Rail stretcher and rail extension method Download PDF

Info

Publication number
JP6076783B2
JP6076783B2 JP2013055041A JP2013055041A JP6076783B2 JP 6076783 B2 JP6076783 B2 JP 6076783B2 JP 2013055041 A JP2013055041 A JP 2013055041A JP 2013055041 A JP2013055041 A JP 2013055041A JP 6076783 B2 JP6076783 B2 JP 6076783B2
Authority
JP
Japan
Prior art keywords
rail
hydraulic cylinder
stretcher
stage
rails
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2013055041A
Other languages
Japanese (ja)
Other versions
JP2014181449A (en
Inventor
祐亮 藤野
祐亮 藤野
誠二 細川
誠二 細川
長谷川 勉
勉 長谷川
Original Assignee
株式会社交通建設
保線機器整備株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社交通建設, 保線機器整備株式会社 filed Critical 株式会社交通建設
Priority to JP2013055041A priority Critical patent/JP6076783B2/en
Publication of JP2014181449A publication Critical patent/JP2014181449A/en
Application granted granted Critical
Publication of JP6076783B2 publication Critical patent/JP6076783B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Machines For Laying And Maintaining Railways (AREA)

Description

本発明は、レールの間隔(軌間)を広げるレールストレッチャーおよびレール間拡張方法に関するもので、特に、ロングレールと言われる全長の長いレールの間隔(軌間)を広げるために使用するレールストレッチャー(Rail-stretcher)およびレール間拡張方法に関する。   The present invention relates to a rail stretcher that expands the distance between rails (gauge) and an inter-rail expansion method, and in particular, a rail stretcher that is used to increase the distance between rails (gauge) that is called a long rail. Rail-stretcher) and rail-to-rail extension method.

ロングレールと言われる全長の長いレールでは、連接軌道等の踏切を交換するために、レールを切断しないことが要求されている。そのため、従来は、複線の場合は並走する他のレールにチェーンブロック基端を引掛ける一方、軌間を拡張すべきレールにチェーンブロック先端を引掛けて広げたり、あるいは特許文献1に記載されたような軌道の敷設替え用軌道建設機械等の大型の重機を使用してレールを広げている。   In a long rail called a long rail, it is required not to cut the rail in order to replace a crossing such as a connecting track. Therefore, conventionally, in the case of a double track, the chain block base end is hooked on another rail running in parallel, while the chain block tip is hooked on a rail to be extended between rails, or is described in Patent Document 1. The rails are widened using large heavy machinery such as a track construction machine for track replacement.

特表平08−503280号公報JP-T-08-503280

しかし、並走する他のレールにチェーンブロック基端を引掛ける一方、軌間を拡張すべきレールにチェーンブロック先端を引掛けて広げる方法では、チェーンブロック基端を引掛けた他のレールに負荷がかかるため、悪影響を及ぼすという問題が発生する。   However, when the chain block base end is hooked to another rail running in parallel, while the tip of the chain block is hooked and widened to the rail to be expanded, the load is applied to the other rail hooked to the chain block base end. Therefore, the problem of adverse effects occurs.

その一方、特許文献1に記載された軌道の敷設替え用軌道建設機械では、大型の重機であるため、機械自体のコストが非常にかかるという問題がある。   On the other hand, since the track construction machine for track laying replacement described in Patent Document 1 is a large heavy machine, there is a problem that the cost of the machine itself is very high.

そこで、本発明は、このような問題点に着目してなされたもので、並走する他のレールに悪影響を与えることなく、かつ、大型の重機も使用せずにレールの間隔を広げることができるレールストレッチャーおよびレール間拡張方法を提供することを目的とする。   Therefore, the present invention has been made paying attention to such problems, and it is possible to widen the interval between the rails without adversely affecting other parallel rails and without using a large heavy machine. An object of the present invention is to provide a rail stretcher and a rail-to-rail extension method.

前記課題を解決するため、本発明のレールストレッチャーは、レールの間隔を広げるレールストレッチャーであって、レールの高さ以上の高さを有し、マクラギに固定されて使用される足場台と、その足場台に着脱可能に固定され、2本のレールの内側からそれぞれ各レールを外側に移動させて軌間を拡張する軌間を拡張する軌間拡張機構部とを有することを特徴とする。
ここで、前記軌間拡張機構部は、油圧により伸縮するピストン先端にレールを掴むレールキャッチ部が設けられた2本の油圧シリンダと、前記足場台の上部に着脱可能に装着され、前記2本の油圧シリンダのレールキャッチ部をそれぞれ外側に向けて設置する2箇所の油圧シリンダ設置部が設けられた油圧シリンダ設置台とを有するようにすると良い。
また、前記油圧シリンダ設置台の2箇所の油圧シリンダ設置部には、それぞれ、2本の油圧シリンダそれぞれの設置位置を2段階でレールを押し広げることができるように1段目位置固定孔および2段目位置固定孔が設けられていると良い。
また、前記軌間拡張機構部には、2本の油圧シリンダそれぞれを前記1段目位置固定孔を利用して各油圧シリンダ設置部の1段目の設置位置に装着し、レールを1段目の間隔で押し広げた後、そのレール間隔を1段目の間隔で保持するための1段目間隔保持ブロックが設けられていると良い。
また、前記軌間拡張機構部には、2本の油圧シリンダそれぞれを前記2段目位置固定孔を利用して各油圧シリンダ設置部の2段目の設置位置に装着し、レールを2段目の間隔で押し広げた後、そのレール間隔を2段目の間隔で保持するための2段目間隔保持ブロックが設けられていると良い。
また、油圧シリンダ設置台の上部には、2本の油圧シリンダそれぞれによって押し広げた2本のレールの復元力によって2本の油圧シリンダが油圧シリンダ設置部から起き上がらないように、2本の油圧シリンダの起き上がりを防止する起立防止ピンが挿入される起立防止ピン挿入孔が設けられているとさらに良い。
また、足場台は、マクラギの両側まで延びる脚部と、脚部それぞれの先端に設けられマクラギに固定される足部とを有し、その足部は、レールの断面形状を有しており、その足部がレールと同様にマクラギに固定可能であると良い。
また、本発明に係るレールストレッチャーを使用したレール間拡張方法は、上述のいずれかのレールストレッチャーを使用したレール間拡張方法であって、間隔を広げるべきレール間に油圧シリンダ設置台に設置したレールストレッチャーを取り付けると共に、レール山越器から吊下げたチェーンブロックの先端部にレールを取り付ける第1工程と、レールストレッチャーを取り付けたレールを、山越器のチェーンブロックを使用してそのレールストレッチャーおよびそのレールストレッチャーが設置された油圧シリンダ設置台と共に吊り上げる第2工程と、レールと共に吊り上げたレールストレッチャーが設置された油圧シリンダ設置台の下に足場台を移動させ、その足場台の足部をマクラギに固定すると共に、その足場台に油圧シリンダ設置台を固定する第3工程と、足場台に油圧シリンダ設置台を固定した後、油圧シリンダ設置台に設置されたレールストレッチャーによって2本のレールの内側からそれぞれ各レールを外側に1段階だけ移動させて軌間を1段階拡張することによりレールの間隔を広げる第4工程と、各レールを外側に1段階だけ移動させて軌間を拡張した後、油圧シリンダ設置台に1段目間隔保持ブロックを挿入する第5工程と、油圧シリンダ設置台に1段目間隔保持ブロックを挿入後、油圧シリンダ設置台からレールストレッチャーを取外して、取外したレールストレッチャーを油圧シリンダ設置台の2段目の位置に設置する第6工程と、油圧シリンダ設置台の2段目の位置に設置されたレールストレッチャーにより各レールを外側に2段階目の移動を実行して軌間を2段階拡張することによりレールの間隔を広げる第7工程とを有することにある。
In order to solve the above problems, the rail stretcher of the present invention is a rail stretcher that widens the interval between the rails, has a height equal to or higher than the height of the rail, and is used by being fixed to sleepers. It is fixed to the scaffold base so as to be detachable, and has a gauge extension mechanism part that extends the gauge by moving each rail to the outside from the inside of the two rails.
Here, the inter-gauge expansion mechanism portion is detachably mounted on two hydraulic cylinders provided with a rail catch portion for gripping a rail at a piston tip that expands and contracts by hydraulic pressure, and on the upper part of the scaffold base. It is preferable to have a hydraulic cylinder installation base provided with two hydraulic cylinder installation parts for installing the rail catches of the hydraulic cylinder toward the outside.
Further, the two hydraulic cylinder installation parts of the hydraulic cylinder installation base are respectively provided with a first stage position fixing hole and 2 so that the installation position of each of the two hydraulic cylinders can be expanded in two stages. A step position fixing hole is preferably provided.
In addition, each of the two hydraulic cylinders is attached to the first-stage installation position of each hydraulic cylinder installation section using the first-stage position fixing hole, and the rail is attached to the first-stage installation mechanism. It is preferable to provide a first-stage interval holding block for holding the rail interval at the first-stage interval after being spread at intervals.
In addition, each of the two hydraulic cylinders is attached to the second-stage installation position of each hydraulic cylinder installation section using the second-stage position fixing hole, and the rail is attached to the second-stage installation mechanism. It is preferable that a second-stage interval holding block is provided for holding the rail interval at the second-stage interval after being expanded at intervals.
In addition, two hydraulic cylinders are provided above the hydraulic cylinder installation base so that the two hydraulic cylinders do not rise from the hydraulic cylinder installation portion due to the restoring force of the two rails spread by the two hydraulic cylinders. It is even better if an upright prevention pin insertion hole is provided in which an upright prevention pin is inserted to prevent the uplift.
Further, the scaffolding base has leg portions extending to both sides of the sleeper, and foot portions provided at the tips of the leg portions and fixed to the sleepers, and the foot portions have a rail cross-sectional shape, It is good that the foot can be fixed to sleepers like the rail.
Further, the rail-to-rail expansion method using the rail stretcher according to the present invention is a rail-to-rail expansion method using any of the above-described rail stretchers, and is installed on the hydraulic cylinder installation base between the rails to be widened. The first step of attaching the rail stretcher and attaching the rail to the tip of the chain block suspended from the rail Yamakoshi device, and the rail attached to the rail stretcher using the Yamakoshi device chain block The second step of lifting together with the hydraulic cylinder installation base on which the letcher and its rail stretcher are installed, and the scaffold base is moved under the hydraulic cylinder installation base on which the rail stretcher lifted with the rail is installed, and the foot of the scaffold base The cylinder is fixed to the sleeper and the hydraulic cylinder The third step of fixing the pedestal and after fixing the hydraulic cylinder mounting base to the scaffolding base, each rail is moved one step outward from the inside of the two rails by the rail stretcher installed on the hydraulic cylinder mounting base. The fourth step to widen the distance between the rails by expanding the gauge by one step, and after extending the gauge by moving each rail outward by one level, insert the first-stage spacing holding block into the hydraulic cylinder installation base After the first step interval holding block is inserted into the hydraulic cylinder installation table, the rail stretcher is removed from the hydraulic cylinder installation table, and the removed rail stretcher is moved to the second stage position of the hydraulic cylinder installation table. The 6th step of installation and the rail stretcher installed at the 2nd step position of the hydraulic cylinder installation base, move each rail to the outside to implement the 2nd step movement. In that it has a seventh step of widening the distance between the rails by 2 stages extend gauge with.

本発明に係るレールストレッチャーおよびレール間拡張方法によれば、レールの高さ以上の高さを有し、マクラギに固定されて使用される足場台と、その足場台に着脱可能に固定され、2本のレールの内側からそれぞれ各レールを外側に移動させて軌間を拡張する軌間を拡張する軌間拡張機構部とを有するレールストレッチャーを拡張すべきレール間に挿入して内側からレールの間隔を広げるため、並走する他のレールに悪影響を与えることなく、かつ、大型の重機も使用せずにレールの間隔を広げることができる。   According to the rail stretcher and the rail extension method according to the present invention, the scaffold has a height equal to or higher than the height of the rail, and is used by being fixed to sleepers, and is detachably fixed to the scaffold. A rail stretcher having a gauge extension mechanism for extending the gauge by moving each rail outward from the inside of the two rails is inserted between the rails to be extended, and the distance between the rails is increased from the inside. In order to widen, the space | interval of a rail can be expanded, without having a bad influence on the other rails which run in parallel, and without using a large sized heavy machine.

本発明に係るレールストレッチャーの正面図である。It is a front view of the rail stretcher which concerns on this invention. 本発明に係るレールストレッチャーの平面図である。It is a top view of the rail stretcher which concerns on this invention. 本発明に係るレールストレッチャーを構成する足場台の正面図である。It is a front view of the scaffolding which comprises the rail stretcher which concerns on this invention. 本発明に係るレールストレッチャーを構成する足場台の正面図である。It is a front view of the scaffolding which comprises the rail stretcher which concerns on this invention. 本発明に係るレールストレッチャーを構成する油圧シリンダ設置台の正面図である。It is a front view of the hydraulic cylinder installation base which comprises the rail stretcher which concerns on this invention. 本発明に係るレールストレッチャーを構成する油圧シリンダ設置台の平面図である。It is a top view of the hydraulic cylinder installation base which comprises the rail stretcher which concerns on this invention. 本発明に係るレールストレッチャーを構成する油圧シリンダの正面図である。It is a front view of the hydraulic cylinder which comprises the rail stretcher which concerns on this invention. 本発明に係るレールストレッチャーを構成する油圧シリンダの平面図である。It is a top view of the hydraulic cylinder which comprises the rail stretcher which concerns on this invention. (a),(b)それぞれ本発明に係るレールストレッチャーを構成する1段目間隔保持ブロックの平面図、正面図である。(A), (b) is the top view and front view of the 1st step | paragraph space | interval holding | maintenance block which respectively comprise the rail stretcher which concerns on this invention. (a),(b)それぞれ本発明に係るレールストレッチャーを構成する2段目間隔保持ブロックの平面図、正面図である。(A), (b) is the top view and front view of the 2nd step | paragraph space | interval holding | maintenance block which respectively comprise the rail stretcher which concerns on this invention. 本発明に係るレール間拡張方法の第1工程の作業を示す正面図である。It is a front view which shows the operation | work of the 1st process of the expansion method between rails which concerns on this invention. 第2工程時の油圧シリンダの位置を示す平面図である。It is a top view which shows the position of the hydraulic cylinder at the time of a 2nd process. 本発明に係るレール間拡張方法の第2工程の作業を示す正面図である。It is a front view which shows the operation | work of the 2nd process of the expansion method between rails which concerns on this invention. 本発明に係るレール間拡張方法の第3工程の作業を示す正面図である。It is a front view which shows the operation | work of the 3rd process of the expansion method between rails which concerns on this invention. 本発明に係るレール間拡張方法の第4工程の作業を示す正面図である。It is a front view which shows the operation | work of the 4th process of the expansion method between rails which concerns on this invention. 本発明に係るレール間拡張方法の第5工程の作業を示す正面図である。It is a front view which shows the operation | work of the 5th process of the expansion method between rails which concerns on this invention. 第5工程によりレール間を拡張した状態を示す平面図である。It is a top view which shows the state which expanded between rails by the 5th process. 本発明に係るレール間拡張方法の第6工程の作業を示す正面図である。It is a front view which shows the operation | work of the 6th process of the expansion method between rails which concerns on this invention. 本発明に係るレール間拡張方法の第7工程の作業を示す正面図である。It is a front view which shows the operation | work of the 7th process of the expansion method between rails which concerns on this invention. 本発明に係るレール間拡張方法の第7工程の作業を示す正面図である。It is a front view which shows the operation | work of the 7th process of the expansion method between rails which concerns on this invention. 第7工程によりレール間を2100mm以上拡張した状態を示す平面図である。It is a top view which shows the state which expanded between rails 2100 mm or more by the 7th process. 第7工程によりレール間を2100mm以上拡張したときの拡大平面図である。It is an enlarged plan view when between rails is expanded 2100 mm or more by the 7th process.

以下、本発明に係る実施の形態のレールストレッチャー1について図面を参照しながら具体的に説明する。   Hereinafter, a rail stretcher 1 according to an embodiment of the present invention will be specifically described with reference to the drawings.

本実施形態に係るレールストレッチャー1は、図1〜図3に示すように、レールの間隔を広げるもので、足場台11と、軌間拡張機構部を構成する油圧シリンダ設置台12、2本の油圧シリンダ13,13、および後述の図9に示す1段目間隔保持ブロック14および2段目間隔保持ブロック15と、これらを連結するため後述するように起立防止ピン16や台同士固定ピン17、シリンダ固定ピン18等の各種ピンを備えている。なお、図1および図2に示すレールストレッチャー1では、2本の油圧シリンダ13,13それぞれを油圧シリンダ設置部12R,12Lの後述する2段目位置固定孔12R2,12L2を使用して2段目に固定した状態を示している。   As shown in FIGS. 1 to 3, the rail stretcher 1 according to the present embodiment widens the interval between the rails, and includes a scaffolding base 11, two hydraulic cylinder installation bases 12 that constitute a gauge extension mechanism portion, and two pieces. The hydraulic cylinders 13, 13 and the first-stage interval holding block 14 and the second-stage interval holding block 15 shown in FIG. Various pins such as a cylinder fixing pin 18 are provided. In the rail stretcher 1 shown in FIGS. 1 and 2, each of the two hydraulic cylinders 13 and 13 is arranged in two stages using second stage position fixing holes 12R2 and 12L2 described later of the hydraulic cylinder installation portions 12R and 12L. It shows the state fixed to the eyes.

<足場台の構成>
足場台11は、図3および図4に示すように、レールの高さ以上の高さを有し、マクラギMに固定して使用されるもので、マクラギMの両側まで延びる脚部11a,11aと、その脚部11a,11aを連結する胴部11bと、脚部11a,11aそれぞれの先端に設けられマクラギMに固定される足部11c,11cと、足場台11を移動する際、作業者が掴む把持部11d等を有する。
<Configuration of scaffolding platform>
As shown in FIGS. 3 and 4, the scaffold base 11 has a height equal to or higher than the height of the rail and is used by being fixed to the sleeper M. The legs 11 a and 11 a extend to both sides of the sleeper M. When moving the scaffold 11, the body 11 b connecting the legs 11 a, 11 a, the legs 11 c, 11 c provided at the tips of the legs 11 a, 11 a and fixed to the sleepers M, Has a gripping part 11d and the like.

胴部11bには、図3に示すように油圧シリンダ設置台12を確実に所定位置に位置決めして固定できるように凹部11b1と貫通孔11b2とが設けられている。   As shown in FIG. 3, the body portion 11b is provided with a recess 11b1 and a through hole 11b2 so that the hydraulic cylinder mounting base 12 can be reliably positioned and fixed at a predetermined position.

足部11c,11cは、レールを切断して使用しているため、レールの断面形状を有しており、その足部11c,11cがレールRと同様にマクラギMに固定可能にしている。そのため、足場台11はレールRと同様にマクラギMに固定することが可能になり、足場台11のマクラギMへの固定に何ら新しい部材が必要ではなく、作業が容易である。ただし、足部11c,11cとしてレールRの端切れを使用することは任意であり、マクラギMにボルト等により固定しても良い。   Since the foot portions 11c and 11c are used by cutting the rail, the foot portions 11c and 11c have a cross-sectional shape of the rail, and the foot portions 11c and 11c can be fixed to the sleeper M like the rail R. Therefore, the scaffold base 11 can be fixed to the sleeper M like the rail R, and no new member is required for fixing the scaffold base 11 to the sleeper M, and the work is easy. However, it is arbitrary to use the end of the rail R as the foot portions 11c, 11c, and it may be fixed to the sleeper M with a bolt or the like.

<油圧シリンダ設置台の構成>
油圧シリンダ設置台12は、図1や図2等に示すように足場台11に着脱可能に固定され、2本のレールRの内側からそれぞれ各レールRを外側に移動させて軌間を拡張する2本の油圧シリンダ13,13がそれぞれ後述する2段式で設置される油圧シリンダ設置部12R,12Lを有する。
<Configuration of hydraulic cylinder installation base>
The hydraulic cylinder mounting base 12 is detachably fixed to the scaffold base 11 as shown in FIGS. 1 and 2, etc., and extends between the rails 2 by moving each rail R outward from the inside of the two rails R 2. Each of the hydraulic cylinders 13 and 13 has hydraulic cylinder installation portions 12R and 12L that are installed in a two-stage manner, which will be described later.

油圧シリンダ設置部12R,12Lは、図6に示すように油圧シリンダ設置台12の底板121と、その底板121に所定間隔を開けて立設された上側板122,123,124によって形成されている。つまり、油圧シリンダ設置部12Rは、底板121と上側板122,123によって形成されている。また、油圧シリンダ設置部12Lは、底板121と上側板123,124によって形成されている。なお、底板121の底面には、上側板122,124の幅で、下側板125,126が設けられている。   As shown in FIG. 6, the hydraulic cylinder installation portions 12R and 12L are formed by a bottom plate 121 of the hydraulic cylinder installation base 12 and upper plates 122, 123, and 124 that are erected on the bottom plate 121 at predetermined intervals. . That is, the hydraulic cylinder installation portion 12 </ b> R is formed by the bottom plate 121 and the upper plates 122 and 123. The hydraulic cylinder installation portion 12L is formed by a bottom plate 121 and upper plates 123 and 124. In addition, lower plates 125 and 126 are provided on the bottom surface of the bottom plate 121 with the width of the upper plates 122 and 124.

また、油圧シリンダ設置部12R,12Lを形成する上側板122,123,124には、図5および図6に示すように、それぞれ油圧シリンダ13,13を2段階で設置して、2段階でレールRを押し広げることができるよう、各油圧シリンダ13,13それぞれの基端部13d,13d(図8参照。)を2段階の位置で固定するための1段目位置固定孔12R1,12L1および2段目位置固定孔12R2,12L2が設けられている。その際、シリンダ固定ピン18を使用する。   Further, as shown in FIGS. 5 and 6, hydraulic cylinders 13 and 13 are respectively installed in two stages on the upper plates 122, 123, and 124 forming the hydraulic cylinder installation parts 12R and 12L, and rails are provided in two stages. First stage position fixing holes 12R1, 12L1 and 2 for fixing the base end portions 13d, 13d (see FIG. 8) of the respective hydraulic cylinders 13, 13 at two positions so that R can be expanded. Stage position fixing holes 12R2 and 12L2 are provided. At that time, the cylinder fixing pin 18 is used.

これは、1067mmのレール間隔(軌間)をそのレールRの内側から2100〜2200mm以上広げるためには、1段階(一度)に1067mmから2100〜2200mm以上広げることはピストンを伸長させる通常の油圧シリンダ13では不可能だからである。そのため、本発明では、後述するように2本の油圧シリンダ13,13それぞれを油圧シリンダ設置部12R,12Lの1段目位置固定孔12R1,12L1および2段目位置固定孔12R2,12L2を使用して2段階で設置して、レールR間を2段階で広げることにした。勿論、3段階以上で広げるようにして良いが、その場合にはその分だけ手間がかかることになる。なお、各油圧シリンダ13,13それぞれの基端部13d,13dには、後述する図7や図8でも説明するようにシリンダ固定孔13d1,13d1が設けられている。   This is because, in order to increase the rail interval (gauge) of 1067 mm from the inside of the rail R by 2100 to 2200 mm or more, it is possible to expand the piston by extending the piston from 1067 mm to 2200 to 2200 mm or more in one step (once). It is impossible. Therefore, in the present invention, as will be described later, the two hydraulic cylinders 13 and 13 are respectively connected to the first-stage position fixing holes 12R1 and 12L1 and the second-stage position fixing holes 12R2 and 12L2 of the hydraulic cylinder installation portions 12R and 12L. In two stages, the space between the rails R is expanded in two stages. Of course, it may be expanded in three or more stages, but in that case, it will take time and effort. Cylinder fixing holes 13d1 and 13d1 are provided in the base end portions 13d and 13d of the respective hydraulic cylinders 13 and 13 as will be described later with reference to FIGS.

さらに、油圧シリンダ設置部12R,12Lを形成する上側板122,123,124には、図5および図6に示すように、油圧シリンダ設置部12R,12Lそれぞれに設置した油圧シリンダ13,13が広げたレールRの復元力によって起き上がらないように起立防止ピン16,16(図1等参照。)を挿入するための起立防止ピン挿入孔16a,16aが設けられている。   Further, as shown in FIGS. 5 and 6, the hydraulic cylinders 13 and 13 installed in the hydraulic cylinder installation portions 12R and 12L are expanded on the upper plates 122, 123 and 124 forming the hydraulic cylinder installation portions 12R and 12L, respectively. Standing prevention pin insertion holes 16a and 16a for inserting standing prevention pins 16 and 16 (see FIG. 1 and the like) are provided so as not to get up by the restoring force of the rail R.

また、油圧シリンダ設置部12R,12Lの後端部には、それぞれ図6に示すように、それぞれ、1段目間隔保持ブロック14または2段目間隔保持ブロック15それぞれの一端部14a,15aが固定されるブロック固定孔127a,128aを設けたブロック固定フランジ部127,128が設けられている。   Further, as shown in FIG. 6, one end portions 14a and 15a of the first-stage interval holding block 14 and the second-stage interval holding block 15 are fixed to the rear ends of the hydraulic cylinder installation portions 12R and 12L, respectively. Block fixing flange portions 127 and 128 provided with block fixing holes 127a and 128a are provided.

なお、この油圧シリンダ設置台12の下側板125,126には、図5および図6に示すように、それぞれ、足場台11の胴部11bの凹部11b1,11b1に上方から嵌って位置決めを行う凸部125a,126aと、足場台11の胴部11bの貫通孔11b2,11b2と位置が合致して後述する台同士固定ピン17が挿入される台同士固定ピン挿入孔125b,126bが設けられている。   As shown in FIGS. 5 and 6, the lower plates 125 and 126 of the hydraulic cylinder mounting base 12 are respectively projected from the upper side into the concave portions 11 b 1 and 11 b 1 of the trunk portion 11 b of the scaffold base 11 for positioning. The portions 125a and 126a and the base-fixing pin insertion holes 125b and 126b into which the base-fixing pins 17 described later are inserted with the positions matching the through holes 11b2 and 11b2 of the trunk portion 11b of the scaffold base 11 are provided. .

<油圧シリンダの構成>
2本の油圧シリンダ13は、それぞれ、図7および図8に示すように油圧によってピストン13bを伸縮させるシリンダ13aと、そのピストン13b先端部に取り付けられてレールRを掴むレールキャッチ部13cと、レールキャッチ部13cと反対側となるシリンダ13aの基端部13dには、後述する図7や図8でも説明するようにシリンダ固定孔13d1が設けられている。
<Configuration of hydraulic cylinder>
As shown in FIGS. 7 and 8, each of the two hydraulic cylinders 13 includes a cylinder 13a that expands and contracts the piston 13b by hydraulic pressure, a rail catch portion 13c that is attached to the tip of the piston 13b and grips the rail R, a rail A cylinder fixing hole 13d1 is provided in the base end portion 13d of the cylinder 13a opposite to the catch portion 13c, as will be described later with reference to FIGS.

レールキャッチ部13cは、それぞれ、ピストン13b先端部に取り付けられてレールRを掴むもので、図7および図8に示すように作業者が掴む把持部13c1,13c1と、レールRの頭頂面が当接するローラー13c2,13c2と、レールRの首部(あご部)に当接するほぼコ字状のキャッチ本体部13c3と、キャッチ本体部13c3のレール当接部とは反対側端部に螺合して設けられ進退動する固定ネジ13c4とを備える。   Each of the rail catch portions 13c is attached to the tip of the piston 13b and grips the rail R. As shown in FIGS. 7 and 8, the grip portions 13c1 and 13c1 gripped by the operator and the top surface of the rail R are in contact with each other. The rollers 13c2 and 13c2 that are in contact with each other, the substantially U-shaped catch main body 13c3 that contacts the neck (chin) of the rail R, and the end of the catch main body 13c3 opposite to the rail abutting portion are screwed together. And a fixed screw 13c4 that moves forward and backward.

また、レールキャッチ部13cのキャッチ本体部13c3の反対側には、1段目間隔保持ブロック14または2段目間隔保持ブロック15それぞれの他端部14b,15bが固定されるブロック固定孔13c51を設けたブロック固定フランジ部13c5が設けられている。   Further, a block fixing hole 13c51 for fixing the other end portions 14b and 15b of the first-stage interval holding block 14 or the second-stage interval holding block 15 is provided on the opposite side of the catch body portion 13c3 of the rail catch portion 13c. A block fixing flange portion 13c5 is provided.

<1段目間隔保持ブロック14および2段目間隔保持ブロック15の構成>
図9(a),(b)はそれぞれ1段目間隔保持ブロック14の平面図、正面図である。また、図10(a),(b)はそれぞれ2段目間隔保持ブロック15の平面図、正面図である。
<Configuration of First Stage Interval Holding Block 14 and Second Stage Interval Holding Block 15>
FIGS. 9A and 9B are a plan view and a front view of the first-stage interval holding block 14, respectively. FIGS. 10A and 10B are a plan view and a front view of the second-stage interval holding block 15, respectively.

1段目間隔保持ブロック14は、図9(a),(b)に示すように油圧シリンダ設置台12において2本の油圧シリンダ13それぞれの油圧シリンダ設置部12aR,12aLにおける設置位置を1段目の設置位置に装着して、レールRを1段目の間隔で押し広げた後、各油圧シリンダ13を2段目の設置位置に移動するために各レールRを1段目の間隔で保持するもので、その一端部14aにはブロック固定孔14a1が設けられている一方、他端部14bにはブロック固定孔14b1が設けられている。なお、1段目間隔保持ブロック14の上側面には、作業者がこの1段目間隔保持ブロック14を掴むための把持部14cが取り付けられている。   As shown in FIGS. 9 (a) and 9 (b), the first-stage interval holding block 14 sets the installation positions in the hydraulic cylinder installation portions 12aR and 12aL of the two hydraulic cylinders 13 in the hydraulic cylinder installation base 12 to the first stage. After the rails R are spread at the first stage intervals, the rails R are held at the first stage intervals in order to move the hydraulic cylinders 13 to the second stage installation positions. The one end portion 14a is provided with a block fixing hole 14a1, while the other end portion 14b is provided with a block fixing hole 14b1. On the upper side surface of the first-stage interval holding block 14, a gripping portion 14c for attaching the first-stage interval holding block 14 to the operator is attached.

また、2段目間隔保持ブロック15は、図10(a),(b)に示すように、2本の油圧シリンダ13,13それぞれの油圧シリンダ設置部12R,12Lにおける設置位置を2段目の設置位置に装着して、レールRを2段目の間隔で押し広げた後、そのレール間隔Rを2段目の間隔で保持する2段目間隔保持ブロック15が設けられるもので、その一端部15aにはブロック固定孔15a1が設けられている一方、他端部15bにはブロック固定孔15b1が設けられている。なお、2段目間隔保持ブロック15の上側面には、作業者がこの2段目間隔保持ブロック15を掴むための把持部15cが取り付けられている。   Further, as shown in FIGS. 10 (a) and 10 (b), the second-stage interval holding block 15 sets the installation positions in the hydraulic cylinder installation portions 12R and 12L of the two hydraulic cylinders 13 and 13 to the second stage. A second-stage interval holding block 15 is provided which is mounted at the installation position and extends the rail R at the second-stage interval and then holds the rail interval R at the second-stage interval. A block fixing hole 15a1 is provided in 15a, while a block fixing hole 15b1 is provided in the other end 15b. A gripping portion 15 c for an operator to grip the second-stage interval holding block 15 is attached to the upper side surface of the second-stage interval holding block 15.

<レールストレッチャーを使用したレール間拡張方法>
次に、上述のように構成されたレールストレッチャー1を使用した本発明に係るレール間拡張方法の作業について、図面を参照して説明する。なお、図14以降では、適宜、レール山越器2,2やチェーンブロック3,3等の図示を省略して説明する。
<How to extend between rails using a rail stretcher>
Next, the operation of the inter-rail expansion method according to the present invention using the rail stretcher 1 configured as described above will be described with reference to the drawings. In FIG. 14 and subsequent figures, the illustration of the rail Yamakoshi 2, 2 and the chain blocks 3, 3 will be omitted as appropriate.

(第1工程)
まず、第1工程では、図11に示すように間隔を広げるべきレールR間に油圧シリンダ設置台12に設置した油圧シリンダ13,13それぞれを取り付けると共に、2台のレール山越器2,2それぞれから吊下げたチェーンブロック3,3の先端部のレールチャック部31,31にレールR,Rを取り付ける。
(First step)
First, in the first step, as shown in FIG. 11, the hydraulic cylinders 13 and 13 installed on the hydraulic cylinder installation base 12 are attached between the rails R to be widened, and the two rails Yamakoshi 2 and 2 are respectively attached. The rails R and R are attached to the rail chuck portions 31 and 31 at the tips of the suspended chain blocks 3 and 3.

その際、図12に示すように油圧シリンダ13,13を、それぞれ油圧シリンダ設置台12の油圧シリンダ設置部12R,12Lにおける1段目の位置に設置する。具体的には、油圧シリンダ13,13のレールキャッチ部13cをそれぞれレールR,Rの方向に向けて対応する油圧シリンダ設置部12R,12Lに設置すると共に、各油圧シリンダ13,13それぞれの基端部13d,13dのシリンダ固定孔13d1,13d1と、各油圧シリンダ設置部12R,12Lの1段目位置固定孔12R1,12L1との位置合わせを行ってシリンダ固定ピン18,18を通して、各油圧シリンダ13,13を油圧シリンダ設置部12R,12Lの1段目の位置に設置する。   At that time, as shown in FIG. 12, the hydraulic cylinders 13 and 13 are installed at the first-stage positions in the hydraulic cylinder installation portions 12R and 12L of the hydraulic cylinder installation base 12, respectively. Specifically, the rail catch portions 13c of the hydraulic cylinders 13 and 13 are installed in the corresponding hydraulic cylinder installation portions 12R and 12L in the directions of the rails R and R, respectively, and the base ends of the respective hydraulic cylinders 13 and 13 are provided. The cylinder fixing holes 13d1 and 13d1 of the portions 13d and 13d and the first-stage position fixing holes 12R1 and 12L1 of the hydraulic cylinder installation portions 12R and 12L are aligned and passed through the cylinder fixing pins 18 and 18, respectively. , 13 are installed at the position of the first stage of the hydraulic cylinder installation portions 12R, 12L.

また、油圧シリンダ設置台12の上部に設けた起立防止ピン挿入孔16a,16aにそれぞれ起立防止ピン16を挿入する。これより、内側から押し広げた2本のレールR,Rの復元力によって2本の油圧シリンダ13,13が油圧シリンダ設置部12から起き上がろうとしても、起立防止ピン挿入孔16a,16aそれぞれに挿入された起立防止ピン16によって2本の油圧シリンダ13,13の起き上がりを防止できる。   Further, the upright prevention pins 16 are inserted into the upright prevention pin insertion holes 16a and 16a provided at the upper part of the hydraulic cylinder mounting base 12, respectively. As a result, even if the two hydraulic cylinders 13 and 13 try to rise from the hydraulic cylinder installation portion 12 due to the restoring force of the two rails R and R pushed from the inside, they are inserted into the standing prevention pin insertion holes 16a and 16a, respectively. The rising prevention pins 16 can prevent the two hydraulic cylinders 13 and 13 from rising.

(第2工程)
第2工程では、図13に示すように2台のレール山越器2,2それぞれから吊下げたチェーンブロック3,3を使用してレールR,Rを吊上げる。その際、レールR,Rには圧シリンダ設置台12に設置した油圧シリンダ13,13が固定されているので、レールR,R共に油圧シリンダ13,13が設置された油圧シリンダ設置台12も吊り上げられる。
(Second step)
In the second step, as shown in FIG. 13, the rails R and R are lifted using chain blocks 3 and 3 suspended from two rail Yamakoshi 2 and 2, respectively. At that time, since the hydraulic cylinders 13 and 13 installed on the pressure cylinder installation base 12 are fixed to the rails R and R, the hydraulic cylinder installation base 12 on which the hydraulic cylinders 13 and 13 are installed is also lifted. It is done.

(第3工程)
第3工程では、図13に示すようにレールR,Rと共に吊り上げられた油圧シリンダ13,13が設置された油圧シリンダ設置台12の下に足場台11を移動させ、その足場台11の足場11c,11cをマクラギMに固定すると共に、図14に示すようにその足場台11に油圧シリンダ設置台12を固定する。
(Third step)
In the third step, as shown in FIG. 13, the scaffold base 11 is moved under the hydraulic cylinder installation base 12 on which the hydraulic cylinders 13 and 13 suspended together with the rails R and R are installed, and the scaffold 11 c of the scaffold base 11 is moved. , 11c are fixed to sleepers M, and a hydraulic cylinder mounting base 12 is fixed to the scaffold base 11 as shown in FIG.

(第4工程)
第3工程によって足場台11に油圧シリンダ設置台12を固定した後、第4工程では、油圧シリンダ設置台12の油圧シリンダ設置部12R,12Lの1段目の位置に設置された油圧シリンダ13,13それぞれを動作させて、図15に示すように油圧シリンダ13,13それぞれのシリンダからピストン13bR,13bLを両側に向けて伸長させる。
(4th process)
After fixing the hydraulic cylinder installation base 12 to the scaffold base 11 in the third step, in the fourth step, the hydraulic cylinders 13 installed at the first stage positions of the hydraulic cylinder installation portions 12R, 12L of the hydraulic cylinder installation base 12, 13 is operated, and the pistons 13bR and 13bL are extended from both cylinders of the hydraulic cylinders 13 and 13 toward both sides as shown in FIG.

これにより、図15に示すように2本のレールRの内側からそれぞれ各レールR,Rを外側に1段階だけ移動させて軌間を1段階拡張することによりレールRの間隔を広げることができる。なお、この第4工程によって油圧シリンダ13,13それぞれのピストンを最大限伸長させても、油圧シリンダ13,13は、それぞれ油圧シリンダ設置台12の油圧シリンダ設置部12R,12Lにおける1段目の位置に設置されているため、レールR間の間隔である軌間は、拡張を予定している2100mm以上には達しない。   Accordingly, as shown in FIG. 15, the distance between the rails R can be widened by moving the rails R and R outward by one step from the inside of the two rails R and expanding the gauge by one step. Even if the pistons of the hydraulic cylinders 13 and 13 are extended to the maximum by the fourth step, the hydraulic cylinders 13 and 13 are positioned at the first stage in the hydraulic cylinder installation portions 12R and 12L of the hydraulic cylinder installation base 12, respectively. Therefore, the gap between the rails R does not reach 2100 mm or more which is planned to be expanded.

(第5工程)
第4工程によって油圧シリンダ設置部12R,12Lの1段目の位置に設置した油圧シリンダ13,13によりレールR間の間隔である軌間を拡張した後、次の第5工程では、油圧シリンダ13,13それぞれをそれぞれ油圧シリンダ設置部12R,12Lの2段目の位置に移動して装着し直すため、図16に示すように油圧シリンダ設置台12に1段目間隔保持ブロック14,14(図9(a),(b)参照。)を挿入して固定する。
(5th process)
After expanding the gauge, which is the interval between the rails R, by the hydraulic cylinders 13 and 13 installed at the first stage positions of the hydraulic cylinder installation portions 12R and 12L in the fourth step, in the next fifth step, the hydraulic cylinders 13 and 13 13 are moved to the second-stage positions of the hydraulic cylinder installation portions 12R and 12L, respectively, so that the hydraulic cylinder installation base 12 has the first-stage interval holding blocks 14 and 14 (see FIG. 9). (See (a) and (b).) Insert and fix.

具体的には、図9(a),(b)に示すように1段目間隔保持ブロック14,14それぞれの一端部14a,14aのブロック固定孔14a1,14a1は、図6に示すように油圧シリンダ設置台12の油圧シリンダ設置部12aR,12aLの左右両側に設けたブロック固定フランジ部127,128のブロック固定孔127a,128aと合わせてブロック固定ピン19により連結する。また、1段目間隔保持ブロック14,14の他端部14b,14bのブロック固定孔14b1,14b1は、図7および図8に示すようにレールキャッチ部13c,13cのキャッチ本体部13c3,13c3の反対側のブロック固定フランジ部13c5,13c5のブロック固定孔13c51,13c51と合わせてブロック固定ピン20により連結する。   Specifically, as shown in FIGS. 9A and 9B, the block fixing holes 14a1 and 14a1 of the one end portions 14a and 14a of the first-stage interval holding blocks 14 and 14 are hydraulically connected as shown in FIG. The block fixing pins 19 are connected together with the block fixing holes 127a, 128a of the block fixing flange portions 127, 128 provided on the left and right sides of the hydraulic cylinder installation portions 12aR, 12aL of the cylinder installation base 12. Further, the block fixing holes 14b1 and 14b1 of the other end portions 14b and 14b of the first-stage interval holding blocks 14 and 14 are formed on the catch body portions 13c3 and 13c3 of the rail catch portions 13c and 13c as shown in FIGS. The block fixing pins 20 are connected together with the block fixing holes 13c51 and 13c51 of the block fixing flange portions 13c5 and 13c5 on the opposite side.

なお、図17は、第4工程により2本のレールR,R間を第1段階まで拡張し、かつ、1段目間隔保持ブロック14,14(図9(a),(b)参照。)を挿入した状態を上から見た平面図である。   In FIG. 17, the space between the two rails R and R is expanded to the first stage by the fourth step, and the first-stage interval holding blocks 14 and 14 (see FIGS. 9A and 9B). It is the top view which looked at the state which inserted A from the top.

(第6工程)
第5工程によって油圧シリンダ設置台12の左右にそれぞれ1段目間隔保持ブロック14,14を挿入後、この第6工程では、油圧シリンダ設置台12から油圧シリンダ13,13それぞれを取外して、油圧シリンダ13,13それぞれのピストンをシリンダ内に縮ませた後、図18に示すように取外した油圧シリンダ13,13それぞれを油圧シリンダ設置台12の2段目の位置に設置する。
(6th process)
After inserting the first-stage spacing holding blocks 14 and 14 on the left and right sides of the hydraulic cylinder mounting base 12 in the fifth step, respectively, in this sixth step, the hydraulic cylinders 13 and 13 are removed from the hydraulic cylinder mounting base 12 and the hydraulic cylinders are removed. After the pistons 13 and 13 are contracted into the cylinders, the removed hydraulic cylinders 13 and 13 are installed at the second-stage positions of the hydraulic cylinder installation base 12 as shown in FIG.

具体的には、図2や図5、図6等に示すように各油圧シリンダ13,13のレールキャッチ部13cをそれぞれレールR,Rの方向に向けて対応する油圧シリンダ設置部12R,12Lに設置すると共に、各油圧シリンダ13,13の基端部13d,13dのシリンダ固定孔13d1,13d1と、各油圧シリンダ設置部12R,12Lの2段目位置固定孔12R2,12L2との位置合わせを行ってシリンダ固定ピン18,18を通し、各油圧シリンダ13,13を油圧シリンダ設置部12R,12Lの2段目の位置に設置する。   Specifically, as shown in FIGS. 2, 5, 6, etc., the rail catch portions 13 c of the hydraulic cylinders 13, 13 are directed to the corresponding hydraulic cylinder installation portions 12 R, 12 L in the directions of the rails R, R, respectively. In addition, the cylinder fixing holes 13d1 and 13d1 of the base end portions 13d and 13d of the hydraulic cylinders 13 and 13 are aligned with the second-stage position fixing holes 12R2 and 12L2 of the hydraulic cylinder installation portions 12R and 12L. Then, the cylinder fixing pins 18 and 18 are passed through, and the respective hydraulic cylinders 13 and 13 are installed at the second stage positions of the hydraulic cylinder installation portions 12R and 12L.

(第7工程)
第6工程によって油圧シリンダ設置台12の2段階の位置に設置した後、次の第7工程により油圧シリンダ13,13それぞれを動作させて、図19に示すように油圧シリンダ13,13それぞれのシリンダからピストン13bR,13bLを伸長させる。
(Seventh step)
After the installation at the two-stage position of the hydraulic cylinder mounting base 12 in the sixth step, the hydraulic cylinders 13 and 13 are operated in the next seventh step, so that the respective cylinders of the hydraulic cylinders 13 and 13 are operated as shown in FIG. The pistons 13bR and 13bL are extended.

この第7工程によって、油圧シリンダ設置台12の2段階の位置に設置された油圧シリンダ13,13それぞれによりピストンを最大限伸長させると、油圧シリンダ13,13は、それぞれ油圧シリンダ設置台12の油圧シリンダ設置部12R,12Lにおける2段目の位置に設置されているため、レールR間の間隔である軌間は、拡張を予定している2100mm以上には達することになる。   In this seventh step, when the pistons are extended to the maximum by the hydraulic cylinders 13 and 13 respectively installed at the two-stage positions of the hydraulic cylinder installation base 12, the hydraulic cylinders 13 and 13 are connected to the hydraulic cylinder installation base 12 respectively. Since it is installed at the position of the second stage in the cylinder installation parts 12R, 12L, the distance between the rails R reaches 2100 mm or more which is planned to be expanded.

その後は、図20や、図21、図22に示すように油圧シリンダ設置台12に2段目間隔保持ブロック15,15(図10(a),(b)参照。)を挿入する。   After that, as shown in FIG. 20, FIG. 21, and FIG. 22, the second-stage interval holding blocks 15 and 15 (see FIGS. 10A and 10B) are inserted into the hydraulic cylinder installation base 12.

具体的には、図10(a),(b)に示すように2段目間隔保持ブロック15,15それぞれの一端部15a,15aのブロック固定孔15a1,15a1は、図6に示すように油圧シリンダ設置台12の油圧シリンダ設置部12aR,12aLの左右両側に設けたブロック固定フランジ部127,128のブロック固定孔127a,128aと合わせてブロック固定ピン19により連結する。また、1段目間隔保持ブロック15,15の他端部15b,15bのブロック固定孔15b1,15b1は、図7および図8に示すようにレールキャッチ部13c,13cのキャッチ本体部13c3,13c3の反対側のブロック固定フランジ部13c5,13c5のブロック固定孔13c51,13c51と合わせてブロック固定ピン20により連結する。   Specifically, as shown in FIGS. 10A and 10B, the block fixing holes 15a1 and 15a1 of the one end portions 15a and 15a of the second-stage interval holding blocks 15 and 15 are hydraulic as shown in FIG. The block fixing pins 19 are connected together with the block fixing holes 127a, 128a of the block fixing flange portions 127, 128 provided on the left and right sides of the hydraulic cylinder installation portions 12aR, 12aL of the cylinder installation base 12. Further, the block fixing holes 15b1 and 15b1 of the other end portions 15b and 15b of the first-stage interval holding blocks 15 and 15 are formed on the catch body portions 13c3 and 13c3 of the rail catch portions 13c and 13c as shown in FIGS. The block fixing pins 20 are connected together with the block fixing holes 13c51 and 13c51 of the block fixing flange portions 13c5 and 13c5 on the opposite side.

その結果、1067mmのレール間隔(軌間)を、図21および図22に示すように上述の第1工程〜第7工程を経ることにより、レールRの内側から2100〜2200mm以上に広げることができる。   As a result, the rail distance (gauge) of 1067 mm can be expanded to 2100 to 2200 mm or more from the inside of the rail R through the first to seventh steps as shown in FIGS. 21 and 22.

従って、上述のレールストレッチャー1によれば、レールRの高さ以上の高さを有し、マクラギMに固定されて使用される足場台11と、足場台11に着脱可能に固定され、2本のレールR,Rの内側からそれぞれ各レールR,Rを外側に移動させて軌間を拡張する軌間を拡張する軌間拡張機構部である油圧シリンダ設置台12および油圧シリンダ13を有するため、並走する他のレールに悪影響を与えることなく、かつ、大型の重機を使用せずにレールRの間隔である軌間を広げることができる。   Therefore, according to the rail stretcher 1 described above, it has a height higher than the height of the rail R and is used by being fixed to the sleeper M, and is detachably fixed to the scaffold base 11. Since the rails R and R are moved from the inside of the rails R and R to the outside and the gauges are extended to extend the gauge, the hydraulic cylinder installation base 12 and the hydraulic cylinder 13 are provided. Therefore, it is possible to widen the gap between the rails R without adversely affecting other rails and without using a large heavy machine.

また、レールストレッチャー1は、足場台11と軌間拡張機構部とに分割できる共に、軌間拡張機構部は油圧シリンダ設置台12と油圧シリンダ13とに分割できるため、レールストレッチャー1を分割して保存や運搬を行うことが可能となり、保存スペースが少なくて済むと共に、運搬も楽になり、非常に便利である。   Moreover, since the rail stretcher 1 can be divided into a scaffolding base 11 and a gauge extension mechanism part, and the gauge extension mechanism part can be divided into a hydraulic cylinder installation base 12 and a hydraulic cylinder 13, the rail stretcher 1 is divided. It can be stored and transported, and it requires a small storage space and is easy to transport, which is very convenient.

特に、このレールストレッチャー1では、油圧シリンダ設置台12の2箇所の油圧シリンダ設置部12R,12Lには、それぞれ、2本の油圧シリンダ13,13それぞれの設置位置を2段階でレールR、Rを押し広げることができるように1段目位置固定孔12R1,12L1および2段目位置固定孔12R2,12L2を設けたため、これら1段目位置固定孔12R1,12L1および2段目位置固定孔12R2,12L2を使用して2段階でレールR,Rの間隔を広げることにより、レールR,R間にセットした2本の油圧シリンダ13,13でも1067mmのレール間隔(軌間)をそのレールRの内側から2100〜2200mm以上広げることができる。   In particular, in this rail stretcher 1, the two hydraulic cylinder installation portions 12R and 12L of the hydraulic cylinder installation base 12 are respectively provided with the installation positions of the two hydraulic cylinders 13 and 13 in two stages. Since the first stage position fixing holes 12R1, 12L1 and the second stage position fixing holes 12R2, 12L2 are provided so that the first stage position fixing holes 12R1, 12L1 and the second stage position fixing holes 12R2, 12R2 can be expanded. 12L2 is used to widen the distance between the rails R and R in two stages, so that the two hydraulic cylinders 13 and 13 set between the rails R and R have a rail distance (gauge) of 1067 mm from the inside of the rail R. It can be expanded 2100-2200 mm or more.

また、このレールストレッチャー1では、2本の油圧シリンダ13,13それぞれを1段目位置固定孔12R1,12L1および2段目位置固定孔12R2,12L2を使用してレールR,Rを1段目および2段目の間隔で押し広げた後、そのレール間隔を保持する1段目間隔保持ブロック15および2段目間隔保持ブロック16を設けたため、レール間隔の拡張作業に油圧シリンダ13,13を使用しても安全に作業を行うことができる。   In the rail stretcher 1, the two hydraulic cylinders 13 and 13 are respectively connected to the rails R and R using the first stage position fixing holes 12R1 and 12L1 and the second stage position fixing holes 12R2 and 12L2. Since the first-stage interval holding block 15 and the second-stage interval holding block 16 that hold the rail interval after being expanded at the interval of the second step are provided, the hydraulic cylinders 13 and 13 are used for the operation of extending the rail interval. Even so, you can work safely.

また、このレールストレッチャー1では、油圧シリンダ設置台12の上部に、内側から押し広げた2本のレールR,Rの復元力によって2本の油圧シリンダ13,13が油圧シリンダ設置部12から起き上がらないように、2本の油圧シリンダ13,13の起き上がりを防止する起立防止ピン16が挿入される起立防止ピン挿入孔16a,16aを設けたため、それぞれ起立防止ピン16を挿入することにより、レール間隔の拡張作業に油圧シリンダ13,13を使用しても安全に作業を行うことができる。   Further, in this rail stretcher 1, the two hydraulic cylinders 13, 13 are raised from the hydraulic cylinder installation part 12 by the restoring force of the two rails R, R pushed and spread from the inside on the upper part of the hydraulic cylinder installation base 12. In order to prevent the two hydraulic cylinders 13 and 13 from rising, the standing prevention pin insertion holes 16a and 16a into which the standing prevention pins 16 are inserted are provided. Even if the hydraulic cylinders 13 are used for the expansion work, the work can be performed safely.

また、このレールストレッチャー1では、足場台11の足部11c,11cはレールRの断面形状にしたため、ボルト等を使用しなくてもレールRと同様に簡単にマクラギMに固定できる。   Further, in this rail stretcher 1, since the foot portions 11c, 11c of the scaffold base 11 have the cross-sectional shape of the rail R, the rail stretcher 1 can be easily fixed to the sleeper M similarly to the rail R without using bolts or the like.

また、本実施形態のレール間拡張方法によれば、足場台11と、足場台11に着脱可能に固定して2本のレールR,Rの内側からそれぞれ各レールR,Rを外側に移動させて軌間を拡張する軌間を拡張する油圧シリンダ設置台12および油圧シリンダ13を有するレールストレッチャー1を使用して上述の第1工程〜第7工程を経ることにより並走する他のレールに悪影響を与えることなく、かつ、大型の重機を使用せずにレールRの間隔を1067mmのレール間隔(軌間)を2100〜2200mm以上に広げることができる。   Further, according to the inter-rail expansion method of the present embodiment, the rails R and R are respectively moved from the inside of the two rails R and R to the outside by being fixed to the scaffolding base 11 and the scaffolding base 11 detachably. By using the rail stretcher 1 having the hydraulic cylinder mounting base 12 and the hydraulic cylinder 13 that extend the gauge, the other rails that run in parallel are adversely affected by going through the first to seventh steps. Without giving, and without using a large-sized heavy machine, the space | interval of the rail R can extend the rail space | interval (gauge) of 1067 mm to 2100-2200 mm or more.

その結果、ロングレールと言われる全長の長いレールでもそのレールを切断せずに、並走する他のレールにも悪影響を与えることなく、かつ、大型の重機を使用せずに、レール間にレールストレッチャー1を設置して、例えば1067mmのレール間隔(軌間)を2100〜2200mm以上に広げて、連接軌道等の踏切を交換することが可能になる。   As a result, even a long rail, called a long rail, does not cut the rail, does not adversely affect other rails that run side by side, and does not use large heavy machinery. By installing the stretcher 1, for example, the rail spacing (gauge) of 1067 mm is widened to 2100 to 2200 mm or more, so that it is possible to exchange the crossing such as the connecting track.

なお、上述のレールストレッチャー1では、軌間拡張機構部として2本の油圧シリンダ13,13を使用して説明したが、本発明では、これに限らず、左右両側の端部からそれぞれピストンが伸長するような油圧シリンダがあればその油圧シリンダ1本で済むし、あるいは油圧式でなく機械式の軌間拡張機構部でも勿論良い。   In the rail stretcher 1 described above, the two hydraulic cylinders 13 and 13 are used as the gauge extending mechanism. However, the present invention is not limited to this, and the pistons extend from both ends of the left and right sides. If there is such a hydraulic cylinder, only one hydraulic cylinder is sufficient, or, of course, a mechanical gauge extension mechanism portion may be used instead of a hydraulic type.

1 レールストレッチャー
11 足場台
11a,11a 脚部
11b 胴部
11c,11c 足部
11d 把持部
12 油圧シリンダ設置台(軌間拡張機構部)
12R,12L 油圧シリンダ設置部
12R1,12L1 1段目位置固定孔
12R2,12L2 2段目位置固定孔
127,128 ブロック固定フランジ部
127a,128a ブロック固定孔
13 油圧シリンダ(軌間拡張機構部)
13a シリンダ
13c レールキャッチ部
13c5 ブロック固定フランジ部
13c51 ブロック固定孔
13d 基端部
13d1,13d1 シリンダ固定孔
14 1段目間隔保持ブロック
14a1,14b1 ブロック固定孔
15 2段目間隔保持ブロック
15a1,15b1 ブロック固定孔
16a,16a 起立防止ピン挿入孔
16 起立防止ピン
17 台同士固定ピン
18 シリンダ固定ピン
19,20 ブロック固定ピン
DESCRIPTION OF SYMBOLS 1 Rail stretcher 11 Scaffolding base 11a, 11a Leg part 11b Trunk part 11c, 11c Foot part 11d Holding part 12 Hydraulic cylinder installation stand (gauge expansion mechanism part)
12R, 12L Hydraulic cylinder installation part 12R1, 12L1 First stage position fixing hole 12R2, 12L2 Second stage position fixing hole 127, 128 Block fixing flange part 127a, 128a Block fixing hole 13 Hydraulic cylinder (gauge expansion mechanism part)
13a Cylinder 13c Rail catch part 13c5 Block fixing flange part 13c51 Block fixing hole 13d Base end part 13d1, 13d1 Cylinder fixing hole 14 First stage interval holding block 14a1, 14b1 Block fixing hole 15 Second stage interval holding block 15a1, 15b1 Block fixing Hole 16a, 16a Standing prevention pin insertion hole 16 Standing prevention pin 17 Fixing pins 18 Cylinder fixing pins 19, 20 Block fixing pins

Claims (8)

レールの間隔を広げるレールストレッチャーであって、
レールの高さ以上の高さを有し、マクラギに固定されて使用される足場台と、
その足場台に着脱可能に固定され、2本のレールの内側からそれぞれ各レールを外側に移動させて軌間を拡張する軌間を拡張する軌間拡張機構部と、
を有することを特徴とするレールストレッチャー。
A rail stretcher that increases the spacing between rails,
A scaffolding base having a height equal to or higher than the height of the rails and used fixed to sleepers;
A gauge extension mechanism part that is detachably fixed to the scaffolding base and extends the gauge by moving each rail to the outside from the inside of the two rails, and
A rail stretcher characterized by comprising:
請求項1記載のレールストレッチャーにおいて、
前記軌間拡張機構部は、
油圧により伸縮するピストン先端にレールを掴むレールキャッチ部が設けられた2本の油圧シリンダと、
前記足場台の上部に着脱可能に装着され、前記2本の油圧シリンダのレールキャッチ部をそれぞれ外側に向けて設置する2箇所の油圧シリンダ設置部が設けられた油圧シリンダ設置台と、
を有することを特徴とするレールストレッチャー。
The rail stretcher according to claim 1,
The gauge extending mechanism part is
Two hydraulic cylinders provided with a rail catch portion that grips the rail at the tip of a piston that expands and contracts by hydraulic pressure;
A hydraulic cylinder mounting base that is detachably attached to the upper part of the scaffolding base and is provided with two hydraulic cylinder mounting parts that respectively set the rail catches of the two hydraulic cylinders facing outward;
A rail stretcher characterized by comprising:
請求項2記載のレールストレッチャーにおいて、
前記油圧シリンダ設置台の2箇所の油圧シリンダ設置部には、それぞれ、2本の油圧シリンダそれぞれの設置位置を2段階でレールを押し広げることができるように1段目位置固定孔および2段目位置固定孔が設けられていることを特徴とするレールストレッチャー。
The rail stretcher according to claim 2,
In the two hydraulic cylinder installation parts of the hydraulic cylinder installation base, the first stage position fixing hole and the second stage position fixing hole are provided so that the rails can be expanded in two stages at the installation positions of the two hydraulic cylinders, respectively. A rail stretcher characterized in that a position fixing hole is provided.
請求項3記載のレールストレッチャーにおいて、
前記軌間拡張機構部には、
2本の油圧シリンダそれぞれを前記1段目位置固定孔を利用して各油圧シリンダ設置部の1段目の設置位置に装着し、レールを1段目の間隔で押し広げた後、そのレール間隔を1段目の間隔で保持するための1段目間隔保持ブロックが設けられていることを特徴とするレールストレッチャー。
In the rail stretcher according to claim 3,
In the gauge extension mechanism part,
Each of the two hydraulic cylinders is mounted at the first stage installation position of each hydraulic cylinder installation part using the first stage position fixing hole, and the rails are pushed and spread at the first stage intervals, and then the rail spacing is increased. A rail stretcher characterized in that a first-stage interval holding block is provided to hold the at a first-stage interval.
請求項3記載のレールストレッチャーにおいて、
前記軌間拡張機構部には、
2本の油圧シリンダそれぞれを前記2段目位置固定孔を利用して各油圧シリンダ設置部の2段目の設置位置に装着し、レールを2段目の間隔で押し広げた後、そのレール間隔を2段目の間隔で保持するための2段目間隔保持ブロックが設けられていることを特徴とするレールストレッチャー。
In the rail stretcher according to claim 3,
In the gauge extension mechanism part,
Each of the two hydraulic cylinders is mounted at the second stage installation position of each hydraulic cylinder installation part using the second stage position fixing hole, and the rails are pushed and spread at the second stage intervals. A rail stretcher characterized in that a second-stage interval holding block is provided to hold the at a second-stage interval.
請求項2〜請求項5のいずれか一の請求項に記載のレールストレッチャーにおいて、
油圧シリンダ設置台の上部には、2本の油圧シリンダそれぞれによって押し広げた2本のレールの復元力によって2本の油圧シリンダが油圧シリンダ設置部から起き上がらないように、2本の油圧シリンダの起き上がりを防止する起立防止ピンが挿入される起立防止ピン挿入孔が設けられていることを特徴とするレールストレッチャー。
In the rail stretcher according to any one of claims 2 to 5,
In the upper part of the hydraulic cylinder mounting base, the two hydraulic cylinders rise up so that the two hydraulic cylinders do not rise from the hydraulic cylinder installation part due to the restoring force of the two rails pushed and spread by each of the two hydraulic cylinders A rail stretcher characterized in that an upright prevention pin insertion hole into which an upright prevention pin is inserted is provided.
請求項1〜請求項6のいずれか一の請求項に記載のレールストレッチャーにおいて、
足場台は、
マクラギの両側まで延びる脚部と、
脚部それぞれの先端に設けられマクラギに固定される足部とを有し、
その足部は、レールの断面形状を有しており、その足部がレールと同様にマクラギに固定可能であることを特徴とするレールストレッチャー。
In the rail stretcher according to any one of claims 1 to 6,
Scaffolding stand
Legs extending to both sides of the sleeper;
A leg portion provided at the tip of each leg portion and fixed to a sleeper;
The leg stretcher has a rail cross-sectional shape, and the leg can be fixed to sleepers like the rail.
請求項4〜請求項7のいずれか一の請求項に記載のレールストレッチャーを使用したレール間拡張方法であって、
間隔を広げるべきレール間に油圧シリンダ設置台に設置したレールストレッチャーを取り付けると共に、レール山越器から吊下げたチェーンブロックの先端部にレールを取り付ける第1工程と、
レールストレッチャーを取り付けたレールを、山越器のチェーンブロックを使用してそのレールストレッチャーおよびそのレールストレッチャーが設置された油圧シリンダ設置台と共に吊り上げる第2工程と、
レールと共に吊り上げたレールストレッチャーが設置された油圧シリンダ設置台の下に足場台を移動させ、その足場台の足部をマクラギに固定すると共に、その足場台に油圧シリンダ設置台を固定する第3工程と、
足場台に油圧シリンダ設置台を固定した後、油圧シリンダ設置台に設置されたレールストレッチャーによって2本のレールの内側からそれぞれ各レールを外側に1段階だけ移動させて軌間を1段階拡張することによりレールの間隔を広げる第4工程と、
各レールを外側に1段階だけ移動させて軌間を拡張した後、油圧シリンダ設置台に1段目間隔保持ブロックを挿入する第5工程と、
油圧シリンダ設置台に1段目間隔保持ブロックを挿入後、油圧シリンダ設置台からレールストレッチャーを取外して、取外したレールストレッチャーを油圧シリンダ設置台の2段目の位置に設置する第6工程と、
油圧シリンダ設置台の2段目の位置に設置されたレールストレッチャーにより各レールを外側に2段階目の移動を実行して軌間を2段階拡張することによりレールの間隔を広げる第7工程と、
を有することを特徴とするレール間拡張方法。
A rail-to-rail expansion method using the rail stretcher according to any one of claims 4 to 7,
A first step of attaching a rail stretcher installed on the hydraulic cylinder installation base between the rails to be widened and attaching a rail to the tip of the chain block suspended from the rail Yamakoshi device;
A second step of lifting the rail attached with the rail stretcher together with the rail stretcher and the hydraulic cylinder mounting base on which the rail stretcher is installed using the Yamakoshi device chain block;
The scaffolding base is moved under the hydraulic cylinder mounting base on which the rail stretcher lifted together with the rail is installed, and the foot of the scaffolding base is fixed to the sleeper, and the hydraulic cylinder mounting base is fixed to the scaffolding base. Process,
After fixing the hydraulic cylinder installation base to the scaffolding base, the rail stretcher installed on the hydraulic cylinder installation base moves each rail one step outward from the inside of the two rails to expand the space between the rails by one step. A fourth step of widening the rail spacing by
A fifth step of inserting the first-stage spacing holding block into the hydraulic cylinder mounting base after extending the rail by moving each rail outward one step;
A sixth step of inserting the first-stage spacing holding block into the hydraulic cylinder installation base, removing the rail stretcher from the hydraulic cylinder installation base, and installing the removed rail stretcher at the second stage position of the hydraulic cylinder installation base; ,
A seventh step of expanding the distance between the rails by executing a second stage movement of each rail to the outside by a rail stretcher installed at the second stage position of the hydraulic cylinder mounting base and expanding the gap between the two stages;
A rail-to-rail expansion method characterized by comprising:
JP2013055041A 2013-03-18 2013-03-18 Rail stretcher and rail extension method Active JP6076783B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2013055041A JP6076783B2 (en) 2013-03-18 2013-03-18 Rail stretcher and rail extension method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2013055041A JP6076783B2 (en) 2013-03-18 2013-03-18 Rail stretcher and rail extension method

Publications (2)

Publication Number Publication Date
JP2014181449A JP2014181449A (en) 2014-09-29
JP6076783B2 true JP6076783B2 (en) 2017-02-08

Family

ID=51700440

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2013055041A Active JP6076783B2 (en) 2013-03-18 2013-03-18 Rail stretcher and rail extension method

Country Status (1)

Country Link
JP (1) JP6076783B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2023075582A (en) * 2021-11-19 2023-05-31 大鉄工業株式会社 Gauge adjustment device and gauge adjustment method

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES2691145B2 (en) * 2017-05-23 2020-04-08 Univ Madrid Carlos Iii Unmanned railway vehicle, system and procedure for the inspection of railway infrastructure and superstructure.
RU2700242C1 (en) * 2018-12-19 2019-09-13 Открытое Акционерное Общество "Российские Железные Дороги" Railway track rail fastening re-laying device

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4813003B1 (en) * 1969-09-02 1973-04-25
JPS5121483B2 (en) * 1971-08-23 1976-07-02
JPH0328403A (en) * 1989-06-27 1991-02-06 Koshin Kensetsu Kk Gauge correcting apparatus for concrete track
JP2007255131A (en) * 2006-03-24 2007-10-04 Futaba Tetsudo Kogyo Kk Rail replacing device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2023075582A (en) * 2021-11-19 2023-05-31 大鉄工業株式会社 Gauge adjustment device and gauge adjustment method
JP7545946B2 (en) 2021-11-19 2024-09-05 大鉄工業株式会社 Gauge adjustment device and gauge adjustment method

Also Published As

Publication number Publication date
JP2014181449A (en) 2014-09-29

Similar Documents

Publication Publication Date Title
JP6076783B2 (en) Rail stretcher and rail extension method
US10023446B2 (en) Transformable table
CN107263409A (en) A kind of longitudinal beam of automobile frame clamps support platform
US20170268382A1 (en) Device for installing and removing a component on a gas turbine
KR101066577B1 (en) Support device for disassembling and assembling large impeller
KR20180058742A (en) Systems for the rapid engagement and disengagement of orbital units to orbital machines, especially chassis of pipe-laying track machines
JP2013213351A (en) Construction method of steel frame structure, and fixing member of steel frame structure
KR101591497B1 (en) Bracket jig for installing hoist-crane wheel and manufacturing hoist-crane method
KR20100011048A (en) Hook for lifting of h-beam
US8833574B2 (en) Gantry with suspending links
JP2019078114A (en) Fall preventing device of scaffold, and moving method of fall preventing device of scaffold
JP3192308U (en) Guide device for supporting pile driving
JP6663726B2 (en) Hanging bracket for hanging scaffold
KR101284190B1 (en) Joint apparatus for form
KR20140128073A (en) Apparatus and Method for Adjusting Hull Block
KR200449262Y1 (en) End Connections for Rails for Automatic Transport
JP3223401U (en) Portable derailment recovery device
JP2016020623A (en) Scaffolding connector and large assembly method and large paying method using the same
JP5281971B2 (en) Gap cover for temporary scaffold
JP6694774B2 (en) Scaffolding for scaffolding
JP6639301B2 (en) Turnout rail spacing material and mounting / detaching work tools
JP6183406B2 (en) Crawler type vehicle
JP6902985B2 (en) Orbital traveling machine
JP7439332B1 (en) Girder construction method and girder erection method
JP2016156159A (en) Simple steps for replacement of temporary scaffolding etc.

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20160107

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20161118

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20161220

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20170111

R150 Certificate of patent or registration of utility model

Ref document number: 6076783

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250