JP6007766B2 JP2012270431A JP2012270431A JP6007766B2 JP 6007766 B2 JP6007766 B2 JP 6007766B2 JP 2012270431 A JP2012270431 A JP 2012270431A JP 2012270431 A JP2012270431 A JP 2012270431A JP 6007766 B2 JP6007766 B2 JP 6007766B2
Authority
JP
Japan
Prior art keywords
boom
hoisting
line
undulation
sheave
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2012270431A
Other languages
Japanese (ja)
Other versions
JP2014114134A (en
Inventor
花本 貴博
貴博 花本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kobelco Construction Machinery Co Ltd
Original Assignee
Kobelco Construction Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kobelco Construction Machinery Co Ltd filed Critical Kobelco Construction Machinery Co Ltd
Priority to JP2012270431A priority Critical patent/JP6007766B2/en
Publication of JP2014114134A publication Critical patent/JP2014114134A/en
Application granted granted Critical
Publication of JP6007766B2 publication Critical patent/JP6007766B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Jib Cranes (AREA)

Description

本発明は、伸縮可能なブームを備えたクレーンに関するものである。   The present invention relates to a crane having an extendable boom.

従来、伸縮可能なブームを備えたクレーンが広く知られている。このような伸縮可能なブームを備えたクレーンは作業性及び輸送性がよいことから、特に狭隘な建設現場でよく用いられている。前記ブームの具体的な構成としては、互いに軸方向に相対移動可能となるように嵌め合わされる複数段の箱形のブーム体を有していて、その相対移動によりブーム全体が伸縮する、いわゆるテレスコープ型のものが広く知られている。   Conventionally, a crane having an extendable boom is widely known. A crane having such an extendable boom is often used particularly in a narrow construction site because it has good workability and transportability. As a specific configuration of the boom, there is a so-called telescope that has a multi-stage box-shaped boom body that is fitted so as to be movable relative to each other in the axial direction. The scope type is widely known.

このような伸縮可能なブームを備えたクレーンでは、当該ブームを起伏させる手段として、一般に、最下段のブーム体の先端側とクレーンのベースとの間に介設される油圧シリンダが搭載され、この油圧シリンダは、前記最下段のブーム体を下から押し上げることによってブーム全体を起立方向に移動させる(例えば特許文献1参照)。   In a crane equipped with such a telescopic boom, as a means for raising and lowering the boom, generally, a hydraulic cylinder interposed between the tip side of the lowermost boom body and the base of the crane is mounted. The hydraulic cylinder moves the entire boom in the standing direction by pushing up the lowermost boom body from below (see, for example, Patent Document 1).

登録実用新案第3062585号公報Registered Utility Model No. 3062585

前記のように油圧シリンダによって下から支えられるブームは、その先端が自由端である、いわゆる片持ち梁の状態にあるため、当該ブームの伸長に伴って、当該ブームの自重及び吊り荷に起因する曲げモーメントが増大し、よって当該ブームの撓みが大きくなる。この撓みを抑えるためにブームの剛性を高めようとすると、その構造は自ずと複雑でかつ重量の大きなものとなり、却って本来の利点である作業性や輸送性を損なうおそれがある。   As described above, the boom supported by the hydraulic cylinder from the bottom is in a so-called cantilever state where the tip is a free end, and is caused by the weight of the boom and the suspended load as the boom extends. The bending moment is increased, and the bending of the boom is increased. If an attempt is made to increase the rigidity of the boom in order to suppress this bending, the structure is naturally complicated and heavy, and the workability and transportability, which are inherent advantages, may be impaired.

前記課題を解決するために、本発明者等は、いわゆるラチスブームと同じく、起伏用ウインチから引き出した起伏用ロープをガイラインを介してブームの先端に連結し、当該起伏用ウインチによるラインの巻取りおよび繰出しによってブームを起伏させることに想到した。このような起伏駆動機構であれば、ブームはその基端部側の回動中心点(例えばブームフットピン)と先端側の前記ラインの連結点とで両端支持されることになるため、ブームの撓みは大幅に削減される。   In order to solve the above-mentioned problems, the present inventors, like a so-called lattice boom, connect a hoisting rope drawn out from a hoisting winch to the tip of the boom via a guy line, and wind the line by the hoisting winch. I came up with the idea to raise and lower the boom. With such an undulating drive mechanism, the boom is supported at both ends by a pivot center point (for example, a boom foot pin) on the proximal end side and a connecting point of the line on the distal end side. The deflection is greatly reduced.

しかしながら、このようなウインチによる起伏駆動機構を伸縮可能なブームに適用した場合、当該ブームの伸縮に伴って当該ブームの先端から起伏用ウインチまでの距離が著しく変動するため、その伸縮時にラインの操作を行わないとブームはその伸縮に伴って起伏方向に大きく動いてしまう。つまり、ブームの伸縮動作と起伏動作とを独立させることができなくなる。このような伸縮動作と起伏動作との相互干渉を回避する手段として、前記ブームの伸縮に応じて前記起伏用ウインチを巻取りまたは繰出し方向に作動させてブームの起伏動作への影響をなくすことが考えられるが、前記のようにブームの伸縮に伴う当該ブームの先端から起伏用ウインチまでの距離の変動は非常に大きいので、当該伸縮動作に起伏用ウインチの作動を追従させるには当該起伏用ウインチを高速で、かつ高い頻度で駆動しなければならない。これは、起伏用ウインチのドラムの大きな慣性力を考えると、現実的とはいえない。   However, when such a hoisting drive mechanism using a winch is applied to an extendable boom, the distance from the tip of the boom to the hoisting winch varies significantly as the boom expands and contracts. Otherwise, the boom will move greatly in the undulation direction as it expands and contracts. That is, it becomes impossible to make the boom expansion / contraction operation and the undulation operation independent. As a means for avoiding such mutual interference between the telescopic operation and the hoisting operation, the hoisting winch is operated in the winding or feeding direction in accordance with the expansion and contraction of the boom to eliminate the influence on the hoisting operation of the boom. Although it is conceivable, the fluctuation of the distance from the tip of the boom to the hoisting winch due to the expansion and contraction of the boom is very large as described above. Therefore, in order to make the operation of the hoisting winch follow the telescopic operation, the hoisting winch Must be driven at high speed and with high frequency. This is not practical considering the large inertial force of the hoisting winch drum.

本発明の目的は、伸縮可能なブームを備えるクレーンであって、起伏用ウインチを用いることにより、当該ブームに作用する曲げモーメントを低く抑えながら当該ブームを起伏させることが可能であり、しかも、当該起伏用ウインチを高速で作動させることなく前記ブームの伸縮動作と起伏動作との干渉を有効に抑止することができるクレーンを提供することにある。   An object of the present invention is a crane including an extendable boom, and by using a hoisting winch, the boom can be raised and lowered while suppressing a bending moment acting on the boom, It is an object of the present invention to provide a crane that can effectively suppress interference between the telescopic motion and the hoisting motion of the boom without operating the hoisting winch at high speed.

本発明が提供するクレーンは、ベースと、このベースに起伏可能に装着され、長手方向に伸縮可能なブームと、前記ブームを伸縮させる伸縮装置と、前記ブームの先端から引出される起伏用ラインと、この起伏用ラインにつながる起伏用ロープと、前記ベースに搭載され、前記起伏用ロープの巻取りおよび繰出しによって前記ブームを前記起伏用ラインを介して起伏方向に操作する起伏用ウインチと、前記ブームに組付けられるライン長さ調整機構と、を備える。このライン長さ調整機構は、前記ブームの先端部に取付けられる先端側シーブを含む複数のシーブを含み、これらのシーブに前記起伏用ラインが巻き掛けられ、かつ、前記ブームの伸長及び収縮に対応して前記先端側シーブからの前記起伏用ラインの繰出し及び当該先端ブーム内への前記起伏用ラインの取り込みがそれぞれ行われるように前記複数のシーブが配置されたものである。   A crane provided by the present invention includes a base, a boom that can be raised and lowered to the base, and can extend and contract in the longitudinal direction, an expansion and contraction device that expands and contracts the boom, and a hoisting line that is drawn from the tip of the boom. A hoisting rope connected to the hoisting line, a hoisting winch mounted on the base and operating the boom in the hoisting direction via the hoisting line by winding and unwinding the hoisting rope, and the boom And a line length adjusting mechanism assembled to. The line length adjusting mechanism includes a plurality of sheaves including a tip side sheave attached to the tip of the boom, the undulation line is wound around these sheaves, and the boom can be expanded and contracted. The plurality of sheaves are arranged so that the hoisting line is fed out from the tip sheave and the hoisting line is taken into the tip boom.

このクレーンによれば、ブームの先端部から引出される起伏用ラインにつながる起伏用ロープを起伏用ウインチが巻取りあるいは繰出して当該ブームを起伏方向に操作することにより、当該先端部が自由端部である状態でブームが起伏される従来のクレーンと異なり、当該ブームに作用する曲げモーメントを低減できるのに加え、当該ブームに組付けられるライン長さ調整機構がブームの伸長及び収縮に応じてそのブームの先端部に取付けられる先端側シーブから起伏用ラインを繰り出し、あるいは起伏用ラインを取り込むから、ブームの伸縮に伴って起伏用ウインチを作動させない場合に当該伸縮に伴って当該ブームが起伏方向に動くのを有効に抑止することができる。換言すれば、ブームの伸縮動作が当該ブームの起伏動作に与える影響を抑止するために前記起伏用ウインチを作動させることを不要にし、もしくはその作動の必要速度を低く抑えることができる。   According to this crane, when the hoisting winch winds or unwinds the hoisting rope connected to the hoisting line drawn from the tip of the boom and the boom is operated in the hoisting direction, the tip becomes a free end. Unlike conventional cranes in which the boom is raised and lowered in this state, the bending moment acting on the boom can be reduced, and the line length adjusting mechanism assembled to the boom can be adjusted according to the extension and contraction of the boom. Since the hoisting line is fed out from the tip side sheave attached to the tip of the boom or the hoisting line is taken in, when the hoisting winch is not operated along with the expansion and contraction of the boom, the boom moves in the hoisting direction along with the expansion and contraction. It is possible to effectively suppress movement. In other words, it is not necessary to operate the hoisting winch in order to suppress the influence of the boom extending and retracting operation on the hoisting operation of the boom, or the required speed of the operation can be kept low.

前記ライン長さ調整機構は、好ましくは、前記ブームの伸長に伴ってその伸長量に対応する長さだけ前記先端側シーブから前記起伏用ラインを繰り出し、前記ブームの収縮に伴ってその収縮量に対応する長さだけ前記先端側シーブから前記起伏用ラインを前記ブーム内に取り込むのが、よい。このようなライン長さ調整機構は、ブームの伸縮動作が当該ブームの起伏動作に与える影響を抑えるための起伏用ウインチの駆動制御を不要にし、もしくはその駆動制御を著しく簡素化することができる。   Preferably, the line length adjusting mechanism feeds the undulation line from the tip sheave by a length corresponding to the extension amount as the boom extends, and adjusts the contraction amount as the boom contracts. It is preferable that the hoisting line is taken into the boom from the tip side sheave by a corresponding length. Such a line length adjusting mechanism eliminates the need for the drive control of the hoisting winch for suppressing the effect of the boom extending and retracting operation on the hoisting operation of the boom, or can greatly simplify the drive control.

具体的には、前記ブームが、当該ブームの長手方向に配列される複数のブーム体を含み、これらのブーム体はこれに隣接するブーム体に対して前記ブームの伸縮方向に相対移動可能となるように嵌合され、前記ライン長さ調整機構は、当該ライン長さ調整機構に含まれるシーブであって前記先端側シーブ以外のシーブが前記各ブーム体の基端側端部及び先端側端部にそれぞれ回転可能に設けられ、前記起伏用ラインは、その先端が前記ブームのうち前記ベースに連結された基端側部分に固定されるとともに前記各シーブに対して前記ブームの基端側に近いブーム体に設けられたシーブから順に掛け渡されて前記先端側シーブから前記ブームの外部へ導出されるものが、好適である。このライン長さ調整機構は、簡素な構造で、前記ブームの伸長及び収縮に対応した先端側シーブからの起伏用ラインの繰出し及び取込みを実現することができる。   Specifically, the boom includes a plurality of boom bodies arranged in the longitudinal direction of the boom, and these boom bodies are movable relative to the boom body adjacent thereto in the telescopic direction of the boom. The line length adjusting mechanism is a sheave included in the line length adjusting mechanism, and the sheaves other than the distal end side sheave are proximal end ends and distal end ends of the boom bodies. The hoisting line is fixed to a base end side portion connected to the base of the boom and is close to the base end side of the boom with respect to each sheave. It is preferable that the sheave is provided in order from the sheave provided on the boom body and led out of the boom from the tip sheave. This line length adjusting mechanism has a simple structure, and can realize the feeding and taking-in of the undulation line from the tip sheave corresponding to the extension and contraction of the boom.

本発明では、前記ライン長さ調整機構に加え、当該ブームの伸縮動作に基づいて前記起伏用ウインチの動作を制御する制御装置をさらに備えてもよい。この制御装置としては、ブームの長さを検出するブーム長さ検出器と、前記ブームの起伏角度を検出するブーム角度検出器と、これらブーム長さ検出器及びブーム角度検出器がそれぞれ検出するブームの長さ及び起伏角度に基づいて前記ブームの伸縮に伴う前記先端側シーブから前記ベース側における前記起伏用ロープの支点に至るまでの距離の変動を吸収するための補正量を演算し、この補正量に基づいて前記起伏用ウインチを動作させるウインチ制御部と、を有するものが好適である。この制御装置は、前記ブームの伸縮が当該ブームの起伏動作に与える影響をより低減することができる。しかも、当該影響は前記ライン長さ調整機構による起伏用ラインの繰出しまたは取込みによって基本的に低減されているので、制御装置が前記起伏動作への影響の抑制のために演算する補正量は小さく、よって起伏用ウインチを高速で動かす必要がない。   In the present invention, in addition to the line length adjusting mechanism, a control device for controlling the operation of the hoisting winch based on the expansion / contraction operation of the boom may be further provided. The control device includes a boom length detector for detecting the boom length, a boom angle detector for detecting the boom undulation angle, and booms detected by the boom length detector and the boom angle detector, respectively. Based on the length and the angle of undulation, a correction amount is calculated to absorb the variation in the distance from the tip sheave to the fulcrum of the undulation rope on the base side as the boom expands and contracts. A winch control unit that operates the hoisting winch based on the amount is preferable. This control device can further reduce the influence of the boom expansion and contraction on the boom hoisting operation. In addition, since the influence is basically reduced by feeding or taking in the undulation line by the line length adjustment mechanism, the correction amount that the control device calculates to suppress the influence on the undulation operation is small. Therefore, it is not necessary to move the hoisting winch at high speed.

以上のように、本発明によれば、伸縮可能なブームを備えるクレーンであって、起伏用ウインチを用いることにより、当該ブームに作用する曲げモーメントを低く抑えながら当該ブームを起伏させることが可能であり、しかも、当該起伏用ウインチを高速で作動させることなく前記ブームの伸縮動作と起伏動作との干渉を有効に抑止することができるクレーンが、提供される。   As described above, according to the present invention, a crane including an extendable boom can be used to raise and lower the boom while suppressing a bending moment acting on the boom by using a hoisting winch. In addition, there is provided a crane that can effectively suppress the interference between the boom telescopic operation and the hoisting operation without operating the hoisting winch at high speed.

本発明の実施の形態にかかるクローラクレーンの側面図である。It is a side view of the crawler crane concerning an embodiment of the invention. 前記クローラクレーンにおけるブームの断面正面図である。It is a cross-sectional front view of the boom in the said crawler crane. 前記ブームの平面図である。It is a top view of the boom. (a)は図3のA−A線断面を模式的に示した図、(b)は図3のB−B線断面を模式的に示した図である。(A) is the figure which showed typically the AA line cross section of FIG. 3, (b) is the figure which showed the BB line cross section of FIG. 3 typically. 前記制御装置を示すブロック図である。It is a block diagram which shows the said control apparatus. 前記制御装置が行う補正量の演算の原理を説明するための模式図である。It is a schematic diagram for demonstrating the principle of the calculation of the correction amount which the said control apparatus performs. 前記制御装置が行う演算制御動作を示すフローチャートである。It is a flowchart which shows the calculation control operation which the said control apparatus performs.

本発明の好ましい実施の形態を、図1〜図7を参照しながら説明する。   A preferred embodiment of the present invention will be described with reference to FIGS.

図1は、本発明の実施の形態に係るクレーンを示す。このクレーンは、いわゆるクローラクレーンであって、クローラ式の下部走行体1と、この下部走行体1上に縦軸まわりに旋回自在に搭載されて当該下部走行体1ととともにベースを構成する上部旋回体2と、この上部旋回体2の前部に起伏可能に装着されるブーム3と、このブーム3の側方に配置される運転室4と、主巻ウインチ5と、補巻ウインチ6と、起伏用ウインチ7と、前記ブーム3から引出される左右一対の起伏用ライン8と、これらの起伏用ライン8にそれぞれ連結される起伏用ロープ9と、前記ブーム3に組付けられるライン長さ調整機構と、備える。前記各ウインチ5,6,7は、それぞれウインチドラムとこれを駆動するモータとを有し、前記上部旋回体2の中間部から後部にかけて順に並ぶように当該上部旋回体2に搭載されている。   FIG. 1 shows a crane according to an embodiment of the present invention. This crane is a so-called crawler crane, and is a crawler-type lower traveling body 1 and an upper swing that is mounted on the lower traveling body 1 so as to be pivotable about a vertical axis and constitutes a base together with the lower traveling body 1. A body 2, a boom 3 mounted on the front portion of the upper swing body 2 so as to be raised and lowered, a cab 4 disposed on the side of the boom 3, a main winding winch 5, and an auxiliary winding winch 6, A hoisting winch 7, a pair of left and right hoisting lines 8 drawn out from the boom 3, hoisting ropes 9 respectively connected to the hoisting lines 8, and a line length adjustment assembled to the boom 3 And a mechanism. Each of the winches 5, 6 and 7 has a winch drum and a motor for driving the winch drum, and is mounted on the upper swing body 2 so as to be arranged in order from the middle portion to the rear portion of the upper swing body 2.

この実施形態に係るブーム3は、ラチス構造を有する基端側構造体31と、同じくラチス構造を有する先端側構造体32と、基端側構造体31と先端側構造体32との間に介在する伸縮可能な中間構造体33と、を有する。前記基端側構造体31は、前記上部旋回体2にブームフットピン13を介して水平軸回りに回動可能に連結され、その回動によってブーム3全体が起伏する。前記先端側構造体32の先端には、主巻用シーブ348及び補巻用シーブ349がそれぞれ回転可能に取付けられ、各シーブ348,349からそれぞれ主巻フック34及び補巻フック35が吊下げられる。   The boom 3 according to this embodiment includes a proximal-side structure 31 having a lattice structure, a distal-side structure 32 also having a lattice structure, and a proximal-side structure 31 and a distal-side structure 32. And an extendable intermediate structure 33. The base end side structure 31 is connected to the upper swing body 2 via a boom foot pin 13 so as to be rotatable about a horizontal axis, and the boom 3 as a whole is raised and lowered by the rotation. A main winding sheave 348 and an auxiliary winding sheave 349 are rotatably attached to the tip of the distal end side structure 32, and the main winding hook 34 and the auxiliary winding hook 35 are suspended from the sheaves 348 and 349, respectively. .

図2〜図4は、前記中間構造体33の構造を示している。図2は中間構造体33が最も収縮した状態を示す断面側面図、図3はその平面図、図4(a)(b)はそれぞれ図2のA−A線及びB−B線に沿った断面図でかつ前記中間構造体33の構造を模式的に示したものである。   2 to 4 show the structure of the intermediate structure 33. 2 is a cross-sectional side view showing a state in which the intermediate structure 33 is most contracted, FIG. 3 is a plan view thereof, and FIGS. 4A and 4B are taken along lines AA and BB in FIG. It is sectional drawing and shows the structure of the said intermediate structure 33 typically.

前記中間構造体33は、複数段のブーム体を備える。図に示される中間構造体33は、ブーム3が伸長した状態でその基端側から順に並ぶ1段ブーム体331、2段ブーム体332、3段ブーム体333及び4段ブーム体334を含み、これらのブーム体331〜334は中空の箱型であって互いに隣接するブーム体がテレスコープ状に嵌合可能(すなわちブーム3の伸縮方向に相対移動可能に嵌合可能)な形状を有する。   The intermediate structure 33 includes a plurality of boom bodies. The intermediate structure 33 shown in the figure includes a first stage boom body 331, a second stage boom body 332, a third stage boom body 333, and a fourth stage boom body 334 arranged in order from the base end side in a state where the boom 3 is extended. These boom bodies 331 to 334 are hollow box-shaped, and have a shape in which adjacent boom bodies can be fitted in a telescope shape (that is, they can be fitted so as to be movable relative to each other in the expansion and contraction direction of the boom 3).

前記2〜4段ブーム体332,333,334の内部には、伸縮装置である油圧シリンダ335,336,337がそれぞれ設けられている。各油圧シリンダ335〜337は、シリンダ本体と、このシリンダ本体に対して軸方向すなわちシリンダ伸縮方向に変位する伸縮ロッドと、を有し、前記シリンダ本体が図2における下向きの姿勢で前記各ブーム体332〜334に収納されて固定され、各伸縮ロッドの先端が直下の段のブーム体にそれぞれ固定されている。従って、これらの油圧シリンダ335,336,337の伸縮作動により各ブーム体331〜334がブーム長手方向に相対変位し、これにより中間構造体33が伸縮する。   The hydraulic cylinders 335, 336, and 337, which are telescopic devices, are provided inside the 2 to 4 stage boom bodies 332, 333, and 334, respectively. Each of the hydraulic cylinders 335 to 337 includes a cylinder main body and an expansion / contraction rod that is displaced in the axial direction, that is, the cylinder expansion / contraction direction with respect to the cylinder main body. 332 to 334 are housed and fixed, and the distal ends of the telescopic rods are respectively fixed to the boom bodies at the level immediately below. Accordingly, the boom bodies 331 to 334 are relatively displaced in the boom longitudinal direction by the expansion and contraction operation of the hydraulic cylinders 335, 336, and 337, and thereby the intermediate structure 33 expands and contracts.

前記1段ブーム体331の基端及び前記第4ブーム体334の先端にはそれぞれ複数の連結部338及び複数の連結部339が設けられている。各連結部338は、1段ブーム体331のブーム本体338aの四隅からそれぞれ対角線状に外側に延びるブラケット338bと、このブラケット338bに固定されるアイピース338cと、を有し、このアイピース338cが図1に示した基端側構造体31とピン結合される。同様に、各連結部339は、4段ブーム体334のブーム本体339aの四隅からそれぞれ対角線状に外側に延びるブラケット339bと、このブラケット338bに固定されるアイピース339cと、を有し、このアイピース339cが図1に示した先端側構造体32とピン結合される。   A plurality of connecting portions 338 and a plurality of connecting portions 339 are provided at the proximal end of the first-stage boom body 331 and the distal end of the fourth boom body 334, respectively. Each connecting portion 338 includes a bracket 338b extending diagonally outward from the four corners of the boom body 338a of the first-stage boom body 331, and an eyepiece 338c fixed to the bracket 338b, and the eyepiece 338c is shown in FIG. The base end structure 31 shown in FIG. Similarly, each connecting portion 339 includes a bracket 339b extending diagonally outward from four corners of the boom body 339a of the four-stage boom body 334, and an eyepiece 339c fixed to the bracket 338b. Is pin-coupled to the distal-end structure 32 shown in FIG.

前記起伏用ライン8は、後に詳述するように前記ブーム3に組付けられたライン長さ調整機構に巻き掛けられて当該ブーム3の先端部から上部旋回体2側に引き出されている。一方、上部旋回体2の後部にはガントリ21が立設され、このガントリ21の頂部及びこの頂部からブーム3側に離間した位置にそれぞれスプレッダ22,23が設けられており、そのうちの上部スプレッダ23に前記起伏用ライン8の端部が連結されている。前記起伏用ロープ9は、その一方の端部を含む部分が前記起伏用ウインチ7のウインチドラムに巻き付けられ、他方の端部を含む部分が前記スプレッダ22,23間に巻回されている。従って、前記起伏用ウインチ7は、そのウインチドラムの回転によって前記起伏用ロープ9を巻取りあるいは巻出すことにより、前記起伏用ライン8を介して前記ブーム3の先端部を前記ブームフットピン13回りに回動操作する、すなわち起伏方向に操作する、ことができる。また、前記下部スプレッダ22の位置は、ベースを構成する上部旋回体2側において前記起伏用ロープ8を支持する支点に相当する。   As will be described in detail later, the hoisting line 8 is wound around a line length adjusting mechanism assembled to the boom 3 and pulled out from the tip of the boom 3 to the upper swing body 2 side. On the other hand, a gantry 21 is erected at the rear part of the upper swing body 2, and spreaders 22 and 23 are provided at the top of the gantry 21 and at positions spaced from the top toward the boom 3, respectively. The end of the undulation line 8 is connected to the undulation. The portion of the hoisting rope 9 that includes one end is wound around the winch drum of the hoisting winch 7, and the portion that includes the other end is wound between the spreaders 22 and 23. Therefore, the hoisting winch 7 winds or unwinds the hoisting rope 9 by the rotation of the winch drum, so that the tip of the boom 3 passes around the boom foot pin 13 via the hoisting line 8. It is possible to perform the rotation operation, that is, the operation in the undulation direction. Further, the position of the lower spreader 22 corresponds to a fulcrum for supporting the hoisting rope 8 on the upper swing body 2 side constituting the base.

前記ライン長さ調整機構は、ブーム3の先端部に設けられる左右一対の先端側シーブ345と、それ以外の複数のシーブであって図2〜図4に示されるようにブーム3に組付けられる左右一対の基端側シーブ340及び左右一対の第1〜第4中間シーブ341〜344とを含み、これらのシーブに巻き掛けられた前記起伏用ライン8を前記ブーム3の伸長に伴ってその伸長量だけ前記先端側シーブ345から繰り出し、逆に前記ブーム3の収縮に伴ってその収縮量だけ前記先端側シーブ345からブーム3内に取込む、すなわち吸収する、ように、前記各シーブが配置されている。なお、図4(a)では各シーブ330〜345の回転軸方向は図の左右方向になるが、これらのシーブは便宜上小円で描かれている。   The line length adjusting mechanism is a pair of left and right tip sheaves 345 provided at the tip of the boom 3 and a plurality of other sheaves, and is assembled to the boom 3 as shown in FIGS. It includes a pair of left and right proximal sheaves 340 and a pair of left and right first to fourth intermediate sheaves 341 to 344, and the undulation line 8 wound around these sheaves extends as the boom 3 extends. The sheaves are arranged so that they are fed out from the tip side sheave 345 by the amount, and conversely, as the boom 3 contracts, the amount of contraction is taken into the boom 3 from the tip side sheave 345, that is, absorbed. ing. In FIG. 4A, the direction of the rotation axis of each sheave 330 to 345 is the left-right direction in the figure, but these sheaves are drawn in small circles for convenience.

前記基端側シーブ340は、前記1段ブーム体331と前記2段ブーム体332の間にそれぞれ収納され、その2段ブーム体332の基端に、ブーム長手方向と直交する特定方向(この実施形態ではブーム3の回動中心軸と平行な方向)の軸回りに回転可能に取り付けられている。前記第1中間シーブ341は、前記1段ブーム体331から突出する前記2段ブーム体332の先端側端部にそれぞれ、3段ブーム体333側に傾斜した姿勢で、前記特定方向の軸回りに回転可能に取り付けられている。前記第2中間シーブ342は、前記2段ブーム体332と前記3段ブーム体333との間にそれぞれ収納され、その3段ブーム体333の基端側端部に、前記特定方向の軸回りに回転可能に取り付けられている。前記第3中間シーブ343は、前記2段ブーム体332から突出する前記3段ブーム体333の先端側端部にそれぞれ、前記4段ブーム体334側に傾斜する姿勢で、前記特定方向の軸回りに回転可能に取り付けられている。前記第4中間シーブ344は、前記3段ブーム体333と前記4段ブーム体334との間にそれぞれ収納され、その4段ブーム体334の基端側端部に、前記特定方向の軸回りに回転可能に取り付けられている。前記先端側シーブ345は、図1に示すように、前記先端側構造体31の先端部にそれぞれ、前記特定方向の軸回りに回転可能に取り付けられている。   The base end side sheave 340 is housed between the first-stage boom body 331 and the second-stage boom body 332, and a base direction of the second-stage boom body 332 has a specific direction orthogonal to the boom longitudinal direction (this implementation). In the embodiment, the boom 3 is attached so as to be rotatable around an axis in a direction parallel to the rotation center axis of the boom 3. The first intermediate sheave 341 is inclined around the axis in the specific direction at a position inclined to the end of the second-stage boom body 332 at the front end side of the second-stage boom body 332 and projecting from the first-stage boom body 331. It is mounted for rotation. The second intermediate sheave 342 is housed between the second-stage boom body 332 and the third-stage boom body 333, and is arranged around the axis in the specific direction at the proximal end of the third-stage boom body 333. It is mounted for rotation. The third intermediate sheave 343 is inclined around the axis in the specific direction at a position inclined to the end of the four-stage boom body 334 at the end of the third-stage boom body 333 protruding from the second-stage boom body 332. It is attached to be rotatable. The fourth intermediate sheave 344 is housed between the third-stage boom body 333 and the fourth-stage boom body 334, and is arranged around the axis in the specific direction at the proximal end of the fourth-stage boom body 334. It is mounted for rotation. As shown in FIG. 1, the tip side sheave 345 is attached to the tip portion of the tip side structure 31 so as to be rotatable about the axis in the specific direction.

このライン長さ調整機構を構成する各シーブに対し、前記左右の各起伏用ライン8は次のように巻き掛けられている。まず、当該起伏用ライン8の一方の端部は、ブーム3のうち上部旋回体2に連結されていて伸縮方向には変位しない基端側部分(この実施形態では1段ブーム体331の先端側端部;この基端側部分は例えば基端側構造体31であってもよい。)に設定された固定点347に固定され、この固定点347から下方の基端側シーブ340に導かれて当該基端側シーブ340に巻き掛けられることにより上向きに180°転回する。以下、同様にして、起伏用ライン8は、2段ブーム体331の先端部の第1中間シーブ341に巻き掛けられることにより下向きに180°転回し、3段ブーム体333の基端部における第2中間シーブ342に巻き掛けられて上向きに180°転回し、3段ブーム体333の先端部における第3中間シーブ343に巻き掛けられることにより下向きに180°転回し、4段ブーム体334の基端部における第4中間シーブ344に巻き掛けられて上向きに180°転回し、さらにブーム3の先端部の先端側シーブ345に巻き掛けられてから上部スプレッダ23に係止される。   The left and right undulation lines 8 are wound around the sheaves constituting the line length adjusting mechanism as follows. First, one end of the hoisting line 8 is connected to the upper swing body 2 of the boom 3 and is not displaced in the telescopic direction (in this embodiment, the distal end side of the first-stage boom body 331). The base end side portion may be, for example, the base end side structure 31.) And fixed to a fixing point 347 set to the base end side sheave 340 from the fixing point 347. By being wound around the base end side sheave 340, it is turned 180 ° upward. Hereinafter, similarly, the hoisting line 8 turns 180 ° downward by being wound around the first intermediate sheave 341 at the distal end portion of the two-stage boom body 331, and rotates at the first end portion of the three-stage boom body 333. 2 wraps around the intermediate sheave 342 and turns upward 180 °, and wraps around the third intermediate sheave 343 at the tip of the three-stage boom body 333 and turns downward 180 °, thereby turning the base of the four-stage boom body 334. It is wound around the fourth intermediate sheave 344 at the end and turned upward by 180 °, and further wound around the tip-side sheave 345 at the tip of the boom 3 and then locked to the upper spreader 23.

このライン長さ調整機構によれば、特に図4(a)から明らかなように、中間構造体33が伸長するとその分だけ先端側シーブ345からブーム3の外部へ起伏用ライン8が繰り出され、逆に中間構造体33が収縮するとその分だけ先端側シーブ345からブーム3の内部に起伏用ライン8が取込まれる。例えば、3段ブーム体333に対して4段ブーム体334がブーム先端側すなわちブーム伸長側に変位すると、その分だけ第3中間シーブ343と第4中間シーブ344との距離が減少し、この距離の減少分に相当する寸法の起伏用ライン8が先端側シーブ345から繰り出される。逆に、3段ブーム体333に対して4段ブーム体334がブーム基端側すなわちブーム収縮側に変位すると、その分だけ第3中間シーブ343と第4中間シーブ344との距離が増大し、この距離の増大分に相当する寸法の起伏用ライン8が先端側シーブ345からブーム3内に取込まれる。   According to this line length adjusting mechanism, as is apparent from FIG. 4A in particular, when the intermediate structure 33 is extended, the hoisting line 8 is fed out of the boom 3 from the tip side sheave 345 to that extent, Conversely, when the intermediate structure 33 contracts, the hoisting line 8 is taken into the boom 3 from the tip side sheave 345 by that amount. For example, when the four-stage boom body 334 is displaced to the boom tip side, that is, the boom extension side with respect to the three-stage boom body 333, the distance between the third intermediate sheave 343 and the fourth intermediate sheave 344 is reduced by that amount. The undulation line 8 having a size corresponding to the reduced amount is fed out from the tip side sheave 345. On the contrary, when the four-stage boom body 334 is displaced to the boom proximal end side, that is, the boom contraction side with respect to the three-stage boom body 333, the distance between the third intermediate sheave 343 and the fourth intermediate sheave 344 increases accordingly. The undulation line 8 having a size corresponding to the increase in the distance is taken into the boom 3 from the tip side sheave 345.

このようなブーム3の伸縮に伴う起伏用ライン8の繰り出し及び取込みは、当該ブーム3の伸長に伴う前記先端側シーブ345から下側スプレッダ22に至るまでの距離(以下「起伏有効距離」と称する。)LRの増減を抑制し、これにより、起伏用ウインチ7が停止したままブーム3が伸縮したときに当該ブーム3が起伏方向に操作されてしまうこと、すなわち、伸縮動作と起伏動作との干渉、を抑制することができる。   The extending and taking-in of the hoisting line 8 accompanying the expansion and contraction of the boom 3 is a distance from the tip sheave 345 to the lower spreader 22 accompanying the extension of the boom 3 (hereinafter referred to as “an effective hoisting distance”). .) Suppressing the increase / decrease of LR, so that the boom 3 is operated in the hoisting direction when the boom 3 is extended and retracted while the hoisting winch 7 is stopped, that is, the interference between the telescopic operation and the hoisting operation. Can be suppressed.

ただし、実際には、起伏用ライン8のうちブーム3の先端部から上部スプレッダ23に至る部分と当該ブーム3との間には図1に示すような狭角γが存在する。しかも、この狭角γはブーム起伏角度に応じて変化する。従って、前記起伏用ウインチ7が停止していても、前記起伏有効距離LRが一定のままであると、ブーム3の中間構造体33の伸縮に伴って実際にはブーム3の起伏角度が僅かに変化する。   However, in reality, a narrow angle γ as shown in FIG. 1 exists between the boom 3 and the portion of the hoisting line 8 extending from the tip of the boom 3 to the upper spreader 23. In addition, the narrow angle γ changes according to the boom undulation angle. Therefore, even if the hoisting winch 7 is stopped, if the hoisting effective distance LR remains constant, the hoisting angle of the boom 3 is actually slightly increased as the intermediate structure 33 of the boom 3 expands and contracts. Change.

このような変化をさらに抑制するため、この実施形態に係るクレーンは、図5に示すような制御装置を備える。この制御装置は、ブーム3の起伏角度α、すなわち図1に示すようにブーム3の基準軸Xと水平線とのなす角度、に相当する検出信号を出力するブーム角度センサ110と、ブーム長さLB(図1)に相当する検出信号を出力するブーム長さセンサ120と、コントローラ100と、を備える。このコントローラ100は、前記ブーム角度センサ110及び前記ブーム長さセンサ120が出力する検出信号と、ブーム3を伸縮させるために操作される伸縮操作レバー130の当該操作に基づき生成される伸縮指令信号と、ブーム3を起伏させるために操作される起伏操作レバー140の当該操作に基づき生成される起伏指令信号と、に基づき、前記ブーム3を伸縮させるための前記油圧シリンダ335〜337の作動と、前記起伏用ウインチ7の作動と、を制御する信号を生成する。前記伸縮操作レバー130及び起伏操作レバー140は前記運転室4内に配置されている。また、ブーム角度センサ110及びブーム長さセンサ120はブーム3の適所に配置されており、例えばロータリエンコーダやポテンショメータにより構成される。   In order to further suppress such changes, the crane according to this embodiment includes a control device as shown in FIG. This control device includes a boom angle sensor 110 that outputs a detection signal corresponding to the undulation angle α of the boom 3, that is, the angle formed by the reference axis X of the boom 3 and the horizontal line as shown in FIG. 1, and the boom length LB. A boom length sensor 120 that outputs a detection signal corresponding to FIG. 1 and a controller 100 are provided. The controller 100 includes a detection signal output from the boom angle sensor 110 and the boom length sensor 120, and an expansion / contraction command signal generated based on the operation of the expansion / contraction operation lever 130 operated to extend / contract the boom 3. The operation of the hydraulic cylinders 335 to 337 for expanding and contracting the boom 3 based on the raising and lowering command signal generated based on the operation of the raising and lowering operation lever 140 operated to raise and lower the boom 3; A signal for controlling the operation of the hoisting winch 7 is generated. The telescopic operation lever 130 and the hoisting operation lever 140 are disposed in the cab 4. In addition, the boom angle sensor 110 and the boom length sensor 120 are disposed at appropriate positions on the boom 3 and include, for example, a rotary encoder or a potentiometer.

前記コントローラ100は、図5に示すような角度演算部101、長さ演算部102、伸縮動作制御部103、起伏動作制御部(制御手段)104、補正部(補正手段)105、メモリ106及び判断部107を含む。各部101〜107は、例えば図示しないCPUに読み込んで実行される各種プログラムによって具現化される。   The controller 100 includes an angle calculation unit 101, a length calculation unit 102, an expansion / contraction operation control unit 103, a undulation operation control unit (control unit) 104, a correction unit (correction unit) 105, a memory 106, and a determination as shown in FIG. Part 107 is included. The units 101 to 107 are embodied by various programs that are read and executed by a CPU (not shown), for example.

角度演算部101は、ブーム角度センサ101が出力する検出信号(ブーム角度信号SA)に基づきブーム3の起伏角度αを演算し、長さ演算部102はブーム長さセンサ102が出力する検出信号(ブーム長さ信号SL)に基づいてブーム長さLBを演算する。メモリ106は、上部旋回体2上でのブーム3の回動支点すなわちブームフットピン13の中心点と、上部旋回体2側での起伏用ロープ9の支点(この実施形態ではガントリ21の頂部の下側スプレッダ22の中心点)と、の垂直距離a及び水平距離bと、前記ブーム回動支点とブーム3の先端側における起伏用ライン8の支点すなわち先端側シーブ345の中心とを結ぶ直線X′が前記基準軸Xに対してなす角度β、を記憶する。   The angle calculation unit 101 calculates the undulation angle α of the boom 3 based on the detection signal (boom angle signal SA) output from the boom angle sensor 101, and the length calculation unit 102 detects the detection signal (output from the boom length sensor 102). The boom length LB is calculated based on the boom length signal SL). The memory 106 includes a pivot point of the boom 3 on the upper swing body 2, that is, a center point of the boom foot pin 13, and a fulcrum of the hoisting rope 9 on the upper swing body 2 side (in this embodiment, the top of the gantry 21). A straight line X connecting the vertical distance a and the horizontal distance b of the lower spreader 22) with the boom rotation fulcrum and the fulcrum of the hoisting line 8 on the tip side of the boom 3, that is, the center of the tip sheave 345. The angle β formed by ′ with respect to the reference axis X is stored.

判断部107は伸縮操作レバー103のレバー操作の有無と、起伏操作レバー104のレバー操作の有無とから、オペレータの操作パターンを判断する。操作パターンとしては、ブーム3の伸縮操作のみが行われる伸縮操作パターンと、ブーム3の起伏操作のみが行われる起伏操作パターンと、ブーム3の伸縮及び起伏操作が同時に行われる複合操作パターンとがある。   The determination unit 107 determines the operator's operation pattern from the presence / absence of the lever operation of the telescopic operation lever 103 and the presence / absence of the lever operation of the hoisting operation lever 104. As the operation patterns, there are an expansion / contraction operation pattern in which only the expansion / contraction operation of the boom 3 is performed, a undulation operation pattern in which only the undulation operation of the boom 3 is performed, and a composite operation pattern in which the expansion / contraction and undulation operations of the boom 3 are performed simultaneously. .

伸縮動作制御部103は、伸縮操作レバー103のレバー操作量VTに基づくブーム3の伸縮動作指令を発するものであり、判断部107が起伏操作パターンであると判断した場合には伸縮動作指令を発しないで中間構造体33の伸縮動作をロックする一方、判断部107が伸縮操作パターン又は複合操作パターンであると判断した場合には上記伸縮動作指令を油圧回路200における各伸縮制御弁235,236,237に入力する。これら伸縮制御弁235〜237は、前記油圧回路200に含まれる図略の油圧ポンプと前記各油圧シリンダ335〜337との間に介在し、前記伸縮動作制御部103から入力される制御信号に応じて開弁することにより、前記油圧ポンプから吐出される作動油を対応する油圧シリンダに供給して当該油圧シリンダを伸長または収縮させる。   The expansion / contraction operation control unit 103 issues an expansion / contraction operation command for the boom 3 based on the lever operation amount VT of the expansion / contraction operation lever 103. When the determination unit 107 determines that the movement operation pattern is a undulation operation pattern, the expansion / contraction operation command is issued. The expansion / contraction operation of the intermediate structure 33 is locked without the determination unit 107 determining that it is an expansion / contraction operation pattern or a composite operation pattern, and the expansion / contraction operation commands are sent to the expansion / contraction control valves 235 and 236 in the hydraulic circuit 200. 237 to input. These expansion / contraction control valves 235 to 237 are interposed between a hydraulic pump (not shown) included in the hydraulic circuit 200 and the hydraulic cylinders 335 to 337, and correspond to control signals input from the expansion / contraction operation control unit 103. By opening the valve, the hydraulic oil discharged from the hydraulic pump is supplied to the corresponding hydraulic cylinder to expand or contract the hydraulic cylinder.

起伏動作制御部104は起伏操作レバー104のレバー操作量VHに基づくブーム3の起伏動作指令を発するものであり、判断部107が起伏操作パターンであると判断した場合には前記起伏動作指令をそのまま前記油圧回路200内の起伏制御弁207に入力する。この起伏制御弁207は、前記油圧ポンプと、前記起伏用ウインチ7に組み込まれたウインチドラム駆動用の油圧モータと、の間に介在し、前記起伏動作制御部104から入力される制御信号に応じて開弁することにより、前記油圧ポンプから吐出される作動油を前記油圧モータに供給して当該油圧モータを巻取り駆動方向または繰出し駆動方向に回転させる。   The hoisting operation control unit 104 issues a hoisting operation command for the boom 3 based on the lever operation amount VH of the hoisting operation lever 104. If the determination unit 107 determines that the hoisting operation pattern is used, the hoisting operation command is used as it is. This is input to the undulation control valve 207 in the hydraulic circuit 200. The hoisting control valve 207 is interposed between the hydraulic pump and a hydraulic motor for driving a winch drum incorporated in the hoisting winch 7, and responds to a control signal input from the hoisting operation control unit 104. By opening the valve, the hydraulic oil discharged from the hydraulic pump is supplied to the hydraulic motor, and the hydraulic motor is rotated in the winding driving direction or the feeding driving direction.

一方、判断部107が伸縮操作パターン又は複合操作パターンであると判断した場合、前記起伏動作制御部104は前記補正部105に前記起伏動作指令を入力し、補正部105はこの起伏動作指令を補正する。具体的に、補正部105はブーム起伏角度αとブーム長さLBと、下記の数式(1)〜(3)式を用いて補正量ΔLrを計算し、上記起伏動作指令にこの補正量ΔLrを加算する。このように補正量ΔLrが加算されて補正された最終起伏動作指令が前記起伏制御弁207に入力される。すなわち、前記起伏動作制御部104及び前記補正部105は、起伏用ウインチ7の動作を制御するウインチ制御部に相当する。   On the other hand, when the determination unit 107 determines that the pattern is an expansion / contraction operation pattern or a composite operation pattern, the undulation operation control unit 104 inputs the undulation operation command to the correction unit 105, and the correction unit 105 corrects the undulation operation command. To do. Specifically, the correction unit 105 calculates the correction amount ΔLr using the boom hoisting angle α, the boom length LB, and the following formulas (1) to (3), and the correction amount ΔLr is set in the hoisting operation command. to add. The final undulation operation command corrected by adding the correction amount ΔLr in this way is input to the undulation control valve 207. That is, the hoisting operation control unit 104 and the correction unit 105 correspond to a winch control unit that controls the operation of the hoisting winch 7.

前記複合操作パターンでの前記起伏動作指令の補正の原理は次のとおりである。まず、前記起伏有効距離LR、すなわち、前記先端側シーブ345から下側スプレッダ22に至るまでの直線距離、は、前記のようにメモリ106が記憶する距離a,b及び角度βを用いて次式(1)により表わすことができる。   The principle of correction of the undulation operation command in the composite operation pattern is as follows. First, the undulation effective distance LR, that is, the linear distance from the tip sheave 345 to the lower spreader 22 is expressed by the following equation using the distances a and b and the angle β stored in the memory 106 as described above. It can be expressed by (1).

Figure 0006007766
Figure 0006007766

ここで、β=tan−1(c/LB)、L=LB/cosβであるから、結局、LRはブーム起伏角度α及びブーム長さLBの関数LR(α,LB)として表わすことができる。一方、ブーム3が伸縮すると、その伸縮量すなわちブーム長さLBの変化量ΔLBに相当する長さの起伏用ライン8が先端側シーブ345から繰り出され、あるいは取り込まれるから、例えば図6に示すように、初期のブーム側の起伏用ライン8の支点(この実施形態では先端側シーブ345の中心点)及び起伏有効距離をそれぞれP1,LR1、この初期状態から例えばブーム3が伸長した後のブーム側の起伏用ライン8の支点及び起伏有効距離をそれぞれP2,LR2とすると、その伸長にかかわらずブーム起伏角度αを一定に保つための前記補正量ΔLr、すなわち、当該ブーム3の伸縮による前記ブーム起伏角度αへの影響を相殺するために起伏用ウインチ7のウインチドラムから繰り出されあるいは当該ウインチドラムに巻き取られなければならない起伏用ロープ9の長さは、次式にて表わすことができる。 Here, since β = tan −1 (c / LB) and L = LB / cos β, LR can be expressed as a function LR (α, LB) of the boom hoisting angle α and the boom length LB. On the other hand, when the boom 3 expands and contracts, the hoisting line 8 having a length corresponding to the expansion / contraction amount, that is, the change amount ΔLB of the boom length LB is drawn out or taken in from the tip side sheave 345. For example, as shown in FIG. Further, the fulcrum (the central point of the tip sheave 345 in this embodiment) of the hoisting line 8 on the initial boom side and the hoisting effective distance are respectively P1 and LR1, and the boom side after the boom 3 is extended from this initial state, for example. If the fulcrum of the hoisting line 8 and the hoisting effective distance are P2 and LR2, respectively, the correction amount ΔLr for keeping the boom hoisting angle α constant regardless of the extension, that is, the boom hoisting due to the expansion and contraction of the boom 3 In order to cancel the influence on the angle α, the hoisting winch 7 is unwound from the winch drum or wound around the winch drum. The length of the hoisting rope 9 shall can be expressed by the following equation.

[数2]
ΔLr=LR1+ΔLB−LR2
=LR(α,LB)+ΔLB−LR(α,LB
ここで、前記補正量ΔLrが正の値である場合はその絶対値は起伏用ウインチ7による起伏用ロープ9の巻取り寸法を意味し、逆に負の値である場合(すなわちブーム3が収縮する場合)の絶対値は起伏用ロープ9の繰出し寸法を意味する。この補正量が前記起伏動作指令に加算されることにより、ブーム3の伸縮にかかわらず起伏操作レバー140の操作量すなわち起伏レバー操作量VH)に正確に追従した(例えば当該操作量VHが0の場合にはブーム3を起伏方向に動かさないための)最終起伏動作指令が生成されることになる。
[Equation 2]
ΔLr = LR1 + ΔLB−LR2
= LR (α 1 , LB 1 ) + ΔLB−LR (α 2 , LB 2 )
Here, when the correction amount ΔLr is a positive value, the absolute value means the winding dimension of the hoisting rope 9 by the hoisting winch 7, and conversely, when the correction amount ΔLr is a negative value (that is, the boom 3 is contracted). The absolute value of (when) means the feeding dimension of the hoisting rope 9. By adding this correction amount to the hoisting operation command, the operation amount of the hoisting operation lever 140, that is, the hoisting lever operation amount VH is accurately followed regardless of the expansion and contraction of the boom 3 (for example, the operation amount VH is 0). In this case, a final hoisting operation command (to prevent the boom 3 from moving in the hoisting direction) is generated.

図6は、前記コントローラ100が実際に行う制御動作を示したものである。   FIG. 6 shows a control operation actually performed by the controller 100.

コントローラ100は、まず、伸縮レバー操作量VT及び起伏レバー操作量VHの読み込み(ステップS1)と、ブーム角度信号SA及びブーム長さ信号SLの読み込み(ステップS2)と、を行い、前記ブーム角度信号SAからブーム起伏角度αを算出し(ステップS3)、前記ブーム長さ信号SLからブーム長さLBを算出する(ステップS4)。   First, the controller 100 reads the telescopic lever operation amount VT and the hoisting lever operation amount VH (step S1), and reads the boom angle signal SA and the boom length signal SL (step S2). The boom raising / lowering angle α is calculated from SA (step S3), and the boom length LB is calculated from the boom length signal SL (step S4).

起伏レバー操作量VHの絶対値が0よりも大きくて伸縮レバー操作量VTの絶対値が0の場合(ステップS5でYES)、すなわち、起伏操作及び伸縮操作のうち起伏操作のみが行われた場合、コントローラ100は、起伏レバー操作量VHに対応した起伏動作指令をそのまま(すなわち補正することなく)起伏制御弁207に入力する(ステップS6)。これにより、前記起伏動作指令に対応する量だけ起伏用ウインチ7による起伏用ロープ9の巻取りまたは繰出しが行われ、これによりブーム3が起伏方向に動かされる。   When the absolute value of the hoisting lever operation amount VH is larger than 0 and the absolute value of the telescopic lever operation amount VT is 0 (YES in step S5), that is, when only the hoisting operation among the hoisting operation and the telescopic operation is performed. The controller 100 inputs the hoisting operation command corresponding to the hoisting lever operation amount VH to the hoisting control valve 207 as it is (that is, without correction) (step S6). As a result, the hoisting winch 7 winds or unwinds the hoisting rope 9 by an amount corresponding to the hoisting operation command, whereby the boom 3 is moved in the hoisting direction.

一方、前記ステップS5でNOの場合、コントローラ100は、ブーム3の伸縮に備えて、ブーム起伏角度α、ブーム長さLBに基づき、前記式(1)を用いた補正量ΔLrの演算を行う(ステップS7)。   On the other hand, in the case of NO in step S5, the controller 100 calculates the correction amount ΔLr using the equation (1) based on the boom undulation angle α and the boom length LB in preparation for the expansion and contraction of the boom 3 ( Step S7).

そして、前記とは逆に、伸縮レバー操作量VTの絶対値が0よりも大きくて伸縮レバー操作量VTの絶対値が0の場合(ステップS8でYES)、すなわち、起伏操作及び伸縮操作のうち伸縮操作のみが行われた場合、コントローラ100は、伸縮レバー操作量VTに対応した伸縮動作指令を伸縮制御弁235〜237に入力して(ステップS9)油圧シリンダ335〜337を作動させることによりブーム3を伸縮させるのに加え、前記補正量ΔLrに対応した起伏動作指令、換言すれば、0の起伏動作指令に前記補正量ΔLrを加算して得られる最終起伏動作指令、を、起伏制御弁207に入力する(ステップS10)。この最終起伏動作指令は、前記のとおり、ブーム3の伸縮に伴ってライン長さ調整機構がその先端側シーブ345によりワイヤロープ8を繰出しまたは取込むことを前提に、当該ブーム3の伸縮にかかわらずブーム起伏角度αを一定に保つための調整用起伏動作指令であるから、この指令に基づいて起伏用ウインチ7による起伏用ロープ9の巻取りまたは繰出しが行われることにより、前記ブーム3を起伏方向に動かさずに当該ブーム3を伸縮させることが実現される。   Contrary to the above, when the absolute value of the telescopic lever operation amount VT is greater than 0 and the absolute value of the telescopic lever operation amount VT is 0 (YES in step S8), that is, out of the undulation operation and the expansion operation When only the expansion / contraction operation is performed, the controller 100 inputs an expansion / contraction operation command corresponding to the expansion / contraction lever operation amount VT to the expansion / contraction control valves 235 to 237 (step S9), and operates the hydraulic cylinders 335 to 337 to operate the boom. 3, the undulation operation command corresponding to the correction amount ΔLr, in other words, the final undulation operation command obtained by adding the correction amount ΔLr to the undulation operation command of 0, (Step S10). As described above, the final hoisting operation command is related to the expansion and contraction of the boom 3 on the assumption that the line length adjusting mechanism pays out or takes in the wire rope 8 by the tip side sheave 345 as the boom 3 expands and contracts. Therefore, the hoisting rope 9 is wound or unwound by the hoisting winch 7 based on this command, so that the boom 3 is raised and lowered. Extending and retracting the boom 3 without moving in the direction is realized.

また、伸縮レバー操作量VTの絶対値及び伸縮レバー操作量VTの絶対値がともに0よりも大きい場合(ステップS11でYES)、すなわち、起伏操作及び伸縮操作が同時に行われた複合操作の場合、コントローラ100は、伸縮レバー操作量VTに対応した伸縮動作指令を伸縮制御弁235〜237に入力して(ステップS12)油圧シリンダ335〜337を作動させることによりブーム3を伸縮させるのに加え、起伏レバー操作量VHに対応した起伏動作指令に前記補正量ΔLrを加算して得られる最終起伏動作指令、を、起伏制御弁207に入力する(ステップS13)。これにより、前記ブーム3の伸縮に影響を受けることなく前記起伏レバー操作量VHに正確に追従した起伏用ウインチ7の駆動制御が、実現される。   When the absolute value of the telescopic lever operation amount VT and the absolute value of the telescopic lever operation amount VT are both greater than 0 (YES in step S11), that is, in the case of a composite operation in which the undulation operation and the expansion operation are performed simultaneously, The controller 100 inputs a telescopic operation command corresponding to the telescopic lever operation amount VT to the telescopic control valves 235 to 237 (step S12) and operates the hydraulic cylinders 335 to 337 to expand and contract the boom 3, A final hoisting operation command obtained by adding the correction amount ΔLr to the hoisting operation command corresponding to the lever operation amount VH is input to the hoisting control valve 207 (step S13). Thus, drive control of the hoisting winch 7 that accurately follows the hoisting lever operation amount VH without being affected by the expansion and contraction of the boom 3 is realized.

なお、伸縮レバー操作量VTの絶対値及び伸縮レバー操作量VTの絶対値がともに0の場合(ステップS5,S8及びS11のいずれにおいてもNO)、コントローラ100は動作指令を出力しない。これにより、ブーム3の静止状態が保たれる。   When the absolute value of the telescopic lever operation amount VT and the absolute value of the telescopic lever operation amount VT are both 0 (NO in any of steps S5, S8, and S11), the controller 100 does not output an operation command. Thereby, the stationary state of the boom 3 is maintained.

以上説明したクレーンによれば、起伏用ウインチ7が起伏用ロープ9を巻取りあるいは繰出してこれにつながる起伏用ライン8を介してブーム3の先端部を起伏方向に操作することにより、当該先端部が自由端部である状態でブームが起伏される従来のクレーンと異なり、当該ブーム3に作用する曲げモーメントを低減できるのに加え、当該ブーム3に組付けられるライン長さ調整機構がブーム3の伸長及び収縮に応じてそのブームの先端部に取付けられる先端側シーブ345から前記起伏用ライン8を繰り出し、あるいは取り込むことにより、仮にブーム3の伸縮に伴って起伏用ウインチ7を作動させない場合でも当該伸縮に伴って当該ブーム3が起伏方向に動くのを有効に抑止することができる。また、ブーム3を先端側にて支持する部位が回転可能な先端側シーブにより構成されることは、当該支点における起伏用ライン8の機械強度的負担の軽減にもつながる。   According to the crane described above, the hoisting winch 7 winds or unwinds the hoisting rope 9 and operates the front end of the boom 3 in the hoisting direction via the hoisting line 8 connected thereto. Unlike conventional cranes in which the boom is raised and lowered with a free end, the bending moment acting on the boom 3 can be reduced, and the line length adjusting mechanism assembled to the boom 3 Even if the hoisting winch 7 is not operated when the boom 3 expands or contracts, the hoisting line 8 is fed out or taken in from the tip side sheave 345 attached to the tip of the boom according to the extension and contraction. It is possible to effectively prevent the boom 3 from moving in the undulation direction as it expands and contracts. In addition, the fact that the portion that supports the boom 3 on the distal end side is configured by a rotatable distal end sheave also leads to a reduction in the mechanical strength of the hoisting line 8 at the fulcrum.

さらに、このクレーンは、前記ライン長さ調整機構に加え、前記ブーム3の伸縮動作に基づいて前記起伏用ウインチ7の動作を制御する制御装置をさらに備え、この制御装置は、ブーム長さLB及び起伏角度αに基づいて前記ブーム3の伸縮に伴う起伏有効距離(先端側シーブ345から上部旋回体2側の起伏用ロープ9の支点である下側スプレッダ22に至るまでの距離)の変動を吸収するための補正量ΔLrを演算し、この補正量ΔLrに基づいて起伏用ウインチ7を動作させるから、前記ブーム3の伸縮が当該ブームの起伏動作に与える影響をより有効に抑制することができる。しかも、前記ブーム3の伸縮がその起伏動作に与える影響は基本的に前記ライン長さ調整機構による起伏用ライン8の繰出しまたは取込みによって低減されているので、前記補正量ΔLrは小さくて済み、よって、当該起伏動作に与える影響をなくすために起伏用ウインチ7を高速で動かす必要性が削減される。   In addition to the line length adjusting mechanism, the crane further includes a control device that controls the operation of the hoisting winch 7 based on the expansion and contraction operation of the boom 3, and the control device includes the boom length LB and the boom length LB. Absorbs fluctuations in the effective lifting distance (distance from the tip sheave 345 to the lower spreader 22 that is the fulcrum of the lifting rope 9 on the upper swing body 2 side) due to the expansion and contraction of the boom 3 based on the lifting angle α. Therefore, since the hoisting winch 7 is operated based on the correction amount ΔLr, the effect of the expansion and contraction of the boom 3 on the hoisting operation of the boom can be more effectively suppressed. In addition, the influence of the expansion and contraction of the boom 3 on the hoisting operation is basically reduced by feeding or taking in the hoisting line 8 by the line length adjusting mechanism, so the correction amount ΔLr can be small. The necessity of moving the hoisting winch 7 at a high speed in order to eliminate the influence on the hoisting operation is reduced.

ただし、本発明に係るクレーンでは、当該制御装置が省略されてもよく、その場合でも、前記ライン長さ調整機構が前記ブームの伸縮に伴って先端側シーブから起伏用ラインを繰出し、あるいは取込むことによって、当該ブームの伸縮がその起伏動作に与える影響を減らすことができる。また、制御装置を具備する場合でも、当該制御装置は必ずしも常時前記のライン長さ調整機構を行うものに限定されない。例えば、ブームが大きく倒伏しているようにその伸縮がその起伏動作に与える影響が小さい状態で当該ブームの伸縮が行われる場合には前記のライン長さ調整制御を停止するといった、制御のオンオフ切換が行われてもよい。   However, in the crane according to the present invention, the control device may be omitted, and even in that case, the line length adjusting mechanism feeds or takes in the undulation line from the tip side sheave as the boom expands and contracts. As a result, it is possible to reduce the influence of the boom expansion and contraction on the undulation operation. Even when a control device is provided, the control device is not necessarily limited to the one that always performs the line length adjustment mechanism. For example, when the boom is expanded and contracted while the expansion and contraction of the boom is performed in a state where the boom is largely lying down, the above-described line length adjustment control is stopped. May be performed.

また、本発明において、ブームの伸縮に伴いライン長さ調整機構が起伏用ラインを繰出しあるいは取込む量は、適宜設定可能である。ただし、前記実施形態のように前記ブーム3の伸縮に伴ってその伸縮量に対応する長さだけ前記先端側シーブ345から起伏用ライン8を繰り出し、あるいは取り込むものは、ブームの伸縮動作が当該ブームの起伏動作に与える影響をより小さくし、また、前記制御装置を具備する場合にその制御内容を著しく簡素化することができる。   In the present invention, the amount by which the line length adjusting mechanism pays out the undulation line as the boom extends and retracts can be set as appropriate. However, as in the above-described embodiment, when the boom 3 is extended or retracted, the hoisting line 8 is extended or taken in from the distal sheave 345 by a length corresponding to the expansion / contraction amount. The influence on the undulation operation can be reduced, and when the control device is provided, the control contents can be greatly simplified.

また、前記制御装置の代わりに、前記起伏有効距離の変動を吸収するように前記先端側シーブがブームに対して特定方向(例えばブーム幅方向)に移動するように当該ブームに取付けられても、ブームの伸縮がその起伏角度に与える影響をなくし、あるいは低減させることができる。その場合、さらに、起伏用ラインの張力やブーム起伏角度に応じて前記先端側シーブを移動させるアクチュエータを備え、これによりブームを倒伏させない程度の力でもってその先端側シーブをブーム側から支持することが、好ましい。   Further, instead of the control device, even if the tip sheave is attached to the boom so as to move in a specific direction (for example, the boom width direction) with respect to the boom so as to absorb the fluctuation of the undulation effective distance, It is possible to eliminate or reduce the influence of the boom expansion and contraction on the undulation angle. In that case, further, an actuator for moving the tip sheave according to the tension of the hoisting line and the boom hoisting angle is provided, thereby supporting the tip sheave from the boom side with a force that does not cause the boom to fall down. Is preferred.

本発明では、ブームの具体的な構造も特に問わない。例えば、前記実施形態ではブーム3に含まれる中間構造体33が複数段のブーム体331〜334を備えることにより伸縮するものを示したが、中間構造体33だけでなくブーム全体が伸縮可能であるものでもよい。また、伸縮可能な部位を構成するブーム体の個数も特に限定されない。それぞれのブーム体を動かすための手段も、前記の油圧シリンダに限らず、例えば電動機等の電動式アクチュエータが用いられてもよい。この点は、起伏用ウインチの駆動についても同様である。   In the present invention, the specific structure of the boom is not particularly limited. For example, in the above-described embodiment, the intermediate structure 33 included in the boom 3 has been shown to expand and contract by being provided with a plurality of stages of boom bodies 331 to 334. However, not only the intermediate structure 33 but also the entire boom can be expanded and contracted. It may be a thing. Further, the number of boom bodies constituting the extendable part is not particularly limited. The means for moving each boom body is not limited to the hydraulic cylinder, and an electric actuator such as an electric motor may be used. The same applies to the driving of the hoisting winch.

本発明では、クレーンの具体的な種類も限定されない。例えば、本発明は、既述のクローラクレーンの他、他の移動式クレーン、例えばホイールクレーンや、タワークレーン等の固定式クレーンについても同様に適用することができる。   In the present invention, the specific type of crane is not limited. For example, the present invention can be similarly applied to other mobile cranes such as a wheel crane and a tower crane in addition to the above-described crawler crane.

1 下部走行体
2 上部旋回体
3 ブーム
7 起伏用ウインチ
8 起伏用ライン
9 起伏用ロープ
13 ブームフットピン
21 ガントリ
22 下側スプレッダ
33 中間構造体
100 コントローラ
104 起伏動作制御部(ウインチ制御部を構成)
105 補正部(ウインチ制御部を構成)
106 メモリ
107 判断部
110 ブーム角度センサ(ブーム角度検出器)
120 ブーム長さセンサ(ブーム長さ検出器)
130 伸縮操作レバー
140 起伏操作レバー
340 基端側シーブ(ライン長さ調整機構を構成)
341〜344 中間シーブ(ライン長さ調整機構を構成)
345 先端側シーブ
DESCRIPTION OF SYMBOLS 1 Lower traveling body 2 Upper revolving body 3 Boom 7 Hoisting winch 8 Hoisting line 9 Hoisting rope 13 Boom foot pin 21 Gantry 22 Lower spreader 33 Intermediate structure 100 Controller 104 Hoisting operation control part (constitutes winch control part)
105 Correction unit (constitutes winch control unit)
106 Memory 107 Judgment Unit 110 Boom Angle Sensor (Boom Angle Detector)
120 Boom length sensor (Boom length detector)
130 Telescopic operation lever 140 Hoisting operation lever 340 Base end side sheave (composed of a line length adjustment mechanism)
341-344 Intermediate sheave (line length adjustment mechanism)
345 Sheave on tip side

Claims (4)

クレーンであって、
ベースと、
このベースに起伏可能に装着され、長手方向に伸縮可能なブームと、
前記ブームを伸縮させる伸縮装置と、
前記ブームの先端から引出される起伏用ラインと、
前記起伏用ラインにつながる起伏用ロープと、
前記ベースに搭載され、前記起伏用ロープの巻取りおよび繰出しによって前記ブームを前記起伏用ラインを介して起伏方向に操作する起伏用ウインチと、
前記ブームを伸縮させるために操作される伸縮操作レバーと、
前記ブームを起伏させるために操作される起伏操作レバーと、
前記ブームに組付けられるライン長さ調整機構と、
前記ブームの伸縮操作及び起伏操作に基づいて、前記伸縮装置及び前記起伏用ウインチの動作を制御する制御装置と、
を備え、
前記ライン長さ調整機構は、前記ブームの先端部に取付けられる先端側シーブを含む複数のシーブを含み、これらのシーブに前記起伏用ラインが巻き掛けられ、かつ、前記ブームの伸長及び収縮に対応して前記先端側シーブからの前記起伏用ラインの繰出し及び当該先端ブーム内への前記起伏用ラインの取り込みがそれぞれ行われるように前記複数のシーブが配置され
前記制御装置は、
前記伸縮操作レバー及び前記起伏操作レバーの操作量に基づいて、前記ブームの伸縮操作及び起伏操作のうち前記伸縮操作のみが行われる伸縮操作パターン、前記伸縮操作及び前記起伏操作のうち前記起伏操作のみが行われる起伏操作パターン、および前記伸縮操作及び前記起伏操作が同時に行われる複合操作パターンの中から前記ブームが操作される操作パターンを判断する判断部と、
前記ブームの長さを検出するブーム長さ検出器と、
前記ブームの起伏角度を検出するブーム角度検出器と、
前記判断部によって、前記操作パターンが前記伸縮操作パターンおよび前記複合操作パターンのうちの何れかであると判断された場合に、前記ブーム長さ検出器及びブーム角度検出器がそれぞれ検出するブームの長さ及び起伏角度に基づいて前記ブームの伸縮に伴う前記先端側シーブから前記ベース側での前記起伏用ロープの支点に至るまでの距離の変動を吸収するための補正量を演算し、この補正量に基づいて前記起伏用ウインチを動作させるウインチ制御部と、
を有する、クレーン。
A crane,
Base and
A boom that can be raised and lowered on this base and can be expanded and contracted in the longitudinal direction;
A telescopic device for expanding and contracting the boom;
A undulation line drawn from the tip of the boom;
A hoisting rope connected to the hoisting line;
A hoisting winch mounted on the base and operating the boom in the hoisting direction via the hoisting line by winding and unwinding the hoisting rope;
A telescopic operation lever operated to extend and contract the boom;
A hoisting operation lever operated to raise and lower the boom;
A line length adjusting mechanism assembled to the boom;
A control device for controlling operations of the telescopic device and the hoisting winch based on the boom telescopic operation and the hoisting operation;
With
The line length adjusting mechanism includes a plurality of sheaves including a tip side sheave attached to a tip portion of the boom, the undulation line is wound around the sheaves, and the boom extends and contracts The plurality of sheaves are arranged so that the undulation line is fed out from the tip side sheave and the undulation line is taken into the tip boom, respectively .
The controller is
Based on the operation amount of the telescopic operation lever and the hoisting operation lever, the telescopic operation pattern in which only the telescopic operation is performed among the telescopic operation and hoisting operation of the boom, and only the hoisting operation is performed among the telescopic operation and the hoisting operation. A determination unit that determines an operation pattern in which the boom is operated from a hoisting operation pattern in which the boom is operated and a composite operation pattern in which the expansion operation and the hoisting operation are performed simultaneously
A boom length detector for detecting the length of the boom;
A boom angle detector for detecting the boom undulation angle;
The boom lengths detected by the boom length detector and the boom angle detector, respectively, when the determination unit determines that the operation pattern is one of the telescopic operation pattern and the composite operation pattern. Based on the height and the undulation angle, a correction amount is calculated to absorb the fluctuation of the distance from the tip sheave to the fulcrum of the undulation rope on the base side due to the expansion and contraction of the boom, and this correction amount A winch control unit for operating the hoisting winch based on
Having a crane.
請求項1記載のクレーンであって、前記ライン長さ調整機構は、前記ブームの伸長に伴ってその伸長量に対応する長さだけ前記先端側シーブから前記起伏用ラインを繰り出し、前記ブームの収縮に伴ってその収縮量に対応する長さだけ前記先端側シーブから前記起伏用ラインを前記ブーム内に取り込む、クレーン。   2. The crane according to claim 1, wherein the line length adjusting mechanism extends the hoisting line from the tip side sheave by a length corresponding to an extension amount of the boom as the boom extends, and the boom contracts. Accordingly, the crane takes in the hoisting line from the tip side sheave into the boom by a length corresponding to the amount of contraction. 請求項2記載のクレーンであって、前記ブームは、当該ブームの長手方向に配列される複数のブーム体を含み、これらのブーム体はこれに隣接するブーム体に対して前記ブームの伸縮方向に相対移動可能となるように嵌合され、前記ブームは、前記ベースに連結されるとともに前記伸縮方向に変位しない基端側部分を備え、前記ライン長さ調整機構は、当該ライン長さ調整機構に含まれるシーブであって前記先端側シーブ以外のシーブが前記各ブーム体の基端側端部及び先端側端部にそれぞれ回転可能に設けられ、前記起伏用ラインは、その先端が前記ブームの前記基端側部分に固定されるとともに前記各シーブに対して前記ブームの基端側に近いブーム体に設けられたシーブから順に掛け渡されて前記先端側シーブから前記ブームの外部に導出される、クレーン。 3. The crane according to claim 2, wherein the boom includes a plurality of boom bodies arranged in a longitudinal direction of the boom, and the boom bodies extend in a telescopic direction of the boom with respect to a boom body adjacent thereto. The boom is connected so as to be relatively movable, and the boom is connected to the base and includes a proximal end portion that is not displaced in the expansion / contraction direction, and the line length adjustment mechanism is connected to the line length adjustment mechanism. The sheaves included are sheaves other than the sheaves on the front end side, and are provided rotatably at the base end side end portions and the front end side end portions of the boom bodies, respectively, and the hoisting line has a distal end at the tip of the boom. It is fixed to the base end side part, and it is spanned in order from the sheave provided on the boom body close to the base end side of the boom to each sheave, and from the tip side sheave to the outside of the boom. Issued is, crane. 請求項1乃至3の何れか1項に記載のクレーンであって、前記判断部によって前記操作パターンが前記起伏操作パターンであると判断された場合に、前記制御装置は、前記伸縮装置を制御して前記ブームの伸縮をロックする、クレーン。4. The crane according to claim 1, wherein the control device controls the telescopic device when the operation unit determines that the operation pattern is the undulation operation pattern. 5. A crane that locks the expansion and contraction of the boom.
JP2012270431A 2012-12-11 2012-12-11 crane Expired - Fee Related JP6007766B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2012270431A JP6007766B2 (en) 2012-12-11 2012-12-11 crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2012270431A JP6007766B2 (en) 2012-12-11 2012-12-11 crane

Publications (2)

Publication Number Publication Date
JP2014114134A JP2014114134A (en) 2014-06-26
JP6007766B2 true JP6007766B2 (en) 2016-10-12

Family

ID=51170575

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2012270431A Expired - Fee Related JP6007766B2 (en) 2012-12-11 2012-12-11 crane

Country Status (1)

Country Link
JP (1) JP6007766B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6521050B2 (en) * 2015-02-16 2019-05-29 株式会社タダノ Hydraulic cylinder, cylinder device, work vehicle, and method of manufacturing hydraulic cylinder

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS618690U (en) * 1984-06-21 1986-01-18 三菱重工業株式会社 crane
JPS62168092U (en) * 1986-04-11 1987-10-24
JPH02149689U (en) * 1989-05-24 1990-12-20

Also Published As

Publication number Publication date
JP2014114134A (en) 2014-06-26

Similar Documents

Publication Publication Date Title
JP5475960B2 (en) Mast raising structure and process for high capacity mobile lift crane
US8720709B2 (en) Crane and method for erecting the crane
JP7840640B2 (en) Method for reducing the load on a vehicle crane and its jib
CN111819149B (en) Crane with a movable crane
JP2018020858A (en) crane
JP6235854B2 (en) Crane assembly method
JP5006622B2 (en) Crane device with telescopic boom
WO2021204938A1 (en) Marine knuckle boom crane
JP6007766B2 (en) crane
CN111411783B (en) Multi-section telescopic composite truss and elevator shaft type straight arm construction equipment with same
JP4402923B2 (en) Tower crane
JP7804430B2 (en) Vehicle crane with jib system
US10065841B2 (en) Compact stowable luffing jib for a crane
WO2005054109A1 (en) Mobile crane
JP5390113B2 (en) Work vehicle
JP7561829B2 (en) Telescoping jib with swing-out mast
JP2018184248A (en) Mobile crane
JP4861579B2 (en) Crane hook horizontal movement control device
JP5508463B2 (en) Crane device with telescopic boom
US20210155462A1 (en) Crane with a jack
JP4296068B2 (en) Failure detection device for aerial work platforms
US11708249B2 (en) Method for operating a crane, and crane
JP4829430B2 (en) Crane hook horizontal movement control device
JP7110753B2 (en) Device for increasing tension of luffing rope and method for increasing tension of luffing rope
JPH0570086A (en) Constant-jib tilt angle control device for mobile crane

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20150722

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20150730

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20160407

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20160510

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20160629

A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A712

Effective date: 20160629

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20160816

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20160829

R150 Certificate of patent or registration of utility model

Ref document number: 6007766

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees