JP6206528B2 - Steel sheet pile closing structure and its construction method - Google Patents
[go: Go Back, main page]

JP6206528B2 - Steel sheet pile closing structure and its construction method - Google Patents

Steel sheet pile closing structure and its construction method Download PDF

Info

Publication number
JP6206528B2
JP6206528B2 JP2016054672A JP2016054672A JP6206528B2 JP 6206528 B2 JP6206528 B2 JP 6206528B2 JP 2016054672 A JP2016054672 A JP 2016054672A JP 2016054672 A JP2016054672 A JP 2016054672A JP 6206528 B2 JP6206528 B2 JP 6206528B2
Authority
JP
Japan
Prior art keywords
steel sheet
sheet pile
underground structure
wall
pile wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2016054672A
Other languages
Japanese (ja)
Other versions
JP2016135987A (en
Inventor
禎郎 塩崎
禎郎 塩崎
森 玄
玄 森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Steel Corp
Original Assignee
JFE Steel Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JFE Steel Corp filed Critical JFE Steel Corp
Priority to JP2016054672A priority Critical patent/JP6206528B2/en
Publication of JP2016135987A publication Critical patent/JP2016135987A/en
Application granted granted Critical
Publication of JP6206528B2 publication Critical patent/JP6206528B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Description

本発明は、トンネル、埋設管、共同溝などの地下構造物が地盤の液状化によって浮上するのを防止するために、鋼製矢板(鋼矢板、鋼管矢板)を用いて構築される鋼製矢板締切構造(鋼矢板締切構造、鋼管矢板締切構造)およびその施工方法に関するものである。   The present invention is a steel sheet pile constructed using steel sheet piles (steel sheet piles, steel pipe sheet piles) in order to prevent underground structures such as tunnels, buried pipes and joint grooves from rising due to liquefaction of the ground. The present invention relates to a deadline structure (steel sheet pile deadline structure, steel pipe sheet pile deadline structure) and its construction method.

トンネル、埋設管、共同溝などの地下構造物が地盤の液状化によって浮上するのを防止するための対策としては、非特許文献1によると、下記の(1)〜(5)にまとめられる。   According to Non-Patent Document 1, the following (1) to (5) are summarized as measures for preventing underground structures such as tunnels, buried pipes, and common grooves from rising due to liquefaction of the ground.

(1)地盤の液状化自体を防止または抑止する。   (1) Prevent or deter liquefaction of the ground itself.

(2)地盤の液状化に伴う局所的な過剰間隙水圧の消散を図る。   (2) Dissipate local excess pore water pressure associated with ground liquefaction.

(3)地盤の液状化に伴う地下構造物底部への砂の回りこみを防止または抑止する。   (3) Prevent or suppress sand sneaking into the bottom of underground structures due to liquefaction of the ground.

(4)地下構造物をアンカーにより固定する。   (4) Fix the underground structure with anchors.

(5)地下構造物の重量化を図る。   (5) Increase the weight of underground structures.

そして、本発明は、上記(3)に基づく構造とその施工方法に関するものである。   And this invention relates to the structure based on said (3), and its construction method.

上記(3)に関する具体的な事例としては、図1に示すように、液状化層2内に位置する地下構造物1の両側に、地表面4から液状化層2を貫通してその下の非液状化層3まで至る連続壁(遮断壁)6を設ける構造が紹介されている。遮断壁6としては、鋼矢板壁、鋼管矢板壁、コンクリート連壁などが該当する。このように遮断壁6によって締め切った構造(締切構造)とすることで、地盤の液状化に伴う地下構造物1の底部への砂の回りこみを防止または抑止するものである。なお、図1中の5は地下水位面である。   As a specific example of the above (3), as shown in FIG. 1, the liquefied layer 2 penetrates from the ground surface 4 on both sides of the underground structure 1 located in the liquefied layer 2 and below it. A structure in which a continuous wall (blocking wall) 6 extending to the non-liquefiable layer 3 is provided is introduced. Examples of the blocking wall 6 include a steel sheet pile wall, a steel pipe sheet pile wall, and a concrete connection wall. Thus, by setting it as the structure closed by the blocking wall 6 (closed structure), the sneaking in of the sand to the bottom part of the underground structure 1 accompanying the liquefaction of the ground is prevented or suppressed. In addition, 5 in FIG. 1 is a groundwater level surface.

地下構造物の耐震性能照査と地震対策ガイドライン(案)、土木学会、平成23年Seismic performance verification of underground structures and earthquake countermeasure guidelines (draft), Japan Society of Civil Engineers, 2011 Iai,Matsunaga,Kameoka:Strain Space Plasticity Model for Cyclic Mobility,SOILS AND FOUNDATIONS,Vol.32,No.2,pp.1−15,1992Iai, Matsusunaga, Kameoka: Strain Space Plasticity Model for Cyclic Mobility, SOILS AND FOUNDATIONS, Vol. 32, no. 2, pp. 1-15, 1992

上述したように、地下構造物が液状化層内にある場合、液状化時に地下構造物が浮上することを防ぐため、地下構造物の両側に、地表から液状化層を貫通してその下の非液状化層まで鋼製矢板(鋼矢板もしくは鋼管鋼管矢板)を打設して遮断壁(鋼製矢板締切構造)を構築する工法が採用されることがある。   As described above, when the underground structure is in the liquefied layer, in order to prevent the underground structure from floating during liquefaction, the liquefied layer penetrates from the ground surface on both sides of the underground structure and below it. A construction method in which a steel sheet pile (steel sheet pile or steel pipe steel pipe sheet pile) is placed up to the non-liquefied layer to construct a barrier wall (steel sheet pile closing structure) may be employed.

しかしながら、このように、地下構造物の両側に鋼製矢板(鋼矢板もしくは鋼管矢板)を打設して鋼製矢板締切構造を構築する場合、液状化層が厚いと、鋼製矢板(鋼矢板もしくは鋼管矢板)の長さが非常に長くなり、材料費、施工費の高騰を招くことになる。また、条件によっては、鋼製矢板締切構造としたことによって、地下構造物自体に作用する地震時の荷重が大きくなり、地下構造物自体の補強が必要となる場合がある。   However, when a steel sheet pile closing structure is constructed by placing steel sheet piles (steel sheet piles or steel pipe sheet piles) on both sides of the underground structure in this way, the steel sheet pile (steel sheet piles) Or, the length of the steel pipe sheet pile) will be very long, leading to a rise in material costs and construction costs. Also, depending on the conditions, the steel sheet pile closing structure increases the earthquake load acting on the underground structure itself, which may require reinforcement of the underground structure itself.

本発明は、上記のような事情に鑑みてなされたものであり、トンネル、埋設管、共同溝などの地下構造物が地盤の液状化によって浮上するのを効率的に防止することができる鋼製矢板締切構造およびその施工方法を提供することを目的とするものである。   The present invention has been made in view of the above circumstances, and is made of steel that can efficiently prevent underground structures such as tunnels, buried pipes, and joint grooves from floating due to liquefaction of the ground. It aims at providing a sheet pile closing structure and its construction method.

本発明者らは、上記課題を解決するために鋭意検討を行い、以下の考え方に基づいて本発明をなした。   In order to solve the above-mentioned problems, the present inventors have intensively studied and made the present invention based on the following concept.

すなわち、液状化による地下構造物の浮上の原因は、液状化により砂層が泥水状になると、浮力を考慮した地下構造物の密度は周囲の泥水よりも小さいため、地下構造物の底部に泥水が回り込こむためと考えられている。したがって、図1に示した鋼製矢板締切構造では、地下構造物の両側に設置された鋼製矢板(鋼矢板もしくは鋼管矢板)が、その泥水の移動を遮断するため、浮上を抑制することができることになる。   That is, the cause of levitation of the underground structure due to liquefaction is that when the sand layer becomes muddy due to liquefaction, the density of the underground structure considering buoyancy is smaller than the surrounding muddy water. It is thought to wrap around. Therefore, in the steel sheet pile closing structure shown in FIG. 1, the steel sheet piles (steel sheet piles or steel pipe sheet piles) installed on both sides of the underground structure block the movement of the muddy water, thereby suppressing the ascent. It will be possible.

そのような観点からみてみると、図1に示した鋼製矢板締切構造において、地下構造物よりも上方の鋼製矢板に関しては、浮上抑止には寄与していない可能性があると考えて、詳細は後述するが、液状化を考慮できる地震応答解析プログラムFLIP(非特許文献2参照)を用いて数値実験を行ったところ、地下構造物よりも上方の鋼製矢板は浮上抑止にほとんど寄与していないことが確認できた。   From such a viewpoint, in the steel sheet pile closing structure shown in FIG. 1, regarding the steel sheet pile above the underground structure, it is thought that there is a possibility that it does not contribute to the levitation suppression. Although details will be described later, when a numerical experiment was performed using the earthquake response analysis program FLIP (see Non-Patent Document 2) that can take liquefaction into consideration, the steel sheet pile above the underground structure almost contributed to the suppression of levitation. It was confirmed that it was not.

本発明は、上記の考え方に基づいており、以下のような特徴を有している。   The present invention is based on the above concept and has the following characteristics.

[1]地盤の液状化によって液状化層内に位置する地下構造物が浮上するのを防止するために、当該地下構造物の両側に鋼製矢板をその下端部が非液状化層に根入れするまで打設して鋼製矢板壁を設置することによって構築した鋼製矢板締切構造であって、前記地下構造物の高さをh、前記鋼製矢板壁の上端から前記地下構造物の下端までの下方に向かう距離をlとした時に、前記鋼製矢板壁の上端の高さ位置が地下水位面以下で、かつ、1.00≧l/h≧0.30を満足していることを特徴とする鋼製矢板締切構造。 [1] In order to prevent the underground structure located in the liquefied layer from rising due to liquefaction of the ground, steel sheet piles are placed on both sides of the underground structure, and the lower end of the sheet is rooted in the non-liquefied layer. It is a steel sheet pile closing structure constructed by placing the steel sheet pile wall and installing the steel sheet pile wall until the height of the underground structure is h 1 from the upper end of the steel sheet pile wall. a distance downward until the lower end when the l 1, the height position of the upper end of the steel sheet pile wall below the groundwater level surface, and satisfies 1.00 ≧ l 1 / h 1 ≧ 0.30 A steel sheet pile closing structure characterized by

[2]前記[1]に記載の鋼製矢板締切構造を構築する際の施工方法であって、複数枚の鋼製矢板をその上端が地表面もしくは地表面からやや上方に位置するように打設する工程Aと、工程Aで打設された鋼製矢板を、ヤットコ鋼製矢板を用いて、前記鋼製矢板壁の上端の高さ位置が地下水位面以下で、かつ、1.00≧l/h≧0.30を満足するように打設する工程Bとを繰り返して、鋼製矢板締切構造を構築することを特徴とする鋼製矢板締切構造の施工方法。 [2] A construction method for constructing the steel sheet pile closing structure according to [1], wherein a plurality of steel sheet piles are hit so that their upper ends are positioned slightly above the ground surface or the ground surface. Step A to be installed and the steel sheet pile placed in Step A using a Yatco steel sheet pile, the height position of the upper end of the steel sheet pile wall is below the groundwater level surface, and 1.00 ≧ A construction method for a steel sheet pile closing structure, wherein a steel sheet pile closing structure is constructed by repeating the step B of placing so as to satisfy l 1 / h 1 ≧ 0.30.

[3]前記[2]に記載の鋼製矢板締切構造の施工方法において用いるヤットコ鋼製矢板であって、打設する鋼製矢板と同じ断面形状の鋼製矢板である本体と、打設する鋼製矢板に打設力を伝達するために前記本体の下端部に取り付けられた突出部材を備えていることを特徴とするヤットコ鋼製矢板。   [3] A Yatco steel sheet pile used in the construction method for the steel sheet pile closing structure according to [2], and a main body which is a steel sheet pile having the same cross-sectional shape as the steel sheet pile to be placed. A Yatco steel sheet pile characterized by comprising a projecting member attached to the lower end of the main body in order to transmit a driving force to the steel sheet pile.

本発明においては、トンネル、埋設管、共同溝などの地下構造物が地盤の液状化によって浮上するのを効率的に防止することができる。   In the present invention, it is possible to efficiently prevent underground structures such as tunnels, buried pipes, and common grooves from rising due to liquefaction of the ground.

地下構造物の浮上対策の具体事例の断面図である。It is sectional drawing of the specific example of the levitation countermeasure of an underground structure. 本発明の実施形態に示す数値実験で対象とした地下構造物の断面図である。It is sectional drawing of the underground structure made into object by the numerical experiment shown to embodiment of this invention. 本発明の実施形態に示す数値実験での検討対象ケース(Case1〜6)を示す断面図である。It is sectional drawing which shows the examination object case (Case1-6) in the numerical experiment shown to embodiment of this invention. 本発明の実施形態に示す数値実験での検討対象ケース(Case7〜10)を示す断面図である。It is sectional drawing which shows the examination object case (Case7-10) in the numerical experiment shown to embodiment of this invention. 本発明の実施形態に示す数値実験で用いた入力地震動の加速度時刻歴波形である。It is the acceleration time history waveform of the input ground motion used in the numerical experiment shown in the embodiment of the present invention. 本発明の実施形態に示す数値実験の結果であり、鋼矢板壁上端から液状化層下端までの距離lと地下構造物上端から液状化層下端までの距離hの比(=l/h)と、浮上抑制率との関係を示したものである。It is the result of the numerical experiment shown in the embodiment of the present invention, and the ratio of the distance l from the upper end of the steel sheet pile wall to the lower end of the liquefied layer and the distance h from the upper end of the underground structure to the lower end of the liquefied layer (= l / h) This shows the relationship with the floating suppression rate. 本発明の実施形態に示す数値実験の結果であり、鋼矢板壁上端と地下構造物下端の距離lと地下構造物の高さhの比(=l/h)と、浮上抑制率との関係を示したものである。It is a result of the numerical experiment shown in the embodiment of the present invention, and the ratio (= l 1 / h 1 ) of the distance l 1 between the steel sheet pile wall upper end and the lower end of the underground structure and the height h 1 of the underground structure, and the suppression of levitation It shows the relationship with the rate. 本発明の実施形態に示す数値実験の結果であり、鋼矢板壁上端から液状化層下端までの距離lと地下構造物上端から液状化層下端までの距離hの比(=l/h)と、平均最大土圧比率との関係を示したものである。It is the result of the numerical experiment shown in the embodiment of the present invention, and the ratio of the distance l from the upper end of the steel sheet pile wall to the lower end of the liquefied layer and the distance h from the upper end of the underground structure to the lower end of the liquefied layer (= l / h) It shows the relationship with the average maximum earth pressure ratio. 本発明の実施形態において用いたヤットコ鋼矢板の概要図である。It is a schematic diagram of the Yatsuko steel sheet pile used in the embodiment of the present invention. 本発明の実施形態における鋼矢板締切構造の第1の施工手順の説明図である。It is explanatory drawing of the 1st construction procedure of the steel sheet pile closing structure in embodiment of this invention. 本発明の実施形態における鋼矢板締切構造の第2の施工手順の説明図である。It is explanatory drawing of the 2nd construction procedure of the steel sheet pile closing structure in embodiment of this invention. 本発明の実施形態における鋼矢板締切構造の第3の施工手順の説明図である。It is explanatory drawing of the 3rd construction procedure of the steel sheet pile closing structure in embodiment of this invention.

本発明においては、上述したように、液状化を考慮できる地震応答解析プログラムFLIPを用いて行った数値実験の結果に基づいて、地下構造物の両側に鋼製矢板をその下端部が非液状化層に根入れするまで打設して鋼製矢板壁を設置することによって構築した鋼製矢板締切構造として、前記地下構造物の高さをh、前記鋼製矢板壁の上端から前記地下構造物の下端までの下方に向かう距離をl(ここで、下方に向かう場合はlは正となり、上方に向かう場合はlは負となる)とした時に、前記鋼製矢板壁の上端の高さ位置が地下水位面以下で、かつ、l/h≧0.30を満足する(すなわち、l/h=0.30となる高さ位置より上方に位置する)ようにしている。 In the present invention, as described above, based on the result of the numerical experiment performed using the earthquake response analysis program FLIP capable of considering liquefaction, the steel sheet piles are placed on both sides of the underground structure and the lower ends thereof are non-liquefied. As a steel sheet pile closing structure constructed by placing the steel sheet pile until it is embedded in a layer, the height of the underground structure is h 1 , and the underground structure from the upper end of the steel sheet pile wall a distance downward until the lower end of the object l 1 (wherein, if the downward l 1 is positive, if the upward l 1 becomes negative) when the upper end of the steel sheet pile wall The height position of the liquid crystal is below the groundwater level and satisfies l 1 / h 1 ≧ 0.30 (that is, located above the height position where l 1 / h 1 = 0.30). ing.

そこで、本発明の実施形態として、上記の数値実験について説明する。なお、ここでは、鋼製矢板として鋼矢板を用いた場合について述べるが、鋼製矢板として鋼管矢板を用いた場合も同様である。   Therefore, the above numerical experiment will be described as an embodiment of the present invention. In addition, although the case where a steel sheet pile is used as a steel sheet pile is described here, the case where a steel pipe sheet pile is used as a steel sheet pile is also the same.

まず、この数値実験において対象とした地下構造物1を図2に示す。図2に示すように、この地下構造物1は、液状化層2内に位置し、高さ6.6m、幅19.3mのコンクリート製で、平均密度は0.92t/mである。そして、地表面4から地下構造物1上面(上端)までは7.8mである。また、地表面4から1.8m地点に地下水位面5があり、地表面4から非液状化層3までは20.4mである。地盤定数については表1に示す。 First, FIG. 2 shows an underground structure 1 that is the subject of this numerical experiment. As shown in FIG. 2, the underground structure 1 is located in the liquefied layer 2 and is made of concrete having a height of 6.6 m and a width of 19.3 m, and the average density is 0.92 t / m 3 . The distance from the ground surface 4 to the upper surface (upper end) of the underground structure 1 is 7.8 m. Moreover, there is a groundwater level surface 5 at a point 1.8 m from the ground surface 4, and the distance from the ground surface 4 to the non-liquefied layer 3 is 20.4 m. The ground constant is shown in Table 1.

Figure 0006206528
Figure 0006206528

そして、数値実験での検討対象ケースとして、図3、図4に示すCase1〜Case10とした。すなわち、以下の如くである。   And it was set as Case1-Case10 shown in FIG. 3, FIG. 4 as an examination object case in a numerical experiment. That is, it is as follows.

Case1は、浮上防止対策を行っていない現状のモデル。   Case 1 is a current model that does not take any measures to prevent ascent.

Case2は、鋼矢板壁7を地表面4から、非液状化層3に2.0m根入れしたモデル。   Case 2 is a model in which a steel sheet pile wall 7 is embedded in the non-liquefied layer 3 by 2.0 m from the ground surface 4.

Case3は、鋼矢板壁7を地下水位面5から、非液状化層3に2.0m根入れしたモデル。   Case 3 is a model in which a steel sheet pile wall 7 is embedded in the non-liquefied layer 3 by 2.0 m from the groundwater level surface 5.

Case4は、鋼矢板壁7を地表面4の4.8m下方から、非液状化層3に2.0m根入れしたモデル。   Case 4 is a model in which the steel sheet pile wall 7 is embedded in the non-liquefied layer 3 by 4.8 m below the ground surface 4.

Case5は、鋼矢板壁7を地表面4の6.8m下方から、非液状化層3に2m根入れしたモデル(すなわち、鋼矢板壁7を地下構造物1上面の1.0m上方から、非液状化層3に2m根入れしたモデル)。   Case 5 is a model in which the steel sheet pile wall 7 is embedded 6.8 m below the ground surface 4 and 2 m into the non-liquefied layer 3 (that is, the steel sheet pile wall 7 is 1.0 m above the upper surface of the underground structure 1 from the top. Model with 2m root in liquefied layer 3).

Case6は、鋼矢板壁7を地表面4の7.8m下方から、非液状化層3に2.0m根入れしたモデル(すなわち、鋼矢板壁7を地下構造物1の上面から、非液状化層3に2.0m根入れしたモデル)。   Case 6 is a model in which the steel sheet pile wall 7 is embedded in the non-liquefied layer 3 from 7.8 m below the ground surface 4 (that is, the steel sheet pile wall 7 is made non-liquefied from the upper surface of the underground structure 1). Model with 2.0m root in layer 3).

Case7は、鋼矢板壁7を地表面4の10.4m下方から、非液状化層に2.0m根入れしたモデル(すなわち、鋼矢板壁7を地下構造物1下面の4.0m上方から、非液状化層3に2.0m根入れしたモデル)。   Case 7 is a model in which steel sheet pile wall 7 is rooted 10.4 m below ground surface 4 and 2.0 m in a non-liquefied layer (that is, steel sheet pile wall 7 is 4.0 m above the lower surface of underground structure 1, A model in which 2.0 m is embedded in the non-liquefied layer 3).

Case8は、鋼矢板壁7を地表面4の12.4m下方から、非液状化層に2.0m根入れしたモデル(すなわち、鋼矢板壁7を地下構造物1下面の2.0m上方から、非液状化層3に2.0m根入れしたモデル)。   Case 8 is a model in which the steel sheet pile wall 7 is rooted 12.4 m below the ground surface 4 and 2.0 m in the non-liquefied layer (that is, the steel sheet pile wall 7 is 2.0 m above the lower surface of the underground structure 1, A model in which 2.0 m is embedded in the non-liquefied layer 3).

Case9は、鋼矢板壁7を地表面4の13.6m下方から、非液状化層に2.0m根入れしたモデル(すなわち、鋼矢板壁7を地下構造物1下面の0.8m上方から、非液状化層3に2.0m根入れしたモデル)。   Case 9 is a model in which the steel sheet pile wall 7 is embedded in the non-liquefied layer from 13.6 m below the ground surface 4 (that is, the steel sheet pile wall 7 from 0.8 m above the lower surface of the underground structure 1, A model in which 2.0 m is embedded in the non-liquefied layer 3).

Case10は、鋼矢板壁7を地表面4の15.4m下方から、非液状化層に2.0m根入れしたモデル(すなわち、鋼矢板壁7を地下構造物1下面の1.0m下方から、非液状化層3に2.0m根入れしたモデル)。   Case 10 is a model in which the steel sheet pile wall 7 is embedded 12.0 m below the ground surface 4 and 2.0 m into the non-liquefied layer (that is, the steel sheet pile wall 7 is 1.0 m below the lower surface of the underground structure 1, A model in which 2.0 m is embedded in the non-liquefied layer 3).

なお、鋼矢板壁7と地下構造物1の距離は左右両方とも0.5mとした。鋼矢板壁7に用いる鋼矢板は、降伏強度295N/mm、断面2次モーメント3.24×10−4/mである。 The distance between the steel sheet pile wall 7 and the underground structure 1 was 0.5 m on both the left and right sides. The steel sheet pile used for the steel sheet pile wall 7 has a yield strength of 295 N / mm 2 and a cross-sectional secondary moment of 3.24 × 10 −4 m 4 / m.

また、入力地震動は、図5に示すテーパー付きの1.0Hzの正弦波、最大加速度4.5m/s、継続時間40秒を用いた。 Moreover, the input seismic motion used the taper 1.0Hz sine wave shown in FIG. 5, the maximum acceleration 4.5 m / s < 2 >, and duration 40 seconds.

そして、数値実験結果として、表2に、各ケースにおける、地中構造物1の上面左右2点の浮上量の平均値と、下記(1)式で定義する浮上抑制率を示す。   And as a numerical experiment result, Table 2 shows the average value of the flying height at the two points on the left and right of the upper surface of the underground structure 1 and the flying restraint rate defined by the following equation (1) in each case.

浮上抑制率=(1−当該ケースの浮上量/Case1の浮上量)×100・・・(1)   Flying suppression rate = (1−flying amount of the case / flying amount of Case 1) × 100 (1)

また、表2に、Case2において鋼矢板壁7に使用した鋼矢板の重量を1.0として、Case3〜Case10の各ケースにおいて鋼矢板壁7に使用した鋼矢板の重量の比率(鋼矢板壁重量比率)を併せて示す。   In Table 2, the weight of the steel sheet pile used in the steel sheet pile wall 7 in Case 2 is 1.0, and the ratio of the weight of the steel sheet pile used in the steel sheet pile wall 7 in each case 3 to Case 10 (steel sheet pile wall weight). The ratio is also shown.

Figure 0006206528
Figure 0006206528

まず、表2に示すように、鋼矢板壁7が地表面4から非液状化層3まで存在して、液状化層2を完全に締切っているCase2の浮上抑制率は86%に達する。   First, as shown in Table 2, the steel sheet pile wall 7 exists from the ground surface 4 to the non-liquefied layer 3, and the floating suppression rate of Case 2 that completely cuts off the liquefied layer 2 reaches 86%.

次に、鋼矢板壁7が液状化層2を完全には締切っていない場合(すなわち、鋼矢板壁7上端を地表面4より下方にした場合)の効果を明確にするために、鋼矢板壁7上端から液状化層2下端までの距離lと、地下構造物1上端から液状化層2下端までの距離hの比(=l/h)をパラメータとして、浮上抑制率との関係を整理したものを図6に示す。   Next, in order to clarify the effect when the steel sheet pile wall 7 does not completely cut off the liquefied layer 2 (that is, when the upper end of the steel sheet pile wall 7 is below the ground surface 4), Using the ratio of the distance l from the upper end of the wall 7 to the lower end of the liquefaction layer 2 and the distance h from the upper end of the underground structure 1 to the lower end of the liquefaction layer 2 (= l / h) as a parameter, the relationship with the levitation suppression rate is organized. The result is shown in FIG.

この図6から、Case3他のように鋼矢板壁7上端を地表面4より下方にした場合でも、Case2のように鋼矢板壁7上端を地表面4に位置させた場合と同等の浮上抑制率を得ることができる範囲があることが分かる。   From FIG. 6, even when the upper end of the steel sheet pile wall 7 is lower than the ground surface 4 as in Case 3 and the like, the floating suppression rate equivalent to the case where the upper end of the steel sheet pile wall 7 is positioned on the ground surface 4 as in Case 2. It can be seen that there is a range where can be obtained.

ちなみに、図6において、l/h=1.0のときが、鋼矢板壁7上端と地下構造物1上端が一致している状態であり、Case6に相当する。また、l/h=0.48のときが、鋼矢板壁7上端と地下構造物1下端が一致している状態であり、Case9とCase10の間に位置している。   Incidentally, in FIG. 6, when l / h = 1.0, the upper end of the steel sheet pile wall 7 and the upper end of the underground structure 1 coincide with each other and corresponds to Case 6. In addition, when l / h = 0.48, the upper end of the steel sheet pile wall 7 and the lower end of the underground structure 1 coincide with each other and are located between Case 9 and Case 10.

そして、図6において、浮上抑制率はCase8(l/h=0.63)付近を折れ曲がり点としていることがわかる。したがって、効率的に浮上抑制効果を得るための目安は、l/h≧0.63となる。すなわち、鋼矢板壁7の上端が地下構造物1の下端よりも若干上方に位置する必要がある。   In FIG. 6, it can be seen that the levitation suppression rate is a bending point near Case 8 (l / h = 0.63). Therefore, a standard for efficiently obtaining the levitation suppression effect is l / h ≧ 0.63. That is, the upper end of the steel sheet pile wall 7 needs to be positioned slightly above the lower end of the underground structure 1.

そこで、さらに、効率的に浮上抑制効果を得ることができる鋼矢板壁7上端の位置を明確にするために、鋼矢板壁7上端と地下構造物1下端の距離lと地下構造物1の高さ(地下構造物1の上端と下端の距離)hの比(=l/h)と、浮上抑制率との関係を整理したものを図7に示す。 Therefore, in order to clarify the position of the upper end of the steel sheet pile wall 7 that can effectively obtain the levitating suppression effect, the distance l 1 between the upper end of the steel sheet pile wall 7 and the lower end of the underground structure 1 and the underground structure 1 FIG. 7 shows a summary of the relationship between the ratio of the height (distance between the upper end and the lower end of the underground structure 1) h 1 (= l 1 / h 1 ) and the floating suppression rate.

この図7から、l/h≧0.30のときに、浮上抑制率が高くなっていることがわかる。したがって、鋼矢板壁7上端を、l/h≧0.30を満足する位置にする(すなわち、l/h=0.30となる位置よりも上方にする)ことで効率的に浮上抑制が図ることができる。 From FIG. 7, it can be seen that when l 1 / h 1 ≧ 0.30, the flying height suppression rate is high. Accordingly, the upper end of the steel sheet pile wall 7 is efficiently set to a position satisfying l 1 / h 1 ≧ 0.30 (that is, above the position where l 1 / h 1 = 0.30). Levitation can be suppressed.

上記の通り、鋼矢板壁7は地表面4まで存在する必要がないことが確認できた。このことによって、鋼矢板の使用量を大幅に減らすことができるようになった。   As described above, it was confirmed that the steel sheet pile wall 7 does not need to exist up to the ground surface 4. As a result, the amount of steel sheet pile used can be greatly reduced.

一方、鋼矢板壁7を設置したことによる地下構造物1への影響を把握するために、表3に、地震時に地下構造物1の左右側面に作用する最大土圧の平均値(12点)を示す。併せて、浮上防止対策を行っていない現状モデル(Case1)における最大土圧の平均値を1.0として、Case2〜Case10の各ケースにおける最大土圧の平均値の比率(平均最大土圧比率)を示す。   On the other hand, in order to grasp the influence on the underground structure 1 due to the installation of the steel sheet pile wall 7, Table 3 shows the average value of the maximum earth pressure acting on the left and right side surfaces of the underground structure 1 during an earthquake (12 points). Indicates. In addition, assuming that the average value of the maximum earth pressure in the current model (Case 1) not taking anti-lift measures is 1.0, the ratio of the average value of the maximum earth pressure in each case of Case 2 to Case 10 (average maximum earth pressure ratio) Indicates.

Figure 0006206528
Figure 0006206528

ここでは、上述した浮上抑制率の整理と同様に、鋼矢板壁7上端から液状化層2下端までの距離lと地下構造物1上端から液状化層2下端までの距離hの比(=l/h)をパラメータとして、平均最大土圧比率との関係を整理したものを図8に示す。   Here, similarly to the above-described arrangement of the floating suppression rate, the ratio of the distance l from the upper end of the steel sheet pile wall 7 to the lower end of the liquefied layer 2 and the distance h from the upper end of the underground structure 1 to the lower end of the liquefied layer 2 (= l FIG. 8 shows the relationship between the average maximum earth pressure ratio and / h) as a parameter.

図8に示すように、鋼矢板壁7の上端が高くなるにしたがって(l/hが大きくなるにしたがって)、地下構造物1に作用する平均最大土圧比率が上昇していることがわかる。   As shown in FIG. 8, it can be seen that the average maximum earth pressure ratio acting on the underground structure 1 increases as the upper end of the steel sheet pile wall 7 increases (as l / h increases).

なかでも、鋼矢板壁7上端を地表面4に位置させたCase2(l/h=1.62)と、鋼矢板壁7上端を地下水位面5としたCase3(l/h=1.48)の差は大きく、地下水位面下5まで鋼矢板壁7上端を打ち下げることで、平均最大土圧比率を1.45(Case2)から1.35(Case3)まで低減することができる。これは、液状化層2が液状化した場合に、液状化層2での地震時挙動と地下水位面5よりも上部の土層での地震時挙動とが大きく異なることが、Case2のように地表面4まで鋼矢板壁7を打設した場合に平均最大土圧比率が増大することに繋がっていると考えられる。   Among them, Case 2 (l / h = 1.62) in which the upper end of the steel sheet pile wall 7 is located on the ground surface 4 and Case 3 (l / h = 1.48) in which the upper end of the steel sheet pile wall 7 is the groundwater level surface 5. The difference of is large, and the average maximum earth pressure ratio can be reduced from 1.45 (Case 2) to 1.35 (Case 3) by lowering the upper end of the steel sheet pile wall 7 to 5 below the groundwater level. This is because, when the liquefied layer 2 is liquefied, the behavior at the time of earthquake in the liquefied layer 2 and the behavior at the time of the earthquake in the soil layer above the groundwater level surface 5 are greatly different, as in Case 2 It is considered that when the steel sheet pile wall 7 is driven up to the ground surface 4, the average maximum earth pressure ratio increases.

そして、鋼矢板壁7上端を地下水位面5に一致させたCase3(l/h=1.48)から、鋼矢板壁7上端を地下構造物1上端に一致させたCase6(l/h=1.00)までの、平均最大土圧比率の変化は緩やかで、1.35〜1.28の値を示している。   Then, from Case 3 (l / h = 1.48) in which the upper end of the steel sheet pile wall 7 coincides with the groundwater level surface 5, Case 6 (l / h = 1) in which the upper end of the steel sheet pile wall 7 coincides with the upper end of the underground structure 1. Change of the average maximum earth pressure ratio until .00) is moderate and shows a value of 1.35 to 1.28.

上記の結果から、鋼矢板壁7設置によって地下構造物1への土圧を増やさないようにするためには、最低限、鋼矢板壁7上端を地下水位面5以下にすることが有効であることがわかる。   From the above results, in order not to increase the earth pressure on the underground structure 1 by installing the steel sheet pile wall 7, it is effective to make the upper end of the steel sheet pile wall 7 below the groundwater level surface 5 at a minimum. I understand that.

ここまで、地下構造物が地盤の液状化によって浮上するのを防止するために構築される鋼製矢板締切構造に関して、地下構造物の浮上抑制と、地下構造物への土圧増加の影響に関して説明をおこなった。   So far, regarding the steel sheet pile closing structure constructed to prevent the underground structure from rising due to liquefaction of the ground, explanations have been given regarding the suppression of the underground structure's rise and the effect of increased earth pressure on the underground structure. I did it.

両者を総合的に判断すると、鋼矢板壁上端の高さ位置は、抑制浮上の観点からは、l/h=0.30となる位置よりも上方とすること、地下構造物への土圧増加を防ぐ観点からは、地下水位面以下とすることが好適であることがわかった。もちろん、鋼矢板使用量削減の観点からは、l/h=0.30となる位置(下限位置)に近いことが好ましい。 If both are judged comprehensively, the height position of the upper end of the steel sheet pile wall should be higher than the position where l 1 / h 1 = 0.30 from the viewpoint of restraint levitation, and the soil to the underground structure From the viewpoint of preventing an increase in pressure, it was found that it is preferable to make the level below the groundwater level. Of course, from the viewpoint of reducing the amount of steel sheet pile used, it is preferable to be close to the position (lower limit position) where l 1 / h 1 = 0.30.

さて、上記のように、上端を地下水位面5以下とする鋼矢板締切構造を構築するためには、鋼矢板の上端を地表面4よりも深い位置まで打設(圧入)することが必要となる。   Now, as described above, in order to construct a steel sheet pile closing structure whose upper end is the groundwater level surface 5 or less, it is necessary to drive (press-fit) the upper end of the steel sheet pile to a position deeper than the ground surface 4. Become.

そこで、ここでは、まず、鋼矢板を上端が地表面4に位置し下端が液状化層2に位置するように打設する工程(工程A)と、次に、そのように打設された鋼矢板を、ヤットコ鋼矢板を用いて、上端が液状化層2の所定位置に位置し下端が非液状化層3に位置するように打設(圧入)する工程(工程B)とを繰り返すことで、上記のような鋼矢板壁7(鋼矢板締切構造)を構築するようにしている。ちなみに、上記の液状化層2の所定位置とは、上述したように、地下水位面5以下で、かつ、l/h=0.30となる位置よりも上方の位置である。 Therefore, here, first, a steel sheet pile is placed so that the upper end is located on the ground surface 4 and the lower end is located on the liquefied layer 2 (step A), and then the steel so placed is placed. By repeating the step (step B) of placing (pressing) the sheet pile using a Yatco steel sheet pile so that the upper end is located at a predetermined position of the liquefied layer 2 and the lower end is located at the non-liquefied layer 3 The steel sheet pile wall 7 (steel sheet pile closing structure) as described above is constructed. Incidentally, the predetermined position of the liquefied layer 2 is a position below the groundwater level surface 5 and above the position where l 1 / h 1 = 0.30, as described above.

図9に上記のヤットコ鋼矢板を示す。図9に示すように、このヤットコ鋼矢板20は、打設する鋼矢板と同じ断面形状の鋼矢板21である本体と、打設する鋼矢板に打設力(圧入力)を伝達するために、本体である鋼矢板21の下端部(詳しくは、ウェブ22の下端部)に取り付けられた突出部材23を備えている。   FIG. 9 shows the Yatco steel sheet pile. As shown in FIG. 9, this Yatco steel sheet pile 20 has a main body that is a steel sheet pile 21 having the same cross-sectional shape as the steel sheet pile to be placed, and a transmission force (pressure input) to the steel sheet pile to be placed. The protrusion member 23 attached to the lower end part (specifically, the lower end part of the web 22) of the steel sheet pile 21 which is a main body is provided.

このようなヤットコ鋼矢板20を用いることによって、上端が地表面に位置し下端が液状化層2に位置するように打設された鋼矢板を、さらに下端が非液状化層3に位置するまで打設することが可能になる。   By using such a Yatco sheet pile 20, the steel sheet pile placed so that the upper end is located on the ground surface and the lower end is located on the liquefied layer 2, and further, the lower end is located on the non-liquefied layer 3. It becomes possible to cast.

上記のような鋼矢板壁7(鋼矢板締切構造)を構築する具体的な施工手順として、第1例(第1の施工手順)を図10に示し、第2例(第2の施工手順)を図11に示し、第3例(第3の施工手順)を図12に示す。   As a concrete construction procedure for constructing the steel sheet pile wall 7 (steel sheet pile closing structure) as described above, the first example (first construction procedure) is shown in FIG. 10, and the second example (second construction procedure). Is shown in FIG. 11, and a third example (third construction procedure) is shown in FIG.

(第1の施工手順:第1例)
まず、図10(a)に示すように、圧入機8を用いて、所要の長さ(鋼矢板壁上端が地下水位面5以下で、かつ、l/h=0.30となる位置よりも上方となるとともに、鋼矢板壁下端が非液状化層に根入れするのに必要な長さ)の鋼矢板11を、その上端が地表面4よりやや上方となるように順次圧入していく。ここで言う「やや上方」とは、圧入機8の鋼矢板11のつかみ代分相当である。なお、この第1例では、図10(b)に示すように、鋼矢板11を16枚分圧入する。ここまでを工程Aと称する。
(First construction procedure: first example)
First, as shown in FIG. 10 (a), using a press-fitting machine 8, the required length (sheet pile wall upper end at less groundwater level surface 5, and the l 1 / h 1 = 0.30 Position The steel sheet pile 11 with the lower end of the steel sheet pile wall (the length necessary for the bottom of the steel sheet pile wall to be embedded in the non-liquefied layer) is sequentially press-fitted so that the upper end is slightly above the ground surface 4. Go. Here, “slightly upward” is equivalent to the gripping allowance of the steel sheet pile 11 of the press-fitting machine 8. In the first example, as shown in FIG. 10B, 16 steel sheet piles 11 are press-fitted. The process so far is referred to as process A.

次に、図10(c)に示すように、圧入機8を反転させて、ヤットコ鋼矢板20を用いて、左端の鋼矢板11を所定の位置まで再圧入させる。図10(d)の示すように、順次、右端4枚の鋼矢板11sを残した状態になるまで、ヤットコ鋼矢板20を用いて、所定の位置への再圧入を行う。ここで、右端4枚の鋼矢板11sを残したのは、圧入機8のつかみ部分の数に合わせており、機械の種類に応じて臨機応変に対応することになる。ここまでを工程Bと称する。   Next, as shown in FIG. 10 (c), the press-fitting machine 8 is reversed, and the leftmost steel sheet pile 11 is re-pressed to a predetermined position using the Yatco steel sheet pile 20. As shown in FIG. 10 (d), the Yatco steel sheet pile 20 is used for re-pressing in sequence until the four rightmost steel sheet piles 11 s remain. Here, the left four steel sheet piles 11 s are left in accordance with the number of gripping portions of the press-fitting machine 8, and will respond flexibly according to the type of machine. The process so far is referred to as process B.

図10(e)は、2回目の工程Aであり、工程Bで残した鋼矢板11sを足がかりに鋼矢板11を順次圧入する。そして、2回目の工程Bを行う。その後は、工程Aと工程Bを繰返し、図10(f)に示すように、所定の範囲で鋼矢板締切構造を構築する。   FIG. 10E shows the second process A, in which the steel sheet piles 11 are sequentially press-fitted using the steel sheet piles 11 s left in the process B as a foothold. Then, the second process B is performed. Thereafter, Step A and Step B are repeated, and a steel sheet pile closing structure is constructed within a predetermined range as shown in FIG.

なお、この第1例では、最初の工程Aで16枚の鋼矢板11を圧入したが、この枚数は現地の施工能率(一度鋼矢板を打設してから時間がかかりすぎると、所定の位置への再圧入が行いにくくなる)に応じて決定すればよい。   In this first example, the 16 steel sheet piles 11 were press-fitted in the first step A, but this number was determined to be the local construction efficiency (if it took too much time once the steel sheet piles were placed, the predetermined position It is difficult to perform re-press-fitting into the head).

また、最終回目の工程Bでは、右端4枚の鋼矢板11sの再圧入することができず、地表面4よりやや上方に突出した状態で残ることになるが、地中構造物1への土圧増加が問題なければ、地表面4で切断しておけば良い。地中構造物1への土圧増加の問題がある場合には、所定の施工範囲よりも4枚余分に鋼矢板11を圧入し、最後に引き抜きを行えばよい。   Moreover, in the process B of the last round, the steel sheet piles 11s of the right end four sheets cannot be re-pressed and remain in a state protruding slightly above the ground surface 4, but the soil to the underground structure 1 is left. If there is no problem in increasing the pressure, it may be cut at the ground surface 4. When there is a problem of an increase in earth pressure on the underground structure 1, four steel sheet piles 11 may be press-fitted in excess of a predetermined construction range and finally pulled out.

そして、上述したように、図10(f)がこの第1例で完成した鋼矢板壁7である。鋼矢板11を連結することにより構成されており、その下端は非液状化層3に根入れされている。ここで、鋼矢板壁7の範囲は図中に点模様で示した範囲となる。つまり、この図10(f)の場合、鋼矢板壁7の上端7aは、図中の太い破線で示した位置となる。この鋼矢板壁上端7aの高さ位置を、地下水位面5以下で、かつ、l/h=0.30となる位置よりも上方となるようにする。 And as above-mentioned, FIG.10 (f) is the steel sheet pile wall 7 completed in this 1st example. The steel sheet pile 11 is connected, and the lower end thereof is embedded in the non-liquefied layer 3. Here, the range of the steel sheet pile wall 7 is the range indicated by the dot pattern in the drawing. That is, in the case of FIG. 10 (f), the upper end 7a of the steel sheet pile wall 7 is at the position indicated by the thick broken line in the figure. The height position of the steel sheet pile wall upper end 7a is set to be lower than the groundwater level surface 5 and higher than the position where l 1 / h 1 = 0.30.

(第2の施工手順:第2例)
現地の地盤条件によっては、鋼矢板の鉛直性を保って圧入することが困難で徐々に傾斜が生じてしまうトラブルが発生することがある。特に、工程Bにおける再圧入時に傾斜が生じてしまうと、引き抜くことが出来ず困難に直面してしまう。
(Second construction procedure: second example)
Depending on the local ground conditions, it may be difficult to press-fit while keeping the steel sheet pile vertical, and troubles may occur that cause a gradual inclination. In particular, if an inclination occurs during re-pressing in the process B, it cannot be pulled out and faces difficulty.

そこで、そのような現象が懸念される場合には、第2の施工手順(第2例)として、基本的には上記の第1の施工手順(第1例)と同様であるが、図11(a)〜(e)に示すように、所要長さの鋼矢板11に対して所々で長尺鋼矢板12(例えば、地下水位面5から非液状化層3へ根入れする長さを有する鋼矢板)を用いることで、その現象を回避することができる。ちなみに、図11では、4枚に1枚は長尺鋼矢板12を用いるようにしている。   Therefore, when such a phenomenon is concerned, the second construction procedure (second example) is basically the same as the first construction procedure (first example), but FIG. As shown in (a) to (e), the steel sheet pile 11 having a required length has a long steel sheet pile 12 (for example, has a length to be embedded in the non-liquefied layer 3 from the groundwater level surface 5). This phenomenon can be avoided by using a steel sheet pile. Incidentally, in FIG. 11, the long steel sheet pile 12 is used for every four sheets.

そして、図11(f)がこの第2例で完成した鋼矢板壁7である。ここで、鋼矢板壁7の範囲は図中に点模様で示した範囲となる。つまり、この図11(f)の場合、鋼矢板壁7の上端7aは、図中の太い破線で示した位置となる。この鋼矢板壁上端7aの高さ位置を、地下水位面5以下で、かつ、l/h=0.30となる位置よりも上方となるようにする。 And FIG.11 (f) is the steel sheet pile wall 7 completed in this 2nd example. Here, the range of the steel sheet pile wall 7 is the range indicated by the dot pattern in the drawing. That is, in the case of FIG. 11 (f), the upper end 7a of the steel sheet pile wall 7 is at the position indicated by the thick broken line in the figure. The height position of the steel sheet pile wall upper end 7a is set to be lower than the groundwater level surface 5 and higher than the position where l 1 / h 1 = 0.30.

(第3の施工手順:第3例)
第3の施工手順(第3例)は、鋼矢板壁7の上端の高さ位置をl/h=0.30となる位置(下限位置)にした場合である。この第3例では、基本的には上記の第2例と同様であるが、図12(a)〜(e)に示すように、所要長さの鋼矢板11と長尺鋼矢板12を交互に配置している。
(Third construction procedure: third example)
The third construction process (third example) is a case where the height position of the upper end of the steel sheet pile wall 7 was l 1 / h 1 = 0.30 and a position (lower limit position). The third example is basically the same as the second example described above. However, as shown in FIGS. 12A to 12E, the steel sheet piles 11 and the long steel sheet piles 12 having the required length are alternately arranged. Is arranged.

そして、図12(f)がこの第3例で完成した鋼矢板壁7である。ここで、鋼矢板壁7の範囲は図12(f)中に点模様で示した範囲となる。つまり、この図12(f)の場合、鋼矢板壁7の上端7aは、図中の太い破線で示した位置(l/h=0.30となる位置)となる。 FIG. 12F shows the steel sheet pile wall 7 completed in this third example. Here, the range of the steel sheet pile wall 7 is the range indicated by the dot pattern in FIG. That is, in the case of FIG. 12 (f), the upper end 7a of the steel sheet pile wall 7 is a position (position where l 1 / h 1 = 0.30) indicated by a thick broken line in the figure.

以上の手法を用いることで、トンネル、埋設管、共同溝などの地下構造物1が地盤の液状化によって浮上するのを効率的に防止することができる。   By using the above method, it is possible to efficiently prevent the underground structure 1 such as a tunnel, a buried pipe, and a common ditch from floating due to liquefaction of the ground.

すなわち、地下構造物1の両側に、その上端の高さ位置が、地下水位面5からl/h=0.30となる地点までの範囲にあり、その下端が非液状化層3に根入れした鋼矢板壁7を構築するようにしたので、鋼矢板の使用量を大幅に減らしたうえで、液状化時の浮上を抑制することができるようになった。 That is, on both sides of the underground structure 1, the height of the upper end is in a range from the groundwater level surface 5 to a point where l 1 / h 1 = 0.30, and the lower end of the underground structure 1 is in the non-liquefaction layer 3. Since the steel sheet pile wall 7 that has been embedded is constructed, the amount of steel sheet pile used can be greatly reduced, and levitation during liquefaction can be suppressed.

また、鋼矢板壁7の上端を地下水位面5以下としたことで、地下構造物1へ作用する外力が増加する度合いを低減することができた。   Moreover, the degree to which the external force which acts on the underground structure 1 increased was able to be reduced by making the upper end of the steel sheet pile wall 7 into the groundwater level surface 5 or less.

また、鋼矢板への打設力(圧入力)を伝達するための突出部材23を有するヤットコ鋼矢板20を用いることで、液状化層2の所定位置から非液状化層3までの区間に鋼矢板壁7を構築することを可能にした。   Further, by using a Yatco steel sheet pile 20 having a projecting member 23 for transmitting a driving force (pressure input) to the steel sheet pile, steel is provided in a section from the predetermined position of the liquefied layer 2 to the non-liquefied layer 3. The sheet pile wall 7 can be constructed.

1 地下構造物
2 液状化層
3 非液状化層
4 地表面
5 地下水位面
6 遮断壁(連続壁)
7 鋼矢板壁
7a 鋼矢板壁上端
8 圧入機
11 鋼矢板
11s 工程Aの最終に圧入した複数の鋼矢板
12 長尺鋼矢板
20 ヤットコ鋼矢板
21 鋼矢板
22 鋼矢板ウェブ
23 突出部材
h 地下構造物上端から液状化層下端までの距離
l 鋼矢板壁上端から液状化層下端までの距離
地下構造物の高さ(上端と下端の距離)
鋼矢板壁上端と地下構造物下端の距離
DESCRIPTION OF SYMBOLS 1 Underground structure 2 Liquefaction layer 3 Non-liquefaction layer 4 Ground surface 5 Groundwater level surface 6 Barrier wall (continuous wall)
7 Steel sheet pile wall 7a Steel sheet pile wall upper end 8 Press-fitting machine 11 Steel sheet pile 11s Multiple steel sheet piles press-fitted at the end of step A 12 Long steel sheet pile 20 Yatco steel sheet pile 21 Steel sheet pile 22 Steel sheet pile web 23 Projecting member h Underground structure Distance from top to bottom of liquefied layer l Distance from top of steel sheet pile wall to bottom of liquefied layer h 1 Height of underground structure (distance between top and bottom)
l 1 Distance steel sheet pile wall top and underground structures lower

Claims (3)

地盤の液状化によって液状化層内に位置する地下構造物が浮上するのを防止するために、当該地下構造物の両側に鋼製矢板をその下端部が非液状化層に根入れするまで打設して鋼製矢板壁を設置することによって構築した鋼製矢板締切構造であって、前記地下構造物はその上面が地表面よりも下に位置する地下構造物であり、前記地下構造物の高さをh、前記鋼製矢板壁の上端から前記地下構造物の下端までの下方に向かう距離をlとした時に、前記鋼製矢板壁の上端の高さ位置が地下水位面以下で、かつ、1.00≧l/h≧0.30を満足していることを特徴とする鋼製矢板締切構造。 In order to prevent the underground structure located in the liquefied layer from rising due to the liquefaction of the ground, the steel sheet piles are driven on both sides of the underground structure until the lower end of the underground structure is embedded in the non-liquefied layer. A steel sheet pile closing structure constructed by installing and installing a steel sheet pile wall, wherein the underground structure is an underground structure whose upper surface is located below the ground surface , When the height is h 1 and the downward distance from the upper end of the steel sheet pile wall to the lower end of the underground structure is l 1 , the height position of the upper end of the steel sheet pile wall is below the groundwater level surface. And the steel sheet pile closing structure characterized by satisfying 1.00 ≧ l 1 / h 1 ≧ 0.30. 請求項1に記載の鋼製矢板締切構造を構築する際の施工方法であって、複数枚の鋼製矢板をその上端が地表面もしくは地表面からやや上方に位置するように打設する工程Aと、工程Aで打設された鋼製矢板を、ヤットコ鋼製矢板を用いて、前記鋼製矢板壁の上端の高さ位置が地下水位面以下で、かつ、1.00≧l/h≧0.30を満足するように打設する工程Bとを繰り返して、鋼製矢板締切構造を構築することを特徴とする鋼製矢板締切構造の施工方法。 It is a construction method at the time of constructing the steel sheet pile closing structure according to claim 1, wherein a plurality of steel sheet piles are placed so that the upper ends thereof are positioned slightly above the ground surface or the ground surface. And the steel sheet pile placed in step A using a Yatco steel sheet pile, the height position of the upper end of the steel sheet pile wall is below the groundwater level surface and 1.00 ≧ l 1 / h The construction method of the steel sheet pile closing structure characterized by constructing a steel sheet pile closing structure by repeating the step B of placing so as to satisfy 1 ≧ 0.30. 請求項2に記載の鋼製矢板締切構造の施工方法において用いるヤットコ鋼製矢板であって、打設する鋼製矢板と同じ断面形状の鋼製矢板である本体と、打設する鋼製矢板に打設力を伝達するために前記本体の下端部に取り付けられた突出部材を備えていることを特徴とするヤットコ鋼製矢板。   A Yatco steel sheet pile used in the construction method of the steel sheet pile closing structure according to claim 2, wherein the main body is a steel sheet pile having the same cross-sectional shape as the steel sheet pile to be cast, and the steel sheet pile to be cast. A Yatco steel sheet pile characterized by comprising a projecting member attached to the lower end of the main body for transmitting a driving force.
JP2016054672A 2016-03-18 2016-03-18 Steel sheet pile closing structure and its construction method Expired - Fee Related JP6206528B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2016054672A JP6206528B2 (en) 2016-03-18 2016-03-18 Steel sheet pile closing structure and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2016054672A JP6206528B2 (en) 2016-03-18 2016-03-18 Steel sheet pile closing structure and its construction method

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
JP2013101971A Division JP5962580B2 (en) 2013-05-14 2013-05-14 Steel sheet pile closing structure and its construction method

Publications (2)

Publication Number Publication Date
JP2016135987A JP2016135987A (en) 2016-07-28
JP6206528B2 true JP6206528B2 (en) 2017-10-04

Family

ID=56512115

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2016054672A Expired - Fee Related JP6206528B2 (en) 2016-03-18 2016-03-18 Steel sheet pile closing structure and its construction method

Country Status (1)

Country Link
JP (1) JP6206528B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6288362B1 (en) * 2017-09-20 2018-03-07 Jfeエンジニアリング株式会社 Steel sheet pile placing method
CN109989431A (en) * 2019-04-22 2019-07-09 郑州市市政工程总公司 Underground structure using row piles to resist groundwater buoyancy and its construction method

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0645943B2 (en) * 1990-03-26 1994-06-15 住友金属工業株式会社 Liquefaction countermeasure construction method for buried structures
JPH09242100A (en) * 1996-03-12 1997-09-16 Sumitomo Metal Ind Ltd Liquefaction countermeasure construction method and steel sheet pile for liquefaction countermeasure
JP2001214465A (en) * 2000-01-31 2001-08-07 Sumitomo Metal Ind Ltd Reinforcement structure for underground structures
JP2001262555A (en) * 2000-03-21 2001-09-26 Sumitomo Metal Ind Ltd Ground liquefaction countermeasures
JP2002180465A (en) * 2000-12-08 2002-06-26 Tokyo Electric Power Co Inc:The A method of driving the entire length of a pile into the ground, and the apparatus and jig
JP2002227185A (en) * 2001-01-29 2002-08-14 Nkk Corp Underground structure lifting prevention method during ground liquefaction
JP4072734B2 (en) * 2006-05-01 2008-04-09 日本シェルターシステム株式会社 Underground shelter and underground shelter strength partition wall forming method
JP4829870B2 (en) * 2007-11-19 2011-12-07 大成建設株式会社 Underground structure

Also Published As

Publication number Publication date
JP2016135987A (en) 2016-07-28

Similar Documents

Publication Publication Date Title
JP5962580B2 (en) Steel sheet pile closing structure and its construction method
CN103790393B (en) A kind of construction method of existing building structure integral replacement
Golightly Tilting of monopiles long, heavy and stiff; pushed beyond their limits
JP5471797B2 (en) Seismic reinforcement structure of revetment structure and existing revetment structure
KR101672391B1 (en) Slipping Pile for Civil and Building Structure
JP6206528B2 (en) Steel sheet pile closing structure and its construction method
JP5919675B2 (en) Composite foundation pile and construction method of composite foundation pile
JP6158398B1 (en) Composite foundation pile
JP2016211215A (en) Rigid connection structure of lower end of support and concrete pile
KR20160102817A (en) Steel pipe pile construction method of sacrificial steel pipe casing partial pullout
JP6082916B2 (en) Underground steel wall structure and construction method of underground steel wall structure
JP6931618B2 (en) Flow control method
KR20120102480A (en) Phc pile with improved end bearing capacity and piling method of phc pile using the same
JP5077857B1 (en) Seismic reinforcement structure of existing structure foundation by composite ground pile foundation technology
JP5382900B2 (en) How to prevent underground structures from floating due to liquefaction
JP2013249691A (en) Earthquake resistant structure of quay wall and seismic strengthening method for quay wall
JP6287358B2 (en) Embankment reinforcement structure
JP2010163771A (en) Structure and construction method for coping with liquefaction of structure
KR101955631B1 (en) Embankment support pile construction method with tube type pile and embankment support pile therewith
JP6804728B2 (en) Liquefaction countermeasure structure design method for structures
EP2971372B1 (en) Axial capacity enhanced pile
JP7260768B2 (en) Slope reinforcement structure and slope reinforcement method
JP4900091B2 (en) Embankment structure, embankment method
JP4958064B2 (en) Seismic reinforcement structure of quay
JP5282963B2 (en) Structure liquefaction countermeasure structure and structure liquefaction countermeasure construction method

Legal Events

Date Code Title Description
A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20170207

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20170330

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20170808

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20170821

R150 Certificate of patent or registration of utility model

Ref document number: 6206528

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees