Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP6093288B2 - Safety management method and safety management system for movable weir repair work - Google Patents
[go: Go Back, main page]

JP6093288B2 - Safety management method and safety management system for movable weir repair work - Google Patents

Safety management method and safety management system for movable weir repair work Download PDF

Info

Publication number
JP6093288B2
JP6093288B2 JP2013249010A JP2013249010A JP6093288B2 JP 6093288 B2 JP6093288 B2 JP 6093288B2 JP 2013249010 A JP2013249010 A JP 2013249010A JP 2013249010 A JP2013249010 A JP 2013249010A JP 6093288 B2 JP6093288 B2 JP 6093288B2
Authority
JP
Japan
Prior art keywords
water
water pressure
weir
warning
work space
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2013249010A
Other languages
Japanese (ja)
Other versions
JP2015105550A (en
Inventor
井上 哲夫
哲夫 井上
水野 正彦
正彦 水野
昌弘 増田
昌弘 増田
満 支倉
満 支倉
良介 朝倉
良介 朝倉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP2013249010A priority Critical patent/JP6093288B2/en
Publication of JP2015105550A publication Critical patent/JP2015105550A/en
Application granted granted Critical
Publication of JP6093288B2 publication Critical patent/JP6093288B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Barrages (AREA)

Description

本発明は、河川に設置される可動堰の改修作業における安全管理方法及び安全管理システムに関するものである。   The present invention relates to a safety management method and a safety management system in repair work of a movable weir installed in a river.

特開2006−124929号公報には、ダムを構成する4台の可動堰を備えたゲートに対して1台ずつ修繕工事を行う方法が記載されている。この公報に記載された方法では、ゲートの修繕に関する各種作業を行う作業スペースとして利用する仮設桟橋をダムの下流側に設置すると共に、修繕対象のゲートの上流側に仮締切ゲートを設置した状態でゲートの修繕工事が行われる。このように仮締切ゲートを設置することによって止水が行われ、修繕工事における河川の水の分断が行われている。   Japanese Patent Application Laid-Open No. 2006-124929 describes a method of performing repair work one by one on a gate provided with four movable weirs constituting a dam. In the method described in this publication, a temporary pier used as a work space for performing various work related to gate repair is installed on the downstream side of the dam, and a temporary closing gate is installed on the upstream side of the gate to be repaired. Gate repair work is performed. In this way, water is stopped by installing a temporary gate, and river water is divided in repair work.

特開2006−124929号公報JP 2006-124929 A

ところで、河川における海岸から比較的近い場所において、可動堰は、河川水における海水の遡上を防止すると共に洪水時に水を下流側に開放させるために設けられる。すなわち、海岸から近い場所に位置する可動堰では、通常時はゲートを閉鎖することによって、可動堰より上流側の河川水と、可動堰より下流側の塩分が混入した河川水とを分断している。そして、洪水発生時等にはゲートを開放して、可動堰より上流側の水を下流側に開放させる。ここで、下流側の塩分が混入した海水が可動堰よりも遡上すると、塩分を多く含んだ河川水が可動堰よりも上流側に移動することとなるので、河川から取得される飲料用水や工業用水に影響を与えるおそれがある。   By the way, in a place relatively close to the coast in the river, the movable weir is provided to prevent the seawater from going up in the river water and to release the water downstream in the event of a flood. In other words, in a movable weir located near the coast, normally the gate is closed to separate river water upstream from the movable weir and river water mixed with salt downstream from the movable weir. Yes. When a flood occurs, the gate is opened, and the water upstream from the movable weir is opened downstream. Here, when seawater mixed with downstream salinity goes up from the movable weir, river water containing a large amount of salt will move upstream from the movable weir. May affect industrial water.

よって、海岸から近い場所に位置する可動堰では、上流側の河川水と下流側の河川水とを分断させて可動堰としての機能を維持させながら、可動堰の改修工事を行うことが求められる。このような可動堰の改修工事は、河川水を上流側と下流側とで分断する分断箇所にて行われ、この分断箇所では多くの作業者が改修作業を行うことになる。よって、分断箇所への河川水の流入等から作業者を守り、作業者が安心して作業を行うことができるための対策を施すことが求められている。また、作業現場によって水深や地質等が異なるため、現場毎に効果的な安全基準を策定する必要がある。   Therefore, the movable weir located near the coast is required to repair the movable weir while maintaining the function as the movable weir by dividing the upstream river water and the downstream river water. . Such repair work of the movable weir is performed at a dividing point where the river water is divided into the upstream side and the downstream side, and many workers perform repair work at the dividing point. Therefore, it is required to take measures to protect the worker from the inflow of river water and the like to the parting site so that the worker can work with peace of mind. In addition, since the water depth and geology differ depending on the work site, it is necessary to formulate effective safety standards for each site.

本発明は、可動堰の改修作業中において、作業者が安心して改修作業を行うことが可能な可動堰の改修作業における安全管理方法及び安全管理システムを提供することを目的とする。   It is an object of the present invention to provide a safety management method and a safety management system in a movable dam repair work that enables an operator to perform the repair work with peace of mind during a movable dam repair work.

本発明に係る可動堰の改修作業における安全管理方法は、河川に設置された少なくとも2本の堰柱と、2本の堰柱の間を架け渡すように設置されたゲートと、を備える可動堰において、ゲートよりも上流側で堰柱のそれぞれに設置された第1の止水構造物と、ゲートよりも下流側で堰柱のそれぞれに設置された第2の止水構造物と、を用いて、2本の堰柱と第1の止水構造物と第2の止水構造物との間に位置する作業空間内で行われる可動堰の改修作業における安全管理方法であって、作業空間の下方に位置する地下水の水圧を測定する水圧測定工程と、水圧測定工程で測定された水圧が基準値以上であることを作業者に知らせることによって、又は作業空間内に設けられた観測井から地下水が流出することによって、作業者に対する警告を行う警告工程と、を備えることを特徴とする。   A safety management method in repair work of a movable weir according to the present invention includes a movable weir comprising: at least two weir columns installed in a river; and a gate installed so as to bridge between the two weir columns. The first water stop structure installed in each of the weir pillars upstream of the gate and the second water stop structure installed in each of the weir pillars downstream of the gate And a safety management method in the repair work of the movable weir performed in the work space located between the two weir pillars, the first water stop structure and the second water stop structure. The water pressure measurement process for measuring the water pressure of the groundwater located below and notifying the worker that the water pressure measured in the water pressure measurement process is above the reference value, or from the observation well provided in the work space Warning to workers by groundwater discharge Cormorants and warning process, characterized in that it comprises a.

この可動堰の改修作業における安全管理方法では、第1の止水構造物と第2の止水構造物とが2本の堰柱のそれぞれに設置されることによって、上流側から下流側への河川水の流入と下流側から上流側への河川水の流入とが防止されており、可動堰の上流側と可動堰の下流側とが分断されている。そして、第1の止水構造物と第2の止水構造物との間の河川水が除去されることにより、第1の止水構造物と第2の止水構造物との間に河川水を有しない作業空間が形成される。この作業空間では、地下水の異常な水圧等によって作業空間内に水が進入する懸念があり、このような事態が生じたときに作業者は作業空間内で作業を継続することができなくなる。しかしながら、本発明に係る安全管理方法では、作業空間の下方に位置する地下水の水圧を測定し、測定した水圧が基準値以上であるときに作業者への警告を行うので、作業者は、実際に水が作業空間内に進入する前に安全でないことを認識することができる。また、作業者は、作業空間内で観測井から水が流出していることを目視することによって、安全でないことを認識することも可能である。このように、地下水の水圧による警告と観測井による警告とを互いに補完させることが可能となっている。   In the safety management method in the repair work of the movable weir, the first water stop structure and the second water stop structure are installed on each of the two weir pillars, so that the upstream side to the downstream side are installed. The inflow of river water and the inflow of river water from the downstream side to the upstream side are prevented, and the upstream side of the movable weir and the downstream side of the movable weir are separated. And river water between the 1st water stop structure and the 2nd water stop structure is removed, and the river between the 1st water stop structure and the 2nd water stop structure is removed. A working space without water is formed. In this work space, there is a concern that water may enter the work space due to abnormal water pressure or the like of groundwater, and when such a situation occurs, the worker cannot continue working in the work space. However, in the safety management method according to the present invention, the water pressure of the groundwater located below the work space is measured, and a warning is given to the worker when the measured water pressure is equal to or higher than a reference value. It can be recognized that water is not safe before entering the work space. The worker can also recognize that it is not safe by visually observing that water is flowing out from the observation well in the work space. In this way, it is possible to complement the warning due to the groundwater pressure and the warning due to the observation well.

また、警告工程は、水圧測定工程で測定された水圧が第1の基準値以上であることを知らせることによって第1段階の警告を行う第1の警告工程と、水圧測定工程で測定された水圧が第1の基準値よりも大きい第2の基準値以上であることを知らせることによって第2段階の警告を行う第2の警告工程と、を備えていてもよい。このように、警告工程を多段階とすることによって、作業者に警告の重要度を認識させることもでき、作業者は直ちに作業を中止しなければならないか否かを認識することも可能となる。   The warning process includes a first warning process for giving a first-stage warning by notifying that the water pressure measured in the water pressure measurement process is equal to or higher than the first reference value, and the water pressure measured in the water pressure measurement process. And a second warning step of performing a second-stage warning by notifying that the value is equal to or greater than a second reference value greater than the first reference value. In this way, by making the warning process multi-stage, it is possible to make the worker recognize the importance of the warning, and it is also possible for the worker to recognize whether the work should be stopped immediately. .

また、警告工程では、作業空間内に設けられた表示手段の表示によって、作業者に対する警告を行ってもよい。このように表示手段による表示で安全でない旨を作業者に警告することによって、作業者は視覚によって安全でない旨を認識することができる。ここで、表示手段による警告としては、例えば回転灯の回転による警告等が挙げられる。   Further, in the warning step, a warning may be given to the worker by displaying on a display means provided in the work space. In this way, by warning the worker that the display means is not safe, the worker can recognize that it is not safe visually. Here, the warning by the display means includes, for example, a warning due to rotation of a rotating lamp.

また、警告工程では、水圧測定工程で測定された水圧が基準値以上であるときに電子メールを送信することによって、作業者に対する警告を行ってもよい。このように電子メールの送信で警告を行うことによって、コンピュータや携帯電話によって安全でない旨を認識することも可能となる。   In the warning step, the worker may be warned by sending an e-mail when the water pressure measured in the water pressure measurement step is equal to or higher than a reference value. In this way, by issuing a warning by sending an e-mail, it is possible to recognize that the computer or mobile phone is not safe.

本発明に係る安全管理システムは、河川に設置された少なくとも2本の堰柱と、2本の堰柱の間を架け渡すように設置されたゲートと、を備える可動堰において、ゲートよりも上流側で堰柱のそれぞれに設置された第1の止水構造物と、ゲートよりも下流側で堰柱のそれぞれに設置された第2の止水構造物と、を用いて、2本の堰柱と第1の止水構造物と第2の止水構造物との間に位置する作業空間内で作業を行う際における安全管理のための安全管理システムであって、作業空間の下方に位置する地下水の水圧を測定する水圧測定手段と、作業空間内に設けられ、地下水を流出させることによって作業者に対する警告を行う観測井と、水圧測定手段で測定された水圧が基準値以上であることを作業者に知らせることによって作業者に対する警告を行う警告手段と、を備えることを特徴とする。   A safety management system according to the present invention is a movable weir comprising at least two weir pillars installed in a river and a gate installed so as to bridge between the two weir pillars. Two weirs using a first water stop structure installed on each of the weir pillars on the side and a second water stop structure installed on each of the weir pillars on the downstream side of the gate A safety management system for safety management when performing work in a work space located between a pillar, a first water stop structure, and a second water stop structure, and located below the work space Water pressure measuring means to measure the water pressure of the groundwater to be measured, an observation well provided in the work space to warn the worker by discharging the groundwater, and the water pressure measured by the water pressure measuring means is above the reference value To the worker by informing Characterized in that it and a warning means for performing tell.

この安全管理システムでは、作業空間の下方に位置する地下水の水圧を測定する水圧測定手段と、水圧が基準値以上であるときに安全でない旨を作業者に警告する警告手段とを備えているので、作業者は、実際に水が作業空間内に進入する前に安全でないことを認識することができる。また、作業空間内に設けられた観測井から水が流出することによっても、作業者は安全でないことを認識することができる。そして、地下水の水圧による警告と観測井による警告とを互いに補完させることが可能となっているので、作業者に、より確実に、安全でないことを認識させることができる。   Since this safety management system includes water pressure measuring means for measuring the water pressure of groundwater located below the work space, and warning means for warning the operator that the water pressure is not safe when the water pressure is above a reference value. The operator can recognize that the water is not safe before actually entering the work space. In addition, the operator can recognize that it is not safe when water flows out from the observation well provided in the work space. And since it becomes possible to mutually complement the warning by the water pressure of groundwater and the warning by an observation well, it can make an operator recognize that it is not safe more reliably.

本発明によれば、可動堰の改修作業中において、作業者が安心して改修作業を行うことができる。   ADVANTAGE OF THE INVENTION According to this invention, during repair work of a movable weir, an operator can perform repair work in comfort.

本発明に係る安全管理システムの適用対象である可動堰を示す斜視図である。It is a perspective view which shows the movable weir which is the application object of the safety management system which concerns on this invention. 図1の可動堰における補強対象部分を示す斜視図である。It is a perspective view which shows the reinforcement object part in the movable dam of FIG. 図1の可動堰にライナープレートを設置した状態を示す斜視図である。It is a perspective view which shows the state which installed the liner plate in the movable dam of FIG. 図3の可動堰の堰柱に止水構造物を設置した状態を示す斜視図である。It is a perspective view which shows the state which installed the water stop structure in the dam pillar of the movable weir of FIG. 図4の止水構造物の間から河川水を除いた状態を示す斜視図である。It is a perspective view which shows the state which remove | eliminated the river water from between the water stop structures of FIG. 図5に示す可動堰における補強対象部分を示す斜視図である。It is a perspective view which shows the reinforcement object part in the movable dam shown in FIG. 堰柱を補強する作業を説明するための堰柱の側面図である。It is a side view of a dam pillar for demonstrating the operation | work which reinforces a dam pillar. 本発明に係る安全管理システムの一実施形態を示す側面図である。1 is a side view showing an embodiment of a safety management system according to the present invention. 水圧計及び観測井の配置状態を示す平面図である。It is a top view which shows the arrangement | positioning state of a water pressure gauge and an observation well. 本発明に係る安全管理方法の一実施形態を示すフローチャートである。It is a flowchart which shows one Embodiment of the safety management method which concerns on this invention. 堰柱の端部に形成された堰柱改良体を示す斜視図である。It is a perspective view which shows the dam pillar improvement body formed in the edge part of a dam pillar. 河川及び作業空間における水位の時系列データの一例を示すグラフである。It is a graph which shows an example of the time series data of the water level in a river and a work space.

以下、図面を参照しつつ、本発明に係る可動堰の改修作業における安全管理方法及び安全管理システムについて詳細に説明する。   Hereinafter, a safety management method and a safety management system in repair work of a movable weir according to the present invention will be described in detail with reference to the drawings.

図1に示されるように、可動堰1は、河川Rにおける可動堰1より上流側の河川水と可動堰1より下流側の河川水とを仕切っている。可動堰1は、河川Rを掛け渡すように配置されており、河川Rにおける比較的海岸に近い場所に設けられている。可動堰1は、河川Rにおける流量や水位を調整するために使用される。また、この可動堰1は、塩分を多く含んだ河川水が上流側に移動することを防止するために設けられている。   As shown in FIG. 1, the movable weir 1 partitions river water upstream of the movable weir 1 in the river R and river water downstream of the movable weir 1. The movable weir 1 is arranged so as to span the river R, and is provided at a location relatively close to the coast in the river R. The movable weir 1 is used to adjust the flow rate and water level in the river R. Moreover, this movable weir 1 is provided in order to prevent the river water containing much salt from moving upstream.

可動堰1は、通常時は既存ゲート2を閉鎖した状態となっており、既存ゲート2が河川Rを閉鎖することによって、河川Rの可動堰1を超えようとする流れが遮断される。また、可動堰1は、洪水等の異常発生時には、既存ゲート2を堰柱3に対して上昇させて開放させることによって、上流側の河川水を下流側に流し込む。なお、開放時における既存ゲート2の高さは、例えば約5mとなっている。このように、可動堰1では、河川Rにおける河川水の流れを制御可能となっている。また、可動堰1の下部には、平板状の底版Bが複数枚配置されている(図9参照)。   The movable weir 1 is normally in a state in which the existing gate 2 is closed, and when the existing gate 2 closes the river R, the flow that attempts to exceed the movable weir 1 of the river R is blocked. In addition, when an abnormality such as a flood occurs, the movable weir 1 raises the existing gate 2 with respect to the weir pillar 3 and opens it, thereby causing the upstream river water to flow downstream. In addition, the height of the existing gate 2 at the time of opening is about 5 m, for example. Thus, in the movable weir 1, the flow of river water in the river R can be controlled. In addition, a plurality of flat bottom plates B are disposed below the movable weir 1 (see FIG. 9).

既存ゲート2は、中空となっており、河川Rの流れを遮るように直線状に配置されている。既存ゲート2の長手方向における両端側には、河川Rに立設されたコンクリート構造体である堰柱3が設けられており、既存ゲート2は、2本の堰柱3を架け渡すように各堰柱3に設置されている。各堰柱3における既存ゲート2が設置される側面には、堰柱3に対して既存ゲート2を昇降させるためのレール部3aが配置されており、既存ゲート2は、レール部3aにスライド移動可能に支持されている。   The existing gate 2 is hollow and is arranged in a straight line so as to block the flow of the river R. At both ends of the existing gate 2 in the longitudinal direction, weir pillars 3 which are concrete structures standing on the river R are provided, and the existing gate 2 is arranged so as to bridge the two weir pillars 3. It is installed on the weir pillar 3. A rail part 3a for raising and lowering the existing gate 2 with respect to the dam pillar 3 is arranged on the side surface of each dam pillar 3 where the existing gate 2 is installed, and the existing gate 2 slides on the rail part 3a. Supported as possible.

なお、図1では、2本の堰柱3と2本の堰柱3を架け渡す1本の既存ゲート2とを図示しているが、実際には、4本の堰柱3と、それぞれの堰柱3を架け渡す3本の既存ゲート2と、が設けられている。また、堰柱3及び既存ゲート2の本数は特に限定されない。   In FIG. 1, two dam posts 3 and one existing gate 2 that bridges the two dam posts 3 are illustrated, but actually, the four dam posts 3 Three existing gates 2 that bridge the weir pillar 3 are provided. Moreover, the number of the dam pillar 3 and the existing gate 2 is not specifically limited.

また、既存ゲート2の両端は、複数本のチェーン(不図示)で支持されており、チェーンで引っ張り上げられることにより一方の方向に回転しながらレール部3aに沿って上昇し、チェーンが降ろされることにより他方の方向に回転しながらレール部3aに沿って下降する。このように、既存ゲート2は、回転しながら堰柱3のレール部3aに沿って昇降するいわゆるローリングゲートである。堰柱3は、河川Rにおいて、河川Rの流れ方向に延びる細長い形状となっている。また、堰柱3のレール部3aは、鉛直方向に対して若干斜めに傾いているので、既存ゲート2の昇降で必要とされる負荷が軽減されている。   Further, both ends of the existing gate 2 are supported by a plurality of chains (not shown), and when pulled up by the chain, it is lifted along the rail portion 3a while rotating in one direction, and the chain is lowered. As a result, it is lowered along the rail portion 3a while rotating in the other direction. Thus, the existing gate 2 is a so-called rolling gate that moves up and down along the rail portion 3a of the weir column 3 while rotating. In the river R, the weir pillar 3 has an elongated shape extending in the flow direction of the river R. Moreover, since the rail part 3a of the weir column 3 is slightly inclined with respect to the vertical direction, the load required for raising and lowering the existing gate 2 is reduced.

図7に示されるように、堰柱3の内部には、堰柱3のひび割れを防止するための用心鉄筋5が格子状に埋め込まれている。用心鉄筋5は、河川Rの幅方向から見て、約20cm四方の格子状に埋め込まれている。また、堰柱3の上部には、作業者が待機する詰所C及び橋Dが設けられている。ここで、橋Dは複数の堰柱3上で架け渡されているので、自動車等は、可動堰1の改修作業が行われているか否かに拘らず、橋Dの上を通って河川Rを渡ることが可能となっている。   As shown in FIG. 7, in the inside of the dam pillar 3, a guard rebar 5 for preventing the dam pillar 3 from cracking is embedded in a lattice shape. The guard rebar 5 is embedded in a grid of about 20 cm square when viewed from the width direction of the river R. In addition, a filling station C and a bridge D where an operator waits are provided on the upper part of the weir pillar 3. Here, since the bridge D is bridged on the plurality of dam pillars 3, automobiles and the like pass over the river R through the bridge D regardless of whether or not the movable dam 1 is being repaired. It is possible to cross.

以上のように構成される可動堰1の改修作業では、既存ゲート2を新設ゲートに交換する作業と堰柱3の耐震補強に関する作業とが行われる。図2に示される堰柱3の側面3bが補強対象の箇所である。新設ゲートは、例えば、堰柱3のレール部3aに沿って回転せずに昇降し且つ中空の殻(シェル)構造を有するいわゆるシェル構造ローラゲートである。また、堰柱3の耐震補強では、改修対象の既存ゲート2の両側に位置する2本の堰柱3に対して補強を行う。   In the repair work of the movable weir 1 configured as described above, the work for replacing the existing gate 2 with a new gate and the work for seismic reinforcement of the weir pillar 3 are performed. A side surface 3b of the weir column 3 shown in FIG. 2 is a portion to be reinforced. The new gate is, for example, a so-called shell structure roller gate that moves up and down without rotating along the rail portion 3a of the weir column 3 and has a hollow shell structure. Further, in the seismic reinforcement of the dam pillar 3, the two dam pillars 3 located on both sides of the existing gate 2 to be repaired are reinforced.

以下では、可動堰1の改修方法について図面を参照しながら説明する。可動堰1の改修は、3本の既存ゲート2のうち2本の既存ゲート2に対して行われるので、2本の既存ゲート2を改修している間に、残りの1本の既存ゲート2は通常通り使用可能となっている。   Below, the repair method of the movable weir 1 is demonstrated, referring drawings. Since the repair of the movable weir 1 is performed on two existing gates 2 of the three existing gates 2, while the two existing gates 2 are being repaired, the remaining one existing gate 2 Can be used as usual.

堰柱3の補強作業、既存ゲート2の撤去作業及び新設ゲートの設置作業は、いずれも2本の堰柱3の間に形成される作業空間S(図5参照)で行われる。作業空間Sは、2本の堰柱3と、堰柱3の上流側に設置される角柱状の第1の止水構造物7と、堰柱3の下流側に設置される角柱状の第2の止水構造物8と、によって形成される空間である。作業空間Sでは、第1及び第2の止水構造物7,8によって、堰柱3の上流側と堰柱3の下流側との両方からの河川水の流入を防止している。第1及び第2の止水構造物7,8の河川Rにおける幅方向の長さは、例えば35mである。また、作業空間Sは、例えば、河川Rの流れ方向の長さが約30m、河川Rの幅方向の長さが約30m、高さが約5mとなっている。   The reinforcement work of the dam pillar 3, the removal work of the existing gate 2, and the installation work of the new gate are all performed in the work space S (see FIG. 5) formed between the two dam pillars 3. The work space S includes two dam pillars 3, a prismatic first water stop structure 7 installed on the upstream side of the dam pillar 3, and a prismatic first part installed on the downstream side of the dam pillar 3. This is a space formed by two water-stop structures 8. In the work space S, the inflow of river water from both the upstream side of the dam pillar 3 and the downstream side of the dam pillar 3 is prevented by the first and second water stop structures 7 and 8. The length of the width direction in the river R of the 1st and 2nd water stop structures 7 and 8 is 35 m, for example. The working space S has, for example, a length in the flow direction of the river R of about 30 m, a length in the width direction of the river R of about 30 m, and a height of about 5 m.

まず、作業空間Sを形成する前の事前作業について説明する。作業空間Sを形成する前の事前作業としては、図3に示されるように、第2の止水構造物8が堰柱3に密着するように堰柱3の端部改修を行う。まず、堰柱3の下流側の端部3dを囲むように略円筒状のライナープレート9を堰柱3の端部3dに設置して端部3dを塞ぐ。そして、ライナープレート9内部の河川水をポンプによって除去し、堰柱3の端部3dを大気中に露出させて、堰柱3の端部3dに対する作業スペースAを得る。   First, the preliminary work before forming the work space S will be described. As prior work before forming the work space S, as shown in FIG. 3, the end of the dam pillar 3 is repaired so that the second water stop structure 8 is in close contact with the dam pillar 3. First, a substantially cylindrical liner plate 9 is installed on the end 3d of the weir column 3 so as to surround the end 3d on the downstream side of the weir column 3 to close the end 3d. Then, the river water inside the liner plate 9 is removed by a pump, and the end 3d of the weir column 3 is exposed to the atmosphere, so that a work space A for the end 3d of the weir column 3 is obtained.

ここで、堰柱3の端部3dとライナープレート9との接触部分にはゴム(不図示)が介在し、このゴムを介してライナープレート9が堰柱3に密着しているので、ライナープレート9内部への河川水の流入は防止されている。また、ライナープレート9は円筒状となっているので、外側からライナープレート9にかかる河川水の水圧はライナープレート9に対して略全方向から付与されることになる。よって、水圧によってライナープレート9が河川R内で移動する事態は発生しにくくなっている。   Here, rubber (not shown) is interposed at the contact portion between the end portion 3d of the weir column 3 and the liner plate 9, and the liner plate 9 is in close contact with the weir column 3 through this rubber. 9 Inflow of river water into the interior is prevented. Further, since the liner plate 9 has a cylindrical shape, the water pressure of the river water applied to the liner plate 9 from the outside is applied to the liner plate 9 from almost all directions. Therefore, it is difficult for the liner plate 9 to move in the river R due to water pressure.

作業スペースAを得た後には、図11に示されるように、堰柱3の端部3dにコンクリートを打設して略直方体状の堰柱改良体3eを形成する。堰柱改良体3eは、第2の止水構造物8を堰柱3に密着させるために設けられる。すなわち、堰柱改良体3eの下流側の側面3fに第2の止水構造物8の平面を密着させることができるので、第2の止水構造物8を堰柱改良体3eの側面3fに押し付けるだけで、作業空間S内への河川水の流入を防止することが可能である。また、上記同様、堰柱3の上流側に対しても、第1の止水構造物7が堰柱3に密着するように堰柱3の端部改修を行う。   After obtaining the work space A, as shown in FIG. 11, concrete is placed on the end 3 d of the dam pillar 3 to form a substantially rectangular parallelepiped dam pillar improvement body 3 e. The dam pillar improvement body 3e is provided to bring the second water stop structure 8 into close contact with the dam pillar 3. That is, since the plane of the second water stop structure 8 can be brought into close contact with the side surface 3f on the downstream side of the weir post improvement body 3e, the second water stop structure 8 is attached to the side face 3f of the weir post improvement body 3e. It is possible to prevent the inflow of river water into the work space S simply by pressing. Similarly to the above, the end of the dam pillar 3 is repaired so that the first water stop structure 7 is in close contact with the dam pillar 3 also on the upstream side of the dam pillar 3.

上記のように堰柱3の端部改修を行った後には、図4に示されるように、第1及び第2の止水構造物7,8の堰柱3に対する設置が行われる。堰柱3に設置する前において、第1及び第2の止水構造物7,8は、略直方体状の中空箱状体となっている。また、止水構造物7,8は、中空とされた状態で船舶によって曳航され、堰柱3の堰柱改良体3eに押し込まれて密着される。そして、止水構造物7,8の内部空間への注水を行って、止水構造物7,8を2本の堰柱3に密着させた状態で沈める。このように、止水構造物7,8内部に注水が行われることによって止水構造物7,8は河川R内に沈むので、止水構造物7,8が浮いてしまうような事態は回避される。   After the end portion of the dam pillar 3 is repaired as described above, the first and second water-stop structures 7 and 8 are installed on the dam pillar 3 as shown in FIG. Before the installation on the weir column 3, the first and second water-stop structures 7 and 8 are substantially rectangular parallelepiped hollow boxes. Moreover, the water stop structures 7 and 8 are towed by the ship in a hollow state, and are pushed into and closely attached to the dam pillar improvement body 3e of the dam pillar 3. Then, water is poured into the internal space of the water stop structures 7 and 8 and the water stop structures 7 and 8 are submerged in close contact with the two weir pillars 3. As described above, since the water-stopping structures 7 and 8 sink into the river R when the water is injected into the water-stopping structures 7 and 8, a situation where the water-stopping structures 7 and 8 float is avoided. Is done.

次に、図5に示されるように、2本の堰柱3と第1の止水構造物7と第2の止水構造物8とで囲まれた領域の河川水を除去することによって作業空間Sを形成する。このように2本の堰柱3と第1の止水構造物7と第2の止水構造物8との間に位置する河川水を除去して作業空間Sを形成することによって、作業空間S内では、陸上と同じように作業を行うことができるようになっている。この河川水を除去する作業は、例えば複数台のポンプP(図8参照)で河川水を汲み上げることによって行われる。   Next, as shown in FIG. 5, the operation is performed by removing the river water in the area surrounded by the two weir pillars 3, the first water stop structure 7 and the second water stop structure 8. A space S is formed. Thus, the work space S is formed by removing the river water located between the two dam posts 3, the first water stop structure 7 and the second water stop structure 8 to form the work space S. In S, work can be performed in the same way as on land. The operation of removing the river water is performed, for example, by pumping the river water with a plurality of pumps P (see FIG. 8).

作業空間Sが形成された後には、既存ゲート2の撤去作業を行う。既存ゲート2は、輪切りのように分解された状態で作業空間Sから外に出され撤去される。既存ゲート2は、例えばランサー切断棒の先端を既存ゲート2に当てて溶融させることによって分解される。分解された既存ゲート2は、クレーン台船のクレーンで吊り上げられることによって作業空間Sから撤去される。   After the work space S is formed, the existing gate 2 is removed. The existing gate 2 is taken out of the work space S and removed in a state of being disassembled like a ring slice. The existing gate 2 is disassembled by, for example, applying the tip of the lancer cutting rod to the existing gate 2 and melting it. The disassembled existing gate 2 is removed from the work space S by being lifted by a crane of a crane carrier.

そして、図6及び図7に示されるように、堰柱3の側面3bに対する補強作業が行われる。また、堰柱3に埋め込まれた用心鉄筋5の場所や大きさ等の配置状況は、鉄筋探査によって予め把握可能となっており、用心鉄筋5の配置状況を把握した後には、堰柱3の表面を斫って用心鉄筋5を露出させる。堰柱3の表面を斫る方法としては、ウォータージェットを用いることができ、ウォータージェットの高圧水流によって、堰柱3の表面を簡単に斫ることができる。なお、上述した鉄筋探査では、堰柱3を斫る量も予め把握しておく。   Then, as shown in FIG. 6 and FIG. 7, the reinforcement work is performed on the side surface 3 b of the weir column 3. In addition, the location and size of the core rebar 5 embedded in the weir column 3 can be grasped in advance by rebar exploration, and after grasping the layout state of the core rebar 5, The guard rebar 5 is exposed over the surface. As a method of rolling the surface of the weir column 3, a water jet can be used, and the surface of the weir column 3 can be easily rolled by the high-pressure water flow of the water jet. In the above-described reinforcing bar exploration, the amount by which the weir pillar 3 is swung is also grasped in advance.

堰柱3の表面を斫って用心鉄筋5を露出させた後には、格子状となっている用心鉄筋5を避けるようにして棒状の補強用鉄筋6を堰柱3の側面3bに挿入させる。このように用心鉄筋5に干渉しないように補強用鉄筋6を挿入することにより、補強用鉄筋6の挿入によって用心鉄筋5が切断される等の問題を回避することができる。補強用鉄筋6は、地震の揺れによってコンクリートがずれて切断される等、剪断による破壊を防止するための剪断補強筋である。補強用鉄筋6を挿入する作業としては、まず堰柱3の側面3bにコアボーリング工法で行われる水平ボーリング等によって補強用鉄筋6を挿入するための貫通孔を開ける。   After exposing the core reinforcing bar 5 over the surface of the weir column 3, the bar-shaped reinforcing reinforcing bar 6 is inserted into the side surface 3 b of the weir column 3 so as to avoid the lattice-shaped core reinforcing bar 5. Thus, by inserting the reinforcing reinforcing bars 6 so as not to interfere with the central reinforcing bar 5, problems such as cutting of the central reinforcing bar 5 due to the insertion of the reinforcing reinforcing bars 6 can be avoided. The reinforcing reinforcing bars 6 are shear reinforcing bars for preventing breakage due to shearing, for example, the concrete is displaced and cut by an earthquake. As an operation for inserting the reinforcing reinforcing bars 6, first, a through hole for inserting the reinforcing reinforcing bars 6 is opened on the side surface 3 b of the weir column 3 by horizontal boring performed by the core boring method.

上記の貫通孔に補強用鉄筋6を挿入し、上記の貫通孔と補強用鉄筋6との間に防錆用のグラウトを充填する。そして、補強用鉄筋6の両端を堰柱3から露出させると共に座金に通し、この状態で補強用鉄筋6の両端を堰柱3の側面3bに固定する。このように堰柱3に補強用鉄筋6を挿入し固定させることによって、堰柱3の補強を行うことが可能であり、コンクリート構造物である堰柱3が引っ張られる力に対する抵抗力を高めることができる。また、堰柱3の補強作業において、補強用鉄筋6の両端に支圧板21を固定させたり堰柱3を増厚させたりすることによって、堰柱3の強度を一層高めることができる。   The reinforcing reinforcing bars 6 are inserted into the through holes, and a rust preventing grout is filled between the through holes and the reinforcing reinforcing bars 6. Then, both ends of the reinforcing reinforcing bar 6 are exposed from the weir column 3 and passed through a washer. In this state, both ends of the reinforcing reinforcing bar 6 are fixed to the side surface 3 b of the weir column 3. By inserting the reinforcing reinforcing bars 6 into the dam pillar 3 and fixing them in this way, it is possible to reinforce the dam pillar 3 and increase the resistance to the pulling force of the dam pillar 3 that is a concrete structure. Can do. Further, in the reinforcement work of the dam pillar 3, the strength of the dam pillar 3 can be further increased by fixing the bearing plates 21 at both ends of the reinforcing reinforcing bars 6 or increasing the thickness of the dam pillar 3.

このように堰柱3の補強作業を完了させた後には、堰柱3のレール部3aの改修等の作業を行って新設ゲートの設置を行う。新設ゲートの設置が完了した後には、作業空間Sへの水の注入、並びに、堰柱3に対する第1及び第2の止水構造物7,8の取り外しを行う。取り外された止水構造物7,8は、船舶で曳航されることによって運び出され、その後一連の作業が完了する。このように運び出された止水構造物7,8は、別の現場で使うことも可能であり、適宜再利用することができる。   After completing the reinforcement work of the dam pillar 3 in this way, the work such as the repair of the rail portion 3a of the dam pillar 3 is performed to install a new gate. After the installation of the new gate is completed, water is injected into the work space S, and the first and second water stop structures 7 and 8 are removed from the weir pillar 3. The removed water-stop structures 7 and 8 are carried out by being towed by a ship, and then a series of operations is completed. The water-stop structures 7 and 8 carried out in this way can be used at another site and can be reused as appropriate.

ところで、止水構造物7,8が2本の堰柱3のそれぞれに設置されることによって、上流側から下流側への河川水の流入と下流側から上流側への河川水の流入とが防止されており、可動堰1の上流側と下流側とが分断されている。そして、図6に示されるように、第1の止水構造物7と第2の止水構造物8との間の河川水が除去されることにより、第1の止水構造物7と第2の止水構造物8の間に河川水を有しない作業空間Sが形成される。   By the way, the water stop structures 7 and 8 are installed in each of the two weir pillars 3 so that the inflow of river water from the upstream side to the downstream side and the inflow of river water from the downstream side to the upstream side are prevented. The upstream side and the downstream side of the movable weir 1 are divided. And as FIG. 6 shows, the river water between the 1st water stop structure 7 and the 2nd water stop structure 8 is removed, and the 1st water stop structure 7 and the 1st water stop structure 7 A work space S having no river water is formed between the two water stop structures 8.

この作業空間Sでは、地下水の異常な水圧等によって作業空間S内に水が進入する懸念があり、このような事態が生じたときに作業者は作業空間S内で作業を継続することができなくなる。そこで、可動堰1では、作業空間Sを形成して作業者が作業空間Sの中で作業を行う場合において、図8に示されるように、作業空間S内に水が進入する事態に対処するために安全管理システム10が設けられている。安全管理システム10は、作業空間S内における作業が可能か否かの安全基準を定める機能を有する。   In this work space S, there is a concern that water may enter the work space S due to abnormal water pressure or the like of groundwater. When such a situation occurs, the worker can continue working in the work space S. Disappear. Therefore, in the movable weir 1, when the work space S is formed and the worker performs work in the work space S, the situation where water enters the work space S as shown in FIG. 8 is dealt with. Therefore, a safety management system 10 is provided. The safety management system 10 has a function of determining safety standards as to whether or not work in the work space S is possible.

安全管理システム10は、作業空間Sの下部に位置する底版Bの直下、及び作業空間Sの下部に位置する地盤の砂層Nにおける地下水の水圧を測定する水圧計(水圧測定手段)11a,11bと、作業空間S内で作業することが安全でない旨を作業者に知らせるためのパトライト(登録商標)等の回転灯(警告手段、表示手段)12と、地下水の水圧が通常よりも高いときに水を流出させる観測井13と、水圧計11a,11bによる水圧の測定データを収集する詰所C内のコンピュータ14と、を備えている。作業空間Sにおける水圧計11a,11b、回転灯12及び観測井13の数や配置については、現場に合わせて適宜変更することが可能である。   The safety management system 10 includes water pressure gauges (water pressure measuring means) 11a and 11b that measure the water pressure of ground water in the sand layer N directly below the bottom plate B positioned below the work space S and below the work space S. Rotating lights (warning means, display means) 12 such as Patlite (registered trademark) for notifying the worker that it is not safe to work in the working space S, and water when the water pressure of groundwater is higher than normal. An observation well 13 and a computer 14 in the filling station C for collecting water pressure measurement data by the water pressure gauges 11a and 11b. About the number and arrangement | positioning of the water pressure gauges 11a and 11b, the rotary lamp 12, and the observation well 13 in the working space S, it is possible to change suitably according to the field.

地下水の水圧は、通常であれば深さに比例した水圧となっているが、作業空間S内に地下水が噴出するおそれがあるときには通常よりも高い異常水圧となっている。水圧計11a,11bは、このような通常よりも高い異常水圧を検出するために設けられている。水圧計11a,11bは、止水構造物7,8及び2本の堰柱3で囲まれる領域から河川水が除去され始めた段階で、水圧の計測を開始する。水圧計11aは底版Bの直下の水圧を測定し、水圧計11bは作業空間Sの下方に位置する地盤の砂層Nにおける地下水の水圧を測定する。水圧計11a,11bは、それぞれ底版Bを貫通して形成されたチェック孔の下端に配置されている。   Normally, the water pressure of the groundwater is proportional to the depth, but when there is a possibility that the groundwater may be ejected into the work space S, the water pressure is higher than usual. The water pressure gauges 11a and 11b are provided to detect such an abnormal water pressure higher than normal. The water pressure gauges 11a and 11b start measuring the water pressure when the river water begins to be removed from the area surrounded by the water blocking structures 7 and 8 and the two weir pillars 3. The water pressure gauge 11a measures the water pressure directly below the bottom slab B, and the water pressure gauge 11b measures the water pressure of groundwater in the ground sand layer N located below the work space S. The water pressure gauges 11a and 11b are disposed at the lower ends of check holes formed through the bottom plate B, respectively.

このように2種類の水圧計11a,11bを配置することによって、より精度の高い水圧測定が実現されている。また、本実施形態において、水圧計11a,11bは、例えば土中間隙水圧計である。作業空間Sの下方のチェック孔内に配置された水圧計11a,11bは、測定した水圧を電気信号に変換し、変換した電気信号をリアルタイムでコンピュータ14に出力する。また、水圧計11a,11bによる水圧の測定範囲は、例えば0.1〜1.0MPaとすることができ、測定した水圧に応じた電気信号を水圧データとして出力する。   By arranging the two types of water pressure gauges 11a and 11b in this way, more accurate water pressure measurement is realized. Further, in the present embodiment, the water pressure gauges 11a and 11b are, for example, soil pore pressure gauges. The water pressure gauges 11a and 11b arranged in the check holes below the work space S convert the measured water pressure into an electric signal, and output the converted electric signal to the computer 14 in real time. Moreover, the measurement range of the water pressure by the water pressure gauges 11a and 11b can be, for example, 0.1 to 1.0 MPa, and an electric signal corresponding to the measured water pressure is output as water pressure data.

なお、図9に示されるように、水圧計11a,11bは複数の箇所に配置されている。ここで、仮に水圧計11a,11bにおいて、接触異常や電線コードの断線等が発生して水圧計11a,11bが異常値を出力した場合には、異常値を出力した水圧計11a,11bの放棄、又は別の水圧計11a,11bの設置が行われる。   In addition, as FIG. 9 shows, the water pressure gauges 11a and 11b are arrange | positioned at several places. If the water pressure gauges 11a and 11b output abnormal values due to contact abnormality or disconnection of the electric wire cords in the water pressure gauges 11a and 11b, the abandonment of the water pressure gauges 11a and 11b that output the abnormal values. Or installation of another water pressure gauge 11a, 11b is performed.

上記のように水圧計11a,11bによって測定された水圧のデータは、コンピュータ14に出力及び保存される。そして、水圧計11a,11bによって測定された水圧のデータは、コンピュータ14で常時閲覧可能となっていると共にコンピュータ14に履歴として残されている。このように水圧計11a,11bを設けることによって、地下水が底版Bの下部に進入しているか及び底版Bの下方に地下水による水圧がかかっているかを検出可能となっている。   The water pressure data measured by the water pressure gauges 11a and 11b as described above is output and stored in the computer 14. The water pressure data measured by the water pressure gauges 11a and 11b is always viewable by the computer 14 and remains in the computer 14 as a history. By providing the water pressure gauges 11a and 11b as described above, it is possible to detect whether the groundwater has entered the lower part of the bottom plate B and whether the water pressure by the groundwater is applied below the bottom plate B.

コンピュータ14は、水圧計11a,11bによって測定された水圧が基準値以上となっている場合に、作業空間S内で作業することが安全でない旨の警報を作業者に通知する。ここで、水圧データは、水圧計11a,11bによって測定された水圧の平均値でもよいし、最大値であってもよい。また、コンピュータ14は、上記の水圧データが基準値以上となっていると判断した場合に、作業空間S内における回転灯12を回転させる。回転灯12は、赤色の回転灯と黄色の回転灯からなる2種類の回転灯を含んでおり、上記の水圧データが1次管理値以上となったときに黄色の回転灯が回転し、上記の水圧データが1次管理値よりも大きい管理基準値以上となったときに赤色の回転灯が回転する。   When the water pressure measured by the water pressure gauges 11a and 11b is equal to or higher than the reference value, the computer 14 notifies the worker of an alarm that it is not safe to work in the work space S. Here, the water pressure data may be an average value of water pressure measured by the water pressure gauges 11a and 11b, or may be a maximum value. Further, when the computer 14 determines that the water pressure data is equal to or higher than the reference value, the computer 14 rotates the rotating lamp 12 in the work space S. The revolving light 12 includes two types of revolving lights comprising a red revolving light and a yellow revolving light. When the water pressure data is equal to or higher than the primary control value, the yellow revolving light rotates, The red rotating lamp rotates when the water pressure data of becomes more than the management reference value larger than the primary management value.

回転灯12は、水圧計11a,11bによって計測された水圧データが基準値以上となったときに作動して、作業空間S内で作業することが安全でないことを作業者に認識させる。回転灯12は、止水構造物7,8近傍における作業者が作業空間Sに向かって降りるときに利用する螺旋階段(不図示)の上部に配置されている。よって、作業空間S内の作業者は勿論、作業空間Sに入ろうとする作業者にも安全でないことを認識させることができる。   The revolving light 12 is activated when the water pressure data measured by the water pressure gauges 11a and 11b is equal to or higher than a reference value, and allows the operator to recognize that it is not safe to work in the work space S. The revolving lamp 12 is disposed on an upper part of a spiral staircase (not shown) used when an operator in the vicinity of the water-stop structures 7 and 8 descends toward the work space S. Therefore, not only the worker in the work space S but also the worker trying to enter the work space S can recognize that it is not safe.

また、水圧計11a,11bによって計測された水圧データが基準値以上となったときには、作業者が保有している携帯電話に安全でない旨を知らせるメールが送信される。なお、安全でない旨のメールを携帯電話に送信する代わりに、又は安全でない旨のメールを携帯電話に送信すると共に、例えば詰所C内のコンピュータ14にメールを送信してもよい。このようにメールの送信や回転灯12によって作業者に異常を知らせる場合、安全でない旨を静かに作業者に伝えることができる。なお、メールの送信や回転灯12に代えて、例えば自動音声によって作業者に安全でない旨を認識させることも可能である。   Further, when the water pressure data measured by the water pressure gauges 11a and 11b is equal to or higher than the reference value, a mail notifying that the worker is not safe is transmitted to the mobile phone held by the worker. Instead of sending an unsafe email to the mobile phone, or sending an unsafe email to the mobile phone, the email may be sent to the computer 14 in the station C, for example. As described above, when an abnormality is notified to the worker by sending an e-mail or the rotating lamp 12, it is possible to quietly inform the worker that it is not safe. In addition, it is possible to make the operator recognize that it is not safe by automatic voice, for example, instead of sending an e-mail or the rotating lamp 12.

また、作業空間S内には、作業空間Sの下方に位置する底版Bから地盤に挿入されて下方に延びる筒状の観測井13が配置されており、作業空間S内に下から水が入り込むおそれがあるときは観測井13から水が流出する。このように、作業空間Sの下方における地下水の水圧が異常水圧となっているときに観測井13から水が流出するので、作業空間S内の作業者は、目視によって直ちに異常を認識することが可能となる。なお、観測井13の材料としては、例えば透明塩ビ材を用いることができる。   Further, in the work space S, a cylindrical observation well 13 that is inserted into the ground from the bottom slab B located below the work space S and extends downward is disposed, and water enters the work space S from below. When there is a fear, water flows out from the observation well 13. Thus, since the water flows out from the observation well 13 when the groundwater pressure below the work space S is an abnormal water pressure, the worker in the work space S can immediately recognize the abnormality visually. It becomes possible. In addition, as a material of the observation well 13, a transparent polyvinyl chloride material can be used, for example.

また、作業空間S内における作業前には、必ず観測井13のチェックが行われ、観測井13に異常がないことが確認される。また、作業空間S内で作業を行う際には、必ず複数の作業者がまとまって作業しており、異常が確認されたときには当該作業者に作業空間Sから退避する旨の案内及び警報が発せられる。なお、作業者が退避するための通路の位置、及び退避する順路、については、作業空間S内で作業者に分かるように表示されている。   Before the work in the work space S, the observation well 13 is always checked, and it is confirmed that the observation well 13 has no abnormality. In addition, when working in the work space S, a plurality of workers are always working together, and when an abnormality is confirmed, a guidance and warning to evacuate from the work space S is issued to the worker. It is done. In addition, the position of the passage for the worker to evacuate and the route to evacuate are displayed in the work space S so that the worker can understand.

次に、図10及び図12を参照しながら、安全管理システム10を用いて作業空間Sの安全管理を行う安全管理方法について説明する。図10に示されるフローチャートの処理は、2本の堰柱3と止水構造物7,8とで囲まれた領域における河川水の除去を開始した時点から可動堰1の改修作業が完了するまで繰り返し実行される。   Next, a safety management method for performing safety management of the work space S using the safety management system 10 will be described with reference to FIGS. 10 and 12. The process of the flowchart shown in FIG. 10 is from the start of removal of river water in the area surrounded by the two dam posts 3 and the water blocking structures 7 and 8 until the repair work of the movable dam 1 is completed. Repeatedly executed.

まず、2本の堰柱3と止水構造物7,8とで囲まれた領域における河川水の除去が開始されると、ステップS11において水圧計11a,11bによる水圧の測定が開始される。ここで、河川水の除去は複数のポンプP(図9参照)によって行われるが、ポンプPによって上記領域からの排水が開始される時刻t以前において、第1の止水構造物7より上流側の水位は略一定となっている。また、上記領域及び第2の止水構造物8より下流側の水位は、潮の干満によって一定周期で変動している。 First, when removal of river water in an area surrounded by the two weir pillars 3 and the water blocking structures 7 and 8 is started, measurement of water pressure by the water pressure gauges 11a and 11b is started in step S11. Here, the removal of the river water is performed by a plurality of pump P (see FIG. 9), at time t 1 before the waste water from the area is started by the pump P, upstream from the first water-stopping structure 7 The water level on the side is almost constant. Further, the water level downstream of the region and the second water stop structure 8 fluctuates at a constant period due to tidal fluctuations.

また、時刻tでポンプPによる排水が行われると、上記領域の上流側に位置する間隙水圧計である水圧計11a,11bの読み値(水位に換算した値)と、上記領域の下流側に位置する水圧計11a,11bの読み値とが低下する。そして、時刻tとなったときに一旦全てのポンプPを停止させると、上流側の水圧計11a,11bの読み値と、下流側の水圧計11a,11bの読み値とが一旦増加する。 Also, when the drainage by the pump P at time t 1 is carried out, pressure gauge 11a is pore pressure gauge located on the upstream side of the area, 11b readings (the value converted into water level), the downstream side of the region And the readings of the water pressure gauges 11a and 11b located at the lower position. Then, once it stops all pump P when a time t 2, the pressure gauge 11a on the upstream side, and readings 11b, pressure gauge 11a of the downstream side, and the readings 11b temporarily increased.

そして、時刻t以降には上記領域における水密調整が行われ、時刻tになったときに再びポンプPによる排水が開始される。すると、上流側の水圧計11a,11bの読み値と、下流側の水圧計11a,11bの読み値とは低下し、時刻tで排水が完了する。こうして上記領域の水位は、ポンプPによって徐々に低下し、最終的に作業空間Sが形成される。作業空間Sが形成される過程において、異常がない場合には水圧計11a,11bの読み値は上昇しないが、例えば上記の水位低下に逆行して水位が上昇する等の現象が発生した場合には、水圧計11a,11bの読み値が上昇する。そして、上昇した水圧計11a,11bの読み値が異常値としてコンピュータ14に検知されることとなる。 Then, at time t 2 after watertight adjustment in the region is performed, waste water is started again by the pump P when it becomes time t 3. Then, pressure gauge 11a on the upstream side, and readings 11b, pressure gauge 11a of the downstream side, decreases the readings 11b, drainage at time t 4 is completed. Thus, the water level in the region is gradually lowered by the pump P, and finally the work space S is formed. When there is no abnormality in the process of forming the work space S, the readings of the water pressure gauges 11a and 11b do not increase. For example, when a phenomenon such as a rise in the water level occurs against the above-described decrease in the water level occurs. Increases the readings of the water pressure gauges 11a and 11b. Then, the readings of the raised water pressure gauges 11a and 11b are detected by the computer 14 as abnormal values.

上記のように2本の堰柱3と止水構造物7,8とで囲まれた領域における排水が行われる過程で、水圧計11a,11bによる測定データはコンピュータ14に出力される(水圧測定工程)。図10に示されるように、ステップS12では、コンピュータ14によって、水圧計11a,11bによる水圧データが一次管理値(第1の基準値)以上であるか否かが判定される。ここで、一次管理値とは、通常時よりも水が作業空間Sに流入する可能性が高くなっており、作業空間S内の監視体制を強めると共に作業空間S内における作業者が退避準備をした方が好ましい値を示している。   In the process of drainage in the area surrounded by the two weir pillars 3 and the water blocking structures 7 and 8 as described above, the measurement data by the water pressure gauges 11a and 11b is output to the computer 14 (water pressure measurement). Process). As shown in FIG. 10, in step S12, the computer 14 determines whether or not the water pressure data by the water pressure gauges 11a and 11b is equal to or higher than the primary management value (first reference value). Here, the primary management value means that there is a higher possibility that water will flow into the work space S than in the normal state. It shows a preferable value.

ステップS12において、水圧データが一次管理値以上でないと判定された場合には一連の処理を終了する。一方、ステップS12において、水圧データが一次管理値以上であると判定された場合にはステップS13に移行して、第1段階の警告として、作業空間S内の作業者に対して警報が出力される。すなわち、黄色の回転灯12が回転を開始すると共に、作業者が保有している携帯電話に安全でない旨を知らせるメールが送信される(第1の警告工程)。   In step S12, when it is determined that the water pressure data is not equal to or higher than the primary management value, the series of processes is terminated. On the other hand, if it is determined in step S12 that the water pressure data is greater than or equal to the primary management value, the process proceeds to step S13, where a warning is output to the worker in the work space S as a first-stage warning. The That is, the yellow revolving light 12 starts rotating, and a mail notifying that it is not safe is transmitted to the mobile phone owned by the worker (first warning step).

そして、ステップS14に移行して、コンピュータ14によって、水圧計11a,11bによる水圧データが管理基準値(第2の基準値)以上であるか否かが判定される。ここで、管理基準値とは、一次管理値よりも大きい値であり、一次管理値よりも更に水が作業空間Sに流入する可能性が高くなっており、作業空間Sから作業者が直ちに退避すべき値を示している。   And it transfers to step S14 and it is determined by the computer 14 whether the water pressure data by the water pressure gauges 11a and 11b is more than a management reference value (2nd reference value). Here, the management reference value is a value larger than the primary management value, and there is a higher possibility that water will flow into the work space S than the primary management value, and the worker immediately retreats from the work space S. The value that should be shown.

ステップS14において、水圧データが管理基準値以上でないと判定された場合には一連の処理を終了する。一方、ステップS14において、水圧データが管理基準値以上であると判定された場合にはステップS15に移行して、作業空間S内の作業者に対して、第2段階の警告として、作業空間Sから直ちに退避すべき旨を示す退避指令が出力される。すなわち、赤色の回転灯12が回転を開始すると共に、作業者が保有している携帯電話に直ちに作業空間Sから退避すべき旨を知らせるメールが出力される(第2の警告工程)。ステップS15で退避指令出力がなされると一連の処理が終了する。そして、作業空間Sから作業者が全員退避した後には、全員退避したことの確認がされた後、河川水を作業空間S内に自動注入することによって、高圧となった地下水による底版Bの損傷が防止される。   In step S14, when it is determined that the water pressure data is not equal to or higher than the management reference value, the series of processes is terminated. On the other hand, when it is determined in step S14 that the water pressure data is equal to or higher than the management reference value, the process proceeds to step S15, and the work space S is used as a second-stage warning to the worker in the work space S. A evacuation command indicating that evacuation should be immediately performed is output. That is, the red rotating lamp 12 starts rotating, and a mail informing that the worker should immediately evacuate from the work space S is output to the mobile phone owned by the worker (second warning step). When a save command is output in step S15, a series of processing ends. Then, after all workers are evacuated from the work space S, it is confirmed that all the workers have evacuated, and then the river slab B is damaged by high-pressure groundwater by automatically injecting river water into the work space S. Is prevented.

以上、可動堰1の改修作業における安全管理方法及び安全管理システム10によれば、作業空間Sの下方に位置する地下水の水圧を測定し、測定した水圧が基準値以上となったときに作業者への警告を行うので、作業者は、実際に水が作業空間S内に進入する前に安全でないことを認識することができる。また、作業者は、作業空間S内で観測井13から水が流出していることを目視することによって、安全でないことを認識することも可能である。このように、水圧計11a,11bで測定された地下水の水圧による警告と観測井13による警告とを互いに補完させることが可能となっている。   As described above, according to the safety management method and the safety management system 10 in the repair work of the movable weir 1, the water pressure of the groundwater located below the work space S is measured, and when the measured water pressure exceeds the reference value, the operator The operator can recognize that the water is not safe before actually entering the work space S. The worker can also recognize that it is not safe by visually observing that water is flowing out from the observation well 13 in the work space S. In this way, the warning due to the groundwater pressure measured by the water pressure gauges 11a and 11b and the warning due to the observation well 13 can be complemented each other.

また、安全管理システム10を用いた安全管理方法によれば、図10に示されるステップS13の警報出力と、ステップS15の退避指令出力とを用いて警告工程を2段階にしている。よって、作業者に警告の重要度を認識させることもでき、作業者は直ちに作業を中止しなければならないか否かを認識することも可能となる。なお、警告工程を3段階以上で実行してもよい。   Further, according to the safety management method using the safety management system 10, the warning process is made into two stages using the alarm output in step S13 and the save command output in step S15 shown in FIG. Therefore, it is possible to make the worker recognize the importance of the warning, and the worker can also recognize whether or not the work should be stopped immediately. Note that the warning process may be executed in three or more stages.

また、警告工程では、回転灯12の回転によって安全でない旨を作業者に警告しているので、作業者は視覚によって安全でない旨を認識することができる。また、警告工程では、水圧測定工程で測定された水圧データが基準値以上となったときに電子メールを送信して警告を行っているので、携帯電話によって作業者が安全でない旨を認識することができる。なお、携帯電話だけでなく、例えば詰所C内のコンピュータ14等に電子メールを送信しても同様の効果が得られる。   Further, in the warning step, the worker is warned that it is not safe due to the rotation of the rotating lamp 12, so that the worker can recognize visually that it is not safe. In the warning process, when the water pressure data measured in the water pressure measurement process exceeds the reference value, an e-mail is sent to warn the operator that the operator is aware that the mobile phone is not safe. Can do. Note that the same effect can be obtained by sending an e-mail not only to the mobile phone but also to, for example, the computer 14 in the station C.

本発明は、上述した実施形態に限定されず、本発明の要旨を逸脱しない範囲で、下記のような種々の変形が可能である。   The present invention is not limited to the above-described embodiment, and various modifications as described below are possible without departing from the gist of the present invention.

例えば、上記実施形態では、回転灯12の回転と電子メールの送信の両方を用いて、安全でない旨を作業者に通知したが、回転灯12の回転及び電子メールの送信のいずれか一方で作業者に通知してもよい。また、回転灯12を表示手段として用いたが、例えば信号機等、回転灯12以外の表示手段を用いてもよい。   For example, in the above-described embodiment, the operator is notified that the rotation is not safe by using both the rotation of the revolving light 12 and the transmission of e-mail. The person may be notified. Moreover, although the revolving light 12 was used as a display means, you may use display means other than the revolving light 12, such as a traffic light.

図10に示されるフローチャートでは、コンピュータ14が水圧計11a,11bによる水圧データを判断して作業者に対する警告を行ったが、例えば水頭等、水圧データ以外の判断基準を用いて、作業者に対して種々の警告を行ってもよい。すなわち、水圧計11a,11bによって測定された水圧を水頭に変換してもよく、このように水圧データを水頭とすることによって、作業者に対して水圧データをわかりやすく表示させることが可能となっている。この場合、上述した管理基準値及び1次管理値も水頭で表され、管理基準値及び1次管理値は、予め定めた安全率と底版Bの厚さとを用いて算出される。   In the flowchart shown in FIG. 10, the computer 14 determines the water pressure data by the water pressure gauges 11 a and 11 b and warns the worker. Various warnings may be issued. That is, the water pressure measured by the water pressure gauges 11a and 11b may be converted into a water head. By using the water pressure data as the water head in this way, the water pressure data can be displayed in an easy-to-understand manner for the operator. ing. In this case, the management reference value and the primary management value described above are also represented by the head, and the management reference value and the primary management value are calculated using the predetermined safety factor and the thickness of the bottom plate B.

具体的には、例えば、作業空間Sの高さを4.5m、安全率を4/3、底版Bの厚さを2.0mとすると、管理基準値は、底版Bからの水頭を、
4.5÷(4/3)−2.0=1.375m→1.3m
とすることができる。また、1次管理値は、底版Bからの水頭を、
4.5÷(4/3)×0.9−2.0≒1.03m→1.0m
とすることができる。このように、1次管理値を管理基準値の90%とすることが可能である。ただし、管理基準値及び1次管理値の決め方については上記に限定されない。
Specifically, for example, when the height of the working space S is 4.5 m, the safety factor is 4/3, and the thickness of the bottom plate B is 2.0 m, the management reference value is the water head from the bottom plate B,
4.5 ÷ (4/3) −2.0 = 1.375m → 1.3m
It can be. The primary control value is the water head from the bottom plate B.
4.5 ÷ (4/3) × 0.9−2.0 ≒ 1.03m → 1.0m
It can be. Thus, the primary management value can be 90% of the management reference value. However, the method for determining the management reference value and the primary management value is not limited to the above.

また、上記実施形態では、作業空間Sから作業者全員が退避した後に河川水を作業空間S内に自動注入したが、例えば水頭が上記の管理基準値を超えて作業空間Sから作業者全員を退避させた後に、水頭差によって観測井13から自動的に作業空間S内への注水を行ってもよい。更に、河川R内に設置した注水ポンプを自動的に稼動させることによって作業空間S内への注水を行ってもよい。   In the above embodiment, the river water is automatically injected into the work space S after all the workers have evacuated from the work space S. However, for example, the water head exceeds the management reference value and all the workers are removed from the work space S. After evacuation, water may be automatically injected from the observation well 13 into the work space S due to a water head difference. Furthermore, water injection into the work space S may be performed by automatically operating a water injection pump installed in the river R.

また、水圧データとしては、地盤の変形又は亀裂による水の浸入に関するデータが含まれ、更に、一日の潮位変動(潮汐変動)、渇水期若しくは台風・集中豪雨時における洪水、又は津波の遡上に関するデータも水圧データとして含まれる。更に、水面に浮かべたブイの変動や構造物の変動をGPSによってリアルタイムで検出したデータを水圧データに代えて用いることも可能である。   In addition, water pressure data includes data on water intrusion due to ground deformation or cracks. Furthermore, daily tide level fluctuations (tide fluctuations), floods during drought periods or typhoons and storms, or tsunami run-up The data regarding is also included as water pressure data. Furthermore, it is also possible to use data obtained by detecting in real time changes in buoys floating on the water surface or changes in structures in place of water pressure data.

上記実施形態では、既存ゲート2を新設ゲートに交換する作業で安全管理システム10を用いた例について説明した。しかしながら、本発明に係る可動堰の改修作業における安全管理方法及び安全管理システムは、既存ゲート2を新設ゲートに交換する作業に限られず、可動堰の改修に関する作業であって河川中に作業空間が形成される作業であれば適用することが可能である。   In the above embodiment, the example in which the safety management system 10 is used in the operation of replacing the existing gate 2 with a new gate has been described. However, the safety management method and the safety management system in the repair work of the movable weir according to the present invention are not limited to the work of replacing the existing gate 2 with the new gate, but are work related to the repair of the movable weir and there is a work space in the river. Any work that is formed can be applied.

1…可動堰、2…既存ゲート(ゲート)、3…堰柱、5…用心鉄筋、6…補強用鉄筋、7,8…止水構造物、9…ライナープレート、10…安全管理システム、11a,11b…水圧計(水圧測定手段)、12…回転灯(表示手段)、13…観測井、14…コンピュータ。 DESCRIPTION OF SYMBOLS 1 ... Movable weir, 2 ... Existing gate (gate), 3 ... Weir pillar, 5 ... Heart rebar, 6 ... Reinforcing bar, 7, 8 ... Water stop structure, 9 ... Liner plate, 10 ... Safety management system, 11a , 11b ... Water pressure gauge (water pressure measuring means), 12 ... Revolving light (display means), 13 ... Observation well, 14 ... Computer.

Claims (5)

河川に設置された少なくとも2本の堰柱と、2本の前記堰柱の間を架け渡すように設置されたゲートと、を備える可動堰において、
前記ゲートよりも上流側で前記堰柱のそれぞれに設置された第1の止水構造物と、前記ゲートよりも下流側で前記堰柱のそれぞれに設置された第2の止水構造物と、を用いて、2本の前記堰柱と前記第1の止水構造物と前記第2の止水構造物との間に位置する作業空間内で行われる可動堰の改修作業における安全管理方法であって、
前記作業空間の下方に位置する地下水の水圧を測定する水圧測定工程と、
前記水圧測定工程で測定された水圧が基準値以上であることを作業者に知らせることによって、又は前記作業空間内に設けられた観測井から前記地下水が流出することによって、前記作業者に対する警告を行う警告工程と、
を備えることを特徴とする可動堰の改修作業における安全管理方法。
In a movable weir comprising: at least two weir pillars installed in a river; and a gate installed to bridge between the two weir pillars,
A first water stop structure installed on each of the weir pillars upstream of the gate; a second water stop structure installed on each of the weir pillars downstream of the gate; In the safety management method in the repair work of the movable weir performed in the work space located between the two dam posts, the first water stop structure, and the second water stop structure There,
A water pressure measuring step for measuring the water pressure of the groundwater located below the work space;
Warning to the operator by notifying an operator that the water pressure measured in the water pressure measuring step is equal to or higher than a reference value, or by the groundwater flowing out from an observation well provided in the work space. A warning process to be performed;
A safety management method in repair work of a movable weir characterized by comprising:
前記警告工程は、
前記水圧測定工程で測定された水圧が第1の基準値以上であることを知らせることによって第1段階の警告を行う第1の警告工程と、
前記水圧測定工程で測定された水圧が前記第1の基準値よりも大きい第2の基準値以上であることを知らせることによって第2段階の警告を行う第2の警告工程と、
を備えることを特徴とする請求項1に記載の可動堰の改修作業における安全管理方法。
The warning process includes
A first warning step for performing a first-stage warning by notifying that the water pressure measured in the water pressure measurement step is equal to or higher than a first reference value;
A second warning step for performing a second-stage warning by notifying that the water pressure measured in the water pressure measurement step is equal to or greater than a second reference value greater than the first reference value;
The safety management method in the repair work of the movable weir according to claim 1.
前記警告工程では、前記作業空間内に設けられた表示手段の表示によって、前記作業者に対する警告を行う請求項1又は2に記載の可動堰の改修作業における安全管理方法。   The safety management method in the repair work of the movable weir according to claim 1 or 2, wherein in the warning step, a warning is given to the worker by display of a display unit provided in the work space. 前記警告工程では、前記水圧測定工程で測定された水圧が基準値以上であるときに電子メールを送信することによって、前記作業者に対する警告を行う請求項1〜3のいずれか一項に記載の可動堰の改修作業における安全管理方法。   The warning process according to any one of claims 1 to 3, wherein a warning is given to the worker by sending an e-mail when the water pressure measured in the water pressure measurement process is equal to or higher than a reference value. A safety management method for renovating movable weirs. 河川に設置された少なくとも2本の堰柱と、2本の前記堰柱の間を架け渡すように設置されたゲートと、を備える可動堰において、
前記ゲートよりも上流側で前記堰柱のそれぞれに設置された第1の止水構造物と、前記ゲートよりも下流側で前記堰柱のそれぞれに設置された第2の止水構造物と、を用いて、2本の前記堰柱と前記第1の止水構造物と前記第2の止水構造物との間に位置する作業空間内で作業を行う際における安全管理のための安全管理システムであって、
前記作業空間の下方に位置する地下水の水圧を測定する水圧測定手段と、
前記作業空間内に設けられ、前記地下水を流出させることによって作業者に対する警告を行う観測井と、
前記水圧測定手段で測定された水圧が基準値以上であることを作業者に知らせることによって前記作業者に対する警告を行う警告手段と、
を備えることを特徴とする安全管理システム。
In a movable weir comprising: at least two weir pillars installed in a river; and a gate installed to bridge between the two weir pillars,
A first water stop structure installed on each of the weir pillars upstream of the gate; a second water stop structure installed on each of the weir pillars downstream of the gate; Safety management for safety management when working in a work space located between the two weir pillars, the first water stop structure, and the second water stop structure A system,
Water pressure measuring means for measuring the water pressure of groundwater located below the work space;
An observation well that is provided in the work space and warns an operator by allowing the groundwater to flow out;
Warning means for warning the worker by notifying the worker that the water pressure measured by the water pressure measuring means is equal to or higher than a reference value;
A safety management system comprising:
JP2013249010A 2013-12-02 2013-12-02 Safety management method and safety management system for movable weir repair work Active JP6093288B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2013249010A JP6093288B2 (en) 2013-12-02 2013-12-02 Safety management method and safety management system for movable weir repair work

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2013249010A JP6093288B2 (en) 2013-12-02 2013-12-02 Safety management method and safety management system for movable weir repair work

Publications (2)

Publication Number Publication Date
JP2015105550A JP2015105550A (en) 2015-06-08
JP6093288B2 true JP6093288B2 (en) 2017-03-08

Family

ID=53435843

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2013249010A Active JP6093288B2 (en) 2013-12-02 2013-12-02 Safety management method and safety management system for movable weir repair work

Country Status (1)

Country Link
JP (1) JP6093288B2 (en)

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS514340B2 (en) * 1971-09-09 1976-02-10
JPS514341B2 (en) * 1971-09-09 1976-02-10
JPS61257535A (en) * 1985-05-10 1986-11-15 Mitsui Constr Co Ltd Controller for settlement of caisson
JP3054349U (en) * 1998-05-26 1998-12-04 日東河川工業株式会社 Simple bypass culvert

Also Published As

Publication number Publication date
JP2015105550A (en) 2015-06-08

Similar Documents

Publication Publication Date Title
CN105064371B (en) A kind of deformation of deep excavation alarm method
CN106400782B (en) A kind of construction method for going along with sb. to guard him hole-drilling interlocking pile using rotary drilling rig construction foundation pit
WO2015106679A1 (en) Construction method for fixing hollow column for supporting marine structures and offshore platforms to a seabed
CN111851484B (en) Method for cutting off semi-invasive prestressed anchor cable in supporting pile by rotary drilling rig
CN106988754A (en) Narrow space shield tunneling machine starting method
CN102296572A (en) Earth and rockfill dam body seepage monitoring structure provided with abandoned dreg site behind dam and construction method thereof
CN110952533A (en) An underwater anti-slip bored pile foundation and its construction method
CN110965581A (en) Protection construction method for underground pipeline in subway construction
CN112227389A (en) Rectangular-section slide-resistant pile combined mechanical pore-forming construction method
CN108005096A (en) A kind of suspension type wall submersion construction method for city vertical shaft construction
JP6093288B2 (en) Safety management method and safety management system for movable weir repair work
KR20110107888A (en) Underwater pier construction method to omit temporary barrier construction.
Abdulrazzaq et al. Sensitivity analysis for dam breach parameters using different approaches for earth-fill dam
CN206143760U (en) Ally oneself with formula of arranging bored concrete pile device on water
JP6104138B2 (en) Rehabilitation of river structures
CN113136878B (en) A trench construction anti-collapse protection device
CN204475350U (en) Bored pile construction system under high-voltage line
CN110158614A (en) Foundation pit enclosure structure invades limit and cuts stub and piling Support Method
CN104141294A (en) Judgment method for soil body seepage failure caused by foundation pit supporting water stopping body defect
CN209538187U (en) Construction structure of occlusal piles in deep foundation pit
JP5847648B2 (en) Tide structure
CN204572017U (en) Subway three layers of frame construction lattice column
CN121051849B (en) Self-collision cofferdam removal system and construction method
CN215562629U (en) Over-filling prevention device for cast-in-place pile
CN204571354U (en) A kind of lattice column of building operations application

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20160414

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20170119

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20170207

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20170210

R150 Certificate of patent or registration of utility model

Ref document number: 6093288

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250