Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP6016740B2 - Schedule-linked printing service device, schedule-linked printing service system, and schedule-linked printing program - Google Patents
[go: Go Back, main page]

JP6016740B2 - Schedule-linked printing service device, schedule-linked printing service system, and schedule-linked printing program - Google Patents

Schedule-linked printing service device, schedule-linked printing service system, and schedule-linked printing program Download PDF

Info

Publication number
JP6016740B2
JP6016740B2 JP2013185201A JP2013185201A JP6016740B2 JP 6016740 B2 JP6016740 B2 JP 6016740B2 JP 2013185201 A JP2013185201 A JP 2013185201A JP 2013185201 A JP2013185201 A JP 2013185201A JP 6016740 B2 JP6016740 B2 JP 6016740B2
Authority
JP
Japan
Prior art keywords
time
print
user
schedule
printing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2013185201A
Other languages
Japanese (ja)
Other versions
JP2015052899A (en
Inventor
浩之 ▲高▼石
浩之 ▲高▼石
幸子 吉村
幸子 吉村
芥田 英彦
英彦 芥田
洋 吉本
洋 吉本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kyocera Document Solutions Inc
Original Assignee
Kyocera Document Solutions Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kyocera Document Solutions Inc filed Critical Kyocera Document Solutions Inc
Priority to JP2013185201A priority Critical patent/JP6016740B2/en
Publication of JP2015052899A publication Critical patent/JP2015052899A/en
Application granted granted Critical
Publication of JP6016740B2 publication Critical patent/JP6016740B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Accessory Devices And Overall Control Thereof (AREA)

Description

本発明は、スケジュール連携印刷サービス装置、スケジュール連携印刷サービスシステム、及びスケジュール連携印刷プログラムに関し、特に、ユーザーのスケジュールと連携して、印刷物をユーザーにとって都合のよい時間帯に出力する技術に関する。   The present invention relates to a schedule-linked printing service apparatus, a schedule-linked printing service system, and a schedule-linked printing program, and more particularly to a technique for outputting a printed matter in a time zone convenient for the user in cooperation with the user's schedule.

企業の会議等のイベントで使用される会議資料を準備するユーザーにとっての利便性を図るために、会議の日時に併せて会議資料の印刷を行う印刷システムが提案されている。例えば、下記特許文献1には、情報管理サーバーがスケジュール情報により指定される会議日時に合わせて印刷ジョブの実行スケジュールを設定し、プリンターが印刷ジョブの実行時期が到来した時に当該印刷ジョブを実行することで、会議資料を会議スケジュールに間に合うように印刷する印刷システムが開示されている。   In order to provide convenience for users who prepare conference materials used in events such as corporate meetings, a printing system that prints conference materials in accordance with the date and time of the conference has been proposed. For example, in the following Patent Document 1, the information management server sets a print job execution schedule in accordance with the meeting date and time specified by the schedule information, and the printer executes the print job when the print job execution time comes. Thus, a printing system that prints meeting materials in time for a meeting schedule is disclosed.

特開2006−72470号公報JP 2006-72470 A

上記特許文献1に示される技術では、会議日時に合わせて会議資料を印刷できるが、この印刷物を取得すべきユーザーが、印刷時点で画像形成装置の近くにいない状況であっても、当該画像形成装置からは印刷物が出力される。このため、画像形成装置に当該印刷物が出力された状態が放置されやすく、セキュリティー上の問題が生じていた。   In the technique disclosed in Patent Document 1, the meeting material can be printed in accordance with the meeting date and time. However, even if the user who should obtain the printed material is not near the image forming apparatus at the time of printing, the image formation is performed. Printed material is output from the device. For this reason, the state in which the printed matter is output to the image forming apparatus is easily left unattended, causing a security problem.

本発明は、上記の問題を解決するためになされたもので、ユーザーが印刷物を入手しやすい時期に印刷を行うことで、印刷物の放置を防止してセキュリティーを確保することを目的とする。   The present invention has been made to solve the above-described problems. An object of the present invention is to prevent printing from being left unattended and ensure security by performing printing at a time when a user can easily obtain the printed material.

本発明の一局面に係るスケジュール連携印刷サービス装置は、印刷データを含む印刷ジョブと、前記印刷ジョブを指示したユーザーを示すユーザー情報と、前記印刷データに基づく印刷物を使用するイベント及びその開催日時を示すイベント情報とを受信する印刷情報受信部と、
前記印刷データの出力先とされ得る予め定められた画像形成装置の性能を記憶する装置性能記憶部と、
前記印刷ジョブが前記印刷データの出力先として示す画像形成装置の性能を前記装置性能記憶部から読み出し、当該印刷ジョブの示す印刷データの印刷に必要な印刷所要時間を算出する印刷所要時間算出部と、
前記ユーザー情報が示すユーザーについての、前記イベント情報が示すイベントの開催日時におけるスケジュールをユーザースケジュールデータベースから取得するユーザースケジュール取得部と、
前記取得されたスケジュールから、前記ユーザーについて、前記イベントの開催日時よりも前となる空き時間を判定する空き時間判定部と、
前記判定された空き時間内で前記印刷データの印刷を完了可能な印刷開始日時を、前記算出された印刷所要時間を用いて算出する印刷開始日時算出部と、
前記算出された印刷開始日時を記憶し、当該印刷開始日時の到来時に、前記印刷ジョブの示す画像形成装置に前記印刷ジョブを送信して印刷を指示する印刷指示部と、を備え
前記印刷開始日時算出部は、前記イベントの開催日時に最も近い前記ユーザーの空き時間内で前記印刷開始日時を算出する
The schedule linkage print service apparatus according to an aspect of the present invention includes a print job including print data, user information indicating a user who has instructed the print job, an event using a printed matter based on the print data, and a date and time of the event. A print information receiving unit for receiving event information indicating;
An apparatus performance storage unit for storing the performance of a predetermined image forming apparatus that can be an output destination of the print data;
A required print time calculation unit that reads the performance of the image forming apparatus indicated by the print job as the output destination of the print data from the apparatus performance storage unit, and calculates the required print time required for printing the print data indicated by the print job; ,
For a user indicated by the user information, a user schedule acquisition unit that acquires a schedule at a date and time of an event indicated by the event information from a user schedule database;
From the acquired schedule, for the user, a free time determination unit for determining a free time before the date and time of the event,
A print start date and time calculating unit that calculates a print start date and time that can complete printing of the print data within the determined idle time using the calculated required print time;
A print instructing unit for storing the calculated print start date and time and instructing printing by transmitting the print job to the image forming apparatus indicated by the print job when the print start date and time arrives ;
The print start date and time calculation unit calculates the print start date and time within an available time of the user closest to the event date and time .

また、本発明の一局面に係るスケジュール連携印刷サービスシステムは、コンピューターと、サーバーと、ユーザースケジュールデータベースと、画像形成装置とを有するスケジュール連携印刷サービスシステムであって、
前記コンピューターは、
印刷データを含む印刷ジョブを生成する印刷ジョブ生成部と、
前記印刷ジョブと、前記印刷ジョブを指示したユーザーを示すユーザー情報と、前記印刷データに基づく印刷物を使用するイベント及びその開催日時を示すイベント情報とを前
記サーバーに対して送信する通信部と、を備え
前記サーバーは、
前記印刷ジョブ、前記ユーザー情報、及び前記イベント情報を前記コンピューターから受信する印刷情報受信部と、
前記印刷データの出力先とされ得る予め定められた画像形成装置の性能を記憶する装置性能記憶部と、
前記印刷ジョブが前記印刷データの出力先として示す画像形成装置の性能を前記装置性能記憶部から読み出し、当該印刷ジョブの示す印刷データの印刷に必要な印刷所要時間を算出する印刷所要時間算出部と、
前記ユーザー情報が示すユーザーについての、前記イベント情報が示すイベントの開催日時におけるスケジュールをユーザースケジュールデータベースから取得するユーザースケジュール取得部と、
前記取得されたスケジュールから、前記ユーザーについて、前記イベントの開催日時よりも前となる空き時間を判定する空き時間判定部と、
前記判定された空き時間内で前記印刷データの印刷を完了可能な印刷開始日時を、前記算出された印刷所要時間を用いて算出する印刷開始日時算出部と、
前記算出された印刷開始日時を記憶し、当該印刷開始日時の到来時に、前記印刷ジョブの示す画像形成装置に前記印刷ジョブを送信して印刷を指示する印刷指示部と、を備え、
さらに前記印刷開始日時算出部は、前記イベントの開催日時に最も近い前記ユーザーの空き時間内で前記印刷開始日時を算出し、
前記ユーザースケジュールデータベースは、
複数のユーザーについての各スケジュールを記憶するスケジュール記憶部を備え、
前記画像形成装置は、
前記サーバーから前記印刷ジョブを受信する印刷ジョブ受信部と、
前記印刷ジョブに基づいて記録媒体に画像形成を行う画像形成部と、を備える。
Also, the schedule cooperation print service system according to an aspect of the present invention includes a computer, a server, and a user schedule database, a schedule cooperation print service system which have the image forming apparatus,
The computer
A print job generation unit that generates a print job including print data;
A communication unit that transmits to the server the print job, user information indicating a user who has instructed the print job, an event using a printed matter based on the print data, and event information indicating the date and time of the event. The server is
A print information receiving unit that receives the print job, the user information, and the event information from the computer;
An apparatus performance storage unit for storing the performance of a predetermined image forming apparatus that can be an output destination of the print data;
A required print time calculation unit that reads the performance of the image forming apparatus indicated by the print job as the output destination of the print data from the apparatus performance storage unit, and calculates the required print time required for printing the print data indicated by the print job; ,
For a user indicated by the user information, a user schedule acquisition unit that acquires a schedule at a date and time of an event indicated by the event information from a user schedule database;
From the acquired schedule, for the user, a free time determination unit for determining a free time before the date and time of the event,
A print start date and time calculating unit that calculates a print start date and time that can complete printing of the print data within the determined idle time using the calculated required print time;
A print instructing unit for storing the calculated print start date and time and instructing printing by transmitting the print job to the image forming apparatus indicated by the print job when the print start date and time arrives;
Further, the print start date and time calculation unit calculates the print start date and time within an empty time of the user closest to the event date and time,
The user schedule database is
A schedule storage unit for storing each schedule for a plurality of users is provided.
The image forming apparatus includes:
A print job receiver for receiving the print job from the server;
An image forming unit that forms an image on a recording medium based on the print job.

また、発明の一局面に係るスケジュール連携印刷プログラムは、コンピューターを、
印刷データを含む印刷ジョブと、前記印刷ジョブを指示したユーザーを示すユーザー情報と、前記印刷データに基づく印刷物を使用するイベント及びその開催日時を示すイベント情報とを受信する印刷情報受信部と、
前記印刷データの出力先とされ得る予め定められた画像形成装置の性能を記憶する装置性能記憶部と、
前記印刷ジョブが前記印刷データの出力先として示す画像形成装置の性能を前記装置性能記憶部から読み出し、当該印刷ジョブの示す印刷データの印刷に必要な印刷所要時間を算出する印刷所要時間算出部と、
前記ユーザー情報が示すユーザーについての、前記イベント情報が示すイベントの開催日時におけるスケジュールをユーザースケジュールデータベースから取得するユーザースケジュール取得部と、
前記取得されたスケジュールから、前記ユーザーについて、前記イベントの開催日時よりも前となる空き時間を判定する空き時間判定部と、
前記判定された空き時間内で前記印刷データの印刷を完了可能な印刷開始日時を、前記算出された印刷所要時間を用いて算出する印刷開始日時算出部と、
前記算出された印刷開始日時を記憶し、当該印刷開始日時の到来時に、前記印刷ジョブの示す画像形成装置に前記印刷ジョブを送信して印刷を指示する印刷指示部と、して機能させ
さらに前記印刷開始日時算出部は、前記イベントの開催日時に最も近い前記ユーザーの空き時間内で前記印刷開始日時を算出させるものである。
Moreover, the schedule cooperation printing program which concerns on 1 aspect of invention is a computer,
A print information receiving unit that receives a print job including print data, user information indicating a user who has instructed the print job, an event of using a printed matter based on the print data, and event information indicating the date and time of the event,
An apparatus performance storage unit for storing the performance of a predetermined image forming apparatus that can be an output destination of the print data;
A required print time calculation unit that reads the performance of the image forming apparatus indicated by the print job as the output destination of the print data from the apparatus performance storage unit, and calculates the required print time required for printing the print data indicated by the print job; ,
For a user indicated by the user information, a user schedule acquisition unit that acquires a schedule at a date and time of an event indicated by the event information from a user schedule database;
From the acquired schedule, for the user, a free time determination unit for determining a free time before the date and time of the event,
A print start date and time calculating unit that calculates a print start date and time that can complete printing of the print data within the determined idle time using the calculated required print time;
The calculated print start date and time is stored, and when the print start date and time arrives, the print job is transmitted to the image forming apparatus indicated by the print job and functions as a print instruction unit that instructs printing .
Further, the printing start time calculator is shall then calculates the printing start time in the idle time of closest the user Dates of the event.

本発明によれば、印刷物を取得すべきユーザーの空き時間内に、当該印刷物を画像形成装置に印刷をさせることが可能なので、ユーザーが印刷物を入手しやすい時期に、画像形成装置から印刷物が出力される。このため、ユーザーからの直接的な印刷指示があったタイミングではなく、印刷実行に適する時期として算出される他のタイミングで上記の印刷を行う制御を行う場合であっても、セキュリティーを確保した上で、印刷物を画像形成装置から出力させることが可能になる。   According to the present invention, it is possible to cause the image forming apparatus to print the printed matter within the available time of the user who should obtain the printed matter, so that the printed matter is output from the image forming apparatus at a time when the user can easily obtain the printed matter. Is done. For this reason, security is ensured even when the above-described printing is performed not at the timing when a direct printing instruction is given from the user but at another timing calculated as a time suitable for printing execution. Thus, it becomes possible to output the printed matter from the image forming apparatus.

本発明の一実施形態に係るスケジュール連携印刷サービス装置を含むシステム全体の構成図である。1 is a configuration diagram of an entire system including a schedule linkage printing service apparatus according to an embodiment of the present invention. コンピューターの電気的構成を示すブロック図である。It is a block diagram which shows the electric constitution of a computer. プリントサーバーの電気的構成を示すブロック図である。FIG. 2 is a block diagram illustrating an electrical configuration of a print server. 各画像形成装置についての装置性能の例を示す図である。It is a figure which shows the example of the apparatus performance about each image forming apparatus. ユーザースケジュールDBに記憶されているカレンダーの一例を示す図である。It is a figure which shows an example of the calendar memorize | stored in user schedule DB. スケジュール連携印刷サービスシステムの印刷処理におけるコンピューターによる処理を示すフローチャートである。It is a flowchart which shows the process by the computer in the printing process of a schedule cooperation printing service system. コンピューターの表示部に表示される画面の例を示す図である。It is a figure which shows the example of the screen displayed on the display part of a computer. スケジュール連携印刷サービスシステムの印刷処理におけるプリントサーバーによる処理を示すフローチャートである。It is a flowchart which shows the process by the print server in the printing process of a schedule cooperation printing service system. スケジュール連携印刷サービスシステムの印刷処理におけるプリントサーバーによる処理の第2実施形態を示すフローチャートである。It is a flowchart which shows 2nd Embodiment of the process by the print server in the printing process of a schedule cooperation printing service system. スケジュール連携印刷サービスシステムの印刷処理におけるプリントサーバーによる処理の第3実施形態を示すフローチャートである。12 is a flowchart illustrating a third embodiment of processing performed by a print server in print processing of a schedule cooperation print service system. スケジュール連携印刷サービスシステムの印刷処理におけるプリントサーバーによる処理の第4実施形態理を示すフローチャートである。It is a flowchart which shows the 4th Embodiment principle of the process by the print server in the printing process of a schedule cooperation printing service system. スケジュール連携印刷サービスシステムの印刷処理におけるプリントサーバーによる処理の第5実施形態理を示すフローチャートである。It is a flowchart which shows the 5th Embodiment principle of the process by the print server in the printing process of a schedule cooperation printing service system.

以下、本発明の一実施形態に係るスケジュール連携印刷サービス装置、スケジュール連携印刷サービスシステム、及びスケジュール連携印刷プログラムについて図面を参照して説明する。図1は、本発明の一実施形態に係るスケジュール連携印刷サービス装置を含むシステム全体の構成図である。   Hereinafter, a schedule cooperation printing service apparatus, a schedule cooperation printing service system, and a schedule cooperation printing program according to an embodiment of the present invention will be described with reference to the drawings. FIG. 1 is a configuration diagram of an entire system including a schedule cooperation print service apparatus according to an embodiment of the present invention.

スケジュール連携印刷サービスシステム100は、プリントサーバー1と、コンピューター2と、画像形成装置3と、ユーザースケジュールDB102(以下、ユーザーDB)とを備える。これらプリントサーバー1と、コンピューター2と、画像形成装置3と、ユーザーDB102とは、LAN(Local Area Network)等により互いに接続されている。   The schedule linkage printing service system 100 includes a print server 1, a computer 2, an image forming apparatus 3, and a user schedule DB 102 (hereinafter referred to as user DB). The print server 1, the computer 2, the image forming apparatus 3, and the user DB 102 are connected to each other via a LAN (Local Area Network) or the like.

コンピューター2は、ユーザーからの指示に基づいて、印刷ジョブを生成して当該印刷ジョブをプリントサーバー1に送信する。また、コンピューター2は、ユーザースケジュールDB102と通信し、コンピューター2で管理しているユーザースケジュール情報を、ユーザースケジュールDB102に送信する。   The computer 2 generates a print job based on an instruction from the user and transmits the print job to the print server 1. In addition, the computer 2 communicates with the user schedule DB 102 and transmits user schedule information managed by the computer 2 to the user schedule DB 102.

ユーザースケジュールDB102は、ユーザースケジュール情報をユーザー毎に記憶するスケジュール記憶部を有し、コンピューター2からの指示に従って当該各ユーザーのスケジュールを記憶、書換、及び削除し、プリントサーバー1が要求するユーザーのスケジュールをプリントサーバー1に送信する。   The user schedule DB 102 includes a schedule storage unit that stores user schedule information for each user, and stores, rewrites, and deletes each user's schedule in accordance with instructions from the computer 2, and the user schedule requested by the print server 1. Is transmitted to the print server 1.

プリントサーバー1は、各コンピューター2からの印刷ジョブを受信してスプールし、印刷実行時期の到来時に、当該印刷ジョブの示す出力先としての画像形成装置3に印刷ジョブを送信して印刷を指示する。プリントサーバー1は、特許請求の範囲におけるスケジュール連携印刷サービス装置及びサーバーの一例である。   The print server 1 receives and spools the print job from each computer 2 and, when the print execution time comes, sends the print job to the image forming apparatus 3 as the output destination indicated by the print job to instruct printing. . The print server 1 is an example of a schedule cooperation print service apparatus and server in the claims.

また、画像形成装置3は、プリントサーバー1から印刷ジョブを受信するデータ送受信部31と、当該印刷ジョブに含まれる印刷データを用いて画像形成(印刷)を行う画像形成部32とを備える。   The image forming apparatus 3 also includes a data transmission / reception unit 31 that receives a print job from the print server 1 and an image formation unit 32 that performs image formation (printing) using print data included in the print job.

コンピューター2の構成を説明する。図2はコンピューターの電気的構成を示すブロック図である。   The configuration of the computer 2 will be described. FIG. 2 is a block diagram showing an electrical configuration of the computer.

コンピューター2は、制御ユニット20と、操作部27と、表示部28とを有する。制御ユニット20は、CPU、RAM、及びROM等からなる。制御ユニット20は、制御部21と、情報記憶部22と、印刷ジョブ生成部23と、通信部24と、スケジューラー25とを備える。   The computer 2 includes a control unit 20, an operation unit 27, and a display unit 28. The control unit 20 includes a CPU, a RAM, a ROM, and the like. The control unit 20 includes a control unit 21, an information storage unit 22, a print job generation unit 23, a communication unit 24, and a scheduler 25.

制御部21は、コンピューター2の全体的な動作制御を司る。   The control unit 21 governs overall operation control of the computer 2.

情報記憶部22は、当該コンピューター2の使用者であるユーザーを示すユーザー情報を記憶している。   The information storage unit 22 stores user information indicating a user who is a user of the computer 2.

印刷ジョブ生成部23は、図略のHDDに記憶されたプリンタードライバーに従って動作することで、ユーザーによる操作部27の操作で指示されたデータを、画像形成装置3に適したフォーマットに変換して印刷データとし、この印刷データを含む印刷ジョブを生成する。更に、印刷ジョブ生成部23は、当該印刷ジョブに基づいた印刷物を使用する会議(イベントの一例)名称及びその開催日時を有するイベント情報を、操作者による操作部27の操作で入力される内容に従って生成する。   The print job generation unit 23 operates according to a printer driver stored in an unillustrated HDD, thereby converting data instructed by the operation of the operation unit 27 by the user into a format suitable for the image forming apparatus 3 and printing. A print job including the print data is generated as data. Further, the print job generation unit 23 receives the event information having the name of the meeting (an example of the event) using the printed matter based on the print job and the date and time of the conference according to the content input by the operation of the operation unit 27 by the operator. Generate.

通信部24は、印刷ジョブ生成部23によって生成された印刷ジョブ、これに対応するイベント情報、及び情報記憶部22に記憶されているユーザー情報(すなわち、当該印刷ジョブを生成したユーザーを示すユーザー情報)を、LANを通じてプリントサーバー1に送信する。   The communication unit 24 includes a print job generated by the print job generation unit 23, event information corresponding to the print job, and user information stored in the information storage unit 22 (that is, user information indicating a user who generated the print job) ) To the print server 1 through the LAN.

スケジューラー25は、上記のHDDに記憶された予定管理アプリケーションに従って動作することで、当該コンピューター2のユーザーについてのスケジュールを管理する。当該スケジュールは、イベント名称及び当該イベントの開催日時を特定して定められるユーザー予定情報により構成されている。スケジューラー25は、操作者による操作部27の操作で入力されるイベント名称及び当該イベントの開催日時によりユーザー予定情報を作成する。スケジューラー25は、当該ユーザー予定情報を日毎、週毎、又は月毎のカレンダーに従って、対応する時間帯に当てはめて記憶することで、ユーザーの予定がいつ入っているかを管理する。スケジューラー25は、ユーザースケジュールDB102と同期しており、スケジューラー25で管理されているユーザースケジュールはユーザースケジュールDB102にも記憶されている。   The scheduler 25 manages the schedule for the user of the computer 2 by operating according to the schedule management application stored in the HDD. The schedule includes user schedule information that is determined by specifying the event name and the date and time of the event. The scheduler 25 creates user schedule information based on the event name input by the operation of the operation unit 27 by the operator and the date and time of the event. The scheduler 25 manages when the user's schedule is entered by storing the user schedule information according to a daily, weekly, or monthly calendar in a corresponding time zone. The scheduler 25 is synchronized with the user schedule DB 102, and the user schedule managed by the scheduler 25 is also stored in the user schedule DB 102.

なお、スケジューラー25は、ユーザースケジュールDB102にアクセスして、当該ユーザースケジュールDB102に記憶されている予定管理アプリケーションに従って動作することで、当該コンピューター2のユーザーについてのスケジュールを管理するようにしてもよい。   The scheduler 25 may manage the schedule for the user of the computer 2 by accessing the user schedule DB 102 and operating according to the schedule management application stored in the user schedule DB 102.

操作部27は、キーボード、マウス、又はタッチパネルを有し、ユーザーにより、印刷対象とするデータ及びこれに用いる画像形成装置3を指定する印刷指示、スケジュール情報及びその送信指示等が入力される。   The operation unit 27 includes a keyboard, a mouse, or a touch panel, and a user inputs data to be printed, a print instruction that specifies the image forming apparatus 3 used for the data, schedule information, and a transmission instruction thereof.

表示部28は、LCD(Liquid Crystal Display)等からなり、操作者に対する操作案内等を表示する。   The display unit 28 includes an LCD (Liquid Crystal Display) or the like, and displays operation guidance for the operator.

次に、プリントサーバー1の構成を説明する。図3はプリントサーバーの電気的構成を示すブロック図である。   Next, the configuration of the print server 1 will be described. FIG. 3 is a block diagram showing the electrical configuration of the print server.

プリントサーバー1は、その制御ユニット10に、制御部11と、印刷情報受信部12と、装置性能記憶部13と、印刷所要時間算出部14と、ユーザースケジュール取得部15と、空き時間判定部16と、印刷開始日時算出部17とを備える。なお、制御ユニット10は、CPU、RAM、及びROM等からなる。   The print server 1 includes a control unit 11, a print information reception unit 12, an apparatus performance storage unit 13, a required print time calculation unit 14, a user schedule acquisition unit 15, and a free time determination unit 16. And a print start date and time calculation unit 17. The control unit 10 includes a CPU, a RAM, a ROM, and the like.

制御部11は、プリントサーバー1の全体的な動作制御を司る。   The control unit 11 manages overall operation control of the print server 1.

印刷情報受信部12は、印刷データを含む上記印刷ジョブと、当該印刷ジョブを作成したユーザーを示すユーザー情報と、この印刷データについての上記イベント情報とをコンピューターから受信する。   The print information receiving unit 12 receives from the computer the print job including print data, user information indicating a user who created the print job, and the event information about the print data.

装置性能記憶部13は、印刷データの出力先とされる予め設定されている画像形成装置3の装置性能を記憶する。本実施形態では、複数の画像形成装置3の装置性能を記憶している。図4は、各画像形成装置3についての装置性能の例を示す図である。   The device performance storage unit 13 stores the device performance of the image forming apparatus 3 set in advance as an output destination of print data. In the present embodiment, the device performance of a plurality of image forming apparatuses 3 is stored. FIG. 4 is a diagram illustrating an example of apparatus performance for each image forming apparatus 3.

装置性能記憶部13は、図4に示すように、プリントサーバー1に記憶されている各画像形成装置3(図3に示す画像形成装置A〜E)について、片面印刷速度、両面印刷速度、ステイプル所要時間、パンチ所要時間等を記憶している。なお、これら各速度としては、例えば、記録紙1枚あたりの所要印刷時間が記憶されている。また、ステイプル又はパンチの所要時間としては、記録紙1束あたりの所要処理時間が記憶されている。   As shown in FIG. 4, the apparatus performance storage unit 13 is configured to print the single-sided printing speed, the double-sided printing speed, and the staple for each of the image forming apparatuses 3 (image forming apparatuses A to E shown in FIG. 3) stored in the print server 1. Time required, time required for punching, etc. are stored. For example, the required printing time per recording sheet is stored as each of these speeds. Further, as the time required for stapling or punching, the required processing time per bundle of recording paper is stored.

印刷所要時間算出部14は、印刷情報受信部12により受信された印刷ジョブを解析し、当該印刷ジョブがその印刷データの出力先として示している画像形成装置3の性能を装置性能記憶部13から読み出し、当該印刷データの印刷に必要な印刷所要時間を算出する。例えば、印刷所要時間算出部14は、印刷ジョブが含む印刷枚数、印刷部数、両面又は片面印刷の別、ステイプル及びパンチ処理の要不要等の情報と、上記読み出した装置性能とを用いて、当該印刷ジョブが示す印刷データを印刷するために必要な印刷所要時間を算出する。   The required print time calculation unit 14 analyzes the print job received by the print information reception unit 12, and displays the performance of the image forming apparatus 3 indicated by the print job as the output destination of the print data from the device performance storage unit 13. Read and calculate the time required for printing the print data. For example, the required print time calculation unit 14 uses the information on the number of prints included in the print job, the number of copies to be printed, whether double-sided or single-sided printing is necessary, whether stapling and punching are necessary, and the read apparatus performance. The time required for printing required to print the print data indicated by the print job is calculated.

ユーザースケジュール取得部15は、印刷情報受信部12に受信された上記ユーザー情報に基づいて、当該ユーザー情報が示すユーザーについてのスケジュールを、ユーザースケジュールDB102から取得する。   Based on the user information received by the print information receiving unit 12, the user schedule acquisition unit 15 acquires a schedule for the user indicated by the user information from the user schedule DB 102.

空き時間判定部16は、ユーザースケジュール取得部15により取得されたスケジュールから、上記イベント情報が示すイベント開催日における上記ユーザーが有する空き時間帯を判定する。   The free time determination unit 16 determines a free time zone of the user on the event date indicated by the event information from the schedule acquired by the user schedule acquisition unit 15.

例えば、ユーザースケジュールDB102は、図5に例を示すようなカレンダーを内蔵するスケジュール記憶部1021(図3)に記憶している。このカレンダーは、ユーザー毎に記憶されている。空き時間判定部16は、上記ユーザーのカレンダーをユーザースケジュールDB102から取得し、上記イベント情報が示すイベントの開催日時に、当該ユーザーの他の予定が記憶されていないかを判断する。ここで、空き時間判定部16は、読み出したカレンダーにおいて、上記イベント開催日時よりも前となる時間帯に、他の予定が記憶されていない時間帯を有すると判断した場合に、当該時間帯を空き時間として判定する。   For example, the user schedule DB 102 is stored in a schedule storage unit 1021 (FIG. 3) that incorporates a calendar as shown in FIG. This calendar is stored for each user. The free time determination unit 16 acquires the user's calendar from the user schedule DB 102 and determines whether another schedule of the user is stored at the event date and time indicated by the event information. Here, when the free time determination unit 16 determines that the read calendar has a time zone in which no other schedule is stored in the time zone before the event date and time, the time zone is determined. Judge as free time.

印刷開始日時算出部17は、空き時間判定部16によって判定された空き時間内において、上記受信された印刷データの印刷を完了することが可能となる印刷開始日時を、印刷所要時間算出部14によって算出された印刷所要時間を用いて算出する。   The print start time calculating unit 17 sets the print start date and time at which the printing of the received print data can be completed within the free time determined by the free time determining unit 16 by using the required print time calculating unit 14. Calculation is performed using the calculated printing time.

制御部(印刷指示部)11は、印刷開始日時算出部17により算出された印刷開始日時を記憶しておき、内蔵するタイマーにより当該印刷開始日時の到来を計時した時に、上記受信した印刷ジョブが示す画像形成装置3に当該印刷ジョブを送信して印刷を指示する。   The control unit (print instruction unit) 11 stores the print start date and time calculated by the print start date and time calculation unit 17, and when the received print job is timed by a built-in timer, the received print job is The print job is transmitted to the image forming apparatus 3 shown to instruct printing.

プリントサーバー1には、更にHDD19が備えられている。このHDD19には、本発明の一実施形態であるスケジュール連携印刷プログラムが記憶されている。制御ユニット10は、当該スケジュール連携印刷プログラムに従って動作することにより、上記の制御部11と、印刷情報受信部12と、装置性能記憶部13と、印刷所要時間算出部14と、ユーザースケジュール取得部15と、空き時間判定部16と、印刷開始日時算出部17として機能する。但し、制御部11、印刷情報受信部12、装置性能記憶部13、印刷所要時間算出部14、ユーザースケジュール取得部15、空き時間判定部16、及び印刷開始日時算出部17は、ハード回路により構成されていてもよい。   The print server 1 further includes an HDD 19. The HDD 19 stores a schedule linkage printing program that is an embodiment of the present invention. The control unit 10 operates in accordance with the schedule linkage printing program, so that the control unit 11, the print information receiving unit 12, the apparatus performance storage unit 13, the required print time calculation unit 14, and the user schedule acquisition unit 15. And the free time determination unit 16 and the print start date and time calculation unit 17. However, the control unit 11, the print information receiving unit 12, the device performance storage unit 13, the required print time calculation unit 14, the user schedule acquisition unit 15, the free time determination unit 16, and the print start date / time calculation unit 17 are configured by hardware circuits. May be.

次に、スケジュール連携印刷サービスシステム100による印刷処理の第1実施形態を説明する。図6はスケジュール連携印刷サービスシステム100の印刷処理におけるコンピューター2による処理を示すフローチャートである。   Next, a first embodiment of a printing process performed by the schedule cooperation printing service system 100 will be described. FIG. 6 is a flowchart showing processing by the computer 2 in the printing processing of the schedule cooperation printing service system 100.

コンピューター2において、ユーザーによる操作部27の操作で印刷対象とするデータが指定されて印刷指示が入力されると、プリンタードライバーが起動される。このとき、制御部21は、図7に例を示すような画面Dを表示部28に表示させる。ここで、ユーザーが操作部27としてのマウスポインター及びキーボードを操作して、例えばイベントとしての会議の名称及び開催日時を入力すると(S1でYES)、印刷ジョブ生成部22は、ユーザーにより指定された上記データを印刷データとした印刷ジョブを生成する(S2)。コンピューター2には、予め印刷に用いる画像形成装置3用のプリンタードライバーが記憶されているため、印刷対象とするデータの指定による印刷指示に、当該データに基づく印刷物の出力先とする画像形成装置3を指定する指示が含まれる。   In the computer 2, when data to be printed is specified by the user operating the operation unit 27 and a print instruction is input, the printer driver is activated. At this time, the control unit 21 causes the display unit 28 to display a screen D as shown in FIG. Here, when the user operates the mouse pointer and the keyboard as the operation unit 27 and inputs, for example, the name and date of the meeting as an event (YES in S1), the print job generation unit 22 is designated by the user. A print job using the data as print data is generated (S2). Since the computer 2 stores in advance a printer driver for the image forming apparatus 3 used for printing, an image forming apparatus 3 that is an output destination of a printed matter based on the data specified by the data to be printed is designated as a print instruction. An instruction to specify is included.

さらに、印刷ジョブ生成部22は、情報記憶部22から、当該コンピューター2の使用者であるユーザーを示すユーザー情報を読み出す(S3)。通信部24は、当該読み出したユーザー情報と、上記印刷ジョブ、さらに、上記イベント情報をプリントサーバー1に送信する(S4)。   Further, the print job generation unit 22 reads out user information indicating a user who is a user of the computer 2 from the information storage unit 22 (S3). The communication unit 24 transmits the read user information, the print job, and the event information to the print server 1 (S4).

次に、プリントサーバー1による処理を説明する。図8はスケジュール連携印刷サービスシステム100の印刷処理におけるプリントサーバー1による処理を示すフローチャートである。   Next, processing by the print server 1 will be described. FIG. 8 is a flowchart showing processing by the print server 1 in the printing processing of the schedule cooperation printing service system 100.

プリントサーバー1において、印刷情報受信部12がコンピューター2から上記ユーザー情報、上記印刷ジョブ、及び上記イベント情報を含む印刷情報を受信すると(S21)、印刷所要時間算出部14は、装置性能記憶部13から当該印刷ジョブが印刷物の出力先として示す画像形成装置3の装置性能を読み出す(S22)。   In the print server 1, when the print information receiving unit 12 receives the print information including the user information, the print job, and the event information from the computer 2 (S 21), the required print time calculating unit 14 includes the apparatus performance storage unit 13. The device performance of the image forming apparatus 3 indicated by the print job as the output destination of the printed matter is read out (S22).

続いて、印刷所要時間算出部14は、上記読み出した画像形成装置3の装置性能に基づいて、上記印刷ジョブに含まれる印刷データについての印刷所要時間を算出する(S23)。   Subsequently, the required print time calculation unit 14 calculates the required print time for the print data included in the print job based on the read device performance of the image forming apparatus 3 (S23).

例えば、印刷所要時間算出部14は、装置性能記憶部13に記憶されている各画像形成装置3の装置性能(図4)の中から、上記印刷ジョブの示す画像形成装置3である画像形成装置Cの装置性能を読み出す。例えば、印刷所要時間算出部14は、印刷ジョブの示す印刷内容が、片面印刷、印刷枚数200枚、1部印刷、ステイプル及びパンチ無の場合、画像形成装置Cの片面印刷速度1.5秒/枚から、印刷所要時間を300秒=5分と算出する。   For example, the required print time calculation unit 14 selects the image forming apparatus 3 that is the image forming apparatus 3 indicated by the print job from the apparatus performances (FIG. 4) of the image forming apparatuses 3 stored in the apparatus performance storage unit 13. Read C device performance. For example, when the print content indicated by the print job is single-sided printing, the number of printed sheets is 200 sheets, one-part printing, stapling or no punching is performed, the required printing time calculation unit 14 starts from the single-sided printing speed of 1.5 seconds / sheet of the image forming apparatus C. The time required for printing is calculated as 300 seconds = 5 minutes.

続いて、ユーザースケジュール取得部15がユーザースケジュールDB102にアクセスし、ユーザースケジュールDB102から当該ユーザーのスケジュールを取得する(S24)。例えば、ユーザースケジュール取得部15は、ユーザースケジュールDB102から当該ユーザーのカレンダーを読み出し、当該ユーザーの各予定及びその日時を示す情報をスケジュールとして取得する。   Subsequently, the user schedule acquisition unit 15 accesses the user schedule DB 102 and acquires the user's schedule from the user schedule DB 102 (S24). For example, the user schedule acquisition unit 15 reads the user's calendar from the user schedule DB 102 and acquires information indicating each schedule and date / time of the user as a schedule.

空き時間判定部16は、ユーザースケジュール取得部15により取得されたスケジュールから、S21で受信された上記イベント情報が示すイベントの開催日における上記ユーザーが有する空き時間であって、当該イベントの開催時刻よりも前の時間帯となる空き時間が存在するかを判定する(S25)。   The vacant time determination unit 16 is the vacant time that the user has on the date of the event indicated by the event information received in S21 from the schedule acquired by the user schedule acquisition unit 15, and is based on the time of the event. It is determined whether there is a free time that is the previous time zone (S25).

ここで、空き時間判定部16は、当該イベントの開催時刻よりも前の時間帯となる空き時間が存在すると判断した場合に(S25でYES)、上記印刷データの印刷を行う時間帯としての空き時間として判定する(S26)。なお、空き時間判定部16は、当該イベントの開催時刻よりも前の時間帯となる空き時間が複数存在する場合は、いずれかの空き時間を1つ選択する。   Here, when the free time determination unit 16 determines that there is a free time that is a time zone before the time when the event is held (YES in S25), the free time is used as a time zone for printing the print data. It is determined as time (S26). Note that the free time determination unit 16 selects one of the free times when there are a plurality of free times in the time zone before the time when the event is held.

例えば、図5に示す例の場合、空き時間判定部16は、上記ユーザーのイベント及びその開催日時がイベント「会議」及び開催時間帯3月15日14時〜16時の場合、当該開催時間帯3月15日14時〜16時の前となる時間帯であって、ユーザーの予定が記憶されていない時間帯を検索する。図5に示す例の場合、時間帯13時〜14時にはユーザーの予定が記憶されておらず、他の時間帯にはユーザーの予定が入っているため、空き時間判定部16は、開催時間帯3月15日14時〜16時よりも前の時間帯である当該時間帯13時〜14時を空き時間として判定する。   For example, in the case of the example shown in FIG. 5, if the user's event and the date and time of the event are the event “conference” and the holding time zone March 15 from 14:00 to 16:00, Search for a time zone before 15:00 on March 15 before the user's schedule is stored. In the case of the example shown in FIG. 5, the user's schedule is not stored at 13:00 to 14:00 in the time zone, and the user's schedule is entered in other time zones. The time zone from 13:00 to 14:00 which is a time zone before 15:00 on March 15 is determined as a free time.

続いて、印刷開始日時算出部17は、上記判定された空き時間内で上記印刷ジョブに基づく印刷が完了するように印刷開始日時を算出する(S27)。例えば、図5に示す例の場合、空き時間が時間帯3月15日13時〜14時であるため、この2時間の間に印刷が完了できる時刻、例えば、印刷所要時間が3分の場合、3月15日13時57分よりも前の時刻を印刷開始日時として算出する。   Subsequently, the print start date and time calculation unit 17 calculates the print start date and time so that printing based on the print job is completed within the determined free time (S27). For example, in the case of the example shown in FIG. 5, since the free time is from 13:00 to 14:00 on March 15, the time when printing can be completed during these two hours, for example, the time required for printing is 3 minutes The time before 13:57 on March 15 is calculated as the print start date and time.

そして、制御部21は、当該算出された印刷開始日時を記憶する(S28)。この後、制御部21は、内蔵するタイマーにより、日時を計測し(S29,S29でNO)、印刷開始日時が到来した時に(S29でYES)、当該画像形成装置3に上記印刷ジョブを送信する(S30)。   Then, the control unit 21 stores the calculated printing start date and time (S28). Thereafter, the control unit 21 measures the date and time with a built-in timer (NO in S29 and S29), and transmits the print job to the image forming apparatus 3 when the print start date and time has arrived (YES in S29). (S30).

画像形成装置3は、データ送受信部31が当該印刷ジョブを受信すると、この印刷ジョブに基づいて画像形成部32が印刷を実行する。   In the image forming apparatus 3, when the data transmitting / receiving unit 31 receives the print job, the image forming unit 32 executes printing based on the print job.

なお、上記のS25において、空き時間判定部16が、当該イベントの開催時刻よりも前の時間帯となる空き時間が存在しないと判断した場合は(S25でNO)、処理は終了する。   In S25 described above, when the vacant time determination unit 16 determines that there is no vacant time in the time zone before the event holding time (NO in S25), the process ends.

この第1実施形態に係る印刷処理によれば、印刷ジョブの実行を指示したユーザーの空き時間、すなわち、他の予定が入っておらず、画像形成装置3が設置されているオフィスに居る可能性が高い時間帯に、当該印刷物を画像形成装置3から出力させることが可能である。これにより、ユーザーが印刷物を入手しやすい時期に画像形成装置3から印刷物が出力され、印刷物の放置が防止される。このため、ユーザーからの直接的な印刷指示があったタイミングではなく、印刷実行に適する時期としてプリントサーバー1により算出される他のタイミングで印刷を行う場合であっても、セキュリティーを確保した上で、印刷物を画像形成装置から出力させることが可能になる。   According to the printing process according to the first embodiment, there is a possibility that the user who has instructed execution of the print job has no idle time, that is, there is no other schedule and is in the office where the image forming apparatus 3 is installed. It is possible to output the printed matter from the image forming apparatus 3 in a high time zone. As a result, the printed material is output from the image forming apparatus 3 at a time when the user can easily obtain the printed material, thereby preventing the printed material from being left unattended. For this reason, security is ensured even when printing is performed at another timing calculated by the print server 1 as a timing suitable for printing execution, not at a timing when a direct printing instruction is issued from the user. The printed material can be output from the image forming apparatus.

次に、スケジュール連携印刷サービスシステム100による印刷処理の第2実施形態を説明する。図9はスケジュール連携印刷サービスシステム100の印刷処理におけるプリントサーバー1による処理の第2実施形態を示すフローチャートである。なお、上記第1実施形態と同様の処理は図示及び説明を省略する。   Next, a second embodiment of print processing by the schedule cooperation print service system 100 will be described. FIG. 9 is a flowchart illustrating a second embodiment of the process performed by the print server 1 in the print process of the schedule cooperation print service system 100. Note that illustration and description of the same processing as in the first embodiment is omitted.

第2実施形態では、第1実施形態に示したS21〜S25の処理と同様の処理が行われ、S25において、空き時間判定部16が、ユーザーの他の予定が記憶されていない時間帯が存在すると判断した場合に(S25でYES)、空き時間判定部16は、更に、当該空き時間が複数であるかを判定する(S31)。   In the second embodiment, processing similar to the processing of S21 to S25 shown in the first embodiment is performed, and in S25, the free time determination unit 16 has a time zone in which other schedules of the user are not stored. If it is determined (YES in S25), the free time determination unit 16 further determines whether there are a plurality of free times (S31).

空き時間判定部16は、当該空き時間が複数であると判定した場合(S31でYES)、イベント開催日時に最も近い空き時間を選択し(S32)、当該空き時間を、上記印刷データの印刷を行う時間帯としての空き時間として判定する(S33)。   If it is determined that there are a plurality of idle times (YES in S31), the idle time determination unit 16 selects the idle time closest to the event date and time (S32), and prints the print data using the idle time. It is determined as a free time as a time zone to be performed (S33).

印刷開始日時算出部17は、上記判定された空き時間内で上記印刷ジョブに基づく印刷が完了するように印刷開始日時を算出する(S34)。この後は、第1実施形態のS28〜S30と同様の処理であるS35〜S37を行う。   The print start date and time calculation unit 17 calculates the print start date and time so that printing based on the print job is completed within the determined free time (S34). Thereafter, S35 to S37, which are the same processes as S28 to S30 of the first embodiment, are performed.

例えば、ユーザーのスケジュールが、図5に示したものである場合、コンピューター2から受信したイベント情報の示すイベント「会議」の開催日時が、3月16日16時〜18時のとき、空き時間判定部16は、複数の空き時間、すなわち、8時〜10時の時間帯、10時〜13時の時間帯、及び14時〜16時の時間帯を、空き時間として判定する。このとき、空き時間判定部16は、イベント「会議」の開催日時3月16日16時〜18時に近い方の時間帯14時〜16時を、上記印刷データの印刷を行う時間帯としての空き時間として判定する。   For example, if the user's schedule is as shown in FIG. 5, the free time determination is performed when the date and time of the event “meeting” indicated by the event information received from the computer 2 is March 16:00 to 18:00 The unit 16 determines a plurality of idle times, that is, a time zone from 8 o'clock to 10 o'clock, a time zone from 10 o'clock to 13 o'clock, and a time zone from 14 o'clock to 16 o'clock as idle times. At this time, the vacant time determination unit 16 uses the time zone from 14:00 to 16:00 that is closer to the event date and time of the event “meeting” March 16 from 16:00 to 18:00 as a time zone for printing the print data. Judge as time.

この第2実施形態によれば、イベント開催日時に最も近い空き時間に印刷データの印刷物が画像形成装置3から出力され、印刷物が出力されてからイベントが開催されるまでの期間が短くなるため、印刷物が放置される危険性が低減し、セキュリティー性が更に高まる。   According to the second embodiment, a printed matter of print data is output from the image forming apparatus 3 in the free time closest to the event date and time, and the period from when the printed matter is output until the event is held is shortened. The risk of leaving the printed material is reduced, and the security is further enhanced.

次に、スケジュール連携印刷サービスシステム100による印刷処理の第3実施形態を説明する。図10はスケジュール連携印刷サービスシステム100の印刷処理におけるプリントサーバー1による処理の第3実施形態を示すフローチャートである。なお、上記第1又は第2実施形態と同様の処理は図示及び説明を省略する。   Next, a description will be given of a third embodiment of print processing by the schedule cooperation print service system 100. FIG. 10 is a flowchart showing a third embodiment of the process performed by the print server 1 in the print process of the schedule linkage print service system 100. Note that illustration and description of the same processing as in the first or second embodiment is omitted.

第3実施形態では、第1実施形態に示したS21〜S25の処理が行われ、空き時間判定部16が、ユーザーの他の予定が記憶されていない時間帯が存在すると判断した場合(S25でYES)、空き時間判定部16は、更に、当該空き時間が上記算出された印刷所要時間以上の長さであるかを判断する(S51)。   In 3rd Embodiment, when the process of S21-S25 shown in 1st Embodiment is performed, and the free time determination part 16 judges that there exists a time slot | zone when the other schedule of a user is not memorize | stored (in S25) YES), the free time determination unit 16 further determines whether the free time is longer than the calculated required print time (S51).

ここで、空き時間判定部16が、当該空き時間が上記算出された印刷所要時間よりも短いと判断した場合は(S51でNO)、処理は終了する。   If the free time determination unit 16 determines that the free time is shorter than the calculated required print time (NO in S51), the process ends.

一方、空き時間判定部16は、更に、当該空き時間が上記算出された印刷所要時間以上の長さであると判断した場合は(S51でYES)、この判定した空き時間が複数存在するかを判定する(S52)。以降は、第2実施形態に示したS32〜S37と同様の処理であるS53〜S58の処理を行う。   On the other hand, when it is determined that the idle time is longer than the calculated required printing time (YES in S51), the idle time determination unit 16 determines whether there are a plurality of the determined idle times. Determine (S52). Thereafter, the processes of S53 to S58, which are the same processes as S32 to S37 shown in the second embodiment, are performed.

例えば、ユーザーのスケジュールが、図5に示したものである場合、コンピューター2から受信したイベント情報の示すイベント「会議」の開催日時が、3月18日16時〜18時のとき、空き時間判定部16は、これよりも前の空き時間、すなわち、15時55分〜16時の時間帯を、空き時間として判定する。ここで、受信した印刷ジョブの示す印刷内容が、大量の印刷、例えば、印刷枚数300枚、両面印刷、ステイプル及びパンチ処理無、の場合、画像形成装置Cの装置性能の場合、印刷時間900秒=15分を要する。   For example, if the user's schedule is as shown in FIG. 5, the free time determination is made when the date and time of the event “meeting” indicated by the event information received from the computer 2 is March 18:00 to 18:00 The part 16 determines the free time before this, that is, the time zone from 15:55 to 16:00 as the free time. Here, when the print content indicated by the received print job is a large amount of printing, for example, 300 sheets printed, double-sided printing, no stapling and punching processing, and the apparatus performance of the image forming apparatus C, the printing time is 900 seconds. Takes 15 minutes.

この場合に、印刷開始日時算出部17が、印刷開始日時を、印刷終了時刻が当該空き時間内である15時55分〜16時の間となるように算出すれば、印刷所要時間よりも空き時間の方が短くても、ユーザーは、当該空き時間内に印刷物を入手することができる。   In this case, if the print start date and time calculation unit 17 calculates the print start date and time so that the print end time is between 15:55 and 16:00, which is within the free time, the free time is shorter than the required print time. Even if it is shorter, the user can obtain the printed matter within the free time.

しかし、第3実施形態では、上記のように空き時間が印刷所要時間以上の長さである場合にのみ、印刷開始日時算出部17が、この空き時間内での印刷開始日時を算出することにより、空き時間内において印刷の開始から終了までが完結するので、画像形成装置3から出力される第1枚目(第1束目)の記録紙から、ユーザーが画像形成装置3の近傍に存在する可能性が高い状態で出力されることになる。このため、印刷物が放置される事態を更に確実に回避でき、印刷物に対するセキュリティー性が更に向上する。   However, in the third embodiment, the print start date / time calculation unit 17 calculates the print start date / time within the idle time only when the idle time is longer than the required print time as described above. Since the start to the end of printing is completed within the free time, the user is present in the vicinity of the image forming apparatus 3 from the first (first bundle) recording paper output from the image forming apparatus 3. It is output with a high possibility. For this reason, the situation where a printed matter is left untreated can be avoided more reliably, and the security of the printed matter is further improved.

次に、スケジュール連携印刷サービスシステム100による印刷処理の第4実施形態を説明する。図11はスケジュール連携印刷サービスシステム100の印刷処理におけるプリントサーバー1による処理の第4実施形態を示すフローチャートである。なお、上記第1乃至第3実施形態と同様の処理は図示及び説明を省略する。   Next, a description will be given of a fourth embodiment of a printing process performed by the schedule cooperation printing service system 100. FIG. FIG. 11 is a flowchart showing a fourth embodiment of the processing by the print server 1 in the printing processing of the schedule linkage printing service system 100. Note that illustration and description of the same processing as in the first to third embodiments is omitted.

第4実施形態では、第1実施形態と同様にして、イベントの開催日時よりも前となる空き時間が存在すると判定された後(S25)、印刷開始日時算出部17は、印刷ジョブにより出力先とされる画像形成装置3から、当該画像形成装置3において実行予定の他の印刷ジョブを示すジョブ情報を取得し(S61)、当該他の印刷ジョブに基づく印刷を行うための印刷所要時間を算出する(S62)。なお、画像形成装置3において実行予定の他の印刷ジョブが存在しない場合は、印刷開始日時算出部17は、当然ながら当該印刷所要時間を算出しない。   In the fourth embodiment, similarly to the first embodiment, after it is determined that there is a free time before the event date and time (S25), the print start date and time calculation unit 17 outputs the output destination by a print job. Job information indicating another print job scheduled to be executed in the image forming apparatus 3 is acquired from the image forming apparatus 3 (S61), and the time required for printing based on the other print job is calculated. (S62). If there is no other print job scheduled to be executed in the image forming apparatus 3, the print start date / time calculating unit 17 naturally does not calculate the required print time.

そして、空き時間判定部16は、S23で算出された印刷所要時間に、当該S62で算出した他の印刷ジョブに基づく印刷を行うための印刷所要時間を加算した上で(S63)、空き時間が印刷所要時間以上の長さであるかの判断を行う(S64)。以降は、第3実施形態に示したS52〜S58と同様の処理であるS65〜S71を行う。   The available time determination unit 16 adds the required print time for performing printing based on the other print job calculated in S62 to the required print time calculated in S23 (S63), and then the available time. It is determined whether the print time is longer than the required printing time (S64). Thereafter, S65 to S71 which are the same processes as S52 to S58 shown in the third embodiment are performed.

この第4実施形態によれば、画像形成装置3が他の印刷ジョブを実行する場合であっても、上記判定した空き時間内において印刷の開始から終了までを完結させることができる。このため、画像形成装置3における印刷ジョブの待ち状態を考慮した上で、印刷物が放置される事態を更に確実に回避でき、印刷物に対するセキュリティー性が更に向上する。   According to the fourth embodiment, even when the image forming apparatus 3 executes another print job, it is possible to complete from the start to the end of printing within the determined idle time. For this reason, in consideration of the waiting state of the print job in the image forming apparatus 3, it is possible to more reliably avoid the situation where the printed material is left unattended, and the security for the printed material is further improved.

なお、印刷開始日時算出部17は、出力先とされる上記画像形成装置3から実行予定の他の印刷ジョブを示すジョブ情報を取得し、判定された空き時間内における、当該他の印刷ジョブの実行に要する時間帯以外の時間帯で前記印刷開始日時を算出するようにしてもよい。この場合、空き時間内で印刷を終了できる印刷開始日時を確実に設定でき、印刷物に対するセキュリティー性を更に確保することができる。   The print start date and time calculation unit 17 acquires job information indicating another print job to be executed from the image forming apparatus 3 that is the output destination, and the other print job within the determined empty time. The print start date and time may be calculated in a time zone other than the time zone required for execution. In this case, it is possible to reliably set the print start date and time at which printing can be completed within the idle time, and it is possible to further ensure the security of printed matter.

次に、スケジュール連携印刷サービスシステム100による印刷処理の第5実施形態を説明する。図12はスケジュール連携印刷サービスシステム100の印刷処理におけるプリントサーバー1による処理の第5実施形態理を示すフローチャートである。なお、上記第1乃至第4実施形態と同様の処理は図示及び説明を省略する。   Next, a description will be given of a fifth embodiment of print processing by the schedule cooperation print service system 100. FIG. 12 is a flowchart showing the fifth embodiment of the processing by the print server 1 in the printing processing of the schedule linkage printing service system 100. Note that illustration and description of the same processing as in the first to fourth embodiments is omitted.

第5実施形態では、第1乃至第4実施形態の上記S25の処理において、イベント開催時刻よりも前となる時間に空き時間が存在しないと判断された場合に(S25でNO)、空き時間判定部16は、当該印刷ジョブの実行依頼日がイベント開催日に限定されているか否かを判断する(S90)。空き時間判定部16は、印刷ジョブの実行依頼日がイベント開催日に限定されているか否かは、印刷ジョブと共に送信されてくる印刷実行依頼日指定情報に基づいて判断する。この印刷実行依頼日指定情報は、当日に限定、又は前日以前も印刷実行許可のいずれかを示す。   In the fifth embodiment, when it is determined in the process of S25 of the first to fourth embodiments that there is no free time before the event holding time (NO in S25), the free time determination The unit 16 determines whether or not the execution request date of the print job is limited to the event date (S90). The free time determination unit 16 determines whether or not the execution request date of the print job is limited to the event date based on the print execution request date designation information transmitted together with the print job. This print execution request date designation information indicates whether the print execution is limited to the current day, or print execution is permitted before the previous day.

ここで、空き時間判定部16は、当該印刷ジョブの印刷実行依頼日がイベント開催日に限定されていると判断した場合は(S90でYES)、処理を終了する。   If the free time determination unit 16 determines that the print execution request date of the print job is limited to the event date (YES in S90), the process ends.

一方、ここで、空き時間判定部16は、当該印刷ジョブの印刷実行依頼日がイベント開催日に限定されておらず、前日以前でもよいとされていると判断した場合は(S90でNO)、前日のユーザースケジュールに空き時間があるか否かを判定する(S91)。ここで、空き時間判定部16が空き時間があると判定した場合(S91でYES)、処理は、S83に移る。なお、空き時間判定部16が空き時間がないと判定した場合(S91でNO)、処理は終了する。   On the other hand, when the free time determination unit 16 determines that the print execution request date of the print job is not limited to the event date and may be before the previous day (NO in S90), It is determined whether there is a free time in the user schedule of the previous day (S91). If the free time determination unit 16 determines that there is free time (YES in S91), the process proceeds to S83. If the free time determination unit 16 determines that there is no free time (NO in S91), the process ends.

これにより、印刷物を使用するイベントの開催日にユーザーに空き時間が無くても、当該イベント開催日時よりも前となる別日の空き時間に、画像形成装置3から印刷物を出力してユーザーに提供することが可能になる。   As a result, even if there is no vacant time on the date of the event that uses the printed matter, the printed material is output from the image forming apparatus 3 and provided to the user during the vacant time on another day before the date and time of the event. It becomes possible to do.

なお、本発明は上記実施の形態の構成に限られず種々の変形が可能である。例えば、プリントサーバー1の制御部11は、上記印刷開始日時を決定した後、ユーザースケジュールDB102にアクセスして、当該ユーザーのカレンダーの当該印刷開始時刻の時間帯に、印刷物を回収する旨を示すタスクを追加するようにしてもよい。これにより、ユーザーに対して、より明確に、印刷の開始及び終了、更には回収を認識させることができる。   The present invention is not limited to the configuration of the above embodiment, and various modifications can be made. For example, after determining the print start date and time, the control unit 11 of the print server 1 accesses the user schedule DB 102 and indicates that the printed material is to be collected at the time of the print start time of the user's calendar. May be added. Thereby, it is possible to make the user more clearly recognize the start and end of printing, and further the collection.

また、上記実施形態では、コンピューター2において、ユーザーがイベントの名称や開催日時を入力して、コンピューター2からプリントサーバー1にイベント情報が送信されるとして説明しているが、これに限られず、次のようにしてもよい。例えば、スケジュール連携印刷サービス100が、図1に破線で示すように、会議等の開催日時のスケジュールの記憶及び管理を行うイベントデータベース101を更に備えるものとする。ユーザーはコンピューター2においてイベント名称(又はイベントを特定するための情報)のみを入力し、コンピューター2からはイベント名称が印刷ジョブ等と共にプリントサーバー1に送信される。プリントサーバー1は、当該イベント名称(又はイベントを特定するための情報)に対応するイベントについての開催日時を、イベントデータベース101から読み出して取得する。   In the above-described embodiment, it is described that the computer 2 inputs the event name and the date and time of the event, and the event information is transmitted from the computer 2 to the print server 1. However, the present invention is not limited to this. It may be as follows. For example, it is assumed that the schedule cooperation printing service 100 further includes an event database 101 for storing and managing a schedule of the date and time of a meeting or the like as indicated by a broken line in FIG. The user inputs only the event name (or information for specifying the event) in the computer 2, and the event name is transmitted from the computer 2 to the print server 1 together with the print job and the like. The print server 1 reads and acquires the date and time of the event corresponding to the event name (or information for specifying the event) from the event database 101.

また、図1乃至図12を用いて上記実施形態により示した構成及び処理は、本発明の一実施形態に過ぎず、本発明を当該構成及び処理に限定する趣旨ではない。   Moreover, the structure and process shown by the said embodiment using FIG. 1 thru | or FIG. 12 are only one Embodiment of this invention, and are not the meaning which limits this invention to the said structure and process.

100 スケジュール連携印刷サービスシステム
1 プリントサーバー
2 コンピューター
3 画像形成装置
31 データ送受信部
32 画像形成部
10 制御ユニット
11 制御部
12 印刷情報受信部
13 装置性能記憶部
14 印刷所要時間算出部
15 ユーザースケジュール取得部
16 空き時間判定部
17 印刷開始日時算出部
20 制御ユニット
21 制御部
22 情報記憶部
23 印刷ジョブ生成部
24 通信部
25 スケジューラー
27 操作部
28 表示部
102 ユーザースケジュールDB
1021 スケジュール記憶部
DESCRIPTION OF SYMBOLS 100 Schedule cooperation printing service system 1 Print server 2 Computer 3 Image formation apparatus 31 Data transmission / reception part 32 Image formation part 10 Control unit 11 Control part 12 Print information reception part 13 Apparatus performance memory | storage part 14 Print required time calculation part 15 User schedule acquisition part 16 Free time determination unit 17 Print start date / time calculation unit 20 Control unit 21 Control unit 22 Information storage unit 23 Print job generation unit 24 Communication unit 25 Scheduler 27 Operation unit 28 Display unit 102 User schedule DB
1021 Schedule storage unit

Claims (7)

印刷データを含む印刷ジョブと、前記印刷ジョブを指示したユーザーを示すユーザー情報と、前記印刷データに基づく印刷物を使用するイベント及びその開催日時を示すイベント情報とを受信する印刷情報受信部と、
前記印刷データの出力先とされ得る予め定められた画像形成装置の性能を記憶する装置性能記憶部と、
前記印刷ジョブが前記印刷データの出力先として示す画像形成装置の性能を前記装置性能記憶部から読み出し、当該印刷ジョブの示す印刷データの印刷に必要な印刷所要時間を算出する印刷所要時間算出部と、
前記ユーザー情報が示すユーザーについての、前記イベント情報が示すイベントの開催日時におけるスケジュールをユーザースケジュールデータベースから取得するユーザースケジュール取得部と、
前記取得されたスケジュールから、前記ユーザーについて、前記イベントの開催日時よりも前となる空き時間を判定する空き時間判定部と、
前記判定された空き時間内で前記印刷データの印刷を完了可能な印刷開始日時を、前記算出された印刷所要時間を用いて算出する印刷開始日時算出部と、
前記算出された印刷開始日時を記憶し、当該印刷開始日時の到来時に、前記印刷ジョブの示す画像形成装置に前記印刷ジョブを送信して印刷を指示する印刷指示部と、を備え
前記印刷開始日時算出部は、前記イベントの開催日時に最も近い前記ユーザーの空き時間内で前記印刷開始日時を算出するスケジュール連携印刷サービス装置。
A print information receiving unit that receives a print job including print data, user information indicating a user who has instructed the print job, an event of using a printed matter based on the print data, and event information indicating the date and time of the event,
An apparatus performance storage unit for storing the performance of a predetermined image forming apparatus that can be an output destination of the print data;
A required print time calculation unit that reads the performance of the image forming apparatus indicated by the print job as the output destination of the print data from the apparatus performance storage unit, and calculates the required print time required for printing the print data indicated by the print job; ,
For a user indicated by the user information, a user schedule acquisition unit that acquires a schedule at a date and time of an event indicated by the event information from a user schedule database;
From the acquired schedule, for the user, a free time determination unit for determining a free time before the date and time of the event,
A print start date and time calculating unit that calculates a print start date and time that can complete printing of the print data within the determined idle time using the calculated required print time;
A print instructing unit for storing the calculated print start date and time and instructing printing by transmitting the print job to the image forming apparatus indicated by the print job when the print start date and time arrives ;
The print start date and time calculation unit is a schedule cooperation print service device that calculates the print start date and time within the user's available time closest to the event date and time .
前記空き時間判定部は、前記空き時間と前記印刷所要時間の長短を比較し、前記空き時間判定部により前記空き時間が前記印刷所要時間以上であると判断されたときに、前記印刷開始日時算出部は、当該空き時間帯内での前記印刷開始日時を算出する請求項1に記載のスケジュール連携印刷サービス装置。 The idle time determination unit compares the idle time and the length of the required print time, and calculates the print start date and time when the idle time is determined by the idle time determination unit to be equal to or longer than the required print time. parts are scheduled cooperative print service device according to claim 1 for calculating the print start time within the idle time zone. 前記印刷開始日時算出部は、前記空き時間が前記印刷所要時間よりも短いときは、前記空き時間判定部によって判定される別の空き時間帯内で前記印刷開始日時を算出する請求項に記載のスケジュール連携印刷サービス装置。 The printing start time calculating unit, when said idle time is shorter than the time necessary for printing is claimed in claim 2 for calculating the print start time in another in the free time period is determined by the interval determination section Schedule linkage printing service device. 前記印刷開始日時算出部は、前記出力先となる画像形成装置から実行予定の他の印刷ジョブを示すジョブ情報を取得し、当該他の印刷ジョブに基づく印刷を行うための印刷所要時間を前記印刷所要時間に加算した上で、前記空き時間と前記印刷所要時間の長短を比較する請求項又は請求項に記載のスケジュール連携印刷サービス装置。 The print start date and time calculation unit obtains job information indicating another print job to be executed from the image forming apparatus serving as the output destination, and displays a print required time for performing printing based on the other print job. The schedule cooperation print service apparatus according to claim 2 or 3 , wherein after adding to the required time, the length of the idle time and the required print time are compared. 前記印刷開始日時算出部は、前記出力先となる画像形成装置から実行予定の他の印刷ジョブを示すジョブ情報を取得し、当該他の印刷ジョブの実行に要する時間帯以外の時間帯で前記印刷開始日時を算出する請求項1乃至請求項のいずれかに記載のスケジュール連携印刷サービス装置。 The print start date / time calculating unit acquires job information indicating another print job to be executed from the image forming apparatus serving as the output destination, and performs the printing in a time zone other than a time zone required for execution of the other print job. The schedule cooperation printing service apparatus according to any one of claims 1 to 4 , which calculates a start date and time. コンピューターと、サーバーと、ユーザースケジュールデータベースと、画像形成装置とを有するスケジュール連携印刷サービスシステムであって、
前記コンピューターは、
印刷データを含む印刷ジョブを生成する印刷ジョブ生成部と、
前記印刷ジョブと、前記印刷ジョブを指示したユーザーを示すユーザー情報と、前記印刷データに基づく印刷物を使用するイベント及びその開催日時を示すイベント情報とを前
記サーバーに対して送信する通信部と、を備え
前記サーバーは、
前記印刷ジョブ、前記ユーザー情報、及び前記イベント情報を前記コンピューターから受信する印刷情報受信部と、
前記印刷データの出力先とされ得る予め定められた画像形成装置の性能を記憶する装置性能記憶部と、
前記印刷ジョブが前記印刷データの出力先として示す画像形成装置の性能を前記装置性能記憶部から読み出し、当該印刷ジョブの示す印刷データの印刷に必要な印刷所要時間を算出する印刷所要時間算出部と、
前記ユーザー情報が示すユーザーについての、前記イベント情報が示すイベントの開催日時におけるスケジュールをユーザースケジュールデータベースから取得するユーザースケジュール取得部と、
前記取得されたスケジュールから、前記ユーザーについて、前記イベントの開催日時よりも前となる空き時間を判定する空き時間判定部と、
前記判定された空き時間内で前記印刷データの印刷を完了可能な印刷開始日時を、前記算出された印刷所要時間を用いて算出する印刷開始日時算出部と、
前記算出された印刷開始日時を記憶し、当該印刷開始日時の到来時に、前記印刷ジョブの示す画像形成装置に前記印刷ジョブを送信して印刷を指示する印刷指示部と、を備え、
さらに前記印刷開始日時算出部は、前記イベントの開催日時に最も近い前記ユーザーの空き時間内で前記印刷開始日時を算出し、
前記ユーザースケジュールデータベースは、
複数のユーザーについての各スケジュールを記憶するスケジュール記憶部を備え、
前記画像形成装置は、
前記サーバーから前記印刷ジョブを受信する印刷ジョブ受信部と、
前記印刷ジョブに基づいて記録媒体に画像形成を行う画像形成部と、を備えるスケジュール連携印刷サービスシステム。
A schedule linkage printing service system having a computer, a server, a user schedule database, and an image forming apparatus,
The computer
A print job generation unit that generates a print job including print data;
A communication unit that transmits to the server the print job, user information indicating a user who has instructed the print job, an event using a printed matter based on the print data, and event information indicating the date and time of the event. The server is
A print information receiving unit that receives the print job, the user information, and the event information from the computer;
An apparatus performance storage unit for storing the performance of a predetermined image forming apparatus that can be an output destination of the print data;
A required print time calculation unit that reads the performance of the image forming apparatus indicated by the print job as the output destination of the print data from the apparatus performance storage unit, and calculates the required print time required for printing the print data indicated by the print job; ,
For a user indicated by the user information, a user schedule acquisition unit that acquires a schedule at a date and time of an event indicated by the event information from a user schedule database;
From the acquired schedule, for the user, a free time determination unit for determining a free time before the date and time of the event,
A print start date and time calculating unit that calculates a print start date and time that can complete printing of the print data within the determined idle time using the calculated required print time;
A print instructing unit for storing the calculated print start date and time and instructing printing by transmitting the print job to the image forming apparatus indicated by the print job when the print start date and time arrives;
Further, the print start date and time calculation unit calculates the print start date and time within an empty time of the user closest to the event date and time,
The user schedule database is
A schedule storage unit for storing each schedule for a plurality of users is provided.
The image forming apparatus includes:
A print job receiver for receiving the print job from the server;
An image forming unit that forms an image on a recording medium based on the print job.
コンピューターを、
印刷データを含む印刷ジョブと、前記印刷ジョブを指示したユーザーを示すユーザー情報と、前記印刷データに基づく印刷物を使用するイベント及びその開催日時を示すイベント情報とを受信する印刷情報受信部と、
前記印刷データの出力先とされ得る予め定められた画像形成装置の性能を記憶する装置性能記憶部と、
前記印刷ジョブが前記印刷データの出力先として示す画像形成装置の性能を前記装置性能記憶部から読み出し、当該印刷ジョブの示す印刷データの印刷に必要な印刷所要時間を算出する印刷所要時間算出部と、
前記ユーザー情報が示すユーザーについての、前記イベント情報が示すイベントの開催日時におけるスケジュールをユーザースケジュールデータベースから取得するユーザースケジュール取得部と、
前記取得されたスケジュールから、前記ユーザーについて、前記イベントの開催日時よりも前となる空き時間を判定する空き時間判定部と、
前記判定された空き時間内で前記印刷データの印刷を完了可能な印刷開始日時を、前記算出された印刷所要時間を用いて算出する印刷開始日時算出部と、
前記算出された印刷開始日時を記憶し、当該印刷開始日時の到来時に、前記印刷ジョブの示す画像形成装置に前記印刷ジョブを送信して印刷を指示する印刷指示部と、して機能させ
さらに前記印刷開始日時算出部は、前記イベントの開催日時に最も近い前記ユーザーの空き時間内で前記印刷開始日時を算出させるスケジュール連携印刷プログラム。
Computer
A print information receiving unit that receives a print job including print data, user information indicating a user who has instructed the print job, an event of using a printed matter based on the print data, and event information indicating the date and time of the event,
An apparatus performance storage unit for storing the performance of a predetermined image forming apparatus that can be an output destination of the print data;
A required print time calculation unit that reads the performance of the image forming apparatus indicated by the print job as the output destination of the print data from the apparatus performance storage unit, and calculates the required print time required for printing the print data indicated by the print job; ,
For a user indicated by the user information, a user schedule acquisition unit that acquires a schedule at a date and time of an event indicated by the event information from a user schedule database;
From the acquired schedule, for the user, a free time determination unit for determining a free time before the date and time of the event,
A print start date and time calculating unit that calculates a print start date and time that can complete printing of the print data within the determined idle time using the calculated required print time;
The calculated print start date and time is stored, and when the print start date and time arrives, the print job is transmitted to the image forming apparatus indicated by the print job and functions as a print instruction unit that instructs printing .
Further, the printing start date and time calculation unit, the event closest to the user's schedule cooperation printing program in the free time Ru to calculate the printing start date and time to hold the date and time of.
JP2013185201A 2013-09-06 2013-09-06 Schedule-linked printing service device, schedule-linked printing service system, and schedule-linked printing program Expired - Fee Related JP6016740B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2013185201A JP6016740B2 (en) 2013-09-06 2013-09-06 Schedule-linked printing service device, schedule-linked printing service system, and schedule-linked printing program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2013185201A JP6016740B2 (en) 2013-09-06 2013-09-06 Schedule-linked printing service device, schedule-linked printing service system, and schedule-linked printing program

Publications (2)

Publication Number Publication Date
JP2015052899A JP2015052899A (en) 2015-03-19
JP6016740B2 true JP6016740B2 (en) 2016-10-26

Family

ID=52701889

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2013185201A Expired - Fee Related JP6016740B2 (en) 2013-09-06 2013-09-06 Schedule-linked printing service device, schedule-linked printing service system, and schedule-linked printing program

Country Status (1)

Country Link
JP (1) JP6016740B2 (en)

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09244833A (en) * 1996-03-13 1997-09-19 Fuji Xerox Co Ltd Spooling device
JP2001014122A (en) * 1999-06-29 2001-01-19 Sharp Corp Printer control device and printer control method
JP2005014535A (en) * 2003-06-27 2005-01-20 Canon Finetech Inc Image forming apparatus
JP2006072471A (en) * 2004-08-31 2006-03-16 Seiko Epson Corp Printing system, information management apparatus, printing apparatus, program, and printing method used therefor
JP2006088641A (en) * 2004-09-27 2006-04-06 Canon Inc Print control apparatus and print control method
JP2011008407A (en) * 2009-06-24 2011-01-13 Konica Minolta Business Technologies Inc System and device for controlling print
JP2011186745A (en) * 2010-03-08 2011-09-22 Konica Minolta Business Technologies Inc Print management device and printer

Also Published As

Publication number Publication date
JP2015052899A (en) 2015-03-19

Similar Documents

Publication Publication Date Title
JP5414242B2 (en) Image processing apparatus, image processing apparatus control method, and program
EP1835394A2 (en) Print management system, data management device and data management method
JP4555324B2 (en) Remote access system
JP2005349704A (en) Printing apparatus, printing restriction management system, printing control program, and recording medium recording printing control program
JP2011039874A (en) Information processing apparatus, information processing method, and program
JP2011257945A (en) Information transmission apparatus, control method of information transmission apparatus, and computer program
JP6341218B2 (en) Image processing apparatus, image processing system, and program
JP4950829B2 (en) Information processing apparatus, image processing apparatus, and information processing method thereof
JP2006031674A (en) Information processing apparatus and method, and program
JP2015052900A (en) Schedule-linked print service device, schedule-linked print service system, and schedule-linked print program
JP3593493B2 (en) Image output system and image output device
JP6016740B2 (en) Schedule-linked printing service device, schedule-linked printing service system, and schedule-linked printing program
JP2013095024A (en) Printing apparatus, printing system, printer driver, and printing method
JP2005327053A (en) Log information management device, log information generation device, log information management program, and recording medium
US8477328B2 (en) Function-providing system
JP2013127775A (en) Analysis system and method thereof
JP2006012124A (en) Job management apparatus, job management system, job management program, and recording medium
JP2009296472A (en) Update information creation processing system for document data, image forming apparatus, update information creation processing method for the document data, and processing program for the same
KR20120023925A (en) Network printer management system for making use of reusable paper
JP6101606B2 (en) Image forming apparatus, schedule linkage printing service system, and schedule linkage printing program
JP7091869B2 (en) Print control unit, print system and program
JP2006011663A (en) Information processing apparatus and information processing method
JP2013114515A (en) Cloud print system, image processing device, image processing method and program
JP2008117128A (en) Information processor, printer, terminal device, print control system, print system, and program
JP2007087042A (en) Print job management system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20150722

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20160615

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20160621

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20160808

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20160830

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20160927

R150 Certificate of patent or registration of utility model

Ref document number: 6016740

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees