態となっている。
The operation support system 1 for the work-in-process storage facility 1 displays a stacking state of the work-in-process materials W stored in the mounting places 5A, 5B, 5C, and 5D, and an indicator (support monitor) that displays the delivery date of each work-in-process material W. ) 10.
As shown in FIG. 2, the support monitor 10 includes a liquid crystal monitor and a CRT monitor. The support monitor 10 is installed in an operation room for operating the transport crane 3, and the operator M can always view the support monitor 11. Further, the support monitor 10 is installed not only in the operation room of the transport crane 3 but also in a control room that collectively manages various processes, and can be viewed by a manager or the like who manages the processes.

詳しくは、支援モニタ10は、保管場所5に保管した仕掛材の山積み状況を表示する状況表示画面Q1を表示するようになっている。状況表示画面Q1の下側には、各保管場所を、文字、数字、記号等により表示する保管場所表示部11が示されている。
状況表示画面Q1の保管場所表示部11には、左側から順に、「第1載置場所5A」を示す「5A」、「第2載置場所5B」を示す「5B」、「第3載置場所5C」を示す「5C」、「第4載置場所5D」を示す「5D」が示されている。
Specifically, the support monitor 10 displays a status display screen Q1 that displays a stacking status of work-in-process materials stored in the storage location 5. On the lower side of the status display screen Q1, there is shown a storage location display unit 11 for displaying each storage location with letters, numbers, symbols, and the like.
In the storage location display section 11 of the status display screen Q1, “5A” indicating “first mounting location 5A”, “5B” indicating “second mounting location 5B”, “third mounting location” in order from the left side. “5C” indicating “location 5C” and “5D” indicating “fourth placement location 5D” are shown.

状況表示画面Q1において、保管場所表示部11の上側には、各載置場所に保管された仕掛材Wを図形(棒グラフ)等によって表示する仕掛材状況表示部12が示されている。仕掛材状況表示部12は、第1載置場所5Aの仕掛材Wを表示する第1エリア12aと、第2載置場所5Bの仕掛材Wを表示する第2エリア12bと、第3載置場所5Cの仕掛材Wを表示する第3エリア12bと、第4載置場所5Dの仕掛材Wを表示する第4エリア12dとに分けられている。   On the status display screen Q1, on the upper side of the storage location display unit 11, there is shown an in-process material status display unit 12 that displays the work-in-process material W stored in each placement location by a figure (bar graph) or the like. The work-in-progress status display unit 12 includes a first area 12a that displays the work-in-process material W at the first placement location 5A, a second area 12b that displays the work-in-process material W at the second placement location 5B, and a third placement. It is divided into a third area 12b for displaying the work-in-process material W at the place 5C and a fourth area 12d for displaying the work-in-process material W at the fourth placement place 5D.

詳しくは、第1エリア12aには、第1載置場所5Aに積み上げられた7枚の仕掛材Wを模した図形が積み上げられた順番に表示され、第2エリア12bには、第2載置場所5Bに積み上げられた10枚の仕掛材Wを示す図形が積み上げられた順番に表示され、第3エリア12cには、第3載置場所5Cに積み上げられた3枚の仕掛材Wを示す図形が積み上げられた順番に表示され、第4エリア12dには、第4載置場所5Dに積み上げられた2枚の仕掛材Wを示す図形が積み上げられた順番に表示されている。即ち、状況表示画面Q1には、各載置場所5A〜5Dに保管された仕掛材Wの山積み状態の分布が表示されている。   Specifically, in the first area 12a, graphics imitating the seven work-in-process materials W stacked in the first mounting place 5A are displayed in the stacked order, and in the second area 12b, the second mounting is performed. Figures indicating the 10 work-in-process materials W stacked in the place 5B are displayed in the order in which they are stacked, and in the third area 12c, the figure indicating the three work-in-process materials W stacked in the third placement place 5C. Are displayed in the order in which they are stacked, and in the fourth area 12d, graphics indicating the two work materials W stacked in the fourth placement place 5D are displayed in the order in which they are stacked. That is, the status display screen Q1 displays the distribution of the piled-up state of the work-in-process materials W stored in the respective placement places 5A to 5D.

さて、支援モニタ10は、状況表示画面Q1において、各仕掛材Wの納期を表示している。詳しくは、仕掛材状況表示部12において、仕掛材Wを示す各図形には納期の余裕度(作業を完了するまでの余裕)に応じて所定の色が着色がなされている。仕掛材Wの納期は、下工程(熱処理工程、検査工程など)の管理を行うコンピュータに存在し、その納期情報は、支援モニタ10を制御するコンピュータに瞬時に転送されることとなっている。   Now, the support monitor 10 displays the delivery date of each work-in-process material W on the status display screen Q1. Specifically, in the work-in-progress material status display unit 12, each figure indicating the work-in-process material W is colored with a predetermined color according to the margin for delivery (allowance for completing the work). The delivery date of the work-in-process material W exists in a computer that manages the lower processes (heat treatment process, inspection process, etc.), and the delivery date information is instantly transferred to the computer that controls the support monitor 10.

納期が最も短い仕掛材Wを示す図形13a(緊急を要する仕掛材Wを示す図形13a)は、例えば「赤色」になっており、納期が遅れている仕掛材Wを示す図形13bは、例えば「ピンク色」になっており、納期に変化の無い仕掛材Wを示す図形13c(予定通りの仕掛材Wを示す図形13c)は、例えば「灰色」になっている。また、規格外れ等で納品することができない仕掛材W(死材)を示す図形13dは、例えば「黒色」になっている。なお、図形の着色について、緊急性が高いものは「暖色系」、緊急度の低いものは「寒色系」にするのが望ましいが、着色は上述したものに限定されない。   The figure 13a indicating the work-in-process material W with the shortest delivery date (the figure 13a indicating the work-in-progress material W requiring urgentness) is, for example, “red”. The figure 13c indicating the work-in-process material W that is “pink” and has no change in delivery date (the figure 13c showing the work-in-process material W as scheduled) is, for example, “gray”. Further, the figure 13d indicating the work-in-process material W (dead material) that cannot be delivered due to out of specification or the like is, for example, “black”. Regarding the coloring of graphics, it is desirable to use “warm color” for those with high urgency and “cold color” for those with low urgency, but coloring is not limited to those described above.

このように、保管場所5に積まれている仕掛材を、工程納期(作業完了すべき日までの余裕)に応じて色分け表示することにより、納期余裕に応じた仕掛材の分布を容易に把握することができる。つまり、支援モニタ10に表示した状況表示画面Q1を見ることにより、納期遅れの余裕度に応じた仕掛材の分布が一目瞭然でわかり(どのような仕掛材がどこの載置場所に詰まれているかを容易に目視確認できる)、どの載置場所に存在する仕掛材(山)を優先的に処理すべきかの判断を簡単にすることができる。   In this way, the work-in-process materials stacked in the storage location 5 are displayed in different colors according to the process delivery date (the margin until the date when the work should be completed), so that the distribution of the work-in-progress material according to the delivery date margin can be easily grasped. can do. That is, by looking at the status display screen Q1 displayed on the support monitor 10, the distribution of the work in progress according to the margin of delivery delay can be seen at a glance (what kind of work place is packed in which place of installation). It is easy to visually check), and it is possible to simplify the determination as to which work-in-process material (mountains) existing at which mounting place should be processed with priority.

支援モニタ10は、保管場所5に保管された仕掛材Wのうち、下工程で同じ作業を行う仕掛材Wを表示する。詳しくは、図3に示す如く、支援モニタ10は、保管場所5に保管された複数の仕掛材Wのうち、諸条件の一致する仕掛材Wを検索する検索画面Q2を表示するようになっている。
検索画面Q2には、仕掛材Wの厚みの範囲、仕掛材Wの幅、仕掛材Wの長さ、下工程における作業内容(仕掛コード)のそれぞれを入力する入力ウインドウが表示されており、各入力ウインドウに任意の条件を入力して、「絞り込み」をクリックすると、この条件に合致する仕掛材が仕掛材状況表示部12(状況表示画面Q1)に表示されるようになっている。なお、検索画面Q2において、仕掛コードは、下工程で行われる作業内容を示すものである。
The support monitor 10 displays the work-in-process material W that performs the same work in the lower process among the work-in-process materials W stored in the storage location 5. Specifically, as shown in FIG. 3, the support monitor 10 displays a search screen Q2 for searching for a work-in-process material W that matches various conditions among a plurality of work-in-process materials W stored in the storage location 5. Yes.
The search screen Q2 displays an input window for inputting the thickness range of the work-in-process material W, the width of the work-in-process material W, the length of the work-in-process material W, and the work content (process code) in the lower process. When an arbitrary condition is input in the input window and “narrow down” is clicked, the work-in-process material that matches this condition is displayed on the work-in-process material status display unit 12 (status display screen Q1). In the search screen Q2, the work-in-process code indicates the content of work performed in the lower process.

検索画面Q2にて同じ条件、例えば、作業内容が同じである仕掛材を検索した場合、図2に示すように、仕掛材状況表示部12には、表示した複数の仕掛材Wのうち、作業内容が同じである仕掛材を、他の仕掛材と区別して表示する。例えば、作業内容が同じ仕掛材Wを太枠14で示す。これにより、作業内容が同じ仕掛材Wがどの場所にあるかを簡単に把握することができる。つまり、作業内容や同時の処理(取り合わせ)が可能な寸法などの条件を指定し、それに合致した仕掛材を状況表示画面Q1に強調表示することができ、処理対象がどの保管場所5のどの位置にあるかを容易に目視確認することができる。   When searching for a work-in-process material having the same condition, for example, the same work content, on the search screen Q2, the work-in-progress status display unit 12 displays a work among the displayed work-in-progress materials W as shown in FIG. Work in process materials with the same contents are displayed separately from other work in progress materials. For example, the work-in-process material W having the same work content is indicated by a thick frame 14. Thereby, it is possible to easily grasp where the work-in-process material W having the same work content is located. In other words, it is possible to specify conditions such as work contents and dimensions capable of simultaneous processing (assortment), and to highlight the work-in-process material that matches the conditions on the status display screen Q1. It can be easily confirmed visually.

さらに、支援モニタ10は、仕掛材Wの納期状況を表示する。
詳しくは、図4に示すように、支援モニタ10は、納期の遅れの状況(遅れ枚数比率)を表示する納期状況画面Q3を表示する。納期状況画面Q3には、例えば、1日の作業を8時間毎に区切った時間軸(横軸)と、保管場所5に保管した全仕掛材Wに対する遅れ枚数比率(納期遅れの枚数/全仕掛材の枚数)を示す縦軸とを有する傾向グラフが表示される。各作業毎(8時間毎)に納期遅れの割合が表示される。
Furthermore, the support monitor 10 displays the delivery date of the work-in-process material W.
Specifically, as shown in FIG. 4, the support monitor 10 displays a delivery date situation screen Q3 that displays a delivery delay situation (delayed sheet ratio). The delivery date status screen Q3 includes, for example, a time axis (horizontal axis) that divides a day's work every 8 hours, and a ratio of the number of delays to all work-in-process materials W stored in the storage location 5 (number of late delivery dates / all work in progress). A trend graph having a vertical axis indicating the number of materials) is displayed. The ratio of delivery delay is displayed for each work (every 8 hours).

これにより、納期状況の1つである納期遅れの状況を把握することができ、オペレータによる作業が適正であるかどうかを判断することができる。例えば、日々あるいはオペレータ交代時間ごとで、納期余裕の少ない仕掛材がどう変化したか、どれくらいの量を処理したか、どれくらいのものが流入したかを把握することができ、操業において、納期遅れの仕掛材の枚数を所定量以下に抑えることができる。保管場所への新規の仕掛材の流入と下工程への仕掛材の搬送量(処理量)のバランスを崩れないようにすることができる。   As a result, it is possible to grasp the status of delivery delay, which is one of the delivery statuses, and to determine whether the work by the operator is appropriate. For example, it is possible to know how the work in progress with less delivery time has changed, how much has been processed, and how much has flowed in every day or every operator change time. The number of work-in-process materials can be suppressed to a predetermined amount or less. It is possible to prevent the balance between the inflow of a new work-in-process material to the storage location and the transport amount (process amount) of the work-in-process material to the lower process.

また、たとえば、納期遅れの材が複数山に分散しており、なおかつ、遅れ枚数比率が低減しない、ないし増加している場合は、あえて配替をしてでも納期遅れの仕掛材を処理する必要があると判断できる場合がある。このような場合にも、仕掛材の山積み状態を容易に確認できるので、どの程度の配替作業が必要かを容易に見積もることが可能であり、要員確保など適切な作業計画立案が可能になる。   Also, for example, if materials with delayed delivery are spread over multiple piles, and the ratio of delayed sheets is not reduced or has increased, it is necessary to process materials that are delayed in delivery even if they are replaced. It can be determined that there is. Even in such a case, it is possible to easily check the piled-up state of work-in-process materials, so it is possible to easily estimate how much replacement work is necessary, and it is possible to make an appropriate work plan such as securing personnel. .

以上述べた如く、本発明の仕掛材保管設備の操業支援システム1によれば、オペレータは、支援モニタ10の状況表示画面Q1に表示された保管場所5の仕掛材Wの山積状態と、仕掛材Wの納期とを見ながら、即ち、保管場所5に保管した全ての仕掛材Wの納期と仕掛材Wの分布を見ながら搬送クレーン3を操作することができる。そのため、どのように搬送クレーン3を動かして仕掛材Wの搬送作業を行えば最適であるかを素早く導くことができる。特に、ユーザの要望や物流状況によって納期が急に変更した場合であっても、最も適した方法で仕掛材Wを下工程に送ることができる。   As described above, according to the operation support system 1 of the work-in-process storage facility of the present invention, the operator can check the pile state of the work-in-process W at the storage location 5 displayed on the status display screen Q1 of the support monitor 10, and the work-in-process material. The transport crane 3 can be operated while looking at the delivery date of W, that is, while looking at the delivery date of all work-in-process materials W stored in the storage place 5 and the distribution of work-in-process materials W. Therefore, it is possible to quickly guide how it is optimal to move the carrying crane 3 and carry the work in progress of the work in progress W. In particular, the work-in-process material W can be sent to the lower process by the most suitable method even when the delivery date is suddenly changed according to the user's request or physical distribution.

仕掛材の納期が短納期になった場合など、至急材や段取り時間、増大などにより処理能力不足の兆候を支援モニタ10を見ることによって把握することができ、この場合には、前工程(圧延工程)を含めた全体生産計画調整を行うことが可能となる。納期状況画面Q3によって納期状況の傾向を把握することができ、処理能力の状態を評価することができる。   When the delivery date of work-in-process materials becomes short, the signs of insufficient processing capacity can be grasped by looking at the support monitor 10 due to urgent materials, setup time, increase, etc. In this case, in the previous process (rolling It is possible to adjust the overall production plan including the process. It is possible to grasp the trend of the delivery date situation on the delivery date situation screen Q3, and to evaluate the state of the processing capability.

なお、本発明の仕掛材保管設備の操業支援システムにおいて、オペレータに示す情報は、上記したものに限定されず、様々な情報を表示するようにしてもよい。
例えば、仕掛材保管設備の操業支援システム1において、載置場所5A〜5D毎に納期状況を数値化し、数値化した指標をガイダンスとして支援モニタ10に表示するようにしてもよい。
In the operation support system for the work-in-process storage facility of the present invention, the information shown to the operator is not limited to the information described above, and various information may be displayed.
For example, in the operation support system 1 for the work-in-process storage facility, the delivery date may be digitized for each of the placement locations 5A to 5D, and the digitized index may be displayed on the support monitor 10 as guidance.

例えば、式(1)に示した余裕指標W1を載置場所5A〜5D毎に計算し、計算した余裕指標W1を表示するようにしてもよいし、式(2)に示すように、枚数指標W2を保管場所毎に計算し、計算した枚数指標W2を表示するようにしてもよい。   For example, the margin index W1 shown in Expression (1) may be calculated for each of the placement locations 5A to 5D, and the calculated margin index W1 may be displayed. As shown in Expression (2), the number index may be displayed. W2 may be calculated for each storage location, and the calculated number index W2 may be displayed.

Figure 0005968832
Figure 0005968832

余裕指標W1では、各載置場所について、余裕日数が少ないほど指標値が大きくなる(遅れの場合は負の数になり、αよりも大きくなる)。ただし、α日以上の余裕があるものはカウントされない。例えば、納期遅れの大きなものがあれば、W1は大きな値になる。それに対し、枚数指標W2では納期余裕程度は考慮されず、仕掛材の枚数のみを考慮している。通常、処理能力に余裕がある場合は、枚数指標W2の大きな山を順次処理すればよいが、余裕指標W1が所定値より大きくなった保管場所がある場合は、下側に納期が短い仕掛材がある載置場所を優先的に処理する必要がある。   In the margin index W1, the index value increases for each placement location as the number of margin days decreases (in the case of a delay, the index value is a negative number and is greater than α). However, those with a margin of α days or more are not counted. For example, if there is a large delivery delay, W1 will be a large value. On the other hand, the number index W2 does not consider the margin for delivery, but considers only the number of work in progress. Usually, when there is a margin in processing capacity, it is sufficient to sequentially process a large peak of the number index W2, but when there is a storage place where the margin index W1 is larger than a predetermined value, the work-in-process material with a short delivery date on the lower side It is necessary to preferentially process a certain place.

このように、余裕指標W1、枚数指標W2を各載置場所について計算し、その推移を見ることで、どの載置場所から処理するかの目安とすることができる。これにより、仕掛の過剰な増加による生産停止などを未然に防止することができる。また、仕掛材において納期分布の遅れが所定範囲内であれば「山優先」(優先搬送作業)を優先とし、納期遅れが増加している場合は「板優先」(配替作業)を優先することができる。   As described above, the margin index W1 and the number index W2 are calculated for each placement location, and by looking at the transition, it can be used as a guideline from which placement location to process. As a result, it is possible to prevent a production stoppage due to an excessive increase in work in advance. In addition, if the delay in the delivery date distribution in the work-in-process material is within a predetermined range, priority is given to “mountain priority” (priority transport work), and if the delay in delivery date has increased, priority is given to “board priority” (replacement work). be able to.

なお、今回開示された実施の形態はすべての点で例示であって制限的なものではないと考えられるべきである。本発明の範囲は上記した説明ではなくて特許請求の範囲によって示され、特許請求の範囲と均等の意味および範囲内でのすべての変更が含まれることが意図される。特に、今回開示された実施形態において、明示的に開示されていない事項、例えば、運転条件や操業条件、各種パラメータ、構成物の寸法、重量、体積などは、当業者が通常実施する範囲を逸脱するものではなく、通常の当業者であれば、容易に想定することが可能な値を採用している。   The embodiment disclosed this time should be considered as illustrative in all points and not restrictive. The scope of the present invention is defined by the terms of the claims, rather than the description above, and is intended to include any modifications within the scope and meaning equivalent to the terms of the claims. In particular, in the embodiment disclosed this time, matters that are not explicitly disclosed, for example, operating conditions and operating conditions, various parameters, dimensions, weights, volumes, and the like of a component deviate from a range that a person skilled in the art normally performs. Instead, values that can be easily assumed by those skilled in the art are employed.

1 仕掛材保管設備
2 圧延設備
3 搬送クレーン
4 ガス切断装置
5 保管場所
5A 第1載置場所
5B 第2載置場所
5C 第3載置場所
5D 第4載置場所
10 表示器(支援モニタ)
11 保管場所表示部
12 仕掛材状況表示部
12a 第1エリア
12b 第2エリア
12c 第3エリア
12d 第4エリア
13 図形
DESCRIPTION OF SYMBOLS 1 Work-in-process material storage facility 2 Rolling facility 3 Transport crane 4 Gas cutting device 5 Storage location 5A 1st mounting location 5B 2nd mounting location 5C 3rd mounting location 5D 4th mounting location 10 Indicator (support monitor)
DESCRIPTION OF SYMBOLS 11 Storage location display part 12 Work-in-progress status display part 12a 1st area 12b 2nd area 12c 3rd area 12d 4th area 13 Graphic

Claims (4)

