Pier structure and reconstruction method Download PDF

Info

Publication number
JP6097595B2
JP6097595B2 JP2013038928A JP2013038928A JP6097595B2 JP 6097595 B2 JP6097595 B2 JP 6097595B2 JP 2013038928 A JP2013038928 A JP 2013038928A JP 2013038928 A JP2013038928 A JP 2013038928A JP 6097595 B2 JP6097595 B2 JP 6097595B2
Authority
JP
Japan
Prior art keywords
pile
sheet pile
head block
pile head
precast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2013038928A
Other languages
Japanese (ja)
Other versions
JP2014167216A (en
Inventor
幹夫 原
幹夫 原
正之 松本
正之 松本
治子 青木
治子 青木
Original Assignee
株式会社日本ピーエス
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社日本ピーエス filed Critical 株式会社日本ピーエス
Priority to JP2013038928A priority Critical patent/JP6097595B2/en
Publication of JP2014167216A publication Critical patent/JP2014167216A/en
Application granted granted Critical
Publication of JP6097595B2 publication Critical patent/JP6097595B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)
  • Revetment (AREA)

Description

本発明は桟橋の構造と再構築方法に関するものである。
特に本発明の対象は、岸壁に沿って鋼管などを打設した矢板壁がすでに構築してある場合であって、その矢板壁に支持力を得て構築した桟橋を再構築する方法、あるいは桟橋の構造に関するものである。
The present invention relates to a structure of a jetty and a reconstruction method.
In particular, the object of the present invention is a case where a sheet pile wall in which a steel pipe or the like is placed along a quay has already been constructed, and a method for reconstructing a pier constructed by obtaining support force on the sheet pile wall, or a pier Is related to the structure of

全国の港湾の既設桟橋が構築から30年以上経過しているために塩害などによるコンクリートの劣化が著しく、特に震災の可能性の高い近時は、早急な架け替えが望まれている。
しかし既存桟橋の架け替えは、すでに海底に打設してある既存の杭をそのまま利用する必要があり、工期の制限や潮位変化への対応など、多くの制約がある。
そのために、それらの要求に対応した新たな技術が求められている。
Since more than 30 years have passed since the construction of existing piers at ports nationwide, concrete deterioration due to salt damage etc. is remarkable, and immediate replacement is desired especially in the recent high possibility of earthquake disaster.
However, the replacement of the existing jetty requires the use of existing piles that have already been placed on the sea floor, and there are many restrictions such as restrictions on the construction period and response to changes in the tide level.
Therefore, a new technology that meets these requirements is required.

特開2000−248526号公報JP 2000-248526 A

前記したような従来の桟橋の改修方法にあっては、次のような問題点がある。
<1> 桟橋を新設する施工の場合には、海水を締切して施工することが一般的である。しかし既存桟橋の再構築工法の場合には、桟橋の供用を維持しながらの部分的施工となるために、海水を締め切ることができない。
<2> このために満干の潮位の変化を受けながら行う、拘束の多い施工となるために、現地での鉄筋の配置、型枠の設置、コンクリート打設などの作業が不可能であるか、困難である。
<3> すでに打設してある既存の杭をそのまま利用して上部工のみの施工となるが、一般に既存杭の打設位置の誤差が大きく、これを前提とした上部工の施工を行わなければならない。
<4> 既存桟橋を供用しながらの再構築工事となるために、工期に制約があり、できるだけ迅速な施工が求められている。
The conventional pier repair method as described above has the following problems.
<1> When constructing a new jetty, it is common to construct it with seawater cut off. However, in the case of the rebuilding method of the existing jetty, the seawater cannot be closed because it is a partial construction while maintaining the service of the jetty.
<2> Because of this, it is a highly constrained construction that is carried out in response to changes in the full tide level, so it is impossible to perform operations such as placement of rebar, formwork, concrete placement, etc. Have difficulty.
<3> The existing piles that have already been placed will be used as they are, and only the superstructure will be constructed. However, there is generally a large error in the placement position of the existing piles, and superstructures must be constructed based on this assumption. I must.
<4> Since the construction work will be rebuilt while the existing pier is in service, the construction period is limited and construction is required as quickly as possible.

上記のような課題を解決する本発明の桟橋の再構築方法は、既設の矢板壁の頭部にブラケットを取り付け、このブラケットを介して、プレキャスト型枠を設置し、型枠内にコンクリートを打設して矢板壁の頭部を一体化した矢板頭ブロックを形成し、一方前記の矢板壁と対向する位置にある既設の支持杭の頭部にもブラケットを介して独立したプレキャスト型枠を設置し、型枠内にコンクリートを打設して杭の頭部に杭頭ブロックを形成し、矢板頭ブロックと杭頭ブロックの間にプレキャスト梁を設置し、矢板頭ブロック、杭頭ブロックと、プレキャスト梁との間に配置したPC鋼線を緊張して一体化し、その後に矢板頭ブロックと杭頭ブロックの上に、プレキャスト床版を設置して行うことを特徴とする。   The method for reconstructing a jetty according to the present invention that solves the above-described problems is that a bracket is attached to the head of an existing sheet pile wall, a precast formwork is installed through this bracket, and concrete is cast into the formwork. A sheet pile head block is formed by integrating the head of the sheet pile wall, while an independent precast formwork is installed via a bracket on the head of the existing support pile located opposite the sheet pile wall. Then, concrete is cast in the formwork to form a pile head block at the head of the pile, a precast beam is installed between the sheet pile head block and the pile head block, and the sheet pile head block, pile head block, and precast It is characterized in that the PC steel wire placed between the beams is tensioned and integrated, and then a precast floor slab is installed on the sheet pile head block and the pile head block.

本発明の桟橋の構造と再構築方法は以上説明したようになるから次のような効果の少なくともひとつを得ることができる。
<1> 既設の杭は必ずしも正確な位置に打設されているとは限らず、位置の誤差が大きい場合もある。このような実情を前提として、杭頭の位置の誤差が存在しても、それらの矢板壁を利用して桟橋の再構築が可能である。
<2> 現場打設のコンクリートと、プレキャストコンクリートとを併用するので、迅速な工事を行うことができ、供用中の桟橋を全面的に早期に開放することができる。
Since the structure and reconstruction method of the pier of the present invention are as described above, at least one of the following effects can be obtained.
<1> Existing piles are not always placed at accurate positions, and there may be large positional errors. On the premise of such a situation, even if there is an error in the position of the pile head, it is possible to reconstruct the pier using these sheet pile walls.
<2> Since the cast-in-place concrete and precast concrete are used in combination, a quick construction can be performed and the pier in service can be fully opened early.

本発明の桟橋再構築工程の説明図。Explanatory drawing of the pier reconstruction process of this invention. 本発明の桟橋再構築工程の説明図。Explanatory drawing of the pier reconstruction process of this invention. 本発明の桟橋再構築工程の説明図。Explanatory drawing of the pier reconstruction process of this invention. 本発明の桟橋再構築工程の説明図。Explanatory drawing of the pier reconstruction process of this invention. 本発明の桟橋再構築工程の説明図。Explanatory drawing of the pier reconstruction process of this invention. 本発明の桟橋再構築工程の説明図。Explanatory drawing of the pier reconstruction process of this invention. 本発明の桟橋再構築の完成した状態の説明図。Explanatory drawing of the completed state of the pier reconstruction of this invention. 本発明の桟橋再構築の完成した状態の説明図。Explanatory drawing of the completed state of the pier reconstruction of this invention.

以下図面を参照にしながら本発明の桟橋再構築工程の好適な実施の形態を詳細に説明する。   Hereinafter, preferred embodiments of the pier reconstruction process of the present invention will be described in detail with reference to the drawings.

<1>前提条件
特に本発明の対象は、岸壁に沿って鋼管などを打設した矢板壁1が構築してあり、その矢板壁1に支持力を得て構築した桟橋を再構築する方法、あるいはその場合の桟橋の構造に関するものである。
したがって本発明の桟橋の再構築方法は、矢板壁1の杭や、矢板壁1とは独立した位置に打設してある支持杭3など、既設の矢板壁1や支持杭3をそのまま利用する工法である。
その場合に前記したように、杭頭の位置は必ずしも設計図通りに正確ではなく、誤差が生じている可能性が高いことを前提としている。
<1> Prerequisites The object of the present invention is a method of reconstructing a jetty constructed by obtaining a supporting force on the sheet pile wall 1 in which a sheet pile wall 1 in which a steel pipe or the like is placed along the quay wall, Or the structure of the pier in that case.
Therefore, the rebuilding method of the pier of the present invention uses the existing sheet pile wall 1 and the support pile 3 as they are, such as the pile of the sheet pile wall 1 and the support pile 3 driven in a position independent of the sheet pile wall 1. It is a construction method.
In this case, as described above, the position of the pile head is not necessarily accurate according to the design drawing, and it is assumed that there is a high possibility that an error has occurred.

<2>ブラケットの取り付け(図1)
既設の矢板壁1の頭部にブラケット2を取り付ける。
この矢板壁1は、鋼管杭、コンクリート杭を並べて打設して構築した壁体である。
矢板壁1の頭部に取り付けるブラケット2は、後述する型枠を支持するための鋼製部材である。
既設の杭が鋼管杭の場合には、その側面に溶接して取り付ける。
既設の杭がコンクリート杭の場合には側面に削孔してボルトなどを挿入してブラケット2を取り付ける。
このブラケット2を、複数本の矢板壁1に共通した高さに取り付ける。
矢板壁1と対向する位置には独立した支持杭3が打設してある。
この支持杭3の頭部にも、前記と同様にブラケット2を取り付ける。
矢板壁1の海側に位置する控え杭4にも同様にブラケット2を取り付ける。
<2> Attaching the bracket (Fig. 1)
The bracket 2 is attached to the head of the existing sheet pile wall 1.
This sheet pile wall 1 is a wall body constructed by placing steel pipe piles and concrete piles side by side.
The bracket 2 attached to the head of the sheet pile wall 1 is a steel member for supporting a formwork described later.
If the existing pile is a steel pipe pile, it is welded to the side.
When the existing pile is a concrete pile, the bracket 2 is attached by drilling holes on the side surface and inserting bolts.
The bracket 2 is attached to a height common to the plurality of sheet pile walls 1.
An independent support pile 3 is placed at a position facing the sheet pile wall 1.
The bracket 2 is also attached to the head of the support pile 3 as described above.
Similarly, the bracket 2 is attached to the retaining pile 4 located on the sea side of the sheet pile wall 1.

<3>底板の設置(図2)
このブラケット2を介して、矢板壁1に共通する底板5を設置する。
矢板壁1と独立した支持杭3のブラケット2にも底板5を設置する。
この底板5は、後述するプレキャスト型枠を支持するための薄板であるから、その加工が容易である。
そのために杭頭の平面視の位置が不ぞろいでも、底板5の形状を加工することによって、複数の杭群に共通した状態で、水平面を維持した底板5を設置することができる。
<3> Installation of bottom plate (Fig. 2)
A bottom plate 5 common to the sheet pile wall 1 is installed through the bracket 2.
The bottom plate 5 is also installed on the bracket 2 of the support pile 3 independent of the sheet pile wall 1.
Since this bottom plate 5 is a thin plate for supporting a precast formwork described later, its processing is easy.
Therefore, even if the position of the pile head in plan view is uneven, by processing the shape of the bottom plate 5, it is possible to install the bottom plate 5 maintaining a horizontal plane in a state common to a plurality of pile groups.

<4>プレキャスト型枠の設置(図3)
矢板壁1の杭頭に取り付けた底板5の上に、工場で生産したプレキャスト型枠6を設置する。
プレキャスト型枠6とは工場生産したコンクリート板であり、鋼製型枠のようにコンクリート打設後に解体する必要がなく、コンクリート構造物の表面として一体となる。
このプレキャスト型枠6は、1枚の板体だけでなく、平面視矩形の容器状の型枠として構成することも可能である。
同様に、支持杭3の杭頭に取り付けた底板5の上にも、プレキャスト型枠6を設置する。
底板5群は前記した様に水平面を維持した状態で設置してあるから、プレキャスト型枠6の設置は簡単に行うことができる。
型枠6は杭頭を囲む状態で、その両側に設置するが、杭頭の位置が不ぞろいでも、型枠6の間隔を広くとっておけば、杭頭の位置が型枠6設置の障害となることがない。
このプレキャスト型枠6で包囲した空間には鉄筋を組み立てる。
<4> Installation of precast formwork (Figure 3)
On the bottom plate 5 attached to the pile head of the sheet pile wall 1, the precast formwork 6 produced in the factory is installed.
The precast form 6 is a concrete plate produced in the factory, and does not need to be demolished after placing the concrete like a steel form, and is integrated as a surface of the concrete structure.
The precast mold 6 can be configured not only as a single plate body but also as a container-shaped mold having a rectangular shape in plan view.
Similarly, the precast formwork 6 is also installed on the bottom plate 5 attached to the pile head of the support pile 3.
Since the bottom plate 5 group is installed in a state where the horizontal plane is maintained as described above, the precast form 6 can be installed easily.
The formwork 6 surrounds the pile head and is installed on both sides of the pile head. However, even if the pile head positions are uneven, if the gap between the formwork 6 is kept wide, the position of the pile head will be an obstacle to the installation of the formwork 6. Never become.
Reinforcing bars are assembled in the space surrounded by the precast form 6.

<5>矢板頭ブロックの形成(図4)
矢板壁1の杭頭に共通した状態で設置したプレキャスト型枠6内に、間詰コンクリート7を投入、打設する。
間詰コンクリート7が硬化して、矢板壁1の頭部を一体化した矢板頭ブロック8を形成する。
矢板頭ブロック8にはコンクリート7打設前に、鉄筋とは別に、シース、PC鋼線、鋼棒を配置しておく。
コンクリート7の硬化後に、この鋼線、鋼棒を緊張することによって、多数本の杭群を一体化した矢板頭ブロック8を強固に一体化することができる。
<5> Formation of sheet pile head block (FIG. 4)
Filled concrete 7 is placed and placed in a precast form 6 installed in a state common to the pile heads of the sheet pile wall 1.
The interstitial concrete 7 is hardened to form a sheet pile head block 8 in which the heads of the sheet pile walls 1 are integrated.
In addition to the reinforcing bars, a sheath, a PC steel wire, and a steel bar are arranged in the sheet pile head block 8 before placing the concrete 7.
By tensioning the steel wire and the steel rod after the concrete 7 is hardened, the sheet pile head block 8 in which a large number of pile groups are integrated can be firmly integrated.

<6>杭頭ブロックの形成(図4)
前記の矢板壁1と対向する位置に支持杭3が打設してある。
この支持杭3の頭部にも、前記と同様の工程でブラケット2を介して独立したプレキャスト型枠6を設置し、この型枠内に鉄筋を組み立てて、間詰コンクリート7を打設する。
この間詰コンクリート7が硬化して、支持杭3の頭部の杭頭ブロック9が形成される。
<6> Pile head block formation (Figure 4)
A support pile 3 is placed at a position facing the sheet pile wall 1.
Also on the head of the support pile 3, an independent precast formwork 6 is installed through the bracket 2 in the same process as described above, a reinforcing bar is assembled in this formwork, and the concrete concrete 7 is placed.
This padded concrete 7 is hardened and a pile head block 9 of the head of the support pile 3 is formed.

<7>ブロック間の距離
前記したように、既設の矢板壁1の杭頭と支持杭3の杭頭との間の距離は、打設時の施工誤差があって一定ではない。
しかしブラケット2に取り付けるプレキャスト型枠6の位置を、多少前後に変化させて微調整することによって、コンクリート7打設後の、矢板頭ブロック8と、杭頭ブロック9間の距離を調整することができる。
そのために、後述するように矢板頭ブロック8と杭頭ブロック9の間にプレキャスト梁10を設置する場合に、工場製品であるプレキャスト梁10の長さと、両ブロック間の距離を正確に一致させることができる。
<7> Distance between Blocks As described above, the distance between the pile head of the existing sheet pile wall 1 and the pile head of the support pile 3 is not constant due to construction errors during placement.
However, it is possible to adjust the distance between the sheet pile head block 8 and the pile head block 9 after placing the concrete 7 by finely adjusting the position of the precast form 6 to be attached to the bracket 2 slightly before and after. it can.
Therefore, when the precast beam 10 is installed between the sheet pile head block 8 and the pile head block 9 as will be described later, the length of the precast beam 10 which is a factory product and the distance between the two blocks should be exactly matched. Can do.

<8>プレキャスト梁の設置(図5)
矢板頭ブロック8と杭頭ブロック9は対向した位置に設置してあり、前記したように対抗するブロック面間の距離は正確である。
そこで両者の間に、工場生産したプレキャスト梁10を設置する。
このプレキャスト梁10の内部には、長手方向に鉄筋とは別に、シース、PC鋼線、鋼棒を配置しておく。
その後に、矢板頭ブロック8、杭頭ブロック9と、プレキャスト梁10との間を貫通させて配置したPC鋼線Pを緊張して一体化する。
プレキャスト梁10は、杭頭ブロック9の両側に、矢板壁1と平行方向にも取り付ける。
その場合にも、杭頭ブロック9とプレキャスト梁10とを貫通させたPC鋼線Pを緊張させることによって強固に一体化することができる。
<8> Installation of precast beams (Fig. 5)
The sheet pile head block 8 and the pile head block 9 are installed at opposing positions, and the distance between the opposing block surfaces is accurate as described above.
Therefore, a precast beam 10 produced in a factory is installed between the two.
Inside the precast beam 10, a sheath, a PC steel wire, and a steel bar are disposed in the longitudinal direction separately from the reinforcing bars.
After that, the PC steel wire P arranged through the sheet pile head block 8, the pile head block 9, and the precast beam 10 is tensioned and integrated.
The precast beam 10 is also attached to both sides of the pile head block 9 in a direction parallel to the sheet pile wall 1.
Also in that case, it can be firmly integrated by tensioning the PC steel wire P through which the pile head block 9 and the precast beam 10 are penetrated.

<9>プレキャスト床版の設置(図6、7、8)
矢板頭ブロック8と杭頭ブロック9、およびプレキャスト梁10の上に、沓座モルタルを打設し、ゴム支承を設置し、アンカーバーを設置する。
その上に、工場製品であるプレキャスト床版11を搭載設置する。
こうして、既設の杭頭の位置が正確な設計線上にない場合でも、それらの誤差を吸収して、短時間で桟橋の再構築を終了することができる。
<9> Precast floor slab installation (Figs. 6, 7, 8)
A saddle mortar is placed on the sheet pile head block 8, the pile head block 9, and the precast beam 10, a rubber bearing is installed, and an anchor bar is installed.
On top of that, a precast floor slab 11 which is a factory product is mounted and installed.
In this way, even if the position of the existing pile head is not on the exact design line, those errors can be absorbed and the reconstruction of the pier can be completed in a short time.

1:矢板壁1
2:ブラケット
3:支持杭
6:プレキャスト型枠
8:矢板頭ブロック
9:杭頭ブロック
10:プレキャスト梁
11:プレキャスト床版
1: Sheet pile wall 1
2: Bracket 3: Support pile 6: Precast formwork 8: Sheet pile head block 9: Pile head block 10: Precast beam 11: Precast floor slab

Claims (1)

既設の矢板壁の頭部にプレキャスト型枠を設置し、
型枠内にコンクリートを打設して矢板壁の頭部を一体化した矢板頭ブロックを形成し、
一方前記の矢板壁と対向する位置にある既設の支持杭の頭部にも独立したプレキャスト型枠を設置し、
型枠内にコンクリートを打設して杭の頭部に杭頭ブロックを形成し、
矢板頭ブロックと杭頭ブロックの間にプレキャスト梁を設置し、
矢板頭ブロック、杭頭ブロックと、プレキャスト梁との間に配置したPC鋼線を緊張して一体化し、
その後に矢板頭ブロックと杭頭ブロックの上に、プレキャスト床版を設置して行うことを特徴とする、
桟橋の再構築方法。
Install a precast formwork on the head of the existing sheet pile wall,
Concrete is placed in the formwork to form a sheet pile head block that integrates the head of the sheet pile wall,
On the other hand, an independent precast formwork is also installed on the head of the existing support pile at the position facing the sheet pile wall,
Concrete is placed in the formwork to form a pile head block on the pile head,
Install a precast beam between the sheet pile head block and the pile head block,
Tension and unify the PC steel wire placed between the sheet pile head block, pile head block, and precast beam,
After that, it is characterized by installing a precast floor slab on the sheet pile head block and pile head block,
How to rebuild the pier.
JP2013038928A 2013-02-28 2013-02-28 Pier structure and reconstruction method Active JP6097595B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2013038928A JP6097595B2 (en) 2013-02-28 2013-02-28 Pier structure and reconstruction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2013038928A JP6097595B2 (en) 2013-02-28 2013-02-28 Pier structure and reconstruction method

Publications (2)

Publication Number Publication Date
JP2014167216A JP2014167216A (en) 2014-09-11
JP6097595B2 true JP6097595B2 (en) 2017-03-15

Family

ID=51617032

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2013038928A Active JP6097595B2 (en) 2013-02-28 2013-02-28 Pier structure and reconstruction method

Country Status (1)

Country Link
JP (1) JP6097595B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110656581A (en) * 2019-09-19 2020-01-07 广州机施建设集团有限公司 Temporary bridge construction process
JP7178050B2 (en) * 2019-10-30 2022-11-25 五洋建設株式会社 Pile support structure and its construction method

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0346524U (en) * 1989-09-08 1991-04-30
JP3150634B2 (en) * 1996-11-22 2001-03-26 佐伯建設工業株式会社 Precast pier structure and wharf construction method using it
JP4645903B2 (en) * 2005-08-30 2011-03-09 東洋建設株式会社 Environmentally friendly pier
JP4667266B2 (en) * 2006-02-16 2011-04-06 前田建設工業株式会社 Pile pier
JP4597921B2 (en) * 2006-07-07 2010-12-15 株式会社日本ピーエス How to build a pier
JP4349638B2 (en) * 2006-09-25 2009-10-21 共和コンクリート工業株式会社 Yaita wall revetment

Also Published As

Publication number Publication date
JP2014167216A (en) 2014-09-11

Similar Documents

Publication Publication Date Title
KR101600845B1 (en) The horizontal structural frame and the underground construction methods using it
JP2010281033A (en) Construction method for reinforcing masonry wall, and masonry structure
KR20130026311A (en) Precast bridge post
JP6097595B2 (en) Pier structure and reconstruction method
JP5584520B2 (en) Reinforcement method of abutment and back embankment
JP2005264514A (en) Foundation slab structure of sea berth structure and its construction method
JP6543077B2 (en) Construction method of structure
JP2016011535A (en) Construction method of the beam part of the pier
JP4597921B2 (en) How to build a pier
KR101133420B1 (en) Precast concrete connection block and the continuity method of composite bridges using it
JP2009097196A (en) Seismically reinforcing structure for cylindrical container structure, and seismically reinforcing method for the same
JP2014020027A (en) Pile foundation structure
CN110847227B (en) A road embankment retaining structure
JP5852475B2 (en) Pile foundation reconstruction method
JP4667266B2 (en) Pile pier
KR20040034555A (en) Abutment and pier using composite pile and sheet pile of a bridge, and it&#39;s construction method
JP6134231B2 (en) Base plate position adjustment system
KR101906322B1 (en) Rahmen bridge allowing longitudinal displacement and construction method therefor
JP5749620B2 (en) Seismic isolation method for existing buildings
KR101293646B1 (en) Bridge construction method using arch support connection member
JP6031626B1 (en) Replacing the seismic isolation device in the pile head seismic isolation structure
KR200422840Y1 (en) Prefabricated slab bridge with H-girder mounted on connecting support member inserted on lattice pile pillar
JP2012180678A (en) Replacement method of water elevated structure
JP3851162B2 (en) Stopper for bridge
JP2009293198A (en) Column base structure and its construction method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20151023

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20160608

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20160719

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20160906

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20170214

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20170220

R150 Certificate of patent or registration of utility model

Ref document number: 6097595

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250