JP6088937B2 - Assembly method of cable suspension type aerial photovoltaic power generation equipment - Google Patents
[go: Go Back, main page]

JP6088937B2 - Assembly method of cable suspension type aerial photovoltaic power generation equipment - Google Patents

Assembly method of cable suspension type aerial photovoltaic power generation equipment Download PDF

Info

Publication number
JP6088937B2
JP6088937B2 JP2013168161A JP2013168161A JP6088937B2 JP 6088937 B2 JP6088937 B2 JP 6088937B2 JP 2013168161 A JP2013168161 A JP 2013168161A JP 2013168161 A JP2013168161 A JP 2013168161A JP 6088937 B2 JP6088937 B2 JP 6088937B2
Authority
JP
Japan
Prior art keywords
cable
power generation
work site
main
suspended
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2013168161A
Other languages
Japanese (ja)
Other versions
JP2015037116A (en
Inventor
高志 伊藤
高志 伊藤
Original Assignee
Jfeテクノス株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jfeテクノス株式会社 filed Critical Jfeテクノス株式会社
Priority to JP2013168161A priority Critical patent/JP6088937B2/en
Publication of JP2015037116A publication Critical patent/JP2015037116A/en
Application granted granted Critical
Publication of JP6088937B2 publication Critical patent/JP6088937B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Photovoltaic Devices (AREA)

Description

この発明は、ケーブル懸架型空中太陽光発電装置を複数個、ケーブルの長手方向に対して非平行な方向に沿って備えるケーブル懸架型空中太陽光発電設備の組立方法に関する。   The present invention relates to a method for assembling a cable-suspended aerial photovoltaic power generation apparatus including a plurality of cable-suspended aerial photovoltaic power generation apparatuses along a direction that is not parallel to the longitudinal direction of the cable.

ケーブル懸架型空中太陽光発電装置を複数個、ケーブルの長手方向に沿って及び/又はケーブルの長手方向に対して非平行な方向に沿って備えるケーブル懸架型空中太陽光発電設備は、よく知られている(特許文献1から6参照)。   A cable-suspended aerial photovoltaic power generation facility provided with a plurality of cable-suspended aerial photovoltaic power generation devices along the longitudinal direction of the cable and / or along a direction not parallel to the longitudinal direction of the cable is well known. (See Patent Documents 1 to 6).

ケーブル懸架型空中太陽光発電設備の構造単位であるケーブル懸架型空中太陽光発電装置は、互いに離隔して配置される複数本の主支柱と該複数本の主支柱間に懸架されるケーブルとを具備する吊構造部と、前記ケーブルに架設される太陽光発電パネルとを備える装置であるので、ケーブル懸架型空中太陽光発電設備を実際に組み立てる際には、たとえば、(1)予め設置しておいた複数本の主支柱に、予め太陽光発電パネルを取り付けておいたケーブルを懸架するという一連の作業を繰り返す、(2)予め設置しておいた複数本の主支柱にケーブルを懸架し、引き続きそのケーブルに太陽光発電パネルを取り付けるという一連の作業を繰り返す、といった方法を選択することになる。   A cable-suspended aerial solar power generation apparatus, which is a structural unit of a cable-suspended aerial photovoltaic power generation facility, includes a plurality of main struts that are spaced apart from each other and cables that are suspended between the plurality of main struts. Since it is a device comprising a suspension structure portion and a photovoltaic power generation panel installed on the cable, when actually assembling a cable suspension type aerial photovoltaic power generation facility, for example, (1) Repeat the series of work of suspending the cable with the solar power panel attached in advance to the multiple main struts. (2) Suspending the cables on the multiple main struts installed in advance. Then, the method of repeating a series of work of attaching a photovoltaic power generation panel to the cable is selected.

中国特許出願公開第699119号明細書Chinese Patent Application Publication No. 699119 国際公開第2009/140564号International Publication No. 2009/140564 米国特許第4832001号明細書U.S. Pat. No. 4,833,001 特開2012−60095号公報JP2012-60095A 欧州特許出願公開第0373234号明細書European Patent Application No. 0373234 カナダ特許出願公開第2004980号明細書Canadian Patent Application No. 20050980

しかし、上記(1)の方法では、太陽光発電パネルが取り付けられているケーブルをケーブル懸架型空中太陽光発電設備の組立作業現場まで輸送しなければならず、積荷が嵩張り、輸送コストも増加する。また、組立作業現場においては、少しずつ当該ケーブルを引き出して予め設置しておいた複数本の主支柱に懸架して行くという非能率的な作業を行わなければならない。   However, in the method (1), the cable to which the photovoltaic power generation panel is attached must be transported to the assembly work site of the cable suspension type aerial photovoltaic power generation equipment, and the load becomes bulky and the transportation cost increases. To do. In addition, at the assembly work site, it is necessary to perform an inefficient work of pulling out the cable little by little and suspending it on a plurality of main pillars that have been installed in advance.

また、上記(2)の方法では、太陽光発電パネルを既設のケーブルの所定位置に取り付けなければならない。このことは、ケーブルに取り付ける太陽光発電パネルの枚数が少ない場合には大きな問題にはならないが、多数の太陽光発電パネルをケーブルに取り付ける場合や多数の吊構造部を組み立てる場合(より大型のケーブル懸架型空中太陽光発電設備を組み立てる場合を含む)には大きな問題となる。太陽光発電パネルを一枚一枚、既設のケーブルの所定位置に取り付けるという手間がかかる作業を繰り返し行うことになるからである。   In the method (2), the photovoltaic power generation panel must be attached to a predetermined position of the existing cable. This is not a big problem when the number of photovoltaic panels attached to the cable is small, but when attaching a large number of photovoltaic panels to the cable or assembling a large number of suspension structures (larger cables This is a big problem for assembly of suspended aerial photovoltaic power generation equipment. This is because the laborious work of attaching the photovoltaic power generation panels one by one to a predetermined position of the existing cable is repeated.

この発明は、上記の問題に鑑みてなされたものであり、ケーブル懸架型空中太陽光発電設備をより能率的に組み立てることが可能な技術、特にその組立方法を提供することを目的とする。   The present invention has been made in view of the above problems, and an object of the present invention is to provide a technique capable of more efficiently assembling a cable-suspended aerial photovoltaic power generation facility, particularly an assembling method thereof.

上記目的を達成するための、この発明の第1の形態に係るケーブル懸架型空中太陽光発電設備の組立方法は、互いに離隔して設置される複数本の主支柱と該複数本の主支柱間に懸架されるケーブルとを具備する吊構造部と、前記ケーブルに架設される太陽光発電パネルと、を備えるケーブル懸架型空中太陽光発電装置を複数個、前記ケーブルの長手方向に対して非平行な方向に沿って並列に配置することにより構成されるケーブル懸架型空中太陽光発電設備の組立方法であって、前記非平行な方向に移動可能な作業サイトを用意する第一の工程と、前記ケーブルと前記太陽光発電パネルとを前記作業サイトに供給する第二の工程と、前記作業サイトにおいて前記太陽光発電パネルを前記ケーブルに順次取り付ける第三の工程と、前記太陽光発電パネルが取り付けられた前記ケーブルを、前記作業サイトから送り出す第四の工程と、前記作業サイトから送り出された前記太陽光発電パネルが取り付けられた前記ケーブルを、予め設置されている複数本の主支柱間に懸架する第五の工程と、前記作業サイトを前記非平行な方向に移動させる第六の工程と、を有しており、前記第六の工程を実行した後、前記第三の工程、前記第四の工程及び前記第五の工程を再度実行する、ことを特徴とする。   In order to achieve the above object, a method for assembling a cable-suspended aerial photovoltaic power generation facility according to the first embodiment of the present invention includes a plurality of main struts installed separately from each other and a plurality of main struts. A plurality of cable-suspended aerial photovoltaic power generation devices each having a suspension structure including a cable suspended on the cable and a photovoltaic power generation panel installed on the cable, and non-parallel to the longitudinal direction of the cable A method for assembling a cable-suspended aerial photovoltaic power generation facility configured by arranging in parallel along a different direction, the first step of preparing a work site movable in the non-parallel direction; and A second step of supplying a cable and the solar power generation panel to the work site; a third step of sequentially attaching the solar power generation panel to the cable at the work site; A fourth step of sending out the cable to which the panel is attached from the work site; and a plurality of main columns in which the cable to which the solar power generation panel sent out from the work site is attached is installed in advance. A fifth step suspended between and a sixth step of moving the work site in the non-parallel direction, and after executing the sixth step, the third step, The fourth step and the fifth step are performed again.

この発明の第2の形態に係るケーブル懸架型空中太陽光発電設備の組立方法は、第1の形態に係るケーブル懸架型空中太陽光発電設備の組立方法であって、前記第三の工程は、前記ケーブルを前記作業サイトから送り出す過程で、そのケーブルに前記太陽光発電パネルを取り付ける工程である、ことを特徴とする。   The assembly method of the cable suspension type aerial photovoltaic power generation facility according to the second aspect of the present invention is the assembly method of the cable suspension type aerial photovoltaic power generation facility according to the first aspect, wherein the third step includes: In the process of sending out the cable from the work site, the solar power generation panel is attached to the cable.

この発明の第3の形態に係るケーブル懸架型空中太陽光発電設備の組立方法は、第1又は第2の形態に係るケーブル懸架型空中太陽光発電設備の組立方法であって、前記ケーブル懸架型空中太陽光発電設備は、前記ケーブル懸架型空中太陽光発電装置を複数個、前記ケーブルの長手方向に沿って直列に配置するように構成されており、前記第五の工程は、前記作業サイトから送り出された前記太陽光発電パネルが取り付けられた前記ケーブルを、前記ケーブルの長手方向に沿って直列に配置するように予め設置されている前記複数本の主支柱間に懸架することにより、複数個の前記ケーブル懸架型空中太陽光発電装置を組み立てる工程である、ことを特徴とする。   An assembly method of a cable suspension type aerial solar power generation facility according to a third aspect of the present invention is an assembly method of the cable suspension type aerial photovoltaic power generation facility according to the first or second aspect, wherein the cable suspension type The aerial photovoltaic power generation facility is configured to arrange a plurality of the cable-suspended aerial photovoltaic power generation devices in series along the longitudinal direction of the cable, and the fifth step starts from the work site. A plurality of the cables, to which the solar power generation panels sent out are attached, are suspended between the plurality of main struts that are installed in advance so as to be arranged in series along the longitudinal direction of the cables. It is the process of assembling the said cable suspension type aerial solar power generation device.

この発明の第4の形態に係るケーブル懸架型空中太陽光発電設備の組立方法は、第1から第3の何れか1つの形態に係るケーブル懸架型空中太陽光発電設備の組立方法であって、前記吊構造部は、前記複数本の主支柱間に各主支柱から離隔して配置し、前記ケーブルが懸架される中間支柱を具備しており、前記第五の工程は、前記作業サイトから送り出された前記太陽光発電パネルが取り付けられた前記ケーブルを、予め設置されている前記複数本の主支柱間及び前記中間支柱に懸架する工程である、ことを特徴とする。   The assembly method of the cable suspension type aerial solar power generation facility according to the fourth aspect of the present invention is an assembly method of the cable suspension type aerial photovoltaic power generation facility according to any one of the first to third aspects, The suspension structure portion is disposed between the plurality of main struts so as to be spaced apart from the main struts, and includes an intermediate strut on which the cable is suspended, and the fifth step is sent out from the work site. It is a step of suspending the cable to which the photovoltaic power generation panel attached is suspended between the plurality of main struts and the intermediate struts that are installed in advance.

この発明の第5の形態に係るケーブル懸架型空中太陽光発電設備の組立方法は、第4の形態に係るケーブル懸架型空中太陽光発電設備の組立方法であって、前記中間支柱は、その中間支柱に対して姿勢の変更が可能に構成されているサドル部を備えており、前記第五の工程は、前記作業サイトから送り出された前記太陽光発電パネルが取り付けられた前記ケーブルを、予め設置されている前記中間支柱が備えるサドル部に懸架する工程である、ことを特徴とする。   An assembly method of a cable suspension type aerial photovoltaic power generation facility according to a fifth aspect of the present invention is an assembly method of a cable suspension type aerial photovoltaic power generation facility according to a fourth aspect, wherein the intermediate strut The saddle part is configured to be capable of changing the attitude with respect to the support column, and the fifth step is previously installed with the cable to which the solar power generation panel sent from the work site is attached. It is the process of suspending to the saddle part with which the said intermediate | middle support | pillar is equipped.

この発明の第6の形態に係るケーブル懸架型空中太陽光発電設備の組立方法は、第1から第5の何れか1つの形態に係るケーブル懸架型空中太陽光発電設備の組立方法であって、前記作業サイトは、前記ケーブルの長手方向に移動可能に構成されており、前記作業サイトを前記長手方向に移動させる第七の工程をさらに有する、ことを特徴とする。   The assembly method of the cable suspension type aerial solar power generation facility according to the sixth aspect of the present invention is an assembly method of the cable suspension type aerial photovoltaic power generation facility according to any one of the first to fifth aspects, The work site is configured to be movable in the longitudinal direction of the cable, and further includes a seventh step of moving the work site in the longitudinal direction.

なお、以下において、吊構造部において複数本の主支柱間に懸架されるケーブルの長手方向を、X方向という場合があり、X方向に対して非平行な方向を、Y方向という場合がある。   In the following description, the longitudinal direction of a cable suspended between a plurality of main struts in the suspension structure may be referred to as the X direction, and the direction non-parallel to the X direction may be referred to as the Y direction.

この発明(特に、この発明の第1の形態)においては、まず、ケーブルと太陽光発電パネルとを作業サイトに供給する。このことは、ケーブル及び太陽光発電パネルを別々にケーブル懸架型空中太陽光発電設備の組立作業現場まで輸送することができることを意味している。それ故、ケーブル及び太陽光発電パネルを一緒に組立作業現場まで輸送する場合であっても、太陽光発電パネルが取り付けられているケーブルを組立作業現場まで輸送する場合、つまり、上記(1)の方法の場合に比べて、積荷が嵩張らず、輸送コストの増加も避けることができる。   In the present invention (particularly, the first embodiment of the present invention), first, a cable and a photovoltaic power generation panel are supplied to a work site. This means that the cable and the photovoltaic power generation panel can be separately transported to the assembly work site of the cable suspension type aerial photovoltaic power generation facility. Therefore, even when the cable and the solar power generation panel are transported together to the assembly work site, the cable to which the solar power generation panel is attached is transported to the assembly work site, that is, in the above (1). Compared with the method, the cargo is not bulky and an increase in transportation costs can be avoided.

また、作業サイトで太陽光発電パネルをケーブルに順次取り付けて、そのケーブルを予め設置されている複数本の主支柱に向けて又はX方向に送り出すので、太陽光発電パネルが取り付けられたケーブルの複数本の主支柱間への懸架作業を滞ることなく又は能率的に行うことができる。それ故、太陽光発電パネルを一枚一枚、既設のケーブルの所定位置に取り付ける場合、つまり、上記(2)の方法の場合に比べて、より少ない手間で懸架作業を行うことができる。   In addition, the photovoltaic panels are sequentially attached to the cables at the work site, and the cables are sent to a plurality of main pillars installed in advance or in the X direction, so that the plurality of cables to which the photovoltaic panels are attached. Suspension work between the main struts of the book can be performed without delay or efficiently. Therefore, it is possible to perform the suspension work with less labor when attaching the photovoltaic power generation panels one by one to a predetermined position of the existing cable, that is, compared with the method (2).

しかも、Y方向に沿って作業サイトを移動させた後、作業サイトで太陽光発電パネルをケーブルに順次取り付けて、そのケーブルを予め設置されている別の複数本の主支柱に向けて又はX方向に送り出し、その別の複数本の支柱間へ懸架するという工程を再度実行するので、Y方向に沿って複数個、並列に配置する構造単位(ケーブル懸架型空中太陽光発電装置)の組立を滞ることなく又は能率的に行うことができる。   Moreover, after moving the work site along the Y direction, the photovoltaic power generation panel is sequentially attached to the cable at the work site, and the cable is directed toward another plurality of main columns that are installed in advance or in the X direction. And the process of suspending between the other plurality of columns is executed again, and the assembly of a plurality of structural units (cable suspension type aerial photovoltaic power generators) arranged in parallel along the Y direction is delayed. Without or efficiently.

総じて、この発明によれば、ケーブル懸架型空中太陽光発電設備をより能率的に組み立てることができる。この発明の効果は、ケーブル懸架型空中太陽光発電設備の組立工期の短縮と組立コストの低減に資するものであり、ケーブルに取り付ける太陽光発電パネルの枚数が少ない場合は言うまでもなく、多数の太陽光発電パネルを取り付ける場合や多数の吊構造部を組み立てる場合(より大型のケーブル懸架型空中太陽光発電設備を組み立てる場合を含む)において、特に有意義であり、有益である。   In general, according to the present invention, the cable-suspended air solar power generation facility can be assembled more efficiently. The effect of the present invention contributes to the shortening of the assembly period of the cable suspension type aerial photovoltaic power generation equipment and the reduction of the assembly cost. Needless to say, the number of photovoltaic panels to be attached to the cable is small. This is particularly meaningful and useful when attaching a power generation panel or assembling a large number of suspension structures (including when assembling a larger cable suspension type aerial photovoltaic power generation facility).

この発明の第2の形態によれば、ケーブルを作業サイトから送り出す過程で、そのケーブルに太陽光発電パネルを順次取り付けるので、第三の工程と第四の工程とを切れ目のなく実行することができ、ひいてはケーブル懸架型空中太陽光発電設備をより効率的に組み立てることができる。   According to the second aspect of the present invention, since the photovoltaic power generation panels are sequentially attached to the cable in the process of sending the cable from the work site, the third step and the fourth step can be performed without any breaks. As a result, the cable suspension type aerial photovoltaic power generation facility can be assembled more efficiently.

この発明の第3の形態によれば、太陽光発電パネルが取り付けられたケーブルを、X方向に沿って直列に配置するように予め設置されているより多くの主支柱間に懸架することができるので、X方向に沿って複数個、直列に配置する構造単位(ケーブル懸架型空中太陽光発電装置)をより能率的に組み立てることができる。   According to the 3rd form of this invention, the cable with which the photovoltaic power generation panel was attached can be suspended between more main pillars previously installed so that it may arrange | position in series along a X direction. Therefore, it is possible to more efficiently assemble a plurality of structural units (cable suspension type aerial solar power generation devices) arranged in series along the X direction.

この発明の第4の形態によれば、太陽光発電パネルが取り付けられたケーブルを、X方向に沿って直列に配置するように予め設置されている複数本の主支柱間及び中間支柱に懸架することができるので、ケーブル懸架型空中太陽光発電装置のうち吊構造部が中間支柱を具備するものを、より能率的に組み立てることができる。   According to the fourth embodiment of the present invention, the cable to which the photovoltaic power generation panel is attached is suspended between the plurality of pre-installed main struts and the intermediate struts so as to be arranged in series along the X direction. Therefore, it is possible to more efficiently assemble the cable suspension type aerial photovoltaic power generation apparatus in which the suspension structure includes the intermediate column.

特に、この第4の形態が奏する効果は、構造部が中間支柱を具備しているケーブル懸架型空中太陽光発電装置が複数個、X方向に沿って直列に配置するように構成されているケーブル懸架型空中太陽光発電設備を組み立てる場合において、その組立工期の短縮と組立コストの低減に資するものであり、特に有意義であり、有益である。   In particular, the effect of the fourth embodiment is that the cable is configured such that a plurality of cable-suspended aerial photovoltaic power generators having a structure portion provided with an intermediate column are arranged in series along the X direction. In the case of assembling a suspension type aerial photovoltaic power generation facility, this contributes to shortening the assembly period and reducing the assembly cost, which is particularly meaningful and useful.

この発明の第5の形態においては、中間支柱がサドル部を備えており、そのサドル部が中間支柱に対して姿勢の変更が可能に構成されているので、太陽光発電パネルが取り付けられたケーブルをサドル部に懸架する際、当該ケーブルを懸架し易くなるように、また、懸架後に当該ケーブルの懸架状態を適正にするために、サドル部の姿勢を調整することができる。それ故、この第5の形態によれば、たとえば、太陽光発電パネルが取り付けられたケーブルを中間支柱に仮懸架し、引き続きサドル部の姿勢を厳密に調整することで適正な懸架状態を実現することができる。   In the fifth embodiment of the present invention, the intermediate strut includes a saddle portion, and the saddle portion is configured such that the posture can be changed with respect to the intermediate strut. When the cable is suspended on the saddle part, the attitude of the saddle part can be adjusted so that the cable can be easily suspended and the cable is properly suspended after the suspension. Therefore, according to the fifth embodiment, for example, a proper suspension state is realized by temporarily suspending the cable to which the photovoltaic power generation panel is attached to the intermediate column, and then strictly adjusting the posture of the saddle portion. be able to.

総じて、この第5の形態によれば、太陽光発電パネルが取り付けられたケーブルの懸架作業をより能率的に行うことができ、ケーブル懸架型空中太陽光発電設備の組立工期の短縮と組立コストの低減に資することができる。また、中間支柱における当該ケーブルの懸架状態の事後調整や保守を行うことが容易になる。   In general, according to the fifth embodiment, the suspension work of the cable to which the photovoltaic power generation panel is attached can be performed more efficiently, and the assembly period of the cable suspension type aerial photovoltaic power generation equipment can be shortened and the assembly cost can be reduced. It can contribute to reduction. In addition, it becomes easy to perform post-adjustment and maintenance of the suspended state of the cable in the intermediate strut.

この発明の第6の形態においては、作業サイトがX方向に移動可能に構成されているので、X方向に沿って複数個、直列に配置するケーブル懸架型空中太陽光発電装置の組立を滞ることなく又は能率的に行うことができる。   In the sixth embodiment of the present invention, since the work site is configured to be movable in the X direction, assembly of a plurality of cable-suspended aerial photovoltaic power generators arranged in series along the X direction is delayed. Without or efficiently.

作業サイトがY方向に移動可能に構成されていることを考え合わせると、この第6の形態によれば、X方向及びY方向に沿って複数個、換言すれば平面的に配置するケーブル懸架型空中太陽光発電装置の組立を滞ることなく又は能率的に行うことができる。   Considering that the work site is configured to be movable in the Y direction, according to the sixth embodiment, a plurality of cable suspension types are arranged along the X direction and the Y direction. Assembling of the air solar power generation apparatus can be performed without delay or efficiently.

なお、この発明において、(1)作業サイトとは、(a)ケーブルと太陽光発電パネルの供給を受けることでき、(b)太陽光発電パネルを前記ケーブルに順次取り付けることができ、(c)太陽光発電パネルが取り付けられたケーブルを、予め設置されている複数本の主支柱間に向けて送り出すことができ、(d)少なくともY方向に移動する又は移動させることができる、作業空間を意味する。   In addition, in this invention, (1) Work site can receive supply of (a) a cable and a photovoltaic power generation panel, (b) A photovoltaic power generation panel can be attached to the said cable sequentially, (c) A cable to which a photovoltaic power generation panel is attached can be sent out between a plurality of pre-installed main columns, and (d) means a work space that can be moved or moved at least in the Y direction. To do.

作業サイトは、少なくとも上記(a)、(b)及び(c)の作業を作業者が行うために必要な作業主面(作業台であれば床面に相当するもの)を必要的に備えており、少なくとも上記(a)、(b)及び(c)の何れかの作業を行う作業者を補助する機器(作業主面の昇降装置を含む)を備えていてもよい。作業主面は、上記(c)の作業がより容易になるように、主支柱や中間支柱が設置される基盤の表面位置よりも高い位置に設定される。   The work site is provided with a work main surface (which corresponds to a floor surface in the case of a work table) necessary for the worker to perform at least the operations (a), (b) and (c). In addition, at least a device (including a lifting device for the work main surface) may be provided to assist the worker who performs any of the operations (a), (b), and (c). The work main surface is set at a position higher than the surface position of the base on which the main support column and the intermediate support column are installed so that the operation (c) becomes easier.

作業サイトは、太陽光発電パネルが取り付けられたケーブルを懸架するために予め設置されている複数本の主支柱のうち最も作業サイトに近い位置にあるものと隣接又は近接する場所に配置させるのが好ましい。作業サイトとそれに最も近い位置にある主支柱との距離が離れ過ぎると、ケーブルの懸架作業を能率的に行うことが難しくなるからである。   The work site should be placed in a location adjacent to or close to the one closest to the work site among the multiple main struts installed in advance to suspend the cable with the photovoltaic panel attached. preferable. This is because if the distance between the work site and the main strut closest to the work site is too large, it is difficult to efficiently perform the cable suspension work.

地面に設置されたケーブル懸架型空中太陽光発電装置の概略側面図(紙面垂直のY方向から眺めた図)であり、(a)は、主支柱と中間支柱の高さが同じ場合であり、(b)は、中央に位置する中間支柱のみが主支柱の高さと同じ場合であり、(c)は、主支柱に比べて中間支柱の高さが低い場合である。It is a schematic side view (view seen from the Y direction perpendicular to the paper surface) of the cable suspended aerial photovoltaic power generator installed on the ground, (a) is the case where the height of the main strut and the intermediate strut is the same, (B) is a case where only the intermediate strut located in the center is the same as the height of the main strut, and (c) is a case where the height of the intermediate strut is lower than that of the main strut. ケーブル懸架型空中太陽光発電装置の概略平面図である。It is a schematic plan view of a cable suspension type air solar power generation device. 中間支柱を示す部分側面図である。It is a partial side view which shows an intermediate | middle support | pillar. 中間支柱を示す部分正面図である。It is a partial front view which shows an intermediate | middle support | pillar. ケーブル懸架型空中太陽光発電装置の組立方法の説明図である。It is explanatory drawing of the assembly method of a cable suspension type | formula air solar power generation device. ケーブル懸架型空中太陽光発電装置の別の組立方法の説明図である。It is explanatory drawing of another assembly method of a cable suspension type | mold air solar power generation device. ケーブル懸架型空中太陽光発電装置の別の組立方法の説明図である。It is explanatory drawing of another assembly method of a cable suspension type | mold air solar power generation device. ケーブル懸架型空中太陽光発電装置の別の組立方法の説明図である。It is explanatory drawing of another assembly method of a cable suspension type | mold air solar power generation device. ケーブル懸架型空中太陽光発電装置の別の組立方法の説明図である。It is explanatory drawing of another assembly method of a cable suspension type | mold air solar power generation device. ケーブル懸架型空中太陽光発電装置の別の組立方法の説明図である。It is explanatory drawing of another assembly method of a cable suspension type | mold air solar power generation device. ケーブル懸架型空中太陽光発電装置の別の組立方法の説明図である。It is explanatory drawing of another assembly method of a cable suspension type | mold air solar power generation device.

次に、この発明の、ケーブル懸架型空中太陽光発電設備の組立方法の一実施態様を図面を参照しながら説明する。   Next, an embodiment of a method for assembling a cable suspension type aerial solar power generation facility according to the present invention will be described with reference to the drawings.

図1は、地面に設置されたケーブル懸架型空中太陽光発電装置の概略側面図(紙面垂直のY方向から眺めた図)であり、(a)は、主支柱と中間支柱の高さが同じ場合であり、(b) は、中央に位置する中間支柱のみが主支柱の高さと同じ場合であり、(c)は、主支柱に比べて中間支柱の高さが低い場合である。図2は、図1に示すケーブル懸架型空中太陽光発電装置を示す概略平面図、図3は、中間支柱を示す部分側面図、図4は、中間支柱を示す部分正面図である。   FIG. 1 is a schematic side view of a cable-suspended aerial photovoltaic power generator installed on the ground (viewed from the Y direction perpendicular to the paper surface), and (a) shows the same height of the main strut and the intermediate strut. (B) is a case where only the intermediate strut located in the center is the same as the height of the main strut, and (c) is a case where the height of the intermediate strut is lower than that of the main strut. 2 is a schematic plan view showing the cable-suspended aerial solar power generation apparatus shown in FIG. 1, FIG. 3 is a partial side view showing the intermediate strut, and FIG. 4 is a partial front view showing the intermediate strut.

先ず、この発明における吊構造部、作業サイト、中間支柱及びサドル部について説明する。   First, the suspension structure portion, work site, intermediate strut, and saddle portion in the present invention will be described.

<吊構造部>
吊構造部は、互いに離隔して設置される複数本の主支柱Mと該複数本の主支柱M間に懸架されるケーブルCとを備えている(図1及び図2参照)。複数本のケーブルCに架設される複数枚の太陽光発電パネルP(図示せず)のそれぞれは、その長手方向がY方向になるように、また、そのパネル面がX方向とY方向により構成される平面(X−Y平面)と略平行になるように架設される。なお、図1及び図2に示すように、ケーブルCの両端は、主支柱Mを介してアンカー部材Aに固定されているが、ケーブルCを主支柱Mに直接固定してもよい。
<Suspension structure part>
The suspension structure portion includes a plurality of main struts M installed separately from each other and a cable C suspended between the plurality of main struts M (see FIGS. 1 and 2). Each of the plurality of photovoltaic power generation panels P (not shown) installed on the plurality of cables C is configured such that the longitudinal direction thereof is the Y direction, and the panel surface is configured by the X direction and the Y direction. It is constructed so as to be substantially parallel to the flat surface (XY plane). As shown in FIGS. 1 and 2, both ends of the cable C are fixed to the anchor member A via the main column M, but the cable C may be directly fixed to the main column M.

<作業サイト>
典型的な作業サイトSは、車輪と当該車輪の制動機構とを備える作業台である。制動機構を働かせない状態における作業台の移動は、駆動装置により車輪を回転させることによる自走であってもよく、人力による移動であってもよい。この作業台は、作業主面の昇降を可能にする昇降装置を備えていてもよい。作業主面を昇降させることができれば、作業者は、ケーブルC及び太陽光発電パネルPの受け入れ、ケーブルへの太陽光発電パネルPの取り付け、太陽光発電パネルPが取り付けられたケーブルCの送り出し等の各作業に好適な作業主面の高さを設定することができる(図5及び図6)。
<Work site>
A typical work site S is a workbench provided with wheels and a braking mechanism for the wheels. The movement of the work table in a state where the braking mechanism is not operated may be self-propelled by rotating a wheel by a driving device, or may be movement by human power. The work table may include an elevating device that allows the work main surface to be raised and lowered. If the work main surface can be raised and lowered, the worker can receive the cable C and the photovoltaic power generation panel P, attach the photovoltaic power generation panel P to the cable, send out the cable C to which the photovoltaic power generation panel P is attached, and the like. The height of the work main surface suitable for each work can be set (FIGS. 5 and 6).

<中間支柱>
ケーブルCの撓みを支える中間支柱Iは、主支柱M間に設置され(図1及び図2参照)、図3の部分側面図及び図4の部分正面図に示すように、直管部材1とサドル部2とからなっている。中間支柱Iは、一本であっても、二本以上であってもよい。なお、図1に示すように、中間支柱Iの両側には、斜材が設けられているが、斜材は、必ずしも必要ない。
<Intermediate strut>
The intermediate strut I that supports the bending of the cable C is installed between the main struts M (see FIGS. 1 and 2). As shown in the partial side view of FIG. 3 and the partial front view of FIG. It consists of saddle part 2. The number of intermediate struts I may be one, or two or more. As shown in FIG. 1, diagonal materials are provided on both sides of the intermediate support column I, but diagonal materials are not always necessary.

<サドル部>
図3及び図4に示すように、サドル部2は、ケーブルCを固定することなく、その撓みを減じ、中間支柱Iからの脱落を防止するものであり、中間支柱Iを構成する直管部材1の上部に取り付けられている。すなわち、直管部材1の上端部には、板状又は円盤状の載台3が溶接などの手段により固定され、当該直管部材1と一体化している。載台3の上面には、凹部3aが形成され、サドル部2の下面に形成された突出部2aが凹部3aに嵌合している。サドル部2の上部には、X方向に延伸する溝2bが形成されており、張力が作用しているケーブルCがその溝2b内に収容される。このとき、当該溝2bの壁面によりケーブルCのY方向の動きが規制されるので、サドル部2、ひいては中間支柱Iの頂部からのケーブルCの脱落が防止される。突出部2aの高さは、当該凹み3aの深さと比べて、同じ又は若干大きいので、サドル部2の底面は、載台3の上面と隙間なく接触するか、若干の隙間を残すように配置される。この結果、サドル部2は、中間支柱Iを構成する直管部材1に対して姿勢の変更が可能になる。なお、主支柱Mの上端部にも同様なサドル部2が取り付けられている。
<Saddle Club>
As shown in FIGS. 3 and 4, the saddle portion 2 reduces the bending without fixing the cable C and prevents the intermediate post I from falling off, and the straight pipe member constituting the intermediate post I 1 is attached to the top. That is, a plate-like or disk-like mounting base 3 is fixed to the upper end portion of the straight pipe member 1 by means such as welding, and is integrated with the straight pipe member 1. A recess 3 a is formed on the upper surface of the mounting table 3, and a protruding portion 2 a formed on the lower surface of the saddle portion 2 is fitted in the recess 3 a. A groove 2b extending in the X direction is formed in the upper portion of the saddle portion 2, and the cable C on which tension is applied is accommodated in the groove 2b. At this time, since the movement of the cable C in the Y direction is restricted by the wall surface of the groove 2b, the cable C is prevented from dropping from the saddle portion 2 and thus from the top of the intermediate column I. Since the height of the protruding portion 2a is the same or slightly larger than the depth of the recess 3a, the bottom surface of the saddle portion 2 is arranged so as to be in contact with the top surface of the mounting table 3 without leaving a gap or to leave a slight gap. Is done. As a result, the saddle portion 2 can change its posture with respect to the straight pipe member 1 constituting the intermediate column I. A similar saddle portion 2 is also attached to the upper end portion of the main column M.

サドル部2の材質は、SCW490、SS400、SM400Aなどから選択する。SS400であれば製作容易で経済的であり好ましい。太陽光発電パネルが比較的大型であり、溶接を要する箇所が多い場合には、SM400Aが好ましい。一本の中間支柱が支える重量がより大きくなる場合には、SCW490(鋳鋼品)を採用するのが好ましいケースもある。   The material of the saddle portion 2 is selected from SCW490, SS400, SM400A, and the like. SS400 is preferable because it is easy to manufacture and economical. SM400A is preferred when the photovoltaic panel is relatively large and there are many locations that require welding. In some cases, it is preferable to adopt SCW490 (cast steel product) when the weight supported by one intermediate column becomes larger.

一本の中間支柱Iが備えるサドル部2は一つでも、二つ以上であってもよい。一つのサドル部2と接触するケーブルCは一本でも、二本以上であってもよい。一つのサドル部2を備える中間支柱Iは、一本でも、二本以上であってもよい。一本の中間支柱Iが複数本のケーブルCの撓みを支える場合には、当該複数本のケーブルCのそれぞれと接触する複数個のサドル部2をその中間支柱Iに設けてもよいし、当該複数本のケーブルCに共通の(又は当該複数本のケーブルCに同時に接触する)一つのサドル部2をその中間支柱Iに設けてもよく、当該複数本のケーブルCの一部のそれぞれに接触する一つ又は二つ以上のサドル部2と、残部に共通の(又は当該複数本のケーブルCに同時に接触する)一つ又は二つ以上のサドル部とを設けてもよい。   One saddle portion 2 provided in one intermediate strut I may be one or two or more. There may be one cable C in contact with one saddle portion 2 or two or more cables C. The number of intermediate struts I having one saddle portion 2 may be one or two or more. When one intermediate strut I supports the bending of the plurality of cables C, a plurality of saddle portions 2 that contact each of the plurality of cables C may be provided on the intermediate strut I, One saddle portion 2 common to the plurality of cables C (or in contact with the plurality of cables C at the same time) may be provided on the intermediate strut I, and is in contact with each part of the plurality of cables C. One or two or more saddle portions 2 may be provided, and one or two or more saddle portions common to the remaining portion (or in contact with the plurality of cables C at the same time) may be provided.

ケーブル懸架型空中太陽光発電装置は、ケーブルCの軸(長手)方向(X方向)の主支柱M間の距離が短い場合には、中間支柱Iは不要であるが、当該距離が長い場合には、ケーブルCならびに当該ケーブルCに架設されたフレームF及び当該フレームFに取り付けられた太陽光発電パネルPの重量を支持するための中間支柱Iが必要になってくる。   When the distance between the main struts M in the axial (longitudinal) direction (X direction) of the cable C is short, the cable suspension type aerial photovoltaic power generator does not require the intermediate strut I, but when the distance is long Requires an intermediate column I for supporting the weight of the cable C, the frame F installed on the cable C, and the photovoltaic panel P attached to the frame F.

以下においては、X方向における中間支柱Iの本数は1以上であるものとして説明するが、この発明は、中間支柱Iがない場合を排除するものではない。   In the following description, it is assumed that the number of intermediate struts I in the X direction is 1 or more. However, the present invention does not exclude the case where there is no intermediate strut I.

図1および図2に示すように、ケーブル懸架型空中太陽光発電装置U[ij]は、X方向において離隔する一対の主支柱M(2i-1)jとM(2i-1)(j+1)との間ならびに当該一対の主支柱間に配置された中間支柱I(2i-1)jk、I(2i-1)j(k+1)、I(2i-1)j(k+2)に懸架された第一のケーブルCaと、X方向において離隔する別の一対の主支柱M(2i)jとM(2i)(j+1)との間ならびに当該一対の主支柱間に配置された中間支柱I(2i)jk、I(2i)j(k+1)、I(2i)j(k+2)に懸架された第二のケーブルCbとからなる一対のケーブルCと、当該一対のケーブルCに架設されたフレームFと、当該フレームFに取り付けられた太陽光発電パネルPとから構成される工作物W(Wa、Wb)を備える吊構造を備えている。なお、i、jともに1以上の整数であり、m,nをそれぞれの上限値とする。   As shown in FIGS. 1 and 2, the cable suspended aerial photovoltaic power generation device U [ij] includes a pair of main struts M (2i-1) j and M (2i-1) (j +) separated in the X direction. 1) and intermediate struts I (2i-1) jk, I (2i-1) j (k + 1), I (2i-1) j (k + 2) arranged between the pair of main struts ) And a pair of main struts M (2i) j and M (2i) (j + 1) separated in the X direction and between the pair of main struts. A pair of cables C comprising a second cable Cb suspended from the intermediate struts I (2i) jk, I (2i) j (k + 1), I (2i) j (k + 2) A suspension structure including a workpiece W (Wa, Wb) including a frame F installed on a pair of cables C and a photovoltaic power generation panel P attached to the frame F is provided. Note that i and j are integers of 1 or more, and m and n are the upper limit values.

工作物W(Wa)を構成する第一のケーブルCaは、その両端が、アンカー部材A(2i-1)LとA(2i-1)Rにより地面Gに固定され、工作物W(Wb)を構成する第二のケーブルCbは、その両端が、アンカー部材A(2i)LとA(2i)Rにより地面Gに固定される。X方向において離隔する一対の主支柱間ならびに当該主支柱間に配置される中間支柱に懸架された一対のケーブル(第一のケーブルCaと第二のケーブルCb)Cには、張力が作用したままである。それ故、当該一対のケーブルCは、地面Gに接する位置から離れた位置に配置され、その結果、当該一対のケーブルCに架設されたフレームFに取り付けられた太陽発電パネルPは、空中に配置される。   Both ends of the first cable Ca constituting the workpiece W (Wa) are fixed to the ground G by anchor members A (2i-1) L and A (2i-1) R, and the workpiece W (Wb) The two ends of the second cable Cb constituting the are fixed to the ground G by anchor members A (2i) L and A (2i) R. A tension is applied to a pair of cables (first cable Ca and second cable Cb) C suspended between a pair of main struts separated in the X direction and intermediate struts arranged between the main struts. It is. Therefore, the pair of cables C is arranged at a position away from the position in contact with the ground G, and as a result, the solar power generation panel P attached to the frame F installed on the pair of cables C is arranged in the air. Is done.

なお、図1及び図2において、中間支柱は、X方向の一対の主支柱間あたり三個(合計六個)描かれているが、X方向の一対の主支柱間あたり一個(合計二個)でも二個(合計四個)でも、四個(合計八個)以上であってもよい。   In FIGS. 1 and 2, three intermediate struts are drawn between a pair of main struts in the X direction (total of six), but one per pair of main struts in the X direction (two in total). However, it may be two (a total of four) or four (a total of eight) or more.

また、図1(a)から(c)に示すように、柱の高さ(サドル部によるケーブル支承位置の高さ)は、(a)に示すように、主支柱と中間支柱とが同じであってもよく、(b)に示すように、X方向において主支柱間の中央に位置する中間支柱のみが主支柱の高さと同じであり、その他の中間支柱は主支柱より低くてもよく、(c)に示すように、主支柱に比べて中間支柱の高さが低くてもよい。無論、図1(a)から(c)以外の態様であってもよい。   As shown in FIGS. 1 (a) to 1 (c), the height of the column (the height of the cable support position by the saddle portion) is the same as that of the main column and the intermediate column as shown in (a). As shown in (b), only the intermediate strut located at the center between the main struts in the X direction is the same as the height of the main strut, and the other intermediate struts may be lower than the main strut, As shown in (c), the height of the intermediate strut may be lower than that of the main strut. Of course, modes other than FIGS. 1A to 1C may be used.

さらに、図2に示すケーブル懸架型空中太陽光発電装置U[ij]の範囲には、アンカー部材(A(2i-1)LとA(2i-1)R、A(2i)LとA(2i)R)が含まれていない、当該範囲を定義する際には、アンカー部材を含めてもよい。   Further, the range of the cable suspension type aerial photovoltaic power generator U [ij] shown in FIG. 2 includes anchor members (A (2i-1) L and A (2i-1) R, A (2i) L and A ( 2i) An anchor member may be included when defining the range that does not include R).

図5は、ケーブル懸架型空中太陽光発電装置U[11]の組立方法の説明図である。図5に基づく説明は、i、jのいずれか一方が1でない、より一般的な場合にも当てはまる。   FIG. 5 is an explanatory diagram of an assembling method of the cable-suspended air solar power generation device U [11]. The description based on FIG. 5 also applies to the more general case where either i or j is not 1.

その組立方法の一例(第一例)は、次に掲げる工程を有する。   An example (first example) of the assembling method includes the following steps.

<工程1> ケーブル懸架型空中太陽光発電装置U[11]の設置予定場所にX方向において隣接する位置に、作業サイトSを設営する。   <Step 1> The work site S is set up at a position adjacent to the installation location of the cable suspended aerial photovoltaic power generation device U [11] in the X direction.

<工程2> 複数本の主支柱M11、M12、M21、M22を設置する。   <Step 2> A plurality of main columns M11, M12, M21, and M22 are installed.

<工程3> 作業サイトSに対して、ケーブルC、フレームF及び太陽光発電パネルPならびにその他の作業上必要な部材、工具等を供給する。   <Step 3> The cable C, the frame F, the photovoltaic power generation panel P, and other members and tools necessary for work are supplied to the work site S.

<工程4> 作業サイトSにおいて、サイト内作業者(図示せず)が工作物Wを作成しながら、工作物Wを構成する第一のケーブルCaを主支柱M12の側から主支柱M11の側へ、第二のケーブルCbを主支柱M22の側から主支柱M21の側へと送り出す。これにより、工作物W(Wa、Wb)を、一対のケーブルCとともに、作業サイトSとは反対側に向かって送り出す。   <Step 4> At the work site S, an on-site worker (not shown) creates the workpiece W, and connects the first cable Ca constituting the workpiece W from the main column M12 side to the main column M11 side. The second cable Cb is sent out from the main column M22 side to the main column M21 side. Thereby, the workpiece W (Wa, Wb) is sent out together with the pair of cables C toward the side opposite to the work site S.

なお、工作物Wは、一対のケーブルC(Ca、Cb)にフレームFを架設し、そのフレームFに太陽光発電パネルPを取り付けることにより構成される。以下においては、第一のケーブルCaを基準に眺めた工作物Wを、Waと表記し、第一のケーブルCbを基準に眺めた工作物Wを、Wbと表記する。   The workpiece W is configured by installing a frame F on a pair of cables C (Ca, Cb) and attaching a photovoltaic power generation panel P to the frame F. In the following, the workpiece W viewed with the first cable Ca as a reference is denoted as Wa, and the workpiece W viewed with the first cable Cb as a reference is denoted as Wb.

<工程5> 作業サイトSから送り出された一対のケーブルCを、主支柱M11、M12間及び主支柱M21、M22間に懸架する。必要に応じて、主支柱M11、M12間及び主支柱M21、M22間に中間支柱I1k、I2kを配置し、当該中間支柱に第一のケーブルCa及び第二のケーブルCbを懸架する。これらにより、工作物W(Wa、Wb)を主支柱M11、M12間及び主支柱M21、M22間に懸架する。   <Step 5> The pair of cables C sent out from the work site S are suspended between the main columns M11 and M12 and between the main columns M21 and M22. If necessary, intermediate struts I1k and I2k are arranged between the main struts M11 and M12 and between the main struts M21 and M22, and the first cable Ca and the second cable Cb are suspended on the intermediate struts. As a result, the workpiece W (Wa, Wb) is suspended between the main columns M11 and M12 and between the main columns M21 and M22.

<工程6> 次の(1)又は(2)の作業を行い、吊構造を構築する。   <Step 6> The following (1) or (2) is performed to construct a suspended structure.

(1)作業サイトS側(主支柱M12、M22がある側)においてアンカー部材A1R(図示せず)により第一のケーブルCaの一端を固定し、アンカー部材A2R(図示せず)により第二のケーブルCbの一端を固定し、作業サイトSの反対側(主支柱M11、M21がある側)において第一のケーブルCaと第二のケーブルCbを−X方向に引っ張る。これにより、一対のケーブルC(Ca、Cb)を、主支柱間、主支柱と中間支柱との間及び中間支柱間において地面Gから離れた位置に配置させ、当該一対のケーブルCに架設されたフレームFに取り付けられた太陽発電パネルPを、空中に配置させる。この張力が印加された状態を維持したままで、作業サイトSの反対側においてアンカー部材A1L(図示せず)により第一のケーブルCaの一端を固定し、アンカー部材A2L(図示せず)により第二のケーブルCbの一端を固定する。   (1) One end of the first cable Ca is fixed by the anchor member A1R (not shown) on the work site S side (the side where the main columns M12 and M22 are located), and the second is fixed by the anchor member A2R (not shown). One end of the cable Cb is fixed, and the first cable Ca and the second cable Cb are pulled in the −X direction on the opposite side of the work site S (the side where the main columns M11 and M21 are present). As a result, the pair of cables C (Ca, Cb) are arranged at positions away from the ground G between the main struts, between the main struts and the intermediate struts, and between the intermediate struts, and are installed on the pair of cables C. The solar power generation panel P attached to the frame F is disposed in the air. While maintaining the state in which this tension is applied, one end of the first cable Ca is fixed by the anchor member A1L (not shown) on the opposite side of the work site S, and the first end is fixed by the anchor member A2L (not shown). One end of the second cable Cb is fixed.

(2)作業サイトS側とは反対側においてアンカー部材A1Lにより第一のケーブルCaの一端を固定し、アンカー部材A2Lにより第二のケーブルCbの一端を固定し、作業サイトS側において第一のケーブルCaと第二のケーブルCbを+X方向に引っ張る。これにより、一対のケーブルC(Ca、Cb)を、主支柱間、主支柱と中間支柱との間及び中間支柱間において地面Gから離れた位置に配置させ、当該一対のケーブルCに架設されたフレームFに取り付けられた太陽発電パネルPを、空中に配置させる。この張力が印加された状態を維持したままで、作業サイトS側においてアンカー部材A1Rにより第一のケーブルCaの一端を固定し、アンカー部材A2Rにより第二のケーブルCbの一端を固定する。   (2) One end of the first cable Ca is fixed by the anchor member A1L on the side opposite to the work site S side, and one end of the second cable Cb is fixed by the anchor member A2L. Pull the cable Ca and the second cable Cb in the + X direction. As a result, the pair of cables C (Ca, Cb) are arranged at positions away from the ground G between the main struts, between the main struts and the intermediate struts, and between the intermediate struts, and are installed on the pair of cables C. The solar power generation panel P attached to the frame F is disposed in the air. While maintaining the state where this tension is applied, one end of the first cable Ca is fixed by the anchor member A1R on the work site S side, and one end of the second cable Cb is fixed by the anchor member A2R.

<工程7> 必要に応じて、主支柱間、主支柱と中間支柱との間及び中間支柱間における一対のケーブルCの垂れ下がり状態を調節して、主支柱と中間支柱が支える重量を適正にする。   <Step 7> If necessary, adjust the hanging state of the pair of cables C between the main struts, between the main struts and the intermediate struts, and between the intermediate struts, and make the weight supported by the main struts and the intermediate struts appropriate. .

上記の第一例において、工程1と工程2とは、実行順序が逆であってもよく、同時に実行するようにしてもよい。   In the above first example, the execution order of step 1 and step 2 may be reversed or may be executed simultaneously.

工程1では、作業サイトSを主支柱M11、M21の側に設置してもよい。その場合、工程4は、工作物Wを構成する第一のケーブルCaを主支柱M11の側から主支柱M12の側へ、第二のケーブルCbを主支柱M21の側から主支柱M22の側へと送り出すことにより、主支柱M11、M12間及び主支柱M21、M22間に工作物W(Wa、Wb)を懸架する工程となる。また、工程6の記載内容は、(ア) 作業サイトS側が主支柱M11、M21がある側となり、アンカー部材A1Lが作業サイトS側にあるアンカー部材となるとともに、作業サイトSの反対側が主支柱M12、M22がある側となり、アンカー部材A1Rが作業サイトSの反対側にあるアンカー部材となること、ならびに (イ) 一対のケーブルCに張力をかける際には+X方向に引っ張る必要があることを考慮したうえで、適宜読み替えることになる。   In step 1, the work site S may be installed on the main column M11, M21 side. In that case, in step 4, the first cable Ca constituting the workpiece W is moved from the main column M11 side to the main column M12 side, and the second cable Cb is transferred from the main column M21 side to the main column M22 side. The work W (Wa, Wb) is suspended between the main struts M11 and M12 and between the main struts M21 and M22. The contents of Step 6 are as follows: (a) The work site S side is the side where the main columns M11 and M21 are located, the anchor member A1L is the anchor member on the work site S side, and the opposite side of the work site S is the main column M12 and M22 are on the side, the anchor member A1R becomes the anchor member on the opposite side of the work site S, and (b) When tension is applied to the pair of cables C, it is necessary to pull in the + X direction. It will be read as appropriate after consideration.

工程3におけるケーブルC、フレームF等の作業サイトSへの供給の仕方は、作業サイトSにおいて作業を行うサイト内作業者と、作業サイトS外で作業を行うサイト外作業者との間の人力作業(たとえば、手渡し)でもよく、専用装置を用いた非人力による供給であってもよく、一部人力、残部非人力による供給であってもよい。工具などは、一回供給すれば足りる場合もある。   The method of supplying the cable C, the frame F, etc. to the work site S in the process 3 is based on the human power between the on-site worker who works at the work site S and the off-site worker who works outside the work site S. It may be work (for example, handing), supply by non-human power using a dedicated device, or supply by partial human power or the remaining non-human power. In some cases, tools and the like need only be supplied once.

工程4における工作物Wの作業サイトSからの送り出しは、たとえば、工作物Wを構成する一対のケーブルC(Ca、Cb)に別のケーブル(牽引補助ケーブル)を取り付け、その牽引補助ケーブルを主支柱M12、M22の側から主支柱M11、M21の側へ牽引することにより実現することができる。その際、当該一対のケーブルCに、X方向に沿って間隔をおいて別のケーブル(引揚補助ケーブル)を取り付け、その引揚補助ケーブルを上方に引っ張りあげることで当該一対のケーブルCを引っ張り上げれば、工作物W(Wa、Wb)が地面Gやその他の障害物に接触しないようにすることができる。ケーブルCを引っ張り上げる場合であっても、地面Gや他の障害物との接触の悪影響を低減するために太陽光発電パネルPの受光面と反対側の面に緩衝材を取り付けるのが好ましい。工程6が完了すれば、牽引補助ケーブル、引揚補助ケーブル及び緩衝材はもはや不要であるので、必要に応じて取り外す。   For sending out the workpiece W from the work site S in the process 4, for example, another cable (traction auxiliary cable) is attached to a pair of cables C (Ca, Cb) constituting the workpiece W, and the traction auxiliary cable is mainly used. This can be realized by pulling from the column M12, M22 side to the main column M11, M21 side. At that time, if another cable (lifting auxiliary cable) is attached to the pair of cables C at intervals along the X direction, and the pair of cables C is pulled upward, the pair of cables C is pulled up. The workpiece W (Wa, Wb) can be prevented from coming into contact with the ground G or other obstacles. Even when the cable C is pulled up, it is preferable to attach a cushioning material to the surface opposite to the light receiving surface of the photovoltaic panel P in order to reduce the adverse effects of contact with the ground G and other obstacles. When step 6 is completed, the traction auxiliary cable, the lifting auxiliary cable, and the cushioning material are no longer necessary, and are removed as necessary.

工程5は、たとえば、引揚補助ケーブルを引き上げたり、特殊機械によりケーブルCを押し上げることにより、当該ケーブルCを主支柱や中間支柱の懸架位置又はそれよりは若干高い位置まで一旦引き上げ、当該ケーブルCを所定位置に若干水平移動させた後降下させることにより、各支柱にケーブルを懸架することにより実現できる。   In step 5, for example, by pulling up the lifting auxiliary cable or by pushing up the cable C with a special machine, the cable C is temporarily lifted to a suspended position of the main strut or the intermediate strut or a slightly higher position, and then the cable C is lifted. This can be realized by suspending the cable on each column by moving it slightly to a predetermined position and then lowering it.

工程6では、一対のケーブルCの一端をアンカー部材により固定した後、当該一対のケーブルを引っ張っている。(当該一対のケーブルCを引っ張る目的は、工作物Wを空中に配置させるためである。その目的を達成することができる限り、引っ張る前に当該一対のケーブルCの一端の固定は、アンカー部材による固定である必要はない。)その場合、当該一対のケーブルCの一端を、別の手段により暫定的に固定した後引っ張ることにより工作物Wを空中に配置させ、その後、アンカー部材により固定するようにしてもよい。   In step 6, after fixing one end of a pair of cables C with an anchor member, the pair of cables is pulled. (The purpose of pulling the pair of cables C is to place the workpiece W in the air. As long as the purpose can be achieved, the one end of the pair of cables C is fixed by the anchor member before pulling. In that case, the work W is placed in the air by temporarily fixing one end of the pair of cables C after being temporarily fixed by another means, and then fixed by the anchor member. It may be.

工程7は、広くは、吊構造に無理がかからないように微調整を行う工程である。たとえば、主支柱や中間支柱がそれらの頂部に設置されたサドル部によりケーブルC(Ca、Cb)を脱落しないように支持する機構を備えている場合であれば、工程7には、サドル部の姿勢や向きを調整することにより、ケーブルCに作用する張力のバランスと分布をできる限り均質にすることが含まれる。   Step 7 is a step of performing fine adjustment so that the suspension structure is not forced. For example, if the main strut and the intermediate strut are provided with a mechanism for supporting the cables C (Ca, Cb) so as not to drop off by the saddle portions installed on the tops thereof, the step 7 includes the saddle portions. It includes making the balance and distribution of the tension acting on the cable C as uniform as possible by adjusting the posture and orientation.

ケーブル懸架型空中太陽光発電装置U[11]の組立方法の別の例(第二例)は、次に掲げる工程を有する。   Another example (second example) of the method for assembling the cable-suspended air solar power generation device U [11] has the following steps.

<工程1> ケーブル懸架型空中太陽光発電装置U[11]の設置予定場所にX方向において隣接する位置に、作業サイトSを設営する。   <Step 1> The work site S is set up at a position adjacent to the installation location of the cable suspended aerial photovoltaic power generation device U [11] in the X direction.

<工程2> 複数本の主支柱M11、M12、M21、M22を設置する。   <Step 2> A plurality of main columns M11, M12, M21, and M22 are installed.

<工程3> 作業サイトSに対して、ケーブルC、フレームF及び太陽光発電パネルPならびにその他の作業上必要な部材、工具等を供給する。   <Step 3> The cable C, the frame F, the photovoltaic power generation panel P, and other members and tools necessary for work are supplied to the work site S.

<工程3A> 作業サイトS側(主支柱M12、M22がある側)においてアンカー部材A1R(図示せず)により第一のケーブルCaの一端を固定し、アンカー部材A2R(図示せず)により第二のケーブルCbの一端を固定する。   <Process 3A> One end of the first cable Ca is fixed by the anchor member A1R (not shown) on the work site S side (the side where the main columns M12 and M22 are present), and the second is fixed by the anchor member A2R (not shown). One end of the cable Cb is fixed.

<工程4> 作業サイトSにおいて、サイト内作業者(図示せず)が工作物Wを作成しながら、工作物Wを構成する第一のケーブルCaを主支柱M12の側から主支柱M11の側へ、第二のケーブルCbを主支柱M22の側から主支柱M21の側へと送り出す。これにより、工作物W(Wa、Wb)を、一対のケーブルCとともに、作業サイトSとは反対側に向かって送り出す。   <Step 4> At the work site S, an on-site worker (not shown) creates the workpiece W, and connects the first cable Ca constituting the workpiece W from the main column M12 side to the main column M11 side. The second cable Cb is sent out from the main column M22 side to the main column M21 side. Thereby, the workpiece W (Wa, Wb) is sent out together with the pair of cables C toward the side opposite to the work site S.

<工程5> 作業サイトSから送り出された一対のケーブルCを、主支柱M11、M12間及び主支柱M21、M22間に懸架する。必要に応じて、主支柱M11、M12間及び主支柱M21、M22間に中間支柱I1k、I2kを配置し、当該中間支柱に第一のケーブルCa及び第二のケーブルCbを懸架する。これらにより、工作物W(Wa、Wb)を主支柱M11、M12間及び主支柱M21、M22間に懸架する。   <Step 5> The pair of cables C sent out from the work site S are suspended between the main columns M11 and M12 and between the main columns M21 and M22. If necessary, intermediate struts I1k and I2k are arranged between the main struts M11 and M12 and between the main struts M21 and M22, and the first cable Ca and the second cable Cb are suspended on the intermediate struts. As a result, the workpiece W (Wa, Wb) is suspended between the main columns M11 and M12 and between the main columns M21 and M22.

<工程6A> 次の作業を行い、吊構造を構築する。   <Step 6A> The following work is performed to construct a suspended structure.

作業サイトSの反対側(主支柱M11、M21がある側)において第一のケーブルCaと第二のケーブルCbを−X方向に引っ張る。これにより、一対のケーブルC(Ca、Cb)を、主支柱間、主支柱と中間支柱との間及び中間支柱間において地面Gから離れた位置に配置させ、当該一対のケーブルCに架設されたフレームFに取り付けられた太陽発電パネルPを、空中に配置させる。この張力が印加された状態を維持したままで、作業サイトSの反対側においてアンカー部材A1L(図示せず)により第一のケーブルCaの一端を固定し、アンカー部材A2L(図示せず)により第二のケーブルCbの一端を固定する。   The first cable Ca and the second cable Cb are pulled in the −X direction on the opposite side of the work site S (the side where the main columns M11 and M21 are present). As a result, the pair of cables C (Ca, Cb) are arranged at positions away from the ground G between the main struts, between the main struts and the intermediate struts, and between the intermediate struts, and are installed on the pair of cables C. The solar power generation panel P attached to the frame F is disposed in the air. While maintaining the state in which this tension is applied, one end of the first cable Ca is fixed by the anchor member A1L (not shown) on the opposite side of the work site S, and the first end is fixed by the anchor member A2L (not shown). One end of the second cable Cb is fixed.

<工程7> 必要に応じて、主支柱間、主支柱と中間支柱との間及び中間支柱間における一対のケーブルCの垂れ下がり状態を調節して、主支柱と中間支柱が支える重量を適正にする。   <Step 7> If necessary, adjust the hanging state of the pair of cables C between the main struts, between the main struts and the intermediate struts, and between the intermediate struts, and make the weight supported by the main struts and the intermediate struts appropriate. .

第一例と第二例との大きな違いは、第一例では、工作物Wを作業サイトSから送り出した後にケーブルの端部を固定するのに対して、第二例では、工作物Wを作業サイトSから送り出す前にケーブルの一端を固定しておくことにある。第二例では、工作物Wを作業サイトSから送り出す際、すでにケーブルの一端が固定されているので、ケーブルCの送り出しを引張りにより行うと、ケーブルCに作用する張力に起因して工作物Wが地面Gから離隔する。それゆえ、工作物Wを地面Gや障害物との接触を回避しながら、送り出すことができるというメリットがある。(第一例の場合、送り出しが終了した後、工作物Wを支柱に懸架するので、地面Gやその他の障害物と衝突しやすい。それゆえに緩衝材などを用意したり、引揚補助ケーブルを用いて接触を回避しなければならない。)   The major difference between the first example and the second example is that in the first example, the end of the cable is fixed after the workpiece W is sent out from the work site S, whereas in the second example, the workpiece W is One end of the cable is fixed before being sent out from the work site S. In the second example, when the workpiece W is sent out from the work site S, one end of the cable is already fixed. Therefore, when the cable C is sent out by pulling, the workpiece W is caused by the tension acting on the cable C. Is separated from the ground G. Therefore, there is an advantage that the workpiece W can be sent out while avoiding contact with the ground G or an obstacle. (In the case of the first example, the workpiece W is suspended on the support after the feeding is finished, so it is easy to collide with the ground G and other obstacles. Therefore, a buffer material or the like is used. To avoid contact)

上記の第二例において、工程1、工程2、工程3、工程5及び工程7についての説明は、第一例における説明と同じである。   In said 2nd example, the description about the process 1, the process 2, the process 3, the process 5, and the process 7 is the same as the description in a 1st example.

工程1では、作業サイトSを主支柱M11、M21の側に設置してもよい。その場合、工程3Aは、作業サイトS側(主支柱M11、M21がある側)においてアンカー部材A1Lにより第一のケーブルCaの一端を固定し、アンカー部材A2Lにより第二のケーブルCbの一端を固定する工程となる。工程4は、工作物Wを構成する第一のケーブルCaを主支柱M11の側から主支柱M12の側へ、第二のケーブルCbを主支柱M21の側から主支柱M22の側へと送り出す工程となる。工程6Aの記載内容は、(ア) 作業サイトS側が主支柱M11、M21がある側となり、作業サイトSの反対側が主支柱M12、M22がある側となり、アンカー部材A1Rが作業サイトSの反対側にあるアンカー部材となること、ならびに (イ) 一対のケーブルCに張力をかける際には+X方向に引っ張る必要があることを考慮したうえで、適宜を読み替えることになる。   In step 1, the work site S may be installed on the main column M11, M21 side. In this case, in step 3A, one end of the first cable Ca is fixed by the anchor member A1L on the work site S side (the side where the main columns M11 and M21 are present), and one end of the second cable Cb is fixed by the anchor member A2L. It becomes a process to do. In step 4, the first cable Ca constituting the workpiece W is sent from the main column M11 side to the main column M12 side, and the second cable Cb is sent from the main column M21 side to the main column M22 side. It becomes. The contents of the process 6A are as follows: (a) The work site S side is the side where the main columns M11 and M21 are located, the opposite side of the work site S is the side where the main columns M12 and M22 are located, and the anchor member A1R is the opposite side of the work site S And (a) when applying tension to the pair of cables C, it is necessary to read them as appropriate in consideration of the necessity of pulling in the + X direction.

工程4における工作物Wの作業サイトSからの送り出しは、第一例と同様、たとえば、工作物Wを構成する一対のケーブルC(Ca、Cb)に取り付けた牽引補助ケーブルを、主支柱M12、M22の側から主支柱M11、M21の側へ牽引することにより実現することができる。その際、当該一対のケーブルCに、X方向に沿って間隔をおいて引揚補助ケーブルを取り付け、当該引揚補助ケーブルを上方に引っ張りあげることで当該一対のケーブルCを引っ張り上げれば、工作物W(Wa、Wb)が地面Gやその他の障害物に接触しないようにすることができる。ケーブルCを引っ張り上げる場合であっても、地面Gや他の障害物との接触の悪影響を低減するために太陽光発電パネルPの受光面と反対側の面に緩衝材を取り付けるのが好ましい。工程6が完了すれば、牽引補助ケーブル、引揚補助ケーブル及び緩衝材はもはや不要であるので、必要に応じて取り外す。   As in the first example, the work W is sent out from the work site S in the process 4 by, for example, connecting the traction auxiliary cable attached to the pair of cables C (Ca, Cb) constituting the work W to the main column M12, This can be realized by pulling from the M22 side to the main column M11, M21 side. At that time, if the lifting auxiliary cable is attached to the pair of cables C at intervals along the X direction and the lifting auxiliary cable is pulled upward to pull up the pair of cables C, the workpiece W ( Wa, Wb) can be prevented from contacting the ground G or other obstacles. Even when the cable C is pulled up, it is preferable to attach a cushioning material to the surface opposite to the light receiving surface of the photovoltaic panel P in order to reduce the adverse effects of contact with the ground G and other obstacles. When step 6 is completed, the traction auxiliary cable, the lifting auxiliary cable, and the cushioning material are no longer necessary, and are removed as necessary.

工程3Aでは、一対のケーブルCの一端をアンカー部材(A1R、A2R)に固定し、その後工程6Aにおいて、当該一対のケーブルCを引っ張っている。(当該一対のケーブルCを引っ張る目的は、工作物Wを空中に配置させるためである。その目的を達成することができる限り、当該一対のケーブルCの一端の固定は、アンカー部材による固定である必要はない。)その場合、当該一対のケーブルCの一端を、別の手段により暫定的に固定した後、引っ張ることにより工作物Wを空中に配置させ、その後、アンカー部材により固定するようにしてもよい。   In step 3A, one end of the pair of cables C is fixed to the anchor member (A1R, A2R), and then in step 6A, the pair of cables C is pulled. (The purpose of pulling the pair of cables C is to place the workpiece W in the air. As long as the purpose can be achieved, the fixing of one end of the pair of cables C is fixing by an anchor member. In that case, after one end of the pair of cables C is temporarily fixed by another means, the workpiece W is placed in the air by pulling, and then fixed by the anchor member. Also good.

ケーブル懸架型空中太陽光発電装置U[11]の組立方法のさらに別の例(第三例)は、次に掲げる工程を有する。   Yet another example (third example) of the method for assembling the cable-suspended air solar power generation device U [11] has the following steps.

<工程1> ケーブル懸架型空中太陽光発電装置U[11]の設置予定場所にX方向において隣接する位置に、作業サイトSを設営する。   <Step 1> The work site S is set up at a position adjacent to the installation location of the cable suspended aerial photovoltaic power generation device U [11] in the X direction.

<工程2A> 複数本の主支柱M11、M12、M21、M22ならびに主支柱M11、M12間に中間支柱I1kを配置し、主支柱M21、M22間に中間支柱I2kを配置する。   <Step 2A> The intermediate strut I1k is disposed between the main struts M11, M12, M21, M22 and the main struts M11, M12, and the intermediate strut I2k is disposed between the main struts M21, M22.

<工程3> 作業サイトSに対して、ケーブルC、フレームF及び太陽光発電パネルPならびにその他の作業上必要な部材、工具等を供給する。   <Step 3> The cable C, the frame F, the photovoltaic power generation panel P, and other members and tools necessary for work are supplied to the work site S.

<工程3A> 作業サイトS側(主支柱M12、M22がある側)においてアンカー部材A1R(図示せず)により第一のケーブルCaの一端を固定し、アンカー部材A2R(図示せず)により第二のケーブルCbの一端を固定する。   <Process 3A> One end of the first cable Ca is fixed by the anchor member A1R (not shown) on the work site S side (the side where the main columns M12 and M22 are present), and the second is fixed by the anchor member A2R (not shown). One end of the cable Cb is fixed.

<工程4> 作業サイトSにおいて、サイト内作業者(図示せず)が工作物Wを作成しながら、工作物Wを構成する第一のケーブルCaを主支柱M12の側から主支柱M11の側へ、第二のケーブルCbを主支柱M22の側から主支柱M21の側へと送り出す。これにより、工作物W(Wa、Wb)を、一対のケーブルCとともに、作業サイトSとは反対側に向かって送り出す。   <Step 4> At the work site S, an on-site worker (not shown) creates the workpiece W, and connects the first cable Ca constituting the workpiece W from the main column M12 side to the main column M11 side. The second cable Cb is sent out from the main column M22 side to the main column M21 side. Thereby, the workpiece W (Wa, Wb) is sent out together with the pair of cables C toward the side opposite to the work site S.

<工程5A> 作業サイトSから送り出された一対のケーブルC(Ca、Cb)を、主支柱M11、M12間及び中間支柱I1kならびに主支柱M21、M22間及び中間支柱I2kに懸架する。これにより、工作物W(Wa、Wb)を主支柱M11、M12間及び中間支柱I1kならびに主支柱M21、M22間及び中間支柱I2kに懸架する。   <Step 5A> A pair of cables C (Ca, Cb) sent from the work site S are suspended between the main struts M11 and M12 and the intermediate struts I1k, and between the main struts M21 and M22 and the intermediate struts I2k. As a result, the workpiece W (Wa, Wb) is suspended between the main columns M11 and M12 and the intermediate column I1k, and between the main columns M21 and M22 and the intermediate column I2k.

<工程6B> 次の作業を行い、吊構造を構築する。   <Step 6B> The following work is performed to construct a suspended structure.

作業サイトSの反対側(主支柱M11、M21がある側)において第一のケーブルCaと第二のケーブルCbを−X方向に引っ張る。この張力が印加された状態を維持したままで、作業サイトSの反対側においてアンカー部材A1Lにより第一のケーブルCaの一端を固定し、アンカー部材A(2i)Lにより第二のケーブルCbの一端を固定する。   The first cable Ca and the second cable Cb are pulled in the −X direction on the opposite side of the work site S (the side where the main columns M11 and M21 are present). While maintaining the state where the tension is applied, one end of the first cable Ca is fixed by the anchor member A1L on the opposite side of the work site S, and one end of the second cable Cb is fixed by the anchor member A (2i) L. To fix.

<工程7> 必要に応じて、主支柱間、主支柱と中間支柱との間及び中間支柱間における一対のケーブルCの垂れ下がり状態を調節して、主支柱と中間支柱が支える重量を適正にする。   <Step 7> If necessary, adjust the hanging state of the pair of cables C between the main struts, between the main struts and the intermediate struts, and between the intermediate struts, and make the weight supported by the main struts and the intermediate struts appropriate. .

第二例と第三例との大きな違いは、第二例では、第一例と同様、主支柱を設置することは必須であるが、中間支柱は必要に応じて設置するものである(第一例及び第二例の工程2及び工程5参照)のに対して、第三例では、主支柱も中間支柱も設置することが必須であるという点である(第三例の工程2A参照)。   The major difference between the second example and the third example is that in the second example, as in the first example, it is essential to install the main strut, but the intermediate strut is installed as necessary (first In the third example, it is indispensable to install both the main strut and the intermediate strut (see step 2A in the third example). .

第三例では、第二例に比べて、一対のケーブルC(Ca、Cb)、従って工作物W(Wa、Wb)が懸架される支柱の本数が多いという点を除き、第二例における説明がおおむねそのまま当てはまる。(第一例から第三例は、文字通り例に過ぎず、この発明は、これらの例に限定されない。)   In the third example, the explanation in the second example is more than that in the second example, except that the number of support columns on which the pair of cables C (Ca, Cb) and therefore the workpiece W (Wa, Wb) are suspended is larger. This is generally true. (The first to third examples are literally examples, and the present invention is not limited to these examples.)

ケーブル懸架型空中太陽光発電装置U[11]の組立方法のさらに別の例(第四例)は、次に掲げる工程を有する。   Yet another example (fourth example) of the method for assembling the cable-suspended air solar power generation device U [11] has the following steps.

<工程1> ケーブル懸架型空中太陽光発電装置の設置予定場所に主支柱Mと中間支柱Iを設置する。   <Process 1> The main support | pillar M and the intermediate | middle support | pillar I are installed in the installation planned place of a cable suspension type | formula aerial solar power generation device.

<工程2> 作業サイトSを主支柱Mあるいは中間支柱Iの近傍に設営する。   <Step 2> The work site S is set up in the vicinity of the main column M or the intermediate column I.

<工程3> ケーブルCを一方の主支柱Mから他方の主支柱Mに亘って送り出し、ケーブルサグ量を保持する高さにして、ケーブルCを全支柱(主支柱M及び中間支柱I)のサドル部2に仮止めする。ケーブルCには、予め所定間隔でフレームFの掴み部を取り付けておく。掴み部は、ケーブルCの供給者が予めケーブルCにボルト等によって取り付けておいてもよいし、作業サイトS上で取り付けてもよい。なお、サグとは、ケーブル自身あるいはこれにかかる各種部材の重量により生じるケーブルの垂れ下がりを意味し、サグ量とは、ケーブルの垂れ下がり量であり、通常は、ケーブルの両端を結ぶ直線とケーブルとの間の鉛直距離を支柱中央部で測った値である。   <Step 3> The cable C is sent from one main support M to the other main support M, and the height of the cable sag is maintained so that the cable C is a saddle of all the supports (main support M and intermediate support I). Temporarily fasten to part 2. The grip portion of the frame F is attached to the cable C at a predetermined interval in advance. The grip portion may be attached to the cable C by a bolt or the like in advance by the supplier of the cable C or may be attached on the work site S. The sag means the sag of the cable caused by the weight of the cable itself or various members related to it, and the sag is the sag of the cable, and usually the straight line connecting the ends of the cable and the cable. It is the value which measured the vertical distance between in the center part of a support | pillar.

<工程4> 中間支柱Iの両側のケーブルCにかかる荷重の偏りなくして、ケーブルCの張力のバランスを取りながら、作業サイトS上でフレームFを掴み部にボルト等により固定する。   <Step 4> The frame F is fixed to the gripping portion on the work site S with bolts or the like while balancing the tension of the cable C without unevenness of the load applied to the cable C on both sides of the intermediate column I.

<工程5> 同時に作業サイトS上でフレームFに太陽光発電パネルPをボルト等により固定する。この作業を繰り返し行う。   <Step 5> At the same time, the photovoltaic power generation panel P is fixed to the frame F on the work site S with bolts or the like. Repeat this operation.

上記第四例によれば、ケーブルCに予め掴み部を取り付けておくことによって、フレームF及び太陽光発電パネルPの取り付け効率が向上する。   According to the fourth example, by attaching the grip portion to the cable C in advance, the attachment efficiency of the frame F and the photovoltaic power generation panel P is improved.

上記において例説した組立方法によりケーブル懸架型空中太陽光発電装置(構造単位)U[11]を組み立てたら、作業サイトSを、Y方向において隣接する構造単位U[21]の設置予定場所のX方向において隣接する位置に移動させ、そこに設営する。そして、少なくとも複数の主支柱M31、M32、M41、M42を備える構造単位U[21]を当該組立方法により組み立てる。その後、さらに作業サイトSを、Y方向において隣接する構造単位U[31]の設置予定場所のX方向において隣接する位置に移動させ、そこに設営する。そして、少なくとも複数の主支柱M51、M52、M61、M62を備える構造単位U[31]を当該組立方法により組み立てる(図6参照)。以降、構造単位U[m1]を組み立てるまで同様の作業を繰り返し、j=1の列の構造単位群の組み立てを終える。   After assembling the cable suspension type aerial photovoltaic power generation device (structural unit) U [11] by the assembly method illustrated above, the work site S is set as X in the planned installation location of the structural unit U [21] adjacent in the Y direction. Move to an adjacent position in the direction and set up there. Then, the structural unit U [21] including at least a plurality of main columns M31, M32, M41, and M42 is assembled by the assembling method. Thereafter, the work site S is further moved to a position adjacent in the X direction of the planned installation location of the structural unit U [31] adjacent in the Y direction, and is set there. Then, the structural unit U [31] including at least a plurality of main columns M51, M52, M61, and M62 is assembled by the assembling method (see FIG. 6). Thereafter, the same operation is repeated until the structural unit U [m1] is assembled, and the assembly of the structural unit group in the column of j = 1 is finished.

次に、作業サイトSを、X方向に、単位構造一個分におおむね相当する距離だけ移動させる。つまり、作業サイトSを、構造単位U[m2]の設置予定場所のX方向において隣接する位置に移動させ、そこに設営する。そして、構造単位U[m2]を当該組立方法により組み立てる。その後、さらに作業サイトSを、Y方向において隣接する構造単位U[(m-1)2]の設置予定場所のX方向において隣接する位置に移動させ、そこに設営する。そして、構造単位U[(m-1)2]を当該組立方法により組み立てる。以降、構造単位U[12]を組み立てるまで同様の作業を繰り返し、j=2の列の構造単位群の組み立てを終える(図7参照)。   Next, the work site S is moved in the X direction by a distance substantially corresponding to one unit structure. That is, the work site S is moved to an adjacent position in the X direction of the planned installation location of the structural unit U [m2] and installed there. Then, the structural unit U [m2] is assembled by the assembling method. Thereafter, the work site S is further moved to a position adjacent in the X direction where the structural unit U [(m-1) 2] adjacent in the Y direction is to be installed, and is set there. Then, the structural unit U [(m-1) 2] is assembled by the assembling method. Thereafter, the same operation is repeated until the structural unit U [12] is assembled, and the assembly of the structural unit group in the column of j = 2 is completed (see FIG. 7).

構造単位群の組み立てを終えるたびに、作業サイトSを、X方向に、単位構造一個分におおむね相当する距離だけ移動させる作業を行うことで、任意の列jの構造単位群の組み立てによる増設を行い(図8参照)、最終的に、j=nの列の構造単位群の組み立てを終えて、M行N列の構造単位により構成される任意の設備単位PU[pq]を組み立てる(図9参照)。なお、p、qは、1以上の整数であり、s、tをそれぞれの上限値とする。   Each time the assembly of the structural unit group is completed, the work site S is moved in the X direction by a distance corresponding to one unit structure, thereby increasing the number of structural unit groups in an arbitrary column j by assembling. (See FIG. 8), finally, the assembly of the structural unit group of j = n columns is finished, and an arbitrary equipment unit PU [pq] composed of the structural units of M rows and N columns is assembled (FIG. 9). reference). Note that p and q are integers of 1 or more, and s and t are the upper limit values.

設備単位PU[pq]を組み立てることにより、より大規模な設備を構成することができる(図10及び図11参照)。   By assembling the equipment unit PU [pq], a larger scale equipment can be configured (see FIGS. 10 and 11).

この発明におけるケーブル懸架型空中太陽光発電設備は、少なくとも一つのケーブル懸架型空中太陽光発電装置を備えるものであるので、図2、図9、図10及び図11にそれぞれ示すものは、いずれもこの発明におけるケーブル懸架型空中太陽光発設備に該当する。   Since the cable suspension type aerial photovoltaic power generation facility according to the present invention includes at least one cable suspension type aerial photovoltaic power generation apparatus, all of those shown in FIG. 2, FIG. 9, FIG. 10, and FIG. It corresponds to the cable suspension type aerial solar power generation equipment in this invention.

X方向とY方向とは互いに直角に交差する関係である必要はなく、図11に示すように互いに斜め(非直角)に交差する関係であってもよい。   The X direction and the Y direction do not have to be perpendicular to each other, and may be obliquely (non-perpendicular) to each other as shown in FIG.

1:直管部材
2:サドル部
2a:突出部
2b:溝
3:載台
3a:凹部
U:ケーブル懸架型空中太陽光発電装置
M:主支柱
I:中間支柱
C:ケーブル
F:フレーム
P:パネル
W:工作物
A:アンカー部材
G:地面
S:作業サイト
PU:設備単位
1: Straight pipe member 2: Saddle portion 2a: Protruding portion 2b: Groove 3: Mounting base 3a: Recessed portion U: Cable suspension type aerial solar power generation device M: Main strut I: Intermediate strut C: Cable F: Frame P: Panel W: Work piece A: Anchor member G: Ground S: Work site PU: Unit of equipment

Claims (6)

互いに離隔して設置される複数本の主支柱と該複数本の主支柱間に懸架されるケーブルとを具備する吊構造部と、前記ケーブルに架設される太陽光発電パネルと、を備えるケーブル懸架型空中太陽光発電装置を複数個、前記ケーブルの長手方向に対して非平行な方向に沿って並列に配置することにより構成されるケーブル懸架型空中太陽光発電設備の組立方法であって、
前記非平行な方向に移動可能な作業サイトを用意する第一の工程と、
前記ケーブルと前記太陽光発電パネルとを前記作業サイトに供給する第二の工程と、
前記作業サイトにおいて前記太陽光発電パネルを前記ケーブルに順次取り付ける第三の工程と、
前記太陽光発電パネルが取り付けられた前記ケーブルを、前記作業サイトから送り出す第四の工程と、
前記作業サイトから送り出された前記太陽光発電パネルが取り付けられた前記ケーブルを、予め設置されている複数本の主支柱間に懸架する第五の工程と、
前記作業サイトを前記非平行な方向に移動させる第六の工程と、
を有しており、
前記第六の工程を実行した後、前記第三の工程、前記第四の工程及び前記第五の工程を再度実行する、
ことを特徴とするケーブル懸架型空中太陽光発電設備の組立方法。
A cable suspension comprising: a suspension structure comprising a plurality of main struts that are spaced apart from each other; and a cable suspended between the plurality of main struts; and a photovoltaic power generation panel that is erected on the cables. A method of assembling a cable-suspended aerial solar power generation facility configured by arranging a plurality of type aerial solar power generation devices in parallel along a direction non-parallel to the longitudinal direction of the cable,
A first step of preparing a work site movable in the non-parallel direction;
A second step of supplying the cable and the photovoltaic panel to the work site;
A third step of sequentially attaching the photovoltaic power generation panel to the cable at the work site;
A fourth step of sending out the cable to which the photovoltaic panel is attached from the work site;
A fifth step of suspending the cable to which the photovoltaic power generation panel sent out from the work site is attached between a plurality of main pillars installed in advance;
A sixth step of moving the work site in the non-parallel direction;
Have
After executing the sixth step, the third step, the fourth step and the fifth step are executed again.
A method for assembling a cable-suspended aerial solar power generation facility characterized by the above.
前記第三の工程は、前記ケーブルを前記作業サイトから送り出す過程で、そのケーブルに前記太陽光発電パネルを取り付ける工程である、
ことを特徴とする請求項1に記載のケーブル懸架型空中太陽光発電設備の組立方法。
The third step is a step of attaching the solar power generation panel to the cable in the process of sending out the cable from the work site.
The method for assembling a cable-suspended aerial solar power generation facility according to claim 1.
前記ケーブル懸架型空中太陽光発電設備は、前記ケーブル懸架型空中太陽光発電装置を複数個、前記ケーブルの長手方向に沿って直列に配置するように構成されており、
前記第五の工程は、前記作業サイトから送り出された前記太陽光発電パネルが取り付けられた前記ケーブルを、前記ケーブルの長手方向に沿って直列に配置するように予め設置されている前記複数本の主支柱間に懸架することにより、複数個の前記ケーブル懸架型空中太陽光発電装置を組み立てる工程である、
ことを特徴とする請求項1又は2に記載のケーブル懸架型空中太陽光発電設備の組立方法。
The cable suspended aerial photovoltaic power generation facility is configured to arrange a plurality of the cable suspended aerial photovoltaic power generation devices in series along the longitudinal direction of the cable,
In the fifth step, the plurality of cables installed in advance so as to be arranged in series along the longitudinal direction of the cable, the cable to which the photovoltaic power generation panel sent out from the work site is attached. It is a process of assembling a plurality of the above-mentioned cable suspension type aerial solar power generation devices by suspending between main pillars.
The method for assembling a cable-suspended aerial solar power generation facility according to claim 1 or 2.
前記吊構造部は、前記複数本の主支柱間に各支柱から離隔して配置し、前記ケーブルが懸架される中間支柱を具備しており、
前記第五の工程は、前記作業サイトから送り出された前記太陽光発電パネルが取り付けられた前記ケーブルを、予め設置されている前記複数本の主支柱間及び前記中間支柱に懸架する工程である、
ことを特徴とする請求項1から3の何れか1つに記載のケーブル懸架型空中太陽光発電設備の組立方法。
The suspension structure portion is disposed between each of the plurality of main struts so as to be separated from each strut, and includes an intermediate strut on which the cable is suspended.
The fifth step is a step of suspending the cable to which the photovoltaic power generation panel sent out from the work site is attached, between the plurality of main struts installed in advance and the intermediate strut,
The method for assembling a cable-suspended air solar power generation facility according to any one of claims 1 to 3.
前記中間支柱は、その中間支柱に対して姿勢の変更が可能に構成されているサドル部を備えており、
前記第五の工程は、前記作業サイトから送り出された前記太陽光発電パネルが取り付けられた前記ケーブルを、予め設置されている前記中間支柱が備えるサドル部に懸架する工程である、ことを特徴とする請求項4に記載のケーブル懸架型空中太陽光発電設備の組立方法。
The intermediate strut includes a saddle portion configured to be capable of changing the posture with respect to the intermediate strut,
The fifth step is a step of suspending the cable to which the solar power generation panel sent out from the work site is attached to a saddle portion provided in the intermediate strut that is installed in advance. The assembly method of the cable suspension type | formula aerial solar power generation facility of Claim 4 to do.
前記作業サイトは、前記ケーブルの長手方向に移動可能に構成されており、
前記作業サイトを前記ケーブルの長手方向に移動させる第七の工程をさらに有する、
ことを特徴とする請求項1から5の何れか1つに記載のケーブル懸架型空中太陽光発電設備の組立方法。
The work site is configured to be movable in the longitudinal direction of the cable,
A seventh step of moving the work site in the longitudinal direction of the cable;
A method for assembling a cable-suspended aerial solar power generation facility according to any one of claims 1 to 5.
JP2013168161A 2013-08-13 2013-08-13 Assembly method of cable suspension type aerial photovoltaic power generation equipment Active JP6088937B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2013168161A JP6088937B2 (en) 2013-08-13 2013-08-13 Assembly method of cable suspension type aerial photovoltaic power generation equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2013168161A JP6088937B2 (en) 2013-08-13 2013-08-13 Assembly method of cable suspension type aerial photovoltaic power generation equipment

Publications (2)

Publication Number Publication Date
JP2015037116A JP2015037116A (en) 2015-02-23
JP6088937B2 true JP6088937B2 (en) 2017-03-01

Family

ID=52687487

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2013168161A Active JP6088937B2 (en) 2013-08-13 2013-08-13 Assembly method of cable suspension type aerial photovoltaic power generation equipment

Country Status (1)

Country Link
JP (1) JP6088937B2 (en)

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4229713B2 (en) * 2003-01-28 2009-02-25 富士電機システムズ株式会社 Solar array
EP2297791A4 (en) * 2008-05-16 2013-04-24 P4P Holdings Llc METHODS AND SYSTEMS FOR SUPPORTING SOLAR NETWORK
JP5569498B2 (en) * 2011-10-03 2014-08-13 日本電気株式会社 Flexible solar cell assembly and installation method of flexible solar cell assembly

Also Published As

Publication number Publication date
JP2015037116A (en) 2015-02-23

Similar Documents

Publication Publication Date Title
JP5671373B2 (en) Bridge removal method and new construction method
CN103410353B (en) Garage steel framework and mounting process
CN201723853U (en) Integrated supporting and hanging frame with comprehensive pipeline arrangement technology for large public building installation project
CN111827483B (en) Construction method for roof curved surface # -shaped combined steel truss girder
JP6270692B2 (en) Lifting device and lifting method
TWI632104B (en) Device for fixing a crane rail in a factory and a load system using the same
JP2019128034A (en) Work bench and construction method using the same
CN202627493U (en) Combined template for constructing elevator shaft
CN201769017U (en) Rail-mounted welding falsework
JP6088937B2 (en) Assembly method of cable suspension type aerial photovoltaic power generation equipment
CN201649668U (en) Lattice column lifting frame
KR101959068B1 (en) Jig structure for construction of building outer wall
CN103848113A (en) Engine material rack
CN201208688Y (en) Fixture for welding large-sized H section steel structural part
CN108365552B (en) Hoisting device and cabinet installation method
CN203403681U (en) Temporary supporting frame of string beam
JP6537258B2 (en) Installation method of solar panel, and gantry apparatus for solar panel
CN116971285A (en) A cast-in-place concrete bridge formwork support system and a method of using the system
CN207829164U (en) Bearing device is adjusted in oblique rollering steel suspension cable in a kind of super-span steel construction
CN102677596A (en) Balanced mounting device for mounting steel box girder decorating plate
KR102734229B1 (en) A support unit for beam-forming of Buildings
CN219080340U (en) Integral lining rack for deep foundation pit wall construction and large template connecting structure thereof
CN222083977U (en) Scaffold for building construction
JP2018178648A (en) Positioning adjustment jig
CN213174845U (en) Temporary assembling device for roof curved surface # -shaped combined steel truss beam construction

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20160309

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20161221

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20170117

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20170206

R150 Certificate of patent or registration of utility model

Ref document number: 6088937

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250