Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP6083702B2 - PC steel connection method and bridge widening method - Google Patents
[go: Go Back, main page]

JP6083702B2 - PC steel connection method and bridge widening method - Google Patents

PC steel connection method and bridge widening method Download PDF

Info

Publication number
JP6083702B2
JP6083702B2 JP2013019315A JP2013019315A JP6083702B2 JP 6083702 B2 JP6083702 B2 JP 6083702B2 JP 2013019315 A JP2013019315 A JP 2013019315A JP 2013019315 A JP2013019315 A JP 2013019315A JP 6083702 B2 JP6083702 B2 JP 6083702B2
Authority
JP
Japan
Prior art keywords
existing
steel material
steel
girder
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2013019315A
Other languages
Japanese (ja)
Other versions
JP2014148870A (en
Inventor
藤原 保久
保久 藤原
安藤 直文
直文 安藤
浅井 洋
洋 浅井
裕司 熊谷
裕司 熊谷
山田 眞人
眞人 山田
康弘 星野
康弘 星野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sumitomo SEI Steel Wire Corp
Sumitomo Mitsui Construction Co Ltd
Original Assignee
Sumitomo SEI Steel Wire Corp
Sumitomo Mitsui Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sumitomo SEI Steel Wire Corp, Sumitomo Mitsui Construction Co Ltd filed Critical Sumitomo SEI Steel Wire Corp
Priority to JP2013019315A priority Critical patent/JP6083702B2/en
Publication of JP2014148870A publication Critical patent/JP2014148870A/en
Application granted granted Critical
Publication of JP6083702B2 publication Critical patent/JP6083702B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Description

本発明は、既設のコンクリート部材内で緊張力が既に導入されている既設のPC鋼材と、既設のコンクリート部材と連続するように新設されるコンクリート部材に配置される新設のPC鋼材とを接続するPC鋼材の接続方法、この接続方法を用いた橋梁の拡幅方法に関するものである。   The present invention connects an existing PC steel material in which tension is already introduced in an existing concrete member, and a new PC steel material arranged on a newly installed concrete member so as to be continuous with the existing concrete member. The present invention relates to a PC steel material connection method and a bridge widening method using this connection method.

コンクリート部材内に緊張材であるPC鋼材を配置し、引張力を導入した状態で該コンクリート部材に定着してプレストレスを導入した構造物が広く用いられている。上記PC鋼材の多くは、コンクリート部材内に埋め込まれたシース内に挿通され、引張力を導入した後にグラウトを施して硬化したグラウトの付着力によってコンクリート部材と一体とされている。   2. Description of the Related Art Structures in which a PC steel material, which is a tension material, is arranged in a concrete member and prestressed by being fixed to the concrete member in a state where a tensile force is introduced are widely used. Most of the above-mentioned PC steel materials are inserted into a sheath embedded in a concrete member, and are integrated with the concrete member by the adhesion force of the grout that is hardened by applying a grout after introducing a tensile force.

このようなPC鋼材によってプレストレスが導入された構造物例えば橋桁の改修や補修、又は橋桁の拡幅等が必要となる場合がある。このような場合には既設のコンクリート部材に連続するように新たなコンクリートを打設し、一体となるようにプレストレスを導入することが望まれる。このためには、既存のコンクリート部材に配置されているPC鋼材に新設するコンクリート部材内に配置するPC鋼材を接続し、既設のコンクリート部材から新設するコンクリート部材に連続するように引張力を導入するのが望ましい。   A structure in which prestress is introduced by such a PC steel material, for example, repair or repair of a bridge girder or widening of a bridge girder may be required. In such a case, it is desired to place new concrete so as to be continuous with the existing concrete member and to introduce prestress so as to be integrated. For this purpose, the PC steel material to be placed in the newly installed concrete member is connected to the PC steel material that has been placed on the existing concrete member, and a tensile force is introduced so as to continue from the existing concrete member to the newly installed concrete member. Is desirable.

しかし、既存のコンクリート部材内に配置されているPC鋼材は、端部が定着具によってコンクリート部材に定着されており、定着具の背面側では、PC鋼材が短く切断されていることが多い。これは定着具及びPC鋼材の端部をコンクリート内に埋め込んで腐食を防止するための処置として広く行われている。このため、PC鋼材の定着端をコンクリート部材内からはつりだしたとしても、このPC鋼材に、新たなPC鋼材を接続することは難しい。また、定着具を取り外すことも、大きな引張力が導入されている状態ではできない。   However, the end of the PC steel material disposed in the existing concrete member is fixed to the concrete member by a fixing tool, and the PC steel material is often cut short on the back side of the fixing tool. This is widely used as a measure for embedding the fixing tool and the end of the PC steel material in the concrete to prevent corrosion. For this reason, even if the fixing end of the PC steel material is lifted from the concrete member, it is difficult to connect a new PC steel material to the PC steel material. Also, the fixing device cannot be removed in a state where a large tensile force is introduced.

一方、特許文献1には、既設のコンクリート部材に削孔を施し、この孔に挿入してグラウトを注入することによって定着されたPC鋼材に新たなコンクリート部材に配置するPC鋼材を接続してプレストレスを導入する方法が記載されている。
しかし、このように既存のコンクリート部材に多くの削孔を行ってPC鋼材を定着した場合には、既設のコンクリート部材と新たに打設するコンクリート部材との接合部付近で複雑な応力が発生し、構造上の弱点となる可能性がある。また、既存のコンクリート部材に多くの削孔を行うことは既存のコンクリート部材の耐力を劣化させる虞がある。
On the other hand, in Patent Literature 1, a PC steel material to be placed on a new concrete member is connected to a PC steel material fixed by drilling a hole in an existing concrete member, and inserting the grout into the hole and injecting grout. A method for introducing stress is described.
However, when many holes are drilled in the existing concrete member and the PC steel material is fixed in this way, complex stress is generated near the joint between the existing concrete member and the newly placed concrete member. May be a structural weakness. Moreover, if many holes are drilled in an existing concrete member, the proof stress of the existing concrete member may be deteriorated.

特開2007−063796号公報JP 2007-063796 A

本発明は、このような事情に鑑みてなされたものであり、その目的は、既存のコンクリート部材内に配置され、緊張力が既に導入されている既設のPC鋼材と、既存のコンクリート部材と連続するように新設されるコンクリート部材に配置される新設のPC鋼材とを接続するPC鋼材の接続方法、及びこのPC鋼材の接続方法を用いた橋梁の拡幅方法を提供することである。   This invention is made | formed in view of such a situation, The objective is arrange | positioned in the existing concrete member, and the existing PC steel material in which the tension | tensile_strength has already been introduced, and an existing concrete member are continuous. It is providing the connection method of PC steel materials which connects the newly installed PC steel materials arrange | positioned to the concrete member newly installed, and the widening method of a bridge using this PC steel material connection method.

上記課題を解決するために、請求項1に係る発明は、 緊張力が導入された状態で既設のコンクリート部材に定着され、周面に付着力が作用してコンクリートと一体となっている既設のPC鋼材と、新設のコンクリート部材内に配置されて引張力が導入される新設のPC鋼材とを、引張力が伝達されるように接続するPC鋼材の接続方法であって、 前記既設のPC鋼材の前記新設のPC鋼材と接続される側の端部に設けられた定着具を除去するとともに、前記既設のコンクリート部材内に埋設されている端部をはつり出して該既設のコンクリート部材から突出させる工程と、 円筒状となった外周部に雄ねじが形成され、中空孔内に前記既設のPC鋼材が挿通される雌コーンと、前記雌コーンの外周部に形成された前記雄ねじに螺合された定着ナットと、前記雌コーンの中空孔の内周面と該中空孔に挿通された前記既設のPC鋼材の外周面との間に押し入れられて前記既設のPC鋼材と前記雌コーンとを固定する雄コーンと、前記定着ナットに当接されて前記既設のPC鋼材の引張力を前記既設のコンクリート部材に伝達する支圧板と、を備える定着具を前記既設のPC鋼材の突出した部分に取り付ける工程と、 前記支圧板と前記既設のコンクリート部材との間にコンクリート又はモルタルを充填して前記既設のPC鋼材の引張力を前記既設のコンクリート部材に伝達することを可能とする工程と、 前記雌コーンの外周部に形成された雄ねじに引張用部材を螺合して該引張用部材を前記既設のPC鋼材の軸線方向に引張し、該引張用部材を引張した状態で前記定着ナットを前記支圧板に密着するように締め付ける工程と、 前記既設のPC鋼材と前記新設のPC鋼材とを接続するためのカプラーの一方の端部に形成された第1の雌ねじを前記雌コーンの外周部に形成された雄ねじと螺合し、該カプラーの他方の端部に形成された第2の雌ねじを介して前記新設のPC鋼材の一方の端部と接続する工程と、を含むPC鋼材の接続方法を提供する。   In order to solve the above-mentioned problem, the invention according to claim 1 is an example in which an existing concrete member is fixed to an existing concrete member in a state in which a tension force is introduced, and an adhesive force acts on a peripheral surface to be integrated with the concrete. A PC steel material connecting method for connecting a PC steel material and a new PC steel material that is arranged in a newly installed concrete member to introduce a tensile force so that the tensile force is transmitted, the existing PC steel material The fixing tool provided at the end connected to the newly installed PC steel material is removed, and the end embedded in the existing concrete member is protruded and protruded from the existing concrete member. A male screw is formed on the outer periphery of the cylindrical shape, the female cone into which the existing PC steel material is inserted into the hollow hole, and the male screw formed on the outer periphery of the female cone. Constant A male which is pressed between a nut and an inner peripheral surface of a hollow hole of the female cone and an outer peripheral surface of the existing PC steel material inserted through the hollow hole to fix the existing PC steel material and the female cone. Attaching a fixing tool comprising a cone and a support plate that contacts the fixing nut and transmits a tensile force of the existing PC steel material to the existing concrete member; A step of filling concrete or mortar between the bearing plate and the existing concrete member to transmit the tensile force of the existing PC steel material to the existing concrete member; A tension member is screwed into a male screw formed on the outer periphery, the tension member is pulled in the axial direction of the existing PC steel material, and the fixing nut is supported in a state where the tension member is pulled. A step of tightening so as to be in close contact with the plate, and a first female screw formed at one end of a coupler for connecting the existing PC steel material and the new PC steel material is formed on the outer peripheral portion of the female cone A method of connecting a PC steel material, the method comprising: connecting to one end portion of the newly installed PC steel material via a second female screw formed on the other end portion of the coupler. provide.

このPC鋼材の接続方法では、既設のコンクリート部材内に配置されているPC鋼材の端部を、コンクリート部材をはつることによって露出させ、定着具を除去するものであるが、一般にPC鋼材がグラウト等の付着力によってコンクリート部材と一体となっていると、定着具を除去しても、PC鋼材の長さ方向におけるほとんどの領域で緊張力が維持され、コンクリート部材のプレストレスも維持される。しかし、この状態ではPC鋼材の周面に作用する付着力によって引張力がコンクリート部材に伝達されており、コンクリート部材の振動等によって徐々に付着力が失われることがあり、コンクリート部材に導入されているプレストレスが減少する虞がある。これに対して、本発明の接続方法では、既設のコンクリートをはつることによって露出したPC鋼材に定着具を取り付け、引張した状態で既設のコンクリート部材に定着することによってプレスレスの低減を抑止することができる。このとき、PC鋼材の定着にくさびとして機能する雄コーンを用いることによって鋼棒、鋼線、鋼より線等の様々なPC鋼材に対しても定着することができる。   In this PC steel connection method, the end of the PC steel disposed in the existing concrete member is exposed by holding the concrete member to remove the fixing tool. Generally, the PC steel is grouted. When the fixing member is removed, the tension force is maintained in most regions in the length direction of the PC steel material, and the prestress of the concrete member is also maintained. However, in this state, the tensile force is transmitted to the concrete member due to the adhesive force acting on the peripheral surface of the PC steel material, and the adhesive force may be gradually lost due to the vibration of the concrete member, etc. There is a risk that the prestress is reduced. On the other hand, in the connection method of the present invention, a fixing tool is attached to the PC steel material exposed by holding the existing concrete, and the press concrete is suppressed by fixing to the existing concrete member in a tensioned state. be able to. At this time, by using a male cone that functions as a wedge for fixing the PC steel material, it can be fixed to various PC steel materials such as a steel bar, a steel wire, and a steel stranded wire.

くさびを用いた定着では、PC鋼材を把持して引張および定着を行うと、くさびとして機能する雄コーンと雌コーンとの間及び雄コーンとPC鋼材との間で滑りが生じて、定着時における引張力の損失が起こる。これに対して、本発明の方法では、雌コーンを把持して引張し、この雌コーンに螺合されたナットを支圧板に締め付けることにより、定着時の損失がほとんど生じないものすることができる。
そして、上記雌コーンに装着したカプラーを介して新設するコンクリート部材に配置するPC鋼材を接続することにより、既設のコンクリート部材から新設のコンクリート部材に連続するように配置されたPC鋼材によってプレストレス導入することが可能となる。
In fixing using a wedge, when a PC steel material is gripped and pulled and fixed, slipping occurs between a male cone and a female cone that function as a wedge and between a male cone and a PC steel material. Loss of tensile force occurs. On the other hand, according to the method of the present invention, the female cone is gripped and pulled, and a nut screwed to the female cone is fastened to the bearing plate, so that almost no loss during fixing can be caused. .
And, by connecting the PC steel material to the newly installed concrete member via the coupler attached to the female cone, pre-stress is introduced by the PC steel material arranged so as to continue from the existing concrete member to the newly installed concrete member. It becomes possible to do.

請求項2に係る発明は、 コンクリートからなる既設の桁に沿って新設の桁を増設し、既設の桁に配置され周面に付着力が作用してコンクリートと一体となっている横方向の既設のPC鋼材に、新設の桁に配置する新設のPC鋼材を接続し、引張力を導入して新設の桁を既設の桁と一体とする橋梁の拡幅方法であって、 前記既設のPC鋼材の前記新設のPC鋼材と接続される側の端部に設けられた定着具を除去するとともに、前記既設の桁内に埋設されている端部をはつり出して該既設の桁から突出させる工程と、 円筒状となった外周部に雄ねじが形成され、中空孔内に前記既設のPC鋼材が挿通される雌コーンと、前記雌コーンの外周部に形成された前記雄ねじに螺合された定着ナットと、前記雌コーンの中空孔の内周面と該中空孔に挿通された前記既設のPC鋼材の外周面との間に押し入れられて前記既設のPC鋼材と前記雌コーンとを固定する雄コーンと、前記定着ナットに当接されて前記既設のPC鋼材の引張力を前記既設のコンクリート部材に伝達する支圧板と、を備える定着具を前記既設のPC鋼材の突出した部分に取り付ける工程と、 前記支圧板と前記既設の桁との間にコンクリート又はモルタルを充填して前記既設のPC鋼材の引張力を前記既設の桁に伝達することを可能とする工程と、 前記雌コーンの外周部に形成された雄ねじに引張用部材を螺合して該引張用部材を前記既設のPC鋼材の軸線方向に引張し、該引張用部材を引張した状態で前記定着ナットを前記支圧板に密着するように締め付ける工程と、 前記既設のPC鋼材と前記新設のPC鋼材とを接続するためのカプラーの一方の端部に形成された第1の雌ねじを前記雌コーンの外周部に形成された雄ねじと螺合し、該カプラーの他方の端部に形成された第2の雌ねじを介して前記新設のPC鋼材の一方の端部と接続する工程と、 前記新設の桁を形成する領域又は予め形成された新設の桁と前記既設の桁との間にコンクリートを打設し、該コンクリートの硬化後、前記新設のPC鋼材を引張して前記新設の桁に定着する橋梁の拡幅方法を提供するものである。   The invention according to claim 2 includes a newly installed girder along an existing girder made of concrete, and is installed in the existing girder in a lateral direction which is arranged on the existing girder and has an adhesive force acting on the peripheral surface. A method of widening a bridge by connecting a new PC steel material to be installed in a newly installed girder to a new PC girder and introducing a tensile force to integrate the new girder with the existing girder, Removing the fixing tool provided at the end on the side connected to the new PC steel material, and protruding the end embedded in the existing girder to project from the existing girder; A male cone is formed on the outer periphery of the cylindrical shape, and the existing PC steel material is inserted into the hollow hole, and a fixing nut screwed into the male screw formed on the outer periphery of the female cone; , And insert into the inner peripheral surface of the hollow hole of the female cone A male cone for fixing the existing PC steel material and the female cone to be pressed between the outer peripheral surface of the existing PC steel material, and a tensile force of the existing PC steel material in contact with the fixing nut A fixing plate comprising: a supporting plate that transmits the pressure plate to the existing concrete member; and a step of attaching the fixing tool to a protruding portion of the existing PC steel material, and filling concrete or mortar between the supporting plate and the existing beam. A step of transmitting the tensile force of the existing PC steel material to the existing beam, and a tension member is screwed onto a male screw formed on the outer peripheral portion of the female cone. Pulling in the axial direction of the existing PC steel material, and tightening the fixing nut so as to be in close contact with the bearing plate in a state where the tension member is pulled, and the existing PC steel material and the newly installed PC steel material, A first female screw formed on one end of a coupler to be connected is screwed with a male screw formed on the outer peripheral portion of the female cone, and a second female screw formed on the other end of the coupler A step of connecting to one end of the newly installed PC steel material via, and placing concrete between a region for forming the newly installed girder or a previously formed newly installed girder and the existing girder, The present invention provides a method for widening a bridge in which after the concrete is hardened, the new PC steel is pulled and fixed on the new girder.

この橋梁の拡幅方法では、請求項1に係る接続方法と同様に、既設の橋桁に配置されているPC鋼材の端部を、橋桁のコンクリートをはつることによって露出させ、橋桁に導入されているプレストレスを維持した状態で定着具を取り付けることができる。そして、PC鋼材の定着にくさびとして機能する雄コーンを用いることによって既設の橋桁に使用されているPC鋼材が鋼棒、鋼線、鋼より線等のいずれであって定着することができる。また、くさびを用いた定着具を使用するものであるが、雌コーンを把持して引張し、この雌コーンに螺合されたナットを支圧板に締め付けることにより、定着時の損失がほとんど生じないものすることができ、既設の橋桁のプレスレスの低減を抑止することができる。そして、上記雌コーンに装着したカプラーを介して新設部分の橋桁に配置するPC鋼材を接続し、引張力を導入することにより、新設の橋桁にプレストレスを導入するともに既設の橋桁と新設の橋桁とを締め付け、一体となった橋桁とすることができる。   In this bridge widening method, as in the connection method according to claim 1, the end of the PC steel material arranged on the existing bridge girder is exposed by sanding the concrete of the bridge girder and introduced into the bridge girder. The fixing device can be attached while maintaining the prestress. By using the male cone that functions as a wedge for fixing the PC steel material, the PC steel material used for the existing bridge girder can be fixed as any of a steel bar, a steel wire, a steel strand, and the like. In addition, a fixing device using a wedge is used, but by holding and pulling a female cone and tightening a nut screwed to the female cone on a bearing plate, there is almost no loss during fixing. Can reduce the pressless reduction of existing bridge girders. And, by connecting the PC steel material to be installed on the bridge girder of the newly installed part via the coupler attached to the female cone and introducing the tensile force, pre-stress is introduced to the newly installed bridge girder and the existing bridge girder and the newly installed bridge girder are introduced. And can be made into an integrated bridge girder.

なお、上記PC鋼材の接続方法及び橋梁の拡幅方法で用いることができるPC鋼材の接続具では、雌コーンの外周面に形成された雄ねじを利用してPC鋼材に引張力を導入し、この雄ねじに螺合された定着ナットを支圧板に締め付けることにより、定着時における定着具の雄コーンと雌コーンとの間のすべり、雄コーンとPC鋼材との間のすべりによる引張力の損失を防止することができる。また、雌コーンの外周面に形成された雄ねじにカプラーの一端を螺合し、このカプラーの他端に形成されている雌ねじの径を調整することにより、径の異なる鋼棒、外周面に雄ねじを有する定着部材が端部に装着された鋼より線等と接続することが可能となる。 Incidentally, in the PC steel connector that can be used in the PC steel connection method and the bridge widening method, a tensile force is introduced into the PC steel using a male screw formed on the outer peripheral surface of the female cone. By tightening the fixing nut screwed into the bearing plate, it is possible to prevent the loss of tensile force due to the sliding between the male cone and the female cone of the fixing tool and the sliding between the male cone and the PC steel during fixing. be able to. In addition, one end of the coupler is screwed to the male screw formed on the outer peripheral surface of the female cone, and the diameter of the female screw formed on the other end of the coupler is adjusted, so that the male screw on the outer peripheral surface has a different diameter. It becomes possible to connect the fixing member having a wire to a steel strand or the like attached to the end.

以上説明したように、本発明のPC鋼材の接続方法及び橋梁の拡幅方法では、既に構築されたコンクリート部材に導入されているプレストレスを維持したまま、既設のコンクリート部材に配置されている既設のPC鋼材と、新しく構築されるコンクリート部材に配置される新設のPC鋼材とを接続することができる。そして、新設のコンクリート部材にプレストレスを導入するともに既設のコンクリート部材と新設のコンクリート部材とを締め付けて一体となった構造とすることができる。   As described above, in the method for connecting PC steel materials and the method for widening a bridge according to the present invention, an existing concrete member disposed on an existing concrete member is maintained while maintaining the prestress introduced to the already constructed concrete member. It is possible to connect the PC steel material and the newly installed PC steel material arranged on the newly constructed concrete member. In addition, prestress is introduced into the new concrete member, and the existing concrete member and the new concrete member are tightened to form an integrated structure.

本発明のPC鋼材の接続方法又は橋梁の拡幅方法で用いることができるPC鋼材の接続具を示す概略断面図である。 It is a schematic sectional drawing which shows the connection tool of PC steel materials which can be used with the connection method of PC steel materials of this invention, or the widening method of a bridge . 本発明の一実施形態であるPC鋼材の接続方法を説明するための概略断面図である。It is a schematic sectional drawing for demonstrating the connection method of PC steel materials which is one Embodiment of this invention. 本発明の一実施形態であるPC鋼材の接続方法を説明するための概略断面図であるIt is a schematic sectional drawing for demonstrating the connection method of PC steel materials which is one Embodiment of this invention. 本発明の一実施形態であるPC鋼材の接続方法を説明するための概略断面図である。It is a schematic sectional drawing for demonstrating the connection method of PC steel materials which is one Embodiment of this invention. 本発明の一実施形態であるPC鋼材の接続方法を説明するための概略断面図である。It is a schematic sectional drawing for demonstrating the connection method of PC steel materials which is one Embodiment of this invention. 図2から図5までに示すPC鋼材の接続方法を用いた橋梁の拡幅方法であって、本発明の一実施形態である橋梁の拡幅方法を説明するための概略断面図である。FIG. 6 is a schematic cross-sectional view for explaining a bridge widening method using the PC steel connection method shown in FIGS. 2 to 5, which is an embodiment of the present invention. 図2から図5までに示すPC鋼材の接続方法を用いた橋梁の拡幅方法であって、本発明の一実施形態である橋梁の拡幅方法を説明するための概略断面図である。FIG. 6 is a schematic cross-sectional view for explaining a bridge widening method using the PC steel connection method shown in FIGS. 2 to 5, which is an embodiment of the present invention. 図2から図5までに示すPC鋼材の接続方法を用いた橋梁の拡幅方法であって、本発明の一実施形態である橋梁の拡幅方法を説明するための概略断面図である。FIG. 6 is a schematic cross-sectional view for explaining a bridge widening method using the PC steel connection method shown in FIGS. 2 to 5, which is an embodiment of the present invention. 図2から図5までに示すPC鋼材の接続方法を用いた橋桁の修復方法を説明するための概略断面図である。It is a schematic sectional drawing for demonstrating the restoration method of a bridge girder using the connection method of PC steel materials shown to FIGS. 図2から図5までに示すPC鋼材の接続方法を用いた橋桁の修復方法を説明するための概略断面図である。It is a schematic sectional drawing for demonstrating the restoration method of a bridge girder using the connection method of PC steel materials shown to FIGS. 図2から図5までに示すPC鋼材の接続方法を用いた橋桁の修復方法を説明するための概略断面図である。It is a schematic sectional drawing for demonstrating the restoration method of a bridge girder using the connection method of PC steel materials shown to FIGS.

以下、本発明の実施の形態を図に基づいて説明する。
図1は、本発明のPC鋼材の接続方法又は橋梁の拡幅方法で用いることができるPC鋼材の接続具を示す概略断面図であり、図2はこのPC鋼材の接続具を用いたPC鋼材の接続方法であって本発明の一実施形態であるPC鋼材の接続方法を説明するための概略断面図である。なお、この実施の形態では、PC鋼材としてPC鋼棒を用いるものとなっている。
このPC鋼材の接続具1は、既設のコンクリート部材10内に配置された既設のPC鋼棒11と、既設のコンクリート部材10と連続するように新設するコンクリート部材12内に配置される新設のPC鋼棒13とを緊張力が伝達されるように接続するものであり、既設のPC鋼棒11に取り付けられる定着具14と、この定着具14を介して既設のPC鋼棒11と新設のPC鋼棒13とを接続するカプラー7と、を含むものである。
Hereinafter, embodiments of the present invention will be described with reference to the drawings.
FIG. 1 is a schematic cross-sectional view showing a PC steel material connector that can be used in the PC steel material connection method or bridge widening method of the present invention, and FIG. 2 shows the PC steel material using the PC steel material connector. It is a connection method, and is a schematic sectional drawing for demonstrating the connection method of PC steel materials which is one Embodiment of this invention. In this embodiment, a PC steel rod is used as the PC steel material.
The PC steel connector 1 includes an existing PC steel rod 11 disposed in an existing concrete member 10 and a new PC disposed in a concrete member 12 newly installed so as to be continuous with the existing concrete member 10. The steel bar 13 is connected to transmit tension, and the fixing tool 14 attached to the existing PC steel bar 11 and the existing PC steel bar 11 and the newly installed PC via the fixing tool 14 are connected. And a coupler 7 for connecting the steel bar 13.

上記定着具14は、円筒状となった外周面に雄ねじが形成された雌コーン2と、雌コーン2が有する中空孔の内側に挿通された既設のPC鋼棒11と雌コーン2の内周面との間に押し入れられてくさびとして機能する雄コーン3と、上記雌コーン2の外周面に形成された雄ねじに螺合された定着ナット4と、既設のPC鋼棒11に導入される引張力を既設のコンクリート部材10に広く伝達させるための支圧板5と、を含むものとなっている。
上記支圧板5は、コンクリート部材10に密着するように又は既設のコンクリート部材10との間に充填されたモルタル16もしくはコンクリートと密着するように配置される。
上記雌コーン2は中空孔を備えており、この中空孔に既設のPC鋼棒11の端部が挿通される。この中空孔の内周面は円錐形状となっており、内径が挿通されたPC鋼棒11の先端側から中央側に向かって縮小されている。
上記定着ナット4は、支圧板5に当接して締め付け可能となっており、既設のPC鋼棒11を引張した状態で雌コーン2の雄ねじに沿って回転させ、支圧板5に密接するまで締め付けて既設のPC鋼棒11を既設のコンクリート部材10に定着するものとなっている。
上記雄コーン3は、複数に分割された楔形状の部材であり、内面には凹凸が形成されて、既設のPC鋼棒11との間で滑りが生じにくくなっている。これら楔形状となった雄コーン3が雌コーン2の中空孔内の周方向に配列されるとともに、それぞれの間に隙間をあけて雌コーン2と既設のPC鋼棒11との間に均等に押し入れられる。これにより、雄コーン3は既設のPC鋼棒11の周面を保持するとともに雌コーン2の円錐状となった中空孔の内周面に強く押し付けられ、既設のPC鋼棒11と雌コーン2とを固定するものである。
The fixing device 14 includes a female cone 2 having a male screw formed on a cylindrical outer peripheral surface, and an existing PC steel rod 11 inserted into a hollow hole of the female cone 2 and the inner circumference of the female cone 2. A male cone 3 that is pushed into the surface and functions as a wedge, a fixing nut 4 screwed into a male screw formed on the outer peripheral surface of the female cone 2, and a tensile force introduced into an existing PC steel rod 11 And a support plate 5 for widely transmitting the force to the existing concrete member 10.
The bearing plate 5 is disposed so as to be in close contact with the concrete member 10 or in close contact with the mortar 16 or concrete filled between the existing concrete member 10.
The female cone 2 has a hollow hole, and the end of the existing PC steel rod 11 is inserted into the hollow hole. The inner peripheral surface of the hollow hole has a conical shape and is reduced from the front end side of the PC steel rod 11 through which the inner diameter is inserted toward the center side.
The fixing nut 4 can be tightened by coming into contact with the bearing plate 5, and the existing PC steel rod 11 is rotated along the male screw of the female cone 2 in a tensioned state, and is tightened until it is in close contact with the bearing plate 5. Thus, the existing PC steel bar 11 is fixed to the existing concrete member 10.
The male cone 3 is a wedge-shaped member divided into a plurality of parts, and has irregularities formed on the inner surface thereof, so that sliding with the existing PC steel rod 11 is difficult to occur. These wedge-shaped male cones 3 are arranged in the circumferential direction in the hollow hole of the female cone 2, and a gap is provided between them so that the female cone 2 and the existing PC steel rod 11 are evenly spaced. It is pushed in. As a result, the male cone 3 holds the circumferential surface of the existing PC steel rod 11 and is strongly pressed against the inner circumferential surface of the hollow hole formed in the conical shape of the female cone 2, so that the existing PC steel rod 11 and the female cone 2 are pressed. Are fixed.

上記カプラー7は、中心軸線上に貫通孔を有するものであり、軸線方向の一方の端部における貫通孔の内周面に第1の雌ねじ7aが形成され、他方の端部における貫通孔の内周面に第2の雌ねじ7bが形成されている。第1の雌ねじ7aは、図1に示すように、雌コーン2の外周面に形成された雄ねじ2aと螺合され、第2の雌ねじ7bは新設のPC鋼棒13の外周面に形成された雄ねじ13aと螺合されるものとなっている。したがって、既設のPC鋼棒11に装着された定着具14及びカプラー7を介して既設のPC鋼棒11と新設のPC鋼棒13とが接続されるものとなっている。
なお、図1に示す例では新設のPC鋼棒13としてプレグラウトタイプのPC鋼棒を使用している。したがって、カプラー7と螺合される雄ねじ13aが形成された部分を除いて予めシース9が装着され、新設のPC鋼棒13に引張力を導入した後に硬化する充填剤が充填されている。また、シース9の端部にはリング部材Lが装着され、このリング部材Lによってシース9内の未硬化の充填材が漏出するのを防止するともに、このリング部材Lがカプラー7に形成された座堀部に嵌め入れられ、固定されるものとなっている。
図1中の符号8は、新設のコンクリート部材12を形成するときに、既設のPC鋼棒11と新設のPC鋼棒13との接続部を覆い、周囲に空隙を保持するためのカプラーシースである。
The coupler 7 has a through-hole on the central axis, the first female screw 7a is formed on the inner peripheral surface of the through-hole at one end in the axial direction, and the inside of the through-hole at the other end A second female screw 7b is formed on the peripheral surface. As shown in FIG. 1, the first female screw 7 a is screwed with the male screw 2 a formed on the outer peripheral surface of the female cone 2, and the second female screw 7 b is formed on the outer peripheral surface of the newly installed PC steel bar 13. It is to be screwed with the male screw 13a. Therefore, the existing PC steel bar 11 and the new PC steel bar 13 are connected via the fixing tool 14 and the coupler 7 attached to the existing PC steel bar 11.
In the example shown in FIG. 1, a pre-grout type PC steel rod is used as the new PC steel rod 13. Accordingly, the sheath 9 is attached in advance except for the portion where the male screw 13a to be screwed with the coupler 7 is formed, and is filled with a filler that hardens after introducing a tensile force to the new PC steel rod 13. Further, a ring member L is attached to the end of the sheath 9, and the ring member L prevents the uncured filler in the sheath 9 from leaking, and the ring member L is formed on the coupler 7. It is inserted into the Zabori part and fixed.
Reference numeral 8 in FIG. 1 denotes a coupler sheath for covering the connecting portion between the existing PC steel bar 11 and the new PC steel bar 13 when the new concrete member 12 is formed, and holding a gap around it. is there.

このようなPC鋼材の接続具1を用いて、既設のPC鋼棒11と新設のPC鋼棒13とを接続するPC鋼材の接続方法について以下に説明する。
既設PCの鋼棒11は、シース15内に挿通されており、図2(a)に示すように、緊張力が導入された状態で既設のコンクリート部材10の端部で定着されている。本実施の形態ではPC鋼材としてPC鋼棒が用いられていることから、定着具31としては既設のコンクリート10の端面に当接した支圧板31aとこの支圧板31aに密着するように締め付けられたナット31bが採用されており、この定着具31はPC鋼棒に引張力を導入した後に打設されたコンクリート32内に埋め込まれている。
A method for connecting a PC steel material for connecting an existing PC steel rod 11 and a new PC steel rod 13 using such a PC steel material connector 1 will be described below.
The steel rod 11 of the existing PC is inserted into the sheath 15 and is fixed at the end of the existing concrete member 10 in a state where tension is introduced, as shown in FIG. In this embodiment, since a PC steel rod is used as the PC steel material, the fixing tool 31 is tightened so as to be in close contact with the bearing plate 31a that is in contact with the end surface of the existing concrete 10 and the bearing plate 31a. A nut 31b is employed, and the fixing tool 31 is embedded in the concrete 32 placed after a tensile force is introduced into the PC steel bar.

まず、このような既設のPC鋼棒11について、シース15内に充填されているグラウトを介してコンクリート部材10への付着力が作用していることを確認する。グラウトの未充填箇所がある場合は、グラウトを再注入して既設のPC鋼棒11とコンクリート部材10と間の付着力を作用させる。
次に、図2(b)に示すように、既設のコンクリート部材10内に埋設されている既設のPC鋼棒11の新設のPC鋼棒が接続される側の定着具31を除去する。つまり、定着具31付近のコンクリートをはつり、支圧板31a及びナット31bを既設のPC鋼棒11の端部とともに露出し、PC鋼棒11の端部を切断する。このとき、PC鋼棒11の端部からは定着具31が除去され、定着具31を除去した端部付近でPC鋼棒11の引張力が失われる。しかし、PC鋼棒11と既設のコンクリート部材10との間に付着力が作用していると、この付着力によってPC鋼棒の11の引張力がコンクリート部材10に伝達され、定着具14を除去した端部付近を除いてPC鋼棒11の引張力は維持される。
なお、既設のコンクリート部材10から露出させる既設のPC鋼棒11の端部11aは、本発明に係る定着具14を装着できる長さを突出させるものとし、本実施の形態では、既設のコンクリート部材10から約200mmを露出させている。
First, it is confirmed that the adhesion force to the concrete member 10 is acting on the existing PC steel rod 11 through the grout filled in the sheath 15. When there is an unfilled portion of the grout, the grout is reinjected to cause an adhesion force between the existing PC steel rod 11 and the concrete member 10 to act.
Next, as shown in FIG. 2 (b), the fixing tool 31 on the side to which the new PC steel bar of the existing PC steel bar 11 embedded in the existing concrete member 10 is connected is removed. That is, the concrete near the fixing tool 31 is hung, the bearing plate 31a and the nut 31b are exposed together with the end of the existing PC steel bar 11, and the end of the PC steel bar 11 is cut. At this time, the fixing tool 31 is removed from the end of the PC steel bar 11, and the tensile force of the PC steel bar 11 is lost near the end from which the fixing tool 31 is removed. However, if an adhesive force acts between the PC steel bar 11 and the existing concrete member 10, the tensile force of the PC steel bar 11 is transmitted to the concrete member 10 by this adhesive force, and the fixing tool 14 is removed. The tensile force of the PC steel bar 11 is maintained except for the vicinity of the end.
In addition, the end part 11a of the existing PC steel bar 11 exposed from the existing concrete member 10 shall project the length which can mount the fixing tool 14 which concerns on this invention, In this Embodiment, the existing concrete member 10 to about 200 mm is exposed.

その後、図3(a)に示すように、既設のPC鋼棒11の端部11aが突出した既設のコンクリート部材10の端面と対向するように支圧板5を装着し、この支圧板5と既設のコンクリート部材との間にモルタル16又はコンクリートを充填して、支圧板5から既設のコンクリート部材10にPC鋼棒11の引張力を伝達することが可能な状態とする。上記モルタル16又はコンクリートが硬化した後、突出したPC鋼棒11を雌コーン2の中空孔に挿通して装着し、この雌コーン2に定着ナット4を螺合して、この定着ナット4を支圧板5に当接又は近接させておく。雌コーン2の内周面と既設のPC鋼棒11の外周面との間には複数に分割された雄コーン3を周方向に間隔を空けて配置し、既設のPC鋼棒11の外周面をしっかりと保持するように均等に押し入れる。   After that, as shown in FIG. 3A, the bearing plate 5 is mounted so as to face the end surface of the existing concrete member 10 from which the end 11a of the existing PC steel bar 11 protrudes. The concrete member is filled with mortar 16 or concrete so that the tensile force of the PC steel bar 11 can be transmitted from the bearing plate 5 to the existing concrete member 10. After the mortar 16 or concrete is hardened, the protruding PC steel rod 11 is inserted through the hollow hole of the female cone 2 and the fixing nut 4 is screwed into the female cone 2 to support the fixing nut 4. It is in contact with or close to the pressure plate 5. Between the inner peripheral surface of the female cone 2 and the outer peripheral surface of the existing PC steel rod 11, a plurality of divided male cones 3 are arranged at intervals in the circumferential direction, and the outer peripheral surface of the existing PC steel rod 11 is disposed. Press evenly to hold firmly.

次に、図3(b)に示すように、引張用部材として引張力導入用ロッド17を用いてジャッキ例えばセンターホールジャッキ18により既設のPC鋼棒11を引張する。上記引張力導入用ロッド17は鋼からなるもので棒状部材の先端に雌コーン2の外周面に形成された雄ねじと螺合することができる雌ねじを有するものであり、後端部は上記センターホールジャッキ18に係止することができるものとなっている。上記センターホールジャッキ18は上記引張力導入用ロッド17に装着し、ジャッキチェア19を介して反力が既設のコンクリート部材10に作用するものとして既設のPC鋼棒11に引張力を導入するものである。また、ジャッキチェア19を用いることにより、センターホールジャッキ18でPC鋼棒11に引張力を導入した状態を維持しながら定着ナット4を操作できるものとする。なお、引張用部材としては、上記カプラー7と、このカプラーの後部の雌ねじに螺合される短い鋼棒とを用いることもできる。   Next, as shown in FIG. 3B, the existing PC steel rod 11 is pulled by a jack, for example, a center hole jack 18, using a pulling force introducing rod 17 as a pulling member. The rod 17 for introducing the tensile force is made of steel, and has a female screw that can be screwed with a male screw formed on the outer peripheral surface of the female cone 2 at the tip of the rod-like member, and the rear end is the center hole. It can be locked to the jack 18. The center hole jack 18 is attached to the rod 17 for introducing the tensile force, and introduces a tensile force to the existing PC steel bar 11 as a reaction force acting on the existing concrete member 10 via the jack chair 19. is there. Further, by using the jack chair 19, it is assumed that the fixing nut 4 can be operated while maintaining a state in which a tensile force is introduced to the PC steel bar 11 by the center hole jack 18. As the pulling member, it is possible to use the coupler 7 and a short steel rod screwed into the female screw at the rear of the coupler.

上記センターホールジャッキ18から引張力導入用ロッド17を介して雌コーン2を軸線方向に引っ張ると、雄コーン3が雌コーン2の円錐状となった内周面と既設のPC鋼棒11との間に押し入れられ、既設のPC鋼棒11と雌コーン2とが固定されて雌コーン2から既設のPC鋼棒11に引張力が伝達される。既設のPC鋼棒11には、長さ方向のほとんどの部分で引張力は既に導入された状態となっているが、新設のPC鋼棒13を接続しようとする端部付近では定着具30を取りはずしたことによって引張力が消失しており、上記引張力の導入によりこの部分に引張力が導入される。これにともない、既設のPC鋼棒11に若干の伸びが生じて雌コーン2はセンターホールジャッキ側に引き寄せられ、図3(b)に示すように雌コーン2に螺合された定着ナット4と支圧板5との間に隙間が生じる。この状態で、図4(a)に示すように定着ナット4を回転し、支圧板5に当接して締め付ける。その後、センターホールジャッキ18による引張力を解放すると、既設のPC鋼棒11は、雄コーン3、雌コーン2、定着ナット4、支圧板5を介して既設のコンクリート部材10に定着される。PC鋼棒11を引張したとき、センターホールジャッキ18からは雌コーン2を介して引張力が既設のPC鋼棒11に伝達されているので、雌コーン2と雄コーン3との間のすべり及び雄コーン3とPC鋼棒11との間のすべりは既に生じており、センターホールジャッキ18による引張力を解放したときにPC鋼棒11の引張力が損失することはほとんどない。したがって、既設のPC鋼棒11の引張力が低下して既設のコンクリート部材10のプレストレスが減少することを防止することができる。   When the female cone 2 is pulled in the axial direction from the center hole jack 18 via the tensile force introducing rod 17, the male cone 3 is formed between the inner peripheral surface of the female cone 2 and the existing PC steel rod 11. The existing PC steel rod 11 and the female cone 2 are fixed in between, and the tensile force is transmitted from the female cone 2 to the existing PC steel rod 11. In the existing PC steel bar 11, tensile force has already been introduced in most of the length direction, but the fixing tool 30 is attached in the vicinity of the end where the new PC steel bar 13 is to be connected. The tensile force disappears due to the removal, and the tensile force is introduced into this portion by the introduction of the tensile force. Along with this, the existing PC steel bar 11 is slightly stretched so that the female cone 2 is drawn toward the center hole jack side, and the fixing nut 4 screwed into the female cone 2 as shown in FIG. A gap is generated between the bearing plate 5 and the bearing plate 5. In this state, the fixing nut 4 is rotated as shown in FIG. Thereafter, when the tensile force by the center hole jack 18 is released, the existing PC steel bar 11 is fixed to the existing concrete member 10 through the male cone 3, the female cone 2, the fixing nut 4, and the bearing plate 5. When the PC steel bar 11 is pulled, the tensile force is transmitted from the center hole jack 18 to the existing PC steel bar 11 through the female cone 2, so that the slip between the female cone 2 and the male cone 3 and The slip between the male cone 3 and the PC steel bar 11 has already occurred, and when the tensile force by the center hole jack 18 is released, the tensile force of the PC steel bar 11 is hardly lost. Therefore, it can prevent that the prestress of the existing concrete member 10 reduces because the tensile force of the existing PC steel bar 11 falls.

既設のPC鋼棒11が上記のように定着されると、引張力導入用ロッド17が取り外される。そして、図4(b)に示すように、カプラー7を介して雌コーン2に新設のPC鋼棒13を接合する。つまり、カプラー7の第1の雌ねじ7aを雌コーン2の外周面に形成された雄ねじ2aを螺合させるとともに、第2の雌ねじ7bに新設のPC鋼棒13の外周面に形成された雄ねじ13aを螺合させる。その後、新設のPC鋼棒13に装着されているシース9と連続するようにカプラーシース8を取り付け、図5(a)に示すように、既設のPC鋼棒11と新設のPC鋼棒13との接続部を覆ってカプラーシース8の開口する先端を支圧板5に当接する。これにより、カプラー7、雌コーン2、雄コーン3及び定着ナット4がカプラーシース8に覆われているので、新設のコンクリート部材12となるコンクリートを打設して上記新設のPC鋼棒13を引張するときに、新設のPC鋼棒13及び既設のPC鋼棒11の伸びによる変位が可能となっている。   When the existing PC steel rod 11 is fixed as described above, the tensile force introducing rod 17 is removed. Then, as shown in FIG. 4B, a new PC steel rod 13 is joined to the female cone 2 via the coupler 7. That is, the male screw 2a formed on the outer peripheral surface of the female cone 2 is screwed with the first female screw 7a of the coupler 7, and the male screw 13a formed on the outer peripheral surface of the newly installed PC steel rod 13 is engaged with the second female screw 7b. Screw together. Thereafter, the coupler sheath 8 is attached so as to be continuous with the sheath 9 attached to the new PC steel bar 13, and as shown in FIG. 5 (a), the existing PC steel bar 11 and the new PC steel bar 13 The tip of the coupler sheath 8 that opens is brought into contact with the bearing plate 5. As a result, the coupler 7, the female cone 2, the male cone 3 and the fixing nut 4 are covered with the coupler sheath 8, so that the concrete to be the new concrete member 12 is cast and the new PC steel rod 13 is pulled. When it does, the displacement by extension of the newly installed PC steel bar 13 and the existing PC steel bar 11 is possible.

このように、既設のPC鋼棒11と新設のPC鋼棒13とがカプラー7を介して接続されると、型枠22設け、図5(b)に示すように新設のコンクリート部材12を形成するためのコンクリートを打設する。このコンクリートの硬化後、ジャッキにより、新設のPC鋼棒13を他端から所定の伸び量となるまで引張し、新設のコンクリート部材12に定着する。その後、既設PC鋼棒11と新設PC鋼棒13との接続部を覆っているカプラーシース8内にグラウトを充填し、接続部の防食を施す。
なお、この実施の形態では新設のPC鋼棒13として、プレグラウトタイプを用いているが、通常のシースに挿通したPC鋼棒を用いて、上記シースをカプラーシースと接続するものであっても良い。このようなPC鋼棒及びシースを用いたときには、新設のコンクリート部材を形成するためのコンクリートが硬化した後に、上記シース内にグラウトを充填して新たに打設したコンクリートと一体化するともともに、PC鋼棒の腐食を防止する。
Thus, when the existing PC steel bar 11 and the new PC steel bar 13 are connected via the coupler 7, the mold 22 is provided to form the new concrete member 12 as shown in FIG. Put concrete to do. After the concrete is hardened, the new PC steel bar 13 is pulled from the other end with a jack until it reaches a predetermined amount of elongation, and is fixed to the new concrete member 12. Thereafter, the grout is filled in the coupler sheath 8 covering the connecting portion between the existing PC steel rod 11 and the newly installed PC steel rod 13, and the connecting portion is protected from corrosion.
In this embodiment, a pre-grout type is used as the newly installed PC steel rod 13, but a PC steel rod inserted through a normal sheath may be used to connect the sheath to the coupler sheath. . When such a PC steel rod and sheath are used, after the concrete for forming a new concrete member is cured, the sheath is filled with grout and integrated with newly placed concrete. Prevents corrosion of PC steel bars.

上記のように、本実施形態のPC鋼材の接続方法では、既設のコンクリート部材10内に配置されて付着力によってコンクリートと一体となっている既設のPC鋼棒11と新たに打設するコンクリート部材12内に配置する新設のPC鋼棒13とを緊張力が伝達するように接続することができる。   As described above, in the method for connecting PC steel materials according to the present embodiment, the existing PC steel rod 11 which is disposed in the existing concrete member 10 and is integrated with the concrete by the adhesive force and the concrete member to be newly placed. 12 can be connected to a newly installed PC steel bar 13 disposed in the housing 12 so that the tension is transmitted.

次に、上記PC鋼材の接続方法を用いた橋梁の拡幅方法について説明する。
図6から図8までは、上記PC鋼材の接続方法を用いて橋梁を拡幅する方法を説明する概略断面図である。なお、この橋梁の拡幅方法においても、上記PC鋼材の接続具を用いるものであり、PC鋼材の接続具に関しては上記実施の形態と同じ符号を付して説明する。
この橋梁20は、図6(a)に示すように、断面がT型となったコンクリートの桁21を幅方向に複数並べて形成されており、この既設の桁21の床版部分21aには幅方向のPC鋼材すなわち横締め鋼材としてPC鋼棒22が緊張力を導入した状態で埋設されている。この既設のPC鋼棒22は、橋梁20の両側縁部すなわち両側部に配置された桁21の床版部分の先端付近で定着されており、該PC鋼棒22の両端部の外周面に形成された雄ねじにナットを螺合し、支圧板を介して既設の桁21に反力が作用するように定着されている。また、橋梁20の両側縁部には地覆23が形成されており、上記PC鋼棒22の定着具24は地覆23を形成するコンクリート内に埋め込まれている。
なお、この既設のPC鋼棒22は床版部の幅方向に配置されたシース(図示しない)内に挿通されており、シース内に充填されたグラウトと付着してコンクリートと一体となっている。
Next, a bridge widening method using the PC steel connection method will be described.
FIG. 6 to FIG. 8 are schematic cross-sectional views for explaining a method of widening a bridge using the PC steel material connection method. This bridge widening method also uses the PC steel connector, and the PC steel connector will be described with the same reference numerals as in the above embodiment.
As shown in FIG. 6A, the bridge 20 is formed by arranging a plurality of concrete girders 21 having a T-shaped cross section in the width direction, and the floor slab portion 21a of the existing girder 21 has a width. A PC steel rod 22 is embedded as a PC steel material in a direction, that is, a laterally tightened steel material, with a tension force introduced. This existing PC steel bar 22 is fixed on both side edges of the bridge 20, that is, near the front end of the floor slab portion of the girder 21 arranged on both sides, and is formed on the outer peripheral surface of both ends of the PC steel bar 22. A nut is screwed onto the male screw thus formed, and is fixed so that a reaction force acts on the existing girder 21 via a support plate. A ground cover 23 is formed on both side edges of the bridge 20, and the fixing tool 24 of the PC steel rod 22 is embedded in the concrete forming the ground cover 23.
The existing PC steel bar 22 is inserted into a sheath (not shown) arranged in the width direction of the floor slab, and is attached to the grout filled in the sheath and integrated with the concrete. .

このような橋梁は次のように拡幅することができる。
まず、シース内のグラウトの充填状況を調査し、グラウトの無充填箇所がある場合はグラウトを注入して既設のPC鋼棒22と床版部分21aを構成するコンクリートとの付着力が作用するものとする。
次に、図6(b)に示すように、既設の桁21の拡幅される側に設けられている地覆223を撤去し、既設のPC鋼棒22の定着具24付近における桁の床版部分21aのコンクリートをはつって既存の定着具24及びPC鋼棒22の定着端付近を露出する。そして、PC鋼棒22を切断して既存の定着具24を除去し、PC鋼棒22の先端部分22aが床版のコンクリートから突き出した状態とする。
このように既存の定着具24を除去することによって既設のPC鋼棒22の引張力は、定着具24からコンクリートに伝達されないものとなり、端部付近で引張力が開放されるが、PC鋼棒22の周面の付着力により既設の桁21のコンクリートに定着される。したがって、定着具24を除去した端部付近を除き、該PC鋼棒22の反対側の端部まで引張力は導入された状態で維持される。
Such a bridge can be widened as follows.
First, the grout filling state in the sheath is investigated. If there is an unfilled portion of the grout, the grout is injected and the adhesive force between the existing PC steel rod 22 and the concrete constituting the floor slab portion 21a acts. And
Next, as shown in FIG. 6 (b), the ground cover 223 provided on the widened side of the existing girder 21 is removed, and the floor slab of the girder in the vicinity of the fixing tool 24 of the existing PC steel rod 22 is removed. The existing fixing tool 24 and the vicinity of the fixing end of the PC steel rod 22 are exposed through the concrete of the portion 21a. Then, the PC steel rod 22 is cut to remove the existing fixing tool 24, and the tip portion 22a of the PC steel rod 22 is projected from the concrete of the floor slab.
By removing the existing fixing tool 24 in this way, the tensile force of the existing PC steel bar 22 is not transmitted from the fixing tool 24 to the concrete, and the tensile force is released near the end portion. It is fixed to the concrete of the existing girder 21 by the adhesive force of the peripheral surface 22. Therefore, the tensile force is maintained in the state where the tensile force is introduced to the opposite end of the PC steel rod 22 except for the vicinity of the end from which the fixing tool 24 is removed.

その後、床版部分21aのコンクリートから突出した既設のPC鋼棒22には、図3(a)に示すように支圧板5を装着し、桁21の床版部分21aのコンクリートと支圧板5との間にモルタル16又はコンクリートを充填して支圧板5から既設の桁21のコンクリートに、PC鋼棒22に導入された引張力の反力を伝達できるものとする。さらに、既設のPC鋼棒22の露出している端部に雌コーン2、雌コーン2の外周面に螺合した定着ナット4を装着し、PC鋼棒22と雌コーン2との間に雄コーン3を押し入れて新たな定着具14を取り付ける。そして、雌コーン2に引張用部材として引張力導入用ロッド17を取り付け、図7(a)及び図3(b)に示すようにセンターホールジャッキ18を用いて雌コーン2を介して既設のPC鋼棒22を軸線方向に引張する。これにより、既設のPC鋼棒22には引張している端部から反対側の定着端までの全長にわたって引張力が導入される。そして、引張力導入用ロッド17を接合した雌コーン2は既設のPC鋼棒22が引張される方向にわずかに移動する。このように引張力を導入した状態で、雌コーン2の外周面に螺合している定着ナット4を支圧板5に密着するまで締め付け、センターホールジャッキ16による引張力を解放して既設のPC鋼棒22を新たな定着具14によって既設の桁21に定着する。
このように既設のPC鋼棒22が定着具14によって既設の桁21に定着され、全長にわたって引張力が導入されていることにより、拡幅工事の施工中に既設の桁21上を供用して繰り返し通行する車両の荷重が作用しても、既設のPC鋼棒22の引張力が低下することはなく、既設の桁21の床版部分の強度を維持することができる。
Then, the existing PC steel rod 22 protruding from the concrete of the floor slab portion 21a is mounted with the bearing plate 5 as shown in FIG. 3 (a), and the concrete of the floor slab portion 21a of the girder 21 and the bearing plate 5 It is assumed that the reaction force of the tensile force introduced into the PC steel rod 22 can be transmitted from the bearing plate 5 to the concrete of the existing girder 21 by filling the mortar 16 or concrete between them. Further, a female cone 2 and a fixing nut 4 screwed onto the outer peripheral surface of the female cone 2 are attached to the exposed end of the existing PC steel rod 22, and a male nut is interposed between the PC steel rod 22 and the female cone 2. The cone 3 is pushed in and a new fixing tool 14 is attached. Then, a tensile force introducing rod 17 is attached to the female cone 2 as a tensile member, and an existing PC is installed via the female cone 2 using a center hole jack 18 as shown in FIGS. 7 (a) and 3 (b). The steel bar 22 is pulled in the axial direction. As a result, a tensile force is introduced into the existing PC steel rod 22 over the entire length from the tensioning end to the opposite fixing end. Then, the female cone 2 joined with the tensile force introducing rod 17 moves slightly in the direction in which the existing PC steel rod 22 is pulled. With the tensile force introduced in this manner, the fixing nut 4 screwed to the outer peripheral surface of the female cone 2 is tightened until it closely contacts the bearing plate 5, and the tensile force by the center hole jack 16 is released to release the existing PC. The steel bar 22 is fixed to the existing girder 21 by the new fixing tool 14.
In this way, the existing PC steel rod 22 is fixed to the existing girder 21 by the fixing tool 14 and the tensile force is introduced over the entire length, so that the existing girder 21 is used repeatedly during the widening work. Even if the load of the passing vehicle acts, the tensile force of the existing PC steel rod 22 does not decrease, and the strength of the floor slab portion of the existing girder 21 can be maintained.

上記のように既設の桁21に配置されたPC鋼棒22が新たな定着具14によって定着された後、図7(b)に示すように既設の桁21に並列して新設の桁25を架け渡す。そして、既設のPC鋼棒22を定着するために用いた雌コーン2の外周面に形成されている雄ねじにカプラー7を螺合し、このカプラー7を介して新設の桁25に配置する新設のPC鋼棒26を接続する。新設のC鋼棒26は、新設の桁25に埋め込まれているシース内に挿通し、拡幅されたときの側縁となる部分で新設の桁25aに定着するための定着具27を装着する。そして、図8(a)に示すように既設の桁21と新設の桁25aとの間の床版部分28a、新設の桁25aと新設の桁25aとの間の床版部分28b及び新設の桁25aの側縁部における新設のPC鋼棒26の定着部29にコンクリートを打設して全ての桁21,25を連結する。コンクリートの硬化後、図8(b)に示すように新設のPC鋼棒26をジャッキ30によって新設の桁25bの側縁部で引張し、定着具27によって新設の桁25bに定着する。これにより、互いに接合された既設の桁21及び新設の桁25の全幅にわたって幅方向のプレストレスが導入され、地覆を復元して拡幅を完了する。   After the PC steel bar 22 arranged on the existing girder 21 is fixed by the new fixing tool 14 as described above, the new girder 25 is installed in parallel with the existing girder 21 as shown in FIG. Cross over. Then, the coupler 7 is screwed into the male screw formed on the outer peripheral surface of the female cone 2 used for fixing the existing PC steel rod 22, and the newly installed girder 25 is arranged via the coupler 7. PC steel rod 26 is connected. The newly installed C steel rod 26 is inserted into a sheath embedded in the newly installed girder 25, and a fixing tool 27 for fixing to the newly installed girder 25a is attached at a portion which becomes a side edge when widened. 8A, the floor slab portion 28a between the existing girder 21 and the new girder 25a, the floor slab portion 28b between the new girder 25a and the new girder 25a, and the new girder Concrete is cast into the fixing portion 29 of the newly installed PC steel rod 26 at the side edge portion 25a to connect all the girders 21 and 25 together. After the concrete is hardened, as shown in FIG. 8B, the new PC steel rod 26 is pulled by the jack 30 at the side edge of the new girder 25 b and fixed to the new girder 25 b by the fixing tool 27. Thereby, the prestress of the width direction is introduced over the full width of the existing girder 21 and the new girder 25 joined together, and the ground cover is restored to complete the widening.

この橋梁の拡幅方法では、既設の桁21に作用している幅方向のプレストレスを維持した状態で拡幅工事を行うことができるので、拡幅工事にともなって既設の橋梁20の供用を制限することを少なくすることができる。また、新設の桁25に配置されたPC鋼棒26を既設の桁21に配置された既設のPC鋼棒21と接続して引張力を導入することができるので、既設の桁21に削孔を施す必要が無く、コストの増大を抑制するとともに、既設の桁21を損傷することなく橋梁を拡幅することができる。   In this method of widening the bridge, the widening work can be performed while maintaining the prestress in the width direction acting on the existing girder 21. Therefore, the use of the existing bridge 20 should be restricted along with the widening work. Can be reduced. In addition, since a tensile force can be introduced by connecting the PC steel rod 26 arranged in the newly installed girder 25 to the existing PC steel rod 21 arranged in the existing girder 21, a hole is formed in the existing girder 21. Therefore, the increase in cost can be suppressed and the bridge can be widened without damaging the existing girder 21.

次に、本発明に係るPC鋼材の接続方法を用いた橋桁の修復方法について説明する。
図9から図11までは、この橋桁の修復方法を説明する概略側面図である。なお、この橋桁の修復方法においても、図1に示すPC鋼材の接続具を用いるものであり、PC鋼材の接続具に関しては図1と同じ符号を付して説明する。
この橋桁41は、図9(a)に示すように、橋桁内にPC鋼棒45を配置し、プレストレスを導入したプレストレストコンクリート桁である。この橋桁41の端部が支承43を介して橋台42上に支持されているが、端部41aが劣化して修復が必要となったものであり、修復は次のように行うことができる。
Next, a method for repairing a bridge girder using the method for connecting PC steel materials according to the present invention will be described.
9 to 11 are schematic side views for explaining the bridge girder repair method. This bridge girder repair method also uses the PC steel connector shown in FIG. 1, and the PC steel connector will be described with the same reference numerals as in FIG.
As shown in FIG. 9A, the bridge girder 41 is a prestressed concrete girder in which a PC steel bar 45 is disposed in the bridge girder and prestress is introduced. The end portion of the bridge girder 41 is supported on the abutment 42 via the support 43, but the end portion 41a is deteriorated and needs to be repaired, and the repair can be performed as follows.

まず、図9(b)に示すように支承43付近に仮支柱44を設け、橋桁41を支承43付近で仮支持する。そして、劣化した端部41aを切断又は破砕して除去する。このとき、橋桁41のコンクリート中に配置されている橋軸方向のPC鋼棒45は、端部が除去された橋桁の端面41bから突出させ、定着具を装着して引張力を導入することができる長さの位置で切断する。このようにPC鋼棒45の端部が切断されて定着具46が除去されるとPC鋼棒45の突出した部分では引張力が解放されるが、PC鋼棒45の周面に付着力が作用しており、端部が除去された橋桁41の端面41bからPC鋼棒45の軸線に沿って作用する付着力でPC鋼棒45が橋桁のコンクリートに定着される。したがって、図9(a)中に示す定着具46が除去されてPC鋼棒45が切断された状態では、橋桁41から突出した部分及び端部が除去された橋桁の端面41bから充分にコンクリートとの付着力が作用するまでの範囲でPC鋼棒45の引張力は解放されるが、橋桁41の長さ方向におけるほとんどの領域でコンクリート内に配置されたPC鋼棒45の引張力が維持される。そして、橋桁41はプレストレスが導入された状態で、支承43に代えて仮支柱44に支持されるとともに他の橋台又は橋脚との間に架け渡された状態が維持される。
なお、橋台42は、橋桁41の端部を除去するときにパラペット部分を除去しておくのが望ましい。
First, as shown in FIG. 9B, a temporary support pole 44 is provided near the support 43, and the bridge girder 41 is temporarily supported near the support 43. Then, the deteriorated end portion 41a is removed by cutting or crushing. At this time, the PC steel rod 45 in the direction of the bridge axis arranged in the concrete of the bridge girder 41 can be protruded from the end face 41b of the bridge girder from which the end has been removed, and a tensile force can be introduced by attaching a fixing tool. Cut at a position where possible. When the end of the PC steel bar 45 is cut and the fixing tool 46 is removed as described above, the tensile force is released at the protruding portion of the PC steel bar 45, but the adhesion force is applied to the peripheral surface of the PC steel bar 45. The PC steel bar 45 is fixed to the concrete of the bridge girder by the adhesive force acting along the axis of the PC steel bar 45 from the end surface 41b of the bridge girder 41 from which the end is removed. Therefore, in a state where the fixing tool 46 shown in FIG. 9A is removed and the PC steel bar 45 is cut, the portion protruding from the bridge girder 41 and the end surface 41b of the bridge girder from which the end portion has been removed are sufficiently filled with concrete. The tensile force of the PC steel bar 45 is released in the range up to the application of the adhesive force, but the tensile force of the PC steel bar 45 disposed in the concrete is maintained in most areas in the length direction of the bridge girder 41. The The bridge girder 41 is supported by the temporary support column 44 instead of the support 43 in a state in which prestress is introduced, and is maintained in a state of being bridged between other abutments or piers.
In addition, as for the abutment 42, when removing the edge part of the bridge girder 41, it is desirable to remove a parapet part.

橋桁の端部41aが除去された後、切断されて橋桁のコンクリートから突き出したPC鋼棒45に、図1に示す定着具14を装着するともに、支圧板5から橋桁41にPC鋼棒45の引張力が伝達されるように支圧板5と橋桁41との間にモルタル又はコンクリートを充填し硬化させる。その後、図3(b)及び図10(a)に示すように装着した定着具14の雌コーン2に引張力導入用ロッド17を接合し、センターホールジャッキ18によってPC鋼棒45に引張力を導入する。この状態で、雌コーン2の外周面に螺合した定着ナット4を回転して定着ナット4を支圧板5に締め付ける。そして、センターホールジャッキ18による引張力を解放することによってPC鋼棒45の端部を雄コーン3、雌コーン2、定着ナット4及び支圧板5を介して橋桁41に定着する。   1 is attached to the PC steel bar 45 cut and protruded from the concrete of the bridge girder after the end 41a of the bridge girder is removed, and the PC steel bar 45 is attached to the bridge girder 41 from the bearing plate 5 Mortar or concrete is filled and cured between the bearing plate 5 and the bridge girder 41 so that the tensile force is transmitted. Thereafter, the tensile force introducing rod 17 is joined to the female cone 2 of the fixing device 14 as shown in FIGS. 3B and 10A, and the PC steel rod 45 is subjected to a tensile force by the center hole jack 18. Introduce. In this state, the fixing nut 4 screwed to the outer peripheral surface of the female cone 2 is rotated to fasten the fixing nut 4 to the bearing plate 5. Then, the end of the PC steel bar 45 is fixed to the bridge girder 41 via the male cone 3, the female cone 2, the fixing nut 4, and the bearing plate 5 by releasing the tensile force by the center hole jack 18.

このように定着されたPC鋼棒45には、図4(b)及び図10(b)に示すように雌コーン2の外周面に形成された雄ねじにカプラー7の第1の雄ねじを螺合し、軸線方向の反対側に形成された第2の雄ねじには接続する新設のPC鋼棒47を螺合して既設のPC鋼棒45に新設のPC鋼棒47を接続する。そして、修復する橋桁の端部に新たな定着具48を装着するともに、橋桁の修復する範囲に鉄筋(図示しない)を配置し、図11(a)に示すように型枠49を組み立てる。そして、型枠49内にコンクリートを打設し、硬化後に型枠49を撤去する。その後、図11(b)に示すようにジャッキ50を用いて新設のPC鋼棒47に引張力を導入し、定着具48によって新たに打設したコンクリートに定着して橋桁端部の修復を完了する。仮支柱44は、橋桁端部の修復が完了した後に撤去し、橋台42のパラペットも復元する。
なお、新設のPC鋼棒47は、上記コンクリートの打設前にシースで被覆しておき、引張力の導入後にシース内のグラウトを施すものであっても良いし、予め装着されたシース内に充填されているグラウト材が引張力の導入後に硬化するプレグラウトタイプのPC鋼棒を用いても良い。
As shown in FIGS. 4B and 10B, the first male screw of the coupler 7 is screwed into the male screw formed on the outer peripheral surface of the female cone 2 as shown in FIGS. 4B and 10B. Then, the new PC steel rod 47 to be connected is screwed to the second male screw formed on the opposite side in the axial direction, and the new PC steel rod 47 is connected to the existing PC steel rod 45. Then, a new fixing tool 48 is attached to the end portion of the bridge girder to be repaired, and a reinforcing bar (not shown) is arranged in a range to be repaired by the bridge girder, and the mold frame 49 is assembled as shown in FIG. Then, concrete is placed in the mold 49, and the mold 49 is removed after curing. After that, as shown in FIG. 11 (b), a tensile force is introduced into the newly installed PC steel bar 47 using the jack 50, and the fixing tool 48 fixes the newly placed concrete to complete the repair of the bridge girder end. To do. The temporary support column 44 is removed after the bridge girder ends have been repaired, and the parapet of the abutment 42 is also restored.
The new PC steel rod 47 may be coated with a sheath before placing the concrete, and grout in the sheath may be applied after the introduction of the tensile force. A pre-grouting type PC steel rod in which the filled grout material hardens after the introduction of tensile force may be used.

以上に説明した実施の形態では、既設のPC鋼材及び新設のPC鋼材の双方がPC鋼棒である場合について説明したが、既設のPC鋼材及び新設のPC鋼材の双方がPC鋼より線であってもよい。また、既設のPC鋼材としてPC鋼棒が用いられているときに、新設のPC鋼材として鋼より線を用いること、又は既設のPC鋼材として鋼より線が用いられているときに新設のPC鋼材としてPC鋼棒を用いることもできる。また、既設のPC鋼材と新設のPC鋼材とが互いに径が異なるものであっても良い。
新設のPC鋼材として鋼より線を用いるときには、新設の鋼より線の接続端部に鋼からなるスリーブを圧着してその外周面に雄ねじが形成されたタイプのものを用い、この雄ねじをカプラーに螺合するのが望ましい。また、雌コーン内に押し入れられてくさびとして作用する雄コーンによって雌コーンを鋼より線に固着し、雌コーンの外周面に形成された雄ねじとカプラーとを螺合するものであっても良い。
In the embodiment described above, the case where both the existing PC steel material and the new PC steel material are PC steel bars has been described. However, both the existing PC steel material and the new PC steel material are stranded wires of PC steel. May be. In addition, when a PC steel rod is used as an existing PC steel, a steel strand is used as a new PC steel, or when a steel strand is used as an existing PC steel PC steel bars can also be used. Further, the existing PC steel material and the new PC steel material may have different diameters.
When using a steel strand as a new PC steel material, use a type in which a sleeve made of steel is crimped to the connecting end of the new steel strand and a male screw is formed on the outer peripheral surface, and this male screw is used as a coupler. It is desirable to screw together. Alternatively, a male cone that is pushed into the female cone and acts as a wedge may be fixed to the steel strand, and a male screw formed on the outer peripheral surface of the female cone and a coupler may be screwed together.

また、本発明は上述の実施の形態に限定されるものではなく、本発明の範囲で他の形態として実施することができる。そして、上記PC鋼材の接続方法は上記のような橋梁の拡幅方法や橋桁の修復方法以外であって、既設のコンクリート部材内に配置されたPC鋼材に新設のPC鋼材を接続する場合においても適用することができる。   Further, the present invention is not limited to the above-described embodiments, and can be implemented as other forms within the scope of the present invention. The PC steel connection method is not limited to the bridge widening method and bridge girder repair method as described above, and is also applicable when connecting a new PC steel material to a PC steel material arranged in an existing concrete member. can do.

1:PC鋼材の接続具、 2:雌コーン、 3:雄コーン、 4:定着ナット、 5:支圧板、 7:カプラー、 8:カプラーシース、 9:新設のPC鋼棒に装着されたシース、 10:既設のコンクリート部材、 11:既設のPC鋼棒、 12:新設のコンクリート部材、 13:新設のPC鋼棒、 14:既設のPC鋼棒の定着具、 15:既設のPC鋼棒に装着されたシース、 16:モルタル、 17:引張力導入用ロッド、 18:センターホールジャッキ、 19:ジャッキチェア、 20:橋梁、 21:既設の橋桁、 22:既設のPC鋼棒、 23:地覆、 24:既設のPC鋼棒の定着具、 25:新設の桁、 26:新設のPC鋼棒、 27:新設のPC鋼棒を定着する定着具、 28:桁間のコンクリートを打設する床版部分、 29:新設のPC鋼棒の定着部、 30:ジャッキ、
31:既設のPC鋼棒を定着する定着具、 32:既設のPC鋼棒の端部及び定着具を
覆うコンクリート、 41:橋桁、 42:橋台、 43:支承、 44:仮支柱、 45:PC鋼棒、 46:修復前におけるPC鋼棒の定着具、 47:修復部分に配置する新設のPC鋼棒、 48:修復後におけるPC鋼棒の定着具、 49:型枠、 50:ジャッキ
1: PC steel connector, 2: Female cone, 3: Male cone, 4: Fixing nut, 5: Supporting plate, 7: Coupler, 8: Coupler sheath, 9: Sheath attached to newly installed PC steel rod, 10: Existing concrete member, 11: Existing PC steel bar, 12: New concrete member, 13: New PC steel rod, 14: Fixing tool for existing PC steel rod, 15: Installed on existing PC steel rod 16: mortar, 17: rod for introducing tensile force, 18: center hole jack, 19: jack chair, 20: bridge, 21: existing bridge girder, 22: existing PC steel bar, 23: ground cover, 24: Fixing tool for existing PC steel bar, 25: New girder, 26: New PC steel bar, 27: Fixing tool for fixing new PC steel bar, 28: Floor slab for placing concrete between girder Part 29: New PC Fixing section of the bar, 30: jack,
31: Fixing tool for fixing an existing PC steel bar, 32: Concrete covering the end and fixing tool of an existing PC steel bar, 41: Bridge girder, 42: Abutment, 43: Support, 44: Temporary support, 45: PC Steel bar, 46: Fixing tool for PC steel bar before repair, 47: Newly installed PC steel bar placed in the repaired part, 48: Fixing tool for PC steel bar after repair, 49: Formwork, 50: Jack

Claims (2)

緊張力が導入された状態で既設のコンクリート部材に定着され、周面に付着力が作用してコンクリートと一体となっている既設のPC鋼材と、新設のコンクリート部材内に配置されて引張力が導入される新設のPC鋼材とを、引張力が伝達されるように接続するPC鋼材の接続方法であって、
前記既設のPC鋼材の前記新設のPC鋼材と接続される側の端部に設けられた定着具を除去するとともに、前記既設のコンクリート部材内に埋設されている端部をはつり出して該既設のコンクリート部材から突出させる工程と、
円筒状となった外周部に雄ねじが形成され、中空孔内に前記既設のPC鋼材が挿通される雌コーンと、 前記雌コーンの外周部に形成された前記雄ねじに螺合された定着ナットと、 前記雌コーンの中空孔の内周面と該中空孔に挿通された前記既設のPC鋼材の外周面との間に押し入れられて前記既設のPC鋼材と前記雌コーンとを固定する雄コーンと、 前記定着ナットに当接されて前記既設のPC鋼材の引張力を前記既設のコンクリート部材に伝達する支圧板と、を備える定着具を前記既設のPC鋼材の突出した部分に取り付ける工程と、
前記支圧板と前記既設のコンクリート部材との間にコンクリート又はモルタルを充填して前記既設のPC鋼材の引張力を前記既設のコンクリート部材に伝達することを可能とする工程と、
前記雌コーンの外周部に形成された雄ねじに引張用部材を螺合して該引張用部材を前記既設のPC鋼材の軸線方向に引張し、該引張用部材を引張した状態で前記定着ナットを前記支圧板に密着するように締め付ける工程と、
前記既設のPC鋼材と前記新設のPC鋼材とを接続するためのカプラーの一方の端部に形成された第1の雌ねじを前記雌コーンの外周部に形成された雄ねじと螺合し、該カプラーの他方の端部に形成された第2の雌ねじを介して前記新設のPC鋼材の一方の端部と接続する工程と、を含むことを特徴とするPC鋼材の接続方法。
It is fixed to the existing concrete member with the tension force introduced, and the existing PC steel material integrated with the concrete by the adhesion force acting on the peripheral surface, and the tensile force is arranged in the new concrete member. A PC steel material connection method for connecting a newly installed PC steel material so that a tensile force is transmitted,
The fixing tool provided at the end portion of the existing PC steel material connected to the newly installed PC steel material is removed, and the end portion embedded in the existing concrete member is squeezed out to form the existing PC steel material. Projecting from the concrete member;
A male cone is formed on the outer periphery of the cylinder and the existing PC steel material is inserted into the hollow hole, and a fixing nut screwed into the male screw formed on the outer periphery of the female cone; A male cone which is pressed between an inner peripheral surface of the hollow hole of the female cone and an outer peripheral surface of the existing PC steel material inserted through the hollow hole to fix the existing PC steel material and the female cone; Attaching a fixing tool to a protruding portion of the existing PC steel material, and a support plate that contacts the fixing nut and transmits a tensile force of the existing PC steel material to the existing concrete member;
A step of filling concrete or mortar between the bearing plate and the existing concrete member to transmit the tensile force of the existing PC steel material to the existing concrete member;
A tension member is screwed into a male screw formed on the outer periphery of the female cone, the tension member is pulled in the axial direction of the existing PC steel material, and the fixing nut is pulled in a state where the tension member is pulled. Tightening the pressure plate so that it closely contacts the pressure plate;
A first female screw formed at one end of a coupler for connecting the existing PC steel material and the new PC steel material is screwed with a male screw formed on the outer peripheral portion of the female cone, and the coupler And connecting to one end portion of the newly-installed PC steel material via a second female screw formed at the other end portion of the PC steel material.
コンクリートからなる既設の桁に沿って新設の桁を増設し、既設の桁に配置され周面に付着力が作用してコンクリートと一体となっている横方向の既設のPC鋼材に、新設の桁に配置する新設のPC鋼材を接続し、引張力を導入して新設の桁を既設の桁と一体とする橋梁の拡幅方法であって、
前記既設のPC鋼材の前記新設のPC鋼材と接続される側の端部に設けられた定着具を除去するとともに、前記既設の桁内に埋設されている端部をはつり出して該既設の桁から突出させる工程と、
円筒状となった外周部に雄ねじが形成され、中空孔内に前記既設のPC鋼材が挿通される雌コーンと、 前記雌コーンの外周部に形成された前記雄ねじに螺合された定着ナットと、 前記雌コーンの中空孔の内周面と該中空孔に挿通された前記既設のPC鋼材の外周面との間に押し入れられて前記既設のPC鋼材と前記雌コーンとを固定する雄コーンと、
前記定着ナットに当接されて前記既設のPC鋼材の引張力を前記既設のコンクリート部材に伝達する支圧板と、を備える定着具を前記既設のPC鋼材の突出した部分に取り付ける工程と、
前記支圧板と前記既設の桁との間にコンクリート又はモルタルを充填して前記既設のPC鋼材の引張力を前記既設の桁に伝達することを可能とする工程と、
前記雌コーンの外周部に形成された雄ねじに引張用部材を螺合して該引張用部材を前記既設のPC鋼材の軸線方向に引張し、該引張用部材を引張した状態で前記定着ナットを前記支圧板に密着するように締め付ける工程と、
前記既設のPC鋼材と前記新設のPC鋼材とを接続するためのカプラーの一方の端部に形成された第1の雌ねじを前記雌コーンの外周部に形成された雄ねじと螺合し、該カプラーの他方の端部に形成された第2の雌ねじを介して前記新設のPC鋼材の一方の端部と接続する工程と、
前記新設の桁を形成する領域又は予め形成された新設の桁と前記既設の桁との間にコンクリートを打設し、該コンクリートの硬化後、前記新設のPC鋼材を引張して前記新設の桁に定着することを特徴とする橋梁の拡幅方法。
A new girder will be added to the existing PC steel in the horizontal direction, which will be installed along the existing girder made of concrete, and will be placed on the existing girder and the adhesive will act on the peripheral surface. A widening method for a bridge that connects a newly installed PC steel material to be installed in and integrates the newly installed girder with the existing girder by introducing a tensile force,
The fixing tool provided at the end portion of the existing PC steel material connected to the new PC steel material is removed, and the end portion embedded in the existing girder is pulled out to the existing girder. Projecting from,
A male cone is formed on the outer periphery of the cylinder and the existing PC steel material is inserted into the hollow hole, and a fixing nut screwed into the male screw formed on the outer periphery of the female cone; A male cone which is pressed between an inner peripheral surface of the hollow hole of the female cone and an outer peripheral surface of the existing PC steel material inserted through the hollow hole to fix the existing PC steel material and the female cone; ,
Attaching the fixing tool to the protruding portion of the existing PC steel material, the bearing plate contacting the fixing nut and transmitting the tensile force of the existing PC steel material to the existing concrete member;
Filling concrete or mortar between the bearing plate and the existing girder and transmitting the tensile force of the existing PC steel material to the existing girder;
A tension member is screwed into a male screw formed on the outer periphery of the female cone, the tension member is pulled in the axial direction of the existing PC steel material, and the fixing nut is pulled in a state where the tension member is pulled. Tightening the pressure plate so that it closely contacts the pressure plate;
A first female screw formed at one end of a coupler for connecting the existing PC steel material and the new PC steel material is screwed with a male screw formed on the outer peripheral portion of the female cone, and the coupler A step of connecting to one end of the new PC steel material via a second female screw formed on the other end of the
Concrete is placed between the existing girder or the area where the new girder is formed, or the pre-formed girder and the existing girder is hardened, and after the concrete is hardened, the new PC steel material is pulled to form the new girder. A method of widening a bridge characterized in that
JP2013019315A 2013-02-04 2013-02-04 PC steel connection method and bridge widening method Active JP6083702B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2013019315A JP6083702B2 (en) 2013-02-04 2013-02-04 PC steel connection method and bridge widening method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2013019315A JP6083702B2 (en) 2013-02-04 2013-02-04 PC steel connection method and bridge widening method

Publications (2)

Publication Number Publication Date
JP2014148870A JP2014148870A (en) 2014-08-21
JP6083702B2 true JP6083702B2 (en) 2017-02-22

Family

ID=51572049

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2013019315A Active JP6083702B2 (en) 2013-02-04 2013-02-04 PC steel connection method and bridge widening method

Country Status (1)

Country Link
JP (1) JP6083702B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6979542B1 (en) * 2021-04-19 2021-12-15 川田建設株式会社 Prestressed concrete deck expansion method

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6117898B1 (en) * 2015-11-25 2017-04-19 中日本高速技術マーケティング株式会社 Structure-tightening method
JP6721940B2 (en) * 2016-04-21 2020-07-15 首都高速道路株式会社 Widening structure of existing PC floor slab
JP6799998B2 (en) * 2016-11-07 2020-12-16 三井住友建設株式会社 Repair method of floor slab and intermediate fixing tool
CN106395674B (en) * 2016-11-25 2019-02-12 柳州市邱姆预应力机械有限公司 Smart Front Cassette Jack
JP7088191B2 (en) * 2017-07-28 2022-06-21 住友電気工業株式会社 Concrete structure
JP6751694B2 (en) * 2017-09-29 2020-09-09 株式会社栗本鐵工所 Insertor for forming sheath connection port, molding method of sheath connection port and installation method of concrete segment
JP7164943B2 (en) * 2017-10-16 2022-11-02 住友電気工業株式会社 Joint error adjustment mechanism and joint
CN108951428B (en) * 2018-08-30 2024-08-20 湖北科技学院 Bridge prestress tensioning equipment
JP7217673B2 (en) * 2019-06-13 2023-02-03 三井住友建設株式会社 Concrete floor slab, method for forming concrete floor slab, and method for repairing concrete floor slab
JP7412139B2 (en) * 2019-11-11 2024-01-12 神鋼鋼線工業株式会社 Tension adjustment jig for PC steel and tension adjustment method for PC steel
JP7388703B2 (en) * 2020-01-14 2023-11-29 極東鋼弦コンクリート振興株式会社 Connection tool for widening and fixing method
JP6830610B1 (en) * 2020-10-22 2021-02-17 株式会社ハナミズキ・ブリッジ・プランニング How to connect PC steel

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS604119U (en) * 1983-06-22 1985-01-12 黒沢建設株式会社 PC steel wire connector
JP2002069929A (en) * 2000-08-30 2002-03-08 Haltec:Kk Connection structure of cable on pc bridge
JP2007231683A (en) * 2006-03-03 2007-09-13 Yokogawa Koji Kk Tension anchoring connection method of connected member by wire
JP4712612B2 (en) * 2006-05-24 2011-06-29 川田建設株式会社 PC tension material intermediate fixing device and intermediate fixing method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6979542B1 (en) * 2021-04-19 2021-12-15 川田建設株式会社 Prestressed concrete deck expansion method
JP2022165122A (en) * 2021-04-19 2022-10-31 川田建設株式会社 Expansion method for prestressed concrete floor slab

Also Published As

Publication number Publication date
JP2014148870A (en) 2014-08-21

Similar Documents

Publication Publication Date Title
JP6083702B2 (en) PC steel connection method and bridge widening method
JP7430155B2 (en) Method for constructing a connection structure between precast structural members and time-cured materials
JP2009108675A (en) Apparatus and method for reinforcing a support structure
KR20110111907A (en) Saddle structure for cable-stayed cable-stayed bridge
CA2864257A1 (en) Device for introducing a force into tension members made of fiber-reinforced flat-strip plastic lamellas
JP6232300B2 (en) Re-fixing method for existing PC steel
JP5261418B2 (en) Method for manufacturing prestressed concrete member
JP7217673B2 (en) Concrete floor slab, method for forming concrete floor slab, and method for repairing concrete floor slab
CN110184954B (en) Bridge prestressed body outer cable dismantling method
JP2018024983A (en) Intermediate fixing device and method of attaching intermediate fixing device
JP6721940B2 (en) Widening structure of existing PC floor slab
JP2006169731A (en) Temporary anchorage device for pretensioned hollow girder transversely fastening prestressing steel, and anchoring method for the same
JP2016098563A (en) Tension fixation method for precast concrete girder using pre-grout pc steel material
JP2005325518A (en) Prestress introduction unit and prestress introduction method
CN117940633A (en) Release system and method for releasing a structural element or a tensioning element
JP4311748B2 (en) Tension material fixing device and tension material fixing method
JP2005090124A (en) Connecting structure for precast floor slab
JP6022997B2 (en) Tensile anchor and tension member
JP2007063796A (en) Structure and method for widening connection of bridge
JP7186670B2 (en) Concrete floor slab repair method
KR101857541B1 (en) Post-tension Anchorage for Reduced Curvature Loss of Tendon
JP2018127866A (en) Anchorage replacement method of pc structure
KR102167163B1 (en) Restrain constructing method using reinforcement construction for ground anchor
JP2006112189A (en) Tensional material anchoring tool
JP2019039141A (en) Intermediate anchor for tendons

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20151001

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20160812

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20160823

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20161017

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20161227

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20170117

R150 Certificate of patent or registration of utility model

Ref document number: 6083702

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313115

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250