JP6100733B2 - Method and apparatus for removing temporary lid in paving work including manhole - Google Patents
[go: Go Back, main page]

JP6100733B2 - Method and apparatus for removing temporary lid in paving work including manhole - Google Patents

Method and apparatus for removing temporary lid in paving work including manhole Download PDF

Info

Publication number
JP6100733B2
JP6100733B2 JP2014124182A JP2014124182A JP6100733B2 JP 6100733 B2 JP6100733 B2 JP 6100733B2 JP 2014124182 A JP2014124182 A JP 2014124182A JP 2014124182 A JP2014124182 A JP 2014124182A JP 6100733 B2 JP6100733 B2 JP 6100733B2
Authority
JP
Japan
Prior art keywords
pavement
temporary
lid
hole
temporary lid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2014124182A
Other languages
Japanese (ja)
Other versions
JP2016003484A (en
Inventor
利明 岡村
利明 岡村
Original Assignee
株式会社ハネックス・ロード
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社ハネックス・ロード filed Critical 株式会社ハネックス・ロード
Priority to JP2014124182A priority Critical patent/JP6100733B2/en
Publication of JP2016003484A publication Critical patent/JP2016003484A/en
Application granted granted Critical
Publication of JP6100733B2 publication Critical patent/JP6100733B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Structures (AREA)
  • Road Repair (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Description

本発明は、マンホールを含む道路の新設舗装工事や、打換舗装工事や、切削オーバーレイ舗装工事のような仮蓋を使用する舗装工事において、舗装層に埋入された仮蓋を撤去する撤去工程を実施するための方法及び装置に関する。 The present invention is a removal process for removing a temporary lid embedded in a pavement layer in a pavement using a temporary lid such as a new pavement work including a manhole, a replacement pavement work, and a cutting overlay pavement work. The present invention relates to a method and an apparatus for carrying out the above.

マンホールを含む道路の舗装工事に関して、本出願人は、「後付工法」(商標登録第4217698号)を提案し、好評を博している。 Regarding the pavement construction of roads including manholes, the present applicant has proposed “post-installation method” (trademark registration No. 4217698) and has been well received.

本出願人の「後付工法」によれば、新設舗装工事の場合、路面に設置されたマンホールの開口を中心支持孔付きの仮蓋により閉塞する仮蓋設置工程と、前記仮蓋の上方を含んで路面を舗装する舗装工程と、舗装表面から前記仮蓋上の舗装層に前記中心支持孔に至る通孔を形成する通孔形成工程と、舗装表面から切断機でマンホール周囲の前記舗装層を円形に切断する切断工程と、少なくとも前記通孔を介して前記中心支持孔にリフト装置を連結することにより、前記切断された切断舗装部と仮蓋を撤去する撤去工程と、蓋受枠を舗装表面と合致するようにマンホールに設置する蓋受枠設置工程と、前記蓋受枠の周囲に舗装補修材を充填して周囲の舗装と一体化する充填工程が実施される。 According to the Applicant's “retrofitting method”, in the case of new paving work, a temporary lid installation step of closing the opening of a manhole installed on the road surface with a temporary lid with a center support hole, and above the temporary lid Including a pavement step for paving the road surface, a through hole forming step for forming a through hole from the pavement surface to the central support hole in the pavement layer on the temporary lid, and the pavement layer around the manhole by a cutting machine from the pavement surface. A cutting step for cutting the substrate into a circle, a removal step for removing the cut cutting pavement and the temporary lid by connecting a lift device to the center support hole through at least the through hole, and paving the lid receiving frame. A lid receiving frame installing step for installing in a manhole so as to coincide with the surface, and a filling step for filling the periphery of the lid receiving frame with a pavement repair material and integrating with the surrounding pavement are performed.

また、打換舗装工事の場合、道路に設置された既存のマンホールの蓋受枠と舗装を除去する既存物除去工程と、マンホールの開口を中心支持孔付きの仮蓋により閉塞する仮蓋設置工程と、前記仮蓋の上方を含んで路面を舗装する舗装工程と、舗装表面から前記仮蓋上の舗装層に前記中心支持孔に至る通孔を形成する通孔形成工程と、舗装表面から切断機でマンホール周囲の前記舗装層を円形に切断する切断工程と、少なくとも前記通孔を介して前記中心支持孔にリフト装置を連結することにより、前記切断された切断舗装部と仮蓋を撤去する撤去工程と、蓋受枠を舗装表面と合致するようにマンホールに設置する蓋受枠設置工程と、前記蓋受枠の周囲に舗装補修材を充填して周囲の舗装と一体化する充填工程が実施される。 Also, in the case of replacement pavement work, an existing manhole cover receiving frame installed on the road and an existing object removal process for removing the pavement, and a temporary lid installation process for closing the manhole opening with a temporary cover with a central support hole, A paving step for paving the road surface including the upper part of the temporary lid, a through hole forming step for forming a through hole from the pavement surface to the central support hole in the pavement layer on the temporary lid, and a cutting machine from the pavement surface. A cutting step of cutting the pavement layer around the manhole into a circle, and removing the cut cut pavement and the temporary lid by connecting a lift device to the center support hole through at least the through hole A step, a lid receiving frame installing step for installing the lid receiving frame in the manhole so as to coincide with the pavement surface, and a filling step for filling the periphery of the lid receiving frame with a pavement repair material to be integrated with the surrounding pavement.

切削オーバーレイ舗装工事の場合、道路に設置された既存のマンホールの周囲の舗装を切断して蓋受枠を除去する既存物除去工程と、マンホールの開口を中心支持孔付きの仮蓋により閉塞する仮蓋設置工程と、前記仮蓋の上方を仮舗装して既存の舗装と同一レベルにする仮舗装工程と、切削機で既存の舗装の表層と前記仮舗装の表面を切削する切削工程と、前記切削面の上にオーバーレイを舗装するオーバーレイ工程と、舗装表面から前記仮蓋上の舗装層に前記中心支持孔に至る通孔を形成する通孔形成工程と、舗装表面から切断機でマンホール周囲の前記舗装層を円形に切断する切断工程と、少なくとも前記通孔を介して前記中心支持孔にリフト装置を連結することにより、前記切断された切断舗装部と仮蓋を撤去する撤去工程と、蓋受枠を舗装表面と合致するようにマンホールに設置する蓋受枠設置工程と、前記蓋受枠の周囲に舗装補修材を充填して周囲の舗装と一体化する充填工程が実施される。 In the case of cutting overlay pavement construction, the existing object removal process that cuts the pavement around the existing manhole installed on the road and removes the lid receiving frame, and the temporary lid that closes the manhole opening with a temporary lid with a central support hole An installation step, a temporary pavement step where the upper portion of the temporary lid is temporarily paved to the same level as the existing pavement, a cutting step of cutting the surface layer of the existing pavement and the surface of the temporary pavement with a cutting machine, and the cutting An overlay process for paving an overlay on the surface, a through hole forming process for forming a through hole from the paved surface to the central support hole in the paved layer on the temporary lid, and the manipulator around the manhole by a cutting machine from the paved surface. A cutting step for cutting the pavement layer into a circle; a removal step for removing the cut cut pavement and the temporary lid by connecting a lift device to the center support hole through at least the through hole; and a lid receiving frame. A lid receiving frame installation step of installing the manhole to match the pavement surface, the filling process of integrating the pavement surrounding filled with surrounding paving repair material of the lid receiving frame is performed.

特許第2623491号公報Japanese Patent No. 2623491 特許第2623492号公報Japanese Patent No. 2623492

本出願人が提案した「後付工法」は、マンホールの開口を中心支持孔付きの仮蓋により閉塞し、仮蓋の上方を含んで舗装を施した後、舗装表面から切断機でマンホール周囲の舗装層を円形に切断し、切断された切断舗装部と共に仮蓋を撤去する工程が実施される。 The “retrofitting method” proposed by the present applicant is that the manhole opening is closed with a temporary lid with a central support hole, and after pavement including the upper part of the temporary lid, the cutting surface is used to wrap around the manhole. A step of cutting the pavement layer into a circle and removing the temporary lid together with the cut pavement portion cut is performed.

前記撤去工程は、種々のリフト装置を使用することにより実施可能であるが、少なくとも、仮蓋を引き上げることにより、該仮蓋と切断舗装部を一挙に引き上げ撤去することが好ましい。 The removal step can be carried out by using various lifting devices, but it is preferable that the temporary lid and the cut pavement are pulled up and removed at least by pulling up the temporary lid.

このため、上述のように、仮蓋に中心支持孔が設けられており、撤去に先立ち、舗装表面から仮蓋上の舗装層に前記中心支持孔に至る通孔を形成し、該通孔を介して前記中心支持孔にリフト装置を連結し、仮蓋を引き上げることにより円形切断された切断舗装部を撤去している。 For this reason, as described above, a center support hole is provided in the temporary lid, and prior to removal, a through hole extending from the pavement surface to the central support hole is formed in the pavement layer on the temporary cover, and the through hole is formed. A lift device is connected to the center support hole through the lifter, and the cut pavement portion that has been circularly cut is removed by pulling up the temporary lid.

ところで、前記通孔形成工程は、一般的にコアドリルを使用し、舗装層の表面から該舗装層の下方に埋入された仮蓋の中心支持孔に向けて、該舗装層を穿孔することにより行われている。 By the way, the said through-hole formation process generally uses a core drill, and drills this pavement layer toward the center support hole of the temporary cover embedded under the pavement layer from the surface of the pavement layer. Has been done.

従って、作業者は、通孔を形成するために、時間と労力を伴う作業を強いられ、作業効率の点で改善すべき課題がある。 Therefore, the worker is forced to perform work with time and labor in order to form the through hole, and there is a problem to be improved in terms of work efficiency.

しかも、通常、仮蓋は、鉄製であるため、舗装層の表面から進入させたコアドリルが仮蓋に接すると、ドリル刃を破損する問題がある。このため、舗装層の表面から目視できない仮蓋に向けてコアドリルによる穿孔を行うことは、熟練した技能が要求され、この点でも改善すべき課題がある。 Moreover, since the temporary lid is usually made of iron, there is a problem that the drill blade is damaged when the core drill that has entered from the surface of the pavement layer contacts the temporary lid. For this reason, drilling with a core drill toward a temporary lid that cannot be seen from the surface of the pavement layer requires skilled skills, and there is also a problem to be improved in this respect.

例えば、上述の切削オーバーレイ舗装工事について図面に基づき説明すると、図8(A)に示すように、舗装工事前の道路は、路盤1に筒状のマンホール2を埋設しており、該マンホール2の上に支持手段3を介して蓋受枠4を設置し、該蓋受枠4に開閉蓋5を搭載している。路盤1には既存の舗装6が施されており、前記支持手段3及び蓋受枠4を舗装6に埋入している。尚、図示省略しているが、通常、舗装6は、基層及び表層のような複数層により形成されている。 For example, the above-described cutting overlay pavement work will be described with reference to the drawings. As shown in FIG. 8A, the road before the pavement work has a cylindrical manhole 2 embedded in the roadbed 1, and the manhole 2 A lid receiving frame 4 is installed on the support means 3 on the upper side, and an opening / closing lid 5 is mounted on the lid receiving frame 4. The roadbed 1 is provided with an existing pavement 6, and the support means 3 and the lid receiving frame 4 are embedded in the pavement 6. Although not shown, the pavement 6 is usually formed of a plurality of layers such as a base layer and a surface layer.

先ず、路面からマンホール2の周囲の舗装6を切断し、切断された舗装部分と蓋受枠4が除去され(既存物除去工程)、図8(B)に示すように、マンホール6の上方に凹部7が形成される。 First, the pavement 6 around the manhole 2 is cut from the road surface, and the cut pavement portion and the cover receiving frame 4 are removed (existing object removing step). As shown in FIG. 7 is formed.

次いで、図8(C)に示すように、マンホール2の開口を仮蓋8により閉塞し(仮蓋設置工程)、該仮蓋8の上方を仮舗装する(仮舗装工程)。この際、仮舗装9は、既存の舗装6と同一レベルとなるように前記凹部7に充填される。その後、切削機で既存の舗装6の表層と前記仮舗装9の表面が所定厚さTに相当して切削され(切削工程)、前記切削面の上にオーバーレイ10が舗装される(オーバーレイ工程)。この状態で、道路は、一時的に交通開放が可能である。 Next, as shown in FIG. 8C, the opening of the manhole 2 is closed with the temporary lid 8 (temporary lid installation step), and the upper portion of the temporary lid 8 is temporarily paved (temporary paving step). At this time, the temporary pavement 9 is filled in the concave portion 7 so as to be at the same level as the existing pavement 6. Thereafter, the surface layer of the existing pavement 6 and the surface of the temporary pavement 9 are cut by a cutting machine corresponding to a predetermined thickness T (cutting process), and the overlay 10 is paved on the cutting surface (overlay process). . In this state, the road can be temporarily opened for traffic.

マンホールを復旧するため、前記仮蓋8には、中心支持孔8aが設けられている。そこで、図8(D)に示すように、コアドリル11により、舗装表面から前記仮蓋3の上の舗装層(仮舗装9)に前記中心支持孔8aに至る通孔12が形成される(通孔形成工程)。 In order to restore the manhole, the temporary lid 8 is provided with a center support hole 8a. Therefore, as shown in FIG. 8D, the core drill 11 forms a through hole 12 from the pavement surface to the central support hole 8a in the pavement layer (temporary pavement 9) on the temporary lid 3 (through). Hole formation step).

その後、図8(E)に示すように、舗装表面から切断機でマンホール周囲の前記舗装層を円形に切断し(切断工程)、切断された切断舗装部と仮蓋8が撤去される(撤去工程)。撤去のためには、種々の装置を使用することが可能であるが、少なくとも前記通孔12を介して前記中心支持孔8aにリフト装置(図例の場合、リフトアップバー13)を連結し、仮蓋8が引き上げられる。 Thereafter, as shown in FIG. 8 (E), the pavement layer around the manhole is cut into a circular shape from the pavement surface with a cutting machine (cutting process), and the cut pavement portion and the temporary lid 8 cut are removed (removal). Process). For removal, various devices can be used, but a lift device (in the example shown, lift-up bar 13) is connected to the center support hole 8a through at least the through hole 12. The temporary lid 8 is pulled up.

最後に、図8(F)に示すように、マンホール2の上に高さ調整可能な支持手段14を介して蓋受枠4を舗装表面と合致するように設置し(蓋受枠設置工程)、該蓋受枠4の周囲に舗装補修材15を充填することにより周囲の舗装と一体化し(充填工程)、該蓋受枠4に開閉蓋5を搭載することにより工事を完了し、交通開放される。尚、支持手段14の具体的構成は、図例の他、種々のものが存在する。 Finally, as shown in FIG. 8 (F), the lid receiving frame 4 is installed on the manhole 2 so as to coincide with the pavement surface via the support means 14 whose height can be adjusted (lid receiving frame installation process). By filling the pavement repair material 15 around the lid receiving frame 4, the pavement repair material 15 is integrated with the surrounding pavement (filling process). By installing the opening / closing lid 5 on the lid receiving frame 4, the construction is completed and the traffic is released. There are various specific configurations of the support means 14 in addition to the illustrated examples.

上述のように、仮蓋8の撤去を可能にする通孔12は、コアドリル11を使用することにより、舗装層の表面から該舗装層の下方に埋入された仮蓋8の中心支持孔8aに向けて、該舗装層を穿孔することにより形成している。この際、仮蓋8は、鉄製のため、コアドリル11が仮蓋8に接触すると、ドリル刃を破損する問題がある。このため、作業に熟練した技能が求められる。また、アスファルト等から成る分厚い舗装層を手持ち式の電動コアドリル11で穿孔する作業は、労力を伴い、労働条件の点において問題がある。 As described above, the through hole 12 that allows the temporary lid 8 to be removed is formed by using the core drill 11 so that the central support hole 8a of the temporary lid 8 embedded in the lower side of the pavement layer from the surface of the pavement layer. The pavement layer is formed by drilling toward the surface. At this time, since the temporary lid 8 is made of iron, there is a problem that the drill blade is damaged when the core drill 11 comes into contact with the temporary lid 8. For this reason, skills skilled in work are required. Further, the work of drilling a thick pavement layer made of asphalt or the like with the hand-held electric core drill 11 involves labor and has a problem in terms of working conditions.

本発明は、上記の仮蓋撤去に関して、コアドリルの使用が不要であり、手持ちの治具等により簡単容易に通孔を形成することができるようにした方法及び装置を提供することを課題とする。 It is an object of the present invention to provide a method and an apparatus that do not require the use of a core drill and can easily and easily form a through hole with a hand-held jig or the like for removing the temporary lid. .

そこで、本発明の方法が手段として構成したところは、上述のような新設舗装工事、打換舗装工事、切削オーバーレイ舗装工事において、前記仮蓋設置工程は、前記舗装工程又は仮舗装工程で形成される舗装又は仮舗装の表面近傍に至る高さを有する柱状体を前記仮蓋の中心支持孔の上に立設する通孔準備工程を含み、前記通孔形成工程は、前記舗装工程又は仮舗装工程により前記舗装層に埋入された状態の柱状体を舗装表面から崩壊又は引抜くことにより通孔を形成する点にある。 Therefore, when the method of the present invention is configured as a means, in the new pavement construction, replacement pavement construction, cutting overlay pavement construction as described above, the temporary lid installation step is formed by the pavement step or the temporary pavement step. Including a through hole preparation step of standing a columnar body having a height reaching the vicinity of the surface of the paving or temporary paving on the center support hole of the temporary lid, wherein the through hole forming step includes the paving step or the temporary paving. It is in the point which forms a through-hole by collapsing or pulling out the columnar body of the state embedded in the said pavement layer by the process from the pavement surface.

切削オーバーレイ舗装工事に関する実施形態において、前記柱状体は、前記切削機で切削可能な素材により形成され、前記仮蓋に立設したとき、該柱状体の上端を前記仮舗装工程で形成される仮舗装の表面から深さDだけ離間させた状態で設置される。 In the embodiment related to the cutting overlay pavement construction, the columnar body is formed of a material that can be cut by the cutting machine, and when standing on the temporary lid, the upper end of the columnar body is formed in the temporary paving step. It is installed in a state separated from the surface of the pavement by a depth D.

そして、本発明の装置が第1の手段として構成したところは、前記舗装工事における仮蓋の撤去方法に使用される装置であり、前記柱状体は、仮蓋の上に中心支持孔を囲んで立設される耐熱保形性及び耐圧保形性を有する筒体と、該筒体に充填される崩壊自在な充填材から成り、前記通孔形成工程において、舗装表面を崩壊することにより前記筒体の上端を露出させると共に、該筒体の上端開口から前記充填材を掻き取ることにより、該筒体の内部空間を介して前記通孔を形成するように構成されて成る点にある。 And the place which the apparatus of this invention comprised as a 1st means is an apparatus used for the removal method of the temporary cover in the said pavement construction, The said columnar body surrounds a center support hole on a temporary cover. The cylinder has a heat-resistant and pressure-resistant shape that is erected, and a collapsible filler that is filled in the cylinder, and the cylinder is formed by collapsing the pavement surface in the through hole forming step. The upper end of the body is exposed and the through hole is formed through the internal space of the cylinder by scraping the filler from the upper end opening of the cylinder.

この際、前記筒体は、紙管により構成され、前記充填材は、発泡樹脂により構成されていることが好ましい。 At this time, it is preferable that the cylindrical body is made of a paper tube and the filler is made of a foamed resin.

また、本発明の装置が第2の手段として構成したところは、前記舗装工事における仮蓋の撤去方法に使用される装置であり、前記柱状体は、仮蓋の上に中心支持孔を囲んで立設される耐熱保形性及び耐圧保形性を有する筒体と、該筒体の上部開口を閉塞する除去自在なキャップ部材から成り、前記通孔形成工程において、舗装表面を崩壊することにより前記キャップを露出させると共に、該キャップを除去することにより、該筒体の内部空間を介して前記通孔を形成するように構成されて成る点にある。 Further, the apparatus of the present invention is configured as a second means for use in a method for removing the temporary lid in the paving work, and the columnar body surrounds a central support hole on the temporary lid. It consists of a cylindrical body having heat-resistant shape and pressure-resistant shape that is erected and a removable cap member that closes the upper opening of the cylindrical body, and in the through hole forming step, by collapsing the pavement surface The cap is exposed, and the cap is removed to form the through hole through the internal space of the cylinder.

更に、本発明の装置が第3の手段として構成したところは、前記舗装工事における仮蓋の撤去方法に使用される装置であり、前記柱状体は、耐熱保形性及び耐圧保形性を有する円柱部材から成り、前記通孔形成工程において、舗装表面を崩壊することにより前記円柱部材の上端部を露出させると共に、該円柱部材を引抜くことにより前記通孔を形成するように構成されて成る点にある。 Furthermore, the apparatus of the present invention is configured as a third means, which is an apparatus used for a method for removing a temporary lid in the paving work, and the columnar body has a heat-resistant shape retention property and a pressure-resistant shape retention property. It comprises a cylindrical member, and in the through hole forming step, the upper end of the cylindrical member is exposed by collapsing the pavement surface, and the through hole is formed by pulling out the cylindrical member. In the point.

本発明によれば、予め仮蓋設置工程において仮蓋23の中心支持孔23aの上に柱状体24を立設する構成であるから、その後、舗装工程により形成される舗装25(新設舗装工事及び打換細工事の場合)又は仮舗装工程により形成される仮舗装35(切削オーバーレイ舗装工事の場合)には、該舗装25又は仮舗装35の表層近傍から中心支持孔23aに至り前記柱状体24が埋入された状態となる。 According to the present invention, since the columnar body 24 is erected on the central support hole 23a of the temporary lid 23 in advance in the temporary lid installation process, the pavement 25 (new paving work and In the case of sublimation work) or in the case of temporary pavement 35 formed by a temporary pavement process (in the case of cutting overlay pavement work), the columnar body 24 reaches the center support hole 23a from the surface layer of the pavement 25 or temporary pavement 35. Will be buried.

従って、通孔形成工程において、従来のようにコアドリルを使用することは必要でなく、簡易な治具により、前記舗装25又は仮舗装35の舗装表面を崩壊することにより柱状体24の上端部を露出させ、該舗装表面から該柱状体24を崩壊又は引抜くことにより、簡単容易に通孔26を形成することができるという優れた効果がある。 Therefore, in the through hole forming step, it is not necessary to use a core drill as in the prior art, and the upper end portion of the columnar body 24 is formed by collapsing the pavement surface of the pavement 25 or the temporary pavement 35 with a simple jig. By exposing and collapsing or pulling out the columnar body 24 from the pavement surface, there is an excellent effect that the through hole 26 can be easily formed.

新設舗装工事に実施される本発明方法の1実施形態を工程順に示す断面図である。It is sectional drawing which shows one Embodiment of this invention method implemented to new paving construction in order of a process. 打換舗装工事に実施される本発明方法の1実施形態を工程順に示す断面図である。It is sectional drawing which shows one Embodiment of the method of this invention implemented in the replacement | paving pavement work order. 切削オーバーレイ舗装工事に実施される本発明方法の1実施形態を工程順に示す断面図である。It is sectional drawing which shows one Embodiment of the method of this invention implemented to cutting overlay pavement work order. 本発明装置の第1実施形態を示しており、(A)は柱状体の斜視図、(B)は仮蓋設置工程を示す断面図、(C)は舗装工程を示す断面図、(D)は通孔形成工程を示す断面図である。1 shows a first embodiment of the device of the present invention, (A) is a perspective view of a columnar body, (B) is a cross-sectional view showing a temporary lid installation process, (C) is a cross-sectional view showing a paving process, (D) These are sectional drawings which show a through-hole formation process. 本発明装置の第2実施形態を示しており、(A)は柱状体の斜視図、(B)は仮蓋設置工程を示す断面図、(C)は舗装工程を示す断面図、(D)は通孔形成工程を示す断面図である。The 2nd Embodiment of this invention apparatus is shown, (A) is a perspective view of a columnar body, (B) is sectional drawing which shows a temporary lid installation process, (C) is sectional drawing which shows a paving process, (D) These are sectional drawings which show a through-hole formation process. 本発明装置の第3実施形態を示しており、(A)は柱状体の斜視図、(B)は仮蓋設置工程を示す断面図、(C)は舗装工程を示す断面図、(D)は通孔形成工程を示す断面図である。3A and 3B show a third embodiment of the device of the present invention, in which (A) is a perspective view of a columnar body, (B) is a sectional view showing a temporary lid installation step, (C) is a sectional view showing a pavement step, and (D). These are sectional drawings which show a through-hole formation process. 本発明装置の第4実施形態を示しており、(A)は柱状体の斜視図、(B)は仮蓋設置工程を示す断面図、(C)は舗装工程を示す断面図、(D)は通孔形成工程を示す断面図である。4 shows a fourth embodiment of the device of the present invention, (A) is a perspective view of a columnar body, (B) is a sectional view showing a temporary lid installation step, (C) is a sectional view showing a paving step, (D). These are sectional drawings which show a through-hole formation process. 従来技術に関する切削オーバーレイ舗装工事を工程順に示す断面図である。It is sectional drawing which shows the cutting overlay pavement construction regarding a prior art in order of a process.

以下図面に基づいて本発明の好ましい実施形態を詳述する。 Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the drawings.

<新設舗装工事>
図1は、本発明装置を使用することにより本発明方法を実施する新設舗装工事を工程順に示している。
<New paving work>
FIG. 1 shows a new pavement construction in which the method of the present invention is implemented by using the device of the present invention in the order of steps.

(舗装工事前)
図1(A)に示すように、舗装工事前の道路は、路盤21に筒状のマンホール22を埋設しており、該マンホール22の上部を開口している。
(Before paving work)
As shown in FIG. 1A, a road before pavement has a tubular manhole 22 embedded in a roadbed 21 and an upper portion of the manhole 22 is opened.

(仮蓋設置工程)
図1(B)に示すように、前記マンホール22の開口は、鉄製その他の金属製の仮蓋23により閉塞される(仮蓋設置工程)。仮蓋23は、後に撤去するために使用する中心支持孔23aを設けている。
(Temporary lid installation process)
As shown in FIG. 1B, the opening of the manhole 22 is closed by a temporary lid 23 made of metal or other metal (temporary lid installation step). The temporary lid 23 is provided with a central support hole 23a used for later removal.

(通孔準備工程)
前記仮蓋設置工程は、後に通孔を形成するために、後述する舗装工程で形成される舗装25(図1(C)参照)の表面近傍に至る高さを有する柱状体24を前記仮蓋23の中心支持孔23aの上に立設する通孔準備工程を含んでいる。柱状体24の具体的構成については後述する。
(Through hole preparation process)
In the temporary lid installation step, the columnar body 24 having a height reaching the vicinity of the surface of the pavement 25 (see FIG. 1C) formed in the pavement step, which will be described later, is formed in order to form a through hole later. 23, a through hole preparation step of standing on the center support hole 23a. A specific configuration of the columnar body 24 will be described later.

(舗装工程)
図1(C)に示すように、路盤21の上には、前記仮蓋23の上方を含んで路面が舗装される(舗装工程)。アスファルト等により成層された舗装25は、通常、基層及び表層のような複数層により形成され、前記仮蓋23と共に柱状体24を埋入する。この状態で、舗装道路は、一時的に交通開放が可能であり、柱状体24は、舗装表面から突出しないように埋入されていることが好ましい。
(Pavement process)
As shown in FIG. 1C, a road surface is paved on the roadbed 21 including the upper portion of the temporary lid 23 (paving step). The pavement 25 stratified by asphalt or the like is usually formed by a plurality of layers such as a base layer and a surface layer, and the columnar body 24 is embedded together with the temporary lid 23. In this state, the paved road can be temporarily opened to traffic, and the columnar body 24 is preferably embedded so as not to protrude from the paved surface.

(通孔形成工程)
図1(D)に示すように、前記仮蓋23を撤去するため、舗装表面から仮蓋23の中心支持孔23aに至る通孔26が形成される(通孔形成工程)。通孔26は、舗装25に埋入された状態の柱状体24を舗装表面から崩壊又は引抜くことにより、簡単容易に形成される。従って、コアドリルは、使用しない。
(Through hole formation process)
As shown in FIG. 1 (D), in order to remove the temporary lid 23, a through hole 26 extending from the pavement surface to the center support hole 23a of the temporary lid 23 is formed (through hole forming step). The through hole 26 is easily and easily formed by collapsing or extracting the columnar body 24 embedded in the pavement 25 from the pavement surface. Therefore, a core drill is not used.

(切断工程及び撤去工程)
舗装表面から切断機でマンホール周囲の前記舗装層25を円形に切断し(切断工程)、その後、図1(E)に示すように、少なくとも前記通孔26を介して前記中心支持孔23aにリフト装置27を連結することにより、前記切断された切断舗装部Pと仮蓋23を撤去する(撤去工程)。撤去は、種々の装置を使用することが可能であるが、少なくとも前記通孔26を介して前記中心支持孔23aにリフト装置27(図例の場合、リフトアップバー)を連結し、仮蓋23を引き上げることにより行われる。
(Cutting process and removal process)
The pavement layer 25 around the manhole is cut into a circular shape from the pavement surface with a cutting machine (cutting step), and then lifted to the center support hole 23a through at least the through hole 26 as shown in FIG. By connecting the device 27, the cut pavement portion P and the temporary lid 23 that have been cut are removed (removal step). Although various devices can be used for removal, a lift device 27 (a lift-up bar in the illustrated example) is connected to the center support hole 23a through at least the through hole 26, and the temporary lid 23 is connected. It is done by pulling up.

(蓋受枠設置工程及び充填工程)
最後に、図1(F)に示すように、マンホール2の2上に高さ調整可能な支持手段28を介して蓋受枠29を舗装表面と合致するように設置し(蓋受枠設置工程)、該蓋受枠29の周囲に舗装補修材30を充填して周囲の舗装と一体化し(充填工程)、該蓋受枠29に開閉蓋31を搭載することにより工事を完了し、交通開放される。尚、支持手段14の構成は、本発明の目的でないので、図面に詳細を省略しているが、種々の構成が採用可能であることを諒解されたい。
(Cover receiving frame installation process and filling process)
Finally, as shown in FIG. 1 (F), the lid receiving frame 29 is installed on the manhole 2 through the support means 28 capable of adjusting the height so as to coincide with the pavement surface (lid receiving frame installation step). A pavement repair material 30 is filled around the lid receiving frame 29 and integrated with the surrounding pavement (filling process). By installing an open / close lid 31 on the lid receiving frame 29, the construction is completed and traffic is released. Since the configuration of the support means 14 is not the object of the present invention, details are omitted in the drawings, but it should be understood that various configurations can be adopted.

<打換舗装工事>
図2は、本発明装置を使用することにより本発明方法を実施する打換舗装工事を工程順に示している。
<Conversion pavement construction>
FIG. 2 shows the replacement pavement work in which the method of the present invention is implemented by using the device of the present invention in the order of steps.

(舗装工事前)
図2(A)に示すように、舗装工事前の道路は、路盤21に筒状のマンホール22を埋設しており、該マンホール22の上に支持手段32を介して蓋受枠29を設置し、該蓋受枠29に開閉蓋31を搭載している。路盤21には既存の舗装33が施されており、前記支持手段32及び蓋受枠29を舗装33に埋入している。
(Before paving work)
As shown in FIG. 2 (A), the road before the paving work has a tubular manhole 22 embedded in the roadbed 21, and a lid receiving frame 29 is installed on the manhole 22 via a support means 32. An opening / closing lid 31 is mounted on the lid receiving frame 29. The roadbed 21 is provided with an existing pavement 33, and the support means 32 and the lid receiving frame 29 are embedded in the pavement 33.

(既存物除去工程)
打換舗装のため、前記マンホール22を残して、路盤21が露出するように、既存の舗装33が除去され、支持手段32を含んで蓋受枠29が除去される(既存物除去工程)。
(Existing material removal process)
For the replacement pavement, the existing pavement 33 is removed so that the roadbed 21 is exposed, leaving the manhole 22, and the cover receiving frame 29 including the support means 32 is removed (existing matter removal step).

(仮蓋設置工程)
図2(B)に示すように、前記マンホール22の開口は、鉄製その他の金属製の仮蓋23により閉塞される(仮蓋設置工程)。仮蓋23は、後に撤去するために使用する中心支持孔23aを設けている。
(Temporary lid installation process)
As shown in FIG. 2B, the opening of the manhole 22 is closed by a temporary lid 23 made of iron or other metal (temporary lid installation step). The temporary lid 23 is provided with a central support hole 23a used for later removal.

(通孔準備工程)
前記仮蓋設置工程は、後に通孔を形成するために、後述する舗装工程で形成される舗装25(図2(C)参照)の表面近傍に至る高さを有する柱状体24を前記仮蓋23の中心支持孔23aの上に立設する通孔準備工程を含んでいる。柱状体24の具体的構成については後述する。
(Through hole preparation process)
In the temporary lid installation step, the columnar body 24 having a height reaching the vicinity of the surface of the pavement 25 (see FIG. 2C) formed in the pavement step, which will be described later, is formed in order to form a through hole later. 23, a through hole preparation step of standing on the center support hole 23a. A specific configuration of the columnar body 24 will be described later.

(舗装工程)
図2(C)に示すように、路盤21の上には、前記仮蓋23の上方を含んで路面が舗装される(舗装工程)。アスファルト等により成層された舗装25は、通常、基層及び表層のような複数層により形成され、前記仮蓋23と共に柱状体24を埋入する。この状態で、舗装道路は、一時的に交通開放が可能であり、その際、柱状体24は、舗装表面から突出しないように埋入されていることが好ましい。
(Pavement process)
As shown in FIG. 2C, a road surface is paved on the roadbed 21 including the upper portion of the temporary lid 23 (paving step). The pavement 25 stratified by asphalt or the like is usually formed by a plurality of layers such as a base layer and a surface layer, and the columnar body 24 is embedded together with the temporary lid 23. In this state, the paved road can be temporarily opened, and the columnar body 24 is preferably embedded so as not to protrude from the paved surface.

(通孔形成工程)
図2(D)に示すように、前記仮蓋23を撤去するため、舗装表面から仮蓋23の中心支持孔23aに至る通孔26が形成される(通孔形成工程)。通孔26は、舗装25に埋入された状態の柱状体24を舗装表面から崩壊又は引抜くことにより、簡単容易に形成される。従って、コアドリルは、使用しない。
(Through hole formation process)
As shown in FIG. 2 (D), in order to remove the temporary lid 23, a through hole 26 extending from the pavement surface to the center support hole 23a of the temporary lid 23 is formed (through hole forming step). The through hole 26 is easily and easily formed by collapsing or extracting the columnar body 24 embedded in the pavement 25 from the pavement surface. Therefore, a core drill is not used.

(切断工程及び撤去工程)
舗装表面から切断機でマンホール周囲の前記舗装層25を円形に切断し(切断工程)、その後、図2(E)に示すように、少なくとも前記通孔26を介して前記中心支持孔23aにリフト装置27を連結することにより、前記切断された切断舗装部Pと仮蓋23を撤去する(撤去工程)。撤去は、種々の装置を使用することが可能であるが、少なくとも前記通孔26を介して前記中心支持孔23aにリフト装置27(図例の場合、リフトアップバー)を連結し、仮蓋23を引き上げることにより行われる。
(Cutting process and removal process)
The pavement layer 25 around the manhole is circularly cut from the pavement surface with a cutting machine (cutting step), and then lifted to the center support hole 23a through at least the through hole 26 as shown in FIG. By connecting the device 27, the cut pavement portion P and the temporary lid 23 that have been cut are removed (removal step). Although various devices can be used for removal, a lift device 27 (a lift-up bar in the illustrated example) is connected to the center support hole 23a through at least the through hole 26, and the temporary lid 23 is connected. It is done by pulling up.

(蓋受枠設置工程及び充填工程)
最後に、図2(F)に示すように、マンホール22の上に高さ調整可能な支持手段28を介して蓋受枠29を舗装表面と合致するように設置し(蓋受枠設置工程)、該蓋受枠29の周囲に舗装補修材30を充填して周囲の舗装と一体化し(充填工程)、該蓋受枠29に開閉蓋31を搭載することにより工事を完了し、交通開放される。蓋受枠29及び開閉蓋31は、図2(A)に示す既存物を撤去後に再利用することが好ましいが、新たなものを使用しても良い。尚、支持手段14の構成は、本発明の目的でないので、図面に詳細を省略しているが、種々の構成が採用可能であることを諒解されたい。
(Cover receiving frame installation process and filling process)
Finally, as shown in FIG. 2 (F), the lid receiving frame 29 is installed on the manhole 22 through the support means 28 capable of adjusting the height so as to coincide with the pavement surface (lid receiving frame installing step). The pavement repair material 30 is filled around the lid receiving frame 29 and integrated with the surrounding pavement (filling process). By installing the opening / closing lid 31 on the lid receiving frame 29, the construction is completed and traffic is released. The lid receiving frame 29 and the opening / closing lid 31 are preferably reused after the existing one shown in FIG. 2A is removed, but new ones may be used. Since the configuration of the support means 14 is not the object of the present invention, details are omitted in the drawings, but it should be understood that various configurations can be adopted.

<切削オーバーレイ舗装工事>
図3は、本発明装置を使用することにより本発明方法を実施する切削オーバーレイ舗装工事を工程順に示している。
<Cutting overlay pavement>
FIG. 3 shows the cutting overlay pavement construction in which the method of the present invention is implemented by using the device of the present invention in the order of steps.

(舗装工事前)
図3(A)に示すように、舗装工事前の道路は、路盤21に筒状のマンホール22を埋設しており、該マンホール22の上に支持手段32を介して蓋受枠29を設置し、該蓋受枠29に開閉蓋31を搭載している。路盤21には既存の舗装33が施されており、前記支持手段32及び蓋受枠29を舗装33に埋入している。
(Before paving work)
As shown in FIG. 3 (A), the road before the paving work has a cylindrical manhole 22 embedded in the roadbed 21, and a lid receiving frame 29 is installed on the manhole 22 via a support means 32. An opening / closing lid 31 is mounted on the lid receiving frame 29. The roadbed 21 is provided with an existing pavement 33, and the support means 32 and the lid receiving frame 29 are embedded in the pavement 33.

(既存物除去工程)
路面からマンホール22の周囲の舗装33を切断し、切断された舗装部分と、支持手段32を含んで蓋受枠29が除去される(既存物除去工程)。従って、マンホール22の上方に、図3(B)に示すような凹部34が形成される。
(Existing material removal process)
The pavement 33 around the manhole 22 is cut from the road surface, and the lid receiving frame 29 is removed including the cut pavement portion and the support means 32 (existing material removing step). Therefore, a recess 34 as shown in FIG. 3B is formed above the manhole 22.

(仮蓋設置工程)
図3(B)に示すように、前記マンホール22の開口は、鉄製その他の金属製の仮蓋23により閉塞される(仮蓋設置工程)。仮蓋23は、後に撤去するために使用する中心支持孔23aを設けている。
(Temporary lid installation process)
As shown in FIG. 3B, the opening of the manhole 22 is closed by a temporary lid 23 made of metal or other metal (temporary lid installation step). The temporary lid 23 is provided with a central support hole 23a used for later removal.

(通孔準備工程)
前記仮蓋設置工程は、後に通孔を形成するために、後述する仮舗装工程で形成される仮舗装35(図3(C)参照)の表面近傍に至る高さを有する柱状体24を前記仮蓋23の中心支持孔23aの上に立設する通孔準備工程を含んでいる。柱状体24の具体的構成については後述する。
(Through hole preparation process)
In the temporary lid installation step, the columnar body 24 having a height that reaches the vicinity of the surface of the temporary pavement 35 (see FIG. 3C) formed in the temporary pavement step described later is formed in order to form a through hole later. It includes a through hole preparation step of standing on the center support hole 23a of the temporary lid 23. A specific configuration of the columnar body 24 will be described later.

(仮舗装工程)
図3(C)に示すように、仮蓋23の上方が仮舗装される(仮舗装工程)。仮舗装35は、既存の舗装33と同一レベルとなるように前記凹部34に充填される。その際、柱状体24は、仮舗装35の表面から突出しないように埋入されていることが好ましい。
(Temporary paving process)
As shown in FIG. 3C, the upper side of the temporary lid 23 is temporarily paved (temporary paving process). The temporary pavement 35 is filled in the concave portion 34 so as to be at the same level as the existing pavement 33. At that time, the columnar body 24 is preferably embedded so as not to protrude from the surface of the temporary pavement 35.

(切削工程及びオーバーレイ工程)
その後、切削機で既存の舗装33の表層と前記仮舗装35の表面が所定厚さTに相当して切削され(切削工程)、前記切削面の上にオーバーレイ36が舗装される(オーバーレイ工程)。従って、道路は、一時的に交通開放が可能である。尚、前記切削の所定厚さTは、通常50mm程度とされ、その上に舗装されるオーバーレイ36の表面は、既設のGL(グラウンドレベル)よりも若干高くされる場合と、同一高さとされる場合と、若干低くされる場合との3つの態様がある。
(Cutting process and overlay process)
Thereafter, the surface layer of the existing pavement 33 and the surface of the temporary pavement 35 are cut by a cutting machine corresponding to a predetermined thickness T (cutting process), and the overlay 36 is paved on the cutting surface (overlay process). . Therefore, the road can be temporarily opened for traffic. The predetermined thickness T of the cutting is usually about 50 mm, and the surface of the overlay 36 paved thereon is set to be slightly higher than the existing GL (ground level) or the same height. There are three modes: slightly lowered.

(通孔形成工程)
図3(D)に示すように、前記仮蓋23を撤去するため、舗装表面から仮蓋23の中心支持孔23aに至る通孔26が形成される(通孔形成工程)。通孔26は、仮舗装35及びオーバーレイ36に埋入された状態の柱状体24を舗装表面から崩壊又は引抜くことにより、簡単容易に形成される。従って、コアドリルは、使用しない。
(Through hole formation process)
As shown in FIG. 3D, in order to remove the temporary lid 23, a through hole 26 is formed from the pavement surface to the central support hole 23a of the temporary lid 23 (through hole forming step). The through-hole 26 is easily and easily formed by collapsing or pulling out the columnar body 24 embedded in the temporary pavement 35 and the overlay 36 from the pavement surface. Therefore, a core drill is not used.

(切断工程及び撤去工程)
舗装表面から切断機でマンホール周囲の前記舗装層を円形に切断し(切断工程)、その後、図3(E)に示すように、少なくとも前記通孔26を介して前記中心支持孔23aにリフト装置27を連結することにより、前記切断された切断舗装部Pと仮蓋23を撤去する(撤去工程)。撤去は、種々の装置を使用することが可能であるが、少なくとも前記通孔26を介して前記中心支持孔23aにリフト装置27(図例の場合、リフトアップバー)を連結し、仮蓋23を引き上げることにより行われる。
(Cutting process and removal process)
The pavement layer around the manhole is cut into a circular shape from the pavement surface with a cutting machine (cutting step), and then, as shown in FIG. By connecting 27, the cut pavement part P and the temporary lid 23 that have been cut are removed (removal step). Although various devices can be used for removal, a lift device 27 (a lift-up bar in the illustrated example) is connected to the center support hole 23a through at least the through hole 26, and the temporary lid 23 is connected. It is done by pulling up.

(蓋受枠設置工程及び充填工程)
最後に、図3(F)に示すように、マンホール22の上に高さ調整可能な支持手段28を介して蓋受枠29を舗装表面と合致するように設置し(蓋受枠設置工程)、該蓋受枠29の周囲に舗装補修材30を充填して周囲の舗装と一体化し(充填工程)、該蓋受枠29に開閉蓋31を搭載することにより工事を完了し、交通開放される。蓋受枠29及び開閉蓋31は、図3(A)に示す既存物を撤去後に再利用することが好ましいが、新たなものを使用しても良い。尚、支持手段14の構成は、本発明の目的でないので、図面に詳細を省略しているが、種々の構成が採用可能であることを諒解されたい。
(Cover receiving frame installation process and filling process)
Finally, as shown in FIG. 3 (F), the lid receiving frame 29 is installed on the manhole 22 through the support means 28 capable of adjusting the height so as to coincide with the pavement surface (lid receiving frame installing step). The pavement repair material 30 is filled around the lid receiving frame 29 and integrated with the surrounding pavement (filling process). By installing the opening / closing lid 31 on the lid receiving frame 29, the construction is completed and traffic is released. The lid receiving frame 29 and the opening / closing lid 31 are preferably reused after the existing one shown in FIG. 3A is removed, but new ones may be used. Since the configuration of the support means 14 is not the object of the present invention, details are omitted in the drawings, but it should be understood that various configurations can be adopted.

<装置の実施形態>
以下、前記柱状体24の実施形態に関して、図4に示す第1実施形態と、図5に示す第2実施形態と、図6に示す第3実施形態と、図7に示す第4実施形態をそれぞれ説明する。
<Embodiment of Apparatus>
Hereinafter, regarding the embodiment of the columnar body 24, the first embodiment shown in FIG. 4, the second embodiment shown in FIG. 5, the third embodiment shown in FIG. 6, and the fourth embodiment shown in FIG. Each will be explained.

図4ないし図7は、柱状体24の各実施形態に関して、切削オーバーレイ工事を例示しているが、柱状体24は、同様に、新設舗装工事及び打換舗装工事にも利用可能であることを理解されたい。 4 to 7 exemplify the cutting overlay work for each embodiment of the columnar body 24, the columnar body 24 can be similarly used for a new paving work and a replacement paving work. I want you to understand.

<第1実施形態>
図4に示す第1実施形態において、柱状体24は、耐熱保形性及び耐圧保形性と切削容易性を有する筒体37と、該筒体37に充填される崩壊自在な充填材38により構成されている。
<First Embodiment>
In the first embodiment shown in FIG. 4, the columnar body 24 is composed of a cylindrical body 37 having heat-resistant shape retention, pressure-resistant shape retention, and ease of cutting, and a collapsible filler 38 filled in the cylindrical body 37. It is configured.

この際、前記の「耐熱保形性」とは、高温のアスファルト合材により仮舗装35及びオーバーレイ36(新設舗装工事及び打換舗装工事の場合は舗装25)が実施されるとき、例えば、塩ビ管等のように容易に熱変形するものではないという意味であり、熱に耐え保形性を持続する材質の特性を意味している。 In this case, the above-mentioned “heat-resistant shape retention” means that when the temporary pavement 35 and the overlay 36 (pavement 25 in the case of new pavement work and replacement pavement work) are carried out with a high-temperature asphalt mixture, for example, PVC This means that it is not easily heat-deformed like a tube or the like, and it means the characteristics of a material that can withstand heat and maintain its shape retention.

また、前記の「耐圧保形性」とは、仮舗装35及びオーバーレイ36(新設舗装工事及び打換舗装工事の場合は舗装25)の上から転圧が実施されるとき、容易に座屈変形するものではないという意味であり、圧力に耐え保形性を持続する材質の特性を意味している。 In addition, the above-mentioned “pressure-retaining shape” means that buckling deformation easily occurs when rolling is performed on the temporary pavement 35 and the overlay 36 (pavement 25 in the case of new pavement work and replacement pavement work). This means that the material has characteristics that can withstand pressure and maintain shape retention.

また、前記の「切削容易性」とは、切削機により仮舗装35の表面が切削される際、もしも、筒体37の上端が切削機の切削刃に接触する場合でも、該切削機により筒体37が埋入状態から引抜かれることはないという意味であり、埋入状態を保持しつつ切削機により切削される材質の特性を意味している。 The “cutability” means that when the surface of the temporary pavement 35 is cut by the cutting machine, even if the upper end of the cylinder 37 is in contact with the cutting blade of the cutting machine, the cutting machine uses the cylinder. This means that the body 37 is not pulled out from the embedded state, and means the characteristics of the material cut by the cutting machine while maintaining the embedded state.

更に、前記の「崩壊自在」とは、金属製の治具(例えば、バールの先端等)により、容易に崩壊し、掻き取ることができる材質の特性を意味している。 Furthermore, the above-mentioned “collapseable” means the property of a material that can be easily collapsed and scraped off by a metal jig (for example, the tip of a bar).

前記の耐熱保形性及び耐圧保形性と切削容易性の条件に適合させるため、筒体37は、紙管37aにより形成されている。 In order to meet the above-mentioned conditions of heat-resistant shape retention, pressure-resistant shape retention, and ease of cutting, the cylindrical body 37 is formed of a paper tube 37a.

従って、図4(A)に示すように、紙管37aを切断することにより、所定長さLの筒体37が形成される。この際、前記所定長さLは、図4(B)に示すように、筒体37を仮蓋23の上に立設したとき、該筒体37の上端が舗装25の表面よりも所定深さDの部分に位置する長さとなるように設定されている。 Therefore, as shown in FIG. 4 (A), a cylindrical body 37 having a predetermined length L is formed by cutting the paper tube 37a. At this time, as shown in FIG. 4B, the predetermined length L is such that when the cylindrical body 37 is erected on the temporary lid 23, the upper end of the cylindrical body 37 has a predetermined depth than the surface of the pavement 25. It is set to be a length located at the portion of the length D.

図4(B)に示すように、仮蓋設置工程において、紙管37aから成る筒体37を仮蓋23の中心支持孔23aを囲むようにして立設すると共に、該筒体37の内部に崩壊自在な充填材38を充填することにより、通孔準備工程が実施される。 As shown in FIG. 4B, in the temporary lid installation step, the cylindrical body 37 made of the paper tube 37 a is erected so as to surround the central support hole 23 a of the temporary lid 23 and can be collapsed inside the cylindrical body 37. By filling the filler 38, a through hole preparation step is performed.

充填材38は、発泡樹脂38aにより構成することが好ましく、例えば、建築用断熱材として市販されているスプレー式の発泡ウレタンを使用することが可能であり、ポリジフェニルメタンジイソシアネート系プレンポリマーを主剤とするスプレー缶の場合、噴出の前後及び噴出中に霧吹き等で水を吹きかけながら細い棒で撹拌することにより、膨張しながら好適に発泡する。尚、本発明の充填材38がこのような発泡樹脂38aに限定されないことは勿論であり、要するに、後述のように、電動工具等を使用することなく、治具等により手動で崩壊することにより掻き出すことが可能な材質のものであれば良い。 The filler 38 is preferably composed of a foamed resin 38a. For example, it is possible to use a spray-type foamed urethane that is commercially available as a heat insulating material for buildings, and a polydiphenylmethane diisocyanate-based prepolymer is used as a main agent. In the case of a spray can, foaming is suitably performed while expanding by stirring with a thin rod while spraying water with a spray or the like before and after spraying and during spraying. Of course, the filling material 38 of the present invention is not limited to such a foamed resin 38a. In short, as described later, it is manually disintegrated by a jig or the like without using an electric tool or the like. Any material that can be scraped may be used.

その後、図4(C)に示すように、仮舗装35が行われ(仮舗装工程)、切削機で既存の舗装33の表層と仮舗装35の表面が所定厚さTに相当して切削される(切削工程)。 Thereafter, as shown in FIG. 4C, a temporary pavement 35 is performed (temporary pavement process), and the surface layer of the existing pavement 33 and the surface of the temporary pavement 35 are cut corresponding to a predetermined thickness T by a cutting machine. (Cutting process).

仮舗装に際して、筒体37は、上述のように、耐熱保形系と耐圧保形性を備えているので、筒状の形状を好適に保持する。 At the time of temporary paving, the cylindrical body 37 has a heat-resistant shape retaining system and a pressure-resistant shape retaining property as described above, and thus preferably retains the tubular shape.

切削に際して、筒体37の上端の所定深さDは、図示のように、D>Tとなるように設定されていることが好ましく、これにより、切削機の切削刃が筒体37の上端に接触することはない。しかも、もしも、切削刃が筒体37の上端に接触した場合でも、筒体37は、上述のように、切削容易性を備えているので、切削刃により切削される。つまり、切削刃により筒体37が埋入状態から引抜かれることはなく、埋入状態を保持する。 At the time of cutting, the predetermined depth D of the upper end of the cylindrical body 37 is preferably set to satisfy D> T as shown in the figure, whereby the cutting blade of the cutting machine is placed at the upper end of the cylindrical body 37. There is no contact. Moreover, even when the cutting blade comes into contact with the upper end of the cylindrical body 37, the cylindrical body 37 is cut by the cutting blade because it has the ease of cutting as described above. That is, the cylindrical body 37 is not pulled out of the embedded state by the cutting blade, and the embedded state is maintained.

その後、オーバーレイ36が舗装された後、図4(D)に示すように通孔形成工程が実施される。通孔26を形成する際、作業者は、手持ちの治具(例えばバール等)により、筒体37の上の薄いオーバーレイ36を含む舗装層を破壊しつつ剥離させ、該筒体37の上端を露出させた後、該筒体37の内部の充填材38を崩壊しつつ掻き出せば良い。 Thereafter, after the overlay 36 is paved, a through hole forming step is performed as shown in FIG. When forming the through hole 26, the operator peels the pavement layer including the thin overlay 36 on the cylinder body 37 by using a hand-held jig (for example, bar), and peels the upper end of the cylinder body 37. After the exposure, the filler 38 inside the cylindrical body 37 may be scraped off while being collapsed.

これにより、充填材38が掻き出された筒体37の内部の空洞部により、舗装面から仮蓋23の中心支持孔23aに至る通孔26が形成される。 Thereby, the through-hole 26 from the pavement surface to the center support hole 23a of the temporary lid 23 is formed by the hollow portion inside the cylindrical body 37 from which the filler 38 is scraped.

<第2実施形態>
図5に示す第2実施形態において、柱状体24は、耐熱保形性及び耐圧保形性と切削容易性を有する筒体37と、該筒体37に充填される崩壊自在な充填材38により構成され、筒体37を紙管37aにより形成し、充填材38を発泡樹脂により形成しており、これらの点は、上記第1実施形態と同様である。
Second Embodiment
In the second embodiment shown in FIG. 5, the columnar body 24 is composed of a cylindrical body 37 having heat-resistant shape retention, pressure-resistant shape retention and cutting ease, and a collapsible filler 38 filled in the cylindrical body 37. The cylindrical body 37 is formed of a paper tube 37a, and the filler 38 is formed of a foamed resin. These points are the same as in the first embodiment.

第2実施形態の筒体37は、図5(A)に示すように、軸方向に所定間隔をあけて周溝39を形成することにより折損自在に構成されている。周溝39は、間隔を密にして連続的に形成されている。 As shown in FIG. 5A, the cylindrical body 37 of the second embodiment is configured to be fragile by forming a circumferential groove 39 at a predetermined interval in the axial direction. The circumferential groove 39 is continuously formed with a close interval.

従って、第2実施形態の場合、現場において長い紙管37aを簡単に折り切断することにより、容易に所定長さLの筒体37を形成できる利点がある。 Therefore, in the case of the second embodiment, there is an advantage that the cylindrical body 37 having a predetermined length L can be easily formed by simply folding and cutting the long paper tube 37a at the site.

しかも、図5(C)に示すように、既存の舗装33の表層と仮舗装35の表面が切削機により切削されるとき、もしも、切削刃が筒体37の上端に接触した場合でも、筒体37は、上述のような切削容易性により切削されるだけでなく、周溝37により折損容易なため、接触する刃に追従して折損片39pを分離させるので、切削刃により筒体37が埋入状態から引抜かれることはなく、埋入状態を確実に保持するという利点がある。 Moreover, as shown in FIG. 5C, when the surface layer of the existing pavement 33 and the surface of the temporary pavement 35 are cut by a cutting machine, even if the cutting blade contacts the upper end of the cylindrical body 37, the cylinder Since the body 37 is not only cut by the ease of cutting as described above, but is easily broken by the circumferential groove 37, the broken piece 39p is separated following the contacting blade. There is an advantage that the embedded state is reliably maintained without being pulled out from the embedded state.

<第3実施形態>
図6に示す第2実施形態において、柱状体24は、耐熱保形性及び耐圧保形性と切削容易性を有する所定長さLの筒体37と、該筒体37の上部開口を閉塞する崩壊自在なキャップ部材40により構成されている。
<Third Embodiment>
In the second embodiment shown in FIG. 6, the columnar body 24 closes a cylindrical body 37 having a predetermined length L having heat-resistant shape retaining property, pressure-resistant shape retaining property and ease of cutting, and an upper opening of the cylindrical body 37. The cap member 40 is configured to be collapsible.

筒体37は、紙管37aにより形成することが好ましい。また、キャップ部材40は、崩壊容易性の他、耐熱保形性及び耐圧保形性と切削容易性を有する紙材により形成することが好ましい。 The cylindrical body 37 is preferably formed by a paper tube 37a. Moreover, it is preferable to form the cap member 40 with the paper material which has heat-resistant shape retention property, pressure-resistant shape retention property, and cutting ease other than the ease of collapse.

従って、第3実施形態の場合、図6(D)に示す通孔形成工程において、通孔26を形成する際、作業者は、手持ちの治具(例えばバール等)により、柱状体24の上の薄いオーバーレイ36を含む舗装層を破壊しつつ剥離させ、筒体37の上端を露出させた後、前記キャップ部材40を崩壊すれば良い。図例の場合、キャップ部材40を破壊しているが、筒体37からキャップ部材40を取外しても良い。従って、前記の「除去自在」とは、破壊と取外しの両方の意味を含んでいる。 Therefore, in the case of the third embodiment, when the through hole 26 is formed in the through hole forming step shown in FIG. 6D, the operator uses a hand-held jig (for example, bar) on the columnar body 24. After the pavement layer including the thin overlay 36 is broken and peeled to expose the upper end of the cylindrical body 37, the cap member 40 may be collapsed. In the case of the illustrated example, the cap member 40 is broken, but the cap member 40 may be removed from the cylindrical body 37. Therefore, the “removable” includes both destruction and removal.

これにより筒体37の内部の空洞部により、舗装面から仮蓋23の中心支持孔23aに至る通孔26が形成される。 As a result, a through hole 26 extending from the paved surface to the center support hole 23 a of the temporary lid 23 is formed by the hollow portion inside the cylindrical body 37.

<第4実施形態>
図7に示す第4実施形態において、柱状体24は、耐熱保形性及び耐圧保形性と切削容易性を有する所定長さLの円柱部材41により構成されている。
<Fourth embodiment>
In the fourth embodiment shown in FIG. 7, the columnar body 24 is constituted by a cylindrical member 41 having a predetermined length L having heat-resistant shape retention, pressure-resistant shape retention, and ease of cutting.

例えば、円柱部材41は、例えば、所定の弾性硬度を有するゴムにより成形することが可能であり、これによれば、耐熱保形性及び耐圧保形性と切削容易性を備えることができ、この場合、底部に嵌合突起41aを一体成形することが可能である。 For example, the cylindrical member 41 can be formed of, for example, rubber having a predetermined elastic hardness. According to this, the cylindrical member 41 can be provided with heat retaining shape, pressure retaining property, and ease of cutting. In this case, the fitting protrusion 41a can be integrally formed on the bottom.

従って、図7(B)に示すように、仮蓋設置工程において、前記嵌合突起41aを中心支持孔23aに嵌入することにより円柱部材41を仮蓋23に立設することにより、通孔準備工程が実施される。 Therefore, as shown in FIG. 7B, in the temporary lid installation step, the cylindrical member 41 is erected on the temporary lid 23 by inserting the fitting protrusion 41a into the center support hole 23a, thereby preparing a through hole. A process is performed.

その後、図7(C)に示すように、仮舗装35が行われ(仮舗装工程)、切削機で既存の舗装33の表層と仮舗装35の表面が所定厚さTに相当して切削される(切削工程)。 Thereafter, as shown in FIG. 7C, a temporary pavement 35 is performed (temporary pavement process), and the surface layer of the existing pavement 33 and the surface of the temporary pavement 35 are cut corresponding to a predetermined thickness T by a cutting machine. (Cutting process).

仮舗装に際して、円柱部材41は、上述のように、耐熱保形系と耐圧保形性を備えているので、円柱状の形状を好適に保持する。 When temporarily paving, the cylindrical member 41 has a heat-resistant shape retaining system and a pressure-resistant shape retaining property as described above, and thus preferably retains the cylindrical shape.

切削に際して、もしも、切削機の切削刃が円柱部材41の上端に接触した場合でも、ゴム製等の円柱部材41は、切削刃により切削され、従って、切削刃により円柱部材41が埋入状態から引抜かれることはなく、埋入状態を保持する。 At the time of cutting, even if the cutting blade of the cutting machine comes into contact with the upper end of the cylindrical member 41, the cylindrical member 41 made of rubber or the like is cut by the cutting blade, so that the cylindrical member 41 is removed from the embedded state by the cutting blade. It will not be pulled out, and will remain buried.

その後、オーバーレイ36が舗装された後、図7(D)に示すように通孔形成工程が実施される。通孔26を形成する際、作業者は、手持ちの治具(例えばバール等)により、円柱部材41の上の薄いオーバーレイ36を含む舗装層を破壊しつつ剥離させ、該円柱部材41の上端を露出させた後、該円柱部材41を舗装層から引抜けば良い。 Then, after the overlay 36 is paved, a through hole forming step is performed as shown in FIG. When forming the through hole 26, the operator peels the pavement layer including the thin overlay 36 on the column member 41 with a hand-held jig (for example, a bar) while breaking the pavement layer, and the upper end of the column member 41 is removed. After the exposure, the cylindrical member 41 may be pulled out from the pavement layer.

これにより、円柱部材41が引抜かれた空洞部により、舗装面から仮蓋23の中心支持孔23aに至る通孔26が形成される。 Thereby, the through-hole 26 from the pavement surface to the center support hole 23a of the temporary lid 23 is formed by the hollow portion from which the columnar member 41 is drawn.

21 路盤
22 マンホール
23 仮蓋
23a 中心支持孔
24 柱状体
25 舗装
26 通孔
27 リフト装置
28 支持手段
29 蓋受枠
30 舗装補修材
31 開閉蓋
32 既存の支持手段
33 既存の舗装
34 凹部
35 仮舗装
36 オーバーレイ
37 筒体
37a 紙管
38 充填材
39 周溝
39p 折損片
40 キャップ部材
41 円柱部材
41a 嵌合突起
21 Subbase 22 Manhole 23 Temporary Lid 23a Center Support Hole 24 Columnar Body 25 Pavement 26 Through Hole 27 Lifting Device 28 Supporting Means 29 Lid Support Frame 30 Pave Repair Material 31 Opening and Closing Lid 32 Existing Supporting Means 33 Existing Pavement 34 Recess 35 Temporary Pavement 36 Overlay 37 Cylindrical body 37a Paper tube 38 Filling material 39 Circumferential groove 39p Broken piece 40 Cap member 41 Column member 41a Fitting protrusion

Claims (8)

路面に設置されたマンホールの開口を中心支持孔付きの仮蓋(23)により閉塞する仮蓋設置工程と、
前記仮蓋の上方を含んで路面を舗装する舗装工程と、
舗装表面から前記仮蓋上の舗装層に前記中心支持孔(23a)に至る通孔(26)を形成する通孔形成工程と、
舗装表面から切断機でマンホール周囲の前記舗装層を円形に切断する切断工程と、
少なくとも前記通孔(26)を介して前記中心支持孔(23a)にリフト装置(27)を連結することにより、前記切断された切断舗装部と仮蓋(23)を撤去する撤去工程と、
蓋受枠を舗装表面と合致するようにマンホールに設置する蓋受枠設置工程と、
前記蓋受枠の周囲に舗装補修材を充填して周囲の舗装と一体化する充填工程とから成る新設舗装工事において、
前記仮蓋設置工程は、前記舗装工程で形成される舗装の表面近傍に至る高さを有する柱状体(24)を前記仮蓋(23)の中心支持孔(23a)の上に立設する通孔準備工程を含み、
前記通孔形成工程は、前記舗装工程により前記舗装層に埋入された状態の柱状体(24)を舗装表面から崩壊又は引抜くことにより通孔(26)を形成することを特徴とするマンホールを含む舗装工事における仮蓋の撤去方法。
A temporary lid installation step of closing an opening of a manhole installed on a road surface with a temporary lid (23) with a center support hole;
A paving step of paving a road surface including the upper part of the temporary lid;
A through hole forming step for forming a through hole (26) from the pavement surface to the central support hole (23a) in the pavement layer on the temporary lid;
A cutting step of cutting the pavement layer around the manhole into a circular shape from the pavement surface with a cutting machine;
A removal step of removing the cut pavement section and the temporary lid (23) cut by connecting a lift device (27) to the center support hole (23a) through at least the through hole (26);
A lid receiving frame installation process for installing the lid receiving frame in the manhole so as to match the pavement surface;
In the new pavement construction consisting of a filling process in which a pavement repair material is filled around the lid receiving frame and integrated with the surrounding pavement,
In the temporary lid installation step, a columnar body (24) having a height reaching the vicinity of the surface of the pavement formed in the pavement step is erected on a central support hole (23a) of the temporary lid (23). Including a hole preparation process,
The through hole forming step forms the through hole (26) by collapsing or pulling out the columnar body (24) embedded in the pavement layer by the pavement step from the pavement surface. How to remove the temporary lid in paving work including
道路に設置された既存のマンホールの蓋受枠と舗装を除去する既存物除去工程と、
マンホールの開口を中心支持孔付きの仮蓋(23)により閉塞する仮蓋設置工程と、
前記仮蓋の上方を含んで路面を舗装する舗装工程と、
舗装表面から前記仮蓋上の舗装層に前記中心支持孔(23a)に至る通孔(26)を形成する通孔形成工程と、
舗装表面から切断機でマンホール周囲の前記舗装層を円形に切断する切断工程と、
少なくとも前記通孔(26)を介して前記中心支持孔(23a)にリフト装置(27)を連結することにより、前記切断された切断舗装部と仮蓋(23)を撤去する撤去工程と、
蓋受枠を舗装表面と合致するようにマンホールに設置する蓋受枠設置工程と、
前記蓋受枠の周囲に舗装補修材を充填して周囲の舗装と一体化する充填工程とから成る打換舗装工事において、
前記仮蓋設置工程は、前記舗装工程で形成される舗装の表面近傍に至る高さを有する柱状体(24)を前記仮蓋(23)の中心支持孔(23a)の上に立設する通孔準備工程を含み、
前記通孔形成工程は、前記舗装工程により舗装層に埋入された状態の柱状体(24)を舗装表面から崩壊又は引抜くことにより通孔を形成することを特徴とするマンホールを含む舗装工事における仮蓋の撤去方法。
An existing object removal process to remove the cover frame and pavement of the existing manhole installed on the road;
A temporary lid installation step of closing the manhole opening with a temporary lid (23) with a central support hole;
A paving step of paving a road surface including the upper part of the temporary lid;
A through hole forming step for forming a through hole (26) from the pavement surface to the central support hole (23a) in the pavement layer on the temporary lid;
A cutting step of cutting the pavement layer around the manhole into a circular shape from the pavement surface with a cutting machine;
A removal step of removing the cut pavement section and the temporary lid (23) cut by connecting a lift device (27) to the center support hole (23a) through at least the through hole (26);
A lid receiving frame installation process for installing the lid receiving frame in the manhole so as to match the pavement surface;
In replaceable pavement construction comprising a filling step of filling a pavement repair material around the lid receiving frame and integrating with the surrounding pavement,
In the temporary lid installation step, a columnar body (24) having a height reaching the vicinity of the surface of the pavement formed in the pavement step is erected on a central support hole (23a) of the temporary lid (23). Including a hole preparation process,
The through-hole forming step is a pavement construction including a manhole characterized in that a through-hole is formed by collapsing or extracting the columnar body (24) embedded in the pavement layer by the pavement step from the pavement surface. To remove the temporary lid.
道路に設置された既存のマンホールの周囲の舗装を切断して蓋受枠を除去する既存物除去工程と、
マンホールの開口を中心支持孔付きの仮蓋(23)により閉塞する仮蓋設置工程と、
前記仮蓋の上方を仮舗装して既存の舗装と同一レベルにする仮舗装工程と、
切削機で既存の舗装の表層と前記仮舗装の表面を切削する切削工程と、
前記切削面の上にオーバーレイを舗装するオーバーレイ工程と、
舗装表面から前記仮蓋上の舗装層に前記中心支持孔(23a)に至る通孔(26)を形成する通孔形成工程と、
舗装表面から切断機でマンホール周囲の前記舗装層を円形に切断する切断工程と、
少なくとも前記通孔(26)を介して前記中心支持孔(23a)にリフト装置(27)を連結することにより、前記切断された切断舗装部と仮蓋(23)を撤去する撤去工程と、
蓋受枠を舗装表面と合致するようにマンホールに設置する蓋受枠設置工程と、
前記蓋受枠の周囲に舗装補修材を充填して周囲の舗装と一体化する充填工程とから成る切削オーバーレイ舗装工事において、
前記仮蓋設置工程は、前記仮舗装工程で形成される仮舗装の表面近傍に至る高さを有する柱状体(24)を前記仮蓋(23)の中心支持孔(23a)の上に立設する通孔準備工程を含み、
前記通孔形成工程は、前記仮舗装工程及びオーバーレイ工程により舗装層に埋入された状態の柱状体(24)を舗装表面から崩壊又は引抜くことにより通孔を形成することを特徴とするマンホールを含む舗装工事における仮蓋の撤去方法。
An existing object removal step of cutting the pavement around an existing manhole installed on the road to remove the lid receiving frame;
A temporary lid installation step of closing the manhole opening with a temporary lid (23) with a central support hole;
Temporary paving process of temporarily paving the upper side of the temporary lid to the same level as existing pavement;
A cutting process of cutting the surface of the existing pavement and the surface of the temporary pavement with a cutting machine;
An overlay process for paving an overlay on the cutting surface;
A through hole forming step for forming a through hole (26) from the pavement surface to the central support hole (23a) in the pavement layer on the temporary lid;
A cutting step of cutting the pavement layer around the manhole into a circular shape from the pavement surface with a cutting machine;
A removal step of removing the cut pavement section and the temporary lid (23) cut by connecting a lift device (27) to the center support hole (23a) through at least the through hole (26);
A lid receiving frame installation process for installing the lid receiving frame in the manhole so as to match the pavement surface;
In the cutting overlay pavement construction comprising a filling step of filling a pavement repair material around the lid receiving frame and integrating with the surrounding pavement,
In the temporary lid installation step, a columnar body (24) having a height reaching the vicinity of the surface of the temporary pavement formed in the temporary pavement step is erected on the central support hole (23a) of the temporary lid (23). Including a through hole preparation step,
The through-hole forming step forms a through-hole by collapsing or extracting the columnar body (24) embedded in the pavement layer by the temporary paving step and the overlay step from the pavement surface. How to remove the temporary lid in paving work including
請求項3に記載の切削オーバーレイ舗装工事において、
前記柱状体(24)は、前記切削機で切削可能な素材により形成され、前記仮蓋(23)に立設したとき、該柱状体(24)の上端を前記仮舗装工程で形成される仮舗装(35)の表面から深さ(D)だけ離間させた状態で設置されることを特徴とするマンホールを含む舗装工事における仮蓋の撤去方法。
In the cutting overlay pavement construction according to claim 3,
The columnar body (24) is formed of a material that can be cut by the cutting machine, and when the columnar body (24) is erected on the temporary lid (23), an upper end of the columnar body (24) is formed in the temporary paving step. A method for removing a temporary lid in pavement work including manholes, characterized in that it is installed with a depth (D) away from the surface of the pavement (35).
請求項1、2、3又は4に記載の舗装工事における仮蓋の撤去方法に使用される装置であり、
前記柱状体(24)は、仮蓋(23)の上に中心支持孔(23a)を囲んで立設される耐熱保形性及び耐圧保形性を有する筒体(37)と、該筒体に充填される崩壊自在な充填材(38)から成り、
前記通孔形成工程において、舗装表面を崩壊することにより前記筒体(37)の上端を露出させると共に、該筒体の上端開口から前記充填材(38)を掻き取ることにより、該筒体(37)の内部空間を介して前記通孔(26)を形成するように構成されて成ることを特徴とするマンホールを含む舗装工事における仮蓋の撤去装置。
It is an apparatus used for the method of removing the temporary lid in the paving work according to claim 1, 2, 3, or 4.
The columnar body (24) includes a cylindrical body (37) having a heat-resistant shape and a pressure-resistant shape that is erected on the temporary lid (23) so as to surround the center support hole (23a), and the cylindrical body Consisting of collapsible filler (38) filled into
In the through hole forming step, the upper end of the cylindrical body (37) is exposed by collapsing the pavement surface, and the cylindrical body (38) is scraped off from the upper end opening of the cylindrical body ( 37) An apparatus for removing a temporary lid in a paving work including a manhole, wherein the through hole (26) is formed through an internal space of 37).
前記筒体(37)は、紙管(37a)により構成され、前記充填材(38)は、発泡樹脂(38a)により構成されて成ることを特徴とする請求項5に記載のマンホールを含む舗装工事における仮蓋の撤去装置。 The pavement including a manhole according to claim 5, wherein the cylindrical body (37) is constituted by a paper tube (37a), and the filler (38) is constituted by a foamed resin (38a). Temporary lid removal device for construction. 請求項1、2、3又は4に記載の舗装工事における仮蓋の撤去方法に使用される装置であり、
前記柱状体(24)は、仮蓋(23)の上に中心支持孔(23a)を囲んで立設される耐熱保形性及び耐圧保形性を有する筒体(37)と、該筒体の上部開口を閉塞する除去自在なキャップ部材(40)から成り、
前記通孔形成工程において、舗装表面を崩壊することにより前記キャップ(40)を露出させると共に、該キャップ(40)を除去することにより、該筒体(37)の内部空間を介して前記通孔(26)を形成するように構成されて成ることを特徴とするマンホールを含む舗装工事における仮蓋の撤去装置。
It is an apparatus used for the method of removing the temporary lid in the paving work according to claim 1, 2, 3, or 4.
The columnar body (24) includes a cylindrical body (37) having a heat-resistant shape and a pressure-resistant shape that is erected on the temporary lid (23) so as to surround the center support hole (23a), and the cylindrical body Consisting of a removable cap member (40) that closes the upper opening of the
In the through hole forming step, the cap (40) is exposed by collapsing the pavement surface, and the cap (40) is removed to remove the cap through the internal space of the cylindrical body (37). (26) A temporary lid removing device in pavement work including a manhole, characterized by being configured to form.
請求項1、2、3又は4に記載の舗装工事における仮蓋の撤去方法に使用される装置であり、
前記柱状体(24)は、耐熱保形性及び耐圧保形性を有する円柱部材(41)から成り、
前記通孔形成工程において、舗装表面を崩壊することにより前記円柱部材(41)の上端部を露出させると共に、該円柱部材(41)を引抜くことにより前記通孔(26)を形成するように構成されて成ることを特徴とするマンホールを含む舗装工事における仮蓋の撤去装置。
It is an apparatus used for the method of removing the temporary lid in the paving work according to claim 1, 2, 3, or 4.
The columnar body (24) is composed of a cylindrical member (41) having heat-resistant shape retention and pressure-resistant shape retention,
In the through hole forming step, the upper end portion of the cylindrical member (41) is exposed by collapsing the pavement surface, and the through hole (26) is formed by pulling out the cylindrical member (41). An apparatus for removing a temporary lid in a pavement work including a manhole, characterized by being configured.
JP2014124182A 2014-06-17 2014-06-17 Method and apparatus for removing temporary lid in paving work including manhole Active JP6100733B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2014124182A JP6100733B2 (en) 2014-06-17 2014-06-17 Method and apparatus for removing temporary lid in paving work including manhole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2014124182A JP6100733B2 (en) 2014-06-17 2014-06-17 Method and apparatus for removing temporary lid in paving work including manhole

Publications (2)

Publication Number Publication Date
JP2016003484A JP2016003484A (en) 2016-01-12
JP6100733B2 true JP6100733B2 (en) 2017-03-22

Family

ID=55222977

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2014124182A Active JP6100733B2 (en) 2014-06-17 2014-06-17 Method and apparatus for removing temporary lid in paving work including manhole

Country Status (1)

Country Link
JP (1) JP6100733B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111005299A (en) * 2019-12-31 2020-04-14 江苏阿道夫公路特种养护工程有限公司 Anti-cracking maintenance process for asphalt pavement around well cover

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108867236A (en) * 2018-07-03 2018-11-23 四川先舟建设工程有限公司 The construction technology of airfield runway
CN113818306B (en) * 2021-10-12 2022-12-30 北京城建设计发展集团股份有限公司 Temporary pavement working plate structure for subway station

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3263355B2 (en) * 1997-12-10 2002-03-04 株式会社ハネックス・ロード Pavement method for road surfaces including manholes
JP4121069B2 (en) * 2002-08-09 2008-07-16 株式会社ハネックス・ロード Circular cutting method in pavement construction
JP2010007348A (en) * 2008-06-26 2010-01-14 Save Machine Co Ltd Method of temporarily paving manhole recessed area during repairing of manhole
JP2013044104A (en) * 2011-08-22 2013-03-04 Shinichi Tsubakimori Temporary cover having double layered structure, and paved road construction method using the same

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111005299A (en) * 2019-12-31 2020-04-14 江苏阿道夫公路特种养护工程有限公司 Anti-cracking maintenance process for asphalt pavement around well cover
CN111005299B (en) * 2019-12-31 2021-05-04 江苏阿道夫公路特种养护工程有限公司 Anti-cracking maintenance process for asphalt pavement around well cover

Also Published As

Publication number Publication date
JP2016003484A (en) 2016-01-12

Similar Documents

Publication Publication Date Title
KR101454224B1 (en) Manhole repair method using variable type circular cutter for excuting drilling and curring of road surface and compass type height adjuster
JP6100733B2 (en) Method and apparatus for removing temporary lid in paving work including manhole
KR101565044B1 (en) The manhol housing supporting apparatus using electromagnet and the manhole repairing method using thereof
KR101417834B1 (en) Method for Rehabilitatian of Manhole
KR101067003B1 (en) Manhole Repair
KR100905728B1 (en) Manhole repair mechanism and manhole repair method using the same
JP6230095B2 (en) Removal method of existing structure
JP2010007348A (en) Method of temporarily paving manhole recessed area during repairing of manhole
EP1738031B1 (en) Hydraulic pile cap removal
CN214783825U (en) A cast-in-place concrete pile head separation device
KR20150106130A (en) The manhole repairing method using a manhol housing supporthing apparatus and a cast for the repair work of a manhole
JP2010007397A (en) Pile head treating method and pile head treating apparatus
CN214783824U (en) A cast-in-place concrete pile head separation device
KR101213454B1 (en) Construction method and support device for extracting h-pile
JP2013155592A (en) Demolition method for border proximity underground concrete construction body
JP2018096159A (en) Support column reinforcement construction method
JP2010189952A (en) Existing pile removing device
JP2008057314A (en) Road surface repair method, rolling plate and guide member used therefor
JP4170944B2 (en) How to remove manhole cover frame.
JP6341027B2 (en) Floor slab widening method
JP6466365B2 (en) Manhole frame installation method
CN206233475U (en) Roofing drain structure
KR20100111090A (en) Arrangement method for head of concrete pile
KR100566668B1 (en) Sliding Reinforcement Structure for Road Slope
JP4358904B1 (en) Prop hole forming device for concrete structures

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20160303

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20170120

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20170131

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20170223

R150 Certificate of patent or registration of utility model

Ref document number: 6100733

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313111

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350