JP6093871B2 - Urban intersection structure - Google Patents
Urban intersection structure Download PDFInfo
- Publication number
- JP6093871B2 JP6093871B2 JP2015540981A JP2015540981A JP6093871B2 JP 6093871 B2 JP6093871 B2 JP 6093871B2 JP 2015540981 A JP2015540981 A JP 2015540981A JP 2015540981 A JP2015540981 A JP 2015540981A JP 6093871 B2 JP6093871 B2 JP 6093871B2
- Authority
- JP
- Japan
- Prior art keywords
- tunnel
- main line
- urban
- overline
- traffic
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C1/00—Design or layout of roads, e.g. for noise abatement, for gas absorption
- E01C1/002—Design or lay-out of roads, e.g. street systems, cross-sections ; Design for noise abatement, e.g. sunken road
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C1/00—Design or layout of roads, e.g. for noise abatement, for gas absorption
- E01C1/02—Crossings, junctions or interconnections between roads on the same level
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C1/00—Design or layout of roads, e.g. for noise abatement, for gas absorption
- E01C1/04—Road crossings on different levels; Interconnections between roads on different levels
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/14—Layout of tunnels or galleries; Constructional features of tunnels or galleries, not otherwise provided for, e.g. portals, day-light attenuation at tunnel openings
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Road Paving Structures (AREA)
- Lining And Supports For Tunnels (AREA)
Description
本発明は都市道路構造に関し、特に都市交差路構造に関する。 The present invention relates to an urban road structure, and more particularly to an urban intersection structure.
どのような交通がいい交通と言うと、インターチェインジでの交通が円滑であればいい交通である。現在、都市の交差路は、主に平面交差、ラウンドアバウト、高架橋、スパゲティのように入り組んだ交差点、ハイクリアランス型トンネル等道路構造を採用する。 What kind of traffic is good traffic is good if the traffic in the interchain is smooth. Currently, urban intersections mainly adopt road structures such as plane intersections, roundabouts, viaducts, intricate intersections such as spaghetti, and high clearance tunnels.
しかしながら、従来の道路構造には、何らかの欠陥があって、都市の渋滞問題を効果的に解決することができなかった。
例えば、平面交差を採用する交差路の場合、交通信号により各車道の通行を交代で制御する必要があり、車両を集中してから通過させるため、交差路での渋滞が容易に起される一方、運転手たちは、赤信号を無視し、早く通過しようとするため、追突事故または環状線での衝突等の事故を容易に起こし、負傷者や、車損害等の大きい損失が発生する。
ラウンドアバウトを採用する交差路の場合、交通流量が大きいところで、交通信号で各車道の通行を交代で制御する必要があるため、同じく上述のような欠陥がある。
高架橋を採用する場合、多層陸橋のように入り組んだ交差点の交差路では、橋の中間両側の斜張橋が長く、橋桁数も多くて、大量な資金投資が必要となる以外、巨大な工事量で、工事時間が長い。一つの交差路の立体交差工事は、通常、何年かがり、さらに、都市の大量の貴重な土地資源を占用し、市内繁華な区間での高架立体交差の建て上がりは、周辺地域商業価値の値下げを招く。これらの原因で、都市では、多数の交差路を高架立体交差に建てることができず、高架立体交差が非常に多くなれば、ボトルネッ効果が出てしまい、高架立体交差を経過してからつぎの道口で更にひどい渋滞を招く。
ハイクリアランス型トンネルを採用する交差路の場合、大型車両をトンネルを通過させるため、トンネルのクリアランスを高く設計する必要があり、通常は5mまでにする。これにより、採掘量が大きくなり、工事時間も長くなり、費用が上がる。これらの原因で、都市では、多数の交差路をハイクリアランス型トンネルに建てることができない。ハイクリアランス型トンネルが非常に多いと、車両がハイクリアランス型トンネルを経過してから更に渋滞となり、同じくボトルネッ効果を引き起こしてしまう。
However, the conventional road structure has some defects and cannot effectively solve the urban traffic congestion problem.
For example, in the case of an intersection that adopts a plane intersection, it is necessary to alternately control the traffic on each roadway according to traffic signals, and traffic is easily caused on the intersection because the vehicles are concentrated before passing. Since drivers ignore the red light and try to pass quickly, accidents such as rear-end collisions or collisions in the loop line easily occur, resulting in large losses such as injuries and vehicle damage.
In the case of a crossing road that uses a roundabout, it is necessary to alternately control traffic on each roadway with traffic signals when the traffic flow is large.
In the case of adopting a viaduct, at the intersection of intricate intersections like multi-layered overpasses, the cable-stayed bridges on both sides of the bridge are long, the number of bridge girders is large, and a large amount of capital investment is required except for a large amount of capital investment. And construction time is long. A three-dimensional intersection construction usually takes several years, and also uses a large amount of valuable land resources in the city. Incurs price cuts. For these reasons, in cities, it is not possible to build a large number of crossroads in an elevated level intersection, and if there are too many elevated levels, the bottleneck effect will occur, and after the elevated level intersection has passed, It causes even worse traffic at the roadway.
In the case of an intersection that employs a high-clearance tunnel, it is necessary to design a high tunnel clearance in order to allow large vehicles to pass through the tunnel. This increases the amount of mining, increases the construction time, and increases costs. For these reasons, many intersections cannot be built in high-clearance tunnels in cities. If there are too many high-clearance tunnels, the vehicle will become more congested after passing through the high-clearance tunnel, causing the bottleneck effect.
本発明は、交通渋滞問題を効果的に解決できる都市交差路構造を提供することを目的とする。当該交差路構造は、小型車両の交差路での滞留時間を著しく減少し、且つ、資金投入、工事量が少なくなり、工事時間が短縮されることができる。 An object of the present invention is to provide an urban intersection structure that can effectively solve the traffic congestion problem. The crossing structure can significantly reduce the residence time of the small vehicle at the crossing, reduce the amount of funds and the amount of construction, and shorten the construction time.
本発明に係る主な技術手段は、交通渋滞問題を解決する都市交差路構造である。
当該都市交差路構造は、「十」字に交差する第1本線及び第2本線を備え、第1本線及び第2本線は、双方向車道であり、第1本線及び第2本線の地上路面は、交差点において、地上路面を共有する1つの中央プラットフォームを構成し、第1本線には、中央プラットフォームの地下から貫通する双方向通行の低トンネルが設置され、低トンネルの車両の通行高さは、2m以上3m以下であり、低トンネルは、地下から中央プラットフォームを貫通した後に地上で復旧し、当該低トンネルの通行方向外側辺から、1つのオーバーライン曲線進入型トンネルが分岐され、オーバーライン曲線進入型トンネルの車両通行高さは、2m以上3m以下であり、オーバーライン曲線進入型トンネルは、低トンネルの上り坂段の前方地下からUターンし、一段曲線上り坂段を経過した後、第2本線と同方向で接続し、第1本線の地上路面は、低トンネルにより、通行方向が反対となる、大型車両が通行できる、左右2つの地面車道に分離され、前記2つの地面車道は、中央プラットフォームで接続して、Uターン方向が反対となり、大型車両がUターンでき、2つのUターン車道を形成し、前記2つのUターン車道は、第2本線の中央プラットフォームにおける直進車道の左右両側に位置し、第1本線の地上路面の通行方向外側辺から、第2本線の外側辺まで回る1つの車道が分岐され、第2本線の通行方向外側辺から、第1本線の外側辺まで回る1つの車道が分岐される。
The main technical means according to the present invention is an urban intersection structure that solves the traffic jam problem.
The city intersection structure includes a first main line and a second main line intersecting with a “10” character, the first main line and the second main line are bidirectional roadways, and the ground road surface of the first main line and the second main line is In the intersection, one central platform sharing the ground road surface is constructed, and the first main line is installed with a two-way low tunnel penetrating from the underground of the central platform, and the traffic height of the low tunnel vehicle is The low tunnel is 2m or more and 3m or less, and the low tunnel recovers on the ground after passing through the central platform from the basement. One overline curve approach type tunnel is branched from the outer side of the low tunnel in the direction of traffic, and the overline curve approach is entered. The vehicle traffic height of the type tunnel is 2m or more and 3m or less, and the overline curve approach type tunnel makes a U-turn from the basement in front of the uphill stage of the low tunnel, After passing the step uphill, connect to the 2nd main road in the same direction, and the ground road surface of the 1st main line is a two tunnels on the left and right sides where the traffic direction is opposite due to the low tunnel and large vehicles can pass. The two ground roads are connected by a central platform, the U-turn direction is opposite, and a large vehicle can make a U-turn to form two U-turn roads. Located on the left and right sides of the straight road on the two-line central platform, one road that branches from the outer side of the first main road to the outer side of the second main line is branched, and the outer side of the second main line One roadway that branches from the side to the outer side of the first main line is branched.
改善された、または好ましい実施方式として、本発明は、下記の技術手段を採用することもできる。 As an improved or preferred implementation mode, the present invention can employ the following technical means.
前記低トンネルの車両通行高さを2.50-2.60mとする。 The vehicle traffic height of the low tunnel is 2.50-2.60 m.
前記低トンネルの車両通行高さは、当該トンネル底部の路面沈下深さ及び該トンネルの頂部路床の上る高さより構成される。 The vehicle traffic height of the low tunnel is constituted by the road surface settlement depth at the bottom of the tunnel and the height above the top road bed of the tunnel.
前記オーバーライン曲線進入型トンネルの車両通行高さを2.50-2.60mとする。 The vehicle traffic height of the overline curve approaching tunnel is set to 2.50-2.60 m.
前記オーバーライン曲線進入型トンネルの車両通行高さは、当該トンネル底部の路面沈下深さ及び該トンネルの頂部路床に対して突出する高さより構成される。 The vehicle traffic height of the overline curve approaching tunnel is configured by a road surface settlement depth at the bottom of the tunnel and a height protruding with respect to the top road bed of the tunnel.
前記第1本線には地下歩道が設置され、当該地下歩道とオーバーライン曲線進入型トンネルの地下Uターン部の間には、避難口が設置される。 An underground sidewalk is installed on the first main line, and an evacuation exit is installed between the underground sidewalk and the underground U-turn part of the overline curve approaching tunnel.
第1本線の前記地下歩道の頂部には、通気孔が設置される。 Ventilation holes are installed at the top of the underground walkway on the first main line.
前記オーバーライン曲線進入型トンネルの頂部には、通気孔が設置される。 A vent is installed at the top of the overline curve approaching tunnel.
前記オーバーライン曲線進入型トンネルの通行方向外側辺には、一時駐車領域が設置される。また、前記低トンネルの入口及び出口の地面には、隆起する雨水分離帯が設置される。本発明は下記のようなメリットを有する。 A temporary parking area is installed on the outer side of the overline curved tunnel. In addition, raised rainwater separation zones are installed on the ground at the entrance and exit of the low tunnel. The present invention has the following merits.
1.本発明に係る上述主な技術案において、中央プラットフォームは、第1本線の低トンネル及びオーバーライン曲線進入型トンネルとともに、大型・小型車両と各方向の車両を分散して通行させる役を務める。第1本線の道路中間及び低トンネルにより小型車通行ための快速線を形成することにより、大型車両の快速線での通行による交通速度が落ちることを効果的に防ぐことができる。第1本線で通行する比例が高い小型車両は、直接に低トンネルを介して第2本線を通過し、且つ第1本線で通行する全てのUターンする車両は、中央プラットフォームを介して、円滑、且つ安全にUターンすることができる。これらの車両は交通信号灯で制御する必要がなく、他の方向の車両に影響が及ばず、第1本線上の車両通行が円滑になり、第1本線に配分する大型車両青信号の通行時間を短縮させることができ、これにより、第1本線及び第2本線上の交通がさらに円滑になる。 1. In the above main technical plan according to the present invention, the central platform, together with the first main line low tunnel and the over-line curve approach type tunnel, serves to distribute large and small vehicles and vehicles in each direction. . By forming a high-speed line for passing small vehicles by the middle of the first main road and a low tunnel, it is possible to effectively prevent a decrease in traffic speed due to the high-speed vehicle passing through the high-speed line. A small vehicle with a high proportion passing on the first main line passes directly through the second main line via a low tunnel, and all U-turn vehicles passing on the first main line pass smoothly through the central platform, And you can safely make a U-turn. These vehicles do not need to be controlled by traffic signal lights, they do not affect vehicles in other directions, smooth traffic on the first main line, and shorten the traffic time of large vehicle green signals distributed to the first main line Thereby, traffic on the first main line and the second main line becomes smoother.
2.ハイクリアランス型トンネルまたは高架立体交差を採用する従来交差路に比べれば、本発明に係る低トンネル及びオーバーライン曲線進入型トンネルの車両通行高さがともに3mを超えないため、工事量や、工事時間を著しく短縮させ、資金投入が低減される。 2. Compared to conventional clearance roads that use high clearance tunnels or elevated three-dimensional intersections, the vehicle traffic height of the low tunnel and overline curve approaching tunnel according to the present invention does not exceed 3 m, Construction time is significantly shortened and funding is reduced.
3.高架立体交差を採用する交差路と比べれば、土地資源の利用が著しく下回り、市区繁華な区間に立ち上がっても、周辺地域商業価値の値下げを招かないし、全都市の多数の車数が多い交差路まで広めやすい。よって、ボトルネッ効果を解決することができ、全都市の交通が更に円滑になる。 3. Compared to the crossroads that use elevated three-dimensional intersections, the use of land resources will be significantly lower, and even if you stand up in a busy section of the city, the commercial value of the surrounding area will not be reduced, and the number of vehicles in all cities will It is easy to spread to many intersections. Therefore, the bottleneck effect can be solved, and traffic in all cities becomes smoother.
4.本発明の1つの改善案において、低トンネルの車両通行高さが3mを超えず、当該車両の通行高さは、当該トンネル底部の路面沈下深さ及び該トンネルの頂部路床の上る高さより構成される。このような半沈下半上昇式トンネル構造は、低トンネル建設に採掘する地面沈下深さをさらに低減させ、地下水を防ぐことができ、基礎杭の工事がより容易に進められ、簡単な板囲いで処理できる。これにより、工事時間を効果的に減少し、建設コストを大幅に低減し、原路面の粉砕された破片、掘り出した硬質砂、泥は、コンクリに混入して十分に混ぜた後、路面上り部分の路盤充填に用いられるため、掘り出した泥を全部搬送する必要がなくなり、工事期間の重型搬送車両による交通への影響を減少する。さらに、地面沈下深さの減少は、下水道の移転、改造に有利である。 4. In one improvement plan of the present invention, the vehicle traffic height of the low tunnel does not exceed 3 m, and the vehicle traffic height is the road subsidence depth at the bottom of the tunnel and the height above the top road bed of the tunnel. Consists of. Such a semi-sinking and semi-sinking tunnel structure can further reduce the ground subsidence depth mined for low tunnel construction, prevent groundwater, facilitate the construction of foundation piles, It can be processed. As a result, construction time is effectively reduced, construction costs are significantly reduced, and crushed fragments of the original road surface, dug out hard sand, and mud are mixed into the concrete and mixed thoroughly before the road surface rises. Because it is used for filling the roadbed, it is no longer necessary to transport all the excavated mud, reducing the impact on heavy transport vehicles during the construction period. Furthermore, the reduction of the ground subsidence depth is advantageous for sewer transfer and remodeling.
5. 本発明の1つの改善案において、オーバーライン曲線進入型トンネルの車両通行高さが3mを超えず、当該車両通行高さは、当該トンネル底部の路面沈下深さ及び該トンネルの頂部路床の上る高さより構成される。これによるメリットは、上述の4と同じく、この以上説明しない。 5. In one improvement plan of the present invention, the vehicle traffic height of the overline curve approaching tunnel does not exceed 3 m, and the vehicle traffic height is determined by the depth of subsidence at the bottom of the tunnel and the top bed of the tunnel. Consists of climbing height. The merit by this is not explained any more, as in 4 above.
6. 本発明の1つの改善案において、低トンネルの入口及び出口の地面には隆起する雨水分離帯が設置されるため、大量雨水が車道により低トンネルに流れ込まないようにして、積水による車両渋滞を防ぐことができ、吸水ポンプの作業負荷も低減させることができる。 6. In one improvement plan of the present invention, a raised rainwater separation zone is installed on the ground at the entrance and exit of the low tunnel, so that a large amount of rainwater does not flow into the low tunnel by the roadway, so that the vehicle congestion due to water And the work load of the water absorption pump can be reduced.
7、本発明は全ての先進国の都市に適用され、特に、路上に複数の小型車による交通渋滞の交差路に対する改造に適用する。これにより、有限の資源により多くの道口の交通円滑を実現し、路面を広めずに都市交通道路を増加させる効果が得られる。 7. The present invention can be applied to cities in all developed countries, and in particular, it can be applied to the remodeling of a traffic jam intersection due to a plurality of small cars on the road. As a result, the smooth traffic of many roadways can be realized with limited resources, and the effect of increasing urban traffic roads without spreading the road surface can be obtained.
以下、図面及び実施例を参照しながら、本発明に対してさらに詳細に説明する。本発明における上述各種車道の幅は、図示に限定せず、実際の場合に応じ、標準に従って、路面の幅を設計することができる。本発明に係る上述「十字交差」は、垂直交差に限定されず、即ち「十」字に交差する2つ本線の交差角は、90度に限定しない。本発明に係る上述「オーバーライン曲線進入型トンネル」は、右通行の国及び地域では、左オーバーライン曲線進入型トンネルを指し、左通行の国及び地域では、右オーバーライン曲線進入型トンネルを指す。 Hereinafter, the present invention will be described in more detail with reference to the drawings and examples. The widths of the above-described various roadways in the present invention are not limited to those shown in the drawings, and the width of the road surface can be designed according to a standard according to actual cases. The above-mentioned “cross intersection” according to the present invention is not limited to the vertical intersection, that is, the intersection angle of the two lines intersecting the “ten” is not limited to 90 degrees. The above-mentioned “overline curve approach type tunnel” according to the present invention indicates a left overline curve approach type tunnel in a right-handed country and region, and indicates a right overline curve approach type tunnel in a left-handed country and region. .
図1を参照する。発明に係る上述交通渋滞問題を解決する都市交差路構造によれば、「十」字に交差する第1本線1と、第2本線2とを備え、第1本線1及び第2本線2は、ともに双方向車道である。
第1本線1及び第2本線2の地上路面は、交差点において、地上路面を共有する1つの中央プラットフォーム3を構成する。
第1本線1には、中央プラットフォーム3の地下から貫通する双方向通行の低トンネル4(図で、低トンネル4の双方向車道の間は仕切壁が仕切られている)が設置される。低トンネル4の車両通行高さは、2m以上3m以下であり、最適値として、2.50-2.60mにすることが好ましい。低トンネル4は、地下から中央プラットフォーム3を貫通した後、地上で復旧する。
Please refer to FIG. According to the city intersection structure that solves the above-mentioned traffic congestion problem according to the invention, it comprises a first main line 1 and a second main line 2 that intersect a “ten”, and the first main line 1 and the second main line 2 are: Both are two-way roadways.
The ground road surface of the 1st main line 1 and the 2nd main line 2 comprises one central platform 3 which shares a ground road surface in an intersection.
The first main line 1 is provided with a two-way low tunnel 4 (partition walls are partitioned between the two-way roads of the low tunnel 4 in the drawing) penetrating from the basement of the central platform 3. The vehicle traffic height of the low tunnel 4 is not less than 2 m and not more than 3 m, and is preferably set to 2.50-2.60 m as an optimum value. The low tunnel 4 recovers on the ground after passing through the central platform 3 from the basement.
同時に図1及び図2を参照する。低トンネル4の通行方向外側辺から、オーバーライン曲線進入型トンネル5が分岐される。図2には、白破線でオーバーライン曲線進入型トンネル5及び低トンネル4の地下部分を示す。オーバーライン曲線進入型トンネル5は、低トンネル4の上り坂段の前方地下からUターンして、一段曲線上り坂段6を経過した後、第2本線2と同方向で接続する。
オーバーライン曲線進入型トンネル5の地下Uターン部は、低トンネル4とずらして、相互に干渉しない。
オーバーライン曲線進入型トンネル5の車両通行高さは、2m以上3m以下であり、最適値として、2.50-2.60mにすることが好ましい。
オーバーライン曲線進入型トンネル5内には、非自動車通行のための非自動車道がさらに区画されることができる。非自動車道と自動車道の間に、きちんと切り離すことが必要である。
At the same time, refer to FIG. 1 and FIG. The overline curve approaching type tunnel 5 is branched from the outer side of the low tunnel 4 in the passing direction. In FIG. 2, an underground curve approaching type tunnel 5 and an underground part of the low tunnel 4 are shown by white broken lines. The overline curve approaching type tunnel 5 makes a U-turn from the front basement of the uphill stage of the low tunnel 4 and passes through the one-stage curved uphill stage 6 and then connects in the same direction as the second main line 2.
The underground U-turn portion of the overline curve approaching type tunnel 5 is shifted from the low tunnel 4 and does not interfere with each other.
The vehicle traveling height of the overline curve approaching type tunnel 5 is not less than 2 m and not more than 3 m, and is preferably 2.50-2.60 m as an optimum value.
A non-motorway for non-automobile traffic can be further divided in the overline curve approaching type tunnel 5. It is necessary to separate between the non-motorway and the motorway.
図1を参照する。第1本線1の地上路面は、低トンネル4により、通行方向が反対となる、大型車両が通行できる、左右2つの地面車道7、8に分離される。前記2つの地面車道7、8は、中央プラットフォーム3で接続して、2つのUターン方向が反対となる、大型車両がUターンできるUターン車道9、10を形成する。当該2つのUターン車道9、10は、第2本線2の中央プラットフォーム3における直進車道の左右両側に位置し、これにより、Uターン車道9、10からUターンする車両は、第2本線2上の直進車両と干渉しない。 Please refer to FIG. The ground road surface of the first main line 1 is separated by the low tunnel 4 into two right and left ground roads 7 and 8 that can pass a large vehicle whose direction of travel is opposite. The two ground roads 7 and 8 are connected by the central platform 3 to form U-turn roads 9 and 10 in which a large vehicle can make a U-turn, in which two U-turn directions are opposite. The two U-turn roads 9, 10 are located on the left and right sides of the straight road on the central platform 3 of the second main line 2, so that vehicles that make a U-turn from the U-turn roads 9, 10 are on the second main line 2. Do not interfere with the straight ahead vehicle.
第1本線1の地上路面の通行方向外側辺から、第2本線2の外側辺まで回る1つの車道11が分岐される。第2本線2の通行方向外側辺から、第1本線1の外側辺まで回る1つの車道12が分岐される。 One roadway 11 that branches from the outer side of the first main line 1 on the ground road surface to the outer side of the second main line 2 is branched. One road 12 that branches from the outer side of the second main line 2 to the outer side of the first main line 1 is branched.
低トンネル4の車両通行高さは、路面採掘深さのみで決めてもよいが、最適な実施方式として、低トンネル4の車両通行高さは、当該トンネル底部の路面沈下深さ及び当該トンネルの頂部路床の上る高さより構成されるべきである。即ち、低トンネル4上方の中央プラットフォーム3が少し上がる。このような半沈下半上昇式トンネル構造は、低トンネル4建設に採掘すべく地面沈下深さをさらに減らすことができ、工事が容易になり、工事時間が短縮され、建設コストが削減でき、下水道の移転、改造に有利である。また、原路面の粉砕された破片、掘り出した硬質砂、泥は、コンクリに混入して十分に混ぜた後、路面上り部分の路盤充填に用いられるため、掘り出した泥を全部搬送する必要がなくなり、工事期間の重型搬送車両による交通への影響を減少する。 The vehicle traffic height of the low tunnel 4 may be determined only by the road surface mining depth, but as an optimal implementation method, the vehicle traffic height of the low tunnel 4 is determined by the road surface subsidence depth of the tunnel bottom and the tunnel tunnel height. It should consist of the height above the top roadbed. That is, the central platform 3 above the low tunnel 4 is slightly raised. Such a semi-subsidence and semi-sink type tunnel structure can further reduce the ground subsidence depth to be mined for low tunnel 4 construction, making the construction easier, reducing the construction time, reducing the construction cost, and sewerage It is advantageous for relocation and remodeling. In addition, crushed debris of the original road surface, dug out hard sand and mud are mixed into the concrete and mixed thoroughly, and then used for filling the roadbed on the road surface, so there is no need to transport all dug out mud. , Reduce the impact on heavy transport vehicles during the construction period.
低トンネル4の車両通行高さを2.50-2.60mとして、半沈下半上昇式トンネル構造を取り組めば、実際の工事を行う際に、掘り出す泥の総深さは、約2.3mとなる。
同様に、オーバーライン曲線進入型トンネル5の車両通行高さは、路面採掘深さのみで決められるが、最適な実施方式として、オーバーライン曲線進入型トンネル5の車両通行高さは、当該トンネル底部の路面沈下深さと当該トンネルの頂部路床の上る高さより構成されるべきである。オーバーライン曲線進入型トンネル5の車両通行高さを2.50-2.60mとして、半沈下半上昇式トンネルを取り組めば、実の工事の際に、掘り出す泥の総深さは、約2.3mとなる。
If the vehicle height of the low tunnel 4 is set to 2.50-2.60m and a semi-sinking and semi-rising tunnel structure is used, the total depth of mud excavated during actual construction will be about 2.3m. Become.
Similarly, the vehicle traffic height of the overline curve approaching type tunnel 5 is determined only by the road surface mining depth, but as an optimal implementation method, the vehicle traffic height of the overline curve approaching type tunnel 5 is determined by the bottom of the tunnel. It should be composed of the depth of subsidence and the height above the top of the tunnel. If the vehicle height of the overline curve entry type tunnel 5 is set to 2.50-2.60 m and a semi-sinking and semi-sinking type tunnel is tackled, the total depth of mud excavated during actual construction will be about 2. 3m.
故障車両がオーバーライン曲線進入型トンネル5内に停滞することを防ぐため、図2を示すように、本実施例は、オーバーライン曲線進入型トンネル5の通行方向外側辺において、一時駐車領域16が設置される。故障車両は、一時駐車領域16に停められ、トレーラの援助を待つ。 In order to prevent the broken vehicle from staying in the overline curve approaching type tunnel 5, as shown in FIG. 2, in this embodiment, the temporary parking area 16 is provided on the outer side of the overline curve approaching type tunnel 5. Installed. The broken vehicle is parked in the temporary parking area 16 and waits for the trailer's assistance.
更なる改善案として、本実施例は、第1本線には地下歩道14が設置され,当該地下歩道14とオーバーライン曲線進入型トンネル5の地下Uターン部の間に、避難口15が設置される。オーバーライン曲線進入型トンネル5に交通事故が起こる場合、オーバーライン曲線進入型トンネル5内の人々は、避難口15を通して、地下歩道14に転移して、避難することができる。通行人が避難口15を勝てに押すことを防ぐため、避難口15を管理する係員を指定すべきである。避難口15は、防火・防煙基準を満たす防火戸を採用することが望ましい。 As a further improvement plan, in this embodiment, an underground sidewalk 14 is installed on the first main line, and an evacuation exit 15 is installed between the underground sidewalk 14 and an underground U-turn portion of the overline curve approaching type tunnel 5. The When a traffic accident occurs in the overline curve approaching type tunnel 5, people in the overline curve approaching type tunnel 5 can move to the underground sidewalk 14 through the evacuation port 15 and evacuate. In order to prevent a passer-by from pushing the evacuation exit 15 by winning, a staff member who manages the evacuation exit 15 should be designated. It is desirable that the evacuation exit 15 employs a fire door that satisfies fire and smoke standards.
本実施例において、地下歩道14の頂部には、通気孔17が設置され、オーバーライン曲線進入型トンネル5の頂部には通気孔18が設置される。通気孔17及び通気孔18は、道路中央部の緑地帯に位置されるため、車両の通行に影響しない。通気孔17及び通気孔18には、換気扇が追設されることもできる。 In this embodiment, a vent hole 17 is installed at the top of the underground sidewalk 14, and a vent hole 18 is installed at the top of the overline curve approaching type tunnel 5. Since the vent hole 17 and the vent hole 18 are located in the green zone at the center of the road, they do not affect the passage of the vehicle. A ventilation fan can be additionally installed in the vent hole 17 and the vent hole 18.
第1本線に地下歩道14を設置する以外、実施例には、第2本線にも地下歩道13が設置される。 Except for installing the underground sidewalk 14 on the first main line, in the embodiment, the underground sidewalk 13 is also installed on the second main line.
大量な雨水が車道を通して低トンネル4に流れ込むことを防ぐため、低トンネル4の入口及び出口の地面に、隆起する雨水分離帯を設置することができる。雨水分離帯の構造は、図3に示すように、低トンネル開口前の約60−80mのところに基点を設置することができる。当該基点から、斜め方向に沿って約15−20mを延長し、垂直方向で0.60−0.80mを上げる。そして、引き続き水平方向に沿って約15m−20mを延長して、低トンネル4に進入する。地下歩道14及びオーバーライン曲線進入型トンネル5の地下Uターン部は、15m−20mの水平延長路段の真下方に位置する。 In order to prevent a large amount of rainwater from flowing into the low tunnel 4 through the roadway, a raised rainwater separation zone can be installed on the ground of the entrance and exit of the low tunnel 4. As shown in FIG. 3, the rainwater separation zone structure can be set at a base point of about 60-80 m before the opening of the low tunnel. From the base point, extend about 15-20m along the diagonal direction and increase 0.60-0.80m in the vertical direction. Then, it continues to extend about 15m-20m along the horizontal direction and enters the low tunnel 4. The underground U-turn part of the underground sidewalk 14 and the overline curve approaching type tunnel 5 is located directly below the horizontal extension road step of 15m-20m.
低トンネル4への雨水進入をよりよく防ぐため、低トンネル4の入口及び出口のところに、透光ペントハウスが追加設されることができ、こうして、雨水による低トンネル4への影響を防ぐ。 In order to better prevent rainwater entering the low tunnel 4, a light-transmitting penthouse can be additionally provided at the entrance and exit of the low tunnel 4, thus preventing the rainwater from affecting the low tunnel 4.
本実施例に係る主な通行方式は、第1本線1で通行する直進小型車両は、直接に低トンネル4を快速に通過し、第1本線1で通行する左折小型車両は、オーバーライン曲線進入型トンネル5を通して、第2本線2に左折し、第1本線1で通行する全部のUターンする車両は、中央プラットフォーム3上のUターン車道9、10を介してUターンする。上述のこれらの車両は、第1本線1の交通量において多数を占め、これらの車両は、交通信号で制御する必要がない。ただし、第1本線1において、大型車両及びUターンする小型車両は、交通信号で制御する必要があるが、このような車両数が少ない。こうして、第1本線1の交通円滑を確保する一方、より多い青信号通行時間を第2本線2に譲ることができ、第2本線2上の車両が赤信号を待つ時間を短縮させ、第2本線2における通行も円滑できるようにし、従い、最終的に、全交差路での交通が円滑になり、交通信号待ちによる交通渋滞問題が解決できる。実際に応用する際に、交通量が大きく、特に、小型車両が多い本線を本発明に係る上述第1本線1とすべきである。 The main traffic system according to the present embodiment is that a straight-ahead small vehicle that passes on the first main line 1 passes through the low tunnel 4 directly and quickly, and a left-turn small vehicle that passes on the first main line 1 enters the overline curve All U-turning vehicles that turn left on the second main line 2 through the tunnel 5 and pass on the first main line 1 make U-turns via U-turn roads 9 and 10 on the central platform 3. These vehicles mentioned above occupy a large number in the traffic volume of the first main line 1, and these vehicles do not need to be controlled by traffic signals. However, in the 1st main line 1, although the large vehicle and the small vehicle which carries out a U turn need to be controlled by a traffic signal, there are few such vehicles. Thus, while ensuring smooth traffic on the first main line 1, it is possible to give more green traffic time to the second main line 2, shortening the time for the vehicles on the second main line 2 to wait for a red signal, and the second main line The traffic in 2 can also be smoothed, and consequently, traffic on all intersections can be smoothed, and the traffic congestion problem due to traffic signal waiting can be solved. In actual application, the main line having a large traffic volume and particularly having a small number of small vehicles should be the first main line 1 according to the present invention.
上述実施例は、右通行の国及び地域に応じるものであるが、本発明は、左通行の国及び地域にも同様に適用できる。例えば、図1和図2を水平で180度を回転すれば、図4及び図5に示す実施例となる。図4及び図5に示す実施例は、左行規則に適用できる例である。図4及び図5における符号は、図1及び図2における符号と一致し、同様な構造を示すため、この以上説明しない。 Although the above-described embodiment is based on a right-passing country and region, the present invention can be similarly applied to a left-passing country and region. For example, when FIG. 1 and FIG. 2 are rotated 180 degrees horizontally, the embodiment shown in FIGS. 4 and 5 is obtained. The embodiment shown in FIGS. 4 and 5 is an example applicable to the left row rule. The reference numerals in FIG. 4 and FIG. 5 coincide with the reference numerals in FIG. 1 and FIG.
Claims (10)
第1本線(1)及び第2本線(2)の地上路面は、交差点において、地上路面を共有する1つの中央プラットフォーム(3)を構成し、
第1本線(1)には、中央プラットフォーム(3)の地下から貫通する双方向通行の低トンネル(4)が設置され、
低トンネル(4)の車両通行高さは、2m以上3m以下であり、
低トンネル(4)は、地下から中央プラットフォーム(3)を貫通して、地上で復旧され、
低トンネル(4)の通行方向外側辺から、1つのオーバーライン曲線進入型トンネル(5)が分岐され、
オーバーライン曲線進入型トンネル(5)の車両通行高さは、2m以上3m以下であり、
オーバーライン曲線進入型トンネル(5)は、低トンネル(4)の上り坂段の前方地下からUターンし、一段の曲線上り坂段(6)を経過して、第2本線(2)と同方向で接続し、
第1本線(1)の地上路面は、低トンネル(4)により、通行方向が反対になって、大型車両を通行させる、左右の2つの地面車道(7、8)に分離され、
前記2つの地面車道は、中央プラットフォーム(3)で接続して、Uターン方向が反対になって、大型車両をUターンさせることができる2つのUターン車道(9、10)を形成し、
前記2つのUターン車道(9、10)は、第2本線(2)の中央プラットフォーム(3)における直進車道の左右両側に位置され、
第1本線(1)の地上路面の通行方向の外側辺で、第2本線(2)の外側辺まで回る1つの車道(11)が分岐され、
第2本線(2)の通行方向の外側辺で、第1本線(1)の外側辺まで回る1つの車道(12)が分岐されることを特徴とする都市交差路構造。 An urban crossing structure that solves the traffic congestion problem, comprising a first main line (1) and a second main line (2) that intersect the “10” character, both of which are two-way roadways,
The ground road surface of the first main line (1) and the second main line (2) constitutes one central platform (3) sharing the ground road surface at the intersection,
On the first main line (1), a two-way low tunnel (4) penetrating from the basement of the central platform (3) is installed,
The vehicle traffic height of the low tunnel (4) is 2m or more and 3m or less,
The low tunnel (4) is restored from the ground, through the central platform (3),
One overline curve approaching tunnel (5) is branched from the outer side of the low tunnel (4) in the direction of traffic,
The vehicle travel height of the overline curve approach type tunnel (5) is 2 m or more and 3 m or less,
Overline curve approach type tunnel (5) makes a U-turn from the basement in front of the uphill stage of the low tunnel (4), passes the first curve uphill stage (6), and is the same as the second main line (2). Connect in direction,
The ground surface of the first main line (1) is separated by the low tunnel (4) into two right and left ground roads (7, 8) that allow large vehicles to pass in the opposite direction of traffic.
The two ground roads are connected by a central platform (3) to form two U-turn roads (9, 10) that can reverse a U-turn direction and allow a large vehicle to make a U-turn,
The two U-turn roads (9, 10) are located on the left and right sides of the straight road in the central platform (3) of the second main line (2),
On the outer side in the direction of travel of the ground surface of the first main line (1), one roadway (11) that turns to the outer side of the second main line (2) is branched,
An urban crossing road structure characterized in that one roadway (12) turning to the outer side of the first main line (1) is branched at the outer side of the second main line (2) in the passing direction.
The urban crossing road structure according to claim 1, characterized in that raised rainwater separation zones are installed on the ground of the entrance and exit of the low tunnel (4).
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| PCT/CN2012/001532 WO2014071543A1 (en) | 2012-11-12 | 2012-11-12 | Municipal crossroads structure |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2015535556A JP2015535556A (en) | 2015-12-14 |
| JP6093871B2 true JP6093871B2 (en) | 2017-03-08 |
Family
ID=50683892
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2015540981A Expired - Fee Related JP6093871B2 (en) | 2012-11-12 | 2012-11-12 | Urban intersection structure |
Country Status (7)
| Country | Link |
|---|---|
| US (1) | US20150284913A1 (en) |
| EP (1) | EP2918724B1 (en) |
| JP (1) | JP6093871B2 (en) |
| KR (1) | KR20150105949A (en) |
| CN (1) | CN104093907B (en) |
| PL (1) | PL2918724T3 (en) |
| WO (1) | WO2014071543A1 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110195386A (en) * | 2018-02-27 | 2019-09-03 | 陈泰丰 | The crossroad vehicle of traffic route intersects guidance method |
Families Citing this family (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106192644A (en) * | 2016-08-27 | 2016-12-07 | 扬州朝华投资有限公司 | A kind of micro-tunneling |
| CN111441205A (en) * | 2019-08-28 | 2020-07-24 | 李文彬 | Interchange type overpass |
| US20220341099A1 (en) * | 2019-09-23 | 2022-10-27 | Deepti Kumari | Interchange system for a roadway |
| CN110616611A (en) * | 2019-10-09 | 2019-12-27 | 湖南志辉知识产权有限公司 | Culvert type three-dimensional traffic system and passing method thereof |
| CN113818298A (en) * | 2020-06-19 | 2021-12-21 | 李海军 | Barrier-free reverse crossroad flyover |
| WO2022057639A1 (en) * | 2020-09-21 | 2022-03-24 | 李强 | Cross interchange for urban arterial road |
| CN112342853A (en) * | 2020-10-27 | 2021-02-09 | 王岩 | Crossroad people car reposition of redundant personnel traffic structure |
| CN113236282A (en) * | 2021-05-20 | 2021-08-10 | 山西省交通新技术发展有限公司 | Tunnel full-section maintenance method under road-occupation-free working condition |
| CN114875730A (en) * | 2022-05-05 | 2022-08-09 | 曹宏伟 | Three-dimensional traffic structure without traffic lights at urban crossroads |
| CN115142869B (en) * | 2022-07-27 | 2025-07-01 | 合肥市规划设计研究院 | A transition structure of an orthogonal double-layer tunnel and its construction method |
Family Cites Families (25)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| BE572980A (en) * | ||||
| US3238854A (en) * | 1961-12-22 | 1966-03-08 | Okubo Kentaro | Continuous-flow traffic interchange |
| US3386351A (en) * | 1963-09-14 | 1968-06-04 | Hara Shusaku | System of grade separation and also underroad parking |
| JPS5539524A (en) * | 1978-09-12 | 1980-03-19 | Shoji Sanae | Road intersection |
| JPS58131203A (en) * | 1982-01-27 | 1983-08-05 | リ−・ス−・ヤン | Double structured h-shaped non-stop free way in downtown |
| US5520478A (en) * | 1994-11-29 | 1996-05-28 | Yin-Lung; Yang | Landscaped urban road intersection |
| JP3096652B2 (en) * | 1997-03-28 | 2000-10-10 | 稔 山本 | Construction method of widening tunnel and emergency parking zone |
| CN1089390C (en) * | 1997-12-09 | 2002-08-21 | 李学思 | Overhead crossing bridge series |
| DE19850937C1 (en) * | 1998-11-05 | 2000-07-13 | Ignaz Walter | Road tunnel arrangement for opening up traffic to metropolitan areas |
| US7473050B2 (en) * | 2003-08-25 | 2009-01-06 | Yingtang Liu | Single-layer interchange overpass |
| JP3606576B1 (en) * | 2004-03-19 | 2005-01-05 | 月灘建設株式会社 | Rotary side-by-side road structure |
| CN2782751Y (en) * | 2005-03-28 | 2006-05-24 | 王世明 | Composite flyover bridge with double road traffic distribution |
| US7234891B2 (en) * | 2005-10-14 | 2007-06-26 | Tsukinada Kensetsu Kabushiki Kaisha | Multi-level road intersection |
| CN100473782C (en) * | 2006-04-05 | 2009-04-01 | 彭振华 | Non-traffic light non-barrier urban multi-level fast traffic road structure |
| US7491009B1 (en) * | 2007-09-05 | 2009-02-17 | Intersection Solutions Llc | Traffic intersection |
| US8109690B2 (en) * | 2008-11-04 | 2012-02-07 | Illinois Institute Of Technology | System for continuous vehicular travel on crossing roadways |
| CN201305804Y (en) * | 2008-11-19 | 2009-09-09 | 莫崧桂 | Improved tunnel concave bridge of traffic hub system for keeping intersection smooth in sixteen directions |
| KR20100064404A (en) * | 2008-12-05 | 2010-06-15 | 여지홍 | Non stop traffic system by half cloverleaf and application method |
| CN201317903Y (en) * | 2008-12-15 | 2009-09-30 | 文蛮 | Lane tunnel bridge at crossing |
| CN101781873A (en) * | 2009-01-15 | 2010-07-21 | 王伟榕 | Convenient and smooth flyover crossroad traffic building without traffic light |
| CN101748669A (en) * | 2010-01-27 | 2010-06-23 | 成都市温江星火专利开发研究所 | Underground intercommunicated overpass |
| CN201581320U (en) * | 2010-01-27 | 2010-09-15 | 成都市温江星火专利开发研究所 | Underground full interchange overpass |
| CN201785668U (en) * | 2010-10-19 | 2011-04-06 | 恒安(湖南)心相印纸业有限公司 | Turning device for roll paper finished product |
| CN202247574U (en) * | 2011-10-14 | 2012-05-30 | 李志卫 | Three-dimensional crossroad of traffic road |
| CN102733279B (en) * | 2012-07-18 | 2016-02-24 | 李力 | Be applied in crossroad comprehensive transportation hub |
-
2012
- 2012-11-12 JP JP2015540981A patent/JP6093871B2/en not_active Expired - Fee Related
- 2012-11-12 PL PL12888202T patent/PL2918724T3/en unknown
- 2012-11-12 CN CN201280067999.0A patent/CN104093907B/en active Active
- 2012-11-12 KR KR1020157015648A patent/KR20150105949A/en not_active Ceased
- 2012-11-12 EP EP12888202.4A patent/EP2918724B1/en active Active
- 2012-11-12 WO PCT/CN2012/001532 patent/WO2014071543A1/en not_active Ceased
- 2012-11-12 US US14/441,967 patent/US20150284913A1/en not_active Abandoned
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110195386A (en) * | 2018-02-27 | 2019-09-03 | 陈泰丰 | The crossroad vehicle of traffic route intersects guidance method |
Also Published As
| Publication number | Publication date |
|---|---|
| EP2918724B1 (en) | 2017-05-31 |
| JP2015535556A (en) | 2015-12-14 |
| KR20150105949A (en) | 2015-09-18 |
| CN104093907A (en) | 2014-10-08 |
| US20150284913A1 (en) | 2015-10-08 |
| EP2918724A4 (en) | 2016-01-27 |
| PL2918724T3 (en) | 2017-10-31 |
| CN104093907B (en) | 2016-05-18 |
| WO2014071543A1 (en) | 2014-05-15 |
| HK1215058A1 (en) | 2016-08-12 |
| EP2918724A1 (en) | 2015-09-16 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP6093871B2 (en) | Urban intersection structure | |
| CN100473782C (en) | Non-traffic light non-barrier urban multi-level fast traffic road structure | |
| CN103938511B (en) | Be applicable to overpass bridge and the passing control method thereof of city crossroad | |
| WO2005031069A1 (en) | A full interchange urban road system and the traffic method of using it | |
| US10465343B2 (en) | Overpass structure with vertical interchange arrangement for crossroads | |
| CN104093905B (en) | Intersection structures that facilitate retrofitting of existing intersections | |
| WO2021036902A1 (en) | Interchange overpass bridge | |
| CN110616611A (en) | Culvert type three-dimensional traffic system and passing method thereof | |
| CN101050617B (en) | Low span-depth path separate passing through inter change cross junction | |
| CN103215867A (en) | Assembled type intersected road system of bridge floor supporting band traveling device | |
| CN203096539U (en) | Three-dimensional transportation system for urban trunk road | |
| CN202416105U (en) | Unblocked bridge for crossroad | |
| CN202164518U (en) | Cross directional barrier-free overpass | |
| CN104404848B (en) | A kind of Multifunctional overpass | |
| CN204982578U (en) | Crossroad does not have red light individual layer overpass | |
| CN104160090B (en) | An Urban Crossroads Structure | |
| CN104093906B (en) | T junction structure | |
| JPS62170601A (en) | Three-dimensional crossing apparatus of street | |
| KR20100044756A (en) | Nonstop traffic system using in the crossroad for half freeway | |
| CN1378016A (en) | Three-layer overpass and small car overpass and path | |
| CN205313931U (en) | Crossing canal system | |
| CN204475097U (en) | Freely to walk in length and breadth overpass bridge | |
| CN104093904B (en) | Intersection structure of main and secondary arterial roads at urban crossroads | |
| CN202688813U (en) | Four-platform one-straight overpass system | |
| RU2492288C1 (en) | Universal separator of transport and pedestrian flows installed on t-junction of major and minor roads |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20150629 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20160411 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20160419 |
|
| RD02 | Notification of acceptance of power of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7422 Effective date: 20160706 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20160805 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A821 Effective date: 20160805 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20170117 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20170213 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 6093871 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| LAPS | Cancellation because of no payment of annual fees |