圧延後の仕掛材を保管場所に一時的に保管すると共に、前記保管場所から前記仕掛材を取り出して切断処理後に下工程に搬送する仕掛材保管設備の操業を支援する操業支援システムであって、
前記操業支援システムは、オペレータが確認可能な表示器を有し、
前記表示器は、前記保管場所に保管された仕掛材の載置状態を表示すると共に、各仕掛材に対する納期を識別可能に表示するように構成されていることを特徴とする仕掛材保管設備の操業支援システム。
An operation support system that temporarily supports the work-in-process material after rolling in a storage location, supports the operation of the work-in-process storage facility that takes out the work-in-process material from the storage location and transports it to a lower process after the cutting process,
The operation support system has a display that can be confirmed by an operator,
The indicator is configured to display a loading state of the work in progress stored in the storage location and to display a delivery date for each work in progress in an identifiable manner. Operation support system.
前記表示器は、前記仕掛材の納期を色分けして表示することを特徴とする請求項1に記載の仕掛材保管設備の操業支援システム。   The operation support system for a work-in-process storage facility according to claim 1, wherein the display unit displays the delivery date of the work-in-process material in different colors. 前記表示器は、前記保管場所に保管された仕掛材のうち、下工程で同じ作業を行う仕掛材を識別可能に表示することを特徴とする請求項1又は2に記載の仕掛材保管設備の操業支援システム。   The said indicator displays the work-in-process material which performs the same operation | work in a lower process among the work-in-process materials stored in the said storage place so that identification is possible, The work-in-process storage equipment of Claim 1 or 2 characterized by the above-mentioned. Operation support system. 前記表示器は、仕掛材の納期状況を時間経過と共に表示することを特徴とする請求項1〜3のいずれかに記載の仕掛材保管設備の操業支援システム。   The operation support system for a work-in-process storage facility according to any one of claims 1 to 3, wherein the display device displays a delivery date status of the work-in-process material over time.
JP2013128099A 2013-06-19 2013-06-19 Operation support system for work-in-process storage equipment Active JP5968832B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2013128099A JP5968832B2 (en) 2013-06-19 2013-06-19 Operation support system for work-in-process storage equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2013128099A JP5968832B2 (en) 2013-06-19 2013-06-19 Operation support system for work-in-process storage equipment

Publications (2)

Publication Number Publication Date
JP2015005002A JP2015005002A (en) 2015-01-08
JP5968832B2 true JP5968832B2 (en) 2016-08-10

Family

ID=52300888

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2013128099A Active JP5968832B2 (en) 2013-06-19 2013-06-19 Operation support system for work-in-process storage equipment

Country Status (1)

Country Link
JP (1) JP5968832B2 (en)

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003058228A (en) * 2001-08-15 2003-02-28 Fujitsu Ten Ltd Product progress management method and device
JP2008207920A (en) * 2007-02-26 2008-09-11 Kobe Steel Ltd Raw material yard arrangement planning method and raw material yard arrangement planning program
JP2009220927A (en) * 2008-03-14 2009-10-01 Topy Ind Ltd Storage place determination system and determination method
JP5444801B2 (en) * 2009-04-15 2014-03-19 Jfeスチール株式会社 Method and apparatus for preparing a plan for charging steel sheet products into a heat treatment furnace

Also Published As

Publication number Publication date
JP2015005002A (en) 2015-01-08

Similar Documents

Publication Publication Date Title
JP6011554B2 (en) Operation support system for production logistics equipment
JP5365759B1 (en) YARD MANAGEMENT DEVICE, YARD MANAGEMENT METHOD, AND COMPUTER PROGRAM
CN110398941B (en) Method and system for glass substrate production control
CN115904267A (en) Production method, production system, and recording medium in which production procedures are recorded
JP5968832B2 (en) Operation support system for work-in-process storage equipment
JP2018128766A (en) Work process planning method, work process planning device and work process planning program
JP5966566B2 (en) Rolling forward control device and rolling forward control method
JP5995245B2 (en) Operation information provision system
CN115708055A (en) Production method, production system, and recording medium having production program recorded thereon
JP5109451B2 (en) Non-fixed location management method of finishing yard and tracking method of steel plate
JP6355962B2 (en) Operation support system for work-in-process storage facilities
JP5736709B2 (en) Product storage location operation support method and storage location support processing apparatus
JP5494194B2 (en) Production target range setting device and production target range setting method
JP5686705B2 (en) Operation support system for manufacturing equipment
JP5223733B2 (en) Rolling coil management system
JP2013126674A (en) Method for charging slab into heating furnace
JP5868252B2 (en) Production schedule decision support system
JP4892848B2 (en) Steel plate manufacturing method
JP4699930B2 (en) Time notification method and apparatus
JP2007269447A (en) Time notification method and apparatus
JPH11262843A (en) Logistics control device
JP2657696B2 (en) Construction site lifting management method
JP5827606B2 (en) Production schedule decision support system
JP5117176B2 (en) Production schedule creation device and production schedule creation program
JP5266966B2 (en) Goods storage plan formulation system and method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20150901

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20160627

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20160705

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20160706

R150 Certificate of patent or registration of utility model

Ref document number: 5968832

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150