Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP6147494B2 - Information processing apparatus and room temperature estimation method - Google Patents
[go: Go Back, main page]

JP6147494B2 - Information processing apparatus and room temperature estimation method - Google Patents

Information processing apparatus and room temperature estimation method Download PDF

Info

Publication number
JP6147494B2
JP6147494B2 JP2012262607A JP2012262607A JP6147494B2 JP 6147494 B2 JP6147494 B2 JP 6147494B2 JP 2012262607 A JP2012262607 A JP 2012262607A JP 2012262607 A JP2012262607 A JP 2012262607A JP 6147494 B2 JP6147494 B2 JP 6147494B2
Authority
JP
Japan
Prior art keywords
temperature
room
value
renovation
heating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2012262607A
Other languages
Japanese (ja)
Other versions
JP2014109809A (en
Inventor
山本 徹
徹 山本
俊宏 野中
俊宏 野中
木村 浩之
浩之 木村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lixil Corp
Original Assignee
Lixil Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lixil Corp filed Critical Lixil Corp
Priority to JP2012262607A priority Critical patent/JP6147494B2/en
Publication of JP2014109809A publication Critical patent/JP2014109809A/en
Application granted granted Critical
Publication of JP6147494B2 publication Critical patent/JP6147494B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Building Environments (AREA)
  • Working Measures On Existing Buildindgs (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

本発明は、データ処理技術に関し、特に、リフォームに伴う部屋の温度変化を予測する技術に関する。   The present invention relates to a data processing technique, and more particularly to a technique for predicting a temperature change in a room accompanying renovation.

現在、家屋全体を対象とするのではなく、家屋内のひと部屋を対象とした断熱リフォームが提案されることがある(例えば非特許文献1参照)。   At present, there is a case where a heat insulation reform for a room in a house is proposed instead of the whole house (see, for example, Non-Patent Document 1).

株式会社LIXIL、“ココエコ|ココだけ簡単快適エコリフォーム”、[online]、[平成24年11月19日検索]、インターネット<URL:http://tostem.lixil.co.jp/lineup/kouhou/cocoeco/>LIXIL Co., Ltd., “Coco Eco | Easy and Comfortable Eco Reform”, [online], [Searched on November 19, 2012], Internet <URL: http://tostem.lixil.co.jp/lineup/kouhou/ cocoeco / >

リフォームの施工にはある程度の費用がかかるものであり、リフォーム施工による効果を事前に顧客へ提示することが、ビジネスの促進に重要であると本発明者は考えた。しかしながら、家屋全体でなく、家屋内のひと部屋を対象とした断熱リフォームを実施することによる効果を定量的に見える化する発想や、その具体的な方法はこれまで十分に提案されてこなかった。   The present inventor considered that renovation construction costs a certain amount of money, and that it is important for business promotion to present the effects of the renovation construction to the customer in advance. However, the idea of quantitatively visualizing the effects of implementing heat insulation reform for a single room in the house, not the entire house, and its specific method have not been sufficiently proposed so far.

本発明は上記課題を鑑みてなされたものであり、主な目的は、建築物内のひと部屋のリフォームによる効果を定量的に予測する技術を提供することにある。   This invention is made | formed in view of the said subject, and the main objective is to provide the technique which predicts quantitatively the effect by renovation of the one room in a building.

上記課題を解決するために、本発明のある態様の情報処理装置は、建築物内の一部屋を単位に設置可能な建材について、その断熱性能を示す指標値を保持する指標値保持部と、建材を設置する前の部屋で測定された温度の情報を取得する取得部と、測定された温度と、建材の指標値にもとづいて、建材を部屋に設置した場合の部屋単体の温度を推定する推定部と、を備える。   In order to solve the above problems, an information processing apparatus according to an aspect of the present invention is an index value holding unit that holds an index value indicating the heat insulation performance of a building material that can be installed in units of one room in a building, Based on the acquisition unit that acquires temperature information measured in the room before the building material is installed, the measured temperature, and the index value of the building material, the temperature of the room alone when the building material is installed in the room is estimated. An estimation unit.

本発明の別の態様は、部屋温度推定方法である。この方法は、建築物内の一部屋を単位に設置可能な建材を設置する前の部屋で測定された温度の情報を取得するステップと、予め定められた建材の断熱性能を示す指標値と、測定された温度にもとづいて、建材を部屋に設置した場合の部屋単体の温度を推定するステップと、をコンピュータが実行する。   Another aspect of the present invention is a room temperature estimation method. This method includes a step of obtaining information of temperature measured in a room before installing a building material that can be installed in one room in a building, an index value indicating a predetermined insulation performance of the building material, Based on the measured temperature, the computer executes a step of estimating the temperature of the room alone when the building material is installed in the room.

なお、以上の構成要素の任意の組合せ、本発明の表現を装置、方法、システム、プログラム、プログラムを格納した記録媒体などの間で変換したものもまた、本発明の態様として有効である。   It should be noted that any combination of the above-described constituent elements and a representation of the present invention converted between an apparatus, a method, a system, a program, a recording medium storing the program, and the like are also effective as an aspect of the present invention.

本発明によれば、建築物内のひと部屋のリフォームによる効果を定量的に予測する技術を提供できる。   ADVANTAGE OF THE INVENTION According to this invention, the technique which predicts quantitatively the effect by renovation of the one room in a building can be provided.

実施の形態のリフォーム診断システムの構成を示す図である。It is a figure which shows the structure of the reform diagnostic system of embodiment. リフォーム対象となるひと部屋の構成要素を模式的に示す図である。It is a figure which shows typically the component of the one room used as renovation object. 図1の診断サーバの機能構成を示すブロック図である。It is a block diagram which shows the function structure of the diagnostic server of FIG. パラメータ保持部が保持するデータの例を示す図である。It is a figure which shows the example of the data which a parameter holding part hold | maintains. 評価基準保持部が保持するデータを模式的に示す図である。It is a figure which shows typically the data which an evaluation criteria holding | maintenance part hold | maintains. 診断必要情報の入力画面を示す図である。It is a figure which shows the input screen of diagnostic required information. 診断必要情報の入力画面を示す図である。It is a figure which shows the input screen of diagnostic required information. 診断必要情報の入力画面を示す図である。It is a figure which shows the input screen of diagnostic required information. 改修後の表面温度算出のための各種パラメータを示す図である。It is a figure which shows the various parameters for surface temperature calculation after repair. 保温力推定部による推定結果を模式的に示す図である。It is a figure which shows typically the estimation result by the heat retention power estimation part. 保温力推定部の詳細処理を示すフローチャートである。It is a flowchart which shows the detailed process of a heat retention power estimation part. 部屋の熱収支式を示す図である。It is a figure which shows the heat balance type | formula of a room. 図9に続く処理を示すフローチャートである。10 is a flowchart illustrating processing subsequent to FIG. 9. 改修後の窓のη0値を示す図である。It is a figure which shows (eta) 0 value of the window after repair. 体感温度診断結果を示す図である。It is a figure which shows a body temperature detection result. 足元の暖かさ診断結果を示す図である。It is a figure which shows a foot warmth diagnostic result. 窓の結露診断結果を示す図である。It is a figure which shows the dew condensation diagnosis result of a window. 部屋の保温力診断結果を示す図である。It is a figure which shows the heat retention diagnostic result of a room. 冷暖房費診断結果を示す図である。It is a figure which shows the air-conditioning expense diagnosis result. 総合診断結果を示す図である。It is a figure which shows a comprehensive diagnosis result.

実施の形態では、建築物(戸建て住宅や集合住宅、オフィス等を含む)内部のひと部屋を単位としたリフォームによる効果を診断するリフォーム診断システムを提案する。リフォーム診断システムが対象とするリフォームは、建築物全体ではなく、ひと部屋を対象としたものである。例えば、既存の窓に対する内窓の追加や、既存の壁や床に対する断熱材の追加的な設置を行うことにより部屋の断熱性、気密性を高めるものである。   In the embodiment, a renovation diagnosis system for diagnosing the effect of renovation in units of a single room inside a building (including a detached house, an apartment house, an office, etc.) is proposed. Renovation targeted by the remodeling diagnosis system is intended for a single room, not the entire building. For example, the heat insulation and airtightness of a room are enhanced by adding an inner window to an existing window and additionally installing a heat insulating material on an existing wall or floor.

リフォーム診断システムでは、利用者が、顧客の住宅においてリフォーム対象となるひと部屋の環境(例えば温度)を実測し、その測定結果をサーバへアップロードする。本実施の形態では、リフォーム診断システムの利用者、すなわち部屋環境を測定する主体をリフォーム施工業者とする。ただし、リフォーム診断システムの利用者は、リフォーム施工業者に限られず、リフォームに関わる種々の主体であってよい。例えば、リフォーム用建材等の販売店(販売業者)、流通店(流通業者)、代理店であってもよい。またリフォーム診断システムの利用者は、リフォームの実施有無を検討する顧客であってもよい。この場合、顧客自身が、リフォーム対象とする部屋の環境情報を測定して、リフォーム診断のウェブサイトへアップロードし、リフォーム診断の結果を画面表示させ確認してもよい。サーバは、利用者からアップロードされた測定結果にもとづいて、仮にリフォームを施工した場合の部屋の環境変化(例えば温度変化)をシミュレーションにより予測し、その予測結果を利用者へ提供する。   In the reform diagnosis system, a user actually measures the environment (for example, temperature) of a room to be reformed in a customer's house and uploads the measurement result to a server. In the present embodiment, the user of the remodeling diagnosis system, that is, the main body that measures the room environment is a remodeling contractor. However, the user of the remodeling diagnosis system is not limited to the remodeling contractor, and may be various subjects related to the remodeling. For example, it may be a dealer (distributor), a distributor (distributor), or an agent of renovation building materials. Further, the user of the remodeling diagnosis system may be a customer who examines whether or not remodeling is performed. In this case, the customer himself / herself may measure the environmental information of the room to be reformed, upload it to the website of the remodeling diagnosis, and display the result of the remodeling diagnosis on the screen for confirmation. Based on the measurement result uploaded from the user, the server predicts the environmental change (for example, temperature change) of the room when the renovation is performed, and provides the prediction result to the user.

これにより、リフォーム前の部屋の環境と、リフォーム後の部屋の環境を定量的に見える化し、リフォーム施工による効果を見える化する。本実施の形態では、住まいの快適性および経済性を損なう主な要因として本発明者が想定した5つの評価項目、具体的には、体感温度、足元の暖かさ、窓の結露、部屋の保温力、冷暖房費のそれぞれについて、リフォーム前後の状態を評価する。   As a result, the environment of the room before the renovation and the environment of the room after the renovation are quantitatively visualized, and the effect of the renovation work is visualized. In the present embodiment, the five evaluation items assumed by the present inventors as main factors that impair the comfort and economy of the house, specifically, the sensory temperature, the warmth of the feet, the condensation of the windows, and the thermal insulation of the room. Evaluate the state before and after renovation for each of power and heating / cooling costs.

図1は、実施の形態のリフォーム診断システムの構成を示す。リフォーム診断システム100は、業者端末102と診断サーバ104を備える。業者端末102および診断サーバ104は、LAN・WAN・インターネット等を含む通信網106を介して接続される。診断サーバ104は、建材メーカにより管理される情報処理装置である。診断サーバ104は、ウェブサーバとして機能し、リフォームによる室内環境の変化をシミュレーションし、予測するウェブサービス(以下、「以下、リフォーム診断サービス」とも呼ぶ。)を提供する。診断サーバ104の詳細は図3以降で後述する。   FIG. 1 shows a configuration of a reform diagnosis system according to an embodiment. The reform diagnosis system 100 includes a trader terminal 102 and a diagnosis server 104. The trader terminal 102 and the diagnostic server 104 are connected via a communication network 106 including a LAN, a WAN, the Internet, and the like. The diagnosis server 104 is an information processing apparatus managed by a building material manufacturer. The diagnosis server 104 functions as a web server, and provides a web service (hereinafter also referred to as “reform diagnosis service”) that simulates and predicts a change in the indoor environment due to reform. Details of the diagnostic server 104 will be described later with reference to FIG.

業者端末102は、リフォーム施工業者が操作する情報処理装置であり、例えばウェブブラウザがインストールされたPCである。携帯電話機やスマートフォン、タブレット端末であってもよい。業者端末102は、通信網106を介して診断サーバ104へアクセスし、リフォーム診断サービスのウェブページをディスプレイに表示させる。リフォーム施工業者は、そのウェブページの入力画面に対してリフォーム対象となる部屋に関する情報を入力し、診断サーバ104へアップロードする。業者端末102は、診断サーバ104による診断処理の結果を診断サーバ104から取得してディスプレイに表示させ、またプリンタに印刷させる。   The trader terminal 102 is an information processing apparatus operated by a renovation contractor, for example, a PC on which a web browser is installed. It may be a mobile phone, a smartphone, or a tablet terminal. The merchant terminal 102 accesses the diagnosis server 104 via the communication network 106 and displays a web page of the reform diagnosis service on the display. The remodeling contractor inputs information regarding the room to be reformed on the input screen of the web page, and uploads it to the diagnosis server 104. The trader terminal 102 acquires the result of the diagnostic processing by the diagnostic server 104 from the diagnostic server 104, displays the result on the display, and causes the printer to print it.

図2は、リフォーム対象となるひと部屋の構成要素を模式的に示す。この部屋は、例えば2階建ての戸建て住宅の場合、1階または2階に設けられた居間(リビング)、寝室、子供部屋、書斎等の中の1つである。リフォーム施工業者は、デジタル温湿度計や騒音計等の各種測定機器を用いて、ひと部屋を形成する全方向の要素、例えば天井、壁4面、床、窓について、表面温度や寸法、方位等、室内環境にかかわる情報を測定・確認する。ここで、リフォーム施工業者が測定・確認し、診断サーバ104へアップロードする情報(以下、「診断必要情報」とも呼ぶ。)を説明する。   FIG. 2 schematically shows components of a room to be reformed. For example, in the case of a two-story detached house, this room is one of a living room (living room), a bedroom, a child room, a study, etc. provided on the first or second floor. The remodeling contractor uses various measuring instruments such as a digital thermo-hygrometer and a sound level meter to determine the surface temperature, dimensions, orientation, etc. of elements in all directions that form a room, such as the ceiling, four walls, floors, and windows. Measure and confirm information related to indoor environment. Here, information (hereinafter, also referred to as “diagnosis required information”) measured and confirmed by the remodeling contractor and uploaded to the diagnosis server 104 will be described.

例えば、診断必要情報は、室内環境の情報として、1)床から120cm上での温度(室温)、湿度、露点温度、2)床から10cm上での温度(床付近温度)、3)天井の寸法、天井表面温度、4)壁4面それぞれの方位、寸法、壁表面温度1、壁表面温度2(異なる2箇所の表面温度)、5)床の寸法、床表面温度、6)窓それぞれの方位、寸法、窓表面温度、窓の種類、日射遮蔽物の種類を含む。また、室内環境測定時の外気温も含む。   For example, diagnosis necessary information includes information on indoor environment: 1) temperature 120 cm above the floor (room temperature), humidity, dew point temperature, 2) temperature 10 cm above the floor (temperature near the floor), 3) ceiling Dimensions, ceiling surface temperature, 4) Orientation, dimension, wall surface temperature 1, wall surface temperature 2 (surface temperature at two different locations), 5) floor dimensions, floor surface temperature, 6) windows Includes orientation, dimensions, window surface temperature, window type, and sunscreen type. It also includes the outside air temperature when measuring the indoor environment.

さらに診断必要情報は、朝晩それぞれの室内温度、外気温、測定時刻を含む朝晩温度差情報、建物の建築年と建物内の部屋の位置用途を含む物件情報、部屋における冷暖房機種類と設定温度、燃料、冷暖房効率を含む冷暖房機器情報を含む。さらにまた、窓の改修(例えば内窓の追加)を行う場合、リフォーム施工業者が選択した改修後の窓の仕様(例えば内窓の種類)を含む。   The information necessary for diagnosis includes morning and evening room temperatures, outside air temperatures, morning and evening temperature difference information including measurement time, property information including the building year of the building and the location of the room in the building, the type of air conditioner and set temperature in the room, Air conditioning equipment information including fuel and air conditioning efficiency is included. Furthermore, when the window is modified (for example, an inner window is added), the specification of the window after the modification (for example, the type of the inner window) selected by the remodeling contractor is included.

図3は、図1の診断サーバ104の機能構成を示すブロック図である。診断サーバ104は、リフォーム診断サービスのためのデータ処理を実行するデータ処理部120と、そのデータ処理のための各種データを記憶する記憶領域であるデータ保持部110を備える。なお、ウェブサーバとしての機能そのものは公知であるため詳細な説明は省略する。   FIG. 3 is a block diagram showing a functional configuration of the diagnostic server 104 of FIG. The diagnosis server 104 includes a data processing unit 120 that executes data processing for the reform diagnosis service, and a data holding unit 110 that is a storage area for storing various data for the data processing. In addition, since the function itself as a web server is well-known, detailed description is abbreviate | omitted.

本明細書のブロック図で示す各ブロックは、ハードウェア的には、コンピュータのCPUやメモリをはじめとする素子や機械装置で実現でき、ソフトウェア的にはコンピュータプログラム等によって実現されるが、ここでは、それらの連携によって実現される機能ブロックを描いている。したがって、これらの機能ブロックはハードウェア、ソフトウェアの組合せによっていろいろなかたちで実現できることは、当業者には理解されるところである。   Each block shown in the block diagram of the present specification can be realized in terms of hardware by elements and mechanical devices such as a CPU and a memory of a computer, and in terms of software, it can be realized by a computer program. , Depicts functional blocks realized by their cooperation. Therefore, those skilled in the art will understand that these functional blocks can be realized in various forms by a combination of hardware and software.

例えば、データ処理部120内の各機能ブロックに対応するプログラムモジュールが診断サーバ104のハードディスク等のストレージに格納されてよい。そして診断サーバ104のCPUが、それらのプログラムモジュールをメインメモリへ読み出して実行することによりデータ処理部120の機能が実現されてもよい。また、データ保持部110の機能は、診断サーバ104のストレージやメインメモリにより実現されてもよい。   For example, a program module corresponding to each functional block in the data processing unit 120 may be stored in a storage such as a hard disk of the diagnosis server 104. Then, the function of the data processing unit 120 may be realized by the CPU of the diagnostic server 104 reading and executing these program modules into the main memory. Further, the function of the data holding unit 110 may be realized by the storage of the diagnostic server 104 or the main memory.

データ保持部110は、パラメータ保持部112と評価基準保持部114を有する。パラメータ保持部112は、後述の診断処理部128によるシミュレーション処理のための各種パラメータを保持する。図4は、パラメータ保持部112が保持するデータの例を示す。ここでは図4(a)〜(d)の4つのテーブルを示しているが、実施の形態で後述する表等の各種パラメータについても、例えばテーブルとしてパラメータ保持部112が保持する。   The data holding unit 110 includes a parameter holding unit 112 and an evaluation reference holding unit 114. The parameter holding unit 112 holds various parameters for simulation processing by a diagnostic processing unit 128 described later. FIG. 4 shows an example of data held by the parameter holding unit 112. Here, four tables shown in FIGS. 4A to 4D are shown. However, the parameter holding unit 112 holds various parameters such as tables described later in the embodiment as a table, for example.

図4(a)は、シミュレーション処理の前提となる固定値のパラメータを保持するテーブルを示している。図4(b)は、リフォーム対象の部屋に対して追加的に設置される建材(以下、「商材」とも呼ぶ。)の情報を保持するテーブルを示している。商材は、部屋を単位としたリフォームに用いる建材、建具であり、ひと部屋を単位に設置可能な建材、建具である。例えば、既存の壁へ追加的に設置する壁断熱材、既存の天井に対して追加的に実施する天井断熱工事、既存の床へ追加的に設置する床断熱材、既存の窓へ追加的に設置する内窓、ドア等を含む。また商材情報は、各種商材の断熱性能を示す指標値であり、言い換えれば、室内環境(例えば温度)に与える影響度合いを示す指標値を含む。例えば熱抵抗値、熱伝導抵抗、熱伝導率等の指標値を定めたものであってもよい。図4(b)では、これらの指標値をA〜Cの記号で示しているが、実際には具体的な数値が格納されてよい。   FIG. 4A shows a table that holds parameters of fixed values that are the premise of the simulation process. FIG. 4B shows a table that holds information on building materials (hereinafter also referred to as “commodities”) additionally installed in the room to be reformed. Commercial materials are building materials and fittings used for remodeling in units of rooms, and building materials and fittings that can be installed in units of one room. For example, additional wall insulation for existing walls, additional ceiling insulation for existing ceilings, additional floor insulation for existing floors, additional to existing windows Includes internal windows and doors to be installed. The product information is an index value indicating the heat insulation performance of various products, in other words, an index value indicating the degree of influence on the indoor environment (for example, temperature). For example, index values such as a thermal resistance value, a thermal conduction resistance, and a thermal conductivity may be determined. In FIG. 4B, these index values are indicated by symbols A to C, but actually, specific numerical values may be stored.

図4(c)は、窓の熱貫流率を保持するテーブルを示している。実施の形態では、既存窓の仕様と、改修後の窓仕様(例えば、追加する内窓の仕様)との組み合わせごとに予め定められた熱貫流率を保持する。図4(c)では、熱貫流率の値をa〜lの記号で示しているが、実際には具体的な数値が格納されてよい。図4(c)の熱貫流率は、これまでのリフォーム前後の測定値にもとづく企業の経験値として予め定められたものである。   FIG.4 (c) has shown the table holding the heat transmissivity of a window. In the embodiment, the heat transmissivity predetermined for each combination of the specification of the existing window and the modified window specification (for example, the specification of the inner window to be added) is maintained. In FIG.4 (c), although the value of the heat transmissivity is shown by the symbol of al, a concrete numerical value may be stored in fact. The heat transmissivity shown in FIG. 4 (c) is predetermined as an experience value of the company based on the measured values before and after the renovation so far.

図3に戻り、評価基準保持部114は、リフォーム後の断熱性の性能について、1から5に亘る評価点の決定基準を保持する。図5は、評価基準保持部114が保持するデータを模式的に示す。評価基準保持部114は、5つの評価項目(体感温度、足元の暖かさ、窓の結露、部屋の保温力、冷暖房費)のそれぞれについて、住宅性能表示制度の等級4、すなわち次世代省エネルギー基準(平成11年)に相当する予め定めた基準値と評価点「5」を対応づけて保持する。また住宅性能表示制度の等級1、すなわち省エネ基準以前に相当する予め定めた基準値と評価点「1」を対応づけて保持する。   Returning to FIG. 3, the evaluation criterion holding unit 114 holds a criterion for determining the evaluation points ranging from 1 to 5 with respect to the heat insulating performance after the reforming. FIG. 5 schematically shows data held by the evaluation reference holding unit 114. For each of the five evaluation items (body temperature, foot warmth, window dew condensation, room heat retention, air conditioning costs), the evaluation standard holding unit 114 is a grade 4 of the house performance display system, that is, the next generation energy saving standard ( A predetermined reference value corresponding to (1999) and an evaluation score “5” are held in association with each other. Further, grade 1 of the house performance display system, that is, a predetermined reference value corresponding to before the energy saving standard and an evaluation score “1” are held in association with each other.

例えば、評価項目「体感温度」については、室温と体感温度の差の基準値を評価点と対応づけてもよい。また評価項目「足元の暖かさ」については、上下温度差の基準値を評価点と対応づけてもよい。また評価項目「窓の結露」については、窓表面温度と露点温度との差の基準値を評価点と対応づけてもよい。また評価項目「部屋の保温力」については、暖房中の室温と暖房停止してから所定時間経過後の室温との温度差の基準値を評価点と対応づけてもよい。また評価項目「冷暖房費」については、単位床面積当りの年間冷暖房負荷の基準値を評価点と対応づけてもよく、年間冷暖房費の基準値を評価点と対応づけてもよい。なお、評価点「5」と「1」の間には、住宅性能表示制度の等級3、すなわち新省エネ基準(平成4年)と、住宅性能表示制度の等級2、すなわち旧省エネ基準(昭和55年)が含まれる。   For example, for the evaluation item “body temperature”, a reference value of the difference between room temperature and body temperature may be associated with the evaluation score. For the evaluation item “warmth of feet”, the reference value of the upper and lower temperature difference may be associated with the evaluation score. For the evaluation item “window condensation”, a reference value of the difference between the window surface temperature and the dew point temperature may be associated with the evaluation point. In addition, for the evaluation item “room heat retention capacity”, a reference value of a temperature difference between a room temperature during heating and a room temperature after a predetermined time has elapsed since heating is stopped may be associated with an evaluation score. For the evaluation item “cooling / heating costs”, the reference value of the annual cooling / heating load per unit floor area may be associated with the evaluation point, or the reference value of the annual cooling / heating cost may be associated with the evaluation point. In addition, between the evaluation points “5” and “1”, the grade 3 of the house performance display system, that is, the new energy saving standard (1992), and the grade 2 of the house performance display system, that is, the old energy saving standard (Showa 55). Year).

図3に戻り、データ処理部120は、入力画面提供部122と、入力情報取得部124と、診断結果提供部126と、診断処理部128を有する。入力画面提供部122は、業者端末102からのアクセスを受け付け、診断必要情報の入力画面を示すウェブページを業者端末102へ送信して表示させる。図6(a)、図6(b)、図6(c)は診断必要情報の入力画面を示す。図6(a)は、入力画面70のうち、物件、部屋、天井、床に関する情報の入力エリアを示している。   Returning to FIG. 3, the data processing unit 120 includes an input screen providing unit 122, an input information acquiring unit 124, a diagnostic result providing unit 126, and a diagnostic processing unit 128. The input screen providing unit 122 accepts access from the supplier terminal 102, and transmits a web page indicating an input screen for diagnosis necessary information to the supplier terminal 102 for display. 6 (a), 6 (b), and 6 (c) show an input screen for diagnosis necessary information. FIG. 6A shows an input area for information related to the property, room, ceiling, and floor in the input screen 70.

図6(b)は、入力画面70のうち、壁、窓に関する情報の入力エリアを示している。リフォーム施工業者はタブ72(壁1〜4)を切り替えて、部屋を構成する壁4面それぞれの情報を入力する。またリフォーム施工業者はタブ74(窓1〜6)を切り替えて、部屋に設けられた1以上の窓それぞれの情報を入力する。窓改修案フィールド76および日射遮蔽物改修案フィールド78において、リフォーム施工業者は、窓の種類および日射遮蔽物の改修案を任意に選択できる。例えば、窓の種類の改修案として、図4(c)で示したように、「CCC単板ガラス」「CCC一般複層ガラス」「CCC断熱複層ガラス」「CCC遮熱複層ガラス」の中からいずれかを選択できてもよい。   FIG. 6B shows an input area for information on walls and windows in the input screen 70. The remodeling contractor switches the tab 72 (walls 1 to 4) and inputs information on each of the four walls constituting the room. Further, the remodeling contractor switches the tab 74 (windows 1 to 6) and inputs information on each of one or more windows provided in the room. In the window renovation proposal field 76 and the solar radiation shielding remediation proposal field 78, the remodeling contractor can arbitrarily select the type of window and the renovation proposal for the solar radiation shielding. For example, as shown in Fig. 4 (c), as a modification plan of the type of window, "CCC single plate glass", "CCC general double-glazed glass", "CCC heat insulating double-glazed glass", "CCC heat-insulating double-glazed glass" You may be able to select either

図6(c)は、入力画面70のうち、朝晩の温度差、冷暖房機器情報の入力エリアを示している。リフォーム施工業者が試算ボタン80をクリックすると、業者端末102は、入力画面70へ入力された診断必要情報を診断サーバ104へアップロードし、診断サーバ104は、診断処理を開始する。なお、入力画面70へ入力された診断必要情報、例えば、改修の有無や、窓の改修案の種類により、リフォーム診断の結果は異なってくる。   FIG. 6C shows an input area for a temperature difference between morning and evening and air conditioning equipment information in the input screen 70. When the remodeling contractor clicks the trial calculation button 80, the contractor terminal 102 uploads the diagnosis necessary information input to the input screen 70 to the diagnosis server 104, and the diagnosis server 104 starts the diagnosis process. It should be noted that the result of the renovation diagnosis differs depending on the information necessary for diagnosis input on the input screen 70, for example, whether or not the repair is performed and the type of the window repair plan.

入力情報取得部124は、入力画面のウェブページに入力された診断必要情報を業者端末102から取得して診断処理部128に渡す。診断結果提供部126は、業者端末102から診断結果のダウンロード要求を受け付け、診断処理部128が作成した診断結果のデータを業者端末102へ送信する。   The input information acquisition unit 124 acquires the necessary diagnosis information input on the web page of the input screen from the supplier terminal 102 and passes it to the diagnosis processing unit 128. The diagnosis result providing unit 126 receives a diagnosis result download request from the supplier terminal 102 and transmits the diagnosis result data created by the diagnosis processing unit 128 to the supplier terminal 102.

診断処理部128は、リフォームに伴う室内状態の変化をシミュレーションすることにより、リフォーム後の室内環境を予測する。診断処理部128は、体感温度推定部130と、床付近温度推定部132と、保温力推定部134と、冷暖房費推定部136と、診断結果作成部138を含む。   The diagnosis processing unit 128 predicts the indoor environment after the renovation by simulating a change in the indoor state accompanying the renovation. The diagnosis processing unit 128 includes a sensible temperature estimation unit 130, a near-floor temperature estimation unit 132, a heat insulation power estimation unit 134, a heating / cooling cost estimation unit 136, and a diagnosis result creation unit 138.

体感温度推定部130は、リフォーム前の体感温度を算出するとともに、リフォーム後の体感温度を推定する。体感温度推定部130は、リフォーム前の体感温度を、1)部屋の各面の表面積を求める、2)部屋の各面の表面温度の平均値(以下、「簡易MRT」と呼ぶ。)を求める、3)体感温度を求める、の3ステップで算出する。またリフォーム後の体感温度を、1)リフォーム対象の改修面について表面温度を補正する、2)改修後の簡易MRTを求める、3)リフォーム後の体感温度を求める、の3ステップで算出する。以下詳細に説明する。   The sensible temperature estimation unit 130 calculates the sensible temperature before remodeling and estimates the sensible temperature after remodeling. The sensible temperature estimation unit 130 obtains the sensible temperature before remodeling 1) obtains the surface area of each surface of the room, and 2) obtains the average surface temperature of each surface of the room (hereinafter referred to as “simple MRT”). 3) The sensory temperature is calculated in three steps. In addition, the sensory temperature after the renovation is calculated in three steps: 1) correcting the surface temperature of the repaired surface to be reformed, 2) obtaining a simple MRT after the modification, and 3) obtaining the sensory temperature after the reforming. This will be described in detail below.

1.リフォーム前の体感温度の算出処理:
1)各面の表面積を求める。
まず、壁、天井、床、窓の表面積を求める。
各壁面の表面積 = 天井高×幅 (4面それぞれ算出)
天井の表面積 = 幅×奥行
床の表面積 = 幅×奥行
窓の表面積 = 幅×高さ (入力画面に入力された窓のみ算出)
1. Calculation process of sensory temperature before renovation:
1) Obtain the surface area of each surface.
First, determine the surface area of walls, ceilings, floors, and windows.
Surface area of each wall = ceiling height x width (calculated for each of the four surfaces)
Ceiling surface area = Width x Depth Floor surface area = Width x Depth Window surface area = Width x Height (Calculated only for windows entered on input screen)

次に、壁の方位と窓の方位が一致した場合に、その壁には窓があると判定して、窓のある壁面の表面積を修正する。
窓を除いた壁の表面積 = (方位が一致する)壁の表面積−窓の表面積
そして、部屋全体の表面積を算出する。
部屋全体の表面積 = 各壁面の表面積+天井の表面積+床の表面積
Next, when the orientation of the wall matches the orientation of the window, it is determined that the wall has a window, and the surface area of the wall surface with the window is corrected.
The surface area of the wall excluding the window = the surface area of the wall (with the same orientation) −the surface area of the window Then, the surface area of the entire room is calculated.
Total surface area of the room = Surface area of each wall + Surface area of the ceiling + Surface area of the floor

2)簡易MRTを求める。
まず、部屋全体の表面積に対する各面の表面積の割合を求める。
壁表面積割合 = (窓のない壁の表面積+窓を除いた壁の表面積)÷部屋全体の表面積
天井表面積割合 = 天井の表面積÷部屋全体の表面積
床表面積割合 = 床の表面積÷部屋全体の表面積
窓表面積割合 = 窓の表面積÷部屋全体の表面積
2) Find a simple MRT.
First, the ratio of the surface area of each surface to the surface area of the entire room is obtained.
Wall surface area ratio = (surface area of the wall without windows + wall surface area excluding windows) ÷ surface area of the entire room ceiling surface area ratio = ceiling surface area ÷ surface area of the entire room floor surface area ratio = floor surface area ÷ surface area of the entire room window Surface area ratio = Window surface area ÷ Total surface area of the room

次に、部屋の各面の表面温度率、すなわち部屋全体の表面温度に対する各面の表面温度の寄与分を求める。なお、壁面については、測定された2点の平均値を用いる。すなわち以下の壁表面温度平均値 = (表面温度1+表面温度2)÷2である。
壁表面温度率 = 壁表面積割合×壁表面温度平均値
天井表面温度率 = 天井表面積割合×天井表面温度
床表面温度率 = 床表面積割合×床表面温度
窓表面温度率 = 窓表面積割合×窓表面温度
そして、各面の表面温度率を足して簡易MRTを算出する。
簡易MRT = 壁表面温度率+天井表面温度率+床表面温度率+窓表面温度率
Next, the surface temperature rate of each surface of the room, that is, the contribution of the surface temperature of each surface to the surface temperature of the entire room is obtained. In addition, about the wall surface, the measured average value of 2 points | pieces is used. That is, the following wall surface temperature average value = (surface temperature 1 + surface temperature 2) ÷ 2.
Wall surface temperature ratio = Wall surface area ratio x Wall surface temperature average value Ceiling surface temperature ratio = Ceiling surface area ratio x Ceiling surface temperature Floor surface temperature ratio = Floor surface area ratio x Floor surface temperature Window surface temperature ratio = Window surface area ratio x Window surface temperature Then, a simple MRT is calculated by adding the surface temperature ratio of each surface.
Simple MRT = Wall surface temperature rate + Ceiling surface temperature rate + Floor surface temperature rate + Window surface temperature rate

3)簡易MRTと室温から、リフォーム前の体感温度を求める。
体感温度 = (簡易MRT+室温)÷2
3) From the simple MRT and room temperature, find the temperature before remodeling.
Experience temperature = (simple MRT + room temperature) ÷ 2

2.リフォーム後の体感温度の推定処理:
ここではまず、改修後の壁表面温度の算出方法を説明する。図7は、改修後の表面温度算出のための各種パラメータを示す。改修前・改修後それぞれの壁面のイメージにおいて、その左側が室内となり、右側が室外(典型的には屋外)となる。
2. Estimated temperature after remodeling:
Here, first, a method for calculating the wall surface temperature after renovation will be described. FIG. 7 shows various parameters for calculating the surface temperature after refurbishment. In the image of each wall before and after the renovation, the left side is indoor and the right side is outdoor (typically outdoor).

ここで、室内側表面温度から室温までの温度上昇を、内外温度差を熱抵抗値の割合で按分した値から求め、改修後の表面温度を算出する。

Figure 0006147494
Here, the temperature rise from the indoor side surface temperature to room temperature is obtained from a value obtained by apportioning the difference between the internal and external temperatures by the ratio of the thermal resistance value, and the surface temperature after renovation is calculated.
Figure 0006147494

同様の考えで、室内側表面温度から室温までの温度上昇の値から、既存壁の熱抵抗値を算出する。

Figure 0006147494
Based on the same idea, the thermal resistance value of the existing wall is calculated from the value of the temperature rise from the indoor surface temperature to room temperature.
Figure 0006147494

上記の式1と式2から、改修後の表面温度は、以下の式3により求まる。

Figure 0006147494
From the above formulas 1 and 2, the surface temperature after the repair is obtained by the following formula 3.
Figure 0006147494

改修後の床表面温度および天井表面温度も同様の考え方(式3)で算出する。なお、床下温度は物件ごとの床下換気量の把握が困難であるため、実施の形態では外気温と同じとする。外気温と同等と見れば、表面温度が低めに出るため、安全側の数値となる。なお、改修後の窓表面温度については、図4(c)で示したように、内窓施工後の窓部分の熱貫流率を予めデータとして保持しておき、その値から表面温度を算出する。   The floor surface temperature and ceiling surface temperature after renovation are calculated using the same concept (Formula 3). Note that the underfloor temperature is the same as the outside air temperature in the embodiment because it is difficult to grasp the underfloor ventilation for each property. If it is equivalent to the outside temperature, the surface temperature will be lower, so it will be a safe value. In addition, about the window surface temperature after a repair, as shown in FIG.4 (c), the heat | fever transmissivity of the window part after an inner window construction is previously hold | maintained as data, and surface temperature is calculated from the value. .

1)表面温度を補正する。
改修対象の各壁面について、その表面温度(tw)を式3にしたがって求める。ここで、αi×r2は、室内側熱伝達率(=9)と、図4(b)に示す壁断熱材AAAの熱抵抗値(=A)の積である9Aとなり、算出式は以下の式4となる。

Figure 0006147494
1) Correct the surface temperature.
The surface temperature (tw) of each wall surface to be repaired is obtained according to Equation 3. Here, αi × r2 is 9A which is the product of the indoor heat transfer coefficient (= 9) and the thermal resistance value (= A) of the wall heat insulating material AAA shown in FIG. Equation 4 is obtained.
Figure 0006147494

天井が改修対象の場合、その表面温度(tc)を式3にしたがって求める。ここで、αi×r2は、室内側熱伝達率(=9)と、図4(b)に示す天井断熱工事の熱抵抗値(=B)の積である9Bとなり、算出式は以下の式5となる。

Figure 0006147494
When the ceiling is to be repaired, the surface temperature (tc) is obtained according to Equation 3. Here, αi × r2 is 9B which is the product of the indoor heat transfer coefficient (= 9) and the thermal resistance value (= B) of the ceiling insulation work shown in FIG. 4B, and the calculation formula is as follows: 5
Figure 0006147494

床が改修対象の場合、その表面温度(tf)を式3にしたがって求める。ここで、αi×r2は、室内側熱伝達率(=9)と、図4(b)に示す床断熱材BBBの熱抵抗値(=C)の積である9Cとなり、算出式は以下の式6となる。

Figure 0006147494
If the floor is to be repaired, its surface temperature (tf) is determined according to Equation 3. Here, αi × r2 is 9C, which is the product of the indoor heat transfer coefficient (= 9) and the thermal resistance value (= C) of the floor heat insulating material BBB shown in FIG. 4 (b). Equation 6 is obtained.
Figure 0006147494

次に、改修対象の各窓について、その表面温度(tm)は以下の式7により求まる。ここで窓の熱貫流率(Ka)は、図4(c)で示したように、現在の窓の種類と、リフォーム施工業者により選択された改修後の窓の種類の組み合わせに応じた値を設定する。

Figure 0006147494
Next, the surface temperature (tm) of each window to be repaired is obtained by the following equation (7). Here, as shown in FIG. 4 (c), the heat transmissivity (Ka) of the window is a value corresponding to the combination of the current window type and the modified window type selected by the renovation contractor. Set.
Figure 0006147494

2)改修後の簡易MRTを求める。
改修面については、得られた改修後の表面温度と表面積の割合を掛けて、改修後の表面温度率を求める。以下の改修壁表面積割合は、改修対象の壁について、窓がない場合はその全体の表面積、窓がある場合は窓をのぞいた表面積を、部屋全体の表面積で割った値である。いずれの温度率についても、改修対象の要素毎(例えば改修する壁毎、改修する窓毎)に算出し合算する。
改修後の壁表面温度率 = 改修壁表面積割合×補正した壁表面温度(tw)
改修後の天井表面温度率 = 天井表面積割合×補正した天井表面温度(tc)
改修後の床表面温度率 = 床表面積割合×補正した床表面温度(tf)
改修後の窓表面温度率 = 窓表面積割合×補正した窓表面温度(tm)
2) Obtain a simple MRT after renovation.
For the repaired surface, the surface temperature ratio after the repair is obtained by multiplying the surface temperature after the repair and the ratio of the surface area. The following surface area ratio of the renovation wall is a value obtained by dividing the total surface area of the wall to be refurbished when there is no window and the surface area excluding the window when there is a window by the surface area of the entire room. Any temperature rate is calculated and added for each element to be repaired (for example, for each wall to be repaired or for each window to be repaired).
Wall surface temperature ratio after renovation = Renovated wall surface area ratio x Corrected wall surface temperature (tw)
Renewed ceiling surface temperature rate = ceiling surface area ratio x corrected ceiling surface temperature (tc)
Floor surface temperature ratio after renovation = Floor surface area ratio x Corrected floor surface temperature (tf)
Window surface temperature ratio after repair = Window surface area ratio x Corrected window surface temperature (tm)

そして各面の表面温度率を全て足して簡易MRTを算出する。なお改修対象外の面、すなわち断熱材を追加しない壁や床、内窓を追加しない窓については、現在の表面温度(すなわちウェブページへの入力値)を使用して求める。
簡易MRT = 改修後の壁表面温度率+改修後の天井表面温度率+改修後の床表面温度率+改修後の窓表面温度率+未改修面の表面温度率(すなわちリフォーム前の体感温度の算出処理において求めた値)
3)改修後の体感温度を求める。
改修後の体感温度 = (改修後の簡易MRT+室温)÷2
Then, a simple MRT is calculated by adding all the surface temperature ratios of each surface. In addition, about the surface which is not a repair object, ie, the wall and floor which do not add a heat insulating material, and the window which does not add an internal window, it calculates | requires using the present surface temperature (namely, input value to a web page).
Simple MRT = Wall surface temperature ratio after repair + Ceiling surface temperature ratio after repair + Floor surface temperature ratio after repair + Window surface temperature ratio after repair + Surface temperature ratio of the unmodified surface (ie Value obtained in the calculation process)
3) Find the temperature after renovation.
Sensitive temperature after renovation = (Simple MRT after renovation + room temperature) ÷ 2

床付近温度推定部132は、リフォーム(改修)前の、室温と床付近温度との差(以下、「上下温度差」とも呼ぶ。)を算出する。そしてリフォーム(改修)後の上下温度差を推定して、リフォーム後の床付近温度を推定する。ここでは、
Ti:床から120cm上での温度(室温)
Tf:床から10cm上での温度(床付近温度)、とする。
The near-floor temperature estimation unit 132 calculates a difference between the room temperature and the near-floor temperature (hereinafter, also referred to as “upper and lower temperature difference”) before the reform (renovation). Then, the temperature difference near the floor after remodeling (renovation) is estimated, and the temperature near the floor after remodeling is estimated. here,
Ti: Temperature 120 cm above the floor (room temperature)
Tf: The temperature 10 cm above the floor (the temperature near the floor).

床付近温度推定部132は、改修前(すなわち現状)の上下温度差を、Ti−Tfにより求める。そして、建築年と、現状の上下温度差にもとづいて係数αと、補正値βを決定する。例えば、床付近温度推定部132は、建築年が古いほど、および/または、現状の上下温度差が大きいほど、αおよび/またはβの値として大きい値を出力する所定の評価関数に、建築年と現状の温度差を入力して、αおよびβの値を取得してもよい。また例えば、データ保持部110は、建築年と現状の温度差の組み合わせと、係数α、補正値βそれぞれとの対応関係を定めたテーブルを保持してもよい。このテーブルも上記評価関数と同様に、建築年が古いほど、および/または、現状の上下温度差が大きいほど、αおよび/またはβの値として大きい値を対応づけたものであってよい。床付近温度推定部132は、このテーブルを参照して、建築年と現状の温度差の組み合わせに対応する係数αおよび補正値βを取得してもよい。   The near-floor temperature estimation unit 132 obtains the difference between the upper and lower temperatures before the repair (that is, the current state) from Ti-Tf. Then, the coefficient α and the correction value β are determined based on the year of construction and the current temperature difference between the upper and lower sides. For example, the near-floor temperature estimation unit 132 sets the building year to a predetermined evaluation function that outputs a larger value as α and / or β as the building year is older and / or the current upper and lower temperature difference is larger. And the current temperature difference may be input to obtain the values of α and β. Further, for example, the data holding unit 110 may hold a table that defines a correspondence relationship between the combination of the building year and the current temperature difference, the coefficient α, and the correction value β. Similarly to the above evaluation function, this table may correspond to a larger value as α and / or β as the building year is older and / or the current upper and lower temperature difference is larger. The near-floor temperature estimation unit 132 may obtain the coefficient α and the correction value β corresponding to the combination of the building year and the current temperature difference with reference to this table.

床付近温度推定部132は、改修後の上下温度差を、
改修後の上下温度差 = α(Ti−Tf)+β、により求める。
そして改修後の床付近温度を、
改修後の床付近温度 = 室温−改修後の上下温度差、により求める。
The near-floor temperature estimation unit 132 calculates the upper and lower temperature difference after the repair,
Upper / lower temperature difference after renovation = α (Ti−Tf) + β.
And the temperature near the floor after renovation,
The temperature near the floor after refurbishment = room temperature-the temperature difference between the top and bottom after renovation

次に、保温力推定部134の推定処理を説明する。従来、建築物全体の断熱性能を示すQ値(熱損失係数)は知られていたが、建築物内における部屋単体の断熱性能を求める発想や、その具体的な方法は十分に提案されてこなかった。本発明者は、暖房中の部屋で実測された第1室内温度と、暖房を停止して所定時間経過後の部屋で実測された第2室内温度から、その部屋の断熱性能(具体的には部屋の各部の熱伝導抵抗)を推定する手法を提案する。このように部屋単体の断熱性能を推定することにより、部屋単体のリフォーム施工前の、その部屋での温度低下の推移と、部屋単体のリフォーム施工後の、その部屋での温度低下の推移を見える化し、リフォーム前後での温度低下の差を見える化する。   Next, the estimation process of the thermal insulation power estimation unit 134 will be described. Conventionally, the Q value (heat loss coefficient) indicating the thermal insulation performance of the entire building has been known, but the idea of obtaining the thermal insulation performance of a single room in the building and its specific method have not been sufficiently proposed. It was. From the first indoor temperature measured in the room being heated and the second indoor temperature measured in the room after a predetermined time has elapsed since heating was stopped, the insulative performance of the room (specifically, We propose a method for estimating the thermal conduction resistance of each part of the room. By estimating the thermal insulation performance of a single room in this way, it is possible to see the transition of the temperature drop in the room before the renovation of the single room and the transition of the temperature drop in the room after the renovation of the single room. Visualize the difference in temperature drop before and after renovation.

また本発明者は、所定の単位時間当りに部屋から失われる熱量の大きさに正相関する指標値であり、建築物内での部屋単体の断熱性能を示す新たな指標値として「保温性能」を定義した。この保温性能を用いることで、リフォーム前後のひと部屋の断熱性能の比較が容易になり、また、異なる部屋間の断熱性能の比較も容易になる。なお実施の形態の保温性能は、その値が小さいほど、部屋の断熱性が高いことを示す。したがって典型的には、リフォーム後の保温性能の値は、リフォーム前の保温性能の値よりも小さくなる。   In addition, the present inventor is an index value that is positively correlated with the amount of heat lost from a room per predetermined unit time, and is a new index value that indicates the heat insulation performance of a single room in a building. Defined. By using this heat retaining performance, it becomes easy to compare the heat insulation performance of one room before and after the renovation, and also to compare the heat insulation performance between different rooms. In addition, the thermal insulation performance of embodiment shows that the heat insulation of a room is so high that the value is small. Therefore, typically, the value of the heat retaining performance after the reforming is smaller than the value of the heat retaining performance before the reforming.

まず保温力推定部134の処理を概説する。図8は、保温力推定部134による推定結果を模式的に示す。保温力推定部134は、リフォーム前の部屋において、暖房中に実測された室内温度(第1室内温度82)と、暖房を停止して所定時間経過後に実測された室内温度(第2室内温度84)にもとづいて、リフォーム前の部屋での時間経過に伴う温度低下の推移(図8の改修前計算値)を推定し、リフォーム前の部屋の保温性能を推定する。実施の形態の第1室内温度は、夜間に暖房を停止したときの室内温度、第2室内温度は、暖房を停止して所定時間が経過した朝の室内温度とする。   First, the process of the heat insulation power estimation unit 134 will be outlined. FIG. 8 schematically shows a result of estimation by the heat retaining power estimation unit 134. In the room before renovation, the thermal insulation power estimation unit 134 measures the indoor temperature measured during heating (first indoor temperature 82) and the indoor temperature measured after a predetermined time has elapsed after stopping the heating (second indoor temperature 84). ), The transition of the temperature drop with the passage of time in the room before renovation (calculated value before renovation in FIG. 8) is estimated, and the heat insulation performance of the room before renovation is estimated. The first room temperature in the embodiment is the room temperature when heating is stopped at night, and the second room temperature is the room temperature in the morning when heating is stopped and a predetermined time has elapsed.

保温力推定部134は、第1室内温度82から第2室内温度84への温度変化に整合するよう現在の断熱性能を推定し、その断熱性能にもとづいて現在の保温性能を特定する。保温力推定部134は、現在の断熱性能を、リフォームに用いる商材の性能(断熱性)の指標値にもとづいて補正することで、リフォーム後の断熱性能を推定する。そしてリフォーム後の断熱性能にもとづいて、リフォーム後の部屋での時間経過に伴う温度低下の推移(図8の改修後計算値)を推定する。またリフォーム後の断熱性能にもとづいてリフォーム後の保温性能を特定する。以下、保温力推定部134の処理の詳細を説明する。   The thermal insulation power estimation unit 134 estimates the current thermal insulation performance so as to match the temperature change from the first indoor temperature 82 to the second indoor temperature 84, and identifies the current thermal insulation performance based on the thermal insulation performance. The heat insulation power estimation unit 134 estimates the heat insulation performance after the renovation by correcting the current heat insulation performance based on the index value of the performance (heat insulation) of the product used for the renovation. And based on the heat insulation performance after renovation, the transition of the temperature drop with the passage of time in the room after renovation (calculated value after repair in FIG. 8) is estimated. Moreover, the heat retention performance after remodeling is specified based on the heat insulation performance after remodeling. Hereinafter, the details of the process of the heat retention estimation unit 134 will be described.

図9は、保温力推定部134の詳細処理を示すフローチャートである。保温力推定部134は、入力画面から必要なデータを取得する(S10)。例えば、建設年、部屋の寸法(幅、奥行、天井高さ)、窓の寸法、窓のU値、暖房停止時の室温および外気温、暖房停止時刻、朝の室温および外気温、朝の室温の測定時刻、断熱改修する部位の情報を取得する。窓のU値は、窓の種類とU値との対応関係を予め保持しておき、入力画面に入力された既存窓の種類に応じたU値を選択し、取得してもよい。   FIG. 9 is a flowchart showing a detailed process of the heat retention estimation unit 134. The thermal insulation power estimation unit 134 acquires necessary data from the input screen (S10). For example, construction year, room dimensions (width, depth, ceiling height), window dimensions, window U value, room temperature and outside temperature when heating is stopped, heating stop time, room temperature and outside temperature in the morning, room temperature in the morning The measurement time and information on the part to be insulated are acquired. The U value of the window may be acquired by holding the correspondence between the window type and the U value in advance and selecting the U value according to the type of the existing window input on the input screen.

保温力推定部134は、壁・天井(屋根)・床の断熱材の熱伝導率(W/mK)を仮定する(S12)。各部の熱伝導率に対応する断熱材の厚さ(mm)と熱伝導抵抗(m2K/W)の両方を変量としてもよいが、断熱材の厚さは所与の固定値としてもよく、熱伝導率の仮定値に対応する熱伝導抵抗の仮定値を算出してもよい。ここで熱伝導抵抗は、
熱伝導抵抗 = 厚さ÷1000÷熱伝導率、により算出できる。
The thermal insulation power estimation unit 134 assumes the thermal conductivity (W / mK) of the wall, ceiling (roof), and floor insulation (S12). Both the insulation thickness (mm) and thermal conductivity resistance (m2K / W) corresponding to the thermal conductivity of each part may be variables, but the insulation thickness may be a given fixed value, An assumed value of thermal conduction resistance corresponding to the assumed value of conductivity may be calculated. Here, the heat conduction resistance is
Thermal conductivity resistance = thickness ÷ 1000 ÷ heat conductivity.

保温力推定部134は、以降のS14〜S20の処理をループし、ニュートン・ラフソン法による計算を繰り返す。保温力推定部134は、改修前の部屋における暖房停止後の室温の推移を推定する(S14)。図10は、部屋の熱収支式を示す。保温力推定部134は、図10の熱収支式にしたがって熱回路網計算を実行し、時間経過に伴う室温の推移を特定する。言い換えれば、暖房停止からの経過時間と、その経過時間に対応する室温との組み合わせを算出する。なお実施の形態の熱回路網計算では、タイムステップは600秒、後退差分法によるシミュレーション、内部発熱(例えば冷蔵庫や他の機器)は66.9W、漏気量は建設年にもとづく相当隙間面積を想定して求めることとする。   The thermal insulation power estimation unit 134 loops the subsequent processing of S14 to S20 and repeats the calculation by the Newton-Raphson method. The thermal insulation power estimation part 134 estimates the transition of the room temperature after the heating stop in the room before renovation (S14). FIG. 10 shows the heat balance equation of the room. The thermal insulation power estimation part 134 performs thermal network calculation according to the heat balance equation of FIG. 10, and specifies the transition of room temperature over time. In other words, a combination of the elapsed time from the heating stop and the room temperature corresponding to the elapsed time is calculated. In the thermal network calculation of the embodiment, the time step is 600 seconds, the simulation by the backward difference method, the internal heat generation (for example, a refrigerator or other equipment) is 66.9 W, and the amount of air leakage is a corresponding gap area based on the construction year. Assume that it is assumed.

保温力推定部134は、S14で算出した朝の室温、すなわち暖房を停止してから所定時間経過後の室温の予測値を、実測値である第2室内温度と比較する(S16)。予測値と実測値の温度差が予め定められた許容値以下(例えば±0.5℃の範囲内)である場合(S18のY)、反復計算ループを抜ける。温度差が許容値を超過する場合(S18のN)、部屋の各部の断熱材の熱伝導率を修正することにより、熱伝導抵抗を修正し(S20)、S14を再度実行する。S18のYになった場合は、S12またはS20で仮定した部屋の断熱性能(具体的には熱伝導率、熱伝導抵抗)を、その部屋の実際の断熱性能として決定し、図11に示すステップを実行する。上記の許容値は、建材メーカの経験や知見にもとづいて、無視できる誤差の閾値、言い換えれば、予測値と実測値が十分に近似すると想定される閾値が定められてよい。   The thermal insulation power estimation unit 134 compares the morning room temperature calculated in S14, that is, the predicted value of the room temperature after the elapse of a predetermined time after stopping the heating, with the second indoor temperature that is an actual measurement value (S16). When the temperature difference between the predicted value and the actually measured value is equal to or smaller than a predetermined allowable value (for example, within a range of ± 0.5 ° C.) (Y in S18), the iterative calculation loop is exited. If the temperature difference exceeds the allowable value (N in S18), the thermal conductivity resistance is corrected by correcting the thermal conductivity of the heat insulating material in each part of the room (S20), and S14 is executed again. When Y in S18, the room thermal insulation performance (specifically, thermal conductivity, thermal conduction resistance) assumed in S12 or S20 is determined as the actual thermal insulation performance of the room, and the steps shown in FIG. Execute. The allowable value may be a threshold value of an error that can be ignored based on the experience and knowledge of the building material manufacturer, in other words, a threshold value that is assumed to sufficiently approximate the predicted value and the actual measurement value.

図11は、図9に続く処理を示すフローチャートである。保温力推定部134は、実測値としての第2室内温度に整合する各部の断熱材の熱伝導率から、各部の断熱材の熱貫流率を算出する。そして以下の式8および式9にもとづいて改修前の部屋の保温性能を算出する(S22)。

Figure 0006147494
FIG. 11 is a flowchart showing processing subsequent to FIG. The thermal insulation power estimation unit 134 calculates the thermal conductivity of the heat insulating material of each part from the thermal conductivity of the heat insulating material of each part that matches the second indoor temperature as an actual measurement value. Based on the following formulas 8 and 9, the heat insulation performance of the room before the repair is calculated (S22).
Figure 0006147494

保温力推定部134は、パラメータ保持部112に商材パラメータとして保持された各商材の熱伝導抵抗を参照して、改修対象の壁、天井(屋根)、床、窓の室内側の熱伝導抵抗に対して、改修により各部に追加設置する商材の熱伝導抵抗を付加する(S24)。そしてS24で修正した各部の熱伝導抵抗にもとづいてS14と同様に熱回路網計算を実行し、改修後の部屋における時間経過に伴う室温の推移を特定する。言い換えれば、暖房停止からの経過時間と、その経過時間に対応する室温との組み合わせを算出する(S26)。この熱回路網計算では、漏気量は改修により減少したものと想定し、改修前の計算よりも小さい値を使用する。   The thermal insulation power estimating unit 134 refers to the heat conduction resistance of each product held as a product parameter in the parameter holding unit 112, and conducts heat conduction on the indoor side of the wall, ceiling (roof), floor, and window to be repaired. To the resistance, the heat conduction resistance of the commercial product additionally installed in each part by refurbishment is added (S24). Then, based on the heat conduction resistance of each part corrected in S24, the thermal circuit network calculation is executed in the same manner as in S14, and the transition of the room temperature with the passage of time in the renovated room is specified. In other words, a combination of the elapsed time from the heating stop and the room temperature corresponding to the elapsed time is calculated (S26). In this thermal network calculation, it is assumed that the amount of air leakage has been reduced by the renovation, and a smaller value than the calculation before the renovation is used.

S26について、例えば図8では、実測値としての第1室内温度82が24℃、第2室内温度が4.4℃、アメダスデータにもとづく夜間の外気温が0.4℃、朝の外気温が−2.7℃の場合に、改修後の部屋における朝(暖房停止後6時間経過時)の室温として11.4℃を推定したことを示している。   As for S26, for example, in FIG. 8, the first indoor temperature 82 as an actual measurement value is 24 ° C., the second indoor temperature is 4.4 ° C., the outside air temperature at night based on AMeDAS data is 0.4 ° C., and the outside air temperature in the morning is In the case of −2.7 ° C., 11.4 ° C. is estimated as the room temperature in the morning after the refurbishment (when 6 hours have passed since the heating was stopped).

保温力推定部134は、S24で修正した各部の熱伝導抵抗に対応する熱貫流率を算出し、S22と同様に式8および式9にもとづいて改修後の部屋の保温性能を算出する(S28)。そして、推定した改修前および改修後の保温性能の値と、推定した改修前および改修後の暖房停止後の室温の推移のデータをデータ保持部110へ格納する(S30)。   The thermal insulation power estimation unit 134 calculates the thermal conductivity corresponding to the heat conduction resistance of each part corrected in S24, and calculates the thermal insulation performance of the room after renovation based on Expression 8 and Expression 9 as in S22 (S28). ). Then, the estimated value of the heat insulation performance before and after the renovation and the estimated data of the transition of the room temperature after the heating stop after the renovation and after the renovation are stored in the data holding unit 110 (S30).

さらに保温力推定部134は、
改修前の室温低下量 = 夜の室温−改修前の朝の室温
改修後の室温低下量 = 夜の室温−改修後の朝の室温
により求めた改修前および改修後の室温低下量をデータ保持部110へ格納する。ここでの夜の室温は、暖房中の(もしくは暖房停止直後の)室温を意味し、朝の室温は、暖房を停止してから所定時間経過後の室温を意味する。
Furthermore, the thermal insulation power estimation unit 134
Room temperature decrease before renovation = Room temperature at night-Room temperature in the morning before renovation Room temperature decrease after renovation = Room temperature decrease at night-Room temperature in the morning after renovation Store to 110. Here, the room temperature at night means the room temperature during heating (or immediately after the heating is stopped), and the morning room temperature means the room temperature after a predetermined time has elapsed since the heating was stopped.

冷暖房費推定部136は、入力画面に入力された冷暖房機器情報と、保温力推定部134により推定された保温性能を所定の評価関数に入力して、リフォーム前および後の年間冷暖房費とCO2排出量を推定する。そしてリフォーム前後での年間冷暖房費とCO2排出量の削減量を推定する。冷暖房費推定部136は、部屋の保温性能の値が小さい、すなわち部屋の断熱性が高いほど、年間冷暖房費およびCO2排出量を小さく決定する。以下、冷暖房費推定部136の詳細処理を説明する。   The heating / cooling cost estimation unit 136 inputs the heating / cooling equipment information input on the input screen and the thermal insulation performance estimated by the thermal insulation power estimation unit 134 into a predetermined evaluation function, and the annual heating / cooling cost and CO2 emission before and after the renovation. Estimate the amount. And the amount of annual cooling and heating costs and CO2 emission reductions before and after renovation are estimated. The heating / cooling cost estimation unit 136 determines the annual heating / cooling cost and the amount of CO2 emission to be smaller as the value of the heat insulation performance of the room is smaller, that is, the heat insulation of the room is higher. Hereinafter, detailed processing of the heating / cooling cost estimation unit 136 will be described.

冷暖房費推定部136は、まず、暖房負荷および冷房負荷の決定パラメータとして、部屋単位の日射取得係数(以下、「部分μ値」と呼ぶ。)を算出する。
1.改修(リフォーム)前の部分μ値の算出:
1)屋根からの日射侵入量を求める。
一般的には、屋根の水平投影面積×天井日射侵入率×方位係数、と想定される。ここで、屋根の水平投影面積には、部屋の天井の表面積を使用する。天井日射侵入率は、以下の式10および式11により算出する。概算U値は概算熱貫流率を意味する。

Figure 0006147494
The heating / cooling cost estimation unit 136 first calculates a solar radiation acquisition coefficient (hereinafter referred to as “partial μ value”) for each room as a determination parameter for the heating load and the cooling load.
1. Calculation of partial μ value before renovation:
1) Find the amount of solar intrusion from the roof.
Generally, it is assumed that the horizontal projected area of the roof × the ceiling solar radiation penetration rate × the orientation coefficient. Here, the surface area of the ceiling of the room is used as the horizontal projected area of the roof. The ceiling solar radiation penetration rate is calculated by the following formulas 10 and 11. The approximate U value means the approximate heat transmissibility.
Figure 0006147494

天井の方位係数について、屋根部分は常に1とするので無視する。以上より、実施の形態では、屋根からの日射侵入量 = 天井表面積×天井日射侵入率、により求める。天窓が設けられている場合は、天窓からの日射侵入量 = 天窓表面積×窓日射侵入率を求め、屋根からの日射侵入量に天窓からの日射侵入量を加える。ただし、屋根からの日射侵入量の計算は、改修対象の部屋が最上階の場合にのみ実行する。   Regarding the ceiling orientation factor, the roof portion is always set to 1, so it is ignored. As described above, in the embodiment, the amount of solar intrusion from the roof = the ceiling surface area × the ceiling solar intrusion rate is obtained. If a skylight is provided, calculate the amount of solar intrusion from the skylight = skylight surface area x window solar intrusion rate, and add the amount of solar intrusion from the skylight to the amount of solar intrusion from the roof. However, the calculation of the amount of solar intrusion from the roof is performed only when the room to be repaired is on the top floor.

2)壁からの日射侵入量を求める。
一般的には、外壁面積×壁日射侵入率×方位係数、と想定される。ここで、外壁面積には、改修対象面の壁表面積(窓表面積を除く)を使用する。壁日射侵入率は、以下の式12および式13により算出する。

Figure 0006147494
2) Find the amount of solar intrusion from the wall.
In general, it is assumed that outer wall area × wall solar radiation penetration rate × azimuth coefficient. Here, the wall surface area (excluding the window surface area) of the surface to be repaired is used as the outer wall area. The wall solar radiation penetration rate is calculated by the following equations 12 and 13.
Figure 0006147494

壁の方位係数については、壁の方位(入力データ)と建築地域区分に対応する値を以下の表から決定する。なお地域区分は、入力画面で選択された地域と地点と予め対応づけられた地域区分を選択する。

Figure 0006147494
For the wall orientation coefficient, the value corresponding to the wall orientation (input data) and the building area classification is determined from the following table. As the region classification, a region classification preliminarily associated with the region and the point selected on the input screen is selected.
Figure 0006147494

以上より、実施の形態では、
壁からの日射侵入量 = 壁表面積×壁の日射侵入率×壁の方位係数、により求める。
From the above, in the embodiment,
Solar radiation penetration amount from wall = wall surface area x wall solar radiation penetration rate x wall orientation coefficient.

3)窓からの日射侵入量を求める。
一般的には、開口面積×窓日射侵入率×方位係数、と想定される。ここで、開口面積には窓表面積を使用する。続いて、窓のη0値を、改修前の窓種類と改修前の日射遮蔽物の組み合わせにもとづいて、以下の表により特定する。

Figure 0006147494
3) Obtain the amount of solar intrusion from the window.
In general, it is assumed that opening area × window solar radiation penetration rate × azimuth coefficient. Here, the window surface area is used as the opening area. Subsequently, the η0 value of the window is specified according to the following table based on the combination of the window type before the renovation and the solar radiation shield before the renovation.
Figure 0006147494

また補正係数を、入力データの庇等の有無に基づいて決定する。そして窓日射侵入率を、窓のη0値と補正係数の積として求める。窓の方位係数については、窓の方位と建築地域区分に対応する値を、上記の表1から決定する。以上より、実施の形態では、
窓からの日射侵入量 = 窓表面積×窓日射侵入率×窓の方位係数、により求める。
The correction coefficient is determined based on the presence or absence of wrinkles in the input data. The window solar radiation penetration rate is obtained as the product of the window η0 value and the correction coefficient. For the window orientation coefficient, the values corresponding to the window orientation and the building area classification are determined from Table 1 above. From the above, in the embodiment,
The amount of solar intrusion from the window = window surface area × window solar intrusion rate × window orientation coefficient.

4)改修前の部分μ値を算出する。
部分μ値を、以下の式14により求める。

Figure 0006147494
4) Calculate the partial μ value before renovation.
The partial μ value is obtained by the following equation (14).
Figure 0006147494

2.改修(リフォーム)後の部分μ値の算出:
1)改修後の屋根からの日射侵入量を求める。
以下の式15は、改修後の天井概算U値の算出方法を示している。天井概算U値の算出方法以外は、改修前の屋根からの日射侵入量を求める場合と同じである。

Figure 0006147494
2. Calculation of partial μ value after renovation:
1) Find the amount of solar intrusion from the roof after renovation.
Equation 15 below shows a method of calculating the approximate ceiling U value after refurbishment. Except for the method of calculating the approximate ceiling U value, it is the same as the case of obtaining the amount of solar intrusion from the roof before renovation.
Figure 0006147494

2)改修後の壁からの日射侵入量を求める。
以下の式16は、改修後の壁概算U値の算出方法を示している。壁概算U値の算出方法以外は、改修前の壁からの日射侵入量を求める場合と同じである。

Figure 0006147494
2) Obtain the amount of solar radiation from the wall after renovation.
Equation 16 below shows a method for calculating the approximate wall U value after refurbishment. Except for the method of calculating the approximate wall U value, the method is the same as that for obtaining the amount of solar intrusion from the wall before renovation.
Figure 0006147494

3)改修後の窓からの日射侵入量を求める。
図12は、改修後の窓のη0値を示す。冷暖房費推定部136は、改修前の窓の種類(既存窓仕様)と、改修後の窓の種類(改修後の窓仕様)と、日射遮蔽物の種類の組み合わせにもとづいて、図12の表により窓のη0値を特定する。図12では、窓のη0値をA1〜L5の記号で示しているが、実際には具体的な数値が格納されてよい。窓のη0値の算出方法以外は、改修前の窓からの日射侵入量を求める場合と同じである。
4)改修後の部分μ値を算出する。
部分μ値を、上記の式14により求める。
3) Find the amount of solar intrusion through the refurbished window.
FIG. 12 shows the η0 value of the window after refurbishment. The air-conditioning cost estimation unit 136 uses the table of FIG. 12 based on the combination of the type of window before renovation (existing window specification), the type of window after renovation (window specification after renovation), and the type of solar shading. To specify the η0 value of the window. In FIG. 12, the η0 value of the window is indicated by symbols A1 to L5, but actually, a specific numerical value may be stored. Except for the method of calculating the η0 value of the window, this is the same as the case of obtaining the amount of solar intrusion from the window before renovation.
4) Calculate the partial μ value after refurbishment.
The partial μ value is obtained by the above equation 14.

続いて冷暖房費推定部136は、部分μ値を用いて冷暖房費とCO2排出量を算出し、改修前後での削減量を算出する。
3.改修前の冷暖房費の算出:
1日の平均気温が15℃以下の場合は暖房負荷を計算し、15℃超の場合は冷房負荷を計算する。

Figure 0006147494
Subsequently, the heating / cooling cost estimation unit 136 calculates the heating / cooling cost and the CO2 emission amount using the partial μ value, and calculates the reduction amount before and after the renovation.
3. Calculation of heating and cooling costs before renovation:
When the average daily temperature is 15 ° C. or lower, the heating load is calculated, and when it exceeds 15 ° C., the cooling load is calculated.
Figure 0006147494

式17および式18のパラメータの意味を以下の表に示す。保温性能「Q」には、保温力推定部134が推定した改修前の保温性能を用い、部分μ値「μ」には、改修前の部分μ値を用いる。表4では間欠運転時間をh1〜h4の記号で示しているが、実際には具体的な数値が格納されてよい。

Figure 0006147494
Figure 0006147494
The meanings of the parameters of Equation 17 and Equation 18 are shown in the following table. For the thermal insulation performance “Q”, the thermal insulation performance before the repair estimated by the thermal insulation power estimation unit 134 is used, and for the partial μ value “μ”, the partial μ value before the repair is used. In Table 4, the intermittent operation time is indicated by symbols h1 to h4, but actual numerical values may be stored.
Figure 0006147494
Figure 0006147494

冷暖房費推定部136は、1日の暖房負荷および冷房負荷に、月毎の日数を掛けることで月毎の暖房負荷および冷房負荷を算出する。そして、月毎の暖房費および冷房費を算出する(式19、式20)。冷暖房費推定部136は、月毎の暖房費の合計と月毎の冷房費の合計の和を、年間冷暖房費として算出する(式21)。

Figure 0006147494
The heating / cooling cost estimation unit 136 calculates the monthly heating load and cooling load by multiplying the daily heating load and cooling load by the number of days per month. Then, monthly heating costs and cooling costs are calculated (Equation 19 and Equation 20). The heating / cooling cost estimation unit 136 calculates the sum of the monthly heating costs and the sum of the monthly cooling costs as the annual cooling / heating costs (Formula 21).
Figure 0006147494

なお、COP値および単価は入力データとして取得され、熱量換算値は燃料種類に応じて決定する。具体的には、電気の場合に1(kWh)、ガスの場合に12.79(kWh/m3)、灯油の場合に10.28(kWh/L)とする。冷房の熱量換算値は常に1(kWh)とする。   The COP value and unit price are acquired as input data, and the heat conversion value is determined according to the fuel type. Specifically, 1 (kWh) is set for electricity, 12.79 (kWh / m3) for gas, and 10.28 (kWh / L) for kerosene. The heat conversion value for cooling is always 1 (kWh).

4.改修前のCO2排出量の算出:
月毎のCO2排出量は、暖房負荷および冷房負荷から燃料の使用量を算出し、それに予め定められたCO2排出係数を掛けて算出する(式22、式23)。年間CO2排出量は、月毎のCO2排出量を年間で合計して算出する(式24)。

Figure 0006147494
4). Calculation of CO2 emissions before renovation:
The monthly CO2 emission amount is calculated by calculating the amount of fuel used from the heating load and cooling load and multiplying it by a predetermined CO2 emission coefficient (Equation 22 and Equation 23). The annual CO2 emissions are calculated by summing the monthly CO2 emissions for the year (Formula 24).
Figure 0006147494

5.改修後の冷暖房費の算出:
1日の暖房負荷および冷房負荷の算出において、保温性能「Q」に、保温力推定部134が推定した改修後の保温性能を用い、部分μ値「μ」に、改修後の部分μ値を用いる。それ以外は、改修前の冷暖房費の算出方法と同じである。
5). Calculation of heating and cooling costs after renovation:
In the calculation of the heating load and cooling load for one day, the heat retention performance after the renovation estimated by the heat retention power estimation unit 134 is used as the heat retention performance “Q”, and the partial μ value after the renovation is represented as the partial μ value “μ”. Use. Other than that, it is the same as the method of calculating the heating and cooling costs before renovation.

6.改修後のCO2排出量の算出:
改修前のCO2排出量の算出方法と同じである。ただし、暖房負荷および冷房負荷が改修前とは異なるため、CO2排出量も異なる値となる。典型的には、改修後は改修前より保温性能の値は小さくなり、部分μ値も小さくなるため、暖房負荷および冷房負荷は小さくなる。その結果、CO2排出量も小さくなる。
6). Calculation of CO2 emissions after renovation:
This is the same as the method for calculating CO2 emissions before renovation. However, since the heating load and the cooling load are different from those before the renovation, the CO2 emission amount is also a different value. Typically, after the renovation, the value of the heat insulation performance is smaller than that before the renovation, and the partial μ value is also small, so that the heating load and the cooling load are small. As a result, CO2 emissions are also reduced.

7.冷暖房費・CO2排出量の削減量の算出:
以下の式25により年間の冷暖房費削減量を算出し、以下の式26により年間のCO2排出削減量を算出する。

Figure 0006147494
7). Calculation of air conditioning costs and CO2 emission reductions:
The annual cooling / heating cost reduction amount is calculated by the following equation 25, and the annual CO2 emission reduction amount is calculated by the following equation 26.
Figure 0006147494

診断結果作成部138は、体感温度推定部130、床付近温度推定部132、保温力推定部134、冷暖房費推定部136のそれぞれによるシミュレーション処理の結果を反映したリフォーム診断結果を作成する。具体的には、リフォーム診断結果として、(1)体感温度診断結果、(2)足元の暖かさ診断結果、(3)窓の結露診断結果、(4)部屋の保温力診断結果、(5)冷暖房費診断結果、(6)総合診断結果、の6種類の文書データを作成する。   The diagnosis result creation unit 138 creates a remodeling diagnosis result reflecting the results of simulation processing performed by the sensible temperature estimation unit 130, the near-floor temperature estimation unit 132, the thermal insulation power estimation unit 134, and the heating / cooling cost estimation unit 136. Specifically, the reform diagnosis results are as follows: (1) sensory temperature diagnosis result, (2) foot warmth diagnosis result, (3) dew condensation diagnosis result of window, (4) room thermal insulation diagnosis result, (5) Six types of document data of the air conditioning cost diagnosis result and (6) comprehensive diagnosis result are created.

診断結果作成部138は、作成したリフォーム診断結果のデータをデータ保持部110へ格納する。診断結果提供部126は、業者端末102からの診断結果提供要求に応じて、リフォーム診断結果のデータをデータ保持部110から取得して業者端末102へ送信する。以下、リフォーム診断結果を詳細に説明する。   The diagnosis result creation unit 138 stores the created renovation diagnosis result data in the data holding unit 110. The diagnosis result providing unit 126 acquires the data of the reform diagnosis result from the data holding unit 110 and transmits it to the supplier terminal 102 in response to the request for providing the diagnosis result from the supplier terminal 102. Hereinafter, the reform diagnosis result will be described in detail.

図13は、体感温度診断結果を示す。診断結果作成部138は、リフォーム前の部屋における周囲の表面温度の平均値として、体感温度推定部130が算出したリフォーム前の簡易MRTを取得する。またリフォーム後の部屋における周囲の表面温度の平均値として、体感温度推定部130が算出したリフォーム後の簡易MRTを取得する。診断結果作成部138は、リフォーム前の簡易MRTと、リフォーム後の簡易MRTとを対比して示す周囲表面温度比較情報10を診断結果データに設定する。これにより、顧客に対してリフォーム前後における部屋の構成要素の表面温度の変化を把握しやすく提示できる。   FIG. 13 shows the temperature sensory diagnosis result. The diagnosis result creation unit 138 acquires the simple MRT before renovation calculated by the sensible temperature estimation unit 130 as the average value of the surrounding surface temperature in the room before renovation. Moreover, the simple MRT after remodeling which the sensation temperature estimation part 130 calculated as the average value of the surrounding surface temperature in the room after remodeling is acquired. The diagnosis result creation unit 138 sets the ambient surface temperature comparison information 10 indicating the simple MRT before the renovation and the simple MRT after the remodeling in the diagnosis result data. Thereby, the change of the surface temperature of the component of the room before and after renovation can be easily presented to the customer.

また診断結果作成部138は、体感温度推定部130が推定したリフォーム前の体感温度と、リフォーム後の体感温度とを対比して示す体感温度比較情報12を設定する。ここでデータ保持部110は、リフォーム前後の体感温度の差と、その差を生じさせる着衣との対応関係を保持し、診断結果作成部138は、体感温度推定部130が算出したリフォーム前後の体感温度の差に対応する着衣の情報を体感温度比較情報12に付加する。これにより、顧客に対して体感温度の改善状況を一層把握しやすい態様で提示できる。   The diagnosis result creation unit 138 also sets the sensory temperature comparison information 12 that compares the sensory temperature before remodeling estimated by the sensory temperature estimation unit 130 with the sensory temperature after remodeling. Here, the data holding unit 110 holds the correspondence between the temperature difference before and after the renovation and the clothing that causes the difference, and the diagnosis result creation unit 138 has the sensory experience before and after the remodeling calculated by the temperature estimation unit 130. Information on clothing corresponding to the temperature difference is added to the temperature-sensitive comparison information 12. Thereby, it can be presented to the customer in a manner that makes it easier to grasp the improvement state of the sensible temperature.

また診断結果作成部138は、評価基準保持部114が保持する評価基準を参照し、室温と、リフォーム前の体感温度との差に対応する評価点をリフォーム前評価点14として診断結果データに設定する。また、室温と、リフォーム後の体感温度との差に対応する評価点をリフォーム後評価点16として設定する。例えば、室温と体感温度の差が、評価点「5」に対応する基準値以下、すなわち住宅性能表示制度の等級4相当の基準値以下であれば評価点「5」を設定する。その一方、室温と体感温度の差が、評価点「1」に対応する基準値以上、すなわち住宅性能表示制度の等級1相当の基準値以上であれば、評価点「1」を設定する。また診断結果作成部138は、室温と体感温度の差が小さいほど高い評価点を設定し、その差が大きいほど低い評価点を設定する。   Further, the diagnostic result creation unit 138 refers to the evaluation criteria held by the evaluation criteria holding unit 114, and sets the evaluation score corresponding to the difference between the room temperature and the sensory temperature before remodeling as the pre-reform score 14 in the diagnosis result data. To do. In addition, an evaluation score corresponding to the difference between the room temperature and the sensory temperature after the renovation is set as the post-reform evaluation score 16. For example, if the difference between the room temperature and the sensory temperature is equal to or less than the reference value corresponding to the evaluation score “5”, that is, equal to or less than the reference value corresponding to the grade 4 of the house performance display system, the evaluation score “5” is set. On the other hand, if the difference between the room temperature and the sensory temperature is not less than the reference value corresponding to the evaluation score “1”, that is, not less than the reference value equivalent to class 1 of the house performance display system, the evaluation score “1” is set. The diagnosis result creation unit 138 sets a higher evaluation score as the difference between the room temperature and the sensory temperature is smaller, and sets a lower evaluation score as the difference is larger.

図14は、足元の暖かさ診断結果を示す。診断結果作成部138は、実測されたリフォーム前の床表面温度と、体感温度推定部130が推定したリフォーム後の床表面温度とを対比して示す床表面温度比較情報20を診断結果データに設定する。また、実測されたリフォーム前の室温と床付近温度にもとづく上下温度差と、床付近温度推定部132が推定したリフォーム後の床付近温度および上下温度差を対比して示す上下温度差比較情報22を設定する。   FIG. 14 shows the results of foot warmth diagnosis. The diagnosis result creation unit 138 sets the floor surface temperature comparison information 20 indicating the floor surface temperature before remodeling actually measured and the floor surface temperature after remodeling estimated by the sensible temperature estimation unit 130 as diagnosis result data. To do. Also, the vertical temperature difference comparison information 22 is shown by comparing the measured vertical temperature difference based on the room temperature before reforming and the temperature near the floor, and the floor temperature and the vertical temperature difference after reform estimated by the floor temperature estimation unit 132. Set.

また診断結果作成部138は、評価基準保持部114が保持する評価基準を参照し、リフォーム前の上下温度差に対応する評価点をリフォーム前評価点24として診断結果データに設定する。また、リフォーム後の上下温度差に対応する評価点をリフォーム後評価点26として設定する。具体的には、上下温度差が小さいほど高い評価点を設定し、上下温度差が大きいほど低い評価点を設定する。   Further, the diagnosis result creation unit 138 refers to the evaluation criteria held by the evaluation criteria holding unit 114, and sets the evaluation score corresponding to the upper and lower temperature difference before the reform as the evaluation score 24 before the reform in the diagnosis result data. In addition, an evaluation point corresponding to the temperature difference between the upper and lower sides after the reform is set as the post-reform evaluation point 26. Specifically, a higher evaluation score is set as the vertical temperature difference is smaller, and a lower evaluation score is set as the vertical temperature difference is larger.

図15は、窓の結露診断結果を示す。診断結果作成部138は、実測されたリフォーム前の窓表面温度と、体感温度推定部130により推定されたリフォーム後の窓表面温度とを対比して示す窓表面温度比較情報30を診断結果データに設定する。複数の窓の表面温度が測定された場合はその平均値を設定してもよく、複数の窓を改修する場合は各窓のリフォーム後の表面温度の平均値を設定してもよい。なお図15には不図示であるが、診断結果作成部138は、窓表面温度比較情報30のグラフに対して露点温度を示す画像(例えばライン等のオブジェクト)を付加してもよい。これにより、リフォームによる結露発生の抑制効果を、顧客に対して一層把握しやすい態様で提示できる。   FIG. 15 shows the result of the window condensation diagnosis. The diagnosis result creation unit 138 compares the window surface temperature comparison information 30 indicating the measured window surface temperature before remodeling with the window surface temperature after remodeling estimated by the sensory temperature estimation unit 130 as diagnosis result data. Set. When the surface temperatures of a plurality of windows are measured, the average value may be set, and when the plurality of windows are repaired, the average value of the surface temperatures after reforming of each window may be set. Although not shown in FIG. 15, the diagnosis result creation unit 138 may add an image (for example, an object such as a line) indicating the dew point temperature to the graph of the window surface temperature comparison information 30. As a result, the effect of suppressing the occurrence of dew condensation due to reform can be presented to the customer in a manner that is easier to grasp.

また診断結果作成部138は、評価基準保持部114が保持する評価基準を参照し、リフォーム前の窓表面温度と露点温度の差に対応する評価点をリフォーム前評価点32として診断結果データに設定する。また、リフォーム後の窓表面温度と露点温度の差に対応する評価点をリフォーム後評価点34として設定する。具体的には、窓表面温度と露点温度の差が大きいほど高い評価点を設定し、その差が小さいほど低い評価点を設定する。   Further, the diagnosis result creation unit 138 refers to the evaluation criteria held by the evaluation criteria holding unit 114, and sets an evaluation score corresponding to the difference between the window surface temperature before renovation and the dew point temperature as diagnostic evaluation data 32 before remodeling in the diagnosis result data. To do. Further, an evaluation point corresponding to the difference between the window surface temperature after renovation and the dew point temperature is set as an evaluation point 34 after renovation. Specifically, a higher evaluation point is set as the difference between the window surface temperature and the dew point temperature is larger, and a lower evaluation point is set as the difference is smaller.

図16は、部屋の保温力診断結果を示す。診断結果作成部138は、冷暖房機器を停止してから所定時間が経過するまでの、外気温の推移と、保温力推定部134が推定したリフォーム前の室温推移と、同じく保温力推定部134が推定したリフォーム後の室温推移とを対比して示す室温推移比較情報40を診断結果データに設定する。   FIG. 16 shows a room thermal insulation diagnosis result. The diagnosis result creation unit 138 includes a change in the outside air temperature until a predetermined time elapses after the cooling / heating device is stopped, a room temperature change before the renovation estimated by the heat insulation power estimation unit 134, and the heat insulation power estimation unit 134. The room temperature transition comparison information 40 showing the estimated room temperature transition after remodeling is set in the diagnosis result data.

また診断結果作成部138は、実測されたリフォーム前の夜の室温(第1室内温度)と、実測されたリフォーム前の朝の室温(第2室内温度)にもとづく温度低下量と、第1室内温度と、保温力推定部134が推定した朝の室温にもとづく温度低下量とを対比して示す温度低下比較情報42を診断結果データに設定する。ここでデータ保持部110は、リフォーム前後の温度低下の差と、その差を生じさせる着衣との対応関係を保持し、診断結果作成部138は、リフォーム前後の温度低下の差に対応する着衣の情報を温度低下比較情報42に付加する。これにより、顧客に対して温度低下の改善状況を一層把握しやすい態様で提示できる。   In addition, the diagnosis result creation unit 138 includes the actually measured room temperature in the night (first room temperature) before renovation, the amount of temperature decrease based on the actually measured room temperature in the morning (second room temperature) before renovation, and the first room. The temperature decrease comparison information 42 showing the temperature and the amount of temperature decrease based on the morning room temperature estimated by the heat retention estimation unit 134 is set in the diagnosis result data. Here, the data holding unit 110 holds the correspondence between the difference in temperature drop before and after the renovation and the clothing that causes the difference, and the diagnosis result creation unit 138 stores the difference in the temperature drop before and after the renovation. The information is added to the temperature decrease comparison information 42. Thereby, it can be presented to the customer in a manner that makes it easier to grasp the improvement status of the temperature drop.

また診断結果作成部138は、評価基準保持部114が保持する評価基準を参照し、リフォーム前の温度低下の幅に対応する評価点をリフォーム前評価点44として診断結果データに設定する。また、リフォーム後の温度低下の幅に対応する評価点をリフォーム後評価点46として設定する。具体的には、温度低下の幅が小さいほど高い評価点を設定し、その幅が大きいほど低い評価点を設定する。   Further, the diagnosis result creating unit 138 refers to the evaluation criteria held by the evaluation criteria holding unit 114, and sets the evaluation score corresponding to the temperature decrease before renovation as the pre-reform assessment score 44 in the diagnosis result data. In addition, an evaluation score corresponding to the width of the temperature drop after the reform is set as the post-reform evaluation score 46. Specifically, a higher evaluation score is set as the temperature drop width is smaller, and a lower evaluation score is set as the width is larger.

図17は、冷暖房費診断結果を示す。診断結果作成部138は、入力画面に入力された冷暖房機器情報50を冷暖房費算出の前提条件として診断結果データに設定する。また、冷暖房費推定部136により推定されたリフォーム前後の年間暖房費を対比して示す冷暖房費比較情報52と、同じく冷暖房費推定部136により推定されたリフォーム前後のCO2排出量を対比して示す環境効果比較情報54を診断結果データに設定する。   FIG. 17 shows the result of air conditioning cost diagnosis. The diagnosis result creation unit 138 sets the air conditioning equipment information 50 input on the input screen in the diagnosis result data as a precondition for calculating the heating and cooling costs. Moreover, the heating / cooling cost comparison information 52 that compares the annual heating costs before and after the renovation estimated by the cooling / heating cost estimation unit 136 and the CO2 emissions before and after the renovation estimated by the cooling / heating cost estimation unit 136 are also illustrated and compared. The environmental effect comparison information 54 is set in the diagnosis result data.

また診断結果作成部138は、評価基準保持部114が保持する評価基準を参照し、リフォーム前の年間冷暖房費に対応する評価点をリフォーム前評価点56として診断結果データに設定する。また、リフォーム後の年間冷暖房費に対応する評価点をリフォーム後評価点58として設定する。具体的には、単位床面積当りの年間冷暖房負荷が小さいほど高い評価点を設定し、単位床面積当りの年間冷暖房負荷が大きいほど低い評価点を設定する。部屋が広いほど、また使用する燃料の単価が高いほど冷暖房費は高くなるため、実施の形態では効果的な比較ができるよう比較の基準として単位面積当りの冷暖房負荷を用いる。なお単位床面積当りの年間冷暖房負荷は、冷暖房費推定部136が推定した月毎の冷房負荷および月毎の暖房負荷を合算した年間冷暖房負荷を、床面積で割った値であってもよく、冷暖房費推定部136が算出してもよく、診断結果作成部138が算出してもよい。   Further, the diagnosis result creation unit 138 refers to the evaluation criteria held by the evaluation criteria holding unit 114, and sets the evaluation score corresponding to the annual cooling / heating cost before renovation as the evaluation score 56 before renovation in the diagnosis result data. In addition, an evaluation score corresponding to the annual cooling / heating cost after renovation is set as an evaluation score 58 after renovation. Specifically, a higher evaluation score is set as the annual cooling / heating load per unit floor area is smaller, and a lower evaluation score is set as the annual cooling / heating load per unit floor area is larger. As the room is larger and the unit price of the fuel used is higher, the heating / cooling cost becomes higher. Therefore, in the embodiment, the cooling / heating load per unit area is used as a reference for comparison so that an effective comparison can be made. The annual cooling / heating load per unit floor area may be a value obtained by dividing the monthly cooling load estimated by the heating / cooling cost estimation unit 136 and the annual heating / cooling load obtained by adding the monthly heating load by the floor area, The heating / cooling cost estimation unit 136 may calculate, or the diagnosis result creation unit 138 may calculate.

図18は、総合診断結果を示す。総合診断結果は、体感温度、足元の暖かさ、窓の結露、部屋の保温力、冷暖房費に関する個々の評価を集約して示すドキュメントである。診断結果作成部138は、リフォーム対象となる建築物および部屋の情報である物件情報60と、部屋の構成要素のそれぞれに対するリフォーム内容を示すリフォーム情報62を診断結果データに設定する。   FIG. 18 shows a comprehensive diagnosis result. The comprehensive diagnosis result is a document that collectively shows individual evaluations relating to the temperature of the body, the warmth of the feet, the condensation of the windows, the heat retention capacity of the room, and the heating and cooling costs. The diagnosis result creation unit 138 sets property information 60, which is information on buildings and rooms to be reformed, and reform information 62 indicating the contents of reform for each of the components of the room in the diagnosis result data.

また診断結果作成部138は、体感温度、足元の暖かさ、窓の結露、部屋の保温力、冷暖房費の各評価項目での評価点をリフォーム前後で対比して示すレーダーチャート64を設定する。これにより、リフォーム前後での部屋の快適性および経済性の改善状況を直感的に、かつ、一目で理解しやすい態様で顧客に提示できる。また、リフォーム前の各評価項目での評価点を合計したリフォーム前評価点66と、リフォーム後の各評価項目での評価点を合計したリフォーム後評価点68を設定する。これにより、仮に個々の評価項目での差は仮に小さくても、評価項目全体で見れば差が大きいことを示しやすくなり、部屋リフォームによる効果を強調しやすくなる。   The diagnostic result creation unit 138 also sets a radar chart 64 that shows the evaluation points in the evaluation items of the sensory temperature, the warmth of the feet, the dew condensation of the windows, the thermal insulation power of the room, and the heating and cooling costs before and after the renovation. Thereby, the comfort of the room before and after the renovation and the improvement status of the economy can be presented to the customer in an intuitive and easy-to-understand manner. In addition, a pre-reform evaluation score 66 obtained by summing up the evaluation scores for each evaluation item before renovation and a post-reform evaluation score 68 obtained by summing up the evaluation scores obtained for each evaluation item after renovation are set. As a result, even if the difference between individual evaluation items is small, it is easy to indicate that the difference is large when viewed as a whole evaluation item, and the effect of room reform can be easily emphasized.

以上の構成によるリフォーム診断システム100の動作を以下説明する。
リフォーム施工業者は、顧客の住宅へ訪問し、リフォーム対象となる部屋の環境情報を実測・確認して診断必要情報を収集する。業者端末102は、HTTP通信にて、通信網106を介して診断サーバ104へアクセスし、リフォーム診断サービスの入力画面ページをディスプレイに表示させる。業者端末102は、リフォーム施工業者が入力画面ページに入力した診断必要情報を診断サーバ104へ送信する。
The operation of the reform diagnosis system 100 having the above configuration will be described below.
The remodeling contractor visits the customer's house, collects information necessary for diagnosis by actually measuring and confirming the environmental information of the room to be remodeled. The merchant terminal 102 accesses the diagnosis server 104 via the communication network 106 by HTTP communication, and displays the input screen page of the reform diagnosis service on the display. The contractor terminal 102 transmits the diagnosis necessary information input on the input screen page by the remodeling contractor to the diagnosis server 104.

診断サーバ104の入力情報取得部124は、業者端末102から送信された診断必要情報を受信する。診断サーバ104の診断処理部128は、診断必要情報にもとづいて、リフォーム対象の部屋について、現在の快適性および経済性と、リフォーム後の快適性および経済性を診断する。具体的には、体感温度、足元の暖かさ、窓の結露、部屋の保温力、冷暖房費の5つの評価項目について、現在の状態を定量的に算出するとともに、リフォーム後の状態をシミュレーションにより定量的に推定する。診断サーバ104の診断結果提供部126は、診断処理部128により作成された文書データであり、リフォーム前後の快適性および経済性を対比して示す診断結果データを業者端末102へ提供する。リフォーム施工業者は、その診断結果データを示しつつ、部屋のリフォームを顧客へ提案する。   The input information acquisition unit 124 of the diagnosis server 104 receives the diagnosis necessary information transmitted from the supplier terminal 102. The diagnosis processing unit 128 of the diagnosis server 104 diagnoses the current comfort and economy and the comfort and economy after the renovation for the room to be reformed based on the diagnosis necessary information. Specifically, the current state is quantitatively calculated for the five evaluation items of sensory temperature, warmth of the feet, window condensation, room heat retention, and heating and cooling costs, and the state after renovation is quantified by simulation. Estimate automatically. The diagnosis result providing unit 126 of the diagnosis server 104 is document data created by the diagnosis processing unit 128, and provides diagnosis result data that compares comfort and economy before and after the renovation to the supplier terminal 102. The remodeling contractor proposes room remodeling to the customer while showing the diagnosis result data.

本実施の形態の診断サーバ104によると、家屋内のひと部屋を対象としたリフォームについて、そのリフォームを実施した場合の部屋単体の温度を推定し、その定量的な数値をリフォームによる効果として顧客へ提示できる。これにより、リフォームビジネスを支援し、リフォーム用建材の販売を促進できる。例えば、リフォーム前後での体感温度を対比させて改善状況を提示することで、リフォーム前の部屋において設定温度が高いにもかかわらず暖かいと感じにくい原因を顧客に示し、またリフォームによりその問題が解消することを顧客に示すことができる。   According to the diagnostic server 104 of the present embodiment, for a reform for a room in a house, the temperature of the room alone when the reform is performed is estimated, and the quantitative value is given to the customer as an effect of the reform. Can present. As a result, it is possible to support the renovation business and promote the sale of renovation building materials. For example, by presenting the improvement status by comparing the sensory temperature before and after renovation, it shows the customer the reason why it is difficult to feel warm despite the high set temperature in the room before renovation, and renovation solves that problem Can be shown to the customer to do.

また診断サーバ104によると、部屋の構成要素(1以上の壁や窓等)のうち、改修対象となる要素について改修後の状態(表面温度等)を推定する一方、改修対象外の要素については改修前の状態を維持したまま、リフォーム後の部屋の状態を推定する。このように、推定処理にリフォームの範囲を反映させることで、推定の精度を向上できる。   Moreover, according to the diagnostic server 104, while estimating the state (surface temperature etc.) after a correction | amendment about the element used as a repair object among the components (one or more walls, windows, etc.) of a room, The state of the room after renovation is estimated while maintaining the state before renovation. Thus, the accuracy of estimation can be improved by reflecting the range of reform in the estimation process.

また診断サーバ104によると、暖房中の室内温度と、暖房停止後の室内温度の2つの実測値にもとづいて、熱回路網計算を繰り返して実測値に整合する部屋単体の断熱性能を推定する。これにより、少ない実測値から、部屋の断熱性能を精度よく推定できる。また、部屋単体の断熱性能および保温性能を算出することで、部屋のリフォーム前とリフォーム後それぞれにおける暖房停止後の温度推移、冷暖房費の推定を実現する。   Further, according to the diagnostic server 104, based on two actually measured values of the room temperature during heating and the room temperature after the heating is stopped, the thermal insulation of the room alone that matches the actually measured value is estimated by repeating the thermal network calculation. Thereby, the heat insulation performance of the room can be accurately estimated from a small number of actually measured values. In addition, by calculating the heat insulation performance and heat insulation performance of the room alone, it is possible to estimate the temperature transition and the heating / cooling cost after the heating stop before and after the room reform.

なお実施の形態の温度推定処理では、リフォーム対象の部屋における現在の断熱材の設置状況を示す情報は必要ない。仮に断熱材の設置状況を示す設計書等の文書が存在する場合でも、文書が示す設置状況は実際の設置状況と必ずしも一致するものではなく、設計書等の文書に依存すると却って推定精度が低下することも考えられる。実施の形態の温度推定処理では、設計書等の文書に依存する代わりに、温度の実測値を用いることで推定精度の低下を抑制する。   In the temperature estimation process of the embodiment, information indicating the current installation state of the heat insulating material in the room to be reformed is not necessary. Even if there is a document such as a design document indicating the installation status of the insulation, the installation status indicated by the document does not necessarily match the actual installation status. It is also possible to do. In the temperature estimation process according to the embodiment, instead of depending on a document such as a design document, a decrease in estimation accuracy is suppressed by using an actually measured temperature value.

以上、本発明を実施の形態をもとに説明した。この実施の形態は例示であり、それらの各構成要素や各処理プロセスの組合せによりいろいろな変形例が可能なこと、またそうした変形例も本発明の範囲にあることは当業者に理解されるところである。   The present invention has been described based on the embodiments. This embodiment is an exemplification, and it will be understood by those skilled in the art that various modifications are possible depending on the combination of each component and each processing process, and such modifications are within the scope of the present invention. is there.

上述した実施の形態および変形例の任意の組み合わせもまた本発明の実施の形態として有用である。組み合わせによって生じる新たな実施の形態は、組み合わされる実施の形態および変形例それぞれの効果をあわせもつ。また、請求項に記載の各構成要件が果たすべき機能は、実施の形態および変形例において示された各構成要素の単体もしくはそれらの連係によって実現されることも当業者には理解されるところである。例えば請求項に記載の「断熱性能」は、実施の形態に記載の「熱伝導率」「熱伝導抵抗」「保温性能」の1つもしくは組み合わせを含む概念である。   Any combination of the above-described embodiments and modifications is also useful as an embodiment of the present invention. The new embodiment generated by the combination has the effects of the combined embodiment and the modified examples. In addition, it should be understood by those skilled in the art that the functions to be fulfilled by the constituent elements described in the claims are realized by the individual constituent elements shown in the embodiments and the modified examples or by their linkage. . For example, “thermal insulation performance” described in the claims is a concept including one or a combination of “thermal conductivity”, “thermal conductivity resistance”, and “thermal insulation performance” described in the embodiments.

100 リフォーム診断システム、 102 業者端末、 104 診断サーバ、 112 パラメータ保持部、 114 評価基準保持部、 122 入力画面提供部、 124 入力情報取得部、 126 診断結果提供部、 128 診断処理部、 130 体感温度推定部、 132 床付近温度推定部、 134 保温力推定部、 136 冷暖房費推定部、 138 診断結果作成部。   DESCRIPTION OF SYMBOLS 100 Reform diagnosis system, 102 Contractor terminal, 104 Diagnosis server, 112 Parameter holding part, 114 Evaluation criteria holding part, 122 Input screen provision part, 124 Input information acquisition part, 126 Diagnosis result provision part, 128 Diagnosis processing part, 130 An estimation unit, 132 a near-floor temperature estimation unit, 134 a thermal insulation power estimation unit, 136 an air conditioning cost estimation unit, and 138 a diagnosis result creation unit.

Claims (6)

建築物内の一部屋を単位に設置可能な建材について、その断熱性能を示す指標値を保持する指標値保持部と、
前記建材を設置する前の部屋で測定された温度の情報を取得する取得部と、
前記測定された温度と、前記建材の指標値にもとづいて、前記建材を前記部屋に設置した場合の前記部屋単体の温度を推定する推定部と、
を備え
前記取得部は、前記建材を設置する前の部屋で測定された、暖房中の第1温度と、暖房を停止してから所定時間経過後の第2温度の情報を取得し、
前記推定部は、
前記第1温度と前記第2温度にもとづいて、前記部屋の現在の断熱性能を推定し、
前記建材の指標値にもとづいて前記現在の断熱性能を補正し、補正後の断熱性能にもとづいて、前記建材を設置した場合の、暖房を停止してから前記所定時間経過後の前記部屋の温度を推定することを特徴とする情報処理装置。
One room in a building for installation can be building materials in a single position, and the index value holding portion for holding an index value indicating the insulation performance,
An acquisition unit for acquiring temperature information measured at the front of the room for installing the building material,
Wherein the measured temperature, based on the index value of the building materials, and the estimating unit that estimates a temperature of the room single case of installing the previous SL building materials to the room,
Equipped with a,
The acquisition unit acquires information on a first temperature during heating, measured in a room before the building material is installed, and a second temperature after a predetermined time has elapsed since the heating was stopped,
The estimation unit includes
Based on the first temperature and the second temperature, the current insulation performance of the room is estimated,
Correcting the current heat insulation performance based on the index value of the building material, and when the building material is installed based on the heat insulation performance after the correction, the temperature of the room after the predetermined time has elapsed since heating was stopped the information processing apparatus according to claim that you estimate.
前記取得部は、前記部屋を形成する要素について測定された表面温度の情報を取得し、
前記推定部は、前記測定された表面温度と、前記建材の指標値にもとづいて、前記建材を設置した場合の前記要素の表面温度を推定することにより、前記建材を設置した場合の前記部屋での体感温度を推定することを特徴とする請求項1に記載の情報処理装置。
Wherein the acquisition unit acquires the information of the measured surface temperature for the elements forming the pre-Symbol part shop,
The estimation unit is configured and measured surface temperature, on the basis of the index value of the building materials, by estimating the surface temperature of the elements of the case of installing the building materials, front Stories portion in the case of installing the building materials The information processing apparatus according to claim 1, wherein a sensory temperature at a shop is estimated.
前記取得部は、前記部屋を形成する複数の要素について測定された表面温度の情報を取得し、
前記推定部は、前記複数の要素のうち前記建材を設置する対象の要素について、前記建材を設置した場合の表面温度の推定値を使用する一方、前記建材を設置する対象外の要素については前記測定された表面温度を使用して、前記建材を一部の要素に設置した場合の前記部屋での体感温度を推定することを特徴とする請求項2に記載の情報処理装置。
Wherein the acquisition unit acquires the information of the measured surface temperature for a plurality of elements forming the pre-Symbol part shop,
The estimation unit uses the estimated value of the surface temperature when the building material is installed for the element to which the building material is to be installed among the plurality of elements, while the non-target element for installing the building material is the above using the measured surface temperature information processing apparatus according to claim 2, characterized in that estimating the sensible temperature of the previous SL unit shop in the case of installing the building materials to some elements.
前記推定部は、前記建材を設置する前の部屋の断熱性能を仮定し、その仮定値にもとづいて、暖房を停止してから前記所定時間経過後の前記部屋の温度を推定し、その推定値と前記第2温度の差が所定値以下である場合に、前記仮定値を前記部屋の現在の断熱性能として決定することを特徴とする請求項1から3のいずれかに記載の情報処理装置。 The estimating unit, the building materials assuming adiabatic performance of previous the room to be installed, and on the basis of the assumed value, to estimate the temperature of the pre-Symbol part shop after the predetermined time period elapses from the stop of the heating, If the difference between the second temperature and the estimated value is less than a predetermined value, according to any one of claims 1 to 3, characterized by determining the assumed value as the current thermal insulation performance of the front Stories portion ya Information processing device. 前記取得部により取得された前記部屋の温度の実測値と、前記推定部により推定された前記部屋の温度の予測値を対比させた情報をユーザへ提供する情報提供部をさらに備えることを特徴とする請求項1からのいずれかに記載の情報処理装置。 Further comprising a measured value of the temperature of the pre-Symbol part shop acquired by the acquisition unit, the information providing unit for providing the user information obtained by comparing the predicted value of the temperature of the pre-Symbol part shop estimated by the estimation unit the information processing apparatus according to claim 1, wherein 4 of the. 建築物内の一部屋を単位に設置可能な建材を設置する前の部屋で測定された温度の情報を取得するステップと、
予め定められた前記建材の断熱性能を示す指標値と、前記測定された温度にもとづいて、前記建材を前記部屋に設置した場合の前記部屋単体の温度を推定するステップと、
をコンピュータが実行し、
前記取得するステップは、前記建材を設置する前の部屋で測定された、暖房中の第1温度と、暖房を停止してから所定時間経過後の第2温度の情報を取得するステップを含み、
前記推定するステップは、
前記第1温度と前記第2温度にもとづいて、前記部屋の現在の断熱性能を推定するステップと、
前記建材の指標値にもとづいて前記現在の断熱性能を補正し、補正後の断熱性能にもとづいて、前記建材を設置した場合の、暖房を停止してから前記所定時間経過後の前記部屋の温度を推定するステップとを含むことを特徴とする部屋温度推定方法。
Acquiring temperature information measured at the front of the room to install can be installed building materials one room in a building in a single position,
Estimating the index value indicating the predetermined heat insulating performance of the building material, based on the measured temperature, the room single temperature when placed in front SL building materials to the room,
The computer runs ,
The obtaining step includes a step of obtaining information on a first temperature during heating measured in a room before the building material is installed, and a second temperature after a predetermined time has elapsed since the heating was stopped,
The estimating step includes:
Estimating a current insulation performance of the room based on the first temperature and the second temperature;
Correcting the current heat insulation performance based on the index value of the building material, and when the building material is installed based on the heat insulation performance after the correction, the temperature of the room after the predetermined time has elapsed since heating was stopped Estimating the room temperature. The room temperature estimation method comprising:
JP2012262607A 2012-11-30 2012-11-30 Information processing apparatus and room temperature estimation method Active JP6147494B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2012262607A JP6147494B2 (en) 2012-11-30 2012-11-30 Information processing apparatus and room temperature estimation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2012262607A JP6147494B2 (en) 2012-11-30 2012-11-30 Information processing apparatus and room temperature estimation method

Publications (2)

Publication Number Publication Date
JP2014109809A JP2014109809A (en) 2014-06-12
JP6147494B2 true JP6147494B2 (en) 2017-06-14

Family

ID=51030432

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2012262607A Active JP6147494B2 (en) 2012-11-30 2012-11-30 Information processing apparatus and room temperature estimation method

Country Status (1)

Country Link
JP (1) JP6147494B2 (en)

Families Citing this family (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6491436B2 (en) * 2014-08-21 2019-03-27 株式会社ウッドワン Insulation effect display system, insulation effect display method, and insulation effect display program
JP6440413B2 (en) * 2014-08-28 2018-12-19 株式会社インテグラル Information processing apparatus, information processing method, and program
WO2016051477A1 (en) * 2014-09-29 2016-04-07 株式会社日立製作所 Service system and method for assisting improvement of air-conditioning of building
JP2016103250A (en) * 2014-11-28 2016-06-02 三協立山株式会社 Housing specification system
JP6660613B2 (en) * 2015-11-19 2020-03-11 パナソニックIpマネジメント株式会社 Thermal insulation performance estimation device and thermal insulation performance estimation method
JP7017891B2 (en) * 2017-09-20 2022-02-09 大和ハウス工業株式会社 Air conditioning system
JP7221658B2 (en) * 2018-11-12 2023-02-14 日本板硝子株式会社 Evaluation method of glass body
JP2019192262A (en) * 2019-06-04 2019-10-31 三協立山株式会社 Construction specification system and dwelling presentation data creation method
JP7261104B2 (en) * 2019-06-28 2023-04-19 大和ハウス工業株式会社 Condensation prediction system and program
JP7499634B2 (en) * 2020-07-17 2024-06-14 アズビル株式会社 Condensation prediction device, air conditioning equipment control device, and condensation prediction method
JP2023136915A (en) * 2022-03-17 2023-09-29 中国電力株式会社 Proposed device and program
JP7850050B2 (en) * 2022-10-11 2026-04-22 パナソニックホームズ株式会社 Building insulation renovation plan generation system, generation method, and program
WO2025063298A1 (en) * 2023-09-22 2025-03-27 株式会社Lixil Determination device, computer program, and determination method
JP2025075392A (en) * 2023-10-31 2025-05-15 ミサワホーム株式会社 Information processing device

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4891471B2 (en) * 2000-04-13 2012-03-07 旭化成ホームズ株式会社 Housing environment information provision device
JP2002189779A (en) * 2000-12-22 2002-07-05 Tokyo Energy Research:Kk Energy information processing system, server, energy information processing apparatus, and recording medium
JP2004030387A (en) * 2002-06-27 2004-01-29 Morishita Komuten:Kk System for inspecting housing performance
JP4985722B2 (en) * 2009-07-23 2012-07-25 三菱電機株式会社 Air conditioner

Also Published As

Publication number Publication date
JP2014109809A (en) 2014-06-12

Similar Documents

Publication Publication Date Title
JP6147494B2 (en) Information processing apparatus and room temperature estimation method
Strachan et al. Whole model empirical validation on a full-scale building
JP5841485B2 (en) Heat loss coefficient estimation device, heat loss coefficient estimation method, and program
Hopfe et al. Uncertainty analysis in building performance simulation for design support
JP5943255B2 (en) Energy management device and energy management system
US20160266594A1 (en) System and method for residential utility monitoring and improvement of energy efficiency
US10731890B2 (en) Air conditioning operation analysis device and non-transitory computer-readable recording medium storing program
JP5509402B2 (en) Heat loss coefficient estimation device, heat loss coefficient estimation method, and program
Allison et al. Simulation, implementation and monitoring of heat pump load shifting using a predictive controller
Jenkins et al. Methods for assessing domestic overheating for future building regulation compliance
Ross et al. Uncertainty quantification in life cycle assessments: Interindividual variability and sensitivity analysis in LCA of air‐conditioning systems
Kim et al. Review of modelling approaches for passive ceiling cooling systems
JP2010078447A (en) Q value analysis system, q value analysis method, and q value analysis program
JP5965192B2 (en) Computer for outputting heat insulation effect, program for causing computer to output heat insulation effect, and method for outputting heat insulation effect in computer
JP5525580B2 (en) Building thermal environment simulation equipment
JP5988217B2 (en) Room thermal characteristics estimation device, program
JP6440413B2 (en) Information processing apparatus, information processing method, and program
US7831525B2 (en) Automated energy transfer calculation and compensation
Kneifel et al. Energy performance sensitivity of a net-zero energy home to design and use specifications
Touchie et al. Using suite energy-use and interior condition data to improve energy modeling of a 1960s MURB
Le Dréau et al. Experimental investigation of the influence of the air jet trajectory on convective heat transfer in buildings equipped with air-based and radiant cooling systems
Brohus et al. Influence of occupants’ behaviour on the energy consumption of domestic buildings
JP6679672B2 (en) Index calculation system
Pacquaut et al. Bayesian approach for the assessment of heat transfer coefficients of buildings under occupancy
JP5005838B1 (en) Utility cost prediction system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20150629

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20160420

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20160531

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20160725

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20161129

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20170119

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20170516

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20170517

R150 Certificate of patent or registration of utility model

Ref document number: 6147494

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313111

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250