JP6087656B2 - Pinhole detection method for water shielding sheet - Google Patents
[go: Go Back, main page]

JP6087656B2 - Pinhole detection method for water shielding sheet - Google Patents

Pinhole detection method for water shielding sheet Download PDF

Info

Publication number
JP6087656B2
JP6087656B2 JP2013029633A JP2013029633A JP6087656B2 JP 6087656 B2 JP6087656 B2 JP 6087656B2 JP 2013029633 A JP2013029633 A JP 2013029633A JP 2013029633 A JP2013029633 A JP 2013029633A JP 6087656 B2 JP6087656 B2 JP 6087656B2
Authority
JP
Japan
Prior art keywords
sheet
water shielding
shielding sheet
pressing member
pinhole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2013029633A
Other languages
Japanese (ja)
Other versions
JP2014158990A (en
Inventor
克樹 高岡
克樹 高岡
藤本 和久
和久 藤本
弓削 陽治
陽治 弓削
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsuboshi Belting Ltd
Original Assignee
Mitsuboshi Belting Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsuboshi Belting Ltd filed Critical Mitsuboshi Belting Ltd
Priority to JP2013029633A priority Critical patent/JP6087656B2/en
Publication of JP2014158990A publication Critical patent/JP2014158990A/en
Application granted granted Critical
Publication of JP6087656B2 publication Critical patent/JP6087656B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Processing Of Solid Wastes (AREA)

Description

本発明は、廃棄物処分場に敷設される遮水シートのピンホール検出方法に関する。   The present invention relates to a pinhole detection method for a water shielding sheet laid in a waste disposal site.

廃棄物処分場に敷設される遮水シートは、その現場敷設時にピンホールが発生することがある。そのため、現場敷設後にピンホールの有無が検査され、ピンホールがあればその部分を補修していた。   Pinholes may occur in the water shielding sheet laid at the waste disposal site when laying the site. For this reason, the presence or absence of a pinhole was inspected after laying the site, and if there was a pinhole, that portion was repaired.

このピンホール検出に適した遮水シートの構成として、日本特許第3710840号には、以下の遮水シートの敷設構造が提案されている。
廃棄物最終処分場において、下地上に通電性シート2(例えば、通電性不織布)と遮水シート1(例えば、加硫ゴムシート、ポリエチレンシート)を順次別体で敷設し、これらのシート1,2間に導電性粘着両面テープなどを介して通電性を確保する構造である。そして前記遮水シート1の上に検査用電極ブラシ7を移動させることで、両シート間の通電状態を電気的に検知して前記遮水シートのピンホール5の有無を検出する。(図1〜3を参照)
すなわち、通電性シート2と遮水シート1を一体化することなく別々に敷設し、両者間の通電性を導電性粘着両面テープなどの通電手段により確保する構造である。
Japanese Patent No. 3,710,840 proposes the construction of the following water shielding sheet as a structure of the water shielding sheet suitable for this pinhole detection.
In the final disposal site for waste, an electrically conductive sheet 2 (for example, an electrically conductive nonwoven fabric) and a water shielding sheet 1 (for example, a vulcanized rubber sheet, a polyethylene sheet) are sequentially laid separately on these substrates. It is a structure which ensures electroconductivity through a conductive adhesive double-sided tape etc. between two. Then, by moving the inspection electrode brush 7 on the water-impervious sheet 1, the energized state between both sheets is electrically detected to detect the presence or absence of the pinhole 5 in the water-impervious sheet. (See Figures 1-3)
That is, the conductive sheet 2 and the water shielding sheet 1 are separately laid without being integrated, and the conductive property between the two is secured by a conductive means such as a conductive adhesive double-sided tape.

特許第3710840号Japanese Patent No. 3710840

しかし、この遮水シートの敷設構造では、通電性シートと遮水シートとの間の良好な通電状態が維持されていなければ、正確にピンホールを検出することが困難であった。例えば、通電性シートと遮水シートとの間に空気等が介在する隙間があると遮水シートのピンホールがあっても通電しにくい。そのため、警報ブザーや警報ランプが作動しないことがある。
そこで、通常通電性シートと遮水シートとは、現場で導電性粘着両面テープや導電性接着剤を用いて局部的もしくは比較的広範囲にわたって接合して隙間を無くす必要がある。この接合作業には多大な施工時間と費用を要する。
However, in this water shielding sheet laying structure, it is difficult to accurately detect a pinhole unless a good energization state is maintained between the conductive sheet and the water shielding sheet. For example, if there is a gap in which air or the like is interposed between the conductive sheet and the water shielding sheet, it is difficult to energize even if there is a pinhole in the water shielding sheet. Therefore, the alarm buzzer and the alarm lamp may not work.
Therefore, it is necessary to join the electrically conductive sheet and the water shielding sheet on the site locally or over a relatively wide range using a conductive adhesive double-sided tape or a conductive adhesive to eliminate a gap. This joining work requires a lot of construction time and cost.

本発明の目的は、通電性シートと遮水シートの接合をなくし、たとえ遮水シートが浮き、これらのシート間に隙間が存在していても、正確に両シート間に通電を行ってピンホールが検出できる方法を提供するものである。   The object of the present invention is to eliminate the bonding between the electrically conductive sheet and the water shielding sheet, and even if the water shielding sheet floats and there is a gap between these sheets, the current is accurately passed between the two sheets to pinhole. Provides a method by which can be detected.

