Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP6204902B2 - Charge / discharge control device and battery system having the same - Google Patents
[go: Go Back, main page]

JP6204902B2 - Charge / discharge control device and battery system having the same - Google Patents

Charge / discharge control device and battery system having the same Download PDF

Info

Publication number
JP6204902B2
JP6204902B2 JP2014235056A JP2014235056A JP6204902B2 JP 6204902 B2 JP6204902 B2 JP 6204902B2 JP 2014235056 A JP2014235056 A JP 2014235056A JP 2014235056 A JP2014235056 A JP 2014235056A JP 6204902 B2 JP6204902 B2 JP 6204902B2
Authority
JP
Japan
Prior art keywords
charge
power storage
discharge
priority
switching timing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2014235056A
Other languages
Japanese (ja)
Other versions
JP2016100950A (en
Inventor
西田 健彦
健彦 西田
三橋 真人
真人 三橋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Heavy Industries Ltd
Original Assignee
Mitsubishi Heavy Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Heavy Industries Ltd filed Critical Mitsubishi Heavy Industries Ltd
Priority to JP2014235056A priority Critical patent/JP6204902B2/en
Publication of JP2016100950A publication Critical patent/JP2016100950A/en
Application granted granted Critical
Publication of JP6204902B2 publication Critical patent/JP6204902B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)

Description

本発明は、充放電制御装置及びこれを有する電池システムに関する。   The present invention relates to a charge / discharge control device and a battery system having the same.

複数の蓄電装置を有する電池システムでは、供給される電力や出力する電力に応じて駆動させる蓄電電池の台数を制御する台数制御を行う電池システムがある。例えば、特許文献1には、電力指令を取得する電力指令取得部と、電力指令取得部が取得した電力指令に基づいて、電力変換器の稼働台数ごとに、当該稼働台数の電力変換器を稼働させた場合の電力有効活用の度合いの指標値を求める指標値取得部と、指標値取得部が取得した指標値に基づいて、電力変換器の稼働台数を決定する稼働台数決定部と、稼働台数決定部が決定した稼働台数に基づいて、稼働させる電力変換器を決定し、当該稼働させる電力変換器に対する個別の電力指令を出力し、停止させる電力変換器に対する停止指令を出力する稼働選択指令部と、を有する電力制御装置が記載されている。   In a battery system having a plurality of power storage devices, there is a battery system that performs unit control for controlling the number of power storage batteries to be driven in accordance with supplied power or output power. For example, in Patent Document 1, a power command acquisition unit that acquires a power command and a power command for the number of operating power converters for each operating number of power converters based on the power command acquired by the power command acquisition unit. An index value acquisition unit that obtains an index value of the degree of effective utilization of power, an operation number determination unit that determines the number of operating power converters based on the index value acquired by the index value acquisition unit, and the number of operations An operation selection command unit that determines a power converter to be operated based on the number of operating units determined by the determination unit, outputs an individual power command for the power converter to be operated, and outputs a stop command for the power converter to be stopped Is described.

特開2013−172567号公報JP 2013-172567 A

特許文献1に記載の電力制御装置で複数の蓄電装置の駆動を制御することで、各蓄電装置を目的の範囲の充電率で運転することができる。しかしながら、特許文献1に記載の電力制御装置は、各蓄電装置の充電率の関係によって、駆動する充電装置が頻繁に切り換わる、応答性を速くしないと制御が追従できないという問題がある。駆動する充電装置が頻繁に切り換わるとその動作により利用効率が下がる。また、制御が追従できない場合、適切に制御ができなくなる。   By controlling the driving of the plurality of power storage devices with the power control device described in Patent Document 1, it is possible to operate each power storage device with a charge rate within a target range. However, the power control device described in Patent Literature 1 has a problem that the charging device to be driven frequently switches depending on the relationship between the charging rates of the respective power storage devices. When the driving charging device is frequently switched, the operation efficiency is lowered due to the operation. Moreover, when control cannot follow, control cannot be performed appropriately.

本発明は、蓄電装置を効率よく運転することができる充放電制御装置及び電池システムを提供することを目的としている。   An object of this invention is to provide the charging / discharging control apparatus and battery system which can drive | operate an electrical storage apparatus efficiently.

上記目的を達成するための本発明は、複数の蓄電装置の充放電を制御する充放電制御装置であって、複数の前記蓄電装置の充電率を取得する充電率取得部と、複数の前記蓄電装置の全体から出力する充放電の目標値を取得する充放電目標値取得部と、前記蓄電装置を使用する優先順位を切り換える切換タイミングを生成する優先順位切換タイミング生成部と、充電率に基づいて優先順位を判定し、前記優先順位切換タイミング生成部で生成された切換タイミングで、優先順位を切り換える優先順位判定部と、前記優先順位判定部で判定された優先順位と、前記充放電目標値取得部で取得した充放電の目標値に基づいて、使用する前記蓄電装置を決定し、決定した前記蓄電装置から充放電を実行させる電力変換司令部と、を有し、前記優先順位切換タイミング生成部は、前記蓄電装置の電池容量と予め設定された許容充電率差とに基づいて算出する基準容量と、前記蓄電装置の最大充放電電流とに基づいて、前記切換タイミングの周期を算出し、算出した周期に基づいて、前記切換タイミングを出力することを特徴とする。   In order to achieve the above object, the present invention provides a charge / discharge control device that controls charging / discharging of a plurality of power storage devices, a charge rate acquisition unit that acquires a charge rate of the plurality of power storage devices, and a plurality of the power storage devices. Based on the charge rate, a charge / discharge target value acquisition unit that acquires a target value of charge / discharge output from the entire device, a priority switching timing generation unit that generates a switching timing for switching the priority of using the power storage device, and A priority order is determined, and a priority order determination unit that switches the priority order at the switching timing generated by the priority order switching timing generation unit, the priority order determined by the priority order determination unit, and the charge / discharge target value acquisition A power conversion command unit that determines the power storage device to be used based on the charge / discharge target value acquired by the unit, and executes charge / discharge from the determined power storage device, and the priority order The replacement timing generation unit calculates a cycle of the switching timing based on a reference capacity calculated based on a battery capacity of the power storage device and a preset allowable charge rate difference and a maximum charge / discharge current of the power storage device. The switching timing is output based on the calculated period.

また、前記優先順位切換タイミング生成部は、前記蓄電装置の電池容量をAh[Wh]とし、前記許容充電率差をα[%]とし、前記基準容量をΔCとし、前記最大充放電電流をA[W]とし、係数をB(0.8≦B≦1)とすると、前記基準容量ΔCを前記蓄電装置の電池容量Ah[Wh]と前記許容充電率差αとに基づいて算出し、切換タイミングの周期TをT=B×((60×ΔC)/A)で算出することが好ましい。   The priority switching timing generation unit sets the battery capacity of the power storage device to Ah [Wh], sets the allowable charge rate difference to α [%], sets the reference capacity to ΔC, and sets the maximum charge / discharge current to A [W], where the coefficient is B (0.8 ≦ B ≦ 1), the reference capacity ΔC is calculated based on the battery capacity Ah [Wh] of the power storage device and the allowable charge rate difference α, and the switching is performed. It is preferable to calculate the timing period T by T = B × ((60 × ΔC) / A).

また、前記優先順位切換タイミング生成部は、前記基準容量ΔCをΔC=Ah×(α/100)で算出することが好ましい。   Moreover, it is preferable that the priority switching timing generation unit calculates the reference capacity ΔC by ΔC = Ah × (α / 100).

また、前記優先順位切換タイミング生成部は、不感帯に対応する不感帯充電率差をβ[%]とし、前記基準容量ΔCをΔC=Ah×((α−β)/100)で算出することが好ましい。   The priority switching timing generation unit preferably calculates the reference capacity ΔC by ΔC = Ah × ((α−β) / 100), where β [%] is the dead zone charging rate difference corresponding to the dead zone. .

また、前記優先順位切換タイミング生成部は、直近の判定時の充電率の差である切換前充電率差をγ[%]とし、前記基準容量ΔCをΔC=Ah×((α+γ)/100)で算出することが好ましい。   The priority switching timing generation unit sets a difference in charging rate before switching, which is a difference in charging rate at the latest determination, to γ [%], and sets the reference capacity ΔC to ΔC = Ah × ((α + γ) / 100). It is preferable to calculate by.

また、前記優先順位切換タイミング生成部は、さらに不感帯に対応する不感帯充電率差をβ[%]とし、直近の判定時の充電率の差である切換前充電率差をγ[%]とし、前記基準容量ΔCをΔC=Ah×((α−β+γ)/100)で算出することが好ましい。   Further, the priority switching timing generation unit further sets the dead zone charging rate difference corresponding to the dead zone to β [%], and sets the charging rate difference before switching, which is the difference in charging rate at the latest determination, to γ [%], The reference capacity ΔC is preferably calculated as ΔC = Ah × ((α−β + γ) / 100).

また、前記係数Bは、1であることが好ましい。   The coefficient B is preferably 1.

また、前記優先順位切換タイミング生成部は、切換タイミングの周期Tから制御遅れに対応する時間を減算した時間を周期として、前記切換タイミングを出力することが好ましい。   The priority switching timing generation unit preferably outputs the switching timing with a period obtained by subtracting a time corresponding to a control delay from a period T of the switching timing.

上記目的を達成するための本発明は、電池システムであって、上記のいずれかに記載の充放電制御装置と、前記充放電制御装置で充放電が制御される複数の蓄電装置と、前記充放電制御装置に複数の前記蓄電装置の全体から出力する充放電の目標値を出力する上位制御装置と、を有する。   The present invention for achieving the above object is a battery system, the charge / discharge control device according to any one of the above, a plurality of power storage devices whose charge / discharge is controlled by the charge / discharge control device, and the charge / discharge device. And a host controller that outputs a target value of charge / discharge output from the entirety of the plurality of power storage devices to the discharge controller.

また、前記複数の蓄電装置は、同一の性能であることが好ましい。   The plurality of power storage devices preferably have the same performance.

本発明によれば、蓄電装置の切り換えの頻度を抑制しつつ、かつ、蓄電装置間の充電率の差が大きくなることを抑制することができる。これにより、蓄電装置を効率よく運転することができる。   ADVANTAGE OF THE INVENTION According to this invention, it can suppress that the difference of the charging rate between electrical storage apparatuses becomes large, suppressing the frequency of switching of an electrical storage apparatus. Thereby, the power storage device can be operated efficiently.

図1は、充放電制御装置を有する電池システムの概略構成を示すブロック図である。FIG. 1 is a block diagram showing a schematic configuration of a battery system having a charge / discharge control device. 図2は、充放電制御装置の処理動作の一例を示すフローチャートである。FIG. 2 is a flowchart illustrating an example of a processing operation of the charge / discharge control device. 図3は、充放電制御装置の処理動作の一例を説明するための説明図である。FIG. 3 is an explanatory diagram for explaining an example of a processing operation of the charge / discharge control device. 図4は、充放電制御装置の処理動作の一例を示すフローチャートである。FIG. 4 is a flowchart illustrating an example of a processing operation of the charge / discharge control device. 図5は、充放電制御装置の処理動作の一例を説明するための説明図である。FIG. 5 is an explanatory diagram for explaining an example of a processing operation of the charge / discharge control device. 図6は、充放電制御装置の処理動作の一例を示すフローチャートである。FIG. 6 is a flowchart illustrating an example of a processing operation of the charge / discharge control device. 図7は、充放電制御装置の処理動作の一例を説明するための説明図である。FIG. 7 is an explanatory diagram for explaining an example of a processing operation of the charge / discharge control device.

以下に添付図面を参照して、本発明の好適な実施形態を詳細に説明する。なお、この実施形態により本発明が限定されるものではなく、また、実施形態が複数ある場合には、各実施形態を組み合わせて構成するものも含むものである。   Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings. In addition, this invention is not limited by this embodiment, and when there are two or more embodiments, what comprises combining each embodiment is also included.

図1は、充放電制御装置を有する電池システムの概略構成を示すブロック図である。電池システム10は、複数の蓄電装置12と、電力系統14と、電線16と、充放電制御装置18と、上位制御装置20と、を有する。電池システム10は、蓄電装置12を2台以上備えていればよく、蓄電装置12を100台以上備えていてもよい。   FIG. 1 is a block diagram showing a schematic configuration of a battery system having a charge / discharge control device. The battery system 10 includes a plurality of power storage devices 12, a power system 14, an electric wire 16, a charge / discharge control device 18, and a host control device 20. The battery system 10 only needs to include two or more power storage devices 12, and may include 100 or more power storage devices 12.

複数の蓄電装置12は、並列で電線16に接続されている。複数の蓄電装置12は、それぞれ、電池部30と、電力変換部32と、SOC判定部34と、を有する。ここで、本実施形態の複数の充電装置12は、製造誤差による差はあるが基本的に同一の性能を有する。具体的には、充電装置12は、電池容量、最大充放電電流値等の設計値が同じである。電池部30は、鉛電池等の二次電池であり、充放電を行う。電池部30は、所定の電池容量の電力を蓄電することができる。電力変換部32は、電池部30と電線16との間に配置されている。電力変換部32は、直流を交流に変換し、後流を直流に変換する。具体的には、電力変換部32は、電池部30に蓄電した電力を直流から交流に変換して配線16に出力する。電力変換部32は、配線16から供給される交流の電力を直流に変換して、電池部30に供給し、電池部30を充電する。電力変換部32は、充放電制御装置18の制御に基づいて、電池部30から放電するか、電池部30を充電するかを切り換える。SOC判定部34は、電池部30の充電率(State Of Charge)を検出する。充電率[%]は、電池部30の電池容量に対する現在の容量の割合である。SOC判定部34は、検出した充電率を充放電制御装置18に送る。   The plurality of power storage devices 12 are connected to the electric wires 16 in parallel. Each of the plurality of power storage devices 12 includes a battery unit 30, a power conversion unit 32, and an SOC determination unit 34. Here, although the some charging device 12 of this embodiment has the difference by a manufacturing error, it has the basically same performance. Specifically, the charging device 12 has the same design values such as battery capacity and maximum charge / discharge current value. The battery unit 30 is a secondary battery such as a lead battery, and performs charging and discharging. The battery unit 30 can store power of a predetermined battery capacity. The power conversion unit 32 is disposed between the battery unit 30 and the electric wire 16. The power conversion unit 32 converts direct current into alternating current and converts the wake into direct current. Specifically, the power conversion unit 32 converts the power stored in the battery unit 30 from direct current to alternating current and outputs it to the wiring 16. The power conversion unit 32 converts alternating current power supplied from the wiring 16 into direct current, supplies the direct current to the battery unit 30, and charges the battery unit 30. The power conversion unit 32 switches between discharging from the battery unit 30 and charging the battery unit 30 based on the control of the charge / discharge control device 18. The SOC determination unit 34 detects the charge rate (State Of Charge) of the battery unit 30. The charging rate [%] is a ratio of the current capacity to the battery capacity of the battery unit 30. The SOC determination unit 34 sends the detected charging rate to the charge / discharge control device 18.

蓄電装置12は、充放電制御装置18の制御に基づいて、電力変換部32を制御し、電池部30から配線16への放電や配線16から供給される電力による電池部30への充電を行う。また、蓄電装置12は、充放電制御装置18の制御に基づいて、充電、放電のいずれも行わず、待機している場合もある。また、蓄電装置12は、SOC判定部34で検出した充電率を充放電制御装置18に送る。   The power storage device 12 controls the power conversion unit 32 based on the control of the charge / discharge control device 18 to discharge the battery unit 30 to the wiring 16 and charge the battery unit 30 with the power supplied from the wiring 16. . In addition, the power storage device 12 may be on standby based on the control of the charge / discharge control device 18 without performing charging or discharging. In addition, the power storage device 12 sends the charge rate detected by the SOC determination unit 34 to the charge / discharge control device 18.

電力系統14は、発電する発電機や、電力を消費する負荷機器を有する系統である。電力系統14は、発電機で発生する電力が負荷機器で消費する電力より多くなる状態や、発電機で発生する電力が負荷機器で消費する電力より少なくなる状態が発生する。電力系統14は、電線16を介して複数の蓄電装置12と接続されている。電線16は、複数の蓄電装置12と電力系統14とを接続している。   The power system 14 is a system having a generator for generating power and a load device that consumes power. In the power system 14, a state where the power generated by the generator is larger than the power consumed by the load device or a state where the power generated by the generator is smaller than the power consumed by the load device occurs. The power system 14 is connected to the plurality of power storage devices 12 via the electric wires 16. The electric wire 16 connects the plurality of power storage devices 12 and the power system 14.

充放電制御装置18の前に上位制御装置20について説明する。上位制御装置20は、発電システム10の発電電力と消費電力とを調整する。上位制御装置20は、電力系統14の発電電力と消費電力とのバランスを検出し、検出した結果に基づいて、複数の充電装置12で充電する電力の全体の目標値、または複数の充電装置12から放電する電力の全体の目標値である充放電目標値を決定し、決定した充放電目標値を充放電制御部18に送る。   The host controller 20 will be described before the charge / discharge controller 18. The host controller 20 adjusts the generated power and the power consumption of the power generation system 10. The host controller 20 detects the balance between the generated power and the power consumption of the power system 14, and based on the detected result, the overall target value of the power charged by the plurality of charging devices 12, or the plurality of charging devices 12 The charge / discharge target value, which is the overall target value of the power discharged from the battery, is determined, and the determined charge / discharge target value is sent to the charge / discharge control unit 18.

充放電制御装置18は、複数の蓄電装置12の充電、放電、停止等の動作を制御する。つまり、充放電制御装置18は、複数の蓄電装置12のうち駆動する台数を制御し、さらに駆動する蓄電装置12で充電を行うか、放電を行うかを制御する。また、充放電制御装置18は、充放電する電流値も制御する。充放電制御装置18は、電力変換司令部50と、優先順位判定部52と、優先順位切換タイミング生成部54と、充電率取得部56と、充放電目標値取得部58と、を有する。   The charge / discharge control device 18 controls operations such as charging, discharging, and stopping of the plurality of power storage devices 12. In other words, the charge / discharge control device 18 controls the number of the plurality of power storage devices 12 to be driven, and further controls whether the driven power storage device 12 performs charging or discharging. The charge / discharge control device 18 also controls the current value to be charged / discharged. The charge / discharge control device 18 includes a power conversion command unit 50, a priority determination unit 52, a priority switching timing generation unit 54, a charge rate acquisition unit 56, and a charge / discharge target value acquisition unit 58.

電力変換司令部50は、各蓄電装置12の充電、放電、停止を決定し、決定に基づいた指令値を各蓄電装置12に出力する。電力変換司令部50は、充放電目標値と後述する優先順位判定部52で生成した優先順位のリストに基づいて、各蓄電装置12の充電、放電、停止を決定する。電力変換司令部50は、駆動する蓄電装置12を制御することで、各蓄電装置12の充放電電力の合計値を充放電目標値とする。   The power conversion command unit 50 determines charging, discharging, and stopping of each power storage device 12 and outputs a command value based on the determination to each power storage device 12. The power conversion command unit 50 determines charging, discharging, and stopping of each power storage device 12 based on the charging / discharging target value and the priority list generated by the priority determination unit 52 described later. The power conversion command unit 50 controls the power storage device 12 to be driven, thereby setting the total value of the charge / discharge power of each power storage device 12 as the charge / discharge target value.

優先順位判定部52は、各蓄電装置12の充電率に基づいて、優先順位を判定し、優先順位のリストを作成する。優先順位判定部52は、放電優先順位リスト52aと充電優先順位リスト52とを作成し、記憶している。放電優先順位リスト52aは、蓄電装置12から放電する際に駆動させる蓄電装置12の優先順位のリストであり、充電率が高い蓄電装置12の優先順位がより高くなる順番で順位が付けられている。充電優先順位リスト52bは、蓄電装置12から充電する際に駆動させる蓄電装置12の優先順位のリストであり、充電率が低い蓄電装置12の優先順位がより高くなる順番で順位が付けられている。優先順位判定部52は、優先順位切換タイミング生成部54で生成した切換タイミングで放電優先順位リスト52aと充電優先順位リスト52bとを作成し、リストに変更があった場合、更新する。   The priority order determination unit 52 determines the priority order based on the charging rate of each power storage device 12, and creates a priority list. The priority determination unit 52 creates and stores a discharge priority list 52a and a charge priority list 52. The discharge priority list 52a is a list of priorities of the power storage devices 12 to be driven when discharging from the power storage device 12, and the power storage devices 12 having a high charging rate are ranked in the order of higher priority. . The charging priority list 52b is a list of the priorities of the power storage devices 12 to be driven when charging from the power storage device 12, and the power storage devices 12 having a low charging rate are ranked in the order of increasing priority. . The priority determination unit 52 creates the discharge priority list 52a and the charge priority list 52b at the switching timing generated by the priority switching timing generation unit 54, and updates the list when there is a change.

優先順位切換タイミング生成部54は、優先順位を切り換える処理を実行する切換タイミングを生成する。優先順位切換タイミング生成部54は、切換タイミングの周期を生成し、その周期に基づいて切換タイミングを優先順位判定部52に出力する。優先順位切換タイミング生成部54は、蓄電装置12の電池容量と許容充電率差とに基づいて算出する基準容量と、蓄電装置12の最大充放電電流とに基づいて、切換タイミングの周期を決定する。蓄電装置12の電池容量と最大充放電電流は、蓄電装置12の性能によって決まる値である。許容充電率差は、予め設定する値である。許容充電率差は、オペレータが発電システム10の全体の構成や、蓄電装置12の特性に基づいて、決定する。切換タイミングの周期の決定方法については後述する。   The priority switching timing generation unit 54 generates switching timing for executing processing for switching the priority. The priority switching timing generation unit 54 generates a cycle of switching timing and outputs the switching timing to the priority determination unit 52 based on the cycle. The priority switching timing generation unit 54 determines the cycle of the switching timing based on the reference capacity calculated based on the battery capacity of the power storage device 12 and the allowable charge rate difference and the maximum charge / discharge current of the power storage device 12. . The battery capacity and the maximum charge / discharge current of power storage device 12 are values determined by the performance of power storage device 12. The allowable charge rate difference is a value set in advance. The allowable charge rate difference is determined by the operator based on the overall configuration of the power generation system 10 and the characteristics of the power storage device 12. A method for determining the cycle of the switching timing will be described later.

充電率取得部56は、各蓄電装置12のSOC判定部34から出力される各蓄電装置12の充電率の情報を取得する。充放電目標値取得部58は、上位制御装置20から出力される充放電目標値を取得する。充放電目標値取得部58は、取得した充放電目標値を電力変換司令部50に出力する。   The charging rate acquisition unit 56 acquires information on the charging rate of each power storage device 12 output from the SOC determination unit 34 of each power storage device 12. The charge / discharge target value acquisition unit 58 acquires the charge / discharge target value output from the host controller 20. The charge / discharge target value acquisition unit 58 outputs the acquired charge / discharge target value to the power conversion command unit 50.

発電システム10は、上位制御装置20により、電力系統14において発電機で発生する電力が負荷機器で消費する電力より多いことを検出した場合、複数の蓄電装置12から放電する電力の総合の目標値を充放電目標値として充放電制御装置18に出力する。充放電制御装置18は、充放電目標値と充電優先順位リスト52bに基づいて、充電量の総合値が充放電目標値の電力となるように、優先順位が高い順に駆動する蓄電装置12を選択する。発電システム10は、選択した優先順位が高い蓄電装置12によって充電を行うことで、電力系統14で余剰となる電力を回収する。   The power generation system 10, when the host control device 20 detects that the power generated by the generator in the power system 14 is larger than the power consumed by the load device, the total target value of the power discharged from the plurality of power storage devices 12. Is output to the charge / discharge control device 18 as a charge / discharge target value. Based on the charge / discharge target value and the charge priority list 52b, the charge / discharge control device 18 selects the power storage devices 12 that are driven in descending order of priority so that the total charge amount becomes the power of the charge / discharge target value. To do. The power generation system 10 collects surplus power in the power system 14 by charging with the selected power storage device 12 having a high priority.

発電システム10は、上位制御装置20により、発電機機で発生する電力が負荷機器で消費する電力より少ないことを検出した場合、複数の蓄電装置12から放電する電力の総合の目標値を充放電目標値として充放電制御装置18に出力する。充放電制御装置18は、充放電目標値と放電優先順位リスト52aに基づいて、放電量の総合値が充放電目標値の電力となるように、優先順位が高い順に駆動する蓄電装置12を選択する。発電システム10は、選択した優先順位が高い蓄電装置12によって放電を行うことで、電力系統14に必要な電力を供給する。   When the power generation system 10 detects that the power generated by the generator is less than the power consumed by the load device, the power generation system 10 charges and discharges the total target value of the power discharged from the plurality of power storage devices 12. The target value is output to the charge / discharge control device 18. Based on the charge / discharge target value and the discharge priority list 52a, the charge / discharge control device 18 selects the power storage devices 12 that are driven in descending order of priority so that the total discharge amount becomes the power of the charge / discharge target value. To do. The power generation system 10 supplies necessary power to the power system 14 by discharging with the selected power storage device 12 having a high priority.

次に、本実施形態の充放電制御装置18による蓄電装置12の制御方法について説明する。図2は、充放電制御装置の処理動作の一例を示すフローチャートである。図3は、充放電制御装置の処理動作の一例を説明するための説明図である。図2に示す処理は、充放電制御装置18の各部で処理を実行することで実現することができる。   Next, the control method of the electrical storage apparatus 12 by the charging / discharging control apparatus 18 of this embodiment is demonstrated. FIG. 2 is a flowchart illustrating an example of a processing operation of the charge / discharge control device. FIG. 3 is an explanatory diagram for explaining an example of a processing operation of the charge / discharge control device. The processing shown in FIG. 2 can be realized by executing processing in each unit of the charge / discharge control device 18.

充放電制御装置18は、優先順位切換タイミング生成部54により、基準容量ΔCと周期Tを算出する(ステップS12)。ここで、優先順位切換タイミング生成部54は、上述したように、蓄電装置12の電池容量と予め設定された許容充電率差とに基づいて基準容量ΔCを算出する。また、優先順位切換タイミング生成部54は、算出する基準容量と、蓄電装置12の最大充放電電流とに基づいて、切換タイミングの周期Tを算出する。基準容量と、蓄電装置12の最大充放電電流とに基づいて、切換タイミングの周期Tを決定する。また、基準容量ΔCは、蓄電装置の電池容量と許容充電率差とに基づいて算出する。   The charge / discharge control device 18 calculates the reference capacity ΔC and the period T by the priority switching timing generation unit 54 (step S12). Here, as described above, the priority order switching timing generation unit 54 calculates the reference capacity ΔC based on the battery capacity of the power storage device 12 and the preset allowable charge rate difference. The priority switching timing generation unit 54 calculates the switching timing period T based on the calculated reference capacity and the maximum charge / discharge current of the power storage device 12. Based on the reference capacity and the maximum charge / discharge current of the power storage device 12, the cycle T of the switching timing is determined. Reference capacity ΔC is calculated based on the battery capacity of the power storage device and the allowable charge rate difference.

具体的には、蓄電装置12の電池容量をAh[Wh]とし、許容充電率差をα[%]とし、最大充放電電流をA[W]とし、係数をBとすると、下記式で基準容量ΔCと周期Tとを算出する。ここで、係数Bは、0.8≦B≦1となる。
ΔC=Ah×(α/100)
T=B×((60×ΔC)/A)
Specifically, when the battery capacity of the power storage device 12 is Ah [Wh], the allowable charge rate difference is α [%], the maximum charge / discharge current is A [W], and the coefficient is B, the following formula is used. The capacity ΔC and the period T are calculated. Here, the coefficient B is 0.8 ≦ B ≦ 1.
ΔC = Ah × (α / 100)
T = B × ((60 × ΔC) / A)

次に、充放電制御装置18は、優先順位判定部52により、前回の判定から時間T経過したかを判定する(ステップS14)。つまり、充放電制御装置18は、算出した周期Tが経過して、優先順位を切り換える制御を実行するタイミングかを判定する。   Next, the charge / discharge control device 18 determines whether the time T has elapsed from the previous determination by the priority determination unit 52 (step S14). That is, the charge / discharge control device 18 determines whether it is time to execute control for switching the priority order after the calculated period T has elapsed.

充放電制御装置18は、時間T経過していない(ステップS14でNo)と判定した場合、ステップS20に進む。充放電制御装置18は、時間T経過した(ステップS14でYes)と判定した場合、優先順位判定部52により放電優先順位または充電優先順位に変更があるかを判定する(ステップS16)。つまり、優先順位判定部52は、記憶している放電優先順位リスト52aと現在の放電優先順位とで順位が異なるか否かを判定する。また、優先順位判定部52は、記憶している充電優先順位リスト52bと現在の充電優先順位とで順位が異なるか否かを判定する。ここで、優先順位判定部52は、蓄電装置12から送られ、充電率取得部56で取得した充電率に基づいて放電優先順位または充電優先順位の変動を常に監視していてもよいし、優先順位判定部52により放電優先順位または充電優先順位に変更があるかを判定する処理時に、処理時点での放電優先順位または充電優先順位を検出してもよい。   When it is determined that the time T has not elapsed (No in step S14), the charge / discharge control device 18 proceeds to step S20. When the charge / discharge control device 18 determines that the time T has elapsed (Yes in step S14), the priority determination unit 52 determines whether there is a change in the discharge priority or the charge priority (step S16). That is, the priority order determination unit 52 determines whether or not the order is different between the stored discharge priority order list 52a and the current discharge priority order. Further, the priority order determination unit 52 determines whether or not the order is different between the stored charge priority list 52b and the current charge priority order. Here, the priority order determination unit 52 may always monitor the change in the discharge priority order or the charge priority order based on the charge rate sent from the power storage device 12 and acquired by the charge rate acquisition unit 56. During the process of determining whether there is a change in the discharge priority or the charge priority by the rank determination unit 52, the discharge priority or the charge priority at the time of the process may be detected.

充放電制御装置18は、放電優先順位と充電優先順位とのいずれも変更なし(ステップS16でNo)と判定した場合、ステップS20に進む。充放電制御装置18は、放電優先順位と充電優先順位とのいずれかで変更あり(ステップS16でYes)と判定した場合、優先順位を切り換える(ステップS18)。つまり、優先順位に変更があった、放電優先順位リスト52a及び充電優先順位リスト52bの少なくとも一方を切り換える。   If the charge / discharge control device 18 determines that neither the discharge priority order nor the charge priority order is changed (No in step S16), the process proceeds to step S20. When it is determined that there is a change in either the discharge priority or the charge priority (Yes in step S16), the charge / discharge control device 18 switches the priority (step S18). That is, at least one of the discharge priority list 52a and the charge priority list 52b that has been changed in priority is switched.

充放電制御装置18は、ステップS14、ステップS16のいずれかでNoと判定した場合、または、ステップS18の処理を行った場合、制御終了かを判定する(ステップS20)。充放電制御装置18は、制御終了ではない(ステップS20でNo)と判定した場合、ステップS14に戻る。つまり、充放電制御装置18は、制御終了と判定するまで、ステップS14からステップS20の処理を繰り返す。充放電制御装置18は、制御終了である(ステップS20でYes)と判定した場合、本処理を終了する。   The charge / discharge control device 18 determines whether the control is completed when it is determined No in either step S14 or step S16 or when the process of step S18 is performed (step S20). When the charge / discharge control device 18 determines that the control is not finished (No in Step S20), the charge / discharge control device 18 returns to Step S14. That is, the charge / discharge control device 18 repeats the processing from step S14 to step S20 until it is determined that the control is finished. If the charge / discharge control device 18 determines that the control is terminated (Yes in step S20), the process is terminated.

充放電制御装置18は、図2に示す処理を行い、基準容量ΔCと、周期TをΔC=Ah×(α/100)、T=B×((60×ΔC)/A)に基づいて算出し、算出した周期Tに基づいて、優先順位の切り換えを行うことで、優先順位の切り換えの頻度を抑制しつつ、蓄電装置12間の充電率の差が大きくなることを抑制することができる。具体的には、図3に示すように、蓄電装置1と蓄電装置2との充電率が同じ状態で、充電率が少し高い蓄電装置2のみの放電を開始した場合であっても時間T経過後に再度優先順位を切り換えることで、蓄電装置1と蓄電装置2との充電率の差が許容SOC差(許容充電率差)よりも大きくなることを抑制することができる。つまり、充放電制御装置18は、頻繁な充放電の優先順位の切り換えを行わずに、蓄電装置12間の充電率の差を管理値(許容充電率差)以内とすることができる。このように、並列に接続された蓄電装置12間の充電率を均等化できることで、電池システム10の全体での充電電力、放電電力の低下を抑制することができる。また、周期T毎に優先順位の切り換え処理を行い、優先順位の切り替え頻度を低減することで、蓄電装置12の起動から電力出力までの時間遅れによる応答不良の発生を抑制することができ、使用する蓄電装置12を切り換えるタイミングで生じる電力変動のリスクを低減することができ、切り換え処理で使用する部品の寿命を長寿命にすることができる。   The charge / discharge control device 18 performs the process shown in FIG. 2 and calculates the reference capacity ΔC and the period T based on ΔC = Ah × (α / 100), T = B × ((60 × ΔC) / A). Then, by switching the priority order based on the calculated period T, it is possible to suppress the difference in the charging rate between the power storage devices 12 while suppressing the frequency of switching the priority order. Specifically, as shown in FIG. 3, the time T has elapsed even when the power storage device 1 and the power storage device 2 have the same charge rate and the discharge of only the power storage device 2 having a slightly higher charge rate is started. By switching the priority order again later, it is possible to suppress the difference in charging rate between the power storage device 1 and the power storage device 2 from becoming larger than the allowable SOC difference (allowable charging rate difference). That is, the charging / discharging control device 18 can set the charging rate difference between the power storage devices 12 within the management value (allowable charging rate difference) without frequently switching the priority order of charging / discharging. As described above, the charge rate between the power storage devices 12 connected in parallel can be equalized, so that reduction in the charge power and the discharge power in the entire battery system 10 can be suppressed. In addition, by performing priority switching processing every cycle T and reducing the frequency of switching priority, it is possible to suppress the occurrence of poor response due to time delay from the start of the power storage device 12 to power output. The risk of power fluctuation occurring at the timing of switching the power storage device 12 to be switched can be reduced, and the life of components used in the switching process can be extended.

また、係数Bを0.8以上1以下とすることで、蓄電装置内の電池セルのばらつきがある場合に対応した係数を設定することができる。つまり、係数を1より小さい値とすることで、蓄電装置の性能にばらつきがある場合でも、充電率の差が許容充電率差以内に維持しつつ、優先順位の切換タイミングが頻繁に生じてしまうことを抑制することができる。   In addition, by setting the coefficient B between 0.8 and 1, it is possible to set a coefficient corresponding to the case where there is a variation in battery cells in the power storage device. In other words, by setting the coefficient to a value smaller than 1, even when there are variations in the performance of the power storage device, the priority switching timing frequently occurs while the charge rate difference is maintained within the allowable charge rate difference. This can be suppressed.

ここで、充放電制御装置18は、蓄電装置12の電池容量と予め設定された許容充電率差とに基づいて基準容量ΔCを算出し、算出した基準容量と、蓄電装置12の最大充放電電流とに基づいて、切換タイミングの周期Tを算出すればよく、さらに各種情報を加味してもよい。   Here, the charge / discharge control device 18 calculates the reference capacity ΔC based on the battery capacity of the power storage device 12 and a preset allowable charge rate difference, and the calculated reference capacity and the maximum charge / discharge current of the power storage device 12. Based on the above, the period T of the switching timing may be calculated, and various information may be added.

次に、図4及び図5を用いて、充放電制御装置18による制御動作の他の例を説明する。図4は、充放電制御装置の処理動作の一例を示すフローチャートである。図5は、充放電制御装置の処理動作の一例を説明するための説明図である。図4に示す処理は、充放電制御装置18の各部で処理を実行することで実現することができる。   Next, another example of the control operation by the charge / discharge control device 18 will be described with reference to FIGS. 4 and 5. FIG. 4 is a flowchart illustrating an example of a processing operation of the charge / discharge control device. FIG. 5 is an explanatory diagram for explaining an example of a processing operation of the charge / discharge control device. The process shown in FIG. 4 can be realized by executing the process in each unit of the charge / discharge control device 18.

充放電制御装置18は、優先順位切換タイミング生成部54により不感帯を加味した基準容量ΔCと周期Tを算出する(ステップS32)。ここで、優先順位切換タイミング生成部54は、蓄電装置12の電池容量と予め設定された許容充電率差と不感帯充電率とに基づいて基準容量ΔCを算出する。不感帯充電率は、予め設定された値である。また、優先順位切換タイミング生成部54は、算出する基準容量と、蓄電装置12の最大充放電電流とに基づいて、切換タイミングの周期Tを算出する。基準容量ΔCと、蓄電装置12の最大充放電電流とに基づいて、切換タイミングの周期Tを決定する。また、基準容量ΔCは、蓄電装置12の電池容量と許容充電率差と不感帯充電率とに基づいて算出する。   The charge / discharge control device 18 calculates the reference capacity ΔC and the period T in consideration of the dead zone by the priority switching timing generation unit 54 (step S32). Here, the priority switching timing generation unit 54 calculates the reference capacity ΔC based on the battery capacity of the power storage device 12, the preset allowable charge rate difference, and the dead zone charge rate. The dead zone charging rate is a preset value. The priority switching timing generation unit 54 calculates the switching timing period T based on the calculated reference capacity and the maximum charge / discharge current of the power storage device 12. A cycle T of the switching timing is determined based on the reference capacity ΔC and the maximum charge / discharge current of the power storage device 12. Reference capacity ΔC is calculated based on the battery capacity of power storage device 12, the allowable charge rate difference, and the dead zone charge rate.

具体的には、不感帯に対応する不感帯充電率をβ[%]とした場合、下記式で基準容量ΔCを算出する。
ΔC=Ah×((α−β)/100)
なお、周期Tは、基準容量ΔCと蓄電装置12の最大充放電電流とに基づいて上記式と同様に算出する。
Specifically, when the dead zone charging rate corresponding to the dead zone is β [%], the reference capacity ΔC is calculated by the following formula.
ΔC = Ah × ((α−β) / 100)
The period T is calculated in the same manner as the above formula based on the reference capacity ΔC and the maximum charge / discharge current of the power storage device 12.

次に、充放電制御装置18は、優先順位判定部52により、前回の判定から時間T経過したかを判定する(ステップS34)。つまり、充放電制御装置18は、算出した周期Tが経過して、優先順位を切り換える制御を実行するタイミングかを判定する。   Next, the charge / discharge control device 18 determines whether the time T has elapsed from the previous determination by the priority determination unit 52 (step S34). That is, the charge / discharge control device 18 determines whether it is time to execute control for switching the priority order after the calculated period T has elapsed.

充放電制御装置18は、時間T経過していない(ステップS34でNo)と判定した場合、ステップS42に進む。充放電制御装置18は、時間T経過した(ステップS34でYes)と判定した場合、優先順位判定部52により放電優先順位または充電優先順位に変更があるかを判定する(ステップS36)。   When it is determined that the time T has not elapsed (No in step S34), the charge / discharge control device 18 proceeds to step S42. If the charge / discharge control device 18 determines that the time T has elapsed (Yes in step S34), the priority determination unit 52 determines whether there is a change in the discharge priority or the charge priority (step S36).

充放電制御装置18は、放電優先順位と充電優先順位とのいずれも変更なし(ステップS36でNo)と判定した場合、ステップS42に進む。充放電制御装置18は、放電優先順位と充電優先順位とのいずれかで変更あり(ステップS36でYes)と判定した場合、充電率の最大値−充電率の最小値≧不感帯充電率であるかを判定する(ステップS38)。つまり、充放電制御装置18は、充電率の最大値と充電率の最小値との差が不感帯充電率よりも大きいかを判定する。   If the charge / discharge control device 18 determines that neither the discharge priority order nor the charge priority order is changed (No in step S36), the process proceeds to step S42. If the charge / discharge control device 18 determines that there is a change in either the discharge priority or the charge priority (Yes in step S36), is the maximum charge rate minus the minimum charge rate ≧ the dead zone charge rate? Is determined (step S38). That is, the charge / discharge control device 18 determines whether the difference between the maximum value of the charging rate and the minimum value of the charging rate is larger than the dead zone charging rate.

充放電制御装置18は、充電率の最大値−充電率の最小値≧不感帯充電率ではない(ステップS38でNo)と判定した場合、つまり、充電率の最大値と充電率の最小値との差が不感帯充電率よりも小さい場合、ステップS42に進む。充放電制御装置18は、充電率の最大値−充電率の最小値≧不感帯充電率である(ステップS38でYes)と判定した場合、優先順位を切り換える(ステップS40)。つまり、優先順位に変更があり、かつ、充電率の最大値と充電率の最小値との差が不感帯充電率よりも大きくなっている場合、放電優先順位リスト52a及び充電優先順位リスト52bの少なくとも一方を切り換える。   The charge / discharge control device 18 determines that it is not the maximum value of the charging rate−the minimum value of the charging rate ≧ the dead zone charging rate (No in step S38), that is, the maximum value of the charging rate and the minimum value of the charging rate. When the difference is smaller than the dead zone charging rate, the process proceeds to step S42. When the charge / discharge control device 18 determines that the maximum value of the charging rate−the minimum value of the charging rate ≧ the dead zone charging rate (Yes in step S38), the charging / discharging control device 18 switches the priority (step S40). That is, when the priority is changed and the difference between the maximum value of the charging rate and the minimum value of the charging rate is larger than the dead zone charging rate, at least one of the discharging priority list 52a and the charging priority list 52b. Switch one side.

充放電制御装置18は、ステップS34、ステップS36、ステップS38のいずれかでNoと判定した場合、または、ステップS40の処理を行った場合、制御終了かを判定する(ステップS42)。充放電制御装置18は、制御終了ではない(ステップS42でNo)と判定した場合、ステップS34に戻る。つまり、充放電制御装置18は、制御終了と判定するまで、ステップS34からステップS42の処理を繰り返す。充放電制御装置18は、制御終了である(ステップS42でYes)と判定した場合、本処理を終了する。   The charge / discharge control device 18 determines whether the control is finished when it is determined No in any of step S34, step S36, and step S38, or when the process of step S40 is performed (step S42). If the charge / discharge control device 18 determines that the control is not finished (No in step S42), the charge / discharge control device 18 returns to step S34. That is, the charge / discharge control device 18 repeats the processing from step S34 to step S42 until it is determined that the control is finished. If the charge / discharge control device 18 determines that the control is complete (Yes in step S42), the process ends.

充放電制御装置18は、図4に示す処理を行い、基準容量ΔCをΔC=Ah×(α−β/100)に基づいて算出し、不感帯充電率を加味して算出した周期Tに基づいて、優先順位の切り換えを行うことでも、優先順位の切り換えの頻度を抑制しつつ、蓄電装置12間の充電率の差が大きくなることを抑制することができる。また、図4に示す処理を行い、不感帯充電率を加味して、充電率の差が不感帯充電率よりも小さい場合、優先順位リストの更新を行わない。これにより、優先順位の切り換えの頻度をさらに抑制することができ、計算結果のノイズによる充電率の比較の誤判断の発生を抑制することができる。具体的には、図5に示すように、蓄電装置1と蓄電装置2との充電率が同じ状態で、1台での放電に切り換わった時に、充電率の差が不感帯充電率よりも小さい場合、優先順位の切り換えを行わずに、蓄電装置2を継続して使用することで、優先順位の切り換えの頻度をさらに抑制することができる。またこの場合も不感帯充電率と許容充電率差を加味して周期Tを検出することで、蓄電装置1と蓄電装置2との充電率との差が許容SOC差(許容充電率差)よりも大きくなることを抑制することができる。   The charge / discharge control device 18 performs the process shown in FIG. 4, calculates the reference capacity ΔC based on ΔC = Ah × (α−β / 100), and based on the cycle T calculated taking the dead zone charging rate into consideration. By switching the priority order, it is possible to suppress the difference in the charging rate between the power storage devices 12 while suppressing the frequency of switching the priority order. In addition, when the process shown in FIG. 4 is performed and the dead zone charging rate is taken into account, and the difference in charging rate is smaller than the dead zone charging rate, the priority list is not updated. Thereby, the frequency of priority switching can be further suppressed, and the occurrence of misjudgment in comparison of charging rates due to noise in the calculation result can be suppressed. Specifically, as shown in FIG. 5, when the charging rates of the power storage device 1 and the power storage device 2 are the same, the difference in the charging rate is smaller than the dead zone charging rate when switching to discharging with one unit. In this case, it is possible to further suppress the frequency of switching the priority order by continuously using the power storage device 2 without switching the priority order. Also in this case, by detecting the period T in consideration of the dead zone charging rate and the allowable charging rate difference, the difference between the charging rates of the power storage device 1 and the power storage device 2 is larger than the allowable SOC difference (allowable charging rate difference). It is possible to suppress the increase.

次に、図6及び図7を用いて、充放電制御装置18による制御動作の他の例を説明する。図6は、充放電制御装置の処理動作の一例を示すフローチャートである。図7は、充放電制御装置の処理動作の一例を説明するための説明図である。図6に示す処理は、充放電制御装置18の各部で処理を実行することで実現することができる。   Next, another example of the control operation by the charge / discharge control device 18 will be described with reference to FIGS. 6 and 7. FIG. 6 is a flowchart illustrating an example of a processing operation of the charge / discharge control device. FIG. 7 is an explanatory diagram for explaining an example of a processing operation of the charge / discharge control device. The processing shown in FIG. 6 can be realized by executing processing in each unit of the charge / discharge control device 18.

充放電制御装置18は、優先順位判定部52により、前回の判定から時間T経過したかを判定する(ステップS52)。つまり、充放電制御装置18は、算出した周期Tが経過して、優先順位を切り換える制御を実行するタイミングかを判定する。充放電制御装置18は、制御開始時の場合、前回の判定はないが、前回の判定から時間T経過したと判定する。   The charge / discharge control device 18 determines whether the time T has elapsed from the previous determination by the priority determination unit 52 (step S52). That is, the charge / discharge control device 18 determines whether it is time to execute control for switching the priority order after the calculated period T has elapsed. The charge / discharge control device 18 determines that the time T has elapsed from the previous determination, although there is no previous determination when the control is started.

充放電制御装置18は、時間T経過していない(ステップS52でNo)と判定した場合、ステップS60に進む。充放電制御装置18は、時間T経過した(ステップS52でYes)と判定した場合、切換前充電率を加味した基準容量ΔCと周期Tを算出する(ステップS54)。切換前充電率は、判定時の対象の蓄電装置12の充電率の差である。ここで、対象の蓄電装置12は、優先順位が最も高い蓄電装置12とその次の蓄電装置12である。つまり、切換前充電率は、充電の場合、蓄電率が最も低い蓄電装置12と、二番目に低い蓄電装置12との充電率の差である。切換前充電率は、放電の場合、蓄電率が最も高い蓄電装置12と、二番目に高い蓄電装置12との充電率の差である。優先順位切換タイミング生成部54は、蓄電装置12の電池容量と予め設定された許容充電率差と、現状の切換前充電率と、に基づいて基準容量ΔCを算出する。また、優先順位切換タイミング生成部54は、算出する基準容量と、蓄電装置12の最大充放電電流とに基づいて、切換タイミングの周期Tを算出する。基準容量ΔCと、蓄電装置12の最大充放電電流とに基づいて、切換タイミングの周期Tを決定する。また、基準容量ΔCは、蓄電装置12の電池容量と許容充電率差と不感帯充電率とに基づいて算出する。   When it is determined that the time T has not elapsed (No in step S52), the charge / discharge control device 18 proceeds to step S60. When it is determined that the time T has elapsed (Yes in step S52), the charge / discharge control device 18 calculates the reference capacity ΔC and the period T in consideration of the pre-switching charge rate (step S54). The pre-switching charging rate is a difference in charging rate of the target power storage device 12 at the time of determination. Here, the target power storage device 12 is the power storage device 12 having the highest priority and the next power storage device 12. That is, in the case of charging, the pre-switching charging rate is a difference in charging rate between the power storage device 12 with the lowest power storage rate and the second lowest power storage device 12. In the case of discharging, the pre-switching charging rate is a difference in charging rate between the power storage device 12 having the highest power storage rate and the second highest power storage device 12. The priority switching timing generation unit 54 calculates a reference capacity ΔC based on the battery capacity of the power storage device 12, a preset allowable charging rate difference, and the current charging rate before switching. The priority switching timing generation unit 54 calculates the switching timing period T based on the calculated reference capacity and the maximum charge / discharge current of the power storage device 12. A cycle T of the switching timing is determined based on the reference capacity ΔC and the maximum charge / discharge current of the power storage device 12. Reference capacity ΔC is calculated based on the battery capacity of power storage device 12, the allowable charge rate difference, and the dead zone charge rate.

具体的には、切換前電率差をγ[%]とした場合、下記式で基準容量ΔCを算出する。
ΔC=Ah×((α+γ)/100)
なお、周期Tは、基準容量ΔCと蓄電装置12の最大充放電電流とに基づいて上記式と同様に算出する。
Specifically, when the difference in electric power before switching is γ [%], the reference capacity ΔC is calculated by the following formula.
ΔC = Ah × ((α + γ) / 100)
The period T is calculated in the same manner as the above formula based on the reference capacity ΔC and the maximum charge / discharge current of the power storage device 12.

充放電制御装置18は、基準容量ΔCと周期Tとを算出したら、優先順位判定部52により放電優先順位または充電優先順位に変更があるかを判定する(ステップS56)。   After calculating the reference capacity ΔC and the cycle T, the charge / discharge control device 18 determines whether there is a change in the discharge priority or the charge priority by the priority determination unit 52 (step S56).

充放電制御装置18は、放電優先順位と充電優先順位とのいずれも変更なし(ステップS56でNo)と判定した場合、ステップS60に進む。充放電制御装置18は、放電優先順位と充電優先順位とのいずれかで変更あり(ステップS56でYes)と判定した場合、優先順位を切り換える(ステップS58)。つまり、優先順位に変更がある場合、放電優先順位リスト52a及び充電優先順位リスト52bの少なくとも一方を切り換える。   If the charge / discharge control device 18 determines that neither the discharge priority order nor the charge priority order is changed (No in step S56), the process proceeds to step S60. When it is determined that there is a change in either the discharge priority or the charge priority (Yes in step S56), the charge / discharge control device 18 switches the priority (step S58). That is, when there is a change in priority, at least one of the discharge priority list 52a and the charge priority list 52b is switched.

充放電制御装置18は、ステップS52、ステップS56のいずれかでNoと判定した場合、または、ステップS58の処理を行った場合、制御終了かを判定する(ステップS60)。充放電制御装置18は、制御終了ではない(ステップS60でNo)と判定した場合、ステップS52に戻る。つまり、充放電制御装置18は、制御終了と判定するまで、ステップS52からステップS60の処理を繰り返す。充放電制御装置18は、制御終了である(ステップS60でYes)と判定した場合、本処理を終了する。   The charge / discharge control device 18 determines whether the control is finished when it is determined No in either step S52 or step S56 or when the process of step S58 is performed (step S60). When the charge / discharge control device 18 determines that the control is not finished (No in step S60), the charge / discharge control device 18 returns to step S52. That is, the charge / discharge control device 18 repeats the processing from step S52 to step S60 until it is determined that the control is finished. If the charge / discharge control device 18 determines that the control is complete (Yes in step S60), the process ends.

充放電制御装置18は、図6に示す処理を行い、基準容量ΔCをΔC=Ah×(α+γ/100)に基づいて算出し、切換前充電率を加味して算出した周期Tに基づいて、優先順位の切り換えを行うことでも、優先順位の切り換えの頻度を抑制しつつ、蓄電装置12間の充電率の差が大きくなることを抑制することができる。また、切換前充電率を加味することで、充電率の差が大きい場合、周期Tを長くし、充電率の差が小さい場合、周期Tを短くすることができる。これにより、現在の状態に応じて周期Tの長さを調整できることで、充電率の差が許容充電率差よりも大きくなることを抑制しつつ、判定の間隔を長くすることができ、優先順位の切り換えの頻度をさらに抑制することができる。具体的には、図7に示すように、蓄電装置1と蓄電装置2との充電率の差を切換前充電率として検出し、切換前充電率を加えて周期Tを求めることで、判定後に1台での放電に切り換わって、優先順位が最も高い蓄電装置1のみが使用された場合も、周期T経過時に蓄電装置1と蓄電装置2との充電率との差が許容SOC差(許容充電率差)よりも大きくなることを抑制することができる。   The charge / discharge control device 18 performs the processing shown in FIG. 6, calculates the reference capacity ΔC based on ΔC = Ah × (α + γ / 100), and based on the cycle T calculated taking into account the charging rate before switching, Even by switching the priority order, it is possible to suppress the difference in the charging rate between the power storage devices 12 while suppressing the frequency of switching the priority order. Further, by adding the pre-switching charge rate, the cycle T can be lengthened when the difference in charge rate is large, and the cycle T can be shortened when the difference in charge rate is small. Thereby, the length of the period T can be adjusted according to the current state, so that the determination interval can be lengthened while suppressing the difference in the charging rate from becoming larger than the allowable charging rate difference. The switching frequency can be further suppressed. Specifically, as shown in FIG. 7, the difference between the charge rates of the power storage device 1 and the power storage device 2 is detected as the pre-switching charge rate, and the cycle T is obtained by adding the pre-switching charge rate. Even when only the power storage device 1 with the highest priority is used after switching to discharge by one unit, the difference between the charge rates of the power storage device 1 and the power storage device 2 when the period T elapses is the allowable SOC difference (allowable (Charge rate difference) can be suppressed.

また、充放電制御装置18は、不感帯に対応する不感帯充電率差β[%]と、直近の判定時の充電率の差である切換前充電率差γ[%]の両方を加味して、基準容量ΔCをΔC=Ah×((α−β+γ)/100)で算出してもよい。これにより、上述した例の両方の効果を得ることができる。   Further, the charging / discharging control device 18 takes into account both the dead zone charging rate difference β [%] corresponding to the dead zone and the charging rate difference γ [%] before switching, which is the difference between the charging rates at the latest determination, The reference capacity ΔC may be calculated by ΔC = Ah × ((α−β + γ) / 100). Thereby, both effects of the example mentioned above can be acquired.

また、本実施形態では、放電優先順位リスト52aと充電優先順位リスト52bとを別々に記憶したが、いずれも充電率に基づいて決定し、優先順位の判定基準が逆になるものであるので、優先順位のリストを1つとし、それぞれの場合に応じて上位から選択するか下位から選択するかを切り換えるようにしてもよい。   Further, in the present embodiment, the discharge priority list 52a and the charge priority list 52b are stored separately, but both are determined based on the charging rate, and the priority criterion is reversed. One priority list may be used, and switching from the upper level or the lower level may be switched according to each case.

また、優先順位切換タイミング生成部54は、算出した切換タイミングの周期Tから制御遅れに対応する時間を減算した時間を新たな周期Tとしてもよい。つまり、T−制御遅れ時間を新たな周期(時間)Tとしてもよい。これにより、制御遅れを加味することができ、蓄電装置12間の充電率の差が開きすぎることを抑制することができる。   The priority switching timing generation unit 54 may set a new period T by subtracting the time corresponding to the control delay from the calculated switching timing period T. That is, the T-control delay time may be set as a new cycle (time) T. Thereby, control delay can be considered and it can suppress that the difference of the charging rate between the electrical storage apparatuses 12 opens too much.

また、係数Bは、1とすることが好ましい。これにより、周期Tをより長くすることができ、切換タイミングをより長くすることができる。   The coefficient B is preferably 1. Thereby, the period T can be made longer and the switching timing can be made longer.

10 電池システム
12 蓄電装置
14 電力系統
16 電線
18 充放電制御装置
20 上位制御装置
30 電池部
32 電力変換部
34 SOC判定部
50 電力変換司令部
52 優先順位判定部
52a 放電優先順位リスト
52b 充電優先順位リスト
54 優先順位切替タイミング生成部
56 充電率取得部
58 充放電目標値取得部
DESCRIPTION OF SYMBOLS 10 Battery system 12 Power storage apparatus 14 Electric power system 16 Electric wire 18 Charging / discharging control apparatus 20 Host control apparatus 30 Battery part 32 Power conversion part 34 SOC determination part 50 Power conversion command part 52 Priority determination part 52a Discharge priority list 52b Charging priority order List 54 Priority switching timing generation unit 56 Charging rate acquisition unit 58 Charge / discharge target value acquisition unit

Claims (10)

複数の蓄電装置の充放電を制御する充放電制御装置であって、
複数の前記蓄電装置の充電率を取得する充電率取得部と、
複数の前記蓄電装置の全体から出力する充放電の目標値を取得する充放電目標値取得部と、
前記蓄電装置を使用する優先順位を切り換える切換タイミングを生成する優先順位切換タイミング生成部と、
充電率に基づいて優先順位を判定し、前記優先順位切換タイミング生成部で生成された切換タイミングで、優先順位を切り換える優先順位判定部と、
前記優先順位判定部で判定された優先順位と、前記充放電目標値取得部で取得した充放電の目標値に基づいて、使用する前記蓄電装置を決定し、決定した前記蓄電装置から充放電を実行させる電力変換司令部と、を有し、
前記優先順位切換タイミング生成部は、前記蓄電装置の電池容量と予め設定された許容充電率差とに基づいて算出する基準容量と、前記蓄電装置の最大充放電電流とに基づいて、前記切換タイミングの周期を算出し、算出した周期に基づいて、前記切換タイミングを出力することを特徴とする充放電制御装置。
A charge / discharge control device for controlling charge / discharge of a plurality of power storage devices,
A charge rate acquisition unit for acquiring the charge rates of the plurality of power storage devices;
A charge / discharge target value acquisition unit for acquiring a target value of charge / discharge output from the entirety of the plurality of power storage devices;
A priority switching timing generating section for generating a switching timing for switching the priority of using the power storage device;
A priority order determination unit that determines a priority order based on a charging rate, and switches the priority order at the switching timing generated by the priority order switching timing generation unit;
Based on the priority order determined by the priority order determination unit and the charge / discharge target value acquired by the charge / discharge target value acquisition unit, the power storage device to be used is determined, and charging / discharging is performed from the determined power storage device. And a power conversion command unit to be executed,
The priority switching timing generation unit is configured to change the switching timing based on a reference capacity calculated based on a battery capacity of the power storage device and a preset allowable charge rate difference and a maximum charge / discharge current of the power storage device. The charge / discharge control apparatus is characterized in that the cycle is calculated and the switching timing is output based on the calculated cycle.
前記優先順位切換タイミング生成部は、前記蓄電装置の電池容量をAh[Wh]とし、前記許容充電率差をα[%]とし、前記基準容量をΔCとし、前記最大充放電電流をA[W]とし、係数をB(0.8≦B≦1)とすると、前記基準容量ΔCを前記蓄電装置の電池容量Ah[Wh]と前記許容充電率差αとに基づいて算出し、切換タイミングの周期TをT=B×((60×ΔC)/A)で算出することを特徴とする請求項1に記載の充放電制御装置。   The priority switching timing generation unit sets the battery capacity of the power storage device to Ah [Wh], sets the allowable charge rate difference to α [%], sets the reference capacity to ΔC, and sets the maximum charge / discharge current to A [W And the coefficient is B (0.8 ≦ B ≦ 1), the reference capacity ΔC is calculated based on the battery capacity Ah [Wh] of the power storage device and the allowable charge rate difference α, and the switching timing The charge / discharge control apparatus according to claim 1, wherein the period T is calculated by T = B × ((60 × ΔC) / A). 前記優先順位切換タイミング生成部は、前記基準容量ΔCをΔC=Ah×(α/100)で算出することを特徴とする請求項2に記載の充放電制御装置。   The charge / discharge control apparatus according to claim 2, wherein the priority switching timing generation unit calculates the reference capacity ΔC by ΔC = Ah × (α / 100). 前記優先順位切換タイミング生成部は、不感帯に対応する不感帯充電率差をβ[%]とし、前記基準容量ΔCをΔC=Ah×((α−β)/100)で算出することを特徴とする請求項2に記載の充放電制御装置。   The priority switching timing generation unit calculates a difference in the dead zone charging rate corresponding to the dead zone as β [%], and calculates the reference capacity ΔC by ΔC = Ah × ((α−β) / 100). The charge / discharge control apparatus according to claim 2. 前記優先順位切換タイミング生成部は、直近の判定時の充電率の差である切換前充電率差をγ[%]とし、前記基準容量ΔCをΔC=Ah×((α+γ)/100)で算出することを特徴とする請求項2に記載の充放電制御装置。   The priority switching timing generation unit calculates the reference charging capacity ΔC as ΔC = Ah × ((α + γ) / 100), assuming that the charging rate difference before switching, which is the difference in charging rate at the latest determination, is γ [%]. The charge / discharge control apparatus according to claim 2, wherein: 前記優先順位切換タイミング生成部は、さらに不感帯に対応する不感帯充電率差をβ[%]とし、直近の判定時の充電率の差である切換前充電率差をγ[%]とし、前記基準容量ΔCをΔC=Ah×((α−β+γ)/100)で算出することを特徴とする請求項2に記載の充放電制御装置。   The priority switching timing generation unit further sets the dead zone charging rate difference corresponding to the dead zone to β [%], and sets the charging rate difference before switching, which is the difference in charging rate at the latest determination, to γ [%]. The charge / discharge control device according to claim 2, wherein the capacity ΔC is calculated by ΔC = Ah × ((α−β + γ) / 100). 前記係数Bは、1であることを特徴とする請求項2から6のいずれか一項に記載の充放電制御装置。   The charge / discharge control apparatus according to any one of claims 2 to 6, wherein the coefficient B is 1. 前記優先順位切換タイミング生成部は、切換タイミングの周期Tから制御遅れに対応する時間を減算した時間を周期として、前記切換タイミングを出力することを特徴とする請求項2から7のいずれか一項に記載の充放電制御装置。   8. The priority order switching timing generation unit outputs the switching timing with a period obtained by subtracting a time corresponding to a control delay from a period T of the switching timing. Charge-discharge control apparatus as described in. 請求項1から8のいずれか一項に記載の充放電制御装置と、
前記充放電制御装置で充放電が制御される複数の蓄電装置と、
前記充放電制御装置に複数の前記蓄電装置の全体から出力する充放電の目標値を出力する上位制御装置と、を有する電池システム。
The charge / discharge control device according to any one of claims 1 to 8,
A plurality of power storage devices whose charge / discharge is controlled by the charge / discharge control device,
A battery system comprising: a higher-order control device that outputs a charge / discharge target value output from the entirety of the plurality of power storage devices to the charge / discharge control device.
前記複数の蓄電装置は、同一の性能であることを特徴とする請求項9に記載の電池システム。   The battery system according to claim 9, wherein the plurality of power storage devices have the same performance.
JP2014235056A 2014-11-19 2014-11-19 Charge / discharge control device and battery system having the same Active JP6204902B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2014235056A JP6204902B2 (en) 2014-11-19 2014-11-19 Charge / discharge control device and battery system having the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2014235056A JP6204902B2 (en) 2014-11-19 2014-11-19 Charge / discharge control device and battery system having the same

Publications (2)

Publication Number Publication Date
JP2016100950A JP2016100950A (en) 2016-05-30
JP6204902B2 true JP6204902B2 (en) 2017-09-27

Family

ID=56077709

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2014235056A Active JP6204902B2 (en) 2014-11-19 2014-11-19 Charge / discharge control device and battery system having the same

Country Status (1)

Country Link
JP (1) JP6204902B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7326491B2 (en) * 2021-01-28 2023-08-15 寧徳時代新能源科技股▲分▼有限公司 Power supply control method for power converter and power converter

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08251714A (en) * 1995-03-10 1996-09-27 Mitsubishi Motors Corp Electric vehicle power supply
JP5434749B2 (en) * 2010-03-31 2014-03-05 株式会社デンソー Battery control system and control method thereof
JP5851879B2 (en) * 2012-02-21 2016-02-03 三菱重工業株式会社 Power control device
CA2831361C (en) * 2012-10-31 2016-10-04 Hitachi, Ltd. Power generation system, backup power supply, data center installation method, power generation system controller, power system, and power generation system operating method

Also Published As

Publication number Publication date
JP2016100950A (en) 2016-05-30

Similar Documents

Publication Publication Date Title
US9653924B2 (en) Battery system
JP6238107B2 (en) Storage battery management system
JP5640387B2 (en) Power supply
JP6168043B2 (en) Adjusting device, assembled battery device and adjusting method
KR101360667B1 (en) Voltage conversion circuit and electronic equipment
JP6102746B2 (en) Storage battery device and charge control method
JP6427826B2 (en) Control device, control method and program
JP2014180214A (en) Power conversion system
WO2012176868A1 (en) Power supply system
JP6712802B2 (en) Power storage system, control device, and power storage device
JP5687349B2 (en) Peak cut system
JP2010233287A (en) Charge / discharge control device and charge / discharge control method
JPWO2011052314A1 (en) Secondary battery control method and power storage device
JP6298634B2 (en) Switching power supply
JP2014128152A (en) Charge and discharge controller, charge and discharge control system and charge and discharge control method
JP6332748B2 (en) Charge / discharge power supply
JP2010068652A (en) Dc power feeding system and power storage device
KR101729273B1 (en) Method and energy management system for controlling maximum demand power of energy storage system comprising plurality of uninterruptible power supply
KR100906993B1 (en) Power Control System and Power Control Method of Fuel Cell Hybrid Power Generation System
KR20150135843A (en) Hybrid energy storage system and method of contolling the same
JP6204902B2 (en) Charge / discharge control device and battery system having the same
CN106992543A (en) The independent micro-capacitance sensor that diesel-driven generator and batteries are constituted
JP2018121468A (en) DC power supply system
JP2012161208A (en) Power supply device and power supply control method
JP6566345B2 (en) Storage battery control device, power storage system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20161101

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20170731

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20170808

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20170901

R150 Certificate of patent or registration of utility model

Ref document number: 6204902

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150