JP6180854B2 - How to remove existing piles - Google Patents
[go: Go Back, main page]

JP6180854B2 - How to remove existing piles - Google Patents

How to remove existing piles Download PDF

Info

Publication number
JP6180854B2
JP6180854B2 JP2013182158A JP2013182158A JP6180854B2 JP 6180854 B2 JP6180854 B2 JP 6180854B2 JP 2013182158 A JP2013182158 A JP 2013182158A JP 2013182158 A JP2013182158 A JP 2013182158A JP 6180854 B2 JP6180854 B2 JP 6180854B2
Authority
JP
Japan
Prior art keywords
existing pile
pile
existing
ground
cutting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2013182158A
Other languages
Japanese (ja)
Other versions
JP2015048665A (en
Inventor
智之 志田
智之 志田
浩毅 村田
浩毅 村田
藤川 長敏
長敏 藤川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP2013182158A priority Critical patent/JP6180854B2/en
Publication of JP2015048665A publication Critical patent/JP2015048665A/en
Application granted granted Critical
Publication of JP6180854B2 publication Critical patent/JP6180854B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Description

本発明は、既存杭の撤去方法に関する。   The present invention relates to a method for removing an existing pile.

既存構造物を解体して新たな構造物を構築する場合には、一般的に、既存構造物の地上部分を解体するとともに基礎を含む地下部分を解体した後、新たな地下部分(基礎)および地上部分を構築する。   When constructing a new structure by dismantling an existing structure, in general, after dismantling the ground part of the existing structure and dismantling the underground part including the foundation, a new underground part (foundation) and Build the ground part.

基礎を解体する際の既存杭の撤去は、地上から杭の周囲をケーシングにより切削し、ケーシングの内部を破砕して撤去するのが一般的である。
また、既存杭の杭径が比較的小さい場合には、杭外周を切削し、地盤と縁切りした後、既存杭を直接引き抜くことも行われている。
When removing the foundation when dismantling the foundation, it is common to cut the periphery of the pile from the ground with a casing and crush and remove the inside of the casing.
Moreover, when the pile diameter of the existing pile is comparatively small, after cutting a pile outer periphery and cutting off with the ground, the existing pile is also pulled out directly.

例えば、特許文献1には、既存杭の外周を囲うようにケーシングを挿入して既存杭と地盤とを縁切りした後、ケーシングの下端からケーシング内にモルタルを注入することで、既存杭を上昇させながら(押し上げながら)既存杭を引き抜く既存杭の撤去方法が開示されている。   For example, in Patent Document 1, after inserting a casing so as to surround the outer periphery of the existing pile and cutting the existing pile and the ground, the existing pile is raised by injecting mortar into the casing from the lower end of the casing. A method for removing an existing pile while pulling it out (while pushing up) is disclosed.

また、特許文献2には、既存杭の芯部分を所定長削孔する削孔作業と、削孔作業により残った円筒状の外周部分の下端部を削孔内から切断する切断作業と、切断された円筒状の外周部分を地中から引き上げる引上げ作業とを繰り返すことにより既存杭を撤去する既存杭の撤去方法が開示されている。   In addition, Patent Document 2 discloses a drilling operation for drilling a core portion of an existing pile for a predetermined length, a cutting operation for cutting a lower end portion of a cylindrical outer peripheral portion left by the drilling operation, and a cutting operation. The removal method of the existing pile which removes the existing pile by repeating the raising operation | work which pulls up the cylindrical outer peripheral part made from underground is disclosed.

特開平06−207412号公報Japanese Patent Application Laid-Open No. 06-207412 特開2012−102559号公報JP 2012-102559 A

特許文献1の既存杭の撤去方法は、既存杭の原形を維持したまま引き抜くため、既存杭の引き抜きに使用する装置や設備が大掛かりとなり、施工費が高価になる場合があった。
また、作業箇所の上空に他の構造物が存在する等、既存杭を引き抜くために必要なスペースを確保することができない場合には採用することができなかった。
Since the existing pile removal method of Patent Document 1 is pulled out while maintaining the original shape of the existing pile, the apparatus and equipment used for pulling out the existing pile become large, and the construction cost may be expensive.
In addition, it was not possible to employ when it was not possible to secure the space necessary for pulling out existing piles, such as when there was another structure above the work site.

特許文献2の既存杭の撤去方法は、切断作業において削孔内に挿入可能な切断装置や、引上げ作業において地中から円筒状の外周部分を掴んで引き上げる引上げ装置等の特殊な機械を使用する必要があった。
また、削孔作業、切断作業および引上げ作業を繰り返し実施するため、作業毎に装置を交換する必要があり、作業に手間がかかる場合があった。
The existing pile removal method of Patent Document 2 uses a special machine such as a cutting device that can be inserted into a drilling hole in a cutting operation, or a lifting device that grips and lifts a cylindrical outer peripheral portion from the ground in a lifting operation. There was a need.
In addition, since the drilling operation, the cutting operation, and the pulling operation are repeatedly performed, it is necessary to replace the apparatus for each operation, which may be time-consuming.

本発明は、前記問題点を解決するものであって、施工個所上空の高さに制限がある場合であっても簡易に既存杭を撤去することができる既存杭の撤去方法を提案することを課題とする。   The present invention solves the above-mentioned problems, and proposes a method for removing an existing pile that can easily remove an existing pile even when the height above the construction site is limited. Let it be an issue.

このような課題を解決する本発明の既存杭の撤去方法は、既存杭の自重と該既存杭に作用する浮力とを考慮した空洞を形成する芯抜き削孔を行い、前記既存杭を有底筒状に成形する芯抜き工程と、前記既存杭の外周囲を掘削して前記既存杭と周辺地盤とを縁切りする縁切工程と、前記既存杭を上昇させて、当該既存杭の一部分を地上に突出させる杭上昇工程と、前記既存杭の地上に突出した突出部分を切断する切断工程とを備えることを特徴としている。 Removing method of the existing pile of the present invention performs a coring drilling to form the cavity in consideration of the buoyancy acting on its own weight and the existing pile of the existing pile bottomed the existing pile to solve such problems ground and coring step of forming into a tubular shape, wherein a drilled the outer periphery of the existing pile to edge cutting and the existing pile and the surrounding ground edge switching process, is raised the existing pile, a portion of the existing pile And a cutting step of cutting a protruding portion protruding above the ground of the existing pile .

かかる既存杭の撤去方法によれば、所定の大きさの空洞を形成する芯抜き削孔を行い、既存杭を軽量化させたうえで浮力を利用して上昇させるため、既存杭を上昇させる際に使用する装置(揚重機)等の小規模化が可能となる。また、既存杭を所定長毎に切断するため、上空に制限がある場合であっても作業を行うことが可能である。 According to removing method such existing pile performs coring drilling to form a cavity of a predetermined size, to increase by utilizing the buoyancy upon which is lighter existing piles, when increasing the existing pile It is possible to reduce the scale of the equipment (lifter) used for the operation. In addition, since the existing pile is cut every predetermined length, it is possible to perform work even when the sky is limited.

また、芯抜き削孔後の既存杭が有底であるため、地下水等による浮力は既存杭の全長にわたって芯抜きを行う場合よりも大きくなり、したがって、既存杭を支持する装置(揚重機)等への負荷を低減することが可能となる。
なお、芯抜き工程と縁切工程の順序は限定されない。
In addition, since the existing pile after core drilling has a bottom, the buoyancy due to groundwater, etc. is greater than when centering over the entire length of the existing pile, so a device (lifter) that supports the existing pile, etc. It becomes possible to reduce the load on the.
The order of the centering process and the edge cutting process is not limited.

前記縁切工程において前記既存杭の外周囲にケーシングを配置し、前記杭上昇工程において前記ケーシングの内側に水や泥水等の液体を注入(注水)すれば、地下水が存在しない場合でも既存杭に浮力が作用するようになるので、より効率的に既存杭の撤去作業を行うことが可能となる。また、地下水が存在する場合においても、水よりも密度が大きい泥水を注水することで既存杭の浮力を増加させてもよい。 If a casing is arranged around the existing pile in the edge cutting step, and a liquid such as water or muddy water is injected into the casing in the pile rising step (water injection), even if there is no groundwater, Since buoyancy comes to act, it becomes possible to perform the removal work of the existing pile more efficiently. Moreover, even when groundwater exists, you may increase the buoyancy of the existing pile by pouring muddy water with a density larger than water.

また、前記杭上昇工程において、前記空洞に水や泥水等の液体を注入(注水)することで、既存杭の上昇量や上昇速度を調整してもよい。こうすることで、浮力に比べて既存杭の杭質量が小さい場合であっても、既存杭が必要以上に突出することを防止でき、また、施工時の安全性を確保することが可能となる。 Moreover, in the said pile raising process, you may adjust the raising amount and raising speed of an existing pile by inject | pouring (water injection) liquids, such as water and muddy water, into the said cavity. By doing this, even if the pile mass of the existing pile is smaller than the buoyancy, it can be prevented that the existing pile protrudes more than necessary, and safety during construction can be ensured. .

本発明の既存杭の撤去方法によれば、施工個所上空の高さに制限がある場合であっても簡易に既存杭を撤去することが可能となる。
また、従来の既存杭の撤去方法に比べて地上からの作業が多いため、作業性に優れている。
さらに、ハンマーグラブ等で既存杭を破砕する場合に比べて工期を短縮することができる。
According to the method for removing an existing pile of the present invention, it is possible to easily remove the existing pile even when the height above the construction site is limited.
Moreover, since there are many work from the ground compared with the removal method of the conventional existing pile, it is excellent in workability | operativity.
Furthermore, the construction period can be shortened compared to the case of crushing existing piles with a hammer grab or the like.

(a)〜(c)は、本実施形態に係る既存杭撤去方法の各工程を示す断面図である。(A)-(c) is sectional drawing which shows each process of the existing pile removal method which concerns on this embodiment. (a)〜(c)は、図1の(c)に続く既存杭撤去方法の各工程を示す断面図である。(A)-(c) is sectional drawing which shows each process of the existing pile removal method following (c) of FIG.

本実施形態では、杭径2.0m、杭長50mの鉄筋コンクリート製の既存杭1を撤去する場合について説明する。なお、既存杭1の形状寸法は限定されない。 This embodiment demonstrates the case where the existing pile 1 made from reinforced concrete with a pile diameter of 2.0 m and a pile length of 50 m is removed. In addition, the shape dimension of the existing pile 1 is not limited.

本実施形態の既存杭の撤去方法は、芯抜き工程と、縁切工程と、杭上昇工程と、切断工程とを備えている。   The removal method of the existing pile of this embodiment is provided with the centering process, the edge cutting process, the pile raising process, and the cutting process.

芯抜き工程は、図1の(a)に示すように、既存杭1に対して芯抜き削孔を行い、既存杭を有底筒状に成形する工程である。 As shown in FIG. 1A, the centering step is a step of forming a centering hole in the existing pile 1 and forming the existing pile into a bottomed cylindrical shape.

既存杭1の芯抜き削孔は、既存杭1の鉄筋(鉄筋籠)2を切断しないように、既存杭1の中央部を軸方向に沿って削孔する。 Coring drilling of existing pile 1, so as not to cut the existing pile 1 rebar (reinforcing bar cage) 2, and drilling along the central portion of the existing pile 1 in the axial direction.

本実施形態では、鉄筋籠の内径が1.8mの既存杭1に対して、直径1.6mの空洞3を形成する。空洞3は、既存杭1に底部を残した状態で、46mの深さに形成する。なお、空洞3の形状寸法は、既存杭の自重と該既存杭に作用する浮力とを考慮して設定する。 In the present embodiment, a cavity 3 having a diameter of 1.6 m is formed with respect to an existing pile 1 having an inner diameter of a reinforcing bar of 1.8 m. The cavity 3 is formed to a depth of 46 m with the bottom left in the existing pile 1. Incidentally, the geometry of the cavity 3 is set in consideration of the buoyancy acting on its own weight and the existing pile of the existing pile.

既存杭1の削孔方法は限定されるものではないが、例えば、オールケーシング掘削機(図示せず)を利用して行えばよい。
なお、空洞3は、削孔に使用した泥水等の安定液で満たしておく。また、削孔に伴い発生したコンクリート片等は、空洞3内から取り除く。
Although the drilling method of the existing pile 1 is not limited, For example, what is necessary is just to perform using an all casing excavator (not shown).
The cavity 3 is filled with a stabilizing liquid such as mud used for drilling. In addition, concrete pieces and the like generated along with the drilling are removed from the cavity 3.

縁切工程は、図1の(b)に示すように、既存杭1の外周囲を掘削して既存杭1と周辺地盤Gとを縁切りする工程である。 Edge switching step, as shown in FIG. 1 (b) is a step of edge cutting of the existing pile 1 and the surrounding ground G by excavating an outer periphery of the existing pile 1.

本実施形態では、既存杭1の外周囲にケーシング4を配置することにより、既存杭1と周辺地盤Gとを縁切りする。 In the present embodiment, by arranging the casing 4 to the outer periphery of the existing pile 1, for edge cutting and existing pile 1 and the surrounding ground G.

縁切り(ケーシング4の配置)は、既存杭1の外周に清水や泥水(安定液)等を循環させながら、オールケーシング掘削機(図示せず)等を用いて行う。
本実施形態では、ケーシング4として、その内径が既存杭1の外径よりも大きく、その長さが既存杭1の長さよりも長いものを使用する。
Edge cutting (arrangement of the casing 4) is performed using an all-casing excavator (not shown) or the like while circulating fresh water or muddy water (stabilizing liquid) or the like around the outer periphery of the existing pile 1.
In the present embodiment, as the casing 4, the casing 4 is used whose inner diameter is larger than the outer diameter of the existing pile 1 and whose length is longer than the length of the existing pile 1.

杭上昇工程は、図1の(c)に示すように、既存杭1を上昇させて、既存杭1の一部分を地上に突出させる工程である。なお、杭上昇工程において、地上に突出させる既存杭1の高さ(突出長)は限定されない。 A pile raising process is a process of raising the existing pile 1 and projecting a part of the existing pile 1 to the ground, as shown in FIG. In addition, in the pile raising process, the height (projection length) of the existing pile 1 to be projected to the ground is not limited.

既存杭1は、既存杭1の内部に残存する安定液を排水することにより既存杭1の見掛け上の比重を小さくすることにより浮力を利用して上昇させる。このとき、必要に応じて揚重機等により既存杭1を吊り上げる。 Existing pile 1 raises utilizing buoyancy by reducing the specific gravity of the apparent existing pile 1 by draining the stabilizing solution remaining in the interior of the existing pile 1. At this time, if necessary, the existing pile 1 is lifted by a lifting machine or the like.

ここで、鉄筋コンクリートの単位体積重量が25kN/mとして、既存杭1の空洞3内に安定液が満水だとすると、既存杭1の重量は2724kN(式1参照)である。なお、安定液の密度は12kN/mとする Here, as the specific weight of the reinforced concrete 25 kN / m 3, stable liquid-full level in the cavity 3 of the existing pile 1 Datosuruto, the weight of existing pile 1 is 2724KN (see equation 1). The density of the stabilizing liquid is 12 kN / m 3 .

1614kN+1110kN=2724kN ・・・ 式1
ここで、
削孔前の既存杭の重量:3927kN=157.1m既存杭の体積)×25kN/m
既存杭撤去部分の重量:2313kN=92.5m(撤去部分の体積)×25kN/m
削孔後の既存杭の重量:1614kN=3927kN−2313kN
満水時の安定液の重量:1110kN=92.5 m(空洞の容積)×12kN/m
1614kN + 1110kN = 2724kN Equation 1
here,
Weight of existing pile before drilling: 3927kN = 157.1m 3 (volume of existing pile ) x 25kN / m 3
Weight of existing pile removal part: 2313kN = 92.5m 3 (volume of removal part) × 25kN / m 3
Weight of existing pile after drilling: 1614kN = 3927kN-2313kN
Weight of stable liquid at full water: 1110 kN = 92.5 m 3 (cavity volume) × 12 kN / m 3

一方、既存杭1の周囲の安定液等により既存杭1に作用する浮力は、1885kN(式2参照)である。
157.1m×12kN/m=1885kN ・・・ 式2
Meanwhile, the buoyancy acting on the existing pile 1 by stabilizing solution or the like around the existing pile 1 is 1885KN (see Equation 2).
157.1m 3 × 12kN / m 3 = 1885kN Equation 2

したがって、既存杭1の空洞3内から安定液をすべて排水すれば、浮力が既存杭1の重量よりも大きくなる(式3参照)。つまり、空洞3から安定液を排水する過程で既存杭1が浮き上がるようになる。
2724kN−1110kN=1614kN<1885kN ・・・ 式3
Thus, if draining all the stabilizing solution from the cavity 3 of the existing pile 1, the buoyancy is greater than the weight of the existing pile 1 (see Equation 3). That is, the existing pile 1 is lifted in the process of draining the stabilizing liquid from the cavity 3.
2724kN-1110kN = 1614kN <1885kN Equation 3

また、本実施形態では、大きな浮力が得られるように、ケーシング4の内側(既存杭1の周囲)に密度の高い泥水を注水する。
なお、浮力だけでは既存杭1が浮き上がらないようにした場合には、揚重機やジャッキ等を利用して既存杭を引き上げる(上昇させる)。また、浮力に比べて、既存杭1の杭質量が小さい場合には、既存杭1の空洞3内に清水等を注水し、浮力とのバランスを取ることで、既存杭の上昇量や上昇速度を調整する。
In the present embodiment, high-density muddy water is poured into the inside of the casing 4 (around the existing pile 1) so as to obtain a large buoyancy.
Incidentally, only the buoyancy in the case of do not float existing pile 1, raise existing pile by using the crane or a jack or the like (increase). Further, as compared with the buoyancy in the case pile the mass of the existing pile 1 is small, and water injection Shimizu like into the cavity 3 of the existing pile 1, by balancing the buoyancy, increase the amount and rate of increase of the existing pile Adjust.

切断工程は、図2の(a)および(b)に示すように、既存杭1の地上に突出した突出部分を切断する工程である。 A cutting process is a process of cutting the protrusion part which protruded on the ground of the existing pile 1, as shown to (a) and (b) of FIG.

切断工程では、まず、図2の(a)に示すように、既存杭1の突出部分に仮受け部材5を設置し、地上部において仮受けする。
既存杭1が所定の高さだけ地上に突出したら、それ以上の浮き上がりを止めるべく、空洞3に安定液や清水等の液体を注入する。
次に、仮受け部材5の上方において、既存杭1の突出部分を切断する。このとき、突出部分には、吊部材6を設置しておく。なお、既存杭1の切断に使用する装置は限定されない。
In the cutting step, first, as shown in FIG. 2 (a), the temporary receiving member 5 is installed on the protruding portion of the existing pile 1 and temporarily received on the ground portion.
When the existing pile 1 protrudes above the ground by a predetermined height, a liquid such as a stabilizing liquid or fresh water is injected into the cavity 3 in order to stop further lifting.
Next, the protruding portion of the existing pile 1 is cut above the temporary support member 5. At this time, the suspension member 6 is installed on the protruding portion. In addition, the apparatus used for the cutting of the existing pile 1 is not limited.

既存杭1の突出部分を切断したら、図2の(b)に示すように、吊部材6にワイヤー等を取り付けて揚重機等を利用して、切断した筒状体7を撤去する。なお、筒状体7の撤去方法は限定されない。また、吊部材6は必要に応じて設置すればよく、必ずしも設置する必要はない。 If the protrusion part of the existing pile 1 is cut | disconnected, as shown to (b) of FIG. 2, a wire etc. will be attached to the suspension member 6, and the cut cylindrical body 7 will be removed using a lifting machine etc. FIG. In addition, the removal method of the cylindrical body 7 is not limited. Moreover, what is necessary is just to install the suspending member 6 as needed, and does not necessarily need to install.

筒状体7を撤去したら、図2の(c)に示すように、空洞3から安定液を排出して既存杭1を浮上させるか、あるいは、揚重機等を利用して既存杭1をさらに引き上げ、既存杭1の残部の上部を地上に突出させる(杭上昇工程)。そして、図2の(a)および(b)に示すように、既存杭1の突出部分を切断し、撤去する(切断工程)。
このように、杭上昇工程および切断工程を繰り返すことにより、既存杭1の全体を撤去する。
When the cylindrical body 7 is removed, as shown in FIG. 2 (c), the stabilizing liquid is discharged from the cavity 3 and the existing pile 1 is levitated, or the existing pile 1 is further removed using a lifting machine or the like. Pull up and make the upper part of the remaining part of the existing pile 1 protrude above the ground (pile raising process). And as shown to (a) and (b) of FIG. 2, the protrusion part of the existing pile 1 is cut | disconnected and removed (cutting process).
Thus, the whole existing pile 1 is removed by repeating a pile raising process and a cutting process.

本実施形態の既存杭の撤去方法によれば、既存杭1に対して芯抜き削孔を行うため、軽量化させた状態で既存杭1を上昇させることができ、揚重機等の引上げ手段の負担の軽減化が可能となる。 According to removing method of the existing pile of the present embodiment, since the cored drilling to existing pile 1, it is possible to raise the existing pile 1 in a state of being lightweight, the pulling means of the crane or the like The burden can be reduced.

既存杭1の芯抜き削孔は、既存杭1が有底の筒状体になるように行うため、底を残さない場合に比べて既存杭1には大きな浮力が作用する。
そのため、既存杭1を上昇させる際の引上げ手段への負荷を軽減すること、あるいは、浮力のみで既存杭1を浮上(上昇)させることが可能となる。
Since the core punching hole of the existing pile 1 is performed so that the existing pile 1 becomes a bottomed cylindrical body, a larger buoyancy acts on the existing pile 1 than in the case where the bottom is not left.
Therefore, it reduces the load on the pulling means when raising the existing pile 1, or it is possible to float the existing pile 1 only buoyancy (rise).

また、既存杭1は、ケーシング4が周設されていることで周面地盤とは縁切りされており、既存杭1に作用する周面摩擦力が取り除かれているか、あるいは、低減されているため、既存杭1を上昇させる際の引上げ手段への負荷がさらに軽減されている。 Moreover, the existing pile 1 is cut off from the peripheral ground by the casing 4 being provided around, and the peripheral frictional force acting on the existing pile 1 is removed or reduced. The load on the pulling means when raising the existing pile 1 is further reduced.

既存杭1に形成された空洞3内への安定液等の注水あるいは排水により、既存杭1の重量と浮力とのバランスを図り、施工時の安全性を確保することを可能としている。 The water injection or drainage stabilizing solution or the like into the cavity 3 formed in the existing pile 1, aims to balance the weight and buoyancy of the existing pile 1, it is made possible to ensure safety during construction.

杭上昇工程および切断工程は、地上から作業することを可能としているため、各工程における作業は、既存の機械工具と簡易な設備を組み合わせて行うことができるため、特殊な機械を使用する必要がなく、比較的安価に既存杭1を撤去することができる。 Since the pile ascending process and the cutting process enable work from the ground, the work in each process can be performed by combining existing machine tools and simple equipment, so it is necessary to use a special machine. The existing pile 1 can be removed relatively inexpensively.

既存杭1の撤去後、鉄筋(鉄筋籠)を建て込み、コンクリートを打設することで、場所打ち杭を形成することができるため、既存杭1の撤去から新設杭の施工までのプロセスを一括して実施することができ、施工性に優れている。 After removing the existing pile 1, cast-in-place piles can be formed by laying reinforcing bars (reinforcing rods) and placing concrete, so the process from removal of existing piles 1 to construction of new piles is integrated. Can be carried out and is excellent in workability.

既存杭1の軽量化を図るとともに既存杭1に作用する浮力を利用して既存杭1を撤去するため、大規模な揚重機等を使用することなく、既存杭1の撤去を行うことができる。そのため、空頭制限下での施工や、比較的施工スペースが小さい場合であっても、施工が可能である。 To remove an existing pile 1, utilizing buoyancy acting on the existing pile 1 with reducing the weight of the existing pile 1, without using a large crane and the like, it is possible to perform removal of existing pile 1 . For this reason, construction can be performed even when the construction is under the restriction of the empty head or when the construction space is relatively small.

以上、本発明の実施形態について説明した。しかし、本発明は、前述の実施形態に限られず、前記の各構成要素については、本発明の趣旨を逸脱しない範囲で、適宜変更が可能である。
例えば、前記実施形態では、芯抜き工程後に縁切工程を行う場合について説明したが、芯抜き工程と縁切工程の順序は限定されるものではなく、縁切工程を実施した後に芯抜き工程を実施してもよい。
The embodiment of the present invention has been described above. However, the present invention is not limited to the above-described embodiment, and the above-described components can be appropriately changed without departing from the spirit of the present invention.
For example, in the embodiment, the case where the edge cutting process is performed after the centering process has been described, but the order of the centering process and the edge cutting process is not limited, and the centering process is performed after the edge cutting process is performed. You may implement.

前記実施形態では、縁切工程においてケーシング4を既存杭1の周囲に配置する場合について説明したが、ケーシング4は必ずしも配置する必要はない。 Although the said embodiment demonstrated the case where the casing 4 was arrange | positioned around the existing pile 1 in an edge cutting process, the casing 4 does not necessarily need to be arrange | positioned.

既存杭1に形成された空洞3の底部に貫通孔を形成し、この貫通孔から既存杭1の下端と地山との間にグラウトを注入することで、既存杭1を押し上げてもよい。 Existing bottom of pile 1 cavity 3 formed in a through hole is formed, by injecting the grout between the lower end and the natural ground of the existing pile 1 from the through-holes may be pushed existing pile 1.

既存杭1は無筋コンクリートであってもよく、必ずしも鉄筋コンクリートである必要はない。また、既存杭1の断面形状は、限定されない。 The existing pile 1 may be unreinforced concrete, and is not necessarily reinforced concrete. Moreover, the cross-sectional shape of the existing pile 1 is not limited.

既存杭
2 鉄筋
3 空洞
4 ケーシング
5 仮受け部材
6 吊部材
7 筒状体
DESCRIPTION OF SYMBOLS 1 Existing pile 2 Reinforcement 3 Cavity 4 Casing 5 Temporary receiving member 6 Hanging member 7 Cylindrical body

Claims (3)

既存杭の自重と該既存杭に作用する浮力とを考慮した空洞を形成する芯抜き削孔を行い、前記既存杭を有底筒状に成形する芯抜き工程と、
前記既存杭の外周囲を掘削して前記既存杭と周辺地盤とを縁切りする縁切工程と、
前記既存杭を上昇させて、当該既存杭の一部分を地上に突出させる杭上昇工程と、
前記既存杭の地上に突出した突出部分を切断する切断工程と、を備えることを特徴とする、既存杭の撤去方法。
A coring process performed coring drilling, molding the existing pile into a bottomed cylindrical shape to form the cavity in consideration of the buoyancy acting on its own weight and the existing pile of the existing pile,
An edge switching step of edge cutting and the existing pile and the surrounding ground by excavating an outer periphery of the existing pile,
Said existing pile was elevated to a pile increasing step to protrude a portion of the existing pile on the ground,
Characterized in that it comprises a cutting step of cutting a protruding portion protruding on the ground of the existing pile removing method of the existing pile.
前記縁切工程において、前記既存杭の外周囲にケーシングを配置し、
前記杭上昇工程において、前記ケーシングの内側に液体を注入することを特徴とする、請求項1に記載の既存杭の撤去方法。
In the edge cutting step, a casing is arranged around the outer periphery of the existing pile ,
The method for removing an existing pile according to claim 1, wherein in the pile raising step, a liquid is injected into the casing.
前記空洞に液体を注入することを特徴とする、請求項1または請求項2に記載の既存杭の撤去方法。   The method for removing an existing pile according to claim 1 or 2, wherein a liquid is injected into the cavity.
JP2013182158A 2013-09-03 2013-09-03 How to remove existing piles Active JP6180854B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2013182158A JP6180854B2 (en) 2013-09-03 2013-09-03 How to remove existing piles

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2013182158A JP6180854B2 (en) 2013-09-03 2013-09-03 How to remove existing piles

Publications (2)

Publication Number Publication Date
JP2015048665A JP2015048665A (en) 2015-03-16
JP6180854B2 true JP6180854B2 (en) 2017-08-16

Family

ID=52698903

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2013182158A Active JP6180854B2 (en) 2013-09-03 2013-09-03 How to remove existing piles

Country Status (1)

Country Link
JP (1) JP6180854B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7649718B2 (en) 2021-08-24 2025-03-21 鹿島建設株式会社 How to remove existing foundations

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH072538U (en) * 1992-02-14 1995-01-13 昇 大山 Labor-saving existing pile extractor and its construction method
JP4471513B2 (en) * 2001-02-19 2010-06-02 江戸川基礎工事株式会社 Existing pile removal method and apparatus
JP3500387B1 (en) * 2002-08-16 2004-02-23 株式会社神島組 Underground existing structure extraction method
JP3701648B2 (en) * 2002-11-13 2005-10-05 株式会社竹中工務店 Steel pipe construction
JP2006057258A (en) * 2004-08-17 2006-03-02 Tone Geo Tech Co Ltd Removal method for foundation pile
GB0425406D0 (en) * 2004-11-18 2004-12-22 Shanks John Method for breaking down concrete piles
JP4886894B1 (en) * 2010-12-06 2012-02-29 横浜ライト工業株式会社 Method for extracting buried pile and foaming water generator
JP2012241329A (en) * 2011-05-16 2012-12-10 Takuma Uchida Method of removing existing pile

Also Published As

Publication number Publication date
JP2015048665A (en) 2015-03-16

Similar Documents

Publication Publication Date Title
JP5095719B2 (en) Cast-in-place pile construction method
JP4392453B2 (en) Method for suppressing levitation of underground buried object and buried structure
JP6217267B2 (en) Method of rebuilding a structure having an underground structure and underground structure
EP3318677B1 (en) Method for forming a reinforced pile and use of an accessory therein
JP2014088687A (en) Method for creating pile body
JP6413469B2 (en) Pile foundation and pile foundation construction method
JP6416139B2 (en) Cast-in-place pile and its construction method
JP6645098B2 (en) Removal method of existing pile
JP6180854B2 (en) How to remove existing piles
JP6209911B2 (en) Method of rebuilding a structure having an underground structure and underground structure
JP2014109175A (en) Construction method for steel pipe concrete pile and steel pipe pile
JP5176788B2 (en) Construction method of underground structure
KR102408334B1 (en) The construction method of underground structure using foundation of existing undergound structure
JP4302861B2 (en) Construction method of cast-in-place concrete pile
CN103410368A (en) Vertical rod reinforcement device used for earth excavation and vertical rod reinforcement method
JP2014105535A (en) Construction method for cast-in-place concrete pile
KR100628511B1 (en) External reinforcement type reverse circulation excavation
JP4425073B2 (en) Cast-in-place concrete construction method
JP6847176B1 (en) Pile construction method
JP2012002053A (en) Construction method for burying tank and the like
JP2007224657A (en) Cast-in-place concrete pile construction method
JP3150903U (en) Cast-in-place concrete pile head forming equipment
KR20220111990A (en) Upper PHC Pile for removeable auxiliary pile and construction method of PHC top-down foundation pile using of the same
JP4872561B2 (en) Construction method of ready-made piles
JP5310364B2 (en) Method for constructing underground continuous wall having shield penetration, and underground continuous wall having shield penetration

Legal Events

Date Code Title Description
RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20160506

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20160616

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20170419

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20170425

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20170525

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20170711

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20170719

R150 Certificate of patent or registration of utility model

Ref document number: 6180854

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250