課題を解決するための手段及び効果Means and effects for solving the problems

第1の本発明のピンホール検出方法は、廃棄物処分場に敷設される遮水シートのピンホール検出方法であって、
前記遮水シートの下地の上に通電性マットを敷設する工程と、前記通電性マットの上に遮水シートを敷設する工程と、前記遮水シート上にシート押え部材を配設して、前記通電性マットに対して押圧する工程と、押圧された前記遮水シートに対して電極ブラシを配設して、ピンホールを検出する工程と、を含み、
前記押圧工程は、前記遮水シートが浮き上がる部分を前記シート押え部材が押圧して、前記遮水シートと前記通電性マットとを密着させるものであり、
前記電極ブラシによる検出工程は、前記シート押え部材による押圧工程の直後に行われ、前記押圧工程での密着部分に沿うように前記電極ブラシを作用させるものであり、
前記電極ブラシと前記シート押え部材とを備える組立体は、取っ手構造の操作部を有し、前記操作部を人力で操作して、前記遮水シートの必要箇所の全体に押圧を作用させることを特徴とするものである。
The pinhole detection method of the first aspect of the present invention is a pinhole detection method for a water shielding sheet laid in a waste disposal site,
A step of laying an electroconductive mat on the base of the water-impervious sheet, a step of laying a water-impervious sheet on the electroconductive mat, a sheet pressing member disposed on the water-impervious sheet, A step of pressing against the conductive mat, and a step of detecting a pinhole by disposing an electrode brush on the pressed water shielding sheet,
In the pressing step, the sheet pressing member presses a portion where the water shielding sheet is lifted, and the water shielding sheet and the conductive mat are brought into close contact with each other.
The detection step by the electrode brush is performed immediately after the pressing step by the sheet pressing member, and the electrode brush is caused to act along the close contact portion in the pressing step ,
Assembly and a said sheet holding member and the electrode brush has an operating portion of the handle structure, the operating portion is operated by human power, Rukoto reacted with pressing the whole of the necessary portions of the water shield sheet It is characterized by.

本発明の構成によれば、遮水シート上のシート押え部材による押圧により、遮水シートと通電性マットとが密着し、両部材間の通電が確保される。この押圧の直後に、すなわち両部材間の通電が確保された状態で、電極ブラシが遮水シートのピンホールを検出する。シート押え部材と電極ブラシとをセットにして遮水シート上を走査移動させることにより、広範囲にわたり両部材間の通電を確保した状態でピンホールを検出することができる。
また、通電性マットと遮水シートとの間には、導電性粘着両面テープのような通電部材が介在しないため、遮水シートの敷設作業は簡単に行える。
According to the configuration of the present invention, the water-impervious sheet and the conductive mat are brought into close contact with each other by pressing by the sheet pressing member on the water-impervious sheet, and energization between the two members is ensured. Immediately after this pressing, that is, in a state where energization between both members is ensured, the electrode brush detects a pinhole in the water shielding sheet. A pinhole can be detected in a state where energization between both members is ensured over a wide range by scanning and moving on the water shielding sheet with the sheet pressing member and the electrode brush set.
In addition, since there is no current-carrying member such as a conductive adhesive double-sided tape between the conductive mat and the water-impervious sheet, the laying operation of the water-impervious sheet can be easily performed.

第2の本発明のピンホール検出方法は、前記第1の発明において、前記押圧工程は、回転可能な前記シート押え部材を前記遮水シート上で回転移動させながら行うものである。   In the pinhole detection method according to a second aspect of the present invention, in the first aspect of the invention, the pressing step is performed while the rotatable sheet pressing member is rotated on the water shielding sheet.

この構成によれば、回転可能なシート押え部材を遮水シート上で回転移動させることで、簡単な構成により広範囲にわたり、遮水シートを通電性マットに押圧することができる。   According to this configuration, by rotating and rotating the rotatable sheet pressing member on the water shielding sheet, the water shielding sheet can be pressed against the conductive mat over a wide range with a simple configuration.

第3の本発明のピンホール検出方法は、前記第2の発明において、前記シート押え部材は、前記電極ブラシに先行するように、前記電極ブラシに装着されているものである。   The pinhole detection method of the third aspect of the present invention is the method according to the second aspect, wherein the sheet pressing member is attached to the electrode brush so as to precede the electrode brush.

この構成によれば、回転可能なシート押え部材と電極ブラシとをセットにして、遮水シート上を走査移動させることができる。   According to this configuration, the rotatable sheet pressing member and the electrode brush can be set and scanned on the water shielding sheet.

第4の本発明のピンホール検出方法は、前記第2又は第3の発明において、前記シート押え部材は、前記遮水シートに、1〜20N/cmの圧力を付与するものである。好ましくは、前記遮水シートに、5〜15N/cmの圧力を付与するものである。 In the pinhole detection method according to a fourth aspect of the present invention, in the second or third aspect, the sheet pressing member applies a pressure of 1 to 20 N / cm 2 to the water shielding sheet. Preferably, a pressure of 5 to 15 N / cm 2 is applied to the water shielding sheet.

この構成によれば、両部材を適切に密着させることができる。すなわち、1N/cm未満では、圧力は小さすぎて遮水シートと通電性マットとが密着しない場合がある。一方、20N/cmを超える圧力になると、遮水シートのピンホールも変形して正確な検査が出来なくなり、またシート押え部材と電極ブラシとをセットにして遮水シート上を走査移動させる作業に負荷がかかり、作業性が悪くなる。 According to this configuration, both members can be properly brought into close contact with each other. That is, when the pressure is less than 1 N / cm 2 , the pressure is too small and the water shielding sheet and the conductive mat may not be in close contact with each other. On the other hand, when the pressure exceeds 20 N / cm 2 , the pinhole of the water shielding sheet is also deformed and accurate inspection cannot be performed, and the sheet pressing member and the electrode brush are set to scan and move on the water shielding sheet. The work load becomes worse and workability becomes worse.

敷設構造、検査装置及び検出方法の概要を示す図である。It is a figure which shows the outline | summary of laying structure, an inspection apparatus, and a detection method.

以下、図面を参照しつつ、本発明の実施の形態を説明する。   Hereinafter, embodiments of the present invention will be described with reference to the drawings.

図1は、敷設構造、検査装置及び検出方法の概要を示す図である。以下敷設構造、検査装置及び検出方法を順に説明する。   FIG. 1 is a diagram illustrating an outline of a laying structure, an inspection apparatus, and a detection method. Hereinafter, the laying structure, the inspection apparatus, and the detection method will be described in order.

〔敷設構造〕
図1に示すように、敷設構造1は、遮水シート2の下地3の上に敷設された通電性マット4と、この通電性マット4の上に、別体に敷設された遮水シート2とからなる。
[Laying structure]
As shown in FIG. 1, the laying structure 1 includes an electrically conductive mat 4 laid on a base 3 of a water shielding sheet 2 and a water shielding sheet 2 laid separately on the conductive mat 4. It consists of.

通電性マット4は、通電性を有する下敷きである。例えば、アルミニウム箔の表面に織布,不織布を貼付したもの、カーボンを混入した繊維を含む導電性不織布、電子共役系導電性高分子であるポリピロールを化学的に形成させた繊維を使用する導電性不織布、アクリル繊維を2価の銅化合物と硫黄とを含む化合物で処理して製造する繊維を使用する導電性不織布、から選ばれる。通電性だけではなく、下敷きとしての補強機能のために、その厚みは、1.0〜20.0mmであるものが好ましい。
通常、この通電性マット4は、遮水シート2の下地3の全面に敷設される。しかし、ピンホールが発生する部位が決まっている場合などには、部分的に通電性マット4を敷設することができる。
The conductive mat 4 is an underlay having electrical conductivity. For example, a conductive fabric using a woven fabric or nonwoven fabric affixed to the surface of an aluminum foil, a conductive nonwoven fabric containing fibers mixed with carbon, or a fiber formed by chemically forming polypyrrole, an electron-conjugated conductive polymer. The nonwoven fabric is selected from conductive nonwoven fabrics using fibers produced by treating acrylic fibers with a compound containing a divalent copper compound and sulfur. The thickness is preferably 1.0 to 20.0 mm for not only the conductivity but also the reinforcing function as an underlay.
Normally, the conductive mat 4 is laid on the entire surface of the base 3 of the water shielding sheet 2. However, the conductive mat 4 can be partially laid when the part where the pinhole is generated is determined.

遮水シート2としては、熱可塑性エラストマー、ポリエチレン、ポリプロピレン、ポリ塩化ビニル等の樹脂素材や、EPDM(エチレン・プロピレン・ジエン・モノマー)、IIR(ブチルゴム)、NR(天然ゴム)、SBR(スチレン・ブタジエンゴム)、CR(クロロプレンゴム)、NBR(アクリロニトリル・ブタジエンゴム)、HNBR(水素化アクリロニトリル・ブタジエンゴム)、CSM(クロロスルフォン化ポリエチレン)等のゴムの素材からなる防水シートを挙げることができる。なかでも、絶縁性に近い熱可塑性エラストマー、ポリエチレン、ポリプロピレン、ポリ塩化ビニル等の樹脂素材が好ましい。カーボンブラックを多く含有させると通電性が高まり、ピンホールがない場合でも正常に通電することになり正確にピンホールを検出することが困難になる。(ピンホールが存在する部位で通電させる必要がある。)また、これらの素材のシートに補強性を高めるために少量のカーボンブラック等が含有されるが、場合によっては、ガラス繊維やポリエステル繊維などからなる補強布を埋設して、機械的強度を向上させたり、寸法的安定性を向上させることも可能である。その厚みは0.5〜3.0mmの範囲であるものが好ましい。   Examples of the water shielding sheet 2 include resin materials such as thermoplastic elastomer, polyethylene, polypropylene, and polyvinyl chloride, EPDM (ethylene propylene diene monomer), IIR (butyl rubber), NR (natural rubber), SBR (styrene / styrene). Examples thereof include waterproof sheets made of rubber materials such as butadiene rubber, CR (chloroprene rubber), NBR (acrylonitrile butadiene rubber), HNBR (hydrogenated acrylonitrile butadiene rubber), and CSM (chlorosulfonated polyethylene). Of these, resin materials such as thermoplastic elastomers, polyethylene, polypropylene, and polyvinyl chloride that are close to insulating are preferable. When a large amount of carbon black is contained, the electrical conductivity is enhanced, and even when there is no pinhole, the current is normally supplied, and it is difficult to accurately detect the pinhole. (It is necessary to energize in the part where the pinhole exists.) In addition, a small amount of carbon black or the like is contained in the sheet of these materials in order to enhance the reinforcement, but in some cases, glass fiber, polyester fiber, etc. It is also possible to improve the mechanical strength or improve the dimensional stability by embedding a reinforcing cloth made of The thickness is preferably in the range of 0.5 to 3.0 mm.

〔検査装置〕
次に、図1を参照しつつ、検査装置10の概要を説明する。
[Inspection equipment]
Next, an outline of the inspection apparatus 10 will be described with reference to FIG.

検査装置10は、電極ブラシ組立体11と、シート押え部材12と、ピンホール検査機13とを備えてなる。   The inspection device 10 includes an electrode brush assembly 11, a sheet pressing member 12, and a pinhole inspection machine 13.

電極ブラシ組立体11は、長方形の箱体21と、その下面から下向きに植毛された電極ブラシ22と、箱体21の上面から斜め上向きに立設された操作部23とを備えてなる。   The electrode brush assembly 11 includes a rectangular box 21, an electrode brush 22 planted downward from the lower surface thereof, and an operation unit 23 erected obliquely upward from the upper surface of the box 21.

長方形の箱体21は、0.5〜1.5m、通常約1mの幅を有する。その幅の全長に渡り、真鍮製の電極ブラシ22が下向きに植毛されている。箱体21の幅が長すぎると、操作しにくい。一方、短すぎると効率的な検査ができなくなる。電極ブラシ22は、次に述べる回転体25の下方、すなわち、回転体25の下方接点の近く迄延在させている。   The rectangular box 21 has a width of 0.5 to 1.5 m, usually about 1 m. A brass electrode brush 22 is planted downward over the entire length of the width. If the width of the box 21 is too long, it is difficult to operate. On the other hand, if it is too short, efficient inspection cannot be performed. The electrode brush 22 extends below the rotary body 25 described below, that is, near the lower contact of the rotary body 25.

操作部23は、人力走査移動又は自動走査移動のために設けられる。図示例では、人力走査移動に適した取っ手構造を示す。自動走査移動の場合、牽引ロープへの接続構造であってもよい。   The operation unit 23 is provided for manual scanning movement or automatic scanning movement. In the illustrated example, a handle structure suitable for manual scanning movement is shown. In the case of automatic scanning movement, a connection structure to the traction rope may be used.

シート押え部材12は、回転体25を回転自在に支持するアーム26を、箱体21の側面に装着自在にして構成される。箱体21に対して装着自在にすれば、回転体25の交換も容易にできる。回転体25を交換すると、次に述べる押圧の圧力を適切なものに変えることが出来る。   The sheet pressing member 12 is configured such that an arm 26 that rotatably supports the rotating body 25 can be mounted on the side surface of the box 21. If the box 21 can be mounted, the rotating body 25 can be easily replaced. When the rotating body 25 is replaced, the pressure of the pressing described below can be changed to an appropriate one.

回転体25は、一本のローラ又は複数本の車輪を回転軸に回転自在に取り付けて構成される。次に述べる押圧の圧力を適切に保つために、回転体25の直径は、50〜200mmのものを用いるのが好ましい。また、ローラや車輪の中に適量の液体を注入することにより、その重量を調整可能にすることもできる。   The rotating body 25 is configured by rotatably mounting one roller or a plurality of wheels on a rotating shaft. In order to keep the pressing pressure described below appropriately, it is preferable to use a rotating body 25 having a diameter of 50 to 200 mm. Moreover, the weight can be adjusted by injecting an appropriate amount of liquid into a roller or a wheel.

このようなシート押え部材12は、通常遮水シート2に1〜20N/cm2、好ましくは5〜15N/cmの圧力を付与して両者部材を密着する荷重を有している。1N/cm未満では、圧力は小さすぎて遮水シート2と通電性マット4とが密着しない場合があり、一方20N/cmを超える圧力になると、遮水シート2のピンホールも変形して正確な検査が出来なくなり、またシート押え部材と電極ブラシとをセットにして遮水シート上を走査移動させる作業に負荷がかかり、作業性が悪くなる。 Such a sheet pressing member 12 usually has a load that applies a pressure of 1 to 20 N / cm 2, preferably 5 to 15 N / cm 2 to the water-impervious sheet 2 to bring the two members into close contact with each other. If the pressure is less than 1 N / cm 2 , the water shielding sheet 2 and the conductive mat 4 may not be in close contact with each other. On the other hand, if the pressure exceeds 20 N / cm 2 , the pinhole of the water shielding sheet 2 is also deformed. Therefore, accurate inspection cannot be performed, and a load is imposed on the work of scanning and moving on the water-impervious sheet with the sheet pressing member and the electrode brush set, resulting in poor workability.

このようなシート押え部材12は、電極ブラシ組立体11の進行方向の前に設けられる。そのため、電極ブラシ組立体11の走査移動時に、シート押え部材12が先行して、遮水シート2を適切に押圧する。
このように、シート押え部材12は、回転可能な車輪などの回転体25を備え、回転軸のアーム26が箱体21に装着されているものであり、遮水シート2を通電性マット4に押圧して密着させる機能を有している。
Such a sheet pressing member 12 is provided in front of the traveling direction of the electrode brush assembly 11. Therefore, when the electrode brush assembly 11 is scanned and moved, the sheet pressing member 12 precedes and appropriately presses the water shielding sheet 2.
As described above, the sheet pressing member 12 includes the rotating body 25 such as a rotatable wheel, the arm 26 of the rotating shaft is mounted on the box body 21, and the water shielding sheet 2 is attached to the conductive mat 4. It has a function of pressing and closely contacting.

検査装置10は、ピンホール検査機13の陰極27を遮水シート2の下側の通電性マット4に接続した後、印加電圧5〜25KVに設定し、シート押え部材12を装着した黄銅線製電極ブラシ22を遮水シート2の面に沿わせて手動走査もしくは自動走査させ、放電(スパーク)の発生が無いか否かを検出する。放電がない場合はピンホールがなく合格品とする。   After connecting the cathode 27 of the pinhole inspection machine 13 to the conductive mat 4 on the lower side of the water shielding sheet 2, the inspection apparatus 10 is set to an applied voltage of 5 to 25 KV and is made of brass wire with the sheet pressing member 12 attached. The electrode brush 22 is manually scanned or automatically scanned along the surface of the water shielding sheet 2 to detect whether or not discharge (spark) has occurred. If there is no discharge, there is no pinhole and the product is accepted.

ピンホール検査機13は高圧コード28を介して接続された幅約1mの真鍮製の電極ブラシ22に高電圧を発生させるとともに前記電極ブラシ22の近傍で生じる放電の発生をランプあるいはブザーによって検知する機能を備えることもできる。   The pinhole inspection machine 13 generates a high voltage on a brass electrode brush 22 having a width of about 1 m connected via a high voltage cord 28 and detects the occurrence of discharge in the vicinity of the electrode brush 22 by a lamp or a buzzer. A function can also be provided.

遮水シート2にピンホールがない場合には、遮水シート2により絶縁されており、放電しない。一方、遮水シート2にピンホールが生じていると、遮水シート2の上面からピンホールを介して前記通電性マット4に放電が発生する。この放電を検知することで、ピンホールを検知できる。   When there is no pinhole in the impermeable sheet 2, it is insulated by the impermeable sheet 2 and does not discharge. On the other hand, if a pinhole is generated in the water shielding sheet 2, a discharge occurs in the conductive mat 4 from the upper surface of the water shielding sheet 2 through the pinhole. Pinholes can be detected by detecting this discharge.

上記印加電圧は20kVを超えると危険となる一方、印加電圧5kV未満とすると上記放電を発生させることができないので、上記ピンホールを検知可能な上記印加電圧は、5kV〜20kVとすることが好ましい。   When the applied voltage exceeds 20 kV, it becomes dangerous. On the other hand, when the applied voltage is less than 5 kV, the discharge cannot be generated. Therefore, the applied voltage capable of detecting the pinhole is preferably 5 kV to 20 kV.

次に、上述した敷設構造1に対して、上述した検査装置10を用いて行う検出方法について説明する。   Next, a detection method performed on the above-described laying structure 1 using the above-described inspection apparatus 10 will be described.

<第1工程>
図1において、第1工程は、遮水シート2の敷設が予定されている下地3の上に、通電性マット4を敷設する工程である。この通電性マット4は、所定幅のシートになっており、これらを並設するように敷きつめる。互いの通電性が確保できるように、幅方向の端をオーバーラップさせるか、又は、導電性テープで接合する。
通常、下地3の上に全面に、通電性マット4を敷設する。ピンホールが発生し易い場所が決まっている場合には、その部分にだけ通電性マット4を敷設することができる。
<First step>
In FIG. 1, the first step is a step of laying the conductive mat 4 on the base 3 on which the water shielding sheet 2 is scheduled to be laid. The conductive mat 4 is a sheet having a predetermined width, and these are placed so as to be arranged side by side. In order to ensure mutual conductivity, the ends in the width direction are overlapped or joined with a conductive tape.
Usually, the conductive mat 4 is laid on the entire surface of the base 3. When a place where pinholes are likely to occur is determined, the conductive mat 4 can be laid only in that portion.

<第2工程>
図1において、第2工程は、下地3の上に敷設された通電性マット4の上に、下地3の全面を覆うように遮水シート2を敷設する工程である。この遮水シート2も所定幅のシートになっており、幅方向の端をオーバーラップさせて敷きつめる。オーバーラップ部分は、熱融着等で接合し、全面にわたって遮水できるようにする。
この遮水シート2の敷設に際して、通電性マット4との間に、接着剤などを介在させない。そのため、図1のように、通電性マット4に対して、遮水シート2が密着しない部分が出来ることがある。
<Second step>
In FIG. 1, the second step is a step of laying the water shielding sheet 2 on the conductive mat 4 laid on the base 3 so as to cover the entire surface of the base 3. This water-impervious sheet 2 is also a sheet having a predetermined width, and is laid with overlapping ends in the width direction. The overlap portion is bonded by heat fusion or the like so that water can be shielded over the entire surface.
When laying the water shielding sheet 2, no adhesive or the like is interposed between the conductive mat 4. Therefore, as shown in FIG. 1, a portion where the water shielding sheet 2 does not adhere to the conductive mat 4 may be formed.

<第3工程>
図1において、第3工程は、遮水シート2上にシート押え部材12を配設して、通電性マット4に対して押圧する工程である。シート押え部材12の回転体25の直径や重量を選択することにより、遮水シート2に対して、1〜20N/cm2、好ましくは5〜15N/cmの圧力を付与する。そうすると、図1のように、シート押え部材12の真下においては、遮水シート2と通電性マット4とが密着し、両部材間の通電が確保される。
操作部23を人力で押して、シート押え部材12の回転体25を転がし、縦横に走査移動させることにより、押圧を遮水シート2の必要箇所の全体に作用させることができる。
<Third step>
In FIG. 1, the third step is a step in which the sheet pressing member 12 is disposed on the water shielding sheet 2 and pressed against the conductive mat 4. By selecting the diameter and weight of the rotating body 25 of the sheet pressing member 12, a pressure of 1 to 20 N / cm 2, preferably 5 to 15 N / cm 2 is applied to the water shielding sheet 2. Then, as shown in FIG. 1, immediately below the sheet pressing member 12, the water-impervious sheet 2 and the conductive mat 4 are in close contact with each other, and energization between the two members is ensured.
By pressing the operation unit 23 by human power, the rotating body 25 of the sheet pressing member 12 is rolled, and the scanning movement is performed in the vertical and horizontal directions, the pressing can be applied to the entire necessary portion of the water shielding sheet 2.

<第4工程>
図1おいて、第4工程は、押圧された遮水シート2に対して電極ブラシ22を配設して、ピンホールを検出する工程である。この第4工程は、前記第3工程の直後に行われる。すなわち、遮水シート2と通電性マット4とが密着し、両部材間の通電が確保された部分に対して、電極ブラシ22を沿わせることにより、確実にピンホールの有無を検査できる。
図1のように、シート押え部材12は、電極ブラシ組立体11に装着されている。そのため、操作部23を操作して、電極ブラシ22を遮水シート2上を走査移動させると、自動的に電極ブラシ22に先行してシート押え部材12による適切な押圧が行われる。
<4th process>
In FIG. 1, the 4th process is a process of arrange | positioning the electrode brush 22 with respect to the pressed water-impervious sheet 2, and detecting a pinhole. This fourth step is performed immediately after the third step. That is, the presence or absence of a pinhole can be reliably inspected by placing the electrode brush 22 along a portion where the water-impervious sheet 2 and the conductive mat 4 are in close contact with each other and the conduction between the two members is ensured.
As shown in FIG. 1, the sheet pressing member 12 is attached to the electrode brush assembly 11. Therefore, when the operation unit 23 is operated and the electrode brush 22 is scanned and moved on the water-impervious sheet 2, an appropriate pressing by the sheet pressing member 12 is automatically performed prior to the electrode brush 22.

つぎに、上述した検出方法の利点を説明する。まず、通電性マット4を敷設する第1工程と、遮水シート2を敷設する第2工程とは、順次、独立して行われる。通電性マット4と遮水シート2との間に通電性を確保する部材を介在させる工程がないため、遮水シート2の敷設作業は簡単に行える。   Next, the advantages of the detection method described above will be described. First, the first step of laying the conductive mat 4 and the second step of laying the water shielding sheet 2 are sequentially performed independently. Since there is no step of interposing a member for ensuring electrical conductivity between the electrically conductive mat 4 and the water shielding sheet 2, the laying operation of the water shielding sheet 2 can be easily performed.

遮水シート2の上にシート押え部材12を配設して、遮水シート2を通電性マット4に押圧するため、遮水シート2が浮き上がる部分があっても、シート押え部材12により、適切な圧力で押圧できる。そのため、遮水シート2と通電性マット4とが密着し、両部材間の通電が確保される。この押圧部分に沿う様に電極ブラシ22を作用させるため、ピンホールが確実に検出できる。   Since the sheet pressing member 12 is disposed on the water shielding sheet 2 and presses the water shielding sheet 2 against the conductive mat 4, even if there is a part where the water shielding sheet 2 is lifted, the sheet pressing member 12 It can be pressed with great pressure. For this reason, the water-impervious sheet 2 and the conductive mat 4 are in close contact with each other, and energization between both members is ensured. Since the electrode brush 22 is made to act along this pressing part, a pinhole can be detected reliably.

通電性マット4に対して遮水シート2を押圧する第3工程の直後に、押圧された遮水シート4に対して電極ブラシ22を沿わせる第4工程が行われる構成である。そのため、シート押え部材12を装着した電極ブラシ組立体11を、人力走査移動又は自動走査移動させるという一度の動作で、ピンホールが検出され、操作性が良い。   Immediately after the third step of pressing the water-impervious sheet 2 against the conductive mat 4, the fourth step of bringing the electrode brush 22 along the pressed water-impervious sheet 4 is performed. Therefore, pinholes are detected and the operability is good with a single operation of manually moving or automatically moving the electrode brush assembly 11 to which the sheet pressing member 12 is mounted.

以上に本発明の好適な実施形態を説明したが、上記の実施形態は以下のように変更して実施することができる。   Although the preferred embodiments of the present invention have been described above, the above embodiments can be implemented with the following modifications.

即ち、上記実施形態では、シート押え部材12は回転体25を用いるものに限らず、押圧パッドを遮水シート2の上を滑らせるというものであってもよい。この場合、押圧パッドの押圧面は、遮水シート2の上を滑り易い材質で構成する。   That is, in the above embodiment, the sheet pressing member 12 is not limited to the one using the rotating body 25, and the pressing pad may be slid on the water shielding sheet 2. In this case, the pressing surface of the pressing pad is made of a material that easily slides on the water shielding sheet 2.

また、シート押え部材12の前後に、電極ブラシ組立体11を二つ備えるものであってもよい。走査移動の端で方向転換することなく、逆方向に移動させるだけで、走査移動ができる。この場合、逆方向移動時に、作動する電極ブラシ組立体11を切り換えればよい。   Further, two electrode brush assemblies 11 may be provided before and after the sheet pressing member 12. The scanning movement can be performed only by moving in the reverse direction without changing the direction at the end of the scanning movement. In this case, the electrode brush assembly 11 to be operated may be switched when moving in the reverse direction.

また、電極ブラシ組立体11の前後にシート押え部材12を二つ備えるものであってもよい。走査移動の端で方向転換することなく、逆方向に移動させるだけで、走査移動ができる。この場合、電極ブラシ組立体11に後に続くシート押え部材12は、先行するシート押え部材12による押圧状態を保持する機能を持たせることができる。   Further, two sheet pressing members 12 may be provided before and after the electrode brush assembly 11. The scanning movement can be performed only by moving in the reverse direction without changing the direction at the end of the scanning movement. In this case, the sheet pressing member 12 following the electrode brush assembly 11 can have a function of holding the pressing state by the preceding sheet pressing member 12.

1 敷設構造
2 遮水シート
3 下地
4 通電性マット
10 検査装置
11 電極ブラシ組立体
12 シート押え部材
13 ピンホール検査機
21 箱体
22 電極ブラシ
23 操作部
25 回転体
26 アーム
27 陰極
28 高圧コード
DESCRIPTION OF SYMBOLS 1 Laying structure 2 Water shielding sheet 3 Base 4 Conductive mat 10 Inspection apparatus 11 Electrode brush assembly 12 Sheet pressing member 13 Pinhole inspection machine 21 Box body 22 Electrode brush 23 Operation part 25 Rotating body 26 Arm 27 Cathode 28 High voltage cord

Claims (4)

廃棄物処分場に敷設される遮水シートのピンホール検出方法であって、
前記遮水シートの下地の上に通電性マットを敷設する工程と、
前記通電性マットの上に遮水シートを敷設する工程と、
前記遮水シート上にシート押え部材を配設して、前記通電性マットに対して押圧する工程と、
押圧された前記遮水シートに対して電極ブラシを配設して、ピンホールを検出する工程と、を含み、
前記押圧工程は、前記遮水シートが浮き上がる部分を前記シート押え部材が押圧して、前記遮水シートと前記通電性マットとを密着させるものであり、
前記電極ブラシによる検出工程は、前記シート押え部材による押圧工程の直後に行われ、前記押圧工程での密着部分に沿うように前記電極ブラシを作用させるものであり、
前記電極ブラシと前記シート押え部材とを備える組立体は、取っ手構造の操作部を有し、前記操作部を人力で操作して、前記遮水シートの必要箇所の全体に押圧を作用させることを特徴とする遮水シートのピンホール検出方法。
A pinhole detection method for a water shielding sheet laid in a waste disposal site,
Laying a conductive mat on the base of the water shielding sheet;
Laying a water shielding sheet on the conductive mat;
Arranging a sheet pressing member on the water-impervious sheet and pressing the conductive mat;
Arranging an electrode brush on the pressed water shielding sheet and detecting a pinhole,
In the pressing step, the sheet pressing member presses a portion where the water shielding sheet is lifted, and the water shielding sheet and the conductive mat are brought into close contact with each other.
The detection step by the electrode brush is performed immediately after the pressing step by the sheet pressing member, and the electrode brush is caused to act along the close contact portion in the pressing step ,
The assembly including the electrode brush and the sheet pressing member has an operation part having a handle structure, and operates the operation part manually to apply pressure to the entire necessary portion of the water shielding sheet. A pinhole detection method for a water shielding sheet that is characterized.
請求項1に記載の遮水シートのピンホール検出方法であって、
前記押圧工程は、回転可能な前記シート押え部材を前記遮水シート上で回転移動させながら行う遮水シートのピンホール検出方法。
It is a pinhole detection method of the impermeable sheet according to claim 1,
The method of detecting a pinhole in a water shielding sheet, wherein the pressing step is performed while the rotatable sheet pressing member is rotated on the water shielding sheet.
請求項2に記載の遮水シートのピンホール検出方法であって、前記シート押え部材は、前記電極ブラシに先行するように、前記電極ブラシに装着されている遮水シートのピンホール検出方法。 The pinhole detection method for a water shielding sheet according to claim 2, wherein the sheet pressing member is attached to the electrode brush so as to precede the electrode brush. 請求項2または3に記載の遮水シートのピンホール検出方法であって、前記シート押え部材は、前記遮水シートに、1〜20N/cm2の圧力を付与する遮水シートのピンホール検出方法。 The pinhole detection method for a water shielding sheet according to claim 2 or 3, wherein the sheet pressing member applies a pressure of 1 to 20 N / cm 2 to the water shielding sheet. Method.
JP2013029633A 2013-02-19 2013-02-19 Pinhole detection method for water shielding sheet Active JP6087656B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2013029633A JP6087656B2 (en) 2013-02-19 2013-02-19 Pinhole detection method for water shielding sheet

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2013029633A JP6087656B2 (en) 2013-02-19 2013-02-19 Pinhole detection method for water shielding sheet

Publications (2)

Publication Number Publication Date
JP2014158990A JP2014158990A (en) 2014-09-04
JP6087656B2 true JP6087656B2 (en) 2017-03-01

Family

ID=51611140

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2013029633A Active JP6087656B2 (en) 2013-02-19 2013-02-19 Pinhole detection method for water shielding sheet

Country Status (1)

Country Link
JP (1) JP6087656B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7093967B2 (en) * 2018-09-28 2022-07-01 鹿島建設株式会社 Inspection system
JP7139259B2 (en) * 2019-01-23 2022-09-20 タキロンシーアイ株式会社 Impermeable sheet inspection device and impermeable sheet inspection method
JP6829489B2 (en) * 2019-07-22 2021-02-10 株式会社イッコウ Spark inspection equipment
JP2024522000A (en) * 2021-06-02 2024-06-05 ソルマックス インターナショナル インコーポレイテッド Apparatus and method for detecting missing parts in liners

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5079485U (en) * 1973-11-20 1975-07-09
JP2561286B2 (en) * 1987-07-24 1996-12-04 大阪瓦斯株式会社 How to repair underground metal pipes
JP2743532B2 (en) * 1989-11-17 1998-04-22 東洋製罐株式会社 Defect inspection method for organic coating layer
JP2791936B2 (en) * 1994-04-25 1998-08-27 クレハエラストマー株式会社 How to join the impermeable sheet
JP3188809B2 (en) * 1994-06-17 2001-07-16 川崎製鉄株式会社 Pipeline inspection device
JP3710840B2 (en) * 1995-02-28 2005-10-26 株式会社ブリヂストン Construction structure of impermeable sheet
JP3134047B2 (en) * 1996-01-31 2001-02-13 タキロン株式会社 Laying structure of waterproof sheet and its protection member
JPH09234443A (en) * 1996-02-29 1997-09-09 Bridgestone Corp Impermeable sheet and its laying method
JP2003190905A (en) * 2001-12-27 2003-07-08 C I Kasei Co Ltd Inspection method of impermeable structure and impermeable sheet

Also Published As

Publication number Publication date
JP2014158990A (en) 2014-09-04

Similar Documents

Publication Publication Date Title
JP6087656B2 (en) Pinhole detection method for water shielding sheet
EP0584469B1 (en) Method and apparatus for lining outdoor fluid containment areas
US20120313617A1 (en) Geocomposite enabling leak detection by electrical scan, and method for use
US9459284B2 (en) Conductivity inspection apparatus and conductivity inspection method
JP2018205165A (en) Water leaking position detection system
CN206824853U (en) A kind of welder of laminated battery lug
CN104627600A (en) Double-layer double-drive conveying device
JP4336504B2 (en) Test method for joints in water shielding sheets
JP7093967B2 (en) Inspection system
JP3710840B2 (en) Construction structure of impermeable sheet
JP6829489B2 (en) Spark inspection equipment
JP3134047B2 (en) Laying structure of waterproof sheet and its protection member
JP2002316118A (en) End treatment structure of impermeable sheet
JPH10281918A (en) Leakage position detecting device of water impermeable sheet
JP4951408B2 (en) Water leakage detection method for water shielding sheet
JP3551999B2 (en) Method for detecting water leakage position of water-impervious sheet and water-impervious sheet used in the method
CN212159345U (en) Tensile detection device is used in PCB board production
JP3810512B2 (en) Defect inspection method for water shielding sheet joints
CN222212680U (en) A walking detection device for large pipeline welds
CN107462466A (en) A kind of film stretching force detecting apparatus
KR100995460B1 (en) Welding device assmebly
CN204470831U (en) Welding leak-proof device
JP3683055B2 (en) Surface electrode unit for water leakage detection and manufacturing method thereof
JPS6339628Y2 (en)
CN206605150U (en) A kind of roof boarding welding machine

Legal Events

Date Code Title Description
A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20150709

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20150709

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20150709

RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20150709

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20160525

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20160531

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20160729

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20161011

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20161024

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20170131

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20170202

R150 Certificate of patent or registration of utility model

Ref document number: 6087656

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250