JP5993758B2 - Anchor bolt anchorage structure and construction method - Google Patents
[go: Go Back, main page]

JP5993758B2 - Anchor bolt anchorage structure and construction method - Google Patents

Anchor bolt anchorage structure and construction method Download PDF

Info

Publication number
JP5993758B2
JP5993758B2 JP2013036293A JP2013036293A JP5993758B2 JP 5993758 B2 JP5993758 B2 JP 5993758B2 JP 2013036293 A JP2013036293 A JP 2013036293A JP 2013036293 A JP2013036293 A JP 2013036293A JP 5993758 B2 JP5993758 B2 JP 5993758B2
Authority
JP
Japan
Prior art keywords
grout
anchor bolt
new
new anchor
existing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2013036293A
Other languages
Japanese (ja)
Other versions
JP2014163154A (en
Inventor
尚幸 荒木
尚幸 荒木
裕子 川原井
裕子 川原井
瑞元 竹村
瑞元 竹村
弘二 清崎
弘二 清崎
賢師 花田
賢師 花田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Steel Corp
Shimizu Corp
Original Assignee
Nippon Steel and Sumitomo Metal Corp
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Steel and Sumitomo Metal Corp, Shimizu Corp filed Critical Nippon Steel and Sumitomo Metal Corp
Priority to JP2013036293A priority Critical patent/JP5993758B2/en
Publication of JP2014163154A publication Critical patent/JP2014163154A/en
Application granted granted Critical
Publication of JP5993758B2 publication Critical patent/JP5993758B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)
  • Joining Of Building Structures In Genera (AREA)

Description

本発明はアンカーボルトを基礎に対して定着するための定着部の構造および施工方法に関する。   The present invention relates to a structure of a fixing portion and a construction method for fixing an anchor bolt to a foundation.

各種工場においては生産設備としての大型機器等を鉄筋コンクリート造の基礎上に設置してアンカーボルトにより固定することが一般的であるが、そのような場合に適用されるアンカーボルトの定着部の構造と施工方法、およびアンカーボルトの交換手法に関しては特許文献1に開示があり、その概要を図8〜図14に示す。   In various factories, it is common to install large equipment as production equipment on a reinforced concrete foundation and fix it with anchor bolts. The construction method and the anchor bolt replacement method are disclosed in Patent Document 1, and the outline thereof is shown in FIGS.

これは、図8〜図11に示す構造(但し、図8は基礎1の下方地盤にアンカーボルト2の交換作業を実施するための作業空間7を既に施工した状態を示し、図9はその作業空間7を施工する前の状態を示している)で基礎1中に設置されていた既存のアンカーボルト2を、図12〜図14に示す手法で新規なアンカーボルト2に交換する場合の適用例であって、アンカーボルト2(特許文献1では基礎ボルト)として図10(a),(b),(c)に示すように軸部2aの基端(上端)にナット3を螺着可能かつ先端(下端)に矩形状の凸部2b(特許文献1では係止部とされている)を径方向両側に突出させた逆T状のものを用い、基礎1中にはシース管4(特許文献1ではアンカースリーブ)を埋設するとともにその底部にアンカープレート5(特許文献1では被係止金具)を設けておいて、アンカーボルト2の先端の凸部2bをそのアンカープレート5に対して係止して定着するようにしたものである。   This is the structure shown in FIGS. 8 to 11 (however, FIG. 8 shows a state in which a work space 7 for exchanging the anchor bolt 2 has already been constructed on the ground below the foundation 1, and FIG. An example of application when the existing anchor bolt 2 installed in the foundation 1 in the state before constructing the space 7 is replaced with a new anchor bolt 2 by the method shown in FIGS. As shown in FIGS. 10 (a), 10 (b), and 10 (c), the nut 3 can be screwed onto the base end (upper end) of the shaft portion 2a as the anchor bolt 2 (base bolt in Patent Document 1). The tip 1 (lower end) is a reverse T-shaped one having a rectangular convex portion 2b (which is a locking portion in Patent Document 1) protruding on both sides in the radial direction. In Reference 1, the anchor sleeve is embedded and the bottom of the anchor plate is anchored. 5 in advance provided (Patent Document 1 engaged bracket), is obtained so as to fix engaged convex portion 2b of the front end of the anchor bolt 2 relative to the anchor plate 5.

上記のアンカープレート5は、図9、図11(a),(b)に示すように中心部にアンカーボルト2の凸部2bに対応してそれが貫通可能な矩形状の貫通孔5aが形成されているとともに、このアンカープレート5の底面にはその貫通孔5aに直交する方向に形成された同じく矩形状の溝部5bが形成されていて、アンカーボルト2の凸部2bを貫通孔5aに通してアンカープレート5の下方に位置させた後、アンカーボルト2を軸線周りに90°回転させて引き上げることによって凸部2bを溝部5bに係合させたうえで、図8、図9に示すように基礎1上に設置した各種機器類のベースプレート6にアンカーボルト2の軸部2aの上端部を通してそこにナット3を螺着して締め付けるようにしている。   As shown in FIGS. 9, 11A and 11B, the anchor plate 5 is formed with a rectangular through hole 5a through which it can penetrate in the center portion corresponding to the convex portion 2b of the anchor bolt 2. In addition, the bottom surface of the anchor plate 5 is formed with a similarly rectangular groove portion 5b formed in a direction orthogonal to the through hole 5a, and the convex portion 2b of the anchor bolt 2 is passed through the through hole 5a. After the anchor plate 5 is positioned below the anchor plate 5, the anchor bolt 2 is rotated 90 ° around the axis and pulled up to engage the convex portion 2 b with the groove portion 5 b, as shown in FIGS. 8 and 9. A nut 3 is screwed into a base plate 6 of various devices installed on the foundation 1 through an upper end portion of a shaft portion 2a of the anchor bolt 2 to be tightened.

そして、特許文献1においては、上記の構造で設置されていた既存のアンカーボルト2を新規なアンカーボルト2に交換する際には、図8に示すように基礎1の下方地盤を掘削してそこに作業空間7を確保したうえで、その作業空間7からの作業によってアンカーボルト2を交換するようにしている。
なお、以下ではアンカーボルト2を交換前の既存アンカーボルト2Aと交換後の新設アンカーボルト2Bとに区別し、アンカープレート5を既存アンカープレート5Aと新設アンカープレート5Bとに区別して説明する。
And in patent document 1, when exchanging the existing anchor bolt 2 installed with the above structure with a new anchor bolt 2, the lower ground of the foundation 1 is excavated as shown in FIG. In addition, after securing the work space 7, the anchor bolt 2 is replaced by work from the work space 7.
In the following description, the anchor bolt 2 is distinguished from the existing anchor bolt 2A before replacement and the new anchor bolt 2B after replacement, and the anchor plate 5 is distinguished from the existing anchor plate 5A and the new anchor plate 5B.

すなわち、まず図12に示すようにシース管4の直下において基礎1の底部をコアボーリングの手法により削孔するとともにシース管4の底蓋4a(図9参照)を切除して作業孔8を形成し、その作業孔8を通して既存アンカーボルト2Aを作業空間7に吊り下ろして図13に示すように既存アンカーボルト2Aを撤去する。
しかる後に、新設アンカーボルト2Bを作業孔8を通してシース管4内に吊り上げて設置するのであるが、その際、特許文献1では新設アンカーボルト2Bの凸部2bを既存アンカープレート5Aに対して係止するのではなく、図14に示すように基礎1の底面に新設アンカープレート5Bを装着してその新設アンカープレート5Bに対して新設アンカーボルト2Bの凸部2bを定着するようにしている。
なお、そのようにする場合には、既存アンカープレート5Aと新設アンカープレート5Bとの間の距離に相当する長さ分だけ、新設アンカーボルト2Bの長さを既存アンカーボルト2Aの長さよりも長くしておく必要がある。また、図14に示す例では新設アンカープレート5Bに防錆用の下部キャップ9を装着するようにしている。
That is, first, as shown in FIG. 12, the bottom of the foundation 1 is drilled by a core boring method directly under the sheath tube 4 and the bottom lid 4a (see FIG. 9) of the sheath tube 4 is cut to form the working hole 8. Then, the existing anchor bolt 2A is suspended in the work space 7 through the work hole 8, and the existing anchor bolt 2A is removed as shown in FIG.
Thereafter, the new anchor bolt 2B is lifted and installed in the sheath tube 4 through the working hole 8, and in that case, in Patent Document 1, the convex portion 2b of the new anchor bolt 2B is locked to the existing anchor plate 5A. Instead, as shown in FIG. 14, a new anchor plate 5B is mounted on the bottom surface of the foundation 1, and the convex portion 2b of the new anchor bolt 2B is fixed to the new anchor plate 5B.
In such a case, the length of the new anchor bolt 2B is made longer than the length of the existing anchor bolt 2A by the length corresponding to the distance between the existing anchor plate 5A and the new anchor plate 5B. It is necessary to keep. Further, in the example shown in FIG. 14, a lower cap 9 for preventing rust is attached to the new anchor plate 5B.

特開2011−94385号公報JP 2011-94385 A

ところで、たとえば老朽化したアンカーボルト2を新規なものに交換するような場合には、交換後のアンカーボルト2に対して交換前よりも大きな緊張力を導入したい場合があるが、図12〜図14に示す手法でアンカーボルト2を交換する場合にはそれが困難な場合がある。
すなわち、図12〜図14に示す従来の手法で既存アンカーボルト2Aを新設アンカーボルト2Bに交換すると、交換後の定着部は図14に示した構造となるのであるが、その場合は基礎1の底面に新たに設置された新設アンカープレート5Bの上方には交換作業のために形成した作業孔8がそのまま断面欠損部となっているので、新設アンカープレート5Bはその周縁部のみが基礎1に押圧されることになり、そのため既存の基礎1のコンクリート強度や作業孔8の径寸法によっては十分な定着耐力を確保できないことが想定される。
By the way, for example, when replacing the old anchor bolt 2 with a new one, it may be desired to introduce a greater tension to the anchor bolt 2 after replacement than before replacement. When the anchor bolt 2 is replaced by the method shown in FIG. 14, it may be difficult.
That is, when the existing anchor bolt 2A is replaced with the new anchor bolt 2B by the conventional method shown in FIGS. 12 to 14, the fixed portion after the replacement has the structure shown in FIG. Since the work hole 8 formed for the replacement work is a cross-sectional defect part as it is above the newly installed anchor plate 5B newly installed on the bottom surface, only the peripheral edge of the newly installed anchor plate 5B is pressed against the foundation 1. Therefore, it is assumed that sufficient fixing strength cannot be secured depending on the concrete strength of the existing foundation 1 and the diameter of the work hole 8.

そのため、定着耐力を増強することを目的としてアンカーボルト2を交換する場合にはこのような交換手法を適用することは好ましくないし、また他の目的でアンカーボルト2を交換する場合においても定着耐力を増強できないことは不合理であるばかりでなく定着部の信頼性や安全性を確保するうえでもやや難がある。   Therefore, it is not preferable to apply such a replacement method when the anchor bolt 2 is replaced for the purpose of enhancing the fixing strength, and also when the anchor bolt 2 is replaced for other purposes, the fixing strength is not improved. Not being able to reinforce is not only unreasonable, but also somewhat difficult to ensure the reliability and safety of the fixing unit.

上記事情に鑑み、本発明は既存アンカーボルトに代えて交換した新設アンカーボルトに対して十分な定着耐力を持たせることができる有効適切な定着部の構造およびその施工方法を提供することを目的とする。   In view of the above circumstances, an object of the present invention is to provide an effective and suitable fixing portion structure capable of giving sufficient fixing strength to a newly installed anchor bolt that is replaced in place of an existing anchor bolt, and a construction method thereof. To do.

請求項1記載の発明は、既存の基礎に埋設されているシース管内に配置されてその下端部に設けられている凸部が前記基礎の底部に埋設されている既存アンカープレートに対して係止された状態で定着されていた既存アンカーボルトを新設アンカーボルトに交換する際に適用されるアンカーボルトの定着部の構造であって、前記基礎の底部に対して新設アンカーボルトが挿通可能な作業孔を該基礎の底面から前記シース管に通じる位置まで形成して、新設アンカーボルトを前記シース管および前記作業孔に挿通せしめ、前記作業孔の開口端に装着した新設アンカープレートに対して前記新設アンカーボルトの先端部に設けられている凸部を係止するとともに、前記新設アンカープレートと前記既存アンカープレートとの間にグラウトを充填して硬化せしめてなり、前記新設アンカーボルトの先端部には、該新設アンカーボルトに対する前記グラウトの付着を断つ縁切り材が巻装されているとともに前記グラウト内に埋設されたスパイラル筋が装着されていることを特徴とする。   According to the first aspect of the present invention, the convex portion disposed at the lower end portion of the sheath tube embedded in the existing foundation is locked to the existing anchor plate embedded in the bottom portion of the foundation. An anchor bolt fixing portion structure applied when replacing an existing anchor bolt that has been fixed in a fixed state with a new anchor bolt, and a work hole through which the new anchor bolt can be inserted into the bottom of the foundation From the bottom surface of the foundation to a position that leads to the sheath tube, a new anchor bolt is inserted into the sheath tube and the working hole, and the new anchor is mounted on the new anchor plate attached to the open end of the working hole. The convex part provided at the tip of the bolt is locked, and a grout is filled between the new anchor plate and the existing anchor plate. It is hardened, and the edge of the new anchor bolt is wound with an edge-cutting material that cuts off the adhesion of the grout to the new anchor bolt, and a spiral line embedded in the grout is mounted. It is characterized by.

請求項2記載の発明は、請求項1記載のアンカーボルトの定着部の構造であって、グラウト注入口およびグラウト排出口を備えたカバーが前記新設アンカープレートに装着されて、該カバーを通して前記グラウトが前記新設アンカープレートと前記既存アンカープレートとの間に充填されて硬化せしめられてなり、前記グラウト内には、上端が前記既存アンカープレートの位置において開口し下端が前記カバーに設けられているグラウト排出口に接続されたグラウト排出ホースが埋設されていることを特徴とする。   According to a second aspect of the present invention, there is provided the anchor bolt fixing portion structure according to the first aspect, wherein a cover having a grout inlet and a grout outlet is attached to the new anchor plate, and the grout is passed through the cover. Is filled between the new anchor plate and the existing anchor plate and hardened, and in the grout, an upper end is opened at the position of the existing anchor plate and a lower end is provided in the cover. A grout discharge hose connected to the discharge port is buried.

請求項3記載の発明は、既存の基礎に埋設されているシース管内に配置されてその下端部に設けられている凸部が前記基礎の底部に埋設されている既存アンカープレートに対して係止された状態で定着されていた既存アンカーボルトを新設アンカーボルトに交換する際に適用されるアンカーボルトの定着部の施工方法であって、前記基礎の底部に対して新設アンカーボルトが挿通可能な作業孔を該基礎の底面から前記シース管に通じる位置まで形成して、新設アンカーボルトを前記シース管および前記作業孔に挿通せしめ、前記作業孔の開口端に装着した新設アンカープレートに対して前記新設アンカーボルトの先端部に設けられている凸部を係止するとともに、前記新設アンカープレートと前記既存アンカープレートとの間にグラウトを充填して硬化せしめ、前記新設アンカーボルトを前記シース管および前記作業孔に挿通せしめるに際しては、予め前記新設アンカーボルトの先端部に、該新設アンカーボルトに対する前記グラウトの付着を断つための縁切り材を予め巻装しておくとともに、前記グラウト内に埋設されるスパイラル筋を装着しておき、前記グラウトが硬化した後に前記新設アンカーボルトを緊張することを特徴とする。   The invention according to claim 3 is arranged in a sheath tube embedded in an existing foundation, and a convex portion provided at the lower end thereof is locked to an existing anchor plate embedded in the bottom of the foundation. A method for constructing a fixing portion of an anchor bolt applied when replacing an existing anchor bolt that has been fixed in a fixed state with a new anchor bolt, in which the new anchor bolt can be inserted into the bottom of the foundation A hole is formed from the bottom surface of the foundation to a position communicating with the sheath tube, and a new anchor bolt is inserted into the sheath tube and the working hole, and the new anchor plate mounted on the open end of the working hole is inserted into the new anchor plate. The convex part provided at the tip of the anchor bolt is locked, and a grout is filled between the new anchor plate and the existing anchor plate. When the new anchor bolt is inserted into the sheath tube and the working hole, an edge cutting material for cutting off the adhesion of the grout to the new anchor bolt is previously provided at the tip of the new anchor bolt. In addition to winding, a spiral line embedded in the grout is attached, and the new anchor bolt is tensioned after the grout is hardened.

請求項4記載の発明は、請求項3記載のアンカーボルトの定着部の施工方法であって、前記グラウトの充填に際しては、グラウト注入口およびグラウト排出口を備えたカバーを前記新設アンカープレートに装着するとともに、前記新設アンカーボルトの先端部には上端が前記既存アンカープレートの位置に開口し下端が前記カバーに設けられているグラウト排出口に接続されるグラウト排出ホースを予め装着しておいて、前記グラウト注入口から前記カバー内に前記グラウトを加圧注入するとともに該グラウトが前記グラウト排出ホースを通して前記グラウト排出口から排出されるまで前記カバー内への前記グラウトの加圧注入を継続することを特徴とする。   According to a fourth aspect of the present invention, there is provided the anchor bolt fixing portion construction method according to the third aspect, wherein when the grout is filled, a cover having a grout inlet and a grout outlet is attached to the new anchor plate. In addition, a grout discharge hose that is connected to a grout discharge port that has an upper end opened at the position of the existing anchor plate and a lower end provided in the cover is attached to the tip of the new anchor bolt in advance, Pressurizing and injecting the grout into the cover from the grout inlet and continuing to pressurize the grout into the cover until the grout is discharged from the grout outlet through the grout discharge hose. Features.

本発明によれば、新設アンカーボルトの先端の凸部を新設アンカープレートに係止したうえで、既存アンカープレートと新設アンカープレートとの間にグラウトを充填して硬化させることにより、交換作業のために形成した作業孔をグラウトにより封止してしまうとともに新設アンカーボルトの先端部をそのグラウトに対して定着し、以て交換前よりも定着耐力を増強することが可能である。   According to the present invention, after the convex portion at the tip of the new anchor bolt is locked to the new anchor plate, the grout is filled between the existing anchor plate and the new anchor plate and hardened for replacement work. It is possible to seal the working hole formed in step 1 with the grout and fix the tip of the new anchor bolt to the grout, thereby increasing the fixing strength compared to before the replacement.

本発明の実施形態である定着部の構造を示す断面図である。FIG. 3 is a cross-sectional view illustrating a structure of a fixing unit according to an embodiment of the present invention. 同、新設アンカーボルトを示す図である。It is a figure which shows a newly installed anchor bolt. 同、カバーを示すもので、(a)は上面図、(b)は断面図、(c)は底面図である。The cover is shown, wherein (a) is a top view, (b) is a cross-sectional view, and (c) is a bottom view. 本発明の実施形態である定着部の施工方法の手順を示すもので、(a)は既存アンカーボルトの状態、(b)は作業孔を形成しつつある状態、(c)は作業孔を形成した状態を示す図である。The procedure of the construction method of the fixing part which is embodiment of this invention is shown, (a) is the state of the existing anchor bolt, (b) is the state which is forming the work hole, (c) is forming the work hole. It is a figure which shows the state which carried out. 同、(a)は既存アンカープレートを切除した状態、(b)はシース管内のコンクリートを切除して既存アンカーボルトを撤去しつつある状態、(c)は既存アンカーボルトを撤去した状態を示す図である。(A) is a state in which the existing anchor plate is removed, (b) is a state in which the concrete in the sheath tube is removed and the existing anchor bolt is being removed, and (c) is a view showing a state in which the existing anchor bolt is removed. It is. 同、(a)は新設アンカーボルトに縁切り材、グラウト排出ホースおよびスパイラル筋を装着した状態、(b)は新設アンカーボルトに新設アンカープレートを装着した状態、(c)は新設アンカープレートを基礎底面に装着した状態を示す図である。(A) shows the state where the edge-cutting material, grout discharge hose and spiral reinforcement are attached to the new anchor bolt, (b) shows the state where the new anchor plate is attached to the new anchor bolt, and (c) shows the state where the new anchor plate is attached to the bottom of the foundation. It is a figure which shows the state mounted | worn to. 同、(a)はカバーを装着した状態、(b)はグラウトを充填しつつある状態を示す図である。(A) is the state which attached the cover, (b) is a figure which shows the state which is being filled with grout. 従来のアンカーボルトの定着部の構造を示すための基礎の全体断面図である。It is a whole sectional view of the foundation for showing the structure of the fixing part of the conventional anchor bolt. 同、アンカーボルトの定着部の構造を示す断面詳細図である。It is a cross-sectional detail drawing which shows the structure of the fixing part of an anchor bolt. 同、アンカーボルトを示す図であって、(a)は上面図、(b)は側面図、(c)は底面図である。It is a figure which shows an anchor bolt, Comprising: (a) is a top view, (b) is a side view, (c) is a bottom view. 同、アンカープレートを示す図であって、(a)は上面図(図9におけるXIa−XIa線視図)、(b)は底面図(図9におけるXIb−XIb線視図)である。It is a figure which shows an anchor plate, Comprising: (a) is a top view (XIa-XIa line view in FIG. 9), (b) is a bottom view (XIb-XIb line view in FIG. 9). 同、既存のアンカーボルトを撤去しつつある状態を示す断面図である。It is sectional drawing which shows the state which is removing the existing anchor bolt same as the above. 同、既存のアンカーボルトを撤去した状態を示す図である。It is a figure which shows the state which removed the existing anchor bolt. 同、新設のアンカーボルトに交換した後の状態を示す図である。It is a figure which shows the state after replacing | exchanging to a new anchor bolt same as the above.

以下、本発明のアンカーボルトの定着部の構造および施工方法の実施形態について図1〜図7を参照して説明する。
なお、本実施形態は、基本的には図8〜図11に示した構造で設置されていた既存アンカーボルト2Aを図12〜図14に示す手法で新設アンカーボルト2Bに交換する場合の適用例であるので、本実施形態における構成要素のうち図8〜図14において既に説明した構成要素に相当するものには同一符号を付して説明を省略ないし簡略化する。
Hereinafter, an embodiment of the anchor bolt fixing portion structure and construction method according to the present invention will be described with reference to FIGS.
In addition, this embodiment is an application example in the case where the existing anchor bolt 2A that is basically installed with the structure shown in FIGS. 8 to 11 is replaced with the new anchor bolt 2B by the method shown in FIGS. Therefore, among the components in the present embodiment, those corresponding to the components already described in FIGS. 8 to 14 are denoted by the same reference numerals, and description thereof is omitted or simplified.

図1は本実施形態の定着部の構造を示すものであり、図2は本実施形態において用いる新設アンカーボルト2Bを示す図、図3は本実施形態において用いるグラウト充填用のカバー13を示す図である。   FIG. 1 shows the structure of the fixing portion of this embodiment, FIG. 2 shows a new anchor bolt 2B used in this embodiment, and FIG. 3 shows a cover 13 for grout filling used in this embodiment. It is.

本実施形態では、図8に示したように基礎1の下方地盤を掘削して作業空間7を確保したうえで、まず既存の基礎1の底部にシース管4に通じて既存アンカーボルト2Aおよび新設アンカーボルト2Bが挿通可能な作業孔8を形成し、その作業孔8を通してシース管4内から既存アンカーボルト2Aを作業空間7に抜き取った後、新設アンカーボルト2Bを作業孔8を通してシース管4内に挿入してそれらシース管4および作業孔8内に挿通せしめて配置し、新設アンカーボルト2Bの先端部に設けられている凸部2bを基礎1の底面において作業孔8の開口端に装着した新設アンカープレート5Bに対して係止することを基本とするものである。
そのうえで本実施形態では、新設アンカープレート5Bと既存アンカープレート5Aの間に無収縮モルタル等のグラウト10を充填して硬化させることにより、そのグラウト10によって作業孔8を封止するとともに、新設アンカーボルト2Bの先端部をそのグラウト10に対して固着せしめて堅固に定着することを主眼としている。
In the present embodiment, as shown in FIG. 8, after excavating the lower ground of the foundation 1 to secure the work space 7, first, the existing anchor bolt 2 </ b> A and the new installation are made through the sheath tube 4 at the bottom of the existing foundation 1. The working hole 8 into which the anchor bolt 2B can be inserted is formed, and the existing anchor bolt 2A is extracted from the sheath tube 4 through the working hole 8 into the working space 7, and then the new anchor bolt 2B is inserted into the sheath tube 4 through the working hole 8. Inserted into the sheath tube 4 and the working hole 8 and disposed, and the convex portion 2b provided at the tip of the new anchor bolt 2B is mounted on the open end of the working hole 8 on the bottom surface of the foundation 1. It is based on locking with respect to the new anchor plate 5B.
In addition, in this embodiment, the grout 10 such as non-shrink mortar is filled between the new anchor plate 5B and the existing anchor plate 5A and hardened to seal the work hole 8 with the grout 10, and the new anchor bolt The main object is to fix the tip of 2B to the grout 10 and fix it firmly.

すなわち、本実施形態では、図14に示した従来の交換後の構造と同様に、新設アンカーボルト2Bの先端に設けられている凸部2bを基礎1の底面に装着した新設アンカープレート5Bに対して係止することでそこに定着することを基本としているが、それに加えて、新設アンカープレート5Bに対して従来における防錆用の下部キャップ9(図14参照)を兼ねるカバー13(図3参照。これについての詳細は後述する)を装着し、そのカバー13を通して新設アンカープレート5Bと既存アンカープレート5Aの間にグラウト10を充填して硬化させるようにしている。
それにより作業孔8は図14に示した従来の構造のようにそのまま空洞として残されるのではなくグラウト10により封止されてしまい、かつ、新設アンカーボルト2Bはその先端の凸部2bが新設アンカープレート5Bに係止されるのみならず軸部2aの先端部が広範囲にわたってグラウト10を介して基礎1の底部に対して固着されてそこに堅固に定着されることになる。
この場合、新設アンカープレート5Bと既存アンカープレート5Aとそれらの間に充填されたグラウト10の全体が構造的に一体化するので、新設アンカーボルト2Bに導入される張力に対する反力は新設アンカープレート5Bのみならずそれらの全体が負担することになり、したがって図14に示した従来の構造に比べて基礎1に対する新設アンカーボルト2Bの先端部の定着耐力を十分に増強することが可能である。
That is, in the present embodiment, as in the conventional structure after replacement shown in FIG. 14, the convex portion 2b provided at the tip of the new anchor bolt 2B is attached to the new anchor plate 5B attached to the bottom surface of the foundation 1. In addition, the cover 13 (see FIG. 3) also serves as a conventional anti-rust lower cap 9 (see FIG. 14) for the new anchor plate 5B. The details of this will be described later), and the grout 10 is filled between the new anchor plate 5B and the existing anchor plate 5A through the cover 13 and hardened.
As a result, the working hole 8 is not left as a hollow as in the conventional structure shown in FIG. 14, but is sealed by the grout 10, and the new anchor bolt 2B has the convex portion 2b at the tip of the new anchor. In addition to being locked to the plate 5B, the tip end portion of the shaft portion 2a is fixed to the bottom portion of the foundation 1 through the grout 10 over a wide range and firmly fixed thereto.
In this case, since the new anchor plate 5B, the existing anchor plate 5A, and the entire grout 10 filled therebetween are structurally integrated, the reaction force against the tension introduced into the new anchor bolt 2B is the new anchor plate 5B. Not only that, but the whole of them bears, so that it is possible to sufficiently enhance the fixing strength of the tip of the new anchor bolt 2B with respect to the foundation 1 as compared with the conventional structure shown in FIG.

また、本実施形態においては、新設アンカープレート5Bと既存アンカープレート5Aとの間に単にグラウト10を充填するのみならず、新設アンカーボルト2Bの先端部にはそのグラウト10内に埋設されるようにスパイラル筋11を配筋しており、さらに新設アンカーボルト2Bの先端部にはグラウト10の付着を断つための縁切り材12が巻装されている。
すなわち、新設アンカーボルト2Bの緊張はグラウト10が硬化した後に行うのであるが、その際にグラウト10が新設アンカーボルト2Bに対して堅固に付着しているとグラウト10に無理な応力が生じる懸念もあるので、本実施形態ではそれを防止するために図2に示すように新設アンカーボルト2Bの軸部2aの先端部周面にグラウト10の付着を断つための縁切り材12を巻装している。したがって新設アンカーボルト2Bに対して所望の緊張力を支障なく導入し得るし、その緊張の際にグラウト10に対して無用な張力が生じることもなく、そのグラウト10中にスパイラル筋11を配筋していることと相まって定着部の強度を十分に確保し得るものとなっている。
In the present embodiment, the grout 10 is not simply filled between the new anchor plate 5B and the existing anchor plate 5A, but the tip of the new anchor bolt 2B is embedded in the grout 10. A spiral line 11 is arranged, and an edge cutting member 12 for cutting off the adhesion of the grout 10 is wound around the tip of the newly installed anchor bolt 2B.
That is, the tension of the new anchor bolt 2B is performed after the grout 10 is hardened. However, if the grout 10 is firmly attached to the new anchor bolt 2B at that time, there is a concern that an excessive stress is generated on the grout 10. Therefore, in this embodiment, in order to prevent this, as shown in FIG. 2, the edge cutting material 12 for cutting off the adhesion of the grout 10 is wound around the peripheral surface of the tip portion 2a of the new anchor bolt 2B. . Therefore, a desired tension force can be introduced to the new anchor bolt 2B without any trouble, and unnecessary tension is not generated on the grout 10 during the tension, and the spiral muscle 11 is arranged in the grout 10. In combination with this, the strength of the fixing portion can be sufficiently secured.

さらに、本実施形態では、新設アンカープレート5Bと既存アンカープレート5Aとの間にグラウト10を隙間無く確実かつ密に充填するべく、新設アンカープレート5Bに装着したカバー13を通してグラウト10を上向きに加圧注入するようにしたうえで、さらに新設アンカーボルト2Bの先端部には図2に示すようにグラウト排出ホース14を組み付けておいて、グラウト10が所定レベルまで確実に充填されたことを確認するようにしている(この点については以下に詳述する)。   Furthermore, in this embodiment, the grout 10 is pressed upward through the cover 13 attached to the new anchor plate 5B so that the grout 10 can be reliably and densely filled between the new anchor plate 5B and the existing anchor plate 5A without gaps. In addition, a grout discharge hose 14 is assembled at the tip of the newly installed anchor bolt 2B as shown in FIG. 2 to confirm that the grout 10 has been reliably filled to a predetermined level. (This point will be described in detail below).

以下、図4〜図7を参照して上記構造の定着部の施工方法について説明する。
図4(a)は交換対象の既存アンカーボルト2Aの設置状況を示すものである。これは,実質的に図9と同様の構造で既存アンカーボルト2Aが設置されているものであるが、基礎1の下方地盤は既に掘削されて作業空間7が確保されており、また既存アンカープレート5Aよりも上方のシース管4内にはコンクリート20が充填され、既存アンカープレート5Aより下方のシース管4内には樹脂や塵埃等の不要物が充填されている点で図9と異なるものである。
Hereinafter, the construction method of the fixing unit having the above structure will be described with reference to FIGS.
FIG. 4A shows the installation state of the existing anchor bolt 2A to be replaced. This is substantially the same structure as in FIG. 9 and the existing anchor bolt 2A is installed, but the lower ground of the foundation 1 has already been excavated to secure the working space 7, and the existing anchor plate 9 is different from FIG. 9 in that the sheath tube 4 above 5A is filled with concrete 20 and the sheath tube 4 below the existing anchor plate 5A is filled with unnecessary materials such as resin and dust. is there.

図4(a)に示す状態から、まず図4(b)に示すようにシース管4の直下において基礎1の底部をコアボーリングの手法で削孔し、かつ図4(c)に示すようにシース管4の底蓋4aを切除してシース管4内の底部に充填されていた不要物を除去し、それにより既存アンカーボルト2Aを抜き取るための作業孔8を形成する。   From the state shown in FIG. 4 (a), first, as shown in FIG. 4 (b), the bottom portion of the foundation 1 is drilled by the core boring method immediately below the sheath tube 4, and as shown in FIG. 4 (c). The bottom lid 4a of the sheath tube 4 is excised to remove unnecessary material from the bottom of the sheath tube 4, thereby forming a working hole 8 for extracting the existing anchor bolt 2A.

図9に示した従来の構造のようにシース管4内が空洞であれば上記の作業孔8を形成した時点で図12に示したように既存アンカーボルト2Aをそのまま下方に引き抜き可能であるが、本実施形態ではシース管4内にコンクリート20が充填されていてそのままでは既存アンカーボルト2Aの引き抜きが不可能である。
そこで、本実施形態では、図5(a)に示すように作業孔8内から既存アンカープレート5Aに対してコアボーリングを行ってその周縁部を残して中心部を切除してしまい、かつシース管4内のコンクリート20に対してもコアボーリングを行って鎖線で示す位置で中心部を周縁部から縁切りする。
これにより既存アンカーボルト2Aの抜き取りが可能となるから、図5(b)に示すようにシース管4内から中心部のコンクリートを除去したうえで既存アンカーボルト2Aを抜き取るか、あるいは既存アンカーボルト2Aとそれに付着しているコンクリート20とを一体に抜き取ってしまえば図5(c)に示す状態となり、これは実質的に図13と同様の状態となる。
If the sheath tube 4 is hollow as in the conventional structure shown in FIG. 9, the existing anchor bolt 2A can be pulled out as it is as shown in FIG. In this embodiment, the concrete 20 is filled in the sheath tube 4, and the existing anchor bolt 2A cannot be pulled out as it is.
Therefore, in this embodiment, as shown in FIG. 5 (a), core boring is performed on the existing anchor plate 5A from the inside of the working hole 8, and the central portion is excised leaving the peripheral edge, and the sheath tube Core boring is also performed on the concrete 20 in 4 to cut the center from the peripheral edge at the position indicated by the chain line.
As a result, the existing anchor bolt 2A can be extracted. Therefore, as shown in FIG. 5B, the concrete at the center is removed from the sheath tube 4 and then the existing anchor bolt 2A is extracted or the existing anchor bolt 2A is removed. 5 and the concrete 20 adhering thereto are extracted together, the state shown in FIG. 5C is obtained, which is substantially the same state as in FIG.

そこで、作業孔8を通してシース管4内に新設アンカーボルト2Bを挿入し、基本的には図14に示したように基礎1の底面に装着した新設アンカープレート5Bに対して新設アンカーボルト2Bの凸部2bを係止するのであるが、その際、新設アンカーボルト2Bの軸部2aの先端部には縁切り材12を巻装するとともにグラウト排出ホース14を組み付けたうえでスパイラル筋11を予め装着し、さらに新設アンカープレート5Bにはグラウト充填用のカバー13を装着する。   Therefore, the new anchor bolt 2B is inserted into the sheath tube 4 through the working hole 8, and basically the convexity of the new anchor bolt 2B with respect to the new anchor plate 5B mounted on the bottom surface of the foundation 1 as shown in FIG. The portion 2b is locked. At that time, the edge cutting member 12 is wound around the tip portion of the shaft portion 2a of the new anchor bolt 2B, and the grout discharge hose 14 is assembled, and the spiral muscle 11 is attached in advance. Further, a grout filling cover 13 is attached to the newly installed anchor plate 5B.

具体的には、図2に示したように新設アンカーボルト2Bの先端部のグラウト10が充填される範囲に対してテープ状の縁切り材12を螺旋状に隙間無く巻装するとともに、その外側にたとえば20mm程度の小径の柔軟なグラウト排出ホース14を添わせてたとえばテープ等の固定具により組み付けておく。
この際、グラウト排出ホース14の上端の位置は既存アンカープレート5Aよりもやや上方の位置において開口するようにしておき、下端は後段で新設アンカープレート5Bの下方に引き出してカバー13に対して接続するのでそのために必要な十分な余長を持たせておく。
Specifically, as shown in FIG. 2, a tape-shaped edge cutting member 12 is spirally wound around the range where the grout 10 at the tip of the newly installed anchor bolt 2B is filled, and the outer side thereof is wound outside. For example, a flexible grout discharge hose 14 having a small diameter of about 20 mm is attached and assembled with a fixture such as a tape.
At this time, the position of the upper end of the grout discharge hose 14 is opened at a position slightly above the existing anchor plate 5A, and the lower end is pulled out below the new anchor plate 5B and connected to the cover 13 at a later stage. So make sure you have enough extra length for that.

そして、図6(a)に示すように新設アンカーボルト2Bの先端部にスパイラル筋11を装着し、さらに図6(b)に示すように新設アンカーボルト2Bの先端に新設アンカープレート5Bを係止し、グラウト排出ホース14の先端部を新設アンカーボルト2Bの凸部2bと新設アンカープレート5Bとの間の隙間(つまり、新設アンカープレート5Bに形成されている貫通孔5a)を通して下方に引き出す。
そのうえで、新設アンカーボルト2Bをシース管4および作業孔8に挿通させ、図6(c)に示すように新設アンカープレート5Bを基礎1の底面に密着させる。その際、新設アンカーボルト2Bを仮緊張することで新設アンカープレート5Bを基礎1の底面に対して押圧し得るが、必要であれば新設アンカープレート5Bをケミカルアンカー等の適宜の固定手段によって基礎1に対して固定することでも良い。また、必要に応じて新設アンカープレート5Bと基礎1の底面との間の隙間に無収縮モルタル等のシール材15を充填すれば良い。
Then, as shown in FIG. 6 (a), the spiral reinforcement 11 is attached to the tip of the new anchor bolt 2B, and the new anchor plate 5B is locked to the tip of the new anchor bolt 2B as shown in FIG. 6 (b). Then, the tip of the grout discharge hose 14 is drawn downward through a gap between the convex portion 2b of the new anchor bolt 2B and the new anchor plate 5B (that is, the through hole 5a formed in the new anchor plate 5B).
Then, the new anchor bolt 2B is inserted through the sheath tube 4 and the working hole 8, and the new anchor plate 5B is brought into close contact with the bottom surface of the foundation 1 as shown in FIG. At that time, the new anchor plate 5B can be pressed against the bottom surface of the foundation 1 by temporarily tensioning the new anchor bolt 2B. If necessary, the new anchor plate 5B can be pressed by a suitable fixing means such as a chemical anchor. It may be fixed against. Moreover, what is necessary is just to fill the clearance gap between the newly installed anchor plate 5B and the bottom face of the foundation 1 with the sealing material 15, such as a non-shrink mortar, as needed.

さらに、図7(a)に示すように新設アンカープレート5Bに対してカバー13を装着する。なお、このカバー13の新設アンカープレート5Bに対する装着は、図6(b)に示す段階で(すなわち新設アンカープレート5Bを新設アンカーボルト2Bに係止した時点で)行っておいても良いし、あるいはさらにそれ以前にカバー13を新設アンカープレート5Bに対して予め装着しておいても良い。   Further, as shown in FIG. 7A, the cover 13 is attached to the new anchor plate 5B. The cover 13 may be attached to the new anchor plate 5B at the stage shown in FIG. 6B (that is, when the new anchor plate 5B is locked to the new anchor bolt 2B), or Furthermore, the cover 13 may be previously attached to the newly installed anchor plate 5B before that.

本実施形態において用いるカバー13は、図3(a)〜(c)に示すように上面が開放された四角形の中空箱状のもので、その各周面が新設アンカープレート5Bの各周面にほぼ密着する大きさとされ、上部に形成されているフランジ部を新設アンカープレート5Bの底面に対して密着させてそれに対してアンカーボルト等により固定されるものである。
カバー13の各周面のうち、対向している二面にはそれぞれグラウト注入口13aおよびグラウト排出口13bが設けられていて、グラウト注入口13aにはカバー13の外側に突出する注入用ソケット13cが設けられているとともに、グラウト排出口13bにはカバー13の内側に向かって排出用ソケット13dが設けられ、その排出用ソケットdに対して上記のグラウト排出ホース14が接続可能とされている。
As shown in FIGS. 3A to 3C, the cover 13 used in the present embodiment is a rectangular hollow box having an open upper surface, and each peripheral surface thereof is formed on each peripheral surface of the newly installed anchor plate 5B. The flange is formed to be in close contact with each other, and the flange formed at the upper part is brought into close contact with the bottom surface of the newly installed anchor plate 5B and fixed thereto with anchor bolts or the like.
A grout inlet 13a and a grout outlet 13b are respectively provided on the two opposing surfaces of the peripheral surface of the cover 13, and the grout inlet 13a has an injection socket 13c that protrudes outside the cover 13. In addition, a discharge socket 13d is provided in the grout discharge port 13b toward the inside of the cover 13, and the grout discharge hose 14 can be connected to the discharge socket d.

図7(a)に示すように、新設アンカーボルト2Bの先端部に組み付けておいたグラウト排出ホース14の下端部を排出用ソケット13dに接続したうえで、カバー13を新設アンカープレート5Bに装着すればグラウト10の充填作業が可能となるので、図7(b)に示すように注入用ソケット13cにグラウト供給ホース(図示せず)を接続してグラウト注入口13aからカバー13内にグラウト10を加圧注入する。
これにより、カバー13内に加圧注入されたグラウト10は、カバー13内全体に満たされた後、図7(b)に矢印で示しているように新設アンカープレート5Bと新設アンカーボルト2Bの凸部2bとの間の隙間(つまり新設アンカープレート5Bに形成されている貫通孔5a)を通って上方に徐々に押し上げられていき、そのレベルが既存アンカープレート5Aのやや上方の位置にまで達するとその時点で余剰のグラウト10がグラウト排出ホース14を通してグラウト排出口13bからカバー13外に排出されてくるから、その時点までグラウト10の充填を継続することにより、グラウト10が既存アンカープレート5Aの上方位置まで確実に充填されたことを目視にて確認し得る。
As shown in FIG. 7A, after connecting the lower end of the grout discharge hose 14 assembled to the tip of the new anchor bolt 2B to the discharge socket 13d, the cover 13 is attached to the new anchor plate 5B. 7 (b), a grout supply hose (not shown) is connected to the injection socket 13c, and the grout 10 is inserted into the cover 13 from the grout inlet 13a. Inject under pressure.
As a result, the grout 10 pressurized and injected into the cover 13 fills the entire cover 13, and then the convexity of the new anchor plate 5B and the new anchor bolt 2B as shown by the arrows in FIG. 7B. When it is gradually pushed upward through a gap with the portion 2b (that is, the through-hole 5a formed in the new anchor plate 5B) and reaches a level slightly above the existing anchor plate 5A. At that time, excess grout 10 is discharged from the grout discharge port 13b to the outside of the cover 13 through the grout discharge hose 14. By continuing to fill the grout 10 up to that point, the grout 10 is located above the existing anchor plate 5A. It can be visually confirmed that it has been reliably filled to the position.

所定の養生時間を経てグラウト10が硬化した後、新設アンカーボルト2Bを緊張して所望の緊張力を導入すれば作業完了となる。この際、既に述べたように新設アンカーボルト2Bはグラウト10に対して縁切り材12により絶縁されているので、その新設アンカーボルト2Bに対して所望の緊張力を支障なく付与できるし、グラウト10に無理な応力が生じることもない。   After the grout 10 has hardened after a predetermined curing time, the new anchor bolt 2B is tensioned and a desired tension is introduced to complete the operation. At this time, as described above, the new anchor bolt 2B is insulated from the grout 10 by the edge cutting material 12, so that a desired tension can be imparted to the new anchor bolt 2B without any trouble, and the grout 10 can be provided. Unreasonable stress does not occur.

以上で本発明の実施形態について説明したが、上記実施形態はあくまで好適な一例であって本発明は上記実施形態に限定されるものではなく、本発明の要旨を逸脱しない範囲内で適宜の設計的変更や応用が可能である。
たとえば、上記実施形態はシース管4内にコンクリート20が充填されていた場合の適用例であるので、既存アンカーボルト2Aを抜き取るために図5(a)、(b)に示したように既存アンカープレート5Aおよびシース管4内のコンクリート20を切除する作業が必要であるが、図9に示したようにシース管4が単なる空洞である場合には当然にそのような作業は不要であり、その場合は既存アンカープレート5Aと新設アンカープレート5Bとの間に対して上記と同様にしてグラウト10を充填すれば良い。
Although the embodiment of the present invention has been described above, the above embodiment is merely a preferred example, and the present invention is not limited to the above embodiment, and may be appropriately designed within the scope of the present invention. Changes and applications are possible.
For example, since the above embodiment is an application example when the sheath 20 is filled with the concrete 20, in order to extract the existing anchor bolt 2 </ b> A, as shown in FIGS. 5A and 5B, the existing anchor is used. The work of cutting the plate 5A and the concrete 20 in the sheath tube 4 is necessary. However, if the sheath tube 4 is a simple cavity as shown in FIG. In this case, the grout 10 may be filled between the existing anchor plate 5A and the new anchor plate 5B in the same manner as described above.

また、上記実施形態では新設アンカープレート5Bに装着したカバー13を通してグラウト10を充填するようにし、その際にはグラウト排出ホース14によりグラウトの充填状況を確認するようにしたが、本発明においては必ずしもそうすることはなく、グラウトの充填工程は他の工程によることでも良いし、その充填工程によってはグラウトの充填状況の確認工程を省略したり他の手法で行うことも妨げるものではない。   Further, in the above embodiment, the grout 10 is filled through the cover 13 attached to the newly installed anchor plate 5B, and in this case, the grout filling state is confirmed by the grout discharge hose 14, but in the present invention, it is not always necessary. This is not the case, and the grout filling process may be performed by another process, and depending on the filling process, the confirmation process of the grout filling state may be omitted or performed by another method.

1 基礎
2 アンカーボルト
2A 既存アンカーボルト
2B 新設アンカーボルト
2a 軸部
2b 凸部
3 ナット
4 シース管
4a 底蓋
5 アンカープレート
5A 既存アンカープレート
5B 新設アンカープレート
5a 貫通孔
5b 溝部
6 ベースプレート
7 作業空間
8 作業孔
9 下部キャップ
10 グラウト
11 スパイラル筋
12 縁切り材
13 カバー
13a グラウト注入口
13b グラウト排出口
13c 注入用ソケット
13d 排出用ソケット
14 グラウト排出ホース
15 シール材
20 コンクリート
DESCRIPTION OF SYMBOLS 1 Foundation 2 Anchor bolt 2A Existing anchor bolt 2B Newly installed anchor bolt 2a Shaft part 2b Convex part 3 Nut 4 Sheath pipe 4a Bottom cover 5 Anchor plate 5A Existing anchor plate 5B New anchor plate 5a Through-hole 5b Groove part 6 Base plate 7 Work space 8 Work Hole 9 Lower cap 10 Grout 11 Spiral line 12 Edge cutting material 13 Cover 13a Grout inlet 13b Grout outlet 13c Injection socket 13d Discharge socket 14 Grout discharge hose 15 Sealing material 20 Concrete

Claims (4)

既存の基礎に埋設されているシース管内に配置されてその下端部に設けられている凸部が前記基礎の底部に埋設されている既存アンカープレートに対して係止された状態で定着されていた既存アンカーボルトを新設アンカーボルトに交換する際に適用されるアンカーボルトの定着部の構造であって、
前記基礎の底部に対して新設アンカーボルトが挿通可能な作業孔を該基礎の底面から前記シース管に通じる位置まで形成して、新設アンカーボルトを前記シース管および前記作業孔に挿通せしめ、
前記作業孔の開口端に装着した新設アンカープレートに対して前記新設アンカーボルトの先端部に設けられている凸部を係止するとともに、前記新設アンカープレートと前記既存アンカープレートとの間にグラウトを充填して硬化せしめてなり、
前記新設アンカーボルトの先端部には、該新設アンカーボルトに対する前記グラウトの付着を断つ縁切り材が巻装されているとともに前記グラウト内に埋設されたスパイラル筋が装着されていることを特徴とするアンカーボルトの定着部の構造。
The convex portion provided at the lower end portion of the sheath tube embedded in the existing foundation was fixed in a state of being locked to the existing anchor plate embedded in the bottom portion of the foundation. The anchor bolt anchor structure applied when replacing an existing anchor bolt with a new anchor bolt,
Forming a working hole through which the new anchor bolt can be inserted into the bottom of the foundation from the bottom surface of the foundation to a position where it can communicate with the sheath tube, and inserting the new anchor bolt into the sheath tube and the working hole;
The convex portion provided at the tip of the new anchor bolt is locked to the new anchor plate attached to the opening end of the working hole, and a grout is provided between the new anchor plate and the existing anchor plate. Fill and harden,
An anchor characterized in that an edge cutting material for cutting off the adhesion of the grout to the new anchor bolt is wound around the tip of the new anchor bolt, and a spiral line embedded in the grout is mounted. Bolt fixing part structure.
請求項1記載のアンカーボルトの定着部の構造であって、
グラウト注入口およびグラウト排出口を備えたカバーが前記新設アンカープレートに装着されて、該カバーを通して前記グラウトが前記新設アンカープレートと前記既存アンカープレートとの間に充填されて硬化せしめられてなり、
前記グラウト内には、上端が前記既存アンカープレートの位置において開口し下端が前記カバーに設けられているグラウト排出口に接続されたグラウト排出ホースが埋設されていることを特徴とするアンカーボルトの定着部の構造。
The anchor bolt fixing portion structure according to claim 1,
A cover having a grout inlet and a grout outlet is attached to the new anchor plate, and the grout is filled and hardened between the new anchor plate and the existing anchor plate through the cover.
Anchor fixing of an anchor bolt, wherein a grout discharge hose connected to a grout discharge port having an upper end opened at the position of the existing anchor plate and a lower end provided in the cover is embedded in the grout. Part structure.
既存の基礎に埋設されているシース管内に配置されてその下端部に設けられている凸部が前記基礎の底部に埋設されている既存アンカープレートに対して係止された状態で定着されていた既存アンカーボルトを新設アンカーボルトに交換する際に適用されるアンカーボルトの定着部の施工方法であって、
前記基礎の底部に対して新設アンカーボルトが挿通可能な作業孔を該基礎の底面から前記シース管に通じる位置まで形成して、新設アンカーボルトを前記シース管および前記作業孔に挿通せしめ、
前記作業孔の開口端に装着した新設アンカープレートに対して前記新設アンカーボルトの先端部に設けられている凸部を係止するとともに、前記新設アンカープレートと前記既存アンカープレートとの間にグラウトを充填して硬化せしめ、
前記新設アンカーボルトを前記シース管および前記作業孔に挿通せしめるに際しては、予め前記新設アンカーボルトの先端部に、該新設アンカーボルトに対する前記グラウトの付着を断つための縁切り材を予め巻装しておくとともに、前記グラウト内に埋設されるスパイラル筋を装着しておき、
前記グラウトが硬化した後に前記新設アンカーボルトを緊張することを特徴とするアンカーボルトの定着部の施工方法。
The convex portion provided at the lower end portion of the sheath tube embedded in the existing foundation was fixed in a state of being locked to the existing anchor plate embedded in the bottom portion of the foundation. It is a construction method of an anchor bolt fixing portion applied when an existing anchor bolt is replaced with a new anchor bolt,
Forming a working hole through which the new anchor bolt can be inserted into the bottom of the foundation from the bottom surface of the foundation to a position where it can communicate with the sheath tube, and inserting the new anchor bolt into the sheath tube and the working hole;
The convex portion provided at the tip of the new anchor bolt is locked to the new anchor plate attached to the opening end of the working hole, and a grout is provided between the new anchor plate and the existing anchor plate. Fill and harden,
When the new anchor bolt is inserted into the sheath tube and the working hole, an edge cutting material for cutting off the adhesion of the grout to the new anchor bolt is previously wound around the tip of the new anchor bolt. Along with the spiral muscles embedded in the grout,
The anchor bolt fixing portion is constructed by tensioning the new anchor bolt after the grout is cured.
請求項3記載のアンカーボルトの定着部の施工方法であって、
前記グラウトの充填に際しては、グラウト注入口およびグラウト排出口を備えたカバーを前記新設アンカープレートに装着するとともに、前記新設アンカーボルトの先端部には上端が前記既存アンカープレートの位置に開口し下端が前記カバーに設けられているグラウト排出口に接続されるグラウト排出ホースを予め装着しておいて、
前記グラウト注入口から前記カバー内に前記グラウトを加圧注入するとともに該グラウトが前記グラウト排出ホースを通して前記グラウト排出口から排出されるまで前記カバー内への前記グラウトの加圧注入を継続することを特徴とするアンカーボルトの定着部の施工方法。
It is a construction method of the fixing part of the anchor bolt according to claim 3,
When filling the grout, a cover having a grout inlet and a grout outlet is attached to the new anchor plate, and an upper end opens at the position of the existing anchor plate at the tip of the new anchor bolt and a lower end A grout discharge hose connected to a grout discharge port provided in the cover is attached in advance,
Pressurizing and injecting the grout into the cover from the grout inlet and continuing to pressurize the grout into the cover until the grout is discharged from the grout outlet through the grout discharge hose. The anchor bolt fixing part construction method is a feature.
JP2013036293A 2013-02-26 2013-02-26 Anchor bolt anchorage structure and construction method Expired - Fee Related JP5993758B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2013036293A JP5993758B2 (en) 2013-02-26 2013-02-26 Anchor bolt anchorage structure and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2013036293A JP5993758B2 (en) 2013-02-26 2013-02-26 Anchor bolt anchorage structure and construction method

Publications (2)

Publication Number Publication Date
JP2014163154A JP2014163154A (en) 2014-09-08
JP5993758B2 true JP5993758B2 (en) 2016-09-14

Family

ID=51614022

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2013036293A Expired - Fee Related JP5993758B2 (en) 2013-02-26 2013-02-26 Anchor bolt anchorage structure and construction method

Country Status (1)

Country Link
JP (1) JP5993758B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106351246B (en) * 2015-07-15 2018-09-14 五冶集团上海有限公司 The integral sleeve installation method of T-bolt diameter≤48mm
CN105672344A (en) * 2016-04-06 2016-06-15 福州大学 Steel bar reinforced foundation grouting sleeve connection structure and method of offshore wind turbines
CN108716368B (en) * 2018-06-28 2024-02-13 中冶长天国际工程有限责任公司 A derrick support column, derrick and derrick correction method
CN112482429B (en) * 2020-11-16 2022-01-28 中国空气动力研究与发展中心设备设计及测试技术研究所 Replaceable secondary grouting anchor bolt foundation with adjustable anchoring length and replacement and installation method

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4977703U (en) * 1972-10-20 1974-07-05
JPH01278700A (en) * 1988-04-27 1989-11-09 R D Metal:Kk Lock bolt with stabilizing implement and lock bolt anchoring method
JPH1077636A (en) * 1996-09-02 1998-03-24 Natl House Ind Co Ltd Anchor bolt and anchor bolt installation structure
JP2003090048A (en) * 2001-09-17 2003-03-28 Sekisui Chem Co Ltd Concrete foundation reinforcement structure, anchor bolt, construction method
JP2003293379A (en) * 2002-03-29 2003-10-15 Daiwa House Ind Co Ltd Crack preventive structure of base concrete in vicinity of anchor
JP3106099U (en) * 2004-06-22 2004-12-16 株式会社カナイ Anchor bolt
JP5170060B2 (en) * 2009-10-29 2013-03-27 新日鐵住金株式会社 How to replace the foundation bolt

Also Published As

Publication number Publication date
JP2014163154A (en) 2014-09-08

Similar Documents

Publication Publication Date Title
JP5993758B2 (en) Anchor bolt anchorage structure and construction method
US9890511B1 (en) Rock bolt seal
JP5926615B2 (en) Shaft wall structure and construction method
CN109736304B (en) Glass fiber composite anchor cable bar, glass fiber composite anchor cable and construction method of anchor rod
CN206408760U (en) A kind of out no-conhesion prestressing anchorage corrosion protection protection device
KR101658738B1 (en) reinforcing method for lining repair of underground structures
JP7211779B2 (en) Shield start-side shaft wall and shield start-side shaft wall construction method
KR20100132222A (en) Grouting reinforcement unit and grouting reinforcement method using the same
JP4325995B2 (en) How to prevent manhole from rising due to liquefaction
JP2001193064A (en) Anchoring method for ground anchor
JP2015229861A (en) Metal ground anchor structure and installation method
KR100310457B1 (en) Waterproofing method of concrete structure
KR101312223B1 (en) Anchor bolt
KR100823603B1 (en) Permanent anchor
JP3140216U (en) Crack-induced waterproof structure
JP5217216B2 (en) Anchor head fixing structure, anchor head fixing method, and grout injection method
JP3194214U (en) Metal ground anchor
CN212358656U (en) Waterproofing system for building deformation joints with adhesive built-in waterstop structure
JP7178861B2 (en) Concrete wall reinforcement method
JP6966964B2 (en) Reinforcement structure and reinforcement method for existing reinforced concrete structures
KR101122139B1 (en) A cylindrical removable packer with opened entrance and soil nailing method with the same
JP2008208597A (en) Post-installed anchor method
CN206581614U (en) Threaded bar planting device
JP6611314B2 (en) Injection structure and injection method
KR200421375Y1 (en) Permanent anchor

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20151113

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20160726

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20160727

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20160822

R150 Certificate of patent or registration of utility model

Ref document number: 5993758

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees