JP5992464B2 - Excavation blade mounting steel pipe for construction of cast-in-place concrete pile and construction method of cast-in-place concrete pile - Google Patents
Excavation blade mounting steel pipe for construction of cast-in-place concrete pile and construction method of cast-in-place concrete pile Download PDFInfo
- Publication number
- JP5992464B2 JP5992464B2 JP2014038205A JP2014038205A JP5992464B2 JP 5992464 B2 JP5992464 B2 JP 5992464B2 JP 2014038205 A JP2014038205 A JP 2014038205A JP 2014038205 A JP2014038205 A JP 2014038205A JP 5992464 B2 JP5992464 B2 JP 5992464B2
- Authority
- JP
- Japan
- Prior art keywords
- steel pipe
- tip
- blade
- excavation
- excavating
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
Description
この発明は、建物の基礎を支えるために地中に現場打ちで築造されるコンクリート系杭の築造に用いる現場打ちコンクリート系杭築造用の掘削刃取付け鋼管、および現場打ちコンクリート系杭の築造方法に関する。 The present invention relates to an excavating blade-attached steel pipe for building a cast-in-place concrete pile used for building a concrete-based pile built in-situ in the ground to support the foundation of the building, and a method for building a cast-in-place concrete pile .
軟弱な地盤の上に建物を建てる場合、柱状改良工法、小口径鋼管杭を埋設する工法等により地盤を補強することが行われている。柱状改良工法は、地盤に杭孔を掘削しながら、掘削した土に固化材を混入して撹拌することにより、土を固化材で固めた柱状改良杭を築造する工法である。 When building a building on soft ground, the ground is reinforced by a columnar improvement method, a method of burying small-diameter steel pipe piles, and the like. The columnar improvement method is a method of constructing a columnar improvement pile in which soil is solidified with a solidifying material by mixing and stirring the solidified material in the excavated soil while excavating a pile hole in the ground.
上記柱状改良工法に代わる工法として、特許文献1に、先端に掘削爪を有する掘削オーガにより地盤に杭孔を掘削し、その杭孔にセメント等からなる水硬性固化材液を充填しつつ、掘削オーガを地盤から引き抜くことにより、水硬性固化材液が固化した置換コラムを築造する工法が提案されている。
As an alternative to the above-mentioned columnar improvement method,
また、特許文献2には、鋼管等からなる筒状のケーシングの下端に掘削刃を有する先端ヘッドを着脱可能に装着し、前記ケーシングおよび先端ヘッドを回転させつつ地中に貫入し、ケーシング内にセメントミルク等を充填し、その後、ケーシングから先端ヘッドを切り離してケーシングのみを地中から引き抜くことにより、コンクリート系杭を築造する工法が提案されている。
Further, in
前記従来の柱状改良工法は、次のような問題がある。
・現場の土と固化材を現場で混合撹拌するため、現場の土質、施工者の違い等により、築造された柱状改良杭の品質にばらつきが生じる。
・固化不良や撹拌不良による強度不足を回避するために、多量の固化材スラリーを注入する必要がある場合があり、環境への負荷が大きい。
・土質によっては、六価クロム等の有害な物質が溶出する可能性がある。事前に六価クロム等が溶出するか否かを試験して、溶出が無いことを確認することは可能であるが、それには費用と期間を要する。
The conventional columnar improvement method has the following problems.
・ Since soil and solidified material are mixed and stirred at the site, the quality of the built-up pillar-shaped piles varies depending on the soil quality at the site and the difference in the installer.
-In order to avoid insufficient strength due to poor solidification or poor stirring, it may be necessary to inject a large amount of solidified material slurry, which places a heavy burden on the environment.
-Depending on the soil, harmful substances such as hexavalent chromium may be eluted. Although it is possible to test whether hexavalent chromium or the like is eluted in advance and confirm that there is no dissolution, this requires cost and time.
小口径鋼管杭を埋設する工法は、次のような問題がある。
・小口径鋼管杭の先端を比較的硬い地盤(一般的にN値>10)に支持させる必要があるため、地盤によっては適用できない場合がある。
・小口径鋼管杭の腐食による劣化が懸念される。そのため、予め腐食しろを見込んで設計している。
The method of burying small diameter steel pipe piles has the following problems.
-Since it is necessary to support the front-end | tip of a small diameter steel pipe pile on comparatively hard ground (generally N value> 10), it may not be applied depending on the ground.
・ Deterioration due to corrosion of small diameter steel pipe piles. For this reason, it is designed in advance to allow for corrosion.
特許文献1の工法は、現場の土を固化材と混合させないので、従来の柱状改良工法の各問題が生じない。しかし、特許文献1の方法は、掘削オーガを地盤から引き抜くときに杭孔の内周面の一部が崩落して、水硬性固化材液に土が混じり込み、良好な置換コラムが形成されない可能性がある。
Since the construction method of
特許文献2の工法は、筒状のケーシング内にセメントミルク等を充填した後、ケーシングを地中から引き抜くため、杭孔の内周面が崩落する心配がない。この工法では、ケーシングに対して先端ヘッドが着脱可能に装着され、ケーシングを地中から引き抜く際にケーシングから先端ヘッドが切り離されて、先端ヘッドは杭孔の底に残される。そのため、ケーシングへの先端ヘッドの装着が容易で、かつケーシングから先端ヘッドが確実に分離されることが求められる。
In the construction method of
特許文献2には、ケーシングに対する先端ヘッドの着脱構造の具体例が、同文献の段落0032〜0036、および図1〜図3に示されている。すなわち、ケーシングの下端内周面に形成された切欠部に、先端ヘッドの本体周壁部に設けられた凸部を挿入・脱出させることで、ケーシングに対して先端ヘッドを着脱する。切欠部に凸部が挿入された状態でケーシングを所定方向に回転させると、切欠部に凸部が係止して、ケーシングに先端ヘッドがつれ回りする。ケーシングの回転を停止しても、切欠部のフック部により凸部が下から受けられるため、ケーシングから先端ヘッドが分離しない。ケーシングを逆方向に回転させると、上記切欠部のフック部から凸部が外れるため、ケーシングから先端ヘッドを分離することが可能となる。
In
上記例の着脱構造は、ケーシングに先端ヘッドを装着する際、ケーシングと先端ヘッドの軸心を揃え、かつ切欠部と凸部の円周方向位相を揃えた状態で、ケーシングに対して先端ヘッドを軸方向に相対移動させなければならないため、先端ヘッドの装着が面倒である。また、ケーシング内への土の侵入を防ぐために、ケーシングに先端ヘッドを装着した状態において、ケーシングの内周に先端ヘッドの本体周壁部の外周全体が嵌る構成であるので、ケーシングを前記逆方向に回転させても、ケーシングの内周面と先端ヘッドの本体周壁部の外周面との摩擦抵抗によりケーシングに対して先端ヘッドがつれ回りして、切欠部のフック部から凸部が外れなかったり、外れてもケーシングの内周面から先端ヘッドの本体周壁部が抜けなかったりして、先端ヘッドが分離しない可能性がある。先端ヘッドが分離しないと、ケーシング内に充填されたセメントミルク等がケーシングと共に持ち上がってしまう。 In the mounting structure of the above example, when the tip head is mounted on the casing, the tip head is mounted on the casing in a state where the axial centers of the casing and the tip head are aligned and the circumferential phase of the notch and the convex is aligned. Since the relative movement in the axial direction is required, it is troublesome to mount the tip head. In addition, in order to prevent dirt from entering the casing, in the state where the tip head is mounted on the casing, the entire outer periphery of the main body peripheral wall portion of the tip head is fitted to the inner periphery of the casing. Even if it is rotated, the tip head rotates around the casing due to frictional resistance between the inner peripheral surface of the casing and the outer peripheral surface of the main body peripheral wall of the tip head, and the convex portion does not come off from the hook portion of the notch, Even if it comes off, the main body peripheral wall portion of the tip head may not come off from the inner peripheral surface of the casing, and the tip head may not be separated. If the tip head is not separated, the cement milk or the like filled in the casing will be lifted together with the casing.
この発明の目的は、現場の土の状態に影響されることなく品質の安定した地盤補強用のコンクリート系杭を築造することができ、かつ現場での施工が容易で確実にコンクリート系杭を築造することができる現場打ちコンクリート系杭築造用の掘削刃取付け鋼管を提供することである。
この発明の他の目的は、現場の土の状態に影響されることなく品質の安定した地盤補強用のコンクリート系杭を築造することができ、かつ現場での施工が容易で確実にコンクリート系杭を築造することができる現場打ちコンクリート系杭の築造方法を提供することである。
この発明のさらに他の目的は、地盤に螺旋状溝を形成して節を設けるときに、前記螺旋状溝が崩れ難い現場打ちコンクリート系杭を築造可能とすることである。
The purpose of this invention is to build a concrete pile for ground reinforcement with stable quality without being affected by the soil condition at the site, and to construct a concrete pile easily and reliably on site. It is to provide an excavating blade-attached steel pipe for on-site concrete pile construction that can be done.
Another object of the present invention is to enable the construction of a concrete pile for ground reinforcement with stable quality without being affected by the soil condition at the site. It is to provide a construction method of on-site concrete piles that can be built.
Still another object of the present invention is to make it possible to build a cast-in-place concrete pile that is difficult to collapse when the spiral groove is formed in the ground and the node is provided.
この発明の現場打ちコンクリート系杭築造用の掘削刃取付け鋼管は、鋼管と、この鋼管の先端に着脱可能に取り付けられて先端面に掘削用刃体を有する先端掘削刃とでなり、前記鋼管の先端の内周面に内径側へ突出する突起が設けられると共に、前記先端掘削刃に、前記鋼管が軸回りに定められた掘削回転方向に回転するとき前記突起に当接して前記先端掘削刃を前記鋼管と一体に回転させる回転受け部と、前記鋼管が前記掘削回転方向と逆向きに回転しつつ引き上げるときに前記突起に係止して前記先端掘削刃が前記鋼管に対して軸方向に分離することを規制する分離規制部とが設けられている。 An excavating blade mounting steel pipe for building a cast-in-place concrete pile according to the present invention includes a steel pipe and a tip excavating blade which is detachably attached to the tip of the steel pipe and has an excavating blade on the tip surface. protrusions protruding to the inner diameter side to the inner peripheral surface of the distal end is provided Rutotomoni, wherein the tip digging edge, said tip digging edge abuts on the projection when the steel pipe is rotated in the drilling rotation direction determined around the axis A rotation receiving portion for rotating the steel pipe integrally with the steel pipe, and when the steel pipe is pulled up while rotating in a direction opposite to the excavation rotation direction, the tip excavation blade is axially moved with respect to the steel pipe. A separation restricting section that restricts separation is provided .
この構成の現場打ちコンクリート系杭築造用の掘削刃取付け鋼管を使用した現場打ちコンクリート系杭の築造は、以下のように行う。
まず、鋼管の先端に先端掘削刃を取り付けて掘削刃取付け鋼管を準備する。鋼管への先端掘削刃の取付けは、鋼管と先端掘削刃の軸心を揃えた状態で、鋼管内に先端掘削刃の回転受け部および分離規制部を進入させることで行う。鋼管と先端掘削刃の円周方向位置を合わせる必要はない。このため、従来のように、ケーシングと先端ヘッドの軸心を揃え、かつ切欠部と凸部の円周方向位相を揃えた状態で、ケーシングに対して先端ヘッドを軸方向に相対移動させるのに比べて、取付けが容易である。なお、鋼管内に回転受け部および分離規制部を進入させた後、先端掘削刃を円周方向のいずれか一方に回転させて、鋼管の突起に分離規制部を係止させておくと、後で掘削刃取付け鋼管を先端掘削刃が下側となるように支持したときに、鋼管から先端掘削刃が自重で落下することを防げる。
Construction of a cast-in-place concrete pile using an excavating blade-attached steel pipe for construction of a cast-in-place concrete pile of this configuration is performed as follows.
First, a drilling blade mounting steel pipe is prepared by attaching a tip drilling blade to the tip of the steel pipe. The tip excavating blade is attached to the steel pipe by allowing the rotation receiving portion and the separation restricting portion of the tip excavating blade to enter the steel pipe with the axis of the steel pipe and the tip excavating blade aligned. It is not necessary to match the circumferential position of the steel pipe and the tip excavation blade. For this reason, in order to move the tip head relative to the casing in the axial direction with the axial centers of the casing and the tip head aligned, and with the circumferential phase of the notch and the convex aligned. In comparison, it is easy to install. Note that after the rotation receiving portion and the separation restricting portion enter the steel pipe, the tip excavating blade is rotated in either one of the circumferential directions so that the separation restricting portion is locked to the protrusion of the steel pipe. When the excavating blade mounting steel pipe is supported so that the tip excavating blade is on the lower side, the tip excavating blade can be prevented from dropping from the steel pipe by its own weight.
このようにして準備された掘削刃取付け鋼管を、先端掘削刃が下側となるように支持した状態で、定められた掘削回転方向に回転させつつ押し下げることによって、先端掘削刃により下方に掘削しながら地盤に貫入させる。このとき、鋼管の突起に先端掘削刃の回転受け部が当接することで、鋼管の回転が先端掘削刃に伝達される。前記掘削回転方向は、回転により鋼管の突起と先端掘削刃の規制分離部とが互いに係止しない方向である。このため、先端掘削刃の規制分離部は鋼管の突起と係止していないが、先端掘削刃は地盤に押し付けられているため、鋼管から先端掘削刃が軸方向に分離することはない。 The excavator blade-attached steel pipe thus prepared is excavated downward by the tip excavator blade by pushing down while rotating in the predetermined excavation rotation direction with the tip excavator blade being supported downward. While penetrating into the ground. At this time, the rotation receiving portion of the tip excavation blade comes into contact with the protrusion of the steel pipe, so that the rotation of the steel pipe is transmitted to the tip excavation blade. The excavation rotation direction is a direction in which the protrusion of the steel pipe and the regulation separating portion of the tip excavation blade are not locked to each other by rotation. For this reason, the regulation separating portion of the tip excavating blade is not locked to the protrusion of the steel pipe, but the tip excavating blade is pressed against the ground, so that the tip excavating blade is not separated from the steel pipe in the axial direction.
次いで、地盤に貫入された掘削刃取付け鋼管の鋼管内にモルタルまたは生コンクリートまたはセメントミルクを充填する。その後、貫入時と同じ方向に鋼管を回転させつつ引き上げる。鋼管の突起に先端掘削刃の規制分離部が係止していないため、先端掘削刃は鋼管から分離してそのまま地中に残され、鋼管だけが引き抜かれる。鋼管の貫入から引き抜きに至るまで、一貫して突起と分離規制部とが互いに係止しない状態に保たれているため、鋼管から先端掘削刃が確実に分離される。鋼管のみを地盤から引き抜くことによって、鋼管の抜き跡となる杭孔に鋼管内のモルタルまたは生コンクリートまたはセメントミルクが流れ込む。モルタルまたは生コンクリートまたはセメントミルクが硬化することで、コンクリート系杭が現場打ちで築造される。 Next, mortar, ready-mixed concrete, or cement milk is filled into the steel pipe of the excavating blade mounting steel pipe that has penetrated into the ground. After that, the steel pipe is pulled up while rotating in the same direction as when penetrating. Since the restriction separating portion of the tip excavation blade is not locked to the protrusion of the steel pipe, the tip excavation blade is separated from the steel pipe and left as it is, and only the steel pipe is pulled out. Since the protrusion and the separation restricting portion are constantly kept from being locked to each other from the penetration of the steel pipe to the drawing, the tip excavation blade is reliably separated from the steel pipe. By pulling out only the steel pipe from the ground, the mortar, ready-mixed concrete, or cement milk in the steel pipe flows into the pile hole that becomes the trace of the steel pipe. By hardening mortar or ready-mixed concrete or cement milk, concrete piles are built on site.
この掘削刃取付け鋼管を使用して現場打ちコンクリート系杭を築造すると、従来の柱状改良工法のように、現場の土と固化材を混合撹拌することがないので、現場の土の状態に影響されることなく、常に品質の安定した地盤補強用のコンクリート系杭を築造することができる。また、土質によって六価クロム等の有害な物質が溶出する心配がない。 When building a cast-in-place concrete pile using this excavated blade-attached steel pipe, the soil and solidified material are not mixed and agitated unlike the conventional columnar improvement method. Therefore, it is possible to build concrete piles for ground reinforcement with stable quality at all times. In addition, there is no worry of toxic substances such as hexavalent chromium eluting depending on the soil.
掘削刃取付け鋼管を地盤に貫入している途中で、何らかの事情により貫入作業を中止する場合は、正常なコンクリート系杭築造作業で鋼管を引き抜く場合と異なり、貫入時の掘削回転方向とは逆方向に鋼管を回転させながら引き抜く。掘削回転方向と逆方向に鋼管を回転させることで、鋼管の突起に先端掘削刃の分離規制部が係止した状態となり、鋼管と共に先端掘削刃も引き上げられる。これにより、先端掘削刃の再利用が可能となる。 When the penetration work is stopped for some reason during the penetration of the steel pipe attached to the drilling blade, the direction opposite to the direction of the excavation rotation at the time of penetration is different from the case where the steel pipe is pulled out by normal concrete pile construction work. Pull out while rotating the steel pipe. By rotating the steel pipe in the direction opposite to the excavation rotation direction, the separation regulating portion of the tip excavation blade is locked to the protrusion of the steel pipe, and the tip excavation blade is also lifted together with the steel pipe. As a result, the tip excavating blade can be reused.
前記先端掘削刃には、前記鋼管に前記先端掘削刃が取り付けられた状態において前記鋼管の内周面に当接して、前記鋼管に対して前記先端掘削刃を芯出しする円筒状の芯出し部が設けられている。
芯出し部が設けられていると、鋼管に対して先端掘削刃を芯出しすることができると共に、芯出し部が鋼管の内周面に当接することで先端掘削刃のガタツキを防止できる。なお、芯出し部を筒状とすると、鋼管と先端掘削刃との隙間を塞ぐ形態となり、鋼管内に土が侵入することを防止でき、良好な現場打ちコンクリート系杭を築造することができる。
The front Symbol tip digging edge, in contact with the inner peripheral surface of the steel pipe in a state in which the tip digging edge in the steel tube is attached, the tip digging edge of out cylindrical core to center with respect to the steel pipe Is provided.
When the centering portion is provided, the tip excavation blade can be centered with respect to the steel pipe, and rattling of the tip excavation blade can be prevented by the centering portion coming into contact with the inner peripheral surface of the steel pipe. If the centering portion is cylindrical, the gap between the steel pipe and the tip excavation blade is closed, so that soil can be prevented from entering the steel pipe, and a good on-site concrete pile can be built.
前記鋼管の下端には、この鋼管の外周面よりも外周側に突出した螺旋状溝形成用刃体が設けられている。
螺旋状溝形成用刃体が設けられていると、掘削刃取付け鋼管により杭孔を掘削した後、鋼管のみを引き抜くときに、杭孔の外周に螺旋状の溝が形成される。掘削刃取付け鋼管を地盤に貫入する際にも、螺旋状溝形成用刃体により上記螺旋状の溝とは逆向きの螺旋状の溝が形成されるが、この逆向きの螺旋状の溝は鋼管を引き抜くときに壊され、代わりに前記螺旋状の溝が形成される。掘削刃取付け鋼管を地盤に貫入するときに、杭孔の周囲の土が鋼管によって周囲に押しやられて地盤が締め固められているため、鋼管の引き抜き時に螺旋状溝を形成すると、形成された螺旋状溝が崩れ難い。
このように、杭孔の外周に螺旋状の溝が形成されることにより、鋼管内に充填されたモルタルまたは生コンクリートまたはセメントミルクが、杭孔だけでなく螺旋状の溝にもモルタルまたは生コンクリートまたはセメントミルクが流し込まれて、螺旋状の節付きコンクリート系杭が築造される。コンクリート系杭が螺旋状の節付きであると、杭周面のせん断抵抗が大きい。そのため、コンクリート系杭の杭周面抵抗力がより一層大きくとれる。杭周面抵抗力が大きいと、以下の利点がある。
・杭径を小さくすることが可能となり、材料費の削減を図ることができる。
・コンクリート系杭の材料が少なくて済み、環境負荷を低減することができる。
・杭先端をN値が比較的小さな地盤に支持させることができるため、杭長を短くすることができる。
前記分離規制部は前記回転受け部から円周方向に延びてこれら回転受け部と分離規制部とでフック状体を成し、
前記回転受け部は、円周方向を向く両側の側面が斜辺となる台形の断面形状であって、前記両側面が前記鋼管の前記突起の表面に対して傾かずに真っ直ぐに当たる方向を向く。
The lower end of the front Symbol steel, spiral groove forming blade protruding on the outer circumferential side are provided from the outer peripheral surface of the steel pipe.
