Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP6164989B2 - Power line communication system and power line communication method - Google Patents
[go: Go Back, main page]

JP6164989B2 - Power line communication system and power line communication method - Google Patents

Power line communication system and power line communication method Download PDF

Info

Publication number
JP6164989B2
JP6164989B2 JP2013182476A JP2013182476A JP6164989B2 JP 6164989 B2 JP6164989 B2 JP 6164989B2 JP 2013182476 A JP2013182476 A JP 2013182476A JP 2013182476 A JP2013182476 A JP 2013182476A JP 6164989 B2 JP6164989 B2 JP 6164989B2
Authority
JP
Japan
Prior art keywords
power line
watt
polling
communication
route
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2013182476A
Other languages
Japanese (ja)
Other versions
JP2015050707A (en
Inventor
陽 中城
陽 中城
功 井出崎
功 井出崎
克己 水戸
克己 水戸
下口 剛史
剛史 下口
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chugoku Electric Power Co Inc
Sumitomo Electric Industries Ltd
Tokyo Electric Power Co Holdings Inc
Original Assignee
Tokyo Electric Power Co Inc
Chugoku Electric Power Co Inc
Sumitomo Electric Industries Ltd
Tokyo Electric Power Co Holdings Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyo Electric Power Co Inc, Chugoku Electric Power Co Inc, Sumitomo Electric Industries Ltd, Tokyo Electric Power Co Holdings Inc filed Critical Tokyo Electric Power Co Inc
Priority to JP2013182476A priority Critical patent/JP6164989B2/en
Publication of JP2015050707A publication Critical patent/JP2015050707A/en
Application granted granted Critical
Publication of JP6164989B2 publication Critical patent/JP6164989B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Cable Transmission Systems, Equalization Of Radio And Reduction Of Echo (AREA)
  • Selective Calling Equipment (AREA)

Description

本発明は、共通の変圧器から電力供給を受ける複数の需要家を対象とした電力線通信システム及び電力線通信方法に関する。   The present invention relates to a power line communication system and a power line communication method for a plurality of consumers who receive power supply from a common transformer.

近年、一般家庭で使用する電力量への関心が高まっており、家庭内でエネルギー管理を行うエネルギー管理システム(HEMS:Home Energy Management System)が注目されている。このシステムでは、宅内に設置されたエネルギー管理機器が、宅内の電気機器の消費電力を監視し、必要に応じてパワーセーブ等の制御を行うことも可能である。   In recent years, interest in the amount of electric power used in ordinary households has increased, and attention has been focused on an energy management system (HEMS: Home Energy Management System) that performs energy management in the household. In this system, the energy management device installed in the home can monitor the power consumption of the electrical devices in the home and perform control such as power saving as necessary.

また、各家の電力量計として、自動検針が可能な通信機能を備えた、いわゆるスマートメータ(登録商標)の導入が進んでいる。かかる電力量計は、検針データを電力会社等の電力供給元に提供するのみならず、宅内のエネルギー管理機器にも提供することができる。これにより、エネルギー管理機器は、前述のように、消費電力を監視し、必要に応じてパワーセーブ等の制御を行うことができる。   Moreover, introduction of what is called a smart meter (registered trademark) having a communication function capable of automatic meter reading is progressing as a watt-hour meter of each house. Such a watt-hour meter can provide meter reading data not only to a power supply source such as a power company but also to energy management equipment in the house. As a result, the energy management device can monitor power consumption and perform control such as power saving as necessary as described above.

エネルギー管理機器と、電力量計との相互の通信には、例えば、専用の通信線を別途必要としない電力線通信(PLC:Power Line Communication)が好適である。特に、マンション等の集合住宅では、電力量計が分厚いコンクリート壁や金属製のドアで囲まれたメータボックスに設けられている。一方、エネルギー管理機器は、家の中に設けられる。このような状況では無線通信が困難な場合が多く、この点でも電力線通信が好適である。   For mutual communication between the energy management device and the watt hour meter, for example, power line communication (PLC) that does not require a dedicated communication line is suitable. Particularly in apartment houses such as apartments, electricity meters are provided in meter boxes surrounded by thick concrete walls and metal doors. On the other hand, the energy management device is provided in the house. In such a situation, wireless communication is often difficult, and power line communication is also preferable in this respect.

電力量計とエネルギー管理機器との間の通信は、基本的には自由に行うものとすることができ、例えば、エネルギー管理機器からランダムに検針データを求め、これに電力量計が答える場合と、電力量計がランダムにエネルギー管理機器に検針データを送りつける場合とがある。   Communication between the watt-hour meter and the energy management device can basically be performed freely. For example, the meter reading data is randomly obtained from the energy management device and the watt-hour meter responds to this. In some cases, the energy meter randomly sends meter reading data to the energy management device.

一方、電力線通信は、電力線を使用するため、集合住宅内の基幹配電線を介して、ある家の通信が、他の家にも漏れる(聞こえる)という状態になる場合がある。このような状態において、各戸でランダムに通信が行われると、信号が衝突する場合も生じる。そこで、通信に、例えばCSMA(Carrier Sense Multiple Access)方式を採用することができる。CSMA方式によれば、信号の衝突を回避しつつ、自由な通信を行うことができる(例えば、特許文献1参照。)。   On the other hand, since power line communication uses a power line, there is a case where communication of one house leaks (sounds) to another house via the main distribution line in the apartment house. In such a state, if communication is performed randomly at each door, there may be cases where signals collide. Therefore, for example, a CSMA (Carrier Sense Multiple Access) system can be adopted for communication. According to the CSMA method, free communication can be performed while avoiding signal collision (see, for example, Patent Document 1).

特開2005−73240号公報JP 2005-73240 A

しかしながら、集合住宅において電力線通信にCSMA方式を採用すると、多数の家で通信が行われることから、ある家で通信を行おうとするとき、既に他の家で通信が行われている、という場合が多くなる。この場合、ランダムな遅延時間(バックオフタイム)後に、再度通信にトライする。このランダムな遅延時間は、通信しようとして待機している家が複数ある場合に、再び、競合するのを避けるためである。しかし、集合住宅の総戸数が多くなると、バックオフタイム後でもまた競合して再々トライを余儀なくされる場合がある。   However, when the CSMA method is adopted for power line communication in an apartment house, communication is performed in many homes. Therefore, when communication is attempted in one house, communication may already be performed in another house. Become more. In this case, communication is tried again after a random delay time (back-off time). This random delay time is to avoid conflicting again when there are multiple houses waiting to communicate. However, if the total number of apartments increases, it may be forced to try again after the back-off time.

図10は、CSMA方式によるデータ伝送の一例を示す図である。例えば、複数(n)の電力量計SM1〜SMnのいずれかが、エネルギー管理機器へ信号を送信しようとする場合に、他の電力量計による送信信号のキャリアが検出されないときは、送信を実行する。例えば電力量計SM1が送信中に、電力量計SMnが送信を行おうとしたときは、キャリア検出により、バックオフタイム後に再トライする。バックオフタイム後にも他の送信が行われているときは、再度、送信できず、2度目のバックオフタイム後に再々トライをしなければならない。集合住宅の総戸数が多くなるほど、このような2回以上のトライが多くなり、待ち時間が長くなると、全体として通信の効率が低下する。   FIG. 10 is a diagram illustrating an example of data transmission by the CSMA method. For example, when any one of a plurality (n) of energy meters SM1 to SMn intends to transmit a signal to an energy management device, transmission is executed when a carrier of a transmission signal by another energy meter is not detected. To do. For example, when the watt-hour meter SM1 is attempting to transmit while the watt-hour meter SM1 is transmitting, retry is made after the back-off time by carrier detection. When another transmission is performed after the back-off time, the transmission cannot be performed again, and another retry must be made after the second back-off time. As the total number of apartments increases, the number of such two or more trials increases, and when the waiting time increases, the overall communication efficiency decreases.

かかる従来の問題点に鑑み、本発明は、共通の変圧器から電力供給を受ける複数の需要家を対象とした電力線通信システム及び電力線通信方法において、需要家の電力量計とエネルギー管理機器との間の通信について効率を高め、確実な通信が実行できるようにすることを目的とする。   In view of such a conventional problem, the present invention provides a power line communication system and a power line communication method for a plurality of consumers who receive power supply from a common transformer. The purpose is to improve the efficiency of communication between the two and to enable reliable communication to be executed.

(1)本発明は、共通の変圧器から電力供給を受ける複数の需要家を対象とした電力線通信システムであって、前記複数の需要家の各々に設けられ、電力線通信の機能を有する電力量計と、前記変圧器と前記電力量計とを繋ぐ電力線を利用した第1ルートの電力線通信により、前記電力量計と通信を行う機能を有するデータ集約機器と、前記複数の需要家の各々に設けられ、前記電力量計と繋ぐ電力線を利用した第2ルートの電力線通信により、前記電力量計と通信を行う機能を有するエネルギー管理機器とを備え、前記電力量計は、前記データ集約機器から逐次ポーリングを受け取るタイミングを時期的基準として前記エネルギー管理機器との通信を実行するものである。   (1) The present invention is a power line communication system for a plurality of consumers who receive power supply from a common transformer, and is provided in each of the plurality of consumers and has a power line communication function. A data aggregating device having a function of communicating with the watt-hour meter by a power line communication of a first route using a power line connecting the transformer and the watt-hour meter, and each of the plurality of consumers Provided with an energy management device having a function of communicating with the watt-hour meter by power line communication of a second route using a power line connected to the watt-hour meter, the watt-hour meter from the data aggregation device Communication with the energy management device is executed with the timing of receiving sequential polling as a timing reference.

上記第1ルートは一般にAルートと呼ばれ、上記第2ルートは一般にBルートと呼ばれている。上記のような電力線通信システムでは、電力量計が、Aルートの通信であるポーリング(例えば、電力量の検針のためのポーリング)を受け取るタイミングを時期的基準としてBルートの通信をエネルギー管理機器との間で実行する。ここで、ポーリングは定期的に行われている。従って、Bルートの通信は、定期的に実行される。その結果、特にBルートにおいて、CSMA方式に任せる場合に比べて通信の効率を高め、Bルートの確実な通信を実現することができる。   The first route is generally referred to as the A route, and the second route is generally referred to as the B route. In the power line communication system as described above, the watt-hour meter uses the timing of receiving polling (for example, polling for metering of electric energy) as the timing reference, and the B-route communication is performed with the energy management device. Run between. Here, polling is performed periodically. Therefore, the B route communication is periodically executed. As a result, it is possible to improve communication efficiency and realize reliable communication of the B route, particularly in the case of the B route, as compared with the case where the CSMA method is used.

(2)また、上記(1)の電力線通信システムにおいて、電力量計とエネルギー管理機器との通信は、電力量の検針のためのポーリングの順番及びタイミングに追従して実行されてもよい。
この場合、ポーリングが一周すれば、電力量計とエネルギー管理機器との通信についても全ての需要家について実行される。
(2) In the power line communication system of (1) above, communication between the watt hour meter and the energy management device may be executed following the order and timing of polling for metering of the electric energy.
In this case, if polling goes around, communication between the watt-hour meter and the energy management device is executed for all customers.

(3)また、上記(1)又は(2)の電力線通信システムにおいて、電力量計は、自己宛のポーリングに対する応答完了後に、同一需要家のエネルギー管理機器との通信を実行するようにしてもよい。
この場合、自己宛のポーリングに対する電力量計からデータ集約機器への応答と、同一需要家での電力量計とエネルギー管理機器との通信とが、時間的に同時に行われないので、Aルート、Bルートで、同一の周波数帯域を使用することができる。
(3) In the power line communication system of (1) or (2) above, the watt hour meter may execute communication with the energy management device of the same consumer after completing the response to the polling addressed to itself. Good.
In this case, since the response from the watt hour meter to the data aggregation device for polling addressed to itself and the communication between the watt hour meter and the energy management device at the same consumer are not performed simultaneously in time, the A route, In the B route, the same frequency band can be used.

(4)また、上記(1)又は(2)の電力線通信システムにおいて、電力量計は、自己宛のポーリングに対する応答を第1の周波数帯域を用いて行うと同時に、第1の周波数帯域とは異なる第2の周波数帯域を用いて、同一需要家の前記エネルギー管理機器との通信を実行するようにしてもよい。
この場合、異なる周波数帯域であることにより同時に通信しても信号同士の干渉が生じない。従って、ポーリング間の限られた時間を、より有効に、活用することができる。
(4) In the power line communication system of (1) or (2), the watt-hour meter performs a response to polling addressed to itself using the first frequency band, and at the same time, what is the first frequency band? You may make it perform communication with the said energy management apparatus of the same consumer using a different 2nd frequency band.
In this case, interference between signals does not occur even if communication is performed simultaneously because of different frequency bands. Therefore, the limited time between polling can be utilized more effectively.

(5)また、上記(1)〜(4)のいずれかの電力線通信システムにおいて、電力量計が、自己宛のポーリングに対する応答を完了し、かつ、同一需要家の前記エネルギー管理機器との通信を完了した後、次のポーリングまでの空き時間に、複数組の電力量計とエネルギー管理機器との通信が、時分割で実行されるようにしてもよい。
この場合、ポーリング間の空き時間を利用して、さらにBルートの通信を行うことができる。
(5) Moreover, in the power line communication system according to any one of the above (1) to (4), the watt-hour meter completes a response to polling addressed to itself and communicates with the energy management device of the same consumer After completing the above, communication between a plurality of sets of watt hour meters and the energy management device may be executed in a time-sharing manner during the idle time until the next polling.
In this case, the B route can be further communicated by using the idle time between polling.

(6)また、上記(5)の電力線通信システムにおいて、空き時間における、複数組の電力量計とエネルギー管理機器との通信は、第1ルートのポーリングの順序に基づく順番にて時分割で実行されるようにしてもよい。
この場合、順番が明確になるので、空き時間を利用したBルートの通信を、より確実に行うことができる。
(6) In the power line communication system of (5) above, communication between a plurality of sets of watt hour meters and energy management devices in idle time is executed in a time-sharing manner in an order based on the polling order of the first route. You may be made to do.
In this case, since the order becomes clear, it is possible to more reliably perform the B route communication using the free time.

(7)また、上記(1)の電力線通信システムにおいて、一度のポーリングに対して、複数組の電力量計とエネルギー管理機器との間で同時に通信が行われ、各組で周波数帯域が異なっていてもよい。
この場合、異なる周波数帯域であることにより同時に通信しても信号同士の干渉が生じない。従って、ポーリング間の限られた時間に、多数のBルートの通信を行うことができる。
(7) In the power line communication system of (1), communication is simultaneously performed between a plurality of sets of watt hour meters and energy management devices for one polling, and the frequency bands are different in each set. May be.
In this case, interference between signals does not occur even if communication is performed simultaneously because of different frequency bands. Therefore, communication of a large number of B routes can be performed in a limited time between polling.

(8)また、上記(1)〜(4)、(7)のいずれかの電力線通信システムにおいて、電力量計が、自己宛のポーリングに対する応答を完了し、かつ、対応するエネルギー管理機器との通信を完了した後、次のポーリングまでの空き時間に、複数組の電力量計と、対応するエネルギー管理機器との通信が、時分割で実行され、かつ、同時に実行される複数組は互いに異なる周波数帯域を使用するようにしてもよい。
この場合、ポーリング間の空き時間を利用して、さらにBルートの通信を行うことができる。また、複数組については、異なる周波数帯域であることにより同時に通信しても信号同士の干渉が生じない。従って、ポーリング間の限られた時間に、多数のBルートの通信を行うことができる。
(8) In the power line communication system according to any one of (1) to (4) and (7), the watt-hour meter completes a response to polling addressed to itself and After the communication is completed, communication between a plurality of sets of watt hour meters and corresponding energy management devices is executed in a time-sharing manner in the idle time until the next polling, and the plurality of sets that are simultaneously executed are different from each other. You may make it use a frequency band.
In this case, the B route can be further communicated by using the idle time between polling. Moreover, even if it communicates simultaneously about several sets because it is a different frequency band, interference between signals does not arise. Therefore, communication of a large number of B routes can be performed in a limited time between polling.

(9)一方、本発明は、共通の変圧器から電力供給を受ける複数の需要家の各々に設けられ、電力線通信の機能を有する電力量計と、前記変圧器と前記電力量計とを繋ぐ電力線を利用した第1ルートの電力線通信により、前記電力量計と通信を行う機能を有するデータ集約機器と、前記複数の需要家の各々に設けられ、前記電力量計と繋ぐ電力線を利用した第2ルートの電力線通信により、前記電力量計と通信を行う機能を有するエネルギー管理機器とを備える電力線通信システムにおける電力線通信方法であって、(a)前記電力量計は、前記データ集約機器から逐次ポーリングを受け取り、(b)前記電力量計は、前記ポーリングを受け取ったタイミングを時期的基準として前記エネルギー管理機器との通信を実行する、電力線通信方法である。   (9) On the other hand, this invention is provided in each of the some consumers who receive electric power supply from a common transformer, and connects the watt-hour meter which has a function of power line communication, and the said transformer and the said watt-hour meter. By using the power line communication of the first route using the power line, the data aggregation device having a function of communicating with the watt hour meter and the first using the power line connected to the watt hour meter provided in each of the plurality of consumers A power line communication method in a power line communication system including an energy management device having a function of performing communication with the watt hour meter by two-route power line communication, wherein: (a) the watt hour meter is sequentially transmitted from the data aggregation device. (B) The watt-hour meter performs communication with the energy management device using the timing at which the polling is received as a timing reference. A.

上記第1ルートは一般にAルートと呼ばれ、上記第2ルートは一般にBルートと呼ばれている。上記のような電力線通信システムでは、電力量計が、Aルートの通信であるポーリング(例えば、電力量の検針のためのポーリング)を受け取るタイミングを時期的基準としてBルートの通信をエネルギー管理機器との間で実行する。ここで、ポーリングは定期的に行われている。従って、Bルートの通信は、定期的に実行される。その結果、特にBルートにおいて、CSMA方式に任せる場合に比べて通信の効率を高め、Bルートの確実な通信を実現することができる。   The first route is generally referred to as the A route, and the second route is generally referred to as the B route. In the power line communication system as described above, the watt-hour meter uses the timing of receiving polling (for example, polling for metering of electric energy) as the timing reference, and the B-route communication is performed with the energy management device. Run between. Here, polling is performed periodically. Therefore, the B route communication is periodically executed. As a result, it is possible to improve communication efficiency and realize reliable communication of the B route, particularly in the case of the B route, as compared with the case where the CSMA method is used.

本発明によれば、需要家の電力量計とエネルギー管理機器との間の通信について効率を高め、確実な通信が実行できる。   ADVANTAGE OF THE INVENTION According to this invention, efficiency can be improved about communication between a consumer's electricity meter and energy management apparatus, and reliable communication can be performed.

共通の変圧器から電力供給を受ける複数の需要家を対象とした本発明の実施形態に係る電力線通信システムの概略構成図である。1 is a schematic configuration diagram of a power line communication system according to an embodiment of the present invention for a plurality of consumers who receive power supply from a common transformer. 図1における主としてAルート、Bルートの電力線通信に着目した接続図である。FIG. 2 is a connection diagram focusing on power line communication of A route and B route in FIG. 1. 第1実施形態におけるデータ伝送の順序の一例を示す図である。図の横方向は時間の経過を表し、横線の上はAルートの信号、下はBルートの信号をそれぞれ表している。It is a figure which shows an example of the order of the data transmission in 1st Embodiment. The horizontal direction in the figure represents the passage of time, the upper part of the horizontal line represents the A route signal, and the lower part represents the B route signal. 図1における主としてAルート、Bルートの電力線通信に着目した接続図である。FIG. 2 is a connection diagram focusing on power line communication of A route and B route in FIG. 1. Aルート、Bルートに割り当てる周波数帯域の分布の一例を示す図である。It is a figure which shows an example of distribution of the frequency band allocated to A route and B route. 第2実施形態におけるデータ伝送の順序の一例を示す図である。It is a figure which shows an example of the order of the data transmission in 2nd Embodiment. 第1実施形態と同様なデータ伝送を行った場合に、空き時間がある場合の一例を示す図である。It is a figure which shows an example when there is idle time when the same data transmission as 1st Embodiment is performed. 第3実施形態におけるデータ伝送の順序の一例を示す図である。It is a figure which shows an example of the order of the data transmission in 3rd Embodiment. 空き時間にTDMA/FDMAの両方を使用した場合のデータ伝送の一例を示す図である。It is a figure which shows an example of the data transmission at the time of using both TDMA / FDMA in idle time. CMSA方式によるデータ伝送の一例を示す図である。It is a figure which shows an example of the data transmission by a CMSA system.

《全体的構成》
図1は、共通の変圧器から電力供給を受ける複数の需要家を対象とした本発明の実施形態に係る電力線通信システムの概略構成図である。図において、電力量計5及びエネルギー管理機器7からの電力線通信の信号は、電路(L2,L3,L4)で減衰して変圧器3に達し、さらに商用周波数を扱う変圧器3の2次側/1次側間の減衰も大きいため、共通の電路L1(6.6kV)を介して異なる変圧器が接続されていても、異なる変圧器の傘下の電路L2(100/200V)にまでは信号が通りにくい。従って、共通の変圧器の傘下にある複数の需要家を対象として、ローカルに電力線通信のネットワークを構成することができる。
<Overall configuration>
FIG. 1 is a schematic configuration diagram of a power line communication system according to an embodiment of the present invention for a plurality of consumers who receive power supply from a common transformer. In the figure, the power line communication signals from the watt-hour meter 5 and the energy management device 7 are attenuated in the electric circuit (L2, L3, L4) and reach the transformer 3, and further the secondary side of the transformer 3 that handles the commercial frequency. / Because the attenuation between the primary sides is large, even if different transformers are connected via the common electric circuit L1 (6.6 kV), the signal is transmitted to the electric circuit L2 (100/200 V) under the different transformers. Is difficult to pass. Accordingly, a power line communication network can be locally configured for a plurality of consumers under the common transformer.

図1において、複数の需要家とは、例えばマンション等の集合住宅1である。集合住宅1では、例えば、構内に設けられた電気室2において電路L1に6.6kVを受電し、変圧器3で単相3線式の100/200Vに変圧する。変圧器3の出力電圧は、電路L2により、各戸に提供される。各戸では、電路L2から電力量計5及び電路L3を介して分電盤6に接続される。   In FIG. 1, the plurality of consumers is an apartment house 1 such as an apartment. In the housing complex 1, for example, 6.6 kV is received on the electric circuit L <b> 1 in the electric room 2 provided on the premises, and the transformer 3 transforms the single-phase three-wire 100/200 V. The output voltage of the transformer 3 is provided to each house by the electric circuit L2. In each house, the distribution board 6 is connected from the electric circuit L2 through the watt-hour meter 5 and the electric circuit L3.

変圧器3の2次側には、データ集約機器(以下、コンセントレータという。)4が設けられ、電路L2に対して、電力線通信の信号の注入/抽出を行うことができる。コンセントレータ4は、例えば光ファイバFを介して電力供給元と繋がっており、電力供給元が制御・管理する装置である。
各戸では、エネルギー管理機器(HEMSと表記)7が、電路L4を介して、分電盤6に接続されている。なお、分電盤6には屋内配線が接続され、多くの家電機器等が接続されるが、ここでは図示は省略する。
On the secondary side of the transformer 3, a data aggregation device (hereinafter referred to as a concentrator) 4 is provided, and power line communication signals can be injected / extracted to / from the electric circuit L2. The concentrator 4 is connected to a power supply source via, for example, an optical fiber F, and is a device that is controlled and managed by the power supply source.
In each house, an energy management device (indicated as HEMS) 7 is connected to a distribution board 6 via an electric circuit L4. In addition, although indoor wiring is connected to the distribution board 6 and many household appliances etc. are connected, illustration is abbreviate | omitted here.

電力量計5は、電力線通信の機能を有し、コンセントレータ4と電力線通信による通信を行うことができる。コンセントレータ4と電力量計5とが電路L2を介して行う電力線通信の第1ルートを、例えば、Aルートという。また、エネルギー管理機器7は、電力線通信の機能を有し、電力量計5と電力線通信による通信を行うことができる。エネルギー管理機器7と電力量計5とが電路L3,L4を介して行う電力線通信の第2ルートを、例えば、上記Aルートと区別してBルートという。Aルートの電力線通信と、Bルートの電力線通信とは、互いに論理的に隔離されている。但し、Aルートの電力線通信を、Bルートのエネルギー管理機器7が聞く(リスニングする。)ことは可能である。   The watt-hour meter 5 has a function of power line communication, and can communicate with the concentrator 4 by power line communication. A first route of power line communication performed by the concentrator 4 and the watt-hour meter 5 through the electric circuit L2 is referred to as an A route, for example. The energy management device 7 has a function of power line communication, and can communicate with the watt hour meter 5 by power line communication. The second route of power line communication performed by the energy management device 7 and the watt-hour meter 5 via the electric paths L3 and L4 is referred to as, for example, the B route in distinction from the A route. The A-route power line communication and the B-route power line communication are logically isolated from each other. However, the energy management device 7 of the B route can listen (listen) to the power line communication of the A route.

《第1実施形態》
第1実施形態に係る電力線通信システム(方法も含む。以下同様。)は、TDMA(Time Division Multiple Access)を利用する。
図2は、図1における主としてAルート、Bルートの電力線通信に着目した接続図である。図において、集合住宅1を構成するn戸を、それぞれ、部屋(家)1−1,1−2,・・・,1−nとする。コンセントレータ4は、周波数帯域fにて、電力量計5(又はSM1〜SMn)に対して、例えばSM1〜SMnの順番に、電力量の検針のためのポーリングを行う。同一の電力量計5に対する検針(ポーリング)の周期は、例えば30分に1回である。
<< First Embodiment >>
The power line communication system (including the method, the same applies hereinafter) according to the first embodiment uses TDMA (Time Division Multiple Access).
FIG. 2 is a connection diagram focusing on power line communication of the A route and the B route in FIG. In the figure, n houses constituting the apartment house 1 are designated as rooms (houses) 1-1, 1-2,. The concentrator 4 polls the watt-hour meter 5 (or SM1 to SMn) in the frequency band f in order of, for example, SM1 to SMn, for example, in the order of SM1 to SMn. The period of meter reading (polling) for the same watt-hour meter 5 is, for example, once every 30 minutes.

ポーリングに対する応答として、電力量計5は、検針データをコンセントレータ4に返信する。コンセントレータ4は検針データを受け取って集約し、電力供給元へ情報を提供する。こうして、所定時間内に、接続されている全ての電力量計5に対してポーリングを実行し、それに対する応答を得ることができる。従って、コンセントレータ4は、接続されている電力量計5の台数も常に把握している。なお、例えば一定時間待って返信が来ない場合は、再度呼びかけるか、又は、次の電力量計5に対してポーリングを行うようにすればよい。   As a response to polling, the watt-hour meter 5 returns meter reading data to the concentrator 4. The concentrator 4 receives and aggregates the meter reading data and provides information to the power supply source. In this way, polling can be performed for all connected watt-hour meters 5 within a predetermined time, and responses to the polling can be obtained. Therefore, the concentrator 4 always knows the number of connected watt-hour meters 5. For example, when a reply does not come after waiting for a certain time, it may be called again or polled for the next watt-hour meter 5.

一方、ポーリングを受け取った電力量計5は、これをトリガにして、その後、Bルートでエネルギー管理機器7に検針データを送信する。このとき、Aルートと同じ周波数帯域fを使用することができる。   On the other hand, the watt-hour meter 5 that has received the poll uses this as a trigger, and then transmits meter reading data to the energy management device 7 via the B route. At this time, the same frequency band f as the A route can be used.

図3は、第1実施形態におけるデータ伝送の順序の一例を示す図である。図の横方向は時間の経過を表し、横線の上はAルートの信号、下はBルートの信号をそれぞれ表している(以下同様。)。前述のように、SM1〜SMnの順番に、電力量の検針のためのポーリングが行われるとすると、まず、コンセントレータ4からAルートで電力量計SM1に検針データ要求のポーリング(SMA1要求)が届く。これを受けて、電力量計SM1は、応答として、Aルートでコンセントレータ4に対し、検針データの提供(SMA1応答)を行う。続いて、電力量計SM1は、Bルートでエネルギー管理機器7に対し、検針データ等を伝送する(SMB1伝送)。SMA1要求、SMA1応答及びSMB1伝送は、時間的に同時ではないので、前述のように、同じ周波数帯域fを使用することができる。
なお、図3におけるSMB1〜SMBnの各伝送は、電力量計5とエネルギー管理機器7との双方向通信(要求と応答)、又は、電力量計5からのデータの送信、の両方の意味を有する(以下同様。)。
FIG. 3 is a diagram illustrating an example of an order of data transmission in the first embodiment. The horizontal direction in the figure represents the passage of time, the horizontal line represents the A route signal, and the lower line represents the B route signal (the same applies hereinafter). As described above, if polling for meter reading of electric energy is performed in the order of SM1 to SMn, first, polling of meter reading data request (SMA1 request) arrives from the concentrator 4 to the electric energy meter SM1 via the A route. . In response, the watt-hour meter SM1 provides meter reading data (SMA1 response) to the concentrator 4 as a response to the A route. Subsequently, the watt-hour meter SM1 transmits meter reading data and the like to the energy management device 7 through the B route (SMB1 transmission). Since the SMA1 request, the SMA1 response, and the SMB1 transmission are not simultaneous in time, as described above, the same frequency band f can be used.
In addition, each transmission of SMB1 to SMBn in FIG. 3 means both bidirectional communication (request and response) between the watt-hour meter 5 and the energy management device 7, or transmission of data from the watt-hour meter 5. (The same shall apply hereinafter.)

以下同様に、ポーリングごとに、電力量計SM2,SM3,・・・,SMnの順にAルートのポーリングを時期的基準としてBルート、すなわち、電力量計5(SM1〜SMn)とエネルギー管理機器7との間で検針データの伝送が行われる。電力量計SM1〜SMnについてのAルート・Bルートの通信が完了すると、その後再び、電力量計SM1から順に、Aルート・Bルートの通信が行われる。   In the same manner, for each polling, the B route, that is, the watt hour meter 5 (SM1 to SMn) and the energy management device 7 with the polling of the A route in the order of the watt hour meters SM2, SM3,. Meter reading data is transmitted to and from. When the communication of the A route / B route for the energy meters SM1 to SMn is completed, the communication of the A route / B route is performed again in order from the energy meter SM1.

以上のように、Aルートの通信である電力量の検針のためのポーリングを受け取るタイミングを時期的基準として、電力量計5は、Bルートの通信をエネルギー管理機器7との間で実行する。ここで、検針のためのポーリングは定期的に行われている。従って、Bルートの通信は、定期的に実行される。その結果、特にBルートにおいて、CSMA方式に任せる場合に比べて通信の効率を高め、Bルートの確実な通信を実現することができる。   As described above, the watt-hour meter 5 performs the B route communication with the energy management device 7 with the timing of receiving the polling for the meter reading of the electric energy as the A route communication as a timing reference. Here, polling for meter reading is performed periodically. Therefore, the B route communication is periodically executed. As a result, it is possible to improve communication efficiency and realize reliable communication of the B route, particularly in the case of the B route, as compared with the case where the CSMA method is used.

また、電力量計5とエネルギー管理機器7との通信は、ポーリングの順番及びタイミングに追従して実行されるので、ポーリングが一周すれば、電力量計5とエネルギー管理機器7との通信についても全ての需要家について実行される。
さらに具体的には、電力量計5は、自己宛のポーリングに対する応答完了後に、同一需要家のエネルギー管理機器7との通信を実行するので(図3)、自己宛のポーリングに対する電力量計5からコンセントレータ4への応答と、同一需要家での電力量計5とエネルギー管理機器7との通信とが、時間的に同時に行われない。これにより、Aルート、Bルートで、同一の周波数帯域(f)を使用することができる。
In addition, since communication between the watt hour meter 5 and the energy management device 7 is executed following the order and timing of polling, communication between the watt hour meter 5 and the energy management device 7 can be performed once the polling is completed. It is executed for all customers.
More specifically, the watt-hour meter 5 executes communication with the energy management device 7 of the same consumer after completing the response to the polling addressed to itself (FIG. 3). To the concentrator 4 and communication between the watt-hour meter 5 and the energy management device 7 at the same consumer are not performed simultaneously in time. Thus, the same frequency band (f) can be used for the A route and the B route.

なお、前述のように、エネルギー管理機器7は、対応する電力量計5がポーリングを受け取ったことを聞く(検出する)ことができるので、エネルギー管理機器7の方から、電力量計5に対して検針データを要求することも可能である。   As described above, the energy management device 7 can hear (detect) that the corresponding watt-hour meter 5 has received the polling. It is also possible to request meter reading data.

なお、DR(デマンドレスポンス)などを行う場合、例えば、上位(電力供給元)からのDR信号を、電力量計5を介してBルートに伝送する場合も同様である。この場合、AルートからのDR信号を受け取り次第、電力量計5は、Bルートに転送すればよい。逆にエネルギー管理機器7からのレスポンス信号は、エネルギー管理機器7からの応答を電力量計5に一旦保存しておき、次のポーリングのタイミングにおいて、コンセントレータ4に返信すればよいと考えられる(DR応答も、初回DR応答以外では、それほど迅速な応答性は求められていない。)。通常、これらの信号のやり取りは、n台の電力量計に対して順次要求と応答を繰り返し行うため、n台の通信が最低30分間以内に終わればよい。また、Aルートにおいて、直接コンセントレータ4から電力量計5まで伝文が到達しない場合(ホップ伝送を行う場合)は、途中の電力量計が信号の中継を行うが、同様にポーリング対象の電力量計が信号を受け取り次第、Bルートの通信を行えばよい。   In the case of performing DR (demand response) or the like, for example, the same applies to a case where a DR signal from a host (power supply source) is transmitted to the B route via the watt-hour meter 5. In this case, as soon as the DR signal from the A route is received, the watt-hour meter 5 may transfer it to the B route. Conversely, the response signal from the energy management device 7 may be stored in the watt-hour meter 5 once after the response from the energy management device 7 is returned to the concentrator 4 at the next polling timing (DR The response is not required to be so quick except for the initial DR response.) Usually, these signals are exchanged sequentially for requests and responses to n watt-hour meters, so that n communications should be completed within a minimum of 30 minutes. When the message does not reach directly from the concentrator 4 to the watt hour meter 5 in the A route (when hop transmission is performed), the middle watt hour meter relays the signal. As soon as the meter receives the signal, the B route may be communicated.

《第2実施形態》
第2実施形態に係る電力線通信システムは、TDMAに加えてFDMA(Frequency Division Multiple Access)も利用する。
図4は、図1における主としてAルート、Bルートの電力線通信に着目した接続図である。図2との違いは、周波数帯域の利用の仕方にある。Aルートの通信には周波数帯域fAが使用される。Bルートの通信には、周波数帯域fB1,fB2,・・・,fBnが使用される。電力線通信の変調方式としては、例えばOFDM(Orthogonal Frequency Division Multiplexing)を採用することができる。使用帯域としては、例えば、10〜450kHzを使用することができる。
<< Second Embodiment >>
The power line communication system according to the second embodiment uses FDMA (Frequency Division Multiple Access) in addition to TDMA.
FIG. 4 is a connection diagram focusing on the power line communication of the A route and the B route in FIG. The difference from FIG. 2 is in how to use the frequency band. The frequency band fA is used for A route communication. Frequency bands fB1, fB2,..., FBn are used for B route communication. For example, OFDM (Orthogonal Frequency Division Multiplexing) can be employed as a modulation method for power line communication. As the use band, for example, 10 to 450 kHz can be used.

図5は、Aルート、Bルートに割り当てるOFDMのキャリア周波数帯域の分布の一例を示す図である。横軸の周波数は、右に行くほど高い。この場合、まず、AルートとBルートとでは、周波数帯域が異なる。また、Bルートの周波数帯域としては、例えば、全て同じ周波数帯域を割り当てることができる。また、小グループごとに同じキャリア周波数帯域を割り当て、異なるグループには異なるキャリア周波数帯域を割り当てるようにしてもよい。総戸数が少ない場合は、各戸ごとに全て異なるキャリア周波数帯域を割り当てることも可能である。   FIG. 5 is a diagram illustrating an example of the distribution of OFDM carrier frequency bands assigned to the A route and the B route. The frequency on the horizontal axis is higher toward the right. In this case, first, the frequency band is different between the A route and the B route. Moreover, as the frequency band of the B route, for example, the same frequency band can be assigned to all. Further, the same carrier frequency band may be assigned to each small group, and different carrier frequency bands may be assigned to different groups. When the total number of houses is small, it is possible to assign different carrier frequency bands for each house.

図6は、第2実施形態におけるデータ伝送の順序の一例を示す図である。
前述のように、SM1〜SMnの順番に、電力量の検針のためのポーリングが行われるとすると、まず、コンセントレータ4からAルートで電力量計SM1に検針データ要求のポーリング(SMA1要求)が届く。これを受けて、電力量計SM1は、応答として、Aルートでコンセントレータ4に対し、検針データの提供(SMA1応答)を行う。また、これと同時に、電力量計SM1は、Bルートでエネルギー管理機器7に対し、検針データを伝送する(SMB1伝送)。同時に送信できるのは、AルートとBルートとでは、周波数帯域が互いに異なるからである。
FIG. 6 is a diagram illustrating an example of the order of data transmission in the second embodiment.
As described above, if polling for meter reading of electric energy is performed in the order of SM1 to SMn, first, polling of meter reading data request (SMA1 request) arrives from the concentrator 4 to the electric energy meter SM1 via the A route. . In response, the watt-hour meter SM1 provides meter reading data (SMA1 response) to the concentrator 4 as a response to the A route. At the same time, the watt-hour meter SM1 transmits meter reading data to the energy management device 7 through the B route (SMB1 transmission). Transmission is possible simultaneously because the A route and the B route have different frequency bands.

以下同様に、ポーリングごとに、電力量計SM2,SM3,・・・,SMnの順にAルートのポーリングを時期的基準としてBルート、すなわち、電力量計5(SM2,SM3,・・・,SMn)からエネルギー管理機器7に対する検針データの送信が行われる。電力量計SM1〜SMnについてのAルート・Bルートの通信が完了すると、再び、電力量計SM1から順に、Aルート・Bルートの通信が行われる。   Similarly, for each polling, the B route, that is, the watt hour meter 5 (SM2, SM3,..., SMn, with the polling of the A route as a timing reference in the order of the watt hour meters SM2, SM3,. ) To transmit the meter reading data to the energy management device 7. When the A route / B route communication for the watt hour meters SM1 to SMn is completed, the A route / B route communication is performed again in order from the watt hour meter SM1.

第2実施形態によれば、第1実施形態と同様の作用効果に加えて、AルートとBルートとで、異なる周波数帯域であることにより、同時に通信しても信号同士の干渉が生じない。従って、ポーリング間の限られた時間を、より有効に、活用することができる。   According to the second embodiment, in addition to the same effects as the first embodiment, the A route and the B route have different frequency bands, so that interference between signals does not occur even if they are simultaneously communicated. Therefore, the limited time between polling can be utilized more effectively.

《第3実施形態》
図7は、第1実施形態と同様なデータ伝送を行った場合に、空き時間がある場合の一例を示す図である。図において、Aルートにおける電力量計5からの検針データの収集は、通常30分ごとに行われることから、総戸数によっては、電力量計SM1からのBルートで検針データを伝送(SMB1伝送)した後、次のポーリングまでに、相応の空き時間があり、この空き時間を、TDMA領域として使用し、Bルートの信号伝送を行うことができる。すなわち、TDMA領域に順次、Bルートの通信を割り当てて、通信を行うことができる。信号伝送は、時間スロットをn台分で均等に分けてもよいし、1台の信号伝送が終わり次第、次の順番のBルート通信を行ってもよい。
<< Third Embodiment >>
FIG. 7 is a diagram illustrating an example when there is a free time when data transmission similar to that of the first embodiment is performed. In the figure, meter reading data from the electricity meter 5 in the A route is normally collected every 30 minutes, so depending on the total number of houses, meter reading data is transmitted via the B route from the electricity meter SM1 (SMB1 transmission). After that, there is a corresponding free time before the next polling, and the free time can be used as a TDMA area to perform B route signal transmission. That is, it is possible to perform communication by sequentially assigning B route communication to the TDMA area. In signal transmission, time slots may be equally divided into n slots, and B-route communication in the next order may be performed as soon as one signal transmission is completed.

図8は、上記の要領による、第3実施形態におけるデータ伝送の順序の一例を示す図である。図において、空き時間のTDMA領域において、例えば、Bルートの通信をB1,B2,・・・,Bnとしてタイムスロットを割り当てることができる。この場合、ポーリング間の空き時間を利用して、さらにBルートの通信を行うことができる。   FIG. 8 is a diagram showing an example of the order of data transmission in the third embodiment according to the above procedure. In the figure, in the TDMA area of the idle time, for example, B slot communication can be assigned as B1, B2,. In this case, the B route can be further communicated by using the idle time between polling.

なお、空き時間を使ってBルートの通信をより確実に行うためには、データを送信する順番を明確に識別する必要がある。Aルートによるポーリング順序から空き時間にデータを送信するタイムスロットの順番を決め、データを送信することが考えられる。あるいは、自局の送信を行う際に、一つ前の順番の他局の信号伝送が終わり次第、伝送を行ってもよい。なお、一つ前の他局の伝送が行われない場合は、一定時間待った後に伝送を行なえばよい。なお、次のAルートによるポーリング周期に達した場合、又は、ポーリングを検知した場合には、次回の空き時間を使って信号伝送を再開すればよい。   In order to perform the communication of the B route more reliably using the free time, it is necessary to clearly identify the order in which data is transmitted. It is conceivable to determine the order of time slots for transmitting data in the idle time from the polling order by the A route and transmit the data. Alternatively, when transmitting the own station, the transmission may be performed as soon as the signal transmission of the other station in the previous order ends. In addition, when transmission of the other station immediately before is not performed, transmission may be performed after waiting for a certain time. When the polling cycle by the next A route is reached or when polling is detected, signal transmission may be resumed using the next idle time.

なお、他局(他の家)が通信中であることを、より確実に認識する手段としては、例えば以下の手段が考えられる。
Bルート側の機器(電力量計5やエネルギー管理機器7)は、他局の通信をリスニングしておき、Aルートのポーリングの順番から自局のBルート側の機器の送信順位をスケジュールするとともに、他局の送信状況を監視しながら、自局の送信順番をあらかじめ予想して信号伝送を行なえば、送信のタイミング制御が容易になる。さらに、PLC伝送においては、電力量計5はエネルギー管理機器7に比べてAルートの信号伝送状況及び他のBルート信号伝送状況の把握精度が高い。エネルギー管理機器7からBルートにより電力量計5に信号伝送を行う際に、電力量計5が他局の送信状況を把握し、他局の送信状況をフラグ化しエネルギー管理機器7へ通知する手段を持たせることで、送信タイミングを教えることができ、無駄なく信号伝送ができると考えられる。以上の認識手段を持たせることにより、より確実に信号の送信タイミングを制御することが可能となる。
As means for more reliably recognizing that another station (other house) is communicating, for example, the following means can be considered.
The devices on the B-route side (the watt-hour meter 5 and the energy management device 7) listen to the communication of other stations, schedule the transmission order of the devices on the B-route side of the own station from the polling order of the A route. If the transmission status of the local station is predicted in advance while performing signal transmission while monitoring the transmission status of other stations, transmission timing control becomes easy. Furthermore, in PLC transmission, the watt-hour meter 5 has a higher accuracy in grasping the signal transmission status of the A route and the other B route signal transmission status than the energy management device 7. When the energy management device 7 transmits a signal to the watt hour meter 5 via the B route, the watt hour meter 5 grasps the transmission status of the other station, flags the transmission status of the other station, and notifies the energy management device 7 of the flag. It is considered that the transmission timing can be taught and signal transmission can be performed without waste. By providing the above recognition means, it is possible to control the signal transmission timing more reliably.

また、OFDMの信号帯域を周波数分割し、各Bルートが使用する周波数をコンセントレータ4から指定するようにしてもよい。この際に、各Bルートが使用する帯域は、家の中の電力線の環境によって通信環境が異なる場合が考えられる。コンセントレータ4と電力量計5においてネゴシエーションすることにより良い周波数帯域を割り振るとともに、伝送を行う順番を予め決めることができる。異なる周波数帯域を効率的に割り振れば、複数のBルートが、同時に通信することができるため、効率良く伝送することができる。   Further, the frequency band of the OFDM signal band may be divided and the frequency used by each B route may be designated from the concentrator 4. At this time, the bandwidth used by each B route may be different in the communication environment depending on the environment of the power line in the house. A good frequency band can be assigned by negotiating with the concentrator 4 and the watt-hour meter 5, and the order of transmission can be determined in advance. If different frequency bands are efficiently allocated, a plurality of B routes can communicate at the same time, so that transmission can be performed efficiently.

図9は、TDMA/FDMAの両方を使用した場合(例として、3種類の周波数帯域を使用した場合)を示す。この場合、空き時間は、TDMA/FDMA領域として使用される。周波数帯域f1を使用するBルートのタイムスロットは、B1,B4,・・・,Bn−2である。周波数帯域f2を使用するタイムスロットは、B2,B5,・・・,Bn−1である。そして、周波数帯域f3を使用するタイムスロットは、B3,B6,・・・,Bnである。同時に行われる3種類のBルートの通信(例えばB1,B2,B3)は、互いに異なる周波数帯域であることにより同時に通信しても信号同士の干渉が生じない。従って、ポーリング間の限られた時間に、多数のBルートの通信を行うことができる。   FIG. 9 shows a case where both TDMA / FDMA are used (for example, when three types of frequency bands are used). In this case, the free time is used as a TDMA / FDMA area. B slot timeslots using the frequency band f1 are B1, B4,..., Bn-2. Time slots using the frequency band f2 are B2, B5,..., Bn-1. Time slots using the frequency band f3 are B3, B6,..., Bn. The three types of B route communication (for example, B1, B2, and B3) performed at the same time do not cause interference between signals even if they are simultaneously communicated because they are in different frequency bands. Therefore, communication of a large number of B routes can be performed in a limited time between polling.

《その他》
なお、図1の全体構成は集合住宅を想定したものであるが、各実施形態の電力線通信システムは、本発明の適用は、これに限定されるものではない。例えば、共通の配電用変圧器(例えば柱上変圧器)の傘下にある複数の戸建て住宅について同様に適用することも可能である。
<Others>
In addition, although the whole structure of FIG. 1 assumes an apartment house, application of this invention is not limited to this for the power line communication system of each embodiment. For example, the present invention can be similarly applied to a plurality of detached houses under the umbrella of a common distribution transformer (for example, a pole transformer).

なお、今回開示された実施の形態はすべての点で例示であって制限的なものではないと考えられるべきである。本発明の範囲は特許請求の範囲によって示され、特許請求の範囲と均等の意味及び範囲内での全ての変更が含まれることが意図される。   The embodiment disclosed this time should be considered as illustrative in all points and not restrictive. The scope of the present invention is defined by the terms of the claims, and is intended to include any modifications within the scope and meaning equivalent to the terms of the claims.

1−1,1−2,1−n 部屋(需要家)
2 電気室
3 変圧器
4 コンセントレータ(データ集約機器)
5 電力量計
6 分電盤
7 エネルギー管理機器(HEMS)
1-1, 1-2, 1-n rooms (customers)
2 Electrical room 3 Transformer 4 Concentrator (data aggregation equipment)
5 Electricity meter 6 Distribution board 7 Energy management equipment (HEMS)

Claims (9)

共通の変圧器から電力供給を受ける複数の需要家を対象とした電力線通信システムであって、
前記複数の需要家の各々に設けられ、電力線通信の機能を有する電力量計と、
前記変圧器と前記電力量計とを繋ぐ電力線を利用した第1ルートの電力線通信により、前記電力量計と通信を行う機能を有するデータ集約機器と、
前記複数の需要家の各々に設けられ、前記電力量計と繋ぐ電力線を利用した第2ルートの電力線通信により、前記電力量計と通信を行う機能を有するエネルギー管理機器とを備え、
前記電力量計は、前記データ集約機器から逐次ポーリングを受け取るタイミングを時期的基準として、前記ポーリングを受け取ってから次の前記ポーリングを受け取るまでの間に規定された一定のタイミングで前記ポーリングを受け取るたびに前記エネルギー管理機器との通信を実行する、電力線通信システム。
A power line communication system for a plurality of consumers who receive power supply from a common transformer,
A watt-hour meter provided in each of the plurality of consumers and having a function of power line communication;
A data aggregation device having a function of communicating with the watt-hour meter by power line communication of a first route using a power line connecting the transformer and the watt-hour meter;
An energy management device provided in each of the plurality of consumers and having a function of communicating with the watt-hour meter by power line communication of a second route using a power line connected to the watt-hour meter,
Each time the watt-hour meter receives the polling at a predetermined timing between the time when the polling is received and the time when the next polling is received, with the timing of receiving the sequential polling from the data aggregation device as a timing reference. A power line communication system for executing communication with the energy management device.
前記電力量計と前記エネルギー管理機器との通信は、電力量の検針のための前記ポーリングの順番及びタイミングに追従して実行される請求項1記載の電力線通信システム。   The power line communication system according to claim 1, wherein communication between the watt-hour meter and the energy management device is executed following the order and timing of the polling for metering the amount of power. 前記電力量計は、自己宛のポーリングに対する応答完了後に、同一需要家の前記エネルギー管理機器との通信を実行する請求項1又は2に記載の電力線通信システム。   3. The power line communication system according to claim 1, wherein the watt-hour meter executes communication with the energy management device of the same consumer after completion of a response to polling addressed to itself. 前記電力量計は、自己宛のポーリングに対する応答を第1の周波数帯域を用いて行い、前記自己宛のポーリングに対する応答と同時に、前記第1の周波数帯域とは異なる第2の周波数帯域を用いて、同一需要家の前記エネルギー管理機器との通信を実行する請求項1又は2に記載の電力線通信システム。 The electricity meter can have rows using a first frequency band the response to the polling addressed to, simultaneously with the response to the polling of the self-addressed, using a second frequency band different from the first frequency band The power line communication system according to claim 1, wherein communication with the energy management device of the same consumer is executed. 前記電力量計が、自己宛のポーリングに対する応答を完了し、かつ、同一需要家の前記エネルギー管理機器との通信を完了した後、次のポーリングまでの空き時間に、複数組の前記電力量計と前記エネルギー管理機器との通信が、時分割で実行される請求項1〜4のいずれか1項に記載の電力線通信システム。   After the watt-hour meter completes the response to the polling addressed to itself and completes communication with the energy management device of the same consumer, a plurality of sets of the watt-hour meters are set in the idle time until the next polling. The power line communication system according to any one of claims 1 to 4, wherein communication with the energy management device is performed in a time division manner. 前記空き時間における、前記複数組の前記電力量計と前記エネルギー管理機器との通信は、前記第1ルートのポーリングの順序に基づく順番にて時分割で実行される請求項5記載の電力線通信システム。   6. The power line communication system according to claim 5, wherein communication between the plurality of sets of watt hour meters and the energy management device in the idle time is performed in a time-sharing manner in an order based on a polling order of the first route. . 一度のポーリングに対して、複数組の前記電力量計と前記エネルギー管理機器との間で同時に通信が行われ、各組で周波数帯域が異なる請求項1記載の電力線通信システム。   The power line communication system according to claim 1, wherein communication is simultaneously performed between a plurality of sets of the watt hour meter and the energy management device with respect to one polling, and a frequency band is different in each set. 前記電力量計が、自己宛のポーリングに対する応答を完了し、かつ、対応する前記エネルギー管理機器との通信を完了した後、次のポーリングまでの空き時間に、複数組の前記電力量計と、対応する前記エネルギー管理機器との通信が、時分割で実行され、かつ、同時に実行される複数組は互いに異なる周波数帯域を使用する請求項1〜4及び7のいずれか1項に記載の電力線通信システム。   The watt hour meter completes a response to the poll addressed to itself, and after completing communication with the corresponding energy management device, a plurality of sets of the watt hour meters in an idle time until the next polling, and 8. The power line communication according to claim 1, wherein communication with the corresponding energy management device is performed in a time-sharing manner, and a plurality of sets that are simultaneously executed use different frequency bands. system. 共通の変圧器から電力供給を受ける複数の需要家の各々に設けられ、電力線通信の機能を有する電力量計と、前記変圧器と前記電力量計とを繋ぐ電力線を利用した第1ルートの電力線通信により、前記電力量計と通信を行う機能を有するデータ集約機器と、前記複数の需要家の各々に設けられ、前記電力量計と繋ぐ電力線を利用した第2ルートの電力線通信により、前記電力量計と通信を行う機能を有するエネルギー管理機器とを備える電力線通信システムにおける電力線通信方法であって、
前記電力量計は、前記データ集約機器から逐次ポーリングを受け取り、
前記電力量計は、前記ポーリングを受け取ったタイミングを時期的基準として、前記ポーリングを受け取ってから次の前記ポーリングを受け取るまでの間に規定された一定のタイミングで前記ポーリングを受け取るたびに前記エネルギー管理機器との通信を実行する、
電力線通信方法。
A power line of a first route that is provided in each of a plurality of consumers that receive power supply from a common transformer and has a power line communication function, and a power line that connects the transformer and the power meter The data aggregation device having a function of communicating with the watt-hour meter by communication and the power line communication of the second route provided in each of the plurality of consumers and using a power line connected to the watt-hour meter. A power line communication method in a power line communication system comprising an energy management device having a function of communicating with a meter,
The watt-hour meter receives sequential polling from the data aggregation device,
The watt-hour meter receives the polling at a predetermined timing from when the polling is received until the next polling is received with the timing when the polling is received as a timing reference. Perform communication with the device,
Power line communication method.
JP2013182476A 2013-09-03 2013-09-03 Power line communication system and power line communication method Active JP6164989B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2013182476A JP6164989B2 (en) 2013-09-03 2013-09-03 Power line communication system and power line communication method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2013182476A JP6164989B2 (en) 2013-09-03 2013-09-03 Power line communication system and power line communication method

Publications (2)

Publication Number Publication Date
JP2015050707A JP2015050707A (en) 2015-03-16
JP6164989B2 true JP6164989B2 (en) 2017-07-19

Family

ID=52700348

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2013182476A Active JP6164989B2 (en) 2013-09-03 2013-09-03 Power line communication system and power line communication method

Country Status (1)

Country Link
JP (1) JP6164989B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106330265B (en) * 2016-09-22 2019-01-18 武汉瑞升科技有限公司 A kind of power wire broadband carrier kilowatt meter reading-out system

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2028770B1 (en) * 2005-05-26 2012-07-11 Panasonic Corporation Communication apparatus enabling coexistence of systems
JP2007019670A (en) * 2005-07-05 2007-01-25 Mitsubishi Electric Corp Power line communication system, access PLC modem, in-home PLC modem, and power line communication method
JP2010250508A (en) * 2009-04-14 2010-11-04 Chugoku Electric Power Co Inc:The Power information management method
US8830980B2 (en) * 2011-05-05 2014-09-09 Texas Instruments Incorporated Superframe coordination in beacon-enabled networks
JP2013106322A (en) * 2011-11-16 2013-05-30 Panasonic Corp Radio communication device and radio communication system including the same

Also Published As

Publication number Publication date
JP2015050707A (en) 2015-03-16

Similar Documents

Publication Publication Date Title
US10015020B2 (en) Interleaved communication with resource providers and a home area network
Jain et al. Survey on smart grid technologies-smart metering, IoT and EMS
JP5942157B2 (en) Handset of power management system and power management system
US9306624B1 (en) Initialization of endpoint devices joining a power-line communication network
US9160410B2 (en) Coexistence method by requesting access to the channel
WO2013128902A1 (en) Cordless handset for power management system and power management system
CN102594633A (en) Generating a network map
Naamane et al. Towards a smart grid communication
WO2014155991A1 (en) Communication system, and communication device
WO2014178603A1 (en) Apparatus and system for data mirror device
KR20140129944A (en) Smart appliance apparatus and network management system
CN111147105B (en) Communication method of slave metering module
JP6164989B2 (en) Power line communication system and power line communication method
US9130658B2 (en) Selection diversity in a powerline communication system
CN104734360A (en) An Instantaneous Current Control System of Power Network
EP2625794B1 (en) Method and apparatus for remote metering the consumption of electricity over power line network
US9602159B2 (en) Communication channel identification in a power line communication network
Sanz et al. Narrowband power line communications evaluation in complex distribution networks
KR20140129947A (en) Smart appliance apparatus and urgent message transmission system
JP5621032B2 (en) Remote meter reading system, terminal station used in it, master station
JP5347130B2 (en) Communications system
KR20140129946A (en) Home energy management system server appartus and urgent message transmission system
JP2014157496A (en) Remote meter-reading system
JP2015070410A (en) Communication apparatus using beacon signal and communication method
KR20140129942A (en) Method and system of network access using federated trust center in multiple home area network environment

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20160125

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20160926

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20161004

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20161202

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20170530

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20170620

R150 Certificate of patent or registration of utility model

Ref document number: 6164989

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313117

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250