JP6186980B2 - Water stop device - Google Patents
[go: Go Back, main page]

JP6186980B2 - Water stop device - Google Patents

Water stop device Download PDF

Info

Publication number
JP6186980B2
JP6186980B2 JP2013152691A JP2013152691A JP6186980B2 JP 6186980 B2 JP6186980 B2 JP 6186980B2 JP 2013152691 A JP2013152691 A JP 2013152691A JP 2013152691 A JP2013152691 A JP 2013152691A JP 6186980 B2 JP6186980 B2 JP 6186980B2
Authority
JP
Japan
Prior art keywords
water stop
water
hose
stop material
material placing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2013152691A
Other languages
Japanese (ja)
Other versions
JP2015021611A (en
Inventor
英輝 川畑
英輝 川畑
昂史 藤田
昂史 藤田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
IHI Corp
Original Assignee
IHI Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by IHI Corp filed Critical IHI Corp
Priority to JP2013152691A priority Critical patent/JP6186980B2/en
Publication of JP2015021611A publication Critical patent/JP2015021611A/en
Application granted granted Critical
Publication of JP6186980B2 publication Critical patent/JP6186980B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Pipe Accessories (AREA)

Description

本発明は、止水材打設用器具に関するものである。   The present invention relates to a water-stopping material placing device.

原子炉圧力容器やその中の核燃料が損傷または溶融する過酷事故が生じた際、これらを補修したり、除去したりする作業が必要となる。このような状態のとき、原子炉格納容器の内部は極めて高い放射線量となっている。つまり、原子炉圧力容器や原子炉格納容器へ接近する作業は容易でない。このため、原子炉格納容器を冠水させ、放射線量を低減させた上で作業を行うことが想定される。   When a severe accident occurs that damages or melts the reactor pressure vessel or the nuclear fuel in it, it is necessary to repair or remove them. In such a state, the inside of the reactor containment vessel has a very high radiation dose. In other words, it is not easy to access the reactor pressure vessel or the reactor containment vessel. For this reason, it is assumed that the reactor containment vessel is submerged and the work is performed after reducing the radiation dose.

下記特許文献1には、原子炉格納容器の冠水方法が開示されている。この方法では、原子炉格納容器を冠水させる手法の一つとして、原子炉圧力容器を収納するドライウェルと、内部にプールが形成されるサプレッションチェンバと、の間を接続する全てのベント管に止水材を打設し、その全てのベント管を閉塞することで水漏れを防止する手法(ベント管閉塞工程)を提案している。   Patent Document 1 below discloses a method for flooding a containment vessel. In this method, as one of the methods of submerging the reactor containment vessel, all the vent pipes connecting between the dry well containing the reactor pressure vessel and the suppression chamber in which the pool is formed are stopped. We have proposed a method (vent pipe closing process) that prevents water leakage by placing water material and closing all the vent pipes.

特開2013−108956号公報JP2013-108956A

ベント管は、内径が約2m前後の大口径の鋼管からなる。このような大口径の管を止水材で閉塞する場合、閉塞したい管に止水材打設のための横穴を開け、その横穴に止水材打設ホースを挿入し、その止水材打設ホースを保持して止水材を打設し、止水材打設完了後、管に開けた横穴の閉止を行うこととなる。
ところで、大口径の管の内部に止水材を打設する高さが高いと、落下時の衝撃で止水材の成分が分離し、上手く固まらず、止水材として機能しなくなる場合がある。しかしながら、高放射線量環境下にあるベント管では、作業者が近接して止水材打設の作業を行うことができない、という問題がある。
The vent pipe is made of a large diameter steel pipe having an inner diameter of about 2 m. When blocking such a large-diameter pipe with a water-stopping material, make a horizontal hole for placing the water-stopping material in the pipe you want to close, insert a water-stopping material casting hose into the horizontal hole, and place the water-stopping material The hose is held and a water-stopping material is driven. After the water-stopping material is cast, the lateral hole opened in the pipe is closed.
By the way, if the height of the water-stopping material placed inside the large-diameter pipe is high, the components of the water-stopping material may be separated by the impact at the time of dropping, and will not solidify well and may not function as a water-stopping material. . However, a vent pipe under a high radiation dose environment has a problem that an operator cannot approach the water-stopping material in close proximity.

本発明は、上記問題点に鑑みてなされたものであり、作業員が近接できない環境下であっても、閉塞したい管を止水材で適切に閉塞することができる止水材打設用器具の提供を目的とする。   The present invention has been made in view of the above-described problems, and is a water-stopping material placing device capable of appropriately closing a pipe to be closed with a water-stopping material even in an environment where workers cannot approach. The purpose is to provide.

上記の課題を解決するために、本発明は、管に形成された横穴から止水材打設ホースを介して前記管の内部に止水材を打設するための止水材打設用器具であって、前記横穴に対して前記止水材打設ホースを進退させるホースガイド部を有する、という構成を採用する。
この構成を採用することによって、本発明では、止水材打設用器具にホースガイド部を設け、管に形成された横穴に対して止水材打設ホースを進退させる。このように、本発明では、止水材打設用器具によって作業員が近接できない環境下で止水材打設ホースを保持し、止水材の打設高さを調整できるため、落下時の衝撃で止水材の成分が分離することなく、閉塞したい管を止水材で適切に閉塞することができる。
In order to solve the above-described problems, the present invention provides a water-stopping material placing device for placing a water-stopping material in a pipe from a lateral hole formed in a pipe via a water-stopping material placing hose. And the structure of having a hose guide part for advancing and retracting the water stop material placing hose with respect to the lateral hole is adopted.
By adopting this configuration, in the present invention, the hose guide portion is provided in the water stop material placing device, and the water stop material placing hose is advanced and retracted with respect to the lateral hole formed in the pipe. In this way, in the present invention, the water stop material placing hose can be held in an environment where an operator cannot approach by the water stop material placing device, and the placement height of the water stop material can be adjusted. It is possible to appropriately close the pipe to be closed with the water-stopping material without separating the components of the water-stopping material by impact.

また、本発明においては、前記横穴に係合し、前記止水材打設ホースが進退する進退方向における移動を規制する係合固定部を有する、という構成を採用する。
この構成を採用することによって、本発明では、止水材打設用器具に係合固定部を設け、横穴に係合させ、止水材打設ホースが進退する進退方向における移動を規制する。このように、本発明では、止水材打設用器具を横穴に係合させて相対的な位置決めをすることで、ホースガイド部による止水材打設ホースのガイドを適切に行うことができ、また、止水材を打設する際に受ける反力による止水材打設用器具の外れを防止することができる。
Moreover, in this invention, the structure of having an engagement fixing | fixed part which regulates the movement in the advancing / retreating direction which engages with the said horizontal hole and the said water stop material placement hose advances / retreats is employ | adopted.
By adopting this configuration, in the present invention, an engagement fixing portion is provided in the water stop material placing instrument and engaged with the lateral hole, thereby restricting movement in the advancing and retreating direction in which the water stop material placing hose advances and retreats. As described above, in the present invention, the water stop material placing hose can be properly guided by the hose guide portion by engaging the water stop material placing device with the lateral hole and performing relative positioning. Moreover, it is possible to prevent detachment of the water stop material placing device due to the reaction force received when placing the water stop material.

また、本発明においては、前記管の外部で前記横穴の周りを囲い、前記管の内部から前記横穴を介してオーバーフローさせた前記止水材で前記横穴の蓋を形成する箱型筐体部を有する、という構成を採用する。
この構成を採用することによって、本発明では、止水材打設用器具に箱型筐体部を設け、管の外部で横穴の周りを囲い、横穴を介してオーバーフローさせた止水材で該横穴の蓋を形成する。このように、本発明では、止水材打設完了後に別途横穴の閉塞を行うことなく、止水材打設ホースが挿入される横穴の閉塞を行うことができる。
Further, in the present invention, a box-shaped housing portion that surrounds the lateral hole outside the tube and forms a lid of the lateral hole with the waterstop material overflowed from the inside of the tube through the lateral hole. The structure of having is adopted.
By adopting this configuration, in the present invention, a box-shaped housing portion is provided in the water-stopping material placing instrument, and the water-stopping material is surrounded by the water-stopping material that surrounds the side hole outside the pipe and overflows through the side hole. Form the lid of the horizontal hole. As described above, in the present invention, the lateral hole into which the water-stopping material placing hose is inserted can be closed without separately closing the lateral hole after completion of the water-stopping material placing.

また、本発明においては、前記止水材打設ホースは、前記管の内部と、前記管の外部であって前記箱型筐体部の内部との間で進退する、という構成を採用する。
この構成を採用することによって、本発明では、止水材打設ホースを管の内部に進入させることで、止水材の成分を分離させることなく、管の内部に止水材を打設することができる。また、本発明では、止水材打設ホースを管の外部であって箱型筐体部の内部に退避させることで、箱型筐体部の内部に止水材を充填させ易くすることができ、横穴を閉塞する蓋を確実に形成することができる。
Moreover, in this invention, the structure which the said water stop material placement hose advances / retreats between the inside of the said pipe | tube and the exterior of the said pipe | tube and the inside of the said box-type housing part is employ | adopted.
By adopting this configuration, in the present invention, the water-stopping material is placed inside the pipe without separating the components of the water-stopping material by allowing the water-stopping material placing hose to enter the pipe. be able to. Further, in the present invention, the water stop material placing hose is retracted outside the pipe and inside the box-type housing part, thereby facilitating filling of the water-stopping material inside the box-type housing part. It is possible to reliably form a lid that closes the lateral hole.

また、本発明においては、前記箱型筐体部は、前記管の外部の形状に応じた形状を有する管接触部を備える、という構成を採用する。
この構成を採用することによって、本発明では、箱型筐体部の管接触部が管の外部の形状に沿って密に接触できるため、箱型筐体部と管との隙間からの止水材の漏れを防止し、箱型筐体部に止水材を充填させて、横穴を閉塞する蓋を確実に形成することができる。
Moreover, in this invention, the said box-shaped housing | casing part is employ | adopted as a structure provided with the pipe | tube contact part which has a shape according to the external shape of the said pipe | tube.
By adopting this configuration, in the present invention, the tube contact portion of the box-shaped housing portion can be in close contact with the external shape of the tube, so that water can be stopped from the gap between the box-shaped housing portion and the tube. It is possible to prevent the leakage of the material, and to fill the box-shaped housing portion with the water-stopping material, thereby reliably forming the lid that closes the lateral hole.

また、本発明においては、前記箱型筐体部は、その内外を連通させる水抜き部を備える、という構成を採用する。
この構成を採用することによって、本発明では、箱型筐体部に水抜き部を設けることで、箱型筐体部の内部から水を排水しつつ箱型筐体部に止水材を充填させて、横穴を閉塞する蓋を確実に形成することができる。
Moreover, in this invention, the said box-shaped housing | casing part employ | adopts the structure of providing the drain part which connects the inside and outside.
By adopting this configuration, in the present invention, a water drainage portion is provided in the box-shaped housing portion, so that water is drained from the inside of the box-shaped housing portion and the water-stopping material is filled in the box-shaped housing portion. Thus, a lid that closes the lateral hole can be reliably formed.

また、本発明においては、前記止水材打設ホースには、フランジが設けられており、前記ホースガイド部は、前記フランジよりも小さな径のガイド穴を備えて前記止水材打設ホースが退くときに前記フランジと接触可能な板ガイド部を有する、という構成を採用する。
この構成を採用することによって、本発明では、止水材打設ホースに設けられたフランジがホースガイド部に設けられた板ガイド部に接触すると、板ガイド部に設けられたガイド穴が閉塞されるため、ガイド穴からの止水材の漏れを防止し、箱型筐体部に止水材を充填させて、横穴を閉塞する蓋を確実に形成することができる。
Further, in the present invention, the water stop material placing hose is provided with a flange, and the hose guide portion includes a guide hole having a smaller diameter than the flange, and the water stop material placing hose is A configuration is adopted in which a plate guide portion that can come into contact with the flange when retracted is employed.
By adopting this configuration, in the present invention, when the flange provided on the water stop material placing hose contacts the plate guide provided on the hose guide, the guide hole provided on the plate guide is closed. Therefore, it is possible to prevent leakage of the water-stopping material from the guide hole, and to fill the box-shaped housing portion with the water-stopping material and to reliably form a lid that closes the lateral hole.

本発明によれば、作業員が近接できない環境下であっても、閉塞したい管を止水材で適切に閉塞することができる。   ADVANTAGE OF THE INVENTION According to this invention, even in the environment where an operator cannot approach, the pipe | tube which wants to be obstruct | occluded can be obstruct | occluded appropriately with a water stop material.

本発明の実施形態における沸騰水型原子炉の概略構成を示す縦断面図である。It is a longitudinal section showing a schematic structure of a boiling water reactor in an embodiment of the present invention. 図1のA−A断面図である。It is AA sectional drawing of FIG. 本発明の実施形態における止水材打設用器具の構成を示す縦断面図である。It is a longitudinal cross-sectional view which shows the structure of the water stop material placement instrument in embodiment of this invention. 本発明の実施形態における止水材打設用器具の外観を示す斜視図である。It is a perspective view which shows the external appearance of the water stop material placement instrument in embodiment of this invention. 本発明の実施形態におけるホースガイド部の構成を示す平面図である。It is a top view which shows the structure of the hose guide part in embodiment of this invention. 本発明の実施形態における止水材打設用器具を用いたベント管閉塞工程における作業を説明するための図である。It is a figure for demonstrating the operation | work in the vent pipe obstruction | occlusion process using the water stop material placement instrument in embodiment of this invention. 本発明の実施形態における止水材打設用器具を用いたベント管閉塞工程における作業を説明するための図である。It is a figure for demonstrating the operation | work in the vent pipe obstruction | occlusion process using the water stop material placement instrument in embodiment of this invention. 本発明の一別実施形態における係合固定部の構成を示す縦断面図である。It is a longitudinal cross-sectional view which shows the structure of the engagement fixing | fixed part in another embodiment of this invention. 本発明の一別実施形態における係合固定部の構成を示す縦断面図である。It is a longitudinal cross-sectional view which shows the structure of the engagement fixing | fixed part in another embodiment of this invention. 本発明の一別実施形態における係合固定部の構成を示す縦断面図である。It is a longitudinal cross-sectional view which shows the structure of the engagement fixing | fixed part in another embodiment of this invention.

以下、図面を参照して、本発明の一実施形態について説明する。なお、以下の図面において、各部材を認識可能な大きさとするために、各部材の縮尺を適宜変更している。また、以下の説明においては、本発明を沸騰水型原子炉の1つであるMARK−I型の原子炉格納容器を冠水させる方法に適用した例について説明する。   Hereinafter, an embodiment of the present invention will be described with reference to the drawings. In the following drawings, the scale of each member is appropriately changed in order to make each member a recognizable size. Moreover, in the following description, the example which applied this invention to the method of flooding the MARK-I type | mold reactor containment vessel which is one of the boiling water reactors is demonstrated.

先ず、MARK−I型の沸騰水型原子炉1について説明する。図1は、本発明の実施形態における沸騰水型原子炉1の概略構成を示す縦断面図である。また、図2は、図1のA−A断面図である。なお、図2においては、後述の原子炉建屋2は省略されている。図1に示すように、沸騰水型原子炉1は、原子炉建屋2と、原子炉格納容器3と、ベントヘッダ4と、ダウンカマ5と、支持部6と、原子炉圧力容器7と、不図示の炉心を備えている。   First, the MARK-I type boiling water reactor 1 will be described. FIG. 1 is a longitudinal sectional view showing a schematic configuration of a boiling water reactor 1 in an embodiment of the present invention. FIG. 2 is a cross-sectional view taken along the line AA in FIG. In FIG. 2, a reactor building 2 described later is omitted. As shown in FIG. 1, a boiling water reactor 1 includes a reactor building 2, a reactor containment vessel 3, a vent header 4, a downcomer 5, a support 6, a reactor pressure vessel 7, The illustrated core is provided.

原子炉建屋2は、原子炉格納容器3と、ベントヘッダ4と、ダウンカマ5と、支持部6と、原子炉圧力容器7と、不図示の炉心とを収納する建屋であり、鉄筋コンクリートにより形成されている。この原子炉建屋2の下部には、後述する原子炉格納容器3のサプレッションチェンバ3bを設置するためのトーラス室2aが設けられている。なお、図示していないが、原子炉建屋2には、他に非常用炉心冷却系ポンプ、浄化設備、燃料プール、機器仮置きプール、非常用ガス処理系設備等が収納されている。   The reactor building 2 is a building that houses a reactor containment vessel 3, a vent header 4, a downcomer 5, a support portion 6, a reactor pressure vessel 7, and a core (not shown), and is formed of reinforced concrete. ing. A torus chamber 2a for installing a suppression chamber 3b of a reactor containment vessel 3 to be described later is provided at the lower part of the reactor building 2. Although not shown, the reactor building 2 also stores an emergency core cooling system pump, a purification facility, a fuel pool, an equipment temporary storage pool, an emergency gas processing system facility, and the like.

原子炉格納容器3は、原子炉圧力容器を収容するドライウェル3aと、ドライウェル3aの周囲に設けられるサプレッションチェンバ3bと、ドライウェル3aとサプレッションチェンバ3bとを接続するベント管3cとから構成されている。   The reactor containment vessel 3 includes a dry well 3a that accommodates the reactor pressure vessel, a suppression chamber 3b that is provided around the dry well 3a, and a vent pipe 3c that connects the dry well 3a and the suppression chamber 3b. ing.

ドライウェル3aは、丸底フラスコ形状とされた鋼鉄製の容器であり、原子炉建屋2の内壁内に設置されている。サプレッションチェンバ3bは、断面形状が図1に示すように円形であり、平面視形状が図2に示すように多角形の環状形状とされた鋼鉄製の容器である。なお、過酷事故によりサプレッションチェンバ3bに破損が生じていなければ、このサプレッションチェンバ3bの内部には水が貯留されてプールが形成されている。ベント管3cは、ドライウェル3aとサプレッションチェンバ3bとの間に設けられており、ドライウェル3aに蒸気が漏れ出したときに蒸気をサプレッションチェンバ3bに導く鋼鉄製の管である。このベント管3cは、図2に示すように、8本設けられている。各ベント管3cは、等間隔で配列されている。   The dry well 3 a is a steel container having a round bottom flask shape, and is installed in the inner wall of the reactor building 2. The suppression chamber 3b is a steel container whose cross-sectional shape is circular as shown in FIG. 1 and whose plan view shape is a polygonal annular shape as shown in FIG. If the suppression chamber 3b is not damaged due to a severe accident, water is stored inside the suppression chamber 3b to form a pool. The vent pipe 3c is provided between the dry well 3a and the suppression chamber 3b, and is a steel pipe that guides the steam to the suppression chamber 3b when the steam leaks into the dry well 3a. As shown in FIG. 2, eight vent pipes 3c are provided. The vent pipes 3c are arranged at equal intervals.

ベントヘッダ4は、サプレッションチェンバ3bの内部にサプレッションチェンバ3bと同心円状に配置される環状の管である。このベントヘッダ4は、全てのベント管3cの先端に接続されている。   The vent header 4 is an annular tube disposed concentrically with the suppression chamber 3b inside the suppression chamber 3b. The vent header 4 is connected to the tips of all the vent pipes 3c.

ダウンカマ5は、ベント管3cに接続されたベントヘッダ4に取り付けられている。このダウンカマ5は、逆U字形状の管部材であり、下方に向く両端に開口5aが設けられ、頂部がベントヘッダ4と接続されている。なお、サプレッションチェンバ3bの内部にプールが形成されている場合には、このプールの水面下にダウンカマ5の開口5aが配置される。このダウンカマ5を介して、サプレッションチェンバ3bの内部空間とベント管3cとが接続されている。このようなダウンカマ5は、図2に示すように、ベントヘッダ4に沿って等間隔で複数設けられている。   The downcomer 5 is attached to the vent header 4 connected to the vent pipe 3c. The downcomer 5 is an inverted U-shaped tube member, and has openings 5 a at both ends facing downward, and the top is connected to the vent header 4. In addition, when the pool is formed in the inside of the suppression chamber 3b, the opening 5a of the downcomer 5 is arrange | positioned under the water surface of this pool. Via the downcomer 5, the internal space of the suppression chamber 3b and the vent pipe 3c are connected. As shown in FIG. 2, a plurality of such downcomers 5 are provided along the vent header 4 at equal intervals.

支持部6は、ドライウェル3aの底部に設けられた鉄筋コンクリート部材であり、原子炉圧力容器7を支持する。原子炉圧力容器7は、支持部6上に固定されてドライウェル3aの内部に配置されている。この原子炉圧力容器7は、鋼鉄製の容器であり、内部に炉心を収納している。不図示の炉心は、核燃料や制御棒によって構成されており、原子炉圧力容器7の内部で支持されている。   The support 6 is a reinforced concrete member provided at the bottom of the dry well 3 a and supports the reactor pressure vessel 7. The reactor pressure vessel 7 is fixed on the support portion 6 and disposed inside the dry well 3a. The reactor pressure vessel 7 is a steel vessel and houses a reactor core therein. The core (not shown) is constituted by nuclear fuel and control rods, and is supported inside the reactor pressure vessel 7.

次に、上記構成の原子炉格納容器3の冠水方法に用いる止水材打設用器具10の構成について図3〜図5を参照して説明する。
なお、本実施形態で採用する原子炉格納容器3の冠水方法は、全てのベント管3c(管)に止水材を打設し、その全てのベント管3cを閉塞することで、水漏れを防止し、原子炉格納容器3を冠水させる方法である。
Next, the structure of the water stopping material placing instrument 10 used in the submersion method of the reactor containment vessel 3 having the above structure will be described with reference to FIGS.
In addition, the flooding method of the reactor containment vessel 3 employed in the present embodiment is to place water-stopping material on all the vent pipes 3c (tubes) and close all the vent pipes 3c, thereby preventing water leakage. This is a method of preventing and flooding the containment vessel 3.

図3は、本発明の実施形態における止水材打設用器具10の構成を示す縦断面図である。また、図4は、本発明の実施形態における止水材打設用器具10の外観を示す斜視図である。また、図5は、本発明の実施形態におけるホースガイド部20の構成を示す平面図である。
図3に示すように、止水材打設用器具10は、ベント管3cに形成された横穴3c1から止水材打設ホース11を介してベント管3cの内部に止水材Cを打設するためのものである。
FIG. 3 is a longitudinal cross-sectional view showing the configuration of the water-stopping material placing instrument 10 according to the embodiment of the present invention. FIG. 4 is a perspective view showing an appearance of the water stop material placing instrument 10 according to the embodiment of the present invention. FIG. 5 is a plan view showing the configuration of the hose guide portion 20 in the embodiment of the present invention.
As shown in FIG. 3, the water-stopping material placing device 10 places a water-stopping material C into the vent pipe 3c through a water-stopping material placing hose 11 from a lateral hole 3c1 formed in the vent pipe 3c. Is to do.

止水材Cとしては、例えば、可塑性のグラウト材が好ましく、具体的には、コンクリート等の一定時間経過後に固化するものや、高分子ゲルや水ガラス等からなるものを用いることができる。本実施形態では、止水材Cとして、可塑性のグラウト材を採用している。
止水材打設ホース11は、所定の剛性と可撓性を有する多層構造のホースである。この止水材打設ホース11のノズル先端部には、フランジ12が設けられている。このフランジ12は、例えば、ナット等の自在に装着できるものであっても良い。
As the water-stopping material C, for example, a plastic grout material is preferable, and specifically, a material such as concrete that solidifies after elapse of a certain time, a material made of polymer gel, water glass, or the like can be used. In the present embodiment, a plastic grout material is employed as the water stop material C.
The water stop material placing hose 11 is a multi-layered hose having predetermined rigidity and flexibility. A flange 12 is provided at the nozzle tip of the water stop material placing hose 11. The flange 12 may be a member that can be freely attached, such as a nut.

止水材打設用器具10は、ホースガイド部20を有する。ホースガイド部20は、横穴3c1に対して止水材打設ホース11を進退自在に保持するものである。ホースガイド部20は、止水材打設ホース11をガイドする複数のガイドローラー21を有する。ガイドローラー21は、フリーローラーであり、止水材打設ホース11が通るガイド筒22の内部に設けられている。   The water-stopping material placing device 10 has a hose guide portion 20. The hose guide part 20 holds the water stop material placing hose 11 with respect to the horizontal hole 3c1 so as to be able to advance and retreat. The hose guide part 20 has a plurality of guide rollers 21 for guiding the water stop material placing hose 11. The guide roller 21 is a free roller and is provided inside the guide cylinder 22 through which the water stop material placing hose 11 passes.

ガイドローラー21は、図5に示すように、止水材打設ホース11の周りに複数配置されている。本実施形態のガイドローラー21は、平面視で止水材打設ホース11を四方向からガイドするようになっている。また、本実施形態のガイドローラー21は、止水材打設ホース11の周面形状に応じた溝が形成された周面21aを有している。このガイドローラー21は、図3に示すように、ガイド筒22の内部に複数段(本実施形態では3段)で設けられている。 As shown in FIG. 5 , a plurality of guide rollers 21 are arranged around the water stop material placing hose 11. The guide roller 21 of the present embodiment guides the water stop material placing hose 11 from four directions in plan view. Moreover, the guide roller 21 of this embodiment has the surrounding surface 21a in which the groove | channel according to the surrounding surface shape of the water stop material placement hose 11 was formed. As shown in FIG. 3, the guide roller 21 is provided in a plurality of stages (three stages in the present embodiment) inside the guide cylinder 22.

ガイドローラー21の最下段の下側には、板ガイド部23が設けられている。板ガイド部23は、ガイド筒22の内部に設けられ、止水材打設ホース11のフランジ12よりも小さな径のガイド穴23aを有している。ガイド穴23aの径は、止水材打設ホース11のホース部分が所定のクリアランスを保持して挿通できるように設定されている。板ガイド部23は、止水材打設ホース11を進退自在にガイドすると共に、止水材打設ホース11が上方に退くときにフランジ12と接触可能な構成となっている。   A plate guide portion 23 is provided below the lowermost stage of the guide roller 21. The plate guide portion 23 is provided inside the guide tube 22 and has a guide hole 23 a having a smaller diameter than the flange 12 of the water stop material placing hose 11. The diameter of the guide hole 23a is set so that the hose portion of the water stop material placing hose 11 can be inserted while maintaining a predetermined clearance. The plate guide portion 23 is configured to guide the water-stopping material placing hose 11 so that the water-stopping material placing hose 11 can move forward and backward, and to come into contact with the flange 12 when the water-stopping material placing hose 11 retracts upward.

止水材打設用器具10は、係合固定部30を有する。係合固定部30は、横穴3c1に係合し、止水材打設ホース11が進退する進退方向における移動を規制するものである。係合固定部30は、ベント管3cの内部に進入し、横穴3c1の縁に係合するフック31を有する。フック31は、ガイド筒22の下端部(一端部)の周面に回動自在に設けられている。本実施形態のフック31は、ガイド筒22の周方向において等間隔で4つ設けられている。   The water-stopping material placing device 10 has an engagement fixing portion 30. The engagement fixing part 30 engages with the horizontal hole 3c1 and regulates the movement in the advancing / retreating direction in which the water stop material placing hose 11 advances / retreats. The engagement fixing part 30 has a hook 31 that enters the inside of the vent pipe 3c and engages with an edge of the lateral hole 3c1. The hook 31 is rotatably provided on the peripheral surface of the lower end portion (one end portion) of the guide tube 22. Four hooks 31 of this embodiment are provided at equal intervals in the circumferential direction of the guide tube 22.

フック31は、ガイド筒22に沿って畳まれた状態(図3において2点鎖線で示す)から、ガイド筒22の外側に展開した状態(図3において実線で示す)へと回動可能な構成となっている。係合固定部30は、フック31を後述する箱型筐体部40の外側から操作する操作部32を有する。操作部32は、ロッド33と、可動リング34と、バネ部材35と、を有する。ロッド33は、後述する箱型筐体部40の内外を連通して設けられ、フック31と可動リング34との間を接続するものである。   The hook 31 is configured to be rotatable from a state folded along the guide tube 22 (shown by a two-dot chain line in FIG. 3) to a state unfolded outside the guide tube 22 (shown by a solid line in FIG. 3). It has become. The engagement fixing part 30 has an operation part 32 for operating the hook 31 from the outside of a box-shaped housing part 40 described later. The operation unit 32 includes a rod 33, a movable ring 34, and a spring member 35. The rod 33 is provided so as to communicate with the inside and outside of a box-shaped housing 40 described later, and connects the hook 31 and the movable ring 34.

可動リング34は、箱型筐体部40の外側でガイド筒22の周面に沿って軸方向に移動可能な構成となっている。可動リング34が、第1の位置(図3において2点鎖線で示す)に位置するとき、それぞれのフック31が畳まれ、また、第2の位置(図3において実線で示す)に位置するとき、それぞれのフック31が展開するようになっている。バネ部材35は、可動リング34を第1の位置から第2の位置に向かって付勢するものである。バネ部材35は、可動リング34と箱型筐体部40との間に配置されている。   The movable ring 34 is configured to be movable in the axial direction along the peripheral surface of the guide tube 22 outside the box-shaped housing unit 40. When the movable ring 34 is located at the first position (indicated by a two-dot chain line in FIG. 3), each hook 31 is folded, and when the movable ring 34 is located at the second position (indicated by a solid line in FIG. 3). Each hook 31 is developed. The spring member 35 urges the movable ring 34 from the first position toward the second position. The spring member 35 is disposed between the movable ring 34 and the box-shaped housing part 40.

ガイド筒22の上端部(他端部)の周面には、ロボットアームが止水材打設用器具10を把持するためのチャック溝24が設けられている。ロボットアームが止水材打設用器具10を把持したとき、そのロボットアームによって可動リング34が押し下げられ、フック31が畳まれるようになっている。また、ロボットアームが止水材打設用器具10を離したとき、バネ部材35によって可動リング34が押し上げられ、フック31が展開するようになっている。   On the peripheral surface of the upper end portion (the other end portion) of the guide tube 22, a chuck groove 24 is provided for the robot arm to grip the water-stopping material placing device 10. When the robot arm grips the water-stopping material placing device 10, the movable ring 34 is pushed down by the robot arm and the hook 31 is folded. Further, when the robot arm releases the water stop material placing device 10, the movable ring 34 is pushed up by the spring member 35 so that the hook 31 is unfolded.

止水材打設用器具10は、箱型筐体部40を有する。箱型筐体部40は、ベント管3cの外部で横穴3c1の周りを囲い、ベント管3cの内部から横穴3c1を介してオーバーフローさせた止水材Cで横穴3c1の蓋を形成するためのものである。箱型筐体部40は、横穴3c1よりも大きく形成された略有底円筒形状を呈している(図4参照)。箱型筐体部40の中心部には、ガイド筒22が挿通され、止水材打設ホース11が通るようになっている。   The water-stopping material placing instrument 10 has a box-shaped housing part 40. The box-shaped housing portion 40 surrounds the side hole 3c1 outside the vent pipe 3c, and forms a lid for the side hole 3c1 with a water stop material C overflowed from the inside of the vent pipe 3c through the side hole 3c1. It is. The box-shaped casing 40 has a substantially bottomed cylindrical shape that is formed larger than the lateral hole 3c1 (see FIG. 4). A guide tube 22 is inserted through the central portion of the box-shaped housing portion 40 so that the water stop material placing hose 11 passes therethrough.

止水材打設ホース11は、ベント管3cの内部だけでなく、箱型筐体部40の内部にも止水材Cを充填させるため、ベント管3cの内部(図3において2点鎖線で示す)と、ベント管3cの外部であって箱型筐体部40の内部(図3において実線で示す)との間で進退できるようになっている。なお、ガイド筒22には貫通穴22aが設けられており、止水材Cは、この貫通穴22aを通って箱型筐体部40の隅々まで充填される。   The water-stopping material placing hose 11 is filled not only inside the vent pipe 3c but also inside the box-shaped housing portion 40 with the water-stopping material C inside (indicated by a two-dot chain line in FIG. 3). Can be moved forward and backward between the outside of the vent pipe 3c and the inside of the box-shaped housing portion 40 (shown by a solid line in FIG. 3). The guide tube 22 is provided with a through hole 22a, and the water blocking material C is filled to every corner of the box-shaped housing portion 40 through the through hole 22a.

箱型筐体部40は、ベント管3cの外部に接触する管接触部41を有する。管接触部41は、図4に示すように、ベント管3cの外部の形状に応じた形状を有する。すなわち、ベント管3cの外部の形状は所定の曲率を有しており、管接触部41は、その曲率に対応したカーブ形状を有している。また、管接触部41は、可撓性を有するガスケット42を有する。このため、ベント管3cの外部に多少の凹凸があっても、ガスケット42が柔軟に変形することで、管接触部41がベント管3cに密に接触できるようになる。   The box-shaped housing part 40 has a pipe contact part 41 that contacts the outside of the vent pipe 3c. As shown in FIG. 4, the tube contact portion 41 has a shape corresponding to the shape of the outside of the vent tube 3c. That is, the external shape of the vent pipe 3c has a predetermined curvature, and the pipe contact portion 41 has a curved shape corresponding to the curvature. Further, the tube contact portion 41 has a flexible gasket 42. For this reason, even if there is some unevenness on the outside of the vent pipe 3c, the gasket contact portion 41 can come into close contact with the vent pipe 3c because the gasket 42 is flexibly deformed.

箱型筐体部40は、水抜き部43を有する。水抜き部43は、図3に示すように、管状になっており、箱型筐体部40の内外を連通させるものである。水抜き部43は、ベント管3cに水が溜まっている場合に、その水が箱型筐体部40の止水材Cの充填を阻害するのを防止するものである。この水抜き部43は、止水材打設用器具10が斜めに延びるベント管3cに取り付けられたときに、最も高くなる箱型筐体部40の角隅部40aにおいて、内外を連通させるようになっている。   The box-shaped housing part 40 has a water draining part 43. As shown in FIG. 3, the water draining portion 43 has a tubular shape and communicates the inside and outside of the box-shaped housing portion 40. The drain part 43 prevents the water from blocking the filling of the water blocking material C of the box-shaped housing part 40 when water is accumulated in the vent pipe 3c. The drainage portion 43 communicates the inside and the outside at the corner portion 40a of the box-shaped housing portion 40 that becomes the highest when the waterstop material placing device 10 is attached to the bent pipe 3c that extends obliquely. It has become.

続いて、上記構成の止水材打設用器具10を用いた原子炉格納容器3の冠水方法(ベント管閉塞工程)について図6及び図7を参照して説明する。
図6及び図7は、本発明の実施形態における止水材打設用器具10を用いたベント管閉塞工程における作業を説明するための図である。ベント管閉塞工程では、図6(a)、図6(b)、図7(a)、図7(b)の順に作業が行われる。なお、ベント管閉塞工程を開始する時点では、原子炉圧力容器7に対する冷却水の供給が継続されており、原子炉圧力容器7から漏れ出した冷却水がベント管3cを介してサプレッションチェンバ3bに流れ出ているものとする(図6及び図7中矢印で示す)。
Next, a method of flooding the containment vessel 3 (vent pipe closing step) using the waterstop material placement instrument 10 having the above-described configuration will be described with reference to FIGS. 6 and 7.
FIG.6 and FIG.7 is a figure for demonstrating the operation | work in the vent pipe obstruction | occlusion process using the water stop material placement instrument 10 in embodiment of this invention. In the vent pipe closing step, operations are performed in the order of FIGS. 6A, 6B, 7A, and 7B. At the time of starting the vent pipe closing process, the cooling water supply to the reactor pressure vessel 7 is continued, and the cooling water leaking from the reactor pressure vessel 7 is sent to the suppression chamber 3b via the vent pipe 3c. It is assumed that it is flowing out (indicated by arrows in FIGS. 6 and 7).

先ず、図6(a)に示すように、原子炉建屋2の内部に設けられると共にトーラス室2aの上階に位置する部屋(以下、上階室2bと称する)にロボットアーム100を設置する。次に、ロボットアーム100にウォータージェット等の穴あけ手段101を装着し、遠隔操作によりベント管3cに横穴3c1と横穴3c2を形成する。横穴3c2は、ベントヘッダ4の接続位置に対応する位置に形成する。横穴3c1は、横穴3c2よりも上流側に形成する。なお、ロボットアーム100の遠隔操作は、例えばトーラス室2aやサプレッションチェンバ3b内に設置した不図示のカメラを用いて行う。   First, as shown in FIG. 6A, the robot arm 100 is installed in a room (hereinafter referred to as the upper floor room 2b) provided in the reactor building 2 and located on the upper floor of the torus room 2a. Next, drilling means 101 such as a water jet is attached to the robot arm 100, and the horizontal hole 3c1 and the horizontal hole 3c2 are formed in the vent pipe 3c by remote control. The horizontal hole 3 c 2 is formed at a position corresponding to the connection position of the vent header 4. The horizontal hole 3c1 is formed on the upstream side of the horizontal hole 3c2. The remote operation of the robot arm 100 is performed using a camera (not shown) installed in the torus chamber 2a or the suppression chamber 3b, for example.

次に、図6(b)に示すように、ベント管3cに形成された横穴3c2から内部にインフラタブルシール102を導入する。インフラタブルシール102は、止水材Cがベントヘッダ4を介して流れ出ることを防止するためのものである。インフラタブルシール102は、袋状のものであり、内部に充填材を注入することで膨らませることができる。充填材は、上階室2bからロボットアーム100によってガイドしてきたホース103を介してインフラタブルシール102に注入する。   Next, as shown in FIG. 6B, the inflatable seal 102 is introduced into the inside through the lateral hole 3c2 formed in the vent pipe 3c. The inflatable seal 102 is for preventing the water stop material C from flowing out through the vent header 4. The inflatable seal 102 has a bag shape and can be inflated by injecting a filler into the inside. The filler is injected into the inflatable seal 102 through the hose 103 guided by the robot arm 100 from the upper floor chamber 2b.

次に、図7(a)に示すように、ベント管3cに形成された横穴3c1に止水材打設用器具10を設置する。止水材打設用器具10は、図3に示すように、横穴3c1に係合する係合固定部30を有する。ロボットアーム100が止水材打設用器具10を把持しているとき、可動リング34が押し下げられており、フック31は、畳まれた状態で横穴3c1に進入する。ロボットアーム100によって、管接触部41がベント管3cの外部の形状に密着するように向きを調整したら、止水材打設用器具10を離す。   Next, as shown to Fig.7 (a), the water stop material placement instrument 10 is installed in the horizontal hole 3c1 formed in the vent pipe 3c. As shown in FIG. 3, the water-stopping material placing instrument 10 has an engagement fixing portion 30 that engages with the lateral hole 3c1. When the robot arm 100 is holding the water stop material placing instrument 10, the movable ring 34 is pushed down, and the hook 31 enters the lateral hole 3c1 in a folded state. After the robot arm 100 adjusts the direction so that the tube contact portion 41 is in close contact with the external shape of the vent tube 3c, the water stop material placing device 10 is released.

ロボットアーム100が止水材打設用器具10から離れると、バネ部材35によって可動リング34が押し上げられ、フック31が展開する。フック31は、横穴3c1の縁に係合し、ベント管3cが厚み方向で挟み込まれることで、止水材打設用器具10の設置が完了する。このように、ベント管3cを厚み方向で挟み込む構造を採用することで、止水材打設用器具10の止水材打設ホース11の進退方向における移動を規制し、ガタを無くすことができる。なお、止水材打設用器具10を設置したら、次のベント管3cにおいて作業をするためにロボットアーム100を撤去しても良い。   When the robot arm 100 is separated from the water stop material placing device 10, the movable ring 34 is pushed up by the spring member 35 and the hook 31 is deployed. The hook 31 engages with the edge of the horizontal hole 3c1, and the vent pipe 3c is sandwiched in the thickness direction, whereby the installation of the waterstop material placing device 10 is completed. In this way, by adopting a structure in which the vent pipe 3c is sandwiched in the thickness direction, the movement of the water-stopping material placing hose 11 of the water-stopping material placing device 10 in the advancing / retreating direction can be restricted, and rattling can be eliminated. . In addition, if the water stop material placement instrument 10 is installed, the robot arm 100 may be removed in order to work in the next vent pipe 3c.

次に、図7(b)に示すように、ベント管3cに形成された横穴3c1から止水材打設ホース11を介してベント管3cの内部に止水材Cを打設する。ベント管3cは、内径が約2m前後の大口径の鋼管からなるため、ベント管3cのトップからボトムに止水材Cを落下させると、その落下の衝撃で止水材Cの成分(例えばコンクリートの場合、砂利等)が分離し、上手く固まらなくなる場合がある。このため、本実施形態では、図3に示すように、止水材打設用器具10にホースガイド部20を設け、ベント管3cに形成された横穴3c1に対して止水材打設ホース11を進退可能とさせている。   Next, as shown in FIG. 7B, the water-stopping material C is driven into the inside of the vent pipe 3 c through the water-stopping material driving hose 11 from the lateral hole 3 c 1 formed in the vent pipe 3 c. Since the vent pipe 3c is made of a large diameter steel pipe having an inner diameter of about 2 m, when the water-stopping material C is dropped from the top to the bottom of the vent pipe 3c, the components of the water-stopping material C (for example concrete) In this case, gravel, etc.) will separate and may not solidify well. For this reason, in this embodiment, as shown in FIG. 3, the hose guide part 20 is provided in the water stop material placing instrument 10, and the water stop material placing hose 11 is inserted into the lateral hole 3c1 formed in the vent pipe 3c. Can be moved forward and backward.

具体的に、上階室2b等から止水材打設ホース11を繰り出し、ベント管3cの内部に進入させることにより、ベント管3cのボトムまでの距離を短くし、止水材Cの落下の衝撃を緩和することができる。このように、本実施形態では、作業員が近接できない環境下で止水材打設ホース11を止水材打設用器具10に保持させ、ホースガイド部20によって止水材Cの打設高さを調整することで、落下時の衝撃で止水材Cの成分を分離させることなく、ベント管3cを止水材Cで適切に閉塞することができる。   Specifically, the water stop material casting hose 11 is extended from the upper floor chamber 2b and the like, and is made to enter the inside of the vent pipe 3c, thereby shortening the distance to the bottom of the vent pipe 3c and preventing the water stop material C from dropping. Impact can be mitigated. As described above, in this embodiment, the water stop material placing hose 11 is held by the water stop material placing device 10 in an environment where an operator cannot approach, and the hose guide portion 20 places the water stop material C at a height of placement. By adjusting the thickness, the vent pipe 3c can be appropriately closed with the water-stopping material C without separating the components of the water-stopping material C by the impact at the time of dropping.

また、本実施形態では、止水材打設用器具10に係合固定部30を設け、横穴3c1に係合させ、止水材打設ホース11が進退する進退方向における移動を規制している。このように、止水材打設用器具10を横穴3c1に係合させて相対的な位置決めをすることで、ホースガイド部20による止水材打設ホース11のガイドを適切に行うことができ、また、止水材Cを打設する際に受ける反力による止水材打設用器具10の外れを防止することができる。   Moreover, in this embodiment, the engagement fixing | fixed part 30 is provided in the water stop material placement instrument 10, and it engages with the horizontal hole 3c1, and the movement in the advancing / retreating direction in which the water stop material placement hose 11 advances / retreats is regulated. . Thus, by engaging the water stop material placing instrument 10 with the horizontal hole 3c1 and performing relative positioning, the hose guide portion 20 can guide the water stop material placing hose 11 appropriately. Moreover, detachment of the water stop material placing instrument 10 due to a reaction force received when placing the water stop material C can be prevented.

止水材打設ホース11をベント管3cの内部に進入させ、止水材Cの打設をある程度行ったら、止水材打設ホース11を徐々に引き上げていく。そして、図3に示すように、止水材打設ホース11をベント管3cの外部であって箱型筐体部40の内部まで退避させる。本実施形態では、止水材打設完了後に別途に横穴3c1の閉塞を行うことなく、止水材打設ホース11が挿入される横穴3c1の閉塞を行うべく、ベント管3cの外部で横穴3c1の周りを箱型筐体部40で囲い、ベント管3cの内部から横穴3c1を介してオーバーフローさせた止水材Cで横穴3c1の蓋を形成するようにしている。   When the water-stopping material placing hose 11 enters the inside of the vent pipe 3c and the water-stopping material C is placed to some extent, the water-stopping material placing hose 11 is gradually pulled up. Then, as shown in FIG. 3, the water stop material placing hose 11 is retracted to the outside of the vent pipe 3 c and the inside of the box-shaped housing part 40. In the present embodiment, the lateral hole 3c1 is closed outside the vent pipe 3c in order to close the horizontal hole 3c1 into which the water stop material placing hose 11 is inserted without separately closing the lateral hole 3c1 after completion of the water stopping material placement. Is surrounded by a box-shaped housing portion 40, and the lid of the horizontal hole 3c1 is formed of a water stop material C overflowed from the inside of the vent pipe 3c through the horizontal hole 3c1.

止水材打設ホース11には、フランジ12が設けられており、ホースガイド部20は、フランジ12よりも小さな径のガイド穴23aを備える板ガイド部23を有する。この構成によれば、止水材打設ホース11が退くと、フランジ12が板ガイド部23に接触し、板ガイド部23に設けられたガイド穴23aが閉塞される。また、箱型筐体部40は、ベント管3cの外部の形状に応じた形状を有する管接触部41を備えている。この構成によれば、管接触部41がベント管3cの外部の形状に沿って密に接触できる。したがって、箱型筐体部40とベント管3cとの隙間や、ガイド穴23aからの止水材Cの漏れを防止し、箱型筐体部40に止水材Cを充填させて、横穴3c1を閉塞する蓋を確実に形成することができる。   The water stop material placing hose 11 is provided with a flange 12, and the hose guide portion 20 has a plate guide portion 23 having a guide hole 23 a having a diameter smaller than that of the flange 12. According to this configuration, when the water stop material placing hose 11 is retracted, the flange 12 comes into contact with the plate guide portion 23 and the guide hole 23 a provided in the plate guide portion 23 is closed. Moreover, the box-shaped housing | casing part 40 is provided with the pipe | tube contact part 41 which has a shape according to the external shape of the vent pipe 3c. According to this structure, the pipe contact part 41 can contact closely along the external shape of the vent pipe 3c. Therefore, the leakage of the water-stopping material C from the gap between the box-shaped housing portion 40 and the vent pipe 3c and the guide hole 23a is prevented, and the water-stopping material C is filled in the box-shaped housing portion 40 so that the horizontal hole 3c1 is filled. It is possible to reliably form a lid for closing the cover.

ベント管3cに冷却水が流れ出ている場合、箱型筐体部40の内部に冷却水が溜まる。本実施形態では、箱型筐体部40に水抜き部43を設けることで、箱型筐体部40の内部から冷却水を排水しつつ箱型筐体部40に止水材Cを充填させることができる。水抜き部43は、図7(b)に示すように、斜めに延びるベント管3cに取り付けられたときに、最も高くなる箱型筐体部40の角隅部40a(図3参照)に配置されているため、箱型筐体部40の内部に溜まった冷却水を最後まで排水することができる。
以上のように、止水材打設用器具10を用いることで、作業員が近接できない環境下であっても、ベント管3cを止水材Cで適切に閉塞することができる。
When the cooling water is flowing out to the vent pipe 3 c, the cooling water is accumulated inside the box-shaped housing unit 40. In the present embodiment, by providing the drainage portion 43 in the box-shaped housing portion 40, the water-stopping material C is filled in the box-shaped housing portion 40 while draining the cooling water from the inside of the box-shaped housing portion 40. be able to. As shown in FIG. 7 (b), the water draining portion 43 is arranged at the corner corner portion 40a (see FIG. 3) of the box-shaped housing portion 40 that becomes the highest when attached to the bent pipe 3c that extends obliquely. Therefore, the cooling water accumulated in the box-shaped casing 40 can be drained to the end.
As described above, by using the water-stopping material placing device 10, the vent pipe 3c can be appropriately closed with the water-stopping material C even in an environment where workers cannot approach.

このように、上述の本実施形態によれば、ベント管3cに形成された横穴3c1から止水材打設ホース11を介してベント管3cの内部に止水材Cを打設するための止水材打設用器具10であって、横穴3c1に対して止水材打設ホース11を進退させるホースガイド部20を有する、という構成を採用することによって、作業員が近接できない環境下であっても、止水材Cの打設高さを調整できるため、落下時の衝撃で止水材Cの成分を分離させることなく、ベント管3cを止水材Cで適切に閉塞することができる。   Thus, according to the above-described embodiment, the water stop material C for driving the water stop material C into the vent pipe 3c from the horizontal hole 3c1 formed in the vent pipe 3c via the water stop material driving hose 11 is provided. By adopting a configuration in which the water material placing device 10 has a hose guide portion 20 that advances and retracts the water stop material placing hose 11 with respect to the lateral hole 3c1, it is possible in an environment where workers cannot approach. However, since the placement height of the water-stopping material C can be adjusted, the vent pipe 3c can be appropriately closed with the water-stopping material C without separating the components of the water-stopping material C by the impact at the time of dropping. .

以上、図面を参照しながら本発明の好適な実施形態について説明したが、本発明は上記実施形態に限定されるものではない。上述した実施形態において示した各構成部材の諸形状や組み合わせ等は一例であって、本発明の主旨から逸脱しない範囲において設計要求等に基づき種々変更可能である。   As mentioned above, although preferred embodiment of this invention was described referring drawings, this invention is not limited to the said embodiment. Various shapes, combinations, and the like of the constituent members shown in the above-described embodiments are examples, and various modifications can be made based on design requirements and the like without departing from the gist of the present invention.

例えば、本発明は、以下の図8〜図10に示す形態を採用し得る。なお、以下の説明において、上述の実施形態と同一又は同等の構成部分については同一の符号を付し、その説明を簡略若しくは省略する。   For example, the present invention may adopt the forms shown in FIGS. 8 to 10 below. In the following description, the same or equivalent components as those in the above-described embodiment are denoted by the same reference numerals, and the description thereof is simplified or omitted.

図8は、本発明の一別実施形態における係合固定部30aの構成を示す縦断面図である。
図8に示すように、係合固定部30aは、横穴3c1に対する位置合わせのための芯出し部50を有する。芯出し部50は、三角形のガイド片であり、ガイド筒22の下端部の周面に複数設けられている。この芯出し部50が横穴3c1に係合することで、ガイド筒22(ホースガイド部20)の芯出しが行われる。この構成によれば、横穴3c1の加工精度が高くなくても、止水材打設用器具10を容易に設置することができる。
FIG. 8 is a longitudinal sectional view showing a configuration of the engagement fixing portion 30a in another embodiment of the present invention.
As shown in FIG. 8, the engagement fixing portion 30a has a centering portion 50 for alignment with the lateral hole 3c1. The centering portion 50 is a triangular guide piece, and a plurality of centering portions 50 are provided on the peripheral surface of the lower end portion of the guide tube 22. The centering portion 50 is engaged with the horizontal hole 3c1, whereby the guide tube 22 (hose guide portion 20) is centered. According to this structure, even if the processing accuracy of the horizontal hole 3c1 is not high, the water-stopping material placing device 10 can be easily installed.

図9は、本発明の一別実施形態における係合固定部30bの構成を示す縦断面図である。
図9に示すように、係合固定部30bは、嵌め込み型のフック52を有する。フック52は、ガイド筒22の下端部の周面に回動自在に設けられている。フック52は、先端部に返し52aがついた略レの字形状を有している。このフック52は、バネ部材53によって先端部が開く方向に付勢されている。この構成によれば、構造が比較的シンプルとなるため、動作の確実性を高め、製造コストを低減することができる。
FIG. 9 is a longitudinal sectional view showing a configuration of the engagement fixing portion 30b in another embodiment of the present invention.
As shown in FIG. 9, the engagement fixing portion 30 b includes a fitting type hook 52. The hook 52 is rotatably provided on the peripheral surface of the lower end portion of the guide tube 22. The hook 52 has a substantially square shape with a barb 52a at the tip. The hook 52 is urged by a spring member 53 in the direction in which the tip end is opened. According to this configuration, since the structure is relatively simple, the reliability of the operation can be improved and the manufacturing cost can be reduced.

図10は、本発明の一別実施形態における係合固定部30cの構成を示す縦断面図である。
図10に示すように、係合固定部30cは、玉フック54を有する。玉フック54は、ワイヤー55で吊られている。この玉フック54は、ガイド筒22の下端部の周りに配置されており、ワイヤー55を引っ張ることで、横穴3c1に楔として挟み込まれるようになっている。この構成によれば、垂直方向だけでなく、水平方向のガタも低減することができる。
FIG. 10 is a longitudinal sectional view showing a configuration of the engagement fixing portion 30c in another embodiment of the present invention.
As shown in FIG. 10, the engagement fixing portion 30 c has a ball hook 54. The ball hook 54 is suspended by a wire 55. The ball hook 54 is disposed around the lower end portion of the guide tube 22, and is inserted into the lateral hole 3 c 1 as a wedge by pulling the wire 55. According to this configuration, not only the vertical direction but also the horizontal play can be reduced.

また、例えば、上記実施形態では、ガイド筒22に貫通穴22aを形成して、止水材Cを箱型筐体部40の内部に充填させる構成について説明したが、本発明はこの構成に限定されるものではなく、ガイド筒22の下端部を櫛歯状や棒状にして、その隙間から止水材Cを充填させる構成を採用してもよい。   Further, for example, in the above-described embodiment, the configuration in which the through hole 22a is formed in the guide tube 22 and the water-stopping material C is filled in the box-shaped housing portion 40 has been described, but the present invention is limited to this configuration. Instead, a configuration in which the lower end portion of the guide tube 22 is formed in a comb-like shape or a rod shape and the water-stopping material C is filled from the gap may be adopted.

また、例えば、上記実施形態では、本発明を沸騰水型原子炉の1つであるMARK−I型の原子炉格納容器を冠水させる方法に適用した例について説明したが、本発明はベント管だけでなく、他の閉塞したい管の止水材の打設の際にも用いることができる。   Further, for example, in the above-described embodiment, an example in which the present invention is applied to a method of flooding a MARK-I type reactor containment vessel, which is one of boiling water reactors, has been described. In addition, it can be used when placing a water-stopping material for a pipe to be closed.

3c…ベント管(管)、3c1…横穴、10…止水材打設用器具、11…止水材打設ホース、12…フランジ、20…ホースガイド部、23…板ガイド部、23a…ガイド穴、30…係合固定部、40…箱型筐体部、41…管接触部、43…水抜き部、C…止水材   3c ... Vent pipe (pipe), 3c1 ... Horizontal hole, 10 ... Water stop material placing device, 11 ... Water stop material placing hose, 12 ... Flange, 20 ... Hose guide part, 23 ... Plate guide part, 23a ... Guide Hole: 30 ... engagement fixing part, 40 ... box-type housing part, 41 ... pipe contact part, 43 ... draining part, C ... water stop material

Claims (8)

管に形成された横穴から止水材打設ホースを介して前記管の内部に止水材を打設するための止水材打設用器具であって、
前記横穴に対して前記止水材打設ホースを進退させるホースガイド部と、
前記横穴に係合し、前記止水材打設ホースが進退する進退方向における移動を規制する係合固定部と、を有する、ことを特徴とする止水材打設用器具。
A water stop material placing device for placing a water stop material into the inside of the pipe from a horizontal hole formed in the pipe via a water stop material placing hose,
A hose guide part for advancing and retracting the water stop material placing hose with respect to the lateral hole ;
An instrument for fixing a water-stopping material , which has an engagement fixing portion that engages with the lateral hole and restricts movement in the advancing and retreating direction in which the water-stopping material placing hose advances and retreats .
前記管の外部で前記横穴の周りを囲い、前記管の内部から前記横穴を介してオーバーフローさせた前記止水材で前記横穴の蓋を形成する箱型筐体部を有する、ことを特徴とする請求項1に記載の止水材打設用器具。 It has a box-shaped housing portion that surrounds the lateral hole outside the tube and forms a lid of the lateral hole with the waterstop material overflowed from the inside of the tube through the lateral hole. The water-stopping material placing device according to claim 1 . 管に形成された横穴から止水材打設ホースを介して前記管の内部に止水材を打設するための止水材打設用器具であって、A water stop material placing device for placing a water stop material into the inside of the pipe from a horizontal hole formed in the pipe via a water stop material placing hose,
前記横穴に対して前記止水材打設ホースを進退させるホースガイド部と、A hose guide part for advancing and retracting the water stop material placing hose with respect to the lateral hole;
前記管の外部で前記横穴の周りを囲い、前記管の内部から前記横穴を介してオーバーフローさせた前記止水材で前記横穴の蓋を形成する箱型筐体部と、を有する、ことを特徴とする止水材打設用器具。A box-shaped housing portion that surrounds the lateral hole outside the tube and forms a lid of the lateral hole with the water blocking material overflowed from the inside of the tube through the lateral hole. A water-stopping material placing device.
前記止水材打設ホースは、前記管の内部と、前記管の外部であって前記箱型筐体部の内部との間で進退する、ことを特徴とする請求項2または3に記載の止水材打設用器具。 The said water stop material placing hose advances / retreats between the inside of the said pipe | tube, and the exterior of the said pipe | tube, and the inside of the said box-type housing part, The Claim 2 or 3 characterized by the above-mentioned. Water stop device. 前記箱型筐体部は、前記管の外部の形状に応じた形状を有する管接触部を備える、ことを特徴とする請求項4に記載の止水材打設用器具。   The said box-type housing | casing part is equipped with the pipe contact part which has a shape according to the external shape of the said pipe | tube, The water stop material placement instrument of Claim 4 characterized by the above-mentioned. 前記箱型筐体部は、その内外を連通させる水抜き部を有する、ことを特徴とする請求項2〜5のいずれか一項に記載の止水材打設用器具。 The said box-type housing | casing part has a drain part which makes the inside and outside communicate, The water stop material placement instrument as described in any one of Claims 2-5 characterized by the above-mentioned. 前記止水材打設ホースには、フランジが設けられており、
前記ホースガイド部は、前記フランジよりも小さな径のガイド穴を備えて前記止水材打設ホースが退くときに前記フランジと接触可能な板ガイド部を有する、ことを特徴とする請求項1〜6のいずれか一項に記載の止水材打設用器具。
The water stop material placing hose is provided with a flange,
The said hose guide part is provided with the guide hole of a diameter smaller than the said flange, and has a board guide part which can contact the said flange when the said water stop material casting hose retracts, The 1st characterized by the above-mentioned. 7. The water stop material placing device according to any one of claims 6.
管に形成された横穴から止水材打設ホースを介して前記管の内部に止水材を打設するための止水材打設用器具であって、A water stop material placing device for placing a water stop material into the inside of the pipe from a horizontal hole formed in the pipe via a water stop material placing hose,
前記横穴に対して前記止水材打設ホースを進退させるホースガイド部を有し、A hose guide part for advancing and retracting the water stop material placing hose with respect to the lateral hole,
前記止水材打設ホースには、フランジが設けられており、The water stop material placing hose is provided with a flange,
前記ホースガイド部は、前記フランジよりも小さな径のガイド穴を備えて前記止水材打設ホースが退くときに前記フランジと接触可能な板ガイド部を有する、ことを特徴とする止水材打設用器具。The hose guide portion has a guide hole having a diameter smaller than that of the flange, and has a plate guide portion that can come into contact with the flange when the water stop material placing hose is retracted. Equipment for installation.
JP2013152691A 2013-07-23 2013-07-23 Water stop device Active JP6186980B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2013152691A JP6186980B2 (en) 2013-07-23 2013-07-23 Water stop device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2013152691A JP6186980B2 (en) 2013-07-23 2013-07-23 Water stop device

Publications (2)

Publication Number Publication Date
JP2015021611A JP2015021611A (en) 2015-02-02
JP6186980B2 true JP6186980B2 (en) 2017-08-30

Family

ID=52486232

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2013152691A Active JP6186980B2 (en) 2013-07-23 2013-07-23 Water stop device

Country Status (1)

Country Link
JP (1) JP6186980B2 (en)

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07233894A (en) * 1994-02-22 1995-09-05 Osaka Gas Co Ltd Pipe end processing execution method and drilling device used in the execution
JP2002333091A (en) * 2001-05-09 2002-11-22 Osaka Gas Co Ltd Gas blowout prevention method
JP4808577B2 (en) * 2006-09-21 2011-11-02 戸田建設株式会社 CFT column concrete filling method and system
JP5923250B2 (en) * 2011-05-19 2016-05-24 東京瓦斯株式会社 Filling and blocking material for gas conduit and filling blocking method
JP5757222B2 (en) * 2011-11-24 2015-07-29 株式会社Ihi Submersion method for reactor containment
JP5806917B2 (en) * 2011-11-25 2015-11-10 日立Geニュークリア・エナジー株式会社 Water-stop agent injection device and water-stop agent injection method

Also Published As

Publication number Publication date
JP2015021611A (en) 2015-02-02

Similar Documents

Publication Publication Date Title
JP5852143B2 (en) Reactor vessel lid WJP construction method and jig
KR101548517B1 (en) Dismantling method for nuclear reactor pressure vessel
JP6186980B2 (en) Water stop device
EP3255637B1 (en) Core catcher and boiling water nuclear plant using the same
JP4276808B2 (en) Equipment for carrying out nuclear power plant equipment
KR101067232B1 (en) How to remove the heat transfer buffer sleeve of the reactor coolant system cold tube
KR20210123897A (en) Dismantling method for calandria of heavy water reactor facilities
JP2015222178A (en) Nuclear reactor building structure handling system with articulated manipulator
JP5757222B2 (en) Submersion method for reactor containment
KR20140060768A (en) Support structure for nuclear reactor
JP2015049060A (en) Fuel debris carry-out apparatus and carry-out method in boiling water nuclear power plant
KR102025875B1 (en) Method for decommissioning pressure heavy water reactor facilities
JP3562900B2 (en) Core shroud installation method and radiation shielding structure in reactor pressure vessel
KR102414757B1 (en) Dismantling method for heavy water reactor facilities
JP7285472B2 (en) Underwater photography device and underwater photography method
JP2009198009A (en) Device for inserting pipe body into sheath pipe using buoyancy
JP5814896B2 (en) Replacement method of core differential pressure and liquid injection control device
JP2015111052A (en) Method for preventing and expanding pollution in power plant, and method for investigating inside power plant
CN114291237B (en) Protective cover plate supporting structure for underwater equipment
KR101128641B1 (en) Blind flange guard and accommodating apparatus of fuel transfer tube in nuclear power plant
KR880002047B1 (en) Cooling water inlet nozzle sealing device of nuclear reactor and its sealing method
JP6170414B2 (en) PCV survey system and PCV survey method
JP4772767B2 (en) Sloshing overflow control device and method
JP5159698B2 (en) Shroud head temporary placement device and method of installing the same
JP5922490B2 (en) Inert gas boundary formation equipment

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20160526

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20170310

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20170404

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20170605

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20170606

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20170704

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20170717

R151 Written notification of patent or utility model registration

Ref document number: 6186980

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R151

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250