When the blade for forming a spiral groove is provided, a spiral groove is formed on the outer periphery of the pile hole when only the steel pipe is extracted after excavating the pile hole with the excavating blade-attached steel pipe. When the excavating blade mounting steel pipe is penetrated into the ground, the spiral groove forming blade body forms a spiral groove opposite to the spiral groove, but the reverse spiral groove is When the steel pipe is pulled out, it is broken and the spiral groove is formed instead. When penetrating the excavating blade mounting steel pipe into the ground, the soil around the pile hole is pushed around by the steel pipe and the ground is compacted. The groove is difficult to collapse.
Thus, by forming a spiral groove on the outer periphery of the pile hole, the mortar or ready concrete or cement milk filled in the steel pipe is not only in the pile hole but also in the spiral groove. Alternatively, cement milk is poured into a spiral knotted concrete pile. When the concrete pile has a spiral knot, the shear resistance of the pile peripheral surface is large. Therefore, the pile peripheral surface resistance force of the concrete pile can be further increased. Large pile surface resistance has the following advantages.
-It is possible to reduce the pile diameter and reduce material costs.
-Less material is required for concrete piles, and environmental load can be reduced.
-Since the tip of the pile can be supported by the ground having a relatively small N value, the pile length can be shortened.
The separation restricting portion extends in a circumferential direction from the rotation receiving portion, and the rotation receiving portion and the separation restricting portion form a hook-like body,
The rotation receiving portion has a trapezoidal cross-sectional shape in which the side surfaces on both sides facing the circumferential direction are hypotenuses, and the both side surfaces face a direction in which the both sides face straightly without being inclined with respect to the surface of the projection of the steel pipe.
この発明の現場打ちコンクリート系杭の築造方法は、前記掘削刃取付け鋼管を、前記先端掘削刃が下側となるように支持した状態で、前記回転受け部における前記分離規制部が突出している側と反対側の面に前記突起が当接する方向である掘削回転方向に回転させつつ押し下げることによって、前記先端掘削刃により下方に掘削しながら地盤に挿入する過程と、前記鋼管内にモルタルまたは生コンクリートまたはセメントミルクを充填する過程と、前記鋼管を前記掘削回転方向に回転させつつ引き上げて、前記鋼管から前記先端掘削刃を分離させた後、前記螺旋状溝形成用刃体により前記鋼管の外周の土に螺旋状の溝を形成しながら、前記鋼管のみを地盤から引き抜くことによって、前記鋼管の抜き跡となる杭孔および前記螺旋状の溝に前記鋼管内のモルタルまたは生コンクリートまたはセメントミルクを流し込む過程とを含む。
このように、鋼管の引き抜き時に螺旋状溝を形成すると、掘削刃取付け鋼管を地盤に貫入するときに、杭孔の周囲の土が鋼管によって周囲に押しやられて地盤が締め固められているため、形成された螺旋状溝が崩れ難い。この現場打ちコンクリート系杭の築造方法の場合、鋼管の抜き跡となる杭孔に加えて、螺旋状溝形成用刃体により形成される螺旋状の溝にもモルタルまたは生コンクリートまたはセメントミルクが流れ込み、節付きのコンクリート系杭が現場打ちで築造される。
Construction method of onsite Concrete system piles of this invention, the digging edge mounting steel pipe, the state in which the tip digging edge is supported so as to be lower, the separation regulating portion protrudes in the rotating receiving part A process of inserting it into the ground while excavating downward with the tip excavating blade, by pushing down while rotating in the excavation rotation direction, which is the direction in which the projection abuts against the surface opposite to the surface on which the mortar or The process of filling the ready-mixed concrete or cement milk, the steel pipe is pulled up while rotating in the excavation rotation direction, the tip excavation blade is separated from the steel pipe, and then the steel pipe is cut by the spiral groove forming blade body. By forming only the steel pipe from the ground while forming a spiral groove in the outer soil, the pile hole that becomes the trace of the steel pipe and the spiral groove And a process of pouring a mortar or ready-mixed concrete or cement milk in the tube.
In this way, when the spiral groove is formed when the steel pipe is drawn, when the drilling blade mounting steel pipe penetrates the ground, the soil around the pile hole is pushed around by the steel pipe and the ground is compacted. The formed spiral groove is difficult to collapse. In the case of this in-situ concrete pile construction method, mortar, ready-mixed concrete or cement milk flows into the spiral groove formed by the spiral groove forming blade body in addition to the pile hole that becomes the trace of the steel pipe. A concrete pile with a knot is built on site.
この発明の節付き現場打ちコンクリート系杭築造用の掘削刃取付け鋼管は、鋼管と、この鋼管の先端に着脱可能に取り付けられて先端面に掘削用刃体を有する先端掘削刃とでなり、前記鋼管の先端の内周面に内径側へ突出する突起が設けられると共に、前記先端掘削刃に、前記鋼管が軸回りに定められた掘削回転方向に回転するとき前記突起に当接して前記先端掘削刃を前記鋼管と一体に回転させる回転受け部と、前記鋼管が前記掘削回転方向と逆向きに回転しつつ引き上げるときに前記突起に係止して前記先端掘削刃が前記鋼管に対して軸方向に分離することを規制する分離規制部とが設けられ、先端掘削刃に、前記鋼管に前記先端掘削刃が取り付けられた状態において前記鋼管の内周面に当接して、前記鋼管に対して前記先端掘削刃を芯出しする円筒状の芯出し部が設けられ、前記鋼管の下端に、この鋼管の外周面よりも外周側に突出した螺旋状溝形成用刃体が設けられ、前記分離規制部は前記回転受け部から円周方向に延びてこれら回転受け部と分離規制部とでフック状体を成し、前記回転受け部は、円周方向を向く両側の側面が斜辺となる台形の断面形状であって、前記両側面が前記鋼管の前記突起の表面に対して傾かずに真っ直ぐに当たる方向を向くため、現場の土の状態に影響されることなく品質の安定した地盤補強用のコンクリート系杭を築造することができ、かつ現場での施工が容易で確実にコンクリート系杭を築造することができる。 The excavation blade mounting steel pipe for building a cast-in-place concrete pile with a node according to the present invention includes a steel pipe and a tip excavation blade which is detachably attached to the tip of the steel pipe and has an excavation blade body on the tip surface, Rutotomoni projection is provided which projects the inner diameter side to the inner circumferential surface of the front end of the steel tube, the tip digging edge, said tip abuts on said projection when said steel pipe is rotated in the drilling rotation direction determined around the axis A rotation receiving portion that rotates the excavation blade integrally with the steel pipe, and the tip excavation blade is pivoted with respect to the steel pipe when the steel pipe is pulled up while rotating in the direction opposite to the excavation rotation direction. a separation regulating portion is provided for regulating the separating direction, the tip digging edge, in contact with the inner peripheral surface of the steel pipe in a state in which the tip digging edge in the steel pipe is attached, to the steel pipe Center the tip excavation blade A cylindrical centering portion is provided, and a lower end of the steel pipe is provided with a spiral groove forming blade body projecting outward from the outer peripheral surface of the steel pipe, and the separation restricting portion is the rotation receiving portion. The rotation receiving portion and the separation regulating portion form a hook-like body extending in the circumferential direction from the rotation receiving portion, and the rotation receiving portion has a trapezoidal cross-sectional shape in which both sides facing the circumferential direction are hypotenuses, to construction of the order to face the direction of striking straight without tilting with respect to the surface of the protrusion, the quality without being affected by the state of the site soil stable concrete piles for soil reinforcement of the side surfaces is the steel pipe It is possible to construct concrete piles easily and reliably on site.
この発明の現場打ちコンクリート系杭の築造方法は、前記掘削刃取付け鋼管を、前記先端掘削刃が下側となるように支持した状態で、前記回転受け部における前記分離規制部が突出している側と反対側の面に前記突起が当接する方向である掘削回転方向に回転させつつ押し下げることによって、前記先端掘削刃により下方に掘削しながら地盤に挿入する過程と、前記鋼管内にモルタルまたは生コンクリートまたはセメントミルクを充填する過程と、前記鋼管を前記掘削回転方向に回転させつつ引き上げて、前記鋼管から前記先端掘削刃を分離させた後、前記螺旋状溝形成用刃体により前記鋼管の外周の土に螺旋状の溝を形成しながら、前記鋼管のみを地盤から引き抜くことによって、前記鋼管の抜き跡となる杭孔および前記螺旋状の溝に前記鋼管内のモルタルまたは生コンクリートまたはセメントミルクを流し込む過程とを含むため、現場の土の状態に影響されることなく品質の安定した地盤補強用の節付きコンクリート系杭を築造することができ、かつコンクリート系杭の節となる地盤の螺旋状溝が崩れ難く、現場での施工が容易で確実に節付きコンクリート系杭を築造することができる。
Construction method of onsite Concrete system piles of this invention, the digging edge mounting steel pipe, the state in which the tip digging edge is supported so as to be lower, the separation regulating portion protrudes in the rotating receiving part A process of inserting it into the ground while excavating downward with the tip excavating blade, by pushing down while rotating in the excavation rotation direction, which is the direction in which the projection abuts against the surface opposite to the surface on which the mortar or The process of filling the ready-mixed concrete or cement milk, the steel pipe is pulled up while rotating in the excavation rotation direction, the tip excavation blade is separated from the steel pipe, and then the steel pipe is cut by the spiral groove forming blade body. By forming only the steel pipe from the ground while forming a spiral groove in the outer soil, the pile hole that becomes the trace of the steel pipe and the spiral groove It includes the process of pouring mortar or ready-mixed concrete or cement milk in the pipe, so that it is possible to build a knotted concrete pile for ground reinforcement with stable quality without being affected by the soil condition at the site, and concrete It is difficult to collapse the spiral groove of the ground that becomes the node of the system pile, and it is easy to construct on the site, and it is possible to build a concrete system pile with a node reliably.
この発明の一実施形態にかかる現場打ちコンクリート系杭築造用の掘削刃取付け鋼管について図面と共に説明する。図1に示すように、この掘削刃取付け鋼管1は、鋼管10と、この鋼管10の先端(図1では下端)に着脱可能に取り付けられる先端掘削刃20とでなる。
An excavating blade mounting steel pipe for building a cast-in-place concrete pile according to an embodiment of the present invention will be described with reference to the drawings. As shown in FIG. 1, the excavating blade-attached
図2に示すように、鋼管10の先端には、この鋼管10の外周面よりも外周側に突出した複数個(例えば2個)または1個の螺旋状溝形成用刃体11が設けられている。螺旋状溝形成用刃11は、例えば円柱状である。鋼管10の先端内周面の円周方向複数箇所(例えば2箇所)には、内径側へ突出するブロック状の突起13が設けられている。このブロック状の突起13の円周方向両側面F1,F2は、鋼管10の軸心O1と平行である。図示の例では、ブロック状の突起13の軸方向位置は、前記螺旋状溝形成用刃体11とほぼ同じとされている。
As shown in FIG. 2, a plurality of (for example, two) or one spiral groove forming
図3、図4に示すように、先端掘削刃20は、全体が鋳造または鍛造による鋼製の一体成形品からなる。先端掘削刃20は、外径寸法が鋼管10とほぼ同じで、反先端側に鋼管10の先端部に嵌り込み可能な円筒状の芯出し部21aが形成された掘削刃本体21を有する。芯出し部21aの高さは、例えば1cm程度である。鋼管10の先端部に芯出し部21aが嵌り込んだ状態では、図5(B)、図6(B)のように、鋼管10の先端面14が掘削刃本体21の芯出し部21aに隣接する段面21bに当接する。このように、鋼管10の中に先端掘削刃20の芯出し部21aが入り込んで連結されることで、鋼管10に対して先端掘削刃20が芯出しされると共に、鋼管10と先端掘削刃20との間の隙間が塞がれる。
As shown in FIG. 3 and FIG. 4, the
図3(B),(C)において、掘削刃本体21の先端面は円すい状面21cとされ、この円すい状面21cに2条の掘削用刃体22が設けられている。2条の掘削用刃体22は、それぞれ先端掘削刃20の軸心O2を通る直径線Lを挟む両側に隣接して同直径線Lと平行に設けられている。詳しくは、一方の掘削用刃体22は、直径線方向の一方の外周側の位置から、軸心O2を越えて、軸心O2ともう一方の外周側の位置との間の中間位置まで延びている。もう一方の掘削用刃体22は、直径線方向のもう一方の外周側の位置から、軸心O2を越えて、軸心O2と前記一方の外周側の位置との間の中間位置まで延びている。
3 (B) and 3 (C), the distal end surface of the
各掘削用刃体22の直径線方向外周側端は、先端側に突出した外刃部22aとされ、他端は外刃部22aよりも先端側に突出した内刃部22bとされている。外刃部22aの直径線方向外側面22aaおよび内刃部22bの直径線方向外側面22baは、いずれも軸心O2に沿う面である。よって、外刃部22aおよび内刃部22bの先端は正面視で鋭角に形成され、地中に食い込み易くなっている。各掘削用刃体22は、直径線Lと直交する方向に一定の幅を有し、直径線Lと直交する方向のどの箇所でも掘削刃本体20に対する高さは同じである。
The outer peripheral side end in the diameter line direction of each
また、図3(A),(B)、図4に示すように、掘削刃本体21には、前記芯出し部21aよりも反先端側に突出した複数(例えば2つ)のフック状体23が設けられている。フック状体23は、掘削刃本体21の芯出し部21aよりも内周側の位置から芯出し部21aよりも反先端側へ延びる回転受け部23aと、この回転受け部23aの反先端側端から円周方向に屈曲した分離規制部23bとからなる。分離規制部23bの屈曲方向は、後で説明する鋼管10の掘削回転方向(A方向)の逆方向である。
Further, as shown in FIGS. 3A, 3B, and 4, the excavation blade
前記回転受け部23aの円周方向両側面F3,F4は、鋼管10に先端掘削刃20を取り付けた状態において前記突起13の円周方向両側面F1,F2にそれぞれ対向する面であって、先端掘削刃20の軸心O2と平行である。回転受け部23aの断面形状は、内径面を上辺とし、前記側面F3,F4をそれぞれ斜辺とする台形である。また、分離規制部23bの先端側の面は係止面F5であって、この係止面F5は、鋼管10に先端掘削刃20を取り付けた状態において鋼管20の前記突起13の反先端側の面に対向する。回転受け部23aの側面F4と係止面5は、互いに鈍角を成す。両面F4,F5の成す角度は例えば95°(軸心O2と垂直な面に対する係止面5の仰角が5°)程度とする。
The circumferential side surfaces F3 and F4 of the
図5、図6は、鋼管10と先端掘削刃20の取付部のそれぞれ異なる状態を示す断面図である。鋼管10への先端掘削刃20の取付けは、次のように行う。すなわち、鋼管10の先端側に先端掘削刃20を配置し、かつ鋼管10と先端掘削刃20の各軸心O1,O2を揃えた状態で、鋼管10内に先端掘削刃20のフック状体23を進入させることで行う。鋼管10と先端掘削刃20の円周方向位置を合わせる必要はない。このため、従来のように、ケーシングと先端ヘッドの軸心を揃え、かつ切欠部と凸部の円周方向位相を揃えた状態で、ケーシングに対して先端ヘッドを軸方向に相対移動させるのに比べて、取付けが容易である。なお、鋼管10内にフック状体23を進入させた後、位置固定状態の鋼管10に対して先端掘削刃20を軸心O2回りに回転させ、図6のように、鋼管10の突起13に分離規制部23bを係止させておくと、後で掘削刃取付け鋼管1を先端掘削刃20が下側となるように支持したときに、鋼管10から先端掘削刃20が自重で落下することを防げる。
5 and 6 are cross-sectional views showing different states of the attachment portions of the
この構成の現場打ちコンクリート系杭築造用の掘削刃取付け鋼管1を使用した現場打ちコンクリート系杭の築造方法を、図7、図8と共に説明する。
A method for constructing an in-situ concrete pile using the excavating blade-attached
まず、図7(A)のように、自走可能な作業車両2等に搭載された回転機構付きの杭打ち装置3に、掘削刃取付け鋼管1を先端掘削刃20が下側となるように支持させる。掘削刃取付け鋼管1の鋼管10は、上端を杭打ち装置3の昇降ヘッド4に固定して取付けておいても良い。その場合、現場打ちコンクリート系杭を築造するごとに、杭打ち装置3により吊り上げた状態の鋼管10の先端に、前記取付け作業により先端掘削刃20を取り付ける。
First, as shown in FIG. 7 (A), the excavating blade mounting
次いで、図7(B)のように、鋼管10を定められた掘削回転方向(A方向)に回転させつつ押し下げることによって、先端掘削刃20により下方に掘削しながら地盤30に貫入させて杭孔31を形成する。このとき、図5のように、鋼管10の突起13の側面F1が先端掘削刃20の回転受け部23aの側面F3に当接することで、鋼管10の回転が先端掘削刃20に伝達される。突起13の側面F1および回転受け部23aの側面F3はそれぞれが鋼管10および先端掘削刃20の回転軸心O1,O2と平行であるため、鋼管10の回転が先端掘削刃20に円滑に伝達される。先端掘削刃20の規制分離部23bは鋼管10の突起13と係止していないが、先端掘削刃20は地盤30に押し付けられているため、鋼管10から先端掘削刃20が軸方向に分離することはない。また、先端掘削刃20に芯出し部21aが設けられているため、鋼管10に対して先端掘削刃20を芯出しすることができると共に、芯出し部21aが鋼管10の内周面に当接することで先端掘削刃20のガタツキを防止できる。芯出し部21aは円筒状であるため、鋼管10と先端掘削刃20との隙間が塞がれ、鋼管10内に土が入り込まない。
Next, as shown in FIG. 7 (B), the
各掘削用刃体22により地盤30を掘削する際、図8(A),(B)のように、先に内刃部22bが地盤30に食い込み、その後で、図8(C)のように、外刃部22aが地盤30に食い込む。このように先端掘削刃20の軸心O2に近い内刃部22bが先に地盤30に食い込むため、掘削刃取付け鋼管1の先端部を側方に振れ動かす力が小さい。外刃部22aが地盤30に食い込むときに、掘削刃取付け鋼管1の先端部を側方に振れ動かす力が作用するが、内刃部22bの軸心O2に沿う直径線方向外側面22baが地盤30の掘削済み周面H1と水平方向においてしっかりと係合し、この係合作用によって、掘削刃取付け鋼管1の先端部の振れ動きが防がれる。また、外刃部22aの直径線方向外側面22aaも軸心O2に沿う面であるので、図8(D)のように、外刃面22aが一旦地盤30に食い込んでしまえば、外刃部22aの直径線方向外側面22aaが掘削済み周面H2と係合して、掘削刃取付け鋼管1の先端部が側方に振れ動くのが防がれる。こうして、掘削刃取付け鋼管1の回転貫入初期段階において、掘削刃取付け鋼管1の先端部が側方に振れ動くことが防がれ、掘削刃取付け鋼管1を安定して地盤30に貫入させることができる。
When excavating the
また、この実施形態では、掘削刃本体21の先端面が円すい状面21cとされているため、掘削された土が円すい状面21cに沿って先端掘削刃20の外周側へ案内される。これにより、掘削刃取付け鋼管1が回転貫入により地盤30にスムーズに貫入されてゆく。しかも、掘削用刃体22で掘削された土が先端掘削刃20の外周側へ案内されることで、掘削刃付き鋼管1の外周側の土が掘削刃付き鋼管1の外周部で密に圧縮されて、地盤30が締め固められる。
Moreover, in this embodiment, since the front end surface of the excavation blade
次いで、図7(C)にように、地盤30に貫入された掘削刃取付け鋼管1の鋼管20内に、セメントミルクSを充填する。セメントミルクSの代わりに、モルタルまたは生コンクリートを充填しても良い。
Next, as shown in FIG. 7C, cement milk S is filled into the
セメントミルクSの充填が完了したら、貫入時と同じ掘削回転方向(A方向)に鋼管10を回転させつつ引き抜く。鋼管10の突起13に先端掘削刃20の規制分離部23bが係止していないため、先端掘削刃20は鋼管10から分離してそのまま杭孔31の底に残され、鋼管10だけが引き抜かれる。鋼管10の貫入から引き抜きに至るまで、一貫して突起13と分離規制部23bとが互いに係止しない状態に保たれているため、鋼管10から先端掘削刃20が確実に分離される。
When the filling of the cement milk S is completed, the
鋼管10のみを引き抜くときに、鋼管10の外周に設けられている螺旋状溝形成用刃体11により、杭孔31の外周に螺旋状の溝32が形成される。掘削刃取付け鋼管1を地盤30に貫入する際にも、螺旋状溝形成用刃体11により上記螺旋状の溝32とは逆向きの螺旋状の溝が形成されるが、この逆向きの螺旋状の溝は鋼管10を引き抜くときに壊され、代わりに前記螺旋状の溝32が形成される。掘削刃取付け鋼管1の貫入時に、掘削刃取付け鋼管1の体積分の土が周囲に押しやられて地盤30が締め固められているため、鋼管10の引き抜き時に螺旋状溝32を形成すると、形成された螺旋状溝32が崩れ難い。
When only the
図7(D)のように、鋼管10のみを地盤30から引き抜くことによって、鋼管10内のセメントミルクSが、鋼管10の抜き跡である杭孔31および螺旋状の溝32に流れ込む。杭孔31内のセメントミルクSを、バイブレーター等を用いて締め固めても良い。鋼管10を完全に引き抜いたなら、セメントミルクSの杭頭部Saを平滑に均す。これにより施工が完了する。セメントミルクSが硬化することで、節付きの現場打ちコンクリート系杭33となる。
As shown in FIG. 7D, by extracting only the
この現場打ちコンクリート系杭33は、円柱状の杭本体の外周に螺旋状の節を有し、この螺旋状の節が地盤30に食い込んでいる。また、掘削刃取付け鋼管1の貫入時に地盤30が締め固められるため、杭周面のせん断抵抗が大きい。
The cast-in-place concrete pile 33 has a spiral node on the outer periphery of the columnar pile body, and the spiral node bites into the
現場打ちコンクリート系杭33の杭周面抵抗力が大きいと、以下の利点がある。
・杭径を小さくすることが可能となり、材料費の削減を図ることができる。
・現場打ちコンクリート系杭33の材料が少なくて済み、環境負荷を低減することができる。
・杭先端をN値が比較的小さな地盤に支持させることができるため、杭長を短くすることができる。
When the pile peripheral surface resistance of the in-situ concrete pile 33 is large, the following advantages are obtained.
-It is possible to reduce the pile diameter and reduce material costs.
-The material for the on-site concrete pile 33 can be reduced, and the environmental load can be reduced.
-Since the tip of the pile can be supported by the ground having a relatively small N value, the pile length can be shortened.
この掘削刃取付け鋼管1を使用した現場打ちコンクリート系杭の築造方法は、従来の柱状改良工法のように、現場の土と固化材を混合撹拌することがないので、現場の土の状態に影響されることなく、常に品質の安定した地盤補強用のコンクリート系杭を築造することができる。また、土質によって六価クロム等の有害な物質が溶出する心配がない。さらに、杭孔の周囲の土が鋼管によって周囲に押しやられて地盤が締め固められるため、コンクリート系杭の杭周面抵抗力が大きくとれる。
The construction method of the cast-in-place concrete pile using this excavating blade-attached
掘削刃取付け鋼管1を地盤30に貫入している途中で、何らかの事情により貫入作業を中止する場合は、正常なコンクリート系杭築造作業で鋼管10を引き抜く場合と異なり、反掘削回転方向(反A方向)に鋼管10を回転させながら引き抜く。掘削回転方向と逆方向に鋼管10を回転させることで、鋼管10の突起13に先端掘削刃20の分離規制部23bが係止した状態となり、鋼管10と共に先端掘削刃20も引き上げられる。これにより、先端掘削刃20の再利用が可能となる。なお、逆回転時には、図6のように鋼管10の突起13の側面F2に先端掘削刃20の回転受け部23aの側面F4が当接した状態となる。
When the penetration work is stopped for some reason during the penetration of the excavating blade-attached
まとめると、この掘削刃取付け鋼管1は、鋼管10の先端に上記構成の先端掘削刃20を着脱可能に取り付けたことにより、以下の効果が得られる。
・先端掘削刃20により、所定の杭径を確保することができる。
・先端掘削刃20により、先端支持力を確保できる。
・鋼管10と先端掘削刃20の円周方向位置を合わせることなく、鋼管10に対して先端掘削刃20をスムーズに脱着することができる。
・鋼管10の先端に嵌め込まれる芯出し部21aを先端掘削刃20に設けたことにより、回転貫入時における鋼管10内への土の侵入を防止できる。
・上記芯出し部21aを設けたことにより、鋼管10に対して先端掘削刃20を安定して取り付けることができる。
・回転貫入時と逆向きに掘削刃取付け鋼管1を回転させることで、鋼管10と共に先端掘削刃20を引き上げて、先端掘削刃20を回収することができる。
In summary, the excavating blade-attached
A predetermined pile diameter can be secured by the
-The tip support force can be secured by the
The
-By providing the
-By providing the centering
The
1…掘削刃取付け鋼管
10…鋼管
11…螺旋状溝形成用刃体
13…突起
20…先端掘削刃
21a…芯出し部
22…掘削用刃体
23…フック状体
23a…回転受け部
23b…分離規制部
30…地盤
31…杭孔
32…螺旋状の溝
33…現場打ちコンクリート系杭
S…セメントミルク
DESCRIPTION OF
Claims (2)
先端掘削刃に、前記鋼管に前記先端掘削刃が取り付けられた状態において前記鋼管の内周面に当接して、前記鋼管に対して前記先端掘削刃を芯出しする円筒状の芯出し部が設けられ、
前記鋼管の下端に、この鋼管の外周面よりも外周側に突出した螺旋状溝形成用刃体が設けられ、
前記分離規制部は前記回転受け部から円周方向に延びてこれら回転受け部と分離規制部とでフック状体を成し、
前記回転受け部は、円周方向を向く両側の側面が斜辺となる台形の断面形状であって、前記両側面が前記鋼管の前記突起の表面に対して傾かずに真っ直ぐに当たる方向を向く、 コンクリート系杭築造用の掘削刃取付け鋼管。 And steel pipes, detachably attached to the tip of the steel pipe becomes at the tip digging edge having an excavating blade to the tip surface, the projections projecting into the inner diameter side is provided on the inner peripheral surface of the distal end of said steel tube Rutotomoni The tip excavating blade has a rotation receiving portion for rotating the tip excavating blade integrally with the steel pipe in contact with the protrusion when the steel pipe rotates in the excavation rotation direction defined around the axis; and A separation restricting portion is provided that locks on the protrusion when pulling up while rotating in the direction opposite to the excavation rotation direction and restricts the tip excavation blade from separating in the axial direction from the steel pipe,
The tip excavating blade is provided with a cylindrical centering portion that abuts the inner peripheral surface of the steel pipe in a state where the tip excavating blade is attached to the steel pipe and centers the tip excavating blade with respect to the steel pipe. And
The lower end of the steel pipe is provided with a spiral groove forming blade body projecting to the outer peripheral side from the outer peripheral surface of the steel pipe,
The separation restricting portion extends in a circumferential direction from the rotation receiving portion, and the rotation receiving portion and the separation restricting portion form a hook-like body,
The rotation receiving portion has a trapezoidal cross-sectional shape in which both side surfaces facing the circumferential direction are hypotenuses, and the both side surfaces are directed in a straight direction without being inclined with respect to the surface of the projection of the steel pipe. Excavation blade mounting steel pipe for construction of steel piles.
前記掘削刃取付け鋼管を、前記先端掘削刃が下側となるように支持した状態で、前記回転受け部における前記分離規制部が突出している側と反対側の面に前記突起が当接する方向である掘削回転方向に回転させつつ押し下げることによって、前記先端掘削刃により下方に掘削しながら地盤に挿入する過程と、
前記鋼管内にモルタルまたは生コンクリートまたはセメントミルクを充填する過程と、 前記鋼管を前記掘削回転方向に回転させつつ引き上げて、前記鋼管から前記先端掘削刃を分離させた後、前記螺旋状溝形成用刃体により前記鋼管の外周の土に螺旋状の溝を形成しながら、前記鋼管のみを地盤から引き抜くことによって、前記鋼管の抜き跡となる杭孔および前記螺旋状の溝に前記鋼管内のモルタルまたは生コンクリートまたはセメントミルクを流し込む過程と、
を含む現場打ちコンクリート系杭の築造方法。 A construction method of a cast-in-place concrete pile using the excavation blade mounting steel pipe for concrete pile construction according to claim 1 ,
In a state in which the excavation blade mounting steel pipe is supported so that the tip excavation blade is on the lower side, the projection comes into contact with the surface of the rotation receiving portion opposite to the side on which the separation restricting portion protrudes. The process of inserting into the ground while excavating downward by the tip excavation blade by pushing down while rotating in a certain excavation rotation direction;
Filling the steel pipe with mortar, ready-mixed concrete, or cement milk, and pulling up the steel pipe while rotating in the excavation rotation direction to separate the tip excavation blade from the steel pipe, and then forming the spiral groove While forming a spiral groove in the soil around the outer periphery of the steel pipe with a blade body, by pulling out only the steel pipe from the ground, a mortar in the steel pipe is formed in the pile hole and the spiral groove that are traces of the steel pipe Or the process of pouring ready-mixed concrete or cement milk,
On-site concrete piles including
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2014038205A JP5992464B2 (en) | 2014-02-28 | 2014-02-28 | Excavation blade mounting steel pipe for construction of cast-in-place concrete pile and construction method of cast-in-place concrete pile |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2014038205A JP5992464B2 (en) | 2014-02-28 | 2014-02-28 | Excavation blade mounting steel pipe for construction of cast-in-place concrete pile and construction method of cast-in-place concrete pile |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2015161143A JP2015161143A (en) | 2015-09-07 |
| JP5992464B2 true JP5992464B2 (en) | 2016-09-14 |
Family
ID=54184434
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2014038205A Active JP5992464B2 (en) | 2014-02-28 | 2014-02-28 | Excavation blade mounting steel pipe for construction of cast-in-place concrete pile and construction method of cast-in-place concrete pile |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP5992464B2 (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112609685B (en) * | 2020-12-08 | 2022-08-23 | 江苏大学 | Concrete pipe pile system suitable for soft soil foundation and construction method thereof |
Family Cites Families (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0420613A (en) * | 1990-05-15 | 1992-01-24 | Maruzen Soil Kk | Method and device for constructing cast-in-place pile |
| JP2002167759A (en) * | 2000-12-05 | 2002-06-11 | Toyo Asano Found Co Ltd | Execution method of foundation pile |
| JP2003184078A (en) * | 2002-11-28 | 2003-07-03 | Jfe Engineering Kk | Cast-in-place concrete pile and its construction method |
| JP2006028859A (en) * | 2004-07-15 | 2006-02-02 | Tiger Industry Co Ltd | Tip end metal fitting of rotary buried pile |
-
2014
- 2014-02-28 JP JP2014038205A patent/JP5992464B2/en active Active
Also Published As
| Publication number | Publication date |
|---|---|
| JP2015161143A (en) | 2015-09-07 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP5852038B2 (en) | Construction method of on-site cast-in-place concrete piles and steel pipes with excavation blades | |
| JP6247065B2 (en) | Excavation blade mounting steel pipe for construction of cast-in-place concrete pile and construction method of cast-in-place concrete pile | |
| JP5199166B2 (en) | Foundation pile structure by site construction and construction method of foundation pile | |
| JP2004263561A (en) | Cast-in-place pile and its construction method | |
| JP5075091B2 (en) | Casting method for cast-in-place piles | |
| JP2014062446A5 (en) | ||
| JP5785531B2 (en) | Steel pipe pile construction method, steel pipe pile members | |
| JP5777166B2 (en) | Ground reinforcement method using small-diameter concrete cast-in-place pile. | |
| JP2006077388A (en) | Pile burying method | |
| JP3192516U (en) | Steel pipe concrete composite pile | |
| JP5992464B2 (en) | Excavation blade mounting steel pipe for construction of cast-in-place concrete pile and construction method of cast-in-place concrete pile | |
| JP6246599B2 (en) | Ground reinforcement method using small-diameter concrete cast-in-place pile. | |
| JP6147507B2 (en) | Construction method and steel pipe for construction of in-situ tapered concrete piles with knots | |
| JP5777167B2 (en) | Ground reinforcement method using small-diameter concrete cast-in-place pile. | |
| JP6640175B2 (en) | Construction method of excavated blade-mounted steel pipe and cast-in-place concrete pile for construction of cast-in-place concrete pile | |
| JP5075094B2 (en) | Construction method and foundation structure of foundation structure in structure | |
| JP6336850B2 (en) | Pile head reinforcement method for foundation pile | |
| JP6616180B2 (en) | Construction method of foundation pile with reinforced pile head | |
| JP2006057404A (en) | Front-end head and construction tool for foundation pile, and foundation pile | |
| JP6336259B2 (en) | Steel pipe with blade for construction of cast-in-place concrete piles with knots | |
| JP2008014000A (en) | Construction method of cast-in-place concrete pile | |
| JP2011047202A (en) | Construction method of cast-in-place concrete pile or cylindrical soil improving body | |
| JP6667277B2 (en) | Construction method of foundation pile reinforced with pile head | |
| JP2016000954A (en) | Tube for constructing knotted pile of cast-in-place concrete | |
| JP2020002598A (en) | Drilling stirrer |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20160114 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20160209 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20160401 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20160802 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20160817 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 5992464 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |