Concrete compaction confirmation method and formwork structure Download PDF

Info

Publication number
JP6147572B2
JP6147572B2 JP2013112738A JP2013112738A JP6147572B2 JP 6147572 B2 JP6147572 B2 JP 6147572B2 JP 2013112738 A JP2013112738 A JP 2013112738A JP 2013112738 A JP2013112738 A JP 2013112738A JP 6147572 B2 JP6147572 B2 JP 6147572B2
Authority
JP
Japan
Prior art keywords
concrete
formwork
compaction
energy
mold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2013112738A
Other languages
Japanese (ja)
Other versions
JP2014231691A (en
Inventor
俊 梁
俊 梁
坂本 淳
淳 坂本
新井 博之
博之 新井
陽一郎 黒羽
陽一郎 黒羽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP2013112738A priority Critical patent/JP6147572B2/en
Publication of JP2014231691A publication Critical patent/JP2014231691A/en
Application granted granted Critical
Publication of JP6147572B2 publication Critical patent/JP6147572B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Description

本発明は、コンクリート締固め確認方法および型枠構造に関する。   The present invention relates to a concrete compaction confirmation method and a formwork structure.

コンクリート構造物では、硬化後のコンクリートの品質を確保するために、打設コンクリートに内部振動機(バイブレータ等)を挿入して振動を加えることで、打設コンクリートを締め固めるのが一般的である。   In concrete structures, in order to ensure the quality of the concrete after hardening, it is common to compact the cast concrete by inserting an internal vibrator (vibrator, etc.) into the cast concrete and applying vibration. .

打設コンクリートの締め固め不足がコンクリート構造物の不具合の原因となる場合がある。
特に、コンクリートの被り部分では、内部振動機を挿入することができないために被りコンクリートの締め固めが不十分となる場合がある。
Insufficient compaction of the cast concrete may cause defects in the concrete structure.
In particular, in the concrete covering portion, since the internal vibrator cannot be inserted, the covering concrete may be insufficiently compacted.

一方、打設コンクリートの締め固め状況は、目視により確認できない。
そのため、型枠内の打設コンクリートの締め固め状況を確認する方法が開発されている。
On the other hand, the compaction status of the cast concrete cannot be confirmed visually.
Therefore, a method for confirming the compaction status of the cast concrete in the mold has been developed.

例えば、特許文献1には、型枠の外面に押し当てられた計測器により型枠内側の静電容量の大小を測定し、型枠内のコンクリートの充填状態を検知する方法が開示されている。   For example, Patent Document 1 discloses a method of measuring the size of the capacitance inside the mold by using a measuring instrument pressed against the outer surface of the mold, and detecting the concrete filling state in the mold. .

また、特許文献2には、型枠内に設置されたセンサー素子により機械振動を電気信号として検出し、この電気信号を予め設定された基準値と比較することでコンクリートの充填状態を確認する方法が開示されている。   Further, Patent Document 2 discloses a method of detecting a mechanical vibration as an electrical signal by a sensor element installed in a mold and comparing the electrical signal with a preset reference value to confirm a concrete filling state. Is disclosed.

特開2007−192571号公報JP 2007-192571 A 特開2004−218369号公報JP 2004-218369 A

特許文献1に記載の方法は、高周波静電容量の変化を計測する方式であるため、型枠の内面に接するコンクリート表面のみの評価となる。そのため、型枠の内面に沿ってモルタルによる層が形成されているような場合には、未充填箇所を見落としてしまうおそれがあった。   Since the method described in Patent Document 1 is a method for measuring a change in high-frequency capacitance, only the concrete surface in contact with the inner surface of the mold is evaluated. Therefore, when a layer of mortar is formed along the inner surface of the mold, there is a possibility that an unfilled portion may be overlooked.

特許文献2に記載の方法は、センサーがコンクリート内に埋め殺しとなるため、コンクリート内に異物が残存することとなる。また、センサーが使い捨てとなるため、費用が嵩む。   In the method described in Patent Document 2, since the sensor is buried in the concrete, foreign matter remains in the concrete. Further, since the sensor is disposable, the cost increases.

本発明は、このような問題点を解決するためになされたものであり、被りコンクリートの締め固め完了を定量的に確認することが可能なコンクリート締固め確認方法および型枠構造を提供することを課題とする。   The present invention has been made to solve such problems, and provides a concrete compaction confirmation method and a formwork structure capable of quantitatively confirming completion of compaction of covered concrete. Let it be an issue.

前記課題を解決するために、本発明のコンクリート締固め確認方法は、締固め完了エネルギーが既知のコンクリートの締め固め状況を確認するものであって、コンクリート内に挿入された内部振動機により型枠内のコンクリートに振動を加えるとともに、鉄筋の外側に打設されて前記型枠に接する被りコンクリートに付与された振動の加速度を前記型枠の外面から計測する工程と、前記加速度および前記加速度の継続時間に基づいて前記被りコンクリートが受けた累積エネルギーを算出する工程と、前記累積エネルギーと前記締固め完了エネルギーとを比較する工程とを備えることを特徴としている。 In order to solve the above-mentioned problems, the concrete compaction confirmation method of the present invention is for confirming the compaction state of concrete having a known compaction completion energy, and is used to form a mold by an internal vibrator inserted into the concrete. A step of measuring the acceleration of the vibration applied to the concrete covered by being placed outside the reinforcing bar and in contact with the formwork from the outer surface of the formwork, and applying the vibration to the concrete inside and the continuation of the acceleration and the acceleration The method includes a step of calculating a cumulative energy received by the covered concrete based on time, and a step of comparing the cumulative energy with the compaction completion energy.

かかるコンクリート締固め確認方法は、被りコンクリートが受けた振動の加速度を計測することで被りコンクリートの締め固め状況を確認するため、被りコンクリートの締め固め状況を定量的に確認することができる。
つまり、被りコンクリートに伝わった振動の加速度により締め固め状況を確認するため、被りコンクリートの締め固め状況を確実に確認することができる。
Since this concrete compaction confirmation method confirms the compaction state of the covering concrete by measuring the acceleration of vibration received by the covering concrete, the compaction state of the covering concrete can be quantitatively confirmed.
That is, since the compaction situation is confirmed by the acceleration of vibration transmitted to the concrete covering, the compaction situation of the concrete covering can be confirmed with certainty.

また、型枠の外部において被りコンクリートの加速度を計測しているため、コンクリート構造物内にセンサー等の異物が残存することがない。
また、型枠の外面において加速度の計測を行うので、加速度計を繰り返し使用することができ、経済的である。
Further, since the acceleration of the covered concrete is measured outside the formwork, no foreign matter such as a sensor remains in the concrete structure.
Moreover, since acceleration is measured on the outer surface of the mold, the accelerometer can be used repeatedly, which is economical.

また、本発明の型枠構造は、型枠と、前記型枠に接する被りコンクリートが受けた振動の加速度を計測する加速度計とを備えており、前記加速度計は、前記型枠の外面に設置されていて、前記型枠内のコンクリートに挿入された内部振動機によって前記被りコンクリートに付与された振動を計測することを特徴としている。 The formwork structure of the present invention includes a formwork and an accelerometer that measures acceleration of vibration received by the covered concrete in contact with the formwork, and the accelerometer is installed on the outer surface of the formwork. We have been, are characterized that you measure the vibrations imparted to the fog concrete internal vibrator which is inserted into the concrete in the formwork.

かかる型枠構造によれば、型枠の外面から被りコンクリートが受けた加速度を計測することで、コンクリート内部の締め固め状況を高精度に確認することができる。
また、加速度計は、型枠の外面に設置されているため、再利用することができる。
According to such a formwork structure, by measuring the acceleration received by the concrete covered from the outer surface of the formwork, it is possible to confirm the compaction state inside the concrete with high accuracy.
Further, since the accelerometer is installed on the outer surface of the formwork, it can be reused.

前記型枠構造において、前記型枠に貫通孔が形成されているとともに、当該型枠の内面には前記貫通孔を遮蔽する板材が設置されていて、前記加速度計が前記板材の外面に設置されていてもよい。
板材として、型枠本体よりも伝達性に優れた材質のものを採用すれば、より高精度に加速度を測定することができる。
In the mold structure, a through hole is formed in the mold frame, and a plate material that shields the through hole is installed on the inner surface of the mold frame, and the accelerometer is installed on the outer surface of the plate material. It may be.
If the plate material is made of a material having better transmissibility than the mold body, the acceleration can be measured with higher accuracy.

本発明のコンクリート締固め確認方法および型枠構造によれば、コンクリート構造物の品質を確保するとともに、高精度かつ安価にコンクリートの締め固め完了を確認することが可能となる。   According to the concrete compaction confirmation method and formwork structure of the present invention, it is possible to ensure the quality of the concrete structure and confirm the completion of compaction of the concrete with high accuracy and low cost.

本発明の実施形態に係るコンクリート締固め確認方法の手順を示すフローチャートである。It is a flowchart which shows the procedure of the concrete compaction confirmation method which concerns on embodiment of this invention. 振動によるコンクリートの締固めの力学的挙動を示す模式図である。It is a schematic diagram which shows the mechanical behavior of the compaction of concrete by a vibration. コンクリートの締め固め状況の一例を示す断面図である。It is sectional drawing which shows an example of the compaction condition of concrete. (a)は本実施形態の型枠構造の一例を示す断面図、(b)は同型枠構造の他の例の示す断面図、(c)は同型枠構造のその他の例を示す断面図である。(A) is sectional drawing which shows an example of the formwork structure of this embodiment, (b) is sectional drawing which shows the other example of the same formwork structure, (c) is sectional drawing which shows the other example of the same formwork structure is there.

以下、本発明の実施形態について説明する。
本実施形態のコンクリート締固め確認方法は、図1に示すように、エネルギー測定工程S1と、打設工程S2と、計測工程S3と、算出工程S4と、比較工程S5とを備えている。
Hereinafter, embodiments of the present invention will be described.
As shown in FIG. 1, the concrete compaction confirmation method of the present embodiment includes an energy measurement step S1, a placement step S2, a measurement step S3, a calculation step S4, and a comparison step S5.

エネルギー測定工程S1は、打設するコンクリートと同じ配合のコンクリートについて、締固めエネルギー測定装置により締固め完了エネルギーを測定する工程である。
測定された締固め完了エネルギーは、図示しないコンピュータに記憶させる。
The energy measuring step S1 is a step of measuring the compaction completion energy with a compaction energy measuring device for concrete having the same composition as the concrete to be placed.
The measured compaction completion energy is stored in a computer (not shown).

なお、締固め完了エネルギーとは、コンクリートを理論密度まで締め固める(コンクリートから空隙を排除する)のに必要なエネルギーである。
締固め完了エネルギーの測定は、容器内に投入されたコンクリート試料が所定の寸法(理論密度)になるまで加振することにより行う。
The compaction completion energy is energy necessary for compacting concrete to a theoretical density (excluding voids from the concrete).
The compaction completion energy is measured by oscillating until the concrete sample put in the container reaches a predetermined size (theoretical density).

本実施形態で使用する締固めエネルギー測定装置(図示せず)は、加速度センサーを備えた振動台、制御盤、コンクリート試料容器、コンクリート試料上面の沈下に追随する円盤、円盤の位置を計測する変位計、および、コンピュータにより構成されている。   The compaction energy measuring device (not shown) used in this embodiment includes a vibration table equipped with an acceleration sensor, a control panel, a concrete sample container, a disk following the settlement of the concrete sample upper surface, and a displacement for measuring the position of the disk. It is composed of a total and a computer.

コンクリート試料容器は、鉛直振動のみが生じる振動台上に固定されている。
制御盤は、振動台に動力を付与するモータの回転開始と同時にコンピュータの計測プログラムをスタートさせるスイッチを備えている。
なお、締固めエネルギー測定装置の構成は限定されない。
The concrete sample container is fixed on a vibration table where only vertical vibration occurs.
The control panel includes a switch that starts a computer measurement program simultaneously with the start of rotation of a motor that applies power to the vibration table.
The configuration of the compaction energy measuring device is not limited.

締固めエネルギー測定装置により、コンクリートを理論密度まで締め固めて、締固め時間t、振動台の最大加速度αmaxおよび振動数fを読み取る。
そして、締固め時間t、最大加速度αmax、振動数fおよび単位容積質量ρを式1に代入して締固め完了エネルギーEを算出する。なお、コンクリート試料の単位容積質量ρは、コンクリート示方配合から計算する。
The compaction energy measuring device compacts the concrete to the theoretical density, and reads the compaction time t, the maximum acceleration α max of the vibration table, and the frequency f.
Then, the compaction completion energy Et is calculated by substituting the compaction time t, the maximum acceleration α max , the frequency f, and the unit volume mass ρ into Equation 1. The unit volume mass ρ of the concrete sample is calculated from the concrete composition.

=ραmax t/4πf ・・・ 式1
ここで、 :t秒間にコンクリートが受けるエネルギー(J/L)
t:振動時間(s)
αmax:最大加速度(m/s
f:振動数(s−1
ρ:試料の単位容積質量(kg/L)
E t = ρα max 2 t / 4π 2 f Equation 1
here, E t : Energy received by concrete in t seconds (J / L)
t: Vibration time (s)
α max : Maximum acceleration (m / s 2 )
f: Frequency (s −1 )
ρ: unit volume mass of the sample (kg / L)

なお、式1は、コンクリートの締固め過程をモデル化することにより締固めエネルギーを算出するものであって、以下に示す考え方に基づいて導出されたものである。   Formula 1 calculates the compaction energy by modeling the compaction process of concrete, and is derived based on the following concept.

振動機からコンクリートに振動が伝播し、振幅yおよび応答加速度αが生じるとき、単位容積質量ρのコンクリートには、慣性力F(=ρα)が生成される。この慣性力Fによって、コンクリートの組成成分が変位を生じ、空隙が充填されることによって、コンクリートの相対密度が増大すると考えることができる。   When vibration is propagated from the vibrator to the concrete and an amplitude y and a response acceleration α are generated, an inertia force F (= ρα) is generated in the concrete having a unit volume mass ρ. It can be considered that the relative density of the concrete increases due to the inertial force F causing a displacement of the composition component of the concrete and filling the voids.

振動機の受けるエネルギーは、図2に示すように、運動エネルギーEと位置エネルギーEとから成り立っている。運動エネルギーEと位置エネルギーEの和は常に一定である。
運動エネルギーEが0になったときに位置エネルギーEが最大となり、運動エネルギーEの減少過程で加速度αが増大して、コンクリートの構成粒子の質量に慣性力Fが生じ、コンクリートの相対密度が増大する。
The energy received by the vibrator is composed of kinetic energy E K and potential energy E P as shown in FIG. The sum of kinetic energy E K and potential energy E P is always constant.
When the kinetic energy E K becomes zero, the potential energy E P becomes maximum, the acceleration α increases in the process of decreasing the kinetic energy E K , and an inertia force F is generated in the mass of the constituent particles of the concrete, and the relative Density increases.

運動エネルギーEの増大過程では、加速度αが減少過程にあるため、慣性力Fは漸減する。締固めは塑性的で不可逆減少であるから、慣性力Fの漸減期では、コンクリートの締固めは静止状態にあると考えられる。 In the process of increasing the kinetic energy E K , the inertia force F gradually decreases because the acceleration α is in the process of decreasing. Since compaction is plastic and irreversibly decreases, it is considered that the concrete compaction is in a stationary state during the gradual decrease of the inertia force F.

振動の1サイクルにおいてコンクリートの充填率が増大する効果が現れるのは、0〜1/4区間と1/2〜3/4区間の2区間である。そして、作用する振動エネルギーの累積が締固めエネルギーとなる。
締固め時間tにおいては、ftサイクルの振動を受けるので、t秒間の締固めの全締固めエネルギーを算出する式1は、次のように導出される。
The effect of increasing the filling rate of concrete in one cycle of vibration appears in two sections of 0 to 1/4 and 1/2 to 3/4. The cumulative vibration energy that acts is the compaction energy.
At the compaction time t, since vibrations of ft cycles are received, Equation 1 for calculating the total compaction energy for compaction for t seconds is derived as follows.

Figure 0006147572
Figure 0006147572

打設工程S2は、エネルギー測定工程S1において使用したコンクリートと同じ配合のコンクリートを型枠内に打設する工程である(図3参照)。
本実施形態で使用する型枠構造1は、図3に示すように、型枠2と型枠2の外面に設置された加速度計3とにより構成されている。
The placing step S2 is a step of placing concrete having the same composition as the concrete used in the energy measuring step S1 in a mold (see FIG. 3).
As shown in FIG. 3, the formwork structure 1 used in the present embodiment includes a formwork 2 and an accelerometer 3 installed on the outer surface of the formwork 2.

なお、加速度計3は、図4の(a)に示すように、型枠2の外面に磁石等により着脱可能に固定してもよいし、図4の(b)または(c)に示すように、型枠2に設けた貫通孔21を遮蔽する板材4の外面に設置してもよい。   As shown in FIG. 4A, the accelerometer 3 may be detachably fixed to the outer surface of the mold 2 with a magnet or the like, or as shown in FIG. 4B or FIG. In addition, it may be installed on the outer surface of the plate member 4 that shields the through hole 21 provided in the mold 2.

板材4として、型枠2の内面に貼り付けられたゴム板(図4の(b)参照)や、型枠2よりも肉薄の板材4(図4の(c)参照)を使用すれば、型枠2の外面に加速度計3を設置した場合よりも受振感度が向上する。なお、図4の(c)の板材4は、スプリング41を介して型枠2の貫通孔21に設置されたいわゆるツタイプラグタイプである。   If the plate 4 is a rubber plate (see FIG. 4B) attached to the inner surface of the mold 2 or a plate 4 thinner than the mold 2 (see FIG. 4C), The vibration receiving sensitivity is improved as compared with the case where the accelerometer 3 is installed on the outer surface of the mold 2. 4C is a so-called two-type lug type installed in the through hole 21 of the mold 2 via a spring 41. The plate material 4 shown in FIG.

型枠2の貫通孔21は、型枠2に新たに形成してもよいし、型枠2の搬送等に使用するために予め型枠2に形成されたものであってもよい。   The through-hole 21 of the mold 2 may be newly formed in the mold 2 or may be previously formed in the mold 2 for use in conveying the mold 2 or the like.

計測工程S3は、図3に示すように、内部振動機(バイブレータ)5により型枠2内のコンクリートに振動を加えるとともに、鉄筋6の外側に打設されて型枠2に接する被りコンクリートに付与された振動の加速度を、型枠2の外面から計測する工程である。   As shown in FIG. 3, the measurement step S <b> 3 applies vibration to the concrete in the mold 2 by an internal vibrator (vibrator) 5 and is applied to the covered concrete that is placed outside the reinforcing bar 6 and contacts the mold 2. This is a step of measuring the acceleration of the generated vibration from the outer surface of the mold 2.

加速度の計測は、型枠2の外面に設置された加速度計3により行う。加速度計3は、型枠2の表面に伝わってきた振動の加速度を測定する。本実施形態では、型枠2の表面の加速度を、型枠2に接する被りコンクリートが受けた振動の加速度とみなす。   The acceleration is measured by an accelerometer 3 installed on the outer surface of the mold 2. The accelerometer 3 measures the acceleration of vibration transmitted to the surface of the mold 2. In the present embodiment, the acceleration on the surface of the mold 2 is regarded as the acceleration of vibration received by the covered concrete in contact with the mold 2.

加速度計3は、図示しないコンピュータに接続されており、加速度計3により計測された加速度の計測データは、コンピュータに送信される。   The accelerometer 3 is connected to a computer (not shown), and acceleration measurement data measured by the accelerometer 3 is transmitted to the computer.

算出工程S4は、振動の加速度および振動の継続時間に基づいて被りコンクリートが受けた累積エネルギーを算出する工程である。
累積エネルギーの算出は、コンピュータにより行う。
The calculation step S4 is a step of calculating the accumulated energy received by the covered concrete based on the acceleration of vibration and the duration of vibration.
Calculation of the accumulated energy is performed by a computer.

加速度および振動の継続時間に基づくエネルギーEは、式1により算出する。

=ραmax t/4πf ・・・ 式1
ここで、 :t秒間にコンクリートが受けるエネルギー(J/L)
t:振動時間(s)
αmax:最大加速度(m/s
f:振動数(s−1
ρ:試料の単位容積質量(kg/L)
Acceleration and energy E t based on the duration of the vibration is calculated by Equation 1.

E t = ρα max 2 t / 4π 2 f Equation 1
here, E t : Energy received by concrete in t seconds (J / L)
t: Vibration time (s)
α max : Maximum acceleration (m / s 2 )
f: Frequency (s −1 )
ρ: unit volume mass of the sample (kg / L)

比較工程S4は、算出工程S4において算出された累積エネルギーとコンピュータに記憶された締固め完了エネルギーとを比較する工程である。   The comparison step S4 is a step of comparing the accumulated energy calculated in the calculation step S4 with the compaction completion energy stored in the computer.

累積エネルギーが締固め完了エネルギーを上回った場合には、被りコンクリートの締固めが完了したと認定し、累積エネルギーが締固め完了エネルギーを下回っている場合は、締固めが不十分と認定する。   When the accumulated energy exceeds the compaction completion energy, it is recognized that the covering concrete has been compacted. When the cumulative energy is less than the compaction completion energy, it is recognized that compaction is insufficient.

以上、本実施形態のコンクリート締固め確認方法および型枠構造によれば、コンクリートの内部に挿入されたバイブレータ5により被りコンクリートに伝わった振動の加速度により締め固め状況を確認するため、被りコンクリートの締め固め状況を確実に確認することができる。
したがって、視認することができない型枠2内部のコンクリートの締め固め状況を確認することができ、ひいては、締め固め不足等の不具合の減少を図り、高品質のコンクリート構造物を構築することができる。
As described above, according to the concrete compaction confirmation method and the formwork structure of the present embodiment, since the compaction state is confirmed by the acceleration of vibration transmitted to the concrete covered by the vibrator 5 inserted into the concrete, It is possible to confirm the solidified state reliably.
Therefore, it is possible to confirm the compaction state of the concrete inside the mold 2 that cannot be visually recognized, and consequently, it is possible to reduce defects such as insufficient compaction and to construct a high-quality concrete structure.

また、加速度計3は型枠2の外面に設置するため、コンクリート構造物内にセンサー等の異物が残存することがない。また、加速度計3は繰り返し使用することができるため、経済的である。   Moreover, since the accelerometer 3 is installed on the outer surface of the mold 2, no foreign substances such as sensors remain in the concrete structure. Moreover, since the accelerometer 3 can be used repeatedly, it is economical.

加速度計3の設置が容易なため、作業性に優れている。
被りコンクリート全体の締固め状況を評価することができる。
被りコンクリートの締固め状況を即時に評価できるため、締め固め作業を確実に行うことができる。
Since installation of the accelerometer 3 is easy, workability is excellent.
It is possible to evaluate the compaction status of the entire covered concrete.
Since the compaction condition of the covered concrete can be evaluated immediately, the compaction work can be performed reliably.

ここで、バイブレータ5によりコンクリートを締め固める際にコンクリートに加えられたエネルギーEは、図3に示すように、バイブレータ5から遠くなるに従って減衰する。したがって、型枠2の外面に設置された加速度計3により、締め固め完了エネルギー以上のエネルギーが付与されたことが確認できれば、加速度計3の位置からバイブレータ5の間では、締め固めに必要なエネルギーが付与されたと評価することができる。したがって、型枠2の外面においてコンクリートに付与された加速度を測定すれば、被りコンクリートの締め固め状況を評価することができる。   Here, the energy E applied to the concrete when the concrete is compacted by the vibrator 5 attenuates as the distance from the vibrator 5 increases as shown in FIG. 3. Therefore, if it can be confirmed by the accelerometer 3 installed on the outer surface of the mold 2 that energy equal to or higher than the completion energy is applied, energy required for compaction between the position of the accelerometer 3 and the vibrator 5 is obtained. Can be evaluated. Therefore, if the acceleration given to the concrete on the outer surface of the formwork 2 is measured, the compaction state of the covered concrete can be evaluated.

以上、本発明の実施形態について説明した。しかし、本発明は、前述の実施形態に限られず、前記の各構成要素については、本発明の趣旨を逸脱しない範囲で、適宜変更が可能である。   The embodiment of the present invention has been described above. However, the present invention is not limited to the above-described embodiment, and the above-described components can be appropriately changed without departing from the spirit of the present invention.

1 型枠構造
2 型枠
3 加速度計
S3 計測工程
S4 算出工程
S5 比較工程
DESCRIPTION OF SYMBOLS 1 Formwork structure 2 Formwork 3 Accelerometer S3 Measurement process S4 Calculation process S5 Comparison process

Claims (3)

締固め完了エネルギーが既知のコンクリートの締め固め状況を確認するコンクリート締固め確認方法であって、
コンクリート内に挿入された内部振動機により型枠内のコンクリートに振動を加えるとともに、鉄筋の外側に打設されて前記型枠に接する被りコンクリートに付与された振動の加速度を前記型枠の外面から計測する工程と、
前記加速度および前記加速度の継続時間に基づいて前記被りコンクリートが受けた累積エネルギーを算出する工程と、
前記累積エネルギーと前記締固め完了エネルギーとを比較する工程と、を備えることを特徴とする、コンクリート締固め確認方法。
A concrete compaction confirmation method for confirming the compaction status of concrete with a known compaction completion energy,
Vibration is applied to the concrete in the formwork by an internal vibrator inserted into the concrete, and the acceleration of vibration applied to the covered concrete that is placed on the outside of the rebar and touches the formwork from the outer surface of the formwork Measuring process;
Calculating the cumulative energy received by the covered concrete based on the acceleration and the duration of the acceleration;
And a step of comparing the accumulated energy with the compaction completion energy.
型枠と、
前記型枠に接する被りコンクリートが受けた振動の加速度を計測する加速度計と、を備える型枠構造であって、
前記加速度計は、前記型枠の外面に設置されていて、前記型枠内のコンクリートに挿入された内部振動機によって前記被りコンクリートに付与された振動を計測することを特徴とする、型枠構造。
Formwork,
An accelerometer that measures acceleration of vibration received by the covered concrete in contact with the formwork, and a formwork structure comprising:
The accelerometer, have been installed on the outer surface of the mold, it characterized that you measure the vibrations imparted to the fog concrete internal vibrator which is inserted into the concrete in the formwork, formwork Construction.
型枠と、
前記型枠に接する被りコンクリートが受けた振動の加速度を計測する加速度計と、を備える型枠構造であって、
前記型枠には、貫通孔が形成されているとともに、当該型枠の内面には前記貫通孔を遮蔽する板材が設置されており、
前記加速度計は、前記板材の外面に設置されていることを特徴とする、型枠構造。
Formwork,
An accelerometer that measures acceleration of vibration received by the covered concrete in contact with the formwork, and a formwork structure comprising:
A through hole is formed in the mold, and a plate material that shields the through hole is installed on the inner surface of the mold,
A formwork structure , wherein the accelerometer is installed on an outer surface of the plate member.
JP2013112738A 2013-05-29 2013-05-29 Concrete compaction confirmation method and formwork structure Active JP6147572B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2013112738A JP6147572B2 (en) 2013-05-29 2013-05-29 Concrete compaction confirmation method and formwork structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2013112738A JP6147572B2 (en) 2013-05-29 2013-05-29 Concrete compaction confirmation method and formwork structure

Publications (2)

Publication Number Publication Date
JP2014231691A JP2014231691A (en) 2014-12-11
JP6147572B2 true JP6147572B2 (en) 2017-06-14

Family

ID=52125253

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2013112738A Active JP6147572B2 (en) 2013-05-29 2013-05-29 Concrete compaction confirmation method and formwork structure

Country Status (1)

Country Link
JP (1) JP6147572B2 (en)

Families Citing this family (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6534539B2 (en) * 2015-03-03 2019-06-26 株式会社フジタ Vibration compacting detector for concrete
JP6503260B2 (en) * 2015-08-05 2019-04-17 鹿島建設株式会社 Measuring device and compaction determination method
JP6619999B2 (en) * 2015-12-03 2019-12-11 大成建設株式会社 Evaluation method, calculation method and calculation device for compaction characteristics of reinforced concrete, and design method for reinforced concrete
JP7056168B2 (en) * 2018-01-24 2022-04-19 株式会社大林組 Pile construction method
JP6960074B2 (en) * 2018-02-23 2021-11-05 五洋建設株式会社 Automatic compaction device
JP7182899B2 (en) * 2018-04-25 2022-12-05 清水建設株式会社 Tunnel lining construction management system, Tunnel lining construction management method
JP6616880B2 (en) * 2018-12-03 2019-12-04 株式会社フジタ Concrete vibration compaction detector
JP7339099B2 (en) * 2019-09-25 2023-09-05 日本国土開発株式会社 Concrete placing method and formwork
JP2022109342A (en) * 2021-01-15 2022-07-28 岐阜工業株式会社 Tunnel concrete compaction device
JP7833965B2 (en) * 2022-05-25 2026-03-23 りんかい日産建設株式会社 Concrete compaction management device, concrete compaction management method, concrete compaction management program, and concrete compaction management system
JP2024015585A (en) * 2022-07-25 2024-02-06 大成建設株式会社 Compaction evaluation method
JP7794708B2 (en) * 2022-07-25 2026-01-06 大成建設株式会社 Compaction Evaluation System
DE102024121270A1 (en) * 2024-07-25 2026-01-29 Peri Se System and procedure for determining a density

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0768765B2 (en) * 1988-12-12 1995-07-26 株式会社大林組 Automatic concrete compaction device and its construction method

Also Published As

Publication number Publication date
JP2014231691A (en) 2014-12-11

Similar Documents

Publication Publication Date Title
JP6147572B2 (en) Concrete compaction confirmation method and formwork structure
JP7728304B2 (en) Concrete pouring method and formwork
KR101067576B1 (en) Indoor measuring method and device for compaction characteristics of fill material
Li et al. Shaking table test on the collapse process of a three-story reinforced concrete frame structure
KR20120004164A (en) Concrete embedded sensor structure and its manufacturing method
JP6183684B2 (en) Method and system for determining compaction of concrete
KR101691896B1 (en) An apparatus for measuring consistency of fresh concrete and a method for measuring consistency of fresh concrete using the same
KR101184048B1 (en) Early-age concrete strength estimation apparatus and method for using impedance
JP6534539B2 (en) Vibration compacting detector for concrete
JP6026341B2 (en) Concrete compaction judgment device
JP2019015084A (en) Concrete filling confirming method
JP2019127736A (en) Pile construction method
JP6179767B2 (en) Tunnel lining arch concrete stop management method
CN106018094B (en) Concrete temperature stress testing machine and test method of creeping
JP6503260B2 (en) Measuring device and compaction determination method
CN108802188A (en) Grouting fullness detection method and system based on sleeve surface excitation
CN105334315A (en) Measuring method of temperature shrinkage stress of mass concrete structures
JP2012132202A (en) Earth pressure gauge installation structure and earth pressure gauge installation method
JP3777550B2 (en) Shear rate measurement method using specimen mold
JP2019007141A (en) Concrete filling detection system and filling detection method
CN105043975A (en) Concrete friction coefficient determination method and device
JP4229277B2 (en) Method for repairing concrete defects generated during construction of concrete structure and vibrator used for repairing the concrete defects
JP7833965B2 (en) Concrete compaction management device, concrete compaction management method, concrete compaction management program, and concrete compaction management system
JP5142054B2 (en) Concrete filling condition inspection method
JP7739252B2 (en) Method for evaluating the degree of fluidity of ready-mixed concrete, measurement sensor, and device for evaluating the degree of fluidity of ready-mixed concrete

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20151215

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20160506

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20160907

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20161101

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20161227

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20170425

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20170517

R150 Certificate of patent or registration of utility model

Ref document number: 6147572